HomeMy WebLinkAboutSWA000097_Add Info Request_20210323ROY COOPER
Governor
MICHAEL S. REGAN
Secretary
BRIAN WRENN
Acting Director
Nicholas Scheopner, EI
Green Mountain Engineering, LLC
7A Wendy Ct.
Greensboro, NC 27409
NORTH CAROLINA
Environmental Quality
March 23, 2021
Subject: Request for Additional Information
Stormwater Permit No. SWA000097
Hennessey International Warehouse
Alamance County
Dear Mr. Scheopner:
The Division of Energy, Mineral and Land Resources (DEMLR), received a Stormwater
Management Fast Track Authorization to Construct (ATC) Permit Application for the subject
project on March 15, 2021. A review of that information has determined that the application is
not complete. The following information is needed to continue the stormwater review:
1. The design professional specified in the application must be licensed by the State of
North Carolina. Please revise the application to specify a licensed design professional.
2. Please complete, sign, and seal the Design Professional's Certification in the application
form
3. Please show all streams, required setbacks, and wetlands on the existing conditions sheet
or a note stating that none exist.
4. Provide pdfs of all revisions, 2 hardcopies of revised plan sheets, and 1 hardcopy of other
documents. Pdfs must be uploaded using the form at:
hgps:Hedocs.deg.nc.gov/Forms/SW_Project Submittal
Please note that this request for additional information is in response to a preliminary review.
The requested information should be received by this Office prior to April 22, 2021, or the
application will be returned as incomplete. The return of a project will necessitate resubmittal
of all required items, including the application fee. Please reference the State assigned project
number SWA00097 on all correspondence.
If you need additional time to submit the information, please submit your request for a time
extension to the Division at the contact below. The request must indicate the date by which you
expect to submit the required information. The Division is allowed 90 days from the receipt of
a completed application to issue the permit.
D EQ
�� North Carolina Department of Environmental Quality I Division of Energy, Mineral and Land Resources
512 North Salisbury Street 1 1612 Mail Service Center I Raleigh, North Carolina 27699-1612
NORTH CAROLINA -
o.P.rtm.M ofEnvironmental n�ara 919.707.9200
The construction of any impervious surfaces, other than a construction entrance under an
approved Sedimentation Erosion Control Plan, is a violation of NCGS 143-215.1 and is subject
to enforcement action pursuant to NCGS 143-215.6A.
If you have any questions concerning this matter please feel free to contact me at
Corey.Anen&ncdenr.gov or (919) 707-3649. Please note that due to the ongoing Covid-19
pandemic, I will be teleworking and will be most easily reached by email.
Sincerely,
Corey Anen
Environmental Engineer
Stormwater Program
cc: Winston-Salem Regional Office