Loading...
HomeMy WebLinkAboutSW8100201_HISTORICAL FILE_20110204STORMWATER DIVISION CODING SHEET POST -CONSTRUCTION PERMITS PERMIT NO. SW8 { ooZa I DOC TYPE ❑ CURRENT PERMIT ❑ APPROVED PLANS En HISTORICAL FILE ❑ COMPLIANCE EVALUATION INSPECTION DOC DATE 2y 1 l D-z-c4 YYYYM M DD NCDENR North Carolina Department of Environment and Natural Resources Division of Water Quality Beverly Eaves Perdue Coleen H. Sullins Governor Director February 4, 2011 Carl Baker, Deputy Public Works Officer USMCB Camp Lejeune Building 1005 Michael Road USMCB Camp Lejeune, NC 28547 Subject: State Stormwater Management Permit No. SW8 100201 French Creek BEQ P-1017 & P-1047 High Density Commercial Wet Detention Pond Project Onslow County Dear Mr. Baker: Dee Freeman Secretary The Wilmington Regional Office received a complete Stormwater Management Permit Application for French Creek BEQ P-1017 & P-1047 on January 24, 2011. Staff review of the plans and specifications has determined that the project, as proposed, will comply with the Stormwater Regulations set forth in Title 15A NCAC 2H.1000 and Session Law 2008-211. We are forwarding Permit No. SW8 100201- dated February 4, 2011, for the construction of the subject project. This permit shall be effective from the date of issuance until June 11, 2020, and shall be subject to the conditions and limitations as specified therein. Please pay special attention to the Operation and Maintenance requirements in this permit. Failure to establish an adequate system for operation and maintenance of the stormwater management system will result in future compliance problems. If any parts, requirements, or limitations contained in this permit are unacceptable, you have the right to request an adjudicatory hearing upon written request within thirty (30) days following receipt of this permit. This request must be in the form of a written petition, conforming to Chapter 150B of the North Carolina General Statutes, and filed with the Office of Administrative Hearings, P.O. Drawer 27447, Raleigh, NC 27611-7447. Unless such demands are made this permit shall be final and . binding. If you have any questions, or need additional information concerning this matter, please contact Chris Baker, or me at (910) 796-7215. Sincerely, d2t Stormwater Supervisor Division of Water Quality GDSlcsb: S:IWQSISTORMWATERIPERMITS&PROJECTS120101100201 HD12011 02 PERMIT 100201 CC'. Howard Resnick, P. E., Coastal Site Design Wilmington Regional Office Wilmington Regional Office One 127 Cardinal Drive Extension, Wilmington, North Carolina 28405 NorthC arol i na Phone: 910-796.7215 4 FAX: 910-350-20041 Customer Service: 1-877-623-6748 4nternel: www wwaterquality.org ,;Vntirrn//1i State Stormwater Management Systems Permit No. SW8 100201 STATE OF NORTH CAROLINA DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES DIVISION OF WATER QUALITY STATE STORMWATER MANAGEMENT PERMIT I HIGH DENSITY COMMERCIAL DEVELOPMENT In accordance with the provisions of Article 21 of Chapter 143, General Statutes of North Carolina as amended, and other applicable Laws, Rules, and Regulations PERMISSION IS HEREBY GRANTED TO USMCB Camp Lejeune French Creek BEQ P-1017 & P-1047 Sneads Ferry Road, Camp Lejeune, Onslow County FOR THE construction, operation and maintenance of 3 wet detention ponds in compliance with the provisions of 15A NCAC 2H .1000 and Session Law 2008-211 (hereafter collectively referred to as the "stormwater rules") the approved stormwater management plans and specifications and other supporting data as attached and on file with and approved by the Division of Water Quality and considered a part of this permit. This permit shall be effective from the date of issuance until June 11, 2020, and shall be subject to the following specified conditions and limitations: I. DESIGN STANDARDS 1. This permit is effective only with respect to the nature and volume of stormwater described in the application and other supporting data. 2. This stormwater system has been approved for the management of stormwater runoff as described in Section 1.7 on page 3 of this permit. The stormwater control, ponds A, B, and C hve been designed to handle the runoff from 305,377, 126,808, and 100,202 square feet of impervious area respectively. 3. A 50' wide vegetative buffer must be provided adjacent impounded structures, streams, rivers and tidal waters. 4. The tract will be limited to the amount of built -upon area indicated on page 3 of this permit, and per approved plans. The built -upon area'for the future development.is limited to 30,000 sf (pond B) and 38,000 Isf (pond C). 5. All stormwater collection and treatment systems must be� located in either dedicated common areas or recorded easements. The final plats for the project will be recorded showing all such required easements, in accordance with the approved plans. 6. The runoff from all built -upon area within the permitted drainage area(s) of this project must be directed into the permitted stormwater control system. Page 2 of 7 State Stormwater Management Systems Permit No. SW8 100201 7. The following design criteria have been provided in the wet detention pond and must be maintained at design condition: Pond A Pond B Pond C a. Drainage Area, acres: Onsite, W. Offsite, ft2 12.52 545,294 None 8.55 372,305 None 15.38 670,143 None b. Total Impervious Surfaces, ft : Offsite, ft2: Offsite, ft2 305,377 305,377 None 126,808 126,808 None 100,202 100,202 None c. Design Storm, inches: 1.5 1.5 1.5 d. Average Pond Design Depth, feet: 5 4 4 e. TSS removal efficiency: 90 90 90 f. Permanent Pool Elevation, FMSL: 15.2 10.65 12.5 Permanent Pool Surface Area, ft : 27,880 13,976 8,821 h. Permitted Storage Volume, ft : 39,423 18,613 16,189 i. Tern orary Storage Elevation, FMSL: 16.2 11.7 13.6 j. Pre-dev. 1 r-24 hr. discharge rate, cfs: 15.67 0.41 15.4 k. Controlling Orifice, in: 3.5 2 1.75 I. Orifice flowrate, cfs: 0.18 0.06 0.05 m. Permitted Forebay Volume, f# : 25,224 10,120 5,440 n. Fountain Horsepower 112 116 118 o. Receiving Stream/River Basin: Co dels Creek 1 White Oak Stream index Number: 19 - 23 q. Classification of Water Body: SC -,NSW II. SCHEDULE OF COMPLIANCE 1. The stormwater management system shall be constructed in its entirety, vegetated and operational for its intended use prior to the construction of any built -upon surface. 2. During construction, erosion shall be kept to a minimum and any eroded areas of the system will be repaired immediately. 3. The permittee shall at all time provide the operation and maintenance necessary to assure the permitted stormwater system functions at optimum efficiency. The approved Operation and Maintenance Plan must be followed in its entirety and maintenance must occur at the scheduled intervals including, but not limited to: a. Semiannual scheduled inspections (every 6 months). b. Sediment removal. C. Mowing and re -vegetation of slopes and the vegetated filter. d. Immediate repair of eroded areas. e. Maintenance of all slopes in accordance with approved plans and specifications. f. Debris removal and unclogging of outlet structure, orifice device, flow spreader, catch basins and piping. g. Access to the outlet structure must be available at all times. 4. Records of maintenance activities must be kept and made available upon request to authorized personnel of DWQ. The records will indicate the date, activity, name of person performing the work and what actions were taken. 5. The facilities shall be constructed as shown on the approved plans. This permit shall become void unless the facilities are constructed in accordance with the conditions of this permit, the approved plans and specifications, and other supporting data. Page 3 of 7 State Stormwater Management Systems Permit No. SW8 100201 6. Decorative spray fountains will be allowed in the stormwater treatment system, subject to the following criteria: a. The fountain must draw its water from less than 2' below the permanent pool surface. b. Separated units, where the nozzle, pump and intake are connected by tubing, may be used only if they draw water from the surface in the deepest part of the pond. c. The falling water from the fountain must be centered in the pond, away from the shoreline. d. The maximum horsepower for a fountain in these ponds see section 1.7.n on page 3 of this permit. 7. Upon completion of construction, prior to issuance of a Certificate of Occupancy, and prior to operation of this permitted facility, a certification must be received from an appropriate designer for the system installed certifying that the permitted facility has been installed in accordance with this permit, the approved plans and specifications, and other supporting documentation. Any deviations from the approved plans and specifications must be noted on the Certification. A modification may be required for those deviations. 8. If the stormwater system was used as an Erosion Control device, it must be restored to design condition prior to operation as a stormwater treatment device, and prior to occupancy of the facility. 9. Access to the stormwater facilities for inspection and maintenance shall be maintained via appropriate recorded easements at all times. 10. The permittee shall submit to the Director and shall have received approval for revised plans, specifications, and calculations prior to construction, for any modification to the approved plans, including, but not limited to, those listed below: a. Any revision to any item shown on the approved plans, including the stormwater management measures, built -upon area, details, etc. b. Project name change. C. Transfer of ownership. d. Redesign or addition to the approved amount of built -upon area or to the drainage area. e. Further development, subdivision, acquisition, lease or sale of any, all or part of the project area. The project area is defined as all property owned by the permittee, for which Sedimentation and Erosion Control Plan approval or a CAMA Major permit was sought. f. Filling in, altering, or piping of any vegetative conveyance shown on the approved plan. 11. Prior to the construction of any permitted future areas shown on the approved plans, the permittee shall submit final site layout and grading plans to the Division for approval. 12. A copy of the approved plans and specifications shall be maintained on file by the Permittee at all times. 13. The Director may notify the permittee when the permitted site does not meet one or more of the minimum requirements of the permit. Within the time frame specified in the notice, the permittee shall submit a written time schedule to the Director for modifying the site to meet minimum requirements. The permittee shall provide copies of revised plans and certification in writing to the Director that the changes have been made. Page 4 of 7 State Stormwater Management Systems Permit No. SW8 100201 III. GENERAL CONDITIONS This permit is not transferable to any person or entity except after notice to and approval by the Director. In the event of a change of ownership, or a name change, the permittee must submit a completed Name/Ownership Change Form signed by both parties, to the Division of Water Quality, accompanied by the supporting documentation as listed on page 2 of the form. The approval of this request will be considered on its merits and may or may not be approved. 2. The permittee is responsible for compliance with all permit conditions until such time as the Division approves the transfer request. Neither the sale of the project nor the transfer of common area to a third party constitutes an approved transfer of the stormwater permit. 3. Failure to abide by the conditions and limitations contained in this permit may subject the Permittee to enforcement action by the Division of Water Quality, in accordance with North Carolina General Statute 143-215.6A to 143-215.6C. 4. The issuance of this permit does not preclude the Permittee from complying with any and all statutes, rules, regulations, or ordinances, which may be imposed by other government agencies {local, state, and federal} having jurisdiction. 5. In the event that the facilities fail to perform satisfactorily, including the creation of nuisance conditions, the Permittee shall take immediate corrective action, including those as may be required by this Division, such as the construction of additional or replacement stormwater management systems. 6. The permittee grants DENR Staff permission to enter the property during normal business hours for the purpose of inspecting all components of the permitted stormwater management facility. 7. The permit remains in force and effect until modified, revoked, terminated or renewed. The permit may be modified, revoked and reissued or terminated for cause. The filing of a request for a permit modification, revocation and re - issuance or termination does not stay any permit condition. 8. Unless specified elsewhere, permanent seeding requirements for the stormwater control must follow the guidelines established in the North Carolina Erosion and Sediment Control Planning and Design Manual. 9. Approved plans and specifications for this project are incorporated by reference and are enforceable parts of the permit. 10. The permittee shall notify the Division of any name, ownership or mailing address changes at least 30 days prior to making such changes. 11. The permittee shall submit a permit renewal request at least 180 days prior to the expiration date of this permit. The renewal request must include the appropriate documentation and the processing fee. Permit issued this the 4th day of February, 2011. NORTH CAROLINA ENVIRONMENTAL MANAGEMENT COMMISSION f• t;oieegy H. sunins, uir ivision of Water Quality Page 5 of 7 State Stormwater Management Systems Permit No. SW8 100201 By Authority of the Environmental Management Commission French Creek BEQ P-1070 & P-1047 Stormwater Permit No. SW8 100201 Onslow County Designer's Certification I, , as a duly registered in the State of North Carolina, having been authorized to observe (periodically/ weekly/ full time) the construction of the project, (Project) for (Project Owner) hereby state that, to the best of my abilities, due care and diligence was used in the observation of the project construction such that the construction was observed to be built within substantial compliance and intent of the approved plans and specifications. The checklist of items on page 2 of this form is included in the Certification. Noted deviations from approved plans and specifications: Signature Registration Number Date SEAL Page 6 of 7 State Stormwater Management Systems Permit No. SW8 100201 Certification Requirements: 1. The drainage area to the system contains approximately the permitted acreage. 2. The drainage area to the system contains no more than the permitted amount of built -upon area. 3. All the built -upon area associated with the project is graded such that the runoff drains to the system. 4. All roof drains are located such that the runoff is directed into the system. 5. The outlet structure elevations are per the approved plan. 6. The outlet structure is located per the approved plans. 7. Trash rack is provided on the outlet structure. 8. All slopes are grassed with permanent vegetation. 9. Vegetated slopes are no steeper than 3.1. 10. The inlets are located per the approved plans and do not cause short- circuiting of the system. 11. The permitted amounts of surface area and/or volume have been provided. 12. Required drawdown devices are correctly sized and located per the approved plans. .13. All required design depths are provided. .14. All required parts of the system are provided, such as a vegetated shelf, and a forebay. 15. The required system dimensions are provided per the approved plans. 16. All components of the stormwater BMP are located in either recorded common areas, or recorded easements. cc: NCDENR-DWQ Regional Office Onslow County Building Inspections Page 7 of 7 DWQ USE ONLY Dite Received Fee Paid Permit Number D20—C' Ap icab Rules: ❑ Coastal SW —1 95 ❑ Coastal SW — 2008 ❑ Ph II - Post Construction (select all that apply) ❑ Non -Coastal SW- HQW/ORW Waters ❑ Universal Stormwater Management Tian ❑ Other WQ M mt Plan: State of North Carolina Department of Environment and Natural Resources Division of Water Quality STORMWATER MANAGEMENT PERMIT APPLICATION FORM This form may be pliolocopied for use as an original I. GENERAL INFORMATION 1. Project Name (subdivision, facility, or establishment name -should be consistent with project name on plans, specifications, letters, operation and maintenance agreements, etc.): FY09 FRENCH CREEK BEO P-1017 P-1047 off Sneads Ferry Road 2. Location of Project (street address): Sneads Ferry Road City:Carnp Lejeune County:Onlsow Zip:28547-2539 3. Directions to project (from nearest major intersection): Intersection of US 17 and NC_24. Take NC 24 East to Holcomb Blvd. Turn right onto Holcomb Blvd. Travel approximately 3.3 miles to Sneads Ferry Road. Turn Left on Sneads Ferry Road. Travel approximately 1.3 miles entrace to site is on the right. 4. Latitude:34° 39' 56" N Longitude:77' 19' 40""W of the main entrance to the project. II. PERMIT INFORMATION: 1. a. Specify whether project is (check one): ❑New ®Modification b.If this application is being submitted as the result of a modification to an existing permit, list the existing permit numberSW8 100201 , its issue date (if known)6-11-10 , and the status of construction: ❑Not Started ®Partially Completed* ❑ Completed* *provide a designer's certification Specify the type of project (check one): ❑Low Density ®High Density ❑Drains to an Offsite Stormwater System ❑Other If this application is being submitted as the result of a previously returned application or a letter from DWQ requesting a state stormwater management permit application, list the stormwater project number, if assigned, and the previous name of the project, if different than currently proposed, 4. a. Additional Project Requirements (check applicable blanks; information on required state permits can be obtained by contacting the Customer Service Center at 1-877-623-6748): ❑CAMA Major ®Sedimentation/Erosion Control: 27 ac of Disturbed Area ❑NPDES Industrial Stormwater Z404/401 Permit: Proposed Impacts b.If any of these permits have already been acquired please provide the Project Name, Project/Permit Number, issue date and the type of each permit: Erosion Control # ONSLO-2010-117. 404 Action ID = 2010-00596 Form SWU-101 Version 073uly2009 Page 1 of 6 7BY F "rVED JAN 2 4 2011 : r III. CONTACT INFORMATION• 1. a. Print Applicant / Signing Official's name and title (specifically the developer, property owner, lessee, designated government official, individual, etc. who owns theg_r_joiect): Applicant/ Organization: MARINE CORPS BASE, CAMP LEIEUNE Signing Official & Title:Carl Baker,Deputy Public Works Officer b. Contact information for person listed in item 1a above: Street Address:BLDG 1005 MICHAEL ROAD City:MCB CAMP LEIEUNE State: Zip:28547 Mailing Address (if applicable): City: State: Zip: Phone: (910 ) 451-2213 Fax: (910 ) 451-2927 Email:carl.h.baker@usmc.mil c. Please check the appropriate box. The applicant listed above is: ® The property owner (Skip to Contact Information, item 3a) ❑ Lessee* (Attach a copy of the lease agreement and complete Contact Information, item 2a and 2b below) ❑ Purchaser* (Attach a copy of the pending sales agreement and complete Contact Information, item 2a and 2b below) ❑ Developer* (Complete Contact Information, item 2a and 2b below.) 2. a. Print Property Owner's name and title below, if you are the lessee, purchaser or developer. (This is the person who owns the property that the project is located on): Property Owner/Organization: Signing Official & Title: b. Contact information for person listed in item 2a above: Street Address: City: Mailing Address (if applicable): City: Phone: ( ) Email: Sta Zip: State: Zip: Fax: { ) 3. a. (Optional) Print the name and title of another contact such as the project's construction supervisor or other person who can answer questions about the project: Other Contact Person/Organization: Signing Official & Title: b. Contact information for person listed in item 3a above: Mailing Address: City: State: Zip: Phone: ( ) _.. Fax: { ) Email: 4. Local jurisdiction for building permits: MCAS Camp Lejeune Point of Contact:Doris Hardin -Langley Phone #: (910 } 451-5694 .BAN 2 4 2011 Form SWU-101 Version 07July2009 Page 2 of 6 lY: I .IV. PROJECT INFORMATION 1. In the space provided below, briefly summarize homer the stormwater runoff will be treated. Runoff will be directed to wet basins, via catch basins, grassed swales and stormwater conduit 2. a. If claiming vested rights, identify the supporting documents provided and the date they were approved: ❑ Approval of a Site Specific Development Plan or PUDApproval Date: ❑ Valid Building Permit Issued Date: ❑ Other: Date: b.Identify the regulation(s) the project has been designed in accordance with: ❑ Coastal SW -1995 ❑ Ph II - Post Construction 3. Stormwater runoff from this project drains to the White Oak River basin. 4. Total Property Area: 30.07 acres 5. Total Coastal Wetlands Area: n a acres 6. Total Surface Water Area: 0.17 acres 7. Total Property Area (4) -Total Coastal Wetlands Area (5) -Total Surface Water Area (6) = Total Project Area-: 29.90 acres Total project area shall be calculated to exclude the followin the normal pool of impounded structures, the area between the banks of streams and rivers, the area below the Normal Nigh Water (NHW) line or Mean High Water (MHiti') line, and coastal wetlands landward from the NHW (or MHW) line. The resultant project area is used to calculate overall percent buuilt upon area (BUA). Non -coastal Wetlands landward of the NHW (or MHW) line may be included in the total project area. 8. Project percent of impervious area: (Total Impervious Area / Total Project Area) X 100 = 40.9 % 9. How many drainage areas does the project have?3 (For high density, count 1 for each proposed engineered stormwater BMP. For low density and other projects, use 1 for the whole property area) 10. Complete the following information for each drainage area identified in Project Information item 9. if there are more than four drainage areas in the project, attach an additional sheet with the information for each area provided in the same format as below. Basin.Information ., Drainage Area A Drainage Area B Drainage Area C Drainage Area Receiving Stream Name Cogdels Creek Cogdels Creek Cogdels Creek Stream Class * SC -NSW SC -NSW SC -NSW Stream Index Number * 19-23 19-23 19-23 Total Drainage Area (sf) 545,294 (12.52 a) 372,305 sf(8.55a) 670,143 sf(15.38a) On -site Drainage Area (sf) 545,294 (12.52 a) 372,305 sf(8.55a) 670,143 sf(15.38a) .Off -site Drainage Area (sf) Proposed Impervious Area** (sf) 305,377 sf (7.01a) 126,808sf(2.91a) 100,202sf(2.30a) `%, Impervious Area** (total) 0.559 34.1 15.0 Impervious** Surface Area Drainage Area Drainage Area Drainage Area Draina e Area _ On -site Buildings/Lots (sf) 50,938 sf (1.17a) On -site Streets (sf) 49,495 sf (1.14a 73,219 sf(1.68a) 58,449 sf(1.34a) On -site Parking (sf) 184,475 sf (4.23a) ' On -site Sidewalks (sf) 10,128 sf (0.23a) 23,589 sf(0.54a) 3,753 sf(0.09a) Other on -site (sf) 10,341 sf (0.24a) Future (sf) 30,000 sf(0.69a) 38,000 sf(0.87a) Off -site (sf) Existing BUA*** (sf) Total (sf): 305,377 sf (7.01a) 126,808sf(2.91a) 100,202sf(2.30a) * Strcani Class and Index Nunubercan be deterniined at: http://ir2o.enr.state.nc.urs/lunzs/reports/rcportsWB. Illml ** hn ierviars area is defined as the built upon area including, but not limited to, buildings, roads, parking areas, sidtewalks, gravel areas, etc. *** Report only that amount of existing BUA that 717ill remain after development. Do not r. r atp -UxIstQ B Etizzaat-i's to be removed acid which will be replaced by new BUA. L; V Form SWU-101 Version 07July2009 Page 3 of'6 JAB 2 4 2011 `11, How was the off -site impervious area listed above determined? Provide documentation. Proiects in Union County: Contact DWQ Central Office staff to check if the project is located within a Threatened & Endangered Species watershed that may be subject to more stringent stornu,ater requirements as per NCAC 02B .0600. V. SUPPLEMENT AND O&M FORMS The applicable state stormwater management permit supplement and operation and maintenance (O&M) forms must be submitted for each BMP specified for this project. The latest versions of the forms can be downloaded from httpLlh2o.enr,state.nc.us/su/bmp_forms.htm. VI. SUBMITTAL REQUIREMENTS Only complete application packages will be accepted and reviewed by the Division of Water Quality (DWQ). A complete package includes all of the items listed below. A detailed application instruction sheet and BMP checklists are available from http://h2c).enr.state.nc.us/su/bmp forms.htm. The complete application package should be submitted to the appropriate DWQ Office. (The appropriate office may be found by locating project on the interactive online map at http://h2o.enr.state.nc.us/su/msi maps.htm.) Please indicate that the following required information have been provided by initialing in the space provided for each item. All original documents MUST be signed and initialed in blue ink. Download the latest versions for each submitted application package from http://h2o.enr.state.nc.us/su/bmp forms.htm_ Initi is 1. Original and one copy of the Stormwater Management Permit Application Form. r K. 2. Original and one copy of the signed and notarized Deed Restrictions & Protective Covenants 9101, Form. (if required as per Part VII belo7o) 3. Original of the applicable Supplement Form(s) (sealed, signed and dated) and O&M 9117, agreement(s) for each BMP. 4. Permit application processing fee of $505 payable to NCDENR. (For an Express review, refer to http://www.envheli2.org/12ages/onestol2exl2ress.html for information on the Express program and the associated fees. Contact the appropriate regional office Express Permit Coordinator for additional information and to schedule the required application meeting.) 5. A detailed narrative (one to two pages) describing the stormwater treatment/management for the project. This is required in addition to the brief summary provided in the Project Information, item 1. 6. A USGS map identifying the site location. If the receiving stream is reported as class SA or the tie, _ receiving stream drains to class SA eaters within'h mile of the site boundary, include the'h mile radius on the map. Sealed, signed and dated calculations. Two sets of plans folded to 8.5" x 14" (sealed, signed, & dated), including: a. Development/Project name. b. Engineer and firm. c. Location map with named streets and NCSR numbers. d. Legend. e. North arrow. f. Scale. g. Revision number and dates. h. Identify all surface waters on the plans by delineating the normal pool elevation of impounded structures, the banks of streams and rivers, the MHW or NHW line of tidal waters, and any coastal wetlands landward of the MHW or NHW lines. • Delineate the vegetated buffer landward from the normal pool elevation of impounded structures, the banks of streams or rivers, and the MHW (or NHW) of tidal waters. i. Dimensioned property/project boundary with bearings & distances. j. Site Layout with all BUA identified and dimensioned. k. Existing contours, proposed contours, spot elevations, finished floor elevations. 1. Details of roads, drainage features, collection systems, and stormwater control measures. m. Wetlands delineated, or a note on the plans that none exist. (Must be delineated by a qualified person. Provide documentation of qualifications and identify the person who made the determination on the plans. n. Existing drainage (including off -site), drainage easements, pipe sizes, runoff calculations. o. Drainage areas delineated (included in the main set of plans, not as a separate document). p. Vegetated buffers (where required). A, le, 14 (it JAN 2 4 ZO11 Form SWU-101 Version 071uly2009 Paye 4 of 6 '9. Copy of any applicable soils report with the associated SHWT elevations (Please identify elevations in addition to depths) as well as a map of the boring locations with the existing elevations and boring logs. Include an 8.5"x11" copy of the NRCS County Soils map with the project area clearly delineated. For projects with infiltration BMPs, the report should also include the soil type, expected infiltration rate, and the method of determining the infiltration rate. (Infiltration Devices submitted to WiRO: Schedule a site visit far DWQ to verifij the SHWT prior to subinillal, (9I0) 796-7378.) 10. A copy of the most current property deed. Deed book: Page No 11. For corporations and limited liability corporations (LLC): Provide documentation from the NC Secretary of State or other official documentation, which supports the titles and positions held by the persons listed in Contact Information, item la, 2a, and/or 3a per NCAC 2H.1003(e). The corporation or LLC must be listed as an active corporation in good standing with the NC Secretary of State, otherwise the application will be returned. http:/ ZwxA,",.secretary,state.nc.us/Corporations/CSearch.aspx VII. DEED RESTRICTIONS AND PROTECTIVE COVENANTS For all subdivisions, outparcels, and future development, the appropriate property restrictions and protective covenants are required to be recorded prior to the sale of any lot. If lot sizes vary significantly or the proposed BUA allocations vary, a table listing each lot number, lot size, and the allowable built -upon area must be provided as an attachment to the completed and notarized deed restriction form. The appropriate deed restrictions and protective covenants forms can be downloaded from http://h2o.enr.state.nc.us/su/bml2 forms.htm#deed restrictions. Download the latest versions for each submittal. In the instances where the applicant is different than the property owner, it is the responsibility of the property owner to sign the deed restrictions and protective covenants form while the applicant is responsible for ensuring that the deed restrictions are recorded. By the notarized signature(s) below, the permit holder(s) certify that the recorded property restrictions and protective covenants for this project, if required, shall include all the items required in the permit and listed on the forms available on the website, that the covenants will be binding on all parties and persons claiming under them, that they will run with the land, that the required covenants cannot be changed or deleted without concurrence from the NC DWQ, and that they will be recorded prior to the sale of any lot. Vlll. CONSULTANT INFORMATION AND AUTHORIZATION Applicant: Complete this section if you wish to designate authority to another individual and/or firm (such as a consulting engineer and/or firm) so that they may provide information on your behalf for this project (such as addressing requests for additional information). Consulting Engineer:Howard Resnik, PE Consulting Firm: Coastal Site Design, PC Mailing Address:Po BOX 4041 City:Wilmington State:NC Zip:28406 Phone: (910 ) 791-4441 Email:hov%,ard@coastalsitedesign.com Fax: 910 791-1501 IX. PROPERTY OWNER AUTHORIZATION (if Contact Information, itein 2 has been filled out, coniplete this section) 1, (print or type naive of person listed in Contact Information, item 2a) , certify that I own the property identified in this permit application, and thus give permission to (print or type name of person listed in Contact Information, item 1 a) with (print or type name of organization listed in Contact Information, item I b) to develop the project as currently proposed. A copy of the lease agreement or pending property sales contract has been provided with the submittal, which indicates the party responsible for the operation and maintenance of the stormwater system. rF?-'F-, _CIFF�, _J'V1 I JAN 2 4 2011 Form SWU-101 Version 07July2009 Page 5 of 6 rl ,As the legal property owner I acknowledge, understand, and agree by my signature below, that if my desigfiated agent (entity listed in Contact Information, item 1) dissolves their company and/or cancels or defaults on their lease agreement, or pending sale, responsibility for compliance with the DWQ Stormwater permit reverts back to me, the property owner. As the property owner, it is my responsibility to notify DWQ immediately and submit a completed Name/Ownership Change Form within 30 days; otherwise 1 will be operating a stormwater treatment facility without a valid permit. I understand that the operation of a stormwater treatment facility without a valid permit is a violation of NC General Statue 143-215.1 and may result in appropriate enforcement action including the assessment of civil penalties of up to $25,000 per day, pursuant to NCGS 143-215.6. Signature: Im a Notary Public for the State of do hereby certify that before me this _ day of Date: County of personally appeared and acknowledge the due execution of the application for a stormwater permit. Witness my hand and official seal, SEAL My commission expires X. APPLICANT'S CERTIFICATION 1, (print or type name of person listed in Contact Information, item 2) Carl Baker certify that the information included on this permit application form is, to the best of my knowledge, correct and that the project will be constructed in conformance with the approved plans, that the required deed restrictions and protective c nants will be ecorded, and that the proposed project complies with the requirements of the applicable to w ler rules uConstruction) 7 15 CAC 2H .1000, SL 2006-246 (Ph. 11- Post Constructionl)Ior SL 2008-211. Signature:�9 Date: _ — /6 I, a�? / /1 /� �/J�� , a Notitry Public for the State of ���/�= .County of do hereby certify that _� _ personally appeared before me this T day of f� `v and ac wle uee execution of the application for a stormwater permit. Witness my hand and official seal,-�77.eth�� AR JOE A. BONNETTE Notary Public Onelow County $taco of North Carolina Comtnisalon free 1 arf,4uA SEAL My commission expires � (OV - J0, 'If JAN 2 4 Z011 "" =3"-lk Fn7� I;!, IzI Permit Numbe : O (to be p� vided by DWQ) Drainage Area Number: Wet Detention Basin Operation and Maintenance Agreement I will keep a maintenance record on this BMP. This maintenance record will be kept in a log in a known set location. Any deficient BMP elements noted in the inspection will be corrected, repaired or replaced immediately. These deficiencies can affect the integrity of structures, safety of the public, and the removal efficiency of the BMP. The wet detention basin system is defined as the wet detention basin, pretreatment including forebays and the vegetated filter if one is provided. This system (check one): ❑ does ® does not incorporate a vegetated filter at the outlet. This system (check one): ❑ does ® does not incorporate pretreatment other than a forebay. Important maintenance procedures: - Immediately after the wet detention basin is established, the plants on the vegetated shelf and perimeter of the basin should be watered twice weekly if needed, until the plants become established (commonly six weeks). - No portion of the wet detention pond should be fertilized after the first initial fertilization that is required to establish the plants on the vegetated shelf. - Stable groundcover should be maintained in the drainage area to reduce the sediment load to the wet detention basin. - if the basin must be drained for an emergency or to perform maintenance, the flushing of sediment through the emergency drain should be minimized to the maximum extent practical. - Once a year, a dam safety expert should inspect the embankment. After the wet detention pond is established, it should be inspected once a month and within 24 hours after every storm event greater than 1.0 inches (or 1.5 inches if in a Coastal County). Records of operation and maintenance should be kept in a known set location and must be available upon request. Inspection activities shall be performed as follows. Any problems that are found shall be repaired immediately. BMP element: Potentialproblem: How I will remediate the problem - The entire BMP Trash/debris is presenL. Remove the trash/debris. The perimeter of the wet Areas of bare soil and/or Regrade the soil if necessary to detention basin erosive gullies have formed. remove the gully, and then plant a ground cover and water until it is established. Provide time and a one-time fertilizer a hcation. Vegetation is too short or too Maintain vegetation at a height of long. approximately six inches. Form SW40 t-Wet Detention Basin O&M-Rev.4 7�D JAN 2 4 2011 lay. Page l of 4 Permit Number W p t.b V)aok (to be provided by DWO Drainage Area Number: BMP element': Potential roblem: How I will remediate the problem. The inlet device: pipe or The pipe is clogged. Unclog the pipe. Dispose of the Swale sediment off -site. The pipe is cracked or Replace the pipe. otherwise damaged. Erosion is occurring in the Regrade the Swale if necessary to Swale. smooth it over and provide erosion control devices such as reinforced turf matting or riprap to avoid future problems with erosion. The forebay Sediment has accumulated to Search for the source of the a depth greater than the sediment and remedy the problem if original design depth for possible. Remove the sediment and sediment storage. dispose of it in a location where it Will not cause impacts to streams or the BMP. Erosion has occurred. Provide additional erosion protection such as reinforced turf matting or riprap if needed to prevent future erosion problems. Weeds are present. Remove the weeds, preferably by hand. If pesticide is used, wipe it on the plants rather than spraying. The vegetated shelf Best professional practices Prune according to best professional show that pruning is needed practices to maintain optimal plant health. Plants are dead, diseased or Determine the source of the dying. problem: soils, hydrology, disease, etc. Remedy the problem and replace plants. Provide a one-time fertilizer application to establish the ground cover if a soil test indicates it is necessary. Weeds are present. Remove the weeds, preferably by hand. If pesticide is used, wipe it on the plants rather than s ra in . The main treatment area Sediment has accumulated to Search for the source of the a depth greater than the sediment and remedy the problem if original design sediment possible. Remove the sediment and storage depth. dispose of it in a location where it will not cause impacts to streams or the BMP. Algal growth covers over Consult a professional to remove 50% of the area. and control the algal growth, Cattails, phragmites or other Remove the plants by wiping them invasive plants cover 50% of with pesticide (do not spray). the basin surface. c1f�IVED Form SW401-Wet Detention Basin O&M-Rev.4 BAN 2 4 2011 Page 2 of 4 7: r Permit Number: &,)R- m V (to be provided by Dl4 Q) Drainage Area Number: BMP element: Potential proble= How I will remediate theproblem: The embankment Shrubs have started to grow Remove shrubs immediately. on the embankment. Evidence of muskrat or Use traps to remove muskrats and beaver activity is present. consult a professional to remove beavers. A tree has started to grow on Consult a dam safety specialist to the embankment. remove the tree. An annual inspection by an Make all needed repairs. appropriate professional shows that the embankment needs repair. (if applicable) The outlet device Clogging has occurred. Clean out the outlet device. Dispose of the sediment off -site. The outlet device is damaged Repair or replace the outlet device. The receiving water Erosion or other signs of Contact the local NC Division of damage have occurred at the Water Quality Regional Office, or outlet. the 401 Oversight Unit at 919-733- 1786. The measuring device used to determine the sediment elevation shall be such that it will give an accurate depth reading and not readily penetrate into accumulated sediments. When the permanent pool depth reads 5.65 feet in the main pond, the sediment shall be removed. When the permanent pool depth reads 4.65 (both forebays) _ feet in the forebay, the sediment shall be removed. Sediment Removal Bottom BASIN DIAGRAM (fiIl in the blanks) 6 7�_ en\ --------------- me 5 n. ment Storage POREBAY Form SW401-Wet Detention Basin O&M-Rev.4 Permanent Pool Elevation 10.65 Pool Sediment Removal Elevation 5 i_V_0_­11_lue Bottom Elevation 4 MAIN POND FRECEIVED JAN 2 4 2011 Page 3 of 4 BY' 1-ft n. Sediment Storage A Y Permit Number: S W P � t&t (to he provided 6y Dlt' ) I acknowledge and agree by my signature below that I am responsible for the performance of the maintenance procedures listed above. I agree to notify DWQ of any problems with the system or prior to any changes to the system or responsible party. Project name:FY09FRENCH CREEK Birch Street and Qonzalez Blvd Extension W BMP drainage area number: Print name:Carl Baker Title-DeputyTitle-Deputy Public Works Officer Address:Bldg. 1005 Michael Rd. Camp Lejeune, NC 28547 Phone:_910) 451-� 13 d 4 Signature: Date: /1 ._ — ID Note: The legally responsible party should not be a homeowners association unless more than 50% of the lots have been sold and a resident of the subdivision has been named the president. Z'7a,,'� �, a Notary Public for the State of County of _ (O/lflo , do hereby certify that Gi personally appeared before me this day of �Z��� and acknowledge the due execution of the forgoing wet detention basin maintenance re uirements. Witness my hand and official seal, /W7Ntary ONNETTE Publlc CountyStatrth Carolina CommEx ires?�'i' SEAL My commission expires V,' �zf !T'7CT�-"TV7EI] Form SW401-Wet Detention Basin O&M-Rev.4 J A N 2 4 2011 BY: Page 4 of 4 It r�,j\�V ...ti 4twc,.•asiVu sp,s�.,.MlV4J'.AP,n.y� - .7« .�. - Permit No.S W g L O O u (fa be provided by DWQ) �� aflF w a 7-�,4w r= NCDENR a STORMWATER MANAGEMENT PERMIT APPLICATION FORM 401 CERTIFICATION APPLICATION FORM WET DETENTION BASIN SUPPLEMENT This form must be fiffed out, printed and submitted. The Required Items Checklist (Part 111) must be printed, fiffed out and submitted aiong with ail of the required information. 1. PROJECT INFORMATION Project name FY09 FRENCH CREEK 9EO P-1017 P-1047 Contact person Howard Resnik Phone number 910-791.441 Dale 11119/2011 Drainage area number B IL DESIGN INFORMATION Site Characteristics Drainage area 372,305 ftz Impervious area, post -development 126,808 ft2 % impervious 34.06 % Design rainfall depth 1.5 in Storage Volume: Non -SA Waters Minimum volume required Volume provided Storage Volume: SA Waters 1.5' runoff volume Pre -development 1-yr, 24-hr runoff Post -development 1-yr, 24-hr runoff Minimum volume required Volume provided Peak Flow Calculations Is the pro/post control of the 1 yr 24hr storm peak flow required? 1-yr, 24-hr rainfall depth Rational C, pre -development Rational C, post -development Rainfall intensity: t -yr, 24-hr storm Pre -development 1-yr, 24-hr peak flow Post -development 1-yr, 24-hr peak flow Pre/Post 1-yr, 24-hr peak flow control Elevations Temporary pool elevation Permanent pool elevation SHWT elevation (approx. at the perm. pool elevation) Top of 1 Oft vegetated shelf elevation Bottom of 1 oft vegetated shelf elevation Sediment cleanout, top elevation (bottom of pond) Sediment cleanout, bottom elevation Sediment storage provided Is there additional volume stored above the stale -required temp. pool? Elevation of the top of the additional volume 16,593 ft3 OK 18,613 ft3 OK, volume provided is equal to or in excess of volume required. ft3 ft3 ft3 ft3 ft3 (Y or N) 3.8 in 0.00 (unitless) 0.00 (unitless) 0.16 irVhr OK 0.00 ft3lsec 0.00 ft3lsec 0,00 ft3lsec 11.70 fmsl 10.65 imsl 15.20 imsl 11.15 tmsl 10.15 tmsl 5.00 imsl 4.00 tmsl 11-00 ft (Y or N)' �`--EU VED 1%7 imsl OK I J A N 2 4 2011 3Y: Form SW401-Wet Detention Basin-Rev.8-91171e9 Parts I, & 0. Design Summary, Page 1 of 2 Permit NS "T D I V 0 �1 (robe provided by DWQ) Ill. DESIGN INFORMATION S Surface Areas Area, temporary pool Area REQUIRED, permanent pocl SAIDA ratio Area PROVIDED, permanent pool, A,,_pd Area, bottom of 1 Oft vegetated shelf, A, snam Area, sediment cleanout, top elevation (bottom of pond), AW_,nd Volumes Volume, temporary pod Volume, permanont pool, V�m_,6 Volume, forebay (sum of forebays if more than one forebay) Forebay % of permanent pool volume SA1DA Table Data Design TSS removal Coastal SAIDA Tabie Used? Mountain/Piedmonl SA/DA Table Used? SAIDA ratio Average depth (used in SAIDA table): Calculation option 1 used? (See Figure 10-2b) Volume, permanent pool, Vpem and Area provided, permanent pool, A,. aDd Average depth calculated Average depth used in SAIDA, dav, (Round to nearest 0.5ft) Calculation option 2 used? (See Figure 10-2b) Area provided, permanent pool, A, ,_p, Area, bottom of 10ft vegetated shelf, AILIV Area, sediment cleanout, top elevation (bottom of pond), A,,,_,,, 'Depth' (distance b/w bottom of 1 Oft shelf and top of sediment) Average depth calculated Average depth used in SAIDA, d.., (Round to nearest 0.5ft) Drawdown Calculations Drawdown through orifice? Diameter of orifice (if circular) Area of orifice (if -non -circular) Coefficient of discharge (CD) Driving head (Ho) Drawdown through weir? Weir type Coefficient of discharge (C.) Length of weir (L) Driving head (H) Pro -development 1-yr, 24-hr peak flow Post -development 1-yr, 24-hr peak flow Storage volume discharge rate (through discharge orifice or weir) Storage volume drawdown time Additional Information Vegetated side slopes Vegetated shelf slope Vegetated shelf width Length of flowpath to width ratio Length to width ratio Trash rack for overflow & orifice? Froeboard provided Vegetated filter provided? Recorded drainage easement provided? Capures all runoff at ultimale build -out? Drain mechanism for maintenance or emergencies is: Form SW401-Wet Detention Basin-Rev.8-9/17/09 23,424 f? 11,244 ft2 3.02 (unitless) 13,976 OK 11,573 5,141 ft2 18,613 ft' OK 48,807 If 10,120 0 20,7% % OK 90 % y (Y or N) n (Y or N) 3.02 (unitless) N (Y or N) 48,807 ft3 13,976 ft' If OK If Y (Y or N) 13,976 ft2 11,573 ft2 5,141 It' 5.15 It 4.18 ft OK 4.0 ft OK y (Y or N) 2.00 in in' 0.60 (unitless) 0.35 It n (Y or N) (unitless) (unitless) It ft 0.41 ft3/sec 4.03 ft3lsec 0.06 ft3isec 3.47 days OK, draws down in 2-5 days, #VALUE! 3 :1 OK 10 :1 OK Y 10.OK 3:1 OK IRFCEx E 3 : y_30 (YorN) OK JAN 2 4 2011 1.0 ft OK n (Y or N) OK n (Y or N) Insufficient- Recorded drainage easement required. Y (Y or N) OK portable pump Parts I. & II. Design Summary, Page 2 of 2 Permit No. v" D (to be provided by DW4) Jill. REQUIRED ITEMS CHECKLIST Please indicate the page or plan sheet numbers where the supporting documentation can be found. An incomplete submittal package will result in a request for additional information. This will delay final review and approval of the project. Initial in the space provided to indicate the following design requirements have been met. If the applicant has designated an agent, the agent may initial below. If a requirement has not been met, attach justification. Pagel Plan Initials Sheet No. 91L C-1D"t 1. Plans (1" - 50' or larger) of the entire site showing: Design at ultimate build -out, Off -site drainage (if applicable), Delineated drainage basins (include Rational C coefficient per basin), Basin dimensions, Pretreatment system, High flow bypass system, Maintenance access, Proposed drainage easement and public right of way (ROW), Overflow device, and Boundaries of drainage easement. If f ll. L-Sb 2. Partial plan (t" = 30' or larger) and details for the wet detention basin showing: Outlet structure with trash rack or similar, Maintenance access, Permanent pool dimensions, Forebay and main pond with hardened emergency spillway, Basin cross-section, Vegetation specification for planting shelf, and Filter strip. 3. Section view of the wet detention basin (1" = 20' or larger) showing: Side slopes, 3:1 or lower, Pretreatment and treatment areas, and Inlet and outlet structures. .I(. C -10LA 4. if the basin is used for sediment and erosion control during construction, clean out of the basin is specified on the plans prior to use as a wet detention basin. G(ALc 5. A table of elevations, areas, incremental volumes & accumulated volumes for overall pond and for forebay, to verify volume provided. 11 fd C -1011 6. A construction sequence that shows how the wet detention basin will be protected from sediment until the entire drainage area is stabilized. 7. The supporting calculations. #.n. e m6A 8. A copy of the signed and notarized operation and maintenance (O&M) agreement. AftA91 N i k 9. A copy of the deed restrictions (if required). t&VAA 10, A soils report that is based upon an actual field investigation, soil borings, and infiltration tests. County soil maps are not an acceptable source of soils information. 7-�',IVED JAN 2 4 2011 BY'. --- Form SW401-Wet Detention Basin -Rev. B-9117/09 Part III. Required Items Checklist, Page 1 of 1 Permit Number SW8100201 Program Category State SW Permit Type State Stormwater Primary Reviewer chris.baker Coastal SW Rule Coastal Stormwater - 2008 Permitted Flow Central Files: APS SWP 02/04/11 Permit Tracking Slip Status Project Type Active Major modification Version Permit Classification 1.10 Individual Permit Contact Affiliation Facility Facility Name Major/Minor Region French Creek BEQ P1017 and P1047 Minor Wilmington Location Address County Sneads Ferry Rd Onslow Camp Lejeune NC 28547 Facility Contact Affiliation Owner Owner Name Owner Type Commanding Officer US Marine Corps - Camp Lejeune Government - Federal Owner Affiliation Carl H. Baker P S C 20004 Camp Lejeune NC 285420004 Scheduled Orig Issue App Received Draft Initiated Issuance Public Notice Issue Effective Expiration 06/11/10 01/24/11 02/03/11 02/03/11 06/10/20 Regulated Activities Reauested/Received Events State Stormwater - HD - Detention Pond Deed restriction requested Deed restriction received Outfall NULL Waterbody Name Stream Index Number Current Class Subbasin U.S. ARMY CORPS OF ENGINEERS WILMINGTON DISTRICT Action ID. 2010-00596 County: Onslow USGS Quad: Camp Lejeune GENERAL PERMIT (REGIONAL AND NATIONWIDE) VERIFICATION Property Owner: US Marine Corps A_ir_Station,N_ew River Address: Attn: Carl Baker Deputy Public Work_ s Officer 1005 Michael Road Camp Lejeune, NC 28542 Telephone No.: (910) 451-2213 Size and location of property (water body, road name/number, town, etc.): The Birch Street Extension, USMC Camp Le*eune, Cogdels Creek, Onslow County, North Carolina, Hydrologic Cataloging Unit 03030001. Description of projects area and activity: Extend _the _existing Birch Street to provide access to the newly constructed Bachelor Enlisted Ouarters and associated parking area. The vroiect will involve two crossinEs of streams and associated wetlands impacting 0.48 acres of jurisdictional wetlands and 250 linear feet of stream, channel. Twin 48- inch RCPs and twin 54-inch RCPs, with an 18-inch RCP equalizer nine will be placed at crossing "A" and "B". respectively. Applicable Law: ® Section 404 (Clean Water Act, 33 USC 1344) ❑ Section 10 (Rivers and Harbors Act, 33 USC 403) Authorization: Regional General Permit Number: Nationwide Permit Number: 14 Your work is authorized by the above referenced permit provided it is accomplished in strict accordance with the attached conditions and your submitted plans. Any violation of the attached conditions or deviation from your submitted plans may subject the permittee to a stop work order, a restoration order and/or appropriate legal action. This verification is valid until the nationwide permit is modified, reissued or revoked. All of the existing nationwide permits are scheduled to be modified, reissued, or revoked prior to March 18, 2012. It is incumbent upon you to remain informed of the changes to the nationwide permits. We will issue a public notice when the nationwide permits are reissued. Furthermore, if you commence (i.e., are under construction) or are under contract to commence before the date that the relevant nationwide permit is modified or revoked, you will have twelve (12) months from the date of the modification or revocation of the nationwide permit to complete the activity under the present terms and conditions of this nationwide permit. Activities subject to Section 404 (as indicated above) may also require an individual Section 401 Water Quality Certification. You should contact the NC Division of Water Quality (telephone (919) 733-1786) to determine Section 401 requirements. For activities occurring within the twenty coastal counties subject to regulation under the Coastal Area Management Act (CAMA), prior to beginning work you must contact the N.C. Division of Coastal Management . This Department of the Army verification does not relieve the permittee of the responsibility to obtain any other required Federal, State or local approvals/permits. If there are any questions regarding this verification, any of the conditions of the Permit, or the Corps of Engineers regulatory program, please contact Mr. Richard K. Spencer at (910) 251-41_7;. Corps Regulatory Official Date: 10 June 2010 Expiration Date of Verification: 18 March 2012 The Wilmington District is committed to providing the highest level of support to the public. To help us ensure we continue to do so, please complete the Customer Satisfaction Survey located at our website at http://regulatory.usacesurvey.coirt/ to complete the survey online. Copy Furnished: Ms, Joanne Steenhuis, DWQ Mr. Stephen Rynas, DCM jAN 2 4 2011 BY Action 1D. 2010-00596 County: Onslow USGS Quad: CampLeieune GENERAL PERMIT SPECIAL CONDITIONS l . Failure to institute and carry out the details of the following special conditions below and the General Conditions attached will result in a directive to cease all ongoing and permitted work within waters of the United States, including wetlands, associated with the permitted project, or such other remedies and/or fines as the U.S. Army Corps of Engineers District Commander or his authorized representatives may seek. 2. Sediment and erosion control measures shall be in place prior to any land disturbance activities. 3. Dewatering of the construction site, if required, shall be accomplished by pumping to a maintained silt bag or approved silting basin. All connections and hose lines shall be inspected for proper coupling fit . and leaks before the commencement of the daily work. Used silt bags shall be changed out in accordance with manufacture's specifications and not allowed to overcharge and release sediment to the surface waters and/or wetlands. Silt bags will not be located within any wetland or surface water. 4. All wetland areas within the project area that are not to be disturbed shall be identified by use of barrier fence to prevent unauthorized impacts to these areas. Staging areas or the stockpiling of construction material shall not be located in any wetlands. 6. Compensatory mitigation for the unavoidable impacts to 0.48 acres of riparian wetlands and 250 linear feet of warm water stream channel associated with the proposed project shall be mitigated by Camp Lejeune by payment to the North Carolina Ecosystem Enhancement Program (NCEEP) in the amount determined by the NCEEP, sufficient to perform the restoration of 500 linear feet of warm water stream and 0.96 acres of riparian wetlands in the White Oak Basin, Cataloging Unit 03030001. Construction within jurisdictional areas on the property shall begin only after the permittee has made full payment to the NCEEP and provided a copy of the payment documentation to the Corps of Engineers, and the NCEEP has provided written confirmation to the Corps of Engineers that it agrees to accept responsibility for the mitigation work required. RECEIVED JAN 2 4 2011 BY-- L 0CA RON MAP D 125 250 5D0 1 inch 250 St, Horizontal r � y WE' LANDS IMPACT AREAS �— za IMPACT AREA A = 5,579 SF = 0.13 AC� IMPACT AREA 8 15.312 SF = 0.35 AC TOTAL = 20.691 = 0.48 AC X. twor TO sc4c, , STREAM IMPACTS o I.APACT AREA A - 148 LF _ 11 MPAC �ADREA 1 IMPACT AREA p = 102 LF ---�� - TOM. = 250 LF I:::' 1 ,', WETLANDS LEI .... p WETLANDS BOUNDARY - TOTAL AREA WITHIN PROJECT LIMITS = i,248.924 SF = 28.67 AC TOTAL ON -SITE WETLANDS = 37.026 SF = 0.8.9 AC .: :::[[[i.[::1 O p ", r 55 FORCE MAIN ..-.�I TOTAL ONSITESTREAM = 379 LINEAR FEET O �0 1 SIDEWALK ROADWAY W[:[:: - _ STORM DRAIN ►vl j IMPACT AREA A,::::-- -.r. `� M1 IMPACT AREA EI " I WETLANDS :BOUNDARY A a SIDEWALK WETLANDS BOUNDARY�G. 452 r _ 0 11 _ 1 : ROADWAY / YW >aE _ �Avv i / f //!1l1711IV17111515 / LLB O ----- - ................ ...... + .� 9 She t 1 ,,Calibre FRENCH CREEK � Job Num°er C>J6.. F.np�rrnn9 Inr, 6pt s�rpa.� �a�ra l.vti 200 3 u�eMn.Cc A0120 430317� OVERALL IMPACT MAP w��.^aYGse^4^erm9 m'1 Oale ALOE cym KH RN/L �• G 0511112010 RECEIVED] JAIL 2 4 2011 BY: WET DETENTION POND ANALYSIS FILE NAME: #VALUEI PROJECT #: SW8 100201 REVIEWER: c. baker PROJECT NAME: Original Run Date: 02/04/2011 Note - User input boxes are shaded in blue Last Modified: 04-Feb-11 Pond 1+ Pond 2 Pond 3 Pond 4 Pond 5 _Pond 6 Receiving Stream: Cogdels Creegdogdols Creek Classification: SC;NSW SC;NSW Index Number: 19-23 19-23 Onsite DA, sf= 372305.00 670143.00 Offsite DA, sf = Total Drainage Area: 0.00 372305.00 670143.00 0.00 0.00 0.00 BuildingslLots, sf= Streets1Park!ng, sf= 73219.00 58449.00 Sidewalk/Concrete, sf= 23589.00 3753.00 7 Other, sf= 30000.00 38000.00 Offsite, sf= 1 1 0.00 126808.00 100202.00 0.00 0.00 0.00 Total Built -upon Area: Built -Upon Area 1 Volume at a Different Design Storm BUA, sf DA, sf Design Storm, inches Rv #DIVIO! #DIV/O! #DIV101 #DIV/O! #DIV10! #DIV/O! Required Volume, cf #DIVl0! #DIV/01 #DIV/O! #DIV/O! #DIWO! #DIVIO! Pond 1 Pond 2 Pond 3 Pond 4 Pond 5 Pond 6 Surface Area % impervious Avg. Oepth Reported, ft: TSS (85% or 90%): SA/DA ratio Req. Min. Surface Arez Storaoe Volume Calci Design Storm, inches: Rational Cc= Rv = Min Req Stg Volume- #DIVIO! 34.06% 14.95% #DIV101 #DIV/0! #DIV/01 4.0 4.0 90 3.02% sn 1.30% #DIVIO! #DIVIO! #DIV/O! #DIV/O! #DIV10! 11262 8680 #DIVIO! #DIV/0! #DIVIO! nations [ 1.5 1.5 #DIV/O! 0.46 0.31 #DIV/O! #DIVIO! #DIV/0! #DIV/O! 0.357 0.185 #DIV/O! #DIVIO! #DIV/O! #DIV101 16593 15461 #DIV101 #DIV101 #DIV101 Top of Sediment elev. 5.00 Top of Sediment area 5141.00 Bottom of shelf elev. 10.15 Bottom of shelf area 11573.00 Permanent Pool Elev= 10.65 Perm Pool Area= 13976 Top of shelf elev= 11 Top of shelf area.= 16536 Temp. Pool Elevation= 11.70 Temp.Pool Area= 23424 Temp. Volume Prov. = 0 18617 Avg. Depth (Calc) #DIV/O! 4,18 Pond-1 Pond 2 Forobay Volume Permanent Pool Vol.= Req. Forebay Volume= Prov. Forebay Volume Percent= (22>%>18) Max. Pump HP 7.00 3240.00 12,00 7190.00 12,50 8821 13 16135 13.60 17032 0 0 16189 4.08 #DIV/0! #DIV/0! Pond 3 Pond 4 Pond 5 0 #DIV/O! Pond 6 0 0 -_ 49426 9885 30078 6016 0 0 0 0 0 0 10120 20% 5440 #DIVIO! 18% #DIV/O! #DIV10! #DIV/O! N/A 116 1/8 ____ NIA_ NIA_ _N/A_ Drawdown OrificelWeir Avg. Head, ft = Average Flow Q2, cfs Average Flow Q5, cfs Q2 Area, sq. in. _ Q5 Area, sq. in. = No. of Orifices Orifice Diameter, in.= Orifice Area, sq. in. _ Weir Height, inches= Weir Length, inches= Weir C = Weir L', off. length= 0.00 0.32 0.34 0.00 0.00 0.00 #DIV10! 0,096 0.089 #DIVIO! #DIV/O! #DIVIO! #DIV10! 0.038 0.036 #DIV10! #DIVIO! #DIVIO! #DIV10! 5.059 4.573 #DIV10! #DIV/0! #DIVIO! #DIWO! 2,024 1.829 #DIV10! #DIVIO! #DIVIO! 1 1 _2.00 1.75 0.000 3.142 2.405 0.000 0,000 0.000 #DIV/O! #DIV10! #DIWO! #DIV/O! #DIV/O! #DIWO! 0.000 -0.064 -0.068 0.000 0,000 0.000 Avg. Flowrate, Q, cfs = 0.000 0.060 0.047 0.000 0.000 0.000 Drawdown, days = #DIV101 3.22 3.80 #DIV101 I #DIV101 I #DIV101 STORMWATER MANAGEMENT CALCULATIONS For FY09 FRENCH CREEK BEQ P-1017 P-1047 PREPARED FOR Deputy Public Works Officer Bld 1005 Michael Road MCB Camp Lejeune 28547 Prepared by: COASTAL SITE DESIGN, PC PO Box 4041 Wilmington, NC 28406 Phone:•910 791-4441 Fax:910r791-1501 LicO C-2710 F' ., — o 'y.% �w RECEIVED JAN 2 4 2011 COASTAL SITE DESIGN, PC PO Box 4041 Wilmington, NC 26406 Phone: 910 791-4441 Fax: 910 791.1501 License # C-2710 FOR STORl1'IWATER EXPRESS REVIEW January 2011 PROJECT NAME: FY09 French Creek P-1017 P-1047 modification to SW8 100201 MCB Camp Lejeune, NC Onslow County PROJECT DESCRIPTION: The project area for this development is 30.07 acres with 27 acres of disturbance. There are 0.67ac of wetlands within the project limits. This project'is for the construction of three BEQ buildings, parking lot, jogging trail, recreation courts and road way extensions for Birch and Gonzalez Streets.. The owner is the United States Marine Corps. Water and sewer utilities will be provided by the BASE. Stormwater from the site will drain to SC, NSW waters located in the White Oak River Basin (index # 19-23). This project is subject to Coastal Stormwater Regulations. The project will be high density utilizing underground conveyance pipe and open channels to discharge stortnwater into 3 wet basins designed for 90% TSS removal. All proposed impervious inside the project limits will be collected. Proposed impervious for the site is 40%. There are no buffer requirements for the development. No offsite runoff will be entering the site. The site will have access to Sneads Ferry Road from an existing road that runs into the site. ECS performed SHWT determinations for the site and their findings were utilized to design the pond. PROJECT BMP: high density/ wet basin. STORMWATER ENGINEER/CONSULTANT: Coastal Site Design, PC PO Box 4041 Wilmington, NC 28406 Rodney Wright rodney @ coastal sitedes ign.com 910 791 4441 office 910 791 1501 fax N JAN 2 4 2011 BY: LT i PROJECT DATA: Pond A Existing Site Data (areas within Property boundary): wetland area 0.00 sf (0.00 acres) upland area 551,752 sf (12.66 acres) Total site area 551,752 s€ (12.66 acres) Proposed Site Data: Proposed Building 50,938 sf (1.17 acres) Proposed asphalt/curb and gutter 184,475 sf (4.23 acres) sidewalks 10, 128 sf (0.23 acres) Fire access road 49,495 sf (1.14 acres) Recreation 10,341 sf (0.24 acres) Total proposed impervious area 305,377 sf (7.01 acres) Soil Types: Abbreviation Type and Description Hydrologic Group Area Bab Baymeade A 12.66 ac (See attached soils map and pages 132-134 of Table 15,- "Physical and Chemical Properties of the Soils") T EC'F,TVED JAN 24 2011 PROJECT DATA: Pond B Existin�Site Data (areas within drainage area): wetland area upland area Total site area Proposed Site Data: Proposed Roads Proposed sidewalks Future Total proposed impervious area Soil Types: 7,609 sf (0.17 acres) 364,696 sf (8.37 acres) 372,305 sf (8.55 acres) 73,219 sf (1.68 acres) 23,589 sf (0.54 acres) 30,000 sf (0.54 acres) 126,808 sf (2.91 acres) Abbreviation Tyne and Description Hydrologic Group Area Bab Baymeade A 5.65 ac Mac Marvyn B 1.13 ac Mk Mucklee D I.42 ac (See attached soils neap and pages 132-134 of Table 15, "Physical and Chemical Properties of the Soils") Vr— JAN 2 4 Z011 DY : --- e PRO ECT DATA: Pond C Existing Site Data (areas within drainage area wetland area upland area Total site area Proposed Site Data: Proposed Roads Proposed sidewalks Future Development Total proposed impervious area Soil Types. 0.00 sf (0.00 acres) 670,143 sf (15.38 acres) 670,143 sf (15.38 acres) 58,449 sf (1.34 acres) 3,753 sf (0.09 acres) 38,000 sf (0.87 acres) 100,202 sf (2.30 acres) Abbreviation Type and Description H drolo is Group Area Bab Baymeade A 13.35 ac Mac Marvyn B 0.24 ac KuB Kureb A 1.79 ac (See attached soils map and pages 132-134 of Table 15, "Physical and Chemical Properties of the Soils") JAN 2 4 �011 POND A CALCULATIONS Pre-dev. Value of Runoff Coefficient (c) for Rational Formula = 0.20 Area = 545,294 sf or 12.52 acres Qmax for pre-dev .1-yr storm =15.67 cfs Post Dev Value of Runoff Coefficient (c) for Rational Formula = 0.54 Area = 545,294 sf or 12.52 acres ((305,377 x 0.95) + (239,917 x 0.20)) / 545,294 = 0.620 or 0.62. Qmax for post-dev 1-yr storm = 48.59 cfs Routed site — areas draining to pond routed through pond (see hydrograph summary & reports): Qmax for post route 1-yr storm = 0.16 cfs Summarv: Qmax for routed post dev 1-yr/24-hr storm = 0.16 cfs < 15.67 cfs.... 0. K. JAN 2 4 2011 POND B CALCULATIONS PRE -DEVELOPED CONDITIONS FOR POND (see hydrograph summary and reports): Pre-dev, to pond CN Pre Developed = 47 (SCS) composite value determined as follows: +/- 245,913 sf of soils area A, woods, fair condition (CN = 36) +/- 64,487 sf of soils area B, woods, fair condition (CN = 60) +/- 61,904 sf of soils area D, woods, fair condition (CN = 79) Area = 372,305 sf or 8.55 acres Hydraulic Length = 260 ft Basin Slope = 4.2% Qmax for pre-dev I-yr/24-hr storm = 0.41 cfs POST -DEVELOPED CONDITIONS FOR POND (see hydrograph summary and reports): Post-dev. to pond CN Pre Developed = 66 (SCS) composite value determined as follows: +/- 126,808 sf of impervious surface (CN = 98) +/- 162,365 sf of soils area A, open space, good condition (CN = 39) +/- 35,865 sf of soils area B, open space, good condition (CN = 61) +/- 47,267 sf of soils area D, open space, good condition (CN = 80) ((126,808 x 98) + (162,365 x 39) + (35,865 x 61) + (47,267 x 80)) / 372,305 = 66.4 USED CN = 66 Area = 372,305 sf or 8.55 acres Hydraulic Length = 1,186 ft Basin•Slope= 1.3% Qmax for post-dev 1-yr/24-hr storm = 4.03 cfs Routed site — areas draining to pond routed through pond (see hydrograph summary & reports): Qmax for post route I-yr/24-hr storm .= 0.35 SUMMARY: Qmax for routed post-dev I-yr/24-hr storm = 0.35 efs < =0.41 cfs.... OX JAN 2 4 2011 POND C CALCULATIONS Pre-dev. Value of Runoff Coefficient (c) for Rational Formula = 0.20. Area = 670,143 sf or 15.38 acres Te = 10 min Qmax for pre-dev 1-yr storm = 15.44 cfs Post Dev Value of Runoff Coefficient (c) for Rational Formula = 0.31 Area = 670,143 sf or 15.38 acres Tc = 10 min (100,202 x 0.95) + (569,941 x 0.20) / 670,143 = 0.31 Qmax for post-dev 1-yr storm = 23.93 cfs Routed site — areas draining to pond routed through pond (see hydrograpli summary & reports): Qmax for post route 1-yi storm = 0.075 cfs Summarv: Qmax for routed post dev 1-yr/24-hr storm = 0.075 cfs < 15.44 cfs .... O.K. 7JAN ,IVED 2 4 2011 : WET DETENTION BASIN CALCULATIONS FRENCH CREEK BEO POND Pond A DETERMINE IMPERVIOUS PERCENTAGE area 10 basin = 545,294 sf 12.52 acres buildings = 50.938 st 1.17 acres paved area = 184,475 5f 4,23 acres sidewalks= 10,128 sf 0.23 acres recrecational = 10,341 sf 0.24 acres fire road = 49,495 st 1.14 acres total impervious surface = 305,377 st 7.01 acres total non -impervious Surface = 239,917 sf 5.51 acres percent imp. = 56.0 % DETERMINE REQUIRED SURFACE AREA from 90% TSS Removal Chart: depth = 5 f1 imp % SAIDA 50 3.5 56.0 x 60 4.3 x = 3.98 minimum surface area = 0.0398 x 545,294 sf 21,704 sf surface area provided = 27,880 st @ elevation 15.2 1.5" VOLUME DETERMINATION: DETERMINE RUNOFF COEFFICIENT (Rv) I = 56.0 percent impervious Rv = ? (runoff coefficient, inches per inch) Rv = 0.05 + 0,009 (1) Rv = 0.55 in in DETERMINE VOLUME design storm = 1.5 inch Rv = 0.55 Win drainage area = 12.52 acres volume= ? volume = (design storm) ( Rv) (drainage area) volume = 0.9 acre-ft volume = 37,763 cf of required storage volume RECEIVED J A N 2 4 2011 COASTAL SITE DESIGN, PC PO BOX 4041 WILMINGTON, NC 264D6 WET DETENTION BASIN STAGE -STORAGE TABLE: INCREMENTAL ELEVATION AREA VOLUME STORAGE (FT) (SF) (cf) (cf) 9 14.985 10 16,556 15,771 11 18.183 17,370 12 19,866 19,025 13 21,606 20,736 14 23,403 22,505 Bottom Shelf 14.7 24,694 16,834 15 26,587 7,692 PP 15.2 .27,880 5,447 - Top Shelf 15.7 42,746 17,657 17,657 16 43.657 12,965 30,621 State Storage 16.2 44,325 8.801 39,423 17 46,875 45.600 85,023 volume at permanent pool (elev. 15.2) = 125,378 cf 1.5' storage volume provided (elev. 16.2) = 39,423 cf total volume of basin = 210,400 cf surface area at bottom of 10[i shelf (14.7) = 24,694 sf volume at bottom of 10:1 shelf = 112,239 cf surface area at top of 10:1 shelf (15.7) = 42,746 sf volume at top of 10:1 shelf = 143,034 cf minimum forebay volume = 25,076 cf AVERAGE POND DEPTH AREA BOTTOM SHELF (ABS) = 24,694 SF AREA PP (APP) = 27,880 SF AREA BOTTOM POND (ABP) = 14,985 $F DEPTH = 14.7 -9 = 5.7 ft [0,25 X (1 + (ABS/APP))]+[((ABS+ABP)12) X (DEPTHIABS)) AVERAGE DEPTH = 5.05 FOREBAY 1 STAGE -STORAGE TABLE: INCREMENTAL ELEVATION AREA VOLUME STORAGE (FT) (SF) (cf) (cf) 11 1,635 12 2,160 1,898 1,898 13 2,742 2,451 4,349 14 3,380 3,061 7,410 15 4,594 3,987 11,397 15.2 5,116 4,855 16,252 forebay volume provided = 16,252 cf FOREBAY 2 STAGE -STORAGE TABLE: INCREMENTAL ELEVATION AREA VOLUME STORAGE (FT) ($F) (Cf) (cf) 11 693l `, IV � 12 1.026 860 860 13 1.416 1.221 14 1,862 1.639 2,081 3.720 ` 3ANi 2 4 �Q1� 15 2.750 2.306 6.026 15.2 3.143 2,947 8,972 Y� forebay volume provided = 8,972 cf ---- COASTAL SITE DESIGN, PC PO BOX 4041 WILMINGTON, NC 28406 STAGE - DISCHARGE TABLE: size of orifice (in) = 3.50 crest length of weir cut (ft) = 0.00 crest length of grates (sf) = 4.0 crest length of spillway (ft) = 20.0 ELEVATION 3.5" PVC WEIR (ft) (cfs) (cfs) 15.2 0.00 16 0.29 no weir cut 16.2 0.32 no weir cut 17 0.43 no weir cut PVC DRAW DOWN Orifice size = 3.50 in Norval Pool Storage Elev. = 15.2 1.5' storage Elev. = 16.2 elevation of orifice = 15.2 elevation of weir cut = 0.0 elevation of grates = 16.2 elevation of spillway = 16.5 GRATES SPILLWAY TOTAL (cfs) (cfs) (Cfs) 0.29 0.00 0.32 9.45 21.21 31.09 Orifice coefficient (C) = 0.6 Average head from 1.5' storage to orifice (h) = (16.2 - 15.2)13 = 0.33 ft Orifice cross sectional area (A) = pi x r^2 = 3.14 x (r112)^2 = 0.06678 sf Acceleration due to gravity (g) = 32.2 fUs^2 Q=CA (2gh)1112 = 0.6 x 0.06678 x (2x32.2x0.33)11/2 = 0.18564 cfs 39,423 f 0.18564 = 212,356 seconds = 2.46 days JAN 2 4 2011 COASTAL SITE DESIGN, PC PO BOX 4041 WILMINGTON, NC 28406 WET DETENTION BASIN CALCULATIONS French Creek Road Pond Birch Street Pond B DETERMINE IMPERVIOUS PERCENTAGE area to basin = 372,305 sf 5.55 acres buildings = - sf - acres paved parking areas = sf acres sidewalks = 23,589 sf 0.54 acres roads new= 73.219 sf 1.68 acres future= 30.000 sf 0.69 acres roads existing = sf acres _ total impervious surface = 125.508 sf 2.91 acres total non4mpervious surface = 245,497 sf 5.64 acres percent imp. = 34.1 % DETERMINE REQUIRED SURFACE AREA from 90% TSS Removal Chart: @ depth = 4 ft imp % SAIDA 30 2.7 34.1 x 40 3.5 x = 3.02 minimum surface area = 0.0302 x 372,305 sf = 11,262 sf surface area provided = 13,976 sf @ elevation 10.65 1.5" VOLUME DETERMINATION: DETERMINE RUNOFF COEFFICIENT (Rv) I = 34.1 percent impervious Rv = ? (runoff coefficient, inches per inch) Rv = 0.05 + 0.009 (1) Rv = 0.36 inrin DETERMINE VOLUME design storm = 1.5 inch Rv = 0.36 in/in drainage.area = 8,55 acres volume = ? volume = (design storm)(Rv)(drainage area) volume = 0.4 acre-N volume = 16,593 of of required storage volume ;C1 1:1VED JAN 2 4 2011 1 B.z COASTAL SITE DESIGN, PC PO BOX 4041 WILMINGTCN, NC 28406 WET DETENTION BASIN STAGE -STORAGE TABLE: INCREMENTAL ELEVATION AREA VOLUME STORAGE (FT) (SF) (cf) (cf) 4 4.066 - 5 5.141 4,604 5 6.272 5.707 7 7.461 6,867 8 8,706 8,084 9 10,007 9,357 10 11,365 10,686 Bottom Shelf 10.15 11.573 1.720 - PP 10.65 13,976 6,387 11 15,751 5,202 5,202 Top Shelf 11.15 16,536 2,422 7,624 State Storage 11.7 23,424 10,989 18,613 12 23.755 10.615 29,228 13 28,584 26,170 55,398 volume at permanent pool (elev. 10.65) = 48,807 cf 1.5" storage volume provided (elev. 11.7) = 18,613 cf total volume of basin = 108,808 cf surface area at bottom of 10:1 shelf (10.15) = 11,573 sf volume at bottom of 10:1 shelf = 47,023 cf surface area at top of 10:1 shelf (11.15) = 16,536 sf volume at top of 10:1 shelf 61,034 cf minimum forebay volume = 9,761 cf AVERAGE POND DEPTH AREA BOTTOM SHELF (ABS) = 11,573 SF AREA PP (APP) = 13,976 SF AREA BOTTOM POND (ABP) = 5.141 SF DEPTH = 10.15 - 5 = 5.15 ft [0.25 X (1 + (ABS1APP))]+(((ABS+ABP)/2) X (DEPTH/ABS)] AVERAGE DEPTH = 4.18 ft FOREBAY A STAGE -STORAGE TABLE: INCREMENTAL ELEVATION AREA VOLUME STORAGE (FT) ($F) (cf) (cf) 5 170 6 348 259 259 7 586 467 726 8 882 734 1.460 9 1,238 1,060 2,520 10 1.650 1,444 3,964 10.65 1,949 1,170 5,134 forebay volume provided = 5,134 cf FOREBAY B STAGE -STORAGE TABLE: INCREMENTAL ELEVATION AREA VOLUME STORAGE (FT) (SF) (cf) (cf) 5 172 6 344 258 258 7 572 458 716 8 857 715 1,431 9 1.198 1,028 2.458 10 1,596 1,397 3,855 10.65 1,885 1.131 4,986 forebay volume provided = 4,986 cf Total forebay volume provided = 10,120 cf {{ �? �'.C`"�:1VED 4_ JAN 2 4 2011 �.r COASTAL SITE DESIGN, PC PO BOX 4041 WILMINGTON, NC 28406 STAGE - DISCHARGE TABLE: size of orifice (in) = 2.00 elevation of orifice = 10.65 crest length of weir cut (ft) = 2.00 elevation of weir cut = 11.7 Crest length of grates (so = 4.0 elevation of grates = 12.0 crest length of spillway (ft) = 20.0 elevation of spillway = 13.0 ELEVATION 2.0" PVC WEIR GRATES SPILLWAY TOTAL (ft) (Cfs) (Cfs) (Cfs) (Cfs) (cfs) 10.65 0.00 11 0.06 - 0.06 12 0.12 1.08 0.00 D.00 1.21 13 0.16 9.78 13.20 0.00 23.14 PVC DRAW DOWN Orifice size = 2.00 In Normal Pool Storage Elev. = 10.65 1.5" storage Elev. = 11.7 Orifice coefficient (C) = 0.6 Average head from 1.5" storage to orifice (h) = (11.7 - 10.65)13 = 0.35 Orifice cross sectional area (A) = pi x rA2 = 3.14 x (r112)12 = 0.02181 sf Acceleration due to gravity (g) = 322 ftlsA2 Q=CA (2gh)A1/2 = 0.6 x 0.02181 x (2x32.2x0.35)A1/2 = 0.06211 cfs 16,972 / 0.06211 = 299,651 seconds = 3.47 days RF,CFIVEI] JAN 2 4 2011 BY; COASTAL S7E DESIGN, PC PO 80X 4041 WILKNGTON, NC 28406 WET DETENTION BASIN CALCULATIONS FRENCH CREEK Road Pond Gonz. Pond C DETERMINE IMPERVIOUS PERCENTAGE area to basin = 670,143 sf 15.38 acres buildings = sf - acres paved area = 58,449 sf 1.34 acres sidewalks = 3,753 sf 0.09 acres future = 38,000 sf 0.87 acres fire road = sf - acres total impervious surface = 100.202 sf 2,30 acres total non -impervious surface = 569,941 sf 13.08 acres percent imp. = 15.0 DETERMINE REQUIRED SURFACE AREA from 90% TSS Removal Chart: @ depth = 4 R imp % SA/OA 10 0.8 15,0 x 20 1.8 x= 1,30 minimum surface area = 0.0130 x 670,143 sf 8,680 sf surface area provided = 8,821 sf @ elevation 12.5 1.5" VOLUME DETERMINATION: DETERMINE RUNOFF COEFFICIENT (Rv) I = 15.0 pe cent impervious Rv = ?(runoff coefficient, inches per inch) Rv = 0.05 + 0.009 (1) Rv = 0.18 inlin DETERMINE VOLUME design storm = 1.5 inch Rv = 0.18 inlin drainage area = 15.38 acres volume = ? volume = (design storm)(Rv)(drainage area) volume= 0.4 acre-1 volume = 15,462 cf of required storage volume ,JAN 2 4 2011 �37; COASTAL SITE DESIGN, PC PO EIOX 4041 W ILMINGTON, NC 28406 WET DETENTION BASIN STAGE -STORAGE TABLE: ELEVATION AREA (FT) (SF) 6 2.620 7 3,240 8 3,917 9 4,650 10 5,523 11 5,441 Bottom Shelf 12 7,190 PP 12.5 0,821 Top Shelf 13 16.135 State Storage 13.6 17,032 14 17,642 15 19,204 16 20,823 volume at permanent pool (elev. 12.5) = 1.5" storage volume provided (elev. 13.6) = total volume of basin = surface area at bottom of 10:1 shelf ( 12.0) _ volume at bottom of 10:1 shelf = Surface area at top of 10:1 shelf (13.0) _ volume at top of 10:1 shelf = minimum forebay volume = AVERAGE POND DEPTH INCREMENTAL VOLUME STORAGE (cf) (co 1,310 2,930 3,579 4,284 5.087 5,4B2 4.003 6.239 9.950 6,935 12.896 20,014 26,673 cf 16,189 cf 82,707 cf 7,190 sf 22,671 cf 16,135 sf 32,912 cf 5,335 cf 6,239 16,189 23,124 36,020 56,034 AREA BOTTOM SHELF (ABS) = 7,190 SF AREA PP (APP) = 8.821 SF AREA BOTTOM POND (ABP) = 3,240 SF DEPTH = 12 -7 = 5.0 A [0,25 X (1 + (ABSIAPP))]+[((ABS+ABP)12) X (DEPTH/ABS)) AVERAGE DEPTH = 4.08 FOREBAY 1 STAGE -STORAGE TABLE: INCREMENTAL ELEVATION AREA VOLUME STORAGE (FT) (SF) (cf) (cf) 9 813 10 1,170 992 992 11 1,583 1,377 2,368 12 2.053 1.818 4.186 12.5 2,962 1,254 5,440 forebay volume provided = 5,44o cf I JAN 2 4 2011 4�c T COASTAL SITE DESIGN, PC PO BOX 4041 WILMINGTON, NC28406 STAGE - DISCHARGE TABLE: size of orifice (in) = 1.75 crest length of weir cut (ft) = 2.00 Crest length of grates (sf) = 4.0 crest length of spillway (ft) = 0.0 ELEVATION 1.75" PVC WEIR 00 (cfs) (cfs) 12.5 0.00 - 13 0.66 14 0.10 1.67 15 C.13 10.93 16 0.15 24.54 PVC DRAW DOWN Orifice size = 1.75 in Normal Pool Storage Elev. = 12.5 1.5" storage Elev. = 13.60 elevation of orifice = 12.5 elevation of weir cut = 13.6 elevation of grates = 14.5 elevation of spillway = 0.0 GRATES SPILLWAY TOTAL (cfs) (cfs) (cfs) - 0.06 - 0.00 1.77 4.67 15.73 24.25 0.00 45.94 Orifice coefficient (C) = 0.6 Average head from 1.5" storage to orifice (h) = (13.6 - 12.5)13 = 0.37 ft Orifice cross sectional area (A) = pi x r^2 = 3.14 x (112)^2 = 0.01669 sf Acceleration due to gravity (g) = 32.2 ftls12 O=CA (2gh)1112 = 0.6 x 0.01669x (202.24.37)^112 = 0.04868 cfs 16,189 / 0.04868 = 332,590 seconds = 3.85 days JAN 2 4 Z011 COASTAL SITE DESIGN, PC PO BOX 4041 WILMINGTON, NC 28406 Hydrograph Summary Report Hydraflow Hydrographs by Intelisolve v9.1 Hyd. Hydrograph Peak Time Time to Hyd. Inflow Maximum Total Hydrograph No. type flow interval peak volume hyd(s) elevation strge used description (origin) (cfs) (min) (min) (cult) (ft) (tuft) 1 Rational 15.67 1 5 4,702 -- --- Pre Dev 2 Rational 48.59 1 5 14,576 --- -- ----- Post Dev 3 Reservoir 0.15E 1 10 11,389 2 15.61 14,530 Routed RECEIVED JAN 2 4 2011 BY: BEQ_site.gpw jj Return Period: 1 Year Wednesday, Jun 2, 2010 Hydrograph Report Hydraflow Hydrographs by Inteiisolve v9.1 Hyd. No. 1 Pre_Dev Hydrograph type = Rational Storm frequency = 1 yrs Time interval = 1 min Drainage area = 12.520 ac Intensity = 6.259 inlhr OF Curve = wilmington_2008.1DF Q (cfs) 18.00 15.00 12.00 • M M 3.00 0.00 r 0 1 2 - Hyd No. 1 Pre_Dev Hyd. No. 1 -- 1 Year Wednesday, Jun 2, 2010 Peak discharge = 15.67 cfs Time to peak = 5 min Hyd. volume = 4,702 cuft Runoff coeff. = 0.2 Tc by User = 5.00 min Asc/Rec limb fact = 111 3 4 5 6 7 Q (cfs) 18.00 15.00 12.00 M M 3.00 -- 1 ' N 0.00 8 9 10 Time (min) RECEIVED ,BAN 2 4 2011 Hydrograph Report Hydraflow Hydrographs by IntelisoNe Al Wednesday, Jun 2, 2010 Hyd. No. 2 Post Dev Hydrograph type = Rational Peak discharge = 48.59 cfs Storm frequency = 1 yrs Time to peak = 5 min Time interval = 1 min Hyd. volume = 14,576 cuft Drainage area = 12.520 ac Runoff coeff. = 0.62* Intensity = 6,259 in/hr Tc by User = 5.00 min OF Curve = wilmington_2008.IDF Asc/Rec limb fact = 111 Composite (Area/C) = [(7.010 x 0.95) + (5.510 x 0.20)11 12,520 Q (cfs) 50.00 40.00 30.00 20.00 10.00 0.00 4 0 1 Hyd No. 2 0 Post_Dev Hyd. No. 2 -- 1 Year 3 4 5 6 7 8 Q (cfs) 50.00 40.00 30,00 20.00 10.00 '• —•---"L 0.00 9 10 Time (min) F - ZECEIVED SAN 2 4 1111 5 3y: Hydrograph Report Hydraflow Hydrographs by Intelisoive Al Hyd. No. 3 Routed Hydrograph type = Reservoir Storm frequency = 1 yrs Time interval = 1 min Inflow hyd. No. = 2 -Post — Dev Reservoir name = BEQ Pod Storage Indication method used. Q (cfs) 50.00 40.00 30.00 20.00 10.00 0.00 0 300 - Hyd No. 3 Routed Hyd. No. 3 -- 1 Year 600 900 1200 Hyd No. 2 Peak discharge Time to peak Hyd. volume Max. Elevation Max. Storage Wednesday, Jun 2, 2010 = 0.158 cfs = 10 min = 11,389 cuft = 15.61 ft = 14,530 cuft Q (cfs) 50,00 40.00 991111121 20.00 10.00 IIIIiI11AIIIIlI11�---1-_-_---- 1 I III ICI II IIIIIC� - - 0.00 1500 1800 2100 2400 2700 3000 1 _l'i "IT Total storage used = 14,530 cult Time (min) RCETV ED JAN 2 4 2 111 B- ' Pond Report Hydraflow Hydrographs by Intelisolve v9.1 Wednesday, Jun 2, 2010 Pond No. 1 - BEQ Pond Pond Data Contours - User -defined contour areas. Conic method used for volume calculation. Begining Elevation = 15,20 ft Stage 1 Storage Table Stage (ft) Elevation (ft) Contour area (sgft) Incr. Storage (tuft) Total storage (tuft) 0.00 15,20 27,880 0 0 0.80 16.00 43,687 28,388 28,388 1.00 16.20 44,325 8,800 37,189 1.80 17.00 46,875 36,472 73,660 Culvert / Orifice Structures Weir Structures [A] [B] [C] [PrfRsr] [A] [B] [C] [D] Rise (in) = 18.00 3.50 0.00 0.00 Crest Len (ft) = 4.00 20.00 0.00 0.00 Span (in) = 18.00 3.50 0.00 0.00 Crest El. (ft) = 16.20 '16.50 0.00 0.00 No. Barrels = 1 1 0 0 Weir Coeff. = 3.33 2.60 2:60 3.33 Invert El. (ft) = 15.20 15.20 0.00 0.00 Weir Type = Riser Broad Broad --- Length (ft) = 39.00 1.00 0.00 0.00 Multi -Stage = Yes Yes No No Slope (%) = 0.50 0.00 0.00 n/a N-Value = .013 .013 .013 n!a Orifice Coeff. = 0.60 0.60 0.60 0.60 Exfil.(in/hr) = 0.000 (by Contour) Multi -Stage = n!a Yes No No TW Elev. (ft) = 0.00 Note: CulverUOrifice outflows are analyzed under inlet (ic) and outlet (oc) control. Weir risers checked for orifice conditions {ic) and submergence (s) Stage (ft) 2.00 1.80 1.60 1.40 1.20 1,00 0.80 0.60 0.40 0.20 0.00 0.00 1.00 2.00 - Total Q Stage I Discharge 3,00 4.00 Elev (ft) 17.20 17.00 16.80 16.60 16.40 16.20 16.00 15.80 15.60 15.40 -- ' 15,20 5.00 6.00 7.00 r FI ED ischarge (cfs) ,I V I .JAN 2 4 2011 Hydrograph Summary Report Hydraflow Hydrographs by Intelisolve v9.1 Hyd. Hydrograph Peak Time Time to Hyd. Inflow Maximum Total Hydrograph No. type flow interval peak volume hyd(s) elevation strge used description (origin) (cfs) (min) (min) (tuft) (ft) (tuft) 1 SCS Runoff 0.414 3 750 5,987 - --- — - Pre dev 2 SCS Runoff 4.026 3 759 30,978 --- ----- ---- Post dev 3 Reservoir 0.354 3 1074 30,349 2 11.81 21,629 Routed RIECEIVEff JAN 2 4 2011 By: FC_BIRCH_POND.gpw C 1L� Return Period: 1 Year Tuesday, Jan 18, 2011 Hydrograph Report Hydraflow Hydrographs by Intelisoive AI Hyd. No. 9 Pre dev Hydrograph type = SCS Runoff Storm frequency = 1 yrs Time interval = 3 min Drainage area = 8.550 ac Basin Slope = 4.2 % Tc method = LAG Total precip. = 3.83 in Storm duration = 24 hrs " Composite (Area/CN) = [(1.480 x 6J) + (5.650 x 36) + (1.420 x 79)] 18.550 Q (cfs) 0.50 0.45 0.40 0.35 0.30 0.25 0.20 0.15 0.10 0.05 000 0 180 - Hyd No. 1 Pre_dev Hyd. No. 1 -- 1 Year 360 540 720 900 Tuesday, Jan 18, 2011 Peak discharge = 0.414 cfs Time to peak = 750 min Hyd. volume = 5,987 cult Curve number = 47* Hydraulic length = 260 ft Time of conc. (Tc) = 12.73 min Distribution = Type III Shape factor = 484 1080 1260 1440 JAIL 2 4 2011 L: Q (cfs) 0.50 0.45 0.40 0.35 0.30 0.25 0.20 0.15 0,10 0.05 0.00 1620 Time (min) Wydrograph Report Hydraflow Hydrographs by Intelisolve v9.1 Hyd. No. 2 Post_dev Hydrograph type = SCS Runoff Storm frequency = 1 yrs Time interval = 3 min Drainage area = 8.550 ac Basin Slope = 1.3 % Tc method = LAG Total precip. = 3.83 in Storm duration = 24 hrs Tuesday, Jan 18, 2011 Peak discharge = 4.026 cfs Time to peak = 759 min Hyd. volume = 30,978 cuft Curve number = 66* Hydraulic length = 1186 ft Time of cone. (Tc) = 47.50 min Distribution = Type III Shape factor = 484 " Composite (Area/CN) = [(2.910 x 98) + (0.830 x 61) + (3.720 x 39) + (1.090 x 80)] / 8.550 Q (cfs) 5.00 SKIM 3.00 MUl d 1.00 0.00—`nrrrr 4r� 0 180 Hyd No. 2 Post_dev Hyd. No. 2 -- 1 Year 360 540 720 900 1080 1260 Q (cfs) 5.00 EMU 3.00 2.00 KI 1 0.00 1440 1620 Time (min) /D JAN 2 4 2011 BY Hydrograph Report HydrAow Hydrographs by Intelisolve v9.1 Hyd. No. 3 Routed Hydrograph type = Reservoir . Storm frequency = 1 yrs Time interval = 3 min Inflow hyd. No. = 2 - Post dev Reservoir name = Pond B^ Storage indication method used. Q (cfs) 5.00 4.00 3.00 2.00 1.00 0.00 1- -_ 14-1 0 900 - Hyd No. 3 Routed Hyd. No. 3 -- 1 Year 1800 2700 3600 Hyd No. 2 Peak discharge Time to peak Hyd. volume Max. Elevation Max. Storage Tuesday, Jan 18,2011 = 0.354 cfs = 1074 min = 30,349 cult = 11.81 ft = 21,629 tuft Q (cfs) 5.00 4.00 3.00 2.00 1.00 6. 1 0.00 4500 5400 6300 7200 8100 9000 Time (min) L.1,110 Total storage used = 21,629 tuft . 7JAN 2 4 ZO11 13Y Pond Report Hydraflow Hydrographs by Intelisolve v9.1 Tuesday, Jan 18, 2011 Pond No. 1 - Pond B Pond Data Contours - User -defined contour areas. Conic method used for volume calculation. Begining Elevation = 10.65 ft Stage I Storage Table Stage (ft) Elevation (ft) Contour area (scift) Incr. Storage (cult) Total storage (cult) 0.00 10.65 13,976 0 0 0.35 11.00 15,751 5,199 5,199 0.50 11.15 16,536 2,421 7,620 0.85 11.50 22,461 6,797 14,417 1,35 12.00 23,755 11,551 25,968 2.35 13.00 28,584 26,130 52,098 Culvert I Orifice Structures Weir Structures [A] [B] [C] [PrfRsr] [A] [B] [C] [D] Rise (in) = 18.00 2.00 0.00 0.00 Crest Len (ft) = 4.00 2.00 20.00 0.00 Span (in) = 18.00 2.00 0.00 0.00 Crest El. (ft) = 12.50 11.70 13.00 0.00 No. Barrels = 1 1 0 0 Weir Coeff. = 3.33 3.33 2.60 3.33 Invert El_ (ft) = 10.65 10.65 0.00 0.00 Weir Type = Riser Rect Broad - Length (ft) = 60.00 1.00 0.00 0.00 Multi -Stage = Yes Yes Yes No Slope (%) = 1.00 0.00 0,00 n/a N-Value = .013 .013 .013 n/a Orifice Coeff. = 0.60 0.60 0.60 0.60 Exfil.(inthr) = 0.000 (by Contour) Multi -Stage = n/a Yes No No TW Elev. (ft) = 0.00 Stage (ft) 3.00 2.00 1.00 0.00 r_ - 1 0.00 1.00 - Total 0 Nole: CuiverUOriflce outflows are analyzed under inlet (ic) and ❑ullet (oc) control. weir risers checked for orifice conditions (ic) and submergence (s). Stage I Discharge 2,00 3,00 4.00 5.00 6.00 Elev (ft) 13.65 12.65 11.65 _ _ _ I _ I. �! 10.65 7.00 8.00 9.00 10.00 ,CEI ED ischarge (cfs) JAN 2 4 2011 BY Hydrograph Summary deport Hydraflow, Hydrographs by Intelisolve v9.1 Hyd, No. Hydrograph type (origin) Peak flow (cfs) Time interval (min) Time to peak (min) Hyd. volume (tuft) Inflow hyd(s) Maximum elevation (ft) Total strge used (tuft) Hydrograph description 1 Rational 15.44 1 10 9,261 — -- -- Pre Dev 2 Rational 23.93 1 10 14,355 -- ------ ---- Post Dev 3 Reservoir 0.075 1 20 10,136 2 13.49 14,301 Routed RECEIVED JAN 2 4 2011 BY: _ FC GONZ POND.gpw Return Period: 1 Year Tuesday, Jan 18, 2011 Hydrograph Report Hydraflow Hydrographs by Intelisolve v9.1 Hyd. No. 1 Pre Dev Hydrograph type = Rational Storm frequency = 1 yrs. Time interval = 1 min Drainage area = 15.380 ac Intensity = .5.018 inlhr IDF Curve = wilmington_2008.IDF Q (cfs) 18.00 15.00 12.00 • 11 . t+ 3.00 Pre_Dev Hyd. No. 1 -- 1 Year Tuesday. Jan 18, 2011 Peak discharge = 15.44 cfs Time to peak = 10 min . Hyd. volume = 9,261 cuft Runoff coeff. = 0.2 Tc by User = 10.00 min Asc/Rec limb fact = 111 0.00 lr _ I I I _$ I I 0 2 4 6 .8 10 12 14 - Hyd No. 1 ,I. me RECEIVED ill I I I'll BY: _ - - - - Q (cfs) 18.00 15.00 12.00 M . fl W11011 0.00 3 18 20 (min) Hydrograph Report Hydrbtlow Hydrographs by Intelisolve v9.1 Hyd. No. 2 Post Dev Hydrograph type = Rational Storm frequency = 1 yrs Time interval = 1 min Drainage area = 15.380 ac Intensity = 5.018 inlhr OF Curve = wilmington_2008.IDF ` Composite (Area/C) = ((13.080 x 0.20) + (2.300 x 0.95)] / 15.380 Q (cfs) 24.00 16.00 12.00 M 4,00 0.00 0 2 -- Hyd No. 2 Post_Dev Hyd. No. 2 -- 1 Year 4 6 8 10 12 Tuesday, Jan 18, 2011 Peak discharge = 23.93 cfs Time to peak = 10 min Hyd. volume = 14,355 cuff Runoff coeff. = 0.31 * Tc by User = 10.00 min Asc/Rec limb fact = 1/1 Q (cfs) 24.00 20.00 16.00 12,00 M 4,00 14 16 18 20 Time (min) JAN 2 4 2011 �Y: Hydrograph Report Hydr1aflowHydrographs by Intefiisolve Al Hyd. No. 3 Routed Hydrograph type = Reservoir Storm frequency = 1 yrs Time interval = 1 min Inflow hyd. No. = 2 - Post _Dev Reservoir name = Pond C Storage Indication method used. Q (cfs) 24.00 20.00 16.00 iPAIII M 4.00 0.00 0 300 Hyd No. 3 Tuesday, Jan 18, 2011 Peak discharge = 0.075 cfs Time to peak = 20 min Hyd. volume = 10,136 cult Max. Elevation = 13.49 ft Max. Storage = 14,301 cult Routed Hyd. No. 3 -- 1 Year 600 900 1200 1500 1800 2100 2400 2700 - Hyd No. 2 i' l.i i--Tj Total storage used = 14,301 tuft -C iEIVED JAN 2 4 2011 Y: Q (cfs) 24.00 20.00 16,00 12.00 4.00 --L 0.00 3000 Time (min) .Pond,Report Hydraflow Hydrographs by Intelisolve Al Tuesday, Jan 18, 2011 Pond No. 1 - Pond C Pond Data Contours - User -defined contour areas. Conic method used for volume calculation. Begining Elevation = 12.50 ft Stage / Storage Table Stage (ft) Elevation (ft) Contour area (sgft) Incr. Storage (cuft) Total storage (cuft) 0.00 12.50 8,821 D 0 0.50 13,00 16,135 6,147 6,147 1.20 13,70 17,032 11,606 17,753 1.5D 14.00 17,642 5,200 22,953 2.50 15.00 19,204 18,416 41,369 3.50 16.00 20,823 20,006 61,375 Culvert I Orifice Structures Weir Structures [A] (B] (Cl (PrfRsrl [Al (Bl (Cl [D] Rise (in) = 18.00 1.75 0,00 0,00 Crest Len (ft) = 4.00 2,00 0.00 0,00 Span (in) = 18"00 1.75 0.00 0.00 Crest El. (ft) = 14.50 13.60 0.00 0.00 No. Barrels = 1 1 0 0 Weir Coeff. = 3.33 3.33 3.33 3.33 Invert El. (ft) = 12"50 12.50 0,00 0.00 Weir Type = Riser Rect - - Length (ft) = 106.00 1.00 0.00 0.00 Multi -Stage = Yes Yes No No Slope (%) = 0.30 0.00 0.00 n/a N-Value = .013 013 013 n/a Orifice Coeff. = D.60 0.60 0.60 0.60 Exilil.(in/hr) = 0.000 (by Contour) Multi -Stage = n/a Yes No No 7W Elev. (ft) = 0.00 Stage (ft) 4.00 3.00 2.OD 1.00 Nate: CulvertfOrifice eutflows are analyzed under inlet (ic) and outlet (oc) control. W eir risers checked for orifice conditions (ic) and submergence (s) Stage / Discharge 0.00 _. I w 0.00 1.D0 2.00 3.00 4.00 5.D0 6,00 7.00 Total Q 8,00 9.00 10.OD 11.00 ",CE VED AN 2 4 2011 psi . Elev (ft) 16.50 15.50 14.50 13.50 - - j- 12.50 12.00 Discharge (cfs) t { Hydraflow Storm Sewers Extension for AutoCAD® Civil 3D® 2009 Plan CB-26 4 31 HW-32 bQ CB-30 m i 2 Outfall Oulfall 7CEIVED JAN 2 4 2011 BY: HW-31 h t WWI pp 9t? HW-23 CB-34 27 Oulfall a CB-35 �, 16 2I Q3 OS-1 CB-15 117lfalb Ou•fall h 3T-g9 � HW-36 MH-7 ST-35 HW-12 7 si-3p outfall Outlall I5t CB-23 O CB-22 Project File: FC-Storm roadway cvs.strn I Number of lines: 21 Date: 01-11-2011 Hydrapow, Sloan Sewers Extension v6.066 Storm Sewer Summary Report Page 1 Line No. Line ID Flow rate (cfs) Line size (in) Line shape 'Line length (ft) Invert EL Dn (ft) Invert EL Up (ft) Line slope , (1/9) HGL down (ft) HGL up (ft) Minor loss (ft) HGL Junct (ft) Dns line No. Junction _ Type 1 ST-43 2.20 18 Cir 40.131 14.32 14.52 0,498 14.89 15.09 0.20 15.29 End Manhole 2 ST-27 5.40 15 Cir 192.354 7.65 12.74 2,646 10.65 13.67 n/a 13.67 j End Generic 3 ST-40 4.60 15 Cir 211.665 12.74 14.39 0.780 13.67 15.25 n1a 15.25j 2 Generic 4 31 1.90 15 Cir 40.547 14.39 15.65 3.107 15.25 16.20 n/a 1620j 3 Manhole 5 ST-28 4.60 15 Cir 45.633 14.87 15.09 0,482 15.73 16.15 0.13 16.28 End Generic 6 ST-29 2.20 15 Cir 24.199 15.09 15.22 0.537 16.28 16.30 0.06 16.36 5 Generic 7 ST-32 2.20 24 Cir 39.965 14.01 14.62 1.526 14.54 15.15 We 15.15 j End Manhole 8 ST-30 14.30 30 Cir 52.403 7.34 7.61 0.515 12.40' 12.46' 0,07 12.53 End Generic 9 ST-41 12.40 30 Cir 26.171 7.61 8.55 3.592 12.53' 12.55' 0.10 12.65 8 Manhole 10 ST-33 10.20 24 Cir 241.025 9,55 10.76 0.502 12.65" 13.14" 0.16 13.31 9 Manhole 11 ST-47 3.70 15 Cir 25.871 11.51 11.66 0.580 13.31' 13.39' 0.14 13.53 10 Manhole 12 33 6.50 18 Cir 18.794 10.76 10.85 0.479 13.31 13.38" 0.21 13.59 10 Manhole 13 ST-42 2.90 15 Cir 13.545 11.49 12.58 8,048 13.59 13.59 0.12 13.70 12 Manhole 14 32 3.60 15 Cir . 17.493 10.85 10.94 0.514 13.59' 13.64' 0.13 13.78 .12 Manhole 15 34 2.20 15 Cir 16.254 10.30 12.13 11.259 12,65 12.72 0.23 12.72 9 Manhole 16 35 44.10 24 Cir 116.329 12.01 12.47 0.395 13.98' 18.21" 3.06 21.27 End Generic 17 ST-35 12,40 36 Cir 89.024 8.05 8.50 0.505 12.50" 12.53" 0.03 12.56 End Manhole 18 ST-49 12.40 36 Cir 123,281 8.50 10.96 1.995 12.56 12.53 0.25 12.78 17 Generic 19 ST-31 10.80 24 Cir 51,781 11.96 13.00 2.008 12.78 14.16 n/a 14.16 18 Manhole 20 ST-51 19.60 24 Cir 193.421 8.60 10.93 1.205 12.50' 13.95' 0.31 14.26 End Generic 21 ST-50 1.80 15 Cir 64.794 11.68 12.97 1.991 14.26' 14.31 0.03 14.35 20 Generic CFV J JAN 2 2011 B Project File: FC-Storm_roadway cvs.stm Number of lines: 21 Run Date: 01-11-2011 1 I NOTES: Return period = 10 Yrs. ; "Surcharged (HGL above crown). ; j - Line contains hyd. jump. TM FP ECS CAROLIMAS, LLP "Setting the Standard for Service" Gi6ZpLIWG Geotechnical • Construction Materials -Environmental • Facilities AA April 28, 2010 Mr. Aaron Eriksson RQ Construction Inc. 3194 Lionshead Avenue Carlsbad, California 92010 Reference: Report of Seasonal High Water Table Estimation French Creek BEQ P-1017-1047 Camp Lejeune, Onslow County, North Carolina ECS Project No. 22.15763B Dear Mr. Eriksson: ECS Carolinas, LLP (ECS) recently conducted an estimation of the Seasonal High Water Table (SHWT) for the proposed stormwater best management practice (BMP) areas at the proposed French Creek BEQ P-1017-1047 on Camp Lejeune; Onslow County, North Carolina. This letter, with attachments, is the report of our estimation. Field Testing On April 21, 2010 ECS conducted an exploration of the subsurface soil and groundwater conditions at four requested locations shown on the attached Boring Location Plan (Figure 1). The purpose of this exploration was to estimate the depth of the SHWT of the in -place soils for the proposed stormwater BMP areas. The locations were surveyed prior to ECS's visit. ECS explored the subsurface soil and groundwater conditions by advancing one hand auger boring into the existing ground surface at the requested boring locations. ECS visually classified the subsurface soils and obtained representative samples of each soil type encountered. ECS recorded the SHWT and groundwater level observed at the time of each hand auger boring. The attached SHWT sheet provides a summary of the subsurface conditions encountered at each hand auger boring location. The area in which boring locations 1 and 2 were located had been cut approximately four feet below the former existing grade elevation. ECS advanced one additional boring (#3) adjacent to boring number one in the natural grade elevation. VED JAN 2 4 2011 7211 Ogden Business Park, Suite 201, Wilmington, NC 2B411 - T: 910-686-9114 • F: 910-686-9666 • www.ecslimfted.corn ECS Carolinas, LLP • ECS Florida, LLC • ECS Illinois, LLC - ECS Mid -Atlantic, LLC ■ ECS Southeast, LLC ECS Texas, LLP Report of SHWrEstimation French Creek BEQ P-1017-1047 Camp Lejeune, Onslow County, North Carolina ECS Project No. 22.15763E April 28, 2010 The groundwater level and the SHWT were estimated at each boring location below the existing grade elevation. Below is a summary of each boring location. Location Water Level SHWT 1 10 inches 0 inches 2 8 inches 0 inches 3 38 inches 24 inches 4 Winches 42 inches 5 40 inches 30 inches The SHWT may vary within the proposed site due to changes in subsurface conditions and elevation. Closure The activities and evaluative approaches used in this assessment are consistent with those normally employed in assessments of this type. Our evaluation of site conditions has been based on our understanding of the project information and the data obtained during our field activities. ECS appreciates the opportunity to provide our services to you on this project. [f you have any questions concerning this report or this project, please contact us at (910) 686-9114. Respectfully, ECS CAROLINAS, LLP K Brooks Wall Walid M. Sobh, P.E. Project Manager Principal Engineer CC: Ryan Littleton — Calibre Engineering; Rodney Wright — Coastal Site Design, PLLC Attachments: Boring Location Plan SHWT sheet REE C z IVED JAN242111 :T it (9 APPROXIMATE BORING LOCATIONS French Creek Site Figure 11— Boring Location Plan Camp Lejeune, Onslow Co., NC ECS Project No. 22-15763B t VZ Provided by: Calibre Engineering April 21, 2010 KBW I JAN 2 4 Z011 Season High Water Table Estimation French Creek BEQ P-1017-1047 Camp Lejeune, Onslow Co., North Carolina ECS Project No. 22.15763B April 21, 2010 Location Depth Soil Description 1 0-24" Tan/gray tine SAND Seasonal High Water Table was estimated to be at 0 inches below the existing grade elevation. Groundwater was encountered at 10 inches below the existing grade elevation. Location Depth Soil Description 2 0-24" Tan/gray fine SAND Seasonal High Water Table was estimated to be at 0 inches below the existing grade elevation. Groundwater was encountered at 8 inches below the existing grade elevation. Location Depth Soil Description 3 0-48" Tan/gray fine SAND Seasonal High Water Table was estimated to be at 24 inches below the existing grade elevation. Groundwater was encountered at 38 inches below the existing grade elevation. Location Depth Soil Description 4 0-181, Gray fine SAND 18"-60" Tan/orange fine SAND Seasonal High Water Table was estimated to be at 42 inches below the existing grade elevation. Groundwater was encountered at 60 inches below the existing grade elevation. RECEIVED JAN 2 4 2011 BY: Season High Water Table Estimation French Creek BEQ P-1017-1047 Camp Lejeune, Onslow Co., North Carolina ECS Project No. 22.15763B April 21, 2010 Location Depth Soil Description 5 0-18" Gray silty SAND 18"-30" Gray fine SAND 30"-40" Hard Pan 40"-60" Tan/gray fine SAND Seasonal High Water Table was estimated to be at 30 inches below the existing grade elevation. Groundwater was encountered at 40 inches below the existing grade elevation. RECEIVED JAN 2 4 2011 BY: r_MUM L ECS. CAROLINAS, LLP CAROLINAs Geotechuical Construction Materials a Environmental • Facilit ust 3, 2010 Mr. Chad Webb Archer Westem/RQ Construction Joint Venture P.O. Box 8444 Camp Lejeune, North Carolina 28547 Re: Infiltration Testing Gonzalez Boulevard/Birch Avenue _._. MCB,Camp Lejeune, Onslow County, North Carolina ECS Project No. 22.16014 Dear Mr. Webb, ECS Carolinas, LLP' (ECS) recently conducted infiltration testing for the .proposed infiltration areas at the above referenced site located off of Gonzalez Boulevard and Birch Avenue in MCB Camp Lejeune; North Carolina.. This letter, with attachments, is the report of our testing. 4 Infiltration Testing Gonzalez Boulevard/Birch Avenue MCS Camp Lejeune, North Carolina ECS Project No. 22.16014 Location Water Level SHWL 1 Winches 6 inches 2 . 70 inches Winches 3 70 inches Winches 4 36 inches 18 inches 5 70 inches 36 inches 6 70 inches Winches 7 75 inches 40 inches 8 85 inches 48 inches 9 85 inches 40 inches 10 85 inches Winches 11 55 inches 16 inches 12 55 inches 13 inches .13 55 inches 16 inches We have conducted thirteen infiltration tests utilizing a compact constant head permeameter near the hand auger borings to estimate the infiltration rate for the subsurface soils. The infiltration tests are typically conducted at two feet above the SHWL. Field Test Results Below is a summary of the infiltration test results: Location Description Depth Inches/hour Inches/minute 1 Dark Gray Silty 10 inches 3.6 0.060 SAND 2 Dark Gray Silty 10 inches 6.5 0.108 SAND 3 Dark Gray Silty 10 inches 8.9 0.148 SAND 4 Gray Fine 10 inches 20.1 0.335 SAND 5 Gray Fine 12 inches 21.1 0.352 SAND 6 Tan Fine 10 inches 8.9 0.148 SAND 7 Tan Fine 16 inches 12.7 0.212 SAND 8 Tan Fine 24 inches 11.2 0.187 SAND 9 Tan Fine 16 inches 9.0 0.150 SAND ���CF1VED 2 JAN 2 4 2011 Infiltration Testing Gonzalez BoulsvardBlrrh Avenue MCB Camp Lejeune, North Carolina ECS Project No. 22.16014 10 Tan Fine 12 inches 7.5 0.125 SAND 11 Tan Fine 10 inches 2.2 0.037 SAND 12 Mottled CIayey 10 inches 1:1 0.018 SAND. 13 Mottled Clayey 10 inches 1.9 0.032 SAND Infiltration rates and SHWL may vary within the proposed site due to changes in elevation and subsurface conditions. If you have any questions regarding this report, please contact us at (910) 686-9114. Respectfully, !«CS CAROLiNA5, LLP ,\A �CAY�.� U'111 Le--- i Winslow E. Goins, P.E. Project Engineer''+++I;r'�. z NC License No. 033751 ���'kh1111� Attachments: Site Diagram Infiltration Testing Form 3 Walid M. Sobh, P. E. Principal Engineer NC License No. 022983 F CEIVED JAN 2 4 2011 'aY: eullwe9 q;joN louna[al duueo gow µ anuand 401[g y JVIO NOILVOO " �g piena0no13 zaIezuoE) _ NOILVHLI[3N1 M ewf MEN '-zj!- ' EIVE-D] JAN 44 2011 :.NYC: Infiltration Testing Form Gonzales Road Camp Lejeune; Onslow County, North Carolina ECS Project No. 22.16014 July 30, 2010 Location Depth Soil Description 0-36" Dark gray SAND wlsilt 36n-48" Gray clayey SAND Seasonal High Water -Table was estimated to be at 6 inches below the existing grade elevation. Infiltration Rate: 3.6 inches per hour Test was conducted at 10 inches below eAsting grade elevation Groundwater was encountered at 30 inches below the existing grade elevation. Location Depth Soil Description 2 0-12" Dark gray fine SAND w/silt 12"-70" Tan fine SAND Seasonal High Water Table was estimated to be at 30 inches below the existing grade elevation. Infiltration Rate: 6.5 inches per hour Test was conducted at 10 inches below existing grade elevation, Groundwater was encountered at 70 inches below the existing grade elevation. Location Depth Soil Description 3 0-16" Dark gray fine SAND wlsilt 16"-70H Tan fine SAND Seasonal High Water Table was. estimated to be at 30 inches below the existing grade elevation. Infiltration Rate: 8.9 inches per hour Test was conducted at 10 inches below existing grade elevation Groundwater was encountered at 70 inches below the existing grade elevation. �]EC]EIVED JAN 2 4 2011 BY: Infiltration Testing Form Gonzales Road Camp Lejeune, Onslow County, North Carolina ECS Project No. 22.16014 July 30, 2010 Location Death Soil Description 4 0-24" Gray tine SAND 24"-30" Dark brown silty SAND (hardpan) 30"-48" Tan fine SAND Seasonal High Water Table was estimated to be at 18 inches below the existing grade elevation. Infiltration Rate: 20.1 inches per hour Test was conducted at 10 inches below existing grade elevation Groundwater was encountered at 36 inches below the existing grade elevation. Location Depth Soil Descri Lion 5 0-24" Gray fine SAND 24"-48n Tan fine SAND 48"-60" Tan clayey SAND Seasonal High Water Table was estimated to be at 36 inches below the existing grade elevation. Infiltration Rate: 21.1 inches per hour Test was. conducted at 12 inches below existing grade elevation Groundwater was encountered at 70 inches below the existing grade elevation. Location Depth Soil Description 6 0-36" Tan fine SAND 36"-60" Tan sandy CLAY Seasonal High Water Table was estimated to be at 30 inches below the existing grade elevation. Infiltration Rate: 8.9 inches per hour Test was conducted at 10 inches below existing grade elevation Groundwater was encountered at 70 inches below the existing grade elevation. RECEDED JAN 2 4 2011 BY: l Infiltration Testing Form Gonzales Road Camp Lejeune, Onslow County, North Carolina ECS Project No. 22.16014 July 30, 2010 Location Depth Soil Description 7 0-60" Tan fine SAND 60"-70" Tan sandy CLAY Seasonal High Water Table was estimated to be at 40 inches below the existing grade elevation. Infiltration Rate: 12.7 inches per hour Test was conducted at 16 inches below existing grade elevation Groundwater was encountered at 75 inches below the existing grade elevation. Location Depth Soil Description 8 0-48" Tan fine SAND 48-"-85" Tan clayey SAND Seasonal High Water Table was estimated to be at 48 inches below the existing grade elevation. Infiltration Rate: 11.2 inches per hour Test was conducted at 24 inches below existing grade elevation Groundwater was encountered at 85 inches below the existing grade elevation. Location Depth Soil Description 9 0-48" Tan fine SAND 48"-85" Tan clayey SAND Seasonal High Water Table was estimated to be at 40 inches below the existing grade elevation. Infiltration Rate: ' 9.0 inches per hour Test was conducted at 16 inches below existing grade elevation Groundwater was encountered at 85 inches below the existing grade elevation. -IVED J Ali 2 4 2.011 Infiltration Testing Form Gonzales Road Camp Lejeune, Onslow County, North Carolina ECS Project No. 22.16014 July 30, 2010 Location Depth Soil Description 10 0-26" Tan fine SAND 26"-85" Tan clayey SAND Seasonal High Water Table was estimated to be at 36 inches below the existing grade elevation. infiltration Rate: 7.5 inches per hour Test was conducted at 12 inches below existing grade elevation Groundwater was encountered at 85 inches below the existing grade elevation. Location Depth Soil Description 11 0-161, Tan fine SAND 16"-85" Tan clayey SAND Seasonal High Water Table was estimated to be at 16 inches below the existing grade elevation. Infiltration Rate: 2.2 inches per hour Test was conducted at 10 inches below existing grade elevation Groundwater was encountered at 55 inches belowthe existing grade elevation. Location Depth Sol[ Description 12 0-60" Tan/orange/gray clayey SAND Seasonal High Water Table was estimated to be at 13 inches below the existing grade elevation. Infiltration Rate: 1.1 inches per hour Test was conducted at 10 inches below existing grade elevation Groundwater was encountered at 55 inches below the existing grade elevation. ,EIV D j4,N 2 4 2011 y , . Infiltration Testing Form Gonzales Road Camp Lejeune, Onslow County, North Carolina ECS Project No. 22.16014 July 30, 2010 Location Depth Soil Descri tion 13 0-60" Tan/orange/gray clayey SAND Seasonal Nigh Water Table was estimated to be at 16 inches below the existing grade elevation. Infiltration Rate: 1.9 inches per hour Test was conducted at 10 inches below existing grade elevation Groundwater was encountered at 55 inches below the existing grade elevation. —CEIVED JAN 2 4 2611 95 ECS A L I g LLP '`Sattin the Standard �br 5url/lce„ T � Geotechnical • Const',uc'lon Materials - Envimnn ental - Facilities ��-«.c; ruccnrce,itq: uro�-s:f7c October 12, 2010 Mr. Chad Webb Archer Western/ RQ Construction Joint Venture French Creek Site Camp Lejeune, North Carolina 28542 Referehce: Report of. Infiltration Testing GoflzalezIBirch Stormwater BMP's Camp Lejeune, Onslow County, North Carolina ECS Project No. 22.16223 Dear Mr. Webb: ECS Carolinas, LLP (ECS) recentfy conducted infiltration testing for the' proposed stormwater best management practice (BMP) areas at the GonzalezlBirch roadway extension site on Camp Lejeune; Onslow County, North Carolina. This letter, with attachments, is the report of our testing. Field Testing On October 8, 2010, ECS conducted an exploration of the subsurface soil and groundwater conditions at two .requested locations shown on the attached Test Location Plan (Figure 1). The test areas were located with GPS equipment. The purpose of this exploration was to. obtain subsurface information of the in -place soils for the proposed stormwater BMP areas. ECS explored the. subsurface soil and groundwater conditions by advancing one hand auger boring into the existing ground surface at. the requested boring locations. ECS visually classified the subsurface soils and obtained representative samples of each soil type encountered. ECS also recorded the groundwater level and the seasonal high water table (SHWT ) observed at the time of the hand auger borings. The attached Infiltration Testing Form provides a summary of the subsurface conditions encountered at the hand auger boring locations. The groundwater level and the SHWT were estimated at the boring locations below the existing grade elevation. A summary of the findings are as follows: Location_.:...:' .. .._.: Water.:Level. - 1 6 inches 0 inches 2 82 inches 50 inches ECS has conducted two infiltration tests utilizing a compact constant head permeameter near the hand auger borings to estimate the infiltration rate for the subsurface soils. Infiltration tests are typically conducted at two feet above the SHWT. If the SHWT is less than three feet, th'e tests are conducted at ten inches below the surface elevation.. CC�IVED JAN 2 4 2011. 72-'['Lbgden Business Park, Suite 201, Wilmington, NC 28411 • T: 910-686-9114 • I': 9 i0-686 9666 www.ecslimiled.com ECS Carolinas. LLP • ECS Florida. [_LC • ECS Illinois, LLC • ECS Mid-Atirnfic, LLC ECS SoulheasL LLC ECS Texas, LLP Report of Infiltration Testing GonzalezlBirch Slormwater BIAP's Camp Lejeune, Onslow County, North Carolina ECS Project No. 22,16223 October 12, 2010 Field Test Results Below is a summary of the infiltration test results: Location ' Doscriptian " Qepth = inches/.' :' hour. 1 Black silty SAND 10 inches 0.0 2 Tan fine SAND 26 inches 4.3 Infiltration rates and SHWT may vary within the proposed. site due to changes in elevation and subsurface conditions. Closure The activities and evaluative approaches used in this assessment are consistent with those normally employed in assessments of this.type. ECS's testing of site conditions has been based on our understanding of the project information and the data obtained during our field activities. ECS appreciates the opportunity to provide our services to you on this project. If you have any questions concerning this report or this project, please contact us at (910) 6B6- 91 14. Respectfully, ECS CAROLINAS, LLP K. Brooks Wall Project Manager Attachments- Figure 1 and Figure 2 -Test Location Plan Infiltration Testing Form U � ` Wa[id M. Sobh, P-E. Principal Engineer CFIVFD 2 LJAN4 za13 Season High Water Table Estimation Gonzalez/Birch Stormwater BMP's Camp Lejeune, Onslow Co., North Carolina ECS Project No. 22.16223 October 8, 2010 Location Depth Soil Description 1 0.-24" Black silty SAND Seasonal High Water Table was estimated to be at 0 inches below the existing grade elevation. Infiltration Rate: 0.0 inches per hour Test was conducted at 10 inches below existing grade elevation Groundwater was encountered at 6 inches below the existing grade elevation. Location Depth Soil Description 2 0-10" Gray silty SAND 1 Y-30" Tan fine SAND 30"-48" Brown/orange clayey SAND 48"-65" Tan fine SAND 65"-90" Tan clayey SAND Seasonal High Water Table was estimated to be at 50 inches below the existing grade elevation. Infiltration Rate: 4.3 inches per hour Test was conducted at 26 inches below existing grade elevation Groundwater was encountered at 82 inches below the existing grade elevation. JAN 2 4 2011 ` r . . 45-38 i; l AAA_ I l/ � yam;`•".� r•l _ �� � J � illy' CVRFT f -i NORTH lit we Cal HW-77 c9 APPROXIMATE TEST LOCATION GonzalezlBirch BMP Camp Lejeune, NC EC5 Project No. 22-16223 October 9, 2010 KBW LLP Figure 1— Test Location Plan Provided by: Calibre iV riL JAN 2 4 2011 \ I Gonzalez/Birch BMP Camp Lejeune, NC BC5 Project No. 22-16223 October 8, 2010 KBW FRENCH CREEK APPROXIMATE TEST LOCATION LLP Figure. 2—Test Location Plan Provided by: Calibre _ i 6 JAN 2 4 2011 it Name of Stream Description Curr, Class Date Basin Stream index Southwest Creek From Mill Run to New C;HQW,NSW 08/Cl/91 White Oak 19-17-�5.5y River Catherine Lake From Catherine Lake to C;NSW 06/O1/91 White Oak 19-17-1 Creek Southeast Creek Catherine Lake Entire Lake S;NSW 08/01/91 White Oak 19-17-1-1 Deep Run From source to C;NSW 08/01/91 White Oak 19-17-2 Southwest Creek Harris Creek From source to C;NSW O6/01/91 White Oak 19-17-3 Southwest Creek Haws Run From source to C;NSW 08/01/91 white Oak 19-17-4 Southwest Creek Tank Creek From source to C;NSW 08/01/91 White Oak 19-17-5 Southwest Creek Hicks Run From source to C;NSW 08/01/91 White Oak 19-17-6 {Hickory Run) Southwest Creek Mill Run From source to SC;NSW 08/01/91 White Oak 19-17-7 Southwest Creek Morgan Bay Entire Bay SC;NSW 08/01/91 White Oak 19-18 Lewis Creek From source to New SC;RQW,NSW 08/01/91 White Oak 19-19 River Cow£ord Branch From source to New C;NSW 08/01/91 White Oak 19-2 River Wallace Creek From source to New SB;NSW 08/01/91 White Oak 19-20 River Bearhead Creek From source to Wallace SB;NSW OB/01/91 White Oak 19-20-1 Creek Beaverdam Creek From source to Wallace SB;NSW 08/01/91 White Oak 19-20-2 Creek Town Creek From source to New SC;HQW,NSW 08/01/91 White Oak 19-21 River Farnell Bay Entire Bay SC;NSW 08/01/91 White Oak 19-22 .,Cogd From source to New SC;NSW 08/01/91 White Oak 19-23 -{Cogl`i'n=aiC=eek}," River Frenchs Creek From source to New SC;NSW O8/01/91 White Oak 19-24 River Jumping Run From source to Frenchs SC;NSW 08/01/91 White Oak 19-24-1 Creek Cowhead Creek From source to Frenchs SC;NSW 08/01/91 White Oak 19-24-2 Creek Duck Creek From source to New SC;NSW D8/01/91 White Oak 19-25 River Whitehurst Creek From source to New SC;HQW,NSW 08/01/91 white Oak 19-26 River Goose Creek From source to New SC;HQW, 08/01/90 White Oak 19-26 River Two Pole Branch From source to New SC;RQW OB/01/90 white Oak 19-29 River Squires Run From source to New C;NSW 06/01/91 White Oak 19-3 River Mill Swamp From source to Squires C;NSW 06/61/91 White Oak 19-3-1 Run Page 4 of 11 i C��Y TED 009-08-15 07:12:25 JAN 44 2011 �Y; ea CAMP LEJEUNE, N. C. a 34077-F3 TF-024 - .. • q .� s ry � • s a' 1952 PHOTOREVISED 1971 -- DMA 5553 111 NE—SERIESV542 / 1y1 � • � _ _' _ r+re r � °e f °® e e� u !r aIlk u C) - Uze 'firebreak �aaa N- 6- = Tank° a �� i � � _ .♦ --~/�`,/ �'i /� � - � as e :. • i 2 a .. /i4 e `a 'er`, y T A R Y �® VIN N. VA ♦ l vrn c N Q ♦ C s o �.. a - i3'ri._..0 •::��?"u.,,i fir: .,_ � �i ..:! O 44 u}•Sii: ''aid^ �:`z"•i�`.-,;.�,� :?", �, �— •,�:V�4+' ;f 'ti'i�: s!F1 1'-•1•}. `+ i O 1' ! � A t \� �� �� �: r� ...'.5' w4:.�rMa r=�.R:...b`i `r.:��='i' � r ♦ rti Name of Stream Description Curr. Class Date Basin Stream Index t Southwest Creek From Mill Run to New C;HQW,NSW 0B/01/91 White Oak 13-17-(6.5) River Catherine Lake From Catherine Lake to C;NSW 08/01/91 White Oak 19-17-1 Creek Southeast Creek Catherine Lake Entire Lake B;NSW 08/01/91 White Oak 19-17-1-1 Deep Run From source to C;NSW 08/01/91 White Oak 19-17-2 Southwest Creek Harris Creek From source to C;NSW 06/01/91 White Oak 19-17-3 Southwest Creek Haws Run From source to C;NSW 08/01/91 White Oak 19-17-4 Southwest Creek Tank Creek From source to C;NSW 08/01/91 White Oak 19-17-5 Southwest Creek Hicks Run From source to C;NSW 08/01/91 White Oak 19-17-6 (Hickory Run) Southwest Creek Mill Run From source to SC;NSW 08/01/91 White Oak 19-17-7 Southwest Creek .Morgan Bay Entire Bay SC;NSW 08/01/91 White Oak 19-16 Lewis Creek From source to New SC;HQW,NSW 08/01/91 White Oak 19-19 River Cowford Branch From source to New C;NSW '08/01/91 White Oak 19-2 River Wallace Creek From source to New SIB; NSW 09/01/91 White Oak 19-20 River Bearhead Creek From source to Wallace SB;NSW OB/01/91 White Oak 19-2D-1 Creek Beaverdam Creek From source to Wallace SB;NSW 08/01/91 White Oak 19-20-2 Creek Town Creek From source to New SC;HQW,NSW 08/01/91 White Oak 19-21 River Parnell Bay Entire Bay SC;NSW 08/01/91 W.Ute Oak 19-22 CogdeT G=.eek',": From source to New SC; NSW 09/01/91 White Oak 19-23 (Co glincCreek);;,e River Frenchs Creek From source to New SC;NSW 08/01/91 White Oak 19-24 River Jumping Run From source to Frenchs SC;NSW 08/01/91 White oak 19-24-1 Creek Cowhead Creek From source to Frenchs SC;NSW 03/01/91 White Oak 19-24-2 Creek Duck Creek From source to New SC;NSW 08/01/91 White Oak 19-25 River Whitehurst Creek From source to New SC;HQW,NSW 08/01/91 White Oak 19-26 River Goose Creek From source to New SC;HQW 08/01/90 White oak 19-28 River Two Pole Branch From source to New SC;HQW 08/01/90 White Oak 19-29 River Squires Run From source to New C;NSW 08/01/91 White oak 19-3 River Mill Swamp From source to Squires C;NSW 08/61/91 white Oak 19-3-1 Run Page 4 of 11 A A, A.'-'-., A .A V ■ -. JAN 2 4 2011 3y: 2009-08-15 07:12:25 Appendices Table 8.03e Runoff curve numbers of urban areas' Curve number for ------ --- - --------Cover Description ------------- -------hydrologic so€I group----�-- Average Cover type and hydrologic condition percent A $ C D 2 impervious area Fully developed urban areas (vegetation established) Open space (lawns, parks, golf courses; cemeteries, etc.) 1: Poor condition (grass cover c 50%) ............................. 68 79 86 89 Fair condition (grass cover 50% to 75%) ..................... 49 e9 79 84 Good condition (grass cover > 75%) ............................ 39 61 74 80 Impervious areas: Paved parking •lots; roofs, driveways, etc. 98 98 98 98 (excluding right-of-way) ............................................... Streets and roads: Paved; curbs and storm sewers (excluding 98 98 98 98 right-of-way).................................................................. Paved; open ditches (including right-of-way) ................ 83 89 92 93 Gravel (including right-of-way) ...................................... 76 85 89 91 Dirt (including right-of-way) ........................................... 72 82 87 89 —' Urban districts: Commercial and business ................................................. 85 89 92 94 95 Industrial ...................... ............................... ............ ........... 72 81 88 91 93 Residential districts by average lot size: 118 acre or less (town houses) ......................................... 65 .77 85 90 92 114 acre .................... ............. ....................... :........ 6.......... . 38 61 - : 75 $3 87 113 acre ............... ............... .............. .......... I'll .......... I......... 30 57 72 81 •86 112 acre ............ ...................................................... I............ 25 54 70 80 85 1 acre .........'............ ............ 20 51 68 79 84 2 acres .... ........................ ............................ ....................... 12' 46 65 .77 82 Developing urban areas Newly graded areas 77 86 91 94 (pervious areas only, no vegetation) 4 ............................... Idle lands (CN's are determined using cover types similar to those in table 2-2c). 1. Average runoff condition, and la = 02S. 2. The average percent impervious area shown was used to develop the composite CN's. other assumptions are as follows; impervious areas are directly connected to the drainage system, impervious areas have a CN of 98, and pervious areas are considered equivalent to open space in good hydrologic condition. CN's for other combinations of conditions may be computed using Figure 8.03c or 8.03d. 3. CN's shown are equivalent to those of pasture: Composite CN's may be computed for other combinations of open space cover type. 4. Composite CN's to use forthe design of temporary measures during grading and construction should be computed using Figure 8.03c or 8.03d based on the degree of development (impervious area percentage .and_the.CN'r i th y graded pervious areas. �CEB/ h;. Rev. 6106 J A 2 Z d j 8.03.15 Appendices Table 8.03g Runoff curve numbers for other agriculture lands' Curve numbers for —Cover description-------- -- hydrologic soil groups Hydrologic Cover type conditdons3 A B C D Pasture, grassland, or range— Poor 68 79 86 69 continuous forage for grazing. 2 Fair 49 69 79 84 Good 39 61 74 30 Meadow --continuous grass, protected — 30 58 71 78 from grazing and generally mowed for .hay. - Brush —brush -weed -grass mixture with Poor 48 67. ' 77 83 brush the major element. 3 Fair- 35 56 70 77 Good 304 48 65 73 Woods —grass combination (orchard or .Poor 57 73 82 96 -� tree farm). a Fair 43 65 - 76 82 Good 32 58 72 79 Woods.' Floor 45 66 77 83 Fair 36 60 73 79 Good 304 55 70 77 Farmsteads —buildings, lanes, — 59 74 82 86 l driveways, and surrounding lots. 1 Average runoff condition, and la= 0.2S. 2 Poor. <50% ground cover or'heavily grazed with no mulch. Fair. 50 to 75% ground .cover and not heavily grazed. r Good. > 75% ground cover and lightly or only occasionally grazed. 3 Poor. -�50% ground cover. Fair 50 to 75% ground cover. Good: >75% ground cover. 4 Actual curve number is less than 30; use CH = 30 for runoff computations. 5 CN's shown were computed for areas with 50% woods and 50% grass (pasture) cover. Other combinations of conditions may be computed from the CN's for woods and pasture. 6 Poor. Forest litter, small trees, and brush are destroyed by heavy grazing or regular burning. Fair. Woods are.grazed but not burned, and some forest"Utter covers the soil. Good: Woods are protected from grazing, and litter and brush adequately cover the soil. i . JAN 1 4 2Dll Rev. 6106 8.03.17 0 Table 8.Q3a Value of Runoff Coefficient Land Use C Land Use C (C) for Rational Formula Business_ Lawns: Downtown areas 0.70-0.95 Sandy soil, flat, 2% 0.05-0.10 Neighborhood areas 0.50-0.70 Sandy soil, ave., 2-7% 0.10-0.15 Sandy soil, steep, 7% 0.15-0.20 Residential: Heavy soil, flat, 2% 0.13-0.17 Single-family areas 0.30-0.50 Heavy soil, ave_, 2-7% 0.18-0.22 Mufti units, detached 0.40--8.60 Heavy soil, steep, 70/. 0.25-0.35 Mufti units, attached 0.60-0.75 Suburban 0.25-0.40 Agr=Jtura! land: Bare packed soil industrial_ Smooth 0.30-0.60 Light areas 0.50-0.80 Rough 0.20-0.50 Heavy areas 0.60-0.90 Cultivated rows . Heavy soil no crop 0.30-0.60 Parks, cemeteries 0.10-0.25 Heavy soil with crop 020-0.50 . Sandy soil no crop 020-0.40 Playgrounds 0,20-0.35 Sandy soil with crop 0.10-0.25 Pasture Railroad yard areas 0.20-0.40 Heavy soil 0.15-0.45 Sandy soil 0.05-0.25 Unimproved areas 0.10-0.30 Woodlands 0.05-0.25 Streets: Asphalt 0.70-0.95 Concrete 0.80-0.95 Brick 0.70-0.85 Drives and walks 0.75-0.85 Roofs 0.75-0.85 MOTE: The designer must use judgment 7o select the appropriate C value within the range for the appropriate land use_ Generally, larger areas with permeable soils, flat slopes, and dense vegetation should have lowest C values_ Smaller areas with slowly permeable soils, steep slopes, and sparse vegetation should be assigned highest C values. Source: American Society of Civil Engineers The overland flow portion of flow time may be determined from Figure 8.03a. The flow time (in minutes) in the channel can be estimated by calculatin; the average velocity in feet per minute and dividing the Iength (in feet) by the average velocity. Step 4. Determine the rainfall intensity, frequency, and duration (Figures 8.03b through 8.03g—source: North Carol;iisa State Highway Commission; Jan_ 1973). Select the chart for the locality closest to your location_ Enter the "duration" axis of the chart with the calculated time of concentration, Tc. Move vertically until you intersect the curve of the appropriate design storm, then move horizontally to read the rainfall intensity factor, i, in inches per hour. Step S. Determine pear discharge, Q {tO/sec), by multiplying the previously determined factors using the rational formula (Sample Problem 8.43a).. E C EIVED JAN 2 4 2011 8.03.2 POINT PRECIPITATION FREQUENCY ESTIMATES FROM NOAA ATLAS 14 .� WnMD7GT0N WSO AIRPORT, NORTH CAROLINA (3I-9457} 34.2683 N 77.9061 W 26 feet from "Pzciphxtt0a-Fr=M=cy Allm 0f the Unrtrd'Smrs" NOAA Aflas 14, Vmlmme 2, Version 3 GM Bonnin, D. Mmin, B. Lm, T. ?amyb k Xyck e, aad D. Rfley NO" NaE=al Wt4uher ScvLi!, Silver Spring, Maryland, 20D4 Ext:wte6, 7uc Feb 5 2008 text �erst otleo�lit3lir inrse precipita5onirequeneyastimates am based on a par£91 dirratien series. ARl is the Average Re=nence i0torva<. dgFumemafion far mo.'arforma5on. NOT_: Fom>ati'urg iurrss e,(attaias rear zt;mtc appear as zem. Upper bound of the 90% confidence interval Precipitation Frequency Estimates Cinches) Ml�N�Thr hr [7�1248 min[Xl�l =Z,�,hr hr 04.day day tiny day day tiny 056 0.90 1.12 1.53 1.91 �229 2.46 3.44 3.58 27 5.42 .68 6.46 7.27 9.65 L1.74 I4.60 17.50 u� 0.66 j1.06 133 1.84 .31 2.79 2.98 3.69 .33. 5.19 6.08 6.S7 7.79 8.71" 11.51 13.96 17.26 20.61 I 10.79 1.24 1 57 224 2.87 3.5fi 3.SI 4.73 5.59 6.71 7.80 8.68 9.79 10.80 14.02 16.74 20.45 24.10 10 _ 0.87 139 1.75 2.54 3.31 4.21 4.54 5.64 16.69 8.03 9 29 10 25 11.46 12.53 16.07 18.94 23.03 26.85 25 OBS 1.56 1.97 2.92 3.89 10.07 11. 88 12.60 13.91 15.07 19.05 22.16 26.61 30.61 50 1.06 1.69 2.14 3.23 4.37 5.95 6.ss 8.20 9.87- 1L.90 13. 11 44.64 1599 17.22 21.55 44.73 29.49 3 3.5 8 100 L15 1.83 2.3i 3.53 4.87 6.84 7.64 9.55 11:58 13.98 15.91 16.93 1828 14.54 24.21 27.39 32.47 36.5$ 200 124 1.96 2.47 3.85 5.4D 7.80 8.81 11.09 13.52 16.38 I8.56 19.49 20.80 22. 99 27.11 30.19 35.58 39.58 500 1.35 2.14 2.69 4.28 6.14 9:28 10.64 33.46 16.57 20.18 22.64 23.42 24.61 25.94 31.26 34.19 39. 66 43.67 I000 1.44 2.27 2.85 4.62 6.75 10.57 12.2fi 15.SS 19.24 23.57 26.25 26.90 27.83 29.18 34.75 37.38 4335 46.91 - i ne upper timme of me connuence intervai m w%commence tevei is ur vame minim m h of ine simuEarea quanme vaiues for a given tequency are greater than: " These precipitation frequency estimates are bmad'an a parSal durafon se ies.'pRl is the Average Recurrence kntervaL ?lease refer to the document for mcre information NOTE: Formatfmg prevents esft3tm near zenD to appear as zem. Lower bound of the"90% confidence interval Precipitation Frequency Estimates Cmches) ARI** 5 gl� 15 �4 60 120 3 a!Lr�Thrl (years} �����11 4.49 0.78 0.97 1.34 1.67 1.94 2.08 2.59 0 0.58 0.93 I,.16 1.61 2.02 2.36 2:53 3.I4 3.64 4.24 5.03 5.70 6.62 7.43 9.98 12.32 15.38 18.42 0.68 ].08 1.37 1.95 2.50 3.02 3.23 4.02 4.70 5.48 6.44 7.19 8.34 9.19 12.L4 14'.78 18.21 21.53 10 0,75 1.20 1.52 2,21 2.87 3.56 3,83 4.78 5,62 6.56 7.64 Ell 9.69 10.65 13.91 16,73 20.47 33.95 25 0.85 1.35 L.71 2.53 337 433 4:73 5.91 5.98 8.15 9.43' 10.28 11.69 12.74 16.38 19.43 23.57 27.20 54 0,92 L.46 1.B5 2.78 3.77 4:99 5.51 6.90 8..21 9.56 10.97 11.63 13.32 14.45 18 35 21.54 25.94 29.67 100 0.98 1.57 1.98 3.03 .17 5.71" 636 8.00 9.57 1 L L0 I2:63 I3.52 15.46 16.23 20.41 23: 55 28.33 32.06 200 1.05 1.67 2.10 3.2: 4.59 6.47 7.29 9.17 11.06 12.80 14.48 15.32 66.89 18. 11 22.55 25.78 30.73 34.41 hr day daY d Y �Y �Y Y �Y 3:00 3.50, 4.1.6 4.73 5.49 6.22 8.37 10.3713.00 15.53 N� o U� POINT PRECIPITATION"��' FREQUENCY ESTIMATES FROM NOAA ATLAS 14 ' iMNIINGTON WSO AIRPORT, NORTH CAROLINA (31-9457) 34.2683 N 77.9061 W 26 feet from "Pracipit=n-Frequency Arlan of tbo United States" NOAA Atlas 14, V olum0 2, Version 3 OM Bonin, D. hvarda, B. Lia, T. Pmzyhol. XYeknand D. Riley NO" National Wead=Servkce Silver Spring,Mayiand 2004 Exnzeted Won Feb 4 2308 r�'.nr.ci�i& i0s ARI (years) 5 rein 10 min 15 min 30 min 6a min. 120 min nhrhr 6 ftr 1Z hr 24 hr 48 hr 4 day d v 10 da 20 day 30 da 45 day 6D day =6.26 jF5.00]4.I6 2.E6 1E 1.05 0.75 0.47 027 0.16 0.09 0.05 0.04'0.03 0.02 0.02 0.01 O.Dl 7.42 5.93 4.97 3.44 �2.15 128 0.91 0=56 O33 0.19 O.l I O 6 70.04 0.03 0.02 0.02 0.02 10.01 8.70 6.97 5.88 D 2.67 I.63 L17 0.72 0.42 025 0.15 0.48. 0.05 0.04 0.03 4.D2 0.02 OA2 10 9.70 7.76 6.54 4.74 3.08 1.93 1.39 0.87 0.51 030 0.17 0.10 0.06 OAS 0.03 0.02 0.02 0.42 -z5­1 1D.96 8.74 EE 5.47 3.64 236 L72 1.08 Ej O38 E 10.12 0.08 0.06 0. 44 0.03 D.02 0.02 5Q 11.9D 9.48 S.DQ 6.03 4.08 2.74 2:02 126 0.75 0.45 026 0.14 D.09 D.07 0.04 OA3 03 OA2 2.59 102 56 5 89 D5 0.3 OI 0.04 A3 a01 .02 20D 1385 1097 9.23 7.19 SA4 3.60 :72 1.71 1.04 0.61 0.35 0.18 D.11 O.OS O.OS 0.-Rio.Q3 0.03 SDO 15.10 11.94 10. 22 i7.97 5.72 27 328 2.D6 127 0.75 0.42 D22 p.13 O.lq O.D6 0-D4 q.03 0.03 1000 16-12 1Z.fiB 10.6218.60 627 4.85 3.77 2.40 L47 D.87 }0.4E D.2S O.IS 0.11 0.07 0.05 0.04 0.43 -- - ' These precipitation frequency admaf=s are based an a aarial Wra5an sages.ARI is to Average Recurrence Interval. rh .ZV iSt0 si817' Pie refer to thew Afor moo: information. NDTF Fannaizpg forms estimates nearzem toappear es zero. Vpper bound of the 90% confidence interval . Precipitation Intensity Estilltaates (in/hr) r day tiay clay ay. day day day (years) min mnmmmPI mhr hrL!Ejl hr 11[d, 6.735 37 4.48 .07 191 1.15 D.82 OSl O30 0.18 0.10 D.06 0.04 . 003 0.02 0.02 0.01 0.01 7.97 6.37 534 3.69 2.31 139 OF991 D.62 0.36 D 22 0.13 O.D7 D.DS 0.04 0.02 0.02 0.02 4A1 =E3Zj 17.46 63O 47 2.57 7178 127 0.79 EE D28 D.16 0.09 0.06 O.D4 D.03 0.02 0.02 7002 10 1D.39 8.32 Ej 5.08 �3.3] 2.10 i.51 0.94 0.56 033 0.19 D.11 Q07 D.OS D.D3 D.03 0.02 0.02 25 11.72 9.34 7.89 5.84 j3.89. 2.57 1.87 1.17 . D.69 0.42 0,24 0,13 O.DB 0.06 0.04 OA3 0.02 0.02 50 100 1 12.74 13.79 10.15 10.96 8.56 6.45 4.37 2,98 2.19 i.37 0.82 D.SD 028 0.15 0.10 D.07 0.04 0,03 4:03 0A2 9.23 7. 77 4.87 3.42 2.54 ] I.6D 0.96 0.58 a33 0.I8 0.11 0.08 4.05 0:04 0.03 0.03 14.84 176 9.8 765439 1 i.I LEI39 00.55 24 09 DD00O3 4200 162 23 107 2 130 0 02 01 01 07 OS0 040 1000 17.33 I3.64 11.42 924 6.75 5.29 4A$ 2.60 1.60 0.98 028 O.I7 0.12 O.D7 .05500 'The upper hound of tie confidence intarval al 9D%corrHence level is The value Wai:h 5%af the simulated quanfle values for a gnmp frequency are greater than. "These precipitation freg6ency estimates are hasedon a paion'es ARI is the Average Recurrence IntervaE Pleese'refer to the dogtmen;alion for more information. NO i c: Farmatnng prevents estimates near zero to appear as zero. * LoWer bound of the 90% confidence interval Precipitation Intensity Estimates ft/hr)' , hr hr hr [�JZ'71IF20]730] (year&) min min min min minZl�l 116.day day day day day 5.86 4.68 3.90 2,67 1.67 0,97 a.69 4.43 0.25 0.15 4:09 0.05 0.03 0.03 0.02 0.01 0.01 0.01 U 6,95 5.55 4.65 3.21 2.02 1.18 0.84 0.52 0.36 EEKE 0.06 0.04. 0:03 0.02 0.02 0.01 0.01 10 8.14 ' 9.02 6.51 722 5.49 3.90. 2.50 1.51 1.08 0.67 0.39 D.23 0.13 0.07 4.05 4'.04 0.03 D.02 0.02 O.al 6.09 REEif 1.78. 1.28 0.80 0.47 227 0.16 0.09 0.06 0.04 0.03 OA2 0.0 0.02 25 ' 10.16 8.09 6.64 5.07 3.37 2.16 1.57 0.99. 0.58 0.34 0.20 0.11 0.07 0.05. O.D3 0.03 0.02 0.02 5D i0.98 8.75 7.38 5.56 3.77 2.50 1.83 L15 4.68 0.40 0 23 0.12 0.08 0.06 0.04 0.03 0.02 0.02 1 00 11.$2 9.40 7.42 6.46 .17 2.85 2.12 1.34 0.79 0.46 D.26 O.I4 0.09 0.07 0.04 0.03 0.03 0.42 = 12-61 lO 8.41 fi.55 4.59 3.24 2.43 1.53 0.92 D.53 0.30 0.16 4.10 0.08 0.05 0.04 0.03 0.02 I • A; R-09-1995 15 : 15 FROM EHNR W I L,M RE3 OFFICE TO 97E24201 8517o TSS REMOVAL 301OOTt VEGETATED FILTER REQUMED 51 10% .9 .s .7 .s .5 a o Q o 0 20 % 1.7 1.3 1.2 1.1 1.0. .9 .8 .7 .6 .5 30 % 2.5 2.2 1.9 1.8 1.6 1.5 1.3 1.2 1.0 .9 3.0 2.6 .12.4 2.1 IS 1.6 1..4 1.1 1.0 50 % 4.2 3.7 3.3 3.0 2.7 14 2.1 1.8 1-1.5 1.3 60 % 5,0 4.5 3.8 3.5 3.2 2.9 2.6 2.3 2.0 1.6 70 % 6.0 5.2 4.5 4.1 13.7 3.1 2.9 2.5 2.1. 1,9 80 % 6.8 6.0 5.2 4.7 14.12 3.7 3.2 2.7 2.2 2.0 90 % 7.5 6.5 1 5.8 5.3 14.8 4.3 3.8 3.3 2.8 1.3 100.% 9.2 7.4 6.8 6.2 5.6 5.0 4 A 3.8 3.2 2.6 90%a TSS REMOVAL NO VEGETATED FILTER REQUWZD DEPTH 3' 3.5' 4.0' 4.5' 5.0' 5.5' 6.0' 6.5' 7.0' 7.5' ASP % 10 % 1.3 1.0 .8 .7 .6 .5 .4 .3 .2 .1 20 % 2.4 2.0 1.8 1.7 1.5 1.4 1.2 1.0 .9 6 $0% 3.5 3.0 2.7 2.5 2.2 .1.9 1 Z.6. 1.3 1.1 :S 40 % 4, 5 4.0 3.5 3.1 2.8 12,5 2.1 1 1.8 1 1.4 1.1""' 50% 5.6 SA 4.3 3.9 3.5 3.1. 2.7 2.3 1.9 1.5 60 % 7.0 16.0 5.3 4.8 4.3 3.9 3.4 2.9 12.4 '1.9 70% .8.I 7.0 6.0 5.5 5.0 4.5-. 3.9 3.4 2.9 2.3. 80 % 9.4 18.0 7.0 6.4. 5.7 5.2 4.6 4.0 3.4 2.8" 90'% 10.7 9.0 7.9 7.2 6.5 5.9 5.2 i 4.6 3.9 3.3 L12L% 12.0 10.0 8.8 1 8.1 7.3 6.6 5.8 5.1 4.3 3.6 Q � o Tabie 8.03a Value of Runoff Coefficient (C) for Rational Formula �1. 8-03.2 Land Use C Land Use C Business: Lawns: . Downtown areas 0.70-0.95 Sandy soil, flat, 20% 0.05-0.10 Neighborhood areas 0.50-0.70 Sandy soil, ave_, 2-7% 0.10-0.15 Sandy soil, steep, 7% 0.15-0.20 Residential: Heavy soil, flat, 20/. 0.13-0.17 Single-family areas 0,30-0-50 Heavy soil, ave., 2-7% 0.1 8-0.22 Multi units, detached 0.40-8.60 Heavy soil, steep, 70/ 0.25-0.35 Multi units, attached 0-60-0.75 Suburban 0.25 0.40 Agricultural land: Bare packed soil Industrial: Smooth 0.30-0.60 Light areas 0.50-0.80 Rough 0.20-0.50 Heavy areas 0.60-0.90 Cultivated rows - Heavy soil no crop 0.30-0.80 Parks, cemeteries 0.10-0.25 Heavy soil with crop 020-0.50 Sandy soil no crop 0.20-0.40 Playgrounds 020-0.35 Sandy soil with crop 0.1 0-0.25 Pasture Railroad yard areas 0,20-0.40 Heavy soil 0.15-0.45 Sandy soil 0.05-0-25 Unimproved areas 0.10-0.30 Woodlands 0,05-0.25 Streets: Asphalt 0.70-0.95 Concrete 0.80-0.95 Brick 0.70-0.85 Drives and walks 0.75-0.85 Roofs 0.75-0.85 NOTE: The designer must use judgment to select the appropriate C value within the range for the appropriate land use_ Generally, larger areas with permeable soils, fiat slopes, and dense vegetation should have lowest C values. Smaller areas with slowly permeable soils, steep slopes, and sparse vegetation should be assigned highest C values. Source: American Society of Civil Engineers The overland flow portion of flow time may be determined from Figure 8.03a: The flow time (in minutes) in the channel can be estimated by calculating the average velocity in feet per minute and dividing the length (in feet) by the average velocity. Step 4. Determine the rainfall intensity, frequency, and duration (Figures 8.03b through 8.03g—source: North Carolina State Highway Commission; Ian_ 1973). Select the chart for the locality closest to your location. Enter the "duration" axis of the chart with the calculated time of concentration, Tc. Move vertically until you intersect the curve of the appropriate design storm, then move horizontally to read the rainfall intensity factor, i, in inches per hour. Step S. Determine peak discharge, Q (ft3/sec), by multiplying the previously determined factors using the rational formula (Sample Problem 8.03a), JA,N 2 4 2011 .J v 6 art For DEN RUse 1�• 1t� � SUJ8 10 0W ONLY Reviewer: /5 North Carolina Department of Environment and Natural Resources Timar {' ZO NC®ENR Request for Express Permit Review Tme q' 3 FILL-IN all the information below and CHECK the Permit(s) you are requesting for express review. FAX or Email the completed form to Express Coordinator along with a completed DETAILED narrative, site plan (PDF file) and vicinity map (same items expected in the application package of the project location. Please include this form in the application package. • Asheville Region -Alison Davidson 828-296-4698;alison.davidson@ncmail.net • Fayetteville or Raleigh Region -David Lee 919-791-4203; david.leeJRncmail.net • Mooresville & -Patrick Grogan 704-663-3772 or patrick.groganAmcmail.net • Washington Region -Lyn Hardison 252-946-9215 or lyn.hardison(dncmail.net • Wilmington Region -Janet Russell 910-350-2004 or lanet.russetKafl►cmaii.net NOTE; Project application received after 12 noon will be stamped in the following work day. Permits of request SW SW SW SW SW Project Name: FY09 FRENCH CREEK &RCH AND GONZALES STREET EXTENSION County: ONSLOW Applicant: CARL BAKER Company: MARINE CORPS BASE CAMP LEJEUNE Address: BLDG 1005 MICHAEL ROAD City: MCB CAMP LEJEUNE, State: NC Zip: 28547-T Phone: 910-451-2213, Fax: 910-451-2927, Email: carl,h,baker@usmc.mil Physical Location:END OF BIRCH STREET / SNEADS FERRY SIDE Project Drains into SC:NSW waters — Water classification 19-23 (for classification see-http://h2o.enr,state.nc.us/bims/reports/rej)ortsWB.htmI) Project Located in WHITE OAK River Basin. Is project draining to class ORW waters? N , within Y2 mile and draining to class SA waters N or within 1 mile and draining to class HQW waters? N Engineer/Consultant: HOWARD RESNIK Company: COASTAL SITE DESIGN PC RECEIVED Address: PO BOX 4041 City: WILMINGTON, State: NC Zip: 28406-_ Phone: 910-791-4441, Fax: 910-791-1501, Email: HOWARD@COASTALSiTEDESIGN.COM JAN 11 2011 SECTION ONE: REQUESTING A SCOPING MEETING ONLY ❑ Scoping Meeting ONLY ❑ DWQ, ❑ DCM, ❑ DLR, ❑ OTHER: BY: SECTION TWO: CHECK ONLY THE PROGRAM (S) YOU ARE REQUESTING FOR EXPRESS PERMITTING ❑ 401 Unit ❑ Stream Origin Determination: # of stream calls — Please attach TOPO map marking the areas in questions ❑ Intermittent./Perennial Determination: — # of stream calls — Please attach TOPO map marking the areas in questions ❑ 401 Water Quality Certification ❑ Isolated Wetland (_linear ft or acres) ❑ Riparian Buffer Authorization ❑ Minor Variance ❑ Major General Variance ® State Stormwater ❑ General ❑ SFR, ❑ SFR < 1 ac. ❑Bkhd & Bt Rmp, ❑ Clear & Grub, ❑ Utility ❑ Other ❑ Low Density ❑ Low Density -Curb & Gutter — # Curb Outlet Swales ❑ Off -site ZSW (Provide permit #)] ® High Density -Detention Pond 2 # Treatment Systems ❑ High Density -Infiltration — #Treatment Systems ElHigh Density -Bio-Retention _ # Treatment Systems El High Density —SW Wetlands _ # Treatment Systems ❑ High Density -Other _ # Treatment Systems / ❑ MOD:[] Major ❑ Minor ❑ Plan Revision ❑ Redev. Exclusion SW (Provide permit#) ❑ Coastal Management ❑ Excavation & Fill ❑ Bridges & Culverts ❑ Structures Information ❑ Upland Development ❑ Marina Development ❑ Urban Waterfront ❑ Land Quality ❑ Erosion and Sedimentation Control Plan with - acres to be disturbed.(CK # (for DENR use)) SECTION THREE — PLEASE CHECK ALL THAT IS APPLICABLE TO YOUR PROJECT (for both scooina and express meetina reauest Wetlands on Site ® Yes ❑ No Buffer Impacts: ❑ No ❑ YES: _acre(s) Wetlands Delineation has been completed: ® Yes ❑ No Isolated wetland on Property ❑ Yes ❑ No US ACOE Approval of Delineation completed: ® Yes ❑ No 404 Application in Process w/ US ACOE: ❑ Yes ❑ No Permit Received from US ACOE ® Yes ❑ No •+**s*+*++s++ss+*******+****++*+++++*ss**************+++I: Dilalii�fR use only++++++ss++ss+******+**+*s++++++++++*******++++*++++++s++++++ Fee Split for multiple permits: (Check # . Total Fee Amount $ SUBMITTAL DATES Fee SUBMITTAL DATES Fee CAMA $ Variance (❑ Mai; ❑ Min) $ SW(❑HD, ❑Ii❑Genl $ 401: $ LOS $ Stream Deter,_ $ NCDENR EXPRESS March 2009 *tT NC®ENR North Carolina Department of Environment and Natural Resources Request for Express Permit Review For DENR Use ONLY 5t% rL1\ Reviewer: Sub ime:rW-2 Confirm:Z FILL-IN all the information below and CHECK the Permit(s) you are requesting for express review. FAX or Email the completed form to Express Coordinator along with a completed DETAILED narrative, site plan (PDF file) and vicinity map (same items expected in the application package of the project location. Please include this form in the application package. -11 C) ) 0- I S • Asheville Region -Alison Davidson 828-296-4698;alison.davidson(a.ncmaiLnet • Fayetteville or Raleigh Region -David Lee 919-791-4203; david.lee(a.ncmail.not • Mooresville & -Patrick Grogan 704-663-3772 or gatrick.-grogan(amcmailmet • Washington Region -Lyn Hardison 252-946-9215 or lyn.hardison(@.ncmail.net • Wilmington Region -Janet Russell 910-350-2004 or janet.russell(a)ncmail.not NOTE: Project application received after 12 noon will be stamped in the following work day. Enter Related SW Permits of request SW SW SW SW SW Jr- o Project Name: FY09 FRENCH CREEK BIRCH AND GONZALES STREET EXTENSION County: ONSLOW Applicant: CARL BAKER Company: MARINE CORPS BASE, CAMP LEJEUNE Address: BLDG 1005 MICHAEL ROAD City: MC8 CAMP LEJEUNE, State: NC Zip: 28547-_ Phone: 910-451-2213, Fax: 910-451-2927, Email: carl.h.baker@usmc.mil Physical Location:END OF BIRCH STREET I SNEADS FERRY SIDE Project Drains into SC:NSW waters -- Water classification 1919 23 (for classification see-http:Ilh2o.enr.state.nc.usibimstreportslreportsWB.hhtml) Project Located in WHITE OAK River Basin. Is project draining to class ORW waters? N , within V2 mile and draining to class SA waters N or within 1 mile and draining to class HQW waters? N ��7 Engineer/Consultant: HOWARD RESNIK Company: COASTAL SITE DESIGN, PC ;_, Address: PO BOX 4041 City: WILMINGTON, Slate: NC Zip: 28406-_ OCT Z Phone: 910-791-4441, Fax: 910-791-1501, Email: HOWARD@COASTALSITEDESIGN.COM SECTION ONE: REQUESTING A SCOPING MEETING ONLY ❑ Scoping Meeting ONLY ❑ DWQ, ❑ DCM, ❑ DLR, ❑ OTHER: SECTION TWO: CHECK ONLY THE PROGRAM (S) YOU ARE REQUESTING FOR EXPRESS PERMITTING ❑ 401 Unit ❑ Stream Origin Determination: _ # of stream calls - Please attach TOPO map marking the areas in questions ❑ Intermittent/Perennial Determination: _ # of stream calls - Please attach TOPO map marking the areas in questions ❑ 401 Water Quality Certification ❑ Isolated Wetland (linear ft or _acres) ❑ Riparian Buffer Authorization ❑ Minor Variance ❑ Major General Variance ® State Stormwater ❑ General ❑ SFR, ❑ SFR < 1 ac. ❑Bkhd & Bt Rmp, ❑ Clear & Grub, ❑ Utility ❑ Other ❑ Low Density ❑ Low Density -Curb & Gutter — # Curb Outlet Swales ❑ Off -site [SW (Provide permit #)] ® High Density -Detention Pond 2 # Treatment Systems ❑ High Density -Infiltration _ #Treatment Systems ❑ High Density -Bio-Retention _ # Treatment Systems ❑ High Density -SW Wetlands _ # Treatment Systems ❑ High Density -Other _# Treatment Systems /❑ MOD:❑ Major ❑ Minor ❑ Plan Revision ❑ Redev. Exclusion SW (Provide permit#) ❑ Coastal Management ❑ Excavation & Fill ❑ Bridges & Culverts ❑ Structures Information ❑ Upland Development ❑ Marina Development ❑ Urban Waterfront ❑ Land Quality ❑ Erosion and Sedimentation Control Plan with 14 acres to be disturbed.(CK # (for DENR use)) SECTION THREE - PLEASE CHECK ALL THAT IS APPLICABLE TO YOUR PROJECT (for both scopina and express meeting request Wetlands on Site ® Yes ❑ No Buffer Impacts: ❑ No ❑ YES: _acre(s) Wetlands Delineation has been completed: ® Yes ❑ No Isolated wetland on Property ❑ Yes ❑ No US ACOE Approval of Delineation completed: ® Yes ❑ No 404 Application in Process wl US ACOE: ❑ Yes ❑ No Permit Received from US ACOE ® Yes ❑ No +*+*+*++*+*******+**+***+*+*++*+++++*+++*+*+*+*+**+*+++*FUr DENR use only+*++*++*+***********w+++++******+***+**++****+*****+*+++++ Fee Split for multiple permits: (Check# Total Fee Amount $ SUBMITTAL DATES Fee SUBMITTAL DATES Fee LAMA $ Variance (❑ Maj; ❑ Min) $ SW (❑ HD, ❑ LID, ❑ Gen) $ 401: $ LQS $ Stream Deter,_ $ NCDENR EXPRESS March 2009 U 41 Q 0 4 ��/.•'.�- ,.�\�:\, c\I'. yam Rz R� ���i�•A � �tr � wp s` .` �� r �:;;-. •xis _ y 1 1 N c,j .P, COASTAL SITE DESIGN, PC PO Box 4041 Wilmington, NC 28406 Phone: 910 791-4441 Fax: 910 791-1501 FOR STORMWATER EXPRESS REVIEW October, 2010 PROJECTNAME: BiRCI-I AND GONZALEZ STREET EXTENSION MCB Camp Lejeune, NC Onslow County PROJECf DESCRIPTION: The project area for this development is 17.42 acres with 29 acres of disturbance. There are 0.67 AC of wetlands within the project limits. This project is for the construction of the roadway extension of Birch and Gonzalez Street and a greenway trail. The owner is the United States Marine Corps. There will be water and sewer utilities installed along the roadway. Stormwater from the site will drain to SC, NSW waters located in the White Oak River Basin (Index # 19-23). The project will be high density utilizing roadside swales and collection systems discharging into 2 wet basins. Proposed impervious for the site is 22.7%. This project is subject to Coastal Stormwater Regulations. There are two wetlands crossing along the proposed way extensions. Culverts and headwalls will be utilized to build the crossings. The wetlands impacts have been approved by the ACOE. The project will have direct access onto Birch Street and Sneads Ferry Road. PROJECT BMP: high density/ wet basins. STORM WATER ENGINEER/CONSULTANT: Coastal Site Design, PC PO Box 4041 Wilmington, NC 28406 Rodney Wright rodney@coastalsitedcsign.com 910 7914441 office 910 791 1501 fax '-OL ' Reviewer: �_ North Carolina Department of Environment and Reviewer: Submit: _ J' Natural Resources NC®ENK Request for Express Permit Review Time: — — �i Confirm: FILL-IN all the information below and CHECK the Permit(s) you are requesting for express review. FAX or Email the completed form to Express Coordinator along with a completed DETAILED narrative, site plan (PDF file] and vicinity map (same items expected in the application package of the project location. Please include this form in the application package. • Asheville Region -Alison Davidson 828-296-4698;atison.davidson((Dncmail.nef • Fayetteville or Raleigh Region -David Lee 919-791-4203; david.lee(dlncmail.net • Mooresville & -Patrick Grogan 704-663-3772 or patrick.trroelan(a)ncmail.net • Washington Region -Lyn Hardison 252-946-9215 or lyn.hardisont@ncmail.net • Wilmington Region -Janet Russell 910-350-2004 or janet.russell(ftcmail.net NOTE: Project application received after 12 noon will be stamped in the following work day. Enter Related SW Permits of request SW SW SW SW SW Project Name: FY09 FRENCH CREEK BIRCH AND GONZALES STREET EXTENSION County: ONSLOW Applicant: CARL BAKER Company: MARINE CORPS BASE, CAMP LEJEUNE Address: BLDG 1005 MICHAEL ROAD City. MCB CAMP LEJEUNE, State: NC Zip: 28547 Phone: 910-451-2213, Fax: 910-451-2927, Email: orl.h.baker@usmc.mil Physical Location:END OF BIRCH STREET / SNEADS FERRY SIDE Project Drains into SC:NSW waters -Water classification 191923 (for classification see-htt :l/h2o.enr.state.nc.us/bims/re arts/re ortsWB.html) Project Located in WHITE OAK River Basin. Is project draining to class ORW waters? N , within '/z mile and draining to class SA waters N of within 1 mile and draining to class HQW waters? N Engineer/Consultant: HOWARD RESNIK Company: COASTAL SITE DESIGN PC Address: PO BOX 4041 City: WILMINGTON, State: NC Zip: 28406 — ~ " Phone: 910-791-4441, Fax:910-791-15001, Email: HOWARD@COASTALSITEDESIGN.COM AUG 2 3 2 1 010 SECTION ONE: REQUESTING A SCOPING MEETING ONLY I ❑ Scoping Meeting ONLY ❑ DWQ, ❑ DCM, ® DLR. ❑ OTHER: B SECTION TWO: CHECK ONLY THE PROGRAMS YOU ARE REQUESTING FOR EXPRESS PERMITTING ❑ 401 Unit ❑ Stream Origin Determination: _ # of stream calls - Please attach TOPO map marking the areas in questions ❑ IntermittentlPerennial Determination: _# of stream calls - Please attach TOPO map marking the areas in questions ❑ 401 Water Quality Certification ❑ Isolated Wetland ( linear ft or _acres) ❑ Riparian Buffer Authorization ❑ Minor Variance ❑ Major General Variance ® State Stormwater ❑ General ❑ SFR, ❑ SFR < 1 ac. ❑Bkhd & Bt Rmp, ❑ Clear & Grub, ❑ Utility ❑ Other ❑ Low Density ❑ Low Density -Curb & Gutter _ # Curb Outlet Swales ❑ Off -site [SW (Provide permit #)1 ® High Density -Detention Pond 4 # Treatment Systems ❑ High Density -Infiltration _ #Treatment Systems ❑ High Density -Bio-Retention _ # Treatment Systems ❑ High Density -SW Wetlands _ # Treatment Systems ❑ High Density -Other _ # Treatment Systems / ❑ MOD:❑ Major ❑ Minor ❑ Plan Revision ❑ Redev. Exclusion SW (Provide Permit #) ❑ Coastal Management ❑ Excavation & Fill ❑ Bridges & Culverts ❑ Structures Information ❑ Upland Development ❑ Marina Development ❑ Urban Waterfront ;� ❑ Land Quality ❑ Erosion and Sedimentation Control Plan with 14 acres to be disturbed.(CK # (for DENR use)) - PLEASE CHECK ALL THAT IS APPLICABLE TO YOUR PROJECT (for both scoping and express meeting request) Wetlands on Site ® Yes ❑ No Buffer Impacts: ❑ No ❑ YES: _acre(s) Wetlands Delineation has been completed: ® Yes ❑ No Isolated wetland on Property ❑ Yes ❑ No US ACOE Approval of Delineation completed: ® Yes ❑ No 404 Application in Process w/ US ACOE: ❑ Yes ❑ No Permit Received from US ACOE ® Yes ❑ No +++***+ww+*+++++++++++**w+ww*w*+*++**+*******s+*w++*++**For DI'NR usG Only*+*****w+ww*+**********+www*****+***w*ww+w+**+*++*+*+*++++* Fee Split for multiplepermits: Check # Total Fee amount $ SUBMITTAL DATES Fee SUBMITTAL DATES Fee CAMA $ Variance (❑ Maj; ❑ Min) $ SW (❑ 140, ❑ LD, ❑ Gen) $ 401: $ LQS $ Stream Deter,— $ NCDEfVR-R RAWAarch 2009 S]!) scIBI ol) COASTAL SITE DESIGN, PC PO Box 4041 Wilmington, NC 28406 Phone: 910 791-4441 Fax: 910 791-1501 FOR STORMWATER EXPRESS REVIEW August, 2010 PROJECT NAME: BIRCH AND GONZALEZ STREET EXTENSION MCB Camp Lejeune, NC Onslow County PROJECT DESCRIPTION: The project area for this development is 16.29 acres with 14 acres of disturbance. "There are 0.67 AC of wetlands within the project limits. This project is for the construction of the roadway extension of Birch and Gonzalez Street and a greenway trail. The owner is the United States Marine Corps. There will be water and sewcr utilities installed along the roadway. Stormwater from the site will drain to SC, NSW waters located in the White Oak River Basin (Index # 19-23). The project will be high density utilizing roadside swales and collection systerns discharging into 4 wet basins. Proposed impervious for the site is 22.7%. This project is subject to Coastal Stormwater Regulations. There are two wetlands crossing along the proposed way extensions. Culverts and headwalls will be utilized to build the crossings. The wetlands impacts have been approved by the ACOE. The project will have direct access onto Birch Street and Sneads Ferry Road. PROJECT BMP: high density/ wet basins. STORMWATER ENGINEER/CONSULTANT: Coastal Site Design, PC PO Box 4041 Wilmington, NC 28406 Rodney Wright rodney@coastalsitedesign.com 910 791 4441 office 910 791 1501 fax GoMaps GIS Page 6 of 6 SwAL� I r l -Ba s UBzs r — �:f•' I ,4z rrrrr '"� i ST�� • ' �'_' - IP 0,0 � I a jr LIMI Ts'OT' DI TUR Cu '„ �.• \ } i \J %/,•UN�INLL Bf. NEW TREE LINE. \ , ,( LIMITS OF DISTURBANCE J •1 `r r 1- (ACEfREEPq EC f1 LINE WILL BE NEW TREE LINE LIMITS OF CISTU CIE PLACE TREE PROTECTION ALONC �' ` \ �; I �' \\\ 1 I ,�• -, LIMirS OF DISTURBANCE �S'L +�' /� ,l �.,0* WALE A 1 r ,�v` � `-' � 1 `—r[1' \\ � .q..\.' \\ 4 ,I•, ♦,•�.—� A 4 / .,.♦ -„ IUMlrS OE CISIURBANCE' /, 'Yt. /' / ♦ .,� ,tJNL WILL BE NEW TREE J�jFLINE._` PLACE'IH" PROTECTION ALt 4(3,, SF \ \ �, \\ , 1 ` ' ' I ♦ % IJVITS OF DISTURBANCE, - _ ! \ WA �♦ '' r/ Y— _`_--.� 1 / IIP I \\\\ \\ I \ x I/ sWµFEri \ �. 5 9� V -y ! � 'P - � r LrMlrs of Dls7ugeANCE � \\ \ SF��� \�„5 I 1 WILLNEW TREE LINE - PALACE TREE PRDTECTION ALONG 'r \ \ \ �1 "'SSFFF�+ / 1- I IP• '" \ I I C.'•F LIMITS of DISTURBANCE' IP Y\ Y1v♦ 'F DISTURBANCE 29A4 AC s AUG Z32010 http:Hmaps.onslowcountyne.govlgomapslmaplmap.cfm?CFID=128703&CFTOKEN=4581... •8/11/2010 1 '77 Russell, Janet From: Rodney Wright [rodney@coastalsitedesign.com] Sent: Thursday, August 26, 2010 12:56 PM To: Russell, Janet; howard@coastalsitedesign.com Cc: 'Towler CIV David W' Subject: RE: Birch & Gonzales Street Extensions Janet, Please cancel this request. The contractors have asked for us to look at reducing the number of ponds proposed, so we're back to the drawing board. Thanks, From: Russell, Janet [mailto:janet.russell@ncdenr.gov] Sent: Wednesday, August 25, 2010 5:12 PM To: howard@coastalsitedesign.com; Rodney Wright Cc: Towler CIV David W Subject: Birch & Gonzales Street Extensions RE: French Creek Birch & Gonzales Street Extensions Rodney & Howard: The Stormwater Submittal Meeting for the Birch & Gonzales Street Ext. has been re -scheduled with Chris Baker on Thursday, September 2 at 10:30 AM herein the office. Please note the change in time and date from what we previously had scheduled. _ * Please respond to this email to confirm and reserve the submittal meeting date & time. Thanks, Janet 404 Wetland Report rJ La o e. For DENR Use �O�NLY !//•vJ Reviewer: North Carolina Department of Environment and submit 2�3 Natural Resources NC®ENR Request for Express Permit Review Time: 11 Confirm: 2- FILL-IN all the information below and CHECK the Permit(s) you are requesting for express review. FAX or Email the completed form to Express Coordinator along with a completed DETAILED narrative, site plan OF fNe) and vicinity, ma same items expected in the application package of the project location. Please include this form in the application package. • Asheville Region -Alison Davidson 828-296-4698;alison.davidson(a7ncmail.net • Fayetteville or Raleigh Region -David Lee 919-791-4203; david.lee(a.ncmail.net • Mooresville & -Patrick Grogan 704-663-3772 or patrick.grogan0,ncmail.net • Washington Region -Lyn Hardison 252-946-9215 or!yn.hardison(o.ncmail.net • Wilmington Region -Janet Russell 910-350-2004 or j_anet-russell{&ncmail.net NOTE: Project application received after 12 noon will be stamped in the following work day. Enter Related SW Permits of request SW SW SW SW SW Project Name: FRENCH CREEK BIRCH AND GONZALES STREET EXTENSION County: ONSLOW Applicant: CARL BAKER Company: MARINE CORPS BASE, CAMP LEJEUNE Address. BLDG 1005 MICHAEL ROAD City: MCB CAMP LEJEUNE, State: NC Zip: 28547-� Phone: 910-451-2213, Fax: 910-451-2927, Email: carl.h.baker@usmc.mil Physical Location:END OF BIRCH STREET / SNEADS FERRY SIDE Project Drains into SCASW waters —Water classification 19-23 (for classification see-htip:/lh2o.enr. state. nc.usibims/reportslreportsWB.html) Project Located in WHITE OAK River Basin. Is project draining to class ORW waters? N , within '/2 mile and draining to class SA waters N or within 1 mile and draining to class HQW waters? N Engineer/Consultant: HOWARD RESNIK Company: COASTAL SITE DESIGN, PC Address: PO BOX4041 City: WILMINGTON, State: NC Zip: 28406-_ Phone: 910-791-4441, Fax: 910-791.1501, Email: HOWARD@COASTALSITEDESIGN.COM SECTION ONE: REQUESTING A SCOPING MEETING ONLY ® Scoping Meeting ONLY ® DWQ, ❑ DCM, ® DLR, ❑ OTHER: SECTION TWO: FEB 0 1 2010 ❑ 401 Unit ❑ Stream Origin Determination: _ # of stream calls — Please attach TOPO map marking the areas in questions ❑ IntermittentlPerennial Determination: _# of stream calls — Please attach TOPO map marking the areas in questions ❑ 401 Water Quality Certification ❑ Isolated Wetland (,linear ft or _acres) ❑ Riparian Buffer Authorization ❑ Minor Variance ❑ Major General Variance ❑ State Stormwater ❑ General ❑ SFR, ❑ SFR < 1 ac. ❑Bkhd & Bt Rmp, ❑ Clear & Grub, ❑ Utility ❑ Other ❑ Low Density ❑ Low Density -Curb & Gutter — # Curb Outlet Swales ❑ Off -site {SW (Provide permit #)] ❑ High Density -Detention Pond _ # Treatment Systems ❑ High Density -Infiltration — #Treatment Systems ElHigh Density -Bio-Retention — # Treatment Systems ❑ High Density —SW Wetlands _ # Treatment Systems ❑ High Density -Other ` # Treatment Systems / ❑ MOD:❑ Major ❑ Minor El Plan Revision ❑ Redev. Exclusion SW (Provide permit#) ❑ Coastal Management ❑ Excavation & Fill ❑ Bridges & Culverts ❑ Structures Information ❑ Upland Development ❑ Marina Development ❑ Urban Waterfront ® Land Quality ® Erosion and Sedimentation Control Plan with 14 acres to be disturbed.(CK # (for DENR use)) SECTION THREE — PLEASE CHECK ALL THAT IS APPLICABLE TO YOUR PROJECT (for both scoDing and express meeting reauest Wetlands on Site ® Yes ❑ No Buffer Impacts: ❑ No ❑ YES: _acre(s) Wetlands Delineation has been completed: ❑ Yes ❑ No Isolated wetland on Property ❑ Yes ❑ No US ACOE Approval of Delineation completed: ❑ Yes ❑ No 404 Application in Process w/ US ACOE: ❑ Yes ❑ No Permit Received from US ACOE ❑ Yes ❑ No use only+*+*s+*s*sss+*+++++ssss+*++++++*+**++++++++****++++*+*+***** Fee Split for multiple permits: (Check# 1 Total Fee Amount $ SUBMITTAL DATES Fee SUBMITTAL DATES Fee CAMA $ Variance (❑ Mai; ❑ Min) $ SW (❑ HD, ❑ LD, ❑ Gen) $ 401: 1 $ LQS $ Stream Deter— $ Z S ep.Y-P, �v _ ro c L NCDENR EXPRESS March 2009 F LOCATION MAP xar ro sarc 1 r y •4 � i iElYJJO ®® wv� 1 � 1► V Y Z COASTAL SITEa DESIGN,PC jib W^ o N [%y[l4C CpP[POAL 4Q1FYi41t tVJ N r V6 fiw Krr W U J ¢ mt �w Z t7 y yy�LL LI a� °.Calibire llw4i GO p�}0 gv111ffwY �'a !�O a•�NP _C-105 c COASTAL SITE DESIGN, PC PO Box 4041 Wilmington, NC 28406 Phone: 910 791-4441 Fax: 910 791-1501 FOR STORMWATER EXPRESS REVIEW February I, 2010 PROJECT NAME: BIRCH AND GONZALEZ STREET EXTENSION MCB Camp Lejeune, NC Onslow County PROJECT DESCRI PTION: The project area for this development is 16.29 acres with 14 acres of disturbance. There are 0.86 AC of wetlands within the project limits. This project is for the construction of the roadway extension of Birch and Gonzalez Street and a greenway trail. The owner is the United States Marine Corps. Water and sewer utilities will be installed along the roadway. Stormwater from the site will drain to SC, NSW waters located in the White Oak River Basin (Index # 19-23). The project will be low density utilizing roadside swales. Proposed impervious for the site is 22.7%. This project is subject to Coastal Stormwater Regulations. There are two wetlands crossing along the proposed way extensions. Culverts and headwalls will be utilized to build the crossings. The necessary paper work to obtain approval for the crossing is in the process of being submitted. The project will have direct access onto Birch Street and Sneads Ferry Road. PROJECT BMP: low density/ roadside swales. STORMWATER ENGINEER/CONSULTANT: Coastal Site Design, PC PO Box 4041 Wilmington, NC 28406 Rodney Wright rodney@coastalsitedesign.com 910 791 4441 office 910 791 1501 fax FEB 0 1 2010 BY: MEMORY TRANSMISSION REPORT FILE NO. 224 DATE 06.11 11:51 TO : 997911501 DOCUMENT PAGES 8 START TIME 06.11 11:52 END TIME OOK' 11:53 PAGES SENT STATUS TIME :06-11-'10 11:53 FAX NO.1 :910-350-2018 NAME :DENR Wilmington SUCCESSFUL TX NOTICE *** State ol2Vort6 Gwt 119 to ttiepnrtrneat o! Eov I--- and h(atnral Raeonr w almi.mc.. Ftegtooal cllmo aivwr(y Ew�4sr Pardrra, Governor IF.iX 4c74rV%1MIL LSI.lEE'I' err FYr�s�wwa. $r crrtary c4: [2LQ) 794 7334_-_-___-- [g am a� 330-zooa - - - - 327 CuAinal ".4vn F.ialenninn, Wiimingrsin, NC 29405 a (910) 796-7215 a An Equ 3 Oppor nily AfWL l L. Aotio 4mp�oyc State of North Carolina Department of Environment and Natural Resources Wilmington Regional Office Beverly Eaves Perdue, Governor FAX COVER SEEET Dee Freeman, Secretary Date: 6 No. Pages (excl. cover): '1'o: Gr%� �� ,��5 /�� From: Jo Casmer Co: �� C- � Phone: (910) 796-7336 _ Fax: r7 Fax: 910 350-2004 / SS vac'/ -- %j / �•/ �� 4/1G• 127 Cardinal Drive Extension, Wilrnington, NC 28405 a (910) 796-7215 o An Equal Opportunity Afrmative Action Hmp ]dyer