Loading...
HomeMy WebLinkAboutSW8030909_HISTORICAL FILE_20031201STORMWATER DIVISION CODING SHEET POST -CONSTRUCTION PERMITS PERMIT NO.-.SW'�Y�, J _30q(�aI DOC TYPE ❑CURRENT PERMIT ❑ APPROVED PLANS HISTORICAL FILE ❑ COMPLIANCE EVALUATION INSPECTION DOC DATE i YYYYMMDD i STATE OF NORTH CAROLINA Department of Environmental Quality 127 Cardinal Drive Extension Wilmington, North Carolina 28405 (910)796-7215 FILE ACCESS RECORD SECTION TIME/DATE I L NAME S Q Al L ,j REPRESENTING Guidelines for Access: The staff of Wilmington Regional Office is dedicated to making public records in our custody readily available to the public for review and copying. We also have the responsibility to the public to safeguard these records and to carry out our day-to-day program obligations. Please read carefully the following guidelines signing the form: 1. Due to the large public demand for file access, we request that you call at least a day in advance to schedule an appointment to review the files. Appointments will be scheduled between 9:00am and 3:O�m. Viewing time ends at 4:45pm. Anyone arriving without__an appointment mayview the files to the extent that time and staff supervision is available. 2. You must specify files you want to review by facility name. The number of files that you may review at one time will be limited to five. 3. You may make copies of a file when the copier is not in use by the staff and if time permits. Cost per copy is .05 cents for copies. Payment may be made by check, money order, or cash at the reception desk. Copies totaling $5.00 or more can also be invoiced for your convenience. 4. FILES MUST BE KEPT IN ORDER YOU FOUND THEM. Files may not be taken from the office. To remove, alter, deface, mutilate, or destroy material in one of these files is a misdemeanor for which you can be fined up to $500.00. No briefcases, large totes, etc. are permitted in the file review area. - 5. In accordance with General Statue 25-3-512, a $25,00 processing fee will be charged and collected for checks on which payment has been refused. FACILITY NAME COUNTY 1. Suss ftW7/o-0Q3'7%3t39_ 'D 2. 4�J1 3 5. Signature and Name of Firm/Business Date Please attach a business curd to thisform Time In COPIES MADE PAID _ INVOICE Time Out State Stormwater Management Systems Permit No. SWS 030909 STATE OF NORTH CAROLINA DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES DIVISION OF WATER QUALITY STATE STORMWATER MANAGEMENT PERMIT HIGH DENSITY DEVELOPMENT In accordance with the provisions of Article 21 of Chapter 143, General Statutes of North Carolina as amended, and other applicable Laws, Rules, and Regulations PERMISSION IS HEREBY GRANTED TO St. James Development Co., LLC The Players Club Clubhouse Brunswick County FOR THE construction, operation and maintenance of a wet detention basin in compliance with the provisions of 15A NCAC 2H .1000 (hereafter referred to as the "stormwater rules') and the approved stonnwater management plans and specifications and other supporting data as attached and on file with and approved by the Division of Water Quality and considered a part of this permit. This permit shall be effective from the date of issuance until December 1, 2013, and shall be subject to the following specified conditions and limitations: 1. DESIGN STANDARDS This permit is effective only with respect to the nature and volume of stormwater described in the application and other supporting data. 2. This stormwater system has been approved for the management of stormwater runoff as described on page 3 of this pennit, the Project Data Sheet. The stormwater control has been designed to handle the runoff from 165,452 square feet of impervious area. 3. The tract will be limited to the amount of built -upon area indicated on page 3 of this permit, and per approved plans. 4. All stormwater collection and treatment systems must be located in either dedicated common areas or recorded easements. The final plats for the project will be recorded showing all such required easements, in accordance with the approved plans. The runoff from all built -upon area within the penmitted drainage area of this project must be directed into the permitted stormwater control system. A permit modification must be submitted and approved prior to the construction of additional built -upon area from outside of the approved drainage area. State Stormwater Management Systems Permit No. SW8 030909 DIVISION OF WATER QUALITY PROJECT DESIGN DATA SHEET Project Name: The Players Club Clubhouse Permit Number: SW8 030909 Location: Brunswick County Applicant: Mr. Jay Atkinson Mailing Address: St. James Development Co, LLC P.O. Box 10879 Southport, NC 28461 Application Date: November 26, 2003 Receiving Stream/River Basin: Beaver Dam Creek / Cape Fear Stream Index Number: CPF18 18-68-12-10 Classification of Water Body: "C Sw" Drainage Area, acres: 8.08 Onsite, sq. ft.: 351,965 Offsite, sq. ft.: none, per engineer Total Impervious Surfaces, sq. ft.: 165,452 Pond Depth, feet: 6 TSS removal efficiency: 90% (no filter is required) Permanent Pool Elevation, FMSL: 34 Permitted Surface Area, sq. ft.: 11,815@Permanent Pool Permitted Storage Volume, cubic ft.: 14,006 Temporary Storage Elevation, FMSL: 35.1 Controlling Orifice: 1.5"� (drawdown in 2-5 days) Pernitted Forebay Volume, cubic ft.: 8,185 v 3 State Stormwater Management Systems Permit No. SW8 030909 11. SCHEDULE OF COMPLIANCE The stormwater management system shall be constructed in its entirety, vegetated and operational for its intended use prior to the construction of any built -upon surface. 2. During construction, erosion shall be kept to a minimum and any eroded areas of the system will be repaired immediately. The permittee shall at all times provide the operation and maintenance necessary to assure the permitted stormwater system functions at optimum efficiency. The approved Operation and Maintenance Plan must be followed in its entirety and maintenance must occur at the scheduled intervals including, but not limited to: a. Semiannual scheduled inspections (every 6 months). b. Sediment removal. C. Mowing and revegetation of slopes and the vegetated filter. d. Immediate repair of eroded areas. e. Maintenance of all slopes in accordance with approved plans and specifications. f. Debris removal and unclogging of outlet structure, orifice device, flow spreader, catch basins and piping. g. Access to the outlet structure must be available at all times. 4. Records of maintenance activities must be kept and made available upon request to authorized personnel of DWQ. The records will indicate the date, activity, name of person performing the work and what actions were taken. Decorative spray fountains will not be allowed in the stormwater treatment system. 6. The facilities shall be constructed as shown on the approved plans. This permit shall become voidable unless the facilities are constructed in accordance with the conditions of this permit, the approved plans and specifications, and other supporting data. 7. Upon completion of construction, prior to issuance of a Certificate of Occupancy, and prior to operation ofthis permitted facility, a certification must be received from an appropriate designer for the system installed certifying that the permitted facility has been installed in accordance with this permit, the approved plans and specifications, and other supporting documentation. Any deviations from the approved plans and specifications must be noted on the Certification. A modification may be required for those deviations. If the stormwater system was used as an Erosion Control device, it must be restored to design condition prior to operation as a stormwater treatment device, and prior to occupancy of the facility. 9. The pennittee shall submit to the Director and shall have received approval for revised plans, specifications, and calculations prior to construction, for any modification to the approved plans, including, but not limited to, those listed below: a. Any revision to any item shown on the approved plans, including the stormwater management measures, built -upon area, details, etc. b. Project name change. C. Transfer of ownership. d. Redesign or addition to the approved amount of built -upon area or to the drainage area. e. Further subdivision, acquisition, or sale of all or part of the project area. The project area is defined as all property owned by the permittee, for which Sedimentation and Erosion Control Plan approval or a CAMA Major pen -nit was sought. f. Filling in, altering, or piping of any vegetative conveyance shown on the approved plan. 0 State Stormwater Management Systems Permit No. SW8 030909 10. The permittee shall submit final site layout and grading plans for any pennitted future areas shown on the approved plans, prior to construction. If the proposed BUA exceeds the amount permitted under this permit, a modification to the permit must be submitted and approved prior to construction. 11. A copy of the approved plans and specifications shall be maintained on file by the Permittee for a minimum of ten years from the date of the completion of construction. 12. At least 30 days prior to the sale or lease of any portion of the property, the permittee shall notify DWQ and provide the name, mailing address and phone number of the purchaser or leasee. An access/maintenance easement to the stormwater facilities shall be granted in favor of the permittee if access to the stormwater facilities will be restricted by the sale or lease of any portion of the property. 13. The pennittee must maintain compliance with the proposed built -upon area and ensure that the runoff from all the built -upon is directed into the permitted system. 14. The Director may notify the pennittee when the permitted site does not meet one or more of the minimum requirements of the pennit. Within the time frame specified in the notice, the permittee shall submit a written time schedule to the Director for modifying the site to meet minimum requirements. The pennittee shall provide copies of revised plans and certification in writing to the Director that the changes have been made. 15. The pennittee must maintain the current permitted drainage area. No additional runoff from outside of the permitted drainage area boundary may enter the permitted stormwater facilities without first applying for and receiving a permit modification. III. GENERAL CONDITIONS 1. This permit is not transferable except after notice to and approval by the Director. In the event of a change of ownership, or a name change, the permittee must submit a formal permit transfer request to the Division of Water Quality, accompanied by a completed name/ownership change form, documentation from the parties involved, and other supporting materials as may be appropriate. The approval of this request will be considered on its merits and may or may not be approved. The pennittee is responsible for compliance with all permit conditions until such time as the Division approves the transfer request. 2. Failure to abide by the conditions and limitations contained in this permit may subject the Permittee to enforcement action by the Division of Water Quality, in accordance with North Carolina General Statute 143-215.6A to 143-215.6C. 3. The issuance of this permit does not preclude the Permittee from complying with any and all statutes, rules, regulations, or ordinances which may be imposed by other government agencies (local, state, and federal) which have jurisdiction. 4. In the event that the facilities fail to perform satisfactorily, including the creation of nuisance conditions, the Pennittee shall take immediate corrective action, including those as may be required by this Division, such as the construction of additional or replacement stormwater management systems. 5. The permittee grants DENR Staff permission to enter the property during normal business hours for the purpose of inspecting all components of the permitted stormwater management facility. 6. The pen -nit may be modified, revoked and reissued or terminated for cause. The filing of a request for a permit modification, revocation and reissuance or termination does not stay any permit condition. State Stormwater Management Systems Permit No. SW8 030909 7. Unless specified elsewhere, permanent seeding requirements for the stormwater control must follow the guidelines established in the North Carolina Erosion and Sediment Control Planning and Design Manual. S. Approved plans and specifications for this project are incorporated by reference and are enforceable parts of the permit. 9. The permittee shall notify the Division any name, ownership or mailing address changes within 30 days. Permit issued this the 1 st day of December 2003. NORTH CAROLINA ENVIRONMENTAL MANAGEMENT COMMISSION Alan W. Klimek, P.., Director '— Division of Water Quality By Authority of the Environmental Management Commission 6 State Stonnwater Management Systems Permit No. SW8 030909 The Players Club Clubhouse Stormwater Permit No, SW8 030909 Brunswick County Designer's Certification 1, as a duly registered in the State of North Carolina, having been authorized to observe (periodically/weekly/full time) the construction of the project, (Project) for (Project Owner) hereby slate that, to the best of my abilities, due care and diligence was used in the observation ofthe project construction such that the construction was observed to be built within substantial compliance and intent of the approved plans and specifications. The checklist of items on page 2 of this form is included in the Certification. Noted deviations from approved plans and specification: SEAL Signature Registration Number Date State Stormwater Management Systems Permit No. SW8 030909 Certification Requirements: 1. The drainage area to the system contains approximately the permitted acreage. 2. The drainage area to the system contains no more than the permitted amount of built -upon area. 3. All the built -upon area associated with the project is graded such that the runoff drains to the system. 4. The outlet/bypass structure elevations are per the approved plan. .5. The outlet structure is located per the approved plans. G. Trash rack is provided on the outlet/bypass structure. .7. All slopes are grassed with permanent vegetation. $. Vegetated slopes are no steeper than 3:1. 9. The inlets are located per the approved plans and do not cause short-circuiting of the system. 10. The permitted amounts of surface area and/or volume have been provided. 11. Required drawdown devices are correctly sized per the approved plans. 12. All required design depths are provided. 13. All required parts of the system are provided, such as a vegetated shelf, and a forebay. 14. The overall dimensions of the system, as shown on the approved plans, are provided. cc: NCDENR-DWQ Regional Office Brunswick County Building Inspections E CAPE FEAR Engineering, Inc. November 24, 2003 Laurie Munn NCDENR Water Quality 127 Cardinal Dr. Ext. Wilmington, NC 28405 RE: The Players Club Clubhouse (SW8 030909) Dear Ms. Munn: Please find the enclosed response to your request for additional information for the above referenced project. 1. The swalc should have been carried all the way to the catch basin. We also decided to separate our swale from the roadside swale with an earthen berm. These changes have been made to the revised drawing. 2. The building will drain to the pond via a swale and sheet flow. The original delineations were for the catch basins and didn't show this area. We had always planned on having this area treated in the pond; we just neglected to show it to you. The drawing has been revised. trust this information to be Sufficient for your review and approval. If you have any questions or require additional information, please contact this office. Thanks for your timely review. Sincerely, Jeffrey Petroff, P.E. cc: File Mark Brambell 151 Poole Road, Suite 100 • Oelville, NC 243451 • TEL: (910) 383-1044 • FAX: (910) 363-1045 www.capefeareng.com Storm Water / Erosion Control Design Narrative and Calculations Subject: The Players Club Clubhouse At St. James Plantation Brunswick County, North Carolina Prepared for St. James Development Co., LLC P.O. Box 10879 Southport, North Carolina 28461 (910) 253-4739 � Z' Date: September, 2003 Prepared by Cape Dear- Engineei-ing, Inc. 151 Poole Road, Suite 100 Belville, North Carolina 28451 (910) 383-1044 DESIGN NARRATIVE 1. GENERAL-.: The project site is located within St. James Plantation in 131-LIrlswick County, North Carolina. The proposed Players Club Clubhouse is a high density submittal with a project boundary of approximately 8.08 acres, The site was originally set aside as a "Future high density site" within the 416 acre low density site of "The Players Club Phase I", SW8 961 103 mod., obtained on June 11, 2001. Drainage considerations are to be in accordance with state stormwater requirements. 2. EXISTING SITE: A temporary clubhouse with parking and a cart barn are on the site. Site topography in the area has a gentle slope from south tO north. The vegetation consists primarily of minor ground cover and a thin stand of trees within the areas of improvement. Subsurface soils arc typically a mixture of sands, silty sands and organics. 3. PROPOSEI) IMPROVEMENTS: Improvements proposed 1r1C1Llde the ConstrLlCt1011 of a clubhOLISC, parking lot, roadways, cart paths, patio homes, and a stormwater pond and collection system. The site will be graded to divert all stormwater runoff from impel-vious surfaces to the proposed catch basins. The pond and collection system will be constructed First to act as a sediment basin. 4. DRAINAGE CALCULATION CONSIDERATIONS: Attached to this design narrative are the drainage calculations determining the amount of stoup water to be contained and treated in the stormwater pond. The proposed pond has the volume to contain the first inch of runoff, an adequate surface area and properly sized forebay and orifice. 5. EROSION CONTROL CONSIDERATIONS: The proposed stormwater pond will be used as a trapping device during construction and has sufficient storage for the calculated amount of disturbance. Also, the lower slope perimeter will be enclosed in silt fence as shown on the plan For added protection. The area of disturbance is limited to within the project area. 6. MAINTENANCE CONSIDERATIONS: Dm-111g construction, the Contractor shall be required to inspect and repair as needed all erosion control devices after any significant rain event- Any measure found not performing its intended Function, shall be repaired immedlatcly. Upon completion of C0r15trLICt10n the establishment of permanent ground cover will be a priority. Erosion Control Specifications Erosion and Sedimentation Control 1.01 General: The contractor shall be responsible for erosion and sedimentation control within the construction limits; for prevention of sediment laden runoff leaving the construction hmlts or entering ditches, streams or watcr impoundments; and for Implementat lon of necessary erosion and sedimentation control measures to meet the requirements of the North Carolina Department of Environment, Health, and Natural Resources. The Contractor shall also be responsible for all damages or fines resulting from erosion or sediment laden runoff in the execution of his contract. 1.02 Construction Sequence: While the use of erosion and sedimentation control devices is especially important on areas of steep topography, easily erodible soils and sites III close proximity to water courses tl1]'0ughollt the construction period, the control measures Should be installed prior to the commeIlcement of land clearing and shall be fully maintained and periodically inspected until final restoration and stabilization is completed. Unrestored cleared areas shall be kept to a minimum. Disturbed areas ahead of construction shall only be accomplished on those segments for the shortest practical distance as required for continual progress. Final restoration shall not be delayed until completion of the project but will be carries[ out in phases as the work proceeds. Under no circumstances will any areas be left denuded for more than (15) fifteen calendar days without some form of stabilization until final restoration is complete. 1.03 Sedimentation: Control Measures: The following are some of the sediment control devices or measures that may be required to prevent sedimentation of streams, water courses, or drainage structures: I . Earth berms and/or diversion and intercept ditches. 2. Sediment traps 3. Filter berms 4. filter inlets 5. Silt fences - not to be placed in streams or ditches pet7mndicular to flow. G. Clieck dams gravel filter 7. Gravel construction exit 1.03.1 Erosion Control Measures: Some of the soil erosion control measures which may be required in this contract are: 1. Earth slope protection 2. Diagonal water break diversion berms 3. Diversion channels 4. Preservation of existing vegetation 5. Storm inlet protection 6. Stream crossings 7. lnergy dissipators S. Matting of rc-seeded areas 1.03.2 Detail Drawing: Examples of sedimentation and erosion control details are shown in these plans for installation at locations designated in the plans or as otherwise required by the regulating agency, or the owner as work proceeds. 1.04 Stream Protection: Where construction activities are necessary in close proximity to streams, and other waterways, they sliall be performed in a manner that does not contribute to degradation of or blockage of the stream -flow. In order to prevent possible degradation or blockages, the contractor shall be required to: 1. Keep all construction debris, excavated materials, brush, rocks, refuse and topsoil as far from these waterways as possible. Restrict machinery operation or stream crossings in waterways to the extent necessary for construction of utilities crossings. 2. If construction work areas are necessary in a waterway, they shall be protected as indicated on the plans. 3. If temporary roadways are essential for the construction activities, they sliall be constructed of soils which are not highly erodible materials and must not span more than half way across the water course or wetland area at any one time unless otherwise approved by the Engineer. These temporary roadways sliall be entirely removed as soon as their requirement is met. Work in these areas shall follow the requirements of the Corp of Engineers or CAMA permit, or plans as applicable. 1.05 Construction Access: The travel of equipment to and from the construction areas shall be minimized not only to protect areas that will not be denuded, but also to prevent the spreading of sediment within and outside of the construction areas. Therefore, special construction equipment travel corridors will be established for this use and instructions shall be issued for their use. Use of these corridors must be fully enforced. Other non- essential traffic will be restricted or discouraged. Indiscriminate and convenience traffic shall not be allowed. 1.06 Stockpile/Barrow Areas: The Contractor shall be responsible for selecting, obtaining and maintaining stockpile or borrow areas which lie may require to complete the contract. He is also required to design and incorporate all necessary sediment and erosion controls measures necessary to prevent erosion and contribution of sediment to adjacent areas. The Contractor is responsible to obtain all necessary permits or approvals for borrow or spoil areas outside the construction limits. 1.07 Disposal of Excess Water from Excavations: The Contractor shall practice management of excess water pumped from excavation to reduce the production and spreading of sediment. Propped water shall be discharged onto stabilized surfaces and allowed to filter through existing vegetation if possible; otherwise, additional control measures may he necessary. If ditches are required to remove pumped water from construction excavations, they shall be givers the same consideration as ally other man- made waterway and they shall be stabilized as to not degrade and produce sediment. 1.08 Excavation and Backfill: F-wavation shall be closely controlled and all the material removed from the excavation shall be selective]), stockpiled in areas where a minimum of sediment Nvill be generated and where other damage will not result from the piled material. Drainage ways shall be protected at all times and the placement of material in Drainage ways for convenience shall not be allowed. Backf-ilhng opci-atlorls shall be performed in such a manner- that remaining trees are not damaged. 1.09 Final Grading and Seeding: Finish grading, topsoiling, seeding and/or soddrllg shall be performed after the construction phase is complete. Permanent vegetation of the areas, that have been disturbed, shall be re-established as rapidly as possible. If the completion Of the CO1lstrL1CtiO11 activities do not coincide with a season in which permanent vegetation can be generated, an interim or temporary program is required. This shall include soil conditioners and mulching as necessary for soil stabilization. In any case, sediment and erosion controls shall be installed promptly and their maintenance assured. 1.10 Approval. The approved Erosion Control Plan will be provided by the Owner, Any standard conditions relating to soil erosion and sediment control issued to the Contractor as a part of any permits shall be available at the job site at all times. End of Section WET POND DATA SKEET PLAYERS CLUB CLUBHOUSE - ST. JAME5 PLANTATION PRELIMINARY DESIGN POND # I DRAINAGE AREA (Ad) = 8.08 ACKE5 IMPERVIOUS AREA (Ati): BUILDINGS: 3.80 ACRES ROADS: 0.00 ACRES PARKING: 0.00 ACRE5 51DEWALK5: _ 0.00 ACRES TOTAL: 3.50 ACRES PERCENT IMPERVIOUS (1): I = Ad/At = 47% f— POND# 15hALL BE G' DEEP AND DESIGNED TO REMOVE 90 % T55. SA/DA= 2.5 REQUIRED 5URf ACE AREA AT PERMANENT POOL: 5ARffc) = 0.203G2 AC. = 88G9.5 1 5F SURFACE AREA PROVIDED AT PERMANENT POOL (EL. 34)= I 1 81 4 5F 5A PROV'D= 1 1514 > 88G9.5 I =5A REM) OK ......................................................................................................................... MINIMUM REQUIRED VOLUME (SIMPLE METI-OD BY TOM 5ChUELER): Rv=0.05+0.009'(I) Rv= 0.473 VOLUME= I "'Rv'Ad = 0.3 1 849 AC -FT = 13673.3 fT ^ 3 VOLUME PROVIDED AT TEMPORARY POOL: INCREM. TOTAL EL. 5(5f� VOL. (CF) VOL. (CFI 34 11815 0 0 35 1 33G4 12589.5 12585.5 3G 14071 14I67.5 2G757 SET TEMP. POOL ELEVATION: REO'D EL.= 35.090G SAY 35.1 VOL. PROV'D = 14000.3 CF ...................................................................................................................... ti VOL. PROV'D= I4000.3 > 13873.3 =VOL. REO'D OK FOREDAY SIZING: PERMANENT POOL VOLUME: INCREM. TOTAL EL 5A F VOL. (CF) VOL. (CF) 28 25GO 1280 I280 29 370G 3133 4413 30 4914 4310 8723 31 G 1 8 1 5547.5 14270.5 32 7504 G842.5 21 1 13 33 8884 8194 29307 34 1 i 8 i 5 10349.5 39G5G.5 REO'D VOLUME = 20% TOTAL = 7931 CF CHECK i=OREBAY VOLUME: INCREM, TOTAL EL. 5A (5E) VOL. (CF) VOL. (CF) 28 309 0 0 29 550 429.5 429.5 30 857 703.5 1 133 31 122G 1041.5 2174.5 32 1G59 1442.5 3G17 33 2150 1904.5 5521.5 34 317G 2GG3 5164.5 PROV'D VOLUME = CF (G' DEEP f�OREBAY) ...................................... ............. ........... ............................ ........... I ............... , VOL. PROV'D= 8184.5 > 7931 =VOL. REQ'D OK ORIFICE 51ZING: REQ'D DRAWDOWN TIME = 2-5 DAYS Q2= 0.06029 CF5 (FOR 2 DAY DRAWDOWN) 05 = 0,0321 1 CI=5 (FOR 5 DAY DRAWDOWN) SELECT A 1.5 INCH CIRCULAR ORIFICE, EL. 34' (PERM. POOL EL.) Q PROV'D= Cd'A'(29h)" I/2 Q PROV'D= 0.04237 WHERE: Cd= 0.G A= 0.0 1227 5F g= 32.2 EF515 h= avg head: (I .4'-0.5"I 12)12 = 0.5 1 4OG ....................... ................ ......... .......... ........ , 02> 0.04237 >Q5 OK The Players Club Clubhouse at St. James Plantation DISTURBED AREA 4- STORAGE CALCULATIONS 15tormwater Porl Disturbed Area = 1:'348,481 ,sf Storage Required: 348,481 sf Pond Area Pond Depth 0.5 0.0833 = t 15 ,91.,8 3� sf f i = 14514 cf Storage Provided - 35,445 cf Provided Required L- 35,445 > 14,514 OK 9/15/03 1 of 1 State of North Carolina Department of Environment and Natural Resources Wilmington Regional Office Michael F. Easley, Governor William G. Ross Jr., Secretary FAX COVER SHEET Date :/d 0 /0 3 No. Of Pages: 3 To: a 4I PP�'1-D _ From: La-t(-AIL ZLJ uCii i CO: CO: OLA)Q. FAX #: /0) - /D FAX#: 910-350-2004 REMARKS: :r+ 1.5 o e 1(itea'�.d .-�D z) to `fftg,��Y � hu i t� 127 Cardinal Drive Extanalon, W[lmington, N.C.164V R45 Telephone (910) 395.390 Fax (910) 390.2004 An Equal oppottnnity Aflirmativo Action Employer i 4F ash - 60'_ ' C� sp�� 60, 4,�(� O - r` .44.5 i r EXISTING r� LAGOON _ !� 0 O lr3 Q o �f FERTILIZATION 1000 SF. MAINTENANCE NA NA NA NA ZATIONZ1000 SF, -- MAINTENANCE APRIL i-10-10 EACH 4-8 WEEKS 1-2 LBS. N. AUG. -- SEPT. 12 LBS. 10-10-10 kRCH 1-10-10 MAY & DEC. 1 /2 TO i LB. N. SEPT. - OCT. 12 LBS. 10-10--10 SUGGESTED WETLAND SPECIES PLANTINGS ON 6:1 VEGETATIVE SHELF (POND) GE--N-US/SPECIES Juncus efFusus Soft 05h Iris versicolor Blue Flog Distichlis spicatca Spike 9roi'yikweed Asclepius incarnata Swamp r VEGETATE POND SLOPES ABOVE PEROA W TN WATER LEVEL AND SlNALE 51pE BERMUDA GRASS , ,W y1Lr- a 50' 0 50' 100' _ All- y (_,;],�� 1 ll �CH= 50' NORMAL WATER 3 - ELEVATIpN = 34.0 RFACE� Su r, g� 67• - i. t _ rj _l- / 40 r I B�IL_ - /. DING� � � / 1FFE=40.0 * COMMUNICATION RESULT REPORT ( NOV.10.2003 12:28PM ) P. 1 FILE MODE OPTION ------------------- 021 MEMORY TX REASON FOR ERROR TTI NCDENR WIRO ADDRESS (GROUP) RESULT PAGE _--------------------- __ ---------------- 89103831045 OK-----------P. 3/3 E-1) HANG UP OR LIME FAIL E-2) BUSY E-3) NO ANSWER E-4) NO FACSIMILE CONNECTION Stat of North Carolina DepaMent of Bnvironmtmt and Na#t d Itapoumea Wilmixigton Regional Offm Miclxael F. Easley, Governor wwjam a. Ross Jr, Sftntm FAX COVER SETT Dq �/I O /D 3 No, Of Pages: To: 00 Penh-4 From u; co:wa� Co: L FAX #: !D D FAQ#: IW.90,2004_ c1P '1 Does wv- o� a1-6a, c lr c p 1 ? REMARKS: � 1,�_�e l (,hx kd 46 =to �.&.yL 137Cfsrdlnal NA 7114Wl40 TdlWiis (pM4 8N900 Fax (910) 400-1p04 An Equol OppaMlilty ARlrmafiva Acclan Rmplayar CAPE FEAR Engineering, Inc. November 3, 2003 Laurie Munn NCDENR Water Quality 127 Cardinal Dr. Ext. Wilmington, NC 28405 RE: The Players Club Clubhouse (SWS 030909) Dear Ms. Munn: I NOV 3 2003 BY: Q Please find the enclosed response to your request for additional information for the above referenced project. 1. The drainage areas are shown as the "railroad type" lines. No offsite area drains to the pond. 2. Finish floor elevations have been added to the plans and spot elevations have been added to the roads and parking areas. The catch basin elevations are supplied in the storm drain schedule. 3. A note specifying vegetation has been added to the plans. 4. The permanent and temporary pool elevations are shown on the pond detail. The permanent pool contour has been labeled and dimensioned in plan view. 5. The vicinity map has been improved. 6. The majority of the project will sheet now to catch basins. A roadside swale will be constructed to provide positive drainage where practical, such as the areas shown oil the plan. The swale arrows have been revised to run along the roadway, not in it. Sorry for the confusion. I trust this information to be sufficient for your review and approval. If you have any questions or require additional information, please contact this office. Thanks for your timely review. Sincerely, ere Petroff, P.E. cc: File ; Mark Brambell 151 Poole Road, Suite 100 • Belville, NC 25451 , 7Et: (910) 353-1044 • FAX: (910) 383-1045 www.capefeareng.com N1 A 0. Michael F. Easley, Governor WHliam G. Ross Jr., Secretary � North Carolina Department of Environment and Natural Resources r Alan W. Klimek, P,E., Director Division of Water Quality Coleen N. Sullins, Deputy Director Division of Water Quality October 23, 2003 Mr. Jay Atkinson St. James Development Co., LLC P.O. Box 10879 Southport, NC 28461 Subject: REQUEST FOR ADDITIONAL INFORMATION Stormwater Project No. SW8 030909 The Players Club Clubhouse Brunswick County Dear Mr. Atkinson: The Wilmington Regional Office received a Stormwater Management Permit Application for The Players Club Clubhouse on September 15, 2003. A preliminary review of that information has determined that the application is not complete. The following information is needed to continue the stormwater review: 1. Please delineate the drainage area to the pond. 2. Please provide finished floor elevations for all buildings and spot elevations on the roadway, golf paths, and in the corners of the parking areas to show that all drainage is directed to the catch basins. Also, please provide top elevations for the catch basins. 3. Please specify pond / swale side slope vegetation and the wetland species to be planted on the 6A shelf. /4. Please label the permanent and temporary pool contours on the pond drawing. Also please dimension the permanent pool contour. ✓ 5. Please add the nearest intersection of two major roads to a legible vicinity map. A major road is any 1, 2 or 3 digit NC, US or interstate highway. 6. The Typical Roadway Section shows roadside swales. Does this project have roadside swales or does the runoff sheet flow to the catch basins? Please note that this request for additional information is in response to a preliminary review. The requested information should be received by this Office prior to November 23, 2003, or the application will be returned as incomplete. The return of a project will necessitate resubmittal of all required items, including the application fee. If you need additional tinnc to submit the information, please mail or fax your request for a time extension to the Division at the address and fax number at the bottom of this letter. The request must indicate the date by which you expect to submit the required information. The Division is allowed 90 days from the receipt of a completed application to issue the permit. N. C. Division of Water Quality 127 Cardinal Drive Extension (910) 395-3900 Customer Service �A Wilmington Regional Office Wilmington, NC 28405 (910) 350-2004 Fax 1 800 623-7748 NIt-DE 2 Mr. Jay Atkinson Page 2 October 23, 2003 The construction of any impervious surfaces, other than a construction entrance under an approved Sedimentation Erosion Control Plan, is a violation of NCGS 143-215.1 and is subject to enforcement action pursuant to NCGS 143-215.6A. Please reference the State assigned project number on all correspondence. Any original documents that need to be revised have been sent to the engineer or agent. All original documents must be returned or new originals must be provided. Copies are not acceptable. If you have any questions concerning this matter please feel free to call me at (910) 395-3900. Sincerely, Laurie Munn Environmental Engineer RSS/:Ism S:1WQSlSTORMWATIADDINF0120031030909.oct03.doc cc: Laurie Munn Jeff Petroff, RE, u. CAPE FEAR %o Engineering, Inc. 151 Poore Roed, suite 100 8elvdJ9, NC 28451 TEL (910) 363.1044 FAX (910) 363.1045 www,copefeareng.com To: NCDENR —Water Quality 127 Cardinal Dr. Ext. Wilmington, NC 28405 Attn: Transmittal Date: 9/15/03 File: 700-23 Subject: The Players Club Clubhouse St. James Plantation Brunswick County ❑ As Requested ❑ For Your Files ❑ For Distribution ® For your Review 1 Action I Approval ❑ Sent via Mail ❑ Sent via Courier Quantity Drawing No. Description 2 Stormwater And Erosion Control Plan 2 Design Narrative with Calculations 2 Original and One Copy of Application 2 Original and One Copy of Supplement 1 $420 Application Fee REMARKS If you have any questions or comments, please contact this office. Thanks. CC: Cane Fear Enaineerina. Inc. TransStormwater.doc