Loading...
HomeMy WebLinkAboutSW8960108_COMPLIANCE_19960917STORMWATER DIVISION CODING SHEET POST -CONSTRUCTION PERMITS PERMIT NO. SW DOC TYPE ❑ CURRENT PERMIT ❑ ' APPROVED PLANS ❑ HISTORICAL FILE COMPLIANCE EVALUATION INSPECTION DOC DATE f� t1Df YYYYM M D D i State of North Carolina Department of Environment, Health, and Natural Resources Wilmington Regional Office James B. Hunt, Jr. DIVISION OF WATER QUALITY Jonathan B. Howes Governor WATER QUALITY SECTION Secretary September 17, 1996 Mr. Benjamin E. Thompson 254 Forsyth Medical Park Winston-Salem, North Carolina 27103 Subject: COMPLIANCE INSPECTION Thompson Apartment Complex -Professional Park Stormwater Project No. SW8 960108 Carteret County Dear Mr. Thompson: Please find attached a copy of the completed form entitled "Stormwater Compliance Inspection Report". The report summarizes the findings of a recent inspection of the project's stormwater controls conducted on September 16, 1996 to determine compliance with Stormwater Certification Number SW8 960108 issued on July 15, 1996. A summary of the findings and comments are noted under Section 6 of the report. Please inform this Office in writing before October 17, 1996 of the specific actions that will be undertaken and the time frame required to correct the deficiencies. Failure to provide the requested information, when required, may initiate enforcement action. If you have any questions please contact me at the Wilmington Regional Office, telephone number (910) 395-3900. Sincerely, Linda Lewis Environmental Engineer JBB/arl: S:1WQSISTORMWATIINSPECT1960108.SEP cc: John Thomas, P.E. Central Files U iiida Lewis-j 127 Cardinal Drive Extension, Wilmington, N.C. 28405-3845 • Telephone 910-395-3900 • Fax 910-350-2004 An Equal Opportunity Affirmative Action Employer { STORMWATER COMPLIANCE INSPECTION REPORT 1. Project Name: Thompson Apartment Complex -Professional Park Project Number: SW8 960108 Control Measure: Detention Pond Water Body: Calico Creek Classification: SC Directions to site, address: Off Symi Circle in Morehead City 2. Inspection Date: September 16, 1996 Weather Conditions: Warm, partly cloudy 3. Comparison of Approved plans vs. As -Built: No construction as of this date. 4. Maintenance Problems: NIA 5. PE Certification Received? Recorded Deed Restrictions Received? 6. Comments: a. Will this project be constructed? Please advise as to the start date. Inspector: Linda Lewis AfL Water Quality/Wilmington Regional Office/(910) 395-3900 JBBlarl: S:IWQSISTORMWAT NSPECT1960108.SEP