Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
SW8090630_HISTORICAL FILE_20110601
i STORMWATER DIVISION CODING SHEET POST -CONSTRUCTION PERMITS PERMIT NO. SW8 a b (:,3 C) DOC TYPE ❑ CURRENT PERMIT ❑ APPROVED PLANS HISTORICAL FILE ❑ COMPLIANCE EVALUATION INSPECTION DOC DATE 2011 0( a YYYYM M DD fib � A* NCDENR North Carolina Department of Environment and Natural Resources Division of Water Quality Beverley Eaves Perdue Coleen H. Sullins Dee Freeman Governor Director Secretary June 1, 2011 Commanding Officer USMCB Camp Lejeune c/o Carl H. Baker; Deputy Public Works Officer Building 1005 Michael Road Camp Lejeune, NC 28547 Subject: State Stormwater Management Permit No, SW8 090630 Mod. New Base Entry Road P-1382, P-1383 and P-1384 High Density Permit - Overall Low Density Linear Road Project with BMP's for the Collected Areas and Areas of Higher Density Onslow County Dear Mr. Baker - The Wilmington Regional Office of the Division of Water Quality received a complete modification to the previously issued Stormwater Management Permit for the New Base Entry Road P-1382, P-1383 and P-1384, on May 31, 2011.. Staff review of the plans and specifications has determined that the modified project, as proposed, will comply with the Stormwater Regulations set forth in Session Law 2008-211 and Title 15A NCAC 2H.1000. We are forwarding modified Permit No. SW8 090630. dated June 1, 2011, for the construction of the built -upon areas and BMP's for the subject project. The modifications covered by this permit include the following: 1. Decreases the overall project area from 19,816,223 sf, to 19,538,433 sf, 2. Decreases the maximum allowed built -upon area for 24%. low density from 4,755,894 sf to 4,689,224 sf. 3. Adds four (4) wet detention ponds B-1, B-2, C-1 and C-2 for the treatment of collected runoff. 4. Provides revised plan sheets L-701, L-702, L-703, L-704, CP106 and GX310 for the gate area showing the access road, landscaping berm and visitor's center. 5. The approved plan set for this project includes the Contract "A" road and gate area plans previously approved on March 22, 2010, as revised per item #4 above, the drainage area maps for all seven ponds, the revised Overview low density plans, and the new Contract "B" and "C" road plans. This permit shall be effective from the date of issuance until February 8, 2020, and shall be subject to the conditions and limitations as specified therein. Please pay special attention to the Operation and Maintenance requirements in this permit. Failure to establish an adequate system for operation and maintenance of the stormwater management system will result in future compliance problems. If any parts, requirements, or limitations contained in this permit are unacceptable, you have the right to request an adjudicatory hearing by filing a petition with the Office of Administrative Hearings (OAH). The petition must conform to Chapter 150B of the North Carolina General Statutes, and must be filed with the OAH within thirty (30) days of receipt of this permit A petition is considered filed when it is received in the Office of Administrative Hearings during Wilmington Regional Office 127 Cardinal Drive Extension, Wilmington, North Carolina 28405 011C Phone: 910-796-7215 i FAX: 910.350-2004 ! Customer Service: 1.877-623-6748 N ort.h Carolina Internet: v+ww.ncwalerquality.org Naturally An Equal Opporly 1 AH rninve AcOri Employer wn+ State Stormwater Management Systems Permit No. SW8 090630 Mod. normal office hours, The OAH accepts filings Monday through Friday between the hours of 8:00 a.m. and 5-00 p.m., except for official state holidays. The petition may be filed by facsimile (fax) or electronic mail by an attached file (with restrictions) - provided the signed original, one (1) copy and a filing fee (if a filing fee is required by NCGS §150B-23.2) is received in the OAH within seven (7) business days following the faxed or electronic transmission. Unless such demands are made this permit shall be final and binding. You should contact the OAH with all questions regarding the filing fee and/or the details of the filing process. The mailing address, telephone and fax numbers for the Office of Administrative Hearings are: 6714 Mail Service Center, Raleigh, NC 27699-6714. Telephone 919-733-2698. FAX 919-733-3378. If you have any questions, or need additional information concerning this matter, please contact Linda Lewis at (910) 796-7215. Sincerely, F'or Colleen H. Sullins, Director Division of Water Quality GDS/arl: S:IWQSIStormwater\Permits & Projects120091090630 HD12011 06 permit 090630 cc: Louise Slate, P.E., MacTec Engineering David U Towler,SMCB Camp-Lejeune- �_ ZWilmirigton Regional Office Stormwater File Page 2 of 9 State Stormwater Management Systems Permit No, SW8 090630 Mod. STATE OF NORTH CAROLINA DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES DIVISION OF WATER QUALITY STATE STORMWATER MANAGEMENT PERMIT OVERALL LOW DENSITY DEVELOPMENT WITH BMP's FOR THE COLLECTED AREAS AND AREAS OF HIGHER DENSITY In accordance with the provisions of Article 21 of Chapter 143, General Statutes of North Carolina as amended, and other applicable Laws, Rules, and Regulations PERMISSION IS HEREBY GRANTED TO USMCB Camp Lejeune New Base Entry Road P-1382, P-1383 and P-1384 NC 24 to Piney Green Road, MCB Camp Lejeune, Onslow County FOR THE construction, operation and maintenance of an overall 24% low density development and three (3) wet detention ponds to treat the collected areas and the areas with a higher density, in compliance with the provisions of Session Law 2008-211 and Title 15A NCAC 2H .1000 (hereafter collectively and separately referred to as the "stormwater rules') and the approved stormwater management plans and specifications and other supporting data as attached and on file with and approved by the Division of Water Quality and considered a part of this permit. This permit shall be effective from the date of issuance until February 8, 2020 and shall be subject to the following specified conditions and limitations: I. DESIGN STANDARDS This permit is effective only with respect to the nature and volume of stormwater described in the application and other supporting data. 2.. The overall tract built -upon area percentage for the project must be maintained at 24%. This project is permitted for a maximum of 4,689,224 square feet of BUA. A total of 4,535,808 square feet is currently proposed and covered by this permit. A plan revision or modification to this permit is required for any additional BUA beyond 4,535,808 square feet. 3. The stormwater systems proposed to treat the runoff generated by the designated collection systems have been approved for the management of stormwater runoff as described in Section 1.10 of this permit. 4. The low density portion of this project utilizes a linear road project with roadside swales to treat runoff. Swales must be designed to pass the peak flow from the 10 year storm at a non -erosive velocity and be maintained with a dense vegetated cover_ 5. Stormwater runoff that is directed to flow through wetlands shall flow into and through these wetlands at a non -erosive velocity of 2 fps or less. Page 3of9 State Stormwater Management Systems Permit No. SW8 090630 Mod. ' 6. The road construction is broken up into three Contracts, A, B and C. The maximum BUA of 4,689,224 square feet covers all three contracts. This permit also covers the seven (7) wet detention ponds, A-1, A-2, A-3, B-1, B-2, C-1 and C-2 that will serve the collected portions of the project. 7. A 50-foot-wide vegetated buffer shall be provided adjacent surface waters, measured horizontally from and perpendicular to the normal pool of impounded structures, the top of bank of both sides of rivers and streams and the mean high waterline of tidal waters. Except for water dependent uses such as bridges, no built -upon area shall be located within the buffer. 8. Within the low density portions of the permitted project, the only runoff conveyance systems allowed will be vegetated conveyances. The minimum side slope for non -curb outlet swales is 3:1 (H:V) as defined in the stormwater rules and as shown on the approved plan. 9. No piping shall be allowed except those amounts shown on the approved plan. 10. The runoff from the collected portions within this overall low density project is being treated in seven (7) wet detention ponds. The following design elements have been permitted for the wet detention pond stormwater facilities, and must be provided in the system at all times. Pond Number A-1 A-2 A-3 B-1 B-2 C-1 C-2 a. Drainage Area, acres: 2,77 2.79 10.96 1.17 1.57 2.77 1,91 Onsite, ft2: 120,575 121,731 477,373 50,843 68,605 120,837 62,995 Offsite, ftx: 0 0 0 0 0 0 0 b. Total Built Upon Area, ftZ: 92,623 92,929 226.917 36,969 42,365 92,322 66,427 Road, ft2: 92,623 92,929 161,738 36,969 42,365 92,322 66,427 Buildings, ftz: 0 0 10,695 0 0 0 0 Parking, ftZ: 0 0 49,846 0 0 0 0 Sidewalk ftz: 0 0 4,638 0 _0 0 0 Offsite, ftz: 0 0 0 0 0 0 0 c. Average Design Depth, feet: 3.5 3.5 3.5 3.0 3.0 3.0 3.0 d_ TSS removal efficiency: 90% 90% 90% 90% 90% 90% 90% e. Design Storm, inches: 1.5 1.5 1.5 1.5 1.5 1.5 1.5 f. Permanent Pool Elev., FMSL: 7.50 16.50 17.0 10.5 8.5 5.0 1.5 g. Permanent Pool Area,ft2: 12,406 13,346 25,785 6,061 10,724 11,141 8,140 h. Permitted Storage Volume, ft3. 13,966 14,916 28,583 4,987 5,927 17,479 13,444 i. Storage Elevation, FMSL: 8.50 17.50 18.0 11.2 9.0 6.3 2.9 j. Controlling Orifice, pipe 0, in.: 2.0 2.0 3.0 1.25 1.5 2.0 1.5 k. Controlling Orifice flowrate. cfs: 0.058 0.058 0.128 .019 .023 .067 .039 I. 1 yr 24 hr pre-dev. Q peak, cfs: 1.97 1.99 7.8 0.83 1.12 1.97 1.36 m. Permanent Pool Volume, W 33,888 39,365 80,652 13,520 26,990 27,923 17,551 n Forebay Volume, ftz: 6,099 7,715 15,041 2,878 5,692 5,222 3,426 o. Maximum Fountain Horsepower:1/8 118 114 0 0 0 0 p. Receiving Stream: ------Northeast Creek----- -Bearbead Creek- -Wallace Creek- q. River Basin: WOK02 WOK02 WOK02 r. Stream Index Number: 19-16-(3.5) 19-20-1 19-20 s. Classification of Water Body: "SC HQW NSW" "SB NSW" "SB NSW" II. SCHEDULE OF COMPLIANCE 1. No one shall fill in, alter, or pipe any drainage feature (such as swales) shown on the approved plans as part of the stormwater management system without submitting a revision to the permit and receiving approval from the Division. 2. The permittee is responsible for monitoring the project on a routine basis to verify that the proposed built -upon area for the project does not exceed the maximum allowed by this permit. Page 4 of 9 State Stormwater Management Systems Permit No. SW8 090630 Mod. 3. The Director may notify the permittee when the permitted site does not meet one or more of the minimum requirements of the permit. Within the time frame specified in the notice, the permittee shall submit a written time schedule to the Director for modifying the site to meet minimum requirements. The permittee shall provide copies of revised plans and certification in writing to the Director that the changes have been made. 4. The stormwater management system shall be constructed in its entirety, vegetated and operational for its intended use prior to the construction of any built -upon surface. 5. The runoff from all built -upon area within the individual drainage areas of the high density collected portions of the project must be directed into the appropriate permitted -stormwater control system. 6. The permittee shall submit to the Director and shall have received approval for revised :plans, specifications, and calculations prior to construction, for any modification to the approved plans, including, but not limited to, those listed below: a. Any revision to the approved plans, regardless of size. b. Redesign or construction of additional built -upon area in excess of the amount covered by this permit. C. Further development, subdivision, acquisition, or sale of any, all or part of the project area. The project area is defined as all property owned by the permittee, for which Sedimentation and Erosion Control Plan approval or a CAMA Major permit was sought. d. Filling in, altering, or piping of any vegetative conveyance shown on the approved x.. plan. e.. The construction of BUA within any designated future areas. 7. The Director may determine that other revisions to the project should require a modification to the permit. 8. All stormwater collection systems, swales and BMP's must be located in either public rights -of -way or dedicated common areas or recorded easements. The final plats for the project must be recorded showing all such required easements, in accordance with the approved plans. 9. During construction, erosion shall be kept to a minimum and any eroded areas of the system will be repaired immediately. 10. Upon completion of construction, prior to issuance of a Certificate of Occupancy, and prior to operation of this permitted facility, a certification must be received from an appropriate designer for the system installed certifying that the permitted facility has been installed in accordance with this permit, the approved plans and specifications, and other supporting documentation. Any deviations from the approved plans and specifications must be noted on the Certification. 11. If the stormwater system was used as an Erosion Control device, it must be restored to design condition prior to operation as a stormwater treatment device, and prior to occupancy of the facility. 12. Unless otherwise shown, permanent seeding requirements for the stormwater control must follow the guidelines established in the North Carolina Erosion and Sediment Control Planning and Design Manual, Page 5 of 9 State Stormwater Management Systems Permit No. SW8 090630 Mod, 13, Decorative spray fountains will be allowed in the stormwater treatment system, subject to the following criteria: a. The permanent pool volume is a minimum of 30,000 cubic feet. b. The fountain must draw its water from less than 2' below the permanent pool surface. c. Separated units, where the nozzle, pump and intake are connected by tubing, may be used only if they draw water from the surface in the deepest part of the pond. d. The falling water from the fountain must be centered in the pond, away from the shoreline. e. The maximum horsepower for the fountain's pump is described in Section 1.9 (o) of this permit. 14. The permittee shall at all times provide the operation and maintenance necessary to assure that all components of the permitted stormwater system function at optimum efficiency. The approved Operation and Maintenance Plan must be followed in its entirety and maintenance must occur at the scheduled intervals including, but not limited to: a. Semiannual scheduled inspections (every 6 months). b. Sediment removal. C. Mowing and re -vegetation of side slopes. d. Immediate repair of eroded areas. e. . Maintenance of side slopes in accordance with approved plans and specifications. f. Debris removal and unclogging of structures, orifice, catch basins and piping. a. Access to all components of the system must be available at all times. 15. Records of maintenance activities must be kept by the permittee. The records will indicate the date, activity, name of person performing the work and what actions were taken. 16. Prior to transfer of the permit, the stormwater facilities will be inspected by DWQ personnel. The facility must be in compliance with all permit conditions. Any items not in compliance must be repaired or replaced to design condition prior to the transfer. Records of maintenance activities performed to date will be required. 111. GENERAL CONDITIONS This permit is not transferable to any person or entity except after notice to and approval by the Director. At least 30 days prior to a change of ownership, or a name change of the Permittee or of the project, or a mailing address change, the permittee shall submit a completed and signed "Name/Ownership Change Form" to the Division of Water Quality, along with the documents as listed on page 2 of the form. The project must be in good standing with DWQ. The approval of this request will be considered on its merits and may or may not be approved. 2. The permittee is responsible for compliance with all of the terms and conditions of this permit until such time as the Director approves the transfer request. Neither the sale of the project nor the conveyance of common area to a third party constitutes an approved transfer of the stormwater permit. 3. Failure to abide by the conditions and limitations contained in this permit may subject the Permittee to enforcement action by the Division of Water Quality, in accordance with North Carolina General Statute 143-215.6A to 143-215.6C. 4. The issuance of this permit does not preclude the Permittee from complying with any and all statutes, rules, regulations, or ordinances, which may be imposed by other government agencies (local, state, and federal), which have jurisdiction. Page 6 of 9 State Stormwater Management Systems Permit No. SW8 090630 Mod. 5. This permit shall become void unless the facilities are constructed in accordance with the conditions of this permit, the approved plans and specifications, and other supporting data. 6. In the event that the facilities fail to perform satisfactorily, including the creation of nuisance conditions, the Permittee shall take immediate corrective action, including those as may be required by this Division, such as the construction of additional or replacement stormwater management systems. 7. The permit may be modified, revoked and reissued or terminated for cause. The filing of a request for a permit modification, revocation and re -issuance or termination does not stay any permit condition. 8. Permittee grants permission to staff of the DWQ to access the property for the purposes of inspecting the stormwater facilities during normal business hours. 9. Approved plans and specifications for this project are incorporated by reference and are enforceable parts of the permit. 10. A copy of the approved plans and specifications shall be maintained on file by the Permittee at all times. 11. The permittee shall submit a permit renewal request at least 180 days prior to the expiration date of this permit. The renewal request must include the renewal application, appropriate documentation and the required processing fee. Permit modified and reissued this the first day of June 2011 NORTH CAROLINA ENVIRONMENTAL MANAGEMENT COMMISSION fr)r CoieeK)H. Sullins, Director Division of Water Quality By Authority of the Environmental Management Commission Page 7 of 9 State Stormwater Management Systems Permit No. SW8 090630 Mod. New Base Entry Road P-1382, P-1383 and P-1384 Page 1 of 2 Stormwater Permit No. SW8 090630 Mod, OnsloW County Designer's Certification I, , as a duly registered in the State of North Carolina, having been authorized to observe (periodically/weekly/full time) the construction of the project, (Project) for (Project Owner) hereby state that, to the best of my abilities, due care and diligence was used in the observation of the project construction such that the construction was observed to be built within substantial compliance and intent of the approved plans and specifications. The checklist of items on page 2 of this form is a part of this Certification. Noted deviations from approved plans and specifications: Signature Registration Number Date SEAL Page 8-of 9 State Stormwater Management Systems Permit No. SW8 090630 Mod, -.. Certification Requirements: Page 2 of 2 1. The drainage area to the system contains approximately the permitted acreage. 2. The drainage area to the system contains no more than the permitted amount of built -upon area. 3. All the built -upon area associated with the project is graded such that the runoff drains to the system. 4. All roof drains are located such that the runoff is directed into the system. 5. The outlet/bypass structure elevations are per the approved plan. 6. The outlet structure is located per the approved plans. 7. Trash rack is provided on the outlet/bypass structure. 8. All slopes are grassed with permanent vegetation. 9. Vegetated slopes are no steeper than 3:1. 10. The inlets are located per the approved plans and do not cause short-circuiting of the system. 11. The permitted amounts of surface area and/or volume have been provided. 12. Required drawdown devices are correctly sized per the approved plans. 13. All required design depths are provided. 14. All required parts of the system are provided, such as a vegetated shelf, a forebay, and the vegetated filter. 15. The required dimensions of the system are provided, per the approved plan. cc: NCDENR-DWQ Regional Office Page 9 of 9 MEMORY TRANSMISSION REPORT FILE NO. DATE TO DOCUMENT PAGES START TIME END TIME PAGES SENT STATUS TIME :06-02-'11 14,24 FAX NO.1 :910-350-2004 NAME :DENR Wilmington 712 06.02 14:16 8 919198318136 10 06.02 14:18 06.02 14:24 10 OK A*i SUCCESSFUL TX NOTICE **� state -f zqurtlr Carolina r>epartment of Enml romment and r4atural Resources Wilmington Rpgionrrl QfFigc �'nvcr/y En vets Perdr�r!. CdVP.Yi}OY Ds+e FY-e?e+m ri.i, .$'rgrrrS[afy "a t Co: jr FA3c 4--4:l'VEI2 SI-X]F-15,rl' Tip. C?f PagQfi' (ey cluAln� saver) 1 ) Irrom. Phone• � S`sb_--)q�(;"::]Z _ — - Frnx#: 910.3'i0-2004 �j,ln��_-ra��•:r_��=aLrialifrR.�i� iL.+►�;��Git_�ilF? �3•T�t11��:1! �� NAV KKK W. • . 7�-7��;<�� 127 Ca.Win w1 Drl.0 Htr....3r.., wlr...lnClP n, N.C. SbiAS 'r'+1a�.1.4..w (w10Y 59L�73� 3 FwwiY 10? 190-200y An F,rn. A! r?nnnrynnll.n/irmw�l+�w wr. l..n F.mnia •rr MEMORY TRANSMISSION REPORT TIME :06-02-11 14:18 FAX NO.1 :910-350-2004 NAME :DENR Wilmington FILE NO. 711 DATE 06.02 14:16 TO : 8 919164512927 DOCUMENT PAGES 10 START TIME 06.02 14:16 END TIME : 06.02 14:18 PAGES SENT 10 STATUS CK *** SUCCESSFUL TX NOTICE ,*' $tata of North Carolina j1�pArt�FAi e*]p,'avirpampPR and Pl ata rwl Ete-re.. Wl c-sosfr Zteloo-21 Of![ce BavartyJray. A-%w ft.y Governor FJ►-7c 4="wER SE7^ si�.Yz.err..v.s, acceotary � 4 i7aic: �O.-1t„--Z -ZllclLk -- - - - - No_ Pagce (mccl_ covia): �b To: From: tK--�PA 127 f`:p,ai—I X>-- E�[tu�r�on_ vv.1—best—._ NC; 211AQ5 � (41 O) 794-7215 r .1h Hqa l 4C>pp4 —aty ^M -u Ajt Aetton ZtmW*Vw Permit Number SW8090630 Central Files. APS SWP 06101 /11 Permit Tracking Slip Program Category Status Project Type State SW i Active Major modification Permit Type �1l- Version Permit Classification State Stormwater 1.30 Individual Primary Reviewer linda.lewis Coastal SW Rule Coastal Stormwater - 2008 - Permitted Flow Facility Name Base Entry Road P1382 P1383 and P1384 Camp Lejeune Location Address New Base Entry Rd Camp Lejeune NC 28547 Permit Contact Affiliation Major/Minor Region Minor Wilmington County Onslow Facility Contact Affiliation Owner Name Owner Type Commanding Officer US Marine Corps - Camp Lejeune Government - Federal Owner Affiliation Carl H. Baker P S C 20004 Camp Lejeune NC 285420004 pates/Events Scheduled Orig Issue App Received Draft Initiated Issuance Public Notice Issue Effective Expiration 02/08/10 05/10i11 06/01/11 06/01/11 02/08/20 Regulated Activities Re ues ed/Received Events State Stormwater - HD - Detention Pond Deed restriction requested State Stormwater - Low Density Deed restriction received Additional information requested 05/19/11 Additional information received 05/31/11 Outfall NULL Waterbody Name Stream Index Number Current Class Subbasin MACTE;C Engineering and Consulting ICJ Atlantic 7604Avenue ACTEC R 1 v Ralele igh, NC 27604 Phone: (919) 876-0416 Fax: (919) 831-8136 LETTER OF TRANSMITTAL TO: Linda Lewis DATE: 5-25-201 1 NCDENR/DWQ Express Permitting PROJECT NO.: 6225 09 4999 127 N. Cardinal Drive Ext. PROD. NAME: Camp Lejeune New Base Entry Point & Road Wilmington, NC.28405 SUBJECT: Revised drawings and calculations for stormwater perm it modification B and C for the Base Entry Point and Road WE TRANSMIT TO YOU: 0 HEREWITH FILYNDER SEPARATE COVER SUBJECT: ACTION: ®DRAWINGS ®FOR YOUR INFORMATION ❑SPECIFICATIONS ❑FOR YOUR COMMENT OR APPROVAL CALCULATIONS ❑RETURNED FOR CORRECTION: RESUBMIT ❑REPORT ❑APPROVED AS NOTED ❑COST ESTIMATE ❑AS REQUESTED OAS NOTED SENT BY: [—]MAIL ❑CERTIFIED MAIL ®EXPRESS FedEx ❑COURIER []HAND DELIVERED ❑FACSIMILE: pages (including transmittal sheet) COPIES DATE DESCRIPTION 1 5-20-1 1 Response to comments 2 5-20-11 Drawdown calculations for wet detention basin Cl 2 5-20-1 l Wet detention basin supplement for basin CI �h�r fe S.Z,4- [ 2 5-20-11 Revised drawing XG504 — Outlet Detail Basin C1 2 5-20-1 1 Revised supplement to table on page 3 of stormwater permit SW08-090630 2 " 5-20-11 Revised drawings XG505, XG507, XG 110, and XG511 showing changes to emergency spillway for wet detention basin C2 2 5-20-1 1 Sheets SWM-12 and SWM-13 showing changes in planting in bioretention area at gate (Contract A) S�2nt F Y (, to o•t a r-t_ o-+r ' . O►.�t. ucs-t �nr REMARKS: Enclosed are the comment responses, revised plan sheets, calculations, and supplements needed Erased on the express review comments. CC: Orathai Buller, MCB Camp Lejeune By: .Jesse Barker, MACTEC ou e Slat Pete Wright, NAVFAC Ioslater@imactec.com RECEIVED Jeff Meador, MACTEC/RK&K Joint Venture Direct Phone: 919-831-8006 MAY 2 6 2011 File (1) BY: (:ONFII)EN'I'IAI,I'I'1' i4O'rICL: This message is intended only for the use of the individual or emity to which it is addressed, and may contain information that is privileged, confidential, and exempt from disclosure under applicable law. If the reader of this message is not the intended recipient, or the employee or agent responsible for delivering the message to the intended recipient, you are hereby notified that any dissemination, distribution, or copying of this communication is strictly prohibited. If you have received this communication in error, please notify us immediately by telephone and return the original message to us at the above address via the US. Postal service. 'thank you. If transmission is not received in good order, please call Louise Slate at 919-831-8006. lh1 i1men(f Form 1?"'Aed 10'78 02 Response to Comments Permit Number SW8 090630 1. The orifice size is based on the required minimum volume to store, not the provided volume. For most of the ponds, the required and provided volumes are close enough to each other and the orifice size range that can accommodate both volumes in 2-5 days is enough to not be a problem. For Pond C-1 however, the gap is relatively large, and the specified .2" diameter orifice is a bit too large. It allows the 11,141 cf volume to drawdown in under 2 days. The draw -down calculations, BMP Supplement and Plan sheet XG5O4 have been revised to show a 1.75" diameter orifice for pond C-1. 2. There is a minor typo on the drainage area breakdown addendum sheet for Pond C- 2. The onsite DA is 82,995 sf, not 66,427 sf, which is the BUA. The onsite drainage area for Pond C2 has been revised on the supplement to the stormwater permit application. 3. Please add some type of stabilization (filter fabric and riprap) or a concrete level spreader to the overflow spillway for Pond C-2. I'm concerned that the frequent (every 2-5 days) and intense flow rates over the spillway may cause continuous erosion problems. Rip rap added to overflow spillway to protect against long term erosion. Please note the overflow spillway will only carry flows in rainfall events greater than 1.5" in depth. The peak flow rates in the spillway are as follows: Q 1 = 0.89 cfs Q10=9.23cfs Q5O = 11.48 cfs Q100= 16.15cfs Plan sheets XG110, XG5O5, XG5O7 and XG511 have been revised to detail the rip rap placement. MAY 26 2011 BY: 5W FCM* 30 Lewis,Linda From: Lewis,Linda Sent: Thursday, May 19, 2011 5:15 PM To: Louise Slate Cc: Jeff Meador Orteador@rkk.com); Russell, Janet Subject: SW8 090630 Addinfo Louise, I've gone over everything and have 3 minor comments: 1. The orifice size is based on the required minimum volume to store, not the provided volume. For most of the ponds, the required and provided volumes are close enough to each other and the orifice size range that can accommodate both volumes in 2-5 days is enough to not be a problem. For Pond C-1 however, the gap is relatively large, and the specified 2" diameter orifice is a bit too large. It allows the 11,141 cf volume to drawdown in under 2 days. 2. There is a minor typo on the drainage area breakdown addendum sheet for Pond C-2. The onsite DA is 82,995 sf, not 66,427 sf, which is the BUA. 3. Please add some type of stabilization (filter fabric and riprap) or a concrete level spreader to the overflow spillway for Pond C-2. I'm concerned that the frequent (every 2-5 days) and intense flowrates over the spillway may cause continuous erosion problems. Please submit the requested information by May 26, 2011. Thanks, Linda Lewis NC Division of Water Quality 127 Cardinal Drive Ext. Wilmington, NC 28405 910-796-7215 Education is the progressive discovery of our own ignorance. -Will Durant E-maiI correspondence to and from this address may be subject to the North Carolina Public Records Law and may be disclosed to third parties. Stormwater Management Plan (Modification of Permit #SW8 090630) Prepared For: MCB Camp Lejeune FY10 MCON Project 1382, New Base Entry Point Camp Lejeune, NC Date: 05-18-12 0, `�'s'S10�k�9 SEAL 035724 oC Sf ,$I)Z AAl-M foil AECOM 701 Corporate Center Dr., Suite 475 Raleigh, NC 27607 919-854-6200 Prepared By: Andrew Wilson, EIT Checked By: Bryan M. Dick, PE, PH MAY 2 4 2.01z Project Description This document is to serve as a modification to an existing permit (SW8 090630) for the FY10 MCON Project 1382, New Base Entry Point, Camp Lejeune, NC. The existing permitted boundary is split up into 8 drainage areas, one Low Density area and 7 high density areas. This "mod" is a result of new parking lot approaches which slightly increases the impervious surfaces in the Low Density drainage area of SW8090630. The runoff generated from the additional impervious surfaces will be treated by the existing permitted low density roadside swales. Contact Information AECOM Technical Services Inc. Attn: Bryan M. Dick, PE, PH 701 Corporate Center Dr., Suite 475 Raleigh, NC 27607 Telephone: 919-854-6252 Fax: 919-854-6259 Identify Protect Involvement The proposed project is located in the White Oak River Basin. The project drains to New River (NCDWQ Index Number 19-(10.5), which has an NCDWQ Stream Classification of SB, HQW, NSW. The Modification will result in the increase in impervious area within the low density drainage area of approximately 10,274 sf. The additional stormwater runoff will be treated via low density practices provided in the existing permitted stormwater Permit Number: SW8 090630. Runoff will be captured and routed to the existing low density stormwater roadside swales. This project is not located within % miles of SA waters, or 575 feet of ORW waters. Stormwater Design Parameters The existing stormwater project permit boundary is established to achieve the Low Density stormwater strategy described in requirements set forth in the Session Law 2008-211 Section 2.(b)3b, sheet flow and flow through vegetated conveyances (grassed swales) are maximized along the project corridor. Generally, the roadway has sheet flow, roadside swales and occasional discharge points discharged to preformed scour holes. No structural BMPs are present for in the Low Density roadway sections. Discussion of Treatment Measures This modification is addressing the adjustments associated with the increase of impervious area within the Low Density drainage area, specifically, to insure that the adjusted impervious percent of the existing Low Density stormwater boundary meets the MAY 2 4 2012 ---- - - - -- - NCDWQ threshold requirement of less than 24%. According to Stormwater Permit Number SW8 090630, the low density boundary will meet this threshold. Conclusion This Stormwater Management Plan represents an environmentally sensitive and effective plan for utilizing the proposed stormwater treatments to accommodate the increased runoff of the proposed site development. MAY 2 4 201Z Half Moon clqa nvill raia'+j'� Vow F?ivarMarin6 CarpsArr Sr;, Hospital Satellite Clinic Location 1 Camp %eleune MC'Base t s .61 yKwverr 91.d N almano Sta II 0 1 2 4 Miles Vicinity Map Legend Naval Hospital Satellite Clinic Marine Corps Base Camp Lejeune MCBCL Roads Onslow County, North Carolina �� • Site Location Study Area A Figure Q County 0 AXOM 1 nD ECCT V7- .. T nD ,� c )OW . . . . . . . . . . . . -y �' :.�y jy ::'.!r`r �' � %.�' Pars ._��'."'.,""=i>,y; �i: ,�.. �, ,• R New Baee-. Eyilb� Foams a-vu4, GatR- - F4 C B Ca-v ,F' L) CLA- VLJZ— NCDE(4R tDrvnW[4.er EjCPY s Kev eat �Copi� NlQ4- v� l J JVVU 30, 2001 Z : od RC) r L.ou.is� SIA-� MAcraz/lkK s K J 1/ `os l opt �a n�a.�-t�� . Co►•.-, L MI5 15Vv PS 3 S�e-t. Fe e ve-.S 5,eeJL5 Cev r l<c G Pon sAk., A4 1<-TL cAcC> A )er�-v •-e, �`� c . �..� L u. d i Di.J je+i rh�B, (�-.P �'`,j""+�e. c�o,u;d . -}nwlt✓ @ fz V-1 wua�-c .J V ,J 1` �pqr iri Wt�r.-C- L .Cflr 9 ��'n'�tQ 1'�rU`J�lr1XiCSy 51'WmWOkt ChYi►u2 Y1��y@r1C�en�,�� to LrJF=b Sr_ c �f s�D't� ��% -f, r �v ��� Sf t44 J 1%Ivp,�jX 13 1, J� �'�/`!h .. k�� 'r /• �. � _'� \-'. U1V. Gw �yJH . aS/ClIm4.0 Ct5L�iG i ,i ® � rr.:Artrr�im.,rnc 4400 MUTI•PURPOSE PATH 1 a' Mp•PURPOg._ 30' 1(y 12' z_ IT $ GRASS iffDIAN 12' 17 1R' 16 6 10 PATH 13'WITH 6' 1T 1T 6 GUARDRAIL s acne ROM GUARDUL a' PAVED ~ _ �� PAM � _ `� IAA PAVED 6 � —' PRDPOSEDPAYE DT PA1113�i B1 EI VARIABLE GR01imi) w 1ID EXISTING SLOPES GROUND ROADWAY TYPICAL SECTION OPTION # 1 (46' MEDIAN) FY10 MCON Project 1262 - New Base Entry Point & Road Marine Corps Base, Camp Lejeune, NC Initial Stormwater Corridor Concepts Discussion June 30, 2009 This narrative describes stormwater management corridor concepts proposed for the FY10 MCON Project 1262, New Base Entry Point & Road project located on the Camp Lejeune Marine Corps Base in Onslow County, North Carolina. The project includes the construction of approximately 6.5 mile roadway 4-lane corridor spanning from Bell Fork Road at NC24 to Sneads Ferry Road and includes four major interchanges and three bridges spanning waterways. The project also includes the construction of a new base entry gate and the widening of Brewster Boulevard. Excluding the planned interchange with NC24, the project is planned to be constructed on property owned by the US government on land that is mostly previously undeveloped. The road will be designed based on NCDOT design standards. The following provides details regarding the property on which the proposed project is planned for construction: Street Address, city, county - New Base Entry Roadway, MCB Camp Lejeune, Onslow County, NC Acres in Tract - to be determined when project boundary is set to allow low density stormwater permitting option Ownership Information from NC Secretary of State Web Site - US Government Property Tax Parcel ID number - US Government Property The project is planned to be phased over three (3) years and be designed and constructed in three (3) phases. The following lists each phase along with the planned construction year in parenthesis: Phase 1 -- From Bell Fork Rd. at Rt. 24 to Brewster Blvd., including road widening at Brewster Blvd. (August 2010) Phase 2 - From Stone St. to Sneads Ferry Rd. (March 2011) Phase 3 - From Brewster Blvd to Stone St. and off -base interchange at Rt. 24 (2012). The project site is located in Onslow County, North Carolina and is in the White Oak River Basin. The roadway drains to three main receiving waters: Northeast Creek, Wallace Creek, and Bearhead Creek. The following table lists each stream with its DWQ Classification. Stream Name DWQ Classification DWQ Index Northeast Creek SC; HQW, NSW 19-16-(3.5) Wallace Creek SB NSW 19-20 Bearhead Creek SB NSW 19-20-1 This project has been included in Grow the Force initiative planning process including a total of approximately 75 projects planned at various site throughout North Carolina including Camp Lejeune, USMC Air Station New River, and MCAS Cherry Point. A Draft Environmental Impact Statement (DEIS) has been prepared for these identified projects. The DEIS is planned to be released for public comment in July 2009. A Record of Decision (ROD) is anticipated in January 2010. The USAGE and DWQ have reviewed wetland and stream delineations shown on the plans and has concurred with the delineation. In addition, coastal wetlands have been delineated by the project team. A DCM determination is taking place this month concerning verification of these determinations and the Section 10 waters within the project corridor. Stream and wetland impacts will be permitted for the entire project through the Army Corps of Engineers (ACE). A 401/404 Initial Stormwater Corridor Concepts Discussion Page 1 of 3 application is planned to be submitted in November 2009 to include all phases of this project. Phases 2 and 3 are anticipated to be permitted as "corridor" impacts. Previous to this submittal, a design charette was conducted to develop a conceptual vertical and horizontal alignment. Representatives from many environmental agencies, including USCG, USACE, DWQ, CAMA, and NMF took part in the discussions. Based on input from these agencies, the alignment was adjusted to improve minimization and avoidance of impacts to natural resources. Historical features located near the project site have been avoided. No water or wastewater service is included as part of this project. The project permit boundary will be established to achieve the Low Density stormwater criteria and will have pockets of High Density. Consistent with Low Density stormwater strategy described in requirements set forth in the Session Law 2008-211 Section 2.(b)3a, sheet flow and flow through vegetated conveyances (grassed swales) will be maximized alongthe project corridor. Generally, the roadway has a 46 ft depressed median cross section. Based on the Roadway Typical Section (Option #1), the typical section includes 70ft of impervious surface (including a planned 10 ft wide sidewalk) and a total corridor width of 188 ft. To achieve the Low Density criteria of less than 24% imperviousness, the project boundary will be established at a minimum of 292 ft. Final placement of the Low Density corridor will be determined at a later date. The roadway will generally have three (3) distinct typical cross sections: Section Proposed Typical Corridor Concept SWM Description Section Concept Tangent Depressed median, Utilize shoulder sheet flow and Low open shoulder, roadside swales. Occasional Density grass swales median discharge points will be discharged to preformed scour holes. No other structural BMPs are proposed in these roadway sections. Curve Sections Depressed median, Utilize shoulder sheet flow and Low open shoulder, roadside swales. Occasional Density grass swales median discharge points will be discharged to preformed scour holes. No other structural BMPs are proposed in these roadway sections, Bridge/Culvert Curb and gutter Collect stormwater in pipe systems High approaches and convey to structural BMP prior Density and other to discharge Pocket sections requiring curb and gutter Proposed structural stormwater BMPs will be designed in accordance with the 2007 NCDENR Stormwater Best Management Practices Manual and will be designed in compliance with requirements set forth in the Session Law 2008-211 Section 2.(b) 4. The total proposed impervious area and placement of structural stormwater BMPs will be determined as the project progresses. Initial Stormwater Corridor Concepts Discussion Page 2 of 3 The stormwater BMPs will be located outside the vegetated buffer for each stream. The new base entry road will pass ciose to some existing and proposed developments served by appropriately sized best management practices; however, it is strongly desired to treat stormwater from this project independently from other development on the base and with the project corridor. The roadway will typically be constructed in fill elevated above existing terrain. Off -site drainage will pass through the roadway via culverts in locations of natural drainage conveyance. Existing streams will be conveyed under the roadway in appropriately sized culverts following typical NCDOT criteria. These culvert crossings will provide a combination of low and high flow conveyances to maintain natural conditions along the jurisdictional corridor passing under the road. The three significant watercourses (Northeast Creek, Wallace Creek and Bearhead Creek) will be spanned by bridges. Coordination with FEMA is planned to ensure compliance with floodplain regulations. In addition to the planned roadway, new base entry gate facilities are planned with Phase 3 of this project. Continued coordination with gate facilities is planned to determine the appropriate stormwater concept for new gate area of the project. The project site is located in an area that is mostly previously undeveloped land. There are some localized areas of development that the roadway corridor will impact, some of which might be pre- 1988 built upon area. An on -site evaluation of soils is currently underway. Results from this evaluation will provide details about infiltration rates, seasonal high water table elevation, and other soil characteristics. This information will be used to assist in the selection and design of appropriate BMPs for the project. Initial Stormwater Corridor Concepts Discussion Page 3 of 3 ,IMF � r '�; . � " '� �. c •� „" .. - '- { ,,,� f V r-r f,.� :•e ! �, y- 'mot 4 ' �%` i A. A ^Y-'� ` M 18n A 1 Ac .- '�\ t}. � ` �� .� - /l . � . �J.: _ 4• "/ / - I -.� -III it ` : 4i•, [PFD All - - �• - _ is Y f 1-14 L JOHNSON. t f' a t ijrch FIR el ARADIS i=' } '� - •ter POINT POINT :. CHARRETTE - 12 MAY 2009 - FY10 MCON Project 1262, New Base Entry Point �RK NOT TO SCALE I Contract B - FY11 Contract A - FY10 Temporary Intersection with NC24 Contract C - FY12 New Gate Facilities Bougainville Dr./Camp Knox Rd. Intersection Northeast Creek Bridges Brewster Blvd. Interchange Bridges North Serving Brewster Blvd. Interchange Ramps South Serving Brewster Blvd, Interchange Ramps, Brewster Blvd. Widening Jl Stone Street Bridees 1 rrris sh, GQ1 G� Contract C - FY12 Grade Separated Interchange with NC 24 �g �nl NAVAL HOSPITAL 00::: �r77 W-6 PARADISE ` %� _ POINT - New ho%,116 B� River NOT TO SCALE C -:I Contract B - FY11 Wallace Creek Bridges Proposed Wallace Creek Road Interchange Bearhead Creek Bridges Holcomb Blvd. Interchange N ge 6 4 C `_.� HADNOT 3 POINT CHARRETTE - 12 MAY 2009 FY10 MCON Project 1262, New Base Entry Point Marine Corps Base, Camp Lejeune, NC CONTRACT PACKAGES Imp nu Ne®� c«T.,b.la nt t.� ti 0 ry Ile .may rr. I- r� 1 0 125 250 500 Feet NiCOE Site USGS Map Naval Hospital Satellite Clinic Legend Marine Corps Base Camp Lejeune Cad Renderer Onsiow County, North Carolina - NICOE Sde MCBCL Rmds Figure 10 a.CM 4 WET DETENTION POND ANALYSIS FILE NAME: S:1WQS�Stormwaterlpermits & projects420091090630 HD12011 03 excel_WP 090630 PROJECT #: SW8 090630 REVIEWER: L Lewis PROJECT NAME Base Entry Road P-1382, 1383 & 1384 Original Run Date: February 28, 2011 Note - User input boxes are shaded in blue. Last Modified 19-May-11 Modification to add ponds 81, B2. C1 and C2. Ponds Al, A2 and A3 are unchanged, Pond A-1 Pond A-2 Pond A-3 Pond B1 Pond B2 Pond C1 Receiving Stream: Northeast Cree Northeast Cree ortheast CreelkBearhead Cree earhead Creel, Wallace Creek Classification: SC HQW SC HQW SC HQW SB NSW SB NSW SB NSW Index Number: 19-16-(3.5) 19-16-(3.5) 19-16-(3.5) 19-20 19-20 19-20-1 Onsite DA, sf= 120575 00 121731 00 477373.00 50834.00 68605.00 120837.00 Offsite DA, sf = 0.00 0.00 0.00 0,00 0,00 0.00 Total Drainage Area,sf 120575.00 121731.00 477373.00 5083400 6860500 120837 00 Total Drainage Area,ac 277 2 79 1096 1.17 1.57 2.77 Built -Upon Area Buildings, sf = New Road. sf = Parking, sf = Sidewalk, sf = Offsite, sf = Total Built -upon Area 10695.00 92623.00 92929.00 161738.00 36969.00 42365.00 92322.00 4984600 4638.00 1 92623.00 1 92929.00 1 226917.00 1 36969.00 1 42365.00 l 92322.00 1 BUA. sf DA. sf Design Storm, inches Rv Volume required, cf C Minimum Surface Area impervious Avg. Design Depth. ft: TSS (85% or 90%): SA/DA ratio PP Surface Area req. Within 1/2 mile SR? Y or 1 yr 24hr Rainfall Depth, SR Pre/ Rv Post/ Rv 1 yr 24 hr Pre/ Volume, ci 1 yr 24 hr Post/ Volume, c Volume Required #DIV/01 #DIV/01 #DIV101 #DIV/0? #DIV/01 #DIV/01 0 0 0 0 0 0 76.82% 76.34% 47.53% 72-72% 61.75% 76.40% 3.5 3.5 3.5 3.0 3.0 3.0 90 90 90 90 90 90 7-68% 7.63% 4.75% 8.45% 719% 8.93% 9262 9293 22692 4298 4935 10793 Pond Al Pond A2 Pond A3 Pond B1 Pond B2 Pond C1 n n n n n n 0.050 0.050 0.050 0.050 0.050 0.050 0.741 0 737 0.478 0 705 0.606 0 738 0 0 0 0 0 0 0 0 0 0 0 0 11174 11215 28512 4477 5196 11141 Top of Sediment Elev. Fn 3.00 11.00 12.00 5.00 4.00 0,00 Top of Sediment Area, sf 4114.00 3045.00 8766.00 533.00 2716.00 2249.00 Bottom of shelf Elev. Fms 7.00 16.00 1650 1000 8.00 4.50 Bottom of shelf Area, sf 10026.00 10333.00 2143200 4456.00 8503.00 8484.00 Permanent Pool Elev= 7.50 16.50 17.00 10.50 8.50 5.00 Perm Pool Area= 12406 13346 25785 6061 10724 11141 Top of shelf elev= 8.00 17.00 17.50 11.00 9,00 5.50 Top of shelf area= 14194 15189 29098 7668 12982 13512 Temp. Pool Elevation= 8.50 17.50 18.00 11.20 9.00 6.30 Temp. Pool Area= 15068 15941 30352 7881 12982 14778 Temp Vol. Prov, cf = 13966 14916 28583 4987 5927 17479 Average Depth = 3.5 3.5 3.5 3.0 3.0 3.5 SHWT 733 16.83 17.5 10 8.9 4.77 S Forebay Volume Permanent Pool Vol.= 33888 Req. Forebay Volume= 6778 Prov. Forebay Volume= 6099 Percent= (22>%>18) 18% Max. Pump HP 1/8 Pond A-1 Drawdown OrificelWeir Avg. Head, ft = 0.31 Average Flow Q2, cfs 0.065 Average Flow Q5, cfs 0.026 Q2 Area, sq. in. = 3.498 Q5 Area, sq. in. = 1.399 No. of Orifices 1 Orifice Diameter, in.= 2.00 Orifice Area, sq. in. = 3 142 Weir Height, inches= Weir Length, inches= Weir C = #DIV/O! Weir L', eff. length- -0.061 Avg Orifice Flowrate, Q, 0.058 Runoff Coefficient Cc 0.150 1 yr 24 hr peak flow tc 10.00 1 yr 24 hr Intensity, I, in/h 4.740 1 yr 24 hr Pre Q peak, cf,, 1.968 Avg. Orifice <Pre Q peak YES Drawdown, days = F 2.23 39365 79750 15102 27245 7873 15950 3020 5449 7715 15041 2878 5692 20% 19% 19% 21 % 1/8 1/4 NIA NIA Pond A-2 0.31 0.065 0.026 3.511 1.405 1 2.00 3 142 #DIV/O! -0.061 0.058 0.150 10.00 4.740 1.987 YES 2.24 Pond A-3 0.29 0.165 0.066 9.137 3.655 1 3.00 7 069 #DIV/O! -0.058 0.128 0.150 10.00 4 740 7.792 YES 259 Pond 61 0.22 0.026 0.010 1.667 0.667 1 1.25 1 227 #DIV/O! -0.043 0 019 0 150 10.00 4.740 0.830 YES 2.72 Pond 62 0.15 0.030 0.012 2.354 0.942 1 1.50 1 767 #DIVIO! -0.029 0.023 0.150 10.00 4.740 1.120 YES 2.66 29056 5811 5222 18% NIA Pond C1 0.41 0 064 0.026 3.028 1.211 1 2.00 3.142 #DIV/O! -0 081 0.067 0.150 10.00 4.740 4.-97-l.a-1 Z YES overwrite the pre Rv value for sites with existing BUA. overwrite the pre -development runoff Cc value for sites with existing BUA. if the project drains to non -SR waters, look up the rainfall depth in the NOAA charts. WET DETENTION POND ANALYSIS FILE NAME: S:1WQ&Stormwater1permits & projects1200%090630 HD12011 03 excel_WP 090630 PROJECT #: SW8 090630 REVIEWER: L. Lewis PROJECT NAME Base Entry Road P-1382, 1383 & 1384 Original Run Date: February 28, 2011 Note - User input boxes are shaded in blue. Last Modifiec 19-May-11 Modification to add Ponds B1, B2, C1, and C2. Ponds A1, A2 and A3 are unchanged. Pond C2 Receiving Stream: Wallace Creek Classification SB NSW Index Number: 19-20-1 Onsite DA, sf= 82995.00 Off site DA, sf = 000 Total Drainage Area,sf: 82995.00 0.00 0.00 0.00 0.00 0.00 Total Drainage Area,ac 1 91 000 0.00 0.00 000 0.00 Built -Upon Area Buildings, sf = New Road, sf = 66427.00 Parking, sf = Sidewalk, sf = Offsite, sf = Total Built -upon Area F 664 77,00 0.00 0.00 0.00 0.00 0.00 BUA. sf DA, sf Design Storm, inches Rv #DIV/0! Volume required, cf 0 Minimum Surface Area % impervious 80.04% Avg Design Depth. ft: 3.0 TSS (85% or 90%) 90 SA/DA ratio 9.40% PP Surface Area req. 7806 Pond C2 Temporary Storage Volume CalCL Within V2 mile SR? Y or I n iyr 24hr Rainfall Depth, SR Pre/ Rv 0.050 Post/ Rv 0.770 1 yr 24 hr Pre/ Volume, cf 0 1 yr 24 hr Post/ Volume, c 0 Volume Required 7 992 Top of Sediment Elev. Frr -3.00 Top of Sediment Area, sf 174900 Bottom of shelf Elev. Fms 1.00 Bottom of shelf Area, sf 593600 Permanent Pool Elev= 1.50 Perm Pool Area= 8140 Top of shelf elev= 2.00 Top of shelf area= 9509 Temp. Pool Elevation= 2.90 Temp.Pool Area= 10562 Temp Vol. Prov, cf = 13444 Average Depth = 3.0 SHWT 1.07 #DIV0 I #DIV/01 I #DIV/01 I #DIV/0! I #DIV/O! 0 J 0 101 0 1 0 #DIV/0! #DIV/01 #DIVIO! #DIV/O! #DIV/O! #DIV/O! #DIVIO! #DIV/O! #DIV/O! #DIV/O! #DIV10! #DIVI01 #DIV10! #DIV10! #DIVIO! 0.050 0.050 0.050 0.050 0.050 #DIV/O! #DIV/0! #DIV/O! #DIV101. #DIV/O! 0 0 0 0 0 #DIV/01 #DIV/01 #DIV/O! #DIV/O! #DIVIO! #DIV10! #DIVIO! #DIVIO! #DIV101 #DIV101 0 0 0 0 j 0 #DIV10! #DIV101 #DIV101 #DIV101 #DIV101 Forebav Volume Permanent Pool Vol.= 18889 0 0 0 0 0 Req. Forebay Volume= 3778 0 0 0 0 0 Prov. Forebay Volume= 3426 Percent= (22>%>18) 18% #DIVIO! #DIV101 #DIVIO! #DIV/01 #DIV/O! Max. Pump HP NIA NIA NIA NIA NIA NIA Pond A4- Pond-r4-2 Road-4" Puad-84— PtR1011=$2 F Drawdown OrificeNVeir Avg. Head, ft = 0.45 0.00 0.00 0.00 0.00 0.00 Average Flow Q2, cfs 0.046 #DIVIO! #DIVIO! #DIV/O! #DIV/O! #DIVIO! Average Flow Q5, cfs 0.018 #DiV/O! #DIVIO! #DIV/O! #DIVIO! #DIVIO! Q2 Area, sq. in. = 2.071 #DIV/O! #DIV/O! #DIV/O! #DIVIO! #DIVIO! Q5 Area, sq. in. = 0.829 #DIV/O! #DIV/O! #DIVIO! #DIVIO! #DIVIO! No. of Orifices 1 Orifice Diameter, in.= 1.50 Orifice Area, sq. in. = 1.767 0.000 0.000 0.000 0.000 0.000 Weir Height, inches= Weir Length, inches= Weir C = #DIV/O! #DIVIO! #DIVIO! #DIV/O! #DIV/O! #DIVIO! Weir U, eff. length= -0.089 0.000 0.000 0.000 0.000 0 000 Avg Orifice Flowrate. Q, 0.039 0 000 0.000 0.000 0.000 0.000 Runoff Coefficient Cc 0.150 0.150 0,150 0,150 0.150 0.150 1 yr 24 hr peak flow tc 10.00 10.00 10.00 10.00 10,00 10.00 1 yr 24 hr Intensity, 1, in/hi 4.740 1 yr 24 hr Pre Q peak, cfs 1,355 0.000 0.000 0.000 0 000 0.000 Avg Orifice <Pre Q peak' YES N N N N N Drawdown, days = 2.34 #DIV101 #DIVIO! #DIVIO! #DIVIO! #DIVIO! J 4 5 ` `'AN" f�Jl �wR , ov COL Brewster t� o �o E Y A . 1 Brewster Blvd 1 • MAY 2 4 202 tl YY Density High h y Area (Permit mat SW8 090630) I I, +� Low Density Area (Permit SW8 090630) C r� 1� rr rl 0 CA- • j 0 For OENR Use ONLY North Carolina Department of Environment and '5-22, k ue S Submit: W. , Natural Resources 30 NCDENR Request for Express Permit Review Time: �•. Confirm:: 15— � FILL-iN all the information below and CHECK the Permits) you are requesting for express review. FAX or Email the completed form to Express Coordinator along with a completed DETAILED narrative, site plan fPDF fife) and vicinity map (same items expected in the application package of the project location. Please include this form in the application package. • Asheville Region -Alison Davidson 828-296-4698;alison.dayidson@ncmail.net • Fayetteville or Raleigh Region -David Lee 919.791-4203; david.lee(dricmail.net • Mooresville & -Patrick Grogan 704-663-3772 or pa trick, grogan(c0cmaii.net • Washington Region -Lyn Hardison 252-946-9215 or lyn. hardison(c0cmail. not • Wilmington Region -Janet Russell 910-350.2004 or janet.russell(alncmaii.net NOTE: Project application received after 12 noon will be stamped in the following work day. Enter Related SW Permits of request SW 8090630 SW SW SW SW Project Name: NEW BASE ENTRY POINT AND ROAD (P1382,1383, AND 1384), USMC County: ONSLOW Applicant: COMMANDING OFFICER MARINE CORPS BASE Company: CAMP LEGEUNE, NC F Address: 1005 MICHAEL ROAD City: CAMP LEGEUNE, State: NC Zip: 28547 Phone: 910-451.2213, Fax: 910451-2927, Email cart h baker@usmc.mil Physical LocatiomMCB CAMP LEJEUNE Project Drains into NEW RIVER waters - Water classification SB,HQW,NSW (for classification see-http:llh2o.enr.state.nc.usibims/reportslreportsWB.html) Project Located in WHITE OAK River Basin. Is project draining to class ORW waters? N , within'/2 mile and draining to class SA waters N, or within 1 mile and draining to class HOW waters? N Engineer/Consultant: ANDREW WILSON, EIT Company: AECOM Address: 701 CORPORATE CENTER DRIVE SUITE 475 City: RALEIGH, State: NC Zip: 27607-_ Phone: 919-854-6225, Fax: 919-854-6259, Email: andrewb.wilson@aecom.com MAY I U SECTION ONE: REQUESTING A SCOPING MEETING ONLY ❑ Scoping Meeting ONLY ❑ DWQ, ❑ DCM, ❑ DLR, ❑ OTHER: SECTION TWO: CHECK ONLY THE PROGRAM (S) YOU ARE REQUESTING FOR EXPRESS PERMITTING ❑ 401 Unit ❑ Stream Origin Determination: _ # of stream calls - Please attach TOPO map marking the areas in questions ❑ IntermittenNPerennial Determination: f # of stream calls - Please attach TOPO map marking the areas in questions El401 Water Quality Certification ❑ Isolated Weiland (_linear ft or acres) ❑ Riparian Buffer Authorization ❑ Minor Variance ❑ Major General Variance ® State Stormwater ❑ General ❑ SFR, ❑ SFR < 1 ac. ❑Bkhd & Bt Rmp, ❑ Clear & Grub, ❑ Utility ❑ Other ❑ Low Density ❑ Low Density -Curb & Gutter _ # Curb Outlet Swales ElOff-site [SW (Provide permit #)I ❑ High Density -Detention Pond — # Treatment Systems ❑ High Density -Infiltration _ #Treatment Systems ❑ High Density -Bio-Retention _ # Treatment Systems ElHigh Density -SW Wetlands _ # Treatment Systems ElHigh Density -Other _ # Treatment Systems /® MOD:❑ Major ® Minor ❑ Plan Revision ❑ Redev Exclusion SW (Provide permit } ❑ Coastal Management ❑ Excavation & Fill ❑ Bridges & Culverts ❑ Structures Information ❑ Upland Development ❑ Marina Development ❑ Urban Waterfront [� Land Quality ❑ Erosion and Sedimentation Control Plan with _ acres to be disturbed.(CK # (for DENR use)) SECTION THREE - PLEASE CHECK ALL THAT IS APPLICABLE TO YOUR PROJECT (for both scopina and express meetina reauest Wetlands on Site ❑ Yes ® No Buffer Impacts ® No ❑ YES: _acre(s) Wetlands Delineation has been completed: ® Yes ❑ No Isolated wetland on Property ❑ Yes ® No US ACOE Approval of Delineation completed: ® Yes ❑ No 404 Application in Process w/ US ACOE: ❑ Yes ❑ No Permit Received from US ACOE ® Yes ❑ No ..... • • . • . • ....s.....i.ss..... ssls!!sp!!!!lss.l.asss.•FO! DENR use onlylilli4iail ti♦ti.!!.!!.l......!•.!•!!.f!lMN.1..l. !!!Hli.• Fee Split for multiple permib: (Check 0 i Total Fie Amount = SUBMITTAL DATES Fee SUBMITTAL DATES Fee CAMA 3 Variance{ IM#j; Min) S SW ( HD, L0, ❑ Gen) $ 401: $ LOS S Stream Deter,_ $ NCDENR EXPRESS March 2009 Stormwater Management Plan (Modification of Permit #SW8 090630) Prepared For: MCB Camp Lejeune FY10 MCON Project 1382, New Base Entry Point Camp Lejeune, NC Date: 05-15-12 AECOM 701 Corporate Center Dr., Suite 475 Raleigh, NC 27607 919-854-6200 MAY l b LUV Prepared By: Andrew Wilson, EIT Checked By: Bryan M. Dick, PE, PH Proiect Description This document is to serve as a modification to an existing permit (SW8 090630) for the FY10 MCON Project 1382, New Base Entry Point, Camp Lejeune, NC. The existing permitted boundary is split up into 8 drainage areas, one Low Density area and 7 high density areas. This "mod" is a result of new parking lot approaches which slightly increases the impervious surfaces in Low Density drainage area of SW8090630. The runoff generated from the additional impervious surfaces will be treated by the existing permitted low density roadside swales. Contact Information AECOM Technical Services Inc. Attn: Bryan M. Dick, PE, PH 701 Corporate Center Dr., Suite 475 Raleigh, NC 27607 Telephone: 919-854-6252 Fax: 919-854-6259 Identify Proiect Involvement The proposed project is located in the White Oak River Basin. The project drains to New River (NCDWQ Index Number 19-(10.5), which has an NCDWQ Stream Classification of SB, HQW, NSW. The Modification will result in the increase in impervious area within the low density drainage area of approximately 10,274 sf. The additional stormwater runoff will be treated via low density practices provided in the existing permitted stormwater Permit Number: SW8 090517. Runoff will be captured and routed to the existing low density stormwater roadside swales. This project is not located within Y2 miles of SA waters, or 575 feet of ORW waters. Stormwater Design Parameters The existing stormwater project permit boundary is established to achieve the Low Density stormwater strategy described in requirements set forth in the Session Law 2008-211 Section 2.(b)3b, sheet flow and flow through vegetated conveyances (grassed swales) are maximized along the project corridor. Generally, the roadway has sheet flow, roadside swales and occasional discharge points discharged to preformed scour holes. No structural BMPs are present for in the Low Density roadway sections. MAY 1 6 lull Discussion of Treatment Measures This modification is addressing the adjustments associated with the increase of impervious area within the Low Density drainage area, specifically, to insure that the adjusted impervious percent of the existing Low Density stormwater boundary meets the NCDWQ threshold requirement of less than 24%. According to Stormwater Permit Number SW8 090630, the low density boundary will meet this threshold. Conclusion This Stormwater Management Plan represents an environmentally sensitive and effective plan for utilizing the proposed stormwater treatments to accommodate the increased runoff of the proposed site development. �I�oon 4 24 Now RiverMbringtTorpsAir Sfe Hospital Satellite y Clinic Location r S 'Y Rrcr++� Rf'd 1 16 N •. ■Ift n Camp Lejeune MC Base 0 1 2 4 Mites Legend MCBCL Roads Site Location Study Area ® County Vicinity Map Naval Hospital Satellite Clinic Marine Corps Base Camp t_ejeune Onslow County, North Carolina Figure sm DISCLOSURE OF WFORMATION iartq,Cf� 91aL �LIRS q i4t0a! x mxnu�w swi Ipf IUDs m xncu wi4A x mmraars q.am m � mnucr, uusa - I. x mwnaw mm Iws uqi Asn wmml rrwrr: w i x r s mxosa . ni nac � aoas x n�z n wiz � muss ra ws,nw siu aorrr nc max �ra�wmr m c ,afam nc scar m r v ro nc a w x n•.e x oas � nc ,vosm ocs is .=..e c TF p�IYClp110� m M31K � $YM fmlfOOlf M fIW 4�t1YlT YfQ S16 ?YlIL1. SMIL Salf 1p[fa iv �4�� m 4f13 n1R4� M �E � m nq [WMCIiG him! LEGEND — smuoce � mrom Ae�- r 0m �°9" OLD MARINE CORPS BASE o: u ooi crew an_S�. G[FASON I�,�(yl STORMWATER MANAGEMENT SW809=PERMTTMOD KJW T{] rNc-u-u•u� E 0�10000 sat I--m GRAPHIC SCALES •C0'r �° +xcr-��i=aaT DWQ USE ONLY ate Received Fee Paid Permit Number - 30 Applicabie Rules:. ❑ Coastal SW -1995 ❑ Coastal SW - 2008 ❑ Ph II - Post Construction (select all that apply) ❑ Non -Coastal SW- HQW/ORW Waters ❑ Universal Stormwater Management Plan ❑ Other WQ M t Plan: State of North Carolina Department of Environment and Natural Resources Division of Water Quality STORMWATER MANAGEMENT PERMIT APPLICATION FORM This form may be photocopied far use as an original I. GENERAL INFORMATION 1. Project Name (subdivision, facility, or establishment name -should be consistent with project name on plans, specifications, letters, operation and maintenance agreements, etc.): New Base Entry Point and Road (P1382, 1383, and 1384), U.S. Marine Corps, Camp Lejeune (includes Hospital Corps Road) 2. Location of Project (street address): U.S. Marine Corps Base, Camp Lejeune City: Camp Lejeune County: Onslow Zip: 28547 3. Directions to project (from nearest major intersection): Heading north into Jacksonville on US 17, turn ont6 NC 24 toward Camp Lejeune. The new base entry road is located to the right before the pedestrian bridge over Rte 24 between His Road and Bell Fork Road. Hospital Corp Road is located on base off Brewster Blvd. across from Stone Street. Use the main entry gate to Camp Lejeune off Rte 24 onto Holcomb Blvd, turn right on Brewster Blvd. and go approx. 0.8 nu. 4. Latitude: 34° 44' 40" N Longitude:77° 23' 30" W of the main entrance to the project. II. PERMIT INFORMATION: 1. a. Specify whether project is (check one): []New ®Modification b.If this application is being submitted as the result of a modification to an existing permit, list the existing permit numberSW8 090630 , its issue date (if known)February 8, 2010 , and the status of construction: NNot Started ❑Partially Completed* ❑ Completed* *provide a designer's certification 2. Specify the type of project (check one): ❑Low Density ®High Density ❑Drains to an Offsite Stormwater System ❑Other 3. If this application is being submitted as the result of a previously returned application or a letter from DWQ requesting a state stormwater management permit application, list the stormwater project number, if assigned, and the previous name of the project, if different than currently proposed, 4. a. Additional Project Requirements (check applicable blanks; information on required state permits can be obtained by contacting the Customer Service Center at 1-877-623-6748): ❑CAMA Major ®Sedimentation/Erosion Control. 199 Contract A/TBD Contract B & C ac of Disturbed Area ❑NPDES Industrial Stormwater N404/401 Permit. Proposed Impacts 5.98 ac. wetlands, 2228_If streams b.If any of these permits have already been acquired please provide the Project Name, Project/Permit Number, issue date and the type of each permit: Erosion & Sedimentation Control Permit ONSLO-2010=104, issued April 20, 201.0 revised permit issued June 28, 2010 and September 16, 2010); 401 WQ Cerfification-No-3836 Issued September 28, 2010,404 Permit SAW-2010-00436 Issued 14 October, 2010. f _ "" d i MAY 1 0 2011 Farm SWU-101 Version 07Ju1y2009 Page 1 of 6 III. CONTACT INFORMATION 1. a. Print Applicant / Signing Official's name and title (specifically the developer, property owner, lessee, designated government official, individual, etc. who owns the project): Applicant/Organization: U.S. Marine Corps, Camp Lejeune Signing Official & Title: Carl Baker, Deputy, of Public Works b. Contact information for person listed in item 1a above: Street Address: Public Works Division, 1005 Michael Road City: Camp Lejeune State: NC Zip: 28547 Mailing Address (if applicable): PSC Box 20005 City: Camp Lejeune State: NC Zip: 28542 Phone: (910 ) 451-2213 Fax: (910- 451-2927 Email: carl.h.baker©usmc.mil c. Please check the appropriate box. The applicant listed above is: ® The property owner (Skip to Contact Information, item 3a) ❑ Lessee* (Attach a copy of the lease agreement and complete Contact Information, item 2a and 2b below) ❑ Purchaser* (Attach a copy of the pending sales agreement and complete Contact Information, item 2a and 2b below) ❑ Developer* (Complete Contact Information, item 2a and 2b below.) 2. a. Print Property Owner's name and title below, if you are the lessee, purchaser or developer. (This is the person who owns the property that the project is located on): Property Owner/Organization: U.S. Marine Corps, Camp Lejeune Signing Official & Title: Carl Baker, Deputy of Public Works b. Contact information for person listed in item 2a above: Street Address: Public Works Division 1005 Michael Road City: Camp Lejeune State: NC Zip: 28547 Mailing Address (if applicable):PSC Box 20005 City: Camp Lejeune State: NC Zip: 28542 Phone: ( 910 ) 451-2213 Fax: { 910 ) 451-2927 Email: carl.h.baker®usmc.mil 3. a. (Optional) Print the name and title of another contact such as the project's construction supervisor or other person who can answer questions about the project: Other Contact Person/Organiza Signing Official & Title: b. Contact information for person listed in item 3a above: Mailing Add City: Phone: { Email: 4. Local jurisdiction for building permits: Point of Contact: State: Fax: Phone #: Zip: Form SWU-101 Version 07July2009 Page 2 of 7 MM 1. 0 2011 IV. PROJECT INFORMATION 1. In the space provided below, briefly summarize how the stormwater runoff will be treated. Low density sections of the roadway will use sheet flow, roadside swales, and pre -formed scour holes.__ High density areas will include, in addition to the above, some piping, that will discharge to a structural BMP such as wet detention basin/pond, prior to discharge. 2. a. If claiming vested rights, identify the supporting documents provided and the date they were approved: ❑ Approval of a Site Specific Development Plan or PUD Approval Date: ❑ Valid Building Permit Issued Date: ❑ Other: Date: b. Identify the regulation(s) the project has been designed in accordance with: ❑ Coastal SW -1995 ❑ Ph lI - Post Construction 3. Stormwater runoff from this project drains to the White Oak River basin. 4 Total Property Area: 448.54 acres 5. Total Coastal Wetlands Area: 1.96 acres 6. Total Surface Water Area: 12.29 acres 7. Total Property Area (4) - Total Coastal Wetlands Area (5) - Total Surface Water Area (6) = Total Project Area*:434.29 acres + Total project area shall be calculated to exclude the foIlozoing the normal pool of impounded structures, the area between the banks of streams and rivers, the area below the Normal High Water (NHW) line or Mean High Water (MHW) line, and coastal wetlands landward from the NHW (or MHW) line. Tile resultant project area is used to calculate overall percent built upon area (BLIA). Non -coastal wetlands landward of the NHW (or MHW) line "ray be included in the total project area. 8. Project percent of impervious area: (Total Impervious Area / Total Project Area) X 100 = 23.21 % 9. How many drainage areas does the project have? 8 (For high density, count 1 for each proposed engineered stormwater BMP. For low density and other projects, use 1 for the whole property area) 10. Complete the following information for each drainage area identified in Project Information item 9. If there are more than four drainage areas in the project, attach an additional sheet with the information for each area provided in the same format as below, Basin. Information Drainage Area LD Drainage Area Al Drainage Area A2 Drainage Area A3 Receiving Stream Name New River Northeast Creek Northeast Creek Northeast Creek Stream Class SB, HQW, NSW SC, HQW, NSW SC, HQW, NSW SC, HQW, NSW Stream Index Number * 19-(10.5) 19-16-(3.5) 19-16-(3.5) 19-16-(3.5) Total Drainage Area (so 19,538,433 120,575 121,731 477,373 On -site Drainage Area (sf) 19,538,433 120,575 121,731 477,373 Off -site Drainage Area (sf) 0 0 0 0 Proposed Im ervious Area** (so 4,535,808 92,623 92,929 226,917 % Impervious Area** total 23.21 76.8 76.3 47.5 Impervious' Surface Area Drainage Area Drainage Area _ Draina e Area - Drai.na e Area On -site Buildings/Lots (sf) 11,516 10,695 On -site Streets (so 4,053,794 92,623 92,929 161,738 On -site Parking (so 49,846 49,846 On -site Sidewalks (so 358,901 4,638 Other on -site (so Future (so Off -site (so Existing BUA*** (so 61,751 Total (so: 4,535,808 92,623 92,929 226,917 * Stream Class and Index Number can be determined at: littp://li2o.enr.state.rtc.us/binis/reports/i_ ortsWB:-htnil-E MAY 1 0 2011 Form SWU-101 Version 07July2009 Page 3 of 7 MY: Supplement to Stormwater Permit SW08-090630 MCB Camp Lejeune Base Entry Point and Road Basin Information Drainage Area B1 Drainage Area B2 Drainage Area Cl Drainage Area C2 Receiving Stream Name Bearhead Creek Bearhead Creek Wallace Creek Wallace Creek Stream Class SB, NSW SB, NSW SB, NSW SB, NSW Stream Index Number 19-20-1 19-20-1 19-204s,AIX- 19-204jt.1O- Total Drainage Area (sf) 50,834 68,605 120,837 82,995 On -site Drainage Area (sf) 50,834 68,605 120,837 82,995 Off -site Drainage Area (sf) O O C) CU Proposed Impervious Area (sf) 36,969 42,365 92,322 66,427 % Impervious area (total) 72.7 61.8 76.4 80.0 Impervious Surface Area On -site Buildings/Lots (sf) On -Site Streets (sf) 36,969 42,365 92,322 66,427 On -site Parking (sf) On -site Sidewalks (sf) Other On -site (sf) Future (sf) Off -site (sf) Existing BUA (sf) Total (sf) 36,969 42,365 92,322 66,427 RECEIVED MAY 2 3 2011 DWQ PROJ ** Imppervious area is def5ned as the built upon area including, but not limited to, buildings, roads, parking areas, sidewalks, gravel areas, etc. *** Report only that amount of existing BUA that will remain after development. Do not report any existing BLIA that is to be removed and which will be replaced by new B UA. 11. How was the off -site impervious area listed above determined? Provide documentation. Offsite impervious area is not calculated because there is no offsite drainage into the water ualiponds and the low densi corridor with pockets of high density measures the corridor only. Projects in _Union County: Contact DbVQ Central Office staff to check if the project is located within a Threatened & Endangered Species watershed that may be subject to more stringent stormwater requirements as per NCAC 02B .0600. V. SUPPLEMENT AND O&M FORMS The applicable state stormwater management permit supplement and operation and maintenance (O&M) forms must be submitted for each BMP specified for this project. The latest versions of the forms can be downloaded from http://h2o.enr.state.nc.us/su/bm2 forms.htm. VI. SUBMITTAL REQUIREMENTS Only complete application packages will be accepted and reviewed by the Division of Water Quality (DWQ). A complete package includes all of the items listed below. A detailed application instruction sheet and BMP checklists are available from hgp://h2o.enrstate.nc.us/su/bmp_forms.htm. The complete application package should be submitted to the appropriate DWQ Office. (The appropriate office may be found by locating project on the interactive online map at hM2://h2o.enr.state.nc.us/su/msi_maps.htrn.) Please indicate that the following required information have been provided by initialing in the space provided for each item. All original documents MUST be signed and initialed in blue ink. Download the latest versions for each submitted application package from hM2://h2o.enr.state.ne.us/su/bmp—forms.htrn. ' 'al 1. Original and one copy of the Stormwater Management Permit Application Form. 2. Original and one copy of the signed and notarized Deed Restrictions & Protective Covenants Form. (if required as per Part VII below) 3. Original of the applicable Supplement Form(s) (sealed, signed and dated) and O&M agreement(s) for each BMP. 4. Permit application processing fee of $505 payable to NCDENR. (For an Express review, refer to:;�Z http^//www.envhelp.org/pa�zes/onestopexpress,htmi for information on the Express progra and the associated fees. Contact the appropriate regional office Express Permit Coordinator for additional information and to schedule the required application meeting.) 5. A detailed narrative (one to two pages) describing the stormwater treatment/managementfor the project. This is required in addition to the brief summary provided in the Project Information, item 1. 6. A USGS map identifying the site location. If the receiving stream is reported as class SA or the receiving stream drains to class SA waters within 1/2 mile of the site boundary, include the'/z mile radius on the map. 7. Sealed, signed and dated calculations. 8. Two sets of plans folded to 8.5" x 14" (sealed, signed, & dated), including: a. Development/Project name. b. Engineer and firm. c. Location map with named streets and NCSR numbers. d. Legend. e. North arrow. f. Scale. g. Revision number and dates. h. Identify all surface waters on the plans by delineating the normal pool elevation of impounded structures, the banks of streams and rivers, the MHW or NHW line of tidal waters, and any Coastal wetlands landward of the MHW or NHW lines. • Delineate the vegetated buffer landward from the normal pool elevation of impounded structures, the banks of streams or rivers, and the MHW (or NHW) of tidal waters. i. Dimensioned property/project boundary with bearings & distances. =BY: j. Site Layout with all BUA identified and dimensioned. k. Existing contours, proposed contours, spot elevations, finished floor elevations. Form SWU-101 Version 071uly2009 Page 4 of 7 1. Details of roads, drainage features, collection systems, and stormwater control measures. m. Wetlands delineated, or a note on the plans that none exist. (Must be delineated by a qualified person. Provide documentation of qualifications and identify the person who made the determination on the plans. n. Existing drainage (including off -site), drainage easements, pipe sizes, runoff calculations. o. Drainage areas delineated (included in the main set of plans, not as a separate document). p. Vegetated buffers (where required). 9. Copy of any applicable soils report with the associated SHWT elevations (Please identify elevations in addition to depths) as well as a map of the boring locations with the existing elevations and boring logs. Include an 8.5"x11" copy of the NRCS County Soils map with tic/ project area clearly delineated. For projects with infiltration BMPs, the report should also include the soil type, expected infiltration rate, and the method of determining the infiltration rate. (Infiltration Devices submitted to WiRO: Schedule a site visit for DWQ to verify the SHWT prior to submittal, (910) 796-7378.) 10. A copy of the most current property deed. Deed book: n/a Page No: n/a h a— 11. For corporations and limited liability corporations (LLC): Provide documentation from the NC Secretary of State or other official documentation, which supports the titles and positions held by the persons listed in Contact Information, item 1a, 2a, and/or 3a per NCAC 21-1.1003(e). The corporation or LLC must be listed as an active corporation in good standing with the NC Secretary of State, otherwise the application will be returned. ht!p://www.secretary.state.nc.us/Corporations/CSearch,aspx VII. DEED RESTRICTIONS AND PROTECTIVE COVENANTS For all subdivisions, outparcels, and future development, the appropriate property restrictions and protective covenants are required to be recorded prior to the sale of any lot. If lot sizes vary significantly or the proposed BUA allocations vary, a table listing each lot number, lot size, and the allowable built -upon area must be provided as an attachment to the completed and notarized deed restriction form. The appropriate deed restrictions and protective covenants forms can be downloaded from http://h2o.enr.state.nc.us/su/bmp forms.htm#deed restrictions. Download the Iatest versions for each submittal. In the instances where the applicant is different than the property owner, it is the responsibility of the property owner to sign the deed restrictions and protective covenants form while the applicant is responsible for ensuring that the deed restrictions are recorded. By the notarized signature(s) below, the permit holder(s) certify that the recorded property restrictions and protective covenants for this project, if required, shall include all the items required in the permit and listed on the forms available on the website, that the covenants will be binding on all parties and persons claiming under them, that they will run with the land, that the required covenants cannot be changed or deleted without concurrence from the NC DWQ and that they will be recorded prior to the sale of any lot. Vill. CONSULTANT INFORMATION AND AUTHORIZATION Applicant: Complete this section if you wish to designate authority to another individual and/or firm (such as a consulting engineer and/or firm) so that they may provide information on your behalf for this project (such as addressing requests for additional information). Consulting Engineer:Louise Slate Consulting Firm: MACTEC Mailing Address:3301 Atlantic Avenue Ci ty:Ra leigh Sta te: NC Zip:27604 Phone: (919 831-8006 Fax: (919 ) 831-8136 Email:los late®mactec.com �F-uVED MAY 1 0 2011 Form SWU-101 Version 07July2009 Page 5 of 7 IX. PROPERTY OWNER AUTHORIZATION (if Contact Information, item 2 has been filled out, complete this section) 1, (print or hype name of person listed in Contact Information, item 2a) , certify that I own the property identified in this permit application, and thus give permission to (print or hjpe name of person listed in Contact Informatimi, item 1a) with (print or hfpe name of organization listed in Contact Infonnation, item 1b) to develop the project as currently proposed. A copy of the lease agreement or pending property sales contract has been provided with the submittal, which indicates the party responsible for the operation and maintenance of the stormwater system. As the legal property owner I acknowledge, understand, and agree by my signature below, that if my designated agent (entity listed in Contact Information, item 1) dissolves their company and/or cancels or defaults on their lease agreement, or pending sale, responsibility for compliance with the DWQ Stormwater permit reverts back to me, the property owner. As the property owner, it is my responsibility to notify DWQ immediately and submit a completed Name/Ownership Change Form within 30 days; otherwise I will be operating a stormwater treatment facility without a valid permit. I understand that the operation of a stormwater treatment facility without a valid permit is a violation of NC General Statue 143-215.1 and may result in appropriate enforcement action including the assessment of civil penalties of up to $25,000 per day, pursuant to NCGS 143-215.6. Signatu re: Date: I, , a Notary Public for the State of County of do hereby certify that personally appeared before me this _ day of and acknowledge the due execution of the application for a stormwater permit. Witness my hand and official seal, SEAL My commission expires Form SWU-l0l Version 07July2009 Page 6 of 7 E I V E D MAY 1 0 2011 Ly: X. APPLICANT'S CERTIFICATION I, (print or hype name of person listed in Contact Information, item 2) Card Baker , certify that the information included on this permit application form is, to the best of my knowledge, correct and that the project will be constructed in conformance with the approved plans, that the required deed restrictions and protective covenants will be recorded, and that the proposed project complies with the requirements of the applicable stormwater rules %ndeK 15A NCAC 2H .1000, SL 2006-246 (Ph. H - Post Construction) or SL 2005-211. W/.V�STWIMJMRa Date: = 5 — it I, a Notary Public for the State of _/U� � /!s . County of Q/lJlj Gd , do hereby certify that /lipersonally appeared before me this Jaday of Nao&// , and ack wled e the due execution of the application for a stormwater permit. Witness my hand and official seal, AUCE A. BQNNETTE Notary Pubile Onalow County rth Caro In SEAL My commission expires 661"IL-1-b/f— Form 5WU-101 Version 07July2009 Page 7 of 7 MAY 1 0 2011 Y: L. 012101a Caput' noloOs brIP — ti MAR 1 N LE CORPS BASE j NRR%P 79, I&OW CAMP LEJEUNE of &qMd4"W Fgr�a Aa Rra�tF�" PC Al o CAI.C5 Stormwater Management Design Construction Contracts BXC DWQ Permit SW8-090630 New Base Entry Road Marine Corps Base, Camp Lejeune Onslow County, North Carolina MAY 1 0 ZQli MACTEC 1 RKBK JV Design By Rummel, Klepper & Kahl, LLP 900 Ridgefield Drive — Suite 350 .•• CAR ''••., 0� •' Raleigh, NC 27609 '� ��.�pFESS'� (919) 878-9560 . :Q r: NC Firm License No. F-1185 SEAL 33184 May 2011 FNGtr,�R.• � �� a ••••.!�J,.lff ff Wet Detention Basin B-1 Design Calculations Water Quality Volume Calculations Wet Detention Basin Bl Drainage Area Parameters Units Formulas Drainage Area 50834 Ft See Drainage Area Map Impervious Area 36969 Ft See Drainage Area Map Impervious % 72.7 IA Impervious Area/Drainage Area Runoff Volume (Simple Method) Rv 0.70 Inchesrunoff/IncheSrainfall Rv=0.05+0.9*IA Rainfall 1.50 Inches Water Quality Design Storm - Coastal County Runoff 1.06 Inches Runoff = RV*Rainfall Runoff 4477 Ft3 Runoff (Ft) = Runoff (in)/12 * DA (Ft2) MAY 1 02011 Area and Volume Calculations Wet Detention Basin 61 Elevation Main Pool Forebay Total Vol (Ft3) Total Vol (Ac-Ft) Comments Area (Ftz) A Vol (Ft) Sum Vol (Ft) Area (Ft) 0 Vol (Ft) Sum Vol (Ft) 5.00 533.3 - 0 0 Bottom of Pond, Sediment Clean Out Top Elevation 6.00 951.4 742 742 742 0.017 7,00 1426.7 1189 1931 272.1 - 0 1,931 0.044 8.00 1958.5 1 1693 3624 546.4 1 409 409 4,033 0.093 9.00 2546.9 1 2253 5877 877.2 712 1121 6,998 0.161 10.00 3191.8 2869 8746 1264.5 1071 2192 10,938 0.251 Inside Edge of Vegetated Shelf 10.50 4392.3 1896 10642 1479.4 686 2878 13,520 0.310 Permanent Pool Elevation 10.50 6061.2 0 10642 2878 13,520 0.310 Permanent Pool Elevation - Area includes Forebay Berm at PPE 11.00 7667.9 3432 14074 2878 16,952 0,389 Outside Edge of Vegetated Shelf 11.20 7880.5 1555 15629 2878 18,507 0.425 Overflow Elevation (Top of WQ Pool) 12.00 8753.7 6654 22283 2878 25,161 0.579 13,00 9896.1 9325 31608 2878 34,486 0,792 14,00 11095 10496 42103 2878 44,981 1.033 Surface Area of Main Pool at PPE (Ft) Surface Area of Forebay at PPE (Ft) Total Surface Area at PPE (Ftz) Total Volume at PPE (Ft) Overflow Elevation (Ft) Total Volume at Overflow Flev (Ft) Total WQv Provided {Ft3) Total WQv Required (Ft3) Volume Torbay Surface Area/Drainage Area Check SA Provided 6061-2 sf DA 50,834 sf SA/DA (provided) 12% SA/DA (required) 8.5% 4392.3 130 Basin Length (ft) 1479.4 50 Average Basin Width (ft) 6061.2 Includes Forebay Berm at PPE 2.6 L:W Ratio 13520 11.2 4456.3 Ahei%heu Includes Main Pool and Forebay 18507 6061.2 Aaerm_Pw, Includes Main Pool, Forebay and Forebay Berm 4987 533.3 Abnt_pond Main Pool Only 4477 5.00 Depth Main Pool 21.29 %of Total at PPE 2.23 d.,, Option 1 3.23 dae Option 2 d.,.: Aver,--c tkltllt of Ikrniancnt Iiou1 tc) use in the SAMA luhl" (h) Option 1 : da = t 1"nn_ ""' A pent, _ t.)l)l tun 7 cl. =0. 7 5 x fP.,4 A I A.,.0 _.vhrlf I`\ E + 1 + Ar.w}J +`y k��fnnJ ( aT}L'�)1�1 1 rw.n _ pM1! J 2" Jl �, J hx _ .hrfj' Draw Down Calculations Wet Detention Basin B1 Water Quality Volume (Ft) 4987 Total WQv Provided Top Elevation of Temp Pool (Ft) 11.2 Overflow Elevation Orifice Invert Elevation (Ft) 10.5 Maximum Head (Ft) 0.65 At Centroid of Orifice Driving Head Ho (Ft) 0.21 1/3 Maximum Head Orifice Diameter (in) 1.25 Orifice Diameter (Ft) 0.10 Orifice Area (Ft2) 0.009 Orifice Coefficient 0.60 Orifice Discharge Q (Ft3/s) 0.02 Days to Complete Drawdown 3.04 Between 2 and 5 Days Q = CnA,2 Where: Q - Discharge (cfs) Ca Q Coefficient of discharge (dimensionless) - sere Table 3-8 �t - Cross-scvtional arrn of flow nt the orifice entrance (sq 1t) g a Acceleration of gravity (32.2 ft/secz) f•fo = Driving heed (ft), uiea5ured from the centrolcl of the: orifice area to the water surface: - Note Usually use Ho/3 to coral+ute dr-awdown thmogh an orifice to refhyt the: fact that head is decreasing as Ihe: drawdown occurs. Figure 3-3 Schematic section through m-i orifice W ,Wx Table Values of Cc7efficieni of Discharge, Co (Mtdceim,1989) i:nlrance condltlun C,I Typical def cult value 0.60 �' juare-edgeit Omni lice. 0.5e9 Concrete Mille, grooved end 0.65 CurrugikI& d 1114ytrl Mlle, mitred lu slope 0.52 C"urru r�tCel met.kl 1i .r, rMjeCtillUfrom lilt I.00 MAY 1 0 2011 BY. - Curve Number Calculations Wet Detention Basin B1 Area # Description Area (Fe) Area Ac CN CN x A 1 Pavement 36,969 0.85 98 83.2 2 Grass - HSG B 7,941 0.18 61 11.1 3 Water 5,924 0.14 98 13.3 4 0.00 0.0 5 0.00 0.0 6 0.00 0.0 7 0.00 0.0 8 0.00 0.0 9 0.00 0.0 10 0.00 0.0 11 0.00 0.0 12 0.00 0.0 13 0.00 0.0 14 0.00 0.0 15 0.00 0.0 16 0.00 0.0 Total 50,834 1.17 1 92 0.0018 Imi2 MAY 1 4 2011 4/3-3/2011 R:\z-misc\Hydro\Road Drain\BMP_B1\NEWSupporting Calculations Bl.xls Curve Number Calculations Wet Detention Basin B1 Existing Conditions Area # Description Area (Ft2) Area (Ac) CN CN x A 1 Pavement 0.00 98 0.0 2 Grass MSG A) 0.00 39 0.0 3 Grass (HSG B 0.00 61 0.0 4 Woods (HSG B) 50,834 1.17 60 70.0 5 0.00 0.0 6 0.00 0.0 7 0.00 0.0 8 0.00 0.0 9 0.00 0.0 10 0.00 0.0 11 0.00 0.0 12 0.00 0.0 13 0.00 0.0 14 0.00 0.0 15 0.00 0.0 16 0.00 0.0 Total 50,834 J 1.17 60 0.0018 mil MAY 1 0 Z011 4/1.3/2011 R:\z-misc\Hydro\Road Drain\BMP_B1\NEWSupporting Calculations BI.xls LAND USE AREA (AC) C I (IN\HR) Q (CFS) PRE -DEVELOPMENT PAVEMENT 0.95 WOODS 1.17 0.20 GRASS 0.40 COMPOSITE (PRE -DEVELOPMENT) 1.17 0.20 4.67 1.09 POST -DEVELOPMENT WATE R 0.14 1.00 PAVEMENT 0.85 0.95 GRASS 0.18 0.40 COMPOSITE (POST -DEVELOPMENT) 1.17 0.87 4.67 4.76 E C V ED MAY 1 0 Z011 BY: Discharge Summary Wet Detention Basin B1 Pre Development 1 yr 24 hour Discharge (cfs) 0.65 Post Development 1 yr 24 hour Discharge (cfs) 4.67 Flow Into Pond Post Development 1 yr 24 hour Discharge (cfs) 0.64 Flow Out of Pond All Values calculated using Pond Pack computer program Using SCS Type III rainfall distribution Ry '�rF MAY 1 0 2011 BY: PondMaker Worksheet Detailed Report: Worksheet (PO-1) - 1 Element Details ID 52 Label Worksheet (PO- 1) - 1 Select Pond to Design PO-1 Flow Allowed Below Target 25.0 Flow Allowed Above Target 10.0 Flow Allowed Below Target 25.0 Flow Allowed Above Target 0.0 Volume Allowed Below Target 25.0 Volume Allowed Above Target 50.0 Tolerance Display Display PASS for values within specified tolerance Notes Volume Pond Type Elevation- Use Void Space? False Volume Elevation -Volume Pond Elevation— Pond Volume (ft) - (ac-ft) 5.00 0.000 6.00 0.017 7.00 0.044 8.00 0.093 9.00 0.161 10.00 0,251 10.50 0.310 11.00 0.389 11.20 0.425 12.00 0.578 13.00 0.792 14.00 1.033 Infiltration Infiltration Method No Infiitration Output Detention Time None Initial Conditions Is Outflow Averaging On? False Elevation (Starting Water 11.20 ft Su rface) Define Starting Water Surface User Defined Elevation Initial Elevation Bentley Systems, Inc. Haestad Methods Solution Bentley PondPack V8i BMP B1.ppc Center [08.11.01.51] 7/2=10 27 Slemon Company Drive Suite 200 W Page 1 of 2 Watertown, CT 06795 USA +1-203-755-1666 MAY 1 0 Z 011 BY: PondMaker Worksheet Detailed Report: Worksheet (PO-1) - 1 PondMaker Worksheet (Routing Design) Design Scenario Design Target Peak Computed Computed Target Return Outflow Peak Outflow Peak Outflow Outflow Event (ft3/s) (ft3/s) vs, Target Volume (ac-ft) Post -Development 1 Year 1 0.65 0.64 Pass 0.051 Post -Development 10 Year 10 3.68 3.44 Pass 0,228 Post -Development 25 Year 25 5.62 7.38 Fail 0.343 Post -Development 50 Year 50 7.39 8.56 Fail 0.449 Post -Development 100 Year 100 9.44 9.65 Fail 0.573 Computed Computed Routing Outlet Computed Freeboard Maximum Volume Outflow Structure Max Water Depth Storage Outflow Volume vs. Elevation (ac-ft) (ac-ft) Target A 0.305 Fail Composite Outlet 11.98 Pass 0.574 Structure - 1 0.606 Fail Composite Outlet 12.57 Pass 0,701 Structure - 1 0.761 Fail Composite Outlet 12.69 Pass 0.725 Structure - 1 0.894 Fail Composite Outlet 12.79 Pass 0,747 Structure - 1 1.042 Fail Composite Outlet 12,94 Pass 0.780 Structure - 1 14.00 13.75 13.50 C 13.25 > 1.3.00 9 u 12.75 'u 12.50 rn 12.25 4 12.00 11.75 a 11.50 11.25 11.00 PondMaker Routing Design 0.00 2.00 4.00 6.00 8.00 10.00 12.00 Flow (W/s) Composite outlet Structure -I -W Target Rating Curve -- Post-Development1 Year --• Post -Development 10 Year �• Post -Development 25 Year -« Post -Development 50 Year -- Post -Development 100 Year Bentley Systems, Inc. Haestad Methods Solution Bentley PondPack V& BMP B1 ppc Center [08 11 01.51] 7�2i2010 27 Siemon Company Drive Suite 200 W Page 2 of 2 Watertown, CT 06795 USA +1-203-755-1666 Wet Detention Basin B-2 Design Calculations Water Quality Volume Calculations Wet Detention Basin B2 Drainage Area Parameters Units Formulas Drainage Area 68605 Ft See Drainage Area Map Impervious Area 42365 Ft See Drainage Area Map Impervious % 61.8 la Impervious Area/Drainage Area Runoff Volume (Simple Method) Rv 0.61 IncheS,unoff/Inches,ainfarl Rv=0.05+0.9*IA Rainfall 1.50 Inches Water Quality Design Storm - Coastal County Runoff 0.91 Inches Runoff = R„*Rainfall Runoff 5195 Ft Runoff (Ft) = Runoff (in)/12 * DA (Fe) IMAY 1 0 2011 7 Area and Volume Calculations Wet Detention Basin BZ Elevation Main Pool Forebay Total Vol (Ft3) Total Vol (Ac-Ft) Comments Area (Ft) A Vol (Ft) Sum Vol (Ft) Area (Ft2) 0 Vol (F13) Sum Vol (Ft3) 4.00 2716A - 0 0 Bottom of Pond, Sediment Clean Out Top Elevation 5-00 3522.3 3119 3119 860.3 0 3,119 0.072 6.00 4384.9 3954 7073 1257.9 1059 1059 9,132 0.187 7,00 5304.2 1 4845 11917 1712.2 1485 2544 14,462 0.332 8.00 6279.9 5792 17709 2222.9 1968 4512 22,221 0.510 Inside Edge of Vegetated Shelf 8.50 $074.4 3589 21298 2499.5 1181 5692 26,990 0.620 Permanent Pool Elevation 8,50 10723.9 0 21298 5692 26,990 0.620 Permanent Pool Elevation - Area Includes Forebay Berm at PPE 9.00 12982.4 5927 27225 5692 32,917 0.756 Outside Edge of Vegetated Shelf, Top of WQ Pool 10.00 14472.8 13728 40952 5692 46,644 1.071 11.00 16019.8 1 15246 55198 1 5592 61,891 1.421 12.00 17623.3 16822 73020 5692 78,712 1.807 4_ Surface Area of Main Pool at PPE (Ft2) 8074.4 104 Basin Length (ft) Surface Area of Forebay at PPE (Ft2) 2499.5 60 Average Basin Width (ft) Total Surface Area at PPE (Ft') 10723.9 Includes Forebay Berm at PPE 3.1 LW Ratio Total Volume at PPE (Ft3) 26990 Overflow Elevation (Ft) 9.0 8502.8 Ayo, shelf Includes Main Pool and Forebay Total Volume at Overflow Elev (Ft3) 32917 10723.9 Ate,, P-m includes Main Pool, Forebay and Forebay Berm Total WQv Provided (Ft3) 5927 2716.1 Awt_p,�d Main Pool Only Total WQv Required (Ft3) 5195 4.00 Depth Main Pool Volume Forbay 21,09 % of Total at PPE 2.52 day Option 1 3.09 da Option 2 Surface Area/Drainage Area Check SA Provided 10723.9 sf d,,s,: Avera�,c depth of l-tr-manent lxxil to use iii the 5A/DA tables (1-1.) DA 68,605 sf fir. nn _ rM„ r Option 1: d,=,- SA/DAtprovided) 16% �prnn_!u SA/DA (required) 7.2% r EZpticrn Z: tl=().?ixl+ A�„ „s,��+j�r1_'r.rr ;�t>rK_y .rX /3r/)rlr fLI` - 1�na ,MIJ 111 fi�MAY0zou Draw Down Calculations Wet Detention Basin B2 Water Quality Volume (Ft) 5927 Total WQv Provided Top Elevation of Temp Pool (Ft) 9 Overflow Elevation Orifice Invert Elevation (Ft) 8.5 Maximum Head (Ft) 0.44 At Centroid of Orifice Driving Head Ho (Ft) 0.14 1/3 Maximum Head Orifice Diameter (in) 1.50 Orifice Diameter (Ft) 0.13 Orifice Area (Ft) 0.012 Orifice Coefficient 0.60 Orifice Discharge Q (Ft3/s) 0.02 Days to Complete Drawdown 3.06 Between 2 and 5 Days = CnAJ tiV[Wrt,: Q — lai%charge(c;f,.) CE, — Coefficient of discharge (dimensionless) - see Table 3 8 A - Cross -sectional area of flow at the orifice entrance (ski ft) g = Acceleration of gravity (32.2 ft/secz) 1.10 = tDriving heal (ft), nleasure;d front the centrvid of the orifice area to thl: wator surface - Nobs Usually usq Hu/3 to i:otnrutr driwdown through an c. d ice to reflect the fact that head iw decre-asing as the drawdown or'c.urs. Figure 3-3 Schunatic section through eat orifice EM — Q = YR2 Tahle 3-8 Values of Ccleff icienl of 0ischarp , Q, (Malcom. 1989) Entranq!c! Condilicon Cr. Typical dufaull value 0.60 Squaw-e..dro!d entrance 0.59 Concrete-s ripe, grooved end 0.65 Cinrilgilukt nu!tal pipe, mitted to slope 0.52 Corl•u gated metal pipm, ptuiectin& front fin 1.00 = ., - r-y 4 �. MAY 00 �q11 Curve Number Calculations Wet Detention Basin B2 Area # Description Area (Fe) Area Ac CN CN x A 1 Pavement 42,365 0.97 98 95.3 2 Water 10,574 0.24 98 23.8 3 Grass - HSG A 7,094 0.16 49 8.0 4 Grass - HSG D 8,572 0.20 84 16.5 5 0.00 0.0 6 0.00 0.0 7 0.00 0.0 8 0.00 0.0 9 0.00 0.0 10 0.00 0.0 11 0.00 0.0 12 0.00 0.0 13 0.00 0.0 14 0.00 0.0 15 0.00 0.0 16 0.00 0.0 Total 68,605 1.57 91 0.0025 mil MAY 0 Z011 4/13/2011 R:\z-misc\Hydro\Road Drain\BMP_B2\NEWSupporting Calculations B2.xls Curve Number Calculations Wet Detention Basin B2 Existing Conditions Description © rrr rr 0 rrr rr © rrr rr 0 rrr rr 0 � rrr rr 0 rrr rr 0 rrr rr rrr rr ® rrr rr ® rrr rr � rrr rr ® rrr rr � rrr rr MAY 1 0 2011 3 Y: 4/13/2011 R:\z-misc\Hydro\Road Drain\BMP_B2\NEWSupporting Calculations B2.xls LAND USE AREA (AC) C I (IN\HR) Q (CFS) PRE -DEVELOPMENT PAVEMENT 0.95 WOODS 1.57 0.20 G RASS 0.40 COMPOSITE (PRE-DEVLOPMENT) 1.57 0.20 4.67 1.47 POST -DEVELOPMENT WATER Q24 1.00 PAVEMENT 0.97 0.95 GRASS 0.36 0.40 COMPOSITE (POST -DEVELOPMENT) 1.57 0.83 5.94 7.75 77C � :.4 vT -ED MAY 1 0 2011 BY: Discharge Summary Wet Detention Basin B2 Pre Development 1 yr 24 hour Discharge (cfs) 1.78 Post Development 1 yr 24 hour Discharge (cfs) 3.88 Flow Into Pond Post Development 1 yr 24 hour Discharge (cfs) 1.02 Flow Out of Pond All Values calculated using PondPack computer program Using SCS Type III rainfall distribution MAY 1 0 2011 BY: PondMaker Worksheet Detailed Report: Worksheet (PO-1) - 1 Element Details ID 52 Label Worksheet (PO-1) - 1 Select Pond to Design PO-1 Flow Allowed Below Target 1,000.0 Flow Allowed Above Target 10.0 Flow Allowed Below Target 1,000.0 Flow Allowed Above Target 0.0 Volume Allowed Below Target 25.0 Volume Allowed Above Target 50.0 Tolerance Display Display PASS for values within specified tolerance Notes Volume Pond Type Elevation- Use Void Space? False Volume Elevation -Volume Pond Elevation Pond Volume A(ft) (ac-ft) 4.00 0.000 5.00 0.072 6.00 0.187 7.00 0.332 8.00 0.510 8.50 0,620 9.00 0.756 10.00 1,071 11.00 1.421 12.00 1.807 Infiltration Infiltration Method No Infiltration Output Detention Time None Initial Conditions Is Outflow Averaging On? Define Starting Water Surface Elevation False Elevation (Starting Water 9.00 ft. Surface) User Defined Initial Elevation Bentley Systems, Inc, Haestad Methods Solution %130 ey PondP ce k V8' BMP B2,ppc Center [08A 1.01 .51] 712/2010 27 Siemon Company Drive Suite 200 W MAY X 0 paQ'�j1 of 2 Watertown, CT 06795 USA +1-203-755-1666 BY: PondMaker Worksheet Detailed Report: Worksheet (PO-1) - 1 PondMaker Worksheet (Routing Design) Design Scenario Design Target Peak Computed Computed Return Outflow Peak Outflow Peak Outflow Event (ft3/s) (ft3/s) vs, Target Post -Development 1 Year 1 1.78 1.02 Pass Post -Development 10 Year 10 5.56 2.47 Pass Post -Development 25 Year 25 7.65 2.99 Pass Post -Development 50 Year 50 9.47 3.35 Pass Post -Development 100 Year 100 11.51 4.36 Pass Computed Computed Routing Outlet Computed Freeboard Maximum Volume Outflow Structure Max Water Depth Storage Outflow Volume vs. Elevation (ac-ft) (ac-ft) Target (ft) 0.346 Fall Composite Outlet 9.44 pass 0.896 Structure - 1 0.748 Fail Composite Outlet 9.41 Pass 1.044 Structure - 1 0.957 Pass Composite Outlet 10.14 Pass 1.120 Structure - 1 1.138 Pass Composite Outlet 10.34 Pass 1.190 Structure - 1 1.339 Pass Composite Outlet 10.55 Pass 1.263 Structure - 1 PondMaker Routing Design 12.00 11.75 't 11.50 c 11.25 q '0 11.00 u 10.75 10.50 t'e 10.25 L a 10.00 v 9.75 c 9.50 OL 9.25 9.00 Target Outflow Volume (ac-ft) 0.162 0.490 0.678 0.845 1.035 aaaa aaaa as aaaaaaaa aaaaaaaa as -------- --- rar rrrrrarr ar r-- rrrrrrr rrrrrarr r• aarararr r rrrrr rrrr arrarraa rraraarr raaarara as 1.00 2.00 4.00 6.00 8.00 10.00 12.00 Flow (ft3/s) - Composite Outlet Structure - 1 f Target Rating Curve --- Post-Developmentl Year ••« Post -Development 10 Year --• Post -Development 25 Year --- Post -Development 50 Year -- Post -Development 100 Year Bentley Systems, Inc Haestad Methods Solution Bentley PondPack V8i BMP B2 ppc Center 108.11,01.51) 7/2/2010 27 Siemon Company Drive Suite 200 W Page 2 of 2 Watertown, CT 06795 USA +1-203.755.1666 MAY ] U 1011 BY: Wet Detention Basin C-1 Design Calculations Water Quality Volume Calculations Wet Detention Basin C1 Drainage Area Parameters Units Formulas Drainage Area 120,837 Ft See Drainage Area Map Impervious Area 92,322 Ft See Drainage Area Map Impervious % 76.4 IA Impervious Area/Drainage Area Runoff Volume (Simple Method) Rv 0.74 Inchesr,,noff/IncheSrainfal, Rv=0.05+0.9*IA Rainfall 1.50 Inches Water Quality Design Storm - Coastal County Runoff 1.11 Inches Runoff = R *Rainfall Runoff 11142 Ft3 Runoff (Ft 3j = Runoff (in)/12 * DA (FtZ) SIT ED, MAY 1 0 2011 Area and Volume Calculations Wet Detention Basin C1 Elevation Main Pool Forebay Total Vol (Ft3) Total Vol (Ac-Ft) Comments Area (Ft) A Vol (Ft3) Sum Vol (Ft") Area (Ft2) A Vol (Ft3) Sum Vol (Ft3) Sediment Clean Out Bottom Elevation 0.00 2249.1 - 0 0 Bottom of Pond, Sediment Clean Out Top Elevation 1.00 3026.3 2638 2638 474.4 - 0 2,638 0.061 Bottom of Forebay, Sediment Clean Out Top Elevation 2.00 3894.6 3460 6098 825.1 650 650 6,748 0.155 3.00 4853.8 4374 10472 1251.4 1038 1688 12,160 0.279 4.00 5903.8 5379 15851 1753.1 1502 3190 19,041 0.437 4.50 6462.8 3092 18943 2021.E 1 944 4134 23,077 0.530 Inside Edge of Vegetated Shelf 5.00 8570.4 3758 22701 2330.5 1088 5222 27,923 0.641 Permanent Pool Elevation 5.00 11141.0 0 22701 5222 1 27,923 0.641 Permanent Pool Elevation - Area Includes Forebay Berm at PPE 5.50 13512.6 6163 28865 5222 34,086 0.783 Outside Edge of Vegetated Shelf 6.00 14392.2 6976 35841 5222 41,063 0,943 6,30 14778.4 4376 40216 5222 45,438 1.043 7.00 16220.6 10850 51066 5222 56,288 1.292 8.00 18142.6 17182 68248 5222 73,469 1.687 Tap of Dam Surface Area of Main Pool at PPE (Ft) Surface Area of Forebay at PPE (W) Total Surface Area at PPE (Ft) Total Volume at PPE (Ft) Overflow Elevation (Ft) Total Volume at Overflow Elev (Ft) Total WQv Provided (Ft) Total WQv Required (Ft3) Volume Forbay Surface Area/Drainage Area Check SA Provided 11141.0 sf DA 120,937 sf SA/DA (provided) 9.22% SA/DA (required) 9.01% MAY 0 2 011 BY: ______ 8570A 166 Basin Length (ft) 2330.5 55 Average Basin Width (ft) 11141.0 Includes Forebay Berm at PPE 3.0 L:W Ratio 27923 6.3 8484.4 Abot shd1 Includes Main Pool and Forebay 45438 11141.0 Aw,-P-P i Includes Main Pool, Forebay and Forebay Berm 17515 2249.1 Aber -pond Main Pool Only 11142 4.50 Depth Main Pool 18.70 %of Total at PPE 2.51 d„ Option 1 3.29 cl ,. Option 2 ck.,: Average !tenth of !permanent piiol kT use in the SA/0A tables (A) P'. _„»r Option 1: r/= A rem _ fw l r1ba.sh.t A,.._ Mf i Ajhw_ ,a 7 � ► el "th C?lptian �: du,, _ {1?ix�l+ - �x� A,x n_,o,, ,� L Draw Down Calculations Wet Detention Basin C1 Water Quality Volume (Ft') 11142 Total WQv Provided Top Elevation of Temp Pool (Ft) 5.86 Overflow Elevation Orifice Invert Elevation (Ft) 5.00 Maximum Head (Ft) 0.79 At Centroid of Orifice Driving Head Ho (R) 0.26 1/3 Maximum Head Orifice Diameter (in) 1.75 Orifice Diameter (Ft) 0.15 Orifice Area (Ft) 0.017 Orifice Coefficient 0.60 Orifice Discharge Q (Ft3/s) 0.04 Days to Complete Drawdown 3.15 Between 2 and 5 Days -c�,n1F2ir� RECEIVED MAY 2 4 2011 DWQ PROd # Where: Q - Discharge (cfs) CD o C:oafficlont of discharge (dimensionless) -see Tthk* 3-8 A - Cross -sectional area of flow at the orifice entrance (sal ft) g ,. Acceleration of gravity (32.2 ft/secz) Ho = l3rivis% head (ft), measuree.l from the. rentroid of the orifice area to the water surfacer - Nolt: Usually use Ho/3 to compute drawdown through an orifice to Teri 't the fact that head is decreasing as the drawdown occurs. Figure! 33 :+rherneatic,ection through an orifice =&t T.jhle 3-8 Values of Coefficient of Discharge, Ca, (Malcom, 1989) Entrane•e• Condition K:r� Tyl.ical deCeult value 0.60 Square -edge+ i vntranre 0,59 Concrete ripe, l;rooved end 0.65 Corrugateel metal pipe, mitred to slope 0.52 Corrugated metal pipe, projecting from fill _ _ 1.00 Curve Number Calculations Wet Detention Basin CI Area # Description Area (Fe) Area Ac CN CN x A 1 Pavement 92,322 2.12 98 207.7 2 Grass - HSG B 17,058 0.39 61 23.9 3 Water 11,457 0.26 98 25.8 4 0.00 0.0 5 0.00 0.0 6 0.00 0.0 7 0.00 0.0 8 0.00 0.0 9 0.00 0.0 10 0.00 0.0 11 0.00 0.0 12 0.00 0.0 13 0.00 0.0 14 0.00 1 0.0 15 0.00 0.0 16 0.00 0.0 Total 120,837 2.77 93 0.0043 jmil 7VED ,MAY0 20T1 4/13/2011 R:\Hydraulics\CALCULATIONS\Pond C1\Supporting Calculations C1.xls Curve Number Calculations Wet Detention Basin C1 Existing Conditions Area # Description Area (Fe) Area Ac CN CN x A 1 Pavement 0.00 98 0.0 2 Grass (HSG A) 0.00 39 0.0 3 Grass (HSG B) 0.00 61 0.0 4 Woods (HSG B 116,381 2.67 60 160.3 5 Water 4,456 0.10 98 10.0 6 0.00 0.0 7 0.00 0.0 8 0.00 0.0 9 0.00 0.0 10 0.00 0.0 11 0.00 0.0 12 0.00 0.0 13 0.00 0_0 14 0.00 0,0 15 0.00 0.0 16 0.00 0.0 Total 120,837 2.77 61 0.0043 mil RIVED MAY } 0 2011 4/13/2011 R:\Hydraulics\CALCULATIONS\Pond C1\Supporting Calculations C1.xls LAND USE AREA (AC) C I (IN\HR) Q (CFS) PRE -DEVELOPMENT PAVEMENT 0.95 WOODS 2.67 0.20 WATER 0.1 1.00 GRASS 0.40 COMPOSITE (PRE-DEVLOPMENT) 2.77 0.23 4.67 2.96 POST -DEVELOPMENT WATER 0.26 1.00 PAVEMENT 2.12 0.95 GRASS 0.39 0.40 COMPOSITE (PRE-DEVLOPMENT) 2.77 0.88 4.67 11.37 E-4 MAY 1 0 Z011 BY: Discharge Summary Wet Detention Basin C1 Pre Development 1 yr 24 hour Discharge (cfs) 1.33 Post Development 1 yr 24 hour Discharge (cfs) 7.18 Flow Into Pond Post Development 1 yr 24 hour Discharge (cfs) 0.92 Flow Out of Pond All Values calculated using PondPack computer program Using SCS Type III rainfall distribution FMAY 1 0 2011 B kT PondMaker Worksheet Detailed Report: Worksheet (PO-1) - 1 Element Details ID 42 Label Worksheet (PO-1) - 1 Select Pond to Design P0-1 Flow Allowed Below Target 25.0 Flow Allowed Above Target 10.0 Flow Allowed Below Target 25.0 Flow Allowed Above Target 0.0 Volume Allowed Below Target 25.0 Volume Allowed Above Target 50.0 Tolerance Display Display PASS for values within specified tolerance Notes Volume Pond Type Elevation- Use Void Space? False Volume Elevation -Volume Pond Elevation Pond Volume (ft) (ac-ft) 0.00 0.000 1.00 0.061 2.00 0.155 3.00 0.279 4.00 0.437 4.50 0.530 5.00 0.641 5.50 0.783 6.00 0.943 7.00 1.294 8.00 1.688 Infiltration Infiltration Method No Infiltration Output Detention Time None Initial Conditions Is Outflow Averaging On? Define Starting Water Surface Elevation False Elevation (Starting Water 5.00 ft Surface) User Defined Initial Elevation PondCl.ppc 51412011 Bentley Systems, Inc. Haestad Methods Solution Center 27 Siemon Company Drive Suite 200 W Watertown. CT 06795 USA + 1 -203-755-1666 Bentley PondPack V8i [08,11.01.51 Page 1 of 2 MAY 1 0 2011 BY: PondMaker Worksheet Detailed Report: Worksheet (130-1) - 1 PondMaker Worksheet (Routing Design) Design Scenario Design Target Peak Computed Computed Target Return Outflow Peak Outflow Peak Outflow Outflow Event (ft3/s) (ft3/s) vs. Target Volume (ac-ft) Post -Development 1 Year 1 1.33 0.92 Fail 0.151 Post -Development 10 Year 10 6.77 12.41 Fall 0.607 Post -Development 25 Year 25 10.09 16.29 Fall 0.893 Post -Development 50 Year 50 13.09 19.08 Fail 1.156 Post -Development 100 Year 100 16.52 22.06 Fail 1.461 Computed Computed Routing Outlet Computed Freeboard Maximum Volume Outflow Structure Max Water Depth Storage Outflow Volume vs. Elevation (ac-ft) (ac-ft) Target (ft) 0.266 Fail Composite Outlet 6.33 Pass 1.059 Structure - 1 0.994 Fail Composite Outlet 6,64 Pass 1.166 Structure - 1 1.371 Fail Composite Outlet 6.71 Pass 1.193 Structure - 1 1.696 Pass Composite Outlet 6.77 Pass 1.213 Structure - 1 2.058 Pass Composite Outlet 6.84 Pass 1.237 Structure - 1 PondMaker Routing Design 8.00 7.75 7.50 C =0 7.25 M > 7.00 w 6.75 u C 6.50 cn 6.25 L 6.00 5.75 C a 5.50 .1ni 5.00 0.00 3.00 6.00 9.00 12.00 15.00 18.00 21.00 24.00 27.00 30.00 33.00 Flow (ft3/5) - Composite Outlet Structure - 1 Target Rating Curve •-- Post -Development 1 Year --- Post -Development 10 Year -• Post -Development 25 Year Post- Development 50 Year •-• Post- Development100Year Bentley Systems, Inc. Haestad Methods Solution PondC1.ppc Center 5/4/2011 27 Siemon Company Drive Suite 200 W Watertown, CT 06795 USA +1-203-755-1666 Bentley PondPack V8i [08.11.01, 51] Page 2of2 MAY XU2011 iT. Wet Detention Basin C-2 Design Calculations Water Quality Volume Calculations Wet Detention Basin C2 Drainage Area Parameters Units Formulas Drainage Area 82,995 Ft See Drainage Area Map Impervious Area 66,427 Ft See Drainage Area Map Impervious % 80.0 IA Impervious Area/Drainage Area Runoff Volume (Simple Method) Rv 0.77 Inc heSrunoff/InchesrainfalI Rv=0.05-+0.9*IA Rainfall 1.50 Inches Water Quality Design Storm - Coastal County Runoff 1.16 Inches Runoff = R„*Rainfall Runoff 7992 Ft Runoff (Ft) = Runoff (in)/12 * DA (Fe) MAY 1 0 ZOiI Area and Volume Calculations Wet Detention Basin C2 Elevation Main Pool Forebay Total Vol Ft3) Total Vol (Ac-Ft) Comments Area (Ftz) A Vol (Ft) Sum Vol (Ft) Area (Ft2) A Vol (Ft") Sum Vol (Ft) Sediment Clean Out Bottom Elevation -3-00 1749 - 0 0 Bottom of Pond, Sediment Clean Out Top Elevation -2.00 2285.0 2017 2017 2,017 0.046 -1.00 2878 2582 4599 837.0 0 4,599 Q106 Bottom of Forebay, Sediment Clean Out Top Elevation 0.00 3528.0 1 3203 7802 1242.0 1 1040 1040 8,841 0.203 1.00 4234 3881 11683 1702.0 1472 2512 14,194 0.326 Inside Edge of Vegetated Shelf 1.50 5536 2443 14125 1954.0 914 3426 17,551 0.403 Permanent Pool Elevation 1.50 8140 0 24125 0 3426 17,551 0.403 Permanent Pool Elevation - Area Includes Forebay Berm at PPE 2.00 9509.0 4412 18537 3426 21,963 0.504 Outside Edge of Vegetated Shelf 2.90 10562 9032 27569 3426 30,995 0.712 Overflow Elevation (Top of WQ Pool) 3.00 10678 1062 28631 3426 32,057 0.736 4.00 11903.0 11291 39922 3426 43,347 0.995 4.50 Top of Dam Surface Area of Main Pool at PPE {Ft)) 5536 130 Basin Length (ft) Surface Area of Forebay at PPE (Ft2) 1954.0 64 Average Basin Width (ft) Total Surface Area at PPE (Ft') 8140.0 Includes Forebay Berm at PPE 2.0 L:W Ratio Overflow Efev (Ft) 2.9 Total Volume at PPE (Ft) 175S1 5936.0 Abot sheu Includes Main Pool and Forebay Total Volume at Overflow Elev (Ft 3} 30995 8140.0 Am, P_i Includes Main Pool, Forebay and Forebay Berm Total WQv Provided (Ft3) 13444 1749 Ab,,y_, Main Pool Only Total WQv Required (Ft3) 7992 4.00 Depth Main Pool Volume Forbay 19.52 % of Total at PPE 2,16 day Option 1 3.02 day Option 2 Surface Area/Drainage Area Check 5A Provided 8159.0 Sf kill,: Avcm e depth of I)ermanent pool to use in the SAIDA lnhles (t"t) DA 82,995 sf Opl'ton l : (/s , _ 5A/DA (provided) 9.83% SA/DA (required) 9.4096 f 1� \ �te..r � )] �` �16,rwri"`;M„� �'Urplir J Option 2: ri= ()25x 1 t + l x CE'7ED 0 2 Y: Draw Down Calculations Wet Detention Basin C2 Water Quality Volume (W) 13444 Total WQv Provided Top Elevation of Temp Pool (Ft) 2,90 Overflow Elevation Orifice Invert Elevation (Ft) 1.50 Maximum Head (Ft) 1.34 At Centroid of Orifice Driving Head Ho (Ft) 0,44 1/3 Maximum Head Orifice Diameter (in) 1.50 Orifice Diameter (Ft) 0.13 Orifice Area (Ft') 0,012 Orifice Coefficient 0.60 Orifice Discharge Q (Ft3/s) 0.04 Days to Complete Drawdown 3.96 Between 2 and 5 Days Q = CnA� 2 Where: Q - Discharge (cfs) CR - Ccx.fficienl of discharge (dimensionless) - sce Table 3-8 f1 = Crass -sectional area of flow at the orifice. entrance (sq ft) g - Acceleration of gravity (32.2 ft/sec=) I-10 = Driving head (tt), Uleasured from the centroicl of Lite orifice area to the; water surface - Note: Usually use. Hu/3 to compute drawdown through an orifice to refit-.t the fact IhaI head is decreasing as the drawdown oc'etim. Figure 3-3 Schematic section throtigh wt orifice = ,7Ra Table.. 3-8 Values of Coefficient of Discharge, Co (Malcom, 1989) Enlraiwe Condition Cu 'Cy pica I dQlaUIt valua 0.60 Square-eLigfcd entrance t1.59 Concrete pipe, grooved end 0.65 Corrugated rttetal pipe, mitred to slope 0.52 Corrugated melal pine, projecting from fill ,1.00 MAY � Curve Number Calculations Wet Detention Basin C2 Area # Description Area (Fig) Area (Ac) CN CN x A 1 Pavement 66,427 1.52 98 149.4 2 Grass - HSG B 4,665 0.11 61 6.5 3 Water 11,903 0.27 98 26.8 4 0.00 0.0 5 0.00 0.0 6 0.00 0.0 7 0.00 0.0 8 0.00 0.0 9 0.00 0.0 10 0.00 0.0 11 0.00 0.0 12 0.00 0.0 13 0.00 0.0 14 0.00 0.0 15 0.00 0.0 16 0.00 0.0 Total 82,995 1.91 96 0.0030 mil MAY Z 0 2 011 4/13/2011 R:\Hydraulics\CALCULATIONS\Pond C2\Supporting Calculations C2.xls Curve Number Calculations Wet Detention Basin C2 Existing Conditions Area # Description Area (Fe) Area (Ac) CN CN x A 1 Pavement 0.00 98 0.0 2 Grass (HSG A) 0.00 39 0.0 3 Grass (HSG B) 0.00 61 0.0 4 Woods (HSG B) 57,165 1.31 60 78.7 5 Water 25,830 0.59 98 58.1 6 0.00 0.0 7 0.00 0.0 8 0.00 0.0 9 0.00 0.0 10 0.00 0.0 11 0.00 0.0 12 0.00 0.0 13 0.00 0.0 14 0.00 0.0 15 0.00 0.0 16 0.00 0.0 Total 1 82,995 1.91 72 0.0030 Imi2 MAY 1 0 2011 4/13/2011 R:\Hydraulics\CALCULATIONS\Pond C2\Supporting Calculations C2.xls LAND USE AREA (AC) C I (IN\HR) Q (CFS) PRE -DEVELOPMENT WATER 0.59 1.00 WOODS 1.32 0.20 GRASS 0.40 COMPOSITE (PRE-DEVLOPMENT) 1.91 0.45 4.67 3.99 POST -DEVELOPMENT WATER 0.27 1.00 PAVEMENT 1.52 0.95 GRASS 0.11 0.40 COMPOSITE (PRE-DEVLOPMENT) 1.91 0.93 4.67 8.25 RECEZ EI) MAY 1 0 2011 BY: Discharge Summary Wet Detention Basin C2 Pre Development 1 yr 24 hour Discharge (cfs) 2.16 Post Development 1 yr 24 hour Discharge (cfs) 5.26 Flow Into Pond Post Development 1 yr 24 hour Discharge (cfs) 0.89 Flow Out of Pond All Values calculated using Pond Pack computer program Using SCS Type III rainfall distribution .L MAY 1 4 2011 BY: PondMaker Worksheet Detailed Report: Worksheet (PO-1) -I Element Details ID 42 Label Worksheet (PO-1) - 1 Select Pond to Design PO-1 Flow Allowed Below Target 25.0 Flow Allowed Above Target 10.0 Flow Allowed Below Target 25.0 Flow Allowed Above Target 0.0 Volume Allowed Below Target 25.0 Volume Allowed Above Target 50.0 Tolerance Display Display PASS for values within specified tolerance Notes Volume Pond Type Elevation- Use Void Space? False Volume Elevation -Volume Pond Elevation Pond Volume .(ft) (ac-ft) -3,00 0.000 -2,00 0.046 -1.00 0.106 0.00 0,203 1.00 0.326 1.50 0.403 2.00 0.504 3.00 0.736 4.00 0.995 Infiltration Infiltration Method No Infiltration Output Detention Time None Initial Conditions Is Outflow Averaging On? Define Starting Water Surface Elevation False Elevation (Starting Water 1.50 ft Surface) User Defined Initial Elevation Bentley Systems, Inc. Haestad Methods Solution Bentley PondPack V8i Pon(IC2.ppe Center 108.11.01.51) 51412011 27 Siemon Company Drive Suite 200 W Page 1 of 2 Watertown, CT 06795 USA +1.203-755-1666 FZVED MAY1a2011 BY: PondMaker Worksheet Detailed Report: Worksheet (130-1) - 1 PondMaker Worksheet (Routing Design) Design Scenario Design - .TargetPeafc Computed Computed. Target . o , ;Return = ; Outflow Peak Outflow Peak Outflow Outflow:. '•Event , ft3 s x .. ( j) a ;' (ft /s}'; ,vs Target' Volume Post -Development 1 Year 1 2.16 0.89 Fail 0.197 Post -Development 10 Year 10 6.75 9.23 Fail 0.596 Post -Development 25 Year 25 9.27 11.61 Fail 0.825 Post -Development 50 Year 50 11.48 13.72 Fail 1.028 Past -Development 100 Year 100 13.95 16.15 Fail 1.259 Computed,:; Computed Routing Outlet Computed .'Freeiboard Maximum t a Volume`s Outflow 3 " Structure` Max.Vilater Depth Storage ,. € putFlow 1 Volume vs = Elevation (ac ft)::_ (ac ft) ° .: Target O,Z03 Pass Composite Outlet 2.94 Pass 0.723 Structure - 1 0.712 Pass Composite Outlet 3.17 Fail 0.761 Structure - 1 0.974 Pass Composite Outlet 3.23 Fail 0.795 Structure - 1 1.199 Pass Composite Outlet 3.27 Fail 0.806 Structure - 1 1.449 Pass Composite Outlet 3.31 Fail 0.816 Structure - 1 PondMaker Routing Design 4.00 3.00 c 0 2.00 a� w m 1.00 =o to 0.00 m -1.00 v c a -2,00 -3.00 - a.aa 7.00 14.00 21.00 28.00 35.00 42.00 49.00 56.00 63.00 70.00 Flow (ft3/s) Composite Outlet Structure - 1 d]• Target Rating Curve •�- Post-Development1 Year --- Post-Development10Year Post-Development25Year --- Post -Development 50 Year -- Post-Development100Year Bentley Systems, Inc. Haestad Methods Solution Bentley Pond Pack V8i PondC2, ppc Center [08.11.01.51] 5/4/2011 27 Siemon Company Dnve Suite 200 W Page 2 of 2 Watertown. CT 06795 USA +1-203-755-1666 MAY 1 0 2 011 ws �: -'W Soils Report MAY 1 0 Z011 + MC$ Camp Lejeanae ' Soil Evaluation Onslow County, North Carolina SEASONAL HIGH WATER TABLE EVALUATION MCB CAMP LEJEUNE BER STORMWATER ONSLOW COUNTY, NORTH CAROLINA MACTEC PROJECT 6225-09-4999 MACTEC Project No.: 6225-09-4999 April 12, 2010 Page I Methodology A MACTEC soil scientist conducted a preliminary evaluation of the soils within areas considered for stormwater best management practices (BMPs) on April 9, 2010. Hand -auger borings were advanced at ten pre -determined locations. This evaluation included field descriptions for soil texture; color; structure; and depth to seasonal high water table (SHWT) if possible. The SHWT depth was based on field observations of soil characteristics through identification of low chroma redoximorphic features (mottles). All depths presented are below the land surface (BLS). Findings The approximate SHWT depth was based on field observations of soil characteristics .through identification of low chroma mottles. The low chroma mottles suggest past conditions of saturation and reducing soil conditions. Evidence of a SHWT was observed at the depths indicated in the table below. Notes 1. Boring Number Depth To Season High Water Table inches BLS SWB-A 90 SWB-B 80 SWB-C 40 SWB-D <12 SWB-E 40 SWB-H 29 SWB-I <12 SWB-J 32 ,SWB-K 30 SWB-L <12 The soils present at boring locations SWB-D, I and L were hydric soils. Evidence of a SWHT was observed within 12 inches of the soil surface. 0.vJL yi ED MAY 1 0 2011 it ' � ! I• 1 . ` 1 1 I 1 , 5 � I � ,.1 • � t .1 1 r \�� Jr F � _ � � f-�_ \ - - 1 � �'� �� ��• / S: � I I l I f I i LCI Al � \'\ ;y �� __ � / �'� �( III I I I � 1 / 3� `I I� � 111 �IIf' ...� � •�II � �'I �/l:�'� �IJ;�GYI, _ .I � 2G1 /G "2GI f �' I I �� � � � �I 11 I ��� -_II ','I ,'•'! FIB 1 • 1 � _- Iy , 4f -� - - - - - - � - i � ` � � i 1 I 4 ` � .1 - � - I��S / (� _� /F�-• - I f I � I I I ' .+ 1f � � i / i i � � � 1 � 4 ,F � 1 �� ; f , - , . -, ,� . �� • � Ili--� ' �`��"� �.- ,� '� !) � l � �' � � � ! . � ��. �� , t t1 �� � I I 1 r I i , � I i i � �� � _. r � � _. I I ,! r � r � - r r •r � r �- - �► 1 �' 41/ 1 - 1 1 J • i I M MCB Camp Lejeune Soil Evaluation Onslow County, North Carolina SEASONAL HIGH WATER TABLE EVALUATION MCB CAMP LEJEUNE BER STORMWATER ONSLOW COUNTY, NORTH CAROLINA MACTEC PROJECT 6225-09-4999 AMCTEC Project No.: 6225-09-4999 August 6, 2010 Page i Methodology A MACTEC soil scientist conducted a preliminary evaluation of the soils within areas considered for stormwater best management practices (BMW) on July 28, 2010. Hand -auger borings were advanced at eight pre -determined locations. This evaluation included field descriptions for soil texture; color; structure; and depth to seasonal high water table (SHWT) if possible. The SHWT depth was based on field observations of soil characteristics through identification of low chroma redoximorphic features (mottles). All depths presented are below the land surface (BLS). Findings The approximate SHWT depth determinations were based on field observations of soil characteristics through identification of low chroma mottles. The low chroma mottles suggest past conditions of saturation and reducing soil conditions. Evidence of a SHWT was observed at the depths indicated in the table below. Boring Number Depth To Season High Water Table inches BLS 'I Or we west Side+of.Wallace Creeks c .; SWB-CIA 24 SWB-C1B 24 SWB-C1C 22 SWB-CID 30 : Saut1>i"east Side of Wall'aeelGieek E SWB-C2A 68 SWB-C2B 82 SWB-C2C 82 SNA93-C2D 76 RF,CF (VED MAY 10Z011 BY: F �r 6710.46 59, '9�959.\ \ 96 - C1 0 f I I ` t j yy � i 4 I v / i 1�11� s �� a rr� ■ wrn� ■ ���� r ��s�� r rr�o� � r i nrr� ,�I Ili I�Ill�il C� F � F SWB - C2A F�- E: 2497272.25 C2 D i b� 288.76 SWB — C2B N SWB — C2C E:2497352.75 Soil Map—Onslow County, North Carolina 34' 41' 14" W 4Q 2T' Mep Scde: 1:10.400 if pnnled on A size (8.5" r 11-) sheet. M a m N Meters 0 100 200 400 600 Feet 0 500 1,000 2.000 3,000 34' 41' 16' 34' 49 29' Natural Resources Conservation Service Web Soil Survey National Cooperative Soil Survey 6/6/2010 Page 1 of 3 G ram: C= U MAP LEGEND Area of Interest {AOI► Area of Interest iAOI i Soils Soil Map Units Special Point Features Blowout ® Borrow Pit X Clay Spot ♦ Closed Depression x Gravel Pit Gravelly Spot ® Landfill n Lava Flow Marsh or swamp yt Mine or Quarry Miscellaneous Water pp Perennial water v Rock Outcrop t Sa1me Spot Sandy Spot Severety Eroded Spot 0 Sinkhole }� Slide or Shp 0 Sodic Spot a Spoil Area d Stony Spot Soil Map—Onslow County. North Carolina Very Stony Spot Wet Spot Other Special Line Features Goy Short Steep Slope Other Political Features Cities Water Features ® Oceans Streams and Canals Transportation +++ Rails interstate Highways US Routes Major Roads Local Roads MAP INFORMATION Map Scale I .10.400 if printed on A size (8.5" x 11") sheet The soil surveys that comprise your AOI were mapped at 1 24,000. Please rely on the bar scale on each map sheet for accurate map measurements Source of Map Natural Resources Conservation Service Web Soil Survey URL http /twebsoilsurvey nres.usda gov Coordinate System: UTM Zone 18N NA083 This product is generated from the USDA-NRCS certified data as of the version date(s) listed below Soil Survey Area Onslow County North Carolina Survey Area Data. Version 11. Jun 5. 2009 Date(s) aerial images were photographed 10114/2006, 7/10/2006 The orthophoto or other base map on which the soil lines were compiled and digitized probably differs from the background imagery displayed on these maps As a result. some minor shifting of mao unit boundaries may be evident Natural Resources am Conservation Service Web Soil Survey National Cooperative Soil Survey 6/6/2010 Page 2 of 3 Soil Map—Onslow County, North Carolina Map Unit Legend Onslow County, North Carolina (NC133) Map Unit Symbol Map Unit Name Acres in AOI Percent of AOI BaB Baymeade fine sand, 0 to 6 percent slopes BmB Baymeade-Urban land complex, 0 to 6 percent slopes KuB Kureb fine sand, 1 to 6 percent slopes MaC Marvyn loamy fine sand, 6 to 15 percent slopes Mk Muckalee loam On Onslow loamy fine sand Ur Urban land W Water Totals for Area of Interest Natural Resources Web Soil Survey Conservation Service National Cooperative Soil Survey 220.1 40.1 % 24.4 4.4% 22.7 4.1 % 100.2 18.3% 82.5 15.0% 87.9 16.0% 8.7 1.6% 2.2 0.4% 648.6 100.0% 07 7 MAY ]UAll 6/6/2010 Page 3 of 3 Soil Map—Onslow County, North Carolina i4` 4114'" 34' 40' 2T' Map ScMe: 1:10.400 6 pnntetl an A sae {$.5^ K 11') sheet. b a+ N Meters 0 100 200 400 600 n Feel 0 500 1,000 2,000 3,000 W 41' 15" �1� Natural Resources Conservation Service Web Soil Survey National Cooperative Soil Survey 6/6/2010 Page 1 of 3 Sod Map-0nslow County, North Carolina MAP LEGEND Area of Interest (AQI) (p Very Stony Spot Area of Interest (AOI) Wet Spot Soils Other Sod Map Units Special Line Features Special Point Features Gully Blowout Short Steep Slope ® Borrow Pit Other X Clay Spot Political Features Closed Depression 46 Cities Gravel Pit Water Features Gravelly Spot ® Oceans ® Landfill Streams and Canals /t Lava Flow Transportation .A, Marsh or swamp +++ Rails V Mme or Quarry Interstate Highways O Miscellaneous Water US Routes p Perennial Water Major Roads Rock Outcrop w Local Roads + Saline Spot Sandy Spot Severely Eroded Spot 0 Sinkhole Slide or Slip 0 Sodic Spot Spoil Area Q Stony Spot MAP INFORMATION Map Scale 1 10.400 if printed on A size (8.5" x 11") sheet. The sort surveys that comprise your AOI were mapped at 1 24.000 Please rely on the bar scale on each map sheet for accurate map measurements Source of Map Natural Resources Conservation Service Web Soil Survey URL http:llwebsoilsurvey nres.usda gov Coordinate System UTM Zone 18N NAD83 This product is generated from the USDA-NRCS certified data as of the version date(s) listed below. Soil Survey Area: Onslow County. North Carolina Survey Area Data: Version 11 Jun 5. 2009 Date(s) aeriai images were photographed 10l14/2006. 7/1012006 The orthophoto or other base map on which the soil lines were compiled and digitized probably differs from the background imagery displayed on these maps As a result. some minor shifting of map unit boundaries may be evident USDA Natural Resources Web Soil Survey 6/612010 Conservation Service National Cooperative Soil Survey Page 2 of 3 Soil MapOnslow County, North Carolina Map Unit Legend Onslow County, North Carolina (NCI 33) Map Unit Symbol Map Unit Name Acres In AOI Percent of AQI BaB Baymeade fine sand, 0 to 6 percent slopes BmB Baymeade-Urban land complex, 0 to 6 percent slopes KuB Kureb fine sand, 1 to 6 percent slopes Mac Marvyn loamyfine sand, 6 to 15 percent slopes Mk Muckalee loam On Onslow loamy fine sand Ur Urban land W Water Totals for Area of Interest Natural Resources Web Soil Survey Conservation Service National Cooperative Soil Survey 220.1 40.1 % 24.4 4.4% 22.7 4.1 % 100.2 18.3% 82.5 15.0% 87.9 16 0% 8.7 1.6% 2.2 0.4% 648.6 100.0% MAY j0Z011 6/6/2010 Page 3 of 3 Soil Map—Onslow County, North Carolina 34' 41' 5F 34' 40' 28" 0 h N ry A 1� v MW Scale. 1:18.40D if prmled on A we f 8.5" z 11 "} sheer m m N Meters 0 250 500 1.000 1500 Feel 0 1.000 2000,4.000 6.000 34" 41' 55' 34 40 31' L�SDA Natural Resources Conservation Service Web Soil Survey National Cooperative Soil Survey 41512011 Page 1 of 3 s4 .1 C MAP LEGEND Area of Interest (A01) Area of Interest (AOI) Soils Soil Map Units Special Point Features k'7 Blowout ® Borrow Pit X Clay Spot Closed Depression y, Gravel Pit Gravelly Spot ® Landfill A Lava Flow .,6 Marsh or swamp V Mine or Quarry 0 Miscellaneous Water Q Perennial Water Rock Outcrop f Saline Spot Sandy Spo. _ Severely Eroded Spot p Sinkhole Slide or Slip 0 Sodic Spot Spoil Area Stony Spot Soli Map—Onslow County. North Carolina (� Very Stony Spot Wet Spot Other Special Line Features Gully Short Steep Slope Other Political Features 19 Cities Water Features Oceans Streams and Canals Transportation + F Rails .�. Interstate Highways US Routes Major Roads Local Roads MAP INFORMATION Map Scale. 1 18.400 if printed on A size (8 5" K 11") sheet. The soi$ surveys that comprise your AOI were mapped at 1.24.000 Please rely on the bar scale on each map sheet for accurate map measurements Source of Map Natural Resources Conservation Service Web Sod Survey URL http llwebscilsurvey nres usda gov Coordinate System: UTM Zone 18N NAD83 This product is generated from the USDA-NRCS certified data as of the version date($) listed below. Soil Survey Area: Onslow County. North Carolina Survey Area Data Version 11. Jun 5. 2009 Date(s) aerial images were photographed 10/1412006. 7/10/2006 The orthophoto or other base map on which the soil Imes were compiled and digitized probably differs from the background imagery displayed on these maps As a result. some minor shifting of map unit boundaries may be evident L]� Natural Resources 11+ Conservation Service Web Soil Survey National Cooperative Soil Survey 4/5/2011 Page 2 of 3 Soil Map—Onslow County, North Carolina Map Unit Legend Onslow County, North Carolina (NC133) Map Unit Symbol Map Unit Name Acres In AOI Percent of AOI BaB Baymeade fine sand, 0 to 6 percent 486.9 slopes BmB Baymeade-Urban land complex, 0 to 69.4 6 percent slopes KuB Kureb fine sand, 1 to 6 percent 71.7 slopes MaC Marvyn loamy fine sand, 6 to 15 239.4 percent slopes Mk Muckalee loam 324.9 On Onslow loamy fine sand 53.6 Pa Pactolus fine sand 76.2 Pt Pits 13.0 Ra Rains fine sandy loam 0.2 Ur Urban land 0.2 W Water 86.6 Totals for Area of Interest 1,422.0 Natural Resources Web Soil Survey Conservation Service National Cooperative Soil Survey 34.2% 4.9% 5.0% 16.8% 22.8% 3.8% 5.4% 0.9% 0.0% 0.0% 6.1 % 100.0% MAY 1 0 2011 4/5/2011 Page 3 of 3 Soil Map—Onslow County. North Carolina 34' 41' 52' 34` 40' 28" n 1p v Map Scale. 1:18.400 i1 pnnted on A size (8.5" x 11 ") sheet. m "am N Meters 0 250 500 1,wo 1,500 Feel 0 1,000 2,000 4.000 6.000 34' 41' W 34' 40' 31" USDA Natural Resources Conservation Servioe Web Soil Survey National Cooperative Soil Survey 415/2011 Page 1 of 3 Sod Map-0nslow County North Carolina MAP LEGEND Area of Interest (AOq Very Stony Spot Area of Interest (AOl) Wet Spot Soils � Other Soil Map Units Special Line Features Special Point Features Gully Blowout Short Steep Slope ® Borrow Pit .r Other X Clay Spot Political Features ♦ Closed Depression � cales ?r Gravel Pft Water Features Gravelly Spot ® oceans ® Landfill Streams and Canals A Lava Flow Transportation ,y & Marsh or swamp +++ Ra°is yt Mine or Quarry �+' Interstate Highways ® Miscellaneous Water US Routes Perennial Water Major Roads R k O t iv Local Roads I., oc u crop + SaEine Spot Sandy Spot Severely Eroded Spot 0 Sinkhole Slide or Slip fy Sodbc Spot = Spoil Area Stony Spot MAP INFORMATION Map Scale 1:18A00 if printed on A size (8 5" - 11 ") sheet The soil surveys that comprise your AOl were mapped at 1:24,000 Please rely on the bar scale on each map sheet for accurate map measurements Source of Map. Natural Resources Conservation Service Web Solt Survey URL http:l/websodsurvey nres usda gov Coordinate System UTM Zone 18N NAD83 This product is generated from the USDA-NRCS certified data as of the version date($) listed below Soil Survey Area: Onsiow County. North Carolina Survey Area Data Version 11, Jun 5, 2009 Date(s) aerial images were photographed 1011412006: 7/10/2006 The orthophoto or other base map on whsch the soil lines were compiled and digitized probably differs from the background imagery displayed on these maps As a result some minor shifting of map unit boundaries may be evident Natural Resources Conservation Service Web Soiil Survey National Cooperative Sorl Survey 4/51201 1 Page 2 of 3 Soil Map—Onslow County, North Carolina Map Unit Legend Onslow County, North Carolina INC133) Map Unit Symbol Map Unit Name Acres in AOI Percent of AOI BaB Baymeade fine sand, 0 to 6 percent 486.9 slopes BmB Baymeade-Urban land complex, 0 to 69.4 6 percent slopes KuB Kureb fine sand, 1 to 6 percent 71.7 slopes MaC Marvyn loamy fine sand, 6 to 15 239.4 percent slopes Mk Muckalee loam 324.9 On Onslow loamy fine sand 53.6 Pa Pactolus fine sand 76.2 Pt Pits 13.0 Ra Rains fine sandy loam 0.2 Ur Urban land 0.2 W Water 86.6 Totals for Area of Interest 1,422.0 Natural Resources Web Soil Survey Conservation Service National Cooperative Soil Survey 34.2 % 4.9% 5.0% 16.8% 22.8% 3.8% 5.4% 0.9% 0.0% 0.0% 6.1 % 100.0% MAY 1 0 2011 BY: 4/5/2011 Page 3 of 3 O� O f(J_ z 0 For DENR Use ONLY LJ U ,,,� lReviewer L L— North Carolina Department of Environment and sutmlr Natural Resources o NCDENRRequest for Express Permit Review Time Z o1 Conrirm, � FILL-IN all the information below and CHECK the Permit(s) you are requesting for express review. FAX or Email the completed form to Express Coordinator along with a completed DETAILED narrative, site plan LPOF file) and vicinity map (same items expected In the application package of the project location. Please include this form in the application package. • Asheville Region -Alison Davidson 828-296-4698;alison.davidson(a).ncmail,net • Fayetteville or Raleigh Region -David Lee 919.791.4203; david.lee(a)ncmail.net • Mooresville & -Patrick Grogan 704.663-3772 or patrick,grogan(@ .ncmail.no • Washington Region -Lyn Hardison 252.946.9215 or lyn.hardison(ancmail.net • Wilmington Region -Janet Russell 910-350-2004 or ianet.russell(a ncmail.not NOTE. Project application received after 12 noon will be stamped in the following work day. Enter Related W Permits of request SW SW SW SW SW Project Name NEW BASF_ ENTRY POINT AND ROAD County. ONSLOW Applicant: CARL BAKER Company: US MARINE CORPS BASE CAMP LEJEUNE Address: PUBLIC WORKS DIVISION, 1005 MICHAEL ROAD City: CAMP LEJEUNE, State: NC Zip: 28W Phone: 910-451-2213, Fax: 910-451-2527, Email: cart h baker@usmc.mil Physical Location MCB CAMP LEJEUNE Project Drains into waters - Water classification SC (for classification see-http:llh2o.enr.state.nc,uslbimsireportslreportsWB.html) Project Located in WHITE OAK River Basin. Is project draining to class ORW waters? N , within '/d mile and draining to class SA waters N. or within 1 mile and draining to class HQW waters? Y_ Engineer/Consultant: LOUISE SLATE Company: MACTEC Address: 3301 ATLANTIC AVENUE City: RALEIGH, Slate: NC Zip: 27604-_ APR 1 3 M ] Phone: 919-a31-8006, Fax,, 919-831-8136, Email: loslale@macteccom SECTION ONE: REQUESTING A SCOPING MEETING ONLY ❑ Scoping Meeting ONLY ❑ DWQ ❑ DCM, ❑ DLR. ❑ OTHER: SECTION TWO: CHECK ONLY THE PROGRAM (S) YOU ARE REQUESTING FOR EXPRESS PERMITTING ❑ 401 Unit ❑ Stream Origin Determination: _ # of stream calls - Please attach TOPO map marking the areas in questions ❑ Intermittent/Perennial Determination: _ # of stream calls - Please attach TOPO map marking the areas in questions ❑ 401 Water Quality Certification ❑ Isolated Welland (_linear ft or _acres) ❑ Riparian Buffer Authorization ❑ Minor Variance ❑ Major General Variance ® State Stormwater ❑ General ❑ SFR, ❑ SFR < 1 ac. ❑Bkhd & Bt Rmp, ❑ Clear & Grub, ❑ Utility ❑ Other ❑ Low Density ❑ Low Density -Curb & Gutter _ # Curb Outlet Swales ❑ Off -site [SW (Provide permit #)] ❑ High Density -Detention Pond _ 9 Treatment Systems ElHigh Density -Infiltration _ #Treatment Systems ElHigh Density -Bio-Retention _ # Treatment Systems ❑ High Density -SW Wetlands _ # Treatment Systems ❑ High Density -Other # Treatment Systems / ® MOD:® Major ❑ Minor ❑ Plan Revision ❑ Redev. Exclusion S' 090630 rovide pernn t ) ❑ Coastal Management ❑ Excavation & Fill ❑ Bridges & Culverts ❑ Structures Information ❑ Upland Development ❑ Marina Development ❑ Urban Waterfront ❑ Land Quality ❑ Erosion and Sedimentation Control Plan with _ acres to be disturbed (CK # (for DENR use)) SECTION THREE - PLEASE CHECK ALL THAT IS APPLICABLE TO YOUR PROJECT (for both scooina and exoress meeting reauest Wetlands on Site ® Yes ❑ No Buffer Impacts: ❑ No ® YES: _acre(s) Wetlands Delineation has been completed: ® Yes ❑ No Isolated wetland on Property ® Yes ❑ No US ACOE Approval of Delineation completed: ® Yes ❑ No 404 Application in Process wl US ALOE: ® Yes ❑ No Permit Received from US ACOE ® Yes ❑ No •....RFt.a...a......�fY#f �ti•t•sa. yi�N •rs r......... *For DENR use Only��s•��sr����st*s••utsit��w*��•�ss*r��t•��s�ats�s�tass♦���s Foe Splitfor multiple permits*: {*;heck N' l Total Fee Amount S SUBMITTAL DATES Fee SUBMITTAL DATES Fee CAMA S Variance (❑ Maj; ❑ Min) $ SW (❑ HD, ❑ LD, ❑ Gen) $ 401: $ LQS — $ Stream Deter, $ NCDENR EXPRESS March 2009 Request for Express Permit Review Stormwater Narrative FY10 MCON Project 1382, New Base Entry Point Camp Lejeune, NC April 12, 2011 This narrative describes the changes in the design to New Base Entry Point since stormwater permit SW8 090630 was issued on February 8, 2010 and modified on June 15, 2010 and again on March 22, 2011. This modification focuses on contracts B and C of the Base Entry Road (BER) which runs from the interchange at Brewster Blvd to the interchange at Holcomb Blvd and Sneads Ferry Road. The overall permitting strategy continues to be low density with pockets of high density. This section of the Base Entry Road includes high density pockets draining to water quality ponds at the bridges over Wallace Creek and Bearhead Creek. The remainder of the road is designed to comply with low density requirements. The project site is located in Onslow County, North Carolina and is in the White Oak River Basin. The roadway drains to three main receiving waters: Northeast Creek, Wallace Creek, and Bearhead Creek. The following table lists each stream with its DWQ Classification. Stream Name DWQ Classification DWQ Index Northeast Creek SC NSW 19-16-(0.5) Wallace Creek SB NSW 19-20 Bearhead Creek SB NSW 19-20-1 The project permit boundary is established to achieve the Low Density stormwater permitting option and has pockets of High Density. Consistent with Low Density stormwater strategy described in requirements set forth in the Session Law 2008-211 Section 2.(b)3b, sheet flow and flow through vegetated conveyances (grassed swales) will be maximized along the project corridor. Generally, the roadway will have a 46 ft depressed median cross section. The roadway will generally have three (3) distinct typical cross sections: Section Description Proposed Typical Section Stormwater Strategy Permitting Strategy Tangent and Depressed median, Utilize shoulder sheet flow and Low Curve Sections open shoulder, grass roadside swales. Occasional median Density swales discharge points will be discharged to preformed scour holes. No other structural BMPs are proposed in these roadway sections. Tangent and Depressed median, Utilize shoulder sheet flow and Low Curve Sections raised median with roadside swales. Occasional median Density curb and gutter and discharge points will be discharged to with open shoulder, grass preformed scour holes. No other Occasional swales structural BMPs are proposed in Pockets of these roadway sections. Collect High stormwater in pipe systems and Density convey to structural BMP prior to discharge Stormwater Narrative Page 1 R CFIVFD MAY ] 0 Z 011 BY: Bridge/Culvert Curb and gutter Collect stormwater in pipe systems Pockets of approaches and and convey to structural BMP prior to High other sections discharge Density requiring curb and gutter Gate n/a Utilize sheet flow and swales or Pocket of collect stormwater in pipe systems High and convey to structural BMP prior to Density discharge Proposed structural stormwater BMPs will be designed in accordance with the 2007 NCDENR Stormwater Best Management Practices Manual and will be designed in compliance with requirements set forth in the Session Law 2008-211 Section 2.(b)3b. The total proposed impervious area and placement of structural stormwater BMPs will be determined as the project progresses. To comply with the low density option, built upon area (BUA) will be 24% or less. The stormwater BMPs will be located outside the vegetated buffer for each stream. The new base entry road will pass close to some existing and proposed developments served by appropriately sized best management practices; however, it is strongly desired to treat stormwater from this project independently from other development on the base and with the project corridor. The roadway will typically be constructed in fill elevated above existing terrain. Off -site drainage will pass through the roadway via culverts in locations of natural drainage conveyance. Existing streams will be conveyed under the roadway in appropriately sized culverts following typical NCDOT criteria. These culvert crossings will provide a combination of low and high flow conveyances to maintain natural conditions along the jurisdictional corridor passing under the road. The three significant watercourses (Northeast Creek, Wallace Creek and Bearhead Creek) will be spanned by bridges. Coordination with FEMA has been conducted to ensure compliance with floodplain regulations. The project site is located in an area that is mostly previously undeveloped land. There are some localized areas of development that the roadway corridor will impact, some of which might be pre-1988 built upon area. Stormwater Narrative Page 2 1R.FC" FIV D MAY 1 0 2011 :'Y: I m 0 NEW A T, ir a0z 0 1 on rT" YT I P —1 l:E91-WlS\5aM UW,A.P.4AWtj d.WD% E)) Jn�a dM I _ 5-- Lei eu ►ti+� — S E[� Sty►-rn v�c�te t��r+-ri.►t . M ACTE C/R K K J V_ I os la trt.� n•La c�-ts_c . Cawt A4Ac: of l Rie¢rC J � ►ri(.*" A ec— C 9,c:sc-,c'p-►+ - .CON^, SVV ew: s�v ncd� r, oV �] .�-ussc 1 - - T]E0 -.. �l G '• r%&S&C- E, ncic4v.�u,�