COMPLIANCE EVALUATION INSPECTION
DOC DATE
YYYYMM DD
Camp Lejeune SW Permit Renewal!
Number
Measure Type
Treatment Number
Permit Number
Expiration Date
Inspection Date
Status
1
WDP
SWP 152
SW8060147
12/31/2020
6/30/2020
In Compliance
1
WDP
SWP 153
SW8 060147
12/31/2020
6/30/2020
In Compliance
2
WDP
SWP 080
SW8060832
10/6/2020
6/9/2020
In Compliance
3
SF
SWP 386
SW8 080313
3/20/2619
6/4/2020
In Compliance
4
SF
SWP 429
SW8 080740
9/1/2020
Not Built
4
WDP
SWP 430
SW8 080740
9/1/2020
Not Built
4
WDP
SWP 431
SW8080740
9/1/2020
Not Built
4
WDP
SWP 432
SW8 080740
9/1/2020
Not Built
4
WET
SWP 151
SW8 080740
9/10/2020
6/9/2020
In Compliance
5
SF
SWP 221
SW8 080907
7/2/2020
5/6/2020
Not in Compliance
5
SF
SWP 222
SW8 080907
7/2/2020
5/6/2020
Not in Compliance
5
SF
SWP 223
SW8080907
7/2/2020
5/6/2020
Not in Compliance
5
SF
SWP 224
SW8 080907
7/2/2020
5/6/2020
Not in Compliance
5
SF
SWP 225
SW8 080907
7/2/2020
5/6/2020
Not in Compliance
6
WDP
SWP 301
SWS 090630
9/8/2020
1/21/2020
In Compliance
6
WDP
SWP 302
SW8 090630
9/8/2020
7/28/2020
In Compliance
6
WDP
SWP 303
SW8 090630
9/8/2020
1/21/2020
In Compliance
6
WDP
SWP 304
SW8 090630
9/8/2020
1/21/2020
In Compliance
6
WDP
SWP 305
SW8 090630
9/8/2020
1/21/2020
In Compliance
6WDP
SWP306
SW8 090630
9/8/2020
1/21/2020
In Compliance
6WDP
SWP307
SW8 090630
9/8/2020
7/28/2020
In Compliance
7
WDP
SWP 250
SW8090815
10/22/2020
6/iS/2020
In Compliance
7
WDP
SWP 360
SW8090815
10/22/2020
6/29/2020
In Compliance
8
WDP
SWP 211
SW8 090901
9/21/2020
6/9/2020
In Compliance
8
WDP
SWP 212
SW8 090901
9/21/2020
6/9/2020
In Compliance
8
WDP
SWP 213
SW8 090901
9/21/2020
5/6/2020
In Compliance
8
WDP
SWP 230
SW8 090901
9/21/2020
6/8/2020
In Compliance
9
WDP
SWP 214
SW8 100201
6/11/2020
6/29/2020
In Compliance
9
WDP
5WP 261
SW8 100201
6/11/2020
7/28/2020
In Compliance
9
WDP
SWP 262
SW8 100201
6/11/2020
6/29/2020
In Compliance
9
WDP
SWP 263
SW8 100201
6/11/2020
7/28/2020
In Compliance
10
IB
SWP 311
SW8 120509
5/30/2020
5/6/2020
Not in Compliance
10
IB
SWP 312
5W8 120S09
5/30/2020
5/6/2020
Not in Compliance
11
WDP
SWP 315
SW8 120806
8/15/2020
6/29/202C
In Compliance
12WDP
SWP013
SW892070S
3/7/2018
6/15/20201nCompiiance
$6,060
1111 f S�`'S 10:17:31 W01
8 2 /9
02-27-' 14 12 : 49 FROM.- �i 'Jr a�a�d own�iwauxi 1wa- 29 l„P0009/0010 f -923
v Permit No. SW8 080313 Mod.
P-1184 Stone Bay DInIng Hall! P-1288 sEQ Rine Range! P-1349 Special Ops Tratning Complex
Stormwater Permit No. SW8 080313 Mod,
Onelow County
Designer's Certification
I, Mary Ann DuRant as a duly registered Professional Engineer in the
Virginia State of� , having been authorized to observe (ariodlcall woskh# (W
too the construction of the project,
P-1349 Special Operations Training Complex (Site #2)
(Project)
for Commanding Officer, MCB Camp Lcjeune (Project Owner) hereby state that, to the
best of my abilities, due care end diligence was used in the observation of the project
construction such that the construction was observed to be built within substantial
oompliance and Intent: of the approved plans and speoii<cations.
The cheokiist of items on page 2 of this form is Included In the Certifioation.
Noted deviations from approved plans and specification:
Diameter of the underdrains in sand filter #3 is 8-inches instead of 6-inches.
Signature
Registration Number VA 037452
Date Nov. 16, 2018
SEAL (Nat Required)
EU1, --_i V E.1
DEC 2 8 2018
Page's of 9
..; ._ a..
�.
1111 10:17:47 12-28-2018 3/9
02-21-'14 12:49 FRU- T-529 P0010/0010 F-923
o14 w olulloin n it IV3UFl y=1Iwilt Jya=Illo
Permft_Na, 5WS 080313 -Mad,
Certificabon Requirements:
YLAD 1. The drainage area to the system contains approximately the permitted
acreage.
2. The drainage area to the system contains no more then the permitted
amount of built -upon area.
MAD 3. All the built -upon area associated with the project is graded such that the
runoff drains to the -system,
�J%A 4. All roof drains are located such that the runoff is directed into the system.
AAD 5. The bypass structure weir elevation is perthe approved plan.
6L B. The bypass structure is located per the approved plans.
A i. A Trash Rack is provided on the bypass structure.
�B. All slopes are grassed.with permanent vegetation.
26k9. Vegetated slopes are no steeper than 3:1.
MR�10. The inlets are located per the approved plans and do not cause short-
circuiting of the system.
AAD11. The permitted amounts of surface area andfor volume have been
provided.
12. All required design depths are provided.
EtAQ 13. All required pads of the system are provided.
AAO 14. The required system dimensions are provided per the approved plans.
cc: NCDENR-DEMLR Wilmington Regional Office
David Towler, MCB Camp Lejeune
DEC , 2 8 2018
Page 9 of 9
1111 10:18:03 12-28-2018 4/9
w may deem sufficient, reissue a certilicate of registration or
avv,wnast;on, provided that a malanly 01 the members of
Vw Board vote in favor of such issuance. 11921, C.1, 9.10,
C.S., s.B055111; 1939, c,219, s.2; 1951, c.1084, s.t;
1953. c.1041, 5.10; 1957, c.1060, s.5; 1973. c.1331,
9.3; 1975. c.681, sA. 1981. c.789, 1969. c.669, $.l.l
e 89C•23. Unlawful to practise engineering or tend
surveying wlthart registration; unlawful use of title or
terms; penattles; Attorney Ganeral to be legal sdvlser.•Any
person who shall practice. or offer to practice, engineering
or land surveying in this State without first being registered
in accordance with Iha provisions of this Chaplet, at any
person, firm, partnership, arganiiation, association,
corporation, or other entity using or employing the words
`engineer- or 'engineering' or 'professional engineer' or
-professional engineering' at 'land surveyor' or 'land
surveying,' or any modification or derivative thereof ;n Its
name or form of business or activity except as registered
under this Chapter or In pursuit of activities exempted by
this Chapter, or any person presenting or attempting to use
the Conlficale of registration or the seal at another, or any
person who shall give any false or forged evidence of any
kind to the Board or to any member thereof In obtaining at
attempting to obtain a oeetilicate of registration, or any
person who shall falsely Impersonate any other registrant of
like or different name, or any person who shall attempt to
use an expired or revolted or nonexistent certificate of
registration, at who shall practice or offer to practice when
not qualified, or any person who falsely claims that he Is
registered under this • Chapter, or any person who shall
r violate any of the provisions of this Chapter, In addition to
Iniunetive procedures set out hefeinbefore, shall be guilty of
a misdemeanor, and may, upon conviction, be sentenced to
pay a fine fall not less than one hundred dollars 16100,001,
nor more than one thousand dollars II1,0001, or suffer
imprisonment for a period not exceeding three months, of
both, in the diarietion of the court- in no event shall there
be representation of at holding out to the pubfic of any
engineering expertise by unregistered persons. It shall be
the duty of all duly constituted officers of the State and all
political subdivisioni thereof to enforce the provisions of
this Chapter and to prosecute any persons violating same.
The Attorney General of the State or his assistant shall
act as legal adviser to the Board and render such legal
assistance as may be necessary in carrying out the
provisions of this Chapter, The Board may employ counsel
and necessary assistance to ald in the enforcement of this
Chapter, and the compensation and expenses therefor shall
be paid from funds of the Board. 11921. C. 1, a. 12; C. S.,
s. 80591n1: 1951, c. 1OB4, s. 1; 1976, c,681, s. 1.1
I 89C-24. Corporate or pertnershlp practice., of
engineering or land survoying,-A corporation orpamve+ rsh;p
may engage in the practice of engineering or find surveying
In this State, provided, however, the person or persons
connected with such corporation or partnership in charge of
the designing or supervision which constitutes such practice
is or are registered as herein required of professionat
r engineers and registered land surveyors. The same
exernplions shalt apply to corporations and partnerships as
apply to Individuals under this Chapter, provided further,
that all corporations hereunder shaft be subject to the
provisions of Chapter 550 of the General Statutes of North
P-1349 Special Operations Training Complex
MARSOC
CAMP LEJEUNE, NORTH CAROLINA
Carolina (1921. c. 1, s. 14; C. S., S. 60551p1; 1961. C:
1084, s. 1; 1969, c. 718, a. 18; 1976, c. 681, s. 1.1
I 89C•25. Umltations on application of Chaplsr.-This
Chapter shall not be construed to prevent or affect:
The practice of architecture, landscape
erchitectura,- or contracting or any other legally
recognized profession or trade; of
The practice of professional engineering or land
surveying in this State or by any person not a
resident of this State and having no established
place of business in this State when this practice
does not aggregate more than 90 days in any
calendar year, whether performed In this State or
elsewhere, or involve more than one specific
project; provided, however, that such person is
legally qualified by registration 10 practice the
said profession in his own state or Country, in
which the requirements and qualifications for
obtaining a certificate of registration are
satisfactory to the Board; in which case the
person shall apply for and the Board win Issue is
temporary permit; or
The practice of professional engineering or land
surveying In this State not to aggregate more
than 90 days by any patron residing in this Stale,
but whose residence has not been of sufficient
duration lax the ' Board to grant or deny
registration; provided, however, such person shall
have filed an application far registration as a
professional engineer or registered land surveyor
and shall have paid the fee provided for In G. S.
89C-14, and provided that such a person is
legally qualified by rttgistralion to practice
professional engineering or land surveying In his
own state or Country in which the requirements
and qualifications for obtaining is canifisate or
registration are satisfactory to the Board, in
which case the person shall apply for and the
Board will issue a temporary permit; or
Engaging in engineering or land surveying as an
employee or assistant under the responsible
charge of a professional engineer or registered
land surveyor or as an employee or assistant of a
nonresident professional engineer or a non
resident re9islerad land surveyor provided for in
subdivisions 12) and 131 of this section, provided
that said work as an employee may not Include
responsible charge of design or supervision: or
The practice of professional engineering of land
surveying by any person not a resident of, and
halting no established place of business In thla
State; as- a"consulthtg associate of a prafessi"Ill
engineer at registered land surveyor registered
haler the provisions of this Chapter; provided,
t n rx id t q
service in his own stale or Country; or
Practice by members of the armed locus or
employees of the government of the United
States while engaged in the practice of
engineering or land surveying sofaly lot said
government an goverrlmant- owned works and
projects; or
1111 10:18:38 12-28-2018 5i9
02-27-'14 12:47 FROM- T-529 P0002/OD10 F-923
*A&
NCDENR
North Carolina Department of Environment and Natural Resources
Division of Energy, Mineral, and sand Resources
Tracy E. Davis, PE, CPM Pat McCrory, Governor
Director John E. 5kvarla, IIi, Secrelary
February 26, 2014
Commanding Officer
MCB Camp Lejeune
c/o Neal Paul, Deputy Public Waft Officer
1005 Michael Road
Camp Lejeune, NC 28642
Subject. State Stormwater Management Permit No. SW8 080313 Mod.
P-1184 Diningg Facility / P-1206 Rine Range BEQ 1
P-1349 Special Ops Training Complex
High Density infiltration Basin 1 Sand Filter Project
Onslow, County
Dear Mr. Paul.
Effective August 1, 2013 the State Stormwater program has been transferred from the Division
of Water Quality (DWO) to the Division of Energy, Mineral and Land Resources (DEMLR). All
previous references to DWO will remain In older etormwater permits Issued prior to August 1,
2013 until they are modified. Please note that this modified permit now references DEMLR as
the Division responsible for Issuance of the permit
The Wilmington Regional Office received a complete, modified Stormwater Management Permit
Application for P-1184 Dining Facility 1 P-1286 Rile Range BEQ / P-1349 Special Ops
Training Complex on February 21, 2014. Staff review of the plans and speelfleatlons has
determined that the project, as proposed, will comply with the Stormwater Regulations set forth
In Session Law 2008-2 1 and Title 15A NCAC 2H.1000. We are forwarding modified Permit
No. SW8 080313 dated February 26, 2014, for the construction, operation and maintenance of
the built -upon areas and BMP'a associated with the subject project.
This permit shall be effective from the data of issuance until December 30 2021. The permittee
and the project shall be subject to the conditions and limitations as specified therein. Please
Nay special attention to the conditions listed in this permit regarding the Operation and
aintenance of the BMP(s), certification of the.BMP's, procedures for changing ownership,
transferring the permit, and renewing the permit Failure to establish an adequate system for
operation and maintenance of the etormwater management system, to certify the BMP's, to
transfer the permit, or to renew the permit, will result in future compliance problems.
The following modifications are covered by and added to this permit:
1. Adds the P-1349 Special Ops T►alning Complex
2. Reduces the drainage area and BUA for Basin #6 slightly. The eliminated portion of DA
8 has been Incorporated Into the now DA-9.
3, Eliminates the previously permitted small infiltration basin for DA-9 and adds a new
Sand Filter 43 in a new location to serve DA-9.
4. Adds DA-10 served by a new Sand Filter#4.
5. The previously permitted infiltration basins In DA's 1, 2, 3, 5, and 7 are unchanged.
6. Permit SW8 040912 will be rescinded upon thv installation and certification of Basins 6
and 7.
7. The plans prevlously approved on April 29, 2008 for P-1184 Stone Bay Dining Hall, and
on July 13, 2012 and November 2, 2013 for the P-1280 BEQ Rifle Range, are
considered part of the approved plans for this modlflcation only in regard to the grading,
layout and details of those projects, grading, layout and details for Basins 1, 2, 3, 5, 8
and 7 and their associated vegetated filters.
Wilmington Reglonel flriee
127 Cardinal Drive Extension, Wilmington, North Camffna 28405 Phone: (910) 198-12151Pax: (910) 350.2D04
10:17:22 12-29-2018 119
Commanding General
Public Works Department
Design Branch
Marine Corps Base
1005 Michael Road
Camp Lejeune, NC 28547
FAX
Fax: (crI o) .350 `QC)b Pages: tV
-10) qa4 -'133
Urgent For Review Please Comment Please Reply Please Review
Comments: t �- `� z,
67-13-'12 15,44 FROM -DEER Wilmington 910-350-2019 T-534 P@009/0010 F-898
orals EnWdMl Ivrana940MV11t systems
Permit No. SW8 080313
Camp Lejeune - P-1184 Dining Facility and P-1286 Rifle Range BEQ
Stormwater Permit No. SW8 080313 Mod_
Onslow Cou - J
Designer's Certification
I, t�►At•+-rl�u "AyC— , as a duly registered a in the
State of North Carolina, having been authorized to observe per o ca weekly/ full
time) the construction of the project, SEE Psrrcrsrr¢tia,n
t�'' 128tp B'Ea?•- ¢.�Ft-t: l�At�sCaF PoAfi7 � gM� �r i
(Project)
for cp1M Ea (Project Owner) hereby state that, to the
best of my abilities, due care and diligence was used in the observation of the project
construction such that the construction was observed to be built within substantial
compliance and intent of the approved plans.and.specifications.
The checklist of items on page 2 of this form is included in the Certification,
Noted deviations from approved plans and specification:
Signature
9A wttg-�
Registration Number 03
Date bko 1
SEAL
ECEIVE
BY:
Page 8 of 9
��
r
�,.
..-
� � � � t
.i1;1
0,7-13-`12 15,44'FROM-DENR Wilmington
Certification Requirements:
910-350-2018 T-534 P001010918 F-898 :
-ACK10 J LV 1 t I lW d lt;l IVIAI IdYUI I MI It Q y*1C11114
Permit oySW8 08031$
1.
The drainage area to the system contains approximately the permitted
acreage.
2.
The drainage area to the system contains no more than the permitted
amount of built -upon area.
✓
3.,
All the built -upon area associated with the project is graded such that the
runoff drains to the system.
✓
4.
All roof drains are located such that the runoff is directed into the system.
5.
The bypass structure weir elevation is per the approved plan.
✓
0,
The bypass structure is located per the approved plans.
a; A
7.
A Trash Rack is provided on the bypass structure.
8.
All slopes are grassed with permanent vegetation.
9.
Vegetated slopes are no steeper than 3:1.
10.
The inlets are located per the approved plans and do not cause short-
circuiting of the system.
11.
The permitted amounts of surface area and/or volume have been
provided.
12.
All required design depths are provided.
13.
All required parts of the system are provided.
14.
The required system dimensions are provided per the approved plans.
NCDENR-DWQ Regional Office
David Towler, MCB Camp Lejeune
SEP 1 ? 205
ray:
Page 9 of 9
r
CAPE FEAR
ENGINEERING
Cape Fear Engineering, Inc. has been contracted by Balfour Beatty to certify the installed
stormwater BMPs as part of the P1286 Bachelor Enlisted Quarters (BEQ's) project on Rifle
Range Road. Cape Fear Engineering was not the original designer of record and was not
contracted to complete as-builts/certifications until after construction was complete; however,
CFE did perform construction staking for the project and performed GIS Data Deliverables for
the project.
This engineer's certification has been prepared based on a combination of as -built survey by Cape
Fear Engineering; redline markups provided by the contractor, GIS Date Deliverables, limited
post construction inspections of completed stormwater BMPs, and verification that CFE
identified punch list items have been completed.
'DIVE
SEP 17 2015
BY:
P:15581558-124 Rifle Range\Admin\ASBUILTS & CER,rS%STORMWATliR12015-09-l6 Final StarmwaterClarification ,doe
67-13-'12 15:44 FROM-DENR Wilmington 910-350-2018 T-534 P@009/0010 F-898
Ouaiaaruiir1WdUdi nnarrdyVillaiu aysiems
eermit No. S 8 08Q313
Camp Lejeune - P-1184 Dining Facility and P-1286 Rifle Range BEQ
Stormwater Permit No. SW8 080313 Mod.
sowCounty
Designer's Certification
i, jj&E'^(— , as a duly registered in the
State of North Carolina, having been authorized to observe (periodically/ weekly/ full
time) the construction of the project, �S�eE AWAGHeo ckA1AV:".M 003S
for M,c MP � NiT (Project Owner) hereby state that, to the
best of my abilities, due care and diligence was used in the observation of the project
construction such that the construction was observed to be built within substantial
compliance and intent of the approved plans and.specifications.
The checklist of items on page 2 of this form is included in the Certification.
Noted deviations from approved plans and specification:
Signature
Registration Number a38c,t 5
Date C3 k% Lo %s
�ECEBeIE
SEP 17 2015
BY:
Page 8 of 9
SEAL
SEAL
' 038615
9i,••'fiNGINE�� .�
„W „T,;,,,,,,,,
- r .
i
•d....
.
J�r
07-13-'12 15;44,FRON-DENR Wilmington 910-350-2018 7-534 P0010/9010 P-898
vta� a�zn i tMcIttl sviai+4YU1I =1It OybtCffN
Permit Ng, SW$ 000§13
Certification Requirements:
✓
I.
The drainage area to the system contains approximately the permitted
acreage.
2.
The drainage area to the system contains no more than the permitted
amount of built -upon area.
3,.
All the built -upon area associated with the project is graded such that the
runoff drains to the system.
4.
All roof drains are located such that the runoff is directed into the system.
'I
5.
The bypass structure weir elevation is per the approved plan.
"00'
6.
The bypass structure is located per the approved plans.
N� a
i.
A Trash Rack is provided on the bypass structure.
8.
All slopes are grassed with permanent vegetation.
✓
9.
Vegetated slopes are no steeper than 3:1.
✓
10.
The inlets are located per the approved plans and do not cause short-
circuiting of the system.
'f
11.
The permitted amounts of surface area and/or volume have been
provided.
12.
All required design depths are provided.
13.
All required parts of the system are provided.
✓
14.
The required system dimensions are provided per the approved plans.
.Co., NCDENR-DWQ Regional Office
David Towler, MCB Camp Lejeune
SEP 17 2015
i
BY:
Page 9 of 9
CAPE FEAR
ENGINEERING
Cape Fear Engineering, Inc. has been contracted by Balfour Beatty to certify the installed
stormwater BMPs as part of the P1286 Bachelor Enlisted Quarters (BEQ's) project on Rifle
Range Road. Cape Fear Engineering was not the original designer of record and was not
contracted to complete as-builtslcertifications until after construction was complete; however,
CFE did perform construction staking for the project and performed G1S Data Deliverables for
the project.
This engineer's certification has been prepared based on a combination of as -built survey by Cape
Fear Engineering; redline markups provided by the contractor, GIS Date Deliverables, limited
post construction inspections of completed stormwater BMPs, and verification that CFE
identified punch list items have been completed.
ECEI!/E
SEP 17 2015
BY:
PA55M558-124 Rifle RangeV dminlASBUILTS & CERTSISTORMWATER12015-09-16 Final Stormwatu Clarification.doe
t
� Y. 1�
4
67-13-'12 15;44 FROM-DENR Wilmington 910-350-2018 T-534 P0009/0010 F--898
arerel0wiinwatar ivtanaywineia Qyslems
permit No. $YV8 080313
Camp Lejeune - P-1184 Dining Facility and P-1286 Rifle Range BEQ
Stormwater Permit No. SW8 080313 Mod.
Onslow County
Designer's Certification
I, M�� VkLt_ j rasa duly registered f-17%:iamtiaNA&,�NgEV2. � in the
State of North Carolina, having been authorized to observe (period weekly/ full
time) the construction of the'project, c*M-MS
'(Project)
for c t^ Lt ^1%5` (Project Owner) hereby state that, to the
best of my abilities, due care and diligence was used in the observation of the project
construction such that the construction was observed to be built within substantial
compliance and intent of the approved plans and. specifications.
The checklist of items on page 2 of this form is included in the Certification.
Noted deviations from approved plans and specification:
SEAL
Signature
1```Uqpusl l u nrUrrrrp"'',
Registration Number a' Sta t 5 �N Cq RQ '
_.... Date =pQF�
SEAL
038615
rl <Tr.0'"
ECEIVE
SEP 17 2015
6Y:
Page 8 of 9
„ w
07-13-'12 15:44'FSOM-DENH Wilmington
Certification Requirements:
' r
910-350-2018 T-534 P0010/0010 F-999
.7taw'imII1Wdto kvidt[c%yt;lIIGIIt JYtmd1IW
Permit No SW8 080313
✓ 1. The drainage area to the system contains approximately the permitted
acreage.
Z2. The drainage area to the system contains no more than the permitted
amount of built -upon area.
3.. All the built -upon area associated with the project is graded such that the
runoff drains to the system.
-4. All roof drains are located such that the runoff is directed into the system.
✓ 5. The bypass structure weir elevation is per the approved plan.
✓ 6. The bypass structure is located per the approved plans.
QI A 7. A Trash Rack is provided on the bypass structure.
✓ 8. All slopes are grassed with permanent vegetation,
✓ 9. Vegetated slopes are no steeper than 3:1.
✓ 1 p. The inlets are located per the approved plans and do not cause short-
clrcuiting of the system.
✓ 11. The permitted amounts of surface area and/or volume have been
provided.
12. All required design depths are provided.
✓ 11 All required parts of the system are provided.
✓ 14. The required system dimensions are provided per the approved plans.
Pc: NCDENR-DWQ Regional Office
David Towler, MCB Camp Lejeune
ECEIVE
SEP 17 2015
BY:
Page 9 of 9
:yi � � � �
,. � '�i,t. r .
�p -� A
ir11r..1 - +n�
♦. _ `{�v
CAPE FEAR
ENGINEERING
Cape Fear Engineering, Inc. has been contracted by Balfour Beatty to certify the installed
stormwater BMPs as part of the P1286 Bachelor Enlisted Quarters (BEQ's) project on Rifle
Range Road. Cape Fear Engineering was not the original designer of record and was not
contracted to complete as-builts/certifications until after construction was complete; however,
CFE did perform construction staking for the project and performed G1S Data Deliverables for
the project.
This engineer's certification has been prepared based on a combination of as -built survey by Cape
Fear Engineering; redline markups provided by the contractor, GIS Date Deliverables, limited
post construction inspections of completed stormwater BMPs, and verification that CFE
identified punch list items have been completed_
ECEi!/E
SEP 17 2015
BY:
P;WM559-124 Rifle RungOAdmiMASBUILTS & CERTSISTORMWATER5.2015-09-16 Final StormwaterClarification,doc
67-13-'12 15AA FROM-DENR Wilmington 910-350-2018 T-534 P0009/0010 F--898
Jfans OIUIIIIM40V MIMfI 90111CISl OySTeMS
Permit No. M 08-0313
Camp Lejeune - P-1184 Dining Facility and P-1280 Rifle Range BEQ
Stormwater Permit No. SW8 080313 Mod.
Qnslow County
Designer's Certification
i, as a duly registered wN in the
State of North Carolina, having been authorized to observe (periodically/ weekty/ full
time) the construction of the project, �� ��c�A'R�FwcA.,cS
12Pxo
(Project)
for P LE gut` (Project Owner) hereby state that, to the
best of my abilities, due care and diligence was used in the observation of the project
construction such that the construction was observed to be built within substantial
compliance and intent of the approved plans and.specifications.
The checklist of items on page 2 of this form Is Included in the Certification.
Noted deviations from approved plans and specification:
SFAL
Signature ``��,�nrluitiiuunrnrnn,
-(1a GAR -,
Registration Number 03F>cvkf �.. • •••. f
.,_... -date CA Ito 1 ` �=o.a�oF�s��o
SEAL r .
0386-15
17
"' G! N
KfT.
"�rlellfJ 111111 �1111�51:� •
ECEIVE
SEP 17 2015
BY:
Page a of 9
��;
r� J
047-13-' 12 15 ; 44 , FROM-DENR Wilmington 910-350-2019 T-534 P0210/0010 F-898
Jtc1kC atV1111WdLW 1V[a11d G111Gi[t Oy*itV11W
Permit No SWS 080313
Certification Requirements:
✓ 1. The drainage area to the system contains approximately the permitted
acreage.
2. The drainage area to the system contains no more than the permitted
amount of built -upon area.
_,/_3.. All the built -upon area associated with the project Is graded such that the
runoff drains to the system.
,4. All roof drains are located such that the runoff is directed into the system.
5. The bypass structure weir elevation is per the approved plan.
- $. The bypass structure is located per the approved plans.
10A 7. A Trash Rack is provided on the bypass structure.
✓ 8. All slopes are grassed with permanent vegetation.
9. Vegetated slopes are no steeper than 3:1.
✓ 10. The inlets are located per the approved plans and do not cause short-
circuiting of the system.
�✓ 11. The permitted amounts of surface area and/or volume have been
provided.
✓ 12. Ali required design depths are provided.
✓ 13. All required parts of the system are provided.
14. The required system dimensions are provided per the approved plans.
cc: NCDENR-DWQ Regional Office
David Towler, MCB Camp Lejeune
ECEIVE
SEP 17 2015
Page 9 of 9 BY;
r.
CASE FEAR
ENGINEERING
Cape Fear Engineering, Inc. has been contracted by Balfour Beatty to certify the installed
stormwater BMPs as part of the P1286 Bachelor Enlisted Quarters (BEQ's) project on Rifle
Range Road. Cape Fear Engineering was not the original designer of record and was not
contracted to complete as-builtslcertifcations until after construction was complete; however,
CFE did perform construction staking for the project and performed GIS Data Deliverables for
the project.
This engineer's certification has been prepared based on a combination of as -built survey by Cape
Fear Engineering; redline markups provided by the contractor, GIS Date Deliverables, limited
post construction inspections of completed stormwater BMPs, and verification that CFE
identified punch list items have been completed.
nFE:CEIVE
I
SEP 11 2015
BY:
1':L55"58-124 Rifle Range\AdminlAS$UIL'rS & CER'I'SISTORMWATER12015.09-16 Final Stormwater ClarifcationADc
F
67-13-' 12 15:44 FROM-DENR Wilmington 910-352-2018 T-534 F0009/0818 F-898
arena atUM MI141 IVIUMAyeiR1Vin vysiems
Permit 080313
Camp Lejeune - P-1184 Dining Facility and P-1286 Rifle Range BEQ
Stormwater Permit No. SW8 080313 plod.
Onslow County
Designer's Certification
1, tr►gt , as a duty registered tau%FL*'+ in the
State of North Carolina, having been authorized to observe (periodically/ waekty/ full
time) the construction of the'project, GAtxvScA-r10NS
f�Es
P kWbLo — Rtr-tC- 9AN6V RF NCYC- CZArr--> — SM? 'VF°I
(Project)
for S N� Eu(Project Owner) hereby state that, to the
best of my abilities, due care and diligence was used In the observation of the project
construction such that the construction was observed to be built within substantial
compliance and intent of the approved plans and. specifications.
The checklist of items on page 2 of this form is included in the Certification,
Noted deviations from approved plans and specification:
SEAL
Signature
CA'R
Registration Number 03 e-A. lam '` . O�
Date g %cm l p -oF�ss�O4;
SEAL-
�' 038515
W
Page 8 of 9
ECEIVE
SEP 17 2015
71
07-13--'12 15:44-FROM-D£NR Wilm-ington
Certification Requirements:
r
910-350-2018 T-534 POON/0910 P-898
atacG AV1IIIYYdRA 1001lAyGlIIGIn 0y*%V1IN
Permit Ng.SW8 080§13
✓ 1. The drainage area to the system contains approximately the permitted
acreage.
2.
The drainage area to the system contains no more than the permitted
amount of built -upon area.
✓
A.
All the built -upon area associated with the project is graded such that the
runoff' drains to the system.
4.
All roof drains are located such that the runoff is directed into the system.
✓
5.
The bypass structure weir elevation is per the approved plan.
✓
0.
The bypass structure is located per the approved plans.
N fa
7.
A Trash Rack is provided on the bypass structure.
✓
8.
All slopes are grassed with permanent vegetation.
✓
9.
Vegetated slopes are no steeper than 3:1.
✓
10.
The inlets are located per the approved plans and do not cause short-
circuiting of the system.
11.
The permitted amounts of sur ue area and/or volume have been
provided.
✓ 12. All required design depths are provided.
13. All required parts of the system are provided.
14. The required system dimensions are provided per the approved plans.
cc: NCDENR-DWQ Regional Office
David Trawler, MCB Camp Lejeune
nECEIVE%
SEP 17 2015
A
BY: Page 9 of 9
CAPE FEAR
ENGINEERING
Cape Fear Engineering, Inc. has been contracted by Balfour Beatty to certify the installed
stormwater BMPs as part of the P1286 Bachelor Enlisted Quarters (BEQ's) project on Rifle
Range Road. Cape Fear Engineering was not the original designer of record and was not
contracted to complete as-builts/certifications until after construction was complete; however,
CFE did perform construction staking for the project and performed GIS Data Deliverables for
the project.
This engineer's certification has been prepared based on a combination of as -built survey by Cape
Fear Engineering; redline markups provided by the contractor, GIS Date Deliverables, limited
post construction inspections of completed stormwater BMPs, and verification that CFE
identified punch list items have been completed_
rE!CEI\iE
ii.
SEP 17 2015
BY:
P;t556\558-124 Rife Range\Admin\ASBUILTS & CERTSISTORMWATERU015-09-I6 Final Slortnwater Clarification doc
CAPE FEAR
E.N-GINEERINC
151 Poole Road, Suite 100
Belville, NC 28451
TEL (910) 383-1044
FAX (910) 383-1045
www.capefearengineering.com
To:
NCDENR
Wilmington Regional Office
DWQ - Stormwater
Attn:
Linda Lewis
❑ As Requested ❑ For Your Files
❑ Sent via Mail ❑ Sent via Courier
Transmittal
Date.- September 16, 2015
File: 559-124 "36"
Subject: P1286 Bachelor Enlisted Quarters
(BEQs) — Rifle Range Road
(SW8080313)
Stormwater Certifications
BMPS 1,2,6,7,9
❑ For Distribution ® For your Review 1 Action 1 Approval
Quantity
Drawing No.
Description
1
Engineer's Certification for BMP 1
1
Engineer's Certification for BMP 2
1
Engineer's Certification for BMP 6
1
Engineer's Certification for BMP 7
1
Engineer's Certification for BMP 9
REMARKS Please find the attached engineering certifications for the stormwater BMPs constructed
as part of the P1286 Rifle Range BEQ Project.
Please let us know if you need any additional info any or if there is any way we can assist. Thanks.
CC:
File 558-124 "36"
Thomas Bradshaw, Camp Lejeune Public Works
Cape Fear Engineering, Inc.
Signed: X&A��
Matthew T Haley/1PE
Received By:
Date:
RECEIVED
SEP .1 7 .2015
P;455M58-124 Rifle RangeAdmiMASBUILTS 8 CERTS%STQRMWATERQ015-09-16 Trans_Stormwater Cert-Rifle Range BEQ,doc
"rt
APR ... 30-2008 WED 09:18 AM NODENR FAX N0, 9103502004 P. 08/09
State Stormwater Management Systems
Permit No. SW8 080313-;
Camp Le eune - P-1184 DininwFacillty at Stone Say 5
Stormwater Permit No. SW8 080313
Onsfow County
Designer's Certification
1, CnRus.NER P. 5-%A.L ,.�as.,a duly registered NofssslomhL �N61NEEA 1n thee.
State of North Carolina, having been authorized'to observe (periodically/ weekly/ full ..
tlme) the Construction of. -,the project,
P- I i8q Disai-ic, F_ AQt t. 1-4 A.T. S-f0WC-. 'BAY
(Project)
for U.S. Govetpmem-r - AG C % L ,v� 4e (Project Owner) hereby state that, to the
best of my abilities, due care and diligence was used In the observation of the project
construction such that the construction was observed to be built within substantial
compliance and intent of the approved plans and specifications.
The checklist of Items on page 2 of this form Is included in the Certification.
Noted deviations from approved plans and specification:
SEAL
Signature
Registration Nurnfer.,4 3565� N CAR
.. - - . . 0
Date 11 2 0-4 . O • F�sS/p •,y
. e SEAL f'
;n.
035656
+
��y��s' N0I N e ilPv��
pkE4t tiN��
���
NOV b g INS
BY:�r
Page 7 of a
0
G'b.r{7k
APR-30-2008 WED 09:18 AM NCDENR
FAX NO. 9103502004
P. 09/09
Certification Requirements:
state stormwater Management Systems
Pgrmit No. SW8 080313
1. The drainage area to the system contains approximately the permitted
acreage.
✓ 2.. The drainage,area tb the system.contains no more than,the-permitted e.
/ amount.of built -upon area i
3. All the built -upon area.assoclated with the projedds graded such that the
/ runoff drains to the system.
✓ 4. All roof drains are located such that the runoff is directed Into the -system.
5. The bypass structure weir.elevation Is per the approved plan.
6. The bypass structure Is located per the approved plans.
�► A 7. A Trash Rack Is provided on the bypass structure.
8. All slopes are grassed with permanent vegetation.
__Z_9. Vegetated slopes are no steeper than 3:1.
10. The inlets are located per the approved plans and do not cause short-
circuiting of the system.
✓ 11. The permitted amounts of surface area and/or volume have been
provided.
J 12. All required design depths are provided.
•l 13. All required parts of the system are provided.
14. The required system dimensions are provided per the approved plans.
cc:. NCDENR-DWQ Regional Office
Onslow County Building Inspections
Page 8 of 8
Architeetrrre & Engineering
4000 IlierlCba.Se 11hd- Suile 20
Rcdergh, Alorlb Carolina 276117
919/ R28-1 S7G
Fern 9191 S28-1 S77
lJlljJ: �I71'lYJJl,i�r!!'�:!lP1:iC11.t7lJJI
We transmit
For Your
The Following
N a
"IS
L bwl Mm !AM
To: 127 Cardinal Drive I.xtension
Wilmington, NC 28405
Attn: Christine Nelson
Date: November 2, 2009
Project No:. NC F81.4
Reference: IMARSOC Dining
® herewith h��.�� ) a 2009
❑ in accordance with your request
BY:
❑ under separate corer
❑
approval..
❑
distribution,to parties
❑
review -and -comment
❑
record
❑
use
®
information
❑
drawings
❑
computer file(s)
❑
specifications
❑
samples
❑
change order
❑
product literature
❑
shop drawinLs
M
other
Copies
Date
Description
1
1 1/02/09
Stonnwater Certification — Engineer
Remarks
Tony.
Please find enclosed the stomiwater certification that has.beerixertified and signed. Please let ine know if you have any questions.
By: Christopher 1-1. Small Copies to: Aaron Volck