DIVISION OF WATER QUALITY
INFILTRATION SYSTEM INVESTIGATION
Complete and email this form to Vincent.Lewis@ncmail.net. if there are more than 7 areas to be tested,
attach a second sheet.
State Soil Scientist Confirmation Visit date/time: Y ` `/12,JF
wd
Project Name: Silver Lake Baptist Curch County: New Hanover
Street Address: 4715 Carolina Beach Road
Directions from the nearest intersection-oftwo major roads:
1.25 miles NW of intersection with South College
>1 acre being disturbed? EYES ❑NO . CAMA Major required? [:]YES. ❑X NO
Consultant Name: Brian Riley / Jack D. Reel,,PE Phone: 910-332-3402
Consultant Firm Name: Thomas & Hutton��ngineering Co.
Bore Number
1
2
3
4
5
a Existing Ground Elevation
b Proposed Bottom Elevation
. _f
c Difference a minus b`'`'
d Add 2 ft. Min. Bore Depth)
e Hardpan Depth?
f Approx. Elev. Of SHWT
4
,,,.1,,r
Max. lowest bottom elev.,
h Infiltration Rate OK?
i Confirmation of SHWT *
$
S
For projects requiring more than 5 hand borings, manpower or equipment to
conduct the excavation must be provided by the consultant.
*State.Soil Scientist Use ONLY
Comments Requesting depth of SHWT only to assist in conceptual design of proposed expansion.
ti
Required Attachments:
1. Legible vicinity map.
2. Complete Soils Report.
3. PDF formatted site plan with the boring locations to be tested. Site plans should
be emailed or hand -delivered only. Illegible faxed maps will not be accepted.
All proposed infiltration areas and existing, active utility lines located within the proposed
basin/trench must be marked and flagged. If these areas are not flagged, the Soils Scientist
reserves the right to decline to do the investigation. If the proposed infiltration system will be
located in an area of existing pavement and there is no open area nearby, equipment capable of
breaking through the impervious layer must be provided. The soils investigation does not take
the place of a soils report prepared by an appropriate professional. The Soils Scientist will only
verify the soil conditions that are reported in the Soils Report, and make a determination as to
the suitability of the site to meet the infiltration design requirements under iVCAC 2H.1000, and
assumes no liability should the system fail.
S:IWQSISTORMWATERIFORMSIinfiltration site visit Revised 3/08
D.-W d. at Pk *�
Ito
ZOO
� 1
y TRACT "E
�.. 5.11 Acre
tit
T"All
fn cAv
�► ;'� ��
-
i9
OF wArE�4 Michael F. Easley, Governor
ca Q William G. Ross Jr., Secretary
�O North Carolina Department of Environment and Natural Resources
00
> Alan W. Klimek, P.E.,Director
Q Division of Water Quality
Coleen H. Sullins, Deputy Director
Division of Water Quality
January 6, 2004
Mr. David C. Braddy, Pastor
Cape Fear Baptist Church
PO Box 705
Carolina Beach, NC 28428
NOTICE OF INSPECTION AND NON-COMPLIANCE
Cape Fear Baptist Church
Stormwater Project No. SW8 020913
New Hanover County
Dear Pastor Braddy:
Please find attached a copy of the completed form entitled "Stormwater Compliance
Inspection Report". The report summarizes the findings of a recent inspection of the
project's stormwater controls conducted on January 5, 2004 to determine compliance
with Stormwater Permit Number SW8 020913 issued on April 3, 2003.
A summary of the findings and comments are noted under Section 4 of the report.
Please inform this Office in writing before February 6, 2004, of the specific actions that
will be undertaken and the time frame required to correct the deficiencies. Failure to
provide the requested information, when required, may initiate enforcement action. If
you have any questions please contact me at the Wilmington Regional Office, telephone
number (910) 395-3900.
Sincerely,
Gary Beecher
Environmental Technician
RSS/ghb: S:IWQSISTORMWATIINSPECT10209'13.Jan 03
cc: consultant
Wilmington Regional Office
Gary Beecher
WAX
N. C. Division of Water Quality 127 Cardinal Drive Extension (910) 395-3900 Customer service Aje
Wilmington Regional Office Wilmington, NC 28405 (910) 350-2004 Fax 1 800 623-7748 NCOENH
STORMWATER COMPLIANCE INSPECTION REPORT
E
Q
Project Name: Cape Fear Baptist Church
Project Number: 020913
Water Body: Snow's Cut
Control Measure
Classification: "SC"
Wet Detention Pond
Directions to site: HWY 421 South, before Carolina Beach Bridge, on (Rt) side
Inspection Date:
Weather Conditions:
Compliance Issues:
January 5, 2004
Dry and Warm
Y N
❑ ❑ The drainage area (including offsite) and built -upon area to the permitted
system are per the approved plan. No unpermitted offsite drainage enters
the system.
❑ ❑ All the built -upon area associated with the project is graded such that the
runoff drains to the system.
❑ ❑ For ponds/infiltration, the outlet/bypass structure relative elevations are
per the approved plan. (Must be verified via as -built survey if in question).
❑ ❑ The inlets and outlet structure are located per the approved plans and do
not cause short-circuiting.
❑ X A trash rack is provided over the outlet weir and orifice.
❑ ® All slopes are grassed with permanent vegetation and are not eroding.
❑ ❑ Vegetated slopes are no steeper than 3:1.
❑ ❑ The approximate amount of permitted surface area has been provided.
(Must be verified via as -built survey or designer's certification.)
❑ ❑ Required drawdown devices are correctly sized per the approved plans.
All required design depths are provided.
❑ ❑ All required parts of the system are provided, such as a vegetated shelf,
and a forebay.
❑ ❑ The designer's certification has been submitted.
❑ ❑ The required deed restrictions are correctly recorded and submitted.
❑ ❑ The number of lots or outparcels is per the permitted amount.
❑ ❑ The built -upon area on the lots or outparcels does not appear to exceed
the maximum amount (must be verified via as -built survey if in question)
❑ ❑ Curb outlet swales are constructed, located properly, are 100' long and
have dense vegetated cover.
❑ ❑ The road, cul-de-sac, parking lot and sidewalk widths are per the
approved plan.
❑ Required maintenance is being performed.
❑ Outparcels have their own offsite permit.
❑ ❑ For low density projects, roadside swales are 3.1, vegetated and stable.
❑ ❑ For low density projects, there are no unpermitted pipes on the project.
4. Required Actions: (Explain each deficiency and what needs to be done to bring
the system back into compliance)
(a) There is no trash rack on top of the outlet structure. The trash racks are
essential in the function of the outlet system. Not only does the rack keep
trash out, it also helps keep small children and animals from failing inside the
outlet structure. A trash rack needs to be placed and fastened on top of the
outlet structure ASAP.
(b) There are several bare spots on the slopes of the pond. These need to be
grassed to prevent further erosion from taking place.
* The majority of the pond looked good, most of the sides were well grassed and
relatively erosion free. The system also seems to be working well.
Inspector: Gary Beecher
Water Quality/Wilmington Regional Officel(910) 395-3900 Ext 222
RSSlghb: S:1WQSISTORMWATIINSPECT1020913.Jan04
DETENTION POND ANALYSIS FILE NAME: G:IDATAIWPDATAIWQSIPOND1020913.WK1
PROJECT #: SW8 020913 REVIEWER: L. Lewis
PROJECT NAME: Cape Fear Baptist Church Modification
DATE: 02-Apr-03
Receiving Stream: Snows Cut Class: SC
Drainage Basin: Cape Fear Index No. CPF24 18-87-31.5
Site Area 1.20 acres
Drainage Area ,..,,272.00` square feet Area = 1.20 acres
IMPERVIOUS AREAS
Rational C
Buildings
8050.00 square feet
Parking
22456.00 square feet
Sidewalks
762.00 square feet
square feet
square feet
square feet
TOTAL
3126800<', square feet Rational Cc= 0.08
SURFACE AREA CALCULATION
% IMPERVIOUS 59.82%
Des. Depth 3
TSS: 90
SA/DA Ratio 6.97%
Req. SA 3646 sf
Prov. SA Fill
:.:::488.3: sf
VOLUME CALCULATION * place a "1" in the box if Rational is used
Rational ?*
Des. Storm
:>: 1 00'
inches
Rv=
0.59
Bottom
8.2 msl
Perm. Pool
J ........' 11,2Q'
msl
Design Pool
11.9 msl
Design SA
5634 sf
Req. Volume
2�6
cf
Prov. Volume
3681.<
cf
ORIFICE CALCULATION
Avg. Head =
Flow Q2, cfs
Flow Q5, cfs
No. of Orifices
Diameter, inches
Drawdown =
0.33 ft
0.015 cfs
0.006 cfs
weir HxW
days
FOREBAY
Perm. Pool Volume=
Req. Forebay Volume=
Provided Volume=
Percent=
SA @ _
Elevation=
11478
2295.6
2213,00
Q2 Area =
0.77
sq. in.
Q5 Area =
0.31
sq. in.
Orifice Area
0.44
sq. in.
Q=
0.009
cfs
'........ . in
x
FN
COMMENTS
Surface Area , Volume and Orifice are within Design Guidelines
in