Loading...
HomeMy WebLinkAboutSW8970603_HISTORICAL FILE_20080408STORMWATER DIVISION CODING SHEET POST -CONSTRUCTION PERMITS PERMIT NO. SW Y`/�l ID�cD3 DOC TYPE ❑CURRENT PERMIT ❑ APPROVED PLANS HISTORICAL FILE ❑ COMPLIANCE EVALUATION INSPECTION DOC DATE YYYYMMDD Michael F. Easley, Governor William G. Ross Jr,, Scerctary North Carolina Department of Environment and Natural Resources Coleen H. Sullins Director Division of Water Quality April 8, 2008 Mr. and Mrs. Carl McGalliard 1074 Hale Beach Road, SW Ocean Isle Beach, NC 28469 Subject:: Stormwater Permit No. SW8970603 Parker's Point Brunswick County Dear Mr. and Mrs. McGalliard: The Division of Water Quality issued a Coastal Stormwater Management Permit, Number SW8970603 to Mr. and Mrs. Carl McGalliard, Owners, for a High Density pond to serve Parker's Point on 3/9/1998. This permit expired on 31912008. Section .1003(h) of 15 A NCAC 2H .1000 (the stormwater rules) requires that applications for permit renewals shall be submitted 180 days prior to the expiration of a permit and must be accompanied by a processing fee, which is currently set at $505.00. If this is still an active project please complete and submit the enclosed renewal application in a timely manner. If this project has not been constructed and a permit is no longer needed, please submit a request to have the permit rescinded. If you have sold the project, or are no longer the permittee, please provide the name, mailing address and phone number of the person or entity that is now responsible for this permit. Enclosed is a form for change of ownership, which should be completed and submitted if the property has changed hands. Your permit requires that upon completion of construction and prior to operation of the permitted treatment units a certification of completion be submitted to the Division from an appropriate designer for the system installed. This is to certify that the permitted facility has been installed in accordance with the permit, the approved plans, specifications and supporting documentation. Please include a copy of the certification with your permit renewal request and processing fee. Enclosed is a copy of a sample certification. Also enclosed is a new Operation and Maintenance agreement that should be completed and submitted along with your renewal application. You should be aware that failure to provide the Designer's Certification and the operation of a stormwater treatment facility without a valid permit, are violations of NC General Statute 143-215.1 and may result in appropriate enforcement action including the assessment of civil penalties of up to $10,000 per day. If you have any questions, please feel free to contact staff in the stormwater group at 910-796-7215. Sincerely, Ed Beck, Regional Supervisor Surface Water Protection Section Wilmington Regional Office Enclosures cc: Wilmington Regional Office Noi7h Caro I i na ,Naturally North Carolina Division of Water Quality 127 Cardinal Drive Extension Wilmington, NC 28405 Phone (910) 796-7215 Customer Service Wilmington Regional Office Internet: u�ww.ncw;ucr, yuality.o� Fax (910) 350-2004 1-877-623-6748 An Equal Opportunity/Affirmative Action Employer — 50% Recycled110% Post Consumer Paper r March 9, 1998 Mr. and Mrs. Carl McGalliard 1074 Hale Beach Road, SW Ocean Isle Beach, NC 28469 Dear Mr. and Mrs. McGalliard: Subject. Permit No. SW8 970603 Parker's Point High Density Commercial Stormwater Project Brunswick County The Wilmington Regional Office received the Stormwater Management Permit Application for Parker's Point on June 4,1997, with final information on March 9, 1998. Staff review of the plans and specifications has determined that the project, as proposed, will comp}y with the Stormwater Regulations set forth in Title 15A NCAC 21-1.1000. We are forwarding Permit No, SW8 970603 dated March 9,1998, for the construction of Parker's Point. This permit shall be effective from the date of issuance until March 9, 2008, and shaft be subject to the conditions and limitations as specified therein. Please pay special attention to the Operation and Maintenance requirements in this permit. Failure to establish an adequate system for operation and maintenance of the stormwater management system will result in future compliance problems. If any parts, requirements, or limitations contained in this permit are unacceptable,you have the right to request an adjudicatory hearing upon written request within thirty (30) days following receipt of this permit. This request must be in the form of a written petition, conforming to Chapter 1 SOB of the North Carolina General Statutes, and filed with the Office of Administrative Hearings, P.O. Drawer 27447, Raleigh, NC 27611-7447, Unless such demands are made this permit shalt be final and binding. If you have any questions, or need additional information concerning this matter, please contact Linda Lewis, or me at (910) 395-3900, Sincerely, Rick Shiver, P.G. Acting Regional Water Quality Supervisor 1155/art: S:\WQS\STORMWAT\PERMIT\970603.MAR cc: Scott Quaintance Stuart Cooke, Agent Delaney Aycock, Brunswick County Inspections Linda Lewis Wilmington Regional Office Central Files State Stoimwater Ntanagement Systems Pelmit No. SW8 97060 STATE OF NORTH CAROLINA DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES DIVISION OF WATER QUALITY STATE STORMWATER MANAGEMENT PERMIT HIGH DENSITY DEVELOPMENT In accordance with the provisions of Article 21 of Chapter 143, General Statutes of North Carolina as amended, and other applicable Laws, Rules, and Regulations PERMISSION 15 HEREBY GRANTED TO Mr. and Mrs. CarlMcGalliard, Owners Parker's Poinr Brunswick Cuunry FORTHE construction, operation and maintenance of 2 sand filters and 2 infiltration basins in compliance with the provisions of 15A NCAC 2H .1000 (hereafter referred to as the "srormwarerrules' and the approved stormwater management plans and specifications and other supporting data as attached and on file with and approved by the Division of Water Quality and considered a part of this permit. This permit shall be effective from the date of issuance until March 9, 2008 and shall be subject to the following specified conditions and limitations: I. DESIGN STANDARDS This permit is effective only with respect to the nature and volume of stormwater described in the application and other supporting data. 2. This stormwater system has been approved for the management of stormwater runoff as described on page 3 of this permit, the Project Data Sheet. The stormwater controls (Basin 1, Basin 2, Sand Filter 1 and Sand Filter 2 have been designed to handle the runoff from 23,914 ft', 10,367 ft" 74,270 ftz and 61,028 ft2, respectively of impervious area. 3. Approved plans and specifications for this project are incorporated by reference and are enforceable parts of the permit. 4. The tract will he limited to the amount of built -upon area indicated on page 3 of this permit, and per approved plans. DIVISION OF WATER QUALITY PROJECT DATA SHEET Project Name: Parker's Point 2 State Stormwater Management Svstems Permit Number: 970603 Location: Brunswick County Applicant: Mr. and Mrs. Carl McGalliard Mailing Address: 1074 hale Beach Road, SW Ocean Isle Beach, NC 28469 Application Date: June 4, 1997 Water Body Receiving Stormwater Runoff: ICWW Classification of Water Body: "SA" Basin 1 Basin 2 Sand Filter 1 Sand Filter 2 BGtZom Elevation, FMSL: 24 27 8 8 Storage Elevation, FMSL: 26.5 28 10 10 Total Impervious Surfaces, ft': 23,914 10,367 74,270 61,028 Units, ft': 9,484 0 26,615 38,290 Pavement, ft': 13,295 0 28,924 18,950 Walks, ft': 915 0 3,790 3,788 Amenity Area, W: 220 10,367 14,941 0 Offsite Impervious Area entering Pond, ft': n/a n/a n/a n/a Required Surface Area, ft': n/a n/a Sediment 360 360 Sand 360 360 Provided Surface Area @ Bottom, W: n/a n/a Sediment 595 36C Sand 760 520 Required Storage Volume, ft3: 3,S98 1,303 Sediment 1,581 1,233 Sand 1,S81 1,233 Provided Storage Volume, ft': 3,986 2,126 Sediment 2,047 1,383 Sand 2,293 1,743 Type of Soil: Wando Sand Seasonal High Water Table, FMSL: 22 Time to Drawdown, hours: 27 25.2 n/a n/a 5. The permittee is responsible forverifying that the proposed built -upon area does not exceed the allowable built -upon area. 6. The following items will require a modification to the permit: 3 State Stormwater Management Systems Permit No. SM 970603 a. Any revision to the approved plans, regardless of size. b. Project name change. C. Transfer of ownership. d. Redesign oraddition to the approved amount of built -upon area. e. Further subdivision of the project area. f. Filling in, altering, or piping of any vegetative conveyance shown on the approved plan, In addition, the Director may determine that other revisions to the project should require a modification to the permit. 7. The Director may notify the permittee when the permitted site does not meet one or more of the minimum requirements of the permit. Within the time frame specified in the notice, the permittee shall submit a written time schedule to the Director for modifying the site to meet minimum requirements. The permiuee shall provide copies of revised plans and certification in writing to the Director that the changes have been made. IL SCHEDULE OF COMPLIANCE 1. The permittee will comply with the following schedule for construction and maintenance of the stormwater management system: a. The stormwater management system shall be constructed in it's entirety, vegetated and operational for it's intended use prior to the construction of any built -upon surface except roads. b. During construction, erosion shall be kept to a minimum and any eroded areas of the system will he repaired immediately. 2. The permittee shall at all times provide the operation and maintenance necessary to assure the permitted stormwater system functions at optimum efficiency. The approved Operation and Maintenance Plan must he followed In its entirety and maintenance must occur at the sched6led intervals including, but not limited to: a. Semiannual scheduled inspections (every 6 months). b. Sediment removal. C. Mowing and revegetation of side slopes for infiltration basins, and all grassed areas of project. d. Immediate repair of eroded areas. e. Maintenance of side slopes In accordance with approved plans and specifications. f. Debris removal and unclogging of sand filter media, infiltration basins, catch basins and piping. g. Access to the sand filters and infiltration basins must be available at all times. I Records of maintenance activities must be kept and made available upon request to authorized personnel of DWQ. The records will indicate the date, activity, name of person performing the work and what actions were taken. 4. This permit shall become voidable unless the facilities are constructed In accordance with the conditions of this permit, the approved plans and specifications, and other supporting data. 5. Upon completion of construction, prior to issuance of a Certificate of Occupancy, and prior to operation of this permitted facility, a certification must be received from an appropriate designer for the system installed certifying that the permitted facility has been installed in accordance with this permit, the approved plans and specifications, and other supporting documentation. Any deviations from the approved plans and specifications must be noted on the Certification. 6. A copy of the approved plans and specifications shall be maintained on file by the Permittee for a minimum of ten years from the date of the completion of construction. 4 State Stozmwater Management Systems Permit No. SWS 970603 Prior to the sale of any portion of the property, an access/maintenance easement to the stormwater facilities shall be granted in favor of the perminee if access to the stormwater facilities will be restricted by the sale of any portion of the property. III. GENERAL CONDITIONS 1. This permit is not transferable. In the event there is a desire for the facilities to change ownership, or there is a name change of the Permiuee, a formal permit request must be submitted to the Division of Water Quality accompanied by an application fee, documentation from the parties involved, and other supporting materials as may be appropriate. The approval of this request will be considered on its merits and may or may not be approved. 2. Failure to abide by the conditions and limitations contained in this permit may subject the Permittee to enforcement action by the Division of Water Quality, in accordance with North Carolina General Statute 143-215.6A to 143-215.6C. 3. The issuance of this permit does not preclude the Permittee from complyingwith any and all statutes, riles, regulations, or ordinances which may be imposed by other government agencies (local, state, and federal) which have jurisdiction. 4. In the event that the facilities fail to perform satisfactorily, including the creation of nuisance conditions, the Permittee shall take Immediate corrective action, including those as may be required by this Division, such as the construction of additional or replacement stormwater management systems. S. The perminee grants DENR Staff permission to enter the property for the purpose of inspecting all components of the permitted stormwater management facility. 6. The permit may he modified, revoked and reissued or terminated for cause. The filing of a request for a permit modification, revocation and reissuance or termination does not stay any permit condition. Permit issued this the 9th day of March, 1998. NORTH CAROLINA ENVIRONMENTAL MANAGEMENT COMMISSION A. Preston Howard, jr_, P.E., Director Division of Water Quality By Authority of the Environmental Management Commission Permit Number SWB 970603 Parker's Point Stormwater Permit No. SW8 970603 Brunswick County Engineer's Certification as a duly registered Professional Engineer in the State of North Carolina, having been authorized to observe (periodically/weekly/full time) the construction of the project, State Stonnwater Management Systems Pet7njt %. SWS 970603 Project) for (Project Owner) hereby state that, in the best of my abilities, due care and diligence was used in the observation of the project construction such that the construction was observed to be built within substantial compliance and intent of the approved plans and specifications. Noted deviations from approved {clans and specification: SEAL Signature Registration Number Date Parkers Pointe September 8, 2008 Stormwater Permit No. SW8 970603 September 8, 2008 CERTIFIED MAIL #7007 0220 0000 8216 7831 RETURN RECEIPT REQUESTED Mr. And Mrs. Carl McGalliard 5685 Watts Rd. Ocean Isle Beach, NC 28469 CERTIFIED MAIL #7007 0220 0000 8216 7855 RETURN RECEIPT REQUESTED Mr. Jim Memory 726 Bluff School Rd. Kernersville, NC 27284 CERTIFIED MAIL #7007 0220 0000 8216 7848 RETURN RECEIPT REQUESTED Mr. Stewart Cooke PO Box 6689 Ocean Isle Beach, NC 28469 NOTICE OF INSPECTION AND NON-COMPLIANCE Parkers Pointe Subdivision Stormwater Project No. SW8 970603 Brunswick County Dear Mr. and Mrs. Carl McGalliard: Please find attached a copy of the completed form entitled "Stormwater Compliance Inspection Report". The report summarizes the findings of a recent inspection of the project's stormwater controls conducted on August 28, 2008 to determine compliance with Stormwater Permit Number SW8 970603 issued on March 9, 2008. A summary of the findings and comments are noted under Section 4 of the report. Please inform this Office in writing before October 8, 2008, of the specific actions that will be undertaken and the time frame required to correct the deficiencies. Failure to provide the requested information, when required, may initiate enforcement action. If you have any questions please contact me at the Wilmington Regional Office, telephone number (910) 796-7215. Sincerely, David Cox Senior Environmental Specialist ENB/dwc: S:IWQSISTORMWATIINSPECT1970603.sep08 cc: Jay Houston, Houston & Associates. Wilmington Regional Office David Cox Page 1 of 6 Parkers Pointe September 8, 2008 Stormwater Permit No. SW8 970603 STORMWATER COMPLIANCE INSPECTION REPORT Project Name Parkers Pointe Project Number: SW8970603 Control Measure: Infiltration Water Body: ICWW Classification: "SA" Directions to site, address: Culpepper Dr. 2. Inspection Date: August 28, Weather Conditions: Sunny 3. Compliance Issues: Y N ®❑ The drainage area (including offsite) and built -upon area to the permitted system are per the approved plan. No unpermitted offsite drainage enters the system. ®❑ All the built -upon area associated with the project is graded such that the runoff drains to the system. ❑ ® For ponds/infiltration, the outlet/bypass structure relative elevations are per the approved plan. (Must be verified via as -built survey if in question). ❑ ® The inlets and outlet structure are located per the approved plans and do not cause short-circuiting. ❑ ® All slopes are grassed with permanent vegetation and are not eroding. ❑ ® Vegetated slopes are no steeper than 3:1. ®❑ The approximate amount of permitted surface area has been provided. (Must be verified via as -built survey or designer's certification.) ❑ ® Required drawdown devices are correctly sized per the approved plans. All required design} depths are provided. ❑ ® All required parts of the system are provided, such as a level spreaders and a overflow bypass. ®❑ The designer's certification has been submitted. ❑ ® The required deed restrictions are correctly recorded and submitted. ❑ ® The number of lots or outparcels is per the permitted amount and have not been subdivided. ❑ ® The built -upon area on the lots or outparcels does not appear to exceed the maximum amount (must be verified via as -built survey if in question) ®❑ The road, cul-de-sac, parking lot and sidewalk widths are per the approved plan. ❑ ® Required maintenance is being performed. ❑ ® Has access been provided to the sand filters . 4. Required Actions: (Explain each deficiency and what needs to be done to bring the system back into compliance) Page 2 of 6 Parkers Pointe September 8, 2008 Stormwater Permit No. SW8 970603 It appears that the approved plan has been subdivided and differs from the approved permit, which did not incorporate any subdivision of the project area. The original permit was approved with a specific floor plan that showed duplexes and did not include a pool house. Please submit a modification that provides the new lot lines, verifies as -built conditions, and incorporates deed restrictions. 2. Please verify that the addition of the pool house did not compromise the design of sand chamber number 1, by recertifying the approved stormwater system. 3. Please perform the maintenance necessary to restore the integrity of the stormwater system which includes, a. Removing accumulated sediment in the sediment basins. b. Remove excess vegetation in the sediment basins and repair all eroded areas. c. The sand in the sand chambers has not been compromised or provide the required maintenance records. d. Repair all crushed catch basins within the permitted stormwater system. 4. Please install all level spreaders within the sediment basins, the flow spreader at the outfail and the overflow bypass as per the approved plan. 5. Please be reminded that your state stormwater permit expired on March 9, 2008 and the operation of a stormwater treatment facility without a valid permit, is a violation of NC General Statue 143-215.1 and may result in appropriate enforcement action including the assessment of civil penalties of up to 10,000 per day. This office sent you a renewal package on April 8, 2008 to this date we have received no response. Inspector: David Cox Water QualitylWilmington Regional Officel(910) 796-7215 Page 3 of 6 Parkers Pointe September 8, 2008 Stormwater Permit No. SW8 970603 Enb/dwc: S:1WQSISTORMWA-RINSPECT1970603.sep08 Parker's Pointe Brunswick County Stormwater Project No. SW8 970603 Designer's Certification I, , as a duly registered in the State of North Carolina, having been authorized to observe (periodically 1 weekly 1 full time) the construction of the project, (Project) for (Project Owner) hereby state that, to the best of my abilities, due care and diligence was used in the observation of the project construction such that the construction was observed to be built within substantial compliance and intent of the approved plans and specifications. Required Items to be checked for this certification to be considered complete are on page 2 of this form. Noted deviations from approved plans and specifications: Signature Registration Number Date SEAL Page 4 of 6 Parkers Pointe September 8, 2008 Stormwater Permit No. SW8 970603 cc: NCDENR DWQ Regional Office Brunswick County Building Inspector Certification Requirements: 1. The drainage area to the system contains approximately the permitted acreage. 2. The drainage area to the system contains no more than the permitted amount of built -upon area. 3. All the built -upon area associated with the project is graded such that the runoff drains to the system. 4. The outlet/bypass structure elevations are per the approved plan. 5. The outlet structure is located per the approved plans. 6. Trash rack is provided on the outlet/bypass structure. 7. All slopes are grassed with permanent vegetation. 8. Vegetated slopes are no steeper than 3:1. 9. The inlets are located per the approved plans and do not cause short- circuiting of the system. 10. The permitted amounts of surface area and/or volume have been provided. 11. Required drawdown devices are correctly sized per the approved plans. 12. All required design depths are provided. 13. Ali required parts of the system are provided, such as a vegetated shelf, and a forebay. 14. The dimensions of the system, as shown on the approved plans, are provided. cc: NCDENR-DWQ Brunswick County Building Inspector Page 5 of 6 Compliance Inspection Report Permit: SW8970603 Effective: 03/09/98 Expiration: Owner: Mr and Mrs Carl McGailiard Project: Parker's Pointe Phase I County: Brunswick Culpepper Ln Region: Wilmington Ocean Isl Bch NC 28469 Contact Person: Carl McGaliard Title: Phone: Directions to Project: Ocean Isle Beach Causeway, Turn right on Culpepper Lane project is on left Type of Project: State Stormwater - Alternative Design State Stormwater - Infiltration System Drain Areas: 1 - On -Site Representative(s): Related Permits: Inspection Date: 12/03/2008 Entry Time: 10:30 AM Primary Inspector: David W Cox Secondary Inspector(s): Reason for Inspection: Follow-up Permit Inspection Type: State Stormwater Facility Status: ❑ Compliant ■ Not Compliant Question Areas: 0 State Stormwater (See attachment summary) Exit Time: 11:00 AM Phone: 910-796-7215 Inspection Type: Compliance Evaluation Page: 1 Permit: SW8970603 Owner - Project: Mr and Mrs Carl McGalliard Inspection Date: 12/03/2008 Inspection Type: Compliance Evaivation Reason for Visit: Follow-up Inspection Summary: 1. Provide a written "Plan of Action" which outlines the actions you will take to correct the violation(s) and a time frame for completion of those actions, on or before January 5, 2008. 2. Submit a modification that addresses the new impervious (built -upon) areas and subdivided areas. This modification should include updated site plans, revised calculations of impervious area and any changes that may be required because of the modification, including recorded deed restrictions. 3. Perform the maintenance necessary to bring the stormwater system into compliance. This includes repairing all crushed catch basins. 4. Install the level spreader and overflow bypass. 5. Recertify the stormwater system to verify that the addition of the pool house did not compromise sand filter 1. Page:2 Permit: SW8970603 Owner - Project: Mr and Mrs Carl McGalliard Inspection Date: 12/03/2008 Inspection Type: Compliance Evaluation File Review Is the permit active? Signed copy of the Engineer's certification is in the file? Signed copy of the Operation & Maintenance Agreement is in the file? Copy of the recorded deed restrictions is in the rile? Comment: Built Upon Area Is the site BUA constructed as per the permit and approval plans? Is the drainage area as per the permit and approved plans? Is the BUA (as permitted) graded such that the runoff drains to the system? Reason for Visit: Follow-up Comment: The inspection revealed the following inconsistencies with the permitted plans. The project area was subdivided and differs from the approved permit. This approval did not incorporate any subdivision within the project area. The original permit was approved with a specific -floor plan that showed town homes, and did not include a pool house. There was no evidence that the overflow bypass located north of sand chamber 1 and the level spreader for this system was ever installed. CUU RA--r— Are the SW measures constructed as per the approved plans? Are the inlets located per the approved plans? Are the outlet structures located per the approved plans? Comment: There was no evidence that the overflow bypass located north of sand chamber 1 and the level spreader for this system was ever installed. Operation and Maintenance Are the SW measures being maintained and operated as per the permit requirements? vas u„ ue NF ■ n n n ■n00 ■nnn nnn■ Yes No NA NE Conn ■nnn ■nnn Yes No NA NE n■nn ■nnn n■nn Yes No NA NE Conn Are the SW BMP inspection and maintenance records complete and available for review or provided to DWQ n ❑ n ■ upon request? Comment: At all times, the permittee shall provide the operation and maintenance necessary to assure the permitted stormwater system functions at optimum efficiency. Therefore, all sediment accumulated in the basins must be removed and all erode areas on the outer slopes must be repaired. Re-establish the approved vegetation on the outer slopes of the sediment basins. Furthermore, access to the sand filters must be available at all times. As stated in the permit, the approved Operation and Maintenance Plan must be followed in its entirety and maintenance must occur at the scheduled intervals. Page:3 December 4, 2008 Parkers Pointe Stormwater Permit No. SW8 970603 December 5, 2008 NOV-2008-PC-0828 CERTIFIED MAIL #7008 1140 0002 9561 9784 RETURN RECEIPT REQUESTED Mr. Ms Carl Mc Galliard 5658 Watts Rd. Ocean Isle Beach, NC 28469 Subject: NOTICE OF VIOLATION Parkers Pointe Stormwater Permit No. SW8 970603 Brunswick County Dear Mr. Ms. Carl McGalllard: On August 28, 2008 and December 3, 2008, Wilmington Regional Office personnel performed a Compliance Inspection of the subject project, located at Hale Beach Road in Ocean Isle, Brunswick County, North Carolina. The inspection was performed to determine the status of compliance with Stormwater Permit Number SW8 970603, issued to you on March 9, 1998. The project has been found in violation of Stormwater Permit Number SW8 970603, issued pursuant to the requirements of 15A NCAC 2H.1000. The violations found are: Failure to build accordina to the approved plan. The inspection revealed the following inconsistencies with the permitted plans. The project area was subdivided and differs from the approved permit. The approved permit did not incorporate any subdivision within the project area. The original permit was approved with a specific floor plan that showed town homes, and did not include a pool house. There was no evidence that the overflow bypass located north of sand chamber 1 and the level spreader for this system was ever installed. Permit conditions require that the permittee shall submit to the Director and shall have received approval for revised plans, specifications, and calculations prior to construction, for any modification to the approved plans. 2. Failure to properly maintain the infiltration system. At all times, the permittee shall provide the operation and maintenance necessary to assure the permitted stormwater system functions at optimum efficiency. Therefore, all sediment accumulated in the basins must be removed. Eroded areas on the outer slopes must be repaired and the approved vegetation must be reestablished on the outer slopes of the sediment basins. Furthermore, access to the sand filters must be available at all times. As stated in the permit, the approved Operation and Maintenance Plan must be followed in its entirety and maintenance must occur at the scheduled intervals, including, but not limited to: Page 1 of 5 December 4, 2008 Parkers Pointe Stormwater Permit No. SW8 970603 a. Semiannual scheduled inspections (every 6 months). b. Sediment removal. c. Mowing and revegetation of side slopes for infiltration basins, and all grassed areas of the project. d. Immediate repair of eroded areas. e. Maintenance of side slopes in accordance with approved plans and specifications. f. Debris removal and unclogging of the sand filter media, infiltration basins, catch basins and piping. g. Access to the sand filters and infiltration basins must be available at all times. 3. Failure to respond to a written request. On April 8, 2008 this office sent you a renewal request package that included a renewal application, Operations and maintenance Agreement and a Transfer of Ownership form. On September 8, 2008, this office sent you a Inspection and Noncompliance Letter. As stated in your permit, "The Director may notify the permittee when the permitted site does not meet one or more of the minimum requirements of the permit. Within the time frame specified in the notice, the permittee shall submit a written time schedule to the Director for modifying the site to meet minimum requirements. The permittee shall also provide copies of revised plans and certification in writing to the Director that the changes have been made". To date, this office has not received your response as required by this permit condition. To correct these violations you must: Provide a written "Plan of Action" which outlines the actions you will take to correct the violation(s) and a time frame for completion of those actions, on or before January 5, 2009. 2. Submit a modification that addresses the new impervious (built -upon) areas and subdivided areas. This modification should include updated site plans, revised calculations of impervious area and any changes that may be required because of the modification, including recorded deed restrictions. 3. Perform the maintenance necessary to bring the stormwater system into compliance. This includes repairing all crushed catch basins. 4. Install the level spreader and overflow bypass. 5. Recertify the stormwater system to verify that the addition of the pool house did not compromise sand filter 1. Failure to provide the "Plan of Action" by January 5, 2009, or to correct the violations by the date designated in the "Plan of Action", are considered violations of 15A NCAC 2H.1000, and may result in the initiation of enforcement action which may include recommendations for the assessment of civil penalties, pursuant to NCGS 143-215.6A. Page 2 of 5 December 4, 2008 Parkers Pointe Stormwater Permit No. SW8 970603 By copy of this letter to the Brunswick County Building Inspector, this Office is requesting that the Building Inspector consider withholding building permits and Certificates of Occupancy for this project until this matter is satisfactorily resolved. If you have any questions concerning this matter, please call David Cox at 796-7318 Sincerely, Goergette Scott Stormwater Supervisor Surface Water Protection Section GSldwc: S:1WQSISTORMWATERINOTICE1970603.dec08 cc: Jay Houston Brunswick County Building Inspections John Hennessey David Cox Central Files Page 3 of 5 December 4, 2008 Parkers Pointe Stormwater Permit No. SW8 970603 Parkers Pointe Brunswick County Stormwater Project No. SW8 970603 Designer's Certification Page 1 of 2 I, , as a duly registered in the State of North Carolina, having been authorized to observe (periodically / weekly / full time) the construction of the project, (Project) for (Project Owner) hereby state that, to the best of my abilities, due care and diligence was used in the observation of the project construction such that the construction was observed to be built within substantial compliance and intent of the approved plans and specifications. Required Items to be checked for this certification to be considered complete are on page 2 of this form. Noted deviations from approved plans and specifications: Signature Registration Number Date SEAL Page 4 of 5 December 4, 2008 Parkers Pointe Stormwater Permit No. SW8 970603 Certification Requirements: Page 2 of 2 i . The drainage area to the system contains approximately the permitted acreage. 2. The drainage area to the system contains no more than the permitted amount of built -upon area. 3. All the built -upon area associated with the project is graded such that the runoff drains to the system. 4. The outlet/bypass structure elevations are per the approved plan. 5. The outlet structure is located per the approved plans. 6. Trash rack is provided on the outlet/bypass structure. 7. All slopes are grassed with permanent vegetation. 8. Vegetated slopes are no steeper than 3:1. 9. The inlets are located per the approved plans and do not cause short- circuiting of the system. 10. The permitted amounts of surface area and/or volume have been provided. 11. Required drawdown devices are correctly sized per the approved plans. 12. All required design depths are provided. 13. All required parts of the system are provided, such as a vegetated shelf, and a forebay. 14. The dimensions of the system, as shown on the approved plans, are provided. CC' NCDENR-DWQ Brunswick County Building Inspections Page 5 of 5 .,,;on i!CDENR-Surface Water Pro, 127 Cardinal Drive E':�tensions Wilmington, NC 28405 of "liveratle As A ddFes. � Unable fo Fo,�ard ❑ InsuPicienlAddress Mr. and Mrs. Carl McGalliard lUn aI-jd f°`"'u153 1074 Hale Beach Road, SW ❑ Unclairnt�d=�R.fusNd ❑Anonplyd - tot Ocean Isle Beach, NC 28469 a .,nU4ln No Siicn Slrhzl ❑ Numa �. ;p�J}� /1 �'malanf l nfegfble � No o Mad ClReceptaGe ❑ ROX Closed - No Or der -----,y ❑ Ret urned ror geRer Addren Z P o�A-0 ' fi :1 NIhiv Ell ltrvl:5 02 1A $ 01.310 0004337146 APR09 2008 MA I LED FROM ZIP CODE 28405 i 5 iJ L"11) � 539 \_ „_ J [ � ���_ ��=� rfY!-_ , April 8, 2008 Mr. and Mrs. Carl McGalliard 1074 Hale Beach Road, SW Ocean Isle Beach, NC 28469 Subject:: Stormwater Permit No. SW8970603 Parker's Point Brunswick County Dear Mr. and Mrs. McGalliard: Michael N. i;asiey, Governor William G. Ross Jr., Secretary North Carolina Department of Fnvironment and Natural Resources Colcen H, Sullins Director Division of Water Quality lfC-05 The Division of Water Quality issued a Coastal Stormwater Management Permit, Number SW8970603 to Mr. and Mrs. Carl McGalliard, Owners, for a High Density pond to serve Parker's Point on 31911998. This permit expired on 31912008. Section .1003(h) of 15 A NCAC 2H .1000 (the stormwater rules) requires that applications for permit renewals shall be submitted 180 days prior to the expiration of a permit and must be accompanied by a processing fee, which is currently set at $505.00. If this is still an active project please complete and submit the enclosed renewal application in a timely manner. If this project has not been constructed and a permit is no longer needed, please submit a request to have the permit rescinded. If you have sold the project, or are no longer the permittee, please provide the name, mailing address and phone number of the person or entity that is now responsible for this permit. Enclosed is a form for change of ownership, which should be completed and submitted if the property has changed hands. Your permit requires that upon completion of construction and prior to operation of the permitted treatment units a certification of completion be submitted to the Division from an appropriate designer for the system installed. This is to certify that the permitted facility has been installed in accordance with the permit, the approved plans, specifications and supporting documentation. Please include a copy of the certification with your permit renewal request and processing fee. Enclosed is a copy of a sample certification. Also enclosed is a new Operation and Maintenance agreement that should be completed and submitted along with your renewal application. You should be aware that failure to provide the Designer's Certification and the operation of a stormwater treatment facility without a valid permit, are violations of NC General Statute 143-215.1 and may result in appropriate enforcement action including the assessment of civil penalties of up to $10,000 per day. If you have any questions, please feel free to contact staff in the stormwater group at 910-796-7215. S erel , Ed Beck, Regional Supervisor Surface Water Protection Section Wilmington Regional Office Enclosures cc: Wilmington Regional Office ol- NliCarolina Naturallil North Carolina Division of Water Quality 127 Cardinal Drive Extension Wilmington, NC 28405 Phone (910) 796.7215 Customer Sezvice Wilmington Regional Office Internet: www.new.teryuality.ort Fax (910)350-2004 1-877-623-6749 An Equal Opportunity/Affirmative Action Employer— 50% Recycled110% Post Consumer Paper STATE OF NORTH CAROL -NA Department of Environmental and Natural Resources 127 Cardinal Drive Extension Wilmington, North Carolina 28405 (910) 796-72I5 ME ACCESS RECORD SECTION SW TIMEIDATE rr 16 ' t) NAME h; ►j 4 au _ --- REPRESENTING NT' [A Guidelines for Access: The staff of Wilmington Regional office is dedicated to making public records in our custody readily available to the public for review and copying. We also have the responsibility to the Public to safeguard these records and to carry out our day-to-day program obligations- Please read carefully the following guidelines signing the farm: Z. Due to the large public demand for fie access, we request thatyou. call, at least a day in advance to schedule an appointment to review the files. Appointments will be, scheduled between MOftm and 3:00pm. Viewing time ends at 4:45pm. Anyone arriving without an appointment may view the files to the extent that time and staff supervision is available. 2. You must specify fles you want to review by facility, name. The number of fdes that you may review at one tune will be limited to five. 3. You may make copies of a file when the copier is not in use by the staff and if time permits. Cost per copy is $.05 cents. Pavment may be made, by check, money order, or cash at the reception desk. Copies totaling $5.00 or more can be invoiced for your eonyedence. 4- MILES MUST BE KEPT IN ORDER YOU FOUND THEM.' files may not be taken from the office. To remove, alter, deface, mutilate, or destroy material in one of these files is a misdemeanor for which you can be fined up to $500,00, Na briefcases, lame totes, etc. are pezmitted in the file review area, . 5. In accordance with General Statue 25-3-512, a $25.00 processing fee will be charged and coliected.for checks on which payment has been refused. FACI.I,ITY NAME COUNTY 2. 3. Signature and Name of Firn-i/Busiaess Date .Please attach a business cmd to this form COPIES MOE PAID S.Adrnin.file access Time In Time Out INVOICE � 3 m S� Z HOUSTON AND ASSOCIATES, P.A. MXM uVATER°Mn"M11pN0R"'"'"" over CONSULTING ENGINEERS PARKERS POfNTE , Ob�1 y a� 117 Pwr BM, P.O. m, rA !M/e0,, HMh CYEIn rr�eP {YI4) lr*ICiID, ��� ���u HOUSTON and ASSOCIATES, P.A. Consulting Engineers SFIALLOTFE, NOR li CAROLINA 28459 Telephone (910) 754-6324 117 Pine Street Facsimile (910) 754-2121 Post Office Box 627 F)-idary, June 23, 2000 Ms. Linda Lewis, Environmental Engineer Division of Water Quality` NC Department of Environment and Natural Resources 127 Cardinal Drive Extension REC:EIVED Wilmington, North Carolina 28405 JUN 3 0 2000 Subject: Parkers Pointe - Phase 1 I SW8 970603 BY' J Partial Certification of Construction Dear Ms. Lewis: In accordance with the conditions and requirements of the subject project permit, I hereby certify that the construction of the stormwater collection system, the sediment basins, and Sand Filter # 1 and Sand Filter #2 has been completed and that the facilities are in substantial accordance with the technical requirements of the approved permit. Our firm performed periodic observation, with due care and diligence during the construction period, to the best of our abilities, to ensure that the grades, sizes and other critical features of the stormwater facilities met the intent of design. The facilities should function as designed as long as they are maintained as required by the permit conditions. At this time, both filters are open to the atmosphere. The developer eventually will construct the pool and pool deck above and around the filters and has been instructed to allow access for maintenance. A removable deck has been proposed. Attached is a drawing of the completed facilities for Phase 1. This certification is good for construction of future impervious surface up to the elevations below Infiltration Basins # 1 and #2. Total impervious surface has been reduced slightly from the approved permit total. We appreciate your attention in this matter. Should you have any comments or require any additional information, please do not hesitate to contact our office at nc our conveniee y � tst`rVui�rrr�,�jR� wC*% r. : Attachment rely, 3ouston, P.E. n and Associates, P.A. pc: Mr. Stuart Cooke, Parkers Pointe Mr. Chris Williams, Planner, Town of Ocean Isle Beach File; 96-0109 (Parkers Pointe - Phase 1 Certifications) ono� W A 7 �9�i✓ January 6, 2009 Mr. & Mrs. Carl Mc Galliard, Owners 5658 Watts Rd. Ocean Isle Beach, NC 28469 CERTIFIED MAIL #7008 1140 0002 9561 9913 RETURN RECEIPT REQUESTED Subject: Ownership of Parker's Pointe Parkers Pointe Stormwater Project No. SW8 970603 Brunswick County Dear Mr. And Mrs. Mc Galliard: Michael F Easley, Governor WilliantC. Rnss Jr., Secretary' North Cnwhna Department of Envirorunent and Natural Resources Coleen H. Sullins Director Division of Water Quality Thank you for your response received on December 29, 2008, Upon a file review, this office has determined that the State Stormwater Permit SW8 970603 is still in your name. Unless you can produce a copy of another State Stormwater Permit for Parker's Pointe issued in someone else's name this will hold you as the responsible party. Permit condition states that in the event there is a desire for the facilities to change ownership, or there is a name change of the Permittee, a formal permit request must be submitted to the Division of Water Quality accompanied by an application, documentation from the parties involved, and other supporting materials as may be appropriate. Due to the circumstances, of non -compliant status, this office cannot proceed with transfer of ownership unless the proposed permittee verifies in writing, to this office that they are willing to address all issues of non-compliance. In order to avoid further action by this office, you must provide a written Plan of Action to this office by February 5, 2009. Failure to provide this written Plan of Action will subject the Permittee to enforcement action by the Division of Water Quality, in accordance with North Carolina General Statute 143-215.6A to 143-215.6C and impose fines of up to $10,000 per day. Another copy of the Notice of Violation issued on December 5, 2008 is attached If you have any questions, please do not hesitate to call me at (910) 796-7318. Sincere) , David Cox Environmental Senior Specialist r GSldwc: S:1WQSlSTORMWATILETTERS120071970603.jan09 . cc: Jay Houston Central files John Hennessey V. ,,iRO= Wne rlhCarolina 'Vaturally North Carolina Division of Water Quality 127 Cardinal Drive Extension Wilmington, NC 28405 , Phone (910) 796-7215 Customer Scrvice Wilmington Regional Office Internet: uwu.ncwxterdualit}um fax (910)350-2004 I-877-623-6748 An Equal Opportunity/Aff rmalive Action Employer — 50% Recycled110% Post Consumer Paper Postal RECEIPTCERTIFIED MAIL,r, i(Domestic Epp ra 1 L0 Postage $ Certlffed Fee rLi m Retum Receipt Fee ' P H as i (Endorsement Required) a, Restricted Delivery Fee 0 (Endarsement Required) r h , q Total Postage & Fees r-q � ent o streei. Aat: . 7vo:; or PO Sax No. - rr�' Q C�w State, ZlP+4 - PARKERS POINT REPORT STORMWATER DECEIVE DEC 0 8 1997 D 3 D E M • JOB NAME PARKER POINT T_RAC, PARCEL: - - - DATE:' 1211819611:17 - i ! I EWT HOLE HORIZON: 1 DEPTH COLOR TEXTURE STRUCTURI OWT COMMENTS 1 ; A 10-3 i VPBR TO BR 1 LS I LOOSE,SG i OAK ,& PINE 30YR. `BW1 13-9 11CK•YELL BRWN ILS ILOOSE,SGi E 19-33 YELL S i LOOSE, SG 1 >75175 !BW2 133-64 1 YELL LTAR=1.2 i !10YR 716 ILS !LOOSE.SGI 'BC !64-75 IVRY.PL.BR ISCL ELOOSE.SG1 ! i ! ;WHITE & YEL. BR 1 LS ! ! I 1 1 I EWT ! 'HOLE •. HORI JDEPTH !COLOR I TEXTURE STRUCTURI OWT I COMMENTS 1 .QN: 21 AP 10-1 ! S & P ! LS I LOOSE. SG i OAK & PINE 30YR. BW1 11-22 i YELL BRWN •; LS _ ; LOOSE,SG ! i BW2 _122-45 ! VR.PALE BRN i LS 1 LOOSE,SG 45l70 i BC 145-75 1 VR.PALE BRN iC,C,D,IOYR 516 , _ LS i LOOSE. SGi I LTAR=1.0 ! ii F,C,D,IOYR 4/3 1LS :EWT HOLE HORIZON: I DEP T H !COLOR i TEXTURE STRUCTUR! OWT I COMMENTS 31AP 10-6 CK BRN ILS LOOSE, SG1 OAK & PINE 30YR, BW1 1-22 YELL BRWN ILS ' LOOSE,SG i BW2 122-3 1 ! VR.PALE BRN j LS LOCSE,SG i 30136 ! BC 131-00 ! VR. PALE BRN ! LTAR=1.0 ! i& WHITE S LOOSE. SG! ! I 1 F, C, D,1 OYR 4/3 :ILS i EWT I HOLE HORIZON: I DEPTH ' COLOR 'TEXTURE STRUCTUR! OWT COMMENTS 4!A 10-3 1V.DKGR,BR : LS LOOSE, SG! OAK & PINE 30YR. 1 !AS , 3-61 i DK.BRWN ILS ! LOOSE, S.G. BW 16-15 LT, YEL BR .LS LOOSE,SG, E 22-31 i 1OYR 713,812 S LOOSE, SG A.' 131-36 ; DK.BRN7.5YR 312 j LS_ LOOSE, SG 30/36 ; LTAR-1.0 BG' 36-41 DK.BRN7,5YR 3/2 I SL WK,SBK - F,C,D,1 OYR 4/3 ! LS ' CG' 41-60 CKGR. BRWN ILS LOOSE,SG1 j I I ! I EWT 1 I HOLE ' HORIZON: !DEPTH I COLOR TEXTURE STRUCTURI OWT 51 AP 10-3 ! S & P ILS I LOOSE, SG I I I BW1 13-22 1 YELL BRWN ' LS j LOOSE, SG I ! ! I BW2 122-50 1 VR. PALE BRN ILS LOOSE:.SG i i BW3 150-62 ; LT,YEL.BRW >60/;75 I C,C.D, I OYR 5/6 ILS i LOOSE,SG I - _ I 1 J i F, C, D,1 OYR 4/3 ! LS ! i ! 1 '1 BC ! 62-72 i BR. YELL LSIS I LOOSE, SG 1621>72 1 1 I i i !EWT HOLE !HORIZON: I DEPTH ; COLOR I TEXTURE: STRUCTURE OWT ! 61 A ' 0-3 1 S& P i LS 1 LOOSE,SG 1 ! !AB 13-11 DK.YELL.BRW iLS !LOOSE, SG1 ! BW1 122-31 ! VR. PALE BRN 1 LS LOOSE,SG; BW2 131-38 ! YELL. BRW ! LS I LOOSE, SG i 451>70 ! I PARKERS POINT REPORT 4 ! C 1 ! 38-45 1 BROWN _ LS i LOOSE, SG ! ! I C2 145-70 DK.BRW LS/S LOOSE,SG ', EWT HOLE I HORIZON: ! DEP_TH-I COLOR TEXTURE_S7RUCTURI OWT_ I ' 71A 10-3 _ !S & P !LS !LOOSE,SGI I i 1 E 13-19 !WHITE is LOOSE, SG 1 i I BW1 ! 19-30 1 VR.PALE 8RN is 1 LOOSE,SGI IBW2 130-70 DDK.YELL. BRW ILS/S ILOOSE,SGI>70/>70 I I I _ I I EWT HOLE I HORIZON: I DEPTH I COLOR !TEXTURE STRUCTURI OWT 81 A ! 0-3 ! S & P ! LS 1 LOOSE, SG ! ! ! I E ! 3-30 1 WHITE is I LOOSE,SG I I I BW1 13045 1 VR.PALE BRN I LS LOOSE,SG I IBW2 i45-51 YELL.BRW !LS I LOOSE. SG 1 45/>70 I I I I BWH 13845 1 DK BR. I LS ', LOOSE, SG' ! I I C2 145-70 I DK.BRW LS/S LOOSE,SG 1 I I ! ! EWT HOLE I HORIZON: I DEPTH I COLOR ! TEXTURE STRUCTURI OWT !COMMENTS 91 A ! 0-3 VPBR TO BR I LS i LOOSE, SG 1 _ I OAK & PINE 30YR. I I AB 13-9 DK. YELL BRWN ! LS 1 LOOSE, SG 1 ! I I BW1 19-40 I YELL I S/LS 1 LOOSE,SG! >75/75 ! i BW2 140-64 VRY.PL.BR I 1 LTAR=1.2 I 1 j 10YR 7/3 !LS LOOSE, SG 1 BC 164-75 ! WHITE & YEL. $R IS i LOOSE, SG ! ! ! I EWT i HOLE I HORIZON: ! DEPTH I COLOR TEXTURB STRUCTURE OWT ! COMMENTS 101A 0-3 VPER TO BR ILS I LOOSE, SG !OAK & PINE 30YR. I AB i 3-9 DKYELL BRWN ! LS LOOSE,SG I -' i BW 1 19-40 € YELL ! S/LS I LOOSE, SG 1 >75/75 ! ! BW2 ! 40-64 ! VRY.PL. BR ! I LTAR=1.2 ! ! 10YR 713 LS LOOSE, SG I BC ; 64-75 WHITE & YEL. BR S 1 LOOSE,SG 1 I I I ! EWT HOLE 1 HORIZON: ! DEPTH COLOR TEXTURE STRUCTURI OWT I 11 I AP 10-3 1 S& P 1 LS i LOOSE,SG! IBW1 13-22 1YELL BRWN LS !LQOSE,SGI 1 BW2 122-50 VR.PALE BRN ,LS LOOSE,SG i ! ISW3 50-62 LT, YEL, 8RW I _ I I>60/>75 !LTAR=1.2 I I IC,C,D.10YR 5/6 ILS iLOOSE, SGI I I I I ! ! F.C,D.10YR 4/3 ILS I BC 162-72 BR.YELL I LS/S I LOOSE,SG1 1 EWT HOLE_ HORIZON: I DEPTH ! COLOR TEXTURE STRUCTURI OW_ T j COMMENTS 121 A 10-3 1 VPBR TO BR I, LS !LOOSE,SG! ! OAK & PINE 30YR. 1 € IBW1 13-9 1DK.YELL BRWN jLS !LOOSE,SGI I E 9-33 'YELL S ! LOOSE,SG!>75175 I. 8W2 133 64 I YELL _ ..._._ LTAR=1.2 1 I 1 110YR 7/6 ! LS ! LOOSE, SG! I ! IBC 64-75 , VRY.PL.BR ! SCL I LOOSE,SG ! WHITE & YEL. BR ILS I Sol SYSTEM; IN NN" tAA "?1A CULPEPPER ROAD Ji. LS;'SAN DTG LOAMY;-SAN bsu BsbILS 8 H'-- WT-@">48INCHES AL '.S YITE ESTIMATEb PERMEABILITY <1 0 MINANCH_ I OCEAN ISLE BEACH BRUNSWICK COUNTY, NC . ..... . Prepared for Stuart Cook AD& LAND MANAGEMENT GROUP, INC. . . . . . . . . . ... .. . ct I Scale: 1 in. = 100 ft. 12 18 96 HOUSTON and ASSOCIATES, P.A. Consulting Engineers SHALLOTTE, NORTH CAROI.INA 28459 Telephone (910) 754-5324 Facsimile (910) 754-2121 Ms. Linda Lewis, Environmental Engineer Division of Environmental Management North Carolina Department of Environment, Health, and Natural Resources 127 Cardinal Drive Extension Wilmington, North Carolina 28405 117 Pine Street Post Office Box 2927 Thursday, December 4, 1997 Subject: Parkers Pointe - Phase 1 Shallotte, North Carolina Resubmittal of Stormwater Plan for Approval Dear Ms. Lewis: DEC 0 8 1997 sr: 23 Enclosed are two copies each of revised plans. In response to your letter dated December 3, 1997 we offer the following revisions: 1. The soils report prepared by Land Management has been enclosed. 2. Both vegetated filters have been delineated, hatched, and labeled. 3. Runoff is proposed to enter infiltration basin #2 by sheet flow and from our conversation earlier today a flow spreader will not be required. We appreciate your attention in this matter. Should you have any comments or require any additional information, please do not hesitate to contact our office at your convenience. Sincerely, Scott W. Quaintance E.I.T. Houston and Associates, P.A. Enclosures pc: Mr. Stuart Cooke File; 96-0109 (Parkers Pointe) State of Forth Carolina Department of Environment and Natural Resources Wilmington Regional Office ,lames B. Hunt, Jr., Governor Wayne McDevitt, Secretary Division of Water Quality December 3, 1997 Mr. Scott Quaintance Houston and Associates PO Box 2927 Shallotte, NC 28459 Subject: REQUEST FOR ADDITIONAL INFORMATION Stonnwater Project No. SW8 970603 Parkers Pointe Bninswick County Dear Mr. Quaintance: The Wilmington Regional Office received previously requested information for the Stonnwater Management Pennit Application for Parkers Pointe on October 28, 1997. A preliminary review of that information has determined that the application is not complete. The following information is needed to continue the stormwater review: 1. The soil bore table on the plans only reports that "wetness" was encountered. This does not equate to the seasonal high water table elevation. Please provide the elevation of the SHWT, and the expected infiltration rate. 2. Please identify all of the vegetated filter area by shading or cross -hatching or some other manner. Please label this area with the words "Vegetated Filter". 3. Where is the flow spreader for Infiltration Basin ##2? None of the sections have it on them. 127 North Cardinal Dr., Wilmiu;ton, North Carolina 28405 Telephone 910-395-3900 FAX 910-350-2004 An Equal Opportunity Affirmative Action Employer 50% recycled/10% post -consumer paper Mr. Quaintance December 3, 1997 - Stormwater-Project N6. -SWS' 970603 = - - - - - - — -- - Please note that this request for additional information is in response to a preliminary review. The requested information should be received by this Office prior to January 5, 1998, or the application will be returned as incomplete. The return of a project will necessitate resubEnittal of all required items, including the application fee. If you have any questions concerning this matter please feel free to call me at (910) 395-3900 Sincerely, Ms. Linda Lewis Environmental Engineer RSSlarl: S:IWQSISTORMWATIADDINFO1970603.DEC cc: Linda Lewis Central Files r HOUSTON and ASSOCIATES, P.A. Consulting Engineers SHALLOTTE, NORTH CAROLINA 28459 Telephone (910) 54-2121 REC R Z ED Post Oftice Box 2117 Pine treel 927 Facsimile (910) 754-2121\�i -� V OCT 2 8 1997 n1day, October 24, 1997 BY: Ms. Linda Lewis, Environmental Engineer Division of Environmental Management North Carolina Department of Environment, Health, and Natural Resources 127 Cardinal Drive Extension Wilmington, North Carolina 28405 Subject: Parkers Pointe - Phase 1 Shallotte, North Carolina Resubmittal of Stormwater Plan for Approval Dear Ms. Lewis: In response to your letter dated September 24, 1997 and our meeting on October 9, 1997 we offer the following revisions: 1. A boring data table and boring locations have been added to Sheet 1. 2. Flow spreaders have been added along the sides of the sand chambers as discussed during our meeting. 3. The monitoring well requirement has been waived per our meeting. 4. Inlet protection is required at all catch basins and only the sediment chamber will be utilized during construction. 5. The 50 feet minimum separation between the flow spreader and MHW for the sand filter has been illustrated. A flow spreader has been added for the off -site bypass swale and Basin 2 overflow with excess of 50 feet to MHW. 6. A note has been added requiring sheet flow from the amenity area to Basin 2. The final site layout has not been determined as we discussed during our meeting. 7. Sidewalks have been added to the typical and the maximum of 4' by 20' was used in revising impervious area calculations. 8. The total square footage has been added tc the typical building footprints. The building layout is final, due to space limitations, as we discussed during our meeting. Ms. Lewis Page Two Parkers Pointe October 24, 1997 Stormwater Enclosed are two copies each of revised plans, calculations, building typical, and application. We appreciate your attention in this matter. Should you have any comments or require any additional information, please do not hesitate to contact our office at your convenience. Sincerely, Scott W. Quaintance E.I.T. Houston and Associates, P.A. Enclosures pc: Mr. Stuart Cooke File; 96-0109 (Parkers Pointe) State of North Carolina Department of Environment and Natural Resources Wilmington Regional Office James B. Hunt, Jr. Division of Water Quality Wayne McDevitt Governor Water Quality Section Secretary September 24, 1997 Mr. Scott Quaintance Houston and Associates PO Box 2927 Shallotte, NC 28459 Subject: REQUEST FOR ADDITIONAL INFORMATION Stormwater Project No. SW8 970603 Parkers Pointe, Phase I Brunswick County Dear Mr. Quaintance: The Wilmington Regional Office received previously requested information for the Stormwater Management Permit Application for. Parkers Pointe, Phase I on August 27, 1997. A preliminary review of that information has determined that the application is not complete. The following information is needed to continue the stormwater review: 1. Provide this Office with a copy of the soils report by Land Management. You cannot simply state that the 2' separation between SHWT and the bottom of the basins will be maintained. You must prove it. The soils report and the required elements for meeting the infiltration criteria must be based on an actual site visit, not gleaned from County soils maps. 2. Where is the flow spreader for the 2 sand filters? The BMP design acts as a natural overflow weir and distribution device, however, since you have not followed that design, another way to evenly distribute the flow over the surface area of the filter must be provided. The design requirements for a sediment chamber specifically require that the outlet to the sand chamber result in sheet flow, ie., even distribution over the sand filter area. I don't see how the asphalt weir you specify will act as a distribution device. 3. hr vida m�t ng we lei ocate� the pl nos -and detail 4. Provide alternate. means of sediment control during construction. Sand filters are only to be utilized in a stable drainage area, per BMP design guidance. 127 Cardinal Drive Extension, Wilmington, N.C. 28405-3845 • Telephone 910-395-3900 • Fax 910.350-2004 An Equal Opportunity Affirmative Action Employer Mr. Quaintance September 24, 1997 Stormwater Project No. SW8 970603 ---------------------------------- 5. Please specify the location and design of and the 50' width (measured to MHW) of the vegetated filters for the overflow from the sand filters and for the off -site bypass swale, per the detail enclosed. It appears that if Basin 2 ever overflowed, it would be picked up by this swale. Direct discharges (through pipes or swales) to SA waters are prohibited. Vegetated filter design can be found. in the BMP guidance. ,N 6. Provide proposed elevations for the facilites behind the clubhouse, (what is that?) and for the tennis courts. 7. Have you accounted for the sidewalks from the front door to the driveway? Please show on the plans and typicals. cox 8. Provide the total square footage for each building on the typical. Is the current layout of the C buildings in stone, or can they be swapped out as the market demands? I just need to make �K - sure that enough impervious area has been allotted to the buildings in case every one of them turns out to be one of the largest ones. Please specify the minimum number of each type of building to be built on the typical. Assume that the number of buildings leftover will be the largest footprint. Please note that this request for additional information is in response to a preliminary review. The requested information should be received by this Office prior to October 24, 1997, or the application will be returned as incomplete. The return of a project will necessitate resubmittal of all required items, including the application fee. If you have any questions concerning this matter please feel free to call me at (910) 395-3900. Sincerely, awl Ms. Linda Lewis Environmental Engineer RSS/arl: S:IWQSISTORMWATIADDINFO1970603.SEP cc: Linda Lewis Central Files 2 HOUSTON and ASSOCIATES, P.A. Consulting Engineers SHALLOTTE. NORTH CAROLINA 28459 Telephone (910) 754-6324 Facsimile (910) 754-2121 Ms. Linda Lewis, Environmental Engineer Division of Environmental Management North Carolina Department of Environment, Health, and Natural Resources 127 Cardinal Drive Extension Wilmington, North Carolina 28405 117 Pine Street Post Office Box 2927 Monday, August 25, 1997 AUG 2 7 1997 Subject: Parkers Pointe - Phase 1 I U Shallotte, North Carolina S r^RMAT Submittal of Stormwater Plan for Approval Dear Ms. Lewis: In response to your letter dated June 20, 1997 we offer the following revisions: 1. The proposed sand filter has been reconfigured and split into two systems in order to reduce the drainage areas to each of the sand filters to less than 2 acres. The sand filters have been designed on the minimum of 540 cubic feet per acre of drainage area, to drawdown within 24 hours, and the design is based on the Stormwater Best Management Practices, NCDEHNR November, 1995, Pages 26 through 31. The sand chambers of both systems are located underneath the proposed pool deck and clearance has been ailowed for access to the chambers for maintenance. 2. Overflows have been provided in the sand filter systems and will have to travel over 50 feet of vegetation prior to reaching the ICWW. 3. A 12 inch pipe, cut in half, has been added to the infiltration basin by connecting to the inlet pipes to allow for a distribution device. The pipe will be laid level and the top edges shall be at the same elevation of the bottom of the basin for even distribution. This method of distributing the flow is much more economical, allows for easier maintenance, and does not create the problems of backing water up into the streets as does the manifold type distribution devices. 4. Wetlands have been delineated on the plans with a 404 Line. 5. A note has been added to the plans requiring the basins to be recorded in access/drainage easements. 6. Flow lines have been added to the plans to demonstrate the off site flow routing. 7. The Mean High Water line has been delineated. 8. Unit footprints with dimensions have been enclosed and no additional decking is proposed. Ms. Lewis Page Two Parkers Pointe August 25, 1997 Stormwater 9. Dimensions have been added to the plan view of the infiltration basins and dimensions have been added to the cross sections of the sand filters due to amount of information on the plan views to avoid confusion. 10. A note has been added to the plans requiring all roof drainage to be directed towards or tied into the storm drainage system. 11. Property line dimensions have been added to the plans. 12. A walkway detail has been provided. 13. Parking spaces have been added with a typical dimension. 14. The storage elevation for Basin 1 has been revised on the cross section to reflect 26.5 MSL. 15. A discussion of the soils has been provided at the beginning of the infiltration basin calculations describing the existing soils and a soil map has been provided. 16. Mr. Cooke's title is land developer and a notarized letter from the land owner has been provided enabling him to apply for the permits. We appreciate your attention in this matter. Should you have any comments or require any additional information, please do not hesitate to contact our office at your convenience. Scott W. Quaintance E.I.T. Houston and Associates, P.A. Enclosures pc: Mr. Stuart Cooke File; 96-0109 (Parkers Pointe) 18 4' 0 0 29.04' r8 o 5.s2, I Garage {',� ! 1 I o I I Garage O Garage 4n ne• r, » nn• 0 2. TYPICAL UNIT DIMENSIONS PARKERS POINTE SCALE: 1 „-20• I C, � _.J� I( Li I S F a SS O O O f� u') r o� ui Garage � Garage o �. 4' ri o TYPICAL UNIT DIMENSIONS PARKERS POINTE SCALE: 1-20' -All MMU , Mu-, Olt Ot$ a Lo ........... ........ 4LJ ZT Lo RK, E?nG Lo L 1-0 3aR mu j., MLI Is :N. L.0 Z!,)c AX, Po Bae B To 1? 71P, z& - .41 F_ For WaEl--T P C Jfir oo IV. 15 Pram. Uo J. 0 A3a. ;�R �ti MhE ;Zz, Rr SL . .. >; ,.•.i:� .._ . � �:�_, .,s.rr�:.ec--• �' - - .•-^".."S:� �e. 'fix'` � A �.; �. :•Y� - � -/17= Brick Kre JCS r V, La• hE:� f LL�31 14a -. -, J.. Er Ma --vf WaB� . 71 O�STAL IN I Ocean -isle Beach 7' A j: BOA 7 ch 'A"EL F COAST r �-. ,, . �,.�-,� _';��- �, �� h`' t; ., 'tir ---STORMWA E R 13 E 0 c E A N I C AUG 2 71997 A T L J:��C U AJ eb V� �0 U pj PROJ # STORMWATER SUBMITTAL REQ S INFILTRATION/EXFILTRATION SYSTEMS Basins and Trench A. Site Plan 1. Development/Project Name 2. Engineer name and firm. ✓ 3. Legend �✓ 4. North Arrow ✓ 5. Location Map with direction, distance to named streets, NCSR numbers. 6. Scale t✓ 7. Date A 8. Revision number and date. 9. Original contours, proposed contours, of elevati n fmished floor elevations. X 10. Existing drainage, including off-site.(Ma of offsite area? XC 11. Property/Project boundary line dimension }C 12. Mean High Water Line, if necessary. 01 A 13. Drainage easements, pipe sizes. >( 14. Wetlands delineated, or a note on the plans that none 0X 15. Details of the road, parking, cul-de-sacs, includin sidewalks, urb and gutter.. Ll_�__ 16. Drainage area to each basin/trench delineated. — X 17. Level spreader mechanism within a basin. (Not needed for trench). X.,— 18 Vegetated filter detail if SA waters involved. This is NOT a connector ditch. 19. Dimensions of the road, parking cul-de-sacs, sidewalks, and curb and gutter. _ A 20. Unit footprint with dimensions and concrete wood deck areas noted. for apartments or condo development. 21. Basin section with: ✓ Bottom elevation Storage elevation ZC�. 5 Zt2` o� s�GLv s ZG• D Slopes:3:1 22. Trench section with: Bottom elevation Height and width of trench. Perforated pipe size Filter fabric ,,�� Fill material 0 23. Bypass structure detail. Must bypass prior to entering the pond/trench. (Not needed if the design storm is the 25 year, 24 hour event.) 24. Location of monitoring wells, if necessary. S2C. c�� arl-e oU41e.f ID s � d ch Sher /e5�1� %� sheP� /v�v S te✓ S 'pi -IP/2cr�e 2CCe,55 �v sf SA- J 2 hr, drowd cw i STORMWATER SUBMITTAL REQUIREMENTS U,TF TRATION/EXFILTRATION SYSTEMS Basins and Trench B. Calculations 1. Required volume, for SA, based on 1.5", for non -bypassing systems, base on 8", for non -SA, base on 1". >L X 2. Soils report including type of soil, depth to Seasonal High Water Table, expected infiitration rate. 3. Provided volume. 4. Drawdown time for the basin/trench. ✓ 5. Built -upon area draining to each basin/trench C. Supporting Documentation 1. A completed permit application. �— a. Is the person who signed the landowner or a Ieasee? Must be landowner. b. Section III completely filled in- can tailor this section for submittal type. _ C. Check signature per .1003 (e). Make sure title is provided. d. If agent signs, signatory authorization from owner. k� e. Attachment A provided for subdivided lots, future development, outparcels.. n✓ f. Mailing address & phone of applicant- no C/O. g. Verify water body classification. ✓ 2. A signed Operation and Maintenance Plan. I r Parkers Pointe Drainage Basin Data 10/21/97 BASIN I.D. UNITS IMPERVIOUS AREA ROADS/DRIVES SIDEWALK PATHS AMENITY TOTAL IMPERVIOUS TOTAL AREA WEIGHTED "C" * * AC AC A 0.000 0.053 0.000 0.000 0.000 0.05 0.95 0.24 B 0.029 0.046 0.000 0.004 0.000 0.08 0.23 0.46 C 0.000 0.139 0.000 0.000 0.005 0.14 0.26 0.61 D 0.000 0.000 0.000 0.000 0.238 0.24 0.50 0.56 E 0.124 0.067 0.006 0.000 0.000 0.20 0.31 0.67 F 0.064 0.053 0.000 0.012 0.000 0.13 0.32 0.50 G 0.064 0.073 0.004 0.010 0.100 0.25 0.45 0.62 H 0.054 0.040 0.000 0.001 0.000 0.10 0.14 0.70 1 0.059 0.064 0.000 0.000 0.039 0.16 0.34 0.56 J 0.105 0.156 0.011 0.000 0.000 0.27 0.43 0.67 K 0.067 0.060 0.007 0.000 0.000 0.13 0.23 0.64 L 0.000 0.022 0.000 0.000 0.000 0.02 0.05 0.52 L1 0.133 0.053 0.007 0.000 0.000 0.19 0.26 0.75 M 0.000 0.000 0.000 0.030 0.000 0.03 0.35 0.26 N 0.193 0.077 0.007 0.000 0.000 0.28 0.35 0.79 O 0.188 0.105 0.013 0.000 0.000 0.31 0.50 0.66 p 0.203 0.093 0.011 0.007 0.000 0.31 0.45 0.72 a 0.065 0.068 0.007 0.000 0.000 0.14 0.19 0.75 R 0.129 0.129 0.007 0.026 0.004 0.30 0.64 0.55 S 0.231 0.093 0.011 0.000 0.000 0.34 0.44 0.77 T 0.000 0.059 0.000 0.001 0.000 0.06 0.08 0.73 U 0.000 0.008 0.000 0.013 0.200 0.22 0.30 0.75 TOTAL 1.707 1.4588 0.092 0.1025 0.5863 3.9466 7.7803 Used most critical sidewalk area @ 20' by 4'= 80 SF per Unit Parkers Pointe Storm Drainage Flowrate Calculations 1 0/21 /97 Storm Drain I.D. Contributing Area Drainage Area Impervious Area Weighted "C" Length Slope *Tc i10 010 ac. ac. ft ft/ft min. in/hr cfs SD1A G,H,I,J,K,L,LI,R,T 2.62 1.48 0.62 730 0.022 2.72 7.0 11.47 SD1 M,N,O,P,Q,S 2.28 1.40 0.66 675 0.021 2.62 7.0 10.55 SD2 M,N,O,P,Q 1.84 1.07 0.63 475 0.025 1.85 7.0 8.18 SD3 N,O 0.85 0.58 0.71 290 0.021 1.37 7.0 4.26 SD4 N 0.35 0.28 0.79 230 0.026 1.05 7.0 1.95 SD5 M,Q 0.54 0.17 0.44 380 0.016 1.87 7.0 1.65 SD6 M 0.35 0.03 0.26 270 0.022 1.26 7.0 0.64 SD7 G,H,I,J,K,L,L1,R 2.54 1.43 0.62 597 0.010 3.15 7.0 11.04 SD8 G,H,I,J,K,L,L1 1.90 1.13 0.65 445 0.022 1.84 7.0 8.59 SD9 J,L 0.48 0.29 0.66 275 0.022 1.29 7.0 2.22 SDiO J 0.43 0.27 0.67 265 0.023 1.23 7.0 2.03 SD11 J 0.43 0.27 0.67 240 0.025 1.10 7.0 2.03 SD12 G,H,I,K 1.16 0.64 0.62 340 0.018 1.64 7.0 4.99 SD13 G,H 0.59 0.35 0.64 175 0.023 0.89 7.0 2.64 SD14 H 0.14 0.10 0.70 150 0.020 0.83 7.0 0.70 SD15 1 0.34 0.16 0.56 160 0.025 0.80 7.0 1.32 SD16 E 0.31 0.20 0.67 160 0.025 0.80 7.0 1.47 SD17 B,C 0.49 0.22 0.54 180 0.022 0.92 7.0 1.86 SD18 C 0.26 0.14 0.61 150 0.020 0.83 7.0 1.13 Parkers Pointe Storm Drainage Inverts 8/13/97 Storm Drain Length Inv. In Inv. Out Throat Elev. Culvert I.D. ! @ Inv. In Diam. in SD1 A 25 8.10 8.00 1 1 .40 18 SD1 5 5 I 9.50 8.00 12.40 18 SD2 200 14.30 ! 9.50 17.00 15 SD3 I 185 19.00 I 14.30 21.50 12 5D4 i 30 j 19.20 I 19.00 I 21.60 12 SD5 I 25 j 14.50 l 14.30 I 17.00 15 S06 I 1 i 0 I 14.80 14.50 16.50 12 SD7 ! 25 8.25 8.10 11.50 18 S08 j 152 I 14.00 I 8.25 17.10 15 SD9 j 25 i 14.70 I 14.50 17.20 12 SD10 15 14.90 I 14.70 i 17.70 12 SDI ? 25 15,10 I 14.90 i 17.70 12 SD12 I 105 1 14.75 ', 13.50 17.70 15 SD13 165 I 19.00 4 15.00 21.60 12 SD14 25 19.20 19.00 21.70 12 SD15 25 15.20 15.00 17.80 12 S016 I 25 ': 24.50 24.30 26.70 12 SD17 ' 55 26.50 24.30 29.00 12 SD18 30 26.80 i 26.50 29.00 12 I Parkers Pointe Cuivert Hydraulics 10/21/97 SD1A HEADWATER ELEVATION CALCULATIONS FLOWRATE _ 11.47 CFS MANNINGS n = 0" 012 DIA. FOR CULVERT PIPE = 18: INCHES DIA. FOR RISER = 0,; INCHES LENGTH OF CULVERT PIPE = 2 5FEET INV. IN ELEV. OF CULVERT = $.101 FEET INV. OUT ELEV. OF CULVERT = 80.0 FEET INLET COEF. FOR CULV. PIPE FLOW = 0.5. INLET COEF. FOR CULVERT INLET CONTROL 0. 6'' RISER WEIR ELEVATION = o oo:, FEET WEIR FLOW COEF. = 0' TAILWATER ELEVATION = 10.00 FEET VELOCITY= 6.49 FPS TAILWATER UNKNOWN = ZERO 0 NO RISER = ZERO (0) RISER DIA. SD1 HEADWATER ELEVATION CALCULATIONS FLOWRATE _ ','! ;10:55 CFS MANNINGS n DIA. FOR CULVERT PIPE = 181 INCHES DIA. FOR RISER = „0; INCHES LENGTH OF CULVERT PIPE = 551 FEET WV. IN ELEV. OF CULVERT = 95O! FEET .`8.0 INV. OUT ELEV. OF CULVERT = . 0 FEET INLET COEF. FOR CULV. PIPE FLOW = 0.5 INLET COEF. FOR CULVERT INLET CONTROL = 0 6 RISER WEIR ELEVATION = 000 FEET WEIR FLOW COEF. TAILWATER ELEVATION = 10.00 FEET VELOCITY= 1.89 FPS TAILWATER UNKNOWN = ZERO f01 NO RISER = ZERO (0) RISER DIA. HEADWATER ELEVATION ASSUMING INLET CONTROL HEAD = 1.82 HEADWATER ELEVATION = 10.67 HEADWATER ELEVATION ASSUMING PIPE FLOW HEAD = 1.24 HEADWATER ELEVATION = 1 1 .24 HEADWATER ELEVATION ASSUMING WEIR FLOW HEAD= #DIV/O! HEADWATER ELEVATION = #DIV/O! HEADWATER ELEVATION ASSUMING INLET CONTROL HEAD = 1.54 HEADWATER ELEVATION = 1 1 .79 HEADWATER ELEVATION ASSUMING PIPE FLOW HEAD = 1.30 HEADWATER ELEVATION = 11.30 HEADWATER ELEVATION ASSUMING WEIR FLOW HEAD = #DIV/O! HEADWATER ELEVATION = #DIV/01 Parkers Pointe Culvert Hydraulics 1 0/21 /97 SD2 HEADWATER ELEVATION CALCULATIONS FLOWRATE _ $.,:.1.8; CFS MANNINGS n DIA. FOR CULVERT PIPE= 15 INCHES DIA FOR RISER= 0! INCHES LENGTH OF CULVERT PIPE _ ;;20,01 FEET INV. IN ELEV. OF CULVERT = 14:30! FEET INV. OUT ELEV. OF CULVERT = 9.50; FEET INLET COEF. FOR CULV. PIPE FLOW INLET COEF. FOR CULVERT INLET CONTROL 0.61 RISER WEIR ELEVATION = 0 001 FEET WEIR FLOW COEF. TAILWATER ELEVATION = 1 1.79 FEET VELOCITY= 1.02 FPS TAILWATER_ UNKNOWN = ZEROS SD3 HEADWATER ELEVATION CALCULATIONS FLOWRATE = a.--- 4:-26 CFS MANNINGSn= „ 0!0:12' DIA FOR CULVERT PIPE _ 12. INCHES DIA FOR RISER INCHES LENGTH OF CULVERT PIPE = 1-8 5 FEET INV. IN ELEV. OF CULVERT = -'.19:00 FEET INV. OUT ELEV. OF CULVERT = 14.30 FEET INLET COEF. FOR CULV. PIPE FLOW = 0.5 INLET COEF. FOR CULVERT INLET CONTROL 06'. RISER WEIR ELEVATION = 0:00FEET WEIR FLOW COEF. = 0'! .. TAILWATER ELEVATION = 16.84 FEET VELOCITY= 5.42 FPS TAILWATER UNKNOWN = ZERO (0) NO RISER = ZERO (0) RISER DIA. HEADWATER ELEVATION ASSUMING INLET CONTROL HEAD = 1.92 HEADWATER ELEVATION = 16.84 HEADWATER ELEVATION ASSUMING PIPE FLOW HEAD = 3.77 HEADWATER ELEVATION = 15.56 HEADWATER ELEVATION ASSUMING WEIR FLOW HEAD = #DIV/O! HEADWATER ELEVATION- #DIV/O! HEADWATER ELEVATION ASSUMING INLET CONTROL HEAD = 1.27 HEADWATER ELEVATION = 20.77 HEADWATER ELEVATION ASSUMING PIPE FLOW HEAD = 2.94 HEADWATER ELEVATION = 19,78 HEADWATER ELEVATION ASSUMING WEIR FLOW HEAD = #DIV/O! HEADWATER ELEVATION = #DIV/O! Parkers Pointe Culvert Hydraulics 10/21/97 SD4 HEADWATER ELEVATION CALCULATIONS FLOWRATE = f.95 CFS MANNINGS n= 0.012 DIA. FOR CULVERT PIPE ; .1 2: INCHES DIA. FOR RISER T s Oj INCHES LENGTH OF CULVERT PIPE = 3`OI FEET INV, IN ELEV. OF CULVERT = 19 20j FEET INV. OUT ELEV. OF CULVERT = 19 D0 FEET INLET COEF. FOR CULV. PIPE FLOW INLET COEF. FOR CULVERT INLET CONTROL =-.'', RISER WEIR ELEVATION = 0 00', FEET WEIR FLOW COEF. TAILWATER ELEVATION = 20.77 FEET VELOCITY= 2.48 FPS TAILWATER UNKNOWN = ZEROS) NO RISER -= ZERO (0) RISER DIA. SD5 HEADWATER ELEVATION CALCULATIONS FLOWRATE = 1 165: CFS MANNINGS n = 0, 012` DIA. FOR CULVERT PIPE = 1 5! INCHES DIA. FOR RISER = 0: INCHES LENGTH OF CULVERT PIPE = 25. FEET INV. IN ELEV. OF CULVERT = 1-450 FEET INV. OUT ELEV. OF CULVERT 1.4.301 FEET INLET COEF. FOR CULV. PIPE FLOW = 0.51 INLET COEF. FOR CULVERT INLET CONTROL =. .-.0. 6. RISER WEIR ELEVATION =i 000. FEET WEIR FLOW COEF. = 0, TAILWATER ELEVATION = 16,84 FEET VELOCITY= 1''3.4: FPS TAILWAT R UNKNOWN = ZERO (0) NO RISER =_ ZERO (0) RISER DIA. HEADWATER ELEVATION ASSUMING INLET CONTROL HEAD = 0.27 HEADWATER ELEVATION = 19.97 HEADWATER ELEVATION ASSUMING PIPE FLOW HEAD = 0.22 HEADWATER ELEVATION = 20.99 HEADWATER ELEVATION ASSUMING WEIR FLOW HEAD = #DIV/01 HEADWATER ELEVATION = #DIV/O! HEADWATER ELEVATION ASSUMING INLET CONTROL HEAD = 0.08 HEADWATER ELEVATION = 15.20 HEADWATER ELEVATION ASSUMING PIPE FLOW HEAD = 0.06 HEADWATER ELEVATION 16.90 HEADWATER ELEVATION ASSUMING WEIR FLOW HEAD = #DIV/O! HEADWATER ELEVATION #DIV/DI Parkers Pointe Culvert Hydraulics 1 0/21 /97 SDB HEADWATER ELEVATION CALCULATIONS FLOWRATE = 0.64 CFS MANNINGS n ; 0r012 HEADWATER ELEVATION ASSUMING INLET CONTROL DIA. FOR CULVERT PIPE = 1 2 INCHES DIA FOR RISER = '0', INCHES HEAD = 0.03 LENGTH OF CULVERT PIPE - 1;1'0 FEET HEADWATER ELEVATION = 15.33 INV. IN ELEV. OF CULVERT = 14.80 FE1=T INV. OUT ELEV. OF CULVERT = 14 50: FEET INLET COEF. FOR CULV. PIPE FLOW = O'5. HEADWATER ELEVATION ASSUMING PIPE FLOW INLET COEF. FOR CULVERT INLET CONTROL = omri RISER WEIR ELEVATION= 000. FEET HEAD = 0.05 WEIR FLOW COEF. = 0 HEADWATER ELEVATION = 16.94 TAILWATER ELEVATION = 16.90 FEET VELOCITY= 0 8 i i FPS TAILWATER UNKNOWN W ZEROS HEADWATER ELEVATION ASSUMING WEIR FLOW NO RISER = ZERO (0) RISERDIA. HEAD = #DIV/O! HEADWATER ELEVATION = #DIV/O! SD7 HEADWATER ELEVATION CALCULATIONS FLOWRATE = 11 :04 CPS MANNINGS n = 0:012 HEADWATER ELEVATION ASSUMING INLET CONTROL DIA. FOR CULVERT PIPE = 18 INCHES DIA. FOR RISER = 0 INCHES HEAD = 1.68 LENGTH OF CULVERT PIPE _ :2 5 FEET HEADWATER ELEVATION = 10.68 INV. IN ELEV. OF CULVERT = 8.25 FEET INV. OUT ELEV. OF CULVERT = 8..10.. FEET INLET COEF. FOR CULV, PIPE FLOW = 0"5 HEADWATER ELEVATION ASSUMING PIPE FLOW INLET COEF. FOR CULVERT INLET CONTROL = :.; 0:6 RISER WEIR ELEVATION = 0.00 FEET HEAD = 1.14 WEIR FLOW COEF. = 0 HEADWATER ELEVATION = 12.38 TAILWATER ELEVATION = 11.24 FEET VELOCITY= ..:6125: FPS TAILWATER UNKNOWN = ZERO (0) HEADWATER ELEVATION ASSUMING WEIR FLOW NO RISER = ZERO (0) RISER DIA, HEAD = #DIV/O! HEADWATER ELEVATION = #DIV/O! Parkers Pointe Culvert Hydraulics 10/21/97 SD8 HEADWATER ELEVATION CALCULATIONS FLOWRATE= 8:59 CFS MANNINGS n = 0.012 DIA. FOR CULVERT PIPE = 1''5! INCHES DIA. FOR RISER = 0 INCHES LENGTH OF CULVERT PIPE = 152i FEET INV. IN ELEV. OF CULVERT 14:'00`: FEET INV. OUT ELEV. OF CULVERT= 8 25i FEET INLET COEF. FOR CULV. PIPE FLOW = 0 :5, . INLET COEF. FOR CULVERT INLET CONTROL 06' RIS1=RWEIR ELEVATION = 0 00; FEET WEIR FLOW COEF. = 0' TAILWATER ELEVATION = 12.38 FEET VELOCITY= 7 00 FPS TAILWATER UNKNOWN = ZERO(Q) NO RISER = ZERO (0) RISER DIA. SD9 HEADWATER ELEVATION CALCULATIONS FLOWRATE = ; 2::22 CFS MANNINGS n= 0. 01 2. DIA. FOR CULVERT PIPE = 1'.2 INCHES DIA. FOR RISER = 0. INCHES LENGTH OF CULVERT PIPE = 2 5 FEET INV. IN ELEV. OF CULVERT= 14.7a FEET INV. OUT ELEV. OF CULVERT = 14 50 FEET INLET COEF. FOR CULV. PIPE FLOW = 0.5 INLET COEF. FOR CULVERT INLET CONTROL_ 0. 6 RISER WEIR ELEVATION = .0.00 FEET WEIR FLOW COEF. = 0 TAILWATER ELEVATION = 16.74 FEET VELOCITY= 2.83 FPS TAILWATER UNKNOWN = ZERO (0) NO RISER = ZERO (0) RISER DIA, HEADWATER ELEVATION ASSUMING INLET CONTROL HEAD = 2.11 HEADWATER ELEVATION = 16.74 HEADWATER ELEVATION ASSUMING PIPE FLOW HEAD = 3.43 HEADWATER ELEVATION 15.81 HEADWATER ELEVATION ASSUMING WEIR FLOW HEAD = #DIV/O! HEADWATER ELEVATION = #DIV/O! HEADWATER ELEVATION ASSUMING INLET CONTROL HEAD = 0.34 HEADWATER ELEVATION = 15.54 HEADWATER ELEVATION ASSUMING PIPE FLOW HEAD = 0.27 HEADWATER ELEVATION = 17.01 HEADWATER ELEVATION ASSUMING WEIR FLOW HEAD = #DIV/01 HEADWATER ELEVATION = #DIV/O! Parkers Pointe Culvert Hydraulics 1 0/21 /97 SD10 HEADWATER ELEVATION CALCULATIONS FLOWRATE 2.03 CFS MANNINGS n = 0.012 DIA. FOR CULVERT PIPE = 12, INCHES DIA. FOR RISER = 0 INCHES LENGTH OF CULVERT PIPE = 1:51 FEET INV. IN ELEV. OF CULVERT = 14.901 FEET INV. OUT ELEV. OF CULVERT = 1.4.7,Q, FEET INLET COEF. FOR CULV. PIPE FLOW = 0.5 INLET COEF. FOR CULVERT INLET CONTROL = 0.6 RISER WEIR ELEVATION = 0.00 FEET WEIR FLOW COEF. = 0 TAILWATER ELEVATION = 17.01 FEET VELOCITY= 2.581; FPS TAILWATER UNKNOWN = ZERO (01 NO RISER = ZERO 0 RISER DIA. SD11 HEADWATER ELEVATION CALCULATIONS FLOWRATE = 2.03 CPS MANNINGS n = 0.012 DIA. FOR CULVERT PIPE = 1 2INCHES DIA FOR RISER = 0 INCHES LENGTH OF CULVERT PIPE _ '2 5 FEET INV. IN ELEV. OF CULVERT = 15.10; FEET INV. OUT ELEV. OF CULVERT = 14.90 FEET INLET COEF. FOR CULV. PIPE FLOW = 0.5 INLET COEF. FOR CULVERT INLET CONTROL = 0.6 RISER WEIR ELEVATION = 0.00 FEET WEIR FLOW COEF. = 0: TAILWATER ELEVATION = 17.20 FEET VELOCITY= 2.5 8' FPS TAILWATER UNKNOWN = ZERO (IG NO RISER ,= ZERO (0) RISER DIA. HEADWATER ELEVATION ASSUMING INLET CONTROL HEAD = 0.29 HEADWATER ELEVATION = 15.69 HEADWATER ELEVATION ASSUMING PIPE FLOW HEAD = 0.20 HEADWATER ELEVATION = 17.20 HEADWATER ELEVATION ASSUMING WEIR FLOW HEAD = #DIV/O! HEADWATER ELEVATION = #DIV/O! HEADWATER ELEVATION ASSUMING INLET CONTROL HEAD = 0,29 HEADWATER ELEVATION = 15.89 HEADWATER ELEVATION ASSUMING PIPE FLOW HEAD = 0,22 HEADWATER ELEVATION = 17.43 HEADWATER ELEVATION ASSUMING WEIR FLOW HEAD = #DIV/01 HEADWATER ELEVATION = #DIV/O! Parkers Pointe Culvert Hydraulics 1 0/21 /97 SD12 HEADWATER ELEVATION CALCULATIONS FLOWRATE = 4.99CFS MANNINGS n = 0:012 DIA. FOR CULVERT PIPE = i!5 INCHES DIA. FOR RISER = 0. INCHES LENGTH OF CULVERT PIPE = 1105 FEET INV. IN ELEV. OF CULVERT = 14 75' FEET INV. OUT ELEV. OF CULVERT = 13 50 FEET INLET COEF. FOR CULV. PIPE FLOW = 0.5 INLET COEF. FOR CULVERT INLET CONTROL 0.6 RISER WEIR ELEVATION = 0. '00 FEET WEIR FLOW COEF. 10 TAILWATER ELEVATION = 16.74 FEET VELOCITY= ;,:4`07 FPS TAILWATER UNKNOWN = ZERO (Ol NO RISER = ZERO (0) RISER_DIA. SD13 HEADWATER ELEVATION CALCULATIONS FLOWRATE - 2' 64 CFS MANNINGS n = l 0012` DIA. FOR CULVERT PIPE = 1 2' INCHES DIA. FOR RISER= 0:: INCHES LENGTH OF CULVERT PIPE = 165 FEET INV, IN ELEV. OF CULVERT = 1.9.00: FEET INV. OUT ELEV. OF CULVERT = 1.5.00 FEET INLET COEF. FOR CULV. PIPE FLOW = 0.5 INLET COEF. FOR CULVERT INLET CONTROL = 0.6 RISER WEIR ELEVATION = "'- 000' FEET WEIR FLOW COEF. _ 0' TAILWATER ELEVATION = 17.66 FEET VELOCITY= .3 36 FPS TAILWATER UNKNOWN W ZERQM NO RISER = ZERO (0) RISER DIA. HEADWATER ELEVATION ASSUMING INLET CONTROL HEAD = 0.71 HEADWATER ELEVATION = 16.09 HEADWATER ELEVATION ASSUMING PIPE FLOW HEAD = 0.92 HEADWATER ELEVATION = 17.66 HEADWATER ELEVATION ASSUMING WEIR FLOW HEAD = #DIV/01 HEADWATER ELEVATION = #DIV/O! HEADWATER ELEVATION ASSUMING INLET CONTROL HEAD = 0.49 HEADWATER ELEVATION = 19.99 HEADWATER ELEVATION ASSUMING PIPE FLOW HEAD = 1.04 HEADWATER ELEVATION = 18.69 HEADWATER ELEVATION ASSUMING WEIR FLOW HEAD = #DIV/O! HEADWATER ELEVATION = #DIV/O! Parkers Pointe Culvert Hydraulics 10/21/97 SD14 HEADWATER ELEVATION CALCULATIONS FLOWRATE = 0. T CPS MANNINGS n = .0.0;12. DIA. FOR CULVERT PIPE _ 1 2 [NCHES DIA. FOR RISER = 0;, INCHES LENGTH OF CULVERT PIPE = 2 5 FEET INV. IN ELEV. OF CULVERT = 19.20 FEET INV. OUT ELEV. OF CULVERT = 19`00 FEET INLET COEF. FOR CULV. PIPE FLOW 10.5' INLET COEF. FOR CULVERT INLET CONTROL Oi6' RISER WEIR ELEVATION = 0.00'° FEET WEIR FLOW COEF. _ ' 0` TAILWATER ELEVATION = 19.99 FEET VELOCITY= 0:89' FPS TAILWATER UNKNOWN = ZERgM NO RISER = ZERO u RISER DIA, SD15 HEADWATER ELEVATION CALCULATIONS FLOWRATE = 1' 3 2 CPS MANNINGS n = 0 '012 DIA. FOR CULVERT PIPE = 1 2 INCHES DIA. FOR RISER = 0 INCHES LENGTH OF CULVERT PIPE _ :2 5 FEET INV. IN ELEV. OF CULVERT = 15 20' FEET INV, OUT ELEV. OF CULVERT = 15.00, FEET INLET COEF. FOR CULV, PIPE FLOW = 0:'5 INLET COEF. FOR CULVERT INLET CONTROL - "' 0`6 RISER WEIR ELEVATION = 0.00 FEET WEIR FLOW COEF. = 0 TAILWATER ELEVATION = 17.66 FEET VELOCITY= ; 68 FPS TAILWAT R UNKNOWN = ZERO i0] NO RISER = ZERO &BISER DIA. HEADWATER ELEVATION ASSUMING INLET CONTROL HEAD = 0.03 HEADWATER ELEVATION = 19.73 HEADWATER ELEVATION ASSUMING PIPE FLOW HEAD = 0.03 HEADWATER ELEVATION = 20.01 HEADWATER ELEVATION ASSUMING WEIR FLOW HEAD = #DIV/O! HEADWATER ELEVATION = #DIV/O! HEADWATER ELEVATION ASSUMING INLET CONTROL HEAD= 0.12 HEADWATER ELEVATION = 15.82 HEADWATER ELEVATION ASSUMING PIPE FLOW HEAD= 0.10 HEADWATER ELEVATION = 17.75 HEADWATER ELEVATION ASSUMING WEIR FLOW HEAD = #DIV/O! HEADWATER ELEVATION = #DIV/O! markers Pointe Culvert Hydraulics 10121 /97 SD16 HEADWATER ELEVATION CALCULATIONS FLOWRATE = 1.47CFS MANNINGS n = 0 O 12' DIA. FOR CULVERT PIPE = 12 INCHES DIA. FOR RISER = O,j INCHES LENGTH OF CULVERT PIPE = 251 FEET INV. IN ELEV. OF CULVERT W 24 50r FEET INV. OUT ELEV. OF CULVERT= '''24.30` FEET INLET COEF. FOR CULV, PIPE FLOW = INLETCOEF. FOR CULVERT INLET CONTROL 0'r6 RISER WEIR ELEVATION = 0:00' FEET WEIR FLOW COEF. = 0 TAILWATER ELEVATION = 2 6.5 0 FEET VELOCITY= 1.87 FPS TAILWATER UNKNOWN = ZERO {O) NO RISER = ZERO, (0) RISER, DIA. SD17 HEADWATER ELEVATION CALCULATIONS FLOWRATE _ '1.86 CFS MANNINGS n = 0.012' DIA. FOR CULVERT PIPE = 12 INCHES DIA. FOR RISEN = 0. INCHES LENGTH OF CULVERT PIPE = 5 5 FEET INV. IN ELEV. OF CULVERT = 26:50', FEET INV. OUT ELEV, OF CULVERT = 24; 30 FEET INLET COEF. FOR CULV. PIPE FLOW = 05 INLET COEF. FOR CULVERT INLET CONTROL RISER WEIR ELEVATION = 0.00: FEET WEIR FLOW COEF. TAILWATER ELEVATION = 26.50 FEET VELOCITY= 2':37 FPS TAILWATER UNKNOWN = ZERO (0) NO RISER = ZERO 0 RISER DIA. HEADWATER ELEVATION ASSUMING INLET CONTROL HEAD = 0.15 HEADWATER ELEVATION = 25.15 HEADWATER ELEVATION ASSUMING PIPE FLOW HEAD= 0.12 HEADWATER ELEVATION = 26.62 HEADWATER ELEVATION ASSUMING WEIR FLOW HEAD = #DIV/O! HEADWATER ELEVATION = #DIV/O! HEADWATER ELEVATION ASSUMING INLET CONTROL HEAD = 0.24 HEADWATER ELEVATION = 27.24 HEADWATER ELEVATION ASSUMING PIPE FLOW HEAD = 0.26 HEADWATER ELEVATION = 26.76 HEADWATER ELEVATION ASSUMING WEIR FLOW HEAD= #DIV/O! HEADWATER ELEVATION = #DIV/O! Parkers Pointe Calvert Hydraulics 10121 /97 SD18 HEADWATER ELEVATION CALCULATIONS FLOWRATE = 1 .13 CFS MANNINGS n = 0:012' DIA. FOR CULVERT PIPE _ " 1`2. INCHES DIA FOR RISER 0'1 INCHES LENGTH OF CULVERT PIPE = ' 3 0' FEET INV. IN ELEV. OF CULVERT = 26.'S0 FEET INV. OUT ELEV. OF CULVERT = 26`;50,; FEET INLET COEF. FOR CULV. PIPE FLOW INLET COEF. FOR CULVERT INLET CONTROL?' 0!`6' RISER WEIR ELEVATION = 0 00 FEET WEIR FLOW COEF. _ 0; TAILWATER ELEVATION = 27.24 FEET VELOCITY= 1:44 FPS TAILWATER UNKNOWN = ZERO UO NO RISER = ZERO (0) RISER DIA- HEADWATER ELEVATION ASSUMING INLET CONTROL HEAD = 0.09 HEADWATER ELEVATION = 27.39 HEADWATER ELEVATION ASSUMING PIPE FLOW HEAD = 0.07 HEADWATER ELEVATION = 27.32 HEADWATER ELEVATION ASSUMING WEIR FLOW HEAD = #DIV/0! HEADWATER ELEVATION = #DIV/0! Telephone (910) 754-6324 Facsimile (910) 754-2121 HOUSTON and .ASSOCIATES, P.A. Consulting Engineers SHALLOTTE, NORTH CAROLINA 28459 Sand Filter Design 117 Pine Street Post Office Box 2927 The following pages illustrate the use of two (2) sand filters for the subject project located along the Intercoastal Waterway. The sand chamber of each of the sand filters is located underneath the proposed pool decking with a clearance of approximately four (4) feet between the top of the decking and the top of the sand for access. The .design criteria for the sand filters is based on the Stormwater Best Management Practices, NCDEHNR November 1995, pages 26 through 31. The following calculations show that each of the sand filters are based on the following design criteria: Sediment Chamber: 1. Volume = 540 CF per Acre of drainage area 2. At least 18 Inches deep 3. Surface area greater than 360 SF 4. Positive drainage to chamber by culvert 5. Outlet to sand chamber only 6. Outlet to sand chamber by sheet flow (Asphalt Weir) Sand Filter Chamber: 1. Volume = 540 CF per Acre of drainage area 2. At least 18 Inches of sand particles less than 2 mm ave. diam. 3. Surface area greater than 360 SF 4. Outlet sized for drawdown within 24 hrs, (we have used a 6 inch pipe cover with Filter Fabric and have illustrated under the given conditions that the sand chamber will drawdown in less than 24 hours) An asphalt overflow weir has been provided between the sand filters and on the outer edge of sand filter # 1. The overflow will travel through a 50 feet vegetative filter prior to reaching the ICWW. Parkers Pointe 1 0/21 /97 Sand Filter #1 Design Contributing Drainage Areas: BASIN IMPERVIOUS AREA TOTAL TOTAL WEIGHTED I.D. BUILDINGS ROADS/DRIVES SIDEWALK PATHS AMENITY IMPERVIOUS AREA "C" AC AC G 0.064 0.073 0.004 0.010 0.100 0.25 0.45 0.62 H 0.054 0.040 0.000 0.001 0.000 0.10 0.14 0.71 1 0.059 0.064 0.000 0.000 0.039 0.16 0.34 0.56 J 0.105 0.156 0.011 0.000 0.000 0.27 0.43 0.67 K 0.067 0.060 0.007 0.000 0.000 0.13 0.23 0.64 L 0.000 0.022 0.000 0.000 0.000 0.02 0.05 0.53 L 1 0.133 0.053 0.007 0.000 0.000 0.19 0.26 0.76 R 0.129 0.129 0.007 0.026 0.004 0.30 0.64 0.55 T 0.000 0.059 0.000 0.001 0.000 0.06 0.08 0.73 U 0.000 0.008 0.000 0.013 0.200 0.22 0.30 0.75 TOTAL 0.611 0.664 0.036 0.051 0.343 1.70 2.93 0.64 Parkers Pointe 10/21/97 SEDIMENT CHAMBER DESIGN #1: Design Criteria: Volume = 540 CF per acre of drainage area At least 18 Inches deep Minimum Surface Area = 360 SF Outlet to Sand Chamber to result in sheet flow Required Storage Volume: 1581 CF Provided Depth of Storage: .. 42, Feet Contour 8' msl: x. . 5,9'S SF Contour 9' msl: 1 00 SF Contour 10' msl: `a 1j4r75 SF Provided Storage Volume: 2047 CF SAND CHAMBER DESIGN #1: Design Criteria: Volume = 540 CF per acre of drainage area At least 18 Inches of sand particles less than 2 mm average diam. Minimum Surface Area = 360 SF Outlet sized such that sand chamber drains within 24 hours Required Storage Volume: 1 581 CF Provided Depth of Storage:2. Feet Contour 8' msl: :760 SF Contour 9' msl: 1 0 S7= Contour 10' msL1,5"50 SF Provided Storage Volume: 2293 CF Sand Filter Outlet Pipes/ Drawdown: Pipe Inlet Covered with Filter Fabric Contech Represenative recommends C-45NW for servicability reasons. Water Flow thru C-45NW at 1 Foot of Head = 120 GPM per SF Pipe Diam. :nq ,' , 6 inches Opening Area: 0.197 SF No. of Pipes: MEM, Flowrate during 24 Hrs: 4542.2 CF/Day "*The allowable flowrate thru the Pipe at a 1 Foot Head during a 24 Hr Period is Greater than the Required and Provided Design Storage of the Sand Filter Therefore, the System will Drawdown in Less than 24 Hours, Parker's Pointe 1 0/2 1 /97 Sand Filter #2 Design Contributing Drainage Areas: BASIN I.D. BUILDINGS IMPERVIOUS AREA ROADS/DRIVES SIDEWALK PATHS AMENITY TOTAL IMPERVIOUS TOTAL AREA WEIGHTED "C" AC AC M 0.000 0.000 0.000 0.030 0.000 0.03 0.35 0.26 N 0.193 0.077 0.007 0.000 0.000 0.28 0.35 0.79 0 0.188 0.105 0.013 0.000 0.000 0.31 0.50 0.66 P 0.203 0.093 0.011 0.007 0.000 0.31 0.45 0.72 Q 0.065 0.068 0.007 0.000 0.000 0.14 0.19 0.75 S 0.231 0.093 0.011 0.000 0.000 0.34 0.44 0.77 Total: 0.879 0.436 0.049 0.037 0.00 1.40 2.28 Parker's Pointe 1 0/21 /97 SEDIMENT CHAMBER DESIGN #2: Design Criteria: Volume = 540 CF per acre of drainage area At least 18 Inches deep Minimum Surface Area = 360 SF Outlet to Sand Chamber to result in sheet flow Required Storage Volume: 1233 CF Provided Depth of Storage: Feet 2 Contour 8' msl: Lg, " 3'6 Q SF Contour 9' msl: Contour 10 msl: k f 11045 �'' ��_„ �. SF Provided Storage Volume: 1 383 CF SAND FILTER CHAMBER DESIGN #2: Design Criteria: Volume = 540 CF per acre of drainage area At least 18 Inches of sand particles less than 2 mm average diam. Minimum Surface Area = 360 SF Outlet sized such that sand chamber drains within 24 hours Required Storage Volume: 1233 CF Provided Depth of Storage:,," Contour 8' msl:520 21, Feet SF Contour 9' msl: 8'5,5 SF Contour 10' msl: 2 0 T Provided Storage Volume: 1 743 CF Sand Filter Outlet Pipesl Drawdown: Pipe Inlet Covered with Filter Fabric Contech Represenative recommends C-45NW for servicabiiity reasons. Water Flow thru C-45NW at 1 Foot of Head = 120 GPM per SF Pipe Diam. "4 �' RQC6 Inches Opening Area: 0.197 SF No. of Pipes: r , Flowrate during 24 Hrs: 4542.2 CF/Day "The allowable flowrate thru the Pipe at a 1 Foot Head during a 24 Hr Period is Greater than the Required and Provided Design Storage of the Sand Filter _. Therefore_ the System will Drawdown in Less than 24 Hours. HOUSTON and ASSOCIATES, P.A. Consulting Engineers SHALLOTTE. NORTH CAROLINA 28459 Telephone (910) 754-6324 117 Pine Street Facsimile (910) 754-2121 Post Office Box 2927 Infiltration Basins The following pages calculate required runoff for design of the proposed infiltration basins based on storing the 25 year storm without discharge. The required rainfall associated with a 25 year storm is 8 Inches. The calculations show the drawdown of the 25 year storm based on the permeability provided from the soil survey of Brunswick County and the soils report prepared by G. Craig Turner of Land Management Group, Inc. Mr. Turner's report indicates the project lies on a high sandy bluff that is deep and well to excessively well drained. Auger borings indicate that the two (2) feet separation between the SHWT and the bottom of the infiltration basins will be maintained. Parkers Pointe Phase 1 Infiltration Basin Data Table Basin 1 Basin 2 Top of Storage Elevation (MSQ: 26.5 28 Bottom of Basin Elevation (MSl_): 24 27 24' Contour Area (SF): 1025 NA 25' Contour Area (SF): 1575 NA 26' Contour Area (SF): 2190 NA 27' Contour Area (SF): NA 1850 28' Contour Area (SF): NA 2400 Depth of Storage (FEET): 2.5 1 Drawdown Time (HRS): 27.00 25.20 Water Shed Classification: SA SA Rainfall Runoff (INCHES): 1.5 1.5 Minimum Required Storage (CF): _ 3,543 1,303 Provided Storage (CF): 3,986 2,126 Parkers Pointe Stormwater Calculations 1 0/21 /97 Infiltration Basin #1 - 25 Year, 24 Hour Storm Drainage Basin I.D.: B,C;E,F Drainage Area: 1 :1'2' Acres Impervious Area: Units:.: 0217; AC Roads/ Drives:0.30& AC Sidewalk 0006 AC Walk Paths. 0 0..1 & AC ;0':0051AC Amenity Total: 0.549 AC % Impervious : Rainfall: "Simple Method" Rv Volume from Runoff: Permeability of Soil: Depth of Storage: Top of Basin Elev. Bottom of Basin Elev. Contour 24' msl: Contour 25' msl: Contour 26' msl: Mean Infiltration Basin Area: Infiltration during 24 Hours: 49.02 % 8,Inches 0.49 15,975 CF Required Storage Volume = Volume From Runoff - Infiltration During 24 Hours Required Storage Volume = -1591 1 CF Provided Storage Volume = Average Surface Area X Depth of Storage Provided Storage Volume = 3986 CF Drawdown Calculations Average Surface Area: 1 594 SF Storage Provided: 3986 CF Permeability: 1 0 Inches/Hour "`Drawdown Time: 27.00 Hours "'Drawdown Time is from beginning of rainfall and assumes a full basin at the end of 24 hours. •* The soil survey of Brunswick County indicates that the soils present are Wando series consisting of excessively drained soils. Based on the SCS data ranges, the infiltration rate for Wando soils is 6.0 to 20.0 inches per hour. Therefore using a rate of 10.0 inches per hour will be conservative. The SCS data distinguishes the high water table to be 4 to 6 feet. Parkers Pointe Stormwater Calculations 1 0/21 /97 Infiltration Basin #1 - 25 Year, 1 Hour Storm Drainage Basin I.D Drainage Area: Impervious Area: % Impervious : Rainfall: "Simple Method" Rv Volume from Runoff: Permeability of Soil: Infiltration Basin Area: Infiltration during 1 Hour: B;C;D,E,F 1 .12 Acres 49.02 % `2.8 Inches 0.49 5591 CF 15:Inches/Hour 1594 SF 1993 CF Required Storage Volume = Volume From Runoff - Infiltration During 1 Hour Required Storage Volume = 3598 CF Provided Storage Volume = Average Surface Area X Depth of Storage Provided Storage Volume = 3986 CF „ The soil survey of Brunswick County indicates that the soils present are Wando series consisting of excessively drained soils. Based on the SCS data ranges, the infiltration rate for Wando soils is 6.0 to 20.0 inches per hour. Therefore using a rate of 15.0 inches per hour will be conservative during the first hour of rainfall. The SCS data distinguishes the high water table to be 4 to 6 feet. Minimum Storage Requirement: Water Classification: SA Rainfall: 1.5 Minimum Volume: 2995 CF Parkers Pointe Stormwater Calculations 5/28/97 Infiltration Basin #2 - 25 Year, 24 Hour Storm Drainage Basin I.D.: D Drainage Area: 0.50 Acres Impervious Area: Units: ''' £50" AC Roads/ Drives: A 'o. AC V Walk Paths: ,� 0� AC Amenity: ''� 0=23821 AC Total: 0.2382 AC % Impervious : Rainfall: "Simple Method" Rv Volume from Runoff: Permeability of Soil: Depth of Storage: Top of Basin Elev.: Bottom of Basin Elev: Contour 27' msl: Contour 28' msl: Infiltration Basin Area: Infiltration during 24 Hours: 47.88 % 8" Inches 0.48 6,948 CF .1'& Inches/Hour 1-:0' FT 270' 0.0425 AC 0.0551° • AC 2 126 SF 42,515 CF Required Storage Volume = Volume From Runoff - Infiltration During 24 Hours Required Storage Volume =-35,567 CF Provided Storage Volume = Average Surface Area X Depth of Storage Provided Storage Volume = 2,126 CF Drawdown Calculations Average Surface Area: Storage Provided: Permeability: ***Drawdown Time: 2,126 SF 2,126 CF 10 Inches/Hour 25.20 Hours ***Drawdown Time is from beginning of rainfall and assumes a full basin at the end of 24 hours. ** The soil survey of Brunswick County indicates that the soils present are Wando series consisting of excessively drained soils. Based on the SCS data ranges, the infiltration rate for Wando soils is 6.0 to 20.0 inches per hour. Therefore using a rate of 10.0 inches per hour will be conservative. The SCS data distinguishes the high water table to be 4 to 6 feet. Parkers Pointe Stormwater Calculations 5/28/97 Infiltration Basin #2 - 25 Year, 1 Hour Storm Drainage Basin I.D.: D Drainage Area: 0.50 Acres Impervious Area: Units. , ' 0:`AC Roads/ Drives E` OyAC Walk Paths" ,0 < AC Amenity x0 2382>AC Total: 0.2382 AC % Impervious: 47.88 % Rainfall - "Simple Inches "Simple Method" Rv 0.48 Volume from Runoff: 2432 CF Permeability of Soil: 1 5Inches/Hour Infiltration Basin Area: 2126 SF Infiltration during 1 Hour: 2657 CF Required Storage Volume = Volume From Runoff - Infiltration During 1 Hour Required Storage Volume = -225 CF Provided Storage Volume = Average Surface Area X Depth of Storage Provided Storage Volume = 2126 CF " The soil survey of Brunswick County indicates that the soils present are Wando series consisting of excessively drained soils. Based on the SCS data ranges, the infiltration rate for Wando soils is 6.0 to 20.0 inches per hour. Therefore using a rate of 15.0 inches per hour will be conservative during the first hour of rainfall. The SCS data distinguishes the high water table to be 4 to 6 feet. Minimum Storage Requirement: Water Classification: SA Rainfall: 1.5 Minimum Volume: 1303 CF Hydrologic and Hydraulic Calculations for T1 (Ono .C@ OCEAN ISLE BEACH BRUNSWICK COUNTY, NORTH CAROLINA Prepared By CONSULTING ENGINEERS ShaIlotte, North Carolina May 1997 Revised August 1997 STORMWATER E C E I V E AUG 2 71997 D PROJ #�706,o3 Parkers Pointe Phase 1 Stormwater Data Table Impervious Surface: Basin #1 Basin #2 Sand Filter#1 Sand Filter#2 Basin A Total Units (SF): 0.217 0.000 0.611 0.879 0.000 1.707 Roadway/ Drives (SF): 0.305 0.000 0.664 0.436 0.053 1.458 Walk Paths (SF): 0.016 0.000 0.051 0.037 0.000 0.104 Amenity (SF): 0.005 0.238 0.343 0.000 0.000 0.586 Total (SF): 0.543 0.238 1.669 1.352 0.053 3.855 Drainage Area (Ac): Total Project Area: % Impervious: 1.12 0.5 2.93 2.28 0.95 7.78 6.77 Acres 49.55 % (BUA/Drainage Area) 56.94 (BUA/ Project Area) Parkers Pointe Drainage Basin Data 5/22/97 BASIN I.D. UNITS IMPERVIOUS AREA ROADS/DRIVES PATHS AMENITY TOTAL IMPERVIOUS TOTAL AREA WEIGHTED "C" AC AC A 0.000 0.053 0.000 0.000 0.05 0.95 0.24 B 0.029 0.046 0.004 0.000 0.08 0.23 0.46 C 0.000 0.139 0.000 0.005 0.14 0.26 0.61 0 0.000 0.000 0.000 0,238 0.24 0.50 0.56 E 0.124 0.067 0.000 0.000 0.19 0.31 0.66 F 0.064 0.053 0.012 0.000 0.13 0.32 0.50 G 0.064 0.073 0.010 0.100 0,25 0.45 0.61 H 0.054 0.040 0.001 0.000 0.10 0.14 0.70 1 0.059 0.064 0.000 0.039 0.16 0.34 0.56 J 0.105 0,156 0.000 0.000 0.26 0.43 0.65 K 0.067 0.060 0.000 0.000 0.13 0.23 0.62 L 0.000 0.022 0.000 0.000 0.02 0.05 0.52 L1 0.133 0.053 0.000 0.000 0.19 0.26 0.73 M 0.000 0.000 0.030 0.000 0,03 0.35 0.26 N 0.193 0.077 0.000 0.000 0,27 0.35 0.78 O 0.188 0.105 0,000 0.000 0.29 0.50 0.64 P 0.203 0.093 0.007 0.000 0.30 0.45 0.70 O 0.065 0.068 0.000 0.000 0,13 0.19 0.72 R 0.129 0.129 0.026 0.004 0.29 0.64 0.54 S 0.231 0.093 0.000 0.000 0.32 0.44 0.75 T 0.000 0.059 0,001 0.000 0.06 0,08 0,73 U 0.000 0.008 0.013 0.200 0.22 0.30 0.75 TOTAL 1.7072 1.4588 0.1025 0.5863 3.8548 7.7803 Parkers Pointe Storm Drainage Flowrate Calculations 811 3/97 Storm Drain I.D. Contributing Area Drainage Area Impervious Area Weighted °C" Length Slope *Tc i10 Q10 ac. ac. ft ftlft min. inlhr cfs SMA G,H,I,J,K,L,LI,R,T 2.62 1.45 0.61 730 0.022 2.72 7.0 11.27 SD1 M,N,O,P,Q,S 2.28 1.35 0.64 675 0.021 2.62 7.0 10.29 SD2 M,N,O,P,Q 1.84 1.03 0.62 475 0.025 1.85 7.0 7.97 SD3 N,O 0.85 0.56 0.69 290 0.021 1.37 7.0 4.15 SD4 N 0.35 0.27 0.78 230 0.026 1.05 7.0 1.91 SD5 M,Q 0.54 0.16 0.43 380 0.016 1.87 7.0 1.61 SD6 M 0.35 0.03 0.26 270 0.022 1.26 7.0 0.64 SD7 G,H,I,J,K,L,L1,R 2.54 1.39 0.61 597 0.010 3.15 7.0 10.84 SD8 G,H,I,J,K,L,L1 1.90 1.10 0.63 445 0.022 1.84 7.0 8.44 SD9 J,L 0.48 0.28 0.64 275 0.022 1,29 7.0 2.16 SD10 J 0.43 0.26 0.65 265 0.023 1.23 7.0 1.97 SD11 J 0.43 0.26 0.65 240 0.025 1.10 7.0 1.97 SD12 G,H,I,K 1.16 0.63 0.61 340 0.018 1.64 7.0 4.93 SD13 G,H 0.59 0.34 0.63 175 0.023 0.89 7.0 2.62 SD14 H 0.14 0.10 0.70 150 0.020 0.83 7.0 0.70 SD15 1 0.34 0.16 0.56 160 0.025 0.80 7.0 1.32 SD16 E 0.31 0.19 0.66 160 0.025 0.80 7.0 1.44 SD17 B,C 0.49 0.22 0.54 180 0.022 0.92 7.0 1.86 SD18 C 0.26 0.14 0.61 150 0.020 0.83 7.0 1.13 Parkers Pointe Storm Drainage Inverts 811 3197 Storm Drain I Length I Inv. In I Inv. out I Throat Elev. I Culvert I.D. I I I 0 Inv. In I Diiam. in SD_1 A 25 8.10 I 8.00 I 11.40 18 _ _� SD1 I 55 9.50 I 8.00 I 12.40 I 18 SD2 200 14.30 9.50 17.00 15 SD3 I 185 19.00 I 14.30 I 21.50 I_ 12 _ SD4 30 119.20 I 19.00 I 21.60 I 12 SD5 i 25 I 14. 5 0-1 14.30 I 17.00 I 15 SD6 I 110 I 14.80 14.50 I 16.50 12 SD7 I 25 I 8.25 I 8.10 I 1 1 .50 I 18 SD8 I 152 14.00 I 8.25 I 17.10 I 15 SD9 I 25 I 14.70 I 14.50 I 17.20 I 12 SDIO I 15 I 14.90 I 14.70 I 17.70 I 12 SDI I 25 15.10 I 14.90 17.70 I 12 SD12 I 105 I 14.75 I 13.50 I 17.70 I 15 SD13 j 165 19.00 I 15.00 I 21.60 12 SD14 I 25 I 19.20 I 19.00 I 21.70 12 SD15 I 25 I 15.20 I 15.00 I 17.80 I 12 SD16 25 I 24.50 I 24.30 I 26.70 i 12 SD17 55 I 26.50 I 24.30 I 29.00 j 12 SD18 I 30 I 26.80 I 26.50 I 29.00 I 12 I I l I I Parkers Pointe Culvert Hydraulics 8/13/97 SD1 A HEADWATER ELEVATION CALCULATIONS FLOWRATE = 1' 1 .2.7` CF S MANNINGS n = 0.012' DIA. FOR CULVERT PIPE _ 18 INCHES DIA. FOR RISER = ' '0`1, INCHES LENGTH OF CULVERT PIPE = =2 5' FEET INV. IN ELEV. OF CULVERT = `'%8.A O FEET INV. OUT ELEV. OF CULVEFIT = *'-8:00�: FEET INLET COEF. FOR CULV. PIPE FLOW INLET COEF. FOR CULVERT INLET CONTROL =. <:; ; ,,,,,0 6°: RISER WEIR ELEVATION = 0: 00 FEET WEIR FLOW COEF. TAILWATER ELEVATION = 10.00 FEET VELOCITY= 6.38 FPS TAILWATER UNKNOWN = ZERO (0) SD1 HEADWATER ELEVATION CALCULATIONS FLOWRATE ' 1`0:29! CFS MANNINGS n = 0.012° DIA. FOR CULVERT PIPE = 1 8! INCHES DIA. FOR RISER = 0, INCHES LENGTH OF CULVERT PIPE _ 5 5, FEET INV. IN ELEV. OF CULVERT = 9.50, FEET INV. OUT ELEV. OF CULVERT = 8.00� FEET INLET COEF. FOR CULV. PIPE FLOW = 0.5. INLET COEF. FOR CULVERT INLET CONTROL = . 0.6; RISER WEIR ELEVATION = 0.00� FEET WEIR FLOW COEF. = 0 TAILWATER ELEVATION = 10.00 FEET VELOCITY= 1.84 FPS TAILWATER UNKNOWN = ggRO TOl HEADWATER ELEVATION ASSUMING INLET CONTROL HEAD = 1.75 HEADWATER ELEVATION = 10.60 HEADWATER ELEVATION ASSUMING PIPE FLOW HEAD= 1.19 HEADWATER ELEVATION = 11.19 HEADWATER ELEVATION ASSUMING WEIR FLOW HEAD = #DIV/O! HEADWATER ELEVATION = #DIV/O! HEADWATER ELEVATION ASSUMING INLET CONTROL HEAD = 1.46 HEADWATER ELEVATION = 11.71 HEADWATER ELEVATION ASSUMING PIPE FLOW HEAD = 1.24 HEADWATER ELEVATION = 11.24 HEADWATER ELEVATION ASSUMING WEIR FLOW HEAD = #DIV/O! HEADWATER ELEVATION = #DIV/O! Parkers Pointe Culvert Hydraulics 8/ 1 3/97 SD2 HEADWATER ELEVATION CALCULATIONS FLOWRATE = 7.97 CFS MANNINGS n = 0'.012 DIA, FOR CULVERT PIPE = 1 5'L INCHES DIA. FOR RISER = 0' INCHES LENGTH OF CULVERT PIPE _ `200, FEET INV. IN ELEV. OF CULVERT = 14:30� FEET INV, OUT ELEV. OF CULVERT= ?` ,:,9:50; FEET INLET COEF. FOR CULV. PIPE FLOW = ;:; 0.5 INLET COEF. FOR CULVERT INLET CONTROL =. ;,' 0-6 RISER WEIR ELEVATION = 0.00! FEET WEIR FLOW COEF. _ TAILWATER ELEVATION = 1 1 .71 FEET VELOCITY= 0.99 FPS TAILWATER UNKNOWN =ZERO (0) SD3 HEADWATER ELEVATION CALCULATIONS FLOWRATE = ` 4A 6i CFS MANNINGS n = 0.012' DIA. FOR CULVERT PIPE _ „ 1 Z INCHES DIA. FOR RISER = 0! INCHES LENGTH OF CULVERT PIPE - 18 Sr FEET INV, IN ELEV. OF CULVERT = 19.00 FEET INV. OUT ELEV. OF CULVERT = 14.30 FEET INLET COEF. FOR CULV. PIPE FLOW = 0.5. INLET COEF. FOR CULVERT INLET CONTROL = 0. 6; RISER WEIR ELEVATION 000FEET WEIR FLOW COEF. = 0 TAILWATER ELEVATION = 16.74 FEET VELOCITY= TAILWATgR UNKNOWN = ZERO (0) 5.28 FPS HEADWATER ELEVATION ASSUMING INLET CONTROL HEAD = 1.82 HEADWATER ELEVATION = 16.74 HEADWATER ELEVATION ASSUMING PIPE FLOW HEAD = 3.58 HEADWATER ELEVATION = 15.29 HEADWATER ELEVATION ASSUMING WEIR FLOW HEAD = #DIV/01 HEADWATER ELEVATION = #DIV/O! HEADWATER ELEVATION ASSUMING INLET CONTROL HEAD = 1.20 HEADWATER ELEVATION = 20.70 HEADWATER ELEVATION ASSUMING PIPE FLOW HEAD = 2.79 HEADWATER ELEVATION = 19.53 HEADWATER ELEVATION ASSUMING WEIR FLOW HEAD = #DIV/O! HEADWATER ELEVATION = #DIV/01 Parkers Pointe Culvert Hydraulics 8/13/97 SD4 HEADWATER ELEVATION CALCULATIONS FLOWRATE = 1.91, CPS MANNINGS n = 0.012' DIA, FOR CULVERT PIPE = 12 INCHES DIA FOR RISER = 0 INCHES LENGTH OF CULVERT PIPE = o-; 3 0� FEET INV. W ELEV. OF CULVERT = 1.9.20 FEET INV. OUT ELEV. OF CULVERT = '19. o 6i FEET INLET COEF. FOR CULV. PIPE FLOW = 0 "s INLET COEF. FOR CULVERT INLET CONTROL � Or.6 RISER WEIR ELEVATION = 0.0O� FEET WEIR FLOW COEF. = ry 0 TAILWATER ELEVATION = 20.70 FEET VELOCITY= 2.43; FPS TAILWATER UNKNOWN =ZERO (0) SD5 HEADWATER ELEVATION CALCULATIONS FLOWRATE = 1 .61' CP5 MANNINGS n = 0.012- DIA. FOR CULVERT PIPE = 1 5 INCHES DIA. FOR RISER = W INCHES LENGTH OF CULVERT PIPE = 2 5€ FEET INV. IN ELEV. OF CULVERT = 14.50E FEET INV. OUT ELEV. OF CULVERT 14.30 FEET INLET COEF. FOR CULV. PIPE FLOW = 0.'5 INLET COEF. FOR CULVERT INLET CONTROL = O:6' RISER WEIR ELEVATION = =O.00V FEET WEIR FLOW COEF. TAILWATER ELEVATION = 16.74 FEET VELOCITY= 1 .31' FPS TAILWATER UNKNOWN = ZERO (0) HEADWATER ELEVATION ASSUMING INLET CONTROL HEAD = 0.26 HEADWATER ELEVATION = 19.96 HEADWATER ELEVATION ASSUMING PIPE FLOW HEAD = 0.21 HEADWATER ELEVATION = 20.92 HEADWATER ELEVATION ASSUMING WEIR FLOW HEAD = #DIV/O! HEADWATER ELEVATION = #DIV/O! HEADWATER ELEVATION ASSUMING INLET CONTROL HEAD = 0.07 HEADWATER ELEVATION = 15.20 HEADWATER ELEVATION ASSUMING PIPE FLOW HEAD = 0.05 HEADWATER ELEVATION = 16.80 HEADWATER ELEVATION ASSUMING WEIR FLOW HEAD = #DIV/O! HEADWATER ELEVATION = #DIV/O! Parkers Pointe Culvert Hydraulics 8/13/97 SD6 HEADWATER ELEVATION CALCULATIONS FLOWRATE = 0:64: CPS MANNINGS n = 0.0121. DIA. FOR CULVERT PIPE = 1 2' INCHES DIA. FOR RISER = " 0 INCHES LENGTH OF CULVERT PIPE _ 1' 1:0i FEET INV. IN ELEV. OF CULVERT 4.80 FEET INV. OUT ELEV. OF CULVERT = 14.50€ FEET INLET COEF. FOR CULV. PIPE FLOW = 0.5{ INLET COEF. FOR CULVERT INLET CONTROL =`r ' 0.6 RISER WEIR ELEVATION = F ' ' O.'00 FEET WEIR FLOW COEF. _ 7 0§ TAILWATER ELEVATION = 16.80 FEET VELOCITY= TAILWATER UNKNOWN = ZERO (0 0:81. FPS SD7 HEADWATER ELEVATION CALCULATIONS FLOWRATE = 10.84 CFS MANNINGS n = .0.0.12. DIA. FOR CULVERT PIPE = 18 INCHES DIA. FOR RISER = 0,. INCHES LENGTH OF CULVERT PIPE = 2 5' FEET INV. IN ELEV. OF CULVERT = 8.25, FEET INV. OUT ELEV. OF CULVERT = 8.10' FEET INLET COEF. FOR CULV. PIPE FLOW = 0.5 INLET COEF. FOR CULVERT INLET CONTROL = ' 0.6 RISER WEIR ELEVATION = 0.00, FEET WEIR FLOW COEF. _ .0 € TAILWATER ELEVATION = 1 1 .19 FEET VELOCITY= 6113', FPS TAILWATER UNKNOWN = ZERO(0) NO RISER = ZERO (0) RISER DIA, HEADWATER ELEVATION ASSUMING INLET CONTROL HEAD = 0.03 HEADWATER ELEVATION = 15.33 HEADWATER ELEVATION ASSUMING PIPE FLOW HEAD = 0.05 HEADWATER ELEVATION = 16.84 HEADWATER ELEVATION ASSUMING WEIR FLOW HEAD = #DIV/0! HEADWATER ELEVATION = #DIV/0! HEADWATER ELEVATION ASSUMING INLET CONTROL HEAD = 1.62 HEADWATER ELEVATION = 10.62 HEADWATER ELEVATION ASSUMING PIPE FLOW HEAD= 1.10 HEADWATER ELEVATION = 12.30 HEADWATER ELEVATION ASSUMING WEIR FLOW HEAD = #DIV/0! HEADWATER ELEVATION = #DIV/0! Parkers Pointe Culvert Hydraulics 8113/97 SD8 HEADWATER ELEVATION CALCULATIONS FLOW RATE MANNINGS n DIA. FOR CULVERT PIPE _ "" 1''5€ INCHES DIA. FOR RISER = 01 INCHES LENGTH OF CULVERT PIPE = 15 2 FEET INV. IN ELEV. OF CULVERT = `:. '=1'A,00! FEET INV. OUT ELEV. OF CULVERT = ; 8.25€ FEET INLET COEF. FOR CULV. PIPE FLOW INLET COEF. FOR CULVERT INLET CONTROL °._. 0;.�6� RISER WEIR ELEVATION = 0.00€ FEET WEIR FLOW COEF. TAILWATER ELEVATION = 12.30 FEET VELOCITY= 6 88 FPS TAILWATER UNKNOWN = ZERO (0) SD9 HEADWATER ELEVATION CALCULATIONS FLOWRATE 2.1�6'CPS MANNINGS n 0:012 DIA. FOR CULVERT PIPE = k 1 2� INCHES DIA. FOR RISER = 0.' INCHES LENGTH OF CULVERT PIPE _ `:,; .2 5; FEET INV. IN ELEV. OF CULVERT = 14.70 FEET INV. OUT ELEV. OF CULVERT = "1:4.50 FEET INLET COEF. FOR CULV. PIPE FLOW = 0.5� INLET COEF. FOR CULVERT INLET CONTROL = 0.6' RISER WEIR ELEVATION = 0.00 FEET WEIR FLOW COEF. _ 0' TAILWATER ELEVATION = 16.67 FEET VELOCITY= 2..751 FPS TAILWATgR Ut4KNOWN= •lI1`�gC : • f HEADWATER ELEVATION ASSUMING INLET CONTROL HEAD = 2.04 HEADWATER ELEVATION = 16.67 HEADWATER ELEVATION ASSUMING PIPE FLOW HEAD = 3.31 HEADWATER ELEVATION = 15.61 HEADWATER ELEVATION ASSUMING WEIR FLOW HEAD = #DIV/O! HEADWATER ELEVATION #DIV/O! HEADWATER ELEVATION ASSUMING INLET CONTROL HEAD = 0.33 HEADWATER ELEVATION = 1 5.53 HEADWATER ELEVATION ASSUMING PIPE FLOW HEAD = 0.25 HEADWATER ELEVATION = 16.92 HEADWATER ELEVATION ASSUMING WEIR FLOW HEAD = #DIV/O! HEADWATER ELEVATION = #DIV/O! Parkers Pointe Culvert Hydraulics 8/13/97 SDI HEADWATER ELEVATION CALCULATIONS FLOWRATE = :1.97' CFS MANNINGS n = „0.012: DIA. FOR CULVERT PIPE = 1 2, INCHES DIA. FOR RISER = 0' INCHES LENGTH OF CULVERT PIPE = 1,5; FEET INV. IN ELEV. OF CULVERT = 4':90 FEET INV. OUT ELEV. OF CULVERT= .",14.70 FEET INLET COEF. FOR CULV. PIPE FLOW = 0.5 INLET COEF. FOR CULVERT INLET CONTROL RISER WEIR ELEVATION = 0.00] FEET WEIR FLOW COEF. TAILWATER ELEVATION = 16.92 FEET VELOCITY= 2.61 FPS TAILWATER UNKNOWN = ZERO (0.) NO RISER = ZERO (0) RISER DIA. SDI HEADWATER ELEVATION CALCULATIONS FLOWRATE = 1.,97' CFS MANNINGS n= 0.012' DIA. FOR CULVERT PIPE = 1'2; INCHES DIA. FOR RISER = 0 INCHES LENGTH OF CULVERT PIPE = 2 & FEET INV. IN ELEV. OF CULVERT = 15.10; FEET INV. OUT ELEV. OF CULVERT = 14.90 FEET INLET COEF, FOR CULV. PIPE FLOW = 0.5 INLET COEF. FOR CULVERT INLET CONTROL = 0: 6 RISER WEIR ELEVATION = 0.00: FEET WEIR FLOW COEF. _:.:.,��0� TAILWATER ELEVATION = 17.11 FEET VELOCITY= -2.'5"1�! FPS TAILWATER UNKNOWN=ZERO (0) HEADWATER ELEVATION ASSUMING INLET CONTROL HEAD = 0.27 HEADWATER ELEVATION = 15.67 HEAD = 0.19 HEADWATER ELEVATION = 1 7.1 1 HEADWATER ELEVATION ASSUMING WEIR FLOW HEAD = #DIV/0! HEADWATER ELEVATION = #DIV/0! HEADWATER ELEVATION ASSUMING INLET CONTROL HEAD = 0.27 HEADWATER ELEVATION = 15.87 HEADWATER ELEVATION ASSUMING PIPE FLOW HEAD = 0.21 HEADWATER ELEVATION = 17.32 HEADWATER ELEVATION ASSUMING WEIR FLOW HEAD = #DIV/01 HEADWATER ELEVATION = #DIV/0! Parkers Pointe Culvert Hydraulics 8/13/97 SD12 HEADWATER ELEVATION CALCULATIONS FLOWRATE _ 4.93` CFS MANNINGS n = 0'.012' DIA. FOR CULVERT PIPE _ .1.5' INCHES DIA FOR RISER = 01 INCHES LENGTH OF CULVERT PI PE = -'' ' `' `A=1'0 5; FEET INV. IN ELEV. OF CULVERT = 14 75I FEET INV. OUT ELEV. OF CULVERT = 13 50( FEET INLET COEF. FOR CULV. PIPE FLOW INLET COEF. FOR CULVERT INLET CONTROL = 0.6 RISER WEIR ELEVATION = ,V0 0 FEET WEIR FLOW COEF. _ �_...o.mma< TAILWATER ELEVATION = 16.67 FEET VELOCITY= TAILWATER UNKNOWN = ZERO (0)(0) O RISER = ZERO (0) RISER DIA. SD13 HEADWATER ELEVATION CALCULATIONS FLOWRATE _ -2:62 CFS MANNINGS n = 0.012! DIA. FOR CULVERT PIPE = -`:1 2' INCHES DIA. FOR RISER = WINCHES LENGTH OF CULVERT PIPE = 1 651 FEET INV. IN ELEV. OF CULVERT = 19..'00t FEET INV. OUT ELEV. OF CULVERT = ". 15,00` FEET INLET COEF. FOR CULV. PIPE FLOW INLET COEF. FOR CULVERT INLET CONTROL =. e.0.64 RISER WEIR ELEVATION ;` ''"000` FEET WEIR FLOW COEF TAILWATER ELEVATION = 17.56 FEET VELOCITY= 3s34' FF5 TAILWATER UNKNOWN = ZER0 (0) NO RISER = ZERO LOLRISER DIA. HEADWATER ELEVATION ASSUMING INLET CONTROL HEAD = 0.70 HEADWATER ELEVATION = 16.07 HEADWATER ELEVATION ASSUMING PIPE FLOW HEAD = 0.90 HEADWATER ELEVATION = 17.56 HEADWATER ELEVATION ASSUMING WEIR FLOW HEAD = #DIV/O! HEADWATER ELEVATION = #DIV/0! HEADWATER ELEVATION ASSUMING INLET CONTROL HEAD = 0.48 HEADWATER ELEVATION = 19.98 HEADWATER ELEVATION ASSUMING PIPE FLOW HEAD = 1.02 HEADWATER ELEVATION = 18.58 HEADWATER ELEVATION ASSUMING WEIR FLOW HEAD = #DIV/01 HEADWATER ELEVATION = #DIV/O! Parkers Pointe Culvert Hydraulics 8/13/97 SD14 HEADWATER ELEVATION CALCULATIONS FLOWRATE = 0: 7CFS MANNINGS n = 0.012" DIA. FOR CULVERT PIPE = 1 2' INCHES DIA. FOR RISER = 0 INCHES LENGTH OF CULVERT PIPE = 2 51, FEET INV. IN ELEV. OF CULVERT = :t•1'.920! FEET INV. OUT ELEV. OF CULVERT = .19. D0 FEET INLET COEF. FOR CULV. PIPE FLOW = 0.5€ INLET COEF. FOR CULVERT INLET CONTROL -. " `0:61 RISER WEIR ELEVATION = .=>0:00 1 FEET WEIR FLOW COEF. TAILWATER ELEVATION = 19.98 FEET VELOCITY= 0° 89� FPS TAILWATER UNKNOWN = ZERO-(Q) SD15 HEADWATER ELEVATION CALCULATIONS FLOWRATE MANNINGS n = 0.012. DIA. FOR CULVERT PIPE = 12. INCHES DIA. FOR RISER = 0 INCHES LENGTH OF CULVERT PIPE = 2 S FEET INV. IN ELEV. OF CULVERT = 1Z.20 FEET INV. OUT ELEV. OF CULVERT = 1.5.00 FEET INLET COEF. FOR CULV. PIPE FLOW W 0.5 INLET COEF. FOR CULVERT INLET CONTROL = 0.6 RISER WEIR ELEVATION = 0.00� FEET WEIR FLOW COEF. = 0 TAILWATER ELEVATION = 17.56 FEET VELOCITY= 1.68, FPS TAILWATER—UNKNOWN = ZERO (0) NO RISER =_ZERO (0) RISER DIA, HEADWATER ELEVATION ASSUMING INLET CONTROL HEAD = 0.03 HEADWATER ELEVATION = 19.73 HEADWATER ELEVATION ASSUMING PIPE FLOW HEAD = 0.03 HEADWATER ELEVATION = 20.01 HEADWATER ELEVATION ASSUMING WEIR FLOW HEAD = #DIV/O! HEADWATER ELEVATION = #DIV/0! HEADWATER ELEVATION ASSUMING INLET CONTROL HEAD = 0.12 HEADWATER ELEVATION = 15.82 HEADWATER ELEVATION ASSUMING PIPE FLOW HEAD = 0.10 HEADWATER ELEVATION = 17.66 HEADWATER ELEVATION ASSUMING WEIR FLOW HEAD = #DIV/O! HEADWATER ELEVATION = #DIV/O! Parkers Pointe Culvert Hydraulics 8/13/97 SD16 HEADWATER ELEVATION CALCULATIONS FLOWRATE = 1.44`CFS MANNINGS n = 0.012 DIA. FOR CULVERT PIPE = 1 2 INCHES DIA. FOR RISER = 0.1 INCHES LENGTH OF CULVERT PIPE _ :x &.' 2 5 FEET INV. IN ELEV. OF CULVERT = ° 24 5O": FEET INV. OUT ELEV. OF CULVERT = °.24:30� FEET INLET COEF. FOR CULV. PIPE FLOW = 0:51; INLET COEF. FOR CULVERT INLET CONTROL -''' ' ` " "0: 6 RISER WEIR ELEVATION = - '0 '00 FEET WEIR FLOW COEF. = m 0 TAILWATER ELEVATION = 26.50 FEET VELOCITY= = - 1 83'= FPS TAILWATER UNKNOWN = ZERO (0) SD17 HEADWATER ELEVATION CALCULATIONS FLOWRATE= 1'86 CP5 MANNINGS n = 0.01:2 DIA. FOR CULVERT PIPE = 1 2! INCHES DIA. FOR RISER = ` 0s INCHES LENGTH OF CULVERT PIPE = 5 5," FEET INV. IN ELEV. OF CULVERT = 26:50 FEET INV. OUT ELEV. OF CULVERT = 24.3& FEET INLET COEF. FOR CULV. PIPE FLOW = `0.5 INLET COEF. FOR CULVERT INLET CONTROL = ' '. ° 0. 6; RISER WEIR ELEVATION = .:.: 0.00: FEET WEIR FLOW COEF. TAILWATER ELEVATION = 26.50 FEET VELOCITY= 237' FPS TAILWATER UNKNOWN = ZERO (0) NO RISER = ZERO (0) RISER DIX HEADWATER ELEVATION ASSUMING INLET CONTROL HEAD= 0.14 HEADWATER ELEVATION = 25.14 HEADWATER ELEVATION ASSUMING PIPE FLOW HEAD = 0.11 HEADWATER ELEVATION = 26.61 HEADWATER ELEVATION ASSUMING WEIR FLOW HEAD = #DIV/O! HEADWATER ELEVATION = #DIV/O! HEADWATER ELEVATION ASSUMING INLET CONTROL HEAD = 0.24 HEADWATER ELEVATION = 2 7.2 4 HEADWATER ELEVATION ASSUMING PIPE FLOW HEAD = 0.26 HEADWATER ELEVATION = 26.76 HEADWATER ELEVATION ASSUMING WEIR FLOW DEAD = #DIV/O! HEADWATER ELEVATION = #DIV/01 Parkers Pointe Culvert Hydraulics 8/13/97 SDI HEADWATER ELEVATION CALCULATIONS FLOWRATE _ 1.13' CFS MANNINGS n 00.12 DIA. FOR CULVERT PIPE = 12': INCHES DIA. FOR RISER = 0, INCHES LENGTH OF CULVERT PIPE = 3 0! FEET INV, IN ELEV. OF CULVERT = 26.80FEET INV. OUT ELEV. OF CULVERT 26:501 FEET INLET COEF. FOR CULV, PIPE FLOW = `0.5. INLET COEF. FOR CULVERT INLET CONTROL = ��� 0: 61 RISER WEIR ELEVATION = 0.001 FEET WEIR FLOW COEF. TAILWATER ELEVATION = 27.24 FEET VELOCITY=° 1.44' FPS TAILWATER UNKNOWN = Z,9,R0 (0) NO RISER = ZE10,(Q)_RISER DIA. HEADWATER ELEVATION ASSUMING INLET CONTROL HEAD = 0.09 HEADWATER ELEVATION = 27.39 HEADWATER ELEVATION ASSUMING PIPE FLOW HEAD = 0.07 HEADWATER ELEVATION = 27.32 HEADWATER ELEVATION ASSUMING WEIR FLOW HEAD = #DIV/O! HEADWATER ELEVATION = #DIV/O! Telephone (910) 754-6324 Facsimile (910) 754-2121 HOUSTON and ASSOCIATES, P.A. Consulting Engineers SHALLOTTE, NORTH CAROLINA 28459 Sand Filter Design 117 Pine Street Post Office Box 2927 The following pages illustrate the use of two (2) sand filters for the subject project located along the Intercoastal Waterway. The sand chamber of each of the sand filters is located underneath the proposed pool decking with a clearance of approximately four (4) feet between the top of the decking and the top of the sand for access. The design criteria for the sand filters is based on the Stormwater Best Management Practices, NCDEHNR November 1995, pages 26 through 31. The following calculations show that each of the sand filters are based on the following design criteria: Sediment Chamber: 1. Volume = 540 CF per Acre of drainage area 2. At least 18 Inches deep 3. Surface area greater than 360 SF 4. Positive drainage to chamber by culvert 5. Outlet to sand chamber only 6. Outlet to sand chamber by sheet flow (Asphalt Weir) Sand Filter Chamber: 1. Volume = 540 CF per Acre of drainage area 2. At least 18 Inches of sand particles less than 2 mm ave. diam. 3. Surface area greater than 360 SF 4. Outlet sized for drawdown within 24 hrs, (we have used a 6 inch pipe cover with Filter Fabric and have illustrated under the given conditions that the sand chamber will drawdown in less than 24 hours) An asphalt overflow weir has been provided between the sand filters and on the outer edge of sand filter # 1. The overflow will travel through a 50 feet vegetative filter prior to reaching the ICWW. Parkers Pointe 8/21/97 Sand Filter #1 Design Contributing Drainage Areas: BASIN I.D. BUILDINGS IMPERVIOUS AREA ROADSIDRIVES PATHS AMENITY TOTAL IMPERVIOUS TOTAL AREA WEIGHTED "C" AC AC G 0.064 0.073 0.010 0.100 0.25 0.45 0.61 H 0.054 0.040 0.001 0.000 0.10 0.14 0.71 1 0.059 0.064 0.000 0.039 0.16 0.34 0.56 J 0.105 0.156 0.000 0.000 0.26 0.43 0.65 K 0.067 0.060 0.000 0.000 0.13 0.23 0.61 L 0.000 0.022 0.000 0.000 0.02 0.05 0.53 L1 0.133 0.053 0.000 0.000 0.19 0.26 0.74 R 0.129 0.129 0.026 0.004 0.29 0.64 0.54 T 0.000 0.059 0.001 0.000 0.06 0.08 0.73 U 0.000 0.008 0.013 0.200 0.22 0.30 0.75 TOTAL 0.611 0.664 0.051 0.343 1.67 2.93 0.63 Parkers Pointe 8/21 /97 SEDIMENT CHAMBER DESIGN: Lam, Design Criteria: Volume = 540 CF per acre of drainage area At least 18 Inches deep Minimum Surface Area = 360 SF Outlet to Sand Chamber to result in sheet flow Required Storage Volume: 1581 CF Provided Depth of Storage: Feet Contour 8' msl: 59' S= Contour 9' msl: 1�0O0 SF Contour 10' msl: � 4'Z 5 E Provided Storage Volume: 2047 CF SAND CHAMBER DESIGN: A i Design Criteria: Volume = 540 CF per acre of drainage area At least 18 Inches of sand particles less than 2 mm average diam. Minimum Surface Area = 360 SF Outlet sized such that sand chamber drains within 24 hours Required Storage Volume: 1 581 CF Provided Depth of Storage: Feet Contour 8' msl: 7�6`C# � Contour 9' msl: J 30 SF Contour 10' msl: S'S"f# SF Provided Storage Volume: 2293 CF Sand Filter Outlet Pipes/ Drawdown: Pipe Inlet Covered with Filter Fabric Contech Represenative recommends C-45NW for servicability reasons. Water Flow thru C-45NW at 1 Foot of Head = 120 GPM per SF Pipe Diam. 6 Inches Opening Area: 0.197 SF No. of Pipes: MEM Flowrate during 24 Hrs: 4542.2 CF/Day ""The allowable Flowrate thru the Pipe at a 1 Foot Head during a 24 Hr Period is Greater than the Required and Provided Design Storage of the Sand Filter Therefore, the System will Drawdown in Less than 24 Hours. Parker's Pointe 8/21 /97 Sand Filter #2 Design Contributing Drainage Areas: BASIN IMPERVIOUS AREA TOTAL TOTAL WEIGHTED I.D. BUILDINGS ROADS/DRIVES PATHS AMENITY IMPERVIOUS AREA "C" AC AC M 0.000 0.000 0.030 0.000 0.03 0.35 0.26 N 0.193 0.077 0.000 0.000 0.27 0.35 0.78 O 0.188 0.105 0.000 0.000 0.29 0.50 0.64 P 0.203 0.093 0.007 0.000 0.30 0.45 0.70 a 0.065 0.068 0.000 0.000 0.13 0.19 0.72 S 0.231 0.093 0.000 0.000 0.32 0.44 0.75 Total: 0.879 0.436 0.037 0.00 1.35 2.28 Parker's Pointe 8/21/97 SEDIMENT CHAMBER DESIGN: 42L Design Criteria: Volume = 540 CF per acre of drainage area At least 18 Inches deep Minimum Surface Area = 360 SF Outlet to Sand Chamber to result in sheet flow Required Storage Volume: 1233 CF Provided Depth of Storage: 2 Feet Contour 8' msl: S0 Sr Contour 9' msl: ST0 SF Contour 10' msl: 4,04� SF Provided Storage Volume: 1 383 CF SAND FILTER CHAMBER DESIGN: -"� a' Design Criteria: Volume = 540 CF per acre of drainage area At least 18 Inches of sand particles less than 2 mm average diam. Minimum Surface Area = 360 SF Outlet sized such that sand chamber drains within 24 hours Required Storage Volume: 1233 CF Provided Depth of Storage: 2 Feet Contour 8' msl: 2.0 SF Contour 9' msl: a65 SF Contour 10' msl: 12.`4.0 g Provided Storage Volume: 1743 CF Sand Filter Outlet Pipes/ Drawdown: Pipe Inlet Covered with Filter Fabric Contech Represenative recommends C-45NW for servicability reasons, Water Flow thru C-45NW at 1 Foot of Head = 120 GPM per SF Pipe Diam. "°gr;$ Inches Opening Area: 0.1 97 SF No. of Pipes: Flowrate during 24 Hrs: 4542.2 CF/Day ""The allowable flowrate thru the Pipe at a 1 Foot Head during a 24 Hr Period is Greater than the Required and Provided Design Storage of the Sand Filter Therefore, the System will Drawdown in Less than 24 Hours. Telephone (910) 754-6324 Facsimile (910) 754-2121 HOUSTON and ASSOCIATES, P.A. Consulting Engineers SHALLOTTE, NORTH CAROLINA 28459 Infiltration Basins 117 Pine Street Post Office Box 2927 The following pages calculate required runoff for design of the proposed infiltration basins based on storing the 25 year storm without discharge. The required rainfall associated with a 25 year storm is 8 Inches. The calculations show the drawdown of the 25 year storm based on the permeability provided from the soil survey of Brunswick County and the soils report prepared by G. Craig Turner of Land Management Group, Inc. Mr. Turner's report indicates the project lies on a high sandy bluff that is deep and well to excessively well drained. Auger borings indicate that the two (2) feet separation between the SHWT and the bottom of the infiltration basins will be maintained. Parkers Pointe Phase 1 Infiltration Basin Data Table Basin 1 Basin 2 Top of Storage Elevation (MSL): 26.5 28 Bottom of Basin Elevation (MSL): 24 27 24' Contour Area (SF): 1025 NA 25' Contour Area (SF): 1575 NA 26' Contour Area (SF): 2190 NA 27' Contour Area (SF): NA 1850 28' Contour Area (SF): NA 2400 Depth of Storage (FEET): 2.5 1 Drawdown Time (HRS): 27.00 25.20 Water Shed Classification: SA SA Rainfall Runoff (INCHES): 1.5 1.5 Minimum Required Storage (CF): 3,543 1,303 Provided Storage (CF): 3,986 2,126 Parkers Pointe Stormwater Calculations 5/22/97 Infiltration Basin #1 - 25 Year, 24 Hour Storm Drainage Basin I.D.: "B,C,E;F Drainage Area: _ 1.,1,2' Acres Impervious Area: Units 0 217 AC Roads/ Drives kaY� 0 305AC Walk Paths �0:016 AC Amenity. ..,` 0005�'AC Total: 0.543 AC % Impervious: Rainfall: "Simple Method" Rv Volume from Runoff: Permeability of Soil: Depth of Storage: Top of Basin Elev. Bottom of Basin Elev. Contour 24' msi: Contour 25' msl: Contour 26' msl: Mean Infiltration Basin Area: Infiltration during 24 Hours: 48.48 % Inches 0.49 15,818 CIF :1`fl'.Inches/Hour 2.5 FT s 24" 0: -0 b235EAC -O° 36V AC ,. r O:k0502' AC 1594 T 31 886 CF Required Storage Volume = Volume From Runoff - Infiltration During 24 Hours Required Storage Volume = -16068 CIF Provided Storage Volume = Average Surface Area X Depth of Storage Provided Storage Volume = 3986 CIF Drawdown Calculations Average Surface Area: Storage Provided: Permeability: "'Drawdown Time: 1594 SF 3986 CIF 10 Inches/Hour 27.00 Hours "'Drawdown Time is from beginning of rainfall and assumes a full basin at the end of 24 hours. " The soil survey of Brunswick County indicates that the soils present are Wando series consisting of excessively drained soils. Based on the SCS data ranges, the infiltration rate for Wando soils is 6.0 to 20.0 inches per hour. Therefore using a rate of 10.0 inches per hour will be conservative. The SCS data distinguishes the high water table to be 4 to 6 feet. Parkers Pointe Stormwater Calculations 5/22/97 Infiltration Basin #1 - 25 Year, 1 Hour Storm Drainage Basin I.D.: B,CAE;F Drainage Area: 1 .12 Acres Impervious Area: Units z 0,2.17:?AC Roads/ Drives ,., . 0 306 AC Walk Paths: 0:0.1,6i AC Amenity eE' 00051AC Total: 0.543 AC % Impervious : 48.48 % Rainfall: Inches "Simple Method" Rv 0.49 Volume from Runoff: 5536 CF Permeability of Sail: 1v5 inches/Hour Infiltration Basin Area: 1594 T Infiltration during 1 Hour: 1993 CF Required Storage Volume = Volume From Runoff - Infiltration During 1 Hour Required Storage Volume = 3543 CF Provided Storage Volume = Average Surface Area X Depth of Storage Provided Storage Volume = 3986 CF The soil survey of Brunswick County indicates that the soils present are Wando series consisting of excessively drained soils. Based on the SCS data ranges, the infiltration rate for Wando soils is 6.0 to 20.0 inches per hour. Therefore using a rate of 15.0 inches per hour will be conservative during the first hour of rainfall. The SCS data distinguishes the high water table to be 4 to 6 feet. Minimum Storage Requirement: Water Classification: SA Rainfall: 1.5 Minimum Volume: 2966 CF Parkers Pointe Stormwater Calculations 5/28/97 Infiltration Basin #2 - 25 Year, 24 Hour Storm Drainage Basin I.D.: D Drainage Area: 0.50' Acres Impervious Area: Units: �" ,"0 AC Roads/ Drives: 0' AC Walk Paths: =',0-; AC Amenity:-01'.2382E AC Total: 0.2382 AC % Impervious: Rainfall: "Simple Method" RV Volume from Runoff: Permeability of Soil: Depth of Storage: Top of Basin Elev.: Bottom of Basin Elev: Contour 27' msl: Contour 28' msl: Infiltration Basin Area: Infiltration during 24 Hours: 47.88 % 8•Inches 0.48 6,948 CF 10 Inches/Hour .01,, FT -a 'x :.27zF0. 0`0.425 AC 0.0551' `AC 2,126 SF 42,515 CF Required Storage Volume = Volume From Runoff - Infiltration During 24 Hours Required Storage Volume =-35,567 CF Provided Storage Volume = Average Surface Area X Depth of Storage Provided Storage Volume = 2,126 CF Drawdown Calculations Average Surface Area: Storage Provided: Permeability: ***Drawdown Time: 2,126 SF 2,126 CF 10 Inches/Hour 25.20 Hours ***Drawdown Time is from beginning of rainfall and assumes a full basin at the end of 24 hours. ** The soil survey of Brunswick County indicates that the soils present are Wando series consisting of excessively drained soils. Based on the SCS data ranges, the infiltration rate for Wanda soils is 6.0 to 20.0 inches per hour. Therefore using a rate of 10.0 inches per hour will be conservative. The SCS data distinguishes the high water table to be 4 to 6 feet. Parkers Pointe Stormwater Calculations 5/28/97 Infiltration Basin #2 - 25 Year, 1 Hour Storm Drainage Basin I.D.: D Drainage Area: 0.50 Acres Impervious Area: Units Ot AC Roads/ Drives:% 0 AC Walk Paths Amenity::,'rz:`« 0 2382!AC Total: 0.2382 AC % Impervious: Rainfall: "Simple Method" Rv Volume from Runoff: Permeability of Soil: Infiltration Basin Area: Infiltration during 1 Hour: 47.88 % _. ..,.w w.2"81Inches 0.48 2432 CF •';1<5i IncheslHour ' 2126 SF 2657 CF Required Storage Volume = Volume From Runoff - Infiltration During 1 Hour Required Storage Volume = -225 CF Provided Storage Volume = Average Surface Area X Depth of Storage Provided Storage Volume = 2126 CF The soil survey of Brunswick County indicates that the soils present are Wando series consisting of excessively drained soils. Based on the SCS data ranges, the infiltration rate for Wando soils is 6.0 to 20.0 inches per hour. Therefore using a rate of 15.0 inches per hour will be conservative during the first hour of rainfall. The SCS data distinguishes the high water table to be 4 to 6 feet. Minimum Storage Requirement: Water Classification. SA Rainfall: 1.5 Minimum Volume: 1303 CF State of North Carolina Department of Environment, Health, and Natural Resources Wilmington Regional Office James B. Hunt, Jr. Division of Water Quality Jonathan B. Howes Governor Water Quality Section Secretary June 20, 1997 Mr. Jay Houston, P.E. Houston and Associates PO Box 2927 Shallotte, NC 28459 Subject: ACKNOWLEDGEMENT OF RECEIPT AND REQUEST FOR ADDITIONAL INFORMATION Stormwater Project No. SW8 970603 Parkers Pointe, Phase I Brunswick County Dear Mr. Houston: The Wilmington Regional Office received a, Stormwater Management Permit Application for Parkers Pointe, Phase I on June 4, 1997. A preliminary review of that information has determined that the application is not complete. The following information is needed to continue the stormwater review: 1. The sand filter you propose is not in accordance with the details provided in the BMP Guidance document. The maximum drainage area for a sand filter is 5 acres, the volume calculations are based on a minimum of 540 cubic feet per acre of drainage area, not the 25 year storm, and the system must drawdown within 24 hours. Maintenance accessibility is very limited. The profile of the proposed system does not fit the profiles shown in the BMP document. You may make this proposal more permittable by: providing a better distribution device throughout the filter; reducing the drainage area to 5 acres; revising the calculations to include the 540 cubic feet per acre requirement; providing a drawdown of less than 24 hours; and providing easy access to to site for routine maintenance. Sand filters need frequent maintenance- I don't envision the owners wanting to remove the pool deck every month to clean out the filter. v,,0� 2. The SA water classification requires all overflows from the sand filter to run through a 50' vegetated filter prior to sheet flowing into the ICWW. 2i �5 3. Provide a distribution device to evenly distribute the runoff into the infiltration basins. See the enclosed detail. 127 Cardinal Drive Extension, Wilmington, N.C. 28405-3845 0 Telephone 910-395-3900 0 Fax 910-350-2004 An Equal Opportunity Affirmative Action Employer ' J Mr. Houston June 20, 1997 Siormwater Project -No. SW8 970603 ---------------------------------------------- t/ 4. Delineate ll wetlands on site, or note on the plans that none exist. Z. Locate the basins in recorded access/drainage easements. 6. There appears to be offsite runoff entering the site at the north property line, and from the west across Causeway Drive. Please clarify/show off -site runoff routing. t% 7. Delineate the Mean High Water Line. e;2GV 8. Provide a typical unit footprint with dimensions, �a�nd note all concrete and wood deck areas. 5� 9. Provide the dimensions of th infiltration basins, and th sand filter Ll� 10. Add a note to the plans that all roof drainage must be directed so that it will be picked up by the basins or the sand filter. f 11. Add the property line dimensions. r/ 12. Add a detail of the walkway. c,-"_ 13. Add dimensions of the parking areas. 14. The storage elevation for Basin 1 is noted as 26.5, but the sectionn details indicate the top elevation as 26. Please clarify. 15. Provide a soils report indicating the depth to the SHWT, the type of soil, and the expected infiltration rate. .� 16. What is the title of Mr. Cooke? Is he the landowner, or a leasee? Add the title to the permit Uy� application. 127 Cardinal Drive Extension, Wilmington, N.C. 28405-3845 0 Telephone 910-395-3900 0 Fax 910-350-2004 An Equal Opportunity AIrmative Action Employer Mr. Houston June 20, 1997 Stormwater Project No. SW$ 970603 -------------------------------------------- Please note that this request for additional information is in response to a preliminary review. The requested information should be received by this Office prior to July 20, 1997, or the application will be returned as incomplete. The return of a project will necessitate resubmittal of all required items, including the application fee. 1f you have any questions concerning this matter please feel free to call me at (910) 395-3900. Sincerely, Ms. Linda Lewis Environmental Engineer RSSlarl: S:1WQSISTORMWATIADDINFO1970603.JUN cc: Linda Lewis Central Files 3 HOUSTON and ASSOCIATES, P:A:' -' ` ' E Consulting SHAL O'1TE, NORTH ECAROLINA 28459� ngineers J �;� 0 419�1 Telephone (910) 754-6324 �,I�7 1�i,' �!�"I 1067dJ11 Pine Street Facsimile (910) 754-2121 PeeFGfte Box 2927 Mesday, June 3, 1997 Ms. Linda Lewis, Environmental Engineer Division of Environmental Management North Carolina Department of Environment, Health, and Natural Resources 127 Cardinal Drive Extension Wilmington, North Carolina 28405 Subject: Parkers Pointe - Phase 1 Shallotte, North Carolina Submittal of Stor>water Plan for Approval Dear Ms. Lewis: On behalf of Stuart Cooke, developer of Parkers Pointe, we are pleased to submit for your review and approval two copies each of the Stormwater Plans, the hydrologic and hydraulic calculations and the executed Permit Application forms. The proposed subject project falls within the high density guidelines. Enclosed is a check in the amount of $385.00 to cover the required high density application fee. We appreciate your attention in this matter. Should you have any comments or require any additional information, please do not hesitate to contact our office at your convenience. Houston, P.E. in and Associates, P.A. JRH/swq Enclosures pc: Mr. Stuart Cooke File; 96-0109 (Parkers Pointe)