HomeMy WebLinkAboutSW8960108_COMPLIANCE_19960917STORMWATER DIVISION CODING SHEET
POST -CONSTRUCTION PERMITS
PERMIT NO.
SW
DOC TYPE
❑ CURRENT PERMIT
❑ ' APPROVED PLANS
❑ HISTORICAL FILE
COMPLIANCE EVALUATION INSPECTION
DOC DATE
f� t1Df
YYYYM M D D
i
State of North Carolina
Department of Environment, Health, and Natural Resources
Wilmington Regional Office
James B. Hunt, Jr. DIVISION OF WATER QUALITY Jonathan B. Howes
Governor WATER QUALITY SECTION Secretary
September 17, 1996
Mr. Benjamin E. Thompson
254 Forsyth Medical Park
Winston-Salem, North Carolina 27103
Subject: COMPLIANCE INSPECTION
Thompson Apartment Complex -Professional Park
Stormwater Project No. SW8 960108
Carteret County
Dear Mr. Thompson:
Please find attached a copy of the completed form entitled "Stormwater Compliance Inspection
Report". The report summarizes the findings of a recent inspection of the project's stormwater controls
conducted on September 16, 1996 to determine compliance with Stormwater Certification Number SW8
960108 issued on July 15, 1996.
A summary of the findings and comments are noted under Section 6 of the report. Please inform
this Office in writing before October 17, 1996 of the specific actions that will be undertaken and the time
frame required to correct the deficiencies. Failure to provide the requested information, when required,
may initiate enforcement action. If you have any questions please contact me at the Wilmington Regional
Office, telephone number (910) 395-3900.
Sincerely,
Linda Lewis
Environmental Engineer
JBB/arl: S:1WQSISTORMWATIINSPECT1960108.SEP
cc: John Thomas, P.E.
Central Files
U iiida Lewis-j
127 Cardinal Drive Extension, Wilmington, N.C. 28405-3845 • Telephone 910-395-3900 • Fax 910-350-2004
An Equal Opportunity Affirmative Action Employer
{ STORMWATER COMPLIANCE INSPECTION REPORT
1. Project Name: Thompson Apartment Complex -Professional Park
Project Number: SW8 960108 Control Measure: Detention Pond
Water Body: Calico Creek Classification: SC
Directions to site, address: Off Symi Circle in Morehead City
2. Inspection Date: September 16, 1996
Weather Conditions: Warm, partly cloudy
3. Comparison of Approved plans vs. As -Built: No construction as of this date.
4. Maintenance Problems: NIA
5. PE Certification Received? Recorded Deed Restrictions Received?
6. Comments:
a. Will this project be constructed? Please advise as to the start date.
Inspector: Linda Lewis AfL
Water Quality/Wilmington Regional Office/(910) 395-3900
JBBlarl: S:IWQSISTORMWAT NSPECT1960108.SEP