Loading...
HomeMy WebLinkAboutSW8080313_COMPLIANCE_20200914STORMWATER DIVISION CODING SHEET POST -CONSTRUCTION PERMITS PERMIT NO. SW8 buo313 DOC TYPE ❑ CURRENT PERMIT ❑ APPROVED PLANS ❑ HISTORICAL FILE COMPLIANCE EVALUATION INSPECTION DOC DATE YYYYMM DD Camp Lejeune SW Permit Renewal! Number Measure Type Treatment Number Permit Number Expiration Date Inspection Date Status 1 WDP SWP 152 SW8060147 12/31/2020 6/30/2020 In Compliance 1 WDP SWP 153 SW8 060147 12/31/2020 6/30/2020 In Compliance 2 WDP SWP 080 SW8060832 10/6/2020 6/9/2020 In Compliance 3 SF SWP 386 SW8 080313 3/20/2619 6/4/2020 In Compliance 4 SF SWP 429 SW8 080740 9/1/2020 Not Built 4 WDP SWP 430 SW8 080740 9/1/2020 Not Built 4 WDP SWP 431 SW8080740 9/1/2020 Not Built 4 WDP SWP 432 SW8 080740 9/1/2020 Not Built 4 WET SWP 151 SW8 080740 9/10/2020 6/9/2020 In Compliance 5 SF SWP 221 SW8 080907 7/2/2020 5/6/2020 Not in Compliance 5 SF SWP 222 SW8 080907 7/2/2020 5/6/2020 Not in Compliance 5 SF SWP 223 SW8080907 7/2/2020 5/6/2020 Not in Compliance 5 SF SWP 224 SW8 080907 7/2/2020 5/6/2020 Not in Compliance 5 SF SWP 225 SW8 080907 7/2/2020 5/6/2020 Not in Compliance 6 WDP SWP 301 SWS 090630 9/8/2020 1/21/2020 In Compliance 6 WDP SWP 302 SW8 090630 9/8/2020 7/28/2020 In Compliance 6 WDP SWP 303 SW8 090630 9/8/2020 1/21/2020 In Compliance 6 WDP SWP 304 SW8 090630 9/8/2020 1/21/2020 In Compliance 6 WDP SWP 305 SW8 090630 9/8/2020 1/21/2020 In Compliance 6WDP SWP306 SW8 090630 9/8/2020 1/21/2020 In Compliance 6WDP SWP307 SW8 090630 9/8/2020 7/28/2020 In Compliance 7 WDP SWP 250 SW8090815 10/22/2020 6/iS/2020 In Compliance 7 WDP SWP 360 SW8090815 10/22/2020 6/29/2020 In Compliance 8 WDP SWP 211 SW8 090901 9/21/2020 6/9/2020 In Compliance 8 WDP SWP 212 SW8 090901 9/21/2020 6/9/2020 In Compliance 8 WDP SWP 213 SW8 090901 9/21/2020 5/6/2020 In Compliance 8 WDP SWP 230 SW8 090901 9/21/2020 6/8/2020 In Compliance 9 WDP SWP 214 SW8 100201 6/11/2020 6/29/2020 In Compliance 9 WDP 5WP 261 SW8 100201 6/11/2020 7/28/2020 In Compliance 9 WDP SWP 262 SW8 100201 6/11/2020 6/29/2020 In Compliance 9 WDP SWP 263 SW8 100201 6/11/2020 7/28/2020 In Compliance 10 IB SWP 311 SW8 120509 5/30/2020 5/6/2020 Not in Compliance 10 IB SWP 312 5W8 120S09 5/30/2020 5/6/2020 Not in Compliance 11 WDP SWP 315 SW8 120806 8/15/2020 6/29/202C In Compliance 12WDP SWP013 SW892070S 3/7/2018 6/15/20201nCompiiance $6,060 1111 f S�`'S 10:17:31 W01 8 2 /9 02-27-' 14 12 : 49 FROM.- �i 'Jr a�a�d own�iwauxi 1wa- 29 l„P0009/0010 f -923 v Permit No. SW8 080313 Mod. P-1184 Stone Bay DInIng Hall! P-1288 sEQ Rine Range! P-1349 Special Ops Tratning Complex Stormwater Permit No. SW8 080313 Mod, Onelow County Designer's Certification I, Mary Ann DuRant as a duly registered Professional Engineer in the Virginia State of� , having been authorized to observe (ariodlcall woskh# (W too the construction of the project, P-1349 Special Operations Training Complex (Site #2) (Project) for Commanding Officer, MCB Camp Lcjeune (Project Owner) hereby state that, to the best of my abilities, due care end diligence was used in the observation of the project construction such that the construction was observed to be built within substantial oompliance and Intent: of the approved plans and speoii<cations. The cheokiist of items on page 2 of this form is Included In the Certifioation. Noted deviations from approved plans and specification: Diameter of the underdrains in sand filter #3 is 8-inches instead of 6-inches. Signature Registration Number VA 037452 Date Nov. 16, 2018 SEAL (Nat Required) EU1, --_i V E.1 DEC 2 8 2018 Page's of 9 ..; ._ a.. �. 1111 10:17:47 12-28-2018 3/9 02-21-'14 12:49 FRU- T-529 P0010/0010 F-923 o14 w olulloin n it IV3UFl y=1Iwilt Jya=Illo Permft_Na, 5WS 080313 -Mad, Certificabon Requirements: YLAD 1. The drainage area to the system contains approximately the permitted acreage. 2. The drainage area to the system contains no more then the permitted amount of built -upon area. MAD 3. All the built -upon area associated with the project is graded such that the runoff drains to the -system, �J%A 4. All roof drains are located such that the runoff is directed into the system. AAD 5. The bypass structure weir elevation is perthe approved plan. 6L B. The bypass structure is located per the approved plans. A i. A Trash Rack is provided on the bypass structure. �B. All slopes are grassed.with permanent vegetation. 26k9. Vegetated slopes are no steeper than 3:1. MR�10. The inlets are located per the approved plans and do not cause short- circuiting of the system. AAD11. The permitted amounts of surface area andfor volume have been provided. 12. All required design depths are provided. EtAQ 13. All required pads of the system are provided. AAO 14. The required system dimensions are provided per the approved plans. cc: NCDENR-DEMLR Wilmington Regional Office David Towler, MCB Camp Lejeune DEC , 2 8 2018 Page 9 of 9 1111 10:18:03 12-28-2018 4/9 w may deem sufficient, reissue a certilicate of registration or avv,wnast;on, provided that a malanly 01 the members of Vw Board vote in favor of such issuance. 11921, C.1, 9.10, C.S., s.B055111; 1939, c,219, s.2; 1951, c.1084, s.t; 1953. c.1041, 5.10; 1957, c.1060, s.5; 1973. c.1331, 9.3; 1975. c.681, sA. 1981. c.789, 1969. c.669, $.l.l e 89C•23. Unlawful to practise engineering or tend surveying wlthart registration; unlawful use of title or terms; penattles; Attorney Ganeral to be legal sdvlser.•Any person who shall practice. or offer to practice, engineering or land surveying in this State without first being registered in accordance with Iha provisions of this Chaplet, at any person, firm, partnership, arganiiation, association, corporation, or other entity using or employing the words `engineer- or 'engineering' or 'professional engineer' or -professional engineering' at 'land surveyor' or 'land surveying,' or any modification or derivative thereof ;n Its name or form of business or activity except as registered under this Chapter or In pursuit of activities exempted by this Chapter, or any person presenting or attempting to use the Conlficale of registration or the seal at another, or any person who shall give any false or forged evidence of any kind to the Board or to any member thereof In obtaining at attempting to obtain a oeetilicate of registration, or any person who shall falsely Impersonate any other registrant of like or different name, or any person who shall attempt to use an expired or revolted or nonexistent certificate of registration, at who shall practice or offer to practice when not qualified, or any person who falsely claims that he Is registered under this • Chapter, or any person who shall r violate any of the provisions of this Chapter, In addition to Iniunetive procedures set out hefeinbefore, shall be guilty of a misdemeanor, and may, upon conviction, be sentenced to pay a fine fall not less than one hundred dollars 16100,001, nor more than one thousand dollars II1,0001, or suffer imprisonment for a period not exceeding three months, of both, in the diarietion of the court- in no event shall there be representation of at holding out to the pubfic of any engineering expertise by unregistered persons. It shall be the duty of all duly constituted officers of the State and all political subdivisioni thereof to enforce the provisions of this Chapter and to prosecute any persons violating same. The Attorney General of the State or his assistant shall act as legal adviser to the Board and render such legal assistance as may be necessary in carrying out the provisions of this Chapter, The Board may employ counsel and necessary assistance to ald in the enforcement of this Chapter, and the compensation and expenses therefor shall be paid from funds of the Board. 11921. C. 1, a. 12; C. S., s. 80591n1: 1951, c. 1OB4, s. 1; 1976, c,681, s. 1.1 I 89C-24. Corporate or pertnershlp practice., of engineering or land survoying,-A corporation orpamve+ rsh;p may engage in the practice of engineering or find surveying In this State, provided, however, the person or persons connected with such corporation or partnership in charge of the designing or supervision which constitutes such practice is or are registered as herein required of professionat r engineers and registered land surveyors. The same exernplions shalt apply to corporations and partnerships as apply to Individuals under this Chapter, provided further, that all corporations hereunder shaft be subject to the provisions of Chapter 550 of the General Statutes of North P-1349 Special Operations Training Complex MARSOC CAMP LEJEUNE, NORTH CAROLINA Carolina (1921. c. 1, s. 14; C. S., S. 60551p1; 1961. C: 1084, s. 1; 1969, c. 718, a. 18; 1976, c. 681, s. 1.1 I 89C•25. Umltations on application of Chaplsr.-This Chapter shall not be construed to prevent or affect: The practice of architecture, landscape erchitectura,- or contracting or any other legally recognized profession or trade; of The practice of professional engineering or land surveying in this State or by any person not a resident of this State and having no established place of business in this State when this practice does not aggregate more than 90 days in any calendar year, whether performed In this State or elsewhere, or involve more than one specific project; provided, however, that such person is legally qualified by registration 10 practice the said profession in his own state or Country, in which the requirements and qualifications for obtaining a certificate of registration are satisfactory to the Board; in which case the person shall apply for and the Board win Issue is temporary permit; or The practice of professional engineering or land surveying In this State not to aggregate more than 90 days by any patron residing in this Stale, but whose residence has not been of sufficient duration lax the ' Board to grant or deny registration; provided, however, such person shall have filed an application far registration as a professional engineer or registered land surveyor and shall have paid the fee provided for In G. S. 89C-14, and provided that such a person is legally qualified by rttgistralion to practice professional engineering or land surveying In his own state or Country in which the requirements and qualifications for obtaining is canifisate or registration are satisfactory to the Board, in which case the person shall apply for and the Board will issue a temporary permit; or Engaging in engineering or land surveying as an employee or assistant under the responsible charge of a professional engineer or registered land surveyor or as an employee or assistant of a nonresident professional engineer or a non resident re9islerad land surveyor provided for in subdivisions 12) and 131 of this section, provided that said work as an employee may not Include responsible charge of design or supervision: or The practice of professional engineering of land surveying by any person not a resident of, and halting no established place of business In thla State; as- a"consulthtg associate of a prafessi"Ill engineer at registered land surveyor registered haler the provisions of this Chapter; provided, t n rx id t q service in his own stale or Country; or Practice by members of the armed locus or employees of the government of the United States while engaged in the practice of engineering or land surveying sofaly lot said government an goverrlmant- owned works and projects; or 1111 10:18:38 12-28-2018 5i9 02-27-'14 12:47 FROM- T-529 P0002/OD10 F-923 *A& NCDENR North Carolina Department of Environment and Natural Resources Division of Energy, Mineral, and sand Resources Tracy E. Davis, PE, CPM Pat McCrory, Governor Director John E. 5kvarla, IIi, Secrelary February 26, 2014 Commanding Officer MCB Camp Lejeune c/o Neal Paul, Deputy Public Waft Officer 1005 Michael Road Camp Lejeune, NC 28642 Subject. State Stormwater Management Permit No. SW8 080313 Mod. P-1184 Diningg Facility / P-1206 Rine Range BEQ 1 P-1349 Special Ops Training Complex High Density infiltration Basin 1 Sand Filter Project Onslow, County Dear Mr. Paul. Effective August 1, 2013 the State Stormwater program has been transferred from the Division of Water Quality (DWO) to the Division of Energy, Mineral and Land Resources (DEMLR). All previous references to DWO will remain In older etormwater permits Issued prior to August 1, 2013 until they are modified. Please note that this modified permit now references DEMLR as the Division responsible for Issuance of the permit The Wilmington Regional Office received a complete, modified Stormwater Management Permit Application for P-1184 Dining Facility 1 P-1286 Rile Range BEQ / P-1349 Special Ops Training Complex on February 21, 2014. Staff review of the plans and speelfleatlons has determined that the project, as proposed, will comply with the Stormwater Regulations set forth In Session Law 2008-2 1 and Title 15A NCAC 2H.1000. We are forwarding modified Permit No. SW8 080313 dated February 26, 2014, for the construction, operation and maintenance of the built -upon areas and BMP'a associated with the subject project. This permit shall be effective from the data of issuance until December 30 2021. The permittee and the project shall be subject to the conditions and limitations as specified therein. Please Nay special attention to the conditions listed in this permit regarding the Operation and aintenance of the BMP(s), certification of the.BMP's, procedures for changing ownership, transferring the permit, and renewing the permit Failure to establish an adequate system for operation and maintenance of the etormwater management system, to certify the BMP's, to transfer the permit, or to renew the permit, will result in future compliance problems. The following modifications are covered by and added to this permit: 1. Adds the P-1349 Special Ops T►alning Complex 2. Reduces the drainage area and BUA for Basin #6 slightly. The eliminated portion of DA 8 has been Incorporated Into the now DA-9. 3, Eliminates the previously permitted small infiltration basin for DA-9 and adds a new Sand Filter 43 in a new location to serve DA-9. 4. Adds DA-10 served by a new Sand Filter#4. 5. The previously permitted infiltration basins In DA's 1, 2, 3, 5, and 7 are unchanged. 6. Permit SW8 040912 will be rescinded upon thv installation and certification of Basins 6 and 7. 7. The plans prevlously approved on April 29, 2008 for P-1184 Stone Bay Dining Hall, and on July 13, 2012 and November 2, 2013 for the P-1280 BEQ Rifle Range, are considered part of the approved plans for this modlflcation only in regard to the grading, layout and details of those projects, grading, layout and details for Basins 1, 2, 3, 5, 8 and 7 and their associated vegetated filters. Wilmington Reglonel flriee 127 Cardinal Drive Extension, Wilmington, North Camffna 28405 Phone: (910) 198-12151Pax: (910) 350.2D04 10:17:22 12-29-2018 119 Commanding General Public Works Department Design Branch Marine Corps Base 1005 Michael Road Camp Lejeune, NC 28547 FAX Fax: (crI o) .350 `QC)b Pages: tV -10) qa4 -'133 Urgent For Review Please Comment Please Reply Please Review Comments: t �- `� z, 67-13-'12 15,44 FROM -DEER Wilmington 910-350-2019 T-534 P@009/0010 F-898 orals EnWdMl Ivrana940MV11t systems Permit No. SW8 080313 Camp Lejeune - P-1184 Dining Facility and P-1286 Rifle Range BEQ Stormwater Permit No. SW8 080313 Mod_ Onslow Cou - J Designer's Certification I, t�►At•+-rl�u "AyC— , as a duly registered a in the State of North Carolina, having been authorized to observe per o ca weekly/ full time) the construction of the project, SEE Psrrcrsrr¢tia,n t�'' 128tp B'Ea?•- ¢.�Ft-t: l�At�sCaF PoAfi7 � gM� �r i (Project) for cp1M Ea (Project Owner) hereby state that, to the best of my abilities, due care and diligence was used in the observation of the project construction such that the construction was observed to be built within substantial compliance and intent of the approved plans.and.specifications. The checklist of items on page 2 of this form is included in the Certification, Noted deviations from approved plans and specification: Signature 9A wttg-� Registration Number 03 Date bko 1 SEAL ECEIVE BY: Page 8 of 9 �� r �,. ..- � � � � t .i1;1 0,7-13-`12 15,44'FROM-DENR Wilmington Certification Requirements: 910-350-2018 T-534 P001010918 F-898 : -ACK10 J LV 1 t I lW d lt;l IVIAI IdYUI I MI It Q y*1C11114 Permit oySW8 08031$ 1. The drainage area to the system contains approximately the permitted acreage. 2. The drainage area to the system contains no more than the permitted amount of built -upon area. ✓ 3., All the built -upon area associated with the project is graded such that the runoff drains to the system. ✓ 4. All roof drains are located such that the runoff is directed into the system. 5. The bypass structure weir elevation is per the approved plan. ✓ 0, The bypass structure is located per the approved plans. a; A 7. A Trash Rack is provided on the bypass structure. 8. All slopes are grassed with permanent vegetation. 9. Vegetated slopes are no steeper than 3:1. 10. The inlets are located per the approved plans and do not cause short- circuiting of the system. 11. The permitted amounts of surface area and/or volume have been provided. 12. All required design depths are provided. 13. All required parts of the system are provided. 14. The required system dimensions are provided per the approved plans. NCDENR-DWQ Regional Office David Towler, MCB Camp Lejeune SEP 1 ? 205 ray: Page 9 of 9 r CAPE FEAR ENGINEERING Cape Fear Engineering, Inc. has been contracted by Balfour Beatty to certify the installed stormwater BMPs as part of the P1286 Bachelor Enlisted Quarters (BEQ's) project on Rifle Range Road. Cape Fear Engineering was not the original designer of record and was not contracted to complete as-builts/certifications until after construction was complete; however, CFE did perform construction staking for the project and performed GIS Data Deliverables for the project. This engineer's certification has been prepared based on a combination of as -built survey by Cape Fear Engineering; redline markups provided by the contractor, GIS Date Deliverables, limited post construction inspections of completed stormwater BMPs, and verification that CFE identified punch list items have been completed. 'DIVE SEP 17 2015 BY: P:15581558-124 Rifle Range\Admin\ASBUILTS & CER,rS%STORMWATliR12015-09-l6 Final StarmwaterClarification ,doe 67-13-'12 15:44 FROM-DENR Wilmington 910-350-2018 T-534 P@009/0010 F-898 Ouaiaaruiir1WdUdi nnarrdyVillaiu aysiems eermit No. S 8 08Q313 Camp Lejeune - P-1184 Dining Facility and P-1286 Rifle Range BEQ Stormwater Permit No. SW8 080313 Mod. sowCounty Designer's Certification i, jj&E'^(— , as a duly registered in the State of North Carolina, having been authorized to observe (periodically/ weekly/ full time) the construction of the project, �S�eE AWAGHeo ckA1AV:".M 003S for M,c MP � NiT (Project Owner) hereby state that, to the best of my abilities, due care and diligence was used in the observation of the project construction such that the construction was observed to be built within substantial compliance and intent of the approved plans and.specifications. The checklist of items on page 2 of this form is included in the Certification. Noted deviations from approved plans and specification: Signature Registration Number a38c,t 5 Date C3 k% Lo %s �ECEBeIE SEP 17 2015 BY: Page 8 of 9 SEAL SEAL ' 038615 9i,••'fiNGINE�� .� „W „T,;,,,,,,,, - r . i •d.... . J�r 07-13-'12 15;44,FRON-DENR Wilmington 910-350-2018 7-534 P0010/9010 P-898 vta� a�zn i tMcIttl sviai+4YU1I =1It OybtCffN Permit Ng, SW$ 000§13 Certification Requirements: ✓ I. The drainage area to the system contains approximately the permitted acreage. 2. The drainage area to the system contains no more than the permitted amount of built -upon area. 3,. All the built -upon area associated with the project is graded such that the runoff drains to the system. 4. All roof drains are located such that the runoff is directed into the system. 'I 5. The bypass structure weir elevation is per the approved plan. "00' 6. The bypass structure is located per the approved plans. N� a i. A Trash Rack is provided on the bypass structure. 8. All slopes are grassed with permanent vegetation. ✓ 9. Vegetated slopes are no steeper than 3:1. ✓ 10. The inlets are located per the approved plans and do not cause short- circuiting of the system. 'f 11. The permitted amounts of surface area and/or volume have been provided. 12. All required design depths are provided. 13. All required parts of the system are provided. ✓ 14. The required system dimensions are provided per the approved plans. .Co., NCDENR-DWQ Regional Office David Towler, MCB Camp Lejeune SEP 17 2015 i BY: Page 9 of 9 CAPE FEAR ENGINEERING Cape Fear Engineering, Inc. has been contracted by Balfour Beatty to certify the installed stormwater BMPs as part of the P1286 Bachelor Enlisted Quarters (BEQ's) project on Rifle Range Road. Cape Fear Engineering was not the original designer of record and was not contracted to complete as-builtslcertifications until after construction was complete; however, CFE did perform construction staking for the project and performed G1S Data Deliverables for the project. This engineer's certification has been prepared based on a combination of as -built survey by Cape Fear Engineering; redline markups provided by the contractor, GIS Date Deliverables, limited post construction inspections of completed stormwater BMPs, and verification that CFE identified punch list items have been completed. ECEI!/E SEP 17 2015 BY: PA55M558-124 Rifle RangeV dminlASBUILTS & CERTSISTORMWATER12015-09-16 Final Stormwatu Clarification.doe t � Y. 1� 4 67-13-'12 15;44 FROM-DENR Wilmington 910-350-2018 T-534 P0009/0010 F--898 arerel0wiinwatar ivtanaywineia Qyslems permit No. $YV8 080313 Camp Lejeune - P-1184 Dining Facility and P-1286 Rifle Range BEQ Stormwater Permit No. SW8 080313 Mod. Onslow County Designer's Certification I, M�� VkLt_ j rasa duly registered f-17%:iamtiaNA&,�NgEV2. � in the State of North Carolina, having been authorized to observe (period weekly/ full time) the construction of the'project, c*M-MS '(Project) for c t^ Lt ^1%5` (Project Owner) hereby state that, to the best of my abilities, due care and diligence was used in the observation of the project construction such that the construction was observed to be built within substantial compliance and intent of the approved plans and. specifications. The checklist of items on page 2 of this form is included in the Certification. Noted deviations from approved plans and specification: SEAL Signature 1```Uqpusl l u nrUrrrrp"'', Registration Number a' Sta t 5 �N Cq RQ ' _.... Date =pQF� SEAL 038615 rl <Tr.0'" ECEIVE SEP 17 2015 6Y: Page 8 of 9 „ w 07-13-'12 15:44'FSOM-DENH Wilmington Certification Requirements: ' r 910-350-2018 T-534 P0010/0010 F-999 .7taw'imII1Wdto kvidt[c%yt;lIIGIIt JYtmd1IW Permit No SW8 080313 ✓ 1. The drainage area to the system contains approximately the permitted acreage. Z2. The drainage area to the system contains no more than the permitted amount of built -upon area. 3.. All the built -upon area associated with the project is graded such that the runoff drains to the system. -4. All roof drains are located such that the runoff is directed into the system. ✓ 5. The bypass structure weir elevation is per the approved plan. ✓ 6. The bypass structure is located per the approved plans. QI A 7. A Trash Rack is provided on the bypass structure. ✓ 8. All slopes are grassed with permanent vegetation, ✓ 9. Vegetated slopes are no steeper than 3:1. ✓ 1 p. The inlets are located per the approved plans and do not cause short- clrcuiting of the system. ✓ 11. The permitted amounts of surface area and/or volume have been provided. 12. All required design depths are provided. ✓ 11 All required parts of the system are provided. ✓ 14. The required system dimensions are provided per the approved plans. Pc: NCDENR-DWQ Regional Office David Towler, MCB Camp Lejeune ECEIVE SEP 17 2015 BY: Page 9 of 9 :yi � � � � ,. � '�i,t. r . �p -� A ir11r..1 - +n� ♦. _ `{�v CAPE FEAR ENGINEERING Cape Fear Engineering, Inc. has been contracted by Balfour Beatty to certify the installed stormwater BMPs as part of the P1286 Bachelor Enlisted Quarters (BEQ's) project on Rifle Range Road. Cape Fear Engineering was not the original designer of record and was not contracted to complete as-builts/certifications until after construction was complete; however, CFE did perform construction staking for the project and performed G1S Data Deliverables for the project. This engineer's certification has been prepared based on a combination of as -built survey by Cape Fear Engineering; redline markups provided by the contractor, GIS Date Deliverables, limited post construction inspections of completed stormwater BMPs, and verification that CFE identified punch list items have been completed_ ECEi!/E SEP 17 2015 BY: P;WM559-124 Rifle RungOAdmiMASBUILTS & CERTSISTORMWATER5.2015-09-16 Final StormwaterClarification,doc 67-13-'12 15AA FROM-DENR Wilmington 910-350-2018 T-534 P0009/0010 F--898 Jfans OIUIIIIM40V MIMfI 90111CISl OySTeMS Permit No. M 08-0313 Camp Lejeune - P-1184 Dining Facility and P-1280 Rifle Range BEQ Stormwater Permit No. SW8 080313 Mod. Qnslow County Designer's Certification i, as a duly registered wN in the State of North Carolina, having been authorized to observe (periodically/ weekty/ full time) the construction of the project, �� ��c�A'R�FwcA.,cS 12Pxo (Project) for P LE gut` (Project Owner) hereby state that, to the best of my abilities, due care and diligence was used in the observation of the project construction such that the construction was observed to be built within substantial compliance and intent of the approved plans and.specifications. The checklist of items on page 2 of this form Is Included in the Certification. Noted deviations from approved plans and specification: SFAL Signature ``��,�nrluitiiuunrnrnn, -(1a GAR -, Registration Number 03F>cvkf �.. • •••. f .,_... -date CA Ito 1 ` �=o.a�oF�s��o SEAL r . 0386-15 17 "' G! N KfT. "�rlellfJ 111111 �1111�51:� • ECEIVE SEP 17 2015 BY: Page a of 9 ��; r� J 047-13-' 12 15 ; 44 , FROM-DENR Wilmington 910-350-2019 T-534 P0210/0010 F-898 Jtc1kC atV1111WdLW 1V[a11d G111Gi[t Oy*itV11W Permit No SWS 080313 Certification Requirements: ✓ 1. The drainage area to the system contains approximately the permitted acreage. 2. The drainage area to the system contains no more than the permitted amount of built -upon area. _,/_3.. All the built -upon area associated with the project Is graded such that the runoff drains to the system. ,4. All roof drains are located such that the runoff is directed into the system. 5. The bypass structure weir elevation is per the approved plan. - $. The bypass structure is located per the approved plans. 10A 7. A Trash Rack is provided on the bypass structure. ✓ 8. All slopes are grassed with permanent vegetation. 9. Vegetated slopes are no steeper than 3:1. ✓ 10. The inlets are located per the approved plans and do not cause short- circuiting of the system. �✓ 11. The permitted amounts of surface area and/or volume have been provided. ✓ 12. Ali required design depths are provided. ✓ 13. All required parts of the system are provided. 14. The required system dimensions are provided per the approved plans. cc: NCDENR-DWQ Regional Office David Towler, MCB Camp Lejeune ECEIVE SEP 17 2015 Page 9 of 9 BY; r. CASE FEAR ENGINEERING Cape Fear Engineering, Inc. has been contracted by Balfour Beatty to certify the installed stormwater BMPs as part of the P1286 Bachelor Enlisted Quarters (BEQ's) project on Rifle Range Road. Cape Fear Engineering was not the original designer of record and was not contracted to complete as-builtslcertifcations until after construction was complete; however, CFE did perform construction staking for the project and performed GIS Data Deliverables for the project. This engineer's certification has been prepared based on a combination of as -built survey by Cape Fear Engineering; redline markups provided by the contractor, GIS Date Deliverables, limited post construction inspections of completed stormwater BMPs, and verification that CFE identified punch list items have been completed. nFE:CEIVE I SEP 11 2015 BY: 1':L55"58-124 Rifle Range\AdminlAS$UIL'rS & CER'I'SISTORMWATER12015.09-16 Final Stormwater ClarifcationADc F 67-13-' 12 15:44 FROM-DENR Wilmington 910-352-2018 T-534 F0009/0818 F-898 arena atUM MI141 IVIUMAyeiR1Vin vysiems Permit 080313 Camp Lejeune - P-1184 Dining Facility and P-1286 Rifle Range BEQ Stormwater Permit No. SW8 080313 plod. Onslow County Designer's Certification 1, tr►gt , as a duty registered tau%FL*'+ in the State of North Carolina, having been authorized to observe (periodically/ waekty/ full time) the construction of the'project, GAtxvScA-r10NS f�Es P kWbLo — Rtr-tC- 9AN6V RF NCYC- CZArr--> — SM? 'VF°I (Project) for S N� Eu(Project Owner) hereby state that, to the best of my abilities, due care and diligence was used In the observation of the project construction such that the construction was observed to be built within substantial compliance and intent of the approved plans and. specifications. The checklist of items on page 2 of this form is included in the Certification, Noted deviations from approved plans and specification: SEAL Signature CA'R Registration Number 03 e-A. lam '` . O� Date g %cm l p -oF�ss�O4; SEAL- �' 038515 W Page 8 of 9 ECEIVE SEP 17 2015 71 07-13--'12 15:44-FROM-D£NR Wilm-ington Certification Requirements: r 910-350-2018 T-534 POON/0910 P-898 atacG AV1IIIYYdRA 1001lAyGlIIGIn 0y*%V1IN Permit Ng.SW8 080§13 ✓ 1. The drainage area to the system contains approximately the permitted acreage. 2. The drainage area to the system contains no more than the permitted amount of built -upon area. ✓ A. All the built -upon area associated with the project is graded such that the runoff' drains to the system. 4. All roof drains are located such that the runoff is directed into the system. ✓ 5. The bypass structure weir elevation is per the approved plan. ✓ 0. The bypass structure is located per the approved plans. N fa 7. A Trash Rack is provided on the bypass structure. ✓ 8. All slopes are grassed with permanent vegetation. ✓ 9. Vegetated slopes are no steeper than 3:1. ✓ 10. The inlets are located per the approved plans and do not cause short- circuiting of the system. 11. The permitted amounts of sur ue area and/or volume have been provided. ✓ 12. All required design depths are provided. 13. All required parts of the system are provided. 14. The required system dimensions are provided per the approved plans. cc: NCDENR-DWQ Regional Office David Trawler, MCB Camp Lejeune nECEIVE% SEP 17 2015 A BY: Page 9 of 9 CAPE FEAR ENGINEERING Cape Fear Engineering, Inc. has been contracted by Balfour Beatty to certify the installed stormwater BMPs as part of the P1286 Bachelor Enlisted Quarters (BEQ's) project on Rifle Range Road. Cape Fear Engineering was not the original designer of record and was not contracted to complete as-builts/certifications until after construction was complete; however, CFE did perform construction staking for the project and performed GIS Data Deliverables for the project. This engineer's certification has been prepared based on a combination of as -built survey by Cape Fear Engineering; redline markups provided by the contractor, GIS Date Deliverables, limited post construction inspections of completed stormwater BMPs, and verification that CFE identified punch list items have been completed_ rE!CEI\iE ii. SEP 17 2015 BY: P;t556\558-124 Rife Range\Admin\ASBUILTS & CERTSISTORMWATERU015-09-I6 Final Slortnwater Clarification doc CAPE FEAR E.N-GINEERINC 151 Poole Road, Suite 100 Belville, NC 28451 TEL (910) 383-1044 FAX (910) 383-1045 www.capefearengineering.com To: NCDENR Wilmington Regional Office DWQ - Stormwater Attn: Linda Lewis ❑ As Requested ❑ For Your Files ❑ Sent via Mail ❑ Sent via Courier Transmittal Date.- September 16, 2015 File: 559-124 "36" Subject: P1286 Bachelor Enlisted Quarters (BEQs) — Rifle Range Road (SW8080313) Stormwater Certifications BMPS 1,2,6,7,9 ❑ For Distribution ® For your Review 1 Action 1 Approval Quantity Drawing No. Description 1 Engineer's Certification for BMP 1 1 Engineer's Certification for BMP 2 1 Engineer's Certification for BMP 6 1 Engineer's Certification for BMP 7 1 Engineer's Certification for BMP 9 REMARKS Please find the attached engineering certifications for the stormwater BMPs constructed as part of the P1286 Rifle Range BEQ Project. Please let us know if you need any additional info any or if there is any way we can assist. Thanks. CC: File 558-124 "36" Thomas Bradshaw, Camp Lejeune Public Works Cape Fear Engineering, Inc. Signed: X&A�� Matthew T Haley/1PE Received By: Date: RECEIVED SEP .1 7 .2015 P;455M58-124 Rifle RangeAdmiMASBUILTS 8 CERTS%STQRMWATERQ015-09-16 Trans_Stormwater Cert-Rifle Range BEQ,doc "rt APR ... 30-2008 WED 09:18 AM NODENR FAX N0, 9103502004 P. 08/09 State Stormwater Management Systems Permit No. SW8 080313-; Camp Le eune - P-1184 DininwFacillty at Stone Say 5 Stormwater Permit No. SW8 080313 Onsfow County Designer's Certification 1, CnRus.NER P. 5-%A.L ,.�as.,a duly registered NofssslomhL �N61NEEA 1n thee. State of North Carolina, having been authorized'to observe (periodically/ weekly/ full .. tlme) the Construction of. -,the project, P- I i8q Disai-ic, F_ AQt t. 1-4 A.T. S-f0WC-. 'BAY (Project) for U.S. Govetpmem-r - AG C % L ,v� 4e (Project Owner) hereby state that, to the best of my abilities, due care and diligence was used In the observation of the project construction such that the construction was observed to be built within substantial compliance and intent of the approved plans and specifications. The checklist of Items on page 2 of this form Is included in the Certification. Noted deviations from approved plans and specification: SEAL Signature Registration Nurnfer.,4 3565� N CAR .. - - . . 0 Date 11 2 0-4 . O • F�sS/p •,y . e SEAL f' ;n. 035656 + ��y��s' N0I N e ilPv�� pkE4t tiN�� ��� NOV b g INS BY:�r Page 7 of a 0 G'b.r{7k APR-30-2008 WED 09:18 AM NCDENR FAX NO. 9103502004 P. 09/09 Certification Requirements: state stormwater Management Systems Pgrmit No. SW8 080313 1. The drainage area to the system contains approximately the permitted acreage. ✓ 2.. The drainage,area tb the system.contains no more than,the-permitted e. / amount.of built -upon area i 3. All the built -upon area.assoclated with the projedds graded such that the / runoff drains to the system. ✓ 4. All roof drains are located such that the runoff is directed Into the -system. 5. The bypass structure weir.elevation Is per the approved plan. 6. The bypass structure Is located per the approved plans. �► A 7. A Trash Rack Is provided on the bypass structure. 8. All slopes are grassed with permanent vegetation. __Z_9. Vegetated slopes are no steeper than 3:1. 10. The inlets are located per the approved plans and do not cause short- circuiting of the system. ✓ 11. The permitted amounts of surface area and/or volume have been provided. J 12. All required design depths are provided. •l 13. All required parts of the system are provided. 14. The required system dimensions are provided per the approved plans. cc:. NCDENR-DWQ Regional Office Onslow County Building Inspections Page 8 of 8 Architeetrrre & Engineering 4000 IlierlCba.Se 11hd- Suile 20 Rcdergh, Alorlb Carolina 276117 919/ R28-1 S7G Fern 9191 S28-1 S77 lJlljJ: �I71'lYJJl,i�r!!'�:!lP1:iC11.t7lJJI We transmit For Your The Following N a "IS L bwl Mm !AM To: 127 Cardinal Drive I.xtension Wilmington, NC 28405 Attn: Christine Nelson Date: November 2, 2009 Project No:. NC F81.4 Reference: IMARSOC Dining ® herewith h��.�� ) a 2009 ❑ in accordance with your request BY: ❑ under separate corer ❑ approval.. ❑ distribution,to parties ❑ review -and -comment ❑ record ❑ use ® information ❑ drawings ❑ computer file(s) ❑ specifications ❑ samples ❑ change order ❑ product literature ❑ shop drawinLs M other Copies Date Description 1 1 1/02/09 Stonnwater Certification — Engineer Remarks Tony. Please find enclosed the stomiwater certification that has.beerixertified and signed. Please let ine know if you have any questions. By: Christopher 1-1. Small Copies to: Aaron Volck