Loading...
HomeMy WebLinkAboutNCC210209_NOT Closeout Documents_20210409North Carolina Department of Environmental Quality Land Resources: Systel Building, 225 Green Street, Suite 714, Fayetteville, NC 28301-5094 (910) 433-3300 County: Bladen Project: Chemours Solar Panel Clearing River basin: Cape Fear Person financially responsible: The Chemours Company — Tom Ei, Director of Project #: BLADE-2021-005 Corporate Remediation Group NPDES COC• NCC210209 Address: 22828 NC Highway 87 West, Fayetteville, NC 28306 1. Project Location: NC 87, Hollow Township Pictures: No 2. Weather and soil conditions: sunny, workable soils Initial inspection: No 3. Is site currently under notice of violation? No 4. Is the site in compliance with S.P.C.A. and rules? Yes If no, check violations below: 5. Violations: 6. Is the site in compliance with NPDES Permit NCG010000 Construction Stormwater requirements? Yes Describe: 7. Has sedimentation damage occurred since last inspection? No If Yes, where? (check all that apply) Degree of damage: 8. Contact made with (name): Jake Fancher, Ethan Moran, Bill Butcher, Scott Miller Inspection report: Sent Report Date given/sent: March 12, 2021 9. Corrective action needed: 10. Comments: Permanent ground cover sufficient to restrain erosion has been established. No additional self -monitoring or self -inspections are required. Project is in compliance and released under the SPCA. Termination of coverage under the NPDES General Stormwater Permit for Construction Activities (NCGO1) must be requested by the permittee via a Notice of Termination (NOT). The NOT is available at: https://edocs.deq.nc.gov/Fonns/NCGOI-Termination. Please note that this correspondence must be uploaded as part of completing the NOT process. Reported by: Mike Lawyer Others present: Date of inspection: March 11, 2021 Time arriving on site: 9:17 AM Time leaving site: 9:54 AM cc: