Loading...
HomeMy WebLinkAboutSW8080740_HISTORICAL FILE_20180504NORTH CAROLINA Department of Environmental Qual II STORMWATER DIVISION CODING SHEET POST -CONSTRUCTION PERMITS PERMIT NO. I SW8 e go74o DOC TYPE I ❑ CURRENT PERMIT ❑ APPROVED PLANS HISTORICAL FILE ❑ COMPLIANCE EVALUATION INSPECTION DOC DATE Zo/Bcs o�L YYYYMMDD 90 f ' J Energy, Mineral & Land Resources rNVIRONMENTAL DUALITY May 4; 2018 ROY COOPER Govemol- MICHAEL S. REGAN Secretary WILLIAM E. (TOBY) VINSON, JR. In terrrtl Dirrctor MC8 Camp Lejeune Attn: Commanding Officer c/o rtiTeal Paul; Deputy Public Works Officer 1005 Michacl Road Camp Lejtn ne, NTC 28542 Sill) jec.t: State Stormwater Manabenieitt Permit No. S%V8 080740 Field Medical Services School and 13achelor 1Lnliste.d Quarters at Camp ,lohnson Project with Areas ol' hoth High Density and Luw Density Onslow County Dear Mr. Paul: 'hhe wilrninglon Regional Office received i completc, rnodil-iecl State StorniNvater Management Permit Application for the subject project on Nlay 4, 201 S. Staff review of the plans and specifications has determined that the project, as proposed, will comply with the Siorinwater Regulations set forth in 'Title 15A NICAC 2H.1000. as amended by Session Law (SL) 2008-21 1 and as sl.ibsequently amended on January 1, 2017 (2017 Rules), as applicable. We are forwarding modified Permit No. SW8 0807,10 dated May 4, 201 8, for the construction, operation and maintenance of the stormwater control measures (SCMs), built -upon areas, as well as the storinwater collection system and/or Vegetated conve.=ance system associated with the subject project. Please add the attached plans to the pl,eviously approved pl an set. Please replace the previous applicatioj7 (SWU-101), srrppleMeMS, and o>erati011 aril M(Iinlenance u�,-eement with the attached modified versions. '['his permit. shall be effective from the date of issuance until September 10, 2020 and shall be subject to the conditions and limitations as specified therein. and does not supersede any other agency permit that may be required. Please pay special attention to the permit condliions regarding the operation and maintenance of the SCMs, stormwater collection system, and/or vegetated conveyances; the limitation of built -upon area; modification of the project; the procedures for changing ownership of and/or transferring the permit; and the need to renew the permit. Please also pay attention to the permit conditions that requires the recordation of deed restrictions and protective covenants, easements, and the maintenance agreement, which must all be provided along with cenifieatiorn upon completion of the project, Failure to comply with these requirements will result in future compliance problems. [)lease refer to Atlachment 1 for a detailed description of the current proposed major modification and a list of all the past modifications approved during the effective period of the permit. ]f any parts, requirements, or limitations contained in this permit are unacceptable, you have the right to request an adjudicatory hearing by filing a �vritterr petition with the Office of Administralive I-learings (OAH). 'fhe written petition artist conform to Chapter 150B of the North Carolina General Statirtes and must be filed with the 0AI1 Within thirty (30) days of receipt of ibis permit. You should contact the 0AI-1 with all questions regarding the filing fee (if a filing fee is required) and/or the details of the filing process at 6714 Mail Service Center, Raleigh, NIC 27699-6714, or via telephone at 919-43 l -3000, or visit their website al www.NCOA11com. Unless such demands are made this permit shall he final and binding. Stale �f Nait}}Carolina I ErjVit Orrr11tn17{ QlaLdit+, I Enemyh4uurat mtd L.ano R sources Wilmiltgton Rryionni Otric'. 1127 Cardinal M`klc Gxlrnninn I Vditntirx tun, KC 2,A05 90 796 7:!i 5 `a State Storfnw jtcr Permit No. SW8 080740 Paee 2 of 2 If VOLT have arty questions; or need additional infoI-]natioti concerning this matter, please contact Christine Hall irr the Wilmington Regional Off ice; ai (910) 796-7215 Sincerelv j(:, William E. (Tab) Vinson; Jr'.; TES Cf'1 SC CI'rt-]; Inlerun Director Division of €;clergy, Mineral and € and Resources Enclosures: Atiachment A — Cenification Forms Attachment 1 — Permirting History GDS/canh: I11SIcrmwaierlYernits k PTo.jcclQ00810807401-I012018 04 ;.re;rnit OSC7,10 cc: riMeredith Cutchin. PE: NAVFAC l lidlant. _k,1C JPT Wilmington Regional Office Stonnwate File Statc of North Carolina 1 'Dnriu-onmenial Qualitk- I Energy, plincra! and Land hrsources "Ohninytun kryiorial Oftice i Q7 Cardinal Drier L+;tcnsio>> I %Yilarinyruri. NC 25405 111Q 796 7217 State Stormwater Management Permit No. SIN8 080740 STATE OF NORTH CAROLINA DEPARTMENT OF ENVIRONMENTAL QUALITY DIVISION OF ENERGY, MINERAL AND LAND RESOURCES STATE STORMWATER MANAGEMENT PERMIT I1111111:W21>1sl:2t►ilk",hWiTAIIJ;1: [•'�il�:���><: ;lLe3:1�1 E•yVr'>��a�l�i]'i��] �bIm In accordance with the provisions of Article 21 of Chapter 143, General Statutes of North Carolina as amended, and other applicable Laws, Rules, and Regulations PERMISSION IS HEREBY GRANTED TO US MCB Camp Lejeune Field Medical Services School and Bachelor Enlisted Quarters at Camp Johnson the vicinity around Company E Street, Camp Lejeune, Onslow County FOR THE construction; operation and maintenance of one (1) constructed wetland, one (1) sand filter, and three (3) wet ponds (:'stormwater control measures or °SCMs") as well as one (1) area of 24% low density (the "low density area") and one (1) area of redevelopment (the "redevelopment area') in compliance with the provisions of Title 15A NCAC 2H .1000 as amended by Session Law (SL) 2008- 211 and as subsequently amended on January 1, 2017 (2017 Rules) (the "stormwater rules") and the approved stormwater management plans: application, supplement(s), specifications; and other supporting data (the "approved plans and specifications') as attached and/or on file with and approved by the Division of Energy, Mineral and Land Resources (the "Division" or :'DEMLR') and considered an enforceable part of this permit. This permit shall be effective from the date of issuance until September 10, 2020 and shall be subject to the following specified conditions and limitations: I. DESIGN STANDARDS 1. This permit is effective only with respect to the management and volume of stormwater described in the approved pl and specifications. The maximum amount of built -upon area (BUA) allowed for the entire project is 340,287 square feet. 2. The redevelopment portion of this project is exempt from State Stormwater permitting requirements under the following conditions: 1) The project must be constructed as shown on the plans submitted to this Office; 2) the proposed redeveloped BUA of 29,302 square feet does not exceed the existing BUA of 88,759 square feet; and 3) The proposed stormwater control (vegetated sheet flow, vegetated swales, and a piped collection system) provides equal protection of surface waters as the existing stormwater control (vegetated sheet flow and a piped collection system). The low density area must not exceed 24% per the requirements of the stormwater rules. Within this low density area this permit covers the construction of a total of 12,266 square feet of proposed BUA. This permit does not provide any allocation of built -upon area for future development within this low density area. Page 1 of 5 State Stormwater Management Permit No. SW8 080740 4. The low density area has maximized dispersed flow of stormwater runoff through vegetated areas and minimized the channelization of flow. Stormwater runoff that could not be released as dispersed flow may be transported by vegetated conveyances with minimum side slopes of 3:1 (H:V) designed to not erode during the peak flow from the 10-year storm event as defined in the stormwater rules and approved by the Division. 5. Within the low density area, no piping shall be allowed except those minimum amounts necessary to direct stormwater runoff beneath a BUA such as a road or driveway when it cannot be avoided. 6. The drainage areas for the on -site stormwater systems will be limited to the amounts of built - upon area indicated in this permit and the approved plans and specifications. The runoff from all built -upon area within the permitted drainage areas of this project must be directed into the permitted stormwater control measures. The stormwater control measures labeled Wetland 1 Sand Filter 1, Pond A, Pond B, and Pond C have been designed Using the runoff treatment method to handle the runoff from 124,078, 33;809, 55;642; 51,560, and 32,508 square feet of built -upon area; respectively. The built -upon area for future development within these drainage areas is limited to 61,622, 4,000, 1,500, 14,000, and 4.750 square feet; respectively. 7. Where a project or lot is located within CAMA's Area of Environmental Concern (AEC), the Division of Coastal Management (DCM) may calculate a different maximum built -upon area based on CAMA regulations. The more restrictive BUA limit of DCM or DEMLR will apply to the project. A 50-foot wide vegetative setback must be provided and maintained adjacent to all surface waters; measured horizontally from the normal pool elevation of impounded structures, from the top of bank of each side of streams or rivers; and from the mean high waterline of tidal waters, perpendicular to the shoreline in accordance with the stormwater rules and the approved plans and specifications. Within the low density area, ail stormwater runoff, including roof drains, shall be released as dispersed flow no closer than at the edge of the vegetated setback and shall not be piped into or through the setback. 9. The stormwater control measures are permitted based on the design criteria presented in the supplements and as shown in the approved plans and specifications. These stormwater control measures must be provided and maintained at the design condition. The approved supplements are incorporated by reference into this permit. 10. Within the constructed wetland drainage area, which is subject to Session Law 2008-211, all runoff being directed into wetlands shall flow into and through those wetlands at a non -erosive velocity. 11. Within the areas subject to the 2017 rules, the peak flow from the 10-year storm event shall not cause erosion downslope of the stormwater outlet discharge point. 12. Decorative spray fountains will be allowed in the wet ponds if documentation is provided demonstrating that the proposed fountain will not cause resuspension of sediment within the pond or cause erosion of the pond side slopes. 13. When using a wet pond for irrigation, it is recommended that some water be maintained in the permanent pool, the vegetated shelf is planted with appropriate species that can handle fluctuating conditions; and human health issues are addressed. 14. The SCM landscape planting plan shown in the approved plans shall be followed in its entirety during construction. After the plants are established, the operation and maintenance agreement must be followed. 15. The sand filter shall be maintained in a manner that results in a drawdown of at least two inches per hour at that sand surface. Page 2 of 5 State Stormwater Management Permit No. SW8 080740 16. The level spreaders and vegetated filter strips shown on the plans are not required by the Division and have not been demonstrated to meet the State Stormwater BMP design requirements and therefore are not considered a part of the approved state stormwater treatment system. These additional measures are incorporated only by reference and are not enforceable parts of the permit II. SCHEDULE OF COMPLIANCE The project and SCM(s) shall be constructed; operated and maintained in accordance with the conditions of this permit and the approved plans and specifications. 2. The on -site stormwater system shall be entirely constructed, vegetated; and operational prior to the construction of any development within the drainage area; per the approved plans and specifications. 3. During construction, erosion shall be kept to a minimum and any eroded areas of the on -site stormwater system will be repaired immediately. If the stormwater system is used as an Erosion Control device, it must be restored to design condition prior to operation as a stormwater treatment device, and prior to occupancy of the facility. 4, All stormwater control measures, stormwater collection systems vegetated conveyance systems, and/or maintenance accesses must be located in public rights -of -way; dedicated common areas that extend to the nearest public right-of-way: and/or permanent recorded easements that extend to the nearest public right-of-way for the purpose of inspection, operation, maintenance, and repair. 5. The permittee shall provide and perform the operation and maintenance necessary, as listed in the signed Operation and Maintenance Agreement to assure that all components of the permitted on -site stormwater system functions at the approved design condition. The approved Operation and Maintenance Agreement is incorporated by reference into this permit and must be followed in its entirety and maintenance must occur at the scheduled intervals. 6. The operation and maintenance agreement must be recorded with the Office of the Register of Deeds. 7. Records of maintenance activities must be kept and made available upon request to authorized personnel of the Division. The records will indicate the date; activity, name of person performing the work and what actions were taken. The final plats for the project must be recorded with the Office of the Register of Deeds. The recorded plat must reference the Operation and Maintenance Agreement and must also show all public rights -of -way, dedicated common areas, and/or permanent drainage easements, in accordance with the approved plans. 9. The permittee is responsible for verifying that the proposed built -upon area for the entire project does not exceed the maximum allowed by this permit. 10. Upon completion of the project; the permittee shall determine whether or not the project is in compliance with the permitted plans and take the necessary following actions: a. If the permittee determines that the project is in compliance with the permitted plans, then within 45 days of completion; the permittee shall submit to the Division one hard copy and one electronic copy of the following: i. The completed and signed Designer's Certification provided in Attachment A noting any deviations from the approved plans and specifications. Deviations may require approval from the Division; ii. A copy of the recorded maintenance agreement; iii. Unless already provided, a copy of the recorded deed restrictions and protective covenants: and iv. A copy of the recorded plat delineating the public rights -of -way, dedicated common areas and/or permanent recorded easements, when applicable. b. If the permittee determines that the project is not in compliance with the permitted plans, the permittee shall submit an application to modify the permit within 30 days of completion of the project or provide a plan of action; with a timeline: to bring the site into compliance. Page 3 of 5 State Stormwater Management Permit No. SW8 080740 11. No person or entity, including the permittee, shall alter any component shown in the approved plans and specifications. Prior to the construction of any modification to the approved plans; the permittee shall submit to the Director; and shall have received approval for modified plans: specifications, and calculations including, but not limited to, those listed below: a. Any modification to the approved plans and specifications; regardless of size including the stormwater control measures, built -upon area, details, etc. b. Redesign or addition to the approved amount of built -upon area or to the drainage area. c. Further development: subdivision; acquisition; lease or sale of any, all or part of the project area as reported in the approved plans and specifications. d. Altering, modifying, removing; relocating, redirecting; regrading or resizing of any component of the approved stormwater control measure; stormwater collection system and/or vegetative conveyance system shown on the approved plan, e. The construction of any allocated future BUA. f. The construction of any permeable pavement for BUA credit that was not included in the approved plans and specifications. g, The construction of any #57 stone area; public trails; or landscaping material to be considered a permeable surface that were not included in the approved plans and specifications. h. Other modifications as determined by the Director. 12. The Director may notify the permittee when the permitted site does not meet one or more of the minimum requirements of the permit. Within the time frame specified in the notice; the permittee shall submit a written time schedule to the Director for- modifying the site to meet minimum requirements. The permittee shall provide copies of modified plans and certification in writing to the Director that the changes have been made. 13. Prior to transfer of the permit, a file review and site inspection will be conducted by Division personnel to ensure the permit conditions have been met and that the project and the on -site stormwater system complies with the permit conditions. Any items not in compliance must be repaired, replaced restored; or resolved prior to the transfer. Records of maintenance activities performed to date may be requested. III. GENERAL CONDITIONS Any individual or entity found to be in noncompliance with the provisions of a stormwater management permit or the requirements of the stormwater rules is subject to enforcement procedures as set forth in NCGS 143 Article 21. The issuance of this permit does not preclude the permittee from complying with and obtaining any other permits or approvals that are required for this development to take place, as required by any statutes, rules; regulations; or ordinances; which may be imposed by any other Local, State or Federal government agency having jurisdiction. Any activities undertaken at this site that cause a water quality violation or undertaken prior to receipt of the necessary permits or approvals to do so are considered violations of NCGS 143-215.1, and subject to enforcement procedures pursuant to NCGS 143-215.6. 3. If the facilities fail to perform satisfactorily, the permittee shall take immediate corrective actions. This includes actions required by this Division and the stormwater rules such as the construction of additional or replacement on -site stormwater systems. These additional or replacement measures shall receive a permit from the Division prior to construction. Page 4 of 5 State Stormwater Management Permit No. SW8 080740 4. This permit is not transferable to any person or entity except after notice to and approval by the Director. The permittee shall submit a completed and signed State Stormwater Request Form for Permit Transfer or Permit Information Update, accompanied by the supporting documentation as listed on the form, to the Division at least 60 days prior to any one or more of the following events: a. Any ownership change including. i. The sale or conveyance of the project area in whole or in part, except in the case of an individual lot sale that is made subject to the recorded deed restrictions and protective covenants; ii. Dissolution of the partnership or corporate entity; subject to NCGS 57D-2-01(e) and NCGS 57D-6-07: b. Bankruptcy; c. Foreclosure, subject to the requirements of Session Law 2013-121: d. A name change of the current permittee; e. A name change of the project; f. A mailing address change of the permittee; 5. The permittee is responsible for compliance with al4 terms and conditions of this permit until the Division approves the transfer request, Neither the sale of the project, in whole or in part; nor the conveyance of common area to a third party constitutes an approved transfer of the permit. 6. The permittee grants Division Staff permission to enter the property during normal business hours to inspect all components of the permitted project. 7. The permit issued shall continue in force and effect until the permittee files a request with the Division for a permit modification, transfer; renewal, or rescission; however; these actions do not stay any permit conditions. 8. Approved plans; application documents: supplements, calculations, operation and maintenance agreement, and specifications for this project are incorporated by reference and are enforceable parts of the permit. A copy of this permit, application, supplements, operation and maintenance agreement, and approved plans and specifications shall be maintained on file by the permittee. 9. Unless specified elsewhere, permanent seeding requirements for the on -site sormwater system must follow the guidelines established in the North Carolina Erosion and Sediment Control Planning and Design Manual. 10. The issuance of this permit does not prohibit the Director from reopening and modifying the permit, revoking and reissuing the permit, or terminating the permit for cause as allowed by the laws, rules, and regulations contained in Title 15A NCAC 2H,1000 and NCGS 143-215.1 et.al. 11. A permit renewal request must be submitted at least 180 days prior to the expiration date of this permit. The renewal request must include the appropriate application, documentation and the processing fee as outlined in Title 15A NCAC 02H.1045(3). Permit modified and reissued this the 4th day of May 2018. NORTH CAROLINA ENVIRONMENTAL MANAGEMENT COMMISSION ;,William E. (Toby Vinson; Jr., PE, CPESC, CPM, Interim Director Division of Energy, Mineral and Land Resources By Authority of the Environmental Management Commission Permit Number SW8 080740 Page 5 of 5 State Stormwater Management Permit No. SW8 080740 Attachment A Certification Forms The following blank Designer Certification forms are included and specific for this project: • As -Built Permittee Certification • As -Built Designer's Certificabon General MDC • As -Built Designer's Certification for Low Density Projects • As -Built Designer's Certification for Wet Detention Pond Project • As -Built Designer's Certification for Sand Filter Project • Constructed Wetland Designers Certification A separate certification is required for each SCM. These blank certification forms may be copied and used, as needed, for -each SCM and/ot- as a partial cedification to address a section or phase of the project. Page 1 of 1 State Stormwater Management Permit No. SW8 080740 ,kS-13t;11.'1' I'I:R.-N71TTh:h: CL;RTWICA'TION I hereby state that 1 ant the current herinittee for the project named above, and 1 certify by Iny signature below, that the project meets the below listed final Sub.rnittal Requirements found in NCAC 021-1.1042(4) and the terms, conditions and provisions listed in the permit documents, plans and specifications oil file with or provided to the 0iyis1011. Check here if this is a partial ccrtificalion. Sc4tion/phasclSCN1 ?:`) Check here if this is pan of a Last Track As-lmih Package Submittal. Printed Narne C.olllttV Of' Signature a Notary Public in the Stttte of do hereby certify That personally appeared before nle this day of and ackno« Iedge the due CSCClition of this as -built certiCcation. (S]EA L) Wiiness my hand and official seal Nly cornniissi(m expires .20 Perinittee's Certification NCAC .1042(4) Completed / i Provided N/A A. DEED RESTRICTIONS / BUA RECORDS I . The deed restrictions arld pl-mective coven lliLs have been recorded and Y or N Contain the necessary language 10 CllsurC that the pro.1cci is n)aintalnEd consistent With the storinwater regulations and with the permit conditions. 2. A copy of the recorded deed restrictions and protective covenants has been Y or N provided to the Divislou. 3. Records which track the RtjA on each lot arc being kept. (Sce Note l) Y or N B. MAINTENANCE- ACCESS 1, The SCNIs are accessible for inspection; maintenance and repair. j Y or N 2. The access is a minimum of 10 feet ,vide. Y or N _ _ 3. The access extends to the nearest public right-of-way. � Y or \ C. EASEMENTS 1. The SCIMs and the componcnts of the runoff collection / conveyance system Y N are located in recorded drainage easements. or 2. A copy of the recorded plat(s) is provided. N [ Y or-F �� D. SINGLE FAMILY RESIDENTIAL LOTS - Plats for residential lots that Y or N �. have an SCM include the following- l . The specific location of the SCN'I on the lot. ' Y or N � 2. A typical detail for the SCN•I.- Y or N i 3. A note that the SCN9 is required to meet Stormwater regulations and that. the lot owner is subject to enforccinent action as set forth in NC(iS. 143 Article Y or N 21 if the SCM is removed, relocated or altered without prior approval. E.. OPERATION AND MAINTENANCE AGREEMENT Y or -N 1. The O&M Agreement is referenced on the final recorded plat. Y or N 2. The 0&.-M Agreement is recorded with the Register of Deeds and appears in 1 the chain of title. Y or N; } Ft OPERATION AND MAINTENANCE PLAN — maintenance records are y N being kept in a known set location for each SCM and are available for review. or G'. DESIGNER'S CERTIFICATION FORM.- has been provided to the Division. Y or N Note1- Acceptable records include ARC approvals, as -built surveys, and county tax records. Page 1 of 12 State Stormwater Management Permit No. SW8 080740 Provide an explanation for every requirement that was not met. and for every `NIA` below. Attach additional sheets as needed. Page 2 of 12 State Stormwater Management Permit No. SW8 080740 AS-1ihlLT DE1SIC;NFWS CERTIIACATION GENERAL NIDC I hereby state that 1 am a licensed professional and I certify by lily signature and seal below, that 1 have observed the construction of the project named above to the best of`rny abilities With all due. care and diligcncc, and that the project rnects the below listed General NIDC found in NCAC 021-1.1050 in accordance with the permit documents, plants and specifications on file with or provided to the Division; except as noted on the "AS- BU111T" drawings, such that the intent of the stormw-ater rules and statutes has been preserved. Check here ifthis is a partial certification. Sect ion/phase/SCNt -=? Check here ifthis is a part of a fast -Track As -Built Package Subrrlittal per .1044(3). Check here if the designer did not observe the construction, but is certifying the project. Check here if'pictures �)ftltc SCN,1 areproyidal. Printed Name NC Registration Number' SE'AI_.: Sigirattu-c Date Consultant's Nhiiling Address: Cite/State/%11' t'hone `umber Consultant's ('mail address: C0 Circle N if the as -built value differs from the flan. IfN is circled, provide an explanation on Page 2. 0N/i3 = not evaluated (provide explanation on page 2) ON/A = not applicable to this SCNI or proliect. Consultant's Certification NCAC .1003((3) & General MDC .1050 tOAs-built ONCE (IN/A IA. TREATMENT REQUIREMENTS l . The SCN,l achieves runoff treatment. Y or N 2. The SCNI achieves runoff'volumc snatch. Y or N . 3. Rtnloff front offsite areas and/or existing 131JA is bypassed. Y or N 4. Runoff from offsitc areas and/or existing BIJA is directed into Y or N the permitted SCM and is accounted for at the full build -out potential. 5. The project controls runoff through an offsite permitted SC\1 Y or N that meets the requirements of the N1 DC. 6. The net area of new RUA increase for an existing project has Y or N been .accounted for at v the appropriate design storm leel. 7. The SCN,t(s) rnects all the specific minimum design crileria. Y or N B. VEGETATED SETBACKS / BUA' 1. The -width of the vegetated setback has been measured From Y or N She normal pool of impontnded waters, the N1lJW line official waters. or the top of bank of each side of rivers or streams. 2. The vegetated setback is niaint<iined in grass or other Y or N vegc(at ton. 3. BUA that meets the requirements of NCGS 143-214.7 (1)2)(2) Y or N is located in the setback. 4. BUA that does not inect the requirements of NCGS 143-214.7 Y or N (1)2)(2) is located within the setback and is limited to: a. Publiely funded linear projects (road; green"vay sidewalk) h. Water -dependent structures c. Nlinimai footprint uses (utility poles, signs, security lighting and appurtenances) 5, Stormwater that is trot treated in an SCN4 is released at the Y or N edge of the setback and alloyed to flow through the setback as. dispersed floe'. Page 3 of 12 State Stormwater Management Permit No. SW8 080740 (DAs-built ON/E (INIA C. STORMWATER OUTLETS —the outlet handles the peak flow Y N from the 10 ear storm with no downslo e erosion. or 1). VARIATIONS 1_ A variation (altcrn,nive) from the stornnvater rule pro�isions I has been implemented. O1 2. The variation provides equal or better stormwater control and Y cclual or better prolcclion of surface waters. or I:. COMPLIANCE WITH OTHER REGULATORY Y N PROGRAMS has been met. or 1 IT. SIZING -tlte volume of the SCM takes the runoff from all surfaces into account and is sufficient to handle the required storm Y or N -de th. G. CON'TAMINATED SOILS — infiltrating SCM's are not located Y or N in or on areas with contaminated soils. II. SIDE SLOPES 1. Vegetated side slopes are no steeper than 31-1:1V, i Y or N 2. Side slopes include retaining walls, gabion walls, or other Y or N surfaces that are steeper than 31-1:1 V. 3, Vegetated side slopes are sleeper than 31-1:1 V (provide Y or N supporting dOCLIMC[ltS for soils and velretation). 1. EROSION PROTECTION 1. The inlets do nol cause erosion in the sc.%'l. Y or N 2. The ourlCt dOCS 1101 MISC erosion downslope of the Cllscharge Y or N point during the peak flow from the 10 Year storin. .I.. EXCESS FLOWS — An overflow / bypass has been provided. Y or N � K. DFWATERING — A method to drawdown standing water has Y or N been provided to facilitate maintenance and inspection. L. CLEANMIT AFTER CONSTRUCTION — the SCM has been Y or N cleaned out. and converted to its approved design state. M. MAINTENANCE ACCESS 1. The SCM is accessible f-or maintenance and repair. Y or N 2. The. access does not include lateral or incline slopes >3:1. Y or N N. DESIGNER QUALIFICATIONS (FAST -TRACK PERMIT) — The designer is licensed under Chapters 89A, 89C, 89E, or 891- of Y or N the General Statutes. Provide an explanation for every MDC that was not met, and for every item marked "NIA or "WE", below. Attach additional pages as needed: Page 4 of 12 State Stormwater Management Permit No. SW8 080740 AS -BUILT DICSk,'NEWS CERTIFICATION FOR LOW DEINSITY PROJECTS I hereby state that 1 am a licensed professional and I certify by my sienaturc and seal below that I have observed the construction of the low density project named above io the best of my abilities with all due care and diligence; and that the project meets all of the N1DC found in NCAC 0211.1003 and is consistent with life permit dOCnmenls, plans and speciflCations on file with or provided to the Division, except as noted on tho "AS- IWIL T" drawings, such that the intent of the siormwater rules and the general statutes has been preserved. Check here if this is if partial certification. Section or phase? Check here ifthis is part ofa Past -Track As -Built Package Submittal per .1044(3), Check here if the Designer did not observe the construction but is certifying the project. Check here if pictures of the project are provided. Printed Name Signature NC Registration Number S EA t.: Date Consultant's %lailing Address: City/State/LIP I'hone Number Consultant's Email Address O Circle N ifthe as -built value differs from the flan/Permit. If N is circled, provide an explanation on page 2. 0N/1 = not evaluated (provide explanation on page 2) OO N/A = not applicable to this proiect / plan. Consultant's Certification (.YIDC .1003) 1 CAs-built ON/1-1 Oa N/A A. Project Density and Built -Upon Area j 1. The project has areas of high density based on natural drainage y N area boundaries. variations in land use or construction phasing. or 2. The project's built -upon area does not exceed the maximum limit Y N specified in the permit. or B. Dispersed Flow — the project maximizes dispersed flow through y N vegetated areas and minimizes channelized flow. or C. Vegetated Conveyances I. Stonmwater that is not released as dispersed flow is transported by vegetated convevances. Y or N 2. The project has it minimal amount of non -vegetated conveyances Y N to reduce erosion. or 3. Other than minimal piping under driveways and roads, no piping y N has been added beyond what is shown on the approved plans. or 4. Side slopes are no steeper than 31-1:1 V. Y or N 5. The conveyance does not erode in response to the peak flow from Y N the 10 vear storm. or D. Curb outlet systems - the project uses curb & gutter with outlets to y N IL grassed swales or vegetated areas that meet the following criteria: or I_ The Swale or vegetated area can carry the peak flow from the 10 storm at a non -erosive velocity. Y or N 2. The longitudinal slope of the swale or vegetated areas does not Y N exceed 5%. or 3. The Swale has a trapezoidal cross-section and a minimum bottom y or N width of two feet. 4. The minimum length of the swalc or vegetated area is 100 feet. Y or N j 5. Side slopes arc no steeper than 31 I:1 V. Y or N 6. The project utilizes treatment swales designed per Section .1061 I Y n lieu of the curb outlet system requirements. r r Page 5 of 12 State Storrnwater Management Permit No. SW8 080740 T As -built I ON/E I. OQ N/A E. Veactated Setbacks 1. The width of the vegetated setback is 50". I Y or N ! k 2. The ,xidt h of the vegctated sciback has been measured from the I ' normal pool of impounded waters. the N11-1W line of tidal waters, Y or N or the top of bank of each side of rivers or streams. 3. The vegetated setback Is maintained Ill .grass or other vcgetatlon. j Y or N 4. BUA that meets the requirements of NCGS 143-214.7(b2)(2) is Y N ' I or located III the setback. 5. RUA that does NOT meet the requirements of NCGS 143- 214.7(b2)(2) is located within 111C setback ;Ind is lirnitcd to: a. Publicly funded linear projects (road, grcenway. or sidewalk) Y N b. 11 aler dependent structures or c. Minimal footprint uses such as poles, signs, utilit., appurtenance,_ and security lights. G, The amount of HUA within the setback is rnininlired and N i channeling of tltc runoff firorn the B11TA has been avoided. or 7. Stormwater is nal discharged (via swale or pipe) through a vegetated setback. Storniwatcr is released at the edge of the � � setback .Ind allowed to flow through the setback as dispersed or flow. F. Outlets — stormwater outlets do not Cause erosion downslope of the discharge point during the peak flow from the 10 year storm. Y or N 1 G. Variations — the project has variations from the MDC that were not I Y N previously approved. (Modification may be required) or H. Deed restrictions (if required) _ are recorded and ensure that the project and the`BUA will be maintained in perpetuity consistent with Y or N the permit, approved plans ands ecifications. 1. For Subdivisions Only (Residential or Commercial) f I . "file number of platted lots is consistent with the approved plans. Y or N 2. The project area is consisle111 with the approved plans. Y or N 3. The layout of the lots and streets is consistent with the approved I Y N plarl. or �- 4. The �vidffi / radius of'strects, paved accesscs,cut de -sacs and N sidewalks is consistent with the approved plan. or 5. No pipin& other than those minimum a1110LIMS ❑UdCd Linder a Y driveway or under a road, has been added. or N 6. The lot grading, road grading, vegetated conveyances. piping, Inverts, and elevations are consistent Willi the approved plans. or \' Provide an explanation for every MDC that was not met; or for every deviation from the permitted condition below: Page 6 of 12 State Stormwater Management Permit No SW8 080740 AS -BUILT I)h:Sl(:Nh:lt'S CERTIFICATION FOR WEA' DF.TFN'TION POND PI OJEICT I hereby state that 1 am a licensed professional and I certify by my signature and sets] belokN,. that I have Observed the construction of the project named above to the best of Iny abilities with all due care and diligence, and that the project Itlects all of the \1] )C found in NCAC 021-1.1053, in accordance with the permit docuincnts, plans and specifications on file with or provided to the Division, except as noted on the "'AS-BUIL`f" drawings, such that the invent of the storinwater roles and the general statutes has been preserved. Check here if this is a partial certification. Section/phase/SCM Check here if this is part of a fast -Track As -Built Package Submittal per .1044(3). Check here if the Designer did not observe the construction, but is certifying the project. Check here if pictures of the SC.N,I are provided. Printed Nanie NC Registration :N'uniber SFAL: Signature Date Consultants llaihrl2 lddress: City/state/ZI i, Phone N-tirilber Consultant's Gmail address i0 Circle N if the as -built value differs from the Planlperrnit. If N is circled, provide an explanation on page 2 ON113 = not evaluated (provide explanation on page 2) 03 N/F1 —riot applicable to this project or SCN,I. This CCr'liftCaliorl must be completed in conjunction with the Gencral N,lDC certification sender NCAC 021-1.1050 Consultant's Certification (MDC .1053) O)As-bullt 02 'N' F 03 N/A A. Forebay / Depths / Fountain I . The available Sediment storage is consistent with [lie approved Y N plan and is a iniltiluuill of'6 in. or 2. Water flow over the forebay berm into the main pond occurs at a non -erosive velocity. Y or N l 3. The provided horebav Volume is 15%-20% of the main pool Y volume. or _ 4. The Forebay entrance elevation is deeper than the exit elevations Y illto the pond. or 5. The Average Designs Depth of the main pond below the permanent pool elevation is consistent with the permitted value`? Y or \; 6. Fountain documentation is provided. Y or N 13. Side slopes / Banks / Vegetated Shelf 1. The width of the t,egetated Shelf is consistent withtile approved Y plans and is a Inillinlunl of'6 feet. orN� 2. The slope of the Vegetated Shelf is consistent with the approved Y N plans and is no steeper than 6: 1. or C. As -built Main Pool / Areas / Volumes / l'levations 1. I he permanent pool surface area provided is consistent with the Y N permitted value_ or 2. The "Temporary Pool Volume provided is consistent with the y N permitted value. or 3. The permanent pool elevation is consistent ,viih the permitted Va1UC. Y or N �I � 4. The temporary pool elevation is consistent with the permitted value. or Page 7 of 12 State Stormwater Management Permit Nc SW8 08074C OAs-built1 O2 N/E OO NIA D. Inlets / Outlet / Urawd_own 1. The design volume draws down in 2-5 days. Y or N 2. The size of the Orifice is consistent with the permitted valtic. Y or N 3. A trash rack is provided on the outlet structure. Y or- N 4. I lydrologic impacts to the receiving cflannel are minimized from Y or N the 1 yr 24 hr storm discharuc? 5. The infers and the outlet location are situatcd her the approved Y or N plan and avoid short-circuiting. E. Vegetation 1 . The vegetated shelf llas bCell planted wilth a millilmlin of dlVCrSC SpccIC5. Or �I 2. The Vegetated shelf plant density is consistent with the approved � plans and is no less than 50 plants per 20{1 sf or no less than 24 Y or N inches on center. Provide an explanation for every MDC that was not met; and for every item marked "NIA" or "WE" below. Attach additional pages as needed: Page 8 of 12 State Stormwater Management Permit No. SWS 080740 AS -BUILT DE.SIC:N>• WS CERTIFICATION FOR SAND FILTER 1'It(.)JECT hereby state that I am a licensed professional and 1 ccnify by my signature and seal below, that I have observed the construction ofthe project named above to the best of my abilities with all dire care and diligence, and that the project meets all ofthe N•IDC found in NCAC 02H.1056, in accordance with the permit documents, plans and specifications on file with or provided to the Division, except as noted on the "AS -BUILT" drawings. such that the intent ofthe siormwaler rules and the general Statutes has been preserved. Check here if this is a partial c:crtification. Section/phtaselSCA-1 "} Check here if this is part of a Fast -'['rack As -Built Package Submittal per .1044(3). Check Isere if'tlte Designer did not observe the construction, but is certifying the projeet. Check here if pictures ofthe SCN•1 arc provided. Printed Name NC Registration Number N- L: Sigrtaturc DwQ Consultant's Mailing Address: City/State/% I }' Phone Number Consultant's 1.tnail address (D Circle N if the as -built value differs from the Plan/permit. If-.N is circled; provide in explanation on page 2 ONIEL =not OWILMIcd (provi(Ie explanation on page 2) ON/n = not applicable to this project or SC:NI. 'this Certification must be completed in conjunction with the General N-iDC certification under NCAC 021+10O Consultant's Certification (MDC .1056) CDAs-built ®N/L ©NIA A. Two -chamber s Lstem I 1. Does the Sand Filter include a Sedinlent chamber and a Sand I Y N I I I chamber or 2. The storage volume in each chamber is equivalent. f Y or N f i 3. The incoming stormwater is evenly distributed across the surface of i Y N ' the sand. j oi, B. Volume / 1H:levations l . The volume of water stored in the sediment chamber anti oil top of t.11e sand in the sand chamber is at least 0.75 dines the treatment Y or N volume. 2. The cicvaiion ofthe bypass device is set at or above the ponding Y N depth associated with the storage volume. or 3. The ponding depth above the sand surface is sip: Beet or less. � Y or N C. Sand Media / Drawdown / SFIWT 1. Does the sand media inect AS'1'N,I C33 or cquivalem? Y or N I 2. The depth of the sand media is consistent with the approved plates � Y N I I and slew and is a minininin of I K". or 3. The depth of the sand media over the undcrdrain is consistent with the approved plans and specs and is a inininiun of 12 inches. N, or _ 4. The sand media provides a minimum drawdown of two inches per Y or ' I hour at the sand surface. 5. Open -bottom design — the minirmun separation to the Sl IWT at the lowest point ofthe stand filter is consistent with the approved plans Y or N find specs and is a inInianurn of 2 feet. 6. Closed -bottom design — 1 hC itlllllmllr'It separation to the Sl IW"1 at the lowest point ofthe sand filter is consistent with the approved Y or N plans and is a minimum of 1 foot, 7. At ]cast one capped clean -out pipe has been provided at the low Y N1 I_. point of each underdrain. or Page 9 of 12 State Stormwater Management Permit No. SW8 080740 Provide an explanation for every MDC that was not met, or for every deviation from the permitted condition below: Page 10 of 12 State Stormwater Management Permit No SW8 080740 CONSTRUCTER) 1VETLAND DY.SICNVA'S CIAZ'I-IFICATION P-828 Field Medical Services School Page 1 of 2 Stormwater Permit No. SW8 080740 Onslow Countv Designer's Certification I, as a duly registered in the State of North Carolina, having been authorized to observe (periodically/weekly/full time) the construction of the project, (Project) for (Project Owner) hereby state that, to the best of my abilities, due care and diligence was used in the observation of the project construction such that the construction was observed to be built within substantial compliance and intent of the approved plans and specifications. The checklist of items on page 2 of this form are a part of this Certification. Noted deviations from approved plans and specifications: Signature Registration Number Date SEAL Page 11 of 12 State Stormwater Management Permit No. SW8 080740 Certification Requirements: Page 2 of 2 1, The drainage area to the system contains approximately the permitted acreage. 2. The drainage area to the system contains no more than the permitted amount of built -upon area. 3. All the built -upon area associated with the project is graded such that the runoff drains to the system. 4. All roof drains are located such that the runoff is directed into the system, 5. The wetland zone elevations are per the approved plan. 6. The wetland is located per the approved plans. 7. A trash rack is provided on the outlet structure. 8. All slopes are grassed with permanent vegetation. 9. Vegetated slopes are no steeper than 3:1. 10. The inlets are located per the approved plans and do not cause short-circuiting of the system. 11. The permitted amounts of wetland zone surface area and volume have been provided. 12. Required drawdown devices are correctly sized and located per the approved plans. 13. All required design depths are provided 14. All required parts of the system are provided. 15. The required number of wetlands plantings have been provided. cc: NCDENR-DEMLR Regional Office Page 12 of 12 Central Files: APS _ SWP 5/4/2018 Permit plumber SW8080740 Permit Tracking Slip Program Category State SW Permit Type State Stormwater Primary Reviewer chrisline.hal€ Coastal SWRule Coastal Stormwater - 2017 Permitted Flow Facility Status Project Type Active Major modification Version Permit Classification 1.30 Individual Permit Contact Affiliation Facility Name MajorlMinor Region Field Medical Services School and Bachelor Enlisted Quarters at Camp Johnson Minor Witminglon Location Address County Inl Of Co St F Co St D And Co St D Co St E Onslow Camp Lejeune Owner NC 23547 Owner Name Commanding Officer Marine Corps Base Camp Lejeune DateslEvents Facility Contact Affiliation Owner Type Government - Federal Owner Affiliation Neal Paul 1005 Michael Rd Camp Lejeune NC 1 28547252 Scheduled Orig Issue App Received Draft Initiated Issuance Public Notice issue I Effective I Expiration 8/22/2008 3/29/2018 514/2018 514/2018 911012020 Regulated Activities Rertuested !Received Events Slate Stormwater - Exempted Additional information requesled 416118 Stale Stormwater - HD - Detention Pond Additional information received 4124118 State Stormwater - HD - Sand filters State Stormwater - HD - Wetlands State Stormwater - Low Density State Stormwater - Redevelopment Outfall Waterbody Name Streamindex Number Current Class Subbasin c State of North Carolina Department of Environmental Quality! Wilmington Regional Office Roy Cooper, Governor Michael Reagan, Secretary FAX COVER SHEET Date: 5 — v� FAX #: \r) -- H-r-:::)( - ---)R�� REMARKS: No. Of Pages: From: fie- k--Se a NCDENR FAX#: 91 0-350-2004 127 Cardinal Drive Extension, Wilmington, N.C. 23405-3845 Telephone (9141) 796-7215 Fax (910) 350-2004 An Equal Opportunity Affirmativc Action Employer MEMORY TRANSMISSION REPORT FILE NO. DATE TO DOCUMENT PAGES START TIME ENO TIME PAGES SENT STATUS 730 ' 05,07 09:29 919104512927 8 05.07 09:29 05.07 09:31 8 OK TIME :05-07-2018 09:31 FAX NO.1 :9103502004 NAME :Mainfax State of North Carolina Department of Environmental Quality Wilmington Regional Office Roy Cooper, Governor Michael Reagan, Secretary FAX COVER SHEET Date:, — No. Of Page: To: L\��1`�c�, ��-`�C..�Lr� From: ��C_ NCDENR FAX #: FAX#: 91 a-3So-2004 REMARKS: �`]`-�ry t e�",� 127 Cardinal Drive Extension, Wilmington, N.C. 28405-3845 Telephone (910) 796-7215 Fax (910) 350-2004 An Equal Opportunity Affirmative Action Employer MEMORY TRANSMISSION REPORT FILE NO. DATE TO DOCUMENT PAGES START TIME END TIME PAGES SENT STATUS 729 05.07 09:26 a 917573410322 8 05.07 09:26 05.07 09:27 0 0050 TIME :05-07-2018 09:27 FAX NO.1 :9103502004 NAME :Mainfax MEMORY TRANSMISSION REPORT TIME :05-07-2018 09:34 FAX NO.1 :9103502004 NAME :Mainfax FILE N0, 731 DATE 05.07 09:33 TO :n 917573410322 DOCUMENT PAGES 8 START TIME 05.07 09:33 END TIME 05.07 09:34 PAGES SENT 0 STATUS 0050 l Hall, Christine From: Cutchin, Meredith A CIV NAVFAC MIDLANT, IPTMC <meredith.cutchin@navy.mil> Sent: Friday, May 04, 2018 10:52 AM To: Hail, Christine Subject: RE: [External] P1320: Updated SW and E&S Application Packages Attachments: Sand Filter.pdf; Wet Pond C.pdf Hello Christine, Sorry for the typos, let me know if you need anything else! Thanks, Meredith Cutchin, PE 757-341-0322 -----Original Message ----- From: Hall, Christine [mailto:Christine.Hall@ncdenr.gov] Sent: Friday, May 04, 201.8 10:07 AM To: Cutchin, Meredith A CIV NAVFAC MIDLANT, IPTMC Subject: [Nan-DoD Source] RE: [External] P1320: Updated SW and E&S Application Packages Meredith, I had a chance to look at the items and found just two small typos on the supplements that I was hoping you could fix and e-mail to me. The first is on the sand filter tab: the volume of runoff from the DA during the design storm under the sand filter MDC section (right hand column, #3) has an extra zero. The second is the average depth for Pond C list 55 ft instead of 3.2 ft as previously reported. Otherwise, it looks good. Christine Hall Environmental Engineer Division of Energy, Mineral and Land Resources - State Stormwater Program Department of Environmental Quality 910 796 7215 office 910 796 7335 direct christine.hall@ncdenr,gov 127 Cardinal Drive Ext. Wilmington, NC 28405 Email correspondence to and from this address is subject to the North Carolina Public Records Law and may be disclosed to third parties. -----Original Message ----- From: Cutchin, Meredith A CIV NAVFAC MIDLANT, IPTMC [mailto:meredith.cutchin@navy. mil] Sent: Monday, April 23, 2018 12:39 PM To: Hall, Rhonda B <rhonda.hall@ncdenr.gov>; Hall, Christine <Christine.Hall@ncdenr.gov> Cc: Towler, David W CIV MARFORCOM, I&E/PWD DESIGN <david.towler@usMc.Mil>; Weaver, Cameron <cameron.weaver@ ncdenr.gov> Subject: [External] P1320: Updated SW and E&S Application Packages CAUTION: External email. Do not click links or open attachments unless verified. Send all suspicious email as an attachment to Report Spam _<mai Ito :report.spam@nc.gov> 9 is EEC(" APR 2 4 2018 Response: Request for Additional Information Stormwater Project No. SW8 080740 Field Medical Services School and Bachelor Enlisted Quarters at Camp .Johnson 1. 15A NCAC 02H.1000: There appears to be a sidewalk proposed on the north side of Company D Street between Harlem Drive and Company F Street that is outside the drainage areas / projects areas shown on the Post Exhibit. This sidewalk does not appear to be shown on the Pre Exhibit or the demolition plan. Please confirm that all proposed improvements have been included and considered for this project. The above -mentioned sidewalk was added under the low density portion of this project. A second small area of sidewalk (NW Corner of Wetlands BMP area) was added to the existing wetlands BMP area. Some of this flow may bypass the Wetlands BMP, but some of it may also end up flowing to the BMP. For this reason, this impervious area was subtracted from the future impervious for that BMP. 2. 15A NCAC 02H.'1042(2)(a)(iv): The drainage area and built -upon area reported for the proposed sand filter on the table attached to the application to replace Section IV.10 differs from the information presented in the supplement and calculations. Please confirm the information is presented consistently and accurately. The drainage area and built -upon area for the proposed sand filter was corrected. All sheets were checked to ensure consistency and accuracy. 3. 15A NCAC 02H.1056(1): The soils report and the provided MDC justification indicates that the seasonal high water table (SHWT) will be 3 feet below the existing grade along the entire slope. The existing elevations in the vicinity of the sand filter range from approximately 11 ft up to 15 ft, which would put the SHWT elevation ranging from approximately 8 ft up to 12 ft. The bottom of the sediment chamber is currently set at 13.1 ft while the bottom of the sand filter chamber is currently set at 11 ft. Based on these elevations, it appears that the section of the sediment chamber that is proposed on the existing elevation above 14.1 ft will have less than the required 2 ft separation (13.1 ft bottom elevation — 2 ft SHWT separation + 3 ft depth to SHWT = 14.1 ft existing ground elevation). Similarly, the section of the sand filter chamber that is proposed above the 12 ft existing elevation will have less than the required 2 ft separation (11 ft bottom elevation — 2 ft SHWT separation + 3 ft depth to SHWT = 12 ft existing ground elevation). This appears to result in a small portion of the sediment chamber and approximately half of the sand filter chamber providing less than the 2 ft separation required for an open sand filter. Please either provide a profile of the ground elevation, SHWT, and sand filter to support that the 2 foot separation will be provided across the entire SCM or re-evaluate the orientation and/or design of the sand filter. The sand filter has been entirely redesigned to take advantage of the natural contours. This removes any possible issues with separation from the SHWT. All sheets and exhibits have been redesigned to reflect this. 4. 15A NCAC 02H.1042(2)(f) and .1056(2): Please provide additional calculations or stage storag�e,ta�bles� to document the sediment chamber and sand filter chamber sizing reported in the supplement. 'r�► ® APR 18 � 2 � 24 Additionally, the provided calculations report the bottom elevation of the sediment chamber (forebay) ® as 13.05 ft or 13 ft while the plans indicate the bottom elevation is set at 13.1 ft. Please ensure the information is presented consistently between the application documents. Recommendation: Provide two separate stage storage tables, one for the sediment chamber (forebay) and one for the sand filter chamber. The sand filter forebay is now at the same elevation as the sand chamber. This allows them to both be exactly 50% of the total volume. Please see the revised calculations. 5. 15A NCAC 02H.1053(1): Pond A, B, and C: For each of these ponds, the third #1 item under the wet pond MDC section of the supplement reports the total permanent pool volume, including both the main pool and the forebay. Please only report the main pool volume in this third #1 item under the wet pond MDC section of the supplement. The forms were updated to reflect only the main pool volume in the third #1 item under the wet pond MDC section of the supplement. 6. 15A NCAC 02H.1053(5)(a): Pond A: The calculations base the percent of forebay volume provided against the total permanent pool volume provided (main pool and forebay). Please compare the forebay volume against the main pool volume only. In comparing the provided forebay volume to the provided main pool volume, it appears that the current forebay design will exceed 20% of the main pool volume (2,769 / 13,233 * 100 = 20.9%). Please either reconsider the design or provide technical justification in accordance with 15A NCAC 02H.1003(6) to demonstrate that the proposed design will provide equal or better stormwater control and equal or better protection of waters of the State than the requirements ® of the MDC and that it will function in perpetuity. Please include an abbreviated version of this justification in the additional information section of the supplement. For Wet Pond A, the forebay volume is 20.9% of the main pool volume. Wet Pond MDC 5: Forebay, states that the forebay volume shall be 15 to 20 percent of the volume in the main pool. The forebay volume being 20.9% versus 20% is not substantial and will not create any difference in the performance of Wet Pond A. Both the forebay and main pond areas of Wet Pond A are already significantly oversized for the drainage area; the additional 0.9% volume in the forebay is not taking any true needed volume away from the main pond or creating a short circuiting issue. If anything, Wet Pond A having an additional 0.9% volume in the forebay will allow additional space for sediment and allow for superior treatment. 8. 15A NCAC 02H.1053(5)(b): The inlet elevation to Pond A is listed as being set at 11 ft on sheet CG-403 and 12 ft on CG-406, which is also the permanent pool elevation. Please confirm which is correct and that the provided forebay entrances are deeper than the forebay exit. The correct inlet elevation is now set at 10 ft for Pond A. Sheet CG-403 and CG-406 have been amended for consistency and accuracy. Forebay entrances were verified to be deeper than the forebay exits; this is reflected in the supplement forms. 9. 15A NCAC 021-1.1042(2)(g)(ii): Please provide dimensioned project or project phase boundary with bearings and distances. A = ��>�V� APR 2 4 20ia BY: r� Bearings and distances have been added to the post developed exhibit. 10. 15A NCAC 02H.1042(3)(b): Under the Compliance with the Applicable Stormwater Program section of the supplement, please identify the stormwater program that applies to this project. Based on the permitting history and proposed changes, this review assumed the built -upon area is subject to the 1995 rules, Session Law 2006-246, Session Law 2008-211, and the 2017 rules while the SCM is subject to the 2017 rules. It was assumed that the built -upon area is subject to the 1995 rules and the 2017 rules while the SCM is subject to the 2017 rules. . C1EIV� { �� APR 2 4 2018 Hall, Christine From: Hall, Christine Sent: Thursday, April 12, 2018 12:29 PM To: 'Cutchin, Meredith A CIV NAVFAC MIDLANT, IPTMC'; Hall, Rhonda B Cc: Towler, David W CIV MARFORCOM, I&E/PWD DESIGN; Durant, Maryann V CIV NAVFAC MIDLANT, IPTMC; Scott, Georgette; Weaver, Cameron Subject: RE: [External] P1320 SW & ES Permits- mod to SW8 080740 Meredith, If you'd like an extension to return the requested information, that's fine. I will be on vacation starting 4/19 and will return to the office on 5/1. Since I won't be able to review it until May ist, the requested information can be submitted any time before May 1st. Thanks for the e-mail Christine Hall Environmental Engineer Division of Energy, Mineral and Land Resources — State Stormwater Program Department of Environmental Quality 910 796 7215 office 910 796 7335 direct christine.hall@ncdenr.gov 127 Cardinal Drive Ext. Wilmington, NC 28405 Email correspondence to and from this address is subject to the North Carolina Public Records Law and may be disclosed to third parties. -----Original Message ----- From: Cutchin, Meredith A CIV NAVFAC MIDLANT, IPTMC [ma ilto:meredith.cutchin@navy. mil] Sent: Wednesday, April 11, 2018 3:33 PM To: Hall, Rhonda B <rhonda.hall@ncdenr.gov>; Hail, Christine <Christine.Hall@ncdenr.gov> Cc: Towler, David W CIV MARFORCOM, I&E/PWD DESIGN <david.towler@usmc.mil>; Durant, Maryann V CIV NAVFAC MIDLANT, IPTMC <maryann.durant@navy.mil> Subject: [External] P1320 SW & ES Permits- mod to SW8 080740 Hello Rhonda & Christine, Due to the redesign of the BMP1: Sand Filter on this project, there will be changes to Skimmer Basin 1. This will require changes to several plans, exhibits, calculations and supporting documentation for both the SW and E&S packages. Christine, I know that you will be on vacation starting the end of next week, but if it is feasible, I would like to request a week extension to April 23rd. This way I can Fed Ex all SW and E&S revised materials to you both at the same time and review the materials a little more closely before I send them back to you. I understand that you will not be able to review the final portions of this application until your return, but we are not in a time crunch to get the permits at this point. If this is not acceptable, I can get the application materials back to you by April 16th and send Rhonda's updates a few days later. Let me know what you think. Thank you! Meredith Cutchin, PE Civil Engineer Marine Corps IPT NAVFAC MVant 757-341-0322 ROY COOPER Governor MICHAEL S. REGAN Secr-elar-y Energy. Mineral& WILLIAM E. (TOSY) VINSON, JR. Interim Director .Land Resources ENVIRONMENTAL OLIALITY April F, 2018 \\ ( [ ,, N�ICH Camp Ujcunc�0. �VV�G�1 \ G� �C""�� Attn: Commanding OfflCeT c/o Neal Paul, Deputy PubliC Works Officer 1005 Michael Road Camp l,cjeunc, NC 28542 Subject: Request for Additional Information Stormirvater Project No. S\N'8 080740 Field \ledical Services School and 13achelor Enlisted (quarters it Camp .lohnson ()nslow County Dear Mr. Paul: The Wilmington Regional Office received and accepted a modified Express State Stormwater tMariagement Permit Application for the subject project on March 29, 2018. A preliminary in-depth review of that information has determined that the application is not complete and that additional information is needed. To continue the review, please provide the following additional information: VI 15A :NCAC 021-1.1000: There appears to be a sidewalk proposed on the north side of Company D Street between Harlem [give and Company h Street. that is outside the drainage areas / projects areas shown on the ]'cast Exhibit. This sidewalk does not appear to be shown on the Pre Lxhibit or the demolition plan. Please confirm that all proposed improvements have been included and considered for this project. 15A NCAC 021-1,1042(2)(a)(iv): ']'he drainage area and built -upon area reported for the proposed sand filter on the table attached to the application to replace Section IV.10 differs from the information presented in the supplement and calculations. Please confirm the information is presented consistently and accurately. ,, 15A NCAC 021-1.1056(1): The soils report.and the provided MDC justification indicates that the seasonal high water table (SI-11'4 T) will be 3 feet below the existing grade along the entire slope. The existing elevations in the vicinity of the sand filter range from approximately I 1 ft up to 15 ft. which would put the SI WT elevation ranging from approximately 8 ft up to 12 It. The bottom of the sediment chamber is currently set at 13.1 ft while the bottom of the sand filter chamber is currently set at I 1 ft. (lased on these elevations, it appears that. the section of the sediment chamber that is proposed on the existing elevation above 14.1 ft will have less than the required 2 ft separation (13.1 ft bottom elevation — 2 ft SHWT separation'- 3 ft depth to SI-IWT = 14.1 ft existing ground elevation). Similarly, the section of the sand filter chamber that is proposed above the 12 ft existing elevation will have less than the required 2 ft separation (1 1 ft.bottorn elevation — 2 ft Sl- WT separation -t-3 ft depth to SI-IWT = 12. ft existing ground elevation). This appears to result in a small portion ofthe sechinent chamber and approximately half of the sand Filter chamber providing less than the 2 ft separation required for an open sand filter. Please either provide a profile of the ground elevation.. SI-IWT, and sand filter to support that the 2 foot. separation will be provided across the entire SCNI or re-evaluate the orientation and/or design of the sand filter. State of North Carolina I Environmental Quality I Energy. Mineral and Land Rcsourecs Milmington Regional Office 1127 Cardinal Drive Extension I Wilmington, NC 28405 9t0 796 7215 Stale Stormwater Permit No. SW8 080740 Page 2 or') 4. 15A NCAC 021-1.1042(2)(0 and .1056(2)i ]'lease provide additional calculations or stage storage tables to document the sediment chamber and sand Filter chamber sizing reported in the supplement. additionally, the provided calculations report the bottom clevation of the sediment chamber (forebay) as 13.05 ft or 13 Fi while the plans indicate the bottom elevation is set at 13.1 ft. Please ensure the information is presentee] consistently between the application documents. hecoannaendation: Provide rat;o separate stage storage tables, one for the sediment chamber (forebu}) clad one jot- the sand filter chamber. V15. 15A NCAC 021-1. 1053(1): Pond A, 13, and C_ For each of these ponds. the third 4111 item under the wet. pond \-iDC section of the suhpiernent reports the total permanent pool volume, including both the plain pool and the forebay. Please only report the main pool volume in this third "1 item under the ),vet pond I DC section of the supplement. Ur 15A NCAC 021-1.1053(5)(a): Pond A: The calculations bike the percent of forebay volume provided against the total permanent pool volume provided (main pool and forebay). Please compare the forchay volume against the main pool volume only. In comparing the provided forebay volume to the provided main pool volume; it appears that the current forebay design will exceed 20% ofthe main pool volume (2,769 / 13,233 * 100 = 209%). ]'lease either reconsider the design or provide technical justification in accordance with 15A NCAC 021-1.1003(6) to demonstrate that the proposed design will provide equal or better stormwater control and equal or better protection of waters of the State than the requirements of the IMDC and that it will function in perpetuity. Please include an abbreviated version of this justification in the additional information section of the supplement. 1/ 7. 15A NCAC 021-1.1053(5) and Page 9 of Chapter A-5 of the NC Design Manual: fonds A. 13, and C: The berm separating the forebay and the plain pool of these ponds are set 0.5 11 higher than the permanent pool elevation. Please either: a. Set the weir at the permanent. pool clevation or no greater than I foot. below it; or b. Reconsider the forebav permanent pool volume and the provided storage volume based on the forebay inaintaining a water elevation 0.5 ft higher than the permanent pool. VV 15A NCAC 021-1.1053(5)(b): The inlet elevation to Pond A is listed as being set at l I it on sheet CG-403 and 12 fton CG-406, which is also the permanent pool elevation. Please confirm which is correct and that the provided fbrebay entrances are deeper than the forebay exit. ✓J. 15A NCAC 021-1.1042(2)(g)(ii): Please provide dimensioned project or project phase boundary with bearings and distances. /LJ 10. 15A NCAC 021-1.1042(3)(b): Under the `'Compliance with the applicable Stormwater Program" section of the supplement, please identify the stormwater program that applies to this project. Based on the permitting history and proposed changes, this review assumed the built -upon area is subject to the 1995 rules, Session Law 2006-246, Session Law 2008-2 11, and the 2017 rules while the SCM is subject .to the 2017 rules. 1 1. Due to the potentially minor nature ofthese comments, the express additional inForniat.ion review fee has been waived. Please remember to confirm that anv revised information is presented consistently throughout the application documents including calculations, supplements, narrative; and plans. Please also remember to provide two hard copies of any updated documents per 15A NCAC 021-1.1042(2), The requested information should be received in this Office prior to April 16, 2018, or the application will be returned as incomplete. if the project is returned and you wish to re -submit to the Express Program, you will need to reschedule the project through the l"Apress Coordinator for the next available review date and will need to resubmit all required items at that time, including the application fec. If additional time is needed to submit the requested information, please email your extension request, prior to the original due date, to the Division at the email address provided below. The extension request must include a justification and a dale of when the requested information will be submitted to the Division, which shall be no later than 5 business days past the original due date Pleose remember that extension requests delay the: issuance ojthe final hermit. Statc of Forth Carolina 1 LnvironmentalQuality I Energy-NEncral and Land Resources WiimingtwReglonaI Office 1127 Cardinal Drive Extension I Wilmingtun, NC 25405 910 790 215 State Storrwwaier Pcrrnit :No, SW8 ON0740 Page 3 of - The construction of any impervious .surfaces, other than a construction entrance under an approved Sedimentation I'�rosion Control Plan; is a violation of \CGS 143-215.1 and is subject to enforcement action pursuant to NCGS 143-215.6A. Please label all packages and cover letters as "1.ixpress" and reference the State assigned project number on all correspondence. If you have any questions concerning this matter, please feel free to call the at (910) 796-7215 or email me at christine.hall@ncdenr.gov. Sincerely, tea& Ok*, Christine Hall Fnvi ronmental 1ingirtccr CiDSlcanh: I11Stonnwatcr\Pcrm1ts & 1'rojccts12008\080740 1-11)1201 8 04 addinfo 080740 cc:-Mercclith Cutchin. PE NAV AC Midlant, NIC HIT Wilmington Regional Office Storm Water file State of North Carolina I Envirornnrntal Quality 4 Energy. Mineral and Land Resources Wihningrun Rcgkmal Offkc 1127 Cardinal briar f xiens#un I Wilrninyttxi, NC 28405 910 79fi 726 Hall, Christine From: Hall, Christine Sent: Friday, April 06, 2018 9:24 AM To: `Cutchin, Meredith A CIV NAVFAC MIDLANT, IPTMC; David Towler Cc: Weaver, Cameron Subject: request for additional information - mod to SW8 080740 Attachments: 2018 04 addinfo 080740.pdf Meredith, Attached is a pdf of the request for additional information for the subject project. Since there are so many different components to this project, I'm going to go ahead and start drafting the permit. I tried to make my review as complete as I could but if I find something while I'm drafting the permit, I may send a follow up e-mail. Let me know if you have any questions or concerns! Christine Hall Environmental Engineer Division of Energy, Mineral and Land Resources — State Stormwater Program Department of Environmental Quality 910 796 7215 office 910 796 7335 direct christine.hall@ncdenr.gov 127 Cardinal Drive Ext Wilmington, NC 28405 Nothing Compares,,,... Email correspondence to and from this address is subject to the North Carolina Public Records Law and may be disclosed to third parties. • • NCDEQ Stormwater Permit Package Submittal FOR P-1320 BACHELOR ENLISTED QUARTERS MCB CAMP LEJEUNE OWNER: COMMANDING OFFICER MCB CAMP LEJEUNE, NC IJ149VFMC March 2018 NAVAL FACILITIES ENGINEERING COMMAND MID -ATLANTIC Marine Corps IPT Building Z-140, Room 104 9324 Virginia Avenue Norfolk, VA 23511-3095i rz+}-� r—, E — BY: C7 • • P-1320 BACHELOR ENLISTED QUARTERS STORMWATER APPLICATION '[ABLE OF CONTENTS Section A: Application Documents A-ppHcation C�k S-a-ndill-er-S-upp4ement-&-M-aintenn-ce-Agree-me,nz �y �137TG a � �� Redevelopment Narrative Minimum Design Criteria Section B: Project Basis of Design Section C: Maps Section D: Storm Drainage Calculations Water Quality Volume Storm Calculations Pond Routing Section E: North Carolina P. E. Exemption Letter Section F: Project Construction Plans Section G: Project Construction Specifications Section H: Exhibits Pre -developed Drainage Post -developed Drainage Section I: Soil Report and Geotechnical Report P1320 Redevelopment Narrative The P1320 BEQ project will modify the existing SW8 080740 Permit in order to achieve stormwater ® permitting. The existing SW8 080740 Permit has one drainage area on which a wetlands BMP provides twice the required treatment. The BMP has been oversized for a future BUA of 62,260 SF. Even with future development, it is very unlikely that this drainage area will ever have that much additional impervious area. The base and master plans show no plans to add additional impervious area here. This area was overdesigned and treats runoff at a superior standard. The P1320 project will add 4 new BMPs; 1 sand filter and 3 wet ponds. The sand filter will be designed to meet the NCDEQ requirements of the 1.5" storm. The wet ponds will meet the NCDEQ requirements of the 1.5" storm and be oversized to treat the 95% storm (2.34"). The wet ponds will be used in combination with level -spreader filter strips to help promote infiltration. Overall, the runoff that will flow to these 4 new BMPs will be treated at. a very high standard. It is proposed that runoff from the Vehicle Maintenance Facility Warehouse (VMFW) portion of the P1320 project not be treated since so much of the surrounding area has undergone redevelopment. The VMFW area would add 9 302 5 of new impervious area. The following will be removing or has already removed significant impervious areas: 1. M309, M316, M318 and M321 to be demolished as part of the_P_1320 project. This will remove 48,662 SF of buildings, sidewalk, a basketball court and gravel. The BEQ that is being built as part of this project replaces these facilities. 2. 8,095 5F of gravel area along Harlem drive to be removed as part of P1320, 3. The steam plant on Harlem drive is to be demolished in the 4tar future. Demolition plans show that this will remove over 15,000 SF of buildings and other impervious areas. 4. M621 and M622 were demolished near the north lot in 2015. This removed over 133,002 SF of impervious area. 5. M520, M521 and M522 were demolished on the P1320 BEQ site in 2011. This removed approximately 15,000 SF of impervious area. �. 6. M619 and M620 were demolished where the North Lot will be constructed around 2000 resulting in 4,000 00 SF of impervious area removal. 7. The master plan also shows that building M324, a 23,000 SF building adjacent to the VMFW is to be demolished and become a green space. • Several other buildings were demolished for the construction of Bradley Hall which was the original project under the SW8 080740 Permit. Other nearby buildings have also been demolished in recent years. An exhibit and dated images from google earth support this narrative. In addition, structures that are being demolished are typically 1 story and they are being replaced with 2 or 3 story structures. The VMFW area is able to meet the definition of redevelopment because it does not result in an increase of built upon area. The VMFW area has a smaller amount of impervious area then the 4 buildings that are being demolished. Therefore, this project results in a lesser amount of runoff being discharged to the same point. Additionally, this area of Camp Johnson is providing a level of stormwater control that is far greater than it has historically, In the past, Camp Johnson had mostly used sheet flow and stormwater piping to ® convey stormwater. As redevelopment occurs, new projects have added stormwater treatment features, swales and BMPs; thus, creating a greater level of stormwater control than existed in the past. P1320 DEMOLITION - 56,757 SF IF- f -,."' s� ' _ 1❑ M309, M136, M318 & M321 - 48,662 SF `.: �2 GRAVEL - 8.095 SF El -- I - El kl -- pRN� PAST DEMOLITION El - - -- — - -LEM DRIVE s ® M621 & M622 (2015) - 13,002 SF - --- — - - - -• � Asa M520, M521 & M522 (2011) - 15,000 SF v P-1320 © M619 & M620 (2000) - 4,000 SF vmFw FW LFLJL _ LOT f-E 997 S F _ 19 Fml FUTURE DEMOLITION - o —_ - COMPANY I - _ MPAN 7REET ,000 SF STEPLANT -' f unr_ - ❑ DEMOLI ION PLANS 5AVVAILABLE � Efl M324 23,000 SF PMT - -- F E .. - JOGgNC TRA1L _ J ❑ ` y y Q - _ 5 -- FILTER BEO MAIN -mac STRIP 2 -' POV LOT Illllil:;.., _.._ .---T•-I - Y o P-132 Q - - _ 70.9 FFLLLIiLLiLjlLJiLLL Q _� - D OFA-WET POND C r 1 1 A BMP 2. WET POND A FILTER BMP T 1 STRIP-1 WET POND 8 2 3 4 GRAPHIC SCALE Cr., 80' 160, - 5 NA/FAC to 2,wJ *ft O ed V 4O 40 Y. CROR RA r.a� Div S. FOROB R.E. @ � U V t.i � U J z z tan CC U LL F- Wa � Yz 0 L= o >� uj z : i Z w w W :2 a Z Q O O ul z u, L'i $ 4 m J r % (� Z �) a =r a t O _ n tL UAS ��.:, N01ED ;�.Q.. NSA EXHIBIT ..� aS,,— M Hn,— X. t a'rw Ar p.r 4 4 ,1 I lb i %N %{*" rp It, Google earth feet 1000 meters 0 1999 0 40(1 Google earth !r _T�+� f 1. � i •f4y ;T 1����, '`y.'•�'15 •. tij',•�y.?'�•: �� i •� � i`��1� i.}� �.r���ys.if'd '� gy'a �!� ��►'j y�:� 'IIr .� .` r. . gbh � * t .,�� ! •it e� � >`t � '. . �r - ,'i dh. b,/ ��. ..r FI �k� �., _s� %,�: �, /.� .: j7�, � !. ,`•;.ti. ��11 :� Sj�• t lit ik Y �,.wn. 'y ,•�r�'(~i3 F.` ,� 7� r1�b;���Tl�t .^.i-�� i�i,4 ��K..4 �� ���`�. fir, /•. 4!'`ji, �• 1 �3' fi R` s '�.� 4L�ie+y •i�r ! ` 3;�'! Z 4;�,Jetie;s91i_":i;rifR i. Go ,SIc earth tees 1000 500 me �`(?]ci 0 • 0 • Goo8le earth :7 • • C;ooSIC earth n U • • • l� u E AA Aw PA P AN F PI �A*w J—. C 141:' 7c�) Y T Mf]S IDS 124 1 M123 r�� 3 loa � * 123 rr f U2 123 J1 M212 Nf213 / � 4 / LEGEND --- AREA PLAN BOUNDARY N23 / EXIST1MG BUILDM 527 PROPOSED OUILL*NG exlsrrMG werLJwas M23 M11 f 23d LAMP JOHNSON .'r i - � f�l �J • 0 P1320: Bachelor Enlisted Quarters BMP 1: Sand Filter Meeting the MDCs Sand Filter MDC SAND FILTER MDC 1. SHWT SEPARATION. The minimum separation between the lowest point of the sand filter system and the SHWT shall be: (a) two feet for open -bottom designs; and Two feet of separation from the SHWT is given. See detail on C-605 and geotechnical report. The SHWT was found to be 3' below existing grades. The sand filter was lined up with the existing grades to maintain the minimum separation. SAND FILTER MDC 2. TWO CHAMBER SYSTEM. The sand filter shall include a sediment chamber and a sand chamber. Storage volume in each chamber shall be equivalent. Volumes are equal. See attached calculations. SAND FILTER MDC 3. SEDIMENT/SAND CHAMBER SIZING. The volume of water that can be stored in the sediment chamber and the sand chamber above the sand surface combined shall be 0.75 times the treatment volume. The elevation of bypass devices shall be set above the ponding depth associated with this volume. The bypass device may be designed to attenuate peak flows. BMP has been sized for the 1.5" storm. The WQV was then multiplied by 0.75. See attached calculations. SAND FILTER MDC 4. MAXIMUM PONDING DEPTH. The maximum ponding depth from the top of the sand to the bypass device shall be six feet. The ponding depth is approximately 1.2' to the WQV. The depth from the sand surface to crown of the pond is 3.3'. See attached calculations. SAND FILTER MDC 5. FLOW DISTRIBUTION. Incoming stormwater shall be evenly distributed over the surface of the sand chamber. A rip rap berm is provided for even distribution. See plans. SAND FILTER MDC 6. SAND MEDIA SPECIFICATION. Sand media shall meet ASTM C33 or the equivalent. Media is specified on Sheet C-605. C7 SAND FILTER MDC 7. MEDIA DEPTH. The filter bed shall have a minimum depth of 18 inches. The minimum depth of sand above the underdrain pipe shall be 12 inches. The Sand Filter bed is 12" deep and the filter bed is 20" deep as specified on C-605. SAND FILTER MDC 8. MAINTENANCE OF MEDIA. The sand filter shall be maintained in a manner that results in a drawdown of at least two inches per hour at the sand surface. The Sand Filter is to be maintained per the maintenance agreement. SAND FILTER MDC 9. CLEAN -OUT PIPES. At least one dean -out pipe shall be provided at the low point of each underdrain line. Clean out pipes shall be capped. Cleanouts are provided at the end of each underdrain as well as through the inlet structure. See plans. = No i P1320: Bachelor Enlisted Quarters BMP 2,3 & 4: Wet Pond A, B & C Meeting the MDCs WET POND MDC WET POND MDC 1. MAIN POOL SURFACE AREA AND VOLUME. The main pool of the wet pond shall be sized using either: (a) The Hydraulic Retention Time (HRT) Method; or (b) The SA/DA and Average Depth Method The wet ponds were sized using (b) The SA/DA and Average Depth Method. See the attached calculations. WET POND MDC 2. MAIN POOL DEPTH. The average depth of the main pool shall be three to eight feet below the permanent pool elevation. The applicant shall have the option of excluding the submerged portion of the vegetated shelf from the calculation of average depth. Average depth was calculated using equation 2. See the attached calculations. WET POND MDC 3. SEDIMENT STORAGE. The forebay and main pool shall have a minimum sediment storage depth of six inches. Wet Ponds are to be over -excavated 6" for sediment. See sheet C-606. WET POND MDC 4. LOCATION OF INLET AND OUTLET. The inlet and outlet shall be located in a manner that avoids short circuiting. Ponds are long and irregularly shaped with the outlet and inlet at opposite ends to avoid short circuiting. See sheet CG-406. WET POND MDC S. FOREBAY. A forebay that meets the following specifications shall be included: (a) Forebay volume shall be 15 to 20 percent of the volume in the main pool; (b) The forebay entrance shall be deeper than the forebay exit; (c) The water flowing over or through the structure that separates the forebay from the main pool shall flow at a non -erosive velocity; and (d) If sediment accumulates in the forebay in a manner that reduces its depth to less than 75% of its design depth, then the forebay shall be cleaned out and returned to its design state. (a) Forebay volumes for Wet Pond B and C have been designed to be 15 to 20 percent of the volume in the main pool. See the attached calculations. The forebay volume in Wet Pond A will be 20.9 For Wet Pond A, the forebay volume is 20.9% of the main pool volume. Wet Pond MDC 5: Forebay, states that the forebay volume shall be 15 to 20 percent of the volume in the main pool. The forebay APR 2 4 2018 �J e • volume being 20.9% versus 20% is not substantial and will not create any difference in the performance of Wet Pond A. Both the forebay and main pond areas of Wet Pond A are already significantly oversized for the drainage area; the additional 0.9% volume in the forebay is not taking any true needed volume away from the main pond or creating a short circuiting issue. If anything, Wet Pond A having an additional 0.9% volume in the forebay will allow additional space for sediment and allow for superior treatment. (b) Water will enter each forebay primarily through a pipe that is closer to the bottom of the pond the water will then have to flow over a shallow area that has been reinforced with rip -rap to exit the pond. See sheet CG-406. (c) The forebay and main pond are separated by a wide rip -rap to promote a low velocity flow. (d) Sediment will be removed per the Wet Pond maintenance agreements. WET POND MDC 6. VEGETATED SHELF. The main pool shall be equipped with a vegetative shelf around its perimeter. The minimum width of the vegetated shelf shall be six feet and the slope shall be no steeper than 6:1, Main Pools of each Wet Pond have a 6' wide vegetative shelf with a 6:1 slope. See Sheets CG-406 and C- 606. WET POND MDC 7. DRAWDOWN TIME. The design volume shall draw down to the permanent pool level between 2 and 5 days. The Wet Ponds will all draw down between 2 and 5 days. See Wet Pond Supplements for details. WET POND MDC 8. PROTECTION OF THE RECEIVING STREAM. The wet pond shall discharge the runoff from the one-year, 24-hour storm in a manner than minimizes hydrologic impacts to the receiving channel. The Wet Ponds will discharge to level spreader filter strips for the one-year, 24-hour storm in an effort to promote infiltration and minimize impacts to the wetlands. WET POND MDC 9. FOUNTAINS. If fountains are proposed, then documentation shall be provided that they will not re -suspend sediment or cause erosion in the pond. No Fountains are proposed. WET POND MDC 10. TRASH RACK. A trash rack or other device shall be provided to prevent large debris from entering the outlet system A grate inlet is at the top of the inlet structure; however, the ponds were modeled so that the 100 year storm will not reach this inlet. See C-606. WET POND MDC 11. VEGETATION. The following criteria apply to vegetation in and around the wet pond: -, '-`E APR 4 by. — --- —:�� (a) The dam structure, including front and back embankment slopes, of the pond shall be vegetated with non -clumping turf grass; trees and woody shrubs shall not be allowed; and (b) The vegetated shelf shall be planted with a minimum of three diverse species of herbaceous, native vegetation at a minimum density of 50 plants per 200 square feet of shelf area. See sheets LP-105, LP-106 & LP-501. • ;DECEIVE t APR 2 4 2018 �� • • E SECTION B: Basis of Design • r11 \I NAFFAC Nava! Facilities Engineering Command NAVFAC MID-ATLANM Civil: BASIS OF DESIGN 1.0 PROJECT INFORMATION 1.1 PROJECT DESCRIPTION AND LOCATION The project will consist of a 70,956 SF bachelor enlisted quarters (BEQ) and a 7,997 SF combined vehicle maintenance facility/warehouse (VMFW). Parking lots and other smaller structures will be constructed to support these two facilities. P1320 will be constructed off of Harlem Drive along Company D and E Streets. The site surrounds the existing Bradley Hall, building M508. 1.2 EXISTING CONDITIONS The existing site is approximately 15 acres. Wetlands surround the perimeter of the majority of the site. A 50' buffer will be maintained to protect the existing wetlands. Some minimal disturbance to the buffer area may occur during grading. The site has moderate to flat slopes and falls in the direction of the surrounding wetlands. Portions of the site were previously developed; abandoned utilities and foundation features may still exist in these areas. Some of the site is presently wooded; previously developed portions have been cleared. The site is not in the 100-yr flood plain. 40 1.3 GEOTECHNICAL See geotechnical report. 1.4 DEMOLITION All trees and vegetation within the limits of disturbance will be cleared and grubbed as needed. All abandoned utilities in the project limits will be removed. Disturbance will be minimized and will only include areas needed to construct the site. 1.5 NEW SITE WORK The project will construct a bachelor enlisted quarters for 396 people. Supporting facilities will include a cleaning station, drying station, outdoor workout area, picnic shelter and a lighted basketball court. To support the BEQ, two personally owned vehicle (POV) parking lots will be constructed to provide parking to students that will be staying in the BEQ. The POV lots will provide: 8 handicapped spaces, 266 POV spaces and 4 motorcycle spaces. The POV spaces will be 9' wide by 18.5' long; handicapped spaces will have the same dimension with additional adjacent space. The motorcycle spaces will be 4.5' by 18.5'. Typical drive aisles will be 26' wide. The project also constructs a combined vehicle maintenance facility/warehouse. The VMFW will have its own 17 space, fenced parking lot as well as additional space to accommodate deliveries to the warehouse portion of the building. Of the 17 spaces, 16 will be oversized 10' by 20' spaces with one 12' by 30' space to accommodate the large vehicles that are utilized by the battalion. The vehicle maintenance portion of the building Marine Corps IPT P1320 0 ENAFFiAC Naval Facilities Engineering Command NAVFAC MID -ATLANTIC has been designed so that vehicles are able to drive through the building for more efficient circulation. The project will relocate the existing hand to hand combat shelter to the east of Bradley Hall to make way for the parking lot. The project will also provide a 6' wide asphalt jogging trail that connects the existing sections of trail. The project will thin a portion of forested area to make room for a preventative medicine trail (PMT). The equipment that is part of this trail will be installed by others. Three wet ponds and a sand filter will treat stormwater from impervious surfaces. Wet ponds will be used in conjunction with level spreader filter strips. 1.6 ATFP Access control will be provided on Company E Street in front of the BEQ and near the combined maintenance drive and sidewalk located at the rear of the building. The standoff distance for the BEQ is 86'. An SBEDS blast analysis was completed at a distance of 42' for the west wall that faces the parking lot. The analysis verified that this distance is adequate for the required level of protection. See structural for additional details. ATFP standoff distance will not apply to the VMFW due to the low occupancy of the building. 1.7 SUSTAINABLE DESIGN The project is seeking to attain Green Globes certification. 1.8 WATER AND FIRE SUPPLY An 8" water main will be extended from the side of building M508. A 4" line will provide domestic service and a 6" line will provide fire flows. Two fire hydrants will provide adequate service to the BEQ. A water permit will be attained. 1.9 SANITARY SEWER The BEQ will be served by three 6" gravity sewer laterals. The VMFW will be served by one 3" line. The 18" sanitary line that currently exists near the proposed VMFW will be rerouted around the building. A sewer permit will be attained. 1.10 NATURAL GAS Natural gas will be supplied to both the BEQ and the VMFW for heating purposes. 1.11 EROSION AND SEDIMENT CONTROL Silt fence, diversion ditches, check dams, inlet protection and sediment traps and a skimmer pond will provide phase I erosion and sediment control. Additional inlet protection will be added in phase II. An erosion and control permit will be attained. AM 1.12 ENVIRONMENTAL PERMITTING Stormwater, Erosion and Sediment Control, Water and Sewer extension permits will be required. Marine Corps IPT P1320 0 MNAFFAC Naval Facilities Engineering Command MAVFAC MID -ATLANTIC 2.0 STORM DRAINAGEISTORMWATER MANAGEMENT 2.1 SITE RUNOFF Soil types were taken from the USDA Soil Survey of Onslow County. Sheet flow in combination with storm drains and roof drains will be used throughout the site. All on site flow with the exception of the VMFW will be routed to the wet ponds sand filter. The project is within a drainage basin which flows to the White Oak River. The receiving stream is Scales Creek. 2.2 STORM DRAINAGE All new impervious areas are intended to flow to the proposed sand filter and wet ponds with the exception of the VMFW area. Minimal curbing and storm sewer piping will be used to promote surface flows. Rainfall intensity values are taken from the NOAA Atlas for the location and are as follows: Time of Concentration = 5 min. (conservative) Rainfall Intensity = 3.60"/hour 1-year 24-hour storm Rational Runoff Coefficients, "C," are taken from the North Carolina Department of Environmental Quality as follows: Roofs, Inclined 1.00 Asphalt 0.95 Concrete 0.95 Lawns, sandy soil 0.15 Wooded 0.15 2.2 STORMWATER MANAGEMENT WATER QUALITY ANALYSIS The sand filter and wet ponds will be constructed to provide the required water quality controls in accordance with NCDEQs standards. The Sand Filter will be designed to handle the 1.5° rain event. Wet ponds will be designed for the 95% storm event of 2.34" per hour to satisfy NAVFAC LID requirements. Additionally, Wet ponds will be used in conjunction with level spreader -filter strips to promote infiltration. The basins will be designed for 90% TSS removal. The BMPs will reduce the 10-year site release to at or below existing levels. The basins will be designed to safely pass the 100 year storm. 3.0 EROSION AND SEDIMENT CONTROL. MANAGEMENT 3.1 PLANNED EROSION AND SEDIMENT CONTROL PRACTICES 1. Temporary Gravel Construction Entrance/Exit: A temporary gravel construction entrance will be installed. 2. Land Grading: Grading will be required on approximately 3 acres. All cut and fill slopes will be 3:1 or flatter to avoid instability due to wetness. (NCSCC ESCM Std. 6.02) Marine Corps IPT P1320 ONAVFWo Naval Facilities Engineering Command NAVFAC MID -ATLANTIC 3, Temporary Silt Fence: Provided around the site to prevent debris and sediment from migrating to downstream drainage courses (NCSCC ESCM Std. 6.62). 4. Rock Check Dams: Provided at entrances to pipe culverts in ditches and swales to reduce erosion by restricting velocity of flow (NCSCC ESCM Std, 6.83). 5. Sod: Provided in all new ditches and swales to maintain bank stability. Sod will also be used for permanent stabilization of all open space areas. Sod will not be used in the base of the sand filters. 6. Erosion Control Matting: Provided in all new ditches and swales to maintain bank stability. 7. Temporary Seeding: See Specifications. 3.2 CONSTRUCTION SCHEDULE 1. Obtain plan approval and other applicable permits. 2. Flag the limits of construction. 3. Install check dams in all existing ditches and swales as indicated. 4. Install temporary gravel construction entrance. 5. Install temporary silt fence around the site and around sediment basins as indicated. 6. Clear and grub the site within the limits of disturbance. 7. Rough grade site, stockpile topsoil, construct swales, culverts and storm drain system. 8. Install building pad, utilities and site work. 40 9, Finish slopes around building upon completion of rough grading. Leave slightly rough and vegetate and mulch immediately. 10. Complete final grading for parking, drives and stabilize with gravel. 11. Complete final grading for the building. 12. Complete final grading of the grounds, topsoil critical areas and permanently vegetate with sod, landscape and mulch. 13. After site is stabilized, remove all temporary measures. 3.3 MAINTENANCE PLAN 1. All erosion and sediment control practices will be inspected weekly and within 24 hours of a 112-inch"rainfall event and every 14 days. A rain gauge shall be installed to measure rain events. Needed repairs will be made immediately to maintain all practices as designed. 2. Sediment will be removed from behind the sediment fence when it becomes about 0.5 ft deep at the fence. The sediment fence will be repaired as necessary to maintain a barrier. 3. All disturbed areas will be sodded as permanent vegetation and temporary measures will be seeded, fertilized, reseeded as necessary, and mulched according to the Seeding Specifications. 3.4 VEGETATIVE PLAN See specification Section 32 92 19 SEEDING and 32 92 23 SODDING. -- End of Section -- Marine Corps IPT P1320 11, 9 SECTION C: Maps 11 k-E, Is. T -4 lie Hal V�('--.�INHTY MAP N07 tO SCALE 00 0.10 ;00'r��� .10 00 'o 00 45, .0 00. 0 LOCATION MAP NOT TO SCALE PROJECT LOCATION I '.�I!/�7' °_ ..,.YI�-.�-i� I �.. 't v, l . � �4� r.'�\ , �••��. •1 `� �{ (��4+L .,�, ILI � � - � + � ! ,, �, -✓+ I /.. .,fir : � ,5/ 1:: ., i J _ ) /f ,• - .i• 1. ut ��=�a a.J'�iF ��'�f J�� �. `�- " +. '�... �(,1 `� ... �(�:� = '/` I C` .\a u �, t.- . � 5'•A�t Cam/' J,S�� �{' �� 1 .(�` .�✓y y.7} 1 •�t" L 1! I I ( a Y, f �Vir �`�- _ x � <; T 'i-. pre ram, •.r�_'. � ;� ,t�``.'.1. Lei r t tl �.�� V 1 :� r'� fir •, I� � �� ,l S ' •��< `^4.• t \�"•^ , ,� •` .1 •`� y iwa, s\' i � i' �.. tl3Ntl'NL3N .r (�� 1 •�.I I 'fir. 4.,i' ` / � �- 11- d Ji + ` •• ie!a� 01 Oct w `?I ,J/ ^ �+w"a« , / :. �' J =1�� � Via.. �-�,, ,� I'! %- �.i ��o <y � x a _ s..). vi'• -.'�.S _'2A . o.. i�m` �)!:'� � ! !' o,r • � ! •6J �... SECTION D: Storm Drainage -Calculations 0 • 0 3/6/2018 Precipitation Frequency Data Server NOAA Atlas 14, Volume 2, Version 3 Location name: Tarawa Terrace, North Carolina,--•ti, USA' s� Latitude: 34.7346°, Longitude:-77.4008° Elevation: 19.69 ft" � source: ESRI Maps %10+-• " source: USGS POINT PRECIPITATION FREQUENCY ESTIMATES G.M. Bonnln, D. Martin, B. Lin, T. Parzybok, M.Yekta, and D. Riley NOAA, National Weather Service, Silver Spring, Maryland PF tabular I PF graphical I Maps& aerials • 0 PF tabular PDS-based point precipitation frequency estimates with 90% confidence intervals (in inches)1 Average recurrence interval (years) Duration 1 2 5 70 25 F50 ������ 100 200 500 1000 0.490 0.577 0.667 0.750 0.846 0.923 0.999 IF 1.08 1.17 11 1.25 5-min (0.454-0.532) (0.534-0.626) (0.616-0.722) (0.691-0.811) (0.775-0.914) (0.843-0.998) (0.907-1.08) (0.969.1.16) (1.05-1.27) (1.11-1.37) 0.783 0.923 1.07 1.20 1.35 1.47 1.59 1.70 1.85 1.98 10-min (0.724-0.850) (0.854-1.00) (0.986.1.16) (1.10.1.30) (1.24.1.48) (1.341.59) I (1.44-1.72) (1.54-1.85) (1.65-2.01) (1.75-2.15) 0.979 1 1.16 1.35 1.52 1.71 1.86 2.01 2.15 2.33 2.48 15-min (0.906.1.06) (1.07-1.26) (1.25.1.46) (1.40-1.64) (1.57.1.85) (1.70.2.01) (1.82-2.17) (1.94-2.33) (2.08-2.53) (2.20-2.70) 1.34 1.60 1.92 2.20 F 2.53 IF 2.80 IF 3.07 IF 3.35 IF 3.71 4.02 30-min (1.24.1.46) (1.48.1.74) (1.77-2.08) (2.02.2.38) (2.32-2.73) 1 (2.56-3.03) (2.79-3.32) (3.02-3.62) (3.31-4.03) (3.56.4.37) 1.67 2.01 2.46 2.86 I 3.37 3.80 4.23 IF 4.69 5.32 5.87 60-min (1.55-1.82) (1.86-2.18) (2.27-2.66) (2.64-3.10) (3.09.3.64) 11 (3.47.4.11) (3.84-4.58) (4.23-5.08) (4.75-5.78J (5.19.6.38) 2.03 3.09 3.66 4.44 1 5.12 F 5.83 IF 8.61 1 F-7-.7-178.69 2-hr (1.87-2.22) (2.27-Z7-2.88) (2.84-3.36) (3.36-3.99) (4.04-4.83) (4.64-5.563) (5.25-6.34) (5.91-7,18) (6.82-8.40) (7.62-9.49) 2.19 2.65 3.34 4.c) 4.90 5.72 1 F-r,.59 7.55 7 F-8-9-6-110.2 3-hr (2.01-2.41) (2.44-2.91) 1 (3.07-367) (3.65-4.38) 1 (4A5.5.36) 1 (5.15.6.25) 407 4,88 600 7.02 (5.90-7,19) (6.70-8.25) (7.86-9.81) (8.87.11.2) 8.12 9.34 11.1 12.8 322 H-h:r:]F-2.67 (244-2.95) (2.95.3.57) 1 (3.71.4.51) (4.43.5.39) 1 (5.42-6.62) 1 (6.29-7.73) (7.21-8.93) (821.10.3) (9.66-12.3) (10.9-14.1) 3.14 3.80 4.83 5.82 7.20 8.48 9.87 11.4 1 13.8 F 1 12-hr (2.85-3.51) (3.44-4,24) 1 (4,36-5.39) 1 (5.23.648) 1 (6.43-8.00) 1 (7.51-9.39) (B.66-10.9) (9.92.12.6) (11.8-15.2) (13.4-17.6) 3,60 4.37 5.66 6.76 8.42 9.87 11.5 13.3 16.1 18.5 24-hr (3,30-3.97) 1 (4,01.4.83) (5.18-6.23) (6.16-7.43) 1 (7.60-9.24) 1 (8.83.10.8) (10.2-12.6) (11.6-14.6) (13.8-17.7) (15.6.20.5) 4.19 5.07 6.51 7.75 9.64 11.3 l 13.1 15.2 18,4 21.1 2�ay (3.82 4.63) (4.63 5.60) (5.92 7.19) (7.02.8.55) (8.68.10.6) (10.1-12.4) (11.6-14.5) (13.2-16.8) (15.6 20,4 (17.7 23.6) ) 4.44 5.37 176.85-11 8.12 1 10.0 11.6 13.4 T 15.4 18.5 21.2 3-aay (4.064.88) (4.91.5.91) 1 (6.25-7.54) 1 (7.37-8.92) 1 (9.02-11.0) (10A-12.8) (11.9.14.8) i (13.5-170) (15.9-20.5) (17.9.23.7) 4.69 5.67 7.20 T 8.48 10.4 12.0 13.7 IF 15.7 IF 18.7 11 21.2 4-day (4.30.5.14) (5.20.6.22) 1 (6.58-7.90) 1 (7.73-9.30) (9.38-11.3) 1 (10.8.13.1) (12.2-15.1) (13.8-17.2) (16.1-20.7) (18.1-23.7) 6.45 6.57 F 8.26 IF 9.66 F 11,7 IF 13.4 15.2 IF 17.2 11 20.1 F 22.5 7�ay (5.02-5.95) (6.05-7.17) 1 (7.59-9.01) (8.85.10.5) (10.6-12,7) 1 (12.1-14,6) (13.7-16.6) (15.3-18.8) (1T6-22.2) (19.4-25.0) 7.33 9.08 10.5 114 16I 18212 10-day {5.65-6.66} (6.77-7.99) (8.37-9.89) (9.67-11.5) 1 (11.5-13.7) (13.1-15.7) (14.6-17.7) (16.3-20.0) (18.6-23.3) (20.5-2fi.1) 8.17 9.73 11.8 33.6 16.0 18.1 20.2 22.5 25.7 28.3 20�ay (7.fi0-B.82) (9.06-10.5) (11.0-12.6) (12.6-14.6) 1 (14.8-17.3) (16.6.19.5) (18.4-21.9) (20.2-24.4) (22,8.28.0) (24.8-31.0) 10.0 11.9 14.3 16.2 18.9 21.1 23.3 25.5 28.6 31.1 30-day (9.38-10.7) (11,1-12.8) (13.4-15.3) (15.2-17.4) (17.6-20.3) (19.5-22.6) (21.4-25.0) (23.3.27.5) ( 25.8-31.0) (27.8-33.8) 12,6 14,8 -17.7 1 20.0 23.2 25.8 28.5 IF 31.3 35.2 11 38.3 =45-day (11.8-13.5) 1 (13.9-15.9) 1 (165.5-19.0) (18.7-21.5) 1 (21.6-25.0) (23.9-27.8) ll.(26.2-30.7) (28.6.33.8) (31.7-38.2) (34.1.41.7) 15.2 17.9 21.0 23.6 F 270 17 29.7 52- A I 35.1 38.8 41.6 60-day {14.3-16.2) {16.819.1) (19.822.4) (22.1.25.1) 11 (25.2-28.7) (27.6-31.6) (30_ 0-34i6)� (32.4-37.6) (35.4-41.8) (37.7-45.0) 1 Precipitation frequency (PF) estimates in this table are based on frequency analysis of partial duration series (PDS). Numbers in parenthesis are PF estimates at lower and upper bounds of the 90% confidence interval. The probability that precipitation frequency estimates (for a given duration and average recurrence interval) will be greater than the upper bound (or less than the lower hound) is 5%. Estimates at upper bounds are not checked against probable maximum precipitation (PMP) estimates and may be higher than currently valid PMP values. Please refer to NOAA Atlas 14 document for more information. Back to Top https:tthdsc.nws.noaa.gov/hdsdpfds/pfcis_printpage.htrnl?tat=34.7346&lon=-77.4008&data=depth&units=english&series=pds#table 114 31612018 Precipitation Frequency Data Server Pi~ graphical • • y- 40 35 C :E 30 a 25 20 15 10 5 0 45 40 35 c 30 a 25 20 Y 1s a 10 5 0 1 2 5 10 25 so 100 200 500 1000 Average recurrence interval (years) NOAA Atlas 14, Volume 2, Version 3 Created (GMT): Tue Mar 6 11:08 25 2018 Back to Too Maps & aerials Small scale terrain PDS-based depth -duration -frequency (DDF) curves Latitude 34 73460. Longitude -77 40081 c c c c e - - - a, a. a, - a, �,, a. a, a, E E E E E ry A ,�,, v roa �� a -tea Duration • A,vrage recurrence enien,al iyearsl 1 2 -- 5 10 — 25 50 — 100 — 200 Soo 1000 Duration 54mn — 2-day — 10-min --- 3-day 15- nwv — 4-day 30 min — 7-day — 60-mrn — 10-day 2�t — 10-day — J-ht — 30-day — 6-hr — 45-day — 124V — 60-day 24-#x https:!lhdsc.nws.noaa.gov/hdsdpfds/pfds_printpage html?lat=34.7346&Ion=-77 4008&data=depth&units=english&senes=pds#table 214 0 0 0 3/6/2018 Precipitation Frequency Data Server 19 110 10 Jacksonvillt. V River ,tation. . _ �eAmfSE F Large scale terrain ""'.' Rocky Mount a R ,Ittyh NA �6r -ayetteville 9 4Y Wilming. O ', r 100hr. 60M, Large scale map uurmm� R«ky hlarru Raleigh GreenviIIr F ayelteville �acNSOn Vfllle LYllhun(�t: r, tOUb�� 60m Large scale aerial htipsJlhdsc-nws.noaa.govlhdsclpfds/ptds_pnntpage.html?lat=34.7346&Ian=-77.40O8&data=depth&units-engIish&series=pds#table 3!4 316/2018 Precipitation Frequency Data Server • • • Back to Top US Department of Commerce National Oceanic and Atmospheric Administration National Weather Service N,2tional Water Center 1325 East West Highway Silver Spring, MD 20910 Questions? HDSC.QuestionsOmoaa.gov Disclaimer https,llhdsc.nws.noaa.gpvlhdscJpfdsfptds_pnntpage.html?lat=34.7346&ion=-77.40088data=depth&units=english&senes=pds#tabie 414 • P1320: AREA FLOWING TO SAND FILTER 1 • • sf acres Total Site 39,463 0.91 Buildings 0 0.00 Sidewalks 0 0.00 Parking Lots 29,809 0.68 Future Impervious 4,000 0.09 Total Impervious 33,809 0.78 Percent Impervious 1 85.67% Coastal Counties: Nan -SA Waters- WQV Calculation 1.5" storm 1.5" of Rainfall RV=0.05+0.9*IA RV=0.05+0.9* (0.78/0.91) 0.8211 V1.5=3630*RD*Rv*A V1.5=3630* 1.5*0.8211 *0.91 4050 *.75 WQV 3038 WQVadj ................................................................................... POND AREA & VOLUME Contour Elevation Contour Area Incremental Volume Total Volume (CF) 13 2224 0 0 14 2856 2540 2540 14.2 2994 585 3125 15 3544 2615 5740 16 4289 3917 9657 16.3 5657 1492 11149 >3038 (WQVadj) FOREBAY VS SAND FILTER VOLUME Forebay is required to be at least 50% of the total volume. Contour Elevation Sand Filter (CF) Forebay (CF) 13 0 0 14 1270 1270 14.2 292 292 Total Volume: 1563 1563 Ratio of Total: 50.0% 50.0% > 50% OK 1.P' ;= APR 2 4 2018 8 Y: - -� _U • • CJ u • l� u P1320: AREA FLOWING TO BMP 2 WETPOND A sf acres Total Site 81,850 1.88 Buildings 0 0.00 Sidewalks 1,155 0.03 Parking Lot 52,987 1.22 Future Impervious 1,500 0.03 Totallmpervious 55,642 1.28 Percent Impervious 1 67.98% 1 68% is the maximum allowed due to Minimum Main Pool 5A constraints Coastal Counties: Non -SA Waters- WC1V Calculation 1.5" storm 0.05+0.9*IA =0.05+0.9* (1.28/ 1.88) 0.6618 1.5" Storm as Required by NCDEQ V1s=3630*RD*RV*A V1.s=3630* 1.5*0.6618* 1.88 6771 WQV 95% Storm as Required by NAVFAC LID V2.34=3630*RD*Rv*A V2.34=3630* 2.34* 0.6618* 1.88 10563 WQV POND AREA & VOLUME Main Pool and Forebay Permanent Pool Volumes (calculated from NCDEQ WQV) j Area Main Pool j A= Vol u=r+e/Average Depth A-15,323/3 I A= 54118 I I Minimum Surface Area Main Pool (3',68%) Forebay Volume I iSA= Ratio (%)*DA V=15-20%*16,003 I jRatio = 5 % V15= 2,400 j jSA Required= 4,093 V20= 3,201 SAAvaliable 4121 Contour Elevation Contour Area Forebay Incremental Volume Forebay Cumulative Volume Forebay Contour Area Main Pond Incremental Volume Main Pond Cumulative Volume Main Pond Total Volume {CIF) 7 0 0 0 1308 0 0 0 8 0 0 0 1785 1547 1547 1547 9 0 0 fl 2332 2059 3605 3605 9.5 819 D 0 2617 1237 4842 4842 10 926 436 436 1 2903 1380 6222 6659 11 1160 1043 1479 3499 3201 9423 1.0903 12 1420 1290 2769 4121 3810 13233 16003 1_i MS / 1639 4408 6136 5129 18362 22170 13.5 2014 968 5376 6933 3267 21629 27005 14 2170 1046 6422 7229 3541 1 25170 31591 15 2400 2285 8707 8244 7737 32906 41613 16 2820 2610 11317 9100 8672 41578 52895 AVERAGE DEPTH Average Depth= Volume of Main -Permanent Pool/Area Main -Permanent Pool Average Depth =13,233/4122 3.21 > 3' OK FOREBAY VOLUME Forebay i required to be 15-20% of the total volume. V=1S-2016,003 .: Forebay Volume= 2769 20.9% * Permanent Pool 11002 > WQV APR 2 4 2018 by: - -- • • CJ • P1320: AREA FLOWING TO BMP 3 WETPOND B sf acres Total Site 80,643 1,85 BuPding5 15,831 0,36 Sidewalks/Cons 6,636 0.15 Parking Lot 15,093 0.35 Future Impervious 14,000 0.32 Total Impervious 51,560 1,18 Percent Impervious 1 63.94% 64% Isthe maximum allowed due to Minimum Main Pool SA constraints Coastal Counties: Non -SA Waters- WQV Calculation 1.5" storm RV=0.05+0.9*iA RV=0.05+0.9'(1.18/1.85 ) 0.6254 1.5" Storm as Required by NCDEQ Vi.s=3630*RD*Rv*A V1-5=3630* 1.5 *0.6254 * 1.85 6305 WQV Storm as Required by NAVFAC LID =3630*RD*Rv*A 3630*2.34*0.6254*1.85 POND AREA & VOLUME r? ain Pool and Forebay Permanent Pool Volumes (calculated from NCDEQ WQV; I I I I (Minimum Surface Area Main Pool (3', 64%) Forebay Volume i$A= Ratio (%)'DA V=15-20%*14,128 'Ratio 4.7 % V15= 2,119 SA Required= 3,790 V20= 2,826 ISAAvaliable= 3836 I Contour Elevation Contour Area Forebay Incremental Volume Forebay Cumulative Volume Forebay Contour Area Main Pond Incremental Volume Main Pond Cumulative Volume Main Pond Total Volume (CF) 5 0 0 r� a 3020 0 0 0 6 0 0 0 1426 1223 1223 12.23 7 0 D 0 1858 1642 2865 2865 8 0 0 0 2315 2087 4952 4952 8.5 819 0 0 2556 1218 6169 6169 9 926 436 436 2797 1338 7508 7944 W 116o 1043 1479 3304 3051 i0558 12037 3836 3570 14128 I fi897, 12 1922 1621 4390 5661 4749 18877 t5267 12.5 2047 967 5358 6114 2944 1 21820 27178 13 2272 1090 6437 6567 3170 24991 31429 14 2737 2505 .8942 7532 7050 32040 40982 14.3 3141 682 9823 8647 2427 34467 44290 AVERAGE DEPTH Average Depth = Volume of Main Permanent Pon!/ Area of Main -Permanent Poo Average Depth= 14128/3836 3.68 ? 3' OK FOREBAY VOLUME Forebay is required to be 15-20% of the total volume. V=15-20%*14128 Forebay Volume = 2769 20% Permanent Pool 10281 > WQV • 1� • P1320: AREA FLOWING TO BMP 4 WETPOND C 51 acres Total Site 57,300 1,32 Buildings 12,782 0.29 Sidewalks 6,410 0.15 Basketball/Fitness 8,566 0.20 Roads 0 0,00 Future Imp 4,750 0.11 Totallmpervious 1 32,508 1 0.75 Percent Impervious 1 56.73% Coastal Counties: Non -SA Waters- WQV Calculation 1.5" storm RV=0.05+0-9•IA RV=0.05+0.9 * (.64/1.32 ) 0,5606 V' Storm as Required by NCDEQ .5=3630'RD•Rv*A .5=3630.1.5 *0.4860' 1.3 2 3999 WQV Storm as Required by NAVFAC UD =3630*RD•Rv*A =3630* 2.34`0.4860'1.32 6264 WQV POND AREA & VOLUME ----------------------------------------^-1 ;Main Pool and Forebay Permanent Pool Volumes (calculated from NCDEQ WQV. ; I I I I Minimum Surface Area Main Pool (3', 57%) Forebay Volume .SA= Ratio (%)'UA V=15-20%'9152 ,Ratio = 4.14 % V15= 1372.8 ISA Required= 2,372 V20= 1830.4 jSAAvafiable_ _ _- 2894-_-_-_-----------------_ -1 Contour Elevation Contour Area Forebay Incremental Volume Forebay Cumulative Volume Forebay Contour Area Main Pond Incremental Volume Main Pond Cumulative Volume Main Pond Total Volume (CF) 7 0 0 0 355 0 0 0 8 0 0 0 662 514 514 514 9 92 0 0 1058 860 1374 1374 10 211 152 152 1479 1269 2642 2794 11 363 297 439 1926 1703 4345 4783 12 547 455 894 2397 2162 6506 7400 13 762 655 8 2646 9152 10700 14 1400 1091 2629 4557 3726 12877 1550b 14.25 1460 358 2987 4557 1139 14016 17003 15 1640 1163 4149 4973 1 3574 f 17590 21739 16 1850 1745 5894 5755 5364 22954 28848 16.3 2436 643 6537 7712 2020 24974 3151i AVERAGE DEPTH Average Depth = Volume of Main -Permanent Pool/ Area of Main -Permanent Pool Average Depth= 9152/2894 3.16 > TON FOREBAY VOLUME Forebay is required to be 15-20% of the total volume. V=15-20%*9152 Forebay Volume = 1548 17% Permanent Pool 6303 > WQV • P1320 BACHELOR ENLISTED QUARTERS • • STORMWATER DITCH CALCULATIONS North Lot Area Flowing to Ditch A -A Impervious Area Grass North Lot Area Flow to Ditch A -A VMFW Area Flowing to Ditch A -A Impervious Area Grass VMFW Area Flowing to Ditch B-B Impervious Area Grass q=CIA ■ 0.5 0.25 10 yr storm 9 Impervious Area Grass in/hr Area SF Acres 29552.00 0.678 2247.00 0.052 5.92 cfs Area SF Acres 7036.756 0.162 14714.087 0.338 0.00 cfs Area 5F Acres 7036.756 0.162 14714.087 0.338 0.00 cfs Area SF Acres 34795.00 0.799 6734.00 0.155 7.18 cfs Divide by 2, 1/2 of flow on each side of ditch Hydrology Report draftow Express Fxtension for AulodesW�? Aut(>CAD1� Civil Mfg) by Autodesk Inc North Lot Ditch AA 10 Year Frequency Hydrograph type Storm frequency (yrs) Drainage area (ac) Rainfall Inten (inlhr) OF Curve u 2.00 1.00 a II = Rational = 10 = 0.340 = 9.028 = Jacksonville. OF 0 - Runoff Hyd - Qp = 2.73 (cfs) Peak discharge (cfs) Time interval (min) Runoff coeff.(C) Tc by User (min) Rec limb factor Runoff Hydrograph 10-yi frequency 5 Friday. Feb 23 2018 = 2.732 = 1 = 0.89 = 5 1.00 Hydrograph Volume = 820 (tuft); 0.019 (aeft) Q (cfs) 3.00 2M 0.00 10 Time (min) C� • • Channel Report araflow Express Extension for Autodesk@ AutoCAD® Civil 3DO by Autodesk. Inc. North Lot A -A Ditch 2 Yr Friday, Feb 23 2018 Trapezoidal Highlighted Bottom Width (ft) = 3.50 Depth (ft) = 0.92 Side Slopes (z:1) = 3.00, 3.00 Q (Cfs) = 2.730 Total Depth (ft) = 1.10 Area (sgft) = 5.76 Invert Elev (ft) = 16.10 Velocity (ftls) = 0.47 Slope (%) = 1.15 Wetted Perim (ft) = 9.32 N-Value = 0.240 Crit Depth, Yc (ft) = 0.25 Top Width (ft) = 9.02 Calculations EGL (ft) = 0.92 Compute by: Known Q Known Q (cfs) = 2.73 Elev (ft) Section 0. 00 17.50 17.00 16.50 16.00 2 4 6 v 8 Reach (ft) Depth (ft) 1.90 1.40 0.40 115IM11 n an 10 12 14 16 v , C7 • 0 Hydrology Report wraflow Express Extension for Autodesk& AutoCAD® Civil 31® by Autodesk, Inc DITCH AA 2-YR Hydrograph type Storm frequency (yrs) Drainage area (ac) Rainfall Inten (inlhr) OF Curve Q (cfs) 2.00 • Rational 2 = 0.180 = 6.940 = Jacksonville. OF Thursday. Nov 2 2017 Peak discharge (cfs) = 1.024 Time interval (min) = 1 Runoff coeff, (C) = 0.82 Tc by User (min) = 5 Rec limb factor = 1.00 Runoff Hydrograph 2-yr frequency 0 5 0 - Runoff Hyd - Qp = 1.02 (cfs) Hydrograph Volume = 307 (cuff); 0.007 facft) Q (cfs) 2.00 1.00 MX 10 Time (min) • • C7 Channel Report F raflowExpress Extension for AulodeskO AutoCAi& Civil 3126 by Autodesk. Inc. Ditch A -A VMFW 2-yr Triangular Side Slopes (z:1) = 3.00, 5.00 Total Depth (ft) = 1.10 Invert Elev (ft) = 17.50 Slope (%) = 0.80 N-Value = 0.240 Calculations Compute by: Known Q Known Q (cfs) = 1.02 Elev (ft) Section 0'0o 18.50 18.00 17,50 1 2 3 4 5 6 Reach (ft) Highlighted Depth (ft) Q (Cfs) Area (sgft) Velocity (ft/s) Wetted Perim (ft) Crit Depth, Yc (ft) Top Width (ft) EGL (ft) Thursday, Nov 2 2017 = 0.90 = 1.020 = 3.24 = 0.31 = 7.44 = 0.34 = 7.20 = 0,90 Depth (ft) 1.50 1.00 0.50 ff-IFT11 A CA 7 8 9 10 11 y ~v • • Cl Hydrology Report draflow Express Extension for AutodeskID AutoCADM Civil 3DO by Autodesk, Inc DITCH AA 10-YR Hydrograph type Storm frequency (yrs) Drainage area (ac) Rainfall Inten (inlhr) OF Curve Q (cfs) • 2.00 1.00 4 9- F = Rational = 10 = 0.180 9.028 = Jacksonville. OF 0 - Runoff Hyd - Qp = 1.33 (cfs) Thursday, Nov 2 2017 Peak discharge (cfs) = 1.333 Time interval (min) = 1 Runoff coeff. (C) = 0.82 Tc by User (min) = 5 Rec limb factor = 1.00 Runoff Hydrograph 10-yr frequency 5 Hydrograph Volume = 400 (cuff); 0.009 (acft) Q (cfs) 2.00 1.00 N- 0.00 10 Time (min) • n LJ Channel Report orraflow Express Extension for Aulodesk® AutoCAM Civil 31M by Autodesk. Inc Ditch A -A VMFW 1 Q-yr Triangular Side Slopes (z:1) = 3,00, 5,00 Total Depth (ft) = 1.10 Invert Elev (ft) = 17.50 Slope (%) = 0.80 N-Value = 0.240 Calculations Compute by: Known Q Known Q (cfs) = 1.33 Elev (ft) Section 0.0D 18.50 18.00 17.50 1 2 3 4 5 6 Reach (ft) Highlighted Depth (ft) Q (Cfs) Area (sgft) Velocity (ftls) Wetted Perim (ft) Crit Depth, Yc (ft) Top Width (ft) EGL (ft) Thursday, Nov 2 2017 = 1,00 = 1.330 = 4.00 = 0.33 = 8.26 = 0.37 = 8.00 = 1,00 7 8 9 10 11 Depth (ft) 1.50 1.00 0.50 rI ij n an U • • = Rational = 2 = 0.570 = 6.940 = Jacksonville, OF Hydrology Report orraflow Express Extension for Autodesk® AutoCAD® Civil 3D® by Autodesk. Inc DITCH BB 2-YR Hydrograph type Storm frequency (yrs) Drainage area (ac) Rainfall Inten (inlhr) OF Curve Q (cfs) 3.00 • 2.00 1 00 0 - Runoff Hyd - Qp = 2.85 (cfs) Peak discharge (cfs) Time interval (min) Runoff coeff. (C) Tc by User (min) Rec limb factor Runoff Hydrograph 2-yr frequency N Thursday. Nov 2 2017 = 2.848 = 1 = 0.72 = 5 = 1.00 Hydrograph Volume = 854 (cuff); 0.020 (acft) Q (cfs) 3.00 2.00 1.00 0.00 10 Time (min) • CJ • Channel Report 49draflow Express Extension for Autodesk® AutoCADD Civil 31M by Autodesk, Inc Ditch B-B VMFW 2-yr Trapezoidal Bottom Width (ft) = 3.00 Side Slopes (z:1) = 3.00, 3.00 Total Depth (ft) = 1.30 Invert Elev (ft) = 15.50 Slope (%) = 0.80 N-Value = 0.240 Calculations Compute by: Known Q Known Q (cfs) = 2.85 Elev (ft) Section 0 00 16,50 16,00 15.50 Highlighted Depth (ft) Q (cfs) Area (sqft) Velocity (ftls) Wetted Perim (ft) Crit Depth, Yc (ft) Top Width (ft) EGL (ft) 1 2 4 6 B 10 12 14 Reach (ft) Thursday. Nov 2 2017 = 1.08 = 2,850 = 6.74 = 0.42 = 9.83 = 0.28 = 9A8 1.08 16 Depth (ft) 1.50 1.00 0.50 M IT = Rational = 10 = 0.570 = 9.028 = Jacksonvilie.IDF Hydrology Report I mflow Express Extension for Autodesk®AutoCAEM Civil 31® by Autodesk, Inc. DITCH BB 10-YR Hydrograph type Storm frequency (yrs) Drainage area (ac) Rainfall Inten (inlhr) OF Curve Q (cfs) 4.00 • 300 2.00 Wit, 0 Runoff Hyd - Qp = 3.71 (cfs) Peak discharge (cfs) Time interval (min) Runoff coeff. (C) Tc by User (min) Rec limb factor Runoff Hydrograph 10-yr frequency 5 Thursday, Nov 2 2017 = 3.705 = 1 = 0,72 = 5 = 1.00 Hydrograph Volume = 1,112 (cuffy 0.026 {acft) Q (cfs) 4.00 300 2.00 0.00 10 Time (min) • 1� u • Channel Report �draftow Express Extension for Autodesk® AutoCAD® Civil 3104 by Autodesk. Inc. Ditch B-B VMFW 10-yr Trapezoidal Bottom Width (ft) = 3.00 Side Slopes (zA) = 3.00, 3.00 Total Depth (ft) = 1.35 Invert Elev (ft) = 15,75 Slope (%) = 0.80 N-Value = 0.240 Calculations Compute by: Known Q Known Q (cfs) = 3.71 E lev (ft) W'UU 17,50 17.00 16.50 16.00 15.50 &'00 a 2 4 6 Section 8 Reach (ft) Highlighted Depth (ft) Q (cfs) Area (sqft) Velocity (ftls) Wetted Perim (ft) Crit Depth, Yc (ft) Top Width (ft) EGL (ft) 10 12 14 Thursday. Nov 2 2017 = 1.22 = 3.710 = 8.13 = 0.46 = 10.72 = 0.33 = 10.32 = 1.22 Depth (ft) 2 25 1 r5 1.25 0.75 0.25 -0.25 • C7 • = Rational = 10 = 0.950 = 9.028 = Jacksonville. OF Hydrology Report orraflow Express Extension for Autodesk® AutoCADO Civil 3DO by Autodesk. Inc Main Lot Ditch AA 10 Yr Frequency Hydrograph type Storm frequency (yrs) Drainage area (ac) Rainfall Inten (inlhr) OF Curve Q (cfs) 8.00 6.00 4.00 2.00 0 - Runoff Hyd - Qp = 7.20 (cfs) Peak discharge (cfs) Time interval (min) Runoff coeff. (C) Tc by User (min) Rec limb factor Runoff Hydrograph 10-yr frequency 5 Friday. Feb 23 2018 = 7.205 1 = 0.84 = 5 1.00 Hydrograph Volume = 2,161 (tuft), 0.050 (acft) Q (cfs) 8.00 4.00 2.00 o.ao 10 Time (min) Channel Report 40draflow Express Extension for Autodesk® AutoCAD® Civil 3D® by Autodesk, Inc Main Lot Ditch AA 10 Yr Trapezoidal Highlighted Bottom Width (ft) = 5.00 Depth (ft) Side Slopes (z:1) = 4.00, 4.00 Q (Cfs) Total Depth (ft) = 2.00 Area (sqft) Invert Elev (ft) = 14.65 Velocity (ftls) Slope (%) = 0.37 Wetted Perim (ft) N-Value = 0.240 Crit Depth, Yc (ft) Top Width (ft) Calculations EGL (ft) Compute by: Known Q Known Q (cfs) = 7.20 Elev (ft) Section 0. 00 16.50 16.00 15.50 15.00 14.50 0.00 0 5 10 15 20 25 30 Reach (ft) Friday, Feb 23 2018 = 1.64 = 7.200 = 18.96 = 0.38 18.52 = 0.37 = 18.12 = 1.64 35 Depth (ft) 2.35 1.85 1.35 0.85 0.35 -0.15 C� J Oft 20 10 30 Outlet it = 0a * La pipe diameter A) "gai r+a ler 0.500 gat` `4a``t\ 60 9'r log t�. �{I 1 " 3 5 10 20 50 100 200 Soo Discharge (tt3/seC) Appendices J.J 0 1000 Curves may not be extrapolated. Figure 8,06a Design of oullet protection protection from a round pipe flowing full, minimum tadwator condition (T. � 0 5 diamcler) Pipe(D18" RCP @ 0.5% Q=8.05 cfs La=9 ft 0 Rev. 12J93 8,063 I• 20 30 Outlet u = 00 - La pipe diameter PD) la 60 li �00, 4 iiillowiililiw11iii1+! iinud!';ain�r ii8RR1iR11HiIRiII1111iIIlYl�lIIIIIfiiltk111k1 illl!iiN�ire io Ill !il II w,;;;II;,:aIlWiii�°II[I�r ' I OF klfii 11 �l"! !i!1l if�iil '�I1Nfl ! �#k 11,�i11MIN I . I =A ��il Ip f l 11 Ni 1 i t N dl II i t 1 20 50 Ica 200 Discharge 500 .-ppeyrdices 4 3 m 2 N ro a 0 1—i 0 1000 Curves may not be extrapolated. Figure 8.06a Design of outlet protection protection from a round pipe flowing full, minimum tailwator condition (T. c 0.5 diameter) PipeO12" RCP @ 4.7% Q=8.3 Cfs La=11 ft Rev. t:i93 I* 8.06.3 ...1'"V ' APR 2 w 2018 r by. _..... -- C� J 02ft t Outlet IN - Do - La pipe 1 diameter (Do) i water - 0.5130 `salt" vee 50 RIO ao Iidis Appendice s N 2 N V Q 3 5 10 20 50 100 200 500 1000 Discharge (Olsec) Curves may not be extrapolated. F)gum 8.O6a Design of outlet protection protecton from a round pipe Hawing lull, minimum railwater condition (Tw < 0.5 dhameter) Pipe 33 18" RCP @ 1.7% Q=14.8 cfs La=12 ft 0 K�,_ tu9a 13.06.3 • 30 Outlet Iy . Do * La pipe 1 diameter (Gb) i Warps - 0.500 ho,p.Q 60 50 t00 200 500 Discharge (O/sec) Appendices LJ0 1000 Curves may not be extrapolated. Figure 8.06a Design of ou'let protection protection from a round pipe Rowing full, minimum tailwatot ooridilion (T. c 0.5 diameter) Pipe 39 18" RCP @ 1.8% Q=15 Cfs La=12 ft 0 Rev. €2/9.1 H,{}(r,j • Appendire.s 30 Outlet w n Da ' La Pipe �-� i diameter (Do) La >r r t 0.500 �pn `Lal��til 7 p\Pp h0 �r ( I1314 41i Hf lu 1 IiI1NHIN II �'•rP'' , I , Illil-------- I jJj Np m fin 1!{uu �� ' r+'�•' fi n! 11 i�1�1.�,.iH' IU. I,� �f�3,il,t�.. • .��������I�!�;� f'I1 I Ir lunm•,:r�11um:.muul u ryry I ` +' r i Ili !II �i11 11111N���11{HII_i111111t1 I BI ill ' 1��� f� p 1111 III1�111111 I 1IN I II jk 1 1 t�i'4I ,fir MI•' 111111 IW! IIIII ! f 11�1 II {E p�+ �%Y".• , �II II I {, Y�1 1 1 1 BM I I r IIE • � 1' , cult ppt{ ppkItry pp 1 I IIII I!r IIIIIUI1p1fFFp IIII� � 1) I I IIII dp�l— r � ���iie; j�i 11��'IF ppptlll gqu���Y`ijj+y II Illlpi ;'f"�{ri,''�1r� ,�!• �! � r,•,rr ll�f 1lt``i!j!i �VtEl�l�ii�l�l��ll�il l�!I � •1 .�s��I+��d1�!"' �Py- ��r ��i r• I 1:� 1111ii Il�lulll � �tlrtlllll!,�■' s..,[MIIIII!i��.��;rj1��r�� ram � WO WIN 1 20 so 100 200 Discharge Curves may not be extrapolated. rlgure 8.06a Design of outlet protection protection from a round pipe flowing full, minimum ra,lwaror condition JTw < 0.5 diameter) Pipe 41 18" RCP @ 13% Q=13 cfs La=10 ft 4 1 0 Rln. E7J93 8,111$,3 • East Side of BEQ a Roof 5F (C=1) Grass SF (C=0.2) Sidewalk SF (C=1) Total SF R1 1914 0 0 1914 R2 1223 0 0 1223 R3 1284 1536 694 3514 R4 1090 0 0 1090 R5 224 0 0 224 R6 396 0 C 396 RGA 0 839 549 1388 R7 341 0 0 341 R8 398 753 288 1439 40 0 1091 834 1925 R9 255 0 0 255 R10 808 0 0 809 R11 1287 1864 757 3908 R11A 0 1820 3858 5678 R12 1477 0 0 1477 R13 916 0 0 916 R14A 0 899 2448 3347 R14 1785 0 0 1785 R15 573 0 0 573 Slope diameter Q required Q avail R1 to R3 1.70% 6 0.49 0.86 R3 to R4 1.70% 8 1.12 1.86 R4 to R6A 1.70% 8 1.47 1.86 R6A to 40 1.70% 8 1 1.87 1 1.86 Slope diameter Q required Q avail R15 to R14A 2.30% 6 0.487 1 R14AtoR11 2.30% 8 1.03 2.16 R13 to R11 4,00% 6 0.49 1.330 R11A to R11 1 4.00% 1 8 1 0.87 2.6 R11 to 40 1 1.20% 1 12 1 3.116 4.6 Slope diameter IQ required jQavail 40 to BMP 4 1 1.80% 18 1 5,198 1 C I A Q 1.00 9 0,044 0.395 1.00 9 0.028 0.253 0.65 9 0.081 0.472 1.00 9 0.025 0.225 1.00 9 0.005 0.046 1.00 9 0.009 0.082 0,52 9 0.032 0.148 1.00 9 0.008 0,070 0.58 9 0,033 0.173 0.55 9 0.044 0.217 1.00 9 Q006 0.053 1.00 9 0.019 0.167 0.62 9 0.090 0.499 0.74 9 0.130 0.872 1.00 9 0.034 0.305 1.00 9 0.021 0.189 0.79 9 0.077 0.543 1.00 9 0.041 0.369 1.00 9 0.013 0.118 q=cia 0 q: flow(cfs) c: runoff coeffiecient i:rainfall intensity (in/hr) a:area(acres) http://www. hawsedc.com/engcaics/Manning- Pipe-F law. ph p Q=1.49/n)A(R^2/3)(S^1/2) n: roughness coefficient A: area R: hydraulic radius S. slope *Pipes to West side of BEQ have very similar or lesser flows 0 0 0 • @ 1.7%-14.8 CFS- OK @ 0.5%- 4.9cfs capacity 0 0 0 • • • FLOW IN UNDERDRAINS Flow through sand media: Surface area of sand filter: Flow through sand filter: Size underdrains for 2 x flow Flow: TO SIZE FOR 1 DRAIN Q* N = S^0.5 = D= D= P-1320: Sand Filter 4 ft/day 0.167 ft/hr 0.000046 ft/sec 1112 s.f. 0.051 C.f.s 2 factor 0.103 C.f.s. n= s= Q= 3/8 D = 16 AWN/S*.5)^3/8 0.0011326 0.0707107 16* (.0016/.0707)^.375 3.40 0.011 0.005 0.103 CFS 0.375 As per Table 5-1 for D less than 5.13 use 2-rows of 4" pipes. The actual design uses 2 rows of 4" pipes --OKAY DRAWDOWN WQV = 3028 C.F. Flow through media = 0.051 C.F.S. 58817.266 seconds 16.3 hours 16.3 is less than 40 okay 2 in/hr � GENE 4 APR 211 2018 BY: _ — U n U • 0 Flow Throueh Orifice P132O: Drawdown Time for Wet Ponds • 0 Q=CcA(2g Ho)^0.5 Drawdown Time Time(seconds) = WQV/Q Time(days)= Time(seconds)/(60*60*24) Q cfs Co 0.6 A Area sq ft g 32.2ft/sec^2 Ho driving head(ft) Drawdown Time (days) WQV Q Wet Pond A 2.54 11002 0.05023 Wet Pond B 2.37 10281 0,05023 Wet Pond C 2.49 6303 0.02935 Q Co A(sq ft) g Ho Wet Pond A 0.05023 0.6 0.00852 32.2 1.5 Wet Pond B 0.05023 0.6 0.00852 32.2 1.5 Wet Pond C 0.02935 0.6 0.00545 32.2 1.25 A(sq ft) D (in) Wet Pond A 0.00852 1.25 Wet Pond B 0.00852 1.25 Wet Pond C 0.00545 1 • • CJ 1 Watershed Model Schematic Hydraflow Hydrographs Extension for AutoCAD® Civil MID 2016 by Autodesk, Inc. v10.5 1 CD 2 w Legend liy� Origin j?Qg�rjotion 1 SCS Runoff Post Development 2 Reservoir Sand Filter 1 SC5 Runoff Pre Development Project: P1320 Sand Filter.gpw Hyd rog ra p h Return Period RePRaP?w Hydrographs Extension for AutoCADV Civil 3130 2016 by Autodesk, Inc. v10.5 Hydrograph Inflow type hyd(s) (origin) Peak Outflow (cfs) 1-yr 12-yr 3-yr 5-yr 10-yr 25-yr 50-yr 100-yr Hydrograph Description 1 SCS Runoff — 4.319 --- - ------ - -- 8.308 14.24 Post Development 2 Reservoir 1 3,128 6.751 ---- ---- 12.04 Sand Filter 1 3 SCS Runoff ---- 2.831 -- { i i I I I I I I I I I 6.437 -- --- 11.79 Pre Development i i I Proj. file: P1320 Sand Rlter,gpw Wednesday, 04 ! 11 12018 • 0 • K3 H yd ro g ra p h Summary Report Hydraflow Hydrographs Extension for AutoCADO Civil 3D® 2016 by Autodesk, Inc. 00.5 Hydrogmph Peak type flow Time Interval Time to Peak Hyd. volume Inflow (Maximum hyd(s) lelevation Total strge used Hydrograph Description (origin) (Gfs) (min) (min) (tuft) (ft) (tuft) 1 SCS Runoff 4.319 2 716 9,737 — ------ -- Post Development 2 Reservoir 3.128 2 720 9,718 1 14.47 4.040 Sand Falter 1 3 SCS Runoff 2.831 2 1 720 7,369 ------ — Pre Development I I P1320 Sand Filter.gpw Return Period: 1 Year Wednesday, 04 / 11 12018 0 • 4 Hydrograph Report Hydraflow Hydrographs Extension for AutoCADS Civil 3DO 2016 by Autodesk, Inc. v10.5 10yd. No. 1 Post Development Hydrograph type = SCS Runoff Storm frequency = 1 yrs Time interval = 2 min Drainage area = 0.910 ac Basin Slope = 0.0 % Tc method = User Total precip. = 3.60 in Storm duration = 24 hrs Composite (Area/CN) = [(0.780 x 98) + (0.130 x 84)110,910 Q (cfs) 5.00 K M 2.00 1.00 I IM II 0 Wednesday, 04 / 11 / 2018 Peak discharge = 4.319 cfs Time to peak = 11.93 hrs Hyd. volume = 9,737 tuft Curve number = 96* Hydraulic length = 0 ft Time of cons. (Tc) = 5.00 min Distribution = Type II Shape factor = 484 Post Development Hyd. No. 1 -- 1 Year 2.0 4.0 6.0 8.0 10.0 Hyd No. 1 Q (cfs) 5.00 4.00 3.00 2.00 1.00 r ra"s 12.0 14.0 16.0 18.0 20.0 Time (hrs) • 0 5 Hydrograph Report Hydraflow Hydrographs Extension for AutoCADV Civil MID 2016 by Autodesk, Inc. v10.5 Wednesday. 0411112018 0yd. No. 2 Sand Filter 1 Hydrograph type = Reservoir Peak discharge = 3.128 cfs Storm frequency = 1 yrs Time to peak = 12.00 hrs. Time interval = 2 min Hyd. volume = 9,718 cuft Inflow hyd. No. = 1 - Post Development Max. Elevation = 14.47 ft Reservoir name = Sand Filter 1 Max. Storage = 4,040 cult Storage Indication method used. Outflow includes exfiltration. Sand Filter 1 Q (cfs) Hyd. No. 2 -- 1 Year Q (cfs) 5.00 5.00 04,00-- 4.00 3.00 3.00 2.00 2.00 1.00 1.00 0.00 0 2 4 0.00 6 8 10 12 14 16 18 20 22 24 26 28 30 40 - Hyd No, 2 Hyd No. 1 ; : ; ; ; ; ; Total storage used = 4,040 Time (hrs) cult • LJ • Pond Report 11 Hydraflow Hydrog►aphs Extension for AtAoCA06 Civil 300 2015 by Autodesk, Inc. 00.5 Pond No. 1 - Sand Filter 1 Pond Data - Contours -User-defined contour areas. Conic method used for volume calculation. Begining Elevation = 13.00 ft Stage 1 Storage Table Stage (ft) Elevation (ft) Contour area (sgft) Incr. Storage (tuft) Total storage (cult) 0.00 13,00 2,224 0 0 1.00 14.00 2,856 2,533 2,533 2.00 15.00 3.544 3,193 5,727 3.00 16.00 4,289 3,910 9,637 3.30 16.30 5,657 1.487 11.124 Culvert 1 Orifice Structures Weir Structures Wednesday. 04 1 11 12018 [A] [B] [C] [PrfRsr] [A] [B] [C] [D] Rise (In) = 12.00 Inactive 0.00 0.00 Crest Len (ft) = 8.00 15.00 0.00 0.00 Span (In) = 12.00 0.00 0.00 0.00 Crest El. (ft) = 14.20 15.00 0.00 0.00 No. Barrels = 1 1 0 0 Weir Coeff. = 2.60 2.60 3.33 3.33 Invert El. (ft) = 11.00 0.00 0.00 0.00 Weir Type = Broad Broad -- - Length (ft) = 42.00 0.00 0.00 0.00 Multi -Stage = Yes No No No Slope (%) = 4.75 0.00 0.00 n1a N-Value = .013 .013 .013 n1a Orifice Coeff. = 0.60 0.60 0.60 0.60 EAL(inlhr) = 2.000 (by Contour) Multi -Stage = n/a Yes No No TW Elev. (ft) = 0.00 Note Culvart/Orifce outflows are analyzed under inlet (ic) and outlet (oc) control Weir nsers chocked for orifice conditions (ic) and submergence (s). Stage 1 Storage 1 Discharge Table Stage Storage Elevation Clv A Clv B Clv C PrfRsr Wr A Wr B Wr C Wr D Exfil User Total ft tuft ft cfs cfs cfs cfs cfs cfs cfs cfs cfs cfs cis 0.10 0 13.10 0.00 0.00 0.013 0.000 0.10 253 13.10 4,63 4.fi3 iC - 0.00 0.06 - 0.013 - = 13 0.013 0,20 507 13.20 4.63 is - - 0.00 0,00 0.026 0.026 0,30 760 13.30 4.63 is -- - - 0.00 0.00 -- - 0.040 - 0.040 0.40 1,013 13,40 4,63 is - -- --- 0.00 0.00 - --- 0.053 - 0,053 0,50 1,267 13.50 4.63 is -- - --- 0.00 0,00 0.066 - 0.066 0,60 1,520 13.60 4.63 is - -- --- 0.00 0.00 --- - 0.079 - 0.079 0.70 1.773 13.70 4.63 is - - -- 0.00 0,00 - 0.093 - 0,093 0.80 2,027 13.80 4.63 is - - - OM 0.00 -- - 0.106 - 0.106 0.90 2,280 13.90 4.63 is - --- 0.00 0.00 -- - 0.119 - 0.119 1.00 2,533 14.00 4.63 is - 0.00 0,00 -- - 0.132 - 0,132 1.10 2.853 14.10 4.63 is - - - OM 0.00 - - 0.135 0.135 1,20 3.172 14.20 4.63 is - - --- 0.00 0.00 -- 0.139 - 0.139 1.30 3,491 14.30 4.63 is -- --- 0.66 0,00 - - 0.142 - 0.800 1.40 3,811 14.40 4.63 is -- - 116 0.00 - - 0,145 2.005 1.50 4,130 14.50 4,63 is -- -- 3.42 0.00 0.148 - 3.566 1.60 4,449 14.60 5.26 is - -- 5.26 0.00 -- 0.151 - 5.413 1.70 4,769 14.70 6.46 is -- - 6.46 s 0,00 -- - 0.155 - 6.612 1.80 5,088 14.80 6.69 is -- - --- 6.69 s 0.00 -- - 0.158 - 6.851 1,90 5,407 14.90 6.86 is - - --- 6.86 s 0.00 - - 0.161 - 7,019 2.00 5,727 15.00 7.00 is - - - - 6.99 s 0.00 - 0.164 --- 7.158 2.10 6,118 15.10 7.12 is -- - - 7.12 s 1.23 -- - 0.168 --- 8.518 2.20 6,509 15.20 7.23 is -- - --- 7.23 s 3.49 -- 0.171 - 10.89 2.30 6,900 15.30 7.34 is - - - --- 7,33 s 6.41 -- -- 0.174 --- 13.92 2.40 7,291 15.40 7.44 is - - -- 7.43 s 9.87 -- - 0.178 - 17.48 2.50 7,682 15.50 7,54 is - -- --- 7.53 s 13.79 --- -- 0.181 21.50 2.60 8,073 15.60 7.64 is - -- 7.64 s 18.13 - - 0.185 - 25.95 2.70 8,464 15.70 7.73 is - - - -- 7.73 s 22.84 --- - 0.188 - 30.76 2.80 8.855 15.80 7.83 is -- - --- 7.82 s 27.91 - - 0.192 - 35.92 2.90 9,246 15.90 7.92 is - - 7.90 s 33.30 -- -- 0.195 - 41.39 3.00 9,637 16.00 8,01 is -- -- -- 8,01 s 39,00 -- - 0,199 - 47.21 3.03 9.786 16.03 8,04 is - - --- 8.03 s 40.77 - - 0.205 - 49,01 3.06 9.934 16.06 8.07 is - - 8.05 s 42.56 --- - 0.211 - 50.82 3.09 10,083 16.09 8.09 is - - -- 8.06 s 44.38 - 0.218 - 52.66 3.12 10,232 16.12 8.12 is - - 8.10 s 46.23 --- - 0.224 -- 54.55 3.15 10,529 16.15 8.15 is 8.13 s 49.10 0.237 - 56.45 3.18 10,529 16.18 8.77 is 8.15 s 49.99 = - 0.237 - 58.38 3.21 10.678 16.21 8.20 is _ - - 8.17 s 51.91 0.243 - 60,32 Continues on next page... 7 SaII{I i it ter 1 Stage 1 Storage 1 Discharge Table Stage Storage Elevation Clv A ft tuft ft cts 3.24 10,826 16.24 8.23 is 3.27 10.975 16.27 8.25 is 3.30 11124 16,30 8.28ic ...End • • Clv B CIv C PffRssr wr A wr B wr C wr D Extil user Total cfs cfs cts cfs cis cfs cfs cfs cfs cfs — — -- 8.22 s 53.85 0.249 — 62.32 -- - — 8.23 s 55.82 -- -- 0.256 — 64.30 — — -- 8.27 s 57.81 — — 0.262 — 66.34 C: • 8 Hydrograph Report Hydratlow Hydrographs Extension for AutoCADO Civil 3DDO 2016 by Autodesk, Inc, v10.5 10yd. No. 3 Pre Development Hydrograph type = SCS Runoff Storm frequency = 1 yrs Time interval = 2 min Drainage area = 0.900 ac Basin Slope = 0.0 % Tc method = User Total precip. = 3.60 in Storm duration = 24 hrs ' Composite (ArealCN) _ + (0.900 x 86)] 10.900 Q (Cfs) 3.00 • 2.00 1.00 0.00 11 ' 0 2 4 Hyd No. 3 0 6 8 Wednesday, 041 11 12018 Peak discharge = 2.831 cfs Time to pear = 12.00 hrs Hyd. volume = 7,369 CA Curve number = 86* Hydraulic length = 0 ft Time of conc. (Tc) = 10.00 min Distribution = Type II Shape factor = 484 Pre Development Hyd. No. 3 -- 1 Year Q (cfs) 3.00 2.00 1.00 ' - ' 0.00 10 12 14 16 18 20 22 24 26 Time (hrs) Hydrograph Summary Report Hydraflow Hydrographs Extension for AutoGApO Civil 3pO 2016 by Autodesk, Inc. 00.5 Hydrograph typo (origin) SCS Runoff Reservoir SCS Runoff P1320 Sand • C� 10 Hydrograph Report Hydraflow Hydrographs Extension for AutoCADO Civil 3130 2016 by Autodesk, Inc, v10.5 16yd. No. 1 Post Development Hydrograph type = SCS Runoff Storm frequency = 10 yrs Time interval = 2 min Drainage area = 0.910 ac Basin Slope = 0.0 % Tc method = User Total precip. = 6.76 in Storm duration = 24 hrs " Composite (Area/CN) = [(0.780 x 98) + (0.130 x 84)11 0.910 Q (cfs) 10.00 I 08.00 tO 4.00 2.00 riTTil 0.0 2.0 Hyd No. 1 Wednesday, 04111 12018 Peak discharge = 8.308 cfs Time to peak = 11.93 hrs Hyd. volume = 19,462 cult Curve number = 96* Hydraulic length = 0 ft Time of conc. (Tc) = 5.00 min Distribution = Type II Shape factor = 484 Post Development Hyd, No. 1 -- 10 Year Q (cfs) 10.00 8.00 6.00 4.00 2.00 0 00 4.0 6.0 8.0 10.0 12.0 14.0 16.0 18.0 20.0 Time (hrs) 11 Hydrograph Report Hydraflow Hydrographs Extension for AutoCA O Civil 3DO 2016 by Autodesk, Inc. v10.5 I&yd. No. 2 Sand Filter 1 Hydrograph type = Reservoir Storm frequency = 10 yrs Time interval = 2 min Inflow hyd. No. = 1 - Post Development Reservoir name = Sand Filter 1 Storage Indication method used. Outflow includes eAltration. Q (cfs) 10.00 08.00 . M 4.00 2.00 Peak discharge Time to peak Hyd. volume Max. Elevation Max. Storage Sand Filter 1 Hyd. No. 2 -- 10 Year Wednesday. 04 / 1112018 = 6.751 cfs = 12.00 h rs = 19,443 cuft = 14.77 ft = 4,955 cult Q (cfs) 10.00 M 4.00 2.00 0.00 0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 Time (hrs) Hyd No. 2 Hyd No. 1 JTTi rl. [ Total storage used = 4,955 cult M Hydrograph Report Hydratlow Hydrographs Extension for AutoCAd® Civil M 2016 by Autodesk, Inc. 00.5 loyd. No. 3 Pre Development Wednesday. 04 Ill 12018 Hydrograph type = SCS Runoff Peak discharge = 6.437 cfs Storm frequency = 10 yrs Time to peak = 12.00 hrs Time interval = 2 min Hyd. volume = 17,301 cuft Drainage area = 0.900 ac Curve number = 86" Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 10.00 min Total precip. = 6.76 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 ' Composite (Area/CN) _ + (0.900 x 86)1 / 0.900 Q (cfs) 7.00 6.00 40 5.00 4.00 3.00 2.00 1.00 0 2 4 Hyd No. 3 Pre Development Hyd. No. 3 -- 10 Year i Q (cfs) 7.00 . 1r 5.00 4.00 3.00 2.00 Q1Z] r.T.ri 6 8 10 12 14 16 18 20 22 24 26 Time (hrs) C: • iF Hydrograph Summary Report Hydraflow Hydrographs Extension for AutoCADS Civil 3178 2016 by Autodesk, Inc. u10.5 Hydrograph Peak Time Time to Hyd. Inflow MaXImUm Total Hydrograph type flow Interval Peak volume hyd(s) elevation strge used Description (origin) (cis( (min) (min) (Cott) (ft) (tuft) 1 SCS Runoff 14.24 2 716 34,111 ------ ------ ---- Post Development 2 Reservoir 12.04 2 720 34.092 1 15.26 6,658 Sand Filter 1 3 SCS Runoff 11.79 2 720 32,860 Pre Development P1320 Sand Filter.gpw Return Period: 100 Year Wednesday. 04 1 11 12018 14 Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD,81 Civil 3DO 2016 by Aulodesk, Inc. v10.w 0yd. No. 1 Post Development Hydrograph type = SCS Runoff Storm frequency = 100 yrs Time interval = 2 min Drainage area = 0.910 ac Basin Slope = 0.0 % Tic method = User Total precip. = 11.50 in Storm duration = 24 hrs ' Composite (ArealCN) = [(0.780 x 98) + (0.130 x 84)] 10,910 Q (cfs) 15.00 9.00 • M M 3.00 0.00 -!- 00 0 Wednesday. 041 11 12018 Peak discharge = 14.24 cfs Time to peak = 11.93 hrs Hyd. volume = 34,111 cuft Curve number = 96* Hydraulic length = 0 ft Time of conc. (Tc) = 5.00 min Distribution = Type II Shape factor = 484 Post Development Hyd. No. 1 — 100 Year 2.0 4.0 6.0 8.0 10.0 12.0 14.0 Hyd No. 1 Q (cfs) 15.00 12M 9.00 3.00 0.00 16.0 18.0 20.0 Time (hrs) 15 Hydrograph Report Hydraflow Hydrographs Extension 0yd. No. 2 for AutoCAOS Civil MID 2016 by Autodesk, Inc. v10.5 Wednesday, 04Ill 12018 Sand Filter 1 Hydrograph type = Reservoir Peak discharge = 12.04 cfs Storm frequency = 100 yrs Time to peak = 12.00 hrs Time interval = 2 min Hyd. volume = 34,092 cult Inflow hyd. No. = 1 - Post Development Max. Elevation = 15.26 ft Reservoir name = Sand Filter 1 Max. Storage = 6,658 tuft Storage Indication method used. Outnow includes eAltration. Sand Filter 1 Q (cfs) Hyd. No. 2 — 100 Year Q (cfs) 15.00 15.00 0.00 12.00 9,00 9.00 6.00 6,00 3.00 3.00 0.00 0.00 0 2 4 6 8 10 12 14 16 18 20 22 24 26 Hyd No. 2 Hyd No. 1 [E=t Total storage used Time (hrs) = 6,658 cult Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2016 by Autodesk, Inc. v10.5 0yd. No. 3 Pre Development Hydrograph type = SCS Runoff Storm frequency = 100 yrs Time interval = 2 min Drainage area = 0.900 ac Basin Slope = 0.0 Tc method = User Total precip. = 11.50 in Storm duration = 24 hrs Composite (ArealCN) _ + (0.900 x 86)1 10.900 Q (cfs) 12.00 M M 4.00 2.00 GTaTi7 0 2 4 Hyd No. 3 Wednesday, 041 11 12018 Peak discharge = 11.79 cfs Time to peak = 12.00 hrs Hyd. volume = 32,860 cult Carve number = 86* Hydraulic length = 0 ft Time of cone. (Tc) = 10.00 min Distribution = Type II Shape factor = 484 Pre Development Hyd. No. 3 — 100 Year Q (cfs) 12.00 10.00 I . IS 4.00 2.00 rrra� 6 8 10 12 14 16 18 20 22 24 Time (hrs) • n LJ • 17 Hydraflow Rainfall Report Hydraflow Hydrographs Extension for AutoCADM Civil 3D® 2016 by Autodesk, Inc. v10.5 Wednesday. 041 11 12018 Return IntensnY-Durstion-Frequenc Equation Coefficients (FHA) Period (Yrs) B D E (NIA) 1 0.0000 0.0000 0.0000 2 69.8703 13.1000 0.8658 3 0.0000 0.0000 0,0000 5 79.2597 14.6000 0.8369 10 88.2351 15.5000 0.8279 25 102,6072 16,5000 0.8217 50 114,8193 17.2000 0.8199 100 127.1596 17.8000 0.8186 File name. SampleFHA.idf Intensity = B / (Tc + O)^E Return Period Intensity Values (Inlltr) (Yrs) 5 min 10 15 0.00 20 0.00 25 0.00 30 0.00 35 0.00 40 0.00 45 0.00 50 0.00 55 0.00 I BO 0.00 1 0.00 0.00 2 5.69 4.61 3.89 3.38 2.99 2.69 2A4 2.24 2.07 1.93 1.81 130 3 0.00 0.00 0.00 O.QO 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 5 6.57 5.43 4.65 4.08 3.65 3.30 3.02 2.79 2.59 2.42 2.27 2.15 10 1 7.24 6.04 5.21 4.59 4.12 3.74 3.43 3.17 1 2.95 2.77 2.60 2.45 25 8.25 6.95 6.03 5.34 4.80 4.38 4.02 3.73 3A8 3.26 3.07 2.91 50 9.04 7.65 6.66 5.92 5.34 4.87 4.49 4.16 3.88 3.65 3.44 3.25 100 9.83 8.36 7.30 6.50 5.87 5.36 4.94 4.59 4.29 4.03 3.80 3.60 Tc = time In minutes. Values may exceed 60 Storm Rainfall Precipitation Table (in) Distribution 1-yr 2-yr 3-yr 5-Yr 10-yr 25 yr 50-yr 1oo-yr SCS 24-hour 3.60 4.37 0.00 0.00 6.76 8.42 OAO 11.50 SCS 6-Hr 0.00 Q.00 0.00 0.00 0.00 0.00 I 0.00 0.00 Huff -1st 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Huff-2nd 000 0.00 0.00 0.00 000 1 000 0.00 0.00 Huff-3rd 0.00 0.00 0.00 0.00 0.00 000 0.00 0.00 Huff-4th 0.00 0.00 0.00 1 0.00 0.00 0.00 0.00 0.00 Huff-Indy MO 0.00 1 0.00 0.00 0.00 0.00 0.00 0.00 Custom J 0100 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Hydraf low Table of Contents Hydraflow Hydrographs Extension for AutoCADS Civil 31M2016 by Autodesk, Inc. 00.5 is P1320 Sand Filter.gpw Wednesday, 04111 12018 atershedModel Schematic..................................................................................... Hydrograph Return Period Recap............................................................................. 2 1 - Year SummaryReport......................................................................................................................... 3 HydrographReports................................................................................................................... 4 Hydrograph No. 1, SCS Runoff, Post Development...... ........................................................... 4 Hydrograph No. 2, Reservoir, Sand Filter 1............................................................................. 5 Pond Report - Sand Filter 1................................................................................................. 6 Hydrograph No. 3, SCS Runoff, Pre Development.................................................................. 8 10 - Year SummaryReport ......................................................................................................................... 9 HydrographReports................................................................................................................. 10 Hydrograph No. 1, SCS Runoff, Post Development............................................................... 10 Hydrograph No. 2, Reservoir, Sand Filter 1........................................................................... 11 Hydrograph No. 3, SCS Runoff, Pre Development................................................................ 12 100 - Year SummaryReport ....................................................................................................................... 13 HydrographReports................................................................................................. ... 14 Hydrograph No. 1, SCS Runoff, Post Development............................................................... 14 Hydrograph No. 2, Reservoir, Sand Filter 1........................................................................... 15 Hydrograph No. 3, SCS Runoff, Pre Development................................................................ 16 OFReport .................................................................................................................. 17 0 Watershed Model Schematic Hydraflow Hydrographs Extension for AuloCAD® Civil 3D® 2016 by Autodesk. Inc. v10.5 • • t"Qngia SCS Runoff SCS Runoff Reservoir Project: P1320 • E Ad Hydrograph Return Period Rep y ra ow Hydrographs Extension for AutoCADS Civil 3EM 2016 by Autodesk, Inc. 00.5 Hydrograph Inflow Peak Outflow (Cfs) Hydrograph type hyd(s) Description (origin) SCS Runoff 1-yr 2-yr 3-yr S-yr 10-yr 25-yr 50-yr 100-yr 14.76 Pre -Developed 1 2.321 ---- — 7.040 - -- - 2 SCS Runoff --- 5.333 - - --- 11.24 ------ ------ 1994 Past -Developed 3 Reservoir 2 0200 -- -- 4.493 ------- ----- 1542 Wei Pond A I r Proj. 031 2 12018 file: P1320 Wetpond A.gpw Friday. I 3 Hydrograph Summary Report Hydraflow Hydrographs Extension for AutoCAD® Civil 3138 2016 by Autodesk, Inc. v10.5 Hydrograph type (origin) Peak Time Time to flaw Interval IPeak (cis) (min) (min) Hyd. volu (Cuft) 1 SCS Runoff 2.321 2 730 9.2, 2 SCS Runoff 5.333 2 724 16. 3 Reservoir 0.200 2 922 14, 1 P 1320 Wetpond A gpw no 261 208 Inflow hyd(s) Maximum elevation (ft) Total strge used (Cult) Hydrograph Description Pre -Developed -- — _ _ Post -Developed 2 13.59 28.043 Wet Pond A jReturn Period 1 Year � Friday, 03 / 2 1 2018 Hydrograph Report 4 Hydrographs Extension for AutoCADO Civil 3DO 2016 by Autodesk. Inc. v10.5 rTN yo. 1 Pre -Developed Hydrograph type = SCS Runoff Storm frequency = 1 yrs Time interval = 2 min Drainage area = 1.880 ac Basin Slope = 0.0 % Tc method = User Total precip. = 3.60 in Storm duration = 24 hrs Composite (Area1CN) _ [(0 150 x 74) + (1.690 x 73) + (0.040 x 98)I 1 1.880 Q (cfs) 3.00 • FAIT 1.00 0.00 0 2 4 Hyd No. 1 Friday. 0312 12018 Peak discharge = 2.321 cfs Time to peak = 12.17 hrs Hyd. volume = 9,215 cult Curve number = 74* Hydraulic length = 0 ft Time of conc. (Tc) = 10.00 min Distribution = Type III Shape factor = 484 Pre -Developed H- d No 1 -- 1 Year 6 8 10 12 14 Q (cfs) 3.00 2.00 1.00 a.00 16 18 20 22 24 26 Time (hrs) • 0 • Hydrograph Report draflow Hydrographs Extension for AutoCADO Civil 3[W 2016 by Autodesk, Inc. v10.5 yd. No. 2 Post -Developed Hydrograph type = SCS Runoff Storm frequency = 1 yrs Time interval = 2 min Drainage area = 1.880 ac Basin Slope = 0.0 % Tc method = User Total precip. = 3.60 in Storm duration = 24 hrs ' Composite (ArealCN) = [(1 280 x 98) + (0.600 x 74)11 1.880 Q (cfs) 6.00 4.00 MR 2.00 M1 11 1 1 0 2 4 Hyd No. 2 6 8 5 Friday, 0312 12018 Peak discharge = 5.333 cfs Time to peak = 12.07 hrs Hyd. volume = 16,261 cuft Curve number = 90* Hydraulic length = 0 ft Time of conc. (Tc) = 5.00 min Distribution = Type III Shape factor = 484 Post -Developed Hyd. No. 2 -- 1 Year 0 (cfs) 6.00 500 400 3.00 2.00 1.00 �- 0.00 10 12 14 16 18 20 22 24 Time (hrs) U • Hydrograph Report draflow Hydrographs Extension for AutoCADC Civil 3DS 2016 Dy Autodesk. Inc v10 5 oyd.No. 3 Wet Pond A Hydrograph type = Reservoir Storm frequency = 1 yrs Time interval = 2 min Inflow hyd. No. = 2 - Post -Developed Reservoir name = BMP 2: Wet Pond A Storage Indication method used. Wet pond routing start elevation = 12 00 ft. �� 00 3.00 2.00 1.00 MID 0 0- 6 Friday. 03 / 2 12018 = 0.200 cfs = 15.37 hrs = 14,208 cuft = 13.59 ft = 28,043 cult Peak discharge Time to peak Hyd. volume Max. Elevation Max_ Storage Wet Pond A Hyd No 3 -- 1 Year 10 20 30 40 50 60 70 80 90 Hyd No. 3 Hyd No. 2 i f i 1 I f i` Total storage used = 28,043 cult Q (cfs) & 00 5.00 4.00 oa 2.00 1.00 0 00 100 Time (hrs) E • 0 Pond Report 7 Hydraflow Hydrographs Exlension for AutoCAD® Civil 3D® 2016 by Autodesk. Inc v10 5 Friday. 03 12 12018 Pond No. I - BMP 2: Wet Pond A Pond Data Contours -User-defined contour areas. Conic method used for volume caiculation. Begining Elevation = 7.00 ft Stage ! Storage Table Stage (ft) Elevation (ft) Contour area (sgft) Incr. Storage (tuft) Total storage (tuft) 0.00 7.00 1.308 0 0 1.00 8.00 1,785 1,540 1,540 2-DO 900 2.332 2.052 3,592 2.50 9.50 3,436 1,433 5,025 3.00 10.00 3.829 1 815 6.841 4.00 11 DO 4.659 4 237 11,077 5,00 12.00 5.541 5,093 16,170 6,00 13.00 7,993 6.729 22.899 7.00 14.00 9,399 8 686 31.585 800 15-00 10,644 10,014 41.599 900 16.00 11,921 11,275 52.875 Culvert I Orifice Structures Weir Structures [A] [B] [C] [PrfRsr] [A] [B] [C] [D] Rise (in) = 12-00 1.25 0.00 0.00 Crest Len (ft) = 2-00 1000 8,00 0.00 Span (in) = 12.00 1.25 0,00 000 Crest El, (ft) = 13.50 1400 15,00 0-00 No. Barrels = 1 1 0 0 Weir Coeff. = 2.60 2,60 260 3,33 Invert El, (ft) = 12.00 12.00 000 0.00 Weir Type = Broad Broad Broad --- Length (ft) = 57.00 1.00 0,00 000 Multi -Stage = Yes No Yes No Slope (%) = 070 1-00 0,00 n1a N-Value = 013 .013 .013 n1a Orifice Coeff. = 0,60 0-60 0,60 0,60 ExfII.(lnlhr) = 0,000 (by Contour) Multi -Stage = n!a Yes- No No TW Elev. (ft)- Note CulveNWiCe outflows are analyzed --0-00 --- - - - under inlet (ie) and outlet (oc) control. Weir risers chocked for of" Conditions (ic) and Sutmergence esl Stage I Storage 1 Discharge Table Stage Storage Elevation Clv A Clv B Clv C PrfRsr Wr A Wr B Wr C Wr D Exfil User Total ft tuft ft cfs cfs cfs cfs cfs cfs cfs cfs cfs cfs cfs 000 0 7.00 0.00 0-00 -- --- 000 000 000 O.DOO 0 t0 154 7-10 000 000 --- 000 000 000 - .-- --- 0-000 020 308 720 0.00 0.00 --- --- 000 000 000 0.000 030 462 7.30 0.00 0.00 --- --- 0.00 0.00 000 --- 0.000 040 616 740 0 00 0.00 --- --- 000 000 000 .-- --- 0-000 0.50 770 7-50 0 00 0.00 --- --- 000 000 000 --- 0.000 0 60 924 7.60 O.00 000 --- --- 0.00 0.00 000 0.000 070 1.078 7-70 000 0.00 --- --- 000 000 0.00 --- 0.000 0 80 1.232 780 0.00 0.00 --- --- 0.00 0.00 000 0.000 0.90 1,386 790 0 00 0.00 --- 0.00 000 0-00 --- 0 000 1.00 1.540 8 00 0.00 0.00 --- --- 0.00 0-00 0 00 0 000 1 10 1,745 8 10 0.00 0.00 --- &00 0 00 0 00 0.000 1 20 1,951 820 0.00 0.00 --- --- 0.00 0 00 0 00 --- --- 0.000 130 2.156 8.30 0.00 0.00 --- 0.00 0.00 0.00 --- --- --- 0.000 1 40 2.361 8.40 000 0.00 --- --- 0.00 0,00 0 00 ... --- 0 000 1.50 2,566 8-50 000 0.00 --- 0.00 0,00 0.00 --- --- 0000 1 60 2.772 860 0.00 0.00 --- --- 0.00 0.00 0,00 0 000 1 70 2,977 8.70 0.00 0.00 --- --- 0,00 0 00 0 00 -- --- 0 000 1.80 3,182 880 0.00 0.00 --- --- 0.00 0.00 0.00 0.000 1.90 3.387 8.90 0.00 0.00 --- --- 0.00 0,00 0 00 --- --- 0 000 200 3,592 9,00 000 0.00 --- --- 0,00 0.00 0,00 --- --- 0 000 2,05 3.736 9.05 0.00 0.00 --- --- 0.00 0-00 0 00 --- --- 0 000 2 10 3,879 9,10 DOD 0.00 --- --- 0-00 0 00 0.00 0 000 2,15 4.022 9 15 0.00 000 --- --- 0.00 0.00 0.00 0.000 220 4.166 9.20 0.00 000 --- --- 0.00 0,00 0 00 - --- --- 0 000 2,25 4.309 9.25 000 000 --- --- 0-00 0.00 0,00 --- --- .- 0 000 2.30 4.452 9-30 0.00 0.90 --- --- 0.00 0.00 0,00 - --- 0 000 2-35 4.595 9.35 000 000 --- --- 0 00 0,00 0.00 --- --- 0.000 2.40 4.739 9.40 0.00 000 0.00 0.00 0 00 --" 0,000 2A5 4.882 9.45 0.00 000 0.00 0.00 0,00 -- --- 0 000 2-50 5,025 9.50 0.00 -- 0 00 0.00 0,00 0,00 --- --- 0 000 2-55 5.207 9.55 0.00 000 --- --- 0.00 000 0.00 --- --- --- 0,000 Continues on next page • • C7 8 BMP 2 Wet Pond A Stage ! Storage 1 Discharge Table tags Storage Elevations CEv A Civ t3 Clv C PrtRsr Wr A Wr B Wr C Wr D E=xfil User Total Cuft ft efs eft cfs Cfs Cfs Cfs Cft cfs Cfs cfs Cfs 2,60 5.388 9.60 0.00 0.00 -- --- 0.00 0.00 0.00 --- --- 0.000 2,65 5.570 9.65 0.00 0.00 --- 0.00 0.00 0.00 --- --- 0.000 2.70 5,751 9-70 0.00 0,00 0.00 0.00 0.00 0.000 2,75 5,933 9.75 0.00 0.00 --- - 0.00 0.00 0.00 --- -•- 0.000 2,80 6,114 9.80 0.00 0.00 - 0.00 0.00 0.00 --- --- --- 0.000 2.85 6.296 9.85 0,00 0.00 0.00 0.00 0.00 --- --- --- 0.000 2.90 6.478 9.90 0.00 0.00 --- - 0.00 0.00 0.00 . - 0.000 2.95 6,659 9.95 0.00 0.00 - 0.00 0.00 0.00 --- --- 0.000 3.00 6.841 10.00 0.00 0.00 -- --- 0.00 0.00 0.00 --- --- 0.000 3.10 7.264 10.10 0.00 0.00 - --- 0.00 0.00 0.00 --- --- 0.000 3.20 7,688 10.20 0.00 0,00 0.00 0.00 0.00 --- - --- 0.000 3.30 6.112 10.30 0.00 0.00 -- --- 0.00 0.00 0.00 -- - --- 0.000 3.40 8.535 10.40 0.00 0.00 --- --- 0-00 0.00 0.00 -- - 0.000 3.50 8.959 10.50 0.00 OM -- 0.00 0.00 0.00 - --- --- 0.000 3.60 9.383 10.60 0.00 0.00 -- - 0.00 0.00 0.00 - --- 0.000 3,70 9,806 10.70 0.00 0.00 - - 0.00 0.00 0.00 - -- 0.000 3.80 10.230 10.80 0.00 0,00 -- 0.00 0.00 0.00 -- --- --- 0-000 3.90 10.654 10.90 0,00 0.00 --- - 0.00 0.00 0.00 - --- --- 0.000 4.00 11.077 11.00 0.00 0.00 --- --- 0.00 0.00 0.00 --- --- --- 0.000 4.10 11.587 11.10 0.00 0.00 -- --- 0.00 0.00 0A0 --- --- --- 0.000 4.20 12.096 11,20 0,00 0.00 --- --- 0.00 0.00 0.00 --- --- --- 0.000 4.30 12.605 11.30 0.00 0.00 --- --- 0.00 0.00 0.00 --- •-• --- 0.000 4.40 13,115 11.40 0.00 0.00 --- •-- 0.00 0.00 0.00 --- --- 0.000 4.50 13.624 11,50 0.00 0.00 - --- 0-00 0.00 0.00 --- --- --- 0.000 4.60 14.133 11.60 0.00 0.00 --- --- 0.00 0.00 0.00 -- --- --- 0.000 4.70 14.643 11.70 0.00 0-00 - 0.00 0.00 0.00 --- 0.000 4.80 15.152 11,80 0,00 0.00 - --- 0.00 0.00 0.00 -- --- 0.000 4.90 15,661 11.90 0.00 0.00 - --- 0.00 0.00 0.00 - 0.000 5.00 16,170 12.00 0.00 0.00 - --- 0.00 0.00 0.00 -- --- --- 0.000 5.10 16,843 12.10 0.01 is 0.01 iC --- --- 0.00 0.00 0.00 --- --- --- 0.009 5.20 17.516 12.20 0.02 is 0.02 is --- --- 0.00 0.00 0.00 --- --- --- 0-015 5.30 18,189 12.30 0.02 iC 0.02 is --- --- 0.00 0.00 0.00 --- --- --- 0.020 5.40 18,862 12.40 0.02 is 0.02 is - -- 0.00 0.00 0.00 -- --- --- 0.024 5.50 19.535 12.50 0.03 is 0.03 iC --- 0.00 0.00 0.00 0.027 5.60 20.208 12.60 0.03 is 0,03 is �- 0.00 0.00 0.00 - - --- 0.030 5.70 20.881 12.70 0.03 is 0.03 is 0.00 0.00 0.00 - - 0.032 5.80 21.554 12.80 0.04 is 0.03 is - --- 0.00 0.00 0.00 --- - 0.035 5.90 22.227 12.90 0.04 is 0.04 is --- 0.00 0.00 0.00 --- --- 0.037 6.00 22.899 13.00 0.04 is 0.04 is --- -- 0.00 0.00 0.00 --- --- 0.039 6.10 23,768 13.10 0.04 le 0.04 is --- --- 0.00 0.00 0.00 --- 0.041 6,20 24,637 13.20 0.04 is 0.04 is --- 0.00 0.00 0.00 --- --- ••• 0.043 6.30 25,505 13.30 0.05 is 0.04 is --- -- 0.00 0.00 0.00 0.045 6.40 26.374 13.40 0.05 is 0.05 iC --- 0.00 0.00 0.00 --- --- --- 0,047 6.50 27,242 13.50 0.05 is 0.05 is -- 0.00 0.00 0.00 --- -- --- 0-048 6.60 28,111 13.60 0.21 is 0.05 is --- --- 0.16 0.00 0.00 --- --- --- 0.213 6.70 28,979 13.70 0.52 is 0.05 is 0.47 0.00 0.00 --- --- --- 0.513 6.80 29,848 13.80 0.91 iC 0.05 is --- 0.85 0.00 0.00 - 0.902 6.90 30.717 13.90 1.38 is 0.05 is - 1.32 0.00 0.00 -- 1.362 7.00 31.585 14A0 1.90 is 0.05 is 1.84 0.00 0.00 --- --- 1.884 7.10 32,587 14.10 2.46 oc 0.04 is --- 2.42 0.82 0.00 -- --- --- 3.280 7.20 33,588 14.20 3.08 oc 0.04 iC --- 3.05 2.33 0.00 --- 5.408 7.30 34,589 14.30 3.61 oc 0.03 is --- --- 3.57 s 4.27 0.00 -- 7.879 7,40 35,591 14.40 3.95 0C 0.03 is --- •-- 3.92 s 6.58 0.00 - - --- 10.53 7,50 36,592 14.50 4.22 oc 0.03 is -- --- 4.20 s 9,19 0.00 -•- 13.41 7.60 37.594 14M 4.46 oc 0.02 is - -- 4.43 s 12.08 0.00 - -- 16.54 7.70 38,595 14.70 4.66 oc 0.02 is ---- --- 4.64 s 15,23 0.00 -- 19.89 7.80 39,596 14.80 4.84 oc 0.02 is - --- 4.82 s 18.60 0,00 - --- 23.45 7.90 40,598 14.90 5.01 oc 0.02 iC - 4 99 s 2220 0.00 -- --- -•- 27.21 8.00 41,599 15.00 5.16 0C 0.02 is --- -•- 5 14 s 26.00 0.00 31.16 8.10 42,727 15,10 5.36 oc 0.01 iC --- --- 4 69 s 30.00 0,66 -• --- --- 35.36 8.20 43,854 15.20 5.54 oc 0.01 is - --- 4.08 s 34.18 1.45 s - --- --- 39.71 8.30 44,982 18,30 5.68 oc 0.01 EC - --- 3.69 s 38.54 1.97 s --- --- 44.21 8.40 46,109 15.40 5.80 0c 0.01 is - 3.41 s 43.07 2.38 s -- 48.87 8,50 47.237 15.50 5.91 oc 0.01 iC - - 3.19 s 47.77 2.71 s - --- --- 53-68 8.60 48.364 15,60 6.02 oc 0.01 is - --- 3.02 s 52.62 2,98 s --- 58.63 8.70 49.492 15.70 6.12 oc 0,00 is 2.89 s 57.63 3 22 s -- - --- 63.74 8,80 50.619 15-80 6.23 oc 0.00 is - --- 2.78 s 62.79 3.43 s --- 69.00 51.747 15,90 6.32 oc 0.00 is - --- 2.70 s 68.09 3.61 s --- - 74.40 9.00 �.8.90 52,875 16.00 6.42 oc 0.00 is - 2.63 s 73.54 3.79 s --- 79 96 ..End d u • • e✓ H y d ro g ra p h Summary Report Hydraflow Hydrographs Extension for AutoCADV Civil 3D®2016 by Autodesk. Inc. v10.5 Hydfograph Time Time to Hyd. Inflow Maximum Total Hydrograph type TPeak w interval Peak volume hyd(a) ielevation strge used Description (origin) fa) (min) (min) (tuft) I (ft) (tuft) 1 SCS Runoff 7.040 2 728 26,980 -- ---- - -- Pre -Developed 2 SCS Runoff 11.24 2 724 35,752 --- -- -- Post -Developed 3 Reservoir 4.493 2 734 33.627 2 14.16 33,157 Wet Pond A P1320 Wetpond A.gpw Return Period: 10 Year Friday, 031212018 • 0 • 14 Hydrograph Report ydraflow Hydrographs Extension for AMCADG) Civil 310 2016 by Autodesk, Inc. v10.5 yd. No. 1 Pre -Developed Hydrograph type = SCS Runoff Storm frequency = 10 yrs Time interval = 2 min Drainage area = 1.880 ac Basin Slope = 0.0 % Tc method = User Total precip. = 6.76 in Storm duration = 24 hrs ' Composite (Area1CN) = 1(0.150 x 74) + (1.690 x 73) * (0 040 x 98)11 1 880 Q (cfs) s.0i 9 6.00 4.00 99 t 2 4 6 8 Hyd No. 1 Friday. 03 f 2 / 2018 Peak discharge = 7.040 cfs Time to peak = 12.13 hrs Hyd, volume = 26,980 cuft Curve number = 74* Hydraulic length = 0 ft Time of conc. (Tc) = 10.00 min Distribution = Type III Shape factor = 484 Pre -Developed Hyd. No. 1 -- 10 Year Q (Cfs) 8.00 . �1 4.00 MM 0.00 10 12 14 16 18 20 22 24 26 Time (hrs) C] • • 11 Hydrograph Report ydrafow Hydrographs Extension for AutoCAD® Civil 31M 2016 by Autodesk. Inc. v10.5 yd. No. 2 Post -Developed Hydrograph type = SCS Runoff Storm frequency = 10 yrs Time interval = 2 min Drainage area = 1.880 ac Basin Slope = 0.0 % Tc method = User Total precip. = 6.76 in Storm duration = 24 hrs ' Composite (Area1CN) = 1(1.280 x 98) + (0.600 x 74)) / 1.880 Q (Cfs) 12.00 9000 8.00 6,00 4.00 r M] 0 00 -L lie 4 6 i N ( , Friday. 03 / 2 12018 Peak discharge = 11.24 cfs Time to peak = 12.07 hrs Hyd. volume = 35,752 cult Curve number = 90* Hydraulic length = 0 ft Time of conc. (Tc) = 5.00 min Distribution = Type III Shape factor = 484 Post -Developed Hyd No. 2 -- 10 Year Q (cfs) 12.00 10.00 8.00 4.00 2.00 0.00 8 10 12 14 16 18 20 22 24 Time (hrs) 12 Hyd rog raph Report rafl" Hydrographs Extension for AutoCADV Civil 3DO 2016 by Autodesk. Inc. 00.5 yd. No. 3 Wet Pond A Hydrograph type = Reservoir Storm frequency = 10 yrs Time interval = 2 min Inflow hyd. No. = 2 - Post -Developed Reservoir name = BMP 2: Wet Pond A Storage Indication method used. Wet pond routing star! elevation = 12.00 ft Q (cfs 12.00 8.00 . �� 4.00 2.00 Peak discharge Time to peak Hyd. volume Max. Elevation Max. Storage Wet Pond A } Hyd. No. 3 -- 10 Year Friday 0312 / 2018 = 4.493 cfs = 12.23 hrs = 33,627 cuft = 14.16 ft = 33,157 cuft 4 8 12 16 20 24 28 32 Hyd No. 3 Hyd No. 2 I I I f T 1 Total storage used = 33,157 cult Q (cfs) 12.00 10.00 M81 4.00 2.00 36 Time (hrs) • r-I LJ 0 13 H y d ro g ra p h Summary Report Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2016 by Autodesk, Inc. 00.5 Hyd►ograph ty pe (origin) 1 I SCS Runoff 2 1 SCS Runoff 3 1 Reservoir P1320 Wetpond, Peak Time Time to flow interval Peak We) (min) (min) Hyd. volume (cult) Inflow hyd(s) Maximum elevation 00 Total Hyd strge used Des (cutt) 14.76 2 728 57,332 -- -- Pre-Develope 19.94 2 724 65.683 -- --- -- Post -Develop 15.42 2 728 63.504 2 14.57 37,236 Wet Pond A kgpw Return Period 100 Year Friday. 03 1 2 / 2018 rograph cription FJ 14 Hydrograph Report ydraflow Hydrographs Extension for AutoCAI MR Civil 30(�) 2016 by Autodesk. Inc. 00.5 yd. No. 1 Pre -Developed Hydrograph type = SCS Runoff Storm frequency = 100 yrs Time interval = 2 min Drainage area = 1.880 ac Basin Slope = 0.0 % Tc method = User Total precip. = 11.50 in Storm duration = 24 hrs Composite (ArearCN) = [(0 150 x 74) + (1.690 x 73) + (0.040 x 98)1/ 1.880 Q (Cfs) 15.00 102.00 • "I es 3.00 0.00 _L 0 Friday. 0312 12018 Peak discharge = 14.76 cfs Time to peak = 12.13 hrs Hyd. volume = 57,332 cult Curve number = 74* Hydraulic length = 0 ft Time of conc. (Tc) = 10.00 min Distribution = Type III Shape factor = 484 Pre -Developed Hyd. No. 1 -- 100 Year 2 4 6 8 10 12 14 Hyd No. 1 Q (Cfs) 15.00 12.00 M 3.00 0.00 16 18 20 22 24 26 Time (hrs) • • r� u lip Hydrograph Report dreflow Hydrographs Extension for AutoCAD® Civil NO 2016 by Autodesk, Inc. v10.5 yd. No. 2 Post -Developed Friday. 0312 / 2018 Hydrograph type = SCS Runoff Peak discharge = 19.94 cfs Storm frequency = 100 yrs Time to peak = 12.07 hrs Time interval = 2 min Hyd. volume = 65,683 tuft Drainage area = 1.880 ac Curve number = 90* Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 5.00 min Total precip. = 11.50 in Distribution = Type III Storm duration = 24 hrs Shape factor = 484 Composite (Area/CN) = [(1.280 x 98) + (0.600 x 74)111.880 Q (cfs) 21.00 12.00 - it i /1 Post -Developed Hyd. No. 2 - 100 Year 0.00 0 2 4 Hyd No. 2 Q (cfs) 21.00 18.00 15.00 12.00 9011161 r r.TO 6 8 10 12 14 16 18 20 22 24 Time (hrs) Hydrograph Report draflow Hydrographs Extension for AutoCADO Civil 3D® 2016 by Autodesk, Inc. 00.5 yd. No. 3 Wet Pond A Hydrograph type = Reservoir Storm frequency = 100 yrs Time interval = 2 min Inflow hyd. No. = 2 - Post -Developed Reservoir name = BMP 2: Wet Pond A Storage Indication method used. Wet pond routing start elevation = 12 00 ft Wet Pond A Peak discharge Time to peak Hyd. volume Max. Elevation Max. Storage 16 Friday. 0312 12018 = 15.42 cfs = 12.13 hrs = 63,504 cult = 14.57 ft = 37,236 cult Q (cfs) Hyd. No. 3 -- 100 Year Q (cfs) 21.00 21.00 00 18.00 15.00 15.00 12.00 12.00 9.00 9,00 6.00 6.00 3.00 3.00 0.00 - 0.00 0 2 4 6 8 10 12 14 16 18 20 22 24 26 Time (hrs) 0 Hyd No. 3 Hyd No. 2 I 11! l 1 Total storage used = 37,236 cult U • • 17 Hydraflow Rainfall Report orraflow Hydrographs Extension for AutoCADO Civil 300 2016 by Autodesk. Inc. v10.5 Friday, 0312 ! 2018 Intensity -Duration -Frequency Equation Coefficients (FHA) Return Period l (Yrs) B D E (NIA) 1 0.0000 0.0000 0.0000 - 2 69.8703 13.1000 0.8658 1-------- 3 0.0000 0.0000 0.0000-------- 5 79.2597 14.6000 0.8369-------- 10 88.2351 155000 08279 -------- 25 102.6072 16.5000 0.8217-------- 50 114.8193 I 17.2000 0,8199-------- 100 127.1596 17.8000 08186 ------ File name: SampleFHA.ldf Intensity = B 1 (Tc + D)AE Return Intensity Values (Infhr) Period (Yrs) 6 min 10 15 20 25 30 36 40 45 50 56 i so - } - - - 1 0-00 0,00 0.00 0.00 1 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 2 5.69 4,61 3.89 3.38 2.99 2.69 2.44 2.24 2.07 1,93 1Al 1.70 3 0.00 0,00 0.00 000 000 0.00 0,00 OM 0-00 0-00 0.00 0.00 5 6-57 543 4.65 4.08 1 3.65 3.30 3.02 2-79 2,59 242 2.27 2 15 I 10 7.24 604 5.21 4.59 i 4.12 3.74 343 3.17 2.95 2.77 260 246 25 8.25 1 6,95 6.03 534 4.80 4.38 4.02 3.73 3-48 3,26 3.07 2,91 50 9.04 T155 6.66 5.92 5.34 1 4.87 4A9 4,16 3,88 3.65 3.44 3,25 100 ` 9.83 8,36 7.30 6.50 5.87 1 5.36 I 494 4,59 4,29 4,03 3,80 3,60 1 Tc = time in minutes. Values may exceed 60. Precip file name: OANC IPT NUCLEUSFtClvihHydrafloMIDRSneadsFerry-24hprecipdepth.pcp (storm Rainfall Precipitation Table (in) Distribution 1-yr 2-yr 4.44 3-yr 0.00 5-yr 10 yr 5.74 676 25-yr 8.52 50-yr 100-yr 11.50 t SCS 24-hour 3.60 997 SCS 6-Hr 000 0.00 0-00 GOO 0.00 000 0,00 0.00 Huff -1st 0.00 0.00 0.00 I 0,00 0,00 0.00 0.00 000 Huff-2nd 0.00 0.00 000 0.00 0.00 000 000 000 Huff-3rd 000 000 000 0.00 0.00 000 0.00 000 Huff-4th 0-00 0.00 0.00 0.00 000 0.00 0.00 0.00 � Huff-Indy 1 0.00 0.00 0.00 I 0.00 000 0.00 0.00 0.00 Custom 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0 r� • Hydraf low Table of Contents P1320 V1lelpond A,gpw araflow Hydrographs Extension for AutoCADO Civil 3130 2016 by Autodesk, Inc. v10.5 Friday, 031212018 Watershed Model Schematic..................................................................................... Hydrograph Return Period Recap............................................................................. 2 1 -Year SummaryReport ......................................................................................................................... 3 HydrographReports........................................................................................ Hydrograph No. 1, SCS Runoff, Pre-Developed.............................•....................................... 4 Hydrograph No. 2, SCS Runoff, Post-Developed.................................................................... 5 Hydrograph No. 3, Reservoir, Wet Pond A.............................................................................. 6 Pond Report - BMP 2: Wet Pond A..................................................................................... 7 10 - Year SummaryReport ......................................................................................................................... 9 HydrographReports................................................................................................................. 10 Hydrograph No. 1, SCS Runoff, Pre-Developed.................................................................... 10 Hydrograph No. 2, SCS Runoff, Post-Developed.................................................................. 11 Hydrograph No. 3, Reservoir, Wet Pond A............................................................................ 12 100 - Year SummaryReport ....................................................................................................................... 13 Hydrograph Reports......................................................:.:...............:........:............................... 14 Hydrograph No. 1 SCS Runoff, Pre -Developed. 14 Hydrograph No. 2, SCS Runoff, Post-Developed.................................................................. 15 Hydrograph No. 3, Reservoir, Wet Pond A............................................................................ 16 OFReport.................................................................................................................. 17 is • u n U Watershed Model Schematic Hydraflow Hydrographs Extension tot AutoCAD® Civil 306 2016 by Autodesk, Inc, v10.5 kw h. Projt 2 Hydrograph Return Period Rep Prat y Hydrographs Extension for AutoCAD® Civil 3D® 2016 by Autodesk, Inc. v10.5 Hydrograph Peak Outflow (cfs) Inflow Hydrograph typo hyd(s) Description (origin) 1-yr 2-yr 3-yr 5-yr 10-yr 25-yr 50-yr 100-yr Pre -Developed 1 SCS Runoff 2.284 — -- --- 6.928 -- --- 14.53 2 SCS Runoff ------ 5.077 - - -- - --- - --- 10.71 ------- ------- 18.98 Post -Developed 3 Reservoir 2 0200 — — — ------- 1 6.498 - -- --- -- 16-33 Wet Pond B Proj file: P1320 Wetpond B.gpw Friday, 03/2/2018 0 • n U 3 Hydrograph Summary Report Hydraflow Hydrograp#ts Extension for AutoCAO®Civil 3D® 2018 by Autodesk, Inc. v10.5 Hydrograph Pack Time Time to I Hyd. Inflow Maximum Total Hydrograph type flow interval Peak volume hyd(s) elevation strge used description (origin) (Cis) (min) (min) (cult) (ft) (tuft) I 1 SCS Runoff 2.284 2 730 9,068 2 SCS Runoff 5.077 2 724 15.483 3 Reservoir 0.200 2 914 13,849 !1 1 P1320 Wetpond B gpw — — — — Pre -Developed ------ -- ----- Post -Developed 2 12.59 28.231 Wet Pond B Return Period: 1 Year I Friday, 03 / 2 / 2018 U • Hydrograph Report 4 draflow Hydrographs Extension for AutoCADO Civil 300 2016 by Autodesk. Inc. v10.5 yd. No. 1 Pre -Developed Hydrograph type = SCS Runoff Storm frequency = 1 yrs Time interval = 2 min Drainage area = 1.850 ac Basin Slope = 0.0 % Tc method = User Total precip. = 3.60 in Storm duration = 24 hrs ' Composite (Area1CN) = ((1 $50 x 74)] 11 850 Q (cfs) 3.00 • 10 2.00 1.00 0.00 1 1' 0 2 4 Hyd No. 1 Friday. 0312 12018 Peak discharge = 2.284 cfs Time to peak = 12.17 hrs Hyd. volume = 9,068 cult Curve number = 74* Hydraulic length = 0 ft Time of conc. (Tc) = 10.00 min Distribution = Type III Shape factor = 484 Pre -Developed Hyd. No. 1 -- 1 Year 6 8 10 12 14 Q (cfs) 3.00 2.00 1.00 -` ' 0.00 16 18 20 22 24 26 Time (hrs) W Hydrograph Report draflow Hydrographs Extension for AutoCAD® Civil 3EM 2016 by Autodesk, Inc. v10.5 0 Y d. No. 2 Post -Developed Hydrograph type = SCS Runoff Storm frequency = 1 yrs Time interval = 2 min Drainage area = 1.790 ac Basin Slope = 0.0 % Tc method = User Total precip. = 3.60 in Storm duration = 24 hrs ' Composite (Area1CN) = [(1 180 x 98) + (0.670 x 74)J 11.790 Q (cfs) 6,00 4.00 3.00 mom Friday. 0312 12018 Peak discharge = 5.077 cfs Time to peak = 12.07 hrs Hyd. volume = 15,483 cult Curve number = 90* Hydraulic length = 0 ft Time of conc. (Tc) = 5.00 min Distribution = Type III Shape factor = 484 Post -Developed Hyd. No. 2 -- 1 Year 000 - 5 10 Q (cfs) 6.00 5.00 4.00 3.00 2.00 1.00 rrra 2 4 6 8 10 12 14 16 18 20 22 24 VVV Time (hrs) Hyd No<� 6 Hydrograph Report ydraflow Hydrographs Extension for AutoCAD@ Civil 3DO 2016 by Autodesk, Inc. v10.5 yd. No. 3 Wet Pond B Hydrograph type = Reservoir Storm frequency = 1 yrs Time interval = 2 min Inflow hyd. No. = 2 - Post -Developed Reservoir name = BMP I Wet Pond B Storage Indication method used. Wet pond routing start elevation = 11 00 ft Q (cfs) 6.00 05-00 4.00 3.00 2.00 1.00 0.00 0 10 . Hyd No. 3 Peak discharge Time to peak Hyd. volume Max. Elevation Max. Storage Wet Pond B Hyd. No. 3 -- 1 Year 20 30 40 Hyd No. 2 Friday. 03 / 212018 = 0.200 cfs 15.23 hrs = 13,849 cult = 12.59 ft = 28,231 cult 50 60 70 80 90 iI1 I [ I f. I Total storage used = 28,231 cuft Q (cfs) 6.00 5.00 4.00 3.00 2.00 i[dl7 1 0.00 100 Time (hrs) • U L� Pond Report Hydraflow Hydrographs Extension for AuioCAD® Civil 3D® 2016 by Autodesk, Inc. 00.5 Pond No. 1 - BMP 3: Wet Pond B Pond Data Contours -User-defined contour areas. Conic method used for volume calculation Begining Elevation = 5 00 ft Stage / Storage Table Stage (ft) Elevation (ft) Contour area (sgft) Incr. Storage (tuft) Total storage (tuft) T Friday, 031212018 000 500 1,020 0 0 1,00 6,00 1A26 1.217 1,217 2.00 7.00 1,858 1,637 2,854 3,00 8,00 2,315 2,082 4.936 3,50 8,50 3,375 1,414 6,350 400 9.00 3,723 1,774 8,124 500 10,00 4,464 4.087 12.212 6-00 11 00 5.256 4.854 17.066 7.00 1200 7.483 6.336 23,402 8.00 13.00 8.839 8,151 31,553 900 1400 10.269 9,544 41.097 9.30 1430 11.788 3,306 44.402 Culvert if Orifice Structures Weir Structures [A] [B] [C] [PrfRsr] [A] [B] [C] [D] Rise fin) = 12.00 1.25 0.00 0.00 Crest Len (ft) = 200 15.00 800 0.00 Span (in) = 1200 1 25 000 000 Crest El. (ft) = 12 50 12.80 13.50 000 No. Barrels = 1 1 0 0 Weir Coeff. = 2.60 260 260 3.33 Invert El. (ft) = 11.00 11.00 0.00 0.00 Weir Type = Broad Broad Broad --- Length (ft) = 5400 1 00 000 0.00 Multi -Stage = Yes No Yes No Slope (%) = 0.74 1.00 0.00 nla N-Value = 013 013 013 n/a Orifice Coeff. = 0.60 0,60 0.60 0.60 EAL(Inlhr) = 0.000 (by Contour) uiti-Stage = nla Yes No No TW Elev. (ft) = 0.00 Note: Ctdv$rtA"(* outflows are analyzed under inlet (ic) and outlet loc) control Weir risers checked for onLce conditions pcl and submergence lsi Stage 1 Storage/ Discharge Table Stage Storage Elevation Civ A Clv B Clv C PrfRsr Wr A Wr B Wr C Wr D Exfil User Total ft tuft ft cfs cfs cfs cts cfs cfs cfs cfs cfs cfs cfs 0.00 0 500 0-00 000 --- --- 0.00 0.00 0.00 --- 0 000 0 10 122 5 10 000 0.00 --- --- 0-01) 0-00 0 00 0.000 0-20 243 5.20 0.00 0.00 --- --- 000 0-00 0.00 0 000 0.30 365 5,30 000 000 --- --- 0.00 000 0.00 --- 0 000 040 487 540 000 0.00 --- 0.0c 0.00 000 0.000 0 50 609 5.50 0.00 0.00 --- 0-00 0 00 0 00 --- --- 0-000 0.60 730 5,60 000 000 --- --- 0.00 0.00 0.00 --- 0.000 0.70 852 570 0,00 000 --- --- 0.00 0-00 0-00 --- --- 0.000 0.80 974 5.80 0,00 0.00 --- --- 0.00 0-00 0.00 --- --- --- 0,000 0 90 1,096 5.90 000 0,00 --- --- 0,00 0.00 0.00 -- 0,000 1.00 1,217 600 000 000 --- 0.00 0.00 0.00 - - - 0.000 110 1,381 6.10 0.00 0.00 --- 0,00 0.00 0.00 0,000 1-20 1,545 6,20 0.00 0.00 --- --- 0,00 000 0.00 --- --- --- 0,000 1.30 1,708 6,30 0.00 000 --- 0.00 0,00 0.00 --- --- --- 0.000 1.40 1,872 640 000 000 --- - 0-00 0-00 0-00 --- 0,000 1 50 2.036 6.50 0.00 000 --- --- 000 000 0.00 --- --- --- 0,000 1.60 2,199 6 60 0-00 0,00 --- --- 0,00 000 0-00 0 000 1 70 2.363 6.70 0.00 0.00 --- 0-00 000 0.00 --- --- --- 0,000 1 80 2.527 6.80 000 000 --- --- 000 0.00 0.00 0 000 1.90 2.691 6,90 0-00 0,00 --- --- 0.00 000 000 0,000 2.00 2.854 700 000 0,00 --- --- 0,00 0-00 0-00 0-000 2.10 3,063 7 10 000 000 --- 0-00 000 0.00 --- --- 0,000 220 3.271 7.20 0.00 000 --- --- 0.00 0.00 0.00 --- --- 0.000 230 3,479 7.30 0-00 000 0.00 0.00 000 --- --- --- 0-000 2.40 3,687 740 0.00 0.00 --- 0.00 0.00 0.00 --- - 0-000 2.50 3,895 7 50 0,00 0.00 --- --- 000 0.00 0.00 --- - --- 0-000 2 60 2.70 4,104 7.60 4,312 7,70 0.00 0-00 0,00 --- 0,00 --- --- --- 0.00 000 0.00 0.00 0 00 0.00 -- --- --- --- 0.000 --- --- 0.000 2,80 4.520 7,80 0.00 0.00 --- 0.00 0.00 0.00 - - --- 0.000 2.90 4,728 7 90 000 0.00 --- 0.00 0.00 0.00 -- 0.000 3.00 4,936 8,00 0.00 000 --- --- 0.00 0.00 0 00 --- --- 0.000 Continues on next page... • • f 8 BMP 3 Wet Pond B Stage 1 Storage I Discharge Table Wtttage Storage Elevation Clv A CIv B Civ C PrfRsr Wr A Wr B Wr C Wr D Exfil User Total tuft ft cfs cfs cfs cfs cfs cfs cfs cfs cfs cfs cfs 3.05 5.078 8.05 0.00 0.00 - --- 0.00 0.00 0,00 -- --- --- 0.000 3,10 5,219 8-10 0.00 0,00 - --- 0,00 0.00 0.00 --- --- --- OAOO 315 5,361 8.15 0-00 0,00 - --- 0-00 0.00 0.00 --- 0,000 3,20 5,502 8.20 0.00 0.00 - --- 0.00 0.00 0-00 --- --- 0.000 325 5,643 8.25 0.00 0.00 - --- 000 0.00 0.00 --- --- 0.000 3.30 5,785 830 0,00 000 0.00 0.00 0.00 -- -- --- 0.000 3,35 5,926 8.35 0.00 0.00 - 0.00 0.00 0.00 --- - 0.000 3.40 6,068 8.40 0.00 0.00 - --- 0.00 0.00 0.00 --- --- 0.000 3.45 6,209 8.45 0.00 0,00 •-- 0.00 0.00 0.00 --- --- --- 0.000 3.50 6,350 8.50 0.00 0.00 -- --- 0.00 0.00 0,00 --- --- 0.000 3.55 6.528 8.55 0.00 0.00 - --- 000 0.00 000 --- --- 0 000 3.60 6,705 8.60 0.00 0.00 --- --- 0,00 0.00 0.00 --- --- 0.000 3.65 6,883 8.65 0.00 0.00 - 0.00 0.00 0.00 --- --- --- 0.000 3.70 7,060 8.70 0.00 0.00 - --- 0.00 0-00 0,00 0.000 3.75 7,237 8.75 0.00 O.DO -- --- 0.00 O.DO 0.00 --- - --- 0.000 3.80 7.415 8.80 OM O.DO - 000 0.00 0.00 --- - --- 0.000 3.85 7,592 8.85 0.00 0.00 --- --- 0.00 0,00 0.00 --- --- -•- 0,000 3.90 7,769 8.90 0.00 0.00 - --- 0-00 0,00 0,00 --- --- 0.000 3.95 7.947 8.95 0.00 0-00 - --- 0.00 0.00 0,00 --- --- 0,000 4.00 8.124 9.00 0.00 0.00 --- --- 0,00 0,00 0.00 --- --- --- 0.000 4.10 8.533 9.10 0.00 0.00 --- --- 0,00 0.00 0,00 --- --- 0.000 4.20 8,942 9.20 0.00 0.00 - 000 0.00 0.00 --- 0.000 4.30 9.350 9.30 0.00 0.00 - --- O.DO 0.00 0.00 0.000 4.40 9,759 9.40 0.00 0.00 - --- 0,00 0.00 0.00 --- - 0.000 4.50 10.168 950 0.00 0.00 - --- 00,0 O.00 000 -- 0.000 4.60 10,577 9.60 0.00 0.00 - --- 0.00 0,00 0,00 --- --- -- 0.000 4.70 10,985 9.70 0.00 0-00 --- --- 0.00 0.00 0.00 --- - 0.000 4.80 11.394 9.80 0.00 0.00 --- 0.00 0.00 O.OD --- -- 0.000 4.90 11,803 9.90 0.00 0.00 - •-- 0,00 0.00 0.00 --- --- -- 0.000 5.00 12.212 10.00 0.00 0.00 - --- 0.00 0.00 0.00 --- 0.000 5.10 12,697 10.10 0.00 0.00 --- --- 0.00 0,00 0,00 --- --- 0.000 5.20 13,182 10.20 0.00 0.00 - --- 0.00 0.00 0.00 --- --- 0.000 5-30 13.668 10,30 0.00 0.00 - --- 0.00 0.00 0.00 --- -- 0.000 5.40 14,153 10.40 0.00 0.00 0.00 OM 0.00 0.000 5.50 14.639 10.50 0.00 OM--- - 0,00 0.00 OM0.000 - _ 5.60 15,124 10.60 0.00 0.00 --- 0.00 0.00 0.00 --- - -- 0.000 5.70 15,609 10.70 0,00 0.00 --- --- OM 0-DO 000 --- - 0.000 5.80 16.095 10.80 0.00 0.00 -- --- 0.00 0.00 0.00 --- --- 0.000 5.90 16,580 10.90 0.00 0.00 --- 0.00 0.00 0.00 --- --- --- 0.000 6.00 17,066 11.00 0.00 0.00 --- 0.00 0,00 0.00 --- --- --- 0.000 6.10 17,699 11.10 0.01 iC 0.01 is - 0.00 0.00 0.00 --- --- --- 0.009 6,20 18,333 11.20 0.02 is 0.02 is - 0,00 0.00 OM --- --- 0.015 6.30 18,967 11.30 0.02 is 0.02 is --- 0.00 0.00 0.00 --- --- 0.020 6.40 19.600 11.40 0.02 ie 0.02 is - 0.00 0.00 0.00 --- --- 0.024 650 20,234 11.50 0.03 is 0.03 is - --- 0.00 0.00 000 --- - --- 0.027 6.60 20,867 11.60 0.03 is 0,03 is --- --- 0.00 0.00 0.00 --- -- 0.030 6.70 21,501 11 70 0.03 is 0.03 is - --- 000 0.00 0.00 --- - 0.032 6.80 22,135 11.80 0.04 is 0,03 is - --- 0.00 0.00 0,00 0.035 6.90 22,768 11.90 0.04 iC 0 04 is - --- 0.00 000 0.00 --- - 0.037 7.00 23.402 12.00 0.04 is 0.04 is - --- 0.00 0.00 0.00 --- 0.039 7.10 24,217 12.10 0.04 is 0.04 is --- 0.00 0,00 0.00 --- --- --- 0.041 7.20 25.032 12.20 0.04 is 0.04 is --- --- 0.00 0.00 0.00 --- --- 0.043 7.30 25,847 12.30 0.05 is 0,04 is 0.00 0.00 0.00 0.045 7.40 26,662 1240 0.05 is 0 05 is - -- 0.00 0.00 0.00 - - 0.047 7.50 27,477 12.50 0.05 is 0,05 iC - --- 0.00 0.00 0.00 --- --- •-- 0.048 7.60 28,292 12.60 0.21 is 0,05 is 0.16 0.00 0.00 --- - --- 0.213 7.70 29.107 1270 0.52 is 0.05 is - --- 0.47 0.00 0.00 --- 0.513 7.80 29,922 12.80 0.91 is 0.05 is - 0.85 0.00 0.00 --- 0.902 7.90 30,738 12.90 1.38 is 0,05 is -- 1.32 1.23 0.00 --- --- --- 2.595 8,00 31.553 13.00 1,90 iC 0.05 is --- --- 1,84 3.49 0.00 --- --- --- 5-373 8.10 32.507 13.10 2.46 oc 0.04 is --- --- 2.42 6.41 0.00 --- •-- 8.866 8,20 33,461 13.20 3.08 Oc 0,04 is --- --- 3.05 9.87 0.00 --- --- 12.95 8.30 34.416 13,30 3,63 oc 0.03 is - --- 3.60 s 13.79 0.00 --- --- --- 17,42 8.40 35,370 1340 3,98 oc 0.03 is --- --- 3.95 s 18.13 0.00 - 22.11 850 36,325 13.50 4 27 oc 0.03 is - 4.24 s 22.84 0.00 --- --- 27.11 8.60 37.279 1360 4.65 Oc 0.02 is - 3.97 s 27.91 0.66 32.56 8.70 38.234 1370 4.97 oc 0.01 is - 3.29 s 33.30 1.67 s --• --- 38.27 8.80 39.188 13.80 5.16 oc 0.01 is - - 2-92 s 39.00 2.23 s --- 44.16 8.90 40.142 13.90 5.31 oc 0,01 is - 2.67 s 44.99 2.63 s --- --- 50.30 9,00 41.097 14,00 5.44 oc 0.01 is - 2.50 s 51.27 2.93 s --- 56.71 903 41.427 14,03 5.48 oc 0.01 is - 2.46 s 53.20 3.01 s --- 58.68 9,06 41,758 1406 5.52 o0 0.01 is --- --- 2.42 s 55,16 3.08 s --- --- - 60.67 Continues on next page.. 0 9 BMP I Wet Pond B Stage 1 Storage 1 Discharge Table Storage Elevation C A •flags ft tuft ft cfss 9,09 42.088 14.09 5.56 oc 912 42.419 14.12 5.59 oc 9.15 42,750 14A5 5.63 oc 918 43,080 14,18 5.66 oc 9,21 43,411 14.21 5.70 oc 9.24 43.741 14.24 5.73 oc 9,27 44.072 14.27 5.77 oc 9.30 44,402 14.30 5.80 oc .End E 0 CIv B Clv C PrfRsr Wr A Wr 8 Wr C Wr D Exfil User Total Cfs cfs cfs cfs cfs cfs cfs cis cfs cfs 0.01 is - - 2.39 s 57.14 3.16 s --- . --- 6270 0.01 iC - --- 2.36 s 59.15 3.23 s --- --- 64.74 0.01 is - 2.33 s 61.17 3 29 s --- --- 66.79 0.01 Io - --- 2.30 s 63.22 3.35 s --- --- 68.88 0.01 is - 2.27 s 65.30 3.41 s --- --- --- 7099 0.01 is - - 2.25 s 67.39 3A7 s --- --- --- 73.12 0.00IC - --- 2.23 s 69,51 3.53 s --- --- --- 75.27 0.00 is --- 2.21 s 71.65 3.58 s --- --- --- 77.44 U • 10 r L I L 1 Hydrograph Summary Report Hydraflow Hydrographs Extension for AutoCAD® Civil 3DO 2016 by Autadesk, Inc. v10.5 Hydrograph type (origin) Peak flow (cfe) Time interval (min) 2 Time to Peak (min) Hyd. volume (cuff) Inflow hyd(s) Maximum elevation (ft) Total strge used (cuff) Hydrograph Description Pre -Developed 1 SCS Runoff 6-928 728 26.549 — --- -- — 2 SCS Runoff 10.71 2 724 34,040 ----- ------ --- Post -Developed 3 Reservoir Wetpond 6.498 B.gpw 2 730 32,346 Return Period I 2 13.04 31,860 Friday, 03 / Wet Pond B 2 1 2018 P1320 10 Year • C7 11 Hydrograph Report raflow Hydrographs Extension for AutoCAD® Civil 3D® 2016 by Autodesk, Inc v10.5 4 Wyd.No. 1 Pre -Developed Hydrograph type = SCS Runoff Storm frequency = 10 yrs Time interval = 2 min Drainage area = 1.850 ac Basin Slope = 0.0 % Tc method = User Total precip. = 6.76 in Storm duration = 24 hrs ' Composite (Area1CN) = [(1.850 x 74)111.850 a (cfs) 7.00 10 6.00 16 3.00 2.00 1.00 0.00 ' ' 0 2 4 Hyd No. 1 6 8 Friday. 0312 12018 Peak discharge = 6.928 cfs Time to peak = 12.13 hrs Hyd. volume = 26,549 cult Curve number = 74* Hydraulic length = 0 ft Time of cone. (Tc) = 10.00 min Distribution = Type III Shape factor = 484 Pre -Developed Hyd. No 1 -- 10 Year a (cfs) 7.00 5.00 4.00 3.00 2.00 1.00 -I I I T I OM 10 12 14 16 18 20 22 24 26 Time (hrs) Hydrograph Report '12 draftow Hydrographs Extension for AutoCADS Civil 3D& 2016 by Autodesk, Inc, v10.5 yd. No. 2 Post -Developed Hydrograph type = SCS Runoff Storm frequency = 10 yrs Time interval = 2 min Drainage area = 1.790 ac Basin Slope = 0.0 % Tc method = User Total precip. = 6.76 in Storm duration = 24 hrs " Composite (Area/CN) = I(1.180 x 98) + (0 670 x 74)] / 1.790 Q (cfs) 12.00 0.00 M . it 4.00 2.00 0.00 1 1 0 2 4 • Hyd No, 2 6 8 Friday, 0312 12018 Peak discharge = 10.71 cfs Time to peak = 12.07 hrs Hyd. volume = 34,040 cuft Curve number = 90w Hydraulic length = 0 ft Time of conc. (Tc) = 5.00 min Distribution = Type III Shape factor = 484 Post -Developed Hyd. No. 2 -- 10 Year Q (cfs) 12.00 10.00 900 4.00 2.00 0.00 10 12 14 16 18 20 22 24 Time (hrs) 13 Hydrograph Report ra"O Hydrographs Extension for AutoCAD® Civil 3D® 2016 by Autodesk, Inc. v10.5 Friday, 03 / 212018 yd. No. 3 Wet Pond B Hydrograph type = Reservoir Peak discharge = 6.498 cfs Storm frequency = 10 yrs Time to peak = 12.17 hrs Time interval = 2 min Hyd. volume = 32,346 cuft Inflow hyd. No. = 2 - Post -Developed Max. Elevation = 13.04 ft Reservoir name = BMP 3: Wet Pond B Max. Storage = 31,860 tuft Storage Indication method used Wet pond routing start elevation = 11.00 ft. Wet Pond B Q (Cfs) Hyd. No. 3 -- 10 Year Q (cfs) 12.00 12.00 1* 00 10.00 8.00 8,00 6.00 6.00 4.00 4.00 2.00 2.00 0.00 0.00 0 2 4 6 8 10 12 14 16 18 20 22 24 26 Hyd No. 3 Hyd No. 2 IFFF1 I-j Total storage used Time (hrs) = 31,860 CA n U • u 14 Hydrograph Summary Report HydraFlow Hydrographs Extension for AutoCADS Civil 31® 2016 by Autodesk, Inc. v10.5 m Hydrograph typo (origin) Peak Time flow Interval (afs) (min) Time to Hyd. Peak volume (min) (tuft) Inflow hyd(s) Maximum elevation (ft) Total strge used (cuft) Hydrograph Description SCS Runoff 14.53 2 728 56,417 --- -- — Pre -Developed SCS Runoff 1898 2 724 62.638 — -- ------ ------ Post -Developed Reservoir 1633 2 726 60,796 2 13.28 34,184 Wet Pond B t20 Wetpond 6 gpw I I Friday. 03 1 I 2 12018 Return Period: 100 Year C� • 15 Hydrograph Report ydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2016 by Autodesk. Inc v10 5 yd. No. 1 Pre -Developed Friday, 03 12 1 2018 Hydrograph type = SCS Runoff Peak discharge = 14.53 cfs Storm frequency = 100 yrs Time to peak = 12.13 hrs Time interval = 2 min Hyd. volume = 56,417 cuft Drainage area = 1.850 ac Curve number = 74* Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 10.00 min Total precip. = 11.50 in Distribution = Type III Storm duration = 24 hrs Shape factor = 484 Composite (Area1CN) = 1(1 850 x 74)] / 1.850 0 (cfs) 15.00 02,00 • "$ AM 3.00 • Pre -Developed Hyd. No. 1 -- 100 Year 2 4 6 8 10 12 14 Hyd No. 1 0 (cfs) 15.00 12.00 M1101 . S, 3.00 I 0.00 16 18 20 22 24 26 Time (hrs) • E I Hydrograph Report dratlow Hydrographs Extension for AutoCAD® Civil MOD 2016 by Autodesk, Inc. 00.5 yd. No. 2 Past -Developed Hydrograph type = SCS Runoff Storm frequency = 100 yrs Time interval = 2 min Drainage area = 1.790 ac Basin Slope = 0.0 % Tc method = User Total precip. = 11.50 in Storm duration = 24 hrs ' Composite (Area/CN) = ((1.180 x 98) + (0.670 x 74)] 1 1.790 Q (cfs) 21.00 OF- 00 15.00 12.00 M1 . M 3.00 Is Friday, 03I 2 12018 Peak discharge = 18.98 cfs Time to peak = 12.07 hrs Hyd. volume = 62,538 cult Curve number = 90" Hydraulic length = 0 ft Time of cone. (Tc) = 5.00 min Distribution = Type III Shape factor = 484 Post -Developed Hyd. No. 2 -- 100 Year 0.00 0 19 Q (cfs) 21.00 18.00 15.00 12.00 MC •ffirs 3.00 2 4 6 8 10 12 14 16 18 20 22 24 -_ Hyd No. 2 Time (hrs) 17 Hydrograph Report draflow Hydrographs Extension for AutoCAD® Civil 3DO 2016 by Autodesk, Inc. v10.5 loyd.No. 3 Wet Pond B Hydrograph type = Reservoir Storm frequency = 100 yrs Time interval = 2 min Inflow hyd. No. = 2 - Post -Developed Reservoir name = BMP 3: Wet Pond B Storage Indication method used Wet pond routing start elevation = 11.00 ft Q (cfs) 21.00 0. 00 15.00 12.00 no i 3.00 10 0 Peak discharge Time to peak Hyd. volume Max. Elevation Max. Storage Wet Pond B Hyd. No. 3 -- 100 Year Friday. 03 / 2 12018 = 16.33 cfs = 12.10 hrs = 60,796 tuft = 13.28 ft = 34,184 cult Q (cfs) 21,00 18,00 15.00 12.00 MU . #R 3.00 rITiT61 2 4 6 8 10 12 14 16 18 20 22 24 26 Hyd No. 3 Hyd No. 2 .I 1, Time (hrs) y y I I l ;Total storage used _ 34,184 tuft • 11 • Hydraflow Rainfall Report 18 raBow Hydrographs Extension for AutoCAD& Civil 3DO 2016 by Autodesk, Inc. v10.5 Return Intensity-Ouration-Frequency Equation Coefficients (FHA) Period (Y1s) B 0 j E (Nil 1 0.0000 0.0000 0.0000 -- 2 69 8703 13-1000 0,8658 - --- 3 0.0oo0 0.0000 0.0000 5 79.2597 14.6000 0.8369 10 88.2351 15.5000 0.8279 25 1026072 16 5000 0.8217 50 114.8193 17.2000 1 0.8199 100 127.1596 17.8000 1 0.8186 File name SampleFHA.idf Intensity. B I (Tc + D)"E Return Intensity Vsiues (inlhr) Porlod r (Yrs) 5 min I 10 15 20 25 30 35 40 1 45 1 0.00 0.00 0.00 0.00 0,00 0.00 0.00 0-00 2 5.69 4.61 3.89 3.38 2.99 2.69 244 2.24 3 0.00 I 0.00 0.00 0.00 0.00 0.00 000 0.00 5 6.57 543 4.65 ' 408 3.65 3.30 302 2.79 10 1 724 604 521 4.59 4.12 3.74 3.43 3.17 25 1 825 695 6.03 5.34 I 4.80 4.38 402 3.73 50 904 7.65 6.66 5.92 5.34 4.87 449 4.16 100 9.83 8.36 7-30 6.50 5.87 1 536 4,94 4.59 Tc = time in minutes. Values may exceed 60. Rainfall Precipitation Table (in) 0-Od 207 000 2.59 2-95 3.48 3.88 4,29 Storm ' 1 Distribution 1-yr 2-yr 3-yr 5-yr 1Q-yr 25-yr 50 yr 100-yr SCS 24-hour 360 4.44 + 0.00 5.74 6.76 852 9.97 ! 11.50 I I SCS 6-Hr 0.00 0.00 0.00 0.00 0.00 0.00 0-00 000 Huff-lst 000 0.00 0.00 0.00 0,00 000 0.00 0.00 Huff-2nd 000 0.00 0.00 0,00 000 000 0.00 0.00 Huff-3rd 0.00 0.00 0 00 0,00 0.00 0 00 0.00 000 i Huff-4th 0.00 0.00 0.00 0.00 000 0.00 0.00 0.00 Huff-Indy 0.00 0.00 0.00 0.00 000 0.00 0.00 0.00 Custom 0.00 0.00 000 0.00 000 0.00 0.00 000 Friday, 0312 12018 50 55 50 0.00 0,00 0.00 1.93 0.00 1-81 0.00 1.70 0-00 2.42 277 2.27 2.60 2.15 2.46 326 3.07 291 365 3,44 325 403 3.80 I 3.60 Hydraf low Table of Contents P1320 Wetpond B.gpw �ydraflow Hydrographs Extension for AutoCADO Civil 3DO 2016 by Autodesk, Inc, 00.5 Friday, 0312 12018 WatershedModel Schematic..................................................................................... 1 Hydrograph Return Period Recap............................................................................. 2 1 - Year SummaryReport......................................................................................................................... 3 HydrographReports................................................................................................................... 4 Hydrograph No. 1, SCS Runoff, Pre-Developed...................................................................... 4 Hydrograph No. 2, SCS Runoff, Post-Developed.................................................................... 5 Hydrograph No. 3, Reservoir, Wet Pond B.............................................................................. 6 Pond Report - BMP 3: Wet Pond B..................................................................................... 7 10 - Year SummaryReport................................................................................................. 10 HydrographReports................................................................................................................. 11 Hydrograph No. 1, SCS Runoff, Pre-Developed.................................................................... 11 Hydrograph No. 2, SCS Runoff, Post-Developed.................................................................. 12 Hydrograph No. 3, Reservoir, Wet Pond B............................................................................ 13 100 - Year SummaryReport, ...................................................................................................................... 14 4D Hydrograph Reports...................................................................................................•............. 15 Hydrograph No. 1, SCS Runoff, Pre -Developed. 15 Hydrograph No. 2, SCS Runoff, Post-Developed.................................................................. 16 Hydrograph No. 3, Reservoir, Wet Pond B. ........................................................................... 17 OFReport .................................................................................................................. 18 0 L7 0 2 Watershed Model Schematic Hytfraflow Hycfrographs Extension for AutoCADV Civil 3i77® 2016 6y Autodesk, Inc. v10.5 5I • 0 Hydrograph Return Period Reps y ra •w Hydrographs Extension for AutoCAD® Civil 3D® 2016 by Autodesk, Inc. v10.5 Pro Hydrograph Inflow Peak Outflow (cfs) Hydrograph type hyd(s) Description (origin) 1-yr 2-yr 3-yr 5-yr 10-yr FS-Yr 50-yr 100-yr Pre -Developed SCS Runoff ----- 1.720 - ------- ------- 5 079 -- - -- - 10.51 SCS Runoff ------ 3 513 -- ---- --- 7.683 - - -- 13.83 Post -Developed Reservoir 2 0202 ------- ------- 3 071 -- -- 10.86 Wet Pond C j. file P1320 Wetpond C gpw Friday, 031 212018 • U • r 1 1 Hydrograph Summary Report Hydraflow Hydrographs Extension for AuIoCAD® Civil 3D® 2016 by Autodesk, Inc. v10.5 Hydrograph type (origin) Peak Time flow interval (cfa) (min) Time to Peak (min) Hyd. volume (tuft) Inflow hyd(s► Maximum elevation IN Total strge used (tuft) Hydrograph Description 1 SCS Runoff 1.720 2 730 6,785 -- ---- Pre -Developed 2 SCS Runoff 3.513 2 724 10,602 ----- ------ Post -Developed 3 Reservoir Wetpond 0.202 2 840 9,602 2 1 Year 14.35 17,633 Wet Pond C P1320 C gpw Return Persod Friday, 03 / 212018 0 • 0 4 Hydrograph Report draflow Hydrographs Extension for AuIoCADO Civil 3DO 2016 by Autodesk, Inc. 00.5 yd. No. 1 Pre -Developed Hydrograph type = SCS Runoff Storm frequency = 1 yrs Time interval = 2 min Drainage area = 1.320 ac Basin Slope = 0.0 % Tc method = User Total precip. = 3.60 in Storm duration = 24 hrs Composite (ArealCN) = ((1.280 x 74) + (0.040 x 98)11 1 320 Q (cfs) 2.00 0.00 ' 1' 0 2 4 Hyd No. 1 Peak discharge Time to peak Hyd, volume Curve number Hydraulic length Time of conc. (Tc) Distribution Shape factor Pre -Developed Hyd. No. 1 -- 1 Year Friday, 0312 12018 = 1.720 cfs = 12.17 hrs = 6,785 cuft = 75" = 0 ft = 10.00 min W Type III 484 6 8 10 12 14 16 18 20 22 24 0 (cfs) 2.00 1.00 1 0.00 26 Time (hrs) Hydrograph Report r draflow Hydrographs Extension for AutoCAD® Civil 3D® 2016 by Autodesk. Inc. v10.5 yd. No. 2 Post -Developed Hydrograph type = SCS Runoff Storm frequency = 1 yrs Time interval = 2 min Drainage area = 1.320 ac Basin Slope = 0.0 % Tc method = User Total precip. = 3.60 in Storm duration = 24 hrs ' Composite (ArealCN) = [(0.750 x 98) + (0.570 x 7,4)j 1 1.320 Q (cfs) 4.00 0 3.00 2.00 1,00 • Friday. 0312 12018 Peak discharge = 3.513 cfs Time to peak = 12.07 hrs Hyd. volume = 10,602 tuft Curve number = 88" Hydraulic length = 0 ft Time of cone. (Tc) = 5.00 min Distribution = Type III Shape factor = 484 Post -Developed Hyd No 2 -- 1 Year 2 4 6 8 10 12 14 Hyd No. 2 Q (Cfs) 4.00 3.00 1.00 0.00 16 18 20 22 24 26 Time (hrs) • U r� U L , Hydrograph Report qvydraflow Hydrographs Extension for AutoCADS Civil NO 2016 by Autodesk, Inc. v10.5 H,yd. No. 3 Wet Pond C Hydrograph type = Reservoir Storm frequency = 1 yrs Time interval = 2 min Inflow hyd. No. = 2 - Post -Developed Reservoir name = BMP 4: Wet Pond C Storage Indication method used. Wet pond routing start elevation = 13.00 ft Q (cfs) 4.00 2.00 1.00 I* Peak discharge Time to peak Hyd. volume Max. Elevation Max. Storage Wet Pond C Hyd. No. 3 --1 Year 10 20 30 40 Hyd No. 3 Hyd No. 2 Friday, 031212018 = 0.202 cfs = 14.00 hrs = 9,602 cuft = 14.35 ft = 17,633 cuft 50 60 70 80 90 TMT I I' Total storage used = 17,633 cult Q (cfs) 4.00 3.00 2.00 1.00 1 0.00 100 Time (hrs) C] Pond Report 7 Hydraflow Hydrographs Extension for AutoCADQ7 Civil 31)0 2016 by Autodesk. Inc 00 5 and No. 1 - BMP 4: Wet Pond C and Data Contours -User-defined contour areas Conic method used for volume calculation Begining Elevation = 7 00 ft Stage 1 Storage Table Stage (ft) Elevation (ft) Contour area (sgft) Incr. Storage {tuft} Total storage (tuft) 000 7,00 365 0 0 1.00 8,00 662 506 506 2.00 9.00 1,150 895 1,401 3-00 10,00 1.690 1,411 2,812 4.00 11.00 2,289 1,982 4,794 5.00 1200, 2.944 2,609 7.403 600 13,00 3.656 3,293 10,696 7-00 1400 5,957 4,759 15 A56 8.00 15,00 6.613 6.282 21 737 9-00 1600 7.605 7,103 28,940 9.30 16.30 10.148 2,654 31,493 Culvert 1 Orifice Structures Weir Structures Friday, 0312 1 2018 [A] [B] [C] [PrfRsr] [A] [B] [C] [D] Rise (in) = 1200 1 00 000 000 Crest Len (ft) = 2.00 10.00 8,00 000 Span (in) = 1200 1.00 0.00 0.00 Crest El. (ft) = 14.25 1500 15,50 0.00 No. Barrels = 1 1 0 0 Weir Coeff. = 2-60 2,60 2.60 3,33 Invert El. (ft) = 1200 13.00 000 000 Weir Type = Broad Broad Broad --- Length (ft) = 3700 1 00 000 000 Multi -Stage = Yes No Yes No Slope (%) = 1.35 1.00 000 n1a N-Value = 013 013 013 n1a Orifice Coeff. = 0.60 060 0.60 060 Exfil.(inlhr) = 0 000 (by Contour) Multi -Stage = nla Yes No No TW Elev. (ft) = 0.00 Note Culvervo fice outnaws are analyzed - under inlet (ic) and cutlet (oc) control weir risers Checkecl for onfice condilions (ic) and submergence (s), Stage I Storage I Discharge Table Stage Storage Elevation Clv A Clv 8 Clv C PrfRsr Wr A Wr B Wr C Wr D Exfll User Total ft tuft ft cfs cfs cfs cfs cfs cfs cfs cfs cfs cfs cfs 0.00 0 700 000 0.00 --- 000 000 000 0 000 0.10 51 7.10 000 0.00 --- --- 000 0-00 000 0 000 0.20 101 7.20 000 0.00 --- --- 0.00 0,00 0,00 --- --- 0000 0.30 152 730 DOG 000 --- --- 000 000 000 --- --- GOOD 040 202 7.40 0.00 0.00 --- --- 000 000 0,00 --- --- --- 0-000 0.50 253 750 0.00 000 --- 000 000 0.00 --- --- 0 000 0.60 304 7.60 000 000 --- 0.00 0.00 0,00 0.000 0.70 354 770 000 GOO --- 000 0,00 0,00 --- --- 0-00C 0-80 405 7.80 0.00 0.00 --- --- 0,00 0,00 0.00 --- - 0.000 0.90 456 7.90 000 0.00 --- --- 0.00 0,00 000 --- -- 0.000 1.00 506 800 000 000 --- --- 0.00 0,00 0,00 --- --- O.ODO 1.10 596 8.10 000 0.00 --- --- 0.00 0,00 000 --- --- --- 0 000 1 20 685 820 0.00 0.00 --- --- 0,00 0,00 0,00 GOOD 130 775 8.30 0.00 0.00 --- --- 0-00 0.00 0.00 --- --- --- 0.000 1 40 864 8.40 0.00 000 --- --- 0.00 0,00 000 --- --- 0 000 1.50 954 8.50 O.00 0.00 --- --- 0.00 0,00 0,00 --- --- 0.000 1.60 1,043 8 60 000 0.00 --- --- 0.00 000 000 --- 0 000 1 70 1,132 870 0.00 0.00 --- --- 000 000 0.00 --- ... 0 000 180 1.222 8.80 0.00 000 --- --- 0,00 0.00 0.00 --- --- 0 000 1.90 1_311 890 0.00 000 --- 0.00 0.00 000 --- --- 0,000 2.00 1,401 9.00 000 0.00 --- --- 000 000 0,00 - 0,000 2 10 1.542 9.10 0.00 000 --- --- 0.00 0.00 000 --- --- 0 000 2.20 1,683 9-20 0.00 0.00 --- --- 0-00 0,00 0,00 --- - 0 000 230 1.824 9.30 000 000 -- --- 000 0.00 000 - 0.000 240 1,965 9.40 0.DO 0.00 --- 000 0.00 0,00 --- --- 0.000 2.50 2,107 9.50 0.00 0 00 --- --- 000 0.00 0,00 --- --- GOOD 260 2,248 9,60 0.00 0 GO --- --- 0.00 0,00 0,00 --- --- 0.ODD 2.70 2.90 2,389 2 970 9.90 0.00 0.00 0.00 --- 0.00 --- 000 0.00 0,00 0,00 0,00 000 --- - 0.000 0-000 2.90 2,671 671 9,90 000 0.00 0.00 0-00 000 --- DODO 3.00 2,812 1000 0. GO 0.00 --- 0,00 0.00 0.00 --- »i O.00O 3.10 3010 10,10 0.00 0.00 --- --- 0,00 0.00 0.00 --- -- 0.000 Continues on next page 8 BMP 4 Wet Pond C Stage I Storage I Discharge Table Stage Storage Elevation Clv A Ctv B Clv C PrtRsr Wr A Wr B Wr C Wr D Exfil User Total ft cuft ft cfs cfs cfs cfs cfs efs efs cfs cfs cis efs 3.20 3.208 10.20 0.00 0.00 ... --- 0.00 0.00 0.00 -- --- 0-000 130 3.407 10.30 0.00 0.00 --- 0.00 0.00 0.00 0.000 3,40 3,605 10.40 000 0.00 --- --- 0.00 0.00 0.00 --- -- •-- 0.000 3.50 3,803 10.50 0.00 0.00 --- 0.00 0.00 0.00 0.000 3.60 4,001 10.60 0,00 0.00 --- --- 0.00 0.00 0.00 --- 0.000 3,70 4,199 10.70 0.00 0,00 --- 0.00 0.00 0.00 --- - - 0,000 3.80 4,398 10.80 0.00 0.00 --- 0.00 0.00 0.00 --- --- --- 0.000 3.90 4.596 10.90 0.00 0.00 --- 0,00 0.00 0.00 --- --- - 0.000 4,00 4,794 11.00 0.00 0.00 --- -- 0.00 0.00 0.00 --- --- - 0.000 4.10 5,055 11.10 0.00 0.00 --- --- 0.00 0.00 0,00 --- -- 0.000 4.20 5.316 11.20 0.00 0.00 --- 0.00 0.00 0.00 --- - 0.000 4.30 5,577 11.30 0.00 0,00 --- 0.00 0.00 0.00 -- - 0.000 4.40 5,838 11.40 0.00 0.00 --- --- 0,00 0.00 0 00 - --- 0.000 4.50 6,099 11.50 0.00 0.00 --- --- 0.00 0.00 0,00 --- --- 0.000 4.60 6.359 11.60 0-00 0.00 --- --- 0-00 0.00 0.00 --- - 0.000 4.70 6.620 11.70 0.00 0.00 --- --- 0.00 0.00 0-00 --- --- 0.000 4.80 6,881 11.80 0.00 0.00 --- --- 0.00 0.00 0.00 --- --- --- 0.000 4.90 7.142 11.90 0.00 0.00 0.00 0.00 000 --- - --- 0.000 5.00 7,403 12.00 0.00 0.00 - - 0.00 0.00 0.00 --- - 0.000 5.10 7.733 12.10 0.00 0.00 - --- 0.00 0.00 0.00 --- --- 0.000 5.20 8,062 12.20 0,00 0-00 - 0-00 0.00 0.00 -- 0.000 5.30 8.391 12.30 0.00 0.00 -- --- 0.00 0.00 0.00 --- 0.000 5.40 8,721 12.40 0.00 0.00 - --- 0,00 0,00 0,00 --- - ••. 0.000 5.50 9.050 12.50 0.00 0.00 --- 0.00 0.00 0.00 --- --- -- 0.000 5.60 9.379 12.60 0.00 0.00 -- 0,00 0.00 0,00 --- --- --- 0.000 5.70 9,709 12.70 0.00 0.00 - --- 0.00 0.00 0-00 --- --- --- 0.000 5.80 10.038 12.80 0.00 0.00 -- --- 0.00 0.00 0.00 --- --- -•- 0.000 5.90 10.367 12.90 0.00 0.00 --- --- 0.00 OM 0,00 --- --- --- 0.000 6.00 10,696 13.00 0.00 0.00 - --- 0.00 0.00 0.00 --- --- 0.000 6.10 11,172 13.10 0.01 is 0.01 is --- 0.00 0.00 0,00 --- 0.006 6.20 11,648 13.20 0.01 is 0.01 is - 0,00 0,00 0.00 --- --- -- 0-010 6.30 12.124 13.30 0.01 is 0.01 is --- 0.00 0.00 0.00 --- --- --- 0.013 6.40 12,600 13.40 0.02 is 0.02 is --- -•- 0.00 0.00 0,00 --- 0.016 6.50 13,076 13.50 0.02 is 0.02 is -- --- 0,00 0,00 0.00 --- --- --- 0,018 6.60 13,552 13.60 0.02 is 0.02 is -- 0.00 0.00 0.00 --- -- --- 0.020 6.70 14.028 13.70 0.02 is 0.02 is --- 0.00 D.00 0.00 --- --- -- 0-021 6.80 14,504 13.80 0.02 is 0.02 is - --- 0.00 0.00 0.00 --- --- --- 0.023 6.90 14,980 1190 0.03 is 0.02 is --- 0.00 0.00 D.00 --- 0.024 7.00 15,456 14.00 0.03 is 0.03 is --- --- 0.00 0.00 0,00 --- --- --- 0.026 710 16,084 14.10 0.03 is 0.03 is - - 0.00 0.00 0.00 --- - -- 0,027 7.20 16.712 14.20 0.03 is 0.03 is --- --- 0.00 0.00 0.00 0.028 7.30 17.340 14.30 0.09 is 0.03 is --- 0.06 0.00 0.00 - 0.088 7.40 17,969 14.40 0.34 is 0.03 is - -- 0.30 0,00 0.00 --- -- 0,333 7.50 18.597 14.50 0.69 is 0.03 is - --- 0.65 0.00 0.00 - --- 0.682 7.60 19,225 14.50 1.13 it 0.03 is 1.08 0.00 0.00 1.110 7.70 19,853 14.70 1.60 is 0.03 is - --- 1.57 0.00 0.00 - 1.604 7.80 20,481 14.80 2.16 is 0.03 is - --- 2.12 0.00 0.00 -- 2.156 7.90 21,109 14,90 2.76 is 0.04 is --- 2.73 0.00 0.00 --- --- 2.761 8.00 21,737 15,00 3.41 is 0.03 is -- 3.38 0.00 0,00 --- •-- 3.412 8,10 22,448 15.10 4.11 is 0.03 in 4.08 0.82 0.00 --- --- --- 4.929 8.20 23,158 15,20 4.84 is 0.03 is --- -- 4.81 2,33 0,00 -- 7,167 8,30 23,868 15.30 5.35 is 0.02 is --- 5.33 s 4.27 0.00 -- --- 9.625 8.40 24,578 15.40 5.67 it 0.02 it --- 5.64 s 6.58 0.00 --- 12.24 8.50 25,289 15.50 5.92 is 0.02 is 5.90 s 9.19 0.00 --- -•- 15.11 8.60 25,999 15.60 6.26 is 0.02 it --- --- 5.58 s 12.08 0.66 -- 18.34 8.70 26,709 1570 6.57 is 0.01 is --- --- 4.72 s 15,23 1.94 s --- 21 80 8.80 27,419 15.80 6.76 is 0.01 is --- --- 4.16 s 18.60 2.58 s - -- --- 25.36 8.90 28,130 15.90 6.90 is 0.01 it --- 3.80 s 22-20 3096 --- --- 29.10 9.00 28,840 16-00 7.02 is 0.01 is --- 3.54 s 26.00 3.48 s -- --- 33.02 9.03 29,105 16.03 7.06 is 0.01 is --- 3.47 s 27A8 3 58 s 34.24 9.06 29.371 1606 7.09 is 0.01 is - --- 3.41 s 28,37 3.67 s 35.47 9.09 29,636 16.09 7.13 is 0.01 is --- --- 3.36 s 29.59 3.76 s --- --- 36.71 9.12 29,901 16.12 7.16 is 0 00 is --- --- 3.31 s 30-82 3.85 s --- --- - 37,98 9.15 30,167 16.15 7.19 is 0.00 is --- --- 3.25 s 32.06 3.93 s --- --- 39.25 9.18 30,432 16.18 7.23 is 0.00 is --- --- 3.21 s 33.33 4 00 5 40.55 9.21 30,697 16.21 7.26 is 0.00 is --- --- 3.17 s 34,61 4.07 s --- --- 41.85 9.24 30,963 16.24 7.29 is 0.00 is - 3.13 s 35.90 4.15 s --- --- 43.18 9.27 31,228 16.27 7.32 is 0.00 is --- --- 3.10 s 37.21 4,22 s --- --- --- 44.53 9.30 31.493 16,30 7.35 is 0.00 is --- 3.06 s 38.54 4.28 s --- - --- 45.88 ...End H y d ro g ra p h Summary Report Hydraflow Hydrographs Extension for AutoCADO Civil 3DO 2016 by Autodesk. Inc. A 0.5 Hydrograph type (origin) SCS Runoff SCS Runoff Reservoir P1320 Wotpon • Ll • 10 Hydrograph Report draflow Hydrographs Extension fof AUtoCAD69 CM1 31>® 2016 by Autodesk. inc. 00 5 yd. No. 1 Pre -Developed Pfiday031 2 12018 Hydrograph type = SCS Runoff Peak discharge = 5.079 cfs Storm frequency = 10 yrs Time to peak = 12.13 hrs Time interval = 2 min Hyd. volume = 19,462 cult Drainage area = 1.320 ac Curve number = 75* Basin Slope = 0.0 % Hydraulic length = 0 ft Tic method = User Time of cone. (Tc) = 10.00 min Total precip. = 6.76 in Distribution = Type III Storm duration = 24 hrs Shape factor = 484 ' Composite (Area/GN) = [(1.280 x 74) + (0.040 x 98)] / 1.320 Q (cfs) 6.00 4.00 3.00 2.00 1.00 • Pre -Developed Hyd. No. 1 -- 10 Year 2 4 6 8 10 12 14 Hyd No, 1 Q (cfs) 6.00 5.00 4.00 3.00 1.00 ' :�' 0.00 16 18 20 22 24 26 Time (hrs) 11 Hydrograph Report draflow Hydrographs Extension for AutoCADS Civil 3D® 2016 by Autodesk, Inc. 00.5 aYd. No. 2 Post -Developed Hydrograph type = SCS Runoff Storm frequency = 10 yrs Time interval = 2 min Drainage area = 1.320 ac Basin Slope = 0.0 % Tc method = User Total precip. = 6.76 in Storm duration = 24 hrs Composite (ArealCN) = [(0.750 x 98) + (0.570 x 74)j 11,320 0 (cfs 8.00 0 6.00 4.00 2.00 M1 10 0 2 4 Hyd No, 2 Friday, 0312 12018 Peak discharge = 7.683 cfs Time to peak = 12.07 hrs Hyd. volume = 24,080 cult Curve number = 88* Hydraulic length = 0 ft Time of cone. (Tc) = 5.00 min Distribution = Type III Shape factor = 484 Post -Developed Hyd. No. 2 -- 10 Year Q (cfs) 8.00 Me 4.00 2.00 ..�, 6 8 10 12 14 16 18 20 22 24 -� Time (hrs) C7 • Hydrograph Report 12 draflow Hydrographs Extension for AutoCADO Civil 3DO 2016 by Autodesk. Inc. 00.5 yd. No. 3 Wet Pond C Hydrograph type = Reservoir Peak discharge Storm frequency = 10 yrs Time to peak Time interval = 2 min Hyd, volume Inflow hyd. No. = 2 - Post -Developed Max. Elevation Reservoir name = BMP 4: Wet Pond C Max. Storage Storage Indication method used. Wet pond routing start elevation = 13 00 ft Wet Pond C Friday. 0312 / 2018 = 3.071 cfs = 12.27 hrs = 23,021 cuft = 14.95 ft = 21,408 cuft Q (cfs) Hyd. No. 3 -- 10 Year Q (cfs) 8.00 8.00 6.00 6.00 4.00 4.00 2.00 2.00 0.00 0.00 0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 is - Time (hrs) Hyd No. 3 Hyd No. 2 111.1 i I i Total storage used = 21.408 tuft 13 1 1 Hydrograph typo (origin) Peak flow Wall Time Interval {min) Time to Hyd. Peak volu (min) (cull 1 SCS Runoff 10.51 2 728 40, 2 SCS Runoff 13.83 2 724 44, 3 I I Reservoir 10-86 2 728 43. Hydrograph Summary Report Hydraflow Hydrographs Extension for AutoCAD®Civil 3D6 2416 by Aulodesk, inc. 00.5 le Inflow (Maximum hyd(s) elevation (ft) Total strge used (cuft) Hydrograph Description Pre -Developed 36 ------ -- — 72 ------ -- -- Post -Developed 35 2 15.36 24,205 Wet fond C P1320 Wetpond C gpw Return Period 100 Year Friday. 03 1 2 12018 14 Hydrograph Report draflow Hydrographs Extension for AutoCADS Civil 31M 2016 by Autodesk, Inc. v10.5 yd. No. 1 Pre -Developed Hydrograph type = SCS Runoff Storm frequency = 100 yrs Time interval = 2 min Drainage area = 1.320 ac Basin Slope = 0.0 % Tc method = User Total precip. = 11.50 in Storm duration = 24 hrs ' Composite (Area/CN) = ](1.280 x 74) + (0.040 x 98)] 1 1-320 Q (cfs) 12.00 : rr . rr 400 2.00 0 I* Friday, 0312 / 2018 Peak discharge = 10.51 cfs Time to peak = 12.13 hrs Hyd. volume = 40,936 cuft Curve number = 75* Hydraulic length = 0 ft Time of conc. (Tc) = 10.00 min Distribution = Type Ill Shape factor = 484 Pre -Developed Hyd. No. 1 -- 100 Year Q (cfs) 12.00 10.00 . rr 4.00 2.00 rrm 2 4 6 8 10 12 14 16 18 20 22 24 26 Hyd No. 1 Time (hrs) • u • Hydrograph Report 15 ydraflow HydrogFaphs Extension for AutoCADO Civil 31M 2016 by Autodesk, Inc. 00.5 yd. No. 2 Post -Developed Hydrograph type = SCS Runoff Storm frequency = 100 yrs Time interval = 2 min Drainage area = 1.320 ac Basin Slope = 0.0 % Tc method = User Total precip. = 11.50 in Storm duration = 24 hrs Composite (Area1CN) = [(0.750 x 98) + (0.570 x 74)] / 1.320 Q (cfs) 14.00 0.00 1000 M . I# 4.00 2.00 Friday, 031212018 Peak discharge = 13.83 cfs Time to peak = 12.07 hrs Hyd. volume = 44,972 cult Curve number = 88* Hydraulic length = 0 ft Time of conc. (Tc) = 5.00 min Distribution = Type III Shape factor = 484 Post -Developed Hyd. No. 2 -- 100 Year 0.00 0 16 Q (cfs) 14.00 12.00 10.00 8.00 4.00 F��Irs] r,Tai 2 4 6 8 10 12 14 16 18 20 22 24 Hyd No. 2 Time (hrs) 16 Hydrograph Report ISdraflow Hydrographs Extension for AutoCACV Civil 3176 2016 by Aulodesk. Inc. v10.5 yd. No. 3 Wet Pond C Hydrograph type = Reservoir Storm frequency = 100 yrs Time interval = 2 min Inflow hyd. No. = 2 - Post -Developed Reservoir name = BMP 4: Wet Pond C Storage Indication method used. Wet pond routing start elevation = 13.00 ft Wet Pond C Peak discharge Time to peak Hyd. volume Max. Elevation Max. Storage Friday, 03 t 2 12018 = 10.86 cfs = 12.13 hrs = 43,895 cuft = 15.36 ft = 24,205 cuft Q (Gfs) Hyd. No. 3 -- 100 Year 0 (cfs) 14.00 14.00 00 1200 10.00 10.00 8.00 8.00 6,00 6.00 4.00 4.00 2.00 2.00 0.00 0,00 0 2 4 6 8 10 12 14 16 18 20 22 24 26 Time (hrs) Hyd No. 3 Hyd No. 2 {L�l Total storage used = 24,205 cult Hydraflow Rainfall Report 17 0 draflow Hydrographs Extension for AutoCADO Civil 3130 2016 by Autodesk. Inc. v10.5 Return Period Intensity -Duration -Frequency Equation Coefficients (FHA) (Yrs) B D E (NIA) 1 0.0000 0.0000 0.0000 -------- 2 69,8703 13.1000 0.8658 -------- 3 0.0000 0.0000 0.0000 -------- 5 79.2597 14.6000 0.8369 -------- 10 88.2351 15.5000 0.8279 -------- 25 102.6072 16.5000 0.8217 -------- 50 114.8193 17.2000 0.8199 100 127.1596 17.8000 0.8186 -------- is .19 File name: SampleFHA.idf Intensity = B 1(Tc + D)^E Friday, 03121 2018 Return Period Intensity Values (inlhr) (Yrs) 5 min 10 15 j 20 25 30 35 40 45 50 55 60 1 0.00 0.00 C.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 2 5.69 4.61 3.89 3.38 2.99 2.69 2.44 2.24 2.07 1.93 1.81 1.70 3 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 5 6.57 5A3 4.65 4.08 3.65 3.30 3.02 2.79 2.59 2.42 2.27 2.15 10 7,24 6.04 5.21 4.59 4.12 3.74 3.43 3.17 2.95 2.77 2.60 2A6 25 8.25 6.95 6.03 5.34 4.80 4.38 4A2 3.73 3.48 3.26 3.07 2.91 50 9.04 7.65 6.66 5.92 5.34 4.87 4A9 4.16 3.88 3.65 3A4 3.25 100 9.83 8.36 7.30 6.50 5.87 5.36 4.94 4.59 4.29 4.03 3.80 3.6C Tc = time in minutes. Values may exceed 60. Precip, file name? OANC IPT NUCLEUS\!CivillHydrafloMIDF1SneadsFerrv24hprecipdepth.pco Storm Rainfall Precipitation Table (in) Distribution 1-yr 2-yr 3-yr 5-yr 10-yr 25-yr 50-yr 100-yr SCS 24-hour 3.60 4.44 0.00 5.74 6.76 8.52 9.97 11.50 SCS 6-Hr O.DO 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Huff -1st 0.00 0.00 0.00 O.OD 0.00 0.00 0.00 0.00 Huff-2nd 0.00 0.00 0.00 0.00 0.00 0.DO D.00 0.00. Huff-3rd 0.00 0.00 MO 0.00 0.00 0.00 0.00 0.00 Huff-4th 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Huff-Indy 0.00 0.00 MO 0.00 0.00 0.00 0.00 0.00 Custom 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Hydraf low Table of Contents P1320 Wetpond C.gpw 0ydraflow Hydrographs Extension for AutoCACO Civil 3D® 2016 by Autodesk, Inc. v10.5 Friday. 03 / 2 12018 Watershed Model Schematic..................................................................................... 1 Hydrograph Return Period Recap............................................................................. 2 1 -Year SummaryReport......................................................................................................................... 3 Hydrograph Reports.................................................................... ... 4 ............................................ Hydrograph No. 1, SCS Runoff, Pre-Developed...................................................................... 4 Hydrograph No. 2, SCS Runoff, Post-Developed.................................................................... 5 Hydrograph No. 3, Reservoir, Wet Pond C.............................................................................. 6 Pond Report - BMP 4: Wet Pond C..................................................................................... 7 10 -Year SummaryReport ......................................................................................................................... 9 HydrographReports................................................................................................................. 10 Hydrograph No. 1, SCS Runoff, Pre-Developed.................................................................... 10 Hydrograph No. 2, SCS Runoff, Post-Developed.................................................................. 11 Hydrograph No. 3, Reservoir, Wet Pond C............................................................................ 12 100 - Year SummaryReport....................................................................................................................... 13 40 Hydrograph Reports................................................................................................................. 14 Hydrograph No. 1, SCS Runoff, Pre-Developed.................................................................... 14 Hydrograph No. 2, SCS Runoff, Post-Developed.................................................................. 15 Hydrograph No. 3, Reservoir, Wet Pond C. ........................................................................... 16 OFReport.................................................................................................................. 17 0 • • 0 SECTION E: NORTH CAROLINA P.E. EXEMPTION LETTER The following pages outline the exemption of the use of the P.E. stamp on projects prepared by U.S. Government personnel for work done on government owned works and projects. NORTH CAROLINA STATE BOARD OF REGISTRATION FOR PROFESSIONAL ENGINEERS AND LAND SURVEYORS 3620 51k FORKS ROAD March30, 1993 RALEiGH,NC,77609 19191781.9a99 t9191101-9547 R, LARRY GREENS RLS Cww, — wILLIAMT.STEUER,FE,RL$ V_C_,. ' Mr. James E. butler, PE BOBBY M. LONG. RLS Department of the Navy - Atlantic Division S-.-.- Naval Facilities Engineering Command RAY I-ANoi;Fm RLS J, ALeeRY BA59. JR, PE, RL8 1510 Gilbert Street J. RICH APO COTTHJGHAM, PE, RLS Norfolk, Virginia 23511.2699 HELEN W. MERRITT, PUBLIC MEMBER ..NA H. RUCKER PE RCS FRANK L. Tu RNER. PUBLIC MEMBER Dear Mr. Butler; JCRRY T. CARTER Err U S... .., In accordance with your written request of March 25, 1993, 1 am enclosing for your information a copy of The North Carolina Engineering and Land Surveying Act, G. S. 89C. I will refer your attention to G. S. 89C-25 which provides limitations on the application of the Statute. Paragraph 6 specifically exempts "Practice by members of the armed forces or employees of the government of the United States while engaged in the practice of engineering or land surveying solely for said government on government -owned works and projects." This exemption should not be construed as to allow engineering services to be provided to the Department of the Navy by non -registered contract employees. For any such circumstance, a North Carolina registrant would need be in responsible charge of any engineering services to be provided for a North Carolina project. I.trust this information will be of some service and ask that you Contact me if this office can be of further assistance. ITC/jsa Enclosures Sincerely, y T. Carter Executive Secretary • • 10 ,t rray deer" sufficient, reissue a certificate of registration of e,nhonzation, provided that a majority of the members of the Board vote in favor of such issuance. (1921, C.I. S.10, C,$., s.6055111; 1939, c.218, s.2; 1951. c.1084, s.l; 1953. c.t041, s.10; 1957, CA060, s.5; 1973, c.1331, s.3; 1915, c.681, s.1; 1981, c.789; 1989. c.669, s-1.1 t 89C•23. Unlawful to practice engineering Or lend suveying without registratlon: unlawful use of title of terms; penalties; Attorney General to be legal adviser. -Any person who shall practice, or offer to practice, engineering or land surveying in this State without first being registered in accordance with the provisions of this Chapter, or any person, firm, partnership, organization, association, corporation, or other entity using or employing the words "engineer" or 'engineering" of 'professional engineer" or 'professional engineering" or "land surveyor or 'land surveying,' or any modification at derivative thereof in its name or form of business or activity except as registered under this Chapter or in pursuit of activities exempted by this Chapter, or any person presenting or attempting to use the certificate of registration or the seal of another, or any person who Shall give any false or forged evidence of any kind to the Board or to any member thereof in obtaining or attempting to obtain a certificate of registration, of any person who shall falsely impersonate any other registrant of like or different name, or any person who shall attempt to use an expired or revoked or nonexistent certificate of registration, or who shall practice or offer to practice when not qualified, or any person who falsely claims that he is registered under this Chapter, of any person who shall r violate any of the provisions of this Chapter, in addition to injunctive procedures set out hereintiefore, shall be guilty of a misdemeanor, and may, upon conviction, be sentenced to pay a fine 1011 not less than one hundred dollars 1s100.00), nor more than cne thousand dollars 151,0001, or suffer imprisonment for a period not exceeding three months, or both, in the discretion of the court. In no event shall there be representation of or holding out to the public of any engineering expertise by unregistered persons, it shalt be the duty of all duly constituted officers of the Slate and all political subdivisions thereof to enforce the provisions of this Chapter and to prosecute any persons violating same. The Attorney General of the State or his assistant shall act as legal adviser to the Board and render such legal assistance as may be necessary in carrying out the provisions of this Chapter. The Board may employ counsef and necessary assistance to aid in the enforcement of this Chapter, and the compensation and expenses therefor shall be paid from funds of the Board. (1921, c. 1, s, 12; C. S., s. 6055(n1; 1951, c. 1084, s. 1; 1975, c.681, is, 1.l 4 89C•23. Corporate or partnership practice - of angineering or lend surveying.•A corporation or partnership may engage in the practice of engineering or land surveying in this State, provided, however, the person or persons connected with such corporation or partnership in charge of the designing or supervision which constitutes such practice is or are registered as herein required of professional engineers and registered land surveyors. The same exemptions shall apply to corporations and partnerships as apply to individuals under this Chapter, provided further, that all Corporations hereunder shall be subject to the provisions of Chapter 558 of the General Statutes of North Carolina 11921, c. 1, s. 14; C. S., s. 60551p); 1951, C. 1084, s. 1; 1969, c. 718. s. 18; 1975, c. 681, s. 11 f 89C•25. Limitations on application of Chapter. -This Chapter shall not be construed to prevent or affect: 1. The practice of architecture, landscape architecture,. or contracting or any other legally recognized profession or trade; or 2. The practice of professional engineering or land surveying in this State or by any person not a resident of this State and having no established place of business in this State when this practice does not aggregate more than 90 days in any calendar year, whether performed in this State or elsewhere, or involve more than one specific project; provided, however, that such person is legally Qualified by registration to practice the said profession in his own state or country, in which the requirements and qualifications for obtaining a certificate of registration are satisfactory to the Board; in which case the person shall apply for and the Board will issue a temporary permit; or 3. The practice of professional engineering or land surveying in this State not to aggregate more than 90 days by any person residing in this State, but whose residence has not been of sufficient duration for the ' Board to grant or deny registration, provided, however, such person shall have filed an application for registration as a professional engineer or registered land surveyor and shall have paid the fee provided for in G. S. 89C-14, " provided that such a person is legally qualified by registration to practice professional engineering or land surveying in his own state Or country in which the requirements and qualifications for obtaining a certificate of registration are satisfactory to the Board, in which case the person shall apply for and fhe Board will issue a temporary permit; or 4. Engaging in engineering or land surveying as an employee or assistant under the responsible charge of a professional engineer or registered land surveyor or as an employee or assistant of a nonresident professional engineer or a non resident registered land surveyor provided for in subdivisions (2) and 13) of this section, provided that said work as an employee may not include responsible charge of design or supervision; or 5. The practice of professional engineering or land surveying by any person not a resident of, and having na established place of business in this State; as•a consulting associate of a professional engineer of registered land surveyor registered under the provisions of this Chapter; provided, the nonresident is qualified for such professional service in his own state or country; or 6. Practice by members of the armed forces or empfoyees of the government of the United States while engaged in the practice of engineering or land surveying solely for said government on government owned works and projects; of I� f SECTION F: Project Construction Plans Attached Separately `i 1• i 2 3 4 5 Sheet List Table Sheet List Table -CONTINUED, NAVFNC DWGSHEET NAVFACo DWG SHEET TITLE I SHEET TITLE _ UMBER I NUMBER GENERAL tANDSCAPE a G-001 COVER SHEET - SITE -- tC-100 I OVERALL LANDSCAPE CONSTRUCTION PLAN G-002 1 SHEET INDEX - SITE - LC-101 I LANDSCAPE CONSTRUCTION PLAN - PRKC LOT NORTH - GEOTECHNICAL LC 102 1 LANDSCAPE CONTRUCTION PLAN -- VMFW B-100 I SUBSURFACE EXPLORATION LOCATION PLAN - LC-103 LANDSCAPE CONSTRUCTION PLAN - MAIN TJRKC LOT - 8-10} SOIL BORING LOGS -- tC-104 LANDSCAPE CONSTRUCTION P1AN - BEQ - D B-102 SOIL BORING LOGS -- LC-105 LANDSCAPE CONSTRUCTION PLAN - H2H COMBAT -- B-103 SOIL BORING LOGS -- LC-401 LANDSCAPE CONSTRUCTION ENLARGED PLANS B-1D4 SOIL BORING & W-SITU TESTING LOGS -- LC-50i LANDSCAPE CONSTRUCTION DETAILS -- � 8-200 SHE PRELOA0ING PLAN, DETAILS & NOTES - LC--502 LANDSCAPE CONSTRUCTION DETAILS - CML LC-503 LANDSCAPE CONSTRUCTION DFTKLS - I C-001 LEGEND NOTES AND ABBREVIATIONS - LC-504 -LANDSCAPE CONSTRUCTION DEUNLS - n CO-100 OVERALL EXIST CONDITIONS & DEMO PLAN -- LP-i00 I OVERALL LANDSCAPE PLANTING PLAN CO-101 EXIST CONDITIONS & DEMO PLAN - PRKG LOT NORTH -- LP-;Ol LANDSCAPE PLANTING PLAN - PRKC LOT NORTH _ E CO-102 EXIST CONDITIONS & DEMO PLAN - VMFW __ LP-102 LANDSCAPE PLANTING PLAN - VMFW -- LP-103 LANDSCAPE PLANTING PLAN -- MAIN PRKG LOT CD-103 EXIST CONDITIONS & DEMO PLAN - MAIN PRKG LOT -- LP-104 LANDSCAPE PLANTING PLAN - BED -- CO-104 EXIST CONDITIONS & DEMO PLAN - BEQ __ LP-105 LANDSCAPE PLANTING PLAN - H2H COMBAT -- �� CO-105 EXIST CONDITIONS & DEMO PLAN - H2H COMBAT -- LP-106 LANDSCAPE PLANTING PLAN - BMP 2 AND 3 -- CO-106 EXIST CONDITIONS & DEMO PLAN - BLALDINGS -- LP-107 LANDSCAPE PLANTLNG PLAN - JOGGING TRAIL -- CO-107 EXIST CONDITIONS, DEMO, AND E&S - JOGGNG TRAIL I -- LP-108 I LIUNDSCAPE PLANTING PLAN - JOGGING TRAIL CD-108 EXIST CONDITIONS, DEMO. AND E&S - JOGGING TRAIL I -- LIP -109 1 LANDSCAPE PLANTING PLAN- DEMO SITE -- CS-200 OVERALL SITE PLAN LP-501 PLANT MATERW- SCKEDHLF AND NOTES - CS-2D1 SITE PLAN - PRKG LOT NORTH LP-502 PLANTING DETAI S CS-202 SITE PLAN - VMFW -' ELECTRICAL _- CS-203 SITE PLAN - MAIN PRKC LOT -' ES001 LEGEND AND NOTES - ELECTRICAL -(7 CS-204 I SITE PLAN - - ED101 - SITE ELECTRICAL DEMO PLAN - PRKG LOT NORTH - CS-205 SITE PLAN - H2H COMBAT - ED102 SITE ELECTRICAL DEMO PLAN - VMFW (� CS-206 SITE & GRADING PLAN - JOGGING TRAIL _ EDI03 AN SITE ELECTRICAL DEMO PLAN - MAIN PRKG LOT a .. CS-207 G SITE & RADING PLAN - JOGGING TRAIL ED104 I SITE ELECTRICAL DEMO PLAN - BEQ CU-300 I OVERALL UDLDY PLAN -- ED105 I SITE ELECTRICAL DEMO PLAN -- H2H COMBAT - CU-301 I LITANY PLAN - PRKG LOT NORTH -- E3�06 SITE ELECTRICAL. DEMGLTHON PLAN - CU-302 LTHLIN PLAN - VMFW ESIDI ELECTRICAL SHE PLAN - PRKG LOT NORTH CU-303 UTILITY PLAN - MAIN PRKG LOT PLAN BEQ -- ES102 ELECTRICAL SHE PLAN - VMFW CU-304 UPUTY - -- ES103 ELECTRICAL STfE PLAN- F1AAN PRKG LOT __ CU-305 UTILITY PLAN - 142H COMBAT -- E5104 ELECTRICAL SITE PLAN - EEC -- �d CU-306 WATER uNE PROFILE - SEC __ CU-307 WATER LINE PROFlLE - BEO __ ESIOS ELECTRICAL SITE PLAN - H21-1 COMBAT -- �A4 /� ES601 I SITE POWER RISER_ DIAGRAM AND DETAILS -- CU-308 SANITARY PROFILE - VMFW ES602 SITE ELECTRICAL DETAILS CU-304 STORM PROFILE - VMFW _ ESCHED SITE ELECTRICAL G ETAILS -- CG-400 OVERALL GRADING AND DRAINAGE PLAN _ ES703 01 LIGHTING FIXTURT SCHEDULE AND DETAILS -_ CG-401 GRADING AND DR4NAGE PLAN - PRKG LOT NORTH _ ES702 I SITE LIGHTING oETAI S - CG-402 GRADNG AND DRAINAGE PLAN - VMFW -- CG-403 GRAOwC AND DRAINAGE PLAN - MAN PRKC LOT -- CC-404 GRADING AND DRAINAGE PLAN - BEQ CC-405 GRADING AND DRAINAGE PLAN - 112H COMBAT - -_- CG-406 GRADING AND DRAINAGE PLAN - BMP 2, 3 AND 4 C-50O OVERALL EROSION AND SEDIMENT CONTROL - PHASE 1 M. CROW RA C-501 E & S CONTROL PLAN PH I - PRKG LOT NORTH - C-502 E & S CONTROL PLAN PH I - VMFW -- P E 3 C-503 E & S CONTROL PLAN PH I - MAIN PRKC LOT E 3 C-504 E& S CONIROL PLAN PH I- BEQ - C-505 E & S CONTROL PLAN PH I - H2H COMBAT -- C-506 I E & S CONTROL PHI - SEDIMENT BASIN 2, 3, & 4 -- 2 U C-507 OVERALL EROSION AND SEDIMENT CONTROL - PHASE 2 -- - 3 6-508 1 E & S CONTROL FLAN PH 2 - PRKG LOT NORTH -- ~a Lu C-509 E & S CONTROL. PLAN PH 2 - VMFW C-51D E & S CONTROL PLAN PH 2 - MAIN PRKG LOT -- C-511 E & S CONTROL PLAN PH 2 - BEQ -- Yi C3 C-512 E & S CONTROL PLAN PH 2 - H2H COMBAT -- 4 p C-513 E & S CONTROL PH2 - SEDIMENT BASIN 2. 3. & 4 I -- 2 o Lu C-514 EROSION AND SEDIMENT CONTROL NOTES - v2 C-515 EROSION AND SEDIMENT CONTROL DETAILS C-6O1 SITE DETAILS w LU o C-602 SITE DETAILS z IZ C-603 SITE DETAILS - Z OJ C-504 GATE & FENCE DETAILS -- " C-605 SAND FILTER STORM DETAILS 1 -- U C-606 WET POND STORM DETAILS -- C-607 WATER DETAILS C--606 SANITARY SEWER DETAILS -- m �IL Ci N 6 uxr N fm FP11fC1 MD -- rMpR M/AL rN'K pYw,E r0 L. Q G-oat 1 2 3 4 5 E SECTION G: Project Construction Specifications Attached Separately IC • fn J • BEQ CAMP JOHNSON MCB CAMP LEJEUNE, NC SECTION 33 40 00 STORM DRAINAGE UTILITIES 02/10 PART I GENERAL 1.1 REFERENCES 17P1320 ePROJECTS WO. NO. 1395787 The publications listed below form a part of this specification to the extent referenced. The publications are referred to within the text by the basic designation only. AMERICAN ASSOCIATION OF STATE HIGHWAY AND TRANSPORTATION OFFICIALS (AASHTO) AASHTO HB--17 (2002; Errata 2003; Errata 2005, 17th Edition) Standard Specifications for Highway Bridges AASHTO M 16-iM/M 167 (2014) Standard Specification for Corrugated Steel Structural Plate, Zinc -Coated, for Field -Bolted Pipe, Pipe -Arches, and Arches AASHTO M 190 (2004; R 2012) Standard Specification for Bituminous Coated Corrugated Metal Culvert Pipe and Pipe Arches AASHTO M 219 (1992; R 2012) Standard Specification for Corrugated Aluminum Alloy Structural Plate for Field -Bolted Pipe, Pipe -Arches, and Arches AASHTO M 243 (1996; R 2012) Standard Specification for Field -Applied Coating of Corrugated Metal Structural Plate for Pipe, Pipe -Arches, and Arches AASHTO M 294 (2016) Standard Specification for Corrugated Polyethylene Pipe, 300- to 1500-mm Diameter AASHTO MP 20 (2013; R 2014) Standard Specification for Steel -Reinforced Polyethylene (PE) Ribbed Pipe, 300- to 1500-mm (12- to 60-in) Diameter AMERICAN CONCRETE INSTITUTE INTERNATIONAL (ACI) ACI 346 (2009) Specification for Cast -in -Place Concrete Pipe AMERICAN RAILWAY ENGINEERING AND MAINTENANCE -OF -WAY ASSOCIATION (AREMA) AREMA Eng Man (2015) Manual for Railway Engineering SECTION 33 40 00 Page I BE4 CAMP JOHNSON 17P1320 MCB CAMP LEJEUNE, NC _ ePROJECTS WO. NO. 1395787 ASTM INTERNATIONAL (ASTM) 0 ASTM A12311'A123M (2015) Standard Specification for Zinc (Hot -Dip Galvanized) Coatings on Iron and Steel Products ASTM A48/A48M (2003; R 2012) Standard Specification for Gray Iron Castings ASTM A536 (1984; R 2014) Standard Specification for Ductile Iron Castings ASTM A716 (2008; R 2014) Standard Specification for Ductile Iron Culvert Pipe ASTM A742%A742M (2013) Standard Specification for Steel Sheet, Metallic Coated and Polymer Precoated for Corrugated Steel Pipe ASTM A760/A760M (2015) Standard Specification for Corrugated Steel Pipe, Metallic -Coated for Sewers and Drains ASTM A76211`A762M (20015) Standard Specification for Corrugated Steel Pipe, Polymer Precoated for Sewers and Drains ASTM A798;'A798M (2013) Standard Practice for Installing Factory -Made Corrugated Steel Pipe for Sewers and Other Applications ASTM A807/A807M (2013) Standard Practice for Installing Corrugated Steel Structural Plate Pipe for Sewers and Other Applications ASTM A849 (2015) Standard Specification for Post -Applied Coatings, Pavings, and Linings for Corrugated Steel Sewer and Drainage Pipe ASTM A929/A929M (2001; R 2013) Standard Specification for Steel Sheet, Metallic -Coated by the Hot -Dip Process for Corrugated Steel Pipe ASTM B26fB26M (2014; E 2015) Standard Specification for Aluminum -Alloy Sand Castings ASTM B745/B745M (2015) Standard Specification for Corrugated Aluminum Pipe for Sewers and Drains ASTM C12 (2016a) Standard Practice for Installing Vitrified Clay Pipe Lines ASTM C139 (2014) Standard Specification for Concrete Masonry Units for Construction of Catch Basins and Manholes 0 SECTION 33 40 00 Page 2 BEQ CAMP JOHNSON 17P1320 MCB CAMP LEJEUNE, NC ePROJECTS WO. NO. 1395787 ASTM C14 (2015) Standard Specification for Concrete Sewer, Storm Drain, and Culvert Pipe ASTM C1433 (2016b) Standard Specification for Precast Reinforced Concrete Monolithic Box Sections for Culverts, Storm Drains, and Sewers ASTM C231C231M (2014) Standard Test Method for Air Content of Freshly Mixed Concrete by the Pressure Method ASTM C270 (2014a) Standard Specification for Mortar for Unit Masonry ASTM C32 (2013) Standard Specification for Sewer and Manhole Brick (Made from Clay or Shale) ASTM C425 (2004; R 2013) Standard Specification for Compression Joints for Vitrified Clay Pipe and Fittings ASTM C443 (2011) Standard Specification for Joints for Concrete Pipe and Manholes, Using Rubber Gaskets ASTM C444 (2003; R 2009) Perforated Concrete Pipe ASTM C4'/8 (2015a) Standard Specification for Precast Reinforced Concrete Manhole Sections ASTM C506 (2016a) Standard Specification for Reinforced Concrete Arch Culvert, Storm Drain, and Sewer Pipe ASTM C507 (2015) Standard Specification for Reinforced Concrete Elliptical Culvert, Storm Drain, and Sewer Pipe ASTM C55 (2016) Standard Specification for Concrete Building Brick ASTM C62 (2013a) Building Brick (Solid Masonry Units Made from Clay or Shale) ASTM C700 (2013) Standard Specification for Vitrified Clay Pipe, Extra Strength, Standard Strength, and Perforated ASTM C76 (2015) Standard Specification for Reinforced Concrete Culvert, Storm Drain, and Sewer Pipe ASTM C277 (2008) External Sealing Bands for Concrete Pipe, Manholes, and Precast Box Sections A4D STM C923 (2008; R 2013; E 2016) Standard Specification for Resilient Connectors Between Reinforced Concrete Manhole SECTION 33 40 00 Page 3 BEQ CAMP JOHNSON 17P1320 MCB CAMP LEJEUNE, NC ePROJECTS WO. NO. 1395787 Structures, Pipes and Laterals ASTM C990 (2009; R 2014) Standard Specification for Joints for Concrete Pipe, Manholes and Precast Box Sections Using Preformed Flexible Joint Sealants ASTM D1056 (2014) Standard Specification for Flexible Cellular Materials - Sponge or Expanded Rubber ASTM D1171 (2016; E 2016) Standard Test Method for Rubber Deterioration - Surface Ozone Cracking Outdoors (Triangular Specimens) ASTM D1S57 (2012; E 2015) Standard Test Methods for Laboratory Compaction Characteristics of Soil Using Modified Effort (56,000 ft-lbf/ft3) (2700 kN-m/m3) ASTM D1751 (2004; E 2013; R 2013) Standard Specification for Preformed Expansion Joint Filler for Concrete Paving and Structural Construction (Nonextruding and Resilient Bituminous Types) ASTM D1752 (2004a; R 2013) Standard Specification for Preformed Sponge Rubber Cork and Recycled PVC Expansion ASTM D1784 (2011) Standard Specification for Rigid Poly(Vinyl Chloride) (PVC) Compounds and Chlorinated Poly(Vinyl Chloride) (CPVC) Compounds ASTM D2167 (2015) Density and Unit Weight of Soil in Place by the Rubber Balloon Method ASTM D2321 (2014; E 2014) Standard Practice for Underground Installation of Thermoplastic Pipe for Sewers and Other Gravity -Flow Applications ASTM D2729 (2011) Poly(Vinyl Chloride) (PVC) Sewer Pipe and Fittings .ASTM D3034 (2016) Standard Specification for Type PSM Poly(Vinyl Chloride) (PVC) Sewer Pipe and Fittings ASTM D3212 (2007; R 2013) Standard Specification for Joints for Drain and Sewer Plastic Pipes Using Flexible Elastomeric Seals ASTM D3350 (2012) Polyethylene Plastics Pipe and Fittings Materials ASTM D6938 (2015) Standard Test Method for In -Place Density and Water Content of Soil and is SECTION 33 40 00 Page 4 BEQ CAMP JOHNSON 17P1320 MCB CAMP LEJEUNE, NC ePROJECTS WO. NO. 1395787 Soil -Aggregate by Nuclear Methods (Shallow is Depth) ASTM F2562'F2562M (2015) Specification for Steel Reinforced Thermoplastic Ribbed Pipe and Fittings for Non -Pressure Drainage and Sewerage ASTM F2736 (2013; E 2014) Standard Specification for 6 to 30 in. (152 To 762 mm) Polypropylene (PP) Corrugated Single Wall Pipe And Double Wall Pipe ASTM F2764F2764M (2016) Standard Specification for 6 to 60 in. Polypropylene (PP) Corrugated Double and Triple Wall Pipe and Fittings for Non -Pressure Sanitary Sewer Applications ASTM F2881 (2011) Standard Specification for 12 to 60 in. (300 to 1500 mm) Polypropylene (PP) Dual Wall Pipe and Fittings for Non -Pressure Storm Sewer Applications ASTM F477 (2014) Standard Specification for Elastomeric Seals (Gaskets) for Joining Plastic Pipe ASTM F679 (2016) Standard Specification for Poly(Vinyl Chloride) (PVC) Large -Diameter Plastic Gravity Sewer Pipe and Fittings ASTM F714 (2013) Polyethylene (PE) Plastic Pipe (SDR-PR) Based on Outside Diameter ASTM F794 (2003; R 2014) Standard Specification for Poly(Vinyl Chloride) (PVC) Profile Gravity Sewer Pipe and Fittings Based on Controlled Inside Diameter ASTM F894 (2013) Polyethylene (PE) Large Diameter Profile wall Sewer and Drain Pipe ASTM F94.9 (2015) Poly(Vinyl Chloride) (PVC) Corrugated Sewer Pipe with a Smooth Interior and Fittings 1.2 SUBMITTALS Government approval is required for submittals with a "G" designation; submittals not having a "G" designation are for Contractor Quality Control approval. Submittals with an "S" are for inclusion in the Sustainability eNotebook, in conformance to Section 01 33 29 SUSTAINABILITY REPORTING. Submit the following in accordance with Section 01 33 00 SUBMITTAL PROCEDURES: SD-04 Samples ISPipe for Culverts and Storm Drains SECTION 33 40 00 Page 5 BEQ CAMP JOHNSON MCB CAMP LEJEUNE, NC SD-07 Certificates Resin Certification Oil Resistant Gasket Leakage Test Hydrostatic Test on Watertight Joints Determination of Density Frame and Cover for Gratings Post -Installation Inspection Report GREEN GLOBES Documentation; G SD-08 Manufacturer's Instructions Placing Pipe; G 17P1320 ePROJECTS WO. NO. 1395787 Submit printed copies of the manufacture's reccommendations for installation prior to installation. LID Verification Report; G 1.3 DELIVERY, STORAGE, AND HANDLING 1.3.1 Delivery and Storage Materials delivered to site shall be inspected for damage, unloaded, and stored with a minimum of handling. Materials shall not be stored directly on the ground. The inside of pipes and fittings shall be kept free of dirt and debris. Before, during, and after installation, plastic pipe and fittings shall be protected from any environment that would result in damage or deterioration to the material. Keep a copy of the manufacturer's instructions available at the construction site at all times and follow these instructions unless directed otherwise by the Contracting Officer. Solvents, solvent compounds, lubricants, elastomeric gaskets, and any similar materials required to install plastic pipe shall be stored in accordance with the manufacturer's recommendations and shall be discarded if the storage period exceeds the recommended shelf life. Solvents in use shall be discarded when the recommended pot life is exceeded. 1.3.2 Handling Materials shall be handled in a manner that ensures delivery to the trench in sound, undamaged condition. Pipe shall be carried to the trench, not dragged. PART 2 PRODUCTS' 2.1 PIPE FOR CULVERTS AND STORM DRAINS Pipe for culverts and storm drains shall be of the sizes indicated and s • SECTION 33 40 00 Page 6 BEQ CAMP JOHNSON MCB CAMP LEJEUNE, NC shall conform to the requirements specified. 2.1.1 Concrete Pipe 17P1320 ePROJECTS WO. NO. 1395787 Manufactured in accordance with and conforming to ASTM C70', Class III , or as noted in the plans. 2.1.1.1 Reinforced Arch Culvert, and Storm Drainpipe Manufactured in accordance with and conforming to ASTM C506, Class A -ITT 2.1.1.2 Reinforced Elliptical Culvert and Storm Drainpipe Manufactured in accordance with and conf.ermincg to ASTM C507. Horizontal elliptical pipe shall be Class HE -III Vertical elliptical pipe shall be Class VE-III . 2.1.1.3 Nonreinforced Pipe Manufactured in accordance with and conforming to ASTM C1.4, Class 3. 2.1.1,4 Cast -In -Place Nonreinforced Conduit ACT 346, except that testing shall be the responsibility of and. at the expense of the Contractor. In the case of other conflicts between ACT 346 and project specifications, requirements of ACI. 346 shall govern. 2.1.2 Clay Wipe Standard or extra strength, as indicated, conforming to ASTM C700. 2.1.3 Corrugated Steel Pipe ASTM A760%A760M, zinc or aluminum (Type 2) coated pipe of either: a. Type [I] [II] pipe with [annular] [helical] 2-2/3 by 1/2 inch corrugations. b. Type [ZR] [IIR] pipe with helical 3/4 by 3/4 by 7-1/2 inch corrugations. 2.1.3.1 Fully Bituminous Coated AASHTO M 190 Type A and ASTM A760;A7GOM zinc or aluminum (Type 2) coated pipe of either: a. Type [11 111] pipe with [annularl [helical] 2-2/3 by 1/2 inch corrugations. b. Type [IRI [TTR] pipe with helical 3/4 by 3/4 by 7-1/2 inch corrugations. 2.1.3.2 Half Bituminous Coated, Part Paved AASHTO M 190 Type B and ASTM A760/A760M zinc or aluminum (Type 2) coated Type [I] [II] pipe with [annular] [helical] 2-2/3 by 1/2 inch corrugations. 2.1.3.3 Fully Bituminous Coated, Part Paved AASHTO M 190 Type C and ASTM A760;1A760M zinc or aluminum (Type 2) coated 4D Type [I] [IT] pipe with [annular] [helical.] 2-2/3 by 1/2 inch corrugations. SECTION 33 40 00 Page 7 BEQ CAMP JOHNSON 17P1320 MCB CAMP LEJEUNE, NC ePROJECTS WO. NO. 1395787 2.1.3.4 Fully Bituminous Coated, Fully Paved AASHTO M 190 Type D and ASTM A760/A760M zinc or aluminum (Type 2) coated Type (I) [II] pipe with [annular] [helical] 2-2/3 by 1/2 inch corrugations. 2:1.3.5 Concrete -Lined ASTM A760/A760M zinc coated Type I corrugated steel pipe with [annular) (helical] 2-2/3 by 1/2 inch corrugations and a concrete lining in accordance with ASTM A849. 2.1.3.6 Polymer Precoated ASTM A762/A762M corrugated steel pipe fabricated from ASTM A742/A742M Grade 10/10 polymer precoated sheet of either: a. Type [I] [II] pipe with [annular] [helical] 2-2/3 by 1/2 inch corrugations. b. Type [IR] [IIR) pipe with helical 3/4 by 3/4 by 7-1/2 inch corrugations. 2.1.3.7 Polymer Precoated, Part Paved ASTM A762/A762M Type [11 [II] corrugated steel pipe and AASHTO M 190 Type B (modified), paved invert only, fabricated from ASTM A742/A'142M Grade 10/10 polymer precoated sheet with [annular] [helical] 2-2/3 by 1/2 inch corrugations. 2.1.3.8 Polymer Precoated, Fully Paved ASTM[ A762/A762M Type [I] [II] corrugated steel pipe and AASHTO M 190 Type D (modified), fully paved only, fabricated from ASTM A7421A742M Gracie 10/10 polymer precoated sheet with [annular] [helical] 2-2/3 by 1/2 inch corrugations. 2.1.4 Corrugated Aluminum Pipe ASTM B745/3745M corrugated aluminum pipe of either: a. Type [11 [II] pipe with [annular] [helical] corrugations. b. Type [IA] [IR] [IIA1 [IIRI pipe with helical corrugations. 2.1.4.1 Aluminum Fully Bituminous Coated Bituminous coating shall conform to ASTM A849 Type [ ]. Piping shall conform to AASHTO M 190 Type A and ASTM B745/B745M corrugated aluminum pipe of either: a. Type [I] [II] pipe with [annular] [helical] corrugations. b. Type [IA] [IR] (11A) [IIR] pipe with helical corrugations. 2.1.4.2 Aluminum Fully Bituminous Coated, Part Paved Bituminous coating shall conform to ASTM A849 Type [ 1. Piping shall conform to AASHTO M 1.90 Type C and ASTM B745/H745M corrugated aluminum is SECTION 33 40 00 Page 8 BEQ CAMP JOHNSON MCB CAMP LEJEURE, NC 17P1320 ePROJECTS WO. NO. 1395787 111 �1 I C alloy pipe of either: a. `Pyre [I] [1I.] pipe with [annular] [helical] corrugations, b. Type [IR] [IIR] pipe with helical corrugations. 2.1.5 Structural Plate, Steel Pipe, Pipe Arches and Arches• Assembled with galvanized steel nuts and bolts, from galvanized corrugated steel plates conforming to AASHTQ M 167M/M 167. Pipe coating, when required, shall conform to the requirements of [AASKTO M 1.9C Type A] [ AASHTO M 2431. Thickness of plates shall be as indicated. 2.1.6 Structural. Plate, Aluminum Pipe, Pipe Arches and Arches Assembled with either aluminum alloy, aluminum coated steel, stainless steel or zinc coated steel nuts and bolts. Nuts and bolts, and aluminum alloy plates shall conform to AASHTO M 219. Pipe coating, when required, shall conform to the requirements of [AASHTO M 190, Type A] [AASHTO M 243 ]. Thickness of plates shall be as indicated. 2.1.7 Ductile Iron Culvert Pipe ASTM A716. 2.1.8 Poly Vinyl Chloride (PVC) Pipe Submit the pipe manufacturer's resin certification, indicating the cell classification of PVC used to manufacture the pipe, prior to installation of the pipe. 2.1.8.1 Type PSM PVC Pipe ASTM D3034, Type PSM, maximum SDR 35, produced from PVC certified by the Manufacturer as meeting the requirements of ASTM D1784, minimum cell class 12454-B. 2.1.8.2 Profile PVC Pipe ASTM F'794, Series 46, produced from PVC certified by the Manufacturer as meeting the requirements of ASTM D1784, minimum cell class 12454-B. 2.1,8.3 Smooth Fall PVC Pipe ASTM F679 produced from PVC certified by the Manufacturer as meeting the requirements of ASTM D1784, minimum cell class 12454-B. 2.1.8.4 Corrugated PVC Pipe ASTM P949 produced from PVC certified by the Manufacturer as meeting the requirements of ASTM D1.784, minimum cell class 12454-B. 2.1.9 Polyethylene (PE) Pipe Submit the pipe manufacturer's resin certification, indicating the cell classification of .PE used to manufacture the pipe, prior to installation of the pipe. The minimum cell classification for polyethylene plastic shall apply to each of the seven primary properties of the cell classification limits in accordance with ASTM D3350. SECTION 33 40 00 Page 9 BEQ CAMP JOHNSON MCB CAMP LEJEUNE, NC 2.1.9.1 Smooth Wall PE Pipe 17P1320 ePROJFCTS WO. NO. 1395787 ASTM F714, maximum DR of 21 for pipes 3 to 24 inches in diameter and maximum DR of 26 for pipes 26 to 48 inches in diameter. Pipe shall be produced from PE certified by the resin producer as meeting the requirements of ASTM D3350, minimum cell class 335434C. 2.1.9.2 Corrugated PE Pipe AASHTO M 294, Type S or C. For slow crack growth resistance, acceptance of resins shall be determined by using the notched constant ligament -stress (NCLS) test meeting the requirements of AASHTO M 294.. Pipe walls shall have the following properties: Nominal Size {inch)) Minimum Wall Area (square in/ft) Minimum Moment of Inertia of Wall Section tin. to the 4th/in.) 12 1.5 0.024 15 1.91 0.053 18 2.34 0.062 24 3.14 0.116 30 3.92 0.163 36 4.50 0.222 42 4.69 0.543 48 5.15 0.543 54 5.67 0.800 60 6.45 0.800 2.1.9.3 Profile Wall PE Pipe ASTM F894, RSC 160, produced from PE certified by the resin producer as meeting the requirements of ASTM D3350, minimum cell class 334433C. Pipe walls shall have the following properties: Nominal Size (inch) Minimum Wall Area (square in/ft) Minimum Moment Cell, Class 334433C Cell Class 335434C 18 2.96 0.052 0.038 21 4.15 0.070 0.051 • • SECTION 33 40 00 Page 10 BEQ CAMP JOHNSON MCB CAMP LEJEUNE, NC 17P1320 ePROJECTS WO. N0, 1395787 E DI � 11 Nominal Size (inch) Minimum Wall Area (square in/ft) Minimum Moment Coll Class 334433C Cell Class 335434C 24 4.66 0.081 0.059 27 5.91 0.125 0.091 30 5.91 0.125 0.091 33 6.99 0.161 0.132 36 7.81 0.202 0.165 42 8.08 0.277 0.227 48 8.82 0.338 0.277 2.1.10 Steel Reinforced Polyethylene (SRPE) Pipe SRPE pipe will meet the requirements of ASTM F2562/F2562tM 8 - 120 inch diameter pipe and AASHTO MP 20 (12 - 60 inch diameter pipe). 2.1.11 Polypropylene (PP) Pipe Double wall and triple wall pipe with a diametex' of 12 to 60 inches shall meet the requirements of ASTM F2736, ASTM F2764/1-'2'764M, or ASTM F2881. 2.2 PERFORATED PIPING 2.2.1 Clay Pipe ASTM C700, [standard] [extra] strength. 2.2.2 Concrete Pipe Manufactured in accordance with and conforming to ASTM C444, and applicable requirements of ASTM C14. 2.2.3 Corrugated Steel Pipe ASTM A760/A760M, Type III, zinc-coati-ed. 2.2.4 Corrugated Aluminum Pipe ASTM E745/B745M, Type III. 2.2.5 Polyvinyl Chl.o7.i.de (PVC) Pipe ASTM D2729. 2.2.6 Polypropylene (PP) Pipe ASTM F2881, Class II perforation patterns. SECTION 33 40 00 Page 11 BEQ CAMP JOHNSON MCB CAMP LEJEUNE, NC 2.3 DRAINAGE STRUCTURES 2.3.1 Flared End Sections 17P1320 ePROJECTS WO. NO. 1395787 Sections shall be of a standard design fabricated from zinc coated steel sheets meeting requirements of ASTM A929/A929M. 2.3.2 Precast Reinforced Concrete Box Manufactured in accordance with and conforming to ASTM C1433. 2.4 MISCELLANEOUS MATERIALS 2.4.1 Concrete Unless otherwise specified, concrete and reinforced concrete shall conform to the requirements for 4,000 psi concrete under Section 03 30 00 CAST -IN -PLACE CONCRETE. The concrete mixture shall have air content by volume of concrete, based on measurements made immediately after discharge from the mixer, of 5 to 7 percent when maximum size of coarse aggregate exceeds 1-1/2 inches. Air content shall be determined in accordance with ASTM C231.C231M. The concrete covering over steel reinforcing shall not be less than 1 inch thick for covers and not less than 1-1/2 inches thick for walls and flooring. Concrete covering deposited directly against the ground shall have a thickness of at least 3 inches between steel and ground. Expansion -joint filler material shall conform to ASTM D1751, or ASTM D1752, or shall be resin -impregnated fiberboard conforming to the physical requirements of ASTM D1752. 2.4.2 Mortar Mortar for pipe joints, connections to,other drainage structures, and brick or block construction shall conform to ASTM C270, Type M, except that the maximum placement time shall be 1 hour. The quantity of water in the mixture shall be sufficient to produce a stiff workable mortar but in no case shall exceed 7 gallons of water per sack of cement. Water shall be clean and free of harmful acids, alkalis, and organic impurities. The mortar shall be used within 30 minutes after the ingredients are mixed with water. The inside of the joint shall be wiped clean and finished smooth. The mortar head on the outside shall be protected from air and sun with a proper covering until satisfactorily cured. 2.4.3 Precast Concrete Segmental Blocks Precast concrete segmental block shall conform to ASTM C139, not more than 8 inches thick, not less than 8 inches long, and of such shape that joints can be sealed effectively and bonded with cement mortar. 2.4.4 Brick Brick shall conform to ASTM C62, Grade SW; ASTM C55, Grade S-I or S-II; or ASTM C32, Grade MS. Mortar for jointing and plastering shall consist of one part portland cement and two parts fine sand. Lime may be added to the mortar in a quantity not more than 25 percent of the volume of cement. The joints shall be filled completely and shall be smooth and free from surplus mortar on the inside of the structure. Brick structures shall be plastered with 1/2 inch of mortar over the entire outside surface of the walls. For square or rectangular structures, brick shall be laid in stretcher courses with a header course every sixth course. For round structures, brick shall SECTION 33 40 00 Page 12 BEQ CAMP JOHNSON MCB CAMP LEJEUNE, NC 17P1320 ePROJECTS WO. NO. 1395787 be laid radially with every sixth course a stretcher course. 2.4.5 Precast Reinforced Concrete Manholes Conform to ASTM C476. Joints between precast concrete risers and tops shall be made with flexible watertight, rubber -type gaskets meeting the requirements of paragraph JOINTS. 2.4.6 Prefabricated Corrugated Metal Manholes Manholes shall be of the type and design recommended by the manufacturer. Manholes shall be complete with frames and cover, or frames and gratings. 2.4.7 Frame and Cover for Gratings Submit certification on the ability of frame and cover or gratings to carry the imposed live load. Frame and cover for gratings shall be cast gray iron, ASTM A48;'A48M, Class 35B; cast ductile iron, ASTM A536, Grade 65-45-12; or cast aluminum, ASTM 326;B26M, Alloy 356.0-T6. Weight, shape, size, and waterway openings for grates and curb inlets shall be as indicated on the plans. The word "Storm Sewer" shall be stamped or cast into covers so that it is plainly visible. 2.4.8 Joints 2.4.8.1 Flexible Watertight Joints a. Flexible watertight joints shall be made with plastic or rubber -type gaskets for concrete pipe and with factory -fabricated resilient materials for clay pipe. The design of joints and the physical requirements for preformed flexible joint sealants shall conform to ASTM C990, and rubber -type gaskets shall conform to ASTM C443. Factory -fabricated resilient joint materials shall conform to ASTM C425. Gaskets shall have not more than one factory -fabricated splice, except that two factory -fabricated splices of the rubber -type gasket are permitted if the nominal diameter of the pipe being gasketed exceeds 54 inches. b. Rubber gaskets shall comply with the oil resistant gasket requirements of ASTM C443. Certified copies of test results shall be delivered to the Contracting Officer before gaskets or jointing materials are installed. Alternate types of watertight joint may be furnished, if specifically approved. 2.4.8.2 External Sealing Bands Requirements for external sealing bands shall conform to ASTM C677. 2.4.8.3 Flexible Watertight, Gasketed Joints a. Gaskets: When infiltration or exfiltration is a concern for pipe lines, the couplings may be required to have gaskets. The closed -cell expanded rubber gaskets shall be a continuous band approximately 7 inches wide and approximately 3/8 inch thick, meeting the requirements of ASTM D1056, Type 2 Al , and shall have a quality retention rating of not less than 70 percent when tested for weather resistance by ozone chamber exposure, Method B of ASTM D1171. Rubber 0-ring gaskets shall be 13/16 inch in diameter for pipe diameters of 36 inches or smaller and 7/8 inch in diameter for larger pipe having 1/2 inch deep end SECTION 33 4G 00 Page 13 BEQ CAMP JOHNSON MCB CAMP LEJEUNE, NC 17P1320 ePROJECTS WO. NO. 1395787 corrugation. Rubber 0-ring gaskets shall be 1-3/8 inches in'diameter for pipe having 1 inch deep end corrugations. 0-rings shall meet the requirements of ASTM C990 or ASTM C'443. Preformed flexible joint sealants shall conform to ASTM C990, Type B. b. Connecting Bands: Connecting bands shall be of the type, size and sheet thickness of band, and the size of angles, bolts, rods and lugs as indicated or where not indicated as specified in the applicable standards or specifications for the pipe. Exterior rivet heads in the longitudinal seam under the connecting band shall be countersunk or the rivets shall be omitted and the seam welded. Watertight joints shall be tested and shall meet the test requirements of paragraph HYDROSTATIC TEST ON WATERTIGHT JOINTS. 2.4.8.4 PVC Plastic Pipes Joints shall be solvent cement or elastomeric gasket type in accordance with the specification for the pipe and as recommended by the pipe manufacturer. 2.4.8.5 Smooth Wall PE Plastic Pipe Pipe shall be joined using butt fusion method as recommended by the pipe manufacturer. 2.4.8.E Corrugated PE Plastic Pipe Pipe joints shall be water tight and shall conform to the requirements in AASHTO M 294. Water tight joints shall be made using a PE coupling and rubber gaskets as recommended by the pipe.manufacturer. Rubber gaskets shall conform to ASTM F477. 2.4,8.7 Profile Wall PE Plastic Pipe Joints shall be gasketed or thermal weld type with integral bell in accordance with ASTM F894. 2.4.8.8 Ductile iron Pipe Couplings and fittings shall be as recommended by the pipe manufacturer. 2.4.8.9 Dual Wall and Triple Wall PP Pipe Spigot shall have two gaskets meeting the requirements of ASTM F477. Gaskets shall be installed by the pipe manufacturer and covered with a removable, protective wrap to ensure the gaskets are free from debris. Use a joint lubricant available from the manufacturer on the gasket and bell during assembly. [ASTM F2881 for 12 to 60 inches pipe][ASTM F2736 for 12 to 30 inches pipe][ASTM F2764/F2764M for 30 to 60 inches pipe] diameters shall have a reinforced bell with a polymer composite band installed by the manufacturer. Fittings shall conform to [ASTM F2881] (ASTM F2736] [ ASTM F2764/F2764M]. Bell and spigot connections shall utilize a spun -on, welded or integral bell and spigot with gaskets meeting ASTM F477. 2.4.8.10 Steel Reinforced Polyethylene (SRPE) Pipe SRPE joints shall meet the requirements of ASTM D3212. 40 SECTION 33 40 00 Page 14 0 E 0 BEQ CAMP JOHNSON MCB CAMP LEJEUNE, NC 2.4.9 Flap Gates 17P1320 ePROJECTS WO. NO. 1395787 Flap Gates shall be medium -duty with circular opening and double -hinged. Top pivot points shall be adjustable. The seat shall be one-piece cast iron with a raised section around the perimeter of the waterway opening to provide the seating face. The seating face of the seat shall be neoprene. The cover shall be one-piece cast iron with necessary reinforcing rib, lifting eye for manual operation, and bosses to provide a pivot point connection with the links. The seating face of the cover shall be neoprene. Links or hinge arms shall be cast or ductile iron. Holes of pivot points shall be bronze bushed. All fasteners shall be either galvanized steel, bronze or stainless steel. 2.5 STEEL LADDER Steel ladder shall be provided where the depth of the storm drainage structure exceeds 12 feet. These ladders shall be not less than 16 inches in width, with 3/4 inch diameter rungs spaced 12 inches apart. The two stringers shall be a minimum 3/8 inch thick and 2-1/2 inches wide. Ladders and inserts shall be galvanized after fabrication in conformance with ASTM A123/A123M. 2.6 RESILIENT CONNECTORS Flexible, watertight connectors used for connecting pipe to manholes and inlets shall conform to ASTM C923. 2.7 EROSION CONTROL RIP RAP Provide non -erodible rock not exceeding 15 inches in its greatest dimension and choked with sufficient small rocks to provide a dense mass with a minimum thickness of 8 inches or as indicated. PART 3 EXECUTION 3.1 INSTALLATION OF PIPE CULVERTS, STORM DRAINS, AND DRAINAGE STRUCTURES Excavation of trenches, and for appurtenances and backfilling for culverts and storm drains, shall be in accordance with the applicable portions of Section 31 23 00.00 20 EXCAVATION AND FILL and the requirements specified below. 3.1.1 Trenching The width of trenches at any point below the top of the pipe shall be not greater than the outside diameter of the pipe plus 36 inches to permit satisfactory jointing and thorough tamping of the bedding material under and around the pipe. Sheeting and bracing, where required, shall be placed within the trench width as specified, without any overexcavation. Where trench widths are exceeded, redesign with a resultant increase in cost of stronger pipe or special installation procedures will be necessary. Cost of this redesign and increased cost of pipe or installation shall be borne by the Contractor without additional cost to the Government. 3.1.2 Removal of Rock Rock in either ledge or boulder formation shall be replaced with suitable materials to provide a compacted earth cushion having a thickness between unremoved rock and the pipe of at least 8 inches or 1/2 inch for each foot SECTION 33 40 00 Page 15 QEQ CAMP JOHNSON 17P1320 MCB CAMP LEJEUNE, NC ePROJECTS WO. NO. 1395787 of fill over the top of the pipe, whichever is greater, but not more than three -fourths the nominal diameter of the pipe. Where bell -and -spigot pipe is used, the cushion shall be maintained under the bell as well as under the straight portion of the pipe. Rock excavation shall be as specified and defined in Section 31 23 00.00 20 EXCAVATION AND FILL . 3.1.3 Removal of Unstable Material Where wet or otherwise unstable soil incapable of properly supporting the pipe, as determined by the Contracting Officer, is unexpectedly encountered in the bottom of a trench, such material shall be removed to the depth required and replaced to the proper grade with select granular material, Compacted as provided in paragraph BACKFILLING. when removal of unstable material is due to the fault or neglect of the Contractor while performing shoring and sheeting, water removal, or other specified requirements, such removal and replacement shall be performed at no additional cost to the Government. 3.2 BEDDING The bedding surface for the pipe shall provide a firm foundation of uniform density throughout the entire length of the pipe. Provide geotextile fabric in accordance with Section 31 05 19 GEOTEXTILE below bedding material where indicated and where yielding foundation conditions exist. 3.2.1 Concrete Pipe Requirements When no bedding class is specified or detailed on the drawings, concrete pipe shall be bedded in granular material minimum 4 inch in depth in trenches with soil foundation. Depth of granular bedding in trenches with rock foundation shall be 1/2 inch in depth per foot of depth of fill, minimum depth of bedding shall be 8 inch up to maximum depth of 24 inches. The middle third of the granular bedding shall be loosely placed. Bell holes and depressions for joints shall be removed and formed so entire barrel of pipe is uniformly supported. The bell hole and depressions for the joints shall be not more than the length, depth, and width required for properly making the particular type of joint. 3.2.2 Clay Pipe Requirements Bedding for clay pipe shall be as specified by ASTM C12. 3.2.3 Corrugated Steel and Aluminum Pipe Bedding for corrugated steel and aluminum pipe and pipe arch shall be in accordance with ASTM A798/'A798M. It is not required to shape the bedding to the pipe geometry. However, for pipe arches, either shape the bedding to the relatively flat bottom arc or fine grade the foundation to a shallow v-shape. Bedding for corrugated structural plate pipe shall meet requirements of ASTM A807/A807M. 3.2.4 Ductile Iran Pipe Bedding for ductile iron pipe shall be as shown on the drawings. 3.2.5 Plastic Pipe Bedding for PVC, PE, SRPE and PP pipe shall meet the requirements of ASTM D2321. Use Class I or II material for bedding, haunching, and initial 40 SECTION 33 40 00 Page 16 BEQ CAMP JOIINSON MC8 CAMP LEJEUNE, NC 17Pi320 ePROJECTS WO. NO. 1395787 0 E-1 backfill . 3.3 PL,ACING PIPE Each pipe shall be thoroughly examined before being laid; defective or damaged pipe shall not be used. Plastic pipe, excluding SRPE pipe shall be protected from exposure to direct sunlight prior to laying, if necessary to maintain adequate pipe stiffness and meet installation deflection requirements. Pipelines shall be laid to the grades and alignment indicated. Proper facilities shall be provided for lowering sections of pipe into trenches. Lifting lugs in vertically elongated pipe shall be placed in the same vertical plane as the major axis of the pipe. Pipe shall not be laid in water, and pipe shall not be laid when trench conditions or weather are unsuitable for such work. Diversion of drainage or dewatering of trenches during construction shall be provided as necessary. Deflection of installed flexible pipe shall not exceed the following limits: TYPE OF PIPE MAXIMUM ALLOWABLE DEFLECTION (percent) Corrugated Steel and Aluminum 5 Concrete -Lined Corrugated Steel 3 Plastic (PVC, PE, SRPE, and PP) 5 Note post installation requirements of paragraph DEFLECTION TESTING in PART 3 of this specification for all pipe products including deflection testing requirements for flexible pipe. 3.3.1 Concrete, Clay, PVC, Ribbed PVC, Ductile Iron and Cast-iron Pipe Laying shall proceed upgrade with spigot ends of bell -and -spigot pipe and tongue ends of tcngue-and-groove pipe pointing in the direction of the flow. 3.3.2 Elliptical and Elliptical Reinforced Concrete Pipe The manufacturer's reference lines, designating the top of the pipe, shall be within 5 degrees of a vertical plane through the longitudinal axis of the pipe, during placement. Damage to or misalignment of the pipe shall be prevented in al.l backfi] l ing operations. 3.3.3 PE, SRPE, and Dual Wall- and Triple Wall PP Pipe Laying shall be with the separate sections joined firmly on a bed shaped to line and grade and shall follow manufacturer's guidelines. 3.3.4 Corrugated Steel and Aluminum Pipe and Pipe Arch Laying shall. be with the separate sections joined firmly together, with the outside laps of circumferential joints pointing upstream, and with longitudinal laps on the sides. Part paved pipe shall be installed so that the centerline of bituminous pavement in the pipe, indicated by suitable markings on the top at each end of the pipe sections, coincides with the specified alignment: of pipe. Fully paved steel pipe or pipe arch shall have a painted or otherwise applied label inside the pipe or pipe arch SECTION 33 40 00 Page 17 BEQ CAMP JOHNSON 17P1320 MCB CAMP LEJEUNE, NC ePROJECTS WO. NO. 1395787 indicating sheet thickness of pipe or pipe arch. Any unprotected meta: in the joints shall be coated with bituminous material as specified in AASHTO M 190 or AASHTO M 243. Interior coating shall be protected against damage from insertion_ or removal of struts or tie wires. Lifting lugs shall be used to facilitate moving pipe without damage to exterior or interior coatings. During transportation and installation, pipe or pipe arch and coupling bands shall be handled with care to preclude damage to the coating, paving or lining. Damaged coatings, pavings and linings shall be repaired in accordance with the manufacturer's recommendations prior to placing backfill. Pipe on which coating, paving or lining has been damaged to such an extent that satisfactory field repairs cannot be made shall be removed and replaced. Vertical elongation, where indicated, shall be accomplished by factory elongation. Suitable markings or properly placed lifting lugs shall be provided to ensure placement of factory elongated pipe in a vertical plane. 3.3.5 Structural -Plate Steel Structural plate shall be installed in accordance with ASTM A807,A807M. Structural plate shall be assembled in accordance with instructions furnished by the manufacturer. Instructions shall show the position of each plate and the order of assembly. Bolts shall be tightened progressively and uniformly, starting at one end of the structure after all plates are in place. The operation shall be repeated to ensure that all bolts are tightened to meet the torque requirements of 200 foot-pounds plus or minus 50 foot-pounds. Any power wrenches used shall be checked by the use of hand torque wrenches or long -handled socket or structural wrenches for amount of torque produced. Power wrenches shall be checked and adjusted frequently as needed, according to type or condition, to ensure proper adjustment to supply the required torque. Am 3.3.6 Structural -Plate Aluminum Structural plate shall be assembled in accordance with instructions furnished by the manufacturer. Instructions shall show the position of each plate and the order of assembly. Bolts shall be tightened progressively and uniformly, starting at one end of the structure after all plates are in place. The operation shall be repeated to ensure that all bolts are torqued to a minimum of 100 foot-pounds on aluminum alloy bolts and a minimum of 150 foot-pounds on galvanized steel bolts. ,Any power wrenches used shall be checked by the use of hand torque wrenches or long -handled socket or structural wrenches for the amount of torque produced. Power wrenches shall be checked and adjusted as frequently as needed, according to type or condition, to ensure that they are in proper adjustment to supply the required torque. 3.3.7 Multiple Culverts Where multiple lines of pipe are installed, adjacent sides of pipe shall be at least half the nominal pipe diameter or 3 feet apart, whichever is less. 3.3.8 Jacking Pipe Through Fills Methods of operation and installation for jacking pipe through fills shall conform to requirements specified in Volume 1, Chapter 1, Part 4 of AREMA Eng Man. r71 U SECTION 33 40 00 Page 18 BEQ CAMP JOHNSON MCB CAMP LEJEUNE, NC 17P1320 ePROJECTS WO. NO. 1395787 0 D7 3.4 JOINTING 3.4.1 Concrete and Clay Pipe 3.4.1.1 Cement -Mortar Bell -and -Spigot Joint The first pipe shall be bedded to the established grade line, with the bell end placed upstream. The interior surface of the bell stall be thoroughly cleaned with a wet brush and the lower portion of the bell filled with mortar as required to bring inner surfaces of abutting pipes flush and even. The spigot end of each subsequent pipe shall be cleaned with a wet brush and uniformly matched into a bell so that sections are closely fitted. After each section is laid, the remainder of the joint shall be filled with mortar, and a bead shall be formed around the outside of the joint with sufficient additional mortar. If mortar is not sufficiently stiff to prevent appreciable slump before setting, the outside of the jo-nt shall be wrapped or bandaged with cheesecloth to hold mortar in place. 3.4.1.2 Cement -Mortar Oakum Joint for Bell -and -Spigot Pipe A closely twisted gasket shall be made of jute or oakum of the diameter required to support the spigot end of the pipe at the proper grade and to make the joint concentric. Joint packing shall be in one piece of sufficient Length to pass around the pipe and lap at top. This gasket shall be thoroughly saturated with neat cement grout. The bell of the pipe shall be thoroughly cleaned with a wet brush, and the gasket shall be laid in the bell for the lower third,of the circumference and. covered with mortar. The spigot of the pipe shall be thoroughly cleaned with a wet brush, inserted in the bell, and carefully driven home. A small amount of mortar shall be inserted in the annular space for the upper two-thirds of the circumference. The gasket shall be lapped at the top of the pipe and driven home in the annular space with a caulking tool. The remainder of the annular space shall be filled completely with mortar and beveled at an angle of approximately 45 degrees with the outside of the bell. if mortar is not sufficiently stiff to prevent appreciable slump before setting, the outside of the joint thus made shall be wrapped with cheesecloth. placing of this type of joint shall be kept at least five joints behind laying operations. 3.4.1.3 Cement -Mortar Diaper Joint for Bell -and -Spigot Pipe The pipe shall be centered so that the annular space is uniform. The annular space shall be caulked with jute or oakum. Before caulking, the inside of the bell and the outside of the spigot shall be cleaned. Ell. Diaper Bands: Diaper bands shall consist of heavy cloth fabric to hold grout in place at joints and shall be cut in lengths that extend one -eighth of the circumference of pipe above the spring line on one side of the pipe and up to the spring line on the other side of the pipe. Longitudinal edges of fabric bands shall be rolled and stitched around two pieces of wire. Width of fabric bands shall be such that after fabric has been securely stitched around both edges on wires, the wires will be uniformly spaced not less than 8 inches apart. Wires shall be cut into lengths to pass around pipe with sufficient extra length for the ends to be twisted at top of pipe to hold the band securely in place; bands shall be accurately centered around lower portion of joint. b. Grout: Grout shall be poured between bend and pipe from the high side SECTION 33 40 q0 Page 19 BEQ CAMP JOHNSON MCB CAMP LEJEUNE, NC 17P1320 ePROJECTS WO. NO. 1395787 of band only, until grout rises to the top of band at the .spring line of pipe, or as nearly so as possible, on the opposite side of pipe, to ensure a thorough sealing of joint around the portion of pipe covered by the band. Silt, slush, water, or polluted mortar grout forced up on the lower side shall be forced out by pouring, and removed. C. Remainder of Joint: The remaining unfilled upper portion of the joint shall be filled with mortar and a bead formed around the outside of this upper portion of the joint with a sufficient amount of additional mortar. The diaper shall be left in place. Placing of this type of joint shall be kept at least five joints behind actual laying of pipe. No backfialing around joints shall be done until joints have been fully inspected and approved. 3.4.1.4 Cement -Mortar Tongue -and -Groove Joint The first pipe shall be bedded carefully to the established grade line with the groove upstream_ A shallow excavation shall be made underneath the pipe at the joint and filled with mortar to provide a bed for the pipe. The grooved end of the first pipe shall be thoroughly cleaned with a wet brush, and a layer of soft mortar applied to the lower half of the groove. The tongue of the second pipe shall be cleaned with a wet brush; while in horizontal position, a layer of soft mortar shall be applied to the upper half of the tongue. The tongue end of the second pipe shall be inserted in. the grooved end of the first pipe until mortar is squeezed out on interior and exterior surfaces. Sufficient mortar shall be used to fill the joint completely and to form a bead on the outside. 3.4.1.5 Cement -Mortar Diaper Joint for Tongue -and -Groove Pipe The joint shall be of the type described for cement -mortar tongue -and -groove joint in this paragraph, except that the shallow excavation directly beneath the joint shall not be filled with mortar until after a gauze or cheesecloth band dipped in cement mortar has been wrapped around the outside of the joint. The cement -mortar bead at the joint shall be at. least 1/2 inch, thick and the width of the diaper band shall be at least 8 inches. The diaper shall be left in place. Placing of this type of joint shall be kept at least five joints behind the actual laying of the pipe. Backfilling around the joints shall not be done until the joints have been fully inspected and approved. 3.4.1.E Plastic Sealing Compound Joints for Tongue -and -Grooved Pipe Sealing compounds shall follow the recommendation of the particular manufacturer in regard to special installation requirements. Surfaces to receive lubricants, primers, or adhesives shall be dry and clean. Sealing compounds shall be affixed to the pipe not more than 3 hours prior to installation of the pipe, and shall be protected from the sun, blowing dust, and other deleterious agents at all Limes. Sealing compounds shall be inspected before installation of the pipe, and any loose or improperly affixed sealing compound shall be removed and replaced. The pipe shall be aligned with the previously installed pipe, and the joint pulled together. If, while making the joint with mastic -type sealant, a slight protrusion of the material is not visible along the entire inner and outer circumference of the joint when the joint is pulled up, the pipe shall be removed and the joint remade. After the joint is made, all inner protrusions shall be cut off flush with the inner surface of the pipe. If non -mastic -type sealant material is used, the "Squeeze -Out" requirement above will be waived. SECTION 33 40 00 Page 20 SEQ CAMP JOHNSON 17P1320 MCB CAMP LEJEi3NE, NC ePROJECTS WO. NO. 1395787 3.4.1.7 Flexible Watertight Joints Gaskets and jointing materials shall be as recommended by the particular manufacturer in regard to use of lubricants, cements, adhesives, and, other special installation requirements. Surfaces to receive lubricants, cements, or adhesives shall be clean and dry. Gaskets and jointing materials shall be affixed to the pipe not more than 24 hours prior to the installation of the pipe, and shall be protected from the sun, blowing dust, and other deleterious agents at all times. Gaskets and jointing materials shall be inspected before installing the pipe; any loose or improperly affixed gaskets and jointing materials shall be removed and replaced. The pipe shall be aligned with the previously installed pipe, and the joint pushed home. If, while the joint is being made the gasket becomes visibly dislocated the pipe shall be removed and the joint remade. 3.4.1.8 External Sealing Band Joint for Noncircular Pipe Surfaces to receive sealing bands shall be dry and clean. Bands shall be installed in accordance with manufacturer's recommendations. 3.4.2 Corrugated Steel and Aluminum Pipe 3.4.2.1 Field Joints Transverse field joints shall be designed so that the successive connection of pipe sections will form a continuous line free of appreciable irregularities in the flow line. In addition, the joints shall meet th.e general performance requirements described in ASTM A798 A798M. Suitable transverse field joints which satisfy the requirements for one or more of the joint performance categovies can be obtained with the following types of connecting bands furnished with suitable band -end fastening devices: corrugated bands, bands with projections, flat bands, and bands of special design that engage factory reformed ends of corrugated pipe. The space between the pipe and connecting bands shall be kept free from dirt and grit so that corrugations fit snugly. The connecting band, while being tightened, shall be tapped with a soft -head mallet of wood, rubber or plastic, to take up slack and ensure a tight joint_ [The annular space between abutting sections of part paved, and fully paved pipe and pipe arch, in sizes 30 inches or larger, shall be filled with a bituminous material after jointing.] Field joints for each type of corrugated metal pipe shall maintain pipe alignment during construction and prevent infiltration of fill material during the life of the installations. The type, size, and sheet thickness of the band and the size of Angles or lugs and bolts shall be as indicated or where not indicated, shall be as specified in the applicable standards or specifications for the pipe, 3.4.2.2 Flexible Watertight, Gasketed Joints Installation shall be as recommended by the gasket manufacturer for use of lubricants and cements and other special installation requirements. The gasket shall be placed over one end of a section of pipe for half the width of the gasket. The other half shall be doubled over the end of the same pipe. When the adjoining section of pipe is in place, the doubled -over half of the gasket shall then be rolled over the adjoining section. Any unevenness in overlap shall be corrected so that the gasket covers the end of pipe sections equally. Connecting bands shall be centered over adjoining sections of pipe, and rods or bolts placed in position and nuts tightened. Band 'tightening: The band shall be tightened evenly, even is tension being kept on the rods or bolts, and the gasket; the gasket shall SECTION 33 40 00 Page 21 BEQ CAMP JOHNSON 17P1320 MCB CAMP LEJEUNE, NC ePROJECTS WO. NO. 1395787 seat properly in the corrugations. Watertight joints shall remain uncovered for a period of time designated, and before being covered, tightness of the nuts shall be measured with a torque wrench. If the nut has tended to loosen its grip on the bolts cr rods, the nut shall be retightened with a torque wrench and remain uncovered until a tight, permanent joint is assured. 3.5 DRAINAGE STRUCTURES 3.5.1 Manholes and Inlets Construction shall be of reinforced concrete, plain concrete, brick, precast reinforced concrete, precast concrete segmental blocks, prefabricated corrugated metal, or bituminous coated corrugated metal; complete with frames and covers or gratings; and with fixed galvanized steel ladders where indicated. Pipe studs and junction chambers of prefabricated corrugated metal manholes shall be fully bituminous -coated and paved when the connecting branch lines are so treated. Pipe connections to concrete manholes and inlets shall be made with flexible, watertight connectors. 3.5.2 Walls and Headwalls Construction shall be as indicated. 3.6 STEEL LADDER INSTALLATION Ladder shall be adequately anchored to the wall by means of steel inserts spaced not more than 6 feet vertically, and shall be installed to provide at least 6 inches of space between the wall and the rungs. The wall along the line of the ladder shall be vertical for its entire length. 3.7 BACKFILLING 3.7.1 Backfilling Pipe in Trenches After the pipe has been properly bedded, selected material from excavation or borrow, at a moisture content that will facilitate compaction, shall be placed along both sides of pipe in layers not exceeding 6 inches in compacted depth. The backfill shall be brought up evenly on both sides of pipe for the full length of pipe. The fill shall be thoroughly compacted under the haunches of the pipe. Each layer shall be thoroughly compacted with mechanical tampers or rammers. This method of filling and compacting shall continue until the fill has reached an elevation equal to the midpoint (spring line) of concrete pipe or has reached an elevation of at least 12 inches above the top of the pipe for flexible pipe. The remainder of the trench shall be backfilled and compacted by spreading and rolling or compacted by mechanical rammers or tampers in layers not exceeding 6 inches. Tests for density shall be made as necessary to ensure conformance to the compaction requirements specified below. Where it is necessary, in the opinion of the Contracting Officer, that sheeting or portions of bracing used be left in place, the contract will be adjusted accordingly. Untreated sheeting shall not be left in place beneath structures or pavements. 3.7.2 Backfilling Pipe in Fill Sections For pipe placed in fill sections, backfill material and the placement and compaction procedures shall be as specified below. The fill• material shall SECTION 33 40 00 Page 22 BEQ CAMP JOHNSON 17P1320 MCB CAMP LEJEUNE, NC ePROJECTS WO. NO. 1395787 be uniformly spread in layers longitudinally on both sides of the pipe, not exceeding 6 inches in compacted depth, and shall be compacted by rolling parallel with pipe or by mechanical tamping or ramming. Prior to commencing normal filling operations, the crown width of the fill at a height of 12 inches above the top of the pipe shall extend a distance of not less than twice the outside pipe diameter on each side of the pipe or 12 feet, whichever is less. After the backfill has reached at least 12 inches above the top of the pipe, the remainder of the fill shall be placed and thoroughly compacted in layers not exceeding 6 inches. Use select granular material for this entire region of backfill for flexible pipe installations. 3.7.3 Movement of Construction Machinery When compacting by rolling or operating heavy equipment parallel with the pipe, displacement of or injury to the pipe shall be avoided. Movement of construction machinery over a culvert or storm drain at any stage of construction shall be at the Contractor's risk. Any damaged pipe shall be repaired or replaced. 3.7.4 Compaction 3.7.4.1 General Requirements Cohesionless materials include gravels, gravel -sand mixtures, sands, and gravelly sands. Cohesive materials include clayey and silty gravels, gravel -silt mixtures, clayey and silty sands, sand -clay mixtures, clays, silts, and very fine sands. When results of compaction tests for moisture -density relations are recorded on graphs, cohesionless soils will show straight lines or reverse -shaped moisture -density curves, and cohesive soils will show normal moisture -density curves. 3.7.4.2 Minimum Density Backfill over and around the pipe and backfill around and adjacent to drainage structures shall be compacted at the approved moisture content to the following applicable minimum density, which will be determined as specified below. a. Under airfield and heliport pavements, paved roads, streets, parking areas, and similar -use pavements including adjacent shoulder areas, the density shall be not less than 90 percent of maximum density for cohesive material and 95 percent of maximum density for cohesionless material, up to the elevation where requirements for pavement subgrade materials and compaction shall control. b. Under unpaved or turfed traffic areas, density shall not be less than 90 percent of maximum density for cohesive material and 95 percent of maximum density for cohesionless material. c. Under nontraffic areas, density shall be not less than that of the surrounding material. 3.8 FIELD PAINTING 3.8.1 Cast -Iron Covers, Frames, Gratings, And Steps After installation, clean cast-iron, not buried in masonry or concrete, of mortar, rust, grease, dirt, and other deleterious materials to bare metal SECTION 33 40 00 Page 23 BEQ CAMP JOHNSON 17PI320 MC9 CAMP LEJEUNE, NC ePROJECTS WO. NO. 1395787 and apply a coat of bituminous paint. 3.8.2 Steel Covers And Frames Or Concrete Frames After installation, clean steel or concrete, not buried in masonry or concrete, of mortar, dirt, grease, and other deleterious materials to bare metal. Apply a coat of primer. Painting must conform to Section 09 90 00 PAINTS AND COATINGS. Do not paint surfaces subject to abrasion. 3.9 FIELD QUALITY CONTROL 3.9.1 Tests Testing is the responsibility of the Contractor. Perform all testing and retesting at no additional cost to the Government. 3.9.1.1 HYDROSTATIC TEST ON WATERTIGHT JOINTS Watertight joints shall be tested and shall meet test requirements of paragraph HYDROSTATIC TEST ON WATERTIGHT JOINTS. Rubber gaskets shall comply with the oil resistant gasket requirements of ASTM C443. Certified copies of test results shall be delivered to the Contracting Officer before gaskets or jointing materials are installed. 3.9.1.1.1 Concrete, Clay, PVC, PE, SRPE and PP Pipe A hydrostatic test shall be made on the watertight joint types as proposed. Only one sample joint of each type needs testing; however, if the sample joint fails because of faulty design or workmanship, an additional sample joint may be tested. During the test period, gaskets or other jointing material shall be protected from extreme temperatures which might adversely affect the performance of such materials. Performance requirements for joints in reinforced and nonreinforced concrete pipe shall conform to ASTM C990 or ASTM C443. Test requirements for joints in clay pipe shall conform to ASTM C425. Test requirements for joints in PVC, PE, and PP plastic pipe shall conform to ASTM D3212. 3.9.1.1.2 Corrugated Steel and Aluminum Pipe A hydrostatic test shall be made on the watertight joint system or coupling band type proposed. The moment strength required of the joint is expressed as 15 percent of the calculated moment capacity of the pipe on a transverse section remote from the joint by the AASHTO HB-17 (Division II, Section 26). The pipe shall be supported for the hydrostatic test with the joint located at the point which develops 15 percent of the moment capacity of the pipe based on the allowable span in feet for the pipe flowing full or 40,000 foot-pounds, whichever is less. Performance requirements shall be met at an internal hydrostatic pressure of 10 psi, for a 10 minute period. for both annular corrugated steel and aluminum pipe and helical corrugated steel and aluminum pipe with factory reformed ends. 3.9.1.2 Determination of Density Testing shall be performed by an approved commercial testing laboratory or by the Contractor subject to approval. Tests shall be performed in sufficient number to ensure that specified density is being obtained. Laboratory tests for moisture -density relations shall be made in accordance with ASTM D1557 except that mechanical tampers may be used provided the • e SECTION 33 40 00 Page 24 BEQ CAMP JOHNSON 17P1320 MCB CAMP LEJEUNE, NC ePROJECTS WO. NO. 1395787 results are correlated with those obtained with the specified hand tamper. Field density tests shall be determined in accordance with ASTM D2167 or ASTM D6938. When .ASTM D6938 is used, the calibration curves shall be checked and adjusted, if necessary, using the sand cone method as described in paragraph Calibration of the referenced publications. ASTM D6938 results in a wet unit weight of soil and ASTM D6938 shall be used to determine the moisture content of the soil. The calibration curves furnished with the moisture gauges shall be checked along with density calibration checks as described in ASTM D69.38. Test results shall be furnished the Contracting Officer. The calibration checks of both the density and moisture gauges shall be made at the beginning of a job on each different type of material encountered and at intervals as directed. 3.9.1.3 Deflection Testing Conduct deflection test no sooner than 30 days after completion of final backfill and compaction testing. Clean or flush all lines prior to testing. Perform a deflection test on entire length of installed flexible pipeline upon completion of work adjacent to and over the pipeline, including backfilling, placement of fill, grading, paving, placement of concrete, and any other superimposed loads. Deflection of pipe in the installed pipeline under external loads shall not exceed limits in paragraph PLACING PIPE above as percent of the average inside diameter of pipe. Use a mandrel to determine if allowable deflection has been exceeded. 3.9.1.3.1 Laser Profiler Inspect pipe interior with laser profiling equipment. Utilize low barrel distortion video equipment for pipe sizes 48 inches or less. Use a camera with suitable lighting to allow a clear picture of the entire periphery of the pipe interior. Center the camera in the pipe both vertically and horizontally. The camera must be able to pan and tilt to a 90 degree angle with the axis of the pipe rotating 360 degrees. Use equipment to move the camera through the pipe that will not obstruct the camera's view or interfere with proper documentation of the pipe's condition. The video image shall be clear, focused, and relatively free from roll static or other image distortion qualities that would prevent the reviewer from evaluating the condition of the pipe. For initial post installation inspections for pipe sizes larger than 48 inches, a visual inspection shall be completed of the pipe interior. 3.9.2 Inspection 3.9.2.1 Post -Installation Inspection Visually inspect each segment of concrete pipe for alignment, settlement, joint separations, soil migration through the joint, cracks, buckling, bulging and deflection. An engineer must evaluate all defects to determine if any remediation or repair is required. 3.9.2.1.1 Concrete Cracks with a width greater than 0.01 inches. An engineer must evaluate all pipes with cracks with a width greater than 0.01 inches but less than 0.10 inches to determine if any remediation or repair is required. 3.9.2.1.2 Flexible Pipe Check each flexible pipe (PE, PVC, PP, Corregated Steel And Aluminum) for SECTION 33 40 00 Page 25 BEQ CAMP JOHNSON 17P1320 MCB CAMP LEJEUNE, NC ePROJECTS WO. NO. 1395787 rips, tears, joint separations, soil migration through the joint, cracks, localized bucking, bulges, settlement and alignment. db 3.9.2.1.3 Post -Installation Inspection Report The deflection results and final post installation inspection report must include: a copy of all video taken, pipe location identification, equipment used for inspection, inspector name, deviation from design, grade, deviation from line, deflection and deformation of flexible pipe, inspector notes, condition of joints, condition of pipe wall (e.g. distress, cracking, wall damage dents, bulges, creases, tears, holes, etc.). 3.9.2.2 Low Impact Development Inspection Inspect Low Impact Development (LID) features indicated on the design portion of the LID Verification Report. Certify LID features were constructed according to plans and specifications or by submitting as -built drawings in accordance with UFGS 01 78 00 Closeout Submittals. When as -built drawings show deviations to the LID features, document the deviations on the LID Verification Report. 3.9.3 Repair Of Defects 3.9.3.1 Leakage Test When leakage exceeds the maximum amount specified, correct source of excess leakage by replacing damaged pipe and gaskets and retest. 3.9.3.2 Deflection Testing When deflection readings are in excess of the allowable deflection of average inside diameter of pipe are obtained, remove pipe which has excessive deflection and replace with new pipe. Retest 30 days after completing backfill, leakage testing and compaction testing. 3.9.3.3 Inspection Replace pipe or repair defects indicated in the Post -Installation Inspection Report. 3.9.3.3.1 Concrete Replace pipes having cracks with a width greater than 0.1 inches. 3.9.3.3.2 Flexible Pipe Replace pipes having cracks or splits. 3.10 PROTECTION Protect storm drainage piping and adjacent areas from superimposed and external loads during construction. 3.11 WARRANTY PERIOD Pipe segments found to have defects during the warranty period must be replaced with new pipe and retested. 0 SECTION 33 40 00 Page 26 CI] E BEQ CAMP JOHNSON MCB CAMP LEJEUNE, NC -- End of Section -- 17P1320 ePROJECTS WO. N0, 1395787 SECTION 33 40 00 Page 27 SECTION H: Exhibits D I E a • A 0 C a THIS AREA DRAfNs IKNI TO A PIPE NETWORK THAT --_ 'DISCHA�tGGES HERE tom' - } �,-2.7; AC / W �J N ca,.y.:..µ,- uyt�iu uud c ,Ir, Or�•4., s•.•J� �. ,7 J usm J 6 -1.5 AC % �\ ' � µ•me""'"'•R.�'^'��,,.-/ .� . 1+ J O DEMOLITION KEYNOTES / 1. L6dtfS OF DiSTURBWCE. /Al � A\ 1 ----� � ! I - - d. -- is = � • � �- � I c '" '� 4�jQR :INEWDSBU FF'ER I It _ I iD.1s." ` AC M = AXM GS / -tom / ti, -- ..._ i� t +/ -.�f. - �• ,.�Y�,� " rar , a- o ` fi'r, i�'" �. f+6' `1 -1 \ iJ�J--L -`''J- , �°� \zN, _ � r ',�� � T•--� I.c�,,..� _(6. � % ,.� • �`7 <* � ,..'AC r_ - - - } 4.v ��'�::. 'i'�....��k:. -y.� ��-' • � —_ -. �.$ _-�� ` _-- � 1 r \� . MEM F d £fT_ -s�a i4.i , j ,I ' 7 1.05 AC _ �,�. f z�, `. •-'- .---- ter'- ---- - I ' - - -�L t+._ f::��. �I,�. dlo lr'; �f KJ �r.. + L1 \ \\ I ' j� L',�` •rr u — � ��� J' . �-rT /.�� � i r'�C A ��-�,�' s'— '�_�� { N' % ;• � \ � .6 _\ � a� _ � � ' 'j 5 qp; i 1/ h ti \ 14 �- ` ��Ia j��• j d" • r. ! ' I �I -� l\ t � y r� � � � � .,r- •-� I f � � �! r , // ,1 / I i� i ~� \.V ,��4p ' w* `r �` 1 � ..._ ..._. � - � ...,y.,�1S '•y W.,�.............. W.,.wa J d r,• [ �! r+�'. I k ��„ r r r � � Y J ^mo_ I �� 0.20 -AC 0.99 AC r�4 � f ��1 � ,��,1 ))�}.\,L /¢``-- �����9, 1 ��% l,��l ! � I�l �C � �t �~ ! � „ I—�--N•-- i' �f :x�l �r�.. •�--•�-- w = _ `` � I �I' ��,\, ' �./ r �� �! Il ��'/ ' �ii/.ff/�// 4 ' � �1 + -r� ,•-�-1 �. ,-, "? �'-�w:�` �.«: 1�_ ..,�. , r_ '� � - f p-` ` --_ CoMpm y_ISTRECT P 0.68 AC `l, l S (�yl, .> ' ki 11�1— �_�/, //[ II^� I % , � 0.7 AC ` J • / // i , j • 2.64 } 1 r/. L a• 2.31 AC , _ r f \/ i �D- ' �f�� _ ' �.�j�'��' ;`F=ti�_ r`�\... �• SD' WET D+suFfER ,; I I y, I , { �,=� �'-v 1 \ AC / } ���- / /r��s. k �� =!"�) J (rr'j _ \� - 1` !(��� -��� - 77 ag 4 11111111 LEGEND r� mwworw �M ICWII. UMFTS OF DISTURBANCE ---- ors -- w•. -- c,. _ I DEMOLISH AND REMOVE J. CDLLIN5 r.,c• wwre" r� rwk�R B. ABBM, P.E rrs rneccro+ �kYxbh CLEAR AND GRUB 3 v 3 Z Lj I REMOVE UPUTIES 5 Z p u LIMITS OF CLEARING AND GRUBBING < z aLn Ln KEYPLAN 1.2 W x uj 4 Z d )6; BCD 1 D23 J o ?_ L cn � U 0 m CD I •:I' `r' Q 107 1 r 1 Z Z r°Iti a 1 8Uu NOM GRAPHIC SCALE 0' 80' 1 60' __ a• _ 1 "=.80- r. PRE EXHIBIT E A • �-7 r� u • • • ��nsyl . aelmo wS. 9MP,: JN24I T[ COEIP+wIpNOF JXW. Z f 4 1 A MM ,Rul hl OPJw �7 MKO rw mmv4 &L6 In 7% SPMAM < 742 • y[•l, tlY FW 224 7 i SF 19.30 Dr WOU a 01K TR nt W CI�I I I `� , �u •� F t1M[lf�'S Am x • + N41107[I[ WENCIA WA • E fMMU 10 5 IDS S NK IBI K P'E�Yl?15 1.0E K S1P 7-we R,[0 ' \ AtA W EW 091 K I i P[Powon 0.7E K E IPERMA 0.13 K I A4E1 16 dIV * S! At / PPEINIOUS- 125 K . {j II otw" OEc k ' ow a II 1 PERNOIK O.Br K so .-Mmoc _ AFA MOW !SS K ` PVhl0U5 0 S7 AC \ \ x AW�O�tlfl � ' 6 K% NNO[. 5 W [sswft10E,ED M i0q N. x=— [ +7[I'Y WcRAMS riP KRI143 ! E E" a' �_9 2v1'mu �. i FILTER :j 11.MIAIMF xt 73 _ .. �✓ 47 u.l N POND UUU •ice r 35' t . 7•ns�a*>t,1 ` \ — VWQPOWAOWA E,R1P— rfsw II ! 7x1[pp ny—/ 5 ?- ` WErPRNgP \ 1 GRAPHIC SCALE -� y s � 4 I+`'��. POST EXHIBIT AP,�ly?016' �! 0 0 0 SECTION I: Soil and Geotechnical Report 0 Attached Separately 0 �J • • • C7 USDA United States A product of the National Department of Cooperative Soil Survey. Agriculture a joint effort of the United States Department of NRCS Agriculture and other Federal agencies. State Natural agencies including the Resources Agricultural Experiment Conservation Stations, and local Service participants Custom Soil Resource Report for Onslow County, North Carolina December 26. 2017 I* I* Custom Soil Resource Report Soil Map (P1320 Soil) S 41 a''J •Y 00%0 2BOOB0 M70 2BM50 h1�rp scale: 1.3,390 t printed on A portrait (8.5" x 11") sheet. N 0 50 10D 200 300 A 0 150 300 e0o Feet9 Map proton: Weir Mercator Corner coordinates: WCS84 Edge tics: UTM Z" 18N WGS84 9 34' 4r W N I 1 34" 43 ?T N MID 3 M ro • 0 • MAP LEGEND Area of Interest (AOt) Area ofInterest (AOI) Soils Soil Map Unit Polygons Sod Map Unit Lines ® Soil Map Unit Points Special Point Features Blowout ® Borrow Pit X Clay Spot Closed Depression Gravel Pit Gravelly Spot Landfill Lava Flow Marsh or swamp n� Mine or Ouarry O Miscellaneous Water O Perennial Water N' Rock Outcrop + Saline Spot Sandy Spot 41W Severely Eroded Spot Sinkhole Slide of Slip �+ Sodic Spot Custom Soil Resource Report MAP INFORMATION a Spoil Area The soil surveys that comprise your AOI were mapped at 1:24, 000. d Stony Spot Very Stony Spot Waming- Sod Map may not be valid at this scale. Wet Spot Enlargement of maps beyond the scale of mapping can cause Other misunderstanding of the detail of mapping and accuracy of soil Special Line Features line placement. The maps do not show the small areas of contrasting soils that could have been shown at a more detailed Water Features scale. Streams and Canals — - Transportation +_" Rails Interstate Highways US Routes Major Roads Local Roads Background . Aerial Photography Please rely an the bar scale on each map sheet for map measurements. Source of Map Natural Resources Conservation Service Web Soil Survey URL: Coordinate System Web Mercator (EPSG:3857) Maps from the Web Soil Survey are based on the Web Mercator projection, which preserves direction and shape but distorts distance and area. A projection that preserves area. such as the Albers equal-area conic projection should be used if more accurate calculations of distance or area are required This product is generated from the USDA -MRCS certified data as of the version date(s) listed below. Soil Survey Area Onslow County. North Carolina Survey Area Data Version 19 Oct 2. 2017 Soil map units are labeled (as space allows) for map scales 1 50,000 or larger. Date(s) aerial images were photographed Dec 31. 2009—Mar 8. 2017 The orthophoto or other base map on which the soil lines were compiled and digitized probably differs from the background imagery displayed on these maps. As a result some minor shifting of map unit boundaries may be evident. 0 0 0 0 0 0 4) Custom Soil Resource Report Map Unit Legend (P1320 Soil) Map Unit Symbol Map Unit Name Acres in A01 Percent of A01 BmB Baymeade-Urban land 122 60.3% complex, 0 to 6 percent slopes CrC Craven fine sandy loam, 4 to a 6.5 32.2% percent slopes Mk ! Muckalee loam 1,5 ` 7.4% Totals for Area of Interest 20.3 100.0% Map Unit Descriptions (P1320 Soil) The map units delineated on the detailed soil maps in a soil survey represent the soils or miscellaneous areas in the survey area. The map unit descriptions, along with the maps, can be used to determine the composition and properties of a unit. A map unit delineation on a soil map represents an area dominated by one or more major kinds of soil or miscellaneous areas. A map unit is identified and named according to the taxonomic classification of the dominant soils. Within a taxonomic class there are precisely defined limits for the properties of the soils. On the landscape, however, the soils are natural phenomena, and they have the characteristic variability of all natural phenomena. Thus, the range of some observed properties may extend beyond the limits defined for a taxonomic class. Areas of soils of a single taxonomic class rarely, if ever, can be mapped without including areas of other taxonomic classes. Consequently, every map unit is made up of the soils or miscellaneous areas for which it is named and some minor components that belong to taxonomic classes other than those of the major soils. Most minor soils have properties similar to those of the dominant soil or soils in the map unit, and thus they do not affect use and management. These are called noncontrasting, or similar, components. They may or may not be mentioned in a particular map unit description. Other minor components, however, have properties and behavioral characteristics divergent enough to affect use or to require different management. These are called contrasting, or dissimilar, components. They generally are in small areas and could not be mapped separately because of the scale used. Some small areas of strongly contrasting soils or miscellaneous areas are identified by a special symbol on the maps. If included in the database for a given area, the contrasting minor components are identified in the map unit descriptions along with some characteristics of each. A few areas of minor components may not have been observed, and consequently they are not mentioned in the descriptions, especially where the pattern was so complex that it was impractical to make enough observations to identify all the soils and miscellaneous areas on the landscape. The presence of minor components in a map unit in no way diminishes the usefulness or accuracy of the data. The objective of mapping is not to delineate ispure taxonomic classes but rather to separate the landscape into landforms or 11 Custom Soil Resource Report landform segments that have similar use and management requirements. The delineation of such segments on the map provides sufficient information for the development of resource plans. If intensive use of small areas is planned, however, onsite investigation is needed to define and locate the soils and miscellaneous areas. An identifying symbol precedes the map unit name in the map unit descriptions. Each description includes general facts about the unit and gives important soil properties and qualities. Soils that have profiles that are almost alike make up a soil series. Except for differences in texture of the surface layer, all the soils of a series have major horizons that are similar in composition, thickness, and arrangement. Soils of one series can differ in texture of the surface layer, slope, stoniness, salinity, degree of erosion, and other characteristics that affect their use. On the basis of such differences, a soil series is divided into soil phases. Most of the areas shown on the detailed soil maps are phases of soil series. The name of a soil phase commonly indicates a feature that affects use or management. For example, Alpha silt loam, 0 to 2 percent slopes, is a phase of the Alpha series. Some map units are made up of two or more major soils or miscellaneous areas. These map units are complexes, associations, or undifferentiated groups. A complex consists of two or more soils or miscellaneous areas in such an intricate pattern or in such small areas that they cannot be shown separately on the maps. The pattern and proportion of the soils or miscellaneous areas are somewhat similar in all areas. Alpha -Beta complex, 0 to 6 percent slopes, is an example. An association is made up of two or more geographically associated soils or ® miscellaneous areas that are shown as one unit on the maps. Because of present or anticipated uses of the map units in the survey area, it was not considered practical or necessary to map the soils or miscellaneous areas separately. The pattern and relative proportion of the soils or miscellaneous areas are somewhat similar. Alpha -Beta association, 0 to 2 percent slopes, is an example. An undifferentiated group is made up of two or more soils or miscellaneous areas that could be mapped individually but are mapped as one unit because similar interpretations can be made for use and management. The pattern and proportion of the soils or miscellaneous areas in a mapped area are not uniform. An area can be made up of only one of the major soils or miscellaneous areas, or it can be made up of all of them. Alpha and Beta soils, 0 to 2 percent slopes, is an example. Some surveys include miscellaneous areas. Such areas have little or no soil material and support little or no vegetation. Rock outcrop is an example. 12 • Custom Soil Resource Report Onslow County, North Carolina BmB--Baymeade-Urban land complex, 0 to 6 percent slopes Map Unit Setting National map unit symbol: 3ws5 Elevation: 20 to 160 feet Mean annual precipitation: 40 to 55 inches Mean annual air temperature: 59 to 70 degrees F Frost -free period: 200 to 280 days Farmland classification: Not prime farmland Map Unit Composition Baymeade and similar soils: 45 percent Urban land: 40 percent Minor components. 8 percent Estimates are based on observations, descriptions, and transects of the mapunit. Description of Baymeade Setting Landform: Ridges on marine terraces Landform position (two-dimensional): Shoulder, summit Landform position (three-dimensional): Crest Down -slope shape: Convex Across -slope shape: Convex Parent material: Loamy and sandy marine deposits Typical profile A - 0 to 2 inches: fine sand E/Bh - 2 to 30 inches: fine sand Bt - 30 to 40 inches: fine sandy loam C - 40 to 80 inches: loamy fine sand Properties and qualities Slope: 0 to 6 percent Depth to restrictive feature: More than 80 inches Natural drainage class: Well drained Runoff class: Very low Capacity of the most limiting layer to transmit water (Ksat) in/hr) Depth to water table: About 48 to 60 inches Frequency of flooding: None Frequency of ponding: None Available water storage in profile: Low (about 3.6 inches) Interpretive groups Land capability classification (irrigated): None specified Land capability classification (nonirrigated): 3s Hydrologic Soil Group: A Hydric soil rating No Description of Urban Land Interpretive groups Land capability classification (irrigated): None specified High (1.98 to 5.95 13 0 Custom Soil Resource Report Land capability classification (nonirrigated): 8 Hydric soil rating: No Minor Components Lynn haven, undrained Percent of map unit: 2 percent Landform: Flats on marine terraces Down -slope shape: Linear Across -slope shape: Linear Hydric soil rating: Yes Torhunta, undrained Percent of map unit: 2 percent Landform: Carolina bays on marine terraces, depressions on stream terraces, flats on marine terraces Down -slope shape: Linear Across -slope shape: Linear Hydric soil rating: Yes Leon Percent of map unit: 2 percent Landform: Flats on marine terraces Down -slope shape: Linear Across -slope shape: Concave Hydric soil rating: Yes Murville, undrained Percent of map unit: 2 percent Landform: Depressions on marine terraces, flats on marine terraces Down -slope shape: Concave Across -slope shape: Concave Hydric soil rating: Yes CrC—Craven fine sandy loam, 4 to 8 percent slopes Map Unit Setting National map unit symbol: 3wsb Elevation: 20 to 160 feet Mean annual precipitation: 40 to 55 inches Mean annual air temperature: 59 to 70 degrees F Frost -free period: 200 to 280 days Farmland classification: Farmland of statewide importance Map Unit Composition Craven and similar soils: 80 percent Minor components: 6 percent Estimates are based on observations, descriptions, and transects of the mapunit. 14 Custom Soil Resource Report 4) Description of Craven Setting Landform: Ridges on marine terraces Landform position (two-dimensional): Shoulder Down -slope shape: Convex Across -slope shape. Convex Parent material: Clayey marine deposits Typical profile Ap - 0 to 7 inches. fine sandy loam E - 7 to 9 inches: fine sandy loam Bt - 9 to 54 inches: clay C - 54 to 80 inches: sandy loam Properties and qualities Slope: 4 to 8 percent Depth to restrictive feature: More than 80 inches Natural drainage class: Moderately well drained Runoff class: Medium Capacity of the most limiting layer to transmit water (Ksat) moderately high (0.06 to 0.20 inlhr) Depth to water table: About 24 to 36 inches Frequency of flooding. None Frequency of ponding: None Moderately low to Available water storage in profile: Moderate (about 8.2 inches) Interpretive groups ® Land capability classification (irrigated): None specified Land capability classification (nonirrigated): 4e Hydrologic Soil Group: D Hydric soil rating: No Minor Components Bibb, undrained Percent of map unit: 3 percent Landform: Flood plains Landform position (two-dimensional): Toeslope Down -slope shape: Concave Across -slope shape: Linear Hydric soil rating; Yes Johnston, undrained Percent of map unit: 2 percent Landform: Flood plains Down -slope shape: Concave Across -slope shape: Linear Hydric soil rating: Yes Muckalee, undrained Percent of map unit: 1 percent Landform: Flood plains Down -slope shape: Concave Across -slope shape: Linear Hydric soil rating: Yes 15 Custom Soil Resource Report • Mk—Muckalee loam Map Unit Setting National map unit symbol: 3wst Elevation: 20 to 160 feet Mean annual precipitation: 40 to 55 inches Mean annual air temperature: 59 to 70 degrees F Frost -free period: 200 to 280 days Farmland classification: Not prime farmland Map Unit Composition Muckalee, undrained, and similar soils: 80 percent Estimates are based on observations, descriptions, and transects of the mapunit. Description of Muckalee, Undrained Setting Landform: Flood plains Down -slope shape: Concave Across -slope shape: Linear Parent material: Sandy and loamy alluvium is Typical profile A - 0 to 24 inches: loam Cg - 24 to 80 inches: sandy loam • Properties and qualities Slope: 0 to 2 percent Depth to restrictive feature: More than 80 inches Natural drainage class. Poorly drained Runoff class: Negligible Capacity of the most limiting layer to transmit water (Ksat): Moderately high to high (0.57 to 1.98 in/hr) Depth to water table: About 0 to 12 inches Frequency of flooding: Frequent Frequency of ponding: None Available water storage in profile: Moderate (about 6.5 inches) Interpretive groups Land capability classification (irrigated): None specified Land capability classification (nonirrigated): 5w Hydrologic Soil Group: BID Hydric soil rating: Yes 16 0 0 0 rr d LL Southeastern Soil & Environmental Associates, Inc. 49 0 P.Q. Box 9321 FayetteviHri, NC PA";1 i PhonWFax (410) i122-4540 Emait rruke(Osouth"slernsoil,com 0 1 VV 1 �ie�►ins, 1.14 i rnciiities '.n •rnelering Command, Camp I.ejcunc, Onslow County, North Carolina 13ORING S11VVT DEPIl (inched Observed Water jincheO ,S-1 35 127 S-2 36 81 S-3 41 128 S-4 45 None S-5 41 Nome 5-6 36 None SOUSiTE EVALUATION - g0IL PHYSICAL ANALYSIS + LAND USEISUKIVIMN PLANNING; 6 WE I LANDS GROUNDWATER ORAINAGEMOUNOING • SURFACErSUBSI.1141 ACE WAti1 E I REATME,N 15Y5 fEMS, EVALUATION h DESIGN Southeastern Soil & Environmental Associates, Inc. F--rfyeltevilte, NC 28311 Pilunia/Fex (910) 622.4540 Email mik0fsnulhBaslemsnilxom Soil Boring Log, Boring S-2, Naval Facilities Engineering Command, Camp Lejeune, Onslow County, North Carolina This trap unit consists ot'moderately well drained to well drained soils on uplatlds. These suits typically formed in moderately coarse textured maxinc sediments. Slopes range from 0 to 2 percent. A - 0 to 17 inches; black ('2.5Y 2.5/1) line sandy loath; weak line granular; very friable; many fine and medium roots; abrupt snkautli boundary F: - 17 to 36 inches; light olive brown (2.5Y 613) tine: sand; single grained; loose; very triable; many tine and medium rants; clear smooth boundary. Bt - 36 to 47 inches; fight ycllowish brown (2.5Y 6/4) sandy lumn; many medium prominent light brownish gray (10YR 6/2) mottics; weak line stthangular blocky isstructure; friable; gradual smooth boundnrv. BC - 47 to 61 inches; olive; vel low (2.5Y 6!6) silty clay loam, many medium prominent. gray (10YR 611) mottles; weak line subangular bluc:ky structure; firm; gradual smooth boundary. 0 Cl - 61 to 85 inches; mixed mottled gray (10YR 6/1), olive yellow (2.5Y 6/6) and yellowish red (5YR 5/8) silty clay to silty clay loam; firm to eery lirrrt; massive structure; gradual wavy boundary. C2 - 85 to 144 inches; gray (10YR 6/1) sandy loam; many medium prominent alive yellow (2.5Y 616) mottles; very friable; massive structure. SHWT @ 36 inches below ground surface (IOYR 6/2) SOIL)SITE EVALUATION - SOIL PFIYSICAI. ANALYSIS - LAND L15E/SUBDMSI0N PLANNING - VUF TLANDS GROUNDWATER DRAINAGEIMOUNUING - SURFACEJSUNSUnrACE WASTE TREATMENT SYSTEMS. EVALUATION & DESIGN L.hdoo - W2M411q P,s-Mnoapf'4ud d 4o u Pp i I z A BACHELOR ENLISTED QUARTERS SITE P-1 320 MCB CAMP LEJEUNE, JACKSONVILLE, NC NAVAL FACILITIES ENGINEERING COMMAND --- MID -ATLANTIC MARINE CORPS IPT, NORFOLK, VA P1320 DRAWING SET INDEX: ® SITE Q BACHELOR ENLISTED QUARTERS (BEQ) Q VEHICLE MAINTENANCE FACILITY WAREHOUSE (VMFW) — 4[sfM —90 Y. CROW RA •'WC4 M4YCl. uar Ids B. FORRTES P_E � Rrncclo� cn �w J z Y uj Ir CJ ky�yH� _ a ~ '' Y P INT � �r Y rings Pdla<v5vilc I 5(nl�/J/ I, pig HO.OIp�Y Gamlon Meys.ale r NCI � � !n picnlunas eo-. City p wmso, s, oleneco lv U Cn � arylawle d /�/y JOCkypn,r�[ (9 cc Z K ir in vernn A N (y C7 0 ♦ ♦ 2 ' i► �S�rr' i Di— C mpEJESLNE 21 � O Q rJ _ oy p P wdloca � }y t,�" A rolwslnne �� P� p �f. ry eVr9aY Hol y k�tl9e 4 iY l- CV 6 V �' wo•os Cn�ner cl a o.o o� i McmPsleea �` co�ETUL VIOMTY Z o CL �A. P pone IETC o IFf OJECF` orm r qla t • ` Boi�m LNono f MAR 29 2018 ••a to re IR ran• cor.rr. wo LOCATION MAP A VICINITY MAP N/" NO[ TO SC&E NOT TO SCALE .... •� - Y: "• .. -- ____ f -G-o01 r a A , L v T ✓ Sheet List Table I Sheet List Table -CONTINUED Hil i�AVFNO DWG SHEET ` NAVFNOO DWG SHEET TITLE SHEET TITLE I — — — — NUMBER I GENERAL LANDSCAPE a G-001 COVER SHEET - SITE _ - LC-100 OVERALL LANDSCAPE CONSTRUCTION PLAN - ~ G-002 SHEET INDEX - SITE LC-101 LANDSCAPE CONSTRUCTION PLAN - PRKG LOT NORTH -- GEOTLCHNICAL LC 102 LANDSCAPE CONTRUCTION PLAN - VMFW -- B-100 SUBSURFACE EXPLORATION LOCATIGN PLAN LC-103 LANDSCAPE CONSTRUCTION PLAN - MAIN PRKG LOT -- 8-101 SOIL BORING LOGS LC-104 LANDSCAPE CONSTRUCTION PLAN - BEQ 8-102 SOIL BORING LOGS -- LC-105 LANDSCAPE CONSTRUCTION PLAN - H2H COMSAT - I B-103 SOIL BORING COGS: LC-401 LAN CONSfRUCTIM ENLARGED PLANS -- B-104 SOIL BORING & W-SITU TESTING LOGS LC-501 LANDSCAPE CONSTRUC" DETAILS - 0-2D0 SITE PRELOADING PLAN, DETAILS & NOTES LC-502 LANDSCAPE CONSTRUCTION DETAILS - C11RL LC-503 LANDSCAPE CONSTRUCTION DETAILS -- - C-001 LEGEND NOTES AND ABBRENATIONS - LC-504 -LANDSCAPE CONSTRUCTION DETAILS I ; CD-100 OVERALL EXIST CONDITIONS & DEMO PLAN -- LP-100 OVERALL LANDSCAPE PLANTING PLAN -- CD-10i EXIST CONDITIONS & DEMO PLAN - PRKG LOT NORTH -- LP-101 LANDSCAPE PLANTING PLAN - PRKG LOT NORTH LP-102 LANDSCAPE PLANTING PLAN - VMFW - CO-102 EXIST CONDITIONS & DEMO PLAN - VMFW -- LP-103 LANDSCAPE PLANTING PLAN - MAIN PRKG LOT -- CD-103 EXIST CONDITIONS & DEMO PLAN - MAIN PRKG LOT 1 -- LP-104 LANDSCAPE PLANTING PLAN - BEQ CD-104 EXIST CONDITIONS & DEMO PLAN - BED -- LP--1A5 LANDSCAPE PLANTING PLAN - H2H COMBAT CO-105 EXIST CONDITIONS & DEMO PLAN - H2H COMBAT -- _ LP-107 LANDSCAPE PLANTING PLAN - BMP 2 AND 3 NS/ CD-106 EXIST CONDFWNS. DEMO AND E&S - BUILDINGS __ LP-108 LANDSCAPE PLANTING PLAN - TRAIL -- CD-107 EXIST CONDITIONS, DEMO, AND E&S - JOGGING TRAIL -- XWJOWNG LP-106 LANDSCAPE F'lANITNG PLAN -JOGGING TRAIL -- CD-108 EXIST CONDmONS, DEMO, AND E&S - JOGGING TRAIL -- LP--109 LANDSCAPE PLANTING PLAN- DEMO SITE CS-200 OVERALL SITE PLAN -- LP-50T PLANT MAIERAL SCHEDULE AND NOTES -- CS-201 SITE PLAN - PRKG LOT NORTH " LP-502 PLAIVTINC DETAILS - CS-202 SITE PLAN - VMFW -- ELECTRICAL CS-203 SITE PLAN - MAIN PRKG LOT - LSO01 LEGEND AND NOTES - ELECTRICAL - CS-204 SITE PLAN -- BED ED101 SITE ELECTRICAL DEMO PLAN - PRKG LOT NORTH CS-205 SITE PLAN - 1-12H COMBAT '- ED102 SITE ELECTRICAL DEMO PLAN - VMFW -- CS-206 SITE & GRADING PLAN - JOGGING TRAIL -- ED103 SITE ELECTRICAL DEMO PLAN - MAIN PRKG LOT CS-207 1 SITE & GRADING PLAN - JOGGING TRAIL -- E0104 SITE ELECTRCAL DEMO PLAN -- BEQ - CU-300 OVERALL UNLITY RM -- ED105 SITE ELECTRICAL DEMO PLAN - H21-1 COMBAT -- CU-301 UTILITY PLAN - PRKG LOT NORTH -- ED106 SITE ELECTRICAL DEMOLITION PLAN - CU-302 UTILITY PLAN - -- ES101 ELECTRICAL SITE PLAN - PRKG LOT NORTH -- CU-303 UTILITY PLAN - MMAKN IN PRKG LOT -- ES102 ELECTRICAL SITE PLAN - VMFW -- CU-304 UTILITY PLAN - BEQ -- E5103 ELECTRICAL SITE PLAN - MAIN PRKG LOT - CU-305 UTILITY PLAN - H2H COMBAT -- ES104 ELECTRICAL SITE PLAN - BEQ -- CU-306 WATER LINE PROFILE - BEO -- ES105 ELECTRICAL SITE PLAN - H2H COMBAT - CU-307 WATER LINE PROFILE - BEQ -- ES601 SITE POWER RISER DIAGRAM AND DETAILS -- CU-308 SANITARY PROFILE - VMFW ES602 STE ELECTRICAL DETAILS - CU-309 STORM PROFLE - VMFW -- ES603 SITE ELECTRICAL DETAILS CG-400 OVERALL GRADING AND DRAINAGE PLAN -- ES701 LIGHTING FIXTURE SCHEDULE AND DETAILS - CG-401 GRADING AND DRAINAGE PLAN - PRKG LOT NORTH -- ES702 SITE LIGHTING DETAILS - CG-402 GRADING AND DRAINAGE PLAN - VMFW -- ES106 ELECTRICAL SITE PLAN - BMP -- CG-403 GRADING AND DRAINAGE PLAN -- MAIN PRKG LOT CG-4(14 GRADING AND DRAINAGE PLAN - BEQ CG-405 GRADING AND DRAINAGE PLAN - F12H COMBAT -- ---- CG-406 GRADING AND DRAINAGE PLAN - 6MP 2, 3 AND 4 -- vm]aea m an C-500 OVERALL EROSION AND SEDIMENT CONTROL - PHASE 1- oFacv wwa] M, CROW RA C-501 E & S CONTROL PLAN PH I - PRKG LOT NORTH C-502 E & S CONTROL PLAN PH 1 - VMFW -- "B. FOFM P..L C-503 E & S CONTROL PLAN PH I - MAIN PRKG LOT 3 C-504 E& 5 CONTROL PLAN PH 1- BEQ -- Z E C-505 E & S CONTROL PLAN PH 1 - H2H COMBAT -- j C-506 E & S CONTROL PHI - SEDIMENT BASIN 2, 3, & 4 -- C-507 OVERALL EROSION AND SEDIMENT CONTROL - PHASE 2cr C-508 E & S CONTROL PLAN PH 2 - PRKG LOT NORTH -- w a w C-509 E & S CONTROL PLAN PH 2 - VMFW -- 12 6 cr C-510 E & S CONTROL PLAN PH 2 - MAIN PRKG LOT -- 5 C-511 E & S CONTROL PLAN PH 2 - BED -- C-512 E & S CONTROL PLAN PH 2 - H2H COMBAT -- � ~ C-513 E & S CONTROL PH2 - SEDIMENT BASIN 2, 3, & 4 -- 2 w cn C-514 EROSION AND SEDIMENT CONTROL NOTES - o cU) I C-515 EROSION AND SEDIMENT CONTROL DETAILS -- z Z C-516 EROSION AND SEDIMENT CONTROL DETAILS z C-601 SITE DETAILS -- z LL C-602 SITE DETAILS -- z O w C-603 SITE DETAILS - ui w C-604 GATE & FENCE DETAILS - +; _ `n C-605 SAND FILTER STORM DETAILS -- m C-606 WET POND STORM DETAILS -- C-607 WATER DETAILS o C-608 SANITARY SEWER DETAILS �• �ZG x a A5 MUTED C,. cnn,R. N/A van a G-002 7 A a�v� .cysar a .p.].�• AI] FILL NAmE. P,1rvC1CPmpLeir�ne\FI LGCN1SOIg_il97585_P ISPU eocnEngtrs\f3 Design\aae ngslsneel\Os_Geolecn\t]p U595_a I,lpO_A-Ip0_lpcollP+Pkn dep LAYOUT NAME, A-= Su85URFOLE EMPLORATION LOCATION PLAN PLOTTSO: TwW*,. Ypeh P1. 20A - t.Som USER: al t.ww IN,. {�-- \ '- � - _`'••- {;g;-'y ,`C r +fir_ `: Jr r�; r ` `;J.`r /`�✓� -; l � �•'\ \ C"t's'•yy.LL�.'o�`y-� ` §-; \ ;ti� � `, �.r -.-C• �� - �/ � 'i '.\ '`:%+r'J` %'•�� .�`,,�,\ _ \ .(s�J ;y•: '°;!\ ''s'� �'' i I� `Y l{.k' sYy \4'. �� k' J + 1 IN, \ 'i^ ✓� .:` `� _ t� ., r r o;` ; 4r" yy , t�:, • /.F ,r•.�� �•./� �/,� i , ' -wA+ 1 `�\ Wry; `+`t•, 4' �//• ��� ��':f,/��� v � r, , ``\ ,�'."-" r . e. �" ` \' `.5 . ,yll. k!-. I ,, h � 'I °'.y�!' ir.' ate+ /'rf'"� .,l�I`+, •1�' �" ' � '�!, IN -114 \ I'\.,>a �; 'r�7/ J? -/1/"!/ % �;. "a�, \ rs� ' ;s� ,�Yn'a. ,.i� � j; ..- 'c•��,, '��, • t,r✓ ���' � r.515 '`, - "4. pp�1 �I+ � r /, 1 r 9 fr -•, . ,I'" �J,. �y,r �f it,, , d'' `�'?; a j'' �r''a � 'J; ', \' f, �''. / !1t/ % -. •-� r +11 i ; i ,yr'a, n'Ar, ,T J j p.�., . . l;E �.` .; ._ �' v-„ r` �,�1 �y;y(✓ L? ;rl�.•% ,.5• ', w. r ',ti i / :; , '*-"._..c'., : r.,d}'" s>„'•r,.�'Sti'_-' i '^r .-�'rrF e u `'`, 71 r'`'�' J': F + I.. -"a+''y,,.++�rS�C�` r i i I � _ r ��_,;. . �• `� � ..P- ,r, ' e. t .,..` \, a ';�..- �� ..:�. ;%'-F-�' (� !' �' 'JUJU +] I ''r �r� � %i� a „av'y Y'.. �;' � 7a ',`• -;r `c i�'�� �� .,;y4• r+�\ f �+ i f1J 1,: � � rl �N ^SIN `. �`�'•, `. \i--``� � a 6 �,\\ `.� �E� �� � 5\ j ( ,,: •�`;ny ,t _ ''�� � u"` �� �•';,11:�.� '�`` _ ~F Y �'\ � •�11, � i�.�� 1\`.\ ' .Z' �� Y/�tr" I � \\,'';ti I� t .ram" « _� - �.�-,i�'• �;Sa 1 +.,'i-,�� •Ii- r - �' `'+`, d_%f` ram" \ �. �, {QN f ' r IN - - �--"-_= _ _ �• r ? j ''L+MA i ,p.` �" "r+1;'`Ai�' rS;�e ti '" \ l i \ iY .,,.E'• =.•'` � -+ 1 Iij1JI 1 f \ ! `\ \� ' .�� ��+_ n �;;.> `�+, `; . •r ^~ ! C:A�" \` \I�" } j.*l�`.�i, \ } •r,,,•.. � ; • .. r 1 r r j: / r, � �.. ;�', _ \1 i # - }\., -.,.r• J '4. -:\ � ..'' t� ``FV�, � a"' `+�ra� � \ i\�'� \ � '.15, �^r�'. r ` d����� �"; - �-}'-� ' � w' ��; - ,lf,ff/; Sk ,, ,., rrJ �J'?"! ! +, `° _•� V.,,� -' ��f' .'" J. 'r S`a `'a�, `�+, i �a �� °ts "1 \ IIIJ'J:'i I Irli N. 7 �; .;Iili{ Ii.\ ,, ti. � � 1. �,, t - , � ..� 4 >1 16'�\,` S 5.1a�4,[5 '.., �^. /�• -:e_.- '."; ;•*i - 1 { : "'.y; ,r - -_rA• tl y ',\,,`„w`�`� .. jjjiii, t YI\ .F r•r;4'�••�Rr-.,� 5.r •+\lam •�'' •':� �•'� -.'� � i i \�� K� '• �.:y � � �/! (r � � AF �' .y ,• P+a� r rk- '� 1 (� I` \ � j f �,` w �'•. ':� � ,S `'' "^^ i , E Ti I , � / � � � 'V � _ :;\6 �'r'a r/"A a '� , ` , �. ` \"`, U�± ` , f f ` 1 �.. �"••, vk ,• 1 I I li l I I ll1 2t, , ��::;',, 'i I', �`_,, ' �,+ A� �,f:k',�,. , ��,. ��X�'ti / I 1 `'1 l!'!II I•' ''�' ;': _ � ,, +�.�•:.^ +fit' 4,\ I I 7: ! I I h \\\\� •� ` a r1V� 4s. �7 .� ` , .` , .,j � '} I }\ � `\. '`,\R•t......- .-'(r } I' I .-..' _. J � r11J, 1 I IS �\'\\ ` � S l /1 /. 'I`1`, \ � f�• � 1 11 11�',1 T' � l� � t;' ~r 1..`` •.�`�`.�, _ �j-`,;t- 1 if w�' `;,��'�``•'\` I ;'!'//n- Il S ,`���. l_ J P /1 J/Jill IN 5�,,\ r � /.., ^` `ice`\.\, ��'; _ �'� lj;, ,;'t, `'� ',�,' ``� ; 'sk:- .•� Ir' �•/LC,,,il}+'' 1-�.- ' .-. \ t\:,'�Fi�.iy it IN.o.1+,III rk 1 Y�f+ i tIN •1 \+.� �.J- '\`-\r �' l , j; r I ` � �Yl / sr-?1 r.% le\\"`"'1' f � ,_1 ';;J/i/,9' S j'• .\ � : „r f r y :% �j:+ �. e e� �T `� .' ,•• .:ate err.-s '.; ;� JJ�� � , t-•- `//;'i// � 11'• / { I, , \ ` TIiILTIS- O i Wi IT, War __ `_.`•�R,_F . it Iji ;7r,Jp /�~ r IN,:-,•l'�'v' �,-�_.� , J•J77p err •' lip " W Sri ) t0 m ' a fI� o 14 N r; x R O r o x a m z m rn � y s� m O A r m CD 3� C CM m z o m z Z Q 0 23K --I m Lo o cn X o-I sio 2 g i C p g ' - DEPARTMENT OF THE "N/ NAVAL FACILITIES ENCINEERIND CCMMrND NAVAL FACILITIES ENGINEERING COMMAND -MID -ATLANTIC TMAIi CORPS VT I FFW UK Sid o R r a ®® CAMP JOHNSON JACKSONVILLE, NC P1320 BACHELOR ENLISTED QUARTERS SUBSURFACE EXPLORATION LOCATION PLAN n 1 7 it .J 1 f m■ SIr 2 d 2 BORING LOG mNsselnly rm LED a [rl.r ROImIC now a-] IRNaQ7 ku1C 4-s]2P Beldnla E.eTM Pea-. WIG �]1[2p1r Job W: lEElx-17-NC-017N-0, CRUJR CeaHr RIO OE a3 LOG= BY, All I1LY. Optl/f0. swplJs a� w.e '°I I Li..rar .=pa• w .v.11 r4ede lmpme^1.. vtr aat6. 1J .-.:+t~if N .uly of ! TLAI �11 9.w1 2 d 2 BORING LOG CONjA.aCillY .R1/1; A OLLT B .G nD.: 1-4 PROICCi NNIL R-IJ2R ledlra EnWN WOMB WIG �} JOB NO.: -17NG-413�14_ 01 D R: Caro;Ine RID. CVE a5 IO n 8,- AIR 4Lv. Oaa*1o1 •� re,n a � r all w.t .oll Lalelataeq aawPle• a a•- wtl.a 1vd NLprk.Ab. lww aL, eY3 NO Midl srn (4P-SJII . Irve. even r,q.,-,y no rvcY a .r.R no91'twN.. = n-w rock 1.4- -u-ayl J a-asrs o oo/a t a-ri. N rERrv,1m as T! iur. Si.c 1 r 2 QO.RkNG LOG mrlrre.clm .ma IM a P.Lr aoRm NP: Ir3 fRP[Cf Iu,G P-I320 lodes 4iL.tl W1L 6/19/2217 JOB N0: [90.' nrxc-01311ro1 flaiat -fdcdoL^ Ma M 45 IOGOEB BY: AIR �11 11w waAnr cpW Nemnw 7J hnm.a< E,BcrncT - NY SeM - llwc. tlL tlw1. ar a.Et HnRlnarllt N..4 for ao.. L.... fw.arcro•.e- �waa 1 .-+-•-. r � a 1Alcwrecied Rn >.� . a-rw r r1A-p_TS Sr: L J1F2S LTaI - i.0. ,e.+ arrt aaly nalsae N - ear .att rw! slra T,le se..s� u7 iPR.tsw >•«s.l N - aoM1 1'PRb M Iltr rwlar trd,i •b1aC d 8' ,. n=N► urM rr=Ip SaN - Oar. sNT eti •w: .er .n ww..: aw.-1e 1sP • Nw-+r+. _ � ep•.e NRRe n +2 Nd n tk1- otl - m.�xn r•r; ow19a %=MP: Il.=N✓: R=W a tasalwl+ J. to wr .w f }}M N -'�! b.rR b.k m.r LLIq RbP ll� pbW Pi�M.eiv lieu; wR r La>dtild.�7R-]s7rrc Caleenae, 5'atl - 1ree. -N- der e.r .Ir 11.a1rnr:: w L•w�bw._F7•mTM, Snell I d 1 BORING LOG OOu1RA01LP w1na, L[O A SHv, BO K MO: S-1 PRO.Itil Nw♦'- P-1]20 BrnNo EMMtl GVRkeo _ mm 6/22/2011 JOB NO.: LCOOL-1]-NC-013]4-01 OR•L[R: DemRDR RIB: BN 51 LOGGED In: AIR Bc . D1alJmlla, as .� ww Ro n s eweR w TJpe: wfa,:Ruc E�Fe.noq - aax Sane -ea. kL Rao. ea: kww lrrl ILe..Lr7(sM7 .-L•Ne r � .oR - 11,me,N,•e Da ,tl a a-t-}l tl rr .0 W..q. r.dw•e IW J .-z-+.l N .s.wc Iwa Ly_� ta-.-• r -Rmt 1•.!r•^•. Res rl 3 �-a-R•s u M,,, Im Ga.le.ra .ncwdwee e,�req wn ail Bd11NG TIR4IN.TE➢ AT 1z 173i rrlaRLea.e fe.eLwnl.u. .ae�3..]36J912 L.ror.r.--nwaJ9n 7 5r.rt J d 2 BORING LOG (a,I1RafSLA w1111 a Dil, e4faC �--J-i----. PRO= M.L. R-1r••n -p.w Fitltr, O✓..r+ W1E !/WHIT JM MB: DMIO C..ewr RG LlE 45 LfJ= Br: AA Ifp. DOOIPrpI � "� Ml mn� ene wr .J Ctro-wen evwr M 5]' wn w wet ,a'I P[.nP LL-rNl N.JP , wn rR ■4L w ,.-sglf 1}tl-sqs , Sea - . n, L•vxn dq: ,.m 1. •-a-.-. }, ODW 700*.Y EJ1 u 75 Snell I r I BORING LOG COWMAM wm1: IEO A RaLT DOICNO W.: S-2 R/1p1EG7 NME; 2 -1370f.�- Gartw _ Am B/2 Hj, DO J49 NO.: 1E001-17-MC-01-77R--01 DRILLER: Carrina RIG: w 51 LBG 0 B MR 128. LnwlaR �� nD1ls • 12, ep.W Honm.r TKe: Autnnletle Effieknh'-8a[ lYq,.r.rey -M.n. ail orr o1R-w. VRA. 6e11. Ied •M /Ld. f:w•nWa; l.ww: Mxk ,-e-}J N � W . J-2-1-. N M-le.e, tlrr oll ..IL .. wr tl ^fie -,,mo.W e.a apa-Rn w aagl ..a H-J-. � W-ay. rToena Iset 6o.rwrrl aew.e.w�.6 L ,->-, RLa •ei aNac ,vllf+iRSEn Ar I z .0 -w I vRR.°pd1'e R'1n'wlwRwr t eky w � uas IW •.�. RL,ir.rlc LwA L.,& Lwtr.-Je.]JRo4]k Lae{,-li.•Wi71! I n �r�pp���.1�� 9rn , d 2 ppLOG C4N.RnC1ED wYflt LEO a O.LY moH b• PROJECT NME: P-13M MIL 6/20/29v] JOB NO_ tE00.-17-rIC-01374-01 DRi1LR: C�IL1L RL: p1[ .S 11XlSD RT: ®.rpa ,w1a,n ra w.l w..[T .aiu s t oPrR 11swer llp.: J.NMnIk E,�aT MS • tl -Luc. rll MP 61W: a1ry vr: Lai (a.mq(suS 4-1-H w N_veNw. INm.1A,tl � s _ 4.... 1" 1cd uRolens d 3' Mi! M Rry w1R � sswl w on .+ R-►a-• ■ yw,or.wbr dlh:p mr - >I,r• bwu s1t .21. mom.-te:1 ittltl.. rW� PPII '.l3 I 9wN Ip Sar{+e: OtT - -Y aoR NvmvOeW RWR.03 s; LL-63J'N S"by iw Su141e ar so. 5ona - �. agry. Low rr; ,wrr bow' aen-.raq. ^-Iwtl f . J �• Mme .a - truce clef; mtn 1a,4-1� l4 ciouw�ra� .r�eor:�tl d Il f.rdfin. d nrl6lq - awe wx .el }YF! N i - le.p rr w.Rle.lc w.e 4sN N umn-been Ldi,R•r.N-,Sal 1BB; - lara]iLr..-173pp791] BORING LOG Yen I d 1 COKIIVCIfD .11111: lC0 A D.L� NORM NO.: S-3 PROSEO NU,E P-13N Bee,gae Cnl.lep Part[e1 MM _ 5/22/2 017 JOB NO.. LEDOL-IT-WC 1374-01 OR1lJER Caa RID: 9Y 51 LGGCEO eI: " D£V, xscelloR I.M%o .avr rer. 110TES � mw W+el lMl� ..wt ne.,1 .ar .nrar 5me-lw.. al[ eb roT .L'r ll'r-I'2 bow: lm (llncallohd - R 1 I n /.IIO,II.L[ �- Ba 4alIR�R ME Owl-NNT, •onq wE: aeR >vl/e.-7^7((Yepp���mWtl J I 1-1-f4 N ( wnG"Mrr im�6 » � 6n>: 1m/a...R. .tsna• RI'flnl3 w w.wl .o. I.a>-R . •->rY N ivlON LrT w s }awe-r N Br] evi -ton/ouxa/nralBr .�eeae RRw - 1.2 Lrt .-►►! N D� as w 1r<.eR•.an .nenntw.e d 1ww a1 WRNG TOw TED AT f2 f7[F a1ur9 IN BY. -�- RP11-Poan Mr:osl.r a.l Le1.w.-3..]Ss.an: lengtl.--TT.4D2]a T6 1W C{ea.wx..urK a,Nn s.rar�c,ae. m do pcs - L�6 oarJ. uw p M. CROW RA �. RwYil tafr Et++.ly fi F'ORf�S P-F. Tw[ n6f[n6r E ❑ � i Tn Z U � Ld J a ?� z g a a Ei Ne ELf a f= c� a Y 7 z Z3 � C LL1 zLLI z J Z m Z z w © LL QQ� N U Z LL Q o z 6 Z Ln 77 i ' Ila (L SULF: AS NOTED Ea..atCy Ro - cne,.- raelw w MIA HC llWneNi � B-102 pe.-,pe. REeype 661.a.WM ]01] 1 L' 19 A I 0 )I LEGEND: SPOT ELEVATION TOP OF CURB (TC) ELEVATION TOP OF WALL (TW) ELEVATION BOTTOM OF WALL (9W) ELEVATION BITUMINOUS FAVEMEM LIGHT OUTY ASPHALT PAVEMENT HEAVY DUTY ASPHALT PAVEMENT CONCRETE PATTERN HEAVE' DUTY CONCRETE PATTERN Cun AND GUTTER BUILDING (BLDG.) CENTERLINE DITCH/SCALE CONTOUR EDGE OF WOODS FENCE GRAVEL SIGN TOE OF SLOPE (TOS) TOP OF BANK (TOLL) TREE STORM SEWER 3 STORM HEADWALL WATER MAIN FIRE HYDRANT WATER VALVE SANITARY SEWER SANITARY MANHOLE SANITARY CLEANOUT OVERHEAD ELECTRIC LINES (OHE) GUY WIRE UNDERGROUND ELECTRIC (UGE) 1 TELEPHONE (TEL) PEDESTAL (PED.) UTILITY POLE UTTUTY POLE W/ LIGHT CYAVC CYI+rG _ 20-- "-- 20.32-,,," TC20.55� TW26.77-,,,,� BW24.DQ-,,," SS - M • 4'00 OHE UGE CIVIL ABBREVIATIONS: A/C A:R CONDITIONING LINT APPROX AP?ROXI.W4TE ATFP AND TERRORISM FORCE PROTECTION MIT MANHOLE FELG BUILDING BDL BOLLARD OW BOTTOM OF WALL CO CLEANOUT CONIC CONCRETE DEMO DEMOLITION 01 DROP INLET DIP DUCTILE IRON PIPE EJB ELECTRIC JUNCTK)N BOX EMH ELECTRIC MANHOLE EXIST EXISTING EP EDGE OF ASPHALT PAVEMENT FDC FIRE DEPARTMENT CONNECTION FEP FUEL EFFICIENT PARKING FES FLARED END SECTION FFE FINISHED FLOOR ELEVATION FH FIRE HYDRANT FL FLOW LINE FM SANITARY SEWER FORCE MAIN TO FIBER OPTIC GV GATE VALVE HP HIGH POINT INV INVERT LF UNFAIR FEET L/P LIGHT POLE MG MATCH EXISTING GRADE MH MANHOLE NIC NOT IN CONTRACT NTS NOT TO SCALE OHE OVERHEAD ELECTRICAL PIV POST INDICATOR VALVE P/P POWER POLE R RADIUS RD ROOF DRAW SCO SANITARY CLEANOUT SMH SANITARY MANHOLE TBM TEMPORARY BENCHMARK TIC TOP OF CURB TEMP TEMPORARY TMH TELEPHONE MANHOLE T PED TELEPHONE PEDESTAL TOG TOP OF BANK TSV TAPPING SLEEVE & VALVE TW TOP OF WALL TYP TYPICAL RCO ROOF DRAIN CLEANOUT RD ROOF DRAIN UD UNDER DRAIN LICE UNDER GROUND ELECTRICAL U.O.N. UNLESS OTHERWISE NOTED WV WATER VALVE VB VALVE BOX W/ WITH DEMOLITION NOTES I. REMOVE AND DISPOSE OF EXISTING MANMADE SURFACE FEATURES WITHIN THE LIMIT OF WORK INCLUDING BUILDINGS, STRUCTURES, PAVFMENTS, SLABS, CURBING, FENCES, UTILITY POLES, SIGNS, ETC. UNLESS INDICATED OTHERWISE ON THE DRAWINGS. REMOVE AND DISPOSE OF EXISTING 13ELOW GROUND UTILITIES AND FOUNDATIONS WITHIN THE LIMITS INDICATED. 2. EXISTING UTILITIES MUST BE TERMINATED, UNLESS OTHERWISE NOTED, IN CONFORMANCE WITH STATE, LOCAL, BASE AND INOMOUAL UPUTY COMPANY STANDARDS, AND DETAILS,COOROINATE UTILITY SERVICE DISCONNECTS WITH THE UTILITY REPRESENTATIVES. 3, DISPOSE OF DEMOLITION DEBRIS IN ACCORDANCE WfTH APPLICABLE FEDERAL, STATE AND LOCAL REGULATIONS, ORDINANCES AND STATUTES. LAYOUT NOTES 1. CURB RADII ARE 5 FEET TO FACE OF CURB UNLESS OTHERWISE NOTED_ 2. CURBING MUST BE CAST -IN -PLACE WITHIN THE SITE, 3. SEE ARCHITECTURAL DRAWINGS FOR EXACT BUILDING DIMENSIONS AND DETAILS CONTIGUOUS TO THE BUILDING, INCLUDING SIDEWALKS, RAMPS, BUILDING ENTRANCES, STAIRWAY, UTILITY PENETRATIONS, CONCRETE DOOR PADS, LOADING DOCKS, BOLLARDS, ETC. 4. ANY PROPERTY LINE MONUMENTATION DISTURBED DURING CONSTRUCTION MUST BE SET OR RESET BY A PROFESSIONAL LICENSED SURVEYOR. UTILITY NOTES I. EXISTING UTILITIES SHORN ARE APPROXIMATE ONLY AND BASED ON FIELD SURVEYS. AVAILABLE RECORDS, VERBAL INFORMATION AND/Oft PHYSICAL FEATURES- OBTAIN DIGGING PERMITS PRIOR TO START OF EXCAVATION, AT LEAST 15 DAYS PRIOR TO STARTING EXCAVATK)N WORK, CONTACT THE CONTRACTING OFFICER TO ALLOW MARKING OF EXISTING BURIED UTILITIES. ALL EXISTING UNDERGROUND UTILITIES IN THE WORK AREA MUST BE POSITIVELY IDENTIFIED BY A THIRD PARTY, INDEPENDENT, PRIVATE UTILITY LOCATING COMPANY AND COORDINATED WITH THE CONTRACTING OFFICER. ANY MARKINGS MADE DURING THE UTILITY INVESTIGATION ]RUST TIE MAINTAINED THROUGHOUT THE CONTRACT. WI"EVER CONTRACT WORK INVOLVES CHIPPING, SAW CUTTING, OR CORE DRILLING THROUGH CONCRETE, BITUMINOUS ASPHALT OR OTHER IMPERVIOUS SURFACES, THE THIRD PARTY, INDEPENDENT, PRIVATE LOCATING COMPANY SHALL LOCATE UTILITY DEPTH BY USE OF GROUND PENETRATING RADAR (GPR), X-RAY, BORE SCOPE, OR ULTRASOUND PRIOR TO THE START OF DEMOLITION AND CONSTRUCTION. OUTAGES TO ISOLATE UTILITY SYSTEMS MUST BE USED IN CIRCUMSTANCES WHERE UTIUTIES ARE UNABLE TO BE POSITIVELY IDENTIFIED. THE USE OF HISTORICAL DRAWINGS DOES NOT ALLEVIATE THE CONTRACTOR FROM MEETING THIS REQUIREMENT. PRIOR TO CONSTRUCTION, THE SITE MUST BE SCANNED WITH ELECTROMAGNETIC AND SONIC EQUIPMENT AND THE GROUND SURFACE MARKED WHERE EXISTING UNDERGROUND UTILITIES AND ANOMALIES ARE DISCOVERED. TAKE THE NECESSARY PRECAUTIONS TO PROTECT THE EXISTING UTILOTFS AND ANY DAMAGE TO THE LMLmFS MOST BE IMMEDIATELY REPAIRED AT THE CONTRACTOR'S EXPENSE. THE CONTRACTOR IS REQUIRED TO AND AGREES TO COMPLY WTH ALL THE PROVISIONS OF THE GOVERNMENT, STATE AND UTILITY FOR UNDERGROUND GAMAGE PREVENTION AND HEREBY AGREES TO HOLD THE GOVERNMENT HARMLESS AGAINST ANY LOSS, DAMAGES AND CLAIMS OF ANY NATURE WHATSOEVER ARISING OUT OF FAILURE TO COMPLY WITH SAID PROVISIONS. 2, THE LOCATIONS, SIZES, AND TYPES OF EXISTING UTILITIES ARE SHOWN AS AN APPROXIMATE REPRESENTATION ONLY. PRIOR TO ORDERING MATERIALS AND BEGINNING OF CONSTRUCTION VERIFY AND DETERMINE THE EXACT LOCATIONS, SIZES, AND ELEVATIONS OF POINTS OF CONNECTIONS TO EXISTING UTILITIES AND, CONFIRM THAT THERE ARE NO INTERFERENCES WITH THE EXISTING UTILITIES AND THE PROPOSED UTILITY ROUTES, INCLUDING ROUTES WITHIN THE PUBLIC RIGHTS -OF -WAY. 3. WHERE AN EXISTING UTILITY IS FOUND TO CONFLICT WITH THE PROPOSED WORK, OR EXISTING CONDITIONS DIFFER FROM THOSE SHOWN SUCH THAT THE WORK CANNOT BE COMPLETED AS INTENDED, THE CONTRACTOR MUST NOTIFY THE CONTRACTING OFFICER IN ACCORDANCE WITH FAR 52.236-2. 4. SET CATCH BASIN RIMS, AND INVERTS OF SEWERS, ORANS. AND DITCHES IN ACCORDANCE W[H ELEVATIONS ON THE GRADING AND UTILITY PLANS. GENERAL NOTES: I. UNLESS OTHERWISE INDICATED, ALL EXISTING STRUCTURES AND FACIUNES MUST REMAIN. 2. ALL DIMENSIONS ARE TO FACE OF BUILDING, FACE OF CURB AND/OR EDGE OF PAVEMENT UNLESS OTHERWISE INDICATED. 3. SOD (CENTIPEDE) ALL DISTURBED PERVIOUS AREAS WITHIN THE LIMITS OF CONSTRUCTION UNLESS OTHERWISE SPECIFIED. 4, NO EARTH WORK/LAID OISTURBANCE IS LO BE PERFORMED UNTIL ALL SOIL EROSION AND SEDIMENT CONTROL DEVICES ARE IN PLACE. 5. ALL GRADE TRANSFNONS BETWEEN NEW AND EXISIM MUST BE SMOOTH AND GRADUAL WITH NO SHARP OR ABRUPT CHANGES. 6. COORDINATE THE WORK OF ALL TRADES - VERIFY ALL FIELD CONDITIONS, QUANTITIES AND DIMENSIONS PRIOR TO COMMENCEMENT OF WORK. ANY DISCREPANCIES MUST BE PROMPTLY BROUGHT TO THE ATTENTION OF THE CONTRACTING OFFICER. 7. EXECUTE ALL WORK WITH CARE TO PROTECT FROM DAMAGE ALL ADJACENT EXISTING FEATURES THAT ARE TO REMAIN. ANY SUCH DAMAGE MUST BE REPAIRED OR REPLACED TO MATCH THE ORIGINAL CONDITION AS APPROVED BY THE CONTRACTING OFFICER AT NO ADDITIONAL COST TO THE GOVERNMENT. B. FINISHED GRADE OF TOP SOIL (AFTER COMPACTION) MUST BE 0.5- TO I - (MAXIMUM) BELOW TOP OF ABUTTING PAVEMENTS, SIDEWALKS AND CURHING. 9 EQUIPMENT AND TRUCK TRACK -TIRE CLEANING/E LASHING STATIONS MUST BE ESTABLISHED AS NECESSARY TO ENSURE THAT NO MUD OR DEBRIS MIGRATES FROM THE CONSTRUCTION SITE TO THE BASE ROADS. 10, ALL HOLES, DEPRESSIONS, EXCAVATIONS, ETC. CREATED AS A RESULT OF DEMOLITION MUST BE BACK -FILLED, COMPACTED, GRADED AND SEEDED, 11. FIELD VERIFY THE ELEVATIONS OF ALL CONNECTIONS TO EXISTING UTILITIES P14OR TO CONSTRUCTING UPSTREAM PORTIONS OF THE NEW UTIUTIES. ANY DISCREPANCIES MUST PROMPTLY BE BROUGHT TO THE ATTENTION OF THE CONTRACTING OFFICER. 12. CGNTAWNATED SOIL SHOULD NOT BE ENCOUNTERED, HOWEVER, IF CONTAMINANTS ARE SUSPECTED THROUGH ODORS OR VISUAL INSPECTIONS DURING EXCAVATION OPERATIONS, STOP WORK AND IMMEDIATELY CONTACT THE CONTRACTING OFFICER FOR FURTHER INSTRUCTIONS. 13. NO WELLS SHOULD EXIST WITHIN THE PROJECT SITE: HOWEVER, IF AN UNMARKED WELL IS DISCOVERED AND INADVERTENTLY DAMAGED, STOP WORK AND IMMEDIATELY CONTACT THE CONTRACTING OFFICER FOR FURTHER INSTRUCTIONS. 5. RIM ELEVATIONS FOR DRAIN AND SLIVER MANHOLES. WATER VALVE COVERS. GAS GATES, ELECTRIC AND TELEPHONE PULL BOXES, AND MANHOLES, AND OTHER SUCH ITEMS, ARE APPROXIMATE AND SHALL BE SET/RFSET AS FOLLOWS: SURVEY NOTES: A. PAVEMENTS AND CONCRETE SURFACES; FLUSH 1. A TOPOGRAPHIC SURVEY OF THE EXISTING SITE WAS PERFORMED IN AUGUST B. ALL SURFACES ALONG ACCESSIBLE ROUTES: FLUSH 2O17 BY SOUTHEASTERN ENGINEERING, INC. C. LANDSCAPE, LOAM AND SEED, AND OTHER EARTH SURFACE AREAS: ONE INCH BELOW SURROUNDING AREA AND TAPER EARTH TO THE RIM HORIZONTAL COORDINATES WERE BASED ON NORTH CAROLINA STATE PLANE ELEVATION. ZONE (NC83F). VERTICAL DATUM IS BASED ON MAV083, CONTROL. POINTS USED OUTING THIS SURVEY: 6. THE LOCATION, SIZE, DEPTH, AND SPECIFICATIONS FOR CONSTRUCTION OF PROPOSED PRIVATE UTILITY SERVICES SHALL BE INSTALLED ACCORDING TO THE PW-8 PW-106 REQUIREMENTS PROVIDED BY, AND APPROVED BY, THE RESPECTIVE UTILITY IN: 360149.96 N: 362716.98 COMPANY. FINAL DESIGN AND LOCATION TO BE COORDINATED WITH THE E: 24794#2.25 E: 2477634.16 CONTRACTING OFFICER. EL: 17.51 EL: 19.43 BRASS DISK BRASS DISK 7, MAKE ARRANGEMENTS FOR AND BE RESPONSIBLE FOR PAYING FEES FOR POLE 2, CONFIRM THE LOCATION OF ALL ITEMS PRIOR TO THE START OF CONSTRUCTION. RELOCATION AND FOR ALTERATION AND ADJUSTMENTS OF GAS, ELECTRIC, TELEPHONE, FIRE ALARM, AND ANY OTHER PRIVATE UTI?_ITIES, WHETHER WORK IS 3. THE EXISTENCE, SIZE AND OR LOCATION OF UTILITIES ARE NOT GUARANTEED BY PERFORMED BY THE CONTRACTOR OR BY THE UTILITY COMPANY. THE SURVEY. UTIUTIFS SHOWN ARE BASED ON ABOVE GROUND STRUCTURES AND AVAILABLE UTILITY PLANS. THE CONTRACTOR SHALL FIELD VERIFY THE S. UTILITY PIPE MATERIALS MUST BE IN ACCORDANCE WITH SPECIFICATIONS, UNLESS LOCATION OF ALL UTILITIES PRIOR TO CONSTRUCTION. OTHERWISE NOTED ON PLAN. 4. THERE ARE JURISDICTIONAL WETLANDS LOCATED WITHIN THE VICINITY OF THE 9, FURNISH EXCAVATION, INSTALLATION, AND BACKFILL OF ELECTRICAL FURNISHED PROJECT BOUNDARY. THE WETLAND LIMITS HAVE BEEN APPROVED BY THE SITEWORK RELATED ITEMS SUCH AS PULL HOXES, CONDUITS, DUCT BANKS, LIGHT uSACE UNDER ACTION ID 2008 2570 DATED MARCH 16, 2009. THESE LIMITS POLE BASES, AND CONCRETE PADS. FURNISH CONCRETE ENCASEMENT OF DUCT ARE SHOWN ON THE PLANS. BANKS IF REQUIRED BY UTILITY COMPANY AND AS INDICATED ON THE DRAWINGS. 5. THE PROJECT SITE LIES WITHIN FLOOD ZONF "X' AS DESCRIBED ON THE FLOOD 10, COORDINATE NATURAL GAS SERVICE WITH PIEDMONT NATURAL GAS. PIEDMONT INSURANCE RATE MAP COMMUNITY MAP 3720438600J PANEL 4385 WITH AN NATURAL GAS IS RESPONSIBLE FOR INSTALLING TH6.4GASJM6TF�R�BUILUNJG,� a. EFFECTIVE DATE OF NOVEMBER 3, 2405. PRESSURE REGULATOR, AND GAS LINES. THE CONTACTOTYWy S jQ2NS A TTHE�-- METER OUTLET- 6. UNLESS OTHERWISE STATED UTILITIES SHOWN HEREON TAKEN FROM UTiLJTY PLANS PREPARED BY UTIUSURVEY, LLC & UNITED CONSULTING. rr�� NAY: Q 2 �+ 20.1 0 7. PER UTILITY LOCATION SERVICES PROVIDED BY UNLISURVEY, LLC & UNITED CONSULTING NO INFORMATION WAS FOUND REGARDING THE SIZE AND TYPES OF THE UNDERGROUND WATER AND GAS LINES. 8, SIZE OF UNDERGROUND WATER LINE SHOWN BASED ON DOCUMENTS RECEIVED FROM BASE (EC-WATER-B5). I [I raw wwn. �� v,®Kmn m auc ---- o W E w Y Lu H- �p Q 0 o £O = LLI t3 Z z w z wLuo Q E w LL. z � Q Q � cz_I J Z 1 < T r Q cvgKCl b wnn cwn. w N/A sAsn -- w C-001 E7 A Hall, Christine From: Cutchin, Meredith A CIV NAVFAC MIDLANT, IPTMC <meredith.cutchin@navy_mil> Sent: Tuesday, March 27, 2018 12:34 PM To: Hall, Christine Subject: RE: [External] P1320: BEQ SW Permit Application Okay, thank you! I thought you may have meant that, but figured it wouldn't hurt to give you more information in case : ] Meredith Cutchin, PE 757-341-0322 -----Original Message ----- From: Hall, Christine [mailto:Christine.Hall@ncdenr.gov] Sent: Tuesday, March 27, 2018 12:32 PM To: Cutchin, Meredith A CIV NAVFAC MIDLANT, IPTMC Subject: [Non-DoD Source] RE: [External] P1320: BEQ SW Permit Application should have clarified that I won't be able to comment on the SHWT until I get the entire package and I have a chance to review it. The goal for submittal is to make sure all the pieces are submitted and the justification is there to support the 2' separation. At the meeting, it wasn't clear if the 2' of separation was provided without the soils report. The revised paragraph looks good and provides enough detail to work with. Thanksi Christine Hall Environmental Engineer Division of Energy, Mineral and Land Resources - State Stormwater Program Department of Environmental Quality 910 796 7215 office 910 796 7335 direct christine,hall@ncdenr.gov 127 Cardinal Drive Ext. Wilmington, NC 28405 Email correspondence to and from this address is subject to the North Carolina Public Records Law and may be disclosed to third parties. -----Original Message ----- From: Cutchin, Meredith A CIV NAVFAC MIDLANT, IPTMC [ma ilto:meredith.cutchin@navy. mil] Sent: Tuesday, March 27, 2018 10:16 AM To: Hall, Christine <Christine.Hall@ncdenr.goy> Subject: RE: [External] P1320: BEQ SW Permit Application Christine, 1. 1 have attached the relevant sheets from the geotech report. I can send you the whole thing or more of it it needed- it is over 100 pages. 2. Let me know if this is detailed enough or if you want the particulars of the VMFW tradeoff to the 4 demolished buildings since I was being more general to the overall site area: The VMFW area is able to meet the definition of redevelopment because it does not result in an increase of built upon area. The VMFW area has a smaller amount of impervious area then the 4 buildings that are being demolished. Therefore, this project results in a lesser amount of runoff being discharged to the same point. Additionally, this area of Camp Johnson is providing a level of stormwater control that is far greater than it has historically. In the past, Camp Johnson had mostly used sheet flow and stormwater piping to convey stormwater. As redevelopment occurs, new projects have added stormwater treatment features, swales and BMPs; thus reducing peak flows and creating a greater level of stormwater control than existed in the past. Thank you! Meredith Cutchin, K 757-341-0322 -----Original Message ----- From: Hail, Christine [mailto:Christine.Hall@ncdenr.gov] Sent: Tuesday, March 27, 2018 8:51 AM To: Cutchin, Meredith A CIV NAVFAC MIDLANT, IPTMC Subject: [Non-DoD Source] RE: [External] P1320: BEQ SW Permit Application Thanks Meredith, I'm not going to be able to comment on the SHWT until I have all the information. For the redevelopment narrative, can you describe the "stormwater control that existed in the past" in that last sentence? Was it sheet flow, piped collection system, swales, or another method? Christine Hall Environmental Engineer Division of Energy, Mineral and Land Resources - State Stormwater Program Department of Environmental Quality 910 796 7215 office 910 796 7335 direct christine.hall@ncdenr,gov 127 Cardinal Drive Ext, Wilmington, NC 28405 Email correspondence to and from this address is subject to the North Carolina Public Records Law and may be disclosed to third parties. -----Original Message ----- From: Cutchin, Meredith A CiV NAVFAC MIDLANT, IPTMC [mailto:meredith.cutchin@navy.mil] Sent: Monday, March 26, 2018 6:06 PM To: Hall, Christine <Christine.Hall @ncdenr.gov> .t } Subject: [External] P1320: BEQSW Permit Application Hi Christine, am getting everything together to send back to you. I think the majority of the corrections were rather straightforward, but I wanted to let you take a quick look at the Redevelopment Narrative and the Sand Filter SHWT explanation: 1, Redevelopment Narrative- I have added some additional information to the last paragraph. 2. Sand Filter SHWT- I originally designed based off of 3' below the 12 contour which gives us a SHWT of 9. 1 consulted with our geotechnical engineer on this project and he felt that this was an acceptable assumption and that the design is justified as is. I had him write up a narrative and added it to MDC 1. Please let me know if you have any concerns with either of these items. I am hoping to have the complete package FedEx'd to you by Thursday morning. Thank you! Meredith Cutchin, PE Civil Engineer Marine Corps IPT NAVFAC Midlant 757-341.-0322 ..: Weaver, Cameron From: Cutchin, Meredith A CIV NAVFAC MIDLANT, IPTMC <meredith.cutchin@navy.miI> Sent: Thursday, February 01, 2018 10:24 AM To: Hall, Christine; Weaver, Cameron Cc: Bradshaw, Thomas C CIV MARFORCOM, I&E - PWD - DESIGN Subject: [External] P1320 Permitting Submittal Meeting Christine, I will likely try to permit as part of one permitting action. Cameron, j Can we please set up a date for mid March? Thank you! I Meredith Cutchin, PE 757-341-0322 REG'D FEB 0 1 2013 -----Original Message ----- From: Hall, Christine(mailto:Christine.Hall@ncdenr.gov] Sent: Tuesday, January 30, 2018 8:29 AM To: Cutchin, Meredith A CIV NAVFAC MIDLANT, IPTMC Cc: Bradshaw, Thomas C CIV MARFORCOM, I&E - PWD - DESIGN Subject: [Non-DoD Source] RE: [External] P1320 Phone Call Meredith, The file should include a drainage area map for the system. I looked through it and the only thing that jumped out at me as a drainage area line was a "project limit" that was delineated on the originally approved site and grading plans around the block (excluding the roads). Unfortunately it's not something we have electronically. There are two ways to approach this. If you are using the standard application, then you could modifying the original permit to add the sidewalk within the existing drainage area and add drainage areas for the improvements proposed as part of your project as a single permitting action. This would only require one fee ($4,000). Alternatively, if you wish to permit them separately, it is lucky there is so much future cause adding the sidewalk would be considered a minor modification to a high density project (what used to be called a plan revision). HD minor mods are $1,500. If you want to do this as a separate action, we'll need a second express request for the minor modification. Let me know if you have any other questions! Christine Hall Environmental Engineer Division of Energy, Mineral and Land Resources - State Stormwater Program Department of Environmental Quality 910 796 7215 office 910 796 7335 direct christine.hall@ncdenr.gov i 127 Cardinal Drive Ext. Wilmington, NC 28405 Email correspondence to and from this address is subject to the North Carolina Public Records Law and may be disclosed to third parties. -----Original Message ----- From: Cutchin, Meredith A CIV NAVFAC MIDLANT, IPTMC [mailto:meredith.cutchin@navy.mil] Sent: Friday, January 26, 2018 12:01 PM To: Hall, Christine <Christine.Hall@ncdenr.gov> Cc: Bradshaw, Thomas C CIV MARFORCOM, I&E - PWD - DESIGN <thomas.bradshaw@usmc.mil> Subject: RE: [External] P1320 Phone Cal! Christine, I forgot to ask one more question during the call. For my sidewalk that will connect to Field Medical Services School (SW8 080740), what additional permit fees will I need to pay in order to add the sidewalk to the permit? Getting checks here takes a very long time. Also, If I read that permit correctly they allotted for an additional future impervious area of 63,152 square feet to drain to the existing BMP. I am not sure if you have a map showing what the "approved drainage area" under this permit is? Thank you! Meredith Cutchin, PE 757-341-0322 -----Original Message ----- From: Hall, Christine [mailto:Christine.Hall @ncdenr.gov] Sent: Thursday, January 25, 2018 4:10 PM To: Cutchin, Meredith A CIV NAVFAC MIDLANT, IPTMC; Weaver, Cameron Cc: Bradshaw, Thomas C CIV MARFORCOM, I&E - PWD - DESIGN Subject: [Non-DoD Source] RE: [External] P1320 Phone Call I don't know about easier but it is a different method. In addition to the Storm-EZ form, you'll still need to provide the usual Supplement EZ to demonstrate the SCMs meet the MDCs, the O&M agreement, and calculations. I'll add a note to my calendar to be available at 10 am. Christine Hall Environmental Engineer Division of Energy, Mineral and Land Resources - State Stormwater Program Department of Environmental Quality 910 796 7215 office 910 796 7335 direct christine.hall@ncdenr.gov 127 Cardinal Drive Ext. Wilmington, NC 28405 Email correspondence to and from this address is subject to the North Carolina Public Records Law and may be disclosed to third parties. -----Original Message ----- From: Cutchin, Meredith A CIV NAVFAC MIDLANT, IPTMC [mailto:meredith.cutchin@navy. mil] Sent: Thursday, January 25, 2018 3:57 PM To: Hall, Christine <Christine.Hall@ncdenr.gov>; Weaver, Cameron <cameron.weaver@ncdenr.gov> Cc: Bradshaw, Thomas C CIV MARFORCOM, I&E - PWD - DESIGN <thomas.bradshaw@usmc.mil> Subject: RE: [External] P1320 Phone Call Okay I'll plan to call you at 10am. Nothing on the project has really changed since my last scoping meeting. Linda had suggested I read about runoff treatment and volume match at that meeting and that section of the stormwater design manual suggests using storm ez, which I do believe Linda mentioned at the meeting was an easier way of permitting. I am happy to permit in whichever way you feel comfortable with. Meredith Cutchin, PE 757-341-0322 -----Original Message ----- From: Hall, Christine[mailto:Christine.Hall @ncdenr.gov] Sent: Thursday, January 25, 2018 3:51 PM To: Cutchin, Meredith A CIV NAVFAC MIDLANT, IPTMC; Weaver, Cameron Cc: Bradshaw, Thomas C CIV MARFORCOM, I&E - PWD - DESIGN. Subject: [Non-DoD Source] RE: [External] P1320 Phone Call Meredith, It almost sounds like you need another scoping meeting. However, I can be available for a short time to discuss this project tomorrow. Anytime after 9:30 is fine with me. Christine Hall Environmental Engineer Division of Energy, Mineral and Land Resources - State Stormwater Program Department of Environmental Quality 910 796 7215 office 910 796 7335 direct christine.hall@ncdenr.gov 127 Cardinal Drive Ext. Wilmington, NC 28405 Email correspondence to and from this address is subject to the North Carolina Public Records Law and may be disclosed to third parties. ._ . -----Original Message ----- From: Cutchin, Meredith A CIV NAVFAC MIDLANT, IPTMC[mailto:meredith.cutchin@navy.mill Sent: Thursday, January 25, 2018 3:27 PM To: Hall, Christine <Christine.Hall@ncdenr.gov>; Weaver, Cameron <cameron.weaver@ncdenr.gov> Cc: Bradshaw, Thomas C CIV MARFORCOM, I&E - PWD - DESIGN <thomas.bradshaw@usmc.mil> Subject: [External] P1320 Phone Call Hello Cameron, I know we touched base about having a phone call yesterday to go over the project, but I did not hear back on a time that worked for you and Christine. Christine, if you have time tomorrow, I would like to go over the project to make sure we are on the same page with the best plan for permitting. Thank you! Meredith Cutchin, PE Civil Engineer Marine Corps IPT NAVFAC Midlant 757-341-0322 Hall, Christine From: Cutchin, Meredith A CIV NAVFAC MIDLANT, IPTMC <meredith.cutchin@navy.mil> Sent: Thursday, February 01, 2018 10:24 AM To: Hall, Christine; Weaver, Cameron Cc: Bradshaw, Thomas C CIV MARFORCOM, I&E - PWD - DESIGN Subject: [External) P1320 Permitting Submittal Meeting Christine, I will likely try to permit as part of one permitting action. Cameron, Can we please set up a date for mid March? Thank you! Meredith Cutchin, PE 757-341-0322 -----Original Message ----- From: Hall, Christine[mailto:Christine.Hall@ncdenr.gov] Sent: Tuesday, January 30, 2018 8:29 AM To: Cutchin, Meredith A C V NAVFAC MIDLANT, IPTMC Cc: Bradshaw, Thomas C CIV MARFORCOM, I&E - PWD - DESIGN Subject: [Non-DoD Source] RE: [External] P1320 Phone Call Meredith, The file should include a drainage area map for the system. I looked through it and the only thing that jumped out at me as a drainage area line was a "project limit" that was delineated on the originally approved site and grading plans around the block (excluding the roads). Unfortunately it's not something we have electronically. There are two ways to approach this. If you are using the standard application, then you could modifying the original permit to add the sidewalk within the existing drainage area and add drainage areas for the improvements proposed as part of your project as a single permitting action. This would only require one fee ($4,000). Alternatively, if you wish to permit them separately, it is lucky there is so much future cause adding the sidewalk would be considered a minor modification to a high density project (what used to be called a plan revision). HD minor mods are $1,500. if you want to do this as a separate action, we'll need a second express request for the minor modification. Let me know if you have any other questions! Christine Hall Environmental Engineer Division of Energy, Mineral and Land Resources - State Stormwater Program Department of Environmental Quality 910 796 7215 office 910 796 7335 direct christine.hall@ncdenr.gov 127 Cardinal Drive Ext. Wilmington, NC 28405 Email correspondence to and from this address is subject to the North Carolina Public Records Law and may be disclosed to third parties. -----Original Message ----- From: Cutchin, Meredith A CIV NAVFAC MIDLANT, IPTMC [mailto:meredith.cutchin@navy. mi1] Sent: Friday, January 26, 2018 12:01 PM To: Hall, Christine <Christine.Hal l@ncdenr.gov> Cc: Bradshaw, Thomas C CIV MARFORCOM, I&E - PWD - DESIGN <thomas.bradshaw@usmc.mil> Subject: RE: [External] P1320 Phone Call Christine, I forgot to ask one more question during the call. For my sidewalk that will connect to Field Medical Services School (SW8 080740), what additional permit fees will I need to pay in order to add the sidewalk to the permit? Getting checks here takes a very long time - Also, If I read that permit correctly they allotted for an additional future impervious area of 63,152 square feet to drain to the existing BMP. I am not sure if you have a map showing what the "approved drainage area" under this permit is? Thank you! Meredith Cutchin, PE 757-341-0322 -----Original Message ----- From: Hall, Christine (mailto:Christine.Hall@ncdenr.gov] Sent: Thursday, January 25, 2018 4:10 PM To: Cutchin, Meredith A CIV NAVFAC MIDLANT, IPTMC; Weaver, Cameron Cc: Bradshaw, Thomas C CIV MARFORCOM, I&E - PWD - DESIGN Subject: [Non-DoD Source] RE: [External) P1320 Phone Call I don't know about easier but it is a different method. In addition to the Storm-EZ form, you'll still need to provide the usual Supplement EZ to demonstrate the SCMs meet the MDCs, the 0&M agreement, and calculations. I'll add a note to my calendar to be available at 10 am. Christine Hall Environmental Engineer Division of Energy, Mineral and Land Resources - State Stormwater Program Department of Environmental Quality 910 796 7215 office 910 796 7335 direct christine.hall@ncdenr,gov 127 Cardinal Drive Ext. Wilmington, NC 28405 Email correspondence to and from this address is subject to the North Carolina Public Records Law and may be disclosed to third parties. -----Original Message ----- From: Cutchin, Meredith A CIV NAVFAC MIDLANT, IPTMC [mailto:meredith.cutchin@navy. mi1] Sent: Thursday, January 25, 2018 3:57 PM To: Hall, Christine <Christine.Hall@ncdenr.gov>; Weaver, Cameron <cameran.weaver@ncdenr.gov> Cc: Bradshaw, Thomas C CIV MARFORCOM, I&E - PWD - DESIGN <thomas.bradshaw@usmc.mil> Subject: RE: [External] P1320 Phone Call Okay I'll plan to call you at 10am. Nothing on the project has really changed since my last scoping meeting. Linda had suggested I read about runoff treatment and volume match at that meeting and that section of the stormwater design manual suggests using storm ez, which I do believe Linda mentioned at the meeting was an easier way of permitting. I am happy to permit in whichever way you feel comfortable with. Meredith Cutchin, PE 757-341-0322 -----Original Message ----- From: Hall, Christine [mailto:Christine.Half@ncdenr.gov] Sent: Thursday, January 25, 2018 3:51 PM To: Cutchin, Meredith A CIV NAVFAC MIDLANT, IPTMC; Weaver, Cameron Cc: Bradshaw, Thomas C CIV MARFORCOM, I&E - PWD - DESIGN Subject: (Nan-DoD Source] RE: (External] P1320 Phone Call Meredith, It almost sounds like you need another scoping meeting. However, I can be available for a short time to discuss this project tomorrow. Anytime after 9:30 is fine with me. Christine Hall Environmental Engineer Division of Energy, Mineral and Land Resources - State Stormwater Program Department of Environmental Quality 910 796 7215 office 910 796 7335 direct christine.hall@ncdenr.gov 1.27 Cardinal Drive Ext. Wilmington, NC 28405 Email correspondence to and from this address is subject to the North Carolina Public Records Law and may be disclosed to third parties. 9 -----Original Message --- From. Cutchin, Meredith A CIV NAVFAC MIDLANT, IPTMC f mailto:meredith.cutchin@navy.mil] Sent: Thursday, January 25, 2018 3:27 PM To: Hall, Christine <Christine.Hall@ncdenr.gov>; Weaver, Cameron <cameron.weaver@ncdenr.gov> Cc: Bradshaw, Thomas C CIV MARFORCOM, I&E - PWD - DESIGN <thomas.bradshaw@usmc.mil> Subject: [External] P1320 Phone Call Hello Cameron, I know we touched base about having a phone call yesterday to go over the project, but I did not hear back on a time that worked for you and Christine. Christine, if you have time tomorrow, I would like to go over the project to make sure we are on the same page with the best plan for permitting. Thank you] Meredith Cutchin, PE Civil Engineer Marine Corps IPT NAVFAC Midlant 757-341-0322 Hall, Christine From: Hall, Christine Sent: Tuesday, January 30, 2018 8:29 AM To: 'Cutchin, Meredith A CIV NAVFAC MIDLANT, 1PTMC' Cc: Bradshaw, Thomas C CIV MARFORCOM, I&E - PWD - DESIGN Subject: RE: [External] P1320 Phone Call Meredith, The file should include a drainage area map for the system. I looked through it and the only thing that jumped out at me as a drainage area line was a "project limit" that was delineated on the originally approved site and grading plans around the block (excluding the roads). Unfortunately it's not something we have electronically. There are two ways to approach this. If you are using the standard application, then you could modifying the original permit to add the sidewalk within the existing drainage area and add drainage areas for the improvements proposed as part of your project as a single permitting action. This would only require one fee ($4,000). Alternatively, if you wish to permit them separately, it is lucky there is so much future cause adding the sidewalk would be considered a minor modification to a high density project (what used to be called a plan revision), HD minor mods are $1,500, If you want to do this as a separate action, we'll need a second express request for the minor modification. Let me know if you have any other questions! Christine Hall Environmental Engineer Division of Energy, Mineral and Land Resources — State Stormwater Program Department of Environmental Quality 910 796 7215 office 910 796 7335 direct christine.hall@ncdenr.gov 127 Cardinal Drive Ext. Wilmington, NC 28405 Email correspondence to and from this address is subject to the North Carolina Public Records Law and may be disclosed to third parties. -----Original Message ----- From: Cutchin, Meredith A CIV NAVFAC MIDLANT, IPTMC [mailto:meredith.cutehin@navy.mil] Sent: Friday, January 26, 2018 12:01 PM To: Hail, Christine <Christine.Hall @ncdenr.gov> Cc: Bradshaw, Thomas C CIV MARFORCOM, I&E - PWD - DESIGN <thomas.bradshaw@usmc.mil> Subject: RE: [External] P1320 Phone Call Christine, I forgot to ask one more question during the call. For my sidewalk that wi0 connect to Field Medical Services School (SW8 080740), what additional permit fees will I need to pay in order to add the sidewalk to the permit? Getting checks here takes a very long time. w ICJ Also, If I read that permit correctly they allotted for an additional future impervious area of 63,152 square feet to drain to the existing BMP. I am not sure if you have a map showing what the "approved drainage area" under this permit is? Thank you! Meredith Cutchin, PE 757-341-0322 -----Original Message ----- From, Hall, Christine[mailto:Christine.Hali@ncdenr,gov] Sent: Thursday, January 25, 2018 4:10 PM To: Cutchin, Meredith A CIV NAVFAC MIDLANT, IPTMC; Weaver, Cameron Cc: Bradshaw, Thomas C CIV MARFORCOM, I&E - PWD - DESIGN Subject: [Non-DoD Source] RE: [External] P1320 Phone Call I don't know about easier but it is a different method. In addition to the Storm-EZ form, you'll still need to provide the usual Supplement EZ to demonstrate the SCMs meet the MDCs, the O&M agreement, and calculations. I'll add a note to my calendar to be available at 10 am. Christine Hall Environmental Engineer Division of Energy, Mineral and Land Resources W State 5tormwater Program Department of Environmentai Quality 910 796 7215 office 910 796 7335 direct christine.hall@ncdenr.gov 127 Cardinal Drive Ext. Wilmington, NC 28405 Email correspondence to and from this address is subject to the North Carolina Public Records Law and may be disclosed to third parties. -----Original Message ----- From: Cutchin, Meredith A CIV NAVFAC MIDLANT, IPTMC jmailto:meredith.cutchin@navy,mil] Sent: Thursday, January 25, 2018 3:57 PM To: Hall, Christine <Christine,HaII@ncdenr.gov>; Weaver, Cameron <cameron.weaver@ncdenr.gov> Cc: Bradshaw, Thomas C CIV MARFORCOM, I&E - PWD - DESIGN <thomas.bradshaw@usmc.mil> Subject: RE: [External] P1320 Phone Call Okay I'll plan to call you at 10am. Nothing on the project has really changed since my last scoping meeting. Linda had suggested I read about runoff treatment and volume match at that meeting and that section of the stormwater design manual suggests using storm ez, which I do believe Linda mentioned at the meeting was an easier way of permitting. I am happy to permit in whichever way you feel comfortable with. TM Meredith Cutchin, PE 757-341-0322 -----Original Message ----- From: Hall, Christine [mailto:Christine.Hall@ncdenr.gov] Sent: Thursday, January 25, 2018 3:51 PM To: Cutchin, Meredith A CIV NAVFAC MIDLANT, IPTMC; Weaver, Cameron Cc: Bradshaw, Thomas C CIV MARFORCOM, I&E - FWD - DESIGN Subject: [Non-DoD Source] RE: [External] P1320 Phone Call Meredith, It almost sounds ►ike you need another scoping meeting. However, 1 can be available for a short time to discuss this project tomorrow. Anytime after 9:30 is fine with me. Christine Hall Environmental Engineer Division of Energy, Mineral and Land Resources - State Stormwater Program Department of Environmental Quality 910 796 7215 office 910 796 7335 direct christine.hall@ncdenr.gov 127 Cardinal Drive Ext. Wilmington, NC 28405 Email correspondence to and from this address is subject to the North Carolina Public Records Law and may be disclosed to third parties. -----Original Message ----- From: Cutchin, Meredith ACIV NAVFAC MIDLANT, IPTMC [mailto: meredAh.cutchin@navy.mill Sent: Thursday, January 25, 2018 3:27 PM To: Hall, Christine <Christine.Hall@ncdenr.gov>; Weaver, Cameron <cameron.weaver@ncdenr.gov> Cc: Bradshaw, Thomas C CIV MARFORCOM, I&E - PWD - DESIGN <thomas.bradshaw@usmc.mil> Subject: [External] P1320 Phone Call Hello Cameron, I know we touched base about having a phone call yesterday to go over the project, but I did not hear back on a time that worked for you and Christine. Christine, if you have time tomorrow, I would like to go over the project to make sure we are on the same page with the best plan for permitting, Thank you! Meredith Cutchin, PE Civil Engineer Marine Corps IPT NAVFAC Midlant 3 r 757-341-0322 For [C' Use ONLY Rev iawer: C lL North Carolina Department of Environmental Quality submr[: Request for Express Permit Review Timo: Confirm: FILL-IN all the information below and CHECK the Permit(s) you are requesting for express review. Call and Email the completed form to the Permit Coordinator along with a completed RETAILED narrative, site plan (PDF file) and vicinity map (same items expected in the application ap ckape of the project location. Please include this form in the application package. • Asheville Region -Alison Davidson 828-296-4698;alison.davidson@ncdenr.gov �ce� Cf • Fayetteville or Raleigh Region -David Lee 919-791-4203; david.lee@ncdenr.gov all-1e • Mooresville or Winston Salem -Marcia Allocco 704-235-2107, marcia.allocco@ncdenr.gov o� 3 • Washington Region -Lyn Hardison 252-948-3842 or IVn.hardison@ncdenr.gov • Wilmington Region -Cameron Weaver 910-796-7303 or cameron.weaver@ncdenr.gov NOTE: Project application received after 12 noon will be stamped in the following work day. Project Name: P-1320 BACHELOR ENLISTED QUARTERS County. ONSLOW Applicant: USMC Company: USMC Address: BLD 1005 MICHAEL ROAD City: CAMP LEJEUNE, State: NC Zip: 28542- Phone: 910-451-3238, Fax: _ _ Email: thomas bradshaw@usmc.mil Physical Location -COMPANY E STREET CAMP JOHNSON Provided Existing Permits 01 related to this Protect SW SW NPDES NPDES WQ WQ E&S E&S Other Project Drains into SC waters — Water classification HQW,NSW (DWR Surface Water Classifications Map) Project Located in WHITE OAK River Basin. Is project draining to class ORW waters? YIN, within'/2 mile and draining to class SA waters Y or within 1 mile and draining to class HOW waters? YIN Engineer/Consultant: MEREDITH CUTCHIN Company: NAVFAC�� �AZa�a Address: 9324 VIRGINIA AVENUE City: NORFOLK, State: VA Zip: 23511-3095 Phone; 757-341-0322, Fax: 757-341-0311, Email: meredith.cutchin and guuy.tran@navy,mil PLEASE PROVIDE ESTIMATED INVESTMENT AND EXPECTED EMPLOYMENT, IF AVAILABLE $ # JOBS SECTION ONE: REQUESTING A SCOPING MEETING ONLY RfC ® Scoping Meeting ONLY ❑ DWR, ❑ DCM, ❑ DEMLR, ❑ OTHER: SECTION TWO: CHECK ONLY THE PROGRAM (S) YOU ARE REQUESTING FOR EXPRESS PERMITTING ❑ 401 Unit ❑ Stream Origin Determination: _ # of stream calls — Please attach TOPO map marking the areas in questions ❑ IntermittendPerennial Determination: ` # of stream calls — Please attach TOPO map marking the areas in questions ❑ 401 Water Quality Certification ❑ Isolated Wetland (_linear ft or _acres) ❑ Riparian Buffer Authorization ❑ Minor Variance ❑ Major General Variance ❑ State Stormwater ❑ General ❑ SFR, ❑ SFR < 1 ac. ❑ Bkhd & Bt Rmp, ❑ Clear & Grub, ❑ Utility ❑ Other ❑ Low Density ❑ Low Density -Curb & Gutter _ # Curb Outlet Swales ❑ Off -site [SW (Provide permit #)] ❑ High Density -Detention Pond — # Treatment Systems ® High Density-)nfiltration _ ,#Treatment Systems ❑ High Density -Bio-Retention _ # Treatment Systems ❑ High Density —SW Wetlands _ # Treatment Systems ® High Density -Other 4 # Treatment Systems /❑ MOD:❑ Major ❑ Minor ❑ Plan Revision ❑ Redev. Exclusion SW {provide permit at ❑ Coastal Management ❑ Excavation & Fill ❑ Bridges & Culverts ❑ Structures Information ❑ Upland Development ❑ Marina Development ❑ Urban Waterfront ® Land Quality ® Erosion and Sedimentation Control Plan with 14 acres to be disturbed. (CK # & Amt. (for DEQ use)) SECTION THREE — PLEASE CHECK ALL THAT IS APPLICABLE TO YOUR PROJECT (for both scoping and express meeting request) Wetlands on Site ® Yes ❑ No Buffer Impacts: ® No ❑ YES: Oacre(s) Wetlands Delineation has been completed: ❑ Yes ® No Isolated wetland on Property ❑ Yes ® No US ACOE Approval of Delineation completed: ❑ Yes ® No 404 Application in Process wl US ACOE: ❑ Yes ® No Permit Received from US ACOE ❑ Yes ® No Fax 1)FQ uu only Fee Split for multiple permits: (Check # 1 Total Fee Amourft3 SUBMITTAL DATES Fee I SUBMITTAL DATES Fee CAMA $ Variance (❑ Maj; ❑ Min) $ SW (❑ HD, ❑ LD, ❑ Gen) $ 401: $ LQS S Stream Deter,_ S NCDEQ EXPRESS March 2016 For DEO Use ONLY Reviewer: North Carolina Department of Environmental Quality s, Request for Express Permit Review Time: confirm: FILL-IN all the information below and CHECK the Permit(s) you are requesting for express review. Call and Email the completed form to the Permit Coordinator along with a completed DETAILED narrative site plan PDF file and vicinity ma same items expected in the application ap ckage of the project location. Please include this form in the application package. • Asheville Region -Alison Davidson 828-296-4698;alison.davidson@ncdenr.gov • Fayetteville or Raleigh Region -David Lee 919-791-4203; david.lee@ncdenr.gov • Mooresville or Winston Salem -Marcia Allocco 704-235-2107; marcia.allocco@ncdenr.gov • Washington Region -Lyn Hardison 252-948-3842 or lyn.hardison@ncdenr.gov • Wilmington Region -Cameron Weaver 910-796-7303 or cameron.weaver@ncdenr.gov NOTE: Project application received after 12 noon will be stamped in the following work day. Project Name: P-1320 BACHELOR ENLISTED QUARTERS County: ONSLOW Applicanl: USMC Company: USMC Address: BLD 1005 MICHAEL ROAD City: CAMP LEJEUNE, State: NC Zip: 28542- Phone: 910-451-3238. Fax: _ _ Email: thomas.bradshaw@usmc.mil Physical Localion:COMPANY E STREET CAMP JOHNSON Provided Existing Permits related to this Protect SW SW _ SW _ NPDES NPDES WQ _ WQ _ E&S _ E&S _ Other Project Drains into SC waters — Water classification HQW,NSW (DWR Surface Water Classifications Map} Project Located in WHITE OAK River Basin. Is project draining to class ORW waters? YIN, within Y2 mile and draining to class SA waters Y. or within 1 mile and draining 10 class HOW waters? YIN Engineer/Consultant: MEREDITH CUTCHIN Company: NAVFAC Address: 9324 VIRGINIA AVENUE City: NORFOLK, State: VA Zip: 23511-3095 Phone: 757-341-0322, Fax: 757-341-0311, Email: meredith.cutchin andguy.tran@navy.mil PLEASE PROVIDE ESTIMATED INVESTMENT AND EXPECTED EMPLOYMENT, IF AVAILABLE $# JOBS SECTION ONE: REQUESTING A SCOPING MEETING ONLY ® Scoping Meeting ONLY ❑ DWR, ❑ DCM, ❑ DEMLR, ❑ OTHER: SECTION TWO: CHECK ONLY THE PROGRAM (S) YOU ARE REQUESTING FOR EXPRESS PERMITTING ❑ 401 Unit ❑ Stream Origin Determination: _ # of stream calls — Please attach TOPO map marking the areas in questions ❑ Intermittent./Perennial Determinaticr; _ # of stream calls — Please attach TOPO map marking the areas in questions ❑ 401 Water Quality Certification ❑ Isolated Wetland (_linear ft or _acres) ❑ Riparian Buffer Authorization ❑ Minor Variance ❑ Major General Variance ❑ State Stormwater ❑ General ❑ SFR, ❑ SFR < 1 ac. ❑ Bkhd & Bt Rmp, ❑ Clear & Grub, ❑ Utility ❑ Other - ❑ Low Density ❑ Low Density -Curb & Gutter ` # Curb Outlet Swales ❑ Off -site [SW (Provide permit #)) ❑ High Density -Detention Pond _ # Treatment Systems ® High Density -Infiltration _ #Treatment Systems ❑ High Density -Bio-Retention _ # Treatment Systems ❑ High Density —SW Wetlands _ # Treatment Systems ® High Density -Other 4 # Treatment Systems / ❑ MOD:® Major ❑ Minor ❑ Plan Revision ❑ Redev. Exclusion SW (Provide permit 4) ❑ Coastal Management ❑ Excavation & Fill ❑ Bridges & Culverts ❑ Structures Information ❑ Upland Development ❑ Marina Development ❑ Urban Waterfront ® Land Quality ® Erosion and Sedimentation Control Plan with 14 acres to be disturbed. (CK # & Amt. (for DEQ use)) SECTION THREE — PLEASE CHECK ALL THAT IS APPLICABLE TO YOUR PROJECT (for both scoping and express meeting request) Wetlands on Site ® Yes ❑ No Wetlands Delineation has been completed: ❑ Yes ® No US ACOE Approval of Delineation completed: ❑ Yes ® No Received from US ACOE ❑ Yes ® No DHJ use r)171V Fee Split for multiple permits: (Check # Buffer Impacts: ® No ❑ YES: Oacre(s) Isolated wetland on Property ❑ Yes ® No 404 Application in Process wi US ACOE: ❑ Yes ® No Permit Total Fee Amount 5 SUBMITTAL DATES Fee SUBMITTAL DATES Fee CAMA $ Variance (❑ Mai; ❑ Min) S SW (❑ HD, ❑ LID, ❑ Gen) S 401: S LOS S Stream Deter,_ S NCDEQ EXPRESS March 2016 ENAfFAC Naval Facilities Engineering Command NAVFAC MILD -ATLANTIC Civil: BASIS OF DESIGN 1.0 PROJECT INFORMATION 1.1 PROJECT DESCRIPTION AND LOCATION The project will consist of a 70,956 SF bachelor enlisted quarters (BEQ) and a 7,997 SF combined vehicle maintenance facility/warehouse (VMFW). Parking lots and other smaller structures will be constructed to support these two facilities. P1320 will be constructed off of Harlem Drive along Company D and E Streets. The site surrounds the existing Bradley Hall, building M508. 1.2 EXISTING CONDITIONS The existing site is approximately 15 acres. Wetlands surround the perimeter of the majority of the site. A 50' buffer will be maintained to protect the existing wetlands. Some minimal disturbance to the buffer area may occur during grading. The site has moderate to flat slopes and falls in the direction of the surrounding wetlands. Portions of the site were previously developed; abandoned utilities and foundation features may still exist in these areas. Some of the site is presently wooded; previously developed portions have been cleared. The site is not in the 100-yr flood plain. 1.3 GEOTECHNICAL See geotechnical report. 1.4 DEMOLITION All trees and vegetation within the limits of disturbance. will be cleared and grubbed as needed. All abandoned utilities in the project limits will be removed. Disturbance will be minimized and will only include areas needed to construct the site. 1.5 NEW SITE WORK The project will construct a bachelor enlisted quarters for 396 people. Supporting facilities will include a cleaning station, drying station, outdoor workout area, picnic shelter and a lighted basketball court. To support the BEQ, two personally owned vehicle (POV) parking lots will be constructed to provide parking to students that will be staying in the BEQ. The POV lots will provide: 8 handicapped spaces, 269 POV spaces and 4 motorcycle spaces. The POV spaces will be 9' wide by 18.5' long; handicapped spaces will have the same dimension with additional adjacent space. The motorcycle spaces will be 4.5' by 18.5'. Typical drive aisles will be 26' wide. The project also constructs a combined vehicle maintenance facility/warehouse. The VMFW will have its own 17 space, fenced parking lot as well as additional space to accommodate deliveries to the warehouse portion of the building. Of the 17 spaces, 16 will be oversized 10' by 20' spaces with one 12' by 30' space to accommodate the large vehicles that are utilized by the battalion. The vehicle maintenance portion of the building Marine Corps IPT P1320 HAdrk ,i P Naval Facilities Engineering Command NAVFAC MID -ATLANTIC has been designed so that vehicles are able to drive through the building for more efficient circulation. The project will relocate the existing hand to hand combat shelter to the east of Bradley Hall to make way for the parking lot. The project will also provide a 6' wide asphalt jogging trail that connects the existing sections of trail. The project will thin a portion of forested area to make room for a preventative medicine trail (PMT). The equipment that is part of this trail will be installed by others. Three wet ponds and one sand filter BMPs will be constructed in order to treat stormwater from impervious surfaces. 1.6 ATFP Access control will be provided to limit access to Company E Street in front of the BEQ as well as access to the combined maintenance drive and sidewalk located at the rear of the building. The standoff distance for the BEQ is 86'. An SBEDS blast analysis was completed at a distance of 42' for the west wall that faces the parking lot. The analysis verified that this distance is adequate for the required level of protection. See structural for additional details. ATFP standoff distance will not apply to the VMFW due to the low occupancy of the building. 1.7 SUSTAINABLE DESIGN The project is seeking to attain DEED or Green Globes certification, 1.8 WATER AND FIRE SUPPLY An 8" water main will be extended from the side of building M508. A 4" line will provide domestic service and a 6" line will provide fire flows. Two fire hydrants will provide adequate service to the BEQ. A water permit will be attained. 1.9 SANITARY SEWER The BEQ will be served by three 6" gravity sewer laterals. The VMFW will be served by one 3" fine. The 18P sanitary fine that currently exists near the proposed VMFW will be rerouted around the building. A sewer permit will be attained. 1.10 NATURAL GAS Natural gas will be supplied to both the BEQ and the VMFW for heating purposes. 1.11 EROSION AND SEDIMENT CONTROL Silt fence, diversion ditches, check dams and sediment traps will provide phase I erosion and sediment control. Inlet protection will be added in phase II. An erosion and control permit will be attained. Marine Corps IPT P1320 NAUFAC Naval Facilities Engineering Command 9 g NAVFAC MIU-ATLAN73G 1.12 ENVIRONMENTAL PERMITTING Water extension and sewer extension permits may be required. Stormwater and erosion and sediment control permits will be required. 2.0 STORM DRAINAGEISTORMWATER MANAGEMENT 2.1 SITE RUNOFF Soil types were taken from the USDA Soil Survey of Onsiow County. Sheet flow in combination with storm drains and roof drains will be used throughout the site. All on site flow will be routed to the sand filters. The project is within a drainage basin which flows to the White Oak River. The receiving stream is Scales Creek. 2.2 STORM DRAINAGE All new impervious areas are intended to flow to the proposed sand filter. Minimal curbing and storm sewer piping will be used to promote surface flows. Rainfall intensity values are taken from the NOAA Atlas for the location and are as follows: Time of Concentration = 5 min. (conservative) Rainfall Intensity = 3.60"/hour 1-year 24-hour storm Rational Runoff Coefficients, "C," are taken from the North Carolina Department of Environmental Quality as follows: Roofs, Inclined 1.00 Asphalt 0.95 Concrete 0.95 Lawns, sandy soil 0.15 Wooded 0.15 2.2 STORMWATER MANAGEMENT WATER QUALITY ANALYSIS Sand filters will be constructed to provide the required water quality controls in accordance with NCDEQs standards. The BMPs will be designed to handle the 1.5" rain event. The basins will be designed for 90% TSS removal. We are required to capture the additional run off generated by the 95% storm event to satisfy NAVFAC LID requirements. The 95% storm event for this area is 2.34 inches per hour. The BMP will reduce the 10-year site release to at or below existing levels. The basins will be designed to safely pass the 100 year storm. Marine Corps IPT P 1320 NAf'�P/K Naval Facilities Engineering Command NAVFAC WD-ATLANPC 3.0 EROSION AND SEDIMENT CONTROL MANAGEMENT 3.1 PLANNED EROSION AND SEDIMENT CONTROL PRACTICES 1. Temporary Gravel Construction Entrance/Exit: A temporary gravel construction entrance will be installed. 2. Land Grading: Grading will be required on approximately 3 acres. All cut and fill slopes will be 3:1 or flatter to avoid instability due to wetness. (NCSCC ESCM Std. 6.02) 3. Temporary Silt Fence: Provided around the site to prevent debris and sediment from migrating to downstream drainage courses (NCSCC ESCM Std. 6.62). 4. Rock Check Dams: Provided at entrances to pipe culverts in ditches and swales to reduce erosion by restricting velocity of flow (NCSCC ESCM Std. 6.83). 5. Sod: Provided in all new ditches and swales to maintain bank stability. Sod will also be used for permanent stabilization of all open space areas. Sod will not be used in the base of the sand filters. 6. Erosion Control Matting: Provided in all new ditches and swales to maintain bank stability. 7. Temporary Seeding: See Specifications. 3.2 CONSTRUCTION SCHEDULE 1. Obtain plan approval and other applicable permits. 2, Flag the limits of construction. 3. Install check dams in all existing ditches and swales as indicated. 4. Install temporary gravel construction entrance. 5. Install temporary silt fence around the site and around sediment basins as indicated, 6. Clear and grub the site within the limits of disturbance. 7. Rough grade site, stockpile topsoil, construct swales, culverts and storm drain system. 8. Install building pad, utilities and site work. 9. Finish slopes around building upon completion of rough grading_ Leave slightly rough and vegetate and mulch immediately. 10. Complete final grading for parking, drives and stabilize with gravel. 11. Complete final grading for the building. 12. Complete final grading of the grounds, topsoil critical areas and permanently vegetate with sod, landscape and mulch. 13. After site is stabilized, remove all temporary measures. 3.3 MAINTENANCE PLAN 1. All erosion and sediment control practices will be inspected weekly and within 24 hours of a 1/2-inch rainfall event and every 14 days. A rain gauge shall be installed to measure rain -events. Needed repairs will be made immediately to maintain all practices as designed. 2. Sediment will be removed from behind the sediment fence when it becomes about 0.5 ft deep at the fence. The sediment fence will be repaired as necessary to maintain a barrier. 3. All disturbed areas will be sodded as permanent vegetation and temporary measures will be seeded, fertilized, reseeded as necessary, and mulched according to the Seeding Specifications. 3.4 VEGETATIVE PLAN Marine Corps IPT P 1320 I SAND -II I EIIIII- _ goILT" i • - - FWdEET aarvE "�- ... - - P-1320 AI _vIAFw VMFW Im 7,99T SF I i i 9 FF=19.30 : COURAW r STREW . . • � �'1M�JwYr��' I ; I • rPrtEVENTATIv[ REpIGNE TRAIL I PhlT I 1 J — III �JO(.flNC iRAi r.KND TO WwD co-W SEE VOTE I.. FILTER .1 STRIP 2 - ' Rrc wer. - E r SF } 1DtlPY fg EF =t�9. -IIIIIIIIIIIII�IIIII! "��� +�"' `� BMP4, OS ----I "[6j SVET POND C 1 S~ IRCNr 51F11ER (P5) VG SIRTOV (as) f L�04t PIC o Ci.NNU S1ATC, ICsj BMP 2: 6 , I WET POND A FILTER BMP 3: ` STRIP 1 WEf POND B IS,' wmAwDs AnD w[nANaS aoukDArrr 51RLAy 911i4Ek LEGEND E I �. Aw�1 p.n ASPrMAr Pa.tutN1 O LFiDI L D2 Cn E I 1 1 I NOTES s ._ THE ARP SEMACk FOR IrE EWO 9I.0.➢E.V'; S 66'. R SR'JC',qh, MkT. AW SS tt S WEN WWII A7 12' FOR '-� ME WEST WA n TCES FAT3 E >&KNO LDS, THE ANALY515 M.' LM O TRAP THIS O5IANCE IS UECTED FOR 111E RE'YJIRED EETRF lE PA91EC11DN THIS 5 AADCOrm iF THEE RER A UNE. — SEE ST7UCILCK FOR AOEIIIIOM DETAIS, J � 2. THERE IS NO ATrP iETfiAO< FOR THE W� III DUE ID to,OCCUPAVa �O PARKING SUMMARY �u icy¢ N BBC L POV EOT plxfrl' FL'�IpPED 6 PFOLCLD SPACES 1PCVTWD STA,vARC' SPACE 9' 1P5 9' IBS 129 _ K y 4• u 71E?CYCLL SPICE AS'•IBS' AS'.IE S' A sw"Pr. ACCESS"Ll SP4E' 5' 1B 9' . 16.5 1w ACSBLE SPACE l ES 9' . 113 N' . 1e5 IC14 sP'as t51 H1 . �_v LOT puEN5g115 FYIAREn PPp�{n SP_PS PPp. . SIAHOAPD SPACE 9' . 155 9' • I&5 47 431CACYCLL SPACE /5=115 45.195 D s141WAD ACCESSkLE SP4E• 5' . IB 9 1P 5 D I:AN'(CE5SIM SPACE P' a 15 9 r I5.51 O `I�SLL sru Ls I EENCIES 4 /STATE(L:J RE'_RLEAIDIIS j_J w• .— \LEA [of IMPAR WRS WNDED SP'(cs I'MI(Ec " SWOON-D %" sPAEc 10 18.5, 1{, 2 ION SPACE 12, r 21' I IDT4 SP-1E1 1] KEYPLAN ' — CS-20G �•• 2fl i / -207 I - GRAPHIC SCALE D• (1a I60' I S CS.200 Weaver, Cameron From: Cutchin, Meredith A CIV NAVFAC MIDLANT, IPTMC <meredith.cutchin@navy.rnif> Sent: Tuesday, December 05, 2017 1:12 PM To: Weaver, Cameron Cc: Bradshaw, Thomas C CIV MARFORCOM, I&E - PWD - DESIGN Subject: [External] P1320-Camp Johnson: Request for Submittal Meeting Attachments: 1320 REQUEST FOR EXPRESS.docx Hello Cameron, I know you guys have been busy so I wanted to see how you were scheduling for the late February early March timeframe? The project would be P1320, for which we had the scoping meeting in September. Hope all is well! Thank you! Meredith -----Original Message ----- From: Cutchin, Meredith A CIV NAVFAC MIDLANT, IPTMC Sent: Tuesday, August 15, 2017 3:54 PM To: cameron.weaver@ncdenr.gov Subject: P1320-Camp Johnson: Request for Scoping Meeting Hello Cameron, Please see the request for a scoping meeting on P1320 at Camp Johnson. I would like to schedule it on September 26th right after the 10am meeting if possible. Please let me know if you need any additional information. Thank you! Meredith Cutchin, PE Civil Engineer Marine Corps IPT NAVFAC M4ant 757-341-0322 Weaver, Cameron From: Cutchin, Meredith A CIV NAVFAC MIDLANT, IPTMC <meredith.cutchin@navy.mil> Sent: Tuesday, January 02, 2018 12:10 PM To: Weaver, Cameron Subject: RE: [External] FW: P1320-Camp Johnson: Request for Submittal Meeting Attachments: P1.320 Site Overview.pdf Hi Cameron, This sheet gives the best big picture prospective of the project; especially when it comes to stormwater. It does not show some of the demolition involved as welt as the extent of the jogging trail. Those additional details can be seen on the rest of the plans. Piease let me know if this is okay. Thank you! Meredith Cutchin, PE 757-341-0322 -----Original Message ----- From: Weaver, Cameron ImaiIto:camecon.weaver@ncdenr.gov] Sent: Tuesday, January 02, 2018 11.43 AM To: Cutchin, Meredith A CIV NAVFAC MIDLANT, IPTMC Subject: [Non-DoD Source] RE: [External] FW: P1320-Camp Johnson: Request for Submittal Meeting Hi Meredith. Companion to my voicemail today ... I only received plans for this request and the form. I need a detailed narrative and a single overall plan sheet showing the extent of the project to add to the packet and then I can get you scheduled with Linda Lewis. Cameron Cameron Weaver Environmental Assistance Coordinator -Wilmington Regional Office NCDEQ-Division of Environmental Assistance and Customer Service 127 Cardinal Drive Ext. Wilmington, NC 28405 91.0-796-7303 NCDEQ NEW WEBSITE: http://deq.nc.gov/ DEACS NEW WEBSITE: http://deq.nc.gov/about/divisions/environmental-assistance-customer-service E-mail correspondence to and from this address may be subject to the North Carolina Public Records Law and may be disclosed to third parties. -Original Message----- From: Cutchin, Meredith A CIV NAVFAC MIDLANT, IPTMC(mailto:meredith.cutchin@navy. mill Sent: Friday, December 22, 2017 11:50 AM To: Weaver, Cameron <cameron.weaver@ncdenr.gov> Subject: [External] FW: P1320-Camp Johnson: Request for Submittal Meeting CAUTION: External email. Do not click links or open attachments unless verified. Send all suspicious email as an attachment to report.spam@nc.gov. Weaver, Cameron From: Cutchin, Meredith A CIV NAVFAC MIDLANT, IPTMC <meredith.cutchin@navy.mil> Sent: Tuesday, January 02, 2018 11:56 AM To: Weaver, Cameron Subject: [External] FW; P1320-Camp Johnson: Request for Submittal Meeting Attachments: 1320 REQUEST FOR EXPRESS.DOCX; 04 P1320 PreFinal BOD CIVIL.docx Cameron, The second document is the Basis of Design. Let me find the best overview sheet and I will send that over Meredith Cutchin, PE 757-341-0322 -----Original Message ----- From: Cutchin, Meredith A CIV NAVFAC MIDLANT, IPTMC Sent: Wednesday, December 20, 2017 6:56 PM To: 'Weaver, Cameron' Subject: P1320-Camp Johnson: Request for Submittal Meeting Apparently the drawings are too large and my email was stuck in the outbox, I will send the drawings in another email. Hi Cameron, Please let me know if you need anything else to schedule the meeting. So my thought is to attempt to attend the SCM Construction Inspection Training(February 28th) on the way to or from the permitting meeting if it works with your scheduling. So these times would be most ideal: Feb 27th at 2pm or March 1st at 11:30 am. I can certainly try to be a little more flexible if it helps or if those dates don't work at all I can send some others. Also- do you have any feedback from the SCM Construction Inspection training? Let me know if you've heard it's not worth attending. Thank you Cameron! Happy Holidays if I don't get a chance to talk to you further! Meredith Cutchin, PE 757-341-0322 -----Original Message ----- From: Weaver, Cameron[mailto:cameron.weaver@ncdenr.gov] Sent: Wednesday, December 06, 2017 11:26 AM To: Cutchin, Meredith A CIV NAVFAC MIDLANT, IPTMC Subject: [Non-DoD Source] RE: [External] P1320-Camp Johnson: Request for Submittal Meeting Hi Meredith. f C We are in mid -February at this moment so gather the details to complete the request packet and send it on when you can so that we meet your timeframe_ Cameron Cameron Weaver Environmental Assistance Coordinator -Wilmington Regional Office NCDEQ-Division of Environmental Assistance and Customer Service 127 Cardinal Drive Ext. Wilmington, NC 2840S 910-796-7303 NCDEQ NEW WEBSITE: http://deq.nc.gov/ DEACS NEW WEBSITE: http://deq.nc.gov/about/divisions/environmental-assistance-customer-service E-mail correspondence to and from this address may be subject to the North Carolina Public Records law and may be disclosed to third parties. -----Original Message ----- From: Cutchin, Meredith A CIV NAVFAC MIDLANT, IPTMC[mailto:meredith.cutchin@navy.mi1] Sent: Tuesday, December 05, 2017 1:12 PM To: Weaver, Cameron <cameron_weaver@ncdenr.gov> Cc Bradshaw, Thomas C CIV MARFORCOM, I&E - PWD - DESIGN <thomas.bradshaw@usmc.mil> Subject: [External] P1320-Camp Johnson: Request for Submittal Meeting CAUTION: External email. Do not click links or open attachments unless verified. Send all suspicious email as an attachment to report.spam@nc.gov. 2 �) North Carolina Department of Environmental Quality Fcr 0EQ Use CVLY R 'iewcr � Request for Express Permit Review r 7ime FILL- all the information below and CHECK the Permit(s) you are requesting for express review. Call and Email the completed form to the Permit Coordinator along with a completed DETAILED narrative site plan PDF file and vicinity ma same items expected in the application ap ckage of the project location. Please include this form in the application package. • Asheville Region -Alison Davidson 828.296-4698,alison.davidson@ncdenr.gov • Fayetteville or Raleigh Region -David Lee 919-791-4203; david.fee@ncdenr.gov • Mooresville or Winston Salem -Marcia Allocco 704-235-2107: marcia.allocco@ncdenr. ov • Washington Region -Lyn Hardison 252-948.3842 or lyn,hardison@ncdenr,gov • Wilmington Region -Cameron Weaver 910-796-7303 or cameron.weaver@ncdenr.gov NOTE: Project application received after 12 noon wily be stamped in the following work day. Project Name. P-1320 BACHELOR ENLISTED QUARTERS County: ONSLOW Applicant: USMC Company: USMC Address: BLD 1005 MICHAEL ROAD City: CAMP LEJEUNE, State: NC Zip: 28542-� Phone: 910 451-3238, Fax: _= Email: ihamas.bradshawC�usme.mil Physical Location•COMPANY E STREET CAMP JOHNSON Provided Existing Permits related to this Project SW SW SW_ NPDES NPDES wo wQ E&S E&S Other Project Drains into SC waters - Water classification HQW,NSW (DWR Surface Water Classifications Map} Project Located in WHITE OAK River Basin. Is project draining to class ORW waters? Y/N. within V2 miie and draining to class SA wavers Y. or within 1 mile and draining to class HOW waters? Y/N Engineer/Consultant: MEREDITH CUTCHIN Company: NAVFAC Address: 9324 VIRGINIA AVENUE City' NORFOLK, State: VA Zip: 23511-3095 Phone: 757-341-0322, Fax: 757-341-0311, Email: meredlth.cutchin andguy tran@nav .mil PLEASE PROVIDE ESTIMATED INVESTMENT AND EXPECTED EMPLOYMENT, IF AVAILABLE S 0 JOBS SECTION ONE: REQUESTING A SCOPING MEETING ONLY ® 5coping Meeting ONLY ❑ DWR, ❑ DCM, ❑ DEMLR, ❑ OTHER: SECTION TWO: CHECK ONLY THE PROGRAM (S) YOU ARE REQUESTING FOR EXPRESS PERMITTING ❑ 401 Unit ❑ Stream Origin Determination: _ # of stream calls - Please attach TOPO map marking the areas in questions ❑ IntermittentlPerennial Determination: _ # of stream calls - Please attach TOPO map marking the areas in questions ❑ 401 Water Quality Certification ❑ Isolated Wetland (_linear ft or _acres) ❑ Riparian Buffer Authorization ❑ Minor Variance ❑ Major General Variance ❑ State Stormwater ❑ General ❑ SFR, ❑ SFR < 1 ac. ❑ Bkhd & Bt Rmp, ❑ Clear & Grub, ❑ Utiiiiy ❑ Other ❑ Low Density ❑ Low Density -Curb & Gutter _.4 Curb Outlet Swales ❑ Off -site [SW (Provide permit #}] ❑ High Density -Detention Pond — # Treatment Systems ® High Density -Infiltration _ #Treatment Systems ❑ High Density -Bio-Retention _ # Treatment Systems ❑ High Density -SW Wetlands _ .# Treatment Systems High Density -Other 4 # Treatment Systems /❑ MOD:Z Major ❑ Minor ❑ Plan Revision ❑ Redev. Exclusion SW (Provide permit 4) ❑ Coastal Management ❑ Excavation & Fill ❑ Brldges & Culverts ❑ Structures Information ❑ Upland Development ❑ Marina Development ❑ Urban Waterfront ® Land Quality ® Erosion and Sedimentation Control Plan with 14 acres to be disturbed. (CK ii & Amt (for Di use)) SECTION THREE - PLEASE CHECK ALL THAT IS APPLICABLE TO YOUR PROJECT (for both scoping and express meeting request) Wetlands on Site ® Yes ❑ No Wetlands Delineation has been completed: ❑ Yes ® No US ACOE Approval of Delineation completed: ❑ Yes ® No Received from US ACOE ❑ Yes ® No n DI-Q ti=sc onh'. Fee Split for multiple permits: (Check # Buffer Impacts: ® No ❑ YES: Oacre(s) Isolated wetland on Property ❑ Yes ® No 404 Application in Process wl US ACOE ❑ Yes ® No Permit Total Fee Amount $ SUBMITTAL DATES Fee SUBMITTAL DATES Fee CAMA S Variance (❑ Mai; [] Min) S SW (❑ HD, ❑ LD, ❑ Gen) S 401: I S LQS S Stream Deter. S NCDEQ EXPRESS March 2016 MIN .��Naval Fa�.•�gi�ering Command Civil: BASIS OF DESIGN 1.0 PROJECT INFORMATION 1.1 PROJECT DESCRIPTION AND LOCATION The project will consist of a 70,956 SF bachelor enlisted quarters (BEQ) and a 7,997 SF combined vehicle maintenance facility/warehouse (VMFW). Parking lots and other smaller structures will be constructed to support these two facilities. P1320 will be constructed off of Harlem Drive along Company D and E Streets. The site surrounds the existing Bradley Hall, building M508. 1.2 EXISTING CONDITIONS The existing site is approximately 12 acres. Wetlands surround the perimeter of the majority of the site. A 50' buffer will be maintained to protect the existing wetlands. Some minimal disturbance to the buffer area may occur during grading. The site has moderate to flat slopes and falls in the direction of the surrounding wetlands. Portions of the site were previously developed; abandoned utilities and foundation features may still exist in these areas. Some of the site is presently wooded; previously developed portions have been cleared. The site is not in the 100-yr flood plain. 1.3 GEOTECHNICAL See geotechnical report. 1.4 DEMOLITION All trees and vegetation within the limits of disturbance will be cleared and grubbed as needed. All abandoned utilities in the project limits will be removed. Disturbance will be minimized and will only include areas needed to construct the site. 1.5 NEW SITE WORK The project will construct a bachelor enlisted quarters for 396 people. Supporting facilities will include a cleaning station, drying station, outdoor workout area; picnic shelter and a lighted basketball court. To support the BEQ, two personally owned vehicle (POV) parking lots will be constructed to provide parking to students that will be staying in the BEQ. The POV lots will provide: 8 handicapped spaces, 269 POV spaces and 4 motorcycle spaces. The POV spaces will be 9' wide by 18.5' long; handicapped spaces will have the same dimension with additional adjacent space. The motorcycle spaces will be 4.5' by 18.5'. Typical drive aisles will be 26' wide. The project also constructs a combined vehicle maintenance facility/warehouse. The VMFW will have its own 17 space, fenced parking lot as well as additional space to accommodate deliveries to the warehouse portion of the building. Of the 17 spaces, 16 will be oversized 10' by 20' spaces with one 12' by 30' space to accommodate the large vehicles that are utilized by the battalion. The vehicle maintenance portion of the building Marine Corps IPT P1320 I,��► Naval Fa cili;ies Ergineed Comma^d L WAVFA,C M10-A;rLA,''W. has been designed so that vehicles are able to drive through the building for more efficient circulation. The project will relocate the existing hand to hand combat shelter to the east of Bradley Hall to make way for the parking lot. The project will also provide a 6' wide asphalt jogging trail that connects the existing sections of trail. The project will thin a portion of forested area to make room for a preventative medicine trail (PMT). The equipment that is part of this trail will be installed by others. Four sand filter BMPs will be constructed in order to treat water from impervious surfaces. 1.6 ATFP Access control will be provided to limit access to Company E Street in front of the BEQ as well as access to the combined maintenance drive and sidewalk located at the rear of the building. The standoff distance for the BEQ is 86'. An SBEDS blast analysis was completed at a distance of 42' for the west wall that faces the parking lot. The analysis verified that this distance is adequate for the required level of protection. See structural for additional details. ATFP standoff distance will not apply to the VMFW due to the low occupancy of the building. 1.7 SUSTAINABLE DESIGN The project is seeking to attain LEED or Green Globes certification. 1.8 WATER AND FIRE SUPPLY An 8" water main will be extended from the side of building M508. A 4" line will provide domestic service and a 6" line will provide fire flows. Two fire hydrants will provide adequate service to the BEQ. A water permit will be attained. 1.9 SANITARY SEWER The BEQ will be served by three 6" gravity sewer laterals. The VMFW will be served by two 3" lines. The 18" sanitary line that currently exists near the proposed VMFW will be rerouted around the building, If required, a sewer permit will be attained. 1.10 NATURAL GAS Natural gas will be supplied to both the BEQ and the VMFW for heating purposes. 1.11 EROSION AND SEDIMENT CONTROL Silt fence, diversion ditches, check dams and skimmer basins will provide phase I erosion and sediment control. Inlet protection will be added in phase II. An erosion and control permit will be attained. Marine Corps IPT P1320 . �'W ^S�hq J Naval Fa ilitiS Frgir^ems{'inr� Command NAVFAc r, ic,-ArLANI IC 1.12 ENVIRONMENTAL PERMITTING Water extension and sewer extension permits may be required. Stormwater and erosion and sediment control permits will be required. 2.0 STORM DRAINAGEISTORMWATER MANAGEMENT 2.1 SITE RUNOFF Soil types were taken from the USDA Soil Survey of Onslow County. Sheet flow in combination with storm drains and roof drains will be used throughout the site. All on site flow will be routed to the sand filters. The project is within a drainage basin which flows to the White Oak River. The receiving stream is Scales Creek. 2.2 STORM DRAINAGE All new impervious areas are intended to flow to the proposed sand filter. Minimal curbing and storm sewer piping will be used to promote surface flows. Rainfall intensity values are taken from the NOAA Atlas for the location and are as follows: Time of Concentration = 5 min. (conservative) Rainfall Intensity = 3.60"/hour 1-year 24-hour storm Rational Runoff Coefficients, "C," are taken from the North Carolina Department of Environmental Quality as follows: Roofs, Inclined 1.00 Asphalt 0.95 Concrete 0.95 Lawns, sandy soil 0.15 Wooded 0.15 2.2 STORMWATER MANAGEMENT WATER QUALITY ANALYSIS Sand filters will be constructed to provide the required water quality controls in accordance with NCDEQs standards. The BMPs will be designed to handle the 1.5" rain event. The basins will be designed for 90% TSS removal. We are required to capture the additional run off generated by the 95% storm event to satisfy NAVFAC LID requirements. The 95% storm event for this area is 2.34 inches per hour. The BMP will reduce the 10-year site release to at or below existing levels. The basins will be designed to safely pass the 100 year storm. Marine Corps IPT P1320 A W PW W"N naval Facilities engineering Cor'nmand 3.0 EROSION AND SEDIMENT CONTROL MANAGEMENT 3.1 PLANNED EROSION AND SEDIMENT CONTROL PRACTICES 1. Temporary Gravel Construction Entrance/Exit A temporary gravel construction entrance will be installed. 2. Land Grading: Grading will be required on approximately 3 acres. All cut and fill slopes will be 3:1 or flatter to avoid instability due to wetness. (NCSCC ESCM Std. 6.02) 3, Temporary Silt Fence: Provided around the site to prevent debris and sediment from migrating to downstream drainage courses (NCSCC ESCM Std. 6.62). 4, Rock Check Dams: Provided at entrances to pipe culverts in ditches and swales to reduce erosion by restricting velocity of flow (NCSCC ESCM Std. 6.83). 5. Sod: Provided in all new ditches and swales to maintain bank stability. Sod will also be used for permanent stabilization of all open space areas. Sod will not be used in the base of the sand filters. 6. Erosion Control Matting: Provided in all new ditches and swales to maintain bank stability. 7. Temporary Seeding: See Specifications. 3.2 CONSTRUCTION SCHEDULE 1. Obtain plan approval and other applicable permits. 2. Flag the limits of construction. 3. Install check dams in all existing ditches and swales as indicated. 4. Install temporary gravel construction entrance. 5. Install temporary silt fence around the site and around sediment basins as indicated. 6. Clear and grub the site within the limits of disturbance. 7. Rough grade site, stockpile topsoil, construct swales, culverts and storm drain system_ 8. Install building pad; utilities and site work. 9. Finish slopes around building upon completion of rough grading. Leave slightly rough and vegetate and mulch immediately. 10. Complete final grading for parking, drives and stabilize with gravel. 11. Complete final grading for the building, 12. Complete final grading of the grounds, topsoil critical areas and permanently vegetate with sod, landscape and mulch. 13. After site is stabilized, remove all temporary measures. 3.3 MAINTENANCE PLAN 1. All erosion and sediment control practices will be inspected weekly and within 24 hours of a 1/2-inch rainfall event and every 14 days. A rain gauge shall be installed to measure rain events. Needed repairs will be made immediately to maintain all practices as designed. 2. Sediment will be removed from behind the sediment fence when it becomes about 0.5 ft deep at the fence. The sediment fence will be repaired as necessary to maintain a barrier. 3. All disturbed areas will be sodded as permanent vegetation and temporary measures will be seeded, fertilized, reseeded as necessary, and mulched according to the Seeding Specifications. 3.4 VEGETATIVE PLAN Marine Corps IPT P1320 m �pr,-� .4 I®� M Laval Facilities Engineering Command HAVFikC WID-XLAWTiC See specification Section 32 92 19 SEEDING and 32 92 23 SODDING. -- End of Section -- Marine Corps IPT P1320 GENERAL SHEET NOTES ' P-Ew NSEo P F OF G15 AvO 07KR SURVF`.^S PRLWUSLI— CCVIX�o el tW ONEaW-Nt. A, VPOAT[0 SWWY fM \l ti `HS P,,%ECT '.5 SDOULfo_ PEE RESnTS OF T'1�5 5UWi" VAl CmIE KVW CN ws Ilff. G X G W) U;Kxl JT \\ WON y.. a eta rpilkt u LF ��mt1�� ., K pi HIM? LTE I; — �- _ i _ H2HC 1 cl KEYPLANAt ' } — + j 0 ,956 $FAIL- AN I'�_400� G• 4 .�;;;,_•• --1� n - G i- 1'i e o� FF _ i7 ! LTcRA/ I , j/ /% U 1{I" 42. /WC / �lllle? im \ GRAPHIC SCALE I I GENERALSHEET NOTE$ ()4 -GS ARE 4 GKft "F"' IAIMX OF Imp4c - tri7n,5 wWo RIDI IFN3• mUM W,) ^ttD i 01101WI T6 410 44E .1Pfi�f+4FF. j /1 7. TMC ICCA:ION la St2rY LNSERFlALR7 UF•tIIIFS+5CR0 IT, "aiE Wt'RGI WT. :.E DATA ON THE DRAWINGS -AS COMI fRIN = ILLS PRV.ffl) U'.' THE b CWEgNNFhi, RUMENCE ORA�NCS 'RON'DED R THE CO4?9NNINT, AN7 ERCN AIICVf. CROLND FEATURE$. IT IS THE CC.':RACTDR'S RESPoNSIKITY IC pK..11rµTELY LOCATE NORI Nl iy AN5 ARTilquc; '.LY N.I EMSIING UIW11E3 P" i'y \ HOT 10 S:All orCO\SIRUC:o DEMOLITION KEYNOTESWill 6, • j I II1 1, aF uLY�, ENnAf'. ONlD4G AN7 L 1 l I ' �1F'rL� �jj J 5 Ct ATNC A 0 DRUBBING �} ER6: *& g11LAI TO SE ON01,990 ✓h OTK;M (MCI N� 56' w:TluiJ xO� ) 5 gEu011E EST'1: U:A}RES � ym LEGEND - ` �...- � 1� i•s' / �� � � - -� �..�L',.`.�a=.��� ` � �_ � �l�' -- 1 ! �, \ \� ,e a..4wi iRTs a usww,.ce ..� - _Y_Y f '!- T _ �' � \ /!fL/� ao ae on.ouseo �vo ya•o r,m..s - 'c/ C1L 10 9E naCV n.0 LdNIBCL q S ru ` / j } •4L` ., y1 as.��'T- '7# `r++� -�. - -�L _ - L.rt 0 QFi— KEYPIAN n iWMCU1Ei1 izP y c 1 0 3 1 I _ t /� }�• 3 �ti'' \'„' � I. � �� Yam. -� � � //���,•, r.N%/%iv/ / i! � ccµ p.➢ GRAPHIC SCALE z I I !_ I J I _ - T�9 1� 7,997SF� "' f .;IFF=1900 1, _ ? refill fill LTE BEE NOTE I. / - = P-1320 N 1 j _ •I .. FF = 17.SU _ � lTER �� ��- SAND FILTER 3 so wtnAn4S Ah7 i — \ l STRGU gUEFER — 3,- 1 1 7 1 2 f LEGEND U" dm -s T nnrt�eNr IiUw O.fr+' A5�Nr1t nAY[4nT NOTES I, THE ArM SITBALN FOR TNIS B'JILONO IS la', A STRZTURA- MT SA095 WS BEEN CCu;ES[D AT 42' FOR TK •--ST WAIL THAT FACTS THE PATRINL LOI, rNE A%A1Y515 VTRTIE7 TWIT THIS OqF ANCE S ADEOLATL FOR THE WWRED UWL or rmTTOTnN PM 5 BETUMU % TIC SEIFNCK ME, STRw URAi FOR A➢UCIOML OETALS. 2. PIANS ARE CONCEPTUAL AS T L,Y IIAVE SFLN Lm CEF OE GR AN) OiNCR SUReFYS PRLAV;15LY COA+PlREO a<T THE W&R.IUGNT. AN LIMATM SUNEY FOR TIS PADAV R SCHIOINFO TkE 3ERXT1 o- 1p5 SVRy!Y UAY WSE pILNEZS .N THE pum PARKING SUMMARY GNf11510N5 SPUCLS r [-PW LOTS A1 C'' VaID.M SPACE 9Na.A". 16IC3' •,'SS' 94'' L.)n*c(Lr SPA sialDq IKLSOIIE SWE• YYE ASE55M SPACE Ta"WIIBa • EGGL SWES •ZMXS WAf�r+A3r1L9G PLOIAPEAmrs fLPE-ILEA LOT p4LNSION; EfOA(>Ep SPACES PAONOEL STWD4K W" SPACE i TON 7KE 12' s ti I K r KEYPL4N GRAPHIC SCALE fY w 1W OnlanoEo m� Weaver, Cameron From: Cutchin, Meredith A CIV NAVFAC MIDLANT, IPTMC <meredith.cutchin cO, navy.mil> Sent: Tuesday, August 15, 2017 3:54 PM To: Weaver, Cameron Subject: P1320-Camp Johnson: Request for Scoping Meeting Attachments: P1320 Preliminary Plans.pdf; 1320 REQUEST FOR EXPRESS.docx; 02 CIVIL.pdf Hello Cameron, Please see the request for a Scoping meeting on P1320 at Camp Johnson. 1 would like to schedule it on September 26th right after the loam meeting if possible. Please let me know if you need any additional information. Thank you! Meredith Cutchin, PE Civil Engineer Marine Corps IPT NAVFAC Midlant 757-341-0322 q I VA loe yAk,7 " CA LID Tvt��c� GY e - � i rl Hall, Christine From: Hall, Christine Sent: Monday, January 22, 2018 8:47 AM To: 'Cutchin, Meredith A CIV NAVFAC MIDLANT, IPTMC' Cc: Thomas Bradshaw; Weaver, Cameron Subject: RE: [External] RE: P-1320 BEQ Attachments: 2014 02 permit 080740.pdf Meredith, The Storm-EZ application has not been updated to meet the 2017 rules. The methodology is still good but if you do elect to you use it, you will need to be very careful the data entered, design of the project, and the SCMs will meet the 2017 rules. I have attached the permit for the Field Medical Services School. In looking at your site plan, there is additional sidewalk proposed within SW8 080740 that will connect these two projects. We don't see a lot of projects using Storm-EZ so if you plan on using it, I'll talk with others to determine the best person to review it. Christine Hali Environmental Engineer Division of Energy, Mineral and Land Resources — State 5tormwater Program Department of Environmental Quality 910 796 7215 office 910 796 7335 direct christine.hall@ncdenr.gov 127 Cardinal Drive Ext_ Wilmington, NC 28405 Email correspondence to and from this address is subject to the North Carolina Public Records Law and may be disclosed to third parties. -----Original Message ----- From: Cutchin, Meredith A CIV NAVFAC MIDLANI IPTMC Irnailto:meredith.cutchin@navy.mil] Sent: Friday, January 19, 2018 4:54 PM To: Hall, Christine <Christine.Hall@ncdenr.gov> Subject: (External] RE: P-1320 BEQ Hello Christine, I. I must have accidently had that boxed checked. I agree it is not in SA waters. 2. I am trying to meet the current rules and have been working on the Storm-EZ form to show compliance. The filter strips will be included on that form; however, the main reason for the filter strips was to meet federal UFC LID requirements. 3. The work does surround the Field Medical Services School, but I was hoping that I would not need to update this permit. I had some of the information on that permit sent over to me from the base, but would you happen to have a full copy? I think our current impacts to this permit should be very minimal if any. Sorry for not responding sooner, I was down at Camp Lejeune for the week and had limited computer use. Would you have some time next week to discuss this project further on the phone? I know that my initial scoping was with Linda, so it may be helpful to walk through some of the assumptions I have made and my goals for permitting. I also wanted to further discuss the use of Storm EZ for permitting since Thomas Bradshaw at the base mentioned he has not seen it used on any Camp Lejeune projects. Thank you! Meredith Cutchin, PE 757-341-0322 -----Original Message ----- From: Hall, Christine[mailto:Christine.Hall@ncdenr.gov] Sent: Wednesday, January 17, 2018 1:13 PM To: Cutchin, Meredith A CN NAVFAC MIDLANT, IPTMC Cc: Weaver, Cameron Subject: [Non -DOD Source] P-1320 BEQ Meredith, I'm looking at the Express request for this project and have a few questions. 1• The express request says this site is within % mi of SA waters. In trying to locate this project, it seems well outside the SA water area. Can you confirm if this project is subject to SA? 2. 1 see filter strips IDed on the site plans. Which set of rules is the BEQ trying to meet? 2017? 3. The work proposed by this project appears to impact / surround the adjacent permit for the Field Medical Services School (SW8 080740). Are you looking to modify this adjacent permit to put the improvements under one permit? Are you looking to permit those improvements separately? Thanks! Christine Hall Environmental Engineer Division of Energy, Mineral and Land Resources - State Stormwater Program Department of Environmental Quality 910 7967215 office 910 796 7335 direct christine.hall@ncdenr.gov Weaver, Cameron From: Cutchin, Meredith A CIV NAVFAC MIDLANT, IPTMC <meredith.cutchin@navy.mil> Sent: Wednesday, January 17, 2018 11:52 AM To: Weaver, Cameron Subject: RE: [External] P1320-Camp Johnson: Request for Submittal Meeting Thank you! Just a reminder for you and me from my old email, I mentioned Feb 27th at 2pm or March 1st at 11:30 am so I could attend the SCM Construction Inspection Training on February 28th on the same trip. Not sure if those dates may be possible. Meredith Cutchin, PE 757-341-0322 -----Original Message ----- From: Weaver, Cameron [mailto:cameron.weaver@ncdenr.gov] Sent: Wednesday, January 17, 2018 11:47 AM To: Cutchin, Meredith A CIV NAVFAC MIDLANT, IPTMC Subject: [Non-DoD Source] RF: [External] P1320-Camp Johnson: Request for Submittal Meeting Hi Meredith. I will be talking with Christine to get you on the schedule as soon as possible. I'll be in touch today. Cameron Cameron Weaver Environmental Assistance Coordinator -Wilmington Regional Office NCDEQ-Division of Environmental Assistance and Customer Service 127 Cardinal Drive Ext. Wilmington, NC 28405 910-796-7303 NCDEQ NEW WEBSITE: http://deq.nc.gov/ DEACS NEW WEBSITE: http://deq.nc.gov/about/divisions/environmental-assistance-customer-service E-mail correspondence to and from this address may be subject to the North Carolina Public Records Law and may be disclosed to third parties. -----Original Message ----- From: Cutchin, Meredith A CIV NAVFAC MIDLANT, IPTMC [ma ilto:meredith.cutchin@navy. mil] Sent: Tuesday, December 05, 2017 1:12 PM To: Weaver, Cameron <cameron.weaver@ncdenr.gov> Cc: Bradshaw, Thomas C CIV MARFORCOM, I&E - FWD - DESIGN <thomas.bradshaw@usmc.mN> Subject: [External] P1320-Camp Johnson: Request for Submittal Meeting CAUTfON: External email. Do not click links or open attachments unless verified. Send all suspicious email as an attachment to feport.spam@nc.gov. 41 `7 C- &I-11 �O t4Y►n" �P- 5CAT\-Vl 2