Loading...
HomeMy WebLinkAboutNCC200339_Notice of Termination_20210409Action History (UTC-05:00) Eastern Time (US & Canada) Subrrit by Anonymous User 4/9/2021 10:23:18 AM (NOT Submittal) Approve by Morman, Alaina 4/12/2021 8:41:12 AM (NOT Request Review- NCC200339) • The task was assigned to Morman, Alaina. The due date is: April 14, 2021 5:00 PM 4/9/2021 10:23 AM 1 � NORTH CAROLINA Enrlronmenral Quallly Certificate of NCC200339 Coverage (COC) Enter the Certificate of Coverage Nmber No.* 2020 Annual Fee Status 2021 Annual Fee Status PAID Nby be blank (if not yet billed). Information associated with this permit: Project Name ATOOD SolarlV Address 2299 Commerce Drive NE, Leland, NC County Brunswick Latitude 34.2730 Longitude -78.0580 Permittee Listed ReNew Petra Construction, LLC. Legally Responsible Greg Peterson Individual NC Reference No. NCG01-2020-0339 E&SC Plan ID BRUNS-2019-035 Original NOI 21052 Tracking No. Date COC Issued 2/24/2020 Prior Rescission Cate populates only if COCwas already rescinded at time of submittal. Date Reason for Rescission/Termination Request: Reason for IT Project Closed -Out Termination of r Sale (Another Owner/Operator obtained a new COC) Coverage * r Mistake or Invalid Coverage r Other Addional IVbre information about the basis of this request, if needed. Explanation Supporting Upload Supporting Documentation if applicable. Documentation Mist beRYforrrat Project Close-out Information: Final Close-out 11/25/2020 Inspection Approval Project Close-out ATOOD Solar IV - ESC-NPDES Final Inspection_11- Approval 222.08KB 25-2020.pdf Documentation Mist be FDFforrrat North Carolina General Statute 143-215.66 (1) provides that: Anyperson who knowinglymakes any false statement, representation, or certification in anyapplication, record, report, plan, or other documentfiled or required to be maintained under this Article or a rule implementing this Article; or who knowingly makes a false statement of a material fact in a rulemaking proceeding or contested case underthis Article; or who falsifies, tampers with, or knowingly renders inaccurate any recording or monitoring deice or method required to be operated or maintained under this Article or rules ofthe Commission implementing this Article shall be guiltyofa Class 2 misdemeanor which mayinclude a fine not to exceed ten thousand dollars ($10,000). rJ I, as an authorized representative, hereby request rescission of coverage under the NPDES Stormwater Permit for the subject facility. I am familiar with the information contained in this request and to the best of my knowledge and belief such information is true, complete and accurate. *This form must be signed by a responsible corporate officer that owns or operates the construction activity, such as a president, secretary, treasurer, or vice president, or a manager that is authorized in accordance with Part IV, Section B, Item (6) of the NCG010000 General Permit. For more information on signatory requirements, see Part IV, Section B, Item (6) of that permit. Signature Type Name* Greg Peterson Title * Chief Executive Office Organization * ReNew Petra Construction Date * 04/09/2021 Email for gpeterson@hep-petra.com Confirmation * Contact Telephone* 919-961-1640 NOT Certification ATOOD Solar IV - NOT Certification Form_04-07- Form 2021.pdf Mist be FDF Fornat Is this COC Already Ensure this OCChas not been rescinded since subrrittal! Rescinded? Additional Email OCd on Notification Errails (Optional) javent@hep-petra.com Original Permittee CCdonWificationErrails Email gpeterson@renewpetra.com Original Site Contact CCd on Notificaiton BTails Email gpeterson@renewpetra.com 863.19KB