Loading...
HomeMy WebLinkAboutSW8080740_HISTORICAL FILE_20080822STORMWATER DIVISION CODING SHEET POST -CONSTRUCTION PERMITS PERMIT NO. SW8 0b 074D DOC TYPE ❑ CURRENT PERMIT ❑ APPROVED PLANS HISTORICAL FILE ❑ COMPLIANCE EVALUATION INSPECTION DOC DATE o azz YYYYM M DD o�0F war�9Q� > August 22, 2008 Carl Baker, Deputy Public Works Officer United States Marine Corps 1005 Michael Road Camp Lejeune, NC 28547 Subject: Stormwater Permit No. SW8 080740 P-828 Field Medical Services School High Density Project Onslow County Dear Mr. Baker: Michael F_ 1,astey, Governor William G Ross Jr., Secretary North Carolina Department of I nvironment and Natural Resources Coleen H_ Sullins Director Division of Water Quality The Wilmington Regional Office received a complete Stormwater Management Permit Application for P-828 Field Medical Services School on August 22, 2008. Staff review of the plans and specifications has determined that the project, as proposed, will comply with the Stormwater Regulations set forth in Title 15A NCAC 2H.1000. We are forwarding Permit No. SW8 080740 dated August 22, 2008, for the construction of the subject project. This permit shall be effective from the date of issuance until August 22, 2018, and shall be subject to the conditions and limitations as specified therein. Please pay special attention to the Operation and Maintenance requirements in this permit. Failure to establish an adequate system for operation and maintenance of the stormwater management system will result in future compliance problems. If any parts, requirements, or limitations contained in this permit are unacceptable, you have the right to request an adjudicatory hearing upon written request within thirty (30) days following receipt of this permit. This request must be in the form of a written petition, conforming to Chapter 150B of the North Carolina General Statutes, and filed with the Office of Administrative Hearings, P.O. Drawer 27447, Raleigh, NC 27611-7447. Unless such demands are made this permit shall be final and binding. If you have any questions, or need additional information concerning this matter, please contact Chris Baker, or me at (910) 796-7215. Si /3,t"/, Edward B6ck — Regional Supervisor Surface Water Protection Section ENBlcsb: S:1WQSISTORMWATERIPERMIT1080740.aug08 cc: Rob Downs, P.E., Greenhorne & O'mara Onslow County Building Inspections Chris Baker (::�Vllilmingto RegionaI-Office ; ) Central Files NotehCaiol' , Ivaiura!!y North Carolina Division of Water Quality 127 Cardinal Drive Extension Wilmington, NC 28405 Plione (910) 796-7215 Wilmington Regional Office lnternett, www.newaterquality.org Fax (910)350-2004 An Equal Opportunily/Ormative Action Employer— 50% Recycled110% Post Consumer Paper Customer Service 1-977-623-6749 State Stormwater Management Systems Permit No. SW8 080740 STATE OF NORTH CAROLINA DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES DIVISION OF WATER QUALITY STATE STORMWATER MANAGEMENT PERMIT HIGH DENSITY DEVELOPMENT In accordance with the provisions of Article 21 of Chapter 143, General Statutes of North Carolina as amended, and other applicable Laws, Rules, and Regulations PERMISSION IS HEREBY GRANTED TO Carl Baker and The United States Marine Corps P-828 Field Medical Services CO Street D, Onslow County FOR THE construction, operation and maintenance of a wet detention pond in compliance with the provisions of 15A NCAC 2H .1000 (hereafter referred to as the "stormwater rules') and the approved stormwater management plans and specifications and other supporting data as attached and on file with and approved by the Division of Water Quality and considered a part of this permit. This permit shall be effective from the date of issuance until August 22, 2018, and shall be subject to the following specified conditions and limitations: I. DESIGN STANDARDS This permit is effective only with respect to the nature and volume of stormwater described in the application and other supporting data. 2. This stormwater system has been approved for the management of stormwater runoff as described in Section 1.6 on page 3 of this permit. The stormwater control has been designed to handle the runoff from 60,622 square feet of impervious area. 3. The tract will be limited to the amount of built -upon area indicated on page 3 of this permit, and per approved plans. 4. All stormwater collection and treatment systems must be located in either dedicated common areas or recorded easements. The final plats for the project will be recorded showing all such required easements, in accordance with the approved plans. 5. The runoff from all built -upon area within the permitted drainage area of this project must be directed into the permitted stormwater control system. Page 2 of 8 State Stormwater Management Systems Permit No. SW8 080740 6. The following design criteria have been provided in the stormwater wetlands and must be maintained at design condition: a. Drainage Area, acres: 5.5 Onsite, ft : 239,581 Offsite, ft2: None b. Total Impervious Surfaces, ft2 60,622 C. Design Storm, inches: 1.5 d. Pond Depth, inches: TP shallow land 12 PP shallow water 6.24 PP deep pool (shallowest) 24 PP deep pool (deepest) 24 e. TSS removal efficiency: 85% f. Depth of topsoil above clay liner, inches NIA g. Pond Elevation, FMSL: TP shallow land (top) 15.2 PP Shallow water (top) 14.2 PP Deep Pool (top) 13.68 PP Most shallow pt of deep pool bottom 11.68 PP Deepest pt of deep pool's bottom 11.68 h. Total wetland zone areas, ft2: 15,512 i. Permitted Storage Volume, ft3: 15,512 j. Controlling Orifice: 2"0 pipe k. Number of plants in planting plan: Herbaceous (4in dia) 186 Shrubs/small trees (1 gal+) 124 Trees (1.5 inch dbh) 31 I. Receiving Stream/River Basin: Scales Creek / White Oak M. Stream Index Number: 19-16-4 n. Classification of Water Body: "SC;HQW;NSW" II. SCHEDULE OF COMPLIANCE 1. The stormwater management system shall be constructed in its entirety, vegetated and operational for its intended use prior to the construction of any built -upon surface. 2. During construction, erosion shall be kept to a minimum and any eroded areas of the system will be repaired immediately. Page 3 of 8 State Stormwater Management Systems Permit No. SW8 080740 3. The permittee shall at all time provide the operation and maintenance necessary to assure the permitted stormwater system functions at optimum efficiency. The approved Operation and Maintenance Plan must be followed in its entirety and maintenance must occur at the scheduled intervals including, but not limited to: a. Semiannual scheduled inspections (every 6 months). b. Sediment removal. C. Mowing and re -vegetation of slopes and the vegetated filter. d. Immediate repair of eroded areas. e. Maintenance of all slopes in accordance with approved plans and specifications. f. Debris removal and unclogging of outlet structure, orifice device, flow spreader, catch basins and piping. g. Access to the outlet structure must be available at all times. 4. Records of maintenance activities must be kept and made available upon request to authorized personnel of DWQ. The records will indicate the date, activity, name of person performing the work and what actions were taken. 5. The facilities shall be constructed as shown on the approved plans. This permit shall become void unless the facilities are constructed in accordance with the conditions of this permit, the approved plans and specifications, and other supporting data. 6. Upon completion of construction, prior to issuance of a Certificate of Occupancy, and prior to operation of this permitted facility, a certification must be received from an appropriate designer for the system installed certifying that the permitted facility has been installed in accordance with this permit, the approved plans and specifications, and other supporting documentation. Any deviations from the approved plans and specifications must be noted on the Certification. A modification may be required for those deviations. 7. If the stormwater system was used as an Erosion Control device, it must be restored to design condition prior to operation as a stormwater treatment device, and prior to occupancy of the facility. 8. Access to the stormwater facilities shall be maintained via appropriate easements at all times. 9. The permittee shall submit to the Director and shall have received approval for revised plans, specifications, and calculations prior to construction, for any modification to the approved plans, including, but not limited to, those listed below: a. Any revision to any item shown on the approved plans, including the stormwater management measures, built -upon area, details, etc. b. Project name change. C. Transfer of ownership. d. Redesign or addition to the approved amount of built -upon area or to the drainage area. e. Further subdivision, acquisition, lease or sale of all or part of the project area. The project area is defined as all property owned by the permittee, for which Sedimentation and Erosion Control Plan approval or a CAMA Major permit was sought. f. Filling in, altering, or piping of any vegetative conveyance shown on the approved plan. Page 4 of 8 State Stormwater Management Systems Permit No. SW8 080740 10. The permittee shall submit final site layout and grading plans for any permitted future areas shown on the approved plans, prior to construction. 11. A copy of the approved plans and specifications shall be maintained on file by the Permittee for a minimum of ten years from the date of the completion of construction. 12. The Director may notify the permittee when the permitted site does not meet one or more of the minimum requirements of the permit. Within the time frame specified in the notice, the permittee shall submit a written time schedule to the Director for modifying the site to meet minimum requirements. The permittee shall provide copies of revised plans and certification in writing to the Director that the changes have been made. III. GENERAL CONDITIONS This permit is not transferable except after notice to and approval by the Director. In the event of a change of ownership, or a name change, the permittee must submit a formal permit transfer request to the Division of Water Quality, accompanied by a completed name/ownership change form, documentation from the parties involved, and other supporting materials as may be appropriate. The approval of this request will be considered on its merits and may or may not be approved. The permittee is responsible for compliance with all permit conditions until such time as the Division approves the transfer request. 2. Failure to abide by the conditions and limitations contained in this permit may subject the Permittee to enforcement action by the Division of Water Quality, in accordance with North Carolina General Statute 143-215.6A to 143-215.6C. 3. The issuance of this permit does not preclude the Permittee from complying with any and all statutes, rules, regulations, or ordinances, which may be imposed by other government agencies (local, state, and federal) having jurisdiction. 4. In the event that the facilities fail to perform satisfactorily, including the creation of nuisance conditions, the Permittee shall take immediate corrective action, including those as may be required by this Division, such as the construction of additional or replacement stormwater management systems. 5. The permittee grants DENR Staff permission to enter the property during normal business hours for the purpose of inspecting all components of the permitted stormwater management facility. 6. The permit may be modified, revoked and reissued or terminated for cause. The filing of a request for a permit modification, revocation and re -issuance or termination does not stay any permit condition. 7. Unless specified elsewhere, permanent seeding requirements for the stormwater control must follow the guidelines established in the North Carolina Erosion and Sediment Control Planning and Design Manual. 8. Approved plans and specifications for this project are incorporated by reference and are enforceable parts of the permit. Page 5 of 8 State Stormwater Management Systems Permit No. SW8 080740 9. The permittee shall notify the Division any name, ownership or mailing address changes within 30 days. Permit issued this the 22nd day of August, 2008. NORTH CAROLINA ENVIRONMENTAL MANAGEMENT COMMISSION for Voieen h. auiiins, uirector Division of Water Quality By Authority of the Environmental Management Commission Page 6 of 8 State Stormwater Management Systems Permit No. SW8 080740 P-828 Field Medical Services School Stormwater Permit No. SW8 080740 Onslow County Designer's Certification I, , as a duly registered in the State of North Carolina, having been authorized to observe (periodically/ weekly/ full time) the construction of the project, (Project) for (Project Owner) hereby state that, to the best of my abilities, due care and diligence was used in the observation of the project construction such that the construction was observed to be built within substantial compliance and intent of the approved plans and specifications. The checklist of items on page 2 of this form is included in the Certification. Noted deviations from approved plans and specification: Signature Registration Number Date SEAL Page 7 of 8 State Stormwater Management Systems Permit No. SW8 080740 Certification Requirements.- 1 The drainage area to the system contains approximately the permitted acreage. 2. The drainage area to the system contains no more than the permitted amount of built -upon area. 3. All the built -upon area associated with the project is graded such that the runoff drains to the system. 4. All roof drains are located such that the runoff is directed into the system. 5. The outlet/bypass structure elevations are per the approved plan. 6. The outlet structure is located per the approved plans. 7. Trash rack is provided on the outlet/bypass structure. 8. All slopes are grassed with permanent vegetation. 9. Vegetated slopes are no steeper than 3,1. 10. The inlets are located per the approved plans and do not cause short- circuiting of the system. 11. The permitted amounts of surface area and/or volume have been provided. 12. Required drawdown devices are correctly sized per the approved plans. 13. All required design depths are provided. 14. All required parts of the system are provided, such as a vegetated shelf, and a forebay. .15. The required system dimensions are provided per the approved plans. cc: NCDENR-DWQ Regional Office Onslow County Building Inspections Page 8 of 8 USE ONLY Date Received Fee Paid Permit Number csv. /to S S�.s State of North Carolina Department of Environment and Natural Resources Division of Water Quality STORMWATER MANAGEMENT PERMIT APPLICATION FORM This farm inay be photocopied for use as an original I. GENERAL INFORMATION 1. Applicants name (specify the name of the corporation, individual, etc. who owns the project): United States Marine Corps 2. Print Owner/Signing Official's name and tit]e (person Iegally responsible for facility and compliance): Carl Baker, PE., Deputy Public Works Officer 3. Mailing Address for person listed in item 2 above: 1005 Midiael City:Camp_L*11D9 State:NC Zip:28547 Phone: (910 ) „451-2213 Fax: (910 _ ) 451-2927 ^ Email:carl.h.baker®usmc.mil 4. Project Name (subdivision, facility, or establishment name -should be consistent with project name on plans, specifications, letters, operation and maintenance agreements, etc.): P-828 Field Medical Services School 5. Location of Project (street address): intersection of CO St F. CO St D and CO St D and CO St E. City: am Lejeun County:Onslow _ _ Zip:28547 _ b. Directions to project (from nearest major intersection): Turn right on Montford Landing Rd off HWX 24 N, turn left on Harlem Dr, turn right pr} CO St. D 7. I.atitude:34° 44' 04.37" N Longitude:777 24'_03,02" W of project 8. Contact person who can answer questions about the project: Narne:&b Downs. PE - Greenhorne & O'mara Telephone Number: (l 5 2-2315 Emafl:rd-owns@g--and-o.com H. PERMIT INFORMATION: 1. Specify whether project is (check one): ®New ❑Renewal ❑Modification 2. If this application is being submitted as the result of a renewal or modification to an existing permit, list the existing permit number and its issue date (if known) 3. Specify the type of project (check one): []Low Density ®High Density ❑Redevelop ❑General Permit [-]Universal SNP []Other 4. Additional Project requirements (check applicable blanks; information on required state permits can be E C E I V E :'ar=-iLNWU_jf)i Page 1 oF4 AUG 11 !; 2008 DWQ obtained by contacting the Customer Service Center at 1-877-623-6748): ❑CAMA Major NSedimentation/Erosion Control ❑404/401 Permit ❑NPDES Stormwater III. PROJECT INFORMATION 1. In the space provided below, summarize how stormwater will be treated. Also attach a detailed narrative (one to two pages) describing stormwater management for the project. Stormwater will be treated through constructed wetlands. Runoff will flow to wetland via sheetflow and grassed swales. Building�runoff will directly discharge into wetland deep pools (foreba� s1_through_underground piper 2. Stormwater runoff from this project drains to the White Oak River basin. 3. Total Property Area: 5. acres 4. Total Wetlands Area: 0 acres 5. 100' Wide Strip of Wetland Area: n/a acres (not applicable if no wetlands exist on site) 6. Total Project Area**:4.78 acres 7. Project Built Upon Area:25 8. How many drainage areas does the project have?1 9. Complete the following information for each drainage area. If there are more than two drainage areas in the project, attach an additional sheet with the information for each area rovided in the same format as below. For high density projects, complete the table with one drainage area for each engineered Stormwater device. Basin Information Drainage Area I Dra_t`nTag­eX_r_e_a eceiving Stream Name Scales Creek Cream Class & Index No. ;H ;N -1 -4 Total Drainage Area (so 239580.96 On -site Drainage Area (som 239580.96 -site Orainage Area s Existing Impervious* Area (so 64583.5 Proposed Impervious*Area (sf) 60622.0 `% Impervious* Area (total) 25 Impervious* Surface Area Drainage Area 1 Drainage Area On -site Buildings (so --site 27652 On Streets(so 0 On -site Parking (so 23385.9 On -site Sidewalks (so 7580.4 Other on -site (so 2003.7 Off-site(so 0 TotaFTsJGF Impervious area is defined as the built upon area including, but not limited to, buildings, roads, parking areas, sidewalks, gravel areas, etc. *"Total project area shall be calculated based on the current policy regarding inclusion of wetlands in the built upon area percentage calculation. This is the area used to calculate percent project built upon area (BUA). 10. How was the off -site impervious area listed above derived IV. DEED RESTRICTIONS AND PROTECTIVE COVENANTS One of the following deed restrictions and protective covenants are required to b eM �ksions, outparceIs and future development prior to the sale of any lot. If iot sizes vary s ii iC�,le fisting each lot Al16 I 1 2008 Form S W U-101 Version 03.27.08 Page 2 of 4 BY: number, size and the allowable built -upon area for each lot must be provided as an attachment. Forms can be downloaded from http:/Ih2o.enr.state.nc,us(sulbmp forms.htm - deed. restrictions, Form DRPC-1 High Density Commercial Subdivisions Form DRPC-2 High Density Developments with Outparcels Form DRPC-3 High Density Residential Subdivisions Form DRPC-4 Low Density Commercial Subdivisions Form DRPC-5 Low Density Residential Subdivisions Form DRPC-6 Low Density Residential Subdivisions with Curb Outlets By your signature below, you certify that the recorded deed restrictions and protective covenants for this project shall include all the applicable items required in the above form, that the covenants wilt be binding on all parties and persons claiming under them, that they will run with the land, that the required covenants cannot be changed or deleted without concurrence from the State, and that they will be recorded prior to the sale of any lot. V. SUPPLEMENT FORMS The applicable state stormwater management permit supplement form(s) listed below must be submitted for each BMP specified for this project. Contact the Stormwater and General Permits Unit at (919) 733-5083 for the status and availability of these forms. Forms can be downloaded from http:(fli2o.enr.state.nc.us/su/bmp forms.htm. Form SW401-Low Density Form SW401-Curb Outlet System Form SW401-Off-Site System Form SW401-Wet Detention Basin Form SW401-Infiltration Basin Form SW401-Infiltration Trench Form SW401-Bioretention Cell Form SW401-Level Spreader Form SW401-Wetland Form SW401-Grassed Swale Form SW401-Sand Filter Form SW401-Permeable Pavement Low Density Supplement Curb Outlet System Supplement Off -Site System Supplement Wet Detention Basin Supplement Infiltration Basin Supplement Underground Infiltration Trench Supplement Bioretention Cell Supplement Level Spreader/Filter Strip/Restored Riparian Buffer Supplement Constructed Wetland Supplement Grassed Swale Supplement Sand Filter Supplement Permeable Pavement Supplement Form SWU-101 Version 03.27.08 Page 3 of 4 R E C E! V E DWQ PF10J # VI. SUBMITTAL REQUIREMENTS Only complete application packages will be accepted and reviewed by the Division of Water Quality (DWQ). A complete package includes all of the items listed below. The complete application package should be submitted to the appropriate DWQ Office. (Appropriate office may be found by locating project on the interactive online map at http://h2o.enr.state.nc.us/stUmsi maps.htm) Please indicate that you have provided the following required information by initialing in the space provided next to each item. nitiak • Original and one copy of the Stormwater Management Permit Application Form • Original and one copy of the Deed Restrictions & Protective Covenants Form (if ti required as per Part IV above) • Original of the applicable Supplement For n(s)and0&M agreement(s) for each BMP 6✓7 • Permit application processing fee of $505 (Express: $4,000 for HD, $2,000 for LD) payable to NCDENR • Calculations & detailed narrative description of stormwater treatment/management • Copy of any applicable soils reportp • Two copies of plans and specifications (sealed, signed & dated), including: - Development/Project name - Engineer and firm -Legend - North arrow - Scale - Revision number & date - Mean high water line - Dimensioned propperty/project boundary - Location map with named streets or NCSR numbers - Original contours, proposed contours, spot elevations, finished floor elevations - Details of roads, drainage features, collection systems, and stormwater control measures - Wetlands delineated, or a note on plans that none exist - Existing drainage (including off -site), drainage easements, pipe sizes, runoff calculations - Drainage areas delineated - Vegetated buffers (where required) VII. AGENT AUTHORIZATION If you wish to designate authority to another individual or firm so that they may provide information on your behalf, please complete this section. (ex. designing engineer or firm) Designated agent (individual or firm): 61rseY.4►o,rv►e. + Mailing Address: 15S(a5- Lc�%*eeV;e") fir, S+c. (07 City: '�-alei3k State: tJC- Zip: Z�:F(ao(o Phone: (_ R 9_ _ _) S 3Z - 2 3 I S Fax: i 919 ) 86-f -83g3 Email: R�Ow taSCa?—aMa-O. ccnn VIII. APPLICANT'S CERTIFICATION I, (print or type name of person listed in General Information, item 2) certify that the information included on this permit application form is, to the best of my knowledge, correct and that the project will k e Constructed it},conformance with the approved plans, that the required deed restrictions and protective caSits will be�r/e'c,�rde , and that the proposed project complies with the requirements of 15A NCAC 2H .1000ovvRfi/n ) Signature: Form SWU-101 Version 03.27.08 Page 4 of Date: J I' _0/ R���V� A 2 �ti& PRD,1'v UWQ Permit Number s 1 q 1 (to be provided by DWQ) r�q� W A T�9Q ARA 7 —! NCDENR STORMWATER MANAGEMENT PERMIT APPLICATION FORM 401 CERTIFICATION APPLICATION FORM WETLAND SUPPLEMENT This form must be filled out, printed and submitted. The Required Items Checklist (Part Ill) must be printed, filled out and submitted along with ail the required information. I. -.PROJECT -INFORMATION, " Project name P-828 Field Medical Services School Contact name Carl Baker, PE, Deputy Public Works Officer Phone number 91OA5172213 Date July 29, 2008 Drainage area number 1 II. DESIGN INFORMATION- �: ... �:.- J'. 'c : , 3. ,. Site Characteristics Drainage area 239,581.00 ft2 Impervious area 60,622.00 ft2 Percent impervious 25.3% % Design rainfall depth 1.50 inch Peak Flow Calculations 1-yr, 24-hrrunoff depth in 1-yr, 24-hr intensity inlhr Pre -development 1-yr, 24-hr runoff ft3lsec Post -development 1-yr, 24-hr runoff 01sec Pre/Post 1-yr, 24-hr peak control ft3lsec Storage Volume: Non -SR Waters Design volume (temporary pool volume) 15,512.00 ft3 OK Depth of temporary poollponding depth (0 Plants) 12.00 in OK Drawdown time 2.37 days OK Diameter of orifice 2.00 in Drawdown orifice diameter may be insufficient. Please provide adequate supporting calculations. Coefficient of discharge (C a) used in orifice diameter 0.60 (unitless) calculation Driving head (Ho) used in the orifice diameter calculation 1.00 ft OK Storage Volume: SR Waters Parameters 1-yr, 24-hr depth 0.00 in Pre -development 1-yr, 24-hr runoff 0.00 ft3 Post -development 1-yr, 24-hr runoff 0.00 ft3 Minimum volume required 0.00 ft3 Volume provided 0.00 ft3 OK � E C E I V En A•.;oj 11 ''1 8 DWQ PROD 4 Form SW401-Wetland-Rev.2 Parts I and 11. Project Design Summary, Page 1 of 4 Permit Number5—W—WrV 7y,� (to be provided by DWQ) Surface Areas of Wetland Zones Surface Area of Entire Wetland Shallow Land The shallow land percentage is: Shallow Water The shallow water percentage is: Deep Pool Forebay portion of deep pool (pretreatment) The forebay surface area percentage is: Non-forebay portion of deep pool The non-forebay deep pool surface area percentage is: Total of wetland zone areas Add or subtract the following area from the zones Topographic Zone Elevations Temporary Pool Shallow Land (top) Permanent Pool Shallow Water (top) Deep Pool (top) Most shallow paint of deep pool's bottom Deepest point of deep pool's bottom Design must meet one of the following two options: This design meets Option #1, Deer) pool is Cinches below SLWT, If ves: SLWT (Seasonally Low Water Table) This design meets Option #2, Has a clay liner If ves: Depth of topsoil above clay liner Topographic Zone Depths Temporary Pool Shallow Land Permanent Pool Shallow Water Deep Pool (shallowest) Deep Pool (deepest) Planting Plan Are cattails included in the planting plan? Number of Plants in planting plan recommended: Herbacious Winch diameter) Shrubslsmall trees (1 gallon or larger) Trees (1.5" dbh) Number of Plants in planting plan provided (several species of each plant type are recommended): Herbacious (4inch diameter) Shrubs/small trees (1 gallon or larger) Trees (2.5" dbh) 15,512.00 ft2 6,200.00 ft2 0.40 % 6,200,00 ft2 0.40 % 1,552.00 ft2 0.10 % 1,560.00 ft2 0.10 % 15,512.00 ft2 0.00 tt2 OK OK OK OK Insufficient non-forebay deep pool area. Al IN 15.20 fmsl 14.20 fmsl 13.68 fmsl 11.68 fmsl 11.68 fmsl y (Y or N) 12.18 fmsl OK no in 12.00 in 6.24 in 24.00 in 24.00 in n (Y of N) 468 312 78 186 124 a OK Insufficient shallow water depth. OK OK M Higher density is recommended. Higher density is recommended. Higher density is recommended. D E C E I V E- 'D Form SW401-Wetland-Rev.2 PROD # DWp Parts I and II. Project Design Summary, Page 2 of 4 Permit Number,(� vim] qo (to be provided by D WQ) Additional Information Can the design volume be contained? y (Y or N) OK Does volume in excess of the design volume flow evenly y (Y or N) OK distributed through a vegetated filter? What is the length of the vegetated filter? 300.00 ft Are calculations for supporting the design volume provided in the y (Y or N) OK application? Is BMP sized to handle all runoff from ultimate build -out? y (Y or N) OK Is the BMP located in a recorded drainage easement with a n1a (Y or N) Insufficient ROW location, recorded access easement to a public Right of Way (ROW)? The length to width ratio is: 3.08 :1 OK Approximate wetland length 262.00 ft Approximate wetland width 85.00 ft Approximate surface area using length and width provided 22,270.00 ftz This approx. surface area is within this number of square feet of the entire wetland surface area reported above: Will the wetland be stabilized within 14 days of construction? y (Y or N) OK Form SW401-Wetland-Rev.2 Parts I and II. Project Design Summary, Page 3 of 4 Permit (to be provided by 0 WQ) III:�; t•, REQUIREDiITEMS CHECKLIST *., �. • ° e.., .� .� k �,.. gym ' > fit... e: t #' �� ,k i � � ::._ Please indicate the page or plan sheet numbers where the supporting documentation can be found. An incomplete submittal package will result in a request for additional information. This will delay final review and approval of the project. Initial in the space provided to indicate the following design requirements have been met. If the applicant has designated an agent, the agent may initial below. If a requirement has not been met, attach justification. Initials Page! Plan Sheet No. C-101-C-105 1. Plans (V - 50' or larger) of the entire site showing: Design at ultimate build -out, Off -site drainage (if applicable), Delineated drainage basins (include Rational C coefficient per basin), Wetland dimensions (and length to width ratio), Pretreatment system, Maintenance access, Proposed drainage easement and public right of way (ROW), Overflow device, and Boundaries of drainage easement. C-501-C-507 2. Plan details (1" = 50' or larger) for the wetland showing: Wetland dimensions (and length to width ratio) - Pretreatment system, Maintenance access, Proposed drainage easement and public right of way (ROW), Design at ultimate build -out, Off -site drainage (if applicable), Overflow device, and - Boundaries of drainage easement. C-506 3. Section view of the wetland 0" = 20' or larger) showing: - Side slopes, 3:1 or lower - Wetland layers All wetlands: Shallow land depth, shallow water depth, deep pool depth Option 1, no clay liner: SLWT depth Option 2, clay liner: Depth of topsoil on top of liner, liner specifications C-104 4. A detailed planting plan (V = 20' or larger) prepared by a qualified individual showing: A variety of suitable species (not including cattails), Sizes, spacing and locations of plantings, Total quantity of each type of plant specified, A planting detail, The source nursery for the plants, and Fertilizer and watering requirements to establish vegetation. C-503 5. A construction sequence that shows how the wetland will be protected from sediment until the entire drainage area is stabilized. ood 6. The supporting calculations (including drawdown calculations). TIM 7. A copy of the signed and notarized operation and maintenance (0&M) agreement. 1 f i � 8. A copy of the deed restrictions (if required). JY8# 9. A soils report that is based upon an actual field investigation, soil borings, and infiltration tests. County soil maps are not an acceptable source of soils information. 5W401-Wetland-Rev.2 Part III, page 1 of 1 I Permit Number. 6u-) ? (to be provided by DWQ) Drainage Area Number: Stormwater Wetland Operation and Maintenance Agreement I will keep a maintenance record on this BMP. This maintenance record will be kept in a log in a known set location. Any deficient BMP elements noted in the inspection will be corrected, repaired or replaced immediately. These deficiencies can affect the integrity of structures, safety of the public, and the removal efficiency of the BMP. Important maintenance procedures: Immediately after the stormwater wetland is established, the wetland plants will be watered twice weekly if needed until the plants become established (commonly six weeks). No portion of the Stormwater wetland will be fertilized after the first initial fertilization that is required to establish the wetland plants. Stable groundcover will be maintained in the drainage area to reduce the sediment load to the wet detention basin. — Once a year, a dam safety expert will inspect the embankment. After the wet detention pond is established, I will inspect it once a month and within 24 hours after every storm event greater than 1.0 inches (or 1.5 inches if in a Coastal County). Records of operation and maintenance will be kept in a known set location and will be available upon request. Inspection activities shall be performed as follows. Any problems that are found shall be repaired immediately. BIAP element: Potentialproblem: How 1 will remediate the problem - The entire BMP Trash debris is present. Remove the trash debris. The perimeter of the Areas of bare soil and/or Regrade the soil if necessary to wetland erosive gullies have formed. remove the gully, and. then plant a ground cover and water until it is established. Provide lime and a one-time Fertilizer application. Vegetation is too short or too Maintain vegetation at a height of long. approximatel six inches. The inlet device: pipe or The pipe is clogged (if Unclog the pipe. Dispose of the swale applicable). sediment off -site. The pipe is cracked or Replace the pipe. otherwise damaged (if applicable). Erosion is occurring in the Regrade the swale if necessary to swale (if applicable), smooth it over and provide erosion control devices such as reinforced turf matting or riprap to avoid future 2roblems with erosion. Page 1 Or BMP element: The forebay The deep pool, shallow water and shallow land areas Potential problem: Sediment has accumulated in the forebay to a depth that inhibits the forebay from functioning well. Erosion has occurred Weeds are present. Algal growth covers over 50% of the deep pool and shallow water areas. Cattails, phragmites or other invasive plants cover 50% of the deep pool and shallow water areas. Shallow land remains flooded more than 5 days after a storm event. Plants are dead, diseased or dying. Best professional practices show that pruning is needed to maintain optimal plant health. Sediment has accumulated and reduced the depth to 75% of the original design depth of the deep pools. How I will remediate the problem: Search for the source of the sediment and remedy the problem if possible. Remove the sediment and dispose of it in a location where it will not cause impacts to streams or the BMP. Provide additional erosion protection such as reinforced turf matting or riprap if needed to prevent future erosion problems. Remove the weeds, preferably by hand. If a pesticide is used, wipe it on the plants rather than spraying. Consult a professional to remove and control the algal growth. Remove the plants by wiping them with pesticide (do not spray) - consult a professional. Unclog the outlet device immediately. Determine the source of the problem: soils, hydrology, disease, etc. Remedy the problem and replace plants. Provide a one-time fertilizer application to establish the ground cover if a soil test indicates it is necessary. _ Prune according to best professional practices. Search for the source of the sediment and remedy the problem if possible. Remove the sediment and dispose of it in a location where it will not cause impacts to streams or the BMP. DECEIVE D DWO PROJ # Form SW401-Wetland O&M-Rev.3 Page 2 of 4 BMP element: Potentialproblem: How I will remediate theproblem: The embankment A tree has started to grow on Consult a dam safety specialist to the embankment. remove the tree. An annual inspection by an Make all needed repairs. appropriate professional shows that the embankment needs repair, Evidence of muskrat or Use traps to remove muskrats and beaver activity is present. consult a professional to remove beavers. The micropool Sediment has accumulated Search for the source of the and reduced the depth to 75% sediment and remedy the problem if of the original design depth, possible. Remove the sediment and dispose of it in a location where it will not cause impacts to streams or the BMP. Plants are growing in the Remove the plants, preferably by micropool. hand. If a pesticide is used, wipe it on the plants rather than spraying. The outlet device Clogging has occurred. Clean out the outlet device. Dispose of the sediment off -site. The outlet device is damaged Repair or replace the outlet device. The receiving water Erosion or other signs of Contact the NC Division of Water damage have occurred at the Quality 401 Oversight Unit at 919- ou tlet. 733-1786. Form SW401-Wetland O&M-Rev.3 Page 3 of 4 Permit Number:6UJ � 0 �(')-7 YD (to be provided by DWQ) acknowledge and agree by my signature below that I am responsible for the performance of the maintenance procedures listed above. i agree to notify DWQ of any problems with the system or prior to any changes to the system or responsible party_ Project name:P-828 Field Medical Services School BMP drainage area number: I area - 5.5 acres Print name:Carl Baker, PE Title:Deputy Public Works Officer Address:1005 Michael Rd Camp Lejeune, NC 28547 Phone Signa Date: Note: The legally responsible party should not be a homeotivners association unless more than 50% of the lots have been sold and a resident of the subdivision has been named the president. a Notary Public for the State of County of �i�J/� , do hereby certify that personally appeared before me this day of `� ,�ir1U� , and acknowledge the due execution of the forgoing stormwater wetland maintenance requirements. Witness my hand and official seal, , AIIC[ A OONMij - NOWV PWIC OrdOw County 8fafa of "Wh com"M Comml IOn a 00123, 2010 SEAL My commission expires Olz Oc/c4/d ® C E R ' E EO AUG � 1 2098 PRO.t # DWO Form SW40 I -Wetland O&M-Rev.3 Page 4 of 4 cowu;p*icw ExbR$a Oct 53' S�jG ZiWA at pis+ CCtowo OUW1 CORUAA VTIC! v VOKKElli Permit Flame: S W 0 6 �J-NO (to he pro14ded by D4VQ) Drainage Area Number: Grassed Swale Operation and Maintenance Agreement I will keep a maintenance record on this BMP. This maintenance record will be kept in a log in a known set location. Any deficient BMP elements noted in the inspection will be corrected, repaired or replaced immediately. These deficiencies can affect the integrity of structures, safety of the public, and the removal efficiency of the BMP. Important maintenance procedures: The drainage area of the grassed swale will be carefully managed to reduce the sediment load to the grassed Swale. After the first-time fertilization to establish the grass in the swale, fertilizer will not be applied to the grassed swale. The grassed swale will be inspected once a quarter. Records of operation and maintenance will be kept in a known set location and will be available upon request. Inspection activities shall be performed as follows. Any problems that are found shall be repaired immediately. BMP element: Potentialproblem: How I will remediate theproblem: The entire length of the Trash/debris is present. Remove the trash/debris. swale Areas of bare soil and/or Regrade the soil if necessary to erosive gullies have formed. remove the gully, and then re -sod (or plant with other appropriate species) and water until established. Provide lime and a one-time fertilizer application. Sediment covers the grass at Remove sediment and dispose in an the bottom of the swale. area that will not impact streams or BMPs. Re -sod if necessary. Vegetation is too short or too Maintain vegetation at a height of lon six inches. The receiving water Erosion or other signs of -approximately Contact the NC Division of Water damage have occurred at the Quality 401 Oversight Unit at 919- outlet. 733-1786. �E C E I V ED AU'3 1 1 ;� DW Q PFiOJ # Form SW40 I -Grassed Swale O&Ni-Rev.3 Page 1 of 2 Permit Number:�6 t +.3'R a.2 U `q 0 (to be provided by MYQ) I acknowledge and agree by my signature below that I am responsible for the performance of the maintenance procedures listed above. I agree to notify DWQ of any problems with the system or prior to any changes to the system or responsible party. Project name:P-828 Field Medical Services School BMP drainage area number: l Print name:Carl Baker, PE Title:Deputy__Public _Works Officer _ Address:1005 Michael Road Date:��� �[� Note: The legally responsible party should not be a homeowners association unless more than 50% of the lots have been sold and a resident of the subdivision has been named the president. I, 0 4 � L�� , a Notary Public for the State of �UF`�� ! 1l G� , County of �� I,J , do hereby certify that t- personally appeared before me this 1 day of us , aDoB , and acknowledge the due execution of the forgoing grassed swale maintenance requirements. Witness my hand and official seal, AUCE A WNN>ETfE Notary Pud1t OnNow County $"to of North camuno "M18"on Expires Oct 23, 2010 SEAL My commission expires - ,gyp/U Form SW401-Grassed Swale O&M-Rev.3 Page 2 of 2 0 0 ''1 Permit Number SW8080740 Central Files: APS SWP 08/22/08 Permit Tracking Slip Program Category Status Project Type State SW Active New Project Permit Type Version Permit Classification State Stormwater 1.00 Individual Primary Reviewer chris.baker Permitted Flow Facilit Permit Contact Affiliation Facility Name Major/Minor Region P 828 Field Medical Services School Minor Wilmington Location Address County Co St F Co St D And Co St D And Co St E Onslow Camp Lejeune NC 28547 Facility Contact Affiliation Owner Name Commanding Officer US Marine Corps - Camp Lejeune Scheduled Orig Issue App Received Draft Initiated Issuance 08/22/08 08/11/08 Owner Type Government - Federal Owner Affiliation Carl Baker, Dir Psc Box 20004 Camp Lejeune NC 285420004 Public Notice Issue Effective Expiration 08/22/08 08/22/08 08/22/18 Regulated Activities Requested/Received Events State Stormwater - HD - Wetlands Deed restriction requested Deed restriction received Additional information received Additional information requested 08/15/08 Outfall NULL Waterbody Name Stream Index Number Current Class Subbasin P. TRANSACTION REPORT AUG-25-2008 MON 09.38 AM FOR: NCDENR 910 350 2004 SEND �c DATE START RECEIVER TX TIME PAGES TYPE NOTE M# DP � >X AUG-25 09:33.AM 919198518393 4147" 9 FAX TX OK 056 TOTAL 4M 47S PAGES; 9 State of North Carolina Department of Environment and Natural Resources 'Wilmington Regional office Michael F. Easley, Governor William G. Ross., Jr., Secretary FAX COVER SIEiEET Date: , � — To: - i NorA-�N � Co: Fax: Re: Hard ca to follnw No. Pages (exel. cover): Express Permitting From: Sandra Exam Phone: a of 796-7255_ Fax; (910) 350-2004 127 Cardinal Drive Extension, Wilmington, NC 284-05 • (910) 796-7215 • An Equal opporwility Affirmative Action Employer !M., IsGREENHORNE & OWARA CONSULTING ENGINH.R5 Letter of Transmittal Greenhorne & O'Mara, Inc. 5565 CENTERVIEW DRIVE, SUITE 107, RALEIGH, NC 27606 NCDENR - Division of Water Quality DATE: 8/21/08 127 Cardinal Dr Extension RE: Proj. No. SW8 080740 Wilmington, NC 28405 PHONE NO: 919-532-2315 Attn: Chris Baker JOB N0: 140560 WE ARE SENDING YOU THE FOLLOWING ITEMS: ATTACHED UNDER SEPARATE COVER CALCULATIONS SPECIFICATIONS X BLUEPRINTS COST ESTIMATE CD COPY OF LETTER MYLARS/SEPIAS VIA: REGULAR MAIL �X OVERNIGHT MAIL F7BY HAND 0 PICKUP F—] MESSENGER COPIES I DATE or NO. I DESCRIPTION 2 1 Revised Sheet C-506 per comments received on 8/15/08 THESE ARE TRANSMITTED AS CHECKED BELOW: X FOR APPROVAL AS APPROVED BY: X FOR REVIEW AS SUBMITTED FOR APPROVAL TO: X FOR YOUR USE FOR YOUR RECORDS AS REQUESTED BY: PLEASE RETURN TO US AFTER USING CC: SIGNED: ANNAPOLIS, MD ATLANTA, GA BALTIMORE, MD BRADENTON, FL BONIFAY, FL FAIRMONT, WV FREDERICKSBURG, VA CHANTILLY, VA GERMANTON, MD JACKSONVILLE, FL LAUREL, MD PANAMA CITY, FL RALEIGH, NC RICHMOND, VA, WEST PALM BEACH, FL TALLAHASSEE, FL CLEARWATER, FL APPENDIX 13.46 lb = 95.77 lb Table A-1 Approximate conversion factors English Gravitational System International System to Parameter to International System English Gravitational System Length Mass Fora Time Specific (or unit) weight Mass density_ Specific gravity Dynamic viscosity Kinematic viscosity Vapor pressure Surface tension Fluid pressure 1 In = 0.0254 m I it = 0.3048 m 1 slut = 14.59 ks 1 lb = 4.448 N Is= Is I lb/ft' = 157.1 N/m' I sh4/ft' = 515.2 kg/m' Same dimensionless value in both systems 1 lb-s/ft' = 47.88 N-s/m' 1 W/s = 0.09290 m'/s 1 Ib/ft' = 47.88 Ps (N/m') 1 ib/ft = 14.59 N/m I Ib/ft' = 47.88 Pa (N/m3) 1 Ib/iu= = ti.895 kPa (kN/m') ) m = 39.37 is Irn=3.281f1 1 kg = 0.06854 slut 1 N = 0.22481b 1s=1s t N/m' = 0.006366 lb/fd 1 kg/in' = 0.001941 shtp/ft' Same dimensionless value in both systems I N-a/m' = 0.02089 lb-s/f ' 1 m'/s = 10.76 ft'/s 1 Ps (N/m2) = 0.02089 lb/ftt I N/m = 0.06853 Ib/ft 1 Pa ftrn') = 0.020891b/ft' 1 kPaON/m=) = 0.1450lb/in= 401 Michael F. Easley, Governor William G. Ross Jr., Secretary North Carolina Department of Environment and Nalural Resources Coleen 11. Sullins Director Division of Water Quality August 15, 2008 Carl Baker, Deputy Public Works.Officer United States Marine Corps 1005 Michael Road Camp Lejeune, NC 28547 Subject: Request for Additional Information Stormwater Project No. SW8 080740 P-828 Field Medical Services School Onslow County Dear Mr. Baker: The Wilmington Regional Office received a State Stormwater Management Permit Application on August 11, 2008. A preliminary review of that information has determined that the application is not complete. The following information is needed to continue the stormwater review: Please correct the wetlands detail C-506. The bottom of the deep pool elevation and the shallow water elevation are both shown to be 4.17m. 2. Please graphically depict the outlet orifice to be at the permanent pool elevation on the same detail. Please note that this request for additional information is in response to a preliminary review. The requested information should be received in this Office prior to August 22, 2008, or the application will be returned as incomplete. The return of a project will necessitate resubmittal of all required items, including the application fee. If you need additional time to submit the information, please mail, email or fax your request for a time extension to the Division at the address and fax number at the bottom of this letter. The request must indicate the date by which you expect to submit the required information. The construction of any impervious surfaces, other than a construction entrance under an approved Sedimentation Erosion Control Plan, is a violation of NCGS 143-215.1 and is subject to enforcement action pursuant to NCGS 143-215.6A. Please reference the State assigned project number on all correspondence. Any original documents that need to be revised have been sent to the engineer or agent. All original documents must be returned or new originals must be provided. Copies are not acceptable. If you have any questions. concerning this matter please feel free to call me at (910) 796-7215 or email me at chris. baker@ncmail. net. Sincerely, Chris Baker Environmental Engineer 11 ENB/csb: S:IWQSISTORMWATERIADDINFO120081080740.aug0$ ne CC: Rob Downs, P.E., Greenhorne & O'mara N.r�i zthCarohna Chris Baker dvalurally North Carolina Division of Water Quality 127 Cardinal Drive Extension Wilmington, NC 28405 Phone (910) 796-7215 Customer Service Wilmington Regional Office Interoct: www.newaterQualitv.org Fax (910) 350-2004 1-877-623-6748 An Equal Opportun4ylAffirmative Action Employer— 50% Recycled110% Post Consumer Paper �9D CAROLINAS ECS CAROLINAS, LLP Geotechnical - Construction Materials - Environmental - Facilities July 7, 2008 Mr. Frank Wing VIRTEXCO 2909 Brunswick Ave. New Beni, North Carolina 28562 Re: Infiltration Evaluation P-828 Field Medical Services School Camp Johnson, North Carolina ECS Project No. 22.14223 Dear Mr. Wing, ECS Carolinas, LLP (ECS) recently conducted an infiltration evaluation for the proposed infiltration areas at site located at off of Co. Street D in Camp Johnson, North Carolina. This letter, with attachments, is the report of our evaluation. Field Testing On July 3, 2007 ECS met with Mr. Frank Wing with Virtexco on site in order to locate the requested test locations. ECS then conducted an exploration of the subsurface soil and ground water conditions at two requested Iocations shown on the attached Site Diagram. The purpose of this exploration was to obtain subsurface information of the in -place soils for the proposed infiltration area. We explored the subsurface soil and ground water conditions by advancing one hand auger boring into the existing ground surface at the two requested boring locations. We visually classified the subsurface soils and obtained representative samples of each soil type encountered. We also recorded the ground water level observed at the time of each band auger boring. The attached Infiltration Evaluation Form provides a summary of the subsurface conditions encountered at each hand auger boring location. The ground water level and the seasonal high ground water level (SHWL) were estimated at each boring location below the existing grade elevation. Below is a summary of each boring location. Location Water Level SHWL 1 Winches 45 inches 2 60 inches 43 inches We have conducted two infiltration tests utilizing a compact constant head permeameter near hand auger borings to estimate the infiltration rate for the subsurface soils. The infiltration tests are typically conducted at two feet above the SHWL. D E C E IV V AUG I i ZOM8 7211 Ogden Business Park Suite 20I Wilmington, NC 28411 910 686-9114 Fax 910 686-96 6 www.ecsf ited.com g g ) i i ) ,aG,, Y Asheville. NC • Charlotte, NC - Greensboro, NC , Greenville, SC • Raleigh, NC • Swansborc. NC * • Wilmington, NC * testing services only Infiltration Evaluation P-828 Field Medical Services School Camp Johnson, North Carolina ECS Project No. 22.14223 Field Test Results Below is a summary of the infiltration test results: Location Description Depth Inches/hour inches/minute I Tan fine SAND 21 inches 12.9 0.21 2 Tan fine SAND 19 inches 7.3 0.12 Infiltration rates and SHWL may vary within the proposed site due to changes in elevation and subsurface conditions. If you have any questions regarding this report, please contact us at (910) 686-9114. Respectfully, ECS CAROLINAS, LLP K. Brooks Wall Staff Geologist Attachments: Site Diagram Infiltration Evaluation \ c AL- Walid M. Sobh, P. E. Principal Engineer NC License No. 22983 W 9 GRA MOAUTWEMKINCO}liR01PLAN ✓l i 3i i A'PER4 SS WACEARFA i lX PU= m o>t of w POAIW6 M ! EMSMAE:2" sl vwue-sss � ;i SST NOTES: R IM1a ¢tit 1, �� ��®C70 � � lAL nti'1fYII!$Itgt�7 woeUONEpEEn 1 yt; , KEY NOTES ILI - ' f ,m (9Wm�11DimMe-3FL _ rt Rtl�+dmesEera-uttf+�d I ) �:. e3+al�ema�swf IdAfF�71C � moonss.DrL � • 11W44 aremum ME ei t GAAPkflC �# a io m >o a s:p d C} V O Q O Q d Infiltration Evaluation P-828 Field Medical Services School Camp Johnson, North Carolina ECS Project No. 22.14223 July 3, 2008 Location Depth Soil_ Description 1 0-45" Tan fine SAND 45"-60" Orange clayey SAND Seasonal High Water Table was estimated to be at 45 inches below the existing grade elevation. Infiltration Rate: 0.21 inches per minute (12.9 inches per hour) Test was conducted at 21 inches below existing grade elevation Ground water was encountered at 60 inches below the existing grade elevation. Location Depth Soil_ Description 2 0-43" Tan fine SAND 43"-60" Orange clayey SAND Seasonal High Water Table was estimated to be at 43 inches below the existing grade elevation. Infiltration Rate: 0.12 inches per minute (7.3 inches per hour) Test was conducted at 19 inches below existing grade elevation Ground water was encountered at 60 inches below the existing grade elevation. Stormwater Management Narrative P-828 Field Medical Services School Camp Lejeune MCB, NC July 2008 Proiect Description The US Marine Corps at Camp Lejeune, NC is proposing to construct a 2569 sq meter (27652 sq foot) building to serve as a classroom / training building for the Field Medical Services School. The project also includes construction of a new 54 space parking lot on the east side of the project site. The project site is bound by CO Street E on the north, CO Street D on the west, CO Street F on the south and a densely wooded area on the east. The project is located on a 22257 sq. meter (5.5 acre) site that is currently occupied by a cluster of buildings and associated parking areas and sidewalks. Existing storm drainage on the site is confined within the perimeter of the above site boundary. There is an existing underground storm structure and piping system running parallel to streets CO Street E, CO Street F, and CO Street D on the project site side of the roads. This existing storm drainage system discharges directly into the wooded area on the east side of the project site. The design method that was used for the constructed storm water wetlands was based on criteria outlined in the NCDENR BMP manual. The rational method was used to calculate the required treatment volume and the conveyance system. All methodologies that are used are consistent with the North Carolina Division of Water Quality, which has jurisdiction over this project. The area being developed is approximately 4.78 acres. One constructed wetland area will be placed on the project site to collect all storm water before it leaves the project site. There is no additional storm water draining onto the site from outside the project limits. Due to this development's proximity from streams, rivers, etc it is not required to maintain buffer areas. Existing Site Conditions The existing site is currently occupied by a cluster of buildings and associated parking areas and sidewalks yielding an impervious surface area of 1.48 acres. This area is believed to have been originally developed in the 1950s and 1960s. There are no known existing wetlands within the project limits. Topographic elevation of the existing site varies from a high of 6.25 meters to a low of 3.75 meters. Design Analysis The existing impervious surface area of the site is approximately 6000 sq. meters (1.48 acres). This project includes a total site impervious surface area of 5632 sq. meters (1.40 acres). Since the new impervious surface area is less than existing, stormwater management measures pertaining to quantity are not required. ❑ � C F 1 V E D AUG 112008 awa PROD Since the new impervious surface area for the site will be 25% of the total project site area the project will be considered a high density development. High Density developments require structured BMPs. We are proposing to install a constructed wetland to treat the first 1.5 inch of runoff generated by new impervious surface included in this project. The 22,257 sq. meter (5.5 acre) site will drain generally from west to east into the constructed wetland area via two grassed lined swales. There will be one swale on the north side of the new building and one on the south side. The wetlands will discharge through an outlet structure then into an existing 18 inch CMP pipe which discharges off site. Stormwater runoff leaving the project site will flow towards the east and will flow through an approximate 300 linear foot wooded area before reaching Scales Creek. Scales Creek is part of the White Oak River Basin and according to NCDENR data has waters classified as SC, HQW and NSW. Roof drain leaders will discharge directly into the constructed wetland to be treated before discharging Scales Creek. The total surface are of the proposed wetland will be 0.36 acres. See attached for wetland sizing calculations. Soil Data An infiltration evaluation was performed by ECS Carolinas, LLC on July 3, 2007 (see attached). Data was taken from two locations on the site. The results show a ground water level 60 inches and a seasonal high water level (SHWL) 45 inches below the existing grade. An infiltration test was performed at several locations on site and the results show an average infiltration rate of 10.1 inches/hour. Summary The overall stormwater management goal is to meet the current regulatory requirements for water quality and quantity treatment and attenuation as required by the North Carolina Division of Water Quality. The proposed design meets and exceeds the regulations of the State and accomplishes these goals. It is our understanding that there are no additional requirements for this site such as CAMA permits due to the site's location. GREENHORNE & OWARA, INC. PLANNING • SITE ENGINEERING • TRANSPORTATION ENVIRONMENTAL • SURVEYING/MAPPING ! S 7 711Q SUBJECT - l_rt'!--;a---r c' BY ��---------� DATE ----'`--�'-=-�_�' _--•-=---- _-�_��,'=----='__t'_r �-'� Vic"-=-� SHEET NO. ------ OF _-_=5----• CHKD. BY -------- DATE ------------ ---y---------------�-----�--� � �:'_-- �----�_--____--------- JOB NO. ________--bw_________-- _�, �, ._-- -, � _. FILE NO. REV. BY --------- . DATE ------------==-=- --"---------�-------- -- `-�..i.-/•�•S- Ap(,,ii . t.'v% `I{...)7{ `� L. trt Y �lJ'{�'-'f-tl"�� 'l^.-4-< <,�'!`. t__�� -.ff'• . I •i,�,..j ` - ._i".E.f: _ D� �i-' I%' � �% i.�7'i.J�.,}'_.;��sr.� �-) "»I I•rt l:- !�r.7 r'�J n��.l '.���1. '�' y(lr i�:-_ [;�'i..l -�'.l �'`�'. .. �_ 1�.,1 r. GREENHORNE & OWARA, INC. PLANNING • SITE ENGINEERING • TRANSPORTATION ENVIRONMENTAL • SURVEYING/MAPPING BY _�_-------- DATE _ /33D/' ?? SUBJECT _IL­jli'_'' L-_�_" =----��'�! f_`-LILT 1 _-_- ---_------ SHEET NO.-----c-- OF----f---- CHKD. BY DATE --- _: -. ;--: - - -------- ---------------------------------------------- - -- -- '- --------------- JOB NO. -- - ---------- REV. BY ----------- DATE ----------- - - ' ,-'r ,,_' -- •------ -==------------------- ---- FILE NO. ---- - ----------------- 1--TL-534 _eokF�, A-T I I l 4 I , ; k I f . I Y GREENHORNS & OWARA, INC. PLANNING • SITE ENGINEERING • TRANSPORTATION ENVIRONMENTAL • SURVEYING/MAPPING BY 2ire ------ - DATESUBJECT---- -----= ------ SHEET NO.4F---2---- CHKD. BY DATE `•= - 7 -- - "f" 1(' i ,r�" <;9 ------------------------'-----==i-'--------===- --1 ------ '�---=---�-II----------- JOB NO. ----� -----= ' ---------- REV. BY -----___-_. DATE ------_--_ "` ": - FILE NO P 1, S� m c, r i I -, ,r a r pf i 100 10 Greenhorne 8 O'Mara, Inc. STORM SEWER COMPUTATION SHEET Manning's 'n' for hydraulc slope: 0.0110 f1 10 YEAR STORM - JUST FULL min. acceptable cover (ft): 1.00 10 YEAR HYDRAULIC CHECK Pipe thickness for cover calc. (in): 0.50 LOCATION: Camp Leieune Calc'd by: JDS JOB NO. 140560 Date: 8104/08 FORM BASED ON U.S. DEPT OF COMMERCE, TP NO. 25. PROJECT: P828 Field Medical Services SO STREET: Roof Drain. Loc.ISiz. Surface C CA E CA Flow t Time I Q 1 Q Dia L Pi eS. Sloe H d.S. V CAP. 90% Full IE IE H d. H.G. TE UP CVR TE LOW acre min. min. 10 YEAR 10 YEAR in. ft. % Check % fps cfs check upper lower delta ft ft CHK ft _ :.Northwest - 10" HDPE- :" 0.15 : 0,95 0.14 0.14 5.0 11-001 1.55 11-001 1.55 10 166 1.00 OK 0.36 4,75 2.59 OK 18:18 - ,16 53 0.59 17.36 North_= 12".HDPE "` 0.22 -" 0.95 0.21 0.35 0.6 5.6 11.00 3.80 11.00 3.80 12 . 222 1.00 OK 0.82 5.35 4.20 OK 16.53 -14;32 1.81 15.32 North Outlet 15" HDPE 0,00 0.95 0.00 0.35 0.7 6.3 11.00 3.81 11.00 3.81 15 .120 1.90 OK 0.25 8.57 10.52 OK -14.32 1204- 0.30 1.25 Northeast 8" HDPE = 0.10 _` 0.95 0.10 0.10 11.00 1.09 11.00 1.09 8 100 . 1.00 OK 0.58 4.09 1.43 OK 15.27 -:14.27 :'. 0.58 0.67 ." 0.4 0.4 Southwest -8"HOPE "' 0.03--� 0.95 0.03 0.03 11.00 0.28 11.00 0.28 .8 - °r49: 1.00 OK 0.04 4.09 1.43 OK = 18-18 17,69 0.02 18,36 r. ="South -8".HDPE •"_ -" 0:01 ":. 0.95 0.01 0.04 0.2 0.2 1 11-001 0.41 11.00 0.41 8 4] 1.00 OK 0.06 4.09 1.43 OK 17.69 =17.2B 0-03 17.95 =- South`- 10" HDPE " 0.18 0.95 0.17 0.21 0.2 0.4 11.00 2.32 11.00 2.32 10; "°180 1.00 OK 0.80 4.75 2.59 OK '17.28" '`15.48 1.44 16.31 South,0utlet 10" HDPE" '0:00 ' 0.95 0.04 0.21 0.6 1.0 11.00 2.33 11.00 2.33 10 109 3.16 OK 0.81 8.43 4.60 OK 15.48 12.04 0.88 0.$8 - :: I C���E AUG 1 12008 PRCU # DwQ STORM.xlsx State of North Carolina Department of Environment and Natura{ Resources Division of Water Quality STORMWATER MANAGEMENT PERMIT APPLICATION Regional Review: Stormwater Wetland Project name P-828 Field Medical Services School Contact name o Drainage area number t Date August 14, 2008 Design Variable Variable Equation Value i Units Volume to Treat: Non•SR Waters Volume to Treat, Reported VR,p„t,d I- 15,512.00 ft' Volume to Treat, Required (Simple Method) IVR.q p„dI=3,630'Rc'Rv'AT� 8,317.36 ft' Adequate design volume calcualted? yes - Adequate design volume used (3,630 ft' minimum)? yes - Drainage area AT,,,, 239,5811 ftz Drainage area AT„W 5.50 acres Impervious area A,, 60.622 ft2 Percent Impervious IA =A,mp1A%Ui 0.25 (unitless) Design Storm Ro 1.5 in Runoff Coefficient RV =.05+.9(IA) 0,28 (unitless) Volume to Treat: SR Waters Volume to Treat, Reported VR,p,ntd 0,00 ft' Volume to Treat, Required VRe area I = 1- r, 24-hr depth, inches 1 12inlftdrain a area, ft2 0,00 1 ft' Adequate design volume calcualted? yes - Geometry Surface Area (Entire Wetland), Reported As,e...R.p.d.d 15,512.00 ft' Surface Area (Entire Wetland), Calculated As,,,,CakmWed =VRpiiedDp, 15,512.00 ftz Adequate surface area provided? yes - Depth of temporary poollponding depth 0'W' 12 in Depth of temporary pooliponding depth DP„n. 1.0 ft Volume of water that can be held in temp, pool VT,mpP,, =(Ay,, ,�,,,,,d)`{Dpa a) 15,512.0 ft' Adequate temporary pool volume provided? yes - The wetland supplement sheet will indicate if the elevations and surface areas are adequate for each topographic zone. If the spreadsheet indicates that they are incorrect, then they must be fixed (also check the number of decimal points). Drawdown Time 2-5 days Gravity g 1 32.2 fVsec` Coefficient of discharge co See Table 3-8 of the BMP Manual 0.60 (unitless) Driving head, Reported H. R.pod.d 1.000 ft Driving head, Calculated H,, cww".d =Dm,„d13 0.333 ft Adequate driving head (H.) reported? no, check decimals. 2 Days: Determining Maximum Orifice Diameter Drawdown Rate 020 =VR.q...a(min160sec)'(hr160min)'(dayl24hr)1(2days) 0.0481 ft3lsec Orifice cross -sectional area Az❑ =Q20,-ACo (SQRT(2'g'Ho,CWr .d))) 0.0173 ft' Onfice radius RZo =SQRT(A2o Pi) 0.074 It Orifice radius Rp❑ 0.89 in Orifice diameter D2D.. Max Diameter =2R20,,, 1.78 in 5 days: Determining Minimum Orifice Diameter Drawdown Rate qsc =VR,R,,;,,d'(min/60sec)'(hr160min)'(day124hr)1(5days) 0,0193 ft'/sec Orifice cross -sectional area A,, =Qso (Ce`(SQRT(2'g'Ho.cdaw ed))) 0.0069 ftz Orifice radius Rso, =SQRT(AID 1Pi) 0,047 ft Orifice radius Rsof, 0.56 in Orifice diameter D-4). ,: Min Diameter 1.13 1n Orifice diameter, reported DR,p,,,td 2.00 in Adequate drawdown onfice size {is it between 02D,, and D )? no Drawdown time, using the reported entice diameter tcrw,r,a =VR .dl(Q,,,,))`(mirV60sec)'(hr160min)•(dayl24hr) 1,59 days Drawdown time, reported tR.q.d.d 2.37 days Adequate drawdown time reported? yes Adequate drawdown time provided? yes - Onfice radius, calculated from reported values RR td =DR12 1,00 in Orifice radius, calculated from reported values RR.p..d 0,08 It Orifice cross -sectional area, calculated from reported values AR d =Pi'RR, d2 0.02 ftz Drawdown Rate, calculated from reported values OR. .d =AR, d`Ca'SQRT(2'g'H.,C.W.W) o.06 ft'isec 113 State of North Carolina Department of Environment and Natural Resources Division of Water Quality STORMWATER MANAGEMENT PERMIT APPLICATION Regional Review: Stormwater Wetland Peak FlowlDverflow Welr Calculations- Davelocad Protect Peak Flaw, Pre (Calculated) OP gc.rx,,a =Cc„,Ip<,Ar,,,�'(fYI2in)'(hr/60min)'(minf60sec) O.DDO R�lsec Peak Flow, Pre (Reported) QP,..R.pmt.d —CC.W V dIP,..CW.We dAT.tW ft1121n)*(hr/60rrin)' min160sec ft'/sec Adequate Qwos„m provided? yes - Peak Flow, Post (Calculated) QP,a,c.�da,d =CCiW wdlP, LCWLA IWAT.W 12 i n )' (h r! 60 m i n )' (m i N 60 sec ) 0.coo ft'lsee Peak Flow, Post (Reported) IQPtR,p.nd —CCakS.te PWAT.4*(11112in)'(hr160min)'(min160sec) 0.000 f6sec Adequate Qt.g.st— Provided? yes - Is the reported Rational C appropriate7 yes - Rational C Reported for developed project (CR,p.d,d): 0.460 (unitless) Rational C That Should be Used for developed project (CC.-.t.d), Calculation below: 0.000 (unitless) Land Uses on Plan Submitted % of Drainage Area (Enter Data from Plan Below Rational C 7— %Impervious Unimproved Areas a m Asphalt 0.95 0.0% Concrete 0.95 0,0% Brick 0,85 0.0% Roofs inclined 1.00 0.0% Roofs' list 0.90 0.0% Lawns sandy soil flat <2 /, 0.10 Lawns sandy soil average 2-7% 0.15 Lawns sandy soil steep �7% 0.20 Lawns heavy soil flat <2% 0.15 Lawns heavy soil average 2-5% 0.20 Lawns heavysoil steep >7 % 0.30 Wooded areas 0.15 0.0% Does not total 100%. Alter yellow cells above,' 0.00% The percent impervious reported is: 25.30% Does this value correspond to the land uses above? no, check decimals Rainfall intensity, Pre: Calculated IP,..c,W,,.dI =dp,.lt�'(60minlhr) 2.89 Whr Rairfall intensity, Pre: Reported IP,..R.p,,,.d O.DO inihr Adequate water quality storm intensity used? no, check decimals Rainfall intensity, Post: Calculated IPP.t, c.tw.,a =dp,.lt,'(60minlhr) 2,89 inlhr Rainfall intensity, Post: Reported 1P..r R.p.,t.d 0.00 in/hr Adequate large storm intensity used? no, check decimals —Hydraulic length L Not on Suppement Sheet - Estimate from Plan 1 000 ft in elevation along L H Not on Suppfement Sheet - Estimate from Plan 3 ft —Change Time of concentration tC = L'1H o aes 128 14.93 min "Depth" from http:llhdsc.nws,noaa.gov/hdscJpfds/ (See internal guidance document for directions on how to determine these values. Depth, pre-dev d=dp,.=dPost Not on Supplement Sheet- Estimate 0.72 in Depth, post dev d=dP,e=dpmt Not on Supplement Sheet - Estimate 0.72 in Drainage area AT.W 239.581 ftz Length of overflow weir required, FOR LARGE STORM ONLY Lwa Po c. w.a =OP„![Cw'(Hw„t s)� t+DIV101 ft Length of overflow weir from plan LW.~ R.p.d.d ft Adequate Weir Length? 9DIV101 Weir Coefficient Cw Typical value, 3.0 (Witless) Height of water above the weir Hw.. Estimate this value based on the maximum stage possible (ie: if there is 1ft of freeboard, then 12 inches) in Height of water above the weir Hw.. 0,00 ft 2/3 State of North Carolina Department of Environment and Natural Resources Division of Water Quality STORMWATER MANAGEMENT PERMIT APPLICATION Regional Review: 5tormwater Wetland PralPnat Davalonmant Peak Finw, Peak Flow, Yost QPW =CC."Io.dlrv.AToW'(ft112in)'(hr160min)'(minl60sec) 0,000 ft'lsec Peak Flow, Pre QP a =CR.PWrh•-PevelepmentltyrlaM,CM�.�atedArou� '(f /12in)'(hrl60min)'(mirV60sec)=Q1K4N,Car".d 5,616 ft'/sec Peak Flow, Amount to Control Qcono-awmoent -Qi 2aM,D.wbP.d-Q� .k,a�.-D.v.bpmeM -5.616 f0sec Adequate peak flow controlled? Always Check Rational C Coefficient for the developed project Cp,podd. or•b .d =CR.P.rt.d 0.46 (unitless) Rational C Coefficient for the pre -development CR.~ P—D—I.pmM 0.35 (unitless) Rainfall intensity, 1yr24hr: Calculated I,rz.n om,C.W..d =d,y�24nrsemm!! (60minfhr) 2.89 irVhr Drainage area Ar„,1 239.581 Ift2 313 Permit Number (to be provided by DWQ) ®� ,A HCDENR STORMWATER MANAGEMENT PERMIT APPLICATION FORM 401 CERTIFICATION APPLICATION FORM WETLAND SUPPLEMENT This form must be filled out, printed and submitted. The Required Items Checklist (Pail 111) must be printed, filled out and submitted along with all the required information. {tFa r"�'"." s I. P.RdJECT INF,ORMATlON-'..•Luatt�a:� .. >:-Z-y�......:��.�.r..d:�..,�.�.,.:�.:�.�.�k�,��:,� Project name P-828 Field Medical Services School Contact name Phone number Date August l4, 2008 Drainage area number 1 IIJDESIGNJlNF,ORMAZION,� , i Site Characteristics Drainage area 239,581 ft2 Drainage area 5.50 acres Impervious area 60,622 ft2 Impervious area 1.39 acres Percent impervious 25.3% % Design rainfall depth 1.5 inch Peak Flow Calculations Does this project require prelpost control of the 1-yr 24-hr peak n (Y or N) flow? 1-yr, 24-hr runoff depth in 1-yr, 24-hr intensity inihr Pre -development 1-yr, 24-hr runoff ft3lsec Post -development 1-yr, 24-hr runoff ft3lsec PfelPost 1-yr, 24-hr peak control ft3lsec Storage Volume: Non -SR Waters Design volume (temporary pool volume) 15.512 ft3 OK AOO WATF9aG S � Depth of temporary poollponding depth (Dpians) 12 in OK Drawdown time 2.37 days OK Diameter of orifice 2.00 in Drawdown orifice diameter may be insufficient. Please provide adequate supporting calculations. Coefficient of discharge (CO) used in orifice diameter 0.60 (unitless) calculation Driving head (Ho) used in the orifice diameter calculation 1,000 ft OK Storage Volume: SIR Waters Parameters 1-yr, 24-hr depth in Pre -development 1-yr, 24-hr runoff ft3 Post -development 1-yr, 24-hr runoff ft3 Minimum volume required ft3 Volume provided ft3 Form SW401-Wetland-Rev. 1 Parts I and H. Project Design Summary, Page 1 of 3 Permit Number (to be provided by DWQ) Surface Areas of Wetland Zones Surface Area of Entire Wetland 15,512 ft2 OK Shallow Land 6,200 ftz OK The shallow land percentage is: 40% Shallow Water 6,200 ft2 OK The shallow water percentage is: 40% Deep Pool Forebay portion of deep pool (pretreatment) 1,552 ftz OK The forebay surface area percentage is: 10% Non-forebay portion of deep pool 1,560 ftz Insufficient non-Forebay deep pool area. The non-Forebay deep pool surface area percentage is: 10% Total of wetland zone areas 15,512 ftz OK Add or subtract the following area from the zones 0.00 ft2 Topographic Zone Elevations Temporary Pool Shallow Land (top) 15.20 fmsl Permanent Pool Shallow Water (top) 14.20 fmsl Deep Pool (top) 13.68 fmsl Most shallow point of deep pool's bottom 11.68 fmsl Deepest point of deep pool's bottom 11.68 fmsl Design must meet one of the following two options: This design meets Option #1, Deep pool is 611nches below SLWT, If yes: y (Y or N) SLWT (Seasonally Low Water Table) 12.18 fmsl OK This design meets Option #2, Has a clay liner no If yes: Depth of topsoil above clay liner in Topographic Zone Depths Temporary Pool Shallow Land 12 in OK Permanent Pool Shallow Water 6.24 in Insufficient shallow water depth. Deep Pool (shallowest) 24 in OK Deep Pool (deepest) 24 in OK Planting Plan Are cattails included in the planting plan? (Y or N) Number of Plants in planting plan recommended: Herbacious (4inch diameter) 468 Shrubs/small trees (1 gallon or larger) 312 Trees (1.5" dbh) Number Plants 78 of in planting plan provided (several species of ¢� r Oe 'el each plant type are recommended): O Herbacious (4inch diameter) Higher density is recommended. Shrubslsmall trees (1 gallon or larger) (Higher g3l density is recommended. Trees (1.5" dbh) Higher density is recommended. Form S1N401-Wetland-Rev. 1 Parts I and It. Project Design Summary, Page 2 of 3 Permit Number (to be provided by DWQ) Additional Information Can the design volume be contained? (Y or N) Does volume in excess of the design volume flow evenly (Y or N) distributed through a vegetated filter? What is the length of the vegetated filter? ft Does the design use a level spreader to evenly distribute flow? (Y or N) Are calculations for supporting the design volume provided in the (Y or N) application? Is BMP sized to handle all runoff from ultimate build -out? (Y or N) Is the BMP located in a recorded drainage easement with a (Y or N) recorded access easement to a public Right of Way (ROW)? The length to width ratio is: :1 Approximate wetland length ft Approximate wetland width ft Approximate surface area using length and width provided o ft2 Will the wetland be stabilized within 14 days of construction? (Y or N) Form SW401-Weiland-Rev.1 Parts I and M. Project Design Summary, Page 3 of 3 April 3, 2007 TO: Kroskin Design Group, P.C. 6160 Kempsville Cr. Suite 316A Norfolk, VA 23502 Attn: Mr. Carl W. Rogers, Jr., NCARB RE: Report of Subsurface Investigation and Geotechnical Engineering Building. P-828 Field Medical Services School Camp LeJeune, North Carolina GET Project No: EC07-159G Dear Mr. Rogers: In compliance with your instructions, we have completed our Geotechnical Engineering Services for the referenced project. 'The results of this study, together with our recommendations, are presented in this report. Often, because of design and construction details that -occur on a project, questions arise concerning subsurface conditions. G E T Solutions, Inc, would be pleased to continue its role as Geotechnical Engineer during the project implementation. We trust that the information contained herein meets your immediate need, and we would ask that you call this office with any questions that you may have. Respectfully Submitted, G E T Solut'ons, Inc. ceJ Gerald W. Stalls Jr., E.I.T. Senior Project Manager Camille A. Kattan, P.E, Principal Engineer NC Reg. # 14103 Copies: (4) Client tttYr tl fill r, t+� YCA�+Rl f. SEAL _ 014103 ell lo ll�ir�tltttt 504 East Elizabeth Street, Suite 2 • Elizabeth City, NC 27909 • Phone (252) 335-9765 info@get-solutionsine.com F335-9766 AUG 1 1 2008 DWR PHOJ # Report of Subsurface Investigation and Geotechnical Engineering Services 3/3106 Building P-828 Field Medical Services School Camp LeJeune, North Carolina GET Project No: EC07-159G EXECUTIVE SUMMARY The proposed construction at this site will consist of building a new single story structure, paved roadways and parking areas, as well as other site infrastructure. The project site is located along the east side of Command Street D within the Camp LeJeune military facility in North Carolina. A brief description of the anticipated characteristics of the new hotel is presented below: • Concrete masonry unit (CMU) walls and/or structural steel framing supported by shallow foundations. • The maximum anticipated wall and column loads were noted not to exceed about 2 to 3 klf and 60 to 70 kips, respectively. • Finish floor elevation of the structure anticipated to be located slightly above the existing grade elevations. Accordingly, cut and/or fill operations are not expected to exceed 2-feet in order to establish the design grade elevations. • First floor to consist of slab -on -grade construction with distributed loads of about 150 pounds per square foot (psf). Our field exploration program included six (6) 10 to 50-foot deep SPT borings and two (2) 50-foot deep CPT borings drilled within the proposed construction areas. A brief description of the subsurface soil conditions is noted below: Boring Locations — Topsoil ranging in thickness from 2 to 4-inches was encountered at the boring locations. Beneath the TOPSOIL the subsurface soils encountered at the boring locations consisted of a very loose to medium dense SAND (SP, SP-SM) with varying amounts of silt underlain by very soft to stiff CLAY (CL, CH) followed by very loose to dense SAND (SP-SM, SM) with varying amounts of silt and clay. Additionally, a deposit of medium stiff CLAY (CL) was encountered with the lower granular soils at the location of boring B-2 from a depth of 18 to 23-feet below existing grades. A brief description of the natural subsurface soil conditions encountered at the SPT boring locations is tabulated on the following page: t, 661g ioiisa [nc 7i{=. Report of Subsurface Investigation and Geotechnical Engineering Services 313106 Building P-828 Field Medical Services School Camp LeJeune, North Carolina GET Project No: EC07-159G RANGES OF AVERAGE STRATUM SPV1 hl- DEPTH (Feet) DESCRIPTION VALUES �'.rY.ui,'(, a�i(�F y{ ��Iti�=:'r'i. rl_•ucl'I'rJ..-r�-�4�liftl`�W7�`s.:`Vs;i�'=�av¢Iliuyi�':�, -: 4."Iv':y�:... �._ .,-.l.:i �i•'17:"2'�a�°�itF:�C:`�C�^e��`-�:=�4��t'=w ='_.`.F�"'>'i � v�='.Sf r_i4�rare :—i'. l�"i''a-iiJ��.r� i:.�1'�:,4�'._:=�,'Skf .;:da,M1.r��� sue. iJr_frs7."T�+'.'. .'�'iy��.?iLn .�.�•"-�.•4iTJ;,Sl.: =R�;'''!`=,'.�:S1w-.'�r��';'t�'a':; �'i "ems � %�s'�;tur. �'.� *,,,;�P�,��`t�:,L��=.�'�� . 4',�`-�—: vst,rc:i„E,�s—..�,�}t=�l�r4''Lsr:i�,,:'��t� f tti Yrl7riF:'�'YE .�, ;r vi �, : r:i �'ttl s;N:��� ; C` =-.L�;: '�1 �.r �i. •r,•air..., I� tSr. .h- 'iL r._r�[*` m' �rCtr::t,,.Y�r �a'� �• _t� _•�re3 s�vB�,;r thraui B,3�and,'PB�irou�i PB''.�.��� 4 r���-Borrn 0 to .3 TOPSOIL SAND (SP, SP-SM) with varying amounts of 0.3 to 4 I 2 to 12 silt Lean CLAY (CL) to Fat CLAY (CH) with 4 to 13 II 6 to 10 varying amounts of sand SAND (SP-SM, SM) with varying amounts 13 to 26 ilI 2 to 32 of silt 18 to 23 IV Lean CLAY (CL) boring B-2 only 5 Note (1) SPT = Standard Penetration Vest, N-Values in Blows -per -foot Groundwater was encountered at depths of approximately 5 to 8-feet below existing grades at the boring locations. Furthermore, the groundwater level encountered at the location of boring B-1 (5-feet below existing grades) is anticipated to be the results of "Perched" water above a restrictive horizon (CLAY). In order to more accurately determine the groundwater level a series of groundwater monitoring wells should be installed and subsequent 24 to 48 hour recordings should be performed. The following evaluations and recommendations were developed based on our field exploration and laboratory -testing program: m Field-testing program during construction to include compaction testing, sub -grade inspection, and foundation excavation observations for bearing capacity verification. o A cut of approximately 4 to 6-inches will be- required to remove the TOPSOIL materials from within the construction areas. Additional recommendations for site clearing and grading are provided in section 4.1 of this report. Y The recommendations within this report must be reviewed in the event that more than 2-feet of fill wily be required to establish the proposed first floor finished elevations. The placement of more than 2-feet of fill is expected to result in excessive settlements within the upper CLAY (CL, CH) deposits. DECEivE GIFT IL o .o DWO PfiOJ # Report of Subsurface Investigation and Geotechnical Engineering Services 313106 Building P-828 Field Medical Services School Camp LeJeune, North Carolina CET Project No; EC07-159G ® Shallow foundations designed using an allowable bearing capacity of 2,000 psf (24-inch embedment, 24-inch width). In preparation for shallow foundation support, the footing excavations should extend into firm natural soil or well compacted structural fill. ■ Estimated total and differential settlements should be up to about 1- inch and about %-inch, respectively. a CMU wall construction should be designed to contain construction joints at on distances not exceeding 20-feet. These joints will provide for more flexible wall members that are less likely to crack as a result of settlement. In The foundations should also be designed with the use of top and bottom reinforcing steel for added rigidity and to increase the foundation performance with respect to settlement. Proposed structure should be designed based on a site seismic classification of "D", as a result of the 50-foot deep CPT borings, our experience in the project area, and the requirements provided in provided in the North Carolina State Building Code (2003 International Building Code with North Carolina Amendments) section 1615.1; Table 1615.1 .1 This summary briefly discusses some of the major topics mentioned in the attached report. This report should be read in its entirety to thoroughly evaluate the contents. 54 .I 5. � §oliilaons l'i O ;12-51 TABLE OF CONTENTS EXECUTIVE SUMMARY ......................... ..................................................... I............. i 1.0 PROJECT INFORMATION...................................................................... 1 1.1 Project Authorization ............................................................. 1 1.2 Project Description..................................................................: 1 1.3 Purpose and Scope of Services .................................................. 1 2.0 FIELD AND LABORATORY PROCEDURES ............................................... 3 2'.1 Field Exploration...................................................................... 3 2.2 Laboratory Testing................................................................... 4 3.0 SITE AND SUBSURFACE CONDITIONS ................................................... 5 3.1 Site Location and Description.................................................... 5 3.2 Subsurface Soil Conditions........................................................ 6 3.3 Groundwater Information.......................................................... 7 4.0 EVALUATION AND RECOMMENDATIONS .............................................. 7 4.1 Clearing and Grading................................................................ 8 4.2. Subgrade Preparation................................................... I ........ ... 8 4.3 Structural Fill and Placement..................................................... 9 4..4 Building Foundation Design Recommendations.. . .......................... 9 4.5 Foundation Excavations.......................................................... 10 4.6 Building Foundation Settlements .............................................. 11 4.7 Wall Construction Joints and Foundation Reinforcement ............. 11 4.8 Seismic Design Recommendations ........................................... 11 4.9 Building Floor Slabs................................................................ 12 4.10 Pavements................................................................ . ......... 12 5.0 CONSTRUCTION CONSIDERATIONS..................................................... 15 5.1 Drainage and Groundwater Concerns ................................ I....... 15 5.2 Excavations.......................................................................... 16 6.0 REPORT LIMITATIONS....................................................................... 17 APPENDIX I - BORING LOCATION SKETCH APPENDIX II - LOG OF BORINGS APPENDIX III W SOIL BORING PROFILE APPENDIX IV — CPT SOUNDINGS APPENDIX V — CLASSIFICATION SYSTEM FOR SOIL EXPLORAITON I] E C E I V E AUS 1 I M8 SolulaorjIc`: PROD # DWO Report of Subsurface Investigation and Geotechnical Engineering Services 4/3107 Building P-828 Field Medical Services School Camp LeJeune, North Carolina GET Project No: EC07-1 59G 1.0 PROJECT INFORMATION 1.1 Project Authorization: G E T Solutions, Inc. has completed our Geotechnical Engineering study for the proposed Building P-828; Field Medical 'Services School project. Authorization to proceed with the services was received from Mr. Carl Rogers, Jr. with Kroskin Design Group, 1 C in the form of an email, dated of March 12, 2006. 1.2 Project Description: The proposed development at this site is planned to consist of building a single story structure, new paved roadways and parking lot, as well as other site infrastructure components. The finish floor elevation of the building is anticipated to be located slightly above the existing site grade elevations. Accordingly, cut and/or fill operations are not expected' to exceed about 2 feet in order to establish the design grade elevations. The new building is anticipated to be constructed of either concrete masonry unit (CMU) walls and/or structural steel framing supported by shallow foundations. The maximum foundation design loads associated with the proposed structure were not known at this time. However, based on our experience with similar structures, the maximum column and wall foundation loads are anticipated to range from about 60 to 70 kips and/or 3 to 4 kips per linear foot, respectively. The first floor is to be constructed as a slab -on - grade member with distributed loads of about 150 pounds per square foot (psf). If any of the noted information is incorrect or has changed, please inform G E T Solutions, Inc. so that we may amend the recommendations presented in this report, if appropriate. 1.3 Purpose and Scope of Services: The purpose of this study was to obtain information on the general subsurface conditions at the proposed project site. The subsurface conditions encountered were then evaluated with respect to the available project characteristics. In this regard, engineering assessments for the following items were formulated: 1 5W1i:ikons.liich<ti! _44 Report of Subsurface Investigation and Geotechnical Engineering Services 413107 Building P-828 Field Medical Services School Camp LeJeune, North Carolina GET Project No: EC07-159G 1. General assessment of the soils revealed by the borings performed at the proposed development. 2. General location and description of potentially deleterious material encountered in the borings that may interfere with construction progress or structure performance, including existing fills, surficial/subsurface organics, or expansive soils. 3. Soil subgrade preparation, including stripping, grading, and compaction, as well as providing Engineering criteria for placement and compaction of approved structural fill material, including weather and equipment effects. 4. Construction considerations for fill placement, subgrade preparation, and foundation excavations. 5. Seismic site classification provided based on the results of two (2) 50-foot deep CPT borings, our experience in the project area, and the requirements provided in the North Carolina State Building Code (2003 International Building Code with North Carolina Amendments) section 1615.1; Table 1615.1.1. 6. Feasibility of utilizing a shallow foundation system for support of the proposed building. Design parameters required for the foundation systems, including foundation sizes, allowable bearing pressures, foundation levels, and expected total and differential settlements. 7. Typical pavement sections recommendations based on the results of three (3). Standard Penetration Test (SPT) borings performed to a depth of 10- feet as well.as our experience with similar soil conditions. A total of three (3) CSR bulk soil samples were obtained and testing is being performed and will be submitted in an addendum to this report to substantiate the recommendations provided herein. The scope of services did not include an environmental assessment for determining the presence or absence of wetlands or hazardous or toxic material in the soil, bedrock, surface water, groundwater or air, on or below or around this site. Any statements in this report or on the boring logs regarding odors, color, unusual or suspicious items or conditions are strictly for the information of the client. Prior to development of this site, an environmental assessment is advisable. z D GE"A AUG�!^ Report of Subsurface Investigation and Geotechnical Engineering Services 413/07 Building P-828 Field Medical Services School Camp LeJeune, North Carolina GET Project No: EC07-159G 2.0 FIELD AND LABORATORY PROCEDURES 2.1 Field Exploration: In order to explore the general subsurface soil types and to aid in developing associated foundation design parameters, three (3) 35 to 50-foot deep Standard Penetration Test (SPT) borings (designated as B-1 through B-3) and three (3) 10-foot deep SPT borings (designated as PB-1 through P13-3) were drilled by G E T Solutions, Inc. within the proposed construction areas. The SPT borings were performed with the use of a power drill rig using mud (rotary wash) drilling procedures. The soil samples were obtained with a Split -Spoon Sampler in general accordance with the Standard Penetration Test (SPT) method ASTM D 1586- These samples were taken at near continuous intervals from the . ground surface Jo a depth of 10 feet and at 5-foot intervals thereafter to the boring termination depth. Additionally, a CBR bulk soil sample was collected from each of the 10-foot deep SPT borings noted above (PB-1 through P13-3). These samples were returned to our Elizabeth City laboratory for natural moisture, full sieve, Atterberg Limits, Standard Proctor, and CBR analysis. The results of the CBR testing procedures were not completed at the time of this report. Accordingly, following the completion of these laboratory testing procedures, an addendum to our report will be submitted to substantiate the pavement section recommendations presented in Section 4.10 of this report. Also, two (2) 50-foot deep Cone Penetrometer (CPT) borings were performed within the proposed building area to evaluate the site for seismic classification. During our initial CPT. boring process refusal was encountered at an approximate depth of 50-feet below existing site grade elevations. Accordingly, in'an attempt to complete the required 100- foot deep CPT boring, a second CPT boring was performed at the approximate location of SPT boring B-3. This second CPT boring location also resulted in refusal at an approximate depth of 50-feet below existing site grade elevations. As the cone was advanced into the ground, tip resistance, sleeve friction and dynamic pore water pressures were recorded approximately every five centimeters. During the site reconnaissance, shear wave velocity measurements were taken at the CPT sounding location at approximate 1-meter intervals to the refusal depths of approximately 50 feet. The CPT soundings were performed by ConeTec, Inc. The boring schedule noting the SPT and CPT boring depths and locations is presented in Table I on the following page. a i 5olitions Inc���;���?rr Report of Subsurface Investigation and Geotechnical Engineering Services 4I3107 Building P-828 Field Medical Services School Camp LeJeune, North Carolina GET Project No: EC07-159G Table I — Boring Schedule -wn�;�=' gift: 4!6 �Fk ��yL � `_� �• Siuc.. ii zn. �;!�s�• ^ _ .fy� t�i:'11_ 'fA',4+c.:L'F�•"fx :"��-'•',;�+,a=. q^�. �Td .""�i� j'► 'j�u•'� '{'2J,u�.:....1� '1'�ati''�m-__ � � .S�10-rr F� _ >:�=�'�,xr�C—C�� � I2.4[�. rr..�e�f������,��Jr:L,m-. ,...ee_. nu�r=--� "�'--!i�'�.�7-`.`r:; '�'t� S �-1-, dc,�-_ - �e �� -r ��— r az+ � "�� e- �� .y' 'i5r �'L�F �-���`,��, �L4s �-� �y�`, r �_'c-�'�-sf..d•�'�'`�»``%;r:. -.. 5�. �L L��i- 3u F'[ :i .::'L�i�'M'�+i'$�`.ail:?+k-.�`C �.i7 'fL e�2f i ;prs�!'Tl`..`.•`.;-� "tc: �l�'-�Ik�°r..ci:lri.,�?-.I �-- Grr�aZa�'�- B-1. 35 Building P-828; Approx. Southwest Corner B-2 50 Building P-828; Approx, Northwest Corner B-3 35 Building; P-828; Approx. Northeast Corner CPT-1 50 Building P-828; Approx. Southeast Corner CPT-1 a 50 Building P-828; Approx. Northeast Corner PB-1 10 Proposed Parking Lot; North Entrance Roadway PB-2 10 Proposed Parking Lot; Approx. Center; East Side PB-3 10 Proposed Parking Lot; South Entrance Roadway The SPT and CPT boring locations were established and were identified in the, field by G E T Solutions Inc. personnel by measuring from existing landmarks. The approximate boring locations are shown on the "Boring Location Plan" attached to this report (Appendix 1, Figure 1). This plan was developed based on the site plan provided to G E T Solutions, Inc. by Kroskin Design Group, PC. 2.2 Laboratory Testing: Representative portions of all soil samples collected during drilling were sealed in glass jars, labeled, and transferred to our Elizabeth City laboratory for classification and analysis. The soil classification was performed by a Geotechnical Engineer in accordance with ASTM D2488. A total of five (5) representative split spoon soil samples were selected and subjected to natural moisture, 4200 sieve wash, and Atterberg Limits testing and analysis in order to corroborate the visual classification of the granular soils. These test results are tabulated below and are also presented on the "Log of Boring" sheets (Appendix 11). 4 5glulirris�z[ni=��ryL` "= Report of Subsurface Investigation and Geotachnical Engineering Services 4/3/07 Building P-828 Field Medical Services School Camp LeJeune, North Carolina GET Project No: EC07-159G Table 11 - Laboratory Test Results U� i� U"•sxino- � �dep� ain5 �'at"ura'1W t5a-•gy�va• t. �Ie —_ :� Y� � & ru gal' His' u� i�i�:h �'.F'.F �Zvi IS.xj11L�� q��qu�_E�_�TS^ - .1.•�'��'-.i•, i'.' p1L�•-Rr=t �I ' ... _ �� '7f'"i'i , E..=rJ.0 r' hE i ��niY 5 i GL•�C �i3 is '�'• ��• 4�a i,ii� �v �- bra _ nsu.a }-r, `y-t`':r is .i i � G.-. „� _ ` f ���64 r" �i � i �-� i �' .Y•a} - ws's�`ciE.ci � � l?k±crz.: . Y.�=9_:`�-'-'���.LC e[.=n�� a 5;=���+�:..— e��'5 � �,_, .::5�n=�s>~•�:L�I �+ �I -� �3' r-r•�_ IJ .J'r<'�' L��'�,.:.c,:�•�`,s��E=��Fli_,=.i'�•-�:I'-�,.'w. � ...R. C ��s����=�_, ^-ins__'-r i 3�, `L � , s`.`.Ri��._i'Ma.;ti41a� r•�u� K.t�� lr:�' �`,�'U��� �.'-' ����� B-1 S-4 6-8 29.5% 79.70/. 43/17/26 CL B-1 S-7 18-20 35.5% 25.6% NT SM B-2 S-2 2-4 14.5 % 5.5 % NT SP-SM B-2 5-13 48-50 19.5% 13.7% NT SM PB-2 S-3 4-6 31.1 % J 93.3% 4611 8/28L CL NT = Not Tested 3.0 SITE AND SUBSURFACE CONDITIONS 3.1 Site Location and Description; The project site is located along the east side of Command Street D within the Camp LeJeune military facility in North Carolina. At the time of our field investigation services, the property was generally observed to consist of grass areas with isolated trees and five (5) existing single story masonry framed structures (buildings 506, M507, and M512 through M514). The site appeared to be relatively level with less than 1-foot change in elevation in 50 feet. The northernmost site boundary consists of Command -Street F followed by existing structures. The westernmost consists of Command Street D followed by an existing parking lot and existing structures. The southernmost boundaries consist of Command Street E followed by a wooded area. The easternmost boundary consists of two existing structures (buildings M511 and M516) followed by a wooded area. 5 I Report of Subsurface Investigation and Geotechnical Engineering Services 413107 Building P-628 Field Medical Services School Camp LeJeune, North Carolina GET Project No: EC07-159G 3.2 Subsurface Soil Conditions: Topsoil ranging in thickness from 2 to 4-inches was encountered at the boring locations. Beneath the TOPSOIL the subsurface soils encountered at the boring locations were consistent at the boring locations, to their explored depths, and were arranged in a three layer configuration, More specifically, the subsurface soils consisted of a very loose to medium dense SAND (SP, SP-SM) with varying amounts of silt underlain by very soft to stiff CLAY (CL, CH) followed by very loose to dense SAND (SP-SM, SM) with varying amounts of silt and clay. Additionally, a deposit of medium stiff CLAY (CL) was encountered with the lower granular soils at the location of boring B-2 from a depth of 18 10 23-feet below existing grades. A brief description of the natural subsurface soil conditions encountered at the SPT boring locations is tabulated below: RANGES OF AVERAGE STRATUM DESCRIPTION SPT") N-VALUE .DEPTH (Feet) 0 to .3� TOPSOIL SAND (SP, SP-SM) with varying amounts of 0.3 to 4 I 2 to 12 silt Lean CLAY (CL) to Fat CLAY (CH) with 4 to 13 fI g to 10 varying amounts of sand SAND (SP-SM, SM) with varying amounts of 13 to 26 111 2 to 32 silt 18 to 23 IV Lean CLAY (CL) boring B-2 only 5 Note (1) SPT = Standard Penetration Test, N-Values in Blows -per -foot The subsurface description is of a generalized nature provided to highlight the major soil strata encountered. The records of the subsurface exploration included in Appendix li (Log of Boring sheets) and the Generalized Soil Profile presented in Appendix. III should be reviewed for specific information as to individual borings. The stratifications shown on the records of the subsurface exploration represent the conditions only at the actual boring locations. Variations may occur and should be expected between boring locations. The stratifications represent the approximate boundary between subsurface materials and the transition may be gradual. C1 Report of Subsurface Investigation and Geotechnical Engineering Services 413107 Building P-82B Field Medical Services School Camp LeJeune, North Carolina GET Project No: EC07-159G 3.3 Groundwater Information; At the time of our field drilling activities, the groundwater table level was found to occur at depths ranging from about 5 to 8 feet below the surface. Furthermore, the groundwater level encountered at the location of boring B-1 (5-feet below existing grades) is anticipated to be the results of "Perched" water above a restrictive horizon (CLAY). in order to more accurately determine the groundwater level a series of groundwater monitoring wells should be installed and subsequent 24 to 48 hour recordings should be performed. Groundwater conditions will vary with environmental variations. and seasonal conditions, such as the frequency and magnitude of rainfall patterns, as well as man-made influences, -such as existing swales, drainage ponds, underdrains, and areas of covered soil (paved parking lots, side walks, etc.). It is estimated normal seasonal high groundwater level will fluctuate within 1 to 1.5 feet above the current levels. We recommend that the contractor determine the actual groundwater levels at the time of the construction to determine groundwater impact on this project, if needed. 4.0 EVALUATION AND RECOMMENDATIONS In general, subsurface soils at this site were very loose to dense Sands with deposits of very soft to stiff CLAY (CL, CH) encountered at depths ranging from 4 to 13-feet and 18 to 23-feet below existing grades. It is anticipated that the footings will bear within the upper very loose sand deposits. Accordingly, the subgrade improvements, which consist of compacting the existing granular soils and the structural fill soils as indicated in Sections 4.2 and 4.3 of this report, will be required to achieve the allowable bearing capacities recommended in Section 4.4. It is considered necessary to increase the foundation rigidity with the use of top and bottom reinforcing steel, as indicated in Section 4.7 of this report, to aid in minimizing the effects of the anticipated foundation settlements. As indicated in Section 4.5 of this report, foundation subgrade improvements in the form of undercut and backfill should be expected when the foundations bear near or on the subsurface cohesive soil deposits (CLAY; CL, CH). The settlements associated with the footings will be minimized with the recommended site improvements included in this report. All foundation design and construction recommendations are presented in the following sections of this report. 7 i 5plutiori5lncs.� h Report of Subsurface Investigation and Geotechnical Engineering Services 413/07 Building P-628 Field Medical Services School Camp LeJeune, North Carolina GET Project No: EC07-159G The recommendations within this report must be reviewed in the event that more than 2-feet of fill will be required to establish the proposed first floor finished elevations. The placement of more than 2-feet of fill is expected to result in excessive settlements within the upper CLAY (CL, CH) deposits. 4.1 Clearing and Grading: The proposed construction areas should be cleared by means of removing existing the structures as well as their associated foundations and utilities vegetation, trees, associated root mat, and topsoil. It is expected that a out ranging from approximately 4 to 6-inches below existing grades will be required to remove the majority of the surface organic soils. The rerhoval-the foundation members and/or existing underground utilities associated with the existing structures may require an excavation depth of about 2 feet below existing grades. This out is expected to be deeper in isolated areas to remove deeper deposits of organic soils, which may become evident during the clearing. ' The project's budget should include an allowance for subgrade improvements (undercut and backfill with select fill). It is recommended that the clearing operations extend laterally at least 5 feet beyond the perimeter of the proposed building area. 4.2 Subgrade Preparation: Following the clearing operation and prior to site grading or any fill placement, the subgrade soils should be evaluated by G E T Solutions, Inc. for stability. Accordingly, the subgrade soils should be proofrolled to check for pockets of soft material hidden beneath a crust of better soil. Several passes should be made by a large rubber -tired roller or loaded dump truck over the construction areas (where possible), with the successive passes aligned perpendicularly. The number of passes will be determined- in the field by the Geotechnical .Engineer depending on the soils conditions. Any pumping and unstable areas observed during proofrolling (beyond the initial cut) should be undercut and/or stabilized at the directions of the Geotechnical Engineer. Following the proof roll and approval by the engineer, it is recommended that, within the construction areas, natural soils below stripped grade should be compacted to a dry density of at least 98 percent of the Modified Proctor maximum dry density (ASTM D1557), as tested to a depth of 12-inches, where possible. This densification will require the use of a large vibratory roller. 8 e k: i sSDi!]t[0175 jnL�f7��_ Report of Subsurface Investigation and Geotechnical Engineering Services 4I3107 Building P-828 Field Medical Services School Camp LeJeune, North Carolina GET Project No: EC07-159G 4.3 Structural Fill and Placement: Following the proper compaction and approval of the natural subgrade soils by the Geotechnical Engineer, the placement of the fill required to establish the design grades may begin. Any material to be used for backfill or structural fill should be evaluated and tested by G E T Solutions, Inc. prior to placement to determine if they are suitable for the intended use. Suitable structural fill material should consist of sand or gravel containing less than 20 percent by weight of fines (SP, SM, SW, GP, GW),' having a liquid limit less than 20 and plastic limit less than 6, and should be free of. rubble, organics, clay, debris and other unsuitable material. All structural fill should be compacted to a dry density of at least 98 percent of the Modified Proctor maximum dry density (ASTM .D1557). In general, the compaction should be accomplished by placing the fill in maximum 10-inch loose lifts and mechanically compacting each lift to at least the specified minimum dry density. A representative of G E T Solutions, Inc, should perform field density tests on each lift as necessary to assure that adequate compaction is achieved. Backfill material in utility trenches within the construction areas should consist of structural fill (as described above), and should be compacted to at least 98 percent of ASTM D1557. This fill should be placed in 4to 6 inch loose lifts when hand compaction equipment is used. 4.4 Building Foundation Design Recommendations: Provided that the previously recommended earthwork construction procedures are property performed, the proposed building can be supported by shallow spread footings bearing over firm natural soil or.well-compacted structural fill material. The footings can be designed using a net allowable soil pressure of up to 2000 pounds per square foot (psf). In using net pressures, the weight of the footings and backfill over the footings, including the weight of the floor slab, need not be considered. Hence, only loads applied at or above the finished floor need to be used for dimensioning the footings. W i 5ol[ifiorisln��-ka�; Report of Subsurface Investigation and Geotechnical Engineering Services 413107 Building P-828 Feld Medical Services School Camp Le,ieune, North Carolina GET Project No: F-007-159G In order to develop the recommended bearing capacity, the bass of the footings should have an embedment of at least 24 inches beneath finished grades, and wall footings should have a minimum width of 24. inches. In addition, isolated square pier footings, if used, are recommended to be a minimum of 3 feet by 3 feet in area for bearing capacity consideration. The recommended 24-inch footing embedment is considered sufficient to provide adequate cover against frost penetration to the bearing soils. 4.5 Foundation Excavations: Immediately prior to reinforcing steel placement, it is suggested that the bearing surfaces of all footing and floor slab areas be compacted using hand operated mechanical tampers, to a dry density of at least 98% of the Modified Proctor maximum dry density (ASTM D 1557) as tested to a depth of 12 inches, for bearing capacity considerations. In this manner, any localized areas, which have been loosened by excavation operations, should be adequately re -compacted. The compaction testing in the base of the footings may be waived by the Geotechnical Engineer, where firm bearing soils are observed during the footing inspections. In addition to compaction testing, hand auger borings with Dynamic Cone Penetrometer (DCP) testing should be performed within the base of the foundation excavations to ensure that the footing bearing soils are suitable for foundation support. Foundation bearing soil improvements are expected to be required where the foundation bearing elevation extends near or bear directly on the very soft cohesive soils encountered within the vicinity of boring B-3 from a depth of 4 to 6-feet below existing grades. Recommendations for bearing improvements (undercut and backfill) should be provided in the field during construction by a representative of G E T Solutions, Inc. Soils exposed in the bases of all satisfactory and remedied foundation excavations should be protected against any detrimental change in condition such as from physical disturbance, rain or frost. Surface run-off water should be drained away from the excavations and not be allowed to pond. If possible, all footing concrete should be placed the same day the excavation is made. If this is not possible, the footing excavations should be adequately protected. 10 Report of Subsurface Investigation and Geotechnical Engineering Services 4/3/07 Building P-828 Field Medical Services School Camp LeJeune, North Carolina GET Project No: EC07-1 59G 4.6 Building Foundation Settlements: It is estimated that, with proper site preparation (as previously presented), the maximum resulting total settlement of the proposed building foundations should be up to 1-inch. The maximum differential settlement magnitude is expected to be about %z-inch between adjacent footings (wall footings and column footings of widely varying loading conditions). The settlements were estimated on the basis of the results of the field penetration tests. Careful field control will contribute substantially towards minimizing the settlements. 4.7 Wall Construction .points and Foundation Reinforcement: In order to further reduce the effect of any potential settlements upon the cast in -place concrete walls, it is recommended that construction joints be implemented at on -center distances not exceeding 20 feet. These joints will provide for more flexible wall members that are less likely to crack as a result of any settlement. In order to provide a more rigid foundation system, more tolerant to the anticipated differential settlements, the wall footings should be designed with top and bottom steel reinforcement and stirrups. This approach will permit the footings to more effectively bridge over soft areas, minimizing the potential for foundation cracking. Column footings should also have top and bottom steel reinforcement. 4.8 Seismic Design Recommendations: The CPT sounding location was established, located and staked in the field by a representative of G E T Solutions, Inc.- The approximate sounding location is shown on . the attached "Boring Location Plan". The results of the completed field exploration program (CPT soundings) indicate that the average shear wave velocity recorded in the upper 50 feet was about 768 feet per second at the location of CPT-1 and 864 feet per second at the location of CPT-2. Additionally, the subsurface cohesive soil deposits encountered at the boring locations were noted to be less than 10-feet in thickness and contained un-drained shear strengths greater than 500 pounds per square foot, as indicated by the CPT soundings. As such based on the soil shear wave velocity test results, it is our professional opinion that the project site is within a site class 'D' in accordance with Table 1615.1 .1 of the 2003 International Building Code. The results of the CPT testing are presented in the attached "CPT Soundings; CPT-1 and CPT-2". 11 l Report of Subsurface Investigation and Geotechnical Engineering Services 413107 Building P-828 Feld Medical Services School Camp LeJeune, North Carolina GET Project No: EC07-159G 4.9 Building Floor Slabs: The floor slabs may be constructed as slab -on -grade members provided the previously recommended earthwork activities and evaluations are carried out properly. It is recommended that all ground floor slabs be directly supported by at least a 4-inch layer of relatively clean, compacted, poorly graded sand (SP) or gravel (GP) with less than 5 percent passing the No. 200 Sieve (0.074 mm). The purpose of the 4-inch layer is to act as a capillary barrier and equalize moisture conditions beneath the slab. It is recommended that all ground floor slabs be "floating" if no turn down slab/foundation system is implemented. That is, generally ground supported and not rigidly connected to walls or foundations. This is to minimize the possibility of cracking and displacement of the floor slabs because of differential movements between the slab and the foundation. It is also recommended that the floor slab bearing soils be covered by a vapor barrier or retarder in order to minimize the potential for floor dampness, which can affect the performance of glued tile and carpet Generally, use a vapor retarder for minimal vapor resistance protection below the slab on grade. When floor finishes, site conditions or other considerations require greater vapor resistance protection, consideration should be given to using a vapor barrier. Selection of a vapor retarder or barrier should be made by the Architect based on project requirements. 4.10 Pavements: California Bearing Ratio (CBR) testing procedures were not completed atthe time of this reporting. However, based on our experience with similar soil conditions it is our professional opinion that the CBR test results of the natural subgrade soils below the existing TOPSOIL will average on the order of about 15. The estimated average soaked CBR value was multiplied by a factor of two-thirds to determine a pavement design CBR value. The two-thirds factor provides the necessary safety margins to compensate for some non -uniformity of the soil. Therefore, a CBR value of 10 should be used designing the pavement sections., Based on our experience with similar soil conditions the following typical minimum pavement sections are used. 12 �5olufion'sliic;*> Report of Subsurface Investigation and Geotechnical Engineering Services 413107 Building P-828 Field Medical Services School Camp LeJeune, North Carolina GET Project No: EC07-159G I. Light Duty Pavement - Parking Areas: Flexible Pavement SUBGRADE: Stable and approved by the Geotechnical Engineer, lined with a Geotextile Geofabric (such as Mirafi 500 X or equivalent), and compacted to at least 100% of ASTM D 696. AGGREGATE BASE: Minimum 8.0 inches of Aggregate Base Material, size NCDOT Type "A". ASPHALT SURFACE: Minimum 2.0 inches *of Asphalt Concrete, NCDOT Type SF9.5A or SF9.5B. Rigid Pavement SUBGRADE: Stable and approved by the Geotechnical Engineer, lined with a Geotextile Geofabric (such as Mirafi 500 X or equivalent), and compacted to at least 100% of ASTM D 698. AGGREGATE BASE: Minimum 6.0 inches of aggregate base material size NCDOT Type "A". CONCRETE: Minimum 6.0 inches of 4,000 psi 28 day strength and air entrained Portland cement concrete. 13 ;5oliitions' ]ric=3 �� ��s`=� Report of Subsurface Investigation and Geotechnical Engineering Services 413107 Building P-828 Feld Medical Services School Camp LeJeune, North Carolina GET Project No: EC07-159G 11. Heavy Duty Pavement - Roadway Areas: Flexible Pavement SUBGRADE: Stable and approved by the Geotechnical Engineer, lined with a Geotextile Geofabric (such as Mirafi 500 X or equivalent), and compacted to at least 100% of ASTM D 698. AGGREGATE BASE: Minimum 8.0 inches of Aggregate Base Material, size NCDOT Type "A". ASPHALT BASE: Minimum 3.0 inches of Asphalt Concrete, NCDOT Type 1-19.OB. ASPHALT SURFACE: Minimum 2.0 inches of Asphalt Concrete, NCDOT Type SF9.5A or SF9.5B. Rigid Pavement. SUBGRADE: Stable and approved by the Geotechnical Engineer, lined with a Geotextile Geofabric (such as Mirafi 500 X or equivalent), and compacted to at least 100% of ASTM D 698. AGGREGATE BASE: Minimum 6.0 inches of aggregate base material, size NCDOT Type "A". CONCRETE: Minimum 8.0 inches of 4,000 psi 28 day strength and air entrained Portland cement concrete. 14 i Soi}iori; Report of Subsurface Investigation and Geotechnical Engineering Services 413/07 Building P-828 Field Medical Services School Camp LeJeune, North Carolina GET Project No: EC07-159G In preparatioh for a stable subgrade support for the pavement section, the following construction steps are recommended: 1. Following pavement rough grading operations, the exposed subgrade should be observed under proofrolling. This proofrolling should be accomplished with a fully loaded dump truck or 7 to 10 ton drum roller to check for pockets of soft material hidden beneath a thin crust of better soil. Any unsuitable materials thus exposed should be removed and replaced with a well -compacted material. The inspection of these phases should be performed by the Geotechnical Engineer or his representative. 2. if excessively unstable subgrade soils are observed during proofrolling and/or fill placement, it is expected that these weak areas can be stabilized by means of thickening the base course layer to 10 to 12 inches anchor the use of a Geotextile Geogrid (such as Tensar BX1100 or- equivalent). These alternates are to be addressed by the Geotechnical Engineer during construction, if necessary, who will recommend the most economical approach at the time. Actual pavement section thickness should be provided by the design civil engineer based on traffic loads, volume, and the owners design life requirements. The previous sections represent minimum thickness representative of typical local construction practices and as such periodic maintenance should be anticipated. All pavement material and construction procedures should conform to North Carolina Department of Transportation (NCDOT) requirements. 5.0 CONSTRUCTION CONSIDERATIONS 5.1 Drainage and Groundwater Concerns: Groundwater ,is expected to interfere with excavations that extend below a depth of approximately 5 feet below existing grades. Dewatering at depths between 5 to 8 feet can most likely be accomplished by pumping from sumps. However, dewatering below the water level may require well pointing. 15 i �5olutio%is�inc s��:- Report of Subsurface Investigation and Geotechnical Engineering Services 413I07 Building P-828 Field Medical Services School Camp Woune, North Carolina GET Project No: EC07-159G Due to the potential for perched ground water levels (as noted in Section 3.3 of this report), it is recommended that the contractor determine the actual groundwater levels at the time of the construction to determine groundwater impact throughout the project site and at specific proposed excavation locations. 5.2 Excavations: In Federal Register, Volume 54, No. 209 (October, 1989), the United States Department of Labor, Occupational Safety and Health Administration (OSHA) amended its "Construction Standards for Excavations, 29 CFR, part 1926, Subpart P". This document was issued to better insure the safety of workmen entering trenches or excavations. It is mandated by this federal regulation that all excavations, whetherthey be utility trenches, basement excavation or footing excavations, be constructed in accordance with the new (OSHA) guidelines. It is our understanding that these regulations are being strictly enforced and if they are not closely followed, the owner and the contractor could be liable for substantial penalties. The contractor is solely responsible for designing and constructing stable, temporary excavations and should shore, slope, or bench the sides of the excavations as required to maintain stability of both the excavation sides and bottom. The contractor's responsible person, as defined in 29 CFR Part 1926, should evaluate the soil exposed in the excavations as part of the contractor's safety procedures. In no case should slope height, slope inclination, or excavation depth, including utility trench excavation depth, exceed those specified in local, state, and federal safety regulations. We are providing this information solely as a service to our client. GET Solutions, Inc. is not assuming responsibility for construction site safety or the contractor's activities; such responsibility is not being implied and should not be inferred. 16 i $606n-)=h)_i7C � ', 4 Report of Subsurface investigation and Geotechnical Engineering Services 413107 Building P-828 Field Medical Services School Camp LeJeune, North Carolina GET Project No: EC07-159G 6.0 REPORT LIMITATIONS The recommendations submitted are based on the available soil information obtained by G E T Solutions, Inc. and the information supplied by the client for the proposed project. If there are any revisions to the plans for this project or if deviations from the subsurface conditions noted in this report are encountered during construction, G E T Solutions, Inc. should be notified immediately to determine if changes in the foundation recommendations are required. If G E T Solutions, Inc. is not retained to perform these functions, G E T Solutions, Inc. can not be responsible for the impact of those conditions on the geotechnical recommendations for the project. The Geotechnical Engineer warrants that the findings, recommendations, specifications or professional advice contained herein have been made in accordance with generally accepted professional geotechnical engineering practices in the local area. No other warranties are implied or expressed. After the plans and specifications are more complete the Geotechnical Engineer should be provided the opportunity to review the final design plans and specifications to assure our engineering recommendations have been properly incorporated into the design documents, in order that the earthwork and foundation recommendations may be properly interpreted and implemented. At that time, it may be necessary to submit supplementary recommendations. This report has been prepared for the exclusive use of Kroskin Design Group, PC as well as their consultants for the specific application to the Proposed Building P-828; Field Medical Services Schoa] project located within the Camp LeJeune military facility in North Carolina. 17 r Sol ifions=anc - tit. APPENDICES I. BORING LOCATION PLAN II. LOG OF BORINGS Ill. GENERALIZED SOIL PROFILE IV; CPT SDUNDINGS V. CLASSIFICATION SYSTEM FOR SOIL EXPLORATION APPENDIX I - BORING LOCATION PLAN LEGEND — APPROXIMATE BORING LOCATIONS GET Project Nanv BUILDING P-282i FIELD HEDICAL SERVICES SCHOOL CAMP LEJE'UNE. NC Project N(m EC07-159G Drawn By- GWS cawlwe•E�.�.. .rar,� Dater 3/26/07 Flip" NDd I SCALD B❑RING L❑CATI❑N PLAN notto scale APPENDIX [i - LOG OF BORINGS A GETPROJECT: MEMO Or,LnVul•hppjgqu*14ij-f Qg LOG OF 13ORING l V No, $-'i Field Medical Services School; P•928 PROJECT No.: EC07-159G CLIENT: Krosldn Design Group. P.G. PROJECT LOCATION: Camp Leleune, North Carolina LOCATION: See Attached Location Plan ELEVATION: TNA DRILLER; W. Riddicic LOGGED BY: _ G. Stalls. E.I.T.C7 DRILLING METHOD: Mud Rotary (wash} DATE: 3-21-07 DEPTH TO - WATER> INITIAL: $ 5-feet AFTER 24 HOURS: v T CAVING> S, a @ m Description a @ " d E o m o U v e TEST RESULTS Plastic Limit. Liquid Limit WaterCDntertt- o PenetratiDn - 10 20. 30 40 50 60 70 D a s a z . 2 z a 3 5 7= r a 4 4 7 8 a is.. iz , 2 2 9, 5 4-inches TOPSOIL ! 3: L 1: 1 :{ ;� 1 t . . . . ::::: ..... :.....:.....:.....:....-:................ ..:.....:.....�.....:.....................- :t 1.......:...........:...... .. ........... I . .. .. ... ..13, . ;•• .... � • • • •: • �• . • • . , . b ... ... ... ... .. .. .. .. ..- ..:.....:. .. ... ......... .- ... ....... .. .. ... .-. .................... ....................... ... .................. ...... Tan, moist, poorly graded fine to medium SAND (SP) to poorly b co? ded fne to medium SAND with silt (SP-SM), very loose to loose Wet from 5-feet; Passible Perched Water 2 - 3 4 io Light Gray -Tan, wet, Lean CLAY (CL) with silt and sand, medium Stiff3 5 Tan, wet, poorly graded fine to medium SAND with silt (SP-SM) to Silty fine SAND (SM), very loose to medium dense Tait -Gray from 18-feet Gray from 23-feet • Tan -Gray from 28-feet Gray from 33-feet 6 7 zo s 9 ao 1 Boring terminated at 35 ft. 40 50 60 70 Figure PAGE 1 of 1 116 ET M. L,n�,,, ry•,� . �.,nn N n Y,�t• rn w�SWAM LOG OF BORING No. B-2 PROJECT: Field Medical Senhces School: P-929 PROJECT NO.: EC07-159G CLIENT: Krosldn Desi2 Groue, P.C. PROJECT LOCATION: Camp LeJeune, North Carolina LOCATION: See Attached Location Plan ELEVATION: 1NA DRILLER: W. Riddick LOGGED BY: _ G. SWis,E.LT. DRILLING METHOD: Mud Ronny (Quash) DATE: 3-21-07 DEPTH TO - WATERS INITIAL: $ 9-feet AFTER 24 HOURS: 4�. CAVING -L �w o. m Description n m Cf d 02 to H o m 0 U o # v o TEST RESULTS Plastic Lt<rlit . — t Liquid Limit Water Content- o Penetration - 10 20 30 40 50 60 70 0 2 3 s 3 4 z 3 2 3 e 18 2 3 s s 11 12r 14 3 s 13 12 7 6 5.5 3. 2-inches TOPSOIL :i •t t t f:t:L): 4:j: ►1 1 :.....:.....:....:.....:.....;..... ... = ................. ....... . I i j ..... I k... .. .- f .:.....:.....:.....:.. :.....:...........:...........:... ; ...I : ........... _........... i • .. . 4. .. ........... I : .. I i .. ... .. ... ... .. .. .. ... .-.36. . - .. .............. " . ' ' " ' " ' • ,................ 0.1 Light Gray, moist, poorly graded fine to medium SAND (SP) to poorly graded fine to medium SAND with silt (SP-SM), loose to medium dense 2 Z4.1-rF t? a 7. 1 is t' 3 4 o Mottled Light Gray -Tan, moist, Lean CLAY (CL) with sand to Fat CLAY (C I) with silt and trace sand, medium stiff' -wet from 8-feet . .. IV 5 - Tan -Gray, wet, poorly graded fine to medium SAND with silt (SP- SM), medium dense 6 20 Tan -Gray, wet, Lean CLAY (CL) with silt and sand, medium stiff 2 Gray, wet, poorly graded fine to medium SAND with silt (SP-SM) to Silty fine SAND (SM), loose to medium dense Trace organics from 23 to 25-feet Tan -Gray from 28-feet Gray from 33-feet Light Gray, wet, Cemented Silty SAND (SM) with trace marine shellfiagnents, medium dense 4 Light Gray, wet, Silty fine to medium SAND (SW, medium dense 7 ; ::: s 3o y 10 ; ; ;:ii: ? ; ; 12 13 s0 Boring terminated at 50 ft. 60 70 Figure PAGE 1 of 1 %_JG I� PROJECT: Field Medical Services School: P-828 PROJECT NO.: EC07-159G CLIENT: Kroskin Desiz Groin, P-C. PROJECT LOCATION: Camp Leleune, North Carolina _ c:nnheiNr!•In.imumrm.7i±l[nS LOCATION: See Attached Location Plan ELEVATION: WA G LOG of BaR�NG DRILLER: W. Riddick LOGGED BY: _ G. Stalls, EJ.T, DRILLING METHOD: Mod Rotary wash DATE: ' 3-21-07~ No. B-3 IDEPTH TO - WATER> INITIAL: 8-feet AFTER 24 HOURS: X CAVING> C. ram, n m m o TEST RESULTS Plastic Limit Liquid Limif 0,12 Description m z m o C7 U WaterConterlt- p o Penetration - 2-inches TOPSOIL .i is k i -rI: t is �:i: i } ' t 2 s 1 i 1 a a 4 t 2 9 11 r 2 2 3 e 3 3 17 1T 15 1 t .. .. . . ... .......:.....:.....:.....:............ ... •..... ..... :......:................. ........;..... .... :.....:.....;...._:..... .. .. .. .. .. .. .. _ .. .. .. .. .. .......... .. ., .. .. .. ... ... :......................:.....:.....:..... t Tan -Gray, moist, poorly graded fine to meditnm SAND (SP) to poorly graded fine to medium SAND with silt (SP-Stu), very loose Light Gray from 2-feet 2 ` g 4 to Mottled Light Gray -Tan, moist, Fat CLAY (CH} with silt and trace sand to Lean CLAY (CL) with silt and sand, very soft to medium stiff Wet from 8-feet 1 Light Gray -Tan, wet, poorly graded fine to medium SAND with silt (SP-SM) to Silty fine SAND (SK, very loose to dense Reddish Tan from 18-feet Gray from 23-feet ' Tan -Gray from 29.5-feet Gray from 33-feet 5 6 20 7 s 30 10 Boring terminated at, 35fL Figure PAGE 1 of 1 ETPROJECT: I IN l�nurrlu,iai•I:n. i,ssn,anrr,u.urn, LOG OF BORING p' No. PB-1 Field Medical Services School;P-828 PROJECT NO.: EC07-1540 CLIENT: Kroslnn Desip Groff"P.C_ PROJECT LOCATION: Cernp Le7eune.Nnrth Carolina - LOCATION: See Attached Locad(m Plan ELEVATION: iNA DRILLER: W. Riddick LOGGED BY: G. Stalls, EXT. DRILLING METHOD: Mad Rotary (wash) DATE: 3-21-07 I DEPTH TO - WATER> INITIAL: $ 8-feet AFTER 24 HOURS: -13n CAVING> ,L W : m ar - Description U m 0 m E - in N o a U o O # TEST RESULTS Plastic Limit Liquid Limit Water Content - o Penetration - 10 20 30 40 50 60 70 0 a s a a a a 3 a s 9-inches TOPSOIL 'L-r.r3. 1 is E ..... ... .. .. 9 : .. .. _ .. .. .. ... ... Cray, moist, poorly graded fine to medium SAND (SP) to poorly graded fine to medium SAND with silt (SP-SNO, loose 2 3 ottled Light Gray -Tan, moist, Lean CLAY (CL) with sand to Fat CLAY (CH) with Silt and trace sand, medium stiff d ao 5 Tan -Gray, wet, poorly graded fine to medium SAND (SP-SNl) with silt, loose Boring terminated at 10 ft.6 20 30 40 so 60 70 Figure PAGE 1 of 1 ETPROJECT: • i:6vr6111ral •I..rinmorurs• rrSILrS LOG of BORING No. PB-Z Field Medical Seniices_School; l'-828 PROJECT NO.: EC07-154G CLIENT: Krosldn Design Group, P.C. PROJECT LOCATION: Camp LeJeufl North Carolina LOCATION: See Attached Location Plan ELEVATION: INA DRILLER: W. Riddick _ LOGGED BY: _ G. Stalls, E.T.T. I: iRILLINGMETHOD: Mud Finary(wash) _ DATE; 3-21-07 DEPTH TO - WATER> INITIAL: 43 8-feet AFTER 24 HOURS: 4P CAVING> -L _ n 4i Q Description E z° N o o m o o TEST RESULTS Plastic Limft - —, Liquid Limit Water Content- a Penetraibn - t0 20 30 40 50 80 7D 0 2 a 4 r s 4 5 z s 4 3 3. 4-inches TOPSOIL :1:1: r s fia1: a i i ' + 1 2 -- ............ .......... :g , .... :. . ......................... . ................ .....:...........:... . Gray, moist, poorly graded free to medium SAND (SP) to poorly graded fine to medium SAND with silt (SP-SK, very loose to medium dense 3 4 io Mottled Light Gray -Tan; moist, Lean CLAY (CL) with sand to Pat CLAY (CH) with sift and trace sand, medium stiff to stiff Wet from 8-feet' 5 4 BoriDg terminated at 10 ft. 20 30 40 50 60 70 Figure PAGE 1 of 1 GETPROJECT: r.wrrmww•r�crrswnrru�a!• ryr�r.� LOG OF BORING g,' 1 V Q, Pg-3 Field Medical Services School. P-828 PROJECT NO.: EC07-159G CLIENT: Kroskin Design Group, P.C. _ PROJECT LOCATION. Camp_Leieune, North Carolina _ LOCATION: See Attached Location Plan ELEVATION: INA DRILLER: W. Riddiek LOGGED BY: G. Stalls, E.I.T. DRILLING METHOD: Mud Rotary (washy _ DATE: 3-21-07 DEPTH TO - WATER> INITIAL: $ 8-feet AFTER 24 HOURS: 'gr CAVING> .C_ _ o Description CL m E z 5 o :3Plastic to o a 0 TEST RESULTS Limit Liquid Limit Water Content- 0 Penetration - 10 20 30 40 50 60 70 0 2 2 t z z 3 3 3 a 2 a 2-inches TOPSOIL 1 J- k ) 1� f1'.E1: { i . ... . :........... .....:...._:.... .....:...............:..... .... .....:.....=.....:.....: .....:.....: ... ------------ 4 Gray, moist, poorly graded fine to medium SAND (SP) to poorly graded fine to medium SAND with silt {SP-511+i), very loose 2 3 z.Mottled Light Gray -Tan, moist, Lean CLAY (CL) with sand to Fat CLAY (CH) with silt and trace sand to Lean CLAY (CL) with silt and sandmedium stiff Wet from om 8-feet 4 zo 5 Boring terminated at 10 $ 20 30 40 so 60 70 Figure PAGE 1 of 1 KEY TO SYMBOL Symbol Description Strata symbols JJJ✓ Topsoil J J J ✓ J JJ✓ r 7: Poorly graded sand z r�aa: with silt %%%,� Lean f�//////ail clay Silty sand Fat cclaymisc. Symbols Zz- Water table during drilling Notes: I. Exploratory borings were drilled on 3-21-07 using a 4-inch diameter continuous flight power auger. 2. No free water was encountered at the time of drilling or when re -checked the following day. 3. Boring locations were taped from existing features and elevations extrapolated from the final design schematic plan. 4. These logs are subject to the limitations, conclusions, and recommendations in this report. r . Results of tests conducted on samples recovered a�reVreported on the logs. APPENDIX III - GENERALIZED SOIL PROFILE Strata symbols Topsoil Poorly graded sand ' [ with sill Lean ® clay Silly rand Fat ® clay KEY TO SYMBOLS Symbol. Description Strata s 2� tots Topsoil JJJ! Poorly graded sand `r77: with silt. ® Lean clay Silty sand Fat clay Misc. symbols a Water table during drilling Notes: 1. Exploratory borings were drilled on 3-21-07 using a 4--inch diameter continuous flight power auger. �2. No free water was encountered at the time of drilling or when re -checked the following day. 3. Boring locations were taped from existing features and elevations extrapolated from the final design schematic plan. 4. These logs are subject to the limitations, conclusions, and recommendations in this report. L Results of tests conducted on samples recovered are reported on the logs. APPENDIX IV - CPT SOUNDINGS -10 -- 2 0 4-1 P4 A -30 -40 -50 GET Solutions Soundi ng: CPT- 1 Cone: 25e3. 1 O7XX Locat ion: Camp Johnson Date_ 02�-Fipr i2O07 q-t (tsf) fs (tsf). Rf ( a) u (ft) SBTn 1000 0.0 4.0 0.0 6.0 0 100 0 12 Max, QepCh: 47.90 (ft) Depth Inc.: 0.164 (ft) r r i r r i i r Refusal -------7------- r G Undefined 9 Gmv lly Sand Lo Sa Sands • Sand Mlxturea Sand Wxtures SIEt3 Mixtur J 3 a SUL& I and Mixtures lays Slll Mlxlurrs Sandy Shad MULures K Sandy andMLntup r S= Saad Mlxtuyes 5llt Mlxturea Sand M[xtures �lnderine� aye �•-- iSandy r:.9F�:atidl GravelSy Sand La Sa SB'i`. Soil Behavior Type (Robertson 1990) .Q Estimated PhreaUc Surface C rTrc Job No: 07-932 Client: GET SdWons Prafect Title; Camp Johnson Operator. ConeTec Hole: CPT-1 Site: Cam Johnson, NC Date:02/Apr12007 Gone:2583,107XX TIMrr Cms) 20 40 50 80 109 120 140 160 180 -10 -40 -50 GET Solutions Soundinq. CPT-2 Cone- 7-583. 107XX l ocat i on: Camp Johnson ❑at e: 02iApr ,-2007 qt (tsf) f s (tsf) Rf (%) 1000 0.0 4.0 0.0 6.0 Max. Depth. 50.36 (ft) Depth Inc.: 0.164 (ft) Refi al U (rL) 5131L1 0 100 0 1.2 �[ —Tndertned Grasellylly Sand to Sa Gm flf�'3� � Sands Sand Mixtures i Silt N tares Sand taix ums Silt hltxturas M-F Sand hllxLurra IZ� Sands GiRV1bzz+ mm� u�- A ^.' Sand Mixturca Silt Mixturrs �7,�g' yj�a Sand MixLuren wM, 51IL Ailxtum Sand Mlxlures Sands -`� Sand Mixturra � Slit RlLxLures Sand Mixtures — Sands Sand Mlxtur r Grawfly Sand to So Sands I i sBT: Soil Behavior Type (Robertson 1990) Estimated Phreatic Surface Shear Wave Vefoc[ty- CPT-2 CONETEC Camp Jahnson ' 07-932 April 2, 2007 I I Shear Wave Veloc ty (IVs) 0 50D 100D 15DO 2000 2500 3000 0 ! 1 1 1 1 1 i I 1 1 I 1 1 I I 1 1 5 I I I 1 1 I I 1 1 I I I I L [ I I i 10 1 I I 1 I I I I I 1 I r I I 1 1 I I 75 1 1 I I I I 1 I 1 1 1 { 1 r I I i 1 1 I 1 I I I • I I I I I I { I I 1 1 I 1 1 r 1 ] 1 I l 1 1 1 1 1 1 1 20 r I 1 1 1 I I I e I 1 I e 1 I I v 25 I 1 I I• k I 1 1 I I I I I 1 I 1 I I i I 1 7 1 M I r 1 i 1 I I I I I 1 I 1 I I 1 I ! I I 1 1 m a 30 1 I ] 1 ! I I I I I I m I e 1 I I I r l { 1 I I I 1 I I I 1 1 1 1 I I I r I I ! 1 1 1 I I I I 1 ! I I I I I 1 I I 1 1 I I 40 I I I I I I I r { I 1 1 1 I I I 45 1 i i I 1 I { I 5o I 1 I r i 1 1 r 1 , I I 55 I 1 1 1 I 1 1 1 1 1 1 I I C 7.Ec Job No: 07-932 alent GET Sot0tlons Project Me_ Camp Johnson Operator. ConeTec Hale_ CPT 2 Site: Camp Job NC Date: 021 Apd 2007 Cone:25B3.107XX TIME (ms) 0 20 40 60 80 100 120 140 160 160 x 10 -t 0 -i 0-i APPENDIX V - CLASSIFICATION SYSTEM FOR SOIL EXPLORATION JW�,_ 0K07LZ0 North Carolina Department of Environment and �F Natural Resources Request for Express Permit Review NCDENR For DENR Use ONLY Reviewer: CS/� Submit $ �5 Time: Confirm FILL-IN all the information below and CHECK the Permit(s) you are requesting for express review. FAX or Email the completed form to Express Coordinator along with a completed DETAILED narrative site plan PDF file and vicinity ma same items expected in the a lication acka e of the project location. Include this form in the application package. 0, • Asheville Region -Alison Davidson 828-296-4698;alison.davidson()-ncmaiLnet • Fayetteville or Raleigh Region -David Lee 919-791-4203; david.lee(fncmail.net �p v r • Mooresv!!!e & -Patrick Grogan 704-663-3772orpatrick._qro_qaiiOnc I net • Washington Region -Lyn Hardison 252-946-9215 or lyn.hardison(CDncmail.net l • _ S e� • Wilmington Region -Janet Russell 910.350-2004 or fanet.russell(fncmail.net (DAr' 01 .,11 NOTE. Project application received after 12 noon will be stamped in the following work day. +ku"t Project Name; P-828 FIELD MEDICAL SERVICES SCHOOL County: ONSLOW Applicant: CARL BAKER, PE Company: CAMP LEJEUNE - US MARINE CORPS Address: 1005 MICHAEL RD City: CAMP LEJEUNE, State: NC Zip: 28547 Phone:910-451-5950 Fax:910-451-5463 Email: CARL,H.BAKER@USMC.MIL E C E I V E' Project is Drains into SC, HQW. NSW waters Project Located in White Oak River Basin Engineer/Consultant: Rob Downs, PE Company: Greenhorne & O'Mara, Inc JUL 2 8 �n8 Address: 5565 CENTERVIEW DR. STE 107 City: RALEIGH, State: NC Zip: 27615 Phone: 919-532-2315 Fax::919-851-8393 Email: rdowns@g-and-o.com DWQ PROJ # (Check all that apply) ❑ Scoping Meeting ONLY ❑ DWQ, ❑ DCM, ❑ DLR, ❑ OTHER: ❑ Stream Origin Determination: # of stream calls — Please attach TOPO map marking the areas in questions ,® State Stormwater ❑ General ❑ SFR, ❑Bkhd & St Rmp, ❑ Clear & Grub, ❑ Utility ❑ Low Density ❑ Low Density -Curb & Gutter _ # Curb Outlet Swales ElOff-site[SW (Provide permit #)) ❑ High Density -Detention Pond _ # Treatment Systems ❑ High Density -Infiltration _ #Treatment Systems ❑ High Density -Bio-Retention _ # Treatment Systems ® High Density —Constructive Wetlands 1 # Treatment Systems.j ❑ High Density -Other _ # Treatment Systems ❑ MODIFICATION SW (Provide permit #) F Coastal Management ❑ Excavation & Fill ❑ Bridges & Culverts ❑ Structures Information ❑ Upland Development ❑ Marina Development ❑ Urban Waterfront ® Land Quality ® Erosion and Sedimentation Control Plan with ll 11-- acres to be disturbed.(CK # (for DENR use)) WETLANDS QUESTIONS MUST BEADDRESSED_B,ELOW re 5 ❑ Wetlands (401): Check all that apply Wetlands on Site ❑ Yes ❑ No Wetlands Delineation has been completed: ❑ Yes ❑ No US ACOE Approval of Delineation completed: ❑ Yes ❑ No 404 Application in Process wf US ACOE: ❑ Yes ❑ No Permit Received from US ACOE ❑ Yes ❑ No Fee Split for multiple permits: Check # Isolated wetland on Property ❑ Yes ❑ No Buffer Impacts: ❑ No ❑ YES: acre(s) Minor Variance: ❑ No ❑ YES Major General Variance ❑ No ❑ YES 401 Application required: ❑Yes ❑ No If YES, ❑ Regular Perennial, Blue line stream, etc on site ❑ yes ❑ No For DENR use only Total Fee Amount $ SUBMITTAL DATES Fee SUBMITTAL DATES Fee CAMA $ Variance Ma"; Min $ SW ❑ HD, ❑ LD, ❑ Gen $ 401: 1 $ LQS $ Stream Deter,_ $ 1 2 3 4 5 IMPERVIOUS SURFACE AREA III E cams wpn wfR .coo sl �//J IE. ARA+�I6 Y4 91 1 G i` muL sa xu - 'IV aan sl i I!1 Y{Rros x - ax p M $ SHEET NOTES: p k 1. NaME Nn wmlEclot AFLPO ALL 9tlN LNNCGL �ooMP wrooPToTa earyua�w toouwxc}sEsn m- t'N.S Ml FPD9pl COIAmA s al Y'-0OAAIKS I l L �.-.I...�� a— a rl.— Xa- _O lQ 4 IIMOMC6m 9�xYO6 / a SA s KEY NOTES Qmw mu t-,ii i b •.4 5.75 i75 ©9I FOM QJrM t µae r A 5d5 ASP — ' 3 - + QIMxpMI AALT PNOWPC- w wtv" NA/F IC C0 I L' QET FR NPpCIRIEIM 5.� i \ auc b6ulE 1[➢IL In ill �tuu Imo, $; 9 '�S:}� M 585 11 5$5 \ `,\ 1r • ,• t� •� \\� �!! 0 MULL OW KU (mrwnlxr To carol na'rAc lw.) QMM Tl. FM M SAx. i. a f t _ AVOiID FII� I�IGL _ "a EIL M m SHI. aN 91. S. _ I — r ll 1 6I FFE- lo �N- SLS E3 I g I I 3 rI l:i p I x 5.85 I S.B$ (�} r E5 w'".. F NI = J L — — — _ _ _ _ _ _ _ _ L�ro I �t t y O 17 ' qyy g -N i• ,\ ,_ - �•+w-�s�cSFwL-ems. ��Y,3.��T�C'�F_ _ lii �V 1L CO. STREET F. e gi GRADING ! DRAINAGE f EROSION CONTROL PLAN- F r n A A g I Cal • 43. +� d = �' I NOT FOR CONSTRUCTION _ GREENHHOcRNE d O'MARA i GRAPHIC SCALE 0i� wari. k . rr+P x�A owoMc.. T v 1 ao t 1211 C �, t C it l 4 Owo PROJ # Stormwater Management Narrative P-828 Field Medical Services School Camp Lejeune MCB, NC July 2008 Project Description The US Marine Corps at Camp Lejeune, NC is proposing to construct a 2569 sq meter (27652 sq foot) building to serve as a classroom / training building for the Field Medical Services School. The project also includes construction of a new 54 space parking lot on the east side of the project site. The project site is bound by CO Street E on the north, CO Street D on the west, CO Street F on the south and a densely wooded area on the east. The project is located on a 22257 sq. meter (5.5 acre) site that is currently occupied by a cluster of buildings and associated parking areas and sidewalks. Existing storm drainage on the site is confined within the perimeter of the above site boundary. There is an existing underground storm structure and piping system running parallel to streets CO Street E, CO Street F, and CO Street D on the project site side of the roads. This existing storm drainage system discharges directly into the wooded area on the east side of the project site. The design method that was used for the constructed storm water wetlands was based on criteria outlined in the NCDENR BMP manual. The rational method was used to calculate the required treatment volume and the conveyance system. All methodologies that are used are consistent with the North Carolina Division of Water Quality, which has jurisdiction over this project. The area being developed is approximately 4.78 acres. One constructed wetland area will be placed on the project site to collect all storm water before it leaves the project site. There is no additional storm water draining onto the site from outside the project limits. Due to this development's proximity from streams, rivers, etc it is not required to maintain buffer areas. Existing Site Conditions The existing site is currently occupied by a cluster of buildings and associated parking areas and sidewalks yielding an impervious surface area of 1.48 acres. This area is believed to have been originally developed in the 1950s and 1960s. There are no known existing wetlands within the project limits. Topographic elevation of the existing site varies from a high of 6.25 meters to a low of 3.75 meters. Design Analysis The existing impervious surface area of the site is approximately 6000 sq. meters (1.48 acres). This project includes a total site impervious surface area of 5632 sq. meters (1.40 acres). Since the new impervious surface area is less than existing, stormwater management measures pertaining to quantity are not required. E C E I V E n DWQ PROJ # Since the new impervious surface area for the site will be 25% of the total project site area the project will be considered a high density development. High Density developments require structured BMPs. We are proposing to install a constructed wetland to treat the first 1.5 inch of runoff generated by new impervious surface included in this project. The 22,257 sq. meter (5.5 acre) site will drain generally from west to east into the constructed wetland area via two grassed lined swales. There will be one Swale on the north side of the new building and one on the south side. The wetlands will discharge through an outlet structure then into an existing 18 inch CMP pipe which discharges off site. Stormwater runoff leaving the project site will flow towards the east and will flow through an approximate 300 linear foot wooded area before reaching Scales Creek. Scales Creek is part of the White Oak River Basin and according to NCDENR data has waters classified as SC, HQW and NSW. Roof drain leaders will discharge directly into the constructed wetland to be treated before discharging Scales Creek. The total surface are of the proposed wetland will be 0.36 acres. See attached for wetland sizing calculations. Soil Data An infiltration evaluation was performed by ECS Carolinas, LLC on July 3, 2007 (see attached). Data was taken from two locations on the site. The results show a ground water level 60 inches and a seasonal high water level (SHWL) 45 inches below the existing grade. An infiltration test was performed at several locations on site and the results show an average infiltration rate of 10.1 inches/hour. Summary The overall stormwater management goal is to meet the current regulatory requirements for water quality and quantity treatment and attenuation as required by the North Carolina Division of Water Quality. The proposed design meets and exceeds the regulations of the State and accomplishes these goals. It is our understanding that there are no additional requirements for this site such as CAMA permits due to the site's location. REt P828 Reld Medical School - Express Erosion Control. Subject: RE: P828 Field Medical School - Express Erosion Control. From: "DOWNS, Rob" <RDOWNS a G-and-O.com> Date: Mon, 28 Jul 2008 10:23:29 -0400 To: "Janet Russell" <Janet.Russell@ncmail.nct>, ""fowler GS05 David W" <david.towler a usme.mil> CC: <fwing a virtexco.com> Janet - We would like to schedule the Express Review Mtg for Erosion Control and Stormwater for Tues 8/5. Please find attached the revised meeting request and stormwater narrative. Do you have 8/5 available? 10am or something around then. Thanks - Robert L. Downs, PE Greenhorne & O'mara, Inc 5565 Centerview Dr. Ste 107 Raleigh, NC 27606 (919)532-2315 (919)851-8393 fax -----Original Message ----- From: Janet Russell [mailto:Janet.Russell@ncmail.net] Sent: Friday, July 25, 2008 1:13 PM To: DOWNS, Rob; Towler GS05 David W Subject: Re: P828 Field Medical School - Express Erosion Control. Rob: I'm looking at the week of August 4th for erosion control and stormwater submittal meetings. We should be able to do the meetings the same day. Please forward me a stormwater narrative so that we know what is being proposed for stormwater treatment. Please follow the guidance in the attached narrative guidance. Thanks, Janet DOWNS, Rob wrote: IJanet - Do you have anything else available next week? If not, I'll coordinate with David and send some dates and times for the week of the 4th. We will probably request to do the EC and Stormwater review at the same time if we need to wait til that week. Thanks - Robert L. Downs, PE Greenhorne & O'mara, Inc 5565 Centerview Dr. Ste 107 Raleigh, NC 27606 (919)532-2315 (919)851--8393 fax -----Original Message ----- From: Janet Russell [mailto:Janet.Russell@ncmail.net] Sent: Wednesday, July 23, 2008 4:56 PM To: DOWNS, Rob Cc: david.towler@usmc.mil; ssteele@virtexco.com Subject: Re: P828 Field Medical School - Express Erosion Control. I of 3 7/28/2008 10:40 AM RE: P828 Field Medical School - Express Erosion Control. Unfortunately we are booked up for July 30. I don't know why that date is the most popular this year!! How does your schedule look for the following week or the 2nd week in August? Please give me some available date & times. Thanks, Janet DOWNS, Rob wrote: Janet - Please find attached our Express Review Mtg request for the Erosion Control for the above referenced project. At this time we are requesting Erosion Control only with Stormwater review to follow a week or so after. David Towler and I will both already be in Wilmington for separate morning meetings on Wed. 7/30. If possible we'd like to schedule the review meeting for that afternoon right after lunch. Please let me know if this will be possible or if you need additional information. Thanks - Robert L. Downs, PE Greenhorne & O'mara, Inc 5565 Centerview Dr. Ste 107 Raleigh, NC 27606 (919)532-2315 (919)851-8393 fax -----Original Message ----- From: Janet Russell[mailto:Janet.Russell@ncmail.net] Sent: Wednesday, July 16, 2008 2:35 PM To: DOWNS, Rob Subject: Re: Express Fees Rob: Please submit the completed Express Request, a vicinity map, a stormwater narrative (see attachment), and a pdf site plan. Thanks, Janet DOWNS, Rob wrote: Janet - Can you please send me the scheduling form that I need to submit for Express Review of erosion control and stormwater? Thanks - Robert L. Downs, PE 2 of 3 7/28/2008 10:40 AM Rli`: P828 Field Medical School - Express Erosion Control. Greenhorne & O'mara, Inc 5565 Centerview Dr. Ste 107 Raleigh, NC 27606 (919)532-2315 (919)851-8393 fax -----Original Message ----- From: Janet Russell[mailto:Janet.Russell@ncmail.net] Sent: Tuesday, July 08, 2008 2:54 PM To: DOWNS, Rob Subject: Express Fees Attached is the fee schedule. Content -Description: Express mtg request EC.pdf Express mtg request EC.pdf Content -Type: application/octet-stream Content -Encoding: base64 Content -Description: P828 EC Express Site.pdf P828 EC Express Site.pdf. Content -Type: application/octet-stream Content -Encoding: base64 Content -Description: P828 Stormwatcr Narrative.pdf P828 Stormwatcr Narrative.pdf. Content -Type: app I i cati on/octet- stream Content -Encoding: base64 3 of 3 7/28/2008 10:40 AM North Carolina Department of Environment and A�� Natural Resources Request for Express Permit Review NCDENR For DENR Use ONLY Reviewer: Submit Time: Confine FiLL-IN all the information below and CHECK the Permit(s) you are requesting for express review. FAX or Email the completed form to Express Coordinator along with a completed DETAILED narrative, site plan (PDF fife) and vicinity map (same items expected in the application package of the project location. Include this form in the application package. `-� • Asheville Region -Alison Davidson 828-296.4698;atison.davidson(@,ncmail.net 3 0 '� r jo "a• • Fayetteville or Raleigh Region -David Lee 919-791-4203; david.lee(ftcmail.net L' ° • Mooresville & -Patrick Grogan 704-663-3772 or patrick.aroaan0mcmail.net • Washington Region -Lyn Hardison 252-946-9215 or lyn.hardison(da►cmail.net • Wilmington Region -Janet Russell 910-350-2004 or janet.russell@ncmail.net NOTE: Project application received after 12 noon will be stamped in the following work day, Project Name: P-828 FIELD MEDICAL SERVICES SCHOOL County: ONSLOW Applicant: CARL BAKER, PE Company: CAMP LEJEUNE - US MARINE CORPS Address: 1005 MICHAEL RD City: CAMP LEJEUNE, State: NC Zip: 28547 Phone:910-451-5950 Fax:910-451-5463 Email: CARL,H.BAKER(a�USMC.MIL E C E it V E Project is Drains into SC, HOW, NSW waters Project Located in White Oak River Basin D Engineer/Consultant; Rob Downs, PE Company: Greenhorne & O'Mara, Inc JUL 2 3 2008 Address: 5565 CENTERVIEW DR. STE 107 City; RALEIGH, State: NC Zip: 27615 Phone: 919-532-2315 Fax::919-851-8393 Email; rdowns(a)q-and-o.com DWQ f'ROJ # (Check all that apply) ❑ Scoping Meeting ONLY ❑ DWQ, ❑ DCM, ❑ DLR, ❑ OTHER: ❑ Stream Origin Determination: # of stream calls — Please attach TOPO map marking the areas in questions ❑ State Stormwater ❑ General ❑ SFR, ❑Bkhd & Bt Rmp, ❑ Clear & Grub, ❑ Utility ❑ Low Density ❑ Low Density -Curb & Gutter _ # Curb Outlet Swales ❑ Off -site [SW (Provide permit #)] ❑ High Density -Detention Pond , # Treatment Systems ❑ High Density -Infiltration , #Treatment Systems ❑ High Density -Bio-Retention # Treatment Systems ❑ High Density —Constructive Wetlands 1 # Treatment Systems ❑ High Density -Other _ # Treatment Systems ❑ MODIFICATION SW (Provide permit #) ❑ Coastal Management ❑ Excavation & Fill ❑ Bridges & Culverts ❑ Structures Information ❑ Upland Development ❑ Marina Development ❑ Urban Waterfront ® Land Quality ® Erosion and Sedimentation Control Plan with acres to be disturbed.(CK # (for DENR use)) WETLANDS gUESTIONS MUST BE ADDRESSED BELOW L4 , r? V k(� tc S ❑ Wetlands (401): Check all that apply Wetlands on Site ❑ Yes ❑ No Wetlands Delineation has been completed: ❑ Yes ❑ No US ACOE Approval of Delineation completed: ❑ Yes ❑ No 404 Application in Process wf US ACOE: ❑ Yes ❑ No Permit Received from US ACOE ❑ Yes ❑ No Fee Split for multiple permits: Check # Isolated wetland on Property ❑ Yes ❑ No Buffer Impacts: ❑ No ❑ YES: acre(s) Minor Variance: ❑ No ❑ YES Major General Variance ❑ No ❑ YES 401 Application required: ❑Yes ❑ No If YES, ❑ Regular Perennial, Blue line stream, etc on site ❑ yes ❑ No For DENR use only Total Fee Amount $ SUBMITTAL HATES SUBMITTAL DATES Fee CAMA Variance ❑ Ma'; Min $ SW ❑ HD, ❑ LD, ElGen AFee 401: $ LQS Stream Deter,. $ 5 PFAM V-1 Ir 'A ra LOCATION MAP uj EXISTING CONDITIONS PLAN A NOT FOR CONSTRUCTION GWHiC SCALE :. I Fk"s JUL2 3 2008��_---- ----��---------�-------------------- DWO pRoJ # 91 IMPERVIOUS SURFACE AREA MMW—NU—MnI=;n7WWE AAFA 43�ra SHEET NOTES: x4 1. WAU #W PWU= APUM ru =ft ILM L M P07 LE4M MM uE 00pa[ctND MoKsoupo M 10 9M wm srm Co. %KL KIN -=RW-CC 4 anm KEY NOTES ©SIT FDa (DWT ro" ww -575 �DKYVM I PW=M (DPK MIT mm:rm _,.'' , •t ; i';j 4_ MAE VCMI MEPL LID FOR UCw,c x bm x 5,0 <DPMDU DW BKU AN 7w 14 (CWM-W IQ moi emu M) (DUM CL MM M SAML 5m NM EX ft 10 LM PROPOSM FELD MENA x 5M -K .55 StMoM PAD= MM PM� WA PADIC 10=0 Do 25M M FFE- &MM x 5m 4 j.� 4 7-V Co. sntm F. -7— ------------ GRADING DRAINAGE! EROSION CONTROL PLAN SCAIE I tit 0 10 20 30 Q 1 ; . NOT FOR CONSTRUCTION GREENHORNE & OUARA EROSION & SEDIMENTATION CONTROL PROJECT NARRARTIVE P-828 Field Medical Service School Camp Lejeune MCB, NC G&O Project 4140560 July 2008 Project Description: E C E l V E J u L Z 3 2008 DWO PROD # The US Marine Corps at Camp Lejeune, INC is proposing to construct a 2569 sq meter building to serve as a classroom / training building for the Field Medical Services School. The project also includes construction of a new 54 space parking lot on the cast side of the project site. The project site is bound by CO Street E on the north, CO Street D on the west, CO Street F on the south and a densely wooded area on the east. Existing storm drainage on the site is confined within the perimeter of the above site boundary. There is an existing underground storm structure and piping system running parallel to streets CO Street E, CO Street F, and CO Street D on the project site side of the roads. This existing storm drainage system discharges directly into the wooded area on the east side of the project site. The disturbed area covers a total area of 19330.43 sq. meters (4.78 acres)] and all the properties surrounding the project are owned by Camp Lejeune. The following measures shall be implemented to minimize pollutants in storm water discharges associated with construction activity at the construction site: stabilized construction entrance, silt fence, hardware wire inlet protection, and stabilization of existing slopes and green space with seed and mulch. The contractor will be working closely will the base's KOICC which will conduct various inspections and oversee the general construction of the project. For design and construction purposes, we have prepared a Grading / Drainage / Erosion Control plan designated as sheet C-105. This sheet shows all grading and temporary erosion control measures. III addition, soil erosion control details as well as all the project soil erosion general notes, erosion control measures/maintenance schedule/notes and the construction sequence for the project have been provided on sheet C-502, C-503, and C-504. A construction entrance will be installed on the north east corner of the site otT CO Street E. The stabilized construction entrances will control tracking of mud, dirt or other debris from the construction site onto adjacent roads and streets. These temporary stabilized stone pads shall be constructed at the above points where vehicular traffic will be leaving the construction site and moving directly onto a paved road or street. It shall extend the full width of the vehicular ingress and egress area and have a minimum length of 50 feet. The entrance shall be maintained in a condition that will prevent tracking or flow of mud onto adjacent roads or streets. If conditions on the site are such that the majority of tite mud is not removed by the vehicles traveling over the stone, the tires of the vehicles shall be washed before entering the road or street. Any inud, which is tracked onto roads or streets, shall be removed on a regular basis. The other primary erosion control measures to be used to minimize pollutants in storm water discharges associated with construction activity at the construction site are silt fence and hardware cloth inlet protection. Silt fence shall be installed on the downhill side of disturbed areas where erosion would occur in the form of sheet and rill erosion. Silt fencing will be installed parallel to CO Street E, CO Street F, and CO Street D to prevent sediment from entering the existing storm inlet structures. As an additional measure, hardware cloth inlet protection will be placed around all existing inlets within the project limits. Silt fencing will also be installed along the perimeter of woods line on the east side of the project site to prevent sediment from leaving the site. Per our analysis, all other sedimentation and erosion control with respect to the stabilization of existing slopes will be addressed using seed and mulch. The contractor will provide a groundcover (temporary or permanent) on exposed slopes within 21 calendar days fol{owing completion of any phase grading; and a permanent groundcover for all disturbed areas within 15 working days (whichever is shorter) following completion of' construction or development. In addition, all green spaces within the project limits will be seeded and/or mulched to maintain a vegetative cover. Due to the minimal slopes of the proposed grassed swales on the north and south sides of the project site additional erosion control measures will be necessary within the swale. The shallow slopes will allow sediment to drop to the swale bottorn before it leaves the project site. 1-1828 Field Medical School - Express Erosion Control. Subject: P828 Field Medical School - Express Erosion Control. From: "DOWNS, Rob" <RDOWNS@G-and-O.com> Date: Wed, 23 Jul 2008 l 5:08:44 -0400 To: "Janet Russell" <Janet.Russel l@ncmai1.net> CC: <david.towler@ustnc.mil>, <ssteele@irtexco.com> Janet - Please find attached our Express Review Mtg request for the Erosion Control for the above referenced project. At this time we are requesting Erosion Control only with Stormwater review to follow a week or so after. David Towler and I will both already be in Wilmington for separate morning meetings on Wed. 7/30. If possible we'd like to schedule the review meeting for that afternoon right after lunch. Please let me know if this will be possible or if you need additional information. Thanks - Robert L. Downs, PE Greenhorne & O'mara, Inc 5565 Centerview Dr. Ste 107 Raleigh, NC 27606 (919)532-2315 (919)851-8393 fax -----Original Message ----- From: Janet Russell [mailto:Janet Sent: Wednesday, July 16, 2008 2: To: DOWNS, Rob Subject: Re: Express Fees Russell@ncmail.netl 35 PM Rob: Please submit the completed Express Request, a vicinity map, a stormwater narrative (see attachment), and a pdf site plan. Thanks, Janet DOWNS, Rob wrote: Janet - Can you please send me the scheduling form that I need to submit for Express Review of erosion control and stormwater? Thanks - Robert L. Downs, PE Greenhorne & O'mara, Inc 5565 Centerview Dr. Ste 107 Raleigh, NC 27606 (919)532-2315 (919)851--8393 fax -----Original Message ----- From: Janet Russell[mailto:Janet.Russell@ncmail.net] Sent: Tuesday, July 08, 2008 2:54 PM To: DOWNS, Rob Subject: Express Fees Attached is the fee schedule. 1 of2 7/23/2008 4:56 I'M Re: Camp Lejeune- Field Medical Services School Subject: Re: Camp Lejeune- Field Medical Services School From: Linda Lewis <linda.lewis@ncmail.net> Date: Fri, I I Jul 2008 13:29:00 -0400 To: "DOWNS, Rob" <RDOWNS a C-and-O.com> CC: Janet.Russell a ncmail.net I'll try to explain as best I can. Onslow County is subject to the NPDES Phase II requirements of Session Law 2006-246. However, under the Session Law exemptions, redevelop projects (i.e., those with total post -construction BUA that is less than what previously existed) are listed as not being subject to those Phase IT rules, however, they are still subject to the Coastal Stormwater rules under NCAC 2H.1000. Under coastal rules, 25% is the maximum BUA for a low density project within 1/2 mile of and draining to SA waters, so I'm not quite sure why you thought it would be high density, but based on the site plan you provided, I would definitely call this a high density project. One thing I don't see is the connection from the parking lot and roof drains into the infiltration system. How does the runoff get there? Also, the top of the system looks like it's grated which is more indicative of an enclosed sand filter than an infiltration trench system. A closed sand filter can be designed irregardless of the SHWT. Even though the BMP says a minimum infiltration trench depth of 3'-8', that is not correct. We will accept shallower trench depths. If you can redesign with a shallower, wider trench, with a bottom that is 24" above the SHWT, that will be fine with us. Linda DOWNS, Rob wrote: Linda - I'm working on a project at Lejeune on a 5 acre site and am having a little trouble meeting stormwater management requirements. Our post -construction impervious surface area is less than our pre -construction area thus stormwater quantity measures are not required. However, we aware we are still required to treat runoff for quality. The total impervious surface area is 25% of the total site area so it is our understanding that it will be considered a High Density site and will require structural BMPs since Onslow is a coastal county. The issue we are running into is meeting NCDENR requirements for the depth of the BMP above the seasonal high water level. Our geotechnical report shows that the SHWL is 43-45 inches below existing grade. Given the BMP requirements of a min 2' above the SHWL we are only left with 19inches of depth for volume. Our current solution uses infiltration trenches on either side of the site to capture runoff from the proposed building and parking area. Worst case we will need a 24" deep stone filled trench with 4-12" pipes. This assumes 6" cover over the pipe and 6" below the pipe (2" stone, 4" sand). BMP design criteria states min. trench depth shall be 36" with the bottom a min 24" above the SHWL. Obviously our current design does not meet this criteria. Researching other BMPs we find the same scenario. Basically our site slopes west to east with a large densely wooded area approximate 300' wide on the east end of the site. We do not have enough fall on the site to drain to a stormwater pond. Can you provide any suggestions on how to handle stormwater quality requirements? Is there a variance/exception that can be issued due to site constraints on the infiltration trench design requirements that will allow us to use the design described above? In.f.iltration rates for the site are excellent ranging from 1.2.9 - l of 7/16/2008 10:33 AM Re:'Camp Lejeune- field Medical Services School ' - 11; 7.3 inches/hour (24-14 times the min design requirement) I have attached for your use a copy of the erosion control plan currently under review at the base. It shows the grading and .infiltration trench locations. Please disregard the trench dimensional info shown on the plan as it is no .Longer correct. Any assistance you can provide would be greatly appreciated. Thanks - Robert L. Downs, PE Greenhorne & O'mara, Inc 5565 Centerview Dr. Ste 107 Raleigh, NC 27606 (919)532-2315 (919)851-8393 fax 2 of 2 7/16/2008 10:33 AM RE: Camp Cejeune- Field Medical Services School ti Subject: RE: Camp Lejeunc- Field Medical Services School From: "DOWNS, Rob" <RDOWNS a G-and-O.com> Date: Fri, 1 l Jul 2008 13:52:12 -0400 To: "Linda Lewis" <linda.lewis@ncmail.net> CC: <Janet.Russell a ncmail.net> Linda - I'm a little confused. So since our site has an impervious area of 25% we are considered high density correct? If not I think our issue goes away and we can treat with grassed swales, filter strips, etc. To answer your questions, parking drainage will flow to the infiltration trenches via curb cuts to grassed swales that will discharge to the infiltration trenches. Roof drains will connect directly to the trenches. The top of the system is gravel. I guess it's bad symbology which made it look grated. The problcm wc'rc having is the SHWT on the site is only 43". This leaves us only 19" of available depth if we are required to stay 24" above the SHWT with the trench bottom. This doesn't leave us a reasonable amount of depth to work with. I'm I misunderstanding or overlooking something here? Given our high SHWT can you suggest any other BMPs we can evaluate? I'd be happy to discuss by phone if you are available. Thanks - Robert L. Downs, PE Greenhorne & O'mara, Inc 5565 Centerview Dr. Ste 107 Raleigh, NC 27606 (919)532-2315 (919)851-8393 fax -----Original Message ----- From: Linda Lewis [mailto:linda.lewis@ncmail.net] Sent: Friday, July 11, 2008 1:29 PM To: DOWNS, Rob Cc: Janet.Russell@ncmail.net Subject: Re: Camp Lejeune- Field Medical Services School Rob: I'll try to explain as best I can. Onslow County is subject to the NPDES Phase II requirements of Session Law 2006-246. However, under the Session Law exempticns, redevelop projects (i.e., those with total post -construction BUA that is less than what previously existed) are listed as not being subject to those Phase II rules, however, they are still subject to the Coastal Stormwater rules under NCAC 2H.1000. Under coastal rules, 25% is the maximum BUA for a low density project within 1/2 mile of and draining to SA waters, so I'm not quite sure why you thought it would be high density, but based on the site plan you provided, I would definitely call this a high density project. One thing I don't see is the connection from the parking lot and roof drains into the infiltration system. How does the runoff get there? Also, the top of the system looks like it's grated which is more indicative of an 1 00 7/16/2008 10:33 AM RIi: P-828 Field Medical Services School Subject: RIB: P-828 Field Medical Services School From:-rowler CIV David W" <david.towler cr usmc.mil> Date: 'rue, 29 Jul 2008 14:49:50 -0400 To: "Janet Russell" <Janet.Russel l a ncmail.net> August 5 is good for me. I'll be there. Thanks, David. -----Original Message ----- From: Janet Russell[mailto:Janet.Russell@ncmail.net] Sent. Tuesday, July 29, 2008 14:31 To: DOWNS, Rob; Towler CIV David W; Carol Miller Subject: P-828 Field Medical Services School *P-828 Field Medical Services School* July 29, 2008 The Express meetings for Land Quality and Stormwater have been scheduled as follows: The Stormwater submittal meeting has been scheduled with *Chris Baker on August 5, 2008 at 10:00 AM *here in the Wilmington Regional Office, 127 Cardinal Drive Ext. The Land Quality submittal meeting has been scheduled with *Carol Miller on August 5, 2008 at 10:45 AM* after the Stormwater meeting. The applicant is required to attend the meetings. Please review the submittal requirements, attached. Note that we would like all plans folded to 9" by 14" in order to fit into our file system. Rob, please respond back to this email confirming that you accept the appointment date / times. Thanks, Janet Russell Express Coordinator 1 of 1 7/29/2008 2:51 I'M RE: P-828 Field Medical Services School Subject: RE: P-828 Field Medical Services School From: "DOWNS, Rob" <RDOWNS a G-and-O.com> Date: Tue, 29 Jul 2008 16:07:12 -0400 To: "Janet Russell" <Janet.Russcll a ncmai1.net>, "Towler GS05 David W" <david.towler a usmc.mil>, "Carol Miller" <CaroLMiller a ncmail.net> CC: <fwing cr virtexco.com>, <sstecle a virtexco.com>, "Bob Belangia" <belangia@mbfarchitects.com> Janet - We accept the mtg date and time. 8/5/08 loam. Robert L. Downs, PE Greenhorne & O'mara, Inc 5565 Centerview Dr. Ste 107 Raleigh, NC 27606 (919)532-2315 (919)851-8393 fax -----Original Message ----- From: Janet Russell(mailto:Janet.Russel.l@ncmail.net] Sent: Tuesday, July 29, 2008 2:31 PM To: DOWNS, Rob; Towler GS05 David W; Carol Miller Subject: P-828 Field Medical Services School *P-828 Field Medical Services School* July 29, 2008 The Express meetings for Land Quality and Stormwater have been scheduled as follows: The Stormwater submittal meeting has been scheduled with *Chris Baker on August 5, 2008 at 10:00 AM *here in the Wilmington Regional Office, 127 Cardinal Drive Ext. The Land Quality submittal meeting has been scheduled with *Carol Miller on August 5, 2008 at 10:45 AM* after the Stormwater meeting. The applicant is required to attend the meetings. Please review the submittal requirements, attached. Note that we would like all plans folded to 9" by 14" in order to fit into our file system. Rob, please respond back to this email confirming that you accept the appointment date / times. Thanks, Janet Russell Express Coordinator I of 1 7/29/2008 4:25 PM