Loading...
HomeMy WebLinkAboutSW8970320_APPROVED PLANS_20040527STORMWATER DIVISION CODING SHEET POST -CONSTRUCTION PERMITS DOC TYPE � ❑ CURRENT PERMIT APPROVED PLANS ❑ HISTORICAL FILE ❑ COMPLIANCE EVALUATION INSPECTION DOC SATE YYYYMMDD N T-)Dr1 SITE z AMSTERDAM WAY I c� v)0 pMIL Z W A� `A1yp5 pR. IL C) rn 15.0 F0WPAY y O Z MARKET STREET ANKAAF- wl51'puw VICINITY MAP NTS LATE WINTER do EARLY SPRING TEMPORARY GRASSING DETAIL SEEDING MIXTURE RYE grain 120 ANNUAL EZA (Kobe in P'redrnorlt and Coastal Plain. Korean in Mountains) 50 Omit arrrwral l..p.a— when duration of torrrporery oovr In not to ereiaw beyond Jurw. SEEDING DATES: mountains - AbaVe 25M ft: Feb. 15-May 15 Wwo 25W ft: Feb. 1-MM 1 Pladmont - Jan. 1-may 1 Coastal Plain - Dec. 1-Apr. 15 SOIL AMENDMENTS Follow ncam!!!alldations of tall beats y20lb/ame gown ogrkal- twal pnntow and 750 lb/acre 10-U-0oftK MULCH Apply a or rnuich rrlrartnq idol A dial! bk dm ad rwarly straW can be used as o mulch alcNalnq coal. MAINTENANCE Fwerullm rIfi Ruasd, refartwm and n+ulch im- SPRING-SUMMER PERMANENT GRASSING DETAIL SEEDING MIXTURE .9!E= RATE (1bZ99 1 POCACOtA BM#00M 5o COMMON 9aAmx l 10 GOWN ULM 10 TALL FE MM 50 SEEDING NOTES 1. Where a nod appeaoua is dmbv4 wM serimm 2. use saran Bamarda grass arlly an an obw It Ca,rlot beasts a pout 8arm111 grams mW be replond wo S LB/Acre oodlpeds¢aoe SEEDING DATES AM 1 - JXY 15 SOIL AMENDMENTS Apply bra and FORM ad teats. or ap* w/Acre wound agrimiturd lllrlmsforlm and 500 1Ab um 10-10-10 frhlitar. FOP­,�PAY 5FC-n.ON W5 r MAN r r / / rI f Mal! FIFAW. i- •- FRAW 10 7 OF • l:: 7'A �I Id.►�11�11i.'i;� FU40� 4FI&VA1QC•7 ,GH CA&VANIZEt7 WIM ITW OVER 5MALL 12LkWTER 'kX ( 8 NIB5H .020 VVIM) P00L 19.2 I SELTIOIJ A"A MSNION PONP NtEf 5TICIT, lm TEMPORARY FALL GRASSING DETAIL SEEDING MIXTURE RATE M&MM) RYE (groin) 120 SEEDING NOTES M1OUKrAM - AlJr. 15-DEC. 15 COASTAL PLAIN and PMIOW - WrG 15-DEC 30 SOIL AMENDMENTS Follow nearwrAWorw of soil teats or apply $000 LB/Acre g►atmd agrlcudhmal tbrwdons and 1.000 LB/Acre 10-10-10 fertAlser. MULCH Apply 4.000 LB/Acre Strew. Anchor show by vft � . r+80w6 or a nwAch andralrq boat A didr with blades sal rwarly draight can be MULCH Apply Ana,or by °��a/Mrs rq w °In.�t� mWng6 or r*t owwq or by m'.lnr�abl, a „mAd! b a A disk with bbdw sot rwaly sbaik jrt can be used as v mrrtdr MAINTENANCE RebrtMew In folm* April wft 50 LB/Aaw nMogau Rspod ow gowth n4ims. Yay bo mowedow ady drew a year. Mhre s n" mppearo�oa is dammed, an* Sartcmm and mas orm am needs used as a nwdch onchsrhq tool. MAINTENANCE Repair pal refartlias dsnloQed stets bnnlsdideq. Tapdua• with50 LB/Acre of dhogan in march. Kit s rwceasary to exterw twrrporary paver bayald June 15, (M. d wdh 50 LB/Am Kobe (Pfwdrnorlt and Coo" Plain} or Karmen (Yaarrtsbw} Mopedeza in late February or early mach FALL�WINTERp PERMANENT GRASSING DETAIL TEMPORARY SUMMER GRASSING DETAIL SEEDING MIXTURE SEEDING MIXTURE IRATE (b/�,1 RATE (1b/acm) TALL FERM (MwW of two or CERmAtf MNUEr 40 200 25 In the pmidrrrortt and mwwrtakm a rnau-stern rwd wwdalgramm toy be NAwbl read al a rate of 50 LB/Acne SEEDING DATES SEEDING NOTES m mMRIr - Alow "J= - MOLRRAM - MAY 15-AM 15 SOIL AMENDMENTS PNMMOW - MAY 1-11t10. 15 OOWAL PLAN - APR. 15-AUO. 15 AApa* Mars and hrWm aooa(1 b moll Mash, or gphr 3.000-500o LB/Aws 1,,OIL" q Ar1m 10-1 Wier wlll. ww.. raft a! sandy scrim}) and SOIL AMENDMENTS Faior naonan oumnm or mod teats or apply 2.GDD W/A4w groaw MULCH ogrlcuftwal Amestaw and 750 LB/Acre 10-10-10 fer. izer. Apply 4,0ap Ave wdn sbaw a epbd" tm er of anWlw e a AI mulch MULCH Anchar by with agl+dt. rorYg, r a by abrrpilg arch a mrrch a+chalnq Wei. A disk .11t! bladar mat xaary oar► bar umad are a mWd Apply 4,000 LB/Acre Straw. Anchor Shaw by Umi&q with oW-% noftq. ardrorlrg tool or a tmlleN anehorirq tool A disk witty Wades mot nearly straight can be used as a mrrdu arldwrtng tow. MAINTENANCE �rrr��a�� MAINTENANCE ENANCE F+ E* amm*V to 00 beds or apply 40 LB/Aam fta" InJ--y or 40 Lg is Saph,nber and 40 LB in Mmorrbr, from o 12-4-1, 18-4-4 ftefortplze "growth N not fully trdsqurois Reseed. refarNize and mulch Tm- .y+,ay�r�', .r t ° % =0 warm medllr, as this inGaOap mborw Imasp fur dMsoou. Reseed. fertit¢e. and rrsdeh darlwged auras "OsalotelyfoNowblg wositxr othr d rnr1"o" mom to a hatght of 2'5-15 br0 a! ntwded. 6" CONC. 4(:KDO prysli-��y� `�' �+y7 611 X6r 1 XVV2.SIXWV223 vvmmt VVIM FAt3ti;IG t-INF0FXXWNT 1 4 11 ABC 5TOW PUMV5 ' f2 PAP R�-NL -71 1 S 1-*7 C A Ir'th/Sf'1 1C7' t7EMWING [PON FiELt2 CONI7hlON5. 00NTRAG11CR 5H&L 090W1NA1T W/ ov"R Sr GPmCHNICAL ENGIN FIR 110 t7E11 12m1w AC11.IAt. PAVEMFW 5CC110N. PAVF,M�N-r 5F,,C-n.ON OUTLET STRUCTURE N D.I. NO.' 1 TOP 21.4 1 W. 19.5 D.I. NO. 2 TOP 22.5 INV. 19.4 LIMITS OF DISTURBANCE 18" F.E.S. INV. 17.5 w/8'x8'x12" ENERGY DISSIPATOR ---,,,, --, N68'01'00"E,1° 200.00' 25' BUFFER EASEMENT EXIST. DITCH EXISTING BUFFER TO BE SUPPLEMENTED IF NECESSARY DETENTION POND TOP OF BANK 23.6 FLOOD POOL 19.2 NORMAL POOL 18.0 BOTTOM 13.0 G't r.r.a. rl Y r O.d- w/8'x8'x12,y NERGY DISSIPATOf vl I N I c NOTE; I Q THERE ARE NO WETLANDS ON THIS SITE D.I. NO. 5 LIMITS OF DISTURBANC TOP 23.0 1 hlti� hlINll� hi4trw wKl11i *E¢�w IAae L� INV. 18.3} =w O 120' I P N FPS OPOSED EXPANSION ' 12,000 SF PROPOSED EL. 25.5 +`� lx1 " j: ' - - I0 la"m wpm I11Riw PPP WIel411 No" P"m _ :. _ . ::::: - ■almli zl I_ j I MATCH EXISTING ASPHALT GRADE; t ELEV 23.7f DRIVE f `�MATCH ASPHALT EXISTING I IN ( I ELEV 24.1 t EXISTING BUILDING I I 20,000 SF I I 00 10'x10'x6" DUMPSTER F.F. EL. 25.5 +�"' PAD TO BE RELOCATED �6 I I I ry�0 i o-h II D.I. NO. 4 TOP 22.8 I c!'I INV. 18.9 2' RETAINING WALL O I o h; }: in T- _ `� I o^_ ''_ OFF E - -,n to I Aso D.I. NO. 3 TOP 23.0 �..r h �p � T--T�,l 1 a INV. 19.1 200,1 "RC 1 1 i ll I I -. 4" PVC SS 1 1 /2" PVC Ill I 4" C.O. 'Pr ��7, I I II ■Aw wl■l� EXIST. DITCH - ,� _ MATCH EXISTING REMOVE EXISTING CURB PI INV. 9A± AND REST - - - _ - - - - EXISTING CONDITIONS - . \ / 1 I I � I I � I I A I I I I I I I SITE PLAN I I 1 " = 40' PROPOSED CURB & GUTTER TO MATCH EXISTING 4mST1 RCP y. ` - EXIST. SS AMSTERDAM WAY SITE WORK NOTES 1. THE CONTRACTOR SHALL VISIT THE SITE AND BECOME FAMILIARIZED WITH EXISTING CONDTIONS BOTH ON AND IMMEDIATELY ADJACENT TO THE SITE. 2. CLEARING: CONTRACTOR SHALL REMOVE ALL TREES AND VEGETATION WITHIN LIMITS OF CONSTRUCTION UNLESS OTHERWISE DESIGNATED TO REMAIN. 3. GRUBBING AND STRIPPING: CONTRACTOR SHALL RAKE AND REMOVE ROOTS, STUMPS, VEGETATION, DEBRIS, EXISTING STRUCTURES ABOVE AND BELOW GRADE, ORGANIC MATERIAL OR ANY OTHER UNSUITABLE MATERIAL WITHIN LIMITS OF CONSTRUCTION. 4. MUCKING: CONTRACTOR SHALL COORDINATE WITH OWNER AND THEIR GEOTECHNICAL REPRESENTATIVE TO COORDINATE REMOVAL OF ANY SOFT AREAS. 5. DISPOSAL: CLEARED, GRUBBED, STRIPPED OR OTHER WASTE MATERIAL SHALL BE REMOVED FROM SITE AND DISPOSED OF IN A PROPERLY PERMITTED FACILITY. 6. FILL AND COMPACTION SHOULD COMPLY WITH GEOTECHNICAL REPORT. 7. THE CONTRACTOR SHALL NOTE THAT THE GRADING PLAN MAY NOT REPRESENT A BALANCED EARTHWORK CONDITION. THE CONTRACTOR SHALL BE RESPONSIBLE FOR CUT AND FILL QUANTITIES AND COMPLETE INSTALLATION TO SPECIFIED GRADES. 8. THE CONTRACTOR SHALL FURNISH SUITABLE BORROW MATERIAL FROM AN OFF -SITE PROPERLY PERMITTED FACILITY AS REQUIRED. 9. THE CONTRACTOR IS RESPONSIBLE FOR THE LOCATION AND PROTECTION OF ALL EXISTING UTILITIES DURING CONSTRUCTION. BEFORE COMMENCING ANY EXCAVATIONS IN OR ALONG ROADWAYS OR RIGHT-OF-WAYS, PUBLIC AREAS OR IN PRIVATE EASEMENTS, THE CONTRACTOR SHALL NOTIFY ALL APPROPRIATE PERSONNEL OF THEIR INTENT TO EXCAVATE, IN WRITING. NOT LESS THAN 10 DAYS PRIOR TO EXCAVATING. 10, THE CONTRACTOR SHALL BE RESPONSIBLE TO COORDINATE DISCONNECTION/ RECONNECTION AND/OR THE RELOCATION OF ALL EXISTING UTILITIES WITH APPROPRIATE PERSONNEL 11. EXISTING SURVEYING PERFORMED BY STUART Y. BENSON, RLS AND SUPPLIED $Y THE OWNER. 12. THE CONTRACTOR SHALL FIELD VERIFY ALL DIMENSIONS AT THE SITE. FURTHERMORE THE CONTRACTOR SHALL REPORT ALL DISCREPANCIES OR QUESTIONS TO THE ENGINEER PRIOR TO INSTALLATION. 13, THE CONTRACTOR SHALL PROVIDE ANY AND ALL LAYOUT REQUIRED TO CONSTRUCT HIS WORK UNLESS OTHERWISE DIRECTED BY OWNER. 14. ALL PVC UTILITY MAINS SHALL BE INSTALLED WITH A MINIMUM OF 36" COVER AT FINAL GRADE. 15. ALL SERVICE CONNECTIONS SHALL BE INSTALLED TO MEET ALL LOCAL AND STATE CODES. METERS, TAPS, MATERIALS, WORKMANSHIP AND ALL FEES SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR AND SHALL COMPLY WITH ALL REQUIREMENTS. 16. ALL PAVEMENT, BASE AND SUBGRADE SHALL COMFORM TO NCDOT STANDARDS INCLUDING WORKMANSHIP, MATERIALS AND EQUIPMENT. APPROPRIATE BARRICADES, SIGNS, LIGHTS OR OTHER TRAFFIC CONTROL DEVICES SHALL BE PROVIDED IN ACCORDANCE WITH NCDOT TO MAINTAIN SAFETY AND TWO WAY TRAFFIC. 17. ALL AREAS SHALL BE GRADED FOR POSITIVE DRAINAGE. THE CONTRACTOR SHALL REPORT ANY DISCREPANCIES TO THE ENGINEER PRIOR TO INSTALLATION. ALL AREAS SHALL BE SLOPED TO DRAIN AWAY FROM BUILDINGS AT ALL TIMES. 18. CONCRETE STORM DRAINAGE PIPE SHALL BE CLASS III WITH RUBBER GASKETED JOINTS AND INSTALLED IN ACCORDANCE WITH MANUFACTURER'S REQUIREMENTS. 19. USE WHITE LANE MARKING PAINT FOR ALL PAVEMENT MARKINGS. PAINT SHALL BE A CHLORINATED RUBBER ALKYD, FS TT-P-115, TYPE III, FACTORY MIXED, QUICK DRYING, NON BLEEDING. REFLECTIVE MATERIAL MAY BE ADDED AT OWNER'S OPTION FOR NIGHT REFLECTING. 20. DUCTILE IRON SHALL BE CLASS 51. 21. CONCRETE FOR WALKS, CURBS AND DRIVES SHALL HAVE A MINIMUMN COMPRESSIVE STRENGTH OF 3000 PSI 0 28 DAYS - AIR ENTRAINED. 22. FIELD TESTING SHALL BE DONE BY AN INDEPENDENT TESTING LABORATORY PAID FOR BY THE OWNER. FURTHER TESTING REQUIRED DUE TO A FAILED TEST WILL BE PAID FOR BY THE CONTRACTOR. 23. SEE GEOTECHNICAL REPORT NO. DATED , BY FOR ADDTIONAL REQUIREMENTS. CONSTRUCTION SEQUENCE 1. NO CUT SLOPE OR FILL SLOPE SHALL EXCEED A RISE OR FALL OF ONE FOOT FOR EVERY RUN OF 3 FEET (1 VERTICAL TO 3 HORIZONTAL). 2. NO SEDIMENT WILL BE ALLOWED TO EXIT THE SITE. ALL EROSION SHALL BE CONTROLLED INCLUDING SIDE SLOPES DURING AND AFTER CONSTRUCTION. 3. IF APPLICABLE, CONSTRUCT PROPOSED RETENTION POND TO ACT AS A SEDIMENT BASIN DURING CONSTRUCTION. REMOVE ACCUMULATION OF SILT AS REQUIRED TO ALLOW PROPER FUNCTIONING. RESTORE POND TO DESIGN LEVELS AT THE COMPLETION OF CONSTRUCTION. 4. IF APPLICABLE, INSTALL DROP INLETS WITH INLET PROTECTION TO ACT AS SILT TRAPS DURING CONSTRUCTION. REMOVE ACCUMULATED SILT AS NEEDED TO PREVENT SILT FROM ENTERING STORM DRAIN PIPING. 5. INSTALL EROSION CONTROL MEASURES BEFORE BEGINNING CONSTRUCTION INCLUDING BUT NOT LIMITED TO GRAVELLED CONSTRUCTION ENTRANCE, SILT FENCE, CHECK DAMS, ETC. INSTALL ALL EROSION CONTROL MEASURES AS SOON AS POSSIBLE AFTER BEGINNING CONSTRUCTION. 6. A 4" LAYER OF TOPSOIL SHALL BE APPLIED TO ALL NEW AREAS TO BE GRASSED. 7. ALL DISTURBED AREAS SHALL BE SEEDED IN ACCORDANCE WITH SEEDING SCHEDULE AS SOON AS POSSIBLE BUT NO LATER THAN 30 DAYS AFTER DISTURBANCE. 8. MAINTAIN ALL EROSION CONTROL MEASURES UNITL PROJECT IS COMPLETE. 9, MORE STRINGENT MEASURES MAY BE REQUIRED TO HALT EROSION IF THOSE ON THIS PLAN PROVE TO BE LESS EFFECTIVE. 10. REMOVE ALL TEMPORARY EROSION CONTROL MEASURES UPON COMPLETION OF CONSTRUCTION. ALL PERMANENT MEASURES SHALL BE WELL ESTABLISHED PRIOR TO PROJECT COMPLETION. _w.,#.», , RECEIVED MAR 19 2004 �s s r�R A 1►tra �?� a sa y!!"re"+l�l �►vw�r:rri-Iru�r.a3r71V1 PlktOd # SEE TOTAL AREA 2.46 ACRES± ZONING 1-1 EXISTING ASPHALT AREA 20,200 SF PROPOSED ASPHALT AREA 3,290 SF EXISTING BUILDING AREA 20,000 SF PROPOSED BUILDING AREA 12,000 SF EXISTING CONCRETE AREA 300 PROPOSED CONCRETE AREA 100 SF TOTAL IMPERVIOUS AREA 55,890 SF REQ. LANDSCAPE AREA (8%) 1,900 SF I EXISTING LANDSCAPE AREA 750 SF Q PROPOSED LANDSCAPE AREA 1370 SF - REQUIRED STREETYARD AREA 3,500 SF V0 PROPOSED STREETYARD AREA 3,595 SF REVISIONS Description I By z 0 1.! l z w z s<4 010s., �4 Z W O zF-1� o172 A 0z -c:4 z W ZO � W � Z W A Z P4 O V z Z l--I N W o N O • rl O w 00 (c F-�-•1 0 W Cd W a L) N co � Z � Z 0 CO . W � CO (0 O 0 O w QZ CL � ��-•! it O rCq .-I • ^� cal C-4 P4, w LEGEND \``fit{Ltkiltl►1f�,, •``�N CAN � EXISTING SPOT ELEVATION - IcSSI / ry�o PROPOSED SPOT ELEVATION ' SEA L EXISTING DROP INLET --v 17374 .�� RUNOFF DIRECTION -m N TEMPORARY SILT FENCE LIMITS OF DISTURBANCE DATE 3-10-04 EXISTING LANDSCAPING w/AREA DESIGN PGT DRAWN MBH (125) LANDSCAPING w/AREA PROPOSED STEETYARD AREPIATE PRINTED C 1 PROPOSED ASPHALT AREA MAR 1 7 2004 SHEET 1 OF 1 03123 N -W Z SITE AMSTERDAM WIND m NE�H�R v z S�REE� M ARK�� VICINITY MAP NTS Ot Sl D.I TO IM C40AM -AGCitRQiVC � `. QpAVL"L _`' '� r4TCR CONC. DL= VWW 50M4 I + r cxAvt�. r�.1xae /ZIM OIC#-I �I.I�iKAYI<iUz NAM5Q�CN rL1EI�t7WA4>ap p1, C.Vl�i� lm fAt4a FLIP G WAM �f' WA= Lvrs RUNG" WNt>•!p LM w/ 5L!191MCNF� _ IlMA-A rI4 rAtxdc w/ 5fM� _ : w - �-� I i t7LdOr -11 N..C.`r w/ aLAcfE � eWWY V55 FA�'OM "►"�"` %NM ICI. T W E5 2x4 Wt7 SLID 51MCIFIC A"Mr- +IM 5Pr439G Al'R.IGATION 7F15 !♦AC 1Fipq Or IN.CT #'1mDfCC't10N IS 1F#5 hemior Or #J..6T rmomcnoN I5 A+°4 CAOLZ vLt M HrAVYn4� Aft APPL.IGACL.0 Af CUW1 #u.GYS WHIM AEI VXM-CI'�3 Mr7 VM-V " AN OVEIa"L.OW 0WAOff 0411 rL.OW C.J4°I�A try I5 I�E.'Cb`55NZY T17 15 I+CLL"5S�R1+TO PI�'VL`Nr CXCESSIVE MWVt df MXi>:55I1�C POWM IN rrd W plump a AIXX t7 51nic us Or 9Ix ucfllf4.` 18" F.E.S. INV. 17.5 M�ON � � V I�i.� w/8'x8'x12" ENERGY DISSIPATOR � DITCH S OF JRBANCE W5 - - - I �-6" x I'-0" x .COO ". AAVA. HAM7ICA6 M12 FAta Na 51a4 I PA'JaJNG" '110RRSERV D VA IVV TF-CAT"4M%WeV WNF, ,t7R►�tf1PIGA,'fON 51'Mt30L. a P�M'r TD WV. P05T W/ *�/ B' ` C.AWILIM � PARKING ILL -ATE V 1,&". PMTS a WA"R5. g" x V-o" x .080 64V ALLM. SIGN TO WA19 "VAN AC4CE551t'7 Z". DOLT TO W17, p05T WI1H 5/ B" CANVILLM G�-_ PL.Al%? Nur5. B0LT5 & WA5HeR5 if 9" x V -0" x .060 51V AL L1M. 50" TO IeBAf7 "MAXIMUM PrN►0Y 1100 20-37.6" , OMT TO VN7. P05T r� WITH 3/ B" CANAL IAA PL.A11 7 u� � w- NJf5, 00LT5 & WA5WR5, 11�JISF t7 �NTION POND VAaaa5im-wa rMTWAIN? 4"x4" P05T. OF BANK 23.6 -- - DD POOL 19.2 a/z•a„n 4/2"KYW) "I I MAL POOL 18.0 MAXIMUM z rOM 13.0 PENALTY VAN 7N_= III $ 100 /�'KM) ACCESS1 3/e•'crw� -` I I -I I I� Ix' 12 I I IEI ICI I II I I--1 I !-I I I 4 *V -�N �*v -am z1 I M I ILj I=III.- °''-„*„z -I 11-1 I MITI T1 (CAL HMI IC4WM2 516N #NAIL TE DATA TAL AREA 2.46 ACRES± 'FiCc AkL 2,500 SF (REHOUSE AREA 29,600 SF INING 1-1 IRKING REQUIRED SPACES 22 AKING PROVIDED SPACES 24 -PHALT AREA 26,708 SF )NCRETE AREA 2840 SF NOSCAPING AREA REQUIRED: 2365 SF NDSCAPING AREA PROVIDED: 2545 SF Cr CONC. =R PAD Nr5 EXISTING SPOT ELEVATION 4 ��o PROPOSED SPOT ELEVATION 1.9 DROP INLET w/INLET PROTECTION zan PROPOSED LANDSCAPING w/AREA TSF aTSIrTEMTP�ORAR Y SILT FENCE P-� LIMIS OF DISTURBANCE V 0. 3 23.0 19.1 Q.I. NO, 2 TOP 22.5 INV. 19.4 � MR I AND P�kRK G a N �+ 4' C.O.;P I 50' GRAVELLED CONSTRUCTION 50' GRAVELLED CONSTRUCTION 7o ENTRANCE (SEE DETAIL) (550) a ENTRANCE (SEE DETAIL} iA n2Orye 7 :� r srnNO Q- �-MATCH EXISTING 25'R-- 5 `- a TS �y - PIPE INV. 21.6t M...' R' EXIST. DITCH -- MIST-15" V. INv ��1 �P-40 ----- ---- -�' -�1"r _ -EXIT SS`-- MATCH EXISTING - PIS INV. T9 �t - - - AMSTERDAM WAY ----.----------- -------- _ N, MATCH EXISTING MATCH EXISTING- - \ / ASPHALT GRADE 22.7± ASPHALT GRADE 23.1t { I I I SITE PLAN I I I I 1" = 40' r� r WMi PAVCAAr-W 5CC110N MAY VAW rMNMNG L4'ON rEL17 G 1,42tt ONS. CONWC110R 5HN.L COOWNAM w/ OVVWR i CNaW,1Z TD MATMEMINZ ACrUft_ PAV ACW %C110N. I'AVEMEN'f SECTION IL P) ( if .0 rY I 51% K-M4 FOR M ORCI�f/M - I - L I y I cA9TM PrAt!Y PROS, - p ; CH-vN �A rap CATM PA51I�5 Alp CH-D +-V FOR YARD INILA 5 GONG. COLD. #a L------J f'I.M1 CONC. GOL.L.Adp II ' /+6t'Fi44.T rAVCMCNr GL.EV. V/V�5 MLow - - - I > TD �' A. 3000 I�51 GONG. MOM$ IKL" fO HAVC 5 NV TRAF. GIBD!' POOnNa 12" • J 41`A\I0 OMNNG Af, *ILN d MOP 1 NLIE!f morA Ll ws .r• �ewKx �000 ems, Jr. "- 0/ 10 w 4ow•rc,w siecrme �! Cis • f�F'S!!i'J7e +.7,{`�_7 TYPICAL NMWA.-K ANtP %ML 0-WR R&W MMAL AGTLSk I. VATER AFTERS ARE TO B£ PROVIDED BY ThC CITY Z ALL VA TER AIE7ERS AWT BE LX4TES VITAff F0LIC RIGHT-DF WAYS AAOIL P £AS£A£NTS 3 WA TEA' KTERS SMLL A97T SE LLCATEB IN DRIVEVAYS / I� -- --------- - i EMPANFJAeW 6 w/ 5 LL WAY VCLi'I'ATiVL I 7fLMy 6' FOMPAY 5E�C110N NT5 E� cm' --ri- er-e A� r ? 50�. "p z TYPr Ir Sa7 COPPER TUBIAG pLpRs, SLOPED TO DFWN AWAY FROM BUILDINGS AT ALL TIMES. 18. CONCRETE STORM DRAINAGE PIPE SHALL BE CLASS III WITH RUBBER GASKETED JOINTS I �LVCwrLu�►Llaaess�Lr�La.aE4"Lr�-[5sI»rrt'ortr 1. VV AND INSTALLED IN ACCORDANCE WITH MANUFACTURER'S REQUIREMENTS. LM 2. K/k.^r10NJONrSCC� 5,1 � � At 19, USE WHITE LANE MARKING PAINT FOR ALL PAVEMENT MARKINGS. PAINT SHALL BE A r5CC �.��� t>"N ��sv PWWV *11=14"004 WV CHLORINATED RUBBER ALKYD, FS TT-P-115, TYPE III, FACTORY MIXED, QUICK DRYING, 4. i�LKfO6" rH LnY%x LrAL rAven+I�Nr WHHIJ2cum, NON BLEEDING. REFLECTIVE MATERIAL MAY BE ADDED AT OWNER'S OPTION FOR 6. I/ 0' VWA*LSLON JOW <94) 0=10V Af Va MAX Af SVVAV" NIGHT REFLECTING. .uwn", AT"LJCrtft%Mro Ad NOTIW ON *M K-AN. 20. DUCTILE IRON SHALL BE CLASS 51. 6. PN v 9ALrarxOrl'f* 21. CONCRETE FOR WALKS, CURBS AND DRIVES SHALL HAVE A MINIMUMN COMPRESSIVE FA1:AA4N4 CUM OR STRENGTH OF 3000 PSI 0 28 DAYS - AIR ENTRAINED. 1. WAW001 w/Osd-10/10WWAL, 22. FIELD TESTING SHALL BE DONE BY AN INDEPENDENT TESTING LABORATORY PAID FOR BY THE OWNER, FURTHER TESTING REQUIRED DUE TO A FAILED TEST WILL BE PAID FOR BY THE CONTRACTOR. 23. SEE GEOTECHNiCAL REPORT NO. __ , DATED -, BY FOR ADDTIONAL REQUIREMENTS. *a MAX.3rACLNG CONSTRUCTION SEQUENCE 1. NO CUT SLOPE OR FILL SLOPE SHALL EXCEED A RISE OR FALL OF ONE FOOT FOR EVERY RUN OF 3 FEET (1 VERTICAL TO 3 HORIZONTAL). 2. NO SEDIMENT WILL BE ALLOWED TO EXIT THE SITE. ALL EROSION SHALL BE CONTROLLED �- '�" •" INCLUDING SIDE SLOPES DURING AND AFTER CONSTRUCTION. :�• ,. 3. IF APPLICABLE, CONSTRUCT PROPOSED RETENTION POND TO ACT AS A SEDIMENT BASIN DURING CONSTRUCTION. REMOVE ACCUMULATION OF SILT AS REQUIRED TO ALLOW PROPER FUNCTIONING. RESTORE POND TO DESIGN LEVELS AT THE COMPLETION OF CONSTRUCTION. 4. IF APPLICABLE, INSTALL DROP INLETS WITH INLET PROTECTION TO ACT AS SILT TRAPS DURING CONSTRUCTION. REMOVE ACCUMULATED SILT AS NEEDED TO PREVENT SILT FROM ' ENTERING STORM DRAIN PIPING. 5. INSTALL EROSION CONTROL MEASURES BEFORE BEGINNING CONSTRUCTION INCLUDING BUT NOT LIMITED TO GRAVELLED CONSTRUCTION ENTRANCE, SILT FENCE, CHECK DAMS, ETC. INSTALL ALL EROSION CONTROL MEASURES AS SOON AS POSSIBLE AFTER BEGINNING CONSTRUCTION. 6. A 4 LAYER OF TOPSOIL SHALL BE APPLIED TO ALL NEW AREAS TO BE GRASSED. 7. ALL DISTURBED AREAS SHALL BE SEEDED IN ACCORDANCE WITH SEEDING SCHEDULE AS FILMSOON AS POSSIBLE BUT NO LATER THAN 30 DAYS AFTER DISTURBANCE. 8. MAINTAIN ALL EROSION CONTROL MEASURES UNITL PROJECT IS COMPLETE. 9. MORE STRINGENT MEASURES MAY BE REQUIRED TO HALT EROSION IF THOSE ON THIS Jow PLAN PROVE TO BE LESS EFFECTIVE. I/•4"'Id" vw w1AN 10. REMOVE ALL TEMPORARY EROSION CONTROL MEASURES UPON COMPLETION OF CONSTRUCTION. Va"K1rF ALL PERMANENT MEASURES SHALL BE WELL ESTABLISHED PRIOR TO PROJECT COMPLETION. - IrJow �� 18" 5Tc1rl.I' A 7 Ll MPAM ION _VW CC _0 C40Nlr.Acn0N JOW C C.1.) 5MWXK_,,,L0J.W 0.r 61' 5 1 - Nt5 Mm 4AL-V PAW aZATING - I" x 1/ 8" MA#3NrA PARS. PA"N VAT H lNft ..l CL", /rI ACH TO 1-1/ 4" x 1-1/ 4" xI/ 4" CALV/V Ma.,! rKAAC. MORi'oR ri?Aw To roP or Ol nxf STi�ddGfl e. ATYAQi GH.vMJ�t71N VHER£ R/V WITH PERMITS TOP Or CwWC I OFtlf'ICC CS AMCSH ,020 Wl�� CAST I,PLAV AFTER BOX 2!5h r4.0017 POOL 19.2 SlDEVAG4' r 16" II I may. i 0 NOI MAt. POOL. 1810 - M& ELL£R H-1422 ALTER ral' V1I2 RISER 1iOt'rOM I3,0 FLFT VF66-2, VF77-I2 5CT10N A - A I i 1 1/2L' IQR e J�2M? SUVICE NTS STANDARD WATER VALVE BOX r%Oa7 POOL, 19.2 & COVER MARKED C,fl. CONC. CURB & GUTTER CONC. SIDEWALK 110 g SEAL CLEAN -OUT \\ N012MN. POOL 18.0 STACK w/DUCT TAPE EXTRA HEAVY (SEE NOTE 2) SOIL PIPE `- 1/8' BEND AfU1H�l per' EXTRA HEAVY 4'S❑IL PIPE SEWER MAIN PLUG w/4' SINGLE TEST PLUG w/WING NUT 4' VITRIFIED CLAY (SEE NOTE 2) TAPPING SADDLE TEE OR WYE (SEE NOTE 1) VC01TOM 0.0 NOTESi 1. SEWER TAPS TO BE PERFORMED BY CITY CREWS EXCEPT WHEN TEES OR WYES ARE INSTALLED IN NEW MAINS LAID BY THE CONTRACTOR. 2. THESE ITEMS SHALL BE INSTALLED WHEN NO HOUSE C❑NNECTI❑N IS MADE AT C.O. �UMELINES MR STANIAR0 CLEAN -OUT SANITARY SEWER HNUSE SERVICE NTS b 17EiiN110N POW an�f STf�1Gil.t� 2,14 COW. IN C04+IC. rN:.CI7 POW W-AM - + GN.V. HOM. Jr. PL L C.005 50L.D W/ a ow *4 a 24" O.C. 2 1171 *4!12"Or- 12" ram, ax REVISIONS Description By FXa51ON co J nj m G\�c�na la r SITE WORK NOTES 1. THE CONTRACTOR SHALL VISIT THE SITE AND BECOME FAMILIARIZED WITH EXISTING CONOTIONS BOTH ON AND IMMEDIATELY ADJACENT TO THE SITE. 2. CLEARING: CONTRACTOR SHALL REMOVE ALL TREES AND VEGETATION WITHIN LIMITS OF CONSTRUCTION UNLESS OTHERWISE DESIGNATED TO REMAIN. 3. GRUBBING AND STRIPPING: CONTRACTOR SHALL RAKE AND REMOVE ROOTS, STUMPS, VEGETATION, DEBRIS, EXISTING STRUCTURES ABOVE AND BELOW GRADE, ORGANIC MATERIAL OR ANY OTHER UNSUITABLE MATERIAL WITHIN LIMITS OF CONSTRUCTION. 4. MUCKING: CONTRACTOR SHALL COORDINATE WITH OWNER AND THEIR GEOTECHNICAL REPRESENTATIVE TO COORDINATE REMOVAL OF ANY SOFT AREAS. 5. DISPOSAL: CLEARED, GRUBBED, STRIPPED OR OTHER WASTE MATERIAL SHALL BE REMOVED FROM SITE AND DISPOSED OF IN A PROPERLY PERMITTED FACILITY. 6. FILL AND COMPACTION SHOULD COMPLY WITH GEOTECHNICAL REPORT. 7. THE CONTRACTOR SHALL NOTE THAT THE GRADING PLAN MAY NOT REPRESENT A BALANCED EARTHWORK CONDITION. THE CONTRACTOR SHALL BE RESPONSIBLE FOR CUT AND FILL QUANTITIES AND COMPLETE INSTALLATION TO SPECIFIED GRADES. 8. THE CONTRACTOR SHALL FURNISH SUITABLE BORROW MATERIAL FROM AN OFF -SITE PROPERLY PERMITTED FACILITY AS REQUIRED. 9. THE CONTRACTOR IS RESPONSIBLE FOR THE LOCATION AND PROTECTION OF ALL EXISTING UTILITIES DURING CONSTRUCTION. BEFORE COMMENCING ANY EXCAVATIONS IN OR ALONG ROADWAYS OR RIGHT-OF-WAYS, PUBLIC AREAS OR IN PRIVATE EASEMENTS, THE CONTRACTOR SHALL NOTIFY ALL APPROPRIATE PERSONNEL OF THEIR INTENT TO EXCAVATE, IN WRITING, NOT LESS THAN 10 DAYS PRIOR TO EXCAVATING. 10. THE CONTRACTOR SHALL BE RESPONSIBLE TO COORDINATE DISCONNECTION/ RECONNECTION AND/OR THE RELOCATION OF ALL EXISTING UTILITIES WITH APPROPRIATE PERSONNEL, 11. EXISTING SURVEYING PERFORMED BY STUART Y. BENSON, RLS AND SUPPLIED BY THE OWNER. 12. THE CONTRACTOR SHALL FIELD VERIFY ALL DIMENSIONS AT THE SITE. FURTHERMORE THE CONTRACTOR SHALL REPORT ALL DISCREPANCIES OR QUESTIONS TO THE ENGINEER PRIOR TO INSTALLATION. 13. THE CONTRACTOR SHALL PROVIDE ANY AND ALL LAYOUT REQUIRED TO CONSTRUCT HIS WORK UNLESS OTHERWISE DIRECTED BY OWNER. 14, ALL PVC UTILITY MAINS SHALL BE INSTALLED WITH A MINIMUM OF 36" COVER AT FINAL GRADE. 15. ALL SERVICE CONNECTIONS SHALL BE INSTALLED TO MEET ALL LOCAL AND STATE CODES. METERS, TAPS, MATERIALS, WORKMANSHIP AND ALL FEES SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR AND SHALL COMPLY WITH ALL REQUIREMENTS. 16. ALL PAVEMENT, BASE AND SU8GRADE SHALL COMFORM TO NCDOT STANDARDS INCLUDING WORKMANSHIP, MATERIALS AND EQUIPMENT. APPROPRIATE BARRICADES, SIGNS, LIGHTS OR OTHER TRAFFIC CONTROL DEVICES SHALL BE PROVIDED IN ACCORDANCE WITH NCDOT TO MAINTAIN SAFETY AND TWO WAY TRAFFIC. 17. ALL AREAS SHALL BE GRADED FOR POSITIVE DRAINAGE. THE CONTRACTOR SHALL REPORT 7- ANY DISCREPANCIES TO THE ENGINEER PRIOR TO INSTALLATION ALL AREAS SHALLa. BE a. Z� O V� Z z lu L Q < -A v_-- kA V\ • 0 00 w z co W � W � U o CC � LO Lr �4 O Z 1 co 1 Z6 W CD � � � I O 0 C \ tw 0) cy, 0 �I r_q P-4 0 4 K APPROVED 4 r g INORTH CAROLINA ENVIPCNYiNtTAL MANAGEMENT COMMISSION � .. DIVISION OF V:ATER QUALITY IDa1LLl5AUG 1Rc17 A� stormwatar Permit No Q U / C� i S E A L S1• 17374 STORMWATER//�l��rrffILL41V1 GREGO���`�. 1 DATE 03-19-0 D E C E (V E DESIGN PGT/SMF DRAWN MLH JUL 2 31997 PROJ �v320 DATE PRUM rAL 1 9 1991 SHEET 1 OF 1 9671