Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
SW8020908_APPROVED PLANS_20040227
STORMWATER DIVISION CODING SHEET POST -CONSTRUCTION PERMITS PERMIT NO. SW �D�U�d 0 DOC TYPE ❑CURRENT PERMIT APPROVED PLANS ❑ HISTORICAL FILE ❑ COMPLIANCE EVALUATION INSPECTION DOC DATE- YYYYMMDD Noe, SHEET NOTES k TMXXK SHALL K PERFORMED IN ACCORDANCE IM TBI THE LOCAL GOVERNING AUTHORITY. • CO C_7 TEL 0.c . , l; �I I• id V4 y ;,�) • 'K CO APPLICABLE STATE. COUNTY. AND LOCAL 7: p c -N THE CONVACIOR SHALL O11TAm AND PAY FOR ALL gt$PECMK CMV"UOK EGAPl M 2, ALL DEMOUIION AND SUBSEQUENT CONSTRUCTION TO K IN ACCORDANCE WATH PERMITS ISSUED AND EDP y THAT MAY K RE"MD. COP IL [THE top 4 F OVARYLVAM FROM THE VOXrr-AMM On D$tAMM ARE DEENED MOCnAJtr BY 111NE OONTRACTOR, 24" 1 Ol DETAILS OF SUICIN DEPARTURES AND REASONS THEREOF SHALL K SLIGNITIED TO IM ORM FOR REVIEW NO DEPARTURES IRON THE CONTRACT DOCUMENTS SHALL BE MADE HHAIIHOUT THE MOTrEN PERMISSION Of THE OWNER. 41 - reign RIM - 2D.35' WZ 41 Hill EXISTING HmPROvEmrmTS DAMAGED 04 DESTROYED OURNO CONSTRucy" SHALL K REPLACED ON • BENCH 18-85' PP ,q MIOM TO INM =MtA& CONDITION, AND TO THE SATIWACTION OF THE OWNER OF THE IW*DvoitNl& • TEL • li $6.44' 5, >WC WV 5 CONTRACTOR SHALL REFER TO ARClmnEcvUNAL PLANS FOR OETAJILS OF BUI"= AM BURDM MH 0 INV 15.14 WE� - RIM - 23)1 2 SEAL BENCH -1 16.57' ONE T. DJGOM AND/OR 00*R DISCLAIM ANY ROLE IN THE CONSTRUCTION MEANS AMID/OR METHODS • - c ASSOCIATED "IH THE PROTECT AS SET FORTH IN THESE 1i 15LU WELL AV -1 a. CONTRACTOR SHALL MAINTAIN AN 'AS BUILT' SET OF DRAvoll To RECORD THE ACTUAL LOCA11ON OF WM Wu ALL P."C PRIOR TO 00$MAU"f� DRAWOM MOLL BE GIVEN 70 THE OWAM UPON COMPLETION OF Ill PRMW KM A COPY OF THE TRAmisal LETTER (FOR RECORD mELPHAK) To THE EmOmmem 9 THE CONTRACTOR 15 RE"CMC " FED VERIFYING THE ACTUAL AND DACT LOCATION, SIZE AND MATERIAL COMPOW" OF ANY DIISTING. WATER OR SEWER SERVICE PROPOSED FOR CMAECION 00 UK i:4 SIGN ON Trig PROACT. THE R[IOC OF ANY UTILITY SOMCIES REQUIRED TO COMPLETE ANY PORTION OF• a THESE CONSTRUCTION PLANS SHALL K THE RESPONSIBILITY OF THE CONTRACTOR. Q, LP,• CONC 0 1 1 10, THE CONTRACTOR MUST, AT ALL TIMES. KEEP THE SES FREE FROM ACCL%KLA?Oa OF WASTE • MATERIALS OR WON CAUSED BY Hill HIS. EMPLOYEES, OR HIS WM, ALL SHALL BE REMOVED CAR' RE T C-1 !NTY FROM THE SITE ON A DALY &42& T& 0 11. FINAL ACCEPTANCE OF VOW BY THE LOCAL GOVERNING AUTHORITY SHALL NOT K MADE UNITIL ALL DR 73? OHM 540M ON THE APPROVED PLAN 15 COMPLETED• Hill 1111111111 ILL 1111111111 HIlklil. I.I. 1.111111.1'7 9 P C '9 QD j I AR I !�C GGI IN •r 1' 12. CONTRACTOR MAU. CALL *11MTH CAROLINA ONE CAW AT LEAST 48 HOLMS PRIOR TO BEGINNING ��AM,!IJNI LY C()� I CONSTRUCTION OR DICAVATION ON 97E TO Ill VOSTING UTILITIES LOCATED. CONTRACTOR TO CONTACT wl�rc # 57�'fl ANY LOCAL U71UIIES 11HAT PROVIDE IHM DOM INDEPENDENT LOCATOR $E"X COMIRACYON SHALL 4 "MATEI.Y REPORT ANY DMOV"AMM TO THE DNMM j z W MH iI I ANY EXCAVAIM kUP K PALLED IN AND TAMPED AT THE CONCLUSION OF EACH W= PERIOD. AND aL RIM 20.64' 1 SP EQUWbNNT AND SLWftU RETAINED 70 THE CONSTRUCTION STAOM AREA. ji i Y, BENCH - 16.02' or SEQUENCE OF CONSTRUCTION ACTIVITIES • z CONIC CONTRACTOR SHALL INSTALL CONSTRUCTION FENCING TO ROUTE PEDESTRIAN ACCESS AWAY FROM TEL W OD . ..... APPROX LOCATION.. J, M) UNDER ONE OF TELECOM CONSTRUCTION ACTIVITIES MR EACH AREA (SIJMWAW R NEW V1ALXWAi MMMO FOVMI F OONSIRUC"4 MCH WALL AVAM 0=#M FOR MOM TKAN 40 HOURS, CINI• PIP c 0 z 1. OBTAIN PLAN APPROVAL AND 07M APftX,4&E PUMM 0 C> LIP (TOP ELE 15.30) 2. FLAG OM ull AND MARK TO K SAVIED, IF ANY. FOR PROIECTM. If; A ........... -CONSTRUCTION MEETING UT" INSPECTION ON SITE. AT LEAST ONE WEEK PRIOR TO THE START OF • S. HOLD PRE -CONSTRUCTION - ------------ Will hil �11 ANY LAND DUtUM04 AC11'AM BRICK 4. INSTALL OMTRMM ENTRANCES. IW PROTECTION FENCE AM SILT 110111i DIM TEMPORARY EROSION i' J / PAD CONTROL DEVICE3 AS REQAUD ljx L VAN �Op/ u'l � `., / /�' /•� ./ / -,bt. 1`Nr , - INSTALL PRE-IREAIXIENT BASIN AND MLIRAI" aASN, X 4 C) WA ROAD 4. OMECTION SY btRWOM, 1181 IkV,11F.S 7. HARVEST ANY 7MM, 7114Q 6374.183'24�Qbj CONC N I• a. POW Silt GRAOIll AND INSTALL ADDITIONAL MMN CONTROL. MAMOAL AS HMO. lf�q 710.. PC 4.)IQ N UNDER PAD 0. PROVIDE TEMPORARY 9MDIMG ON ALL MWFM AREAS THAT WALL BE Ill FOR 14 DAYS OR LONGER. GROUND • LP TANK .0 10, PERMANENT GRASS SHALL BE INSTALLED FOR ALL AREAS AT FINAL GRAM AM 04 SEASON. FERTILIZE. • �/ / 11YD PP /WATER AND E It I AS IMMMtIDD TO ESTAMM AND MAINTAIN VIGOROUS STAND OF GRASSIL v Eli -SEPTIC EN 0 1. INSTALL STORM DRAINAGE SYSTEM AND OLL7 "MCMT TRAPS, 2. RAMIM BY INSPECTOR. z �,j 0 11 MILLIE CONSTRUCT" AND FINAL 1111HADIM r 0 TEL BOX A(�,�, r Cvt S, ELC if LP 141,0=%ii 94&L SHE INSTALLED FOR ALL AREAS AT FINAL GRADE AND N SEASON, FERTUM WAURM TO ESTABLISH AND MAINTAIN VOOROU3 STAND OF CRASS. MINN Of CMIRUCIM AND THE STE IS STAKM. (A) REMOVE ALL ACCUMULATED 15. AFTER COMPLETION P SEDIMENT FROM PRE-TREATIMENT MENTION BASM AND DO�OK 4 SIGN t ;* , // % '� �_,F 4 `' r - REMOVE ALL • r MMFOU" EROSION CONTROL hCAWtM SMOOTH All APPLYA&lUH__ • THE uwv V, )'AL APPROVAL By INSPECTION. • LP 0 memo allow PIP •>_ TIC (D AF.7�1r I Ill INSPECT AND MAINTAIN ALL OMIN CONTROL LgAWM EVERY 7 DAY3 AND All EACH NOTE: . , I SKINIFICANT RAWALk. I IMICHIM OR GREATER) AM DOCUMENT WITH INSPECTION m Es ALL FENCES ARE CHAIN LINK. C 0 Ti% quom Solt �xl I %ULT % :1 DEMOLITION NOTES Lu �c z WOOD cow 0 W ft / , - . , 0 Z TRAINING PAD MOWN ftftm • Of X: aJ TEL i STRUCTURES > ST I. W ORAMC IS TO 00" 01 7HE TREE COmSTRUCTOm AW.#S 4M TREE CIIIIIIi ROOT ;ONES, ` ,. �� :_, /:� 4,. 1;Vi 41 1 CLEANOUTS LOCATED IN AREAS Of DENIOUTION OR SUBSEQUENT CONSTRUCTION SHALL K PROTECTED FROM A,-. H, DAMAGE AND HAMM 11) 111USH VAIN NEW ORADE, PAD LW-41 I P POLE I Al ITEMS AND EQUIPMENT REMOVED BY CONTRACTOR SHALL REVERT TO OWNER FOR REVILE OR DISPOSAL. • If ":4 P�', 111 4mAnDrALTIk ATE% 4. REMOVE DMM M"M (.1i MMM) 10 FIRST 010 AMIr OR SAIN CUT TO OBTAIN A OEM If J, I EDGE FOR HIM OOM5TRWIM• . . ......... (SEE a lf*RE ASPHALT SECTION IS REMOVED, CONTRACTOR IM&L USE A SAW CUT AT 14C UMITS OF DEMOLITION CWAi LINK FENCE TO MIA A CLEAN EML 2' 2 BEL 7.7.69 6, CONTRACTOR SHALL RESTORE THE LAY DOM AM STA&t4 AREA TO ORIGINAL OMOMONS AND TO INC SATISFACTION OF THE OWNER, PRIOR TO DOMLaATM AT THE OONCLUSION OF THE Pill • 7. CONSTRUCTION OF UnUM OUTSIDE THE LIMITS OF CONSTRUCTION FENCING SHALL K COORCO"710 "IN SCHOOL. ES SHALL !PERFORMED IN • MOCUT". AND SIN DENT OONSTRLIC7M OF STORM DRAINAGE FACILITI K LP•SUCH A MAKER THAT THE OLD PIPE AND SIRUCTUM ARE REMOVED AND MEW STRUCTURES AND PIPING ARE q,, 4 4v 13RICK LP IMAIEDHATUY PUT INTO SERmCE. CONTRACTOR SHALL ENSURE THAT &TOM DRAINAGE 000 NOT REMAIN OUT • LP 0 0. illov 0 LP Di OF SERACE FOR LOW THAN 12 HOURS AT A TIME, PROWSOM SHALL K MAX TO MAINTAIN $701m WATER • CONCb? Bux DRAINAGE MINING COKMIWX7M FUEL AK�A 7, A 9, REMOVAL OF ELECTRICAL UTLnM SHALL K DOE I THE LOCAL POWER COhPAW, • RIM TEL Wv ALA 7.31 0 RELOCATION Of OU7M UMJM 10 K COWI)KAIM WM THE LOCAL UITILITY FROWX". 0 INV. 7�09 LP �_Y C) POST '4'._ UP 'DOI• CC :1. OVERHEAD ELECTRICAL SUN"= TO K RELOCAID OUT OF THE LuTS OF MIURSAmM By INE: • -C RAMP co WHEN. X PARKING �• .d METER PIP R,� 10 VAULTS 1z bi LO ARE:A 12, WATER, SEM, ELIECTRICAL AND GAS UTILITY SERVICES TO K REMOVED TO THE PUBLIC III AND PUUOGIED • OR TERMINATED AT A METER (AS APPROPRIATE). GENERAL CONTRACTOR TO SCHEDULE AND COORDINAIIE THIS ASPHALT OHM WITH UTILITY PROVIDER. L Li 0 0 PARKING - i > Cil - � OP BY THE UTILITY PWAM CONTRACTOR SHALL SOOM AND CWMMMATE rrU WORK " THE B K WALL R;.;,P t I& DZMWAL OR GAS UYIl SOtOM 10 BE RDKMM SHALL BE REMOVED AND 1111HELOCATED (AS SOCAMD) X-, V T 777-1- 1 .%1- " APPROPRIATE SOrOM PROMM ALL SERVICES 94WW K MTAUM PRIOR 10 THE INSTALLATION OF • C L", PAVEMENT, SMEWALK& CUM AND GUTTER, OR INISIALIATIONI OF MEN Ii• z OTHER PEW T wtm bolkir . I �. 10 208 14. WBE UTILITIES (70 BE 11HENICIVED) IMPACT THE FOOTPRINT OF THE WIN BUILDING, CONTRACTOR .4 94AU DICAVATIE. AND REWW AN ADDITIONAL 2 FEET Or SIOLS TO EITHER SIDE OF Pli 1171i AC 07 80" TO REMOVE INIMITABLE SOLS, 02M SOLS SHALL BE UILIZED FOR BAOftL TEL IWK SMS PSWOR14M IN ACCORDANCE WATH ODEMCA104 AND 97E PLAN. • MH 0 S. THE ASSUMPTION IS THAT ?HE 12* RCP SMWn ROOF ORAN LINES FOR OALMM 310. CONTRACTION 94ALL 000004ECT SUBMWA" DRAINAGE AND AVERT STORMWATUt TO BASK ALL SUBSURFACE PIPE AND • ei rCl�_-RITZ 4ND V.. # STRtXILWAM SHALL K REOM, 0 C5 TREE PROTECTION NOTES ELM_ �. ! I -,` L AT THE START OF GRADING K�AX14MG THE STRIPPING OF TOPSON. OR LOW" OF DISTINIQ GRADE 0 AROUND A TIMM A CLEAN, SHAM, VEHITICAL CUT WALL K MADE AT T04E EDGE OF THE ME SAVE AREA • THE 'SAME INK AS OTHER OWSM CONTROL mEASum ARE HNSITALL90 THE TREE PROTECTION FDNMO 0 SHALL K MTALLED ON THE WE OF IM CUT PJ"MT AWAY FROM THE TREE MJW. 04 2. TWIST ORAGE OF MATERIAL FLL� OR E"LENT SHALL K PERMITTED WTHM THE PROTECTED AREA. AND O TRESPA"NO SHALL K ALLOWED WITHIN THE WLNDARY OF IM PROTECTED ARE% AND SHALL K qD 0 TEL 50 W= ON THE GRADING AND EROSION CONTROL PLANS AND POSTED ON THE PR07ECIM FENCE. A • L • PROTECTION HENCE CONSTRUCTED OF MATERIAL RESISTANT TO DEGRADATION BY SUN IM, AND MOISTURE • P (,A/'I 1,301 FOR THE DURATION OF THE CONSTRUCTION SHALL BE INSTALLED AT THE SAME TIME As THE umm 2 J, 00f, CONTROL W.UUMM AM SHALL RERAN 01 PLACE LINK ALL CONIVAXIft IN THE VICINITY OF THE IBM • HAS KEN COMPLEIM. I THICIE PMTMIM FDCM SHALL K MOTALLED PRIOR 10 OEMOLITNOM OPERATIONS N SUCH A MAWM _17 ZhTTL SAFETY NOTES 0 4TPR -A� - I. OWSMK7" OUTSIDE THE TEMPORARY OMMMIM FENCE SHALL BE COQFdMATM VAIN SCHOOL AS 10 MEANLY AND ADEQUATELY SEPARATE ALL TRW TO K REMOVED FROM 111HENAmem VEGETATION. • crill hidif _6-Pyc HOURS, ANY EXCAVATION MUST K FILLED IN AND TAWO AT THE CONCLUSION OF CA W= I . . PP AND EOUPMENT AND SUPPLIES REROMM TO THE CONSTRUCTION STAGING AREAL EACH PERIOD.• CIA 2. ALL MATERIALS AND CONSTRUCTION SHALL REMAIN WnM THE OMDARO OF THE COlftYWOTIN • vs 00 ri _ss- FOCNM F NECESSARY CONSTRUCTION FENCING OWN 0 REMOVED TO rAWTAW ACCESS BY THE • IF CONTRACTOR FOR aiI4 MUST K REPLACED AT THE END OF E#,m PERIOD TO DIRECT P PLOWMAN 1111MI AWAY INN HAZARDOUS AREA& RIM 9.72' APPROV• H If /I & CCMTRWTICN FENCING SHALL K PIAM AROUND BLAB TO PROVIDE CONTINUED ACCESS TO THE ED• BENCH - 4.V' al INLET BOTTOM FACILITIES O-ASLRDOMS MW&C COM7"MK NEW COM51RMTMN IN THESE AREAS SHALL K• INV. 3 92 NORTH CAROLINA EW/:2CN'!Fr4TAL GRATE 6 3' COORDINATED VAIN SCHOOL ADMP#S7itATNN, AND WOW SHALL K PERFORMED AS DIRECTED BY THE 10G INV. 4.1 SCHOOL. OR MINING OFr-SCHOOL. HOURS, VEOM4K AND DCMWM @W-MS. F�1.4 I A LP SCHOOL Notxm G4ATE 4.88' DROP ll D4 4 CONSTRUCTION SHALL K DONE IN 9" A MANNER TO MAINTAIN ACCESS TO ALL RADOM WING w ` ` `�` o° pA /JCRATE - 1 2-7- FC-6-2-U-4 INV, - 1.9, 114� 1.16' CONC k DEMOLITION LEGEND z WOOD IPICKET ECSTM CONCRETE • 0 1 N HONE E CONSTRUCTION AREA DEMOLITION KEY •0 ell F771 EXISTING COMORM (70 BE MMM) 0 K, DO NOT ENTER I REMOVE WOOD TRAINING STRUCTURES z LP T CONC (1) REMOVE 0011911ING CONCRETE 3 1�' -ALT 11% DOPM ASPHALT (TO K REMOVED) u m S P (Z) REMOVE EXWM STORM ORMIAGE PIPE 0 0 30 30' RCP (3) REMOVE EXISTING LIGHT POLE POST &4" K 1.33 Lb Ill %TEL EXISTING BUILDING REMOVED) Cr INV - 3.4' Z CIOORDIMI WITH UTILITY PROVIDER TO RD=TE DUSTING F cI LP TANK (ABOVE / BELOW GROUND) U WAIMCWOWW SIGN & DEMOLISH EXISTING BUILDING 011STING VTXM (TO BE REMOVED) GRATE 4.62' W-W cl m" AS ONDION ADM W INV 0.21' 0 DITSTING MOSU CLASSIHOW TO BE RELOCATED BY OWNER ®REMOVE DSTNO WOOD DECK CILL(�E REmOvE Exwm ELccmHCAL unury SERVICE METER OtAMOk UV OMPAW, ENTM MO CM K RDW") 00 1�5 Hill NNW sinuck ®REMOVE EK011i FOXE 0 W ELC BOX 0 16, POILY L#ARCADE FABRIC z MSTING VEGETATION M BE REMOVEID M" 1: j�:: - EXISTING 7428 (TO BE REMOVED) U F 111. REMOVE EXISTING CURB & GUM z MIN ELEC REHIci Dasixim wAnim LINE 0.1 YN 0 LP ADD ALTERNATE NO&OI DOMING ASPHALT PAVEMIDITIT LOM Or CC*ISTRt$Clnm cd I DI 0 MH eft UP 0 END 1 0 MH CONC - OWMM SIGNS 70 K MAW 4W CV&4$t& IffA7HBUW4W MA=L#J- RELOCATE DIMING FINE HYDAI -------- - SAWCVr WIN 0 WALLACE ROAD REMOVAL: PIPE - LErilm ARE TO K r TECH MIN., CLEARLY LEGIBLE AND VAM AS CETAILM MH 0 MH 0 PIPE PAD INV= -1.21 SM ARE To BE PLACED NO CREA7EN THAN 5W ON CDM. SEE DEMOLITION NOTE 13 a 1, DCLiOtM AM REMOVE EXIS11MG MOM ASPHALT AND PLACIE 60 AT EACH END OF WEAR M41KOCTM FENCING AND W ON WITTER TODEAM ©REMOVE A PORTION OF Ill AND CHAIN FIERCE IDOSTING FENCE (TO BE REMOVED) III 0 GRAVEL SUBBASE IN AREA SHOWN ABOVE FILL WIH TOPSOIL, FOR OMTRwrom AREAS LESS INAN low IN PERNM PROVIDE No Lim T04AN ONE E�g • 0 c ON GRADE TO PROVIDE POIll DRAINAGE AND SEED PER WTM mm pa All ROICIVE EXISTING DOMESTIC WATER METER CO i'Il, • IP • 0 ALARM 2. PROVIDE VALLEY GUTTER PER DETAIL ON SHEET Cl ATTACH WO MXGICLY TO FIM POSTS AND IFASW. ®COP DMINIG DOINESITIC WATOUK 10' OU'll BUILDING GROMC SCAM M.PAPE ADJACENT PAR" SPACES AS g� TO DE - Femcm Ham K &MWAM TmROLOMT OMINX=x TM OR iWAMMO FENCING 244L K mEmAcm OOMAIMY TO mHaTTAm ACCOMIE SNEYT IMAM$ IN p000hpo- REMOVE 5' OF !EXISTING WATOWK AND CAP ON a 0 Roam DRIVEWAY OONW.01=. - ADNOWk I" OR FENCING WAY GE REaLmum BY LOCAL AUTHORITIES / PUBLIC UMM DOMESTIC ME OF METERS. WINTER TOB & EXTEND DOSING SOIL DRAE TO DWMG PAINING LOT. L42ED ON ACTUAL RED MOTION& SYSTEM PUMP PROVIDE 4' Cl WTH w0i CE07EXTLE KTvM SUB -BASE 0 REMOVE EXW1NC WALK AND CASIC. WOVEN GIVOTEKTILIE FABRIC TO K Will BOOK CONSTRUCTION FENCING WAXIVIE EXWINIO BIJOICK HEADWALL HOUSE '::3 AMOCO 2002, DOOM 07-200 OR APPROVED EQUAL DETAIL to DEMOLITION PLAN - PHASE 1 TOTAL • b1l I. - 4 r• - r T r -r -.4 v j r� r� f � JET g'- - fgoH1iH '' �� --w— w—ter = SOP a it / As 41 I �R ~— ;I I D •. 1 I -� - -. T I , ` I-- I I I s C7 E 1 _ way a Z s ' -- - _ - - s� RAMP _ Y $ 1 t i { TOO 4- 1 h. F , - y o �• IaIP! "III Il..tl-: I:LiI II ',IYlgll" III r6Wl:lii I� . uIU1LL���.Lilo - �`_-�,x�.,«a«x«� air I;`M1M \F 3 It vil n T z p a I I .�1 11141 7n fo I rJ 4 I. _ ' tcp �0 IN - 0 i ti i - r F cr r" TV331^I is 1 _ 4T......•_,•..,; .7, -!ram ' G - z *,00.9i8a'r _ » ,.».., ..:3 -. g„x» r - - a i f _ u r. I v� f 1 0 z yyy Q N O Z 2i sY A t; D o, 4 j $a-03 m �ri90 el a 1xa J{ \ n a Soil 37.ra j sI i At >` I? # l All NK M y4 �+ Z i j I� _ - _ All sT �r Y41 LINK FENCE w_-�f V go a >�s8 v� !QI IE ss lax �� _ I — z ! r iHIP iii fi ea'cx WAJ.x f 1 y v m= C-7;_ SIX 9 moor rl c! cz 19 To USA. - is 3� _ Q E. " �' �y. �• �r� o e �. p Y y� Y w , r� o �. o Y N - va zi m q >-y iRC 3Uy+ r. _ - a}o $Q Vi a QW*+ = :�` 1 Q �k �y r m O i �W o� m iR 3d ^� _ i1-: uTT 'LY— '$ V i'$`i� F _ r� > yy Y z § $ c O °+iK O <c e p i r g A <c, �� r O a„Y n 3i zy Q �zo gE ice' z I O� 4 m o 8t o �i3 }� , n �>i d� F#�y 15 p €o rf �r y A z gig 40 x : l 1 a z ~ 0 -- a Ill' $ 4 s fR m -g € ' Ef �'� _�� Eli _2 € a i C . .y spa iQ1i ti Z Y 12 F - % I 611 1 c% o 91 - yQ�i i Irl �� Irl yy C ~�Y 111rly ar r goo I ��� a _ - �s a�11E #� Z X Rm F Q a o : � ; � A ' o sstt "A a y $ R i 01 Ron 1 9 lop MR > b o > !i 3i i P 89 9yj a € t > \' • 100032T NO. • REVISIONS • CONSULTANTS o , ayes howe CARTERET COMMUNITY COLLEGE :TEYYARTENGINEERINGINC ADDITIONS 4 RENOVATIONS SSCCI ATION P•CRHECKED BY � PRO �E 551ON �L dL ARCHITECTS -DRAWN BY Tre. wcAu - 1 11 W ,IT C 16 AUG. 02 MOREHEAD CITY, NORTH CAROUNA I -.4 WHERE NEW CURBING IS INSTALLED. ROADWAY WIDTH M.-' BE 24' FACE TO FACE, f f SHEET NOTES f I. ALL DEMOLITION, AND ANY St WENT 006T UCTIO N, SMALL BE PERFORMED N ACCORDANCE TAM � THESE PLANS AND SPECIFICATIONS APPROVED BY THE LOCAL DOYELbINO AUTHORITY, • a I ALL DEMOLITION MCI SUBSEQUENT CONSTRUCTION TO BE N ACCORDANCE WITH PERMITS ISSUED AND ?P APPLICABLE STATE, COUNTY. AND LOCAL COOES. • • I THE CONTRACTOR SMALL OBTAIN AND PAY FOR ALL INSPECTIONS, CERTIFICATION& EQUIPMENT, M. • . THAT MAY BE RE4UM, EC)p • 4. F DEPARTURES FROM THE WI ECIFIGITION6 OR ORAl16lOS ME DEELED NECESSARY BY THE (XTNTRACIOR, • DETAILS OF SUCH DEPARTURES AND REASONS THEREOF SHALL BE SUBMITTED TO THE DOER FOR REVIEW. • NO DEPARTURES FROM THE CONTRACT DOCUMENTS SMALL BE MADE WITIDIR 1HE WRITTEN PERMISSION OF / THE DIRT. / 6 • d"r 5, DMSTINC IMPROVEMENTS DANA= OR DESTROYED DURING CONSTRUCTION SHALL BE REPLACED OR RESTORED TO THEIR ORIGINAL CONDITION, AND TO THE SATWWTION OF THE OWNER OF THE NPROVEMENNTL 6. CONTRACTOR SHALL REFER TO ARCHITECTURAL PLANS FOR DETAILS OF BUILDINGS AND 8U1 DNO DIMENSIONS, • 7, ENGINEER AND/OR OWNER OWLAM ANY ROLE N THE CONSTRUCTION YENS AND/ON METHODS • Y ISSS• 6 ASSOCIATED TAM THE PRO,ECT AS BET FORTH IN THESE PLANS, • ' & CONTRACTOR SMALL MAINTAIN AN 'AS BUILT SET OF DRAWNDS TO RECORD THE ACTUAL LOCATION OF ALL PIPNO PRIOR TO CO CEA.MDNT. IRAMI NG6 SMALL BE OVEN TO THE OWNER UPON COMPLETION OF THE • ,•,�� .,,Nk. PROJECT WITH A COPY OF THE 1RANSWTTIL LETTER (FOR HEOORD KEEPM) TO THE ENGINEER. • „.,.. „N�`,�� B. THE CONTRACTOR1S RESPONSIBLE FOR FIELD VERIFYING THE ACTUAL AND DUCT LWATIOM, SIZE AND MATERIAL COMPOSITION OF ANY FWTNO WATER OR SEWER SERVICE PROPOSED FOR CONNECTION OR USE ON THIS PROJECT. THE RELOCATION OF ANY UTILITY SERIACES REQUIRED 70 COMPLETE ANY PORTION OF • THESE OOISIRUC110N PLANS SMALL BE THE RESPOMSIBLITY Of THE CONTRACTOR. 10. THE CONTRACTOR MUST, AT ALL TIMES, KEEP THE PREMISES FREE FROM ACCUMULATIONS OF WASTE • MATERIALS OR RIRB1M CAUSED BY HIM, HIS DpLOdEB, OR HIS WORK. ALL MMIS SHALL LE REMOVED FROM THE STE ON A DALY BASS. 11. FINAL ACCEPTANCE OF WORIC BY THE LOCAL GOVERMNO AUTHORITY SMALL NOT ME MADE UMTL ALL WORK SHOWN ON THE APPROVED PLAN 15 COMPLETED, I 1 17. CONTRACTOR SHALL CALL "MONTH CAROLNA ONE CALL' AT LEAST 48 HOURS PRIOR TO BEGINNING 6 li CONSTRUCTION OR EXCAVATION ON STE TO HAVE DISTING UTLJiR3 LOCATED, CONTRACTOR TO CONTACT : w z ANY LOCAL UTLNTIES THAT PROVIDE THEN OIN INDEPENDENT LOCATOR SERVICE. CONTRACTOR SHALL • U IMMEDIATELY REPORT ANY DISCREPANCIES TO THE EN(MF,EL " u• 13. ANY EIKOAYA11014 MUST X FILLED N AND TAMPED AT THE CONCLUSION OF EACH NNdlK PERIOD, AND • • rl�' ' EQUIPMENT AND SUPPUES RETUNED TO THE CONSTRUCTION STAINING AREA, SIGNAGE, STRIPING, AND MARKING NOTES a 1, ALL SIGNA E SMALL CONFORM 70 STATE DOT STANDARDS. SNAKE SMALL BE INSTALLED BY • 1tN{I CONTRACTOR. : V) 2. ALL LOT STRIPING AND DIRECTIONAL ARRaft SHALL BE WHITE REFIECrig PANT AND SHALL CONFORM • Z • O +' 70 STATE DDT STANDARDS ARID SPECFXA70M : U • I[iI 3. HANDICAP SYMBOLS SHOWN N THESE PLANS ARE FOR LOCATION AND INFORMATIONAL PURPOSES ONLY. SEE OCTAL SHEET FOR ACTUAL CONSTRUCTION MEANS. METHODS, AND MARICNGS. • 4, ALL TRAFFIC CONTROL DEICES, PAVEMENT MARKINGS, 9GK AND SIGN" WALL BE DESIG ED. • INSTALLED MID MAINTAINED N CONFORMANCE WITH THE STANDARDS SET FORM N THE MANUAL CN INFORM TRAFFIC CONTROL DEVICE& • • 3 CONCRETE AND SIDEWALK NOTES : o 1. CONTRACTOR SHAWL WEfERENCE THE ARCHMT IRAL PLANS FOR DIMENSIONS. "M AND MAY S'ECFIpATIOEB, PROVDE CONSTRUCTION JOKM INWALMYS EVERY 10' (MAXIMUM). OR AS INDICATED IN • • w : w O AROKECTNAL PLAN S►EETSHEETS,Z CS 0 i2 C Z O 2. COMA PADS AND WALKWAYS; UMESS OTHERWHE NOTED. ARE 3000 PSL OF a TMOMOS WIN W OC W CC 9LLI 12'31Y w1.2 x w1WELDED WILE FABRIC THROUGHOUT. • a • Ii a d S. DUIPSTER PAD SMALL BE 3000 PSI (2B DAYS STRDNGM). 6' *KKMM WITH r x r *cc X WN.O • WELDED RIME FABRIC MMOUGHC%lT. : NN 04 4. DESIGN AND SPEOR7CAT10NS OF CONCRETE PAO FOR PROPANE TANKS TO BE PROVIDED BY NHeI_Hc : Z \ \ \ \ 8011 i OF NOW C111lD11NA 1. � � • \ c " I CONSTRUCTION NOTES +f EMU f 1. SLOPE OF ASPHALT AT KMNCAPPED PMNQIG SPACES AND ACCiSS AlSin SILL NOT 01)CEED 1/4' PER FOOT. : � ® 49 ACCESSIBILITY NOTES 1. ALL REQUIRED COTS RILL NEED TO BE TREATED AS AN ACCESSIBLE ENTRANCE AS PER SECTION 62.1.2 : O } m VOL 1-C AND THERE OM MUST WEFT ALL RWAtEEwTS OF VOL I-C. • Z } ® 2. STANDARD R7-Go RESERVED PARID1Ki AND YA7aMNN PENALTY 825E NOW 20-37.6 51GNI3 MUST BE INSTALLED IN FRONT PARING SPACES, VAN ACCESSIBLE $ION($) MUST BE • • • � O m w , OF THE MA DICAPKD PROVIDED N FRONT OF VAN ACCESSIBLE SPACES. • O 0 Li �¢ Si f GAS NOTES f iMr meow 1. CONTRACTOR TO COORDINATE OAS UTILITY INSTALLATION TAM CAMPUS PHYSICAL PLANT PERSONNEL. � 5 1 , • • • • I • ADS] ALTERNATE CONSTRUCTION NOTES • SEE SIDEWALK NOTES FOR SPECOCATIONS : Iil1 / (SE- NbTE MEANS AND MEMIDS AND OONNSTRUCTTc sue' WIDE CONCRETE WALK BE10W ® CONSVWCT 5' WIDE CONCRETE WALK M CONCRETE DURMPSI PAD. SEE DETAL &IC N ® INSTALL STEPS; SEE ARCH. ® INSTALL TO V CONCRETE SI EW AIX 7RANSMOIC • J O • O' ® INSTALL 10 NODE CONCRETE SIDEWALK ® : O • C _ INSTALL It RIDE CONCRETE SIDEWIAU( ® INSTALL 15' WIDE CONCRETE SDEWALIK : ® INSTALL CONC, SIDEWALK TO MATCH EXISTING • ® CONCRETE SLAB; SEE STRUCTURAL DETAIL 2 ON SHEET S-8 : ® 24" CONCRETE CURB AND GUTTER; SEE DETAIL SHEET C-O.I ® FW8N CURB AND GUTTER • O _ Z INSTALL CONCRETE N.C. RAMP; SEE DETAIL SHEET C-5.1 : z' ® INSTALL H.C. RAMP; SEE ARCH. W ® TRANSITION TO FLUSH CURB ® TURN DOWN SIDEWALK; SEE DETAIL 5.1R • S�- ® INSTALL 24" VALLEY GUTTER; SEE DETAIL 5AS ® MATCH STYLE AND WADTH OF CURBING; CCNSTRCUT CURBING • ® INSTALL FLUSH CURB AT MECHANICAL YARD; SEE DETAIL S.IU m INSTALL LIGHT DUTY PAVEMENT; SEE OCTAL SAM • ` ` IN INSTALL HEAVY DUTY PAVEMENT; SEE DETAIL 8,11 • V Cj ® ASPHALT PAVEMENT REPAIM. SEE DETAIL 5,1A • LL • O p ® INSTALL CONC, PAVEMENT ® BANKS STREET ASPHALT PAVEMENT REPAIR; SEE DETAIL 5,IT INSTALL TEMPORARY GRAVEL DRIVE r • v F S ADD ALTERNATE: INSTALL WWI ACCE5s18LE H.C. SIGN; SEE OCTAL &ID INSTALL N.C. SIGN SEE OCTAL 8,1D • Q 31 WALLACE ROAD REMOVAL: NOT USED ; Q W GRAVELTE SUBBASE IN AREA SHOWN ASOW FILL WANT TOPSOIL,® BOLLARDS. INSTTALL ALL "VVAAN//CCAR PO4X PREFERRED PARING" SKIN; SEE OCTAL 3.1M GRADE TO PRONIOE POSMVE DRAINAGE AND SEED PER 94= ® INSTALL CONCRETE RHEELSTOPS; SEE DETAIL SAP • 2. PROVIDE VALLEY CUTTER PER OCTAL ON SHEET IM.I. RESTRPE ADAMI NT PARKING SPACES AS SHOW TO DELINEATE ® PANT r WIDE STRIPING ® PANT a WIDE STRIPNG AT 4V ANGLE • ■ , V DRIVEWAY COMECRON. ® INSTALL KHAN LNK FENCE 1. EXTEND DO$TM1G SOIL DRIVE TO DUSTING PMMWNG LOT. llt E TO DUMPSTER PAD OCTAL C5.1C INSTALL ONE 5 LOOP IN -GROUND m UND MTD. WAVE -TYPE BICYCLE RACK PROMOE 4' CABC WITH WOVEN GEOTEX7ME BET EON SAS -BASE 42" HIGH AND CAM WOVEN GEOTDRLE FABRIC TO BE MMAF7 11001L AMOCO Z= DOWN CM-M OR APPROVED EQUAL ® MECHANICAL YARD; SEE ARCHITECTURAL FOR DETAIL • • • : • • • • : • • • • a Z • mn py • �n • • U � z p J SHADING LEGEND PARKING DATA � O � 0 u • - DOSING CONCRETE PAVEMENT PARKING REQUIRED I F I SPACE PER 600 SO FT PLUS I SPACE PER OFFICE . mc L.I G r - EIOBTNO NULDING K&L H.C. SPACES �'W E W C HEALTH SCIENCE BO 3 � J H 1"W Z z -NEW CONCRETE / CONCRETE $IDEIWALKSy� Yr z U N - "on OF C NST"'C"G" ®ET08TING - STNgYiO CIIRBING o PARNUNi REOUIRM, " SPACES OGSTING PAAKI�N' REMOVED: 108 SPACES �� W D 11 i N r I"" : z m ®PARg1O - FIAISH CURBING NEEDED: NOD-S$+125.136 E 3 PARKING PROVIDED: 136 SPACES (INCLUDES 6 t t 8 A001110NAL� N• HANDICAP /� U `V i �_ - ASPHALT PAVEMENT PATCH SPACES) S ' E fi 0 -�_ ® : M 0 �W • • • GRAPHIC SCALE • • : GIS • • N O )b-00 • • G-2.1 to V illim SITE PLAN - PHASE I • TOTAL • • 7 J FOP M I "jLR rr000GE S,ORnG� �' E wnn r, r r f 1 SHEET NOTES I. ALL DEMOLJTION. AMD ANY 8UB8EODENT �4 SHALL BE FN7FORMED N ACCORDANCE TRTH THESE PLANS AND IiPEGIFIGLTI(>t15 APPNLOyEp K 711E LOCAL OOVQtNIRIO AYTIORRC • 2. ALL Dp10U1R0N AND 9UB9E01RENr COILSIIRICTDN TO BE IN ACCORDANCE rHITH PERMITS ISSUED AND • EOP - - APPLICABLE STATE, COUNTY, AND LOCAL COOES, THE CONTRACTOR SHALL OBTAIN AND PAY FOR ALL CERTIFICATIONS, EQUIPMENT, ETC. • • - - THAT MAY BE REONIAED. • _ '--OF vVd }..� Ili • EOP 4, F DEPARTURES FROM THE SPECFKA �HXt DRAIN ARE DEEMED NECESSARY BY THE OOIITRACTOR • DETAILS OF SUCH OEPARTl1E9 AND RE THEREOF WALL BE SlBMTTED 10 THE OLDER FUR RE X • EDP NO DEPARiT1RE8 FROM THE CONTRACT DOCUMENTS SHALL BE BADE WITHOUT THE 1041 PERMISSION OF 46 THE DKIMER, • ® �y i•y - �" Q. E)OS— IMPROVEMENTS DAMA( OR DESTROIIED OLRWO CONSTRt1C110N SHALL. BE REPLACED OR • ' ORIGINAL CONpTON, AND 10 THE SATISFACTION OF THE ORNER OF THE IMPROY[MIDITH, EIP !' ---..- j7j7` ` S. TOR SHALL REFER TO ARCHITECTURAL PLANS FOR DETAILS OF BUILDINGS AND BU M 257. ENGINEER y- W�I y �� • ASSOCIATED MITII 711E PR'0,[GTp A5 8E7' FORTSCILAM ANY H THESE PLANS IN THE OONSIRUCIION AND/OR METHODS : 15634 " fR CONTRACTOR SMALL MAINTAIN AN 'AS BUILT' SET OF ORAIMNGB TO 111E ACTUAL LOCATION OF ALL PIPINO PRIOR M CONCEALMENT ORA OF THE ''.UL PROTECT VAIN THE TIER • .,..uu.n+',,`,` 1R _rw A COPY OF THE 11E TRANSMITTAL HEELER (FOR RECORD Ili) TO THE QIO/EDt. • I: THE CONTRACTOR K RESPONSIBLE FOR FOLD VF IFTNC THE ACTUAL AND EXACT LOCATION. SIZE AND _ ^ 51GN MATERIAL COMPOSITION OF ANY E1G8TW Will OR SENIM SERNCE PROPOM FOR CONNECTION OR UK • Pa % s. L4 ctis;uxw_,.v,v cac r _ 1 ON THIS PRO,OCT: THE RELOCATION OF ANy UTILITY SERNCES IOQIRRED TO COMPLETE ANY PORTION OF 1HHESE CONSTRUCTION PLANS SHALL BE THE RES"ONSIBLITY OF THE CONTRACTOR. : / :�\ . �ci.;vcs.�.,xsvis.: x.+xr.:,.si�xss• x i ��- � �8)'_, ,'. . : / / �' �yt�' - _ '� .� - '- )•: �� 10. THE CONTRACTOR MUST, AT ALL TIMES, KW ONE PRESSES FRIZ FROM ACCIIMULATIOMS OF WASTE t MAIEIIKS OR RUSEISII CAUSES try HIM, HIS DOW)IEES, ON HIS. 1UOIMt. ALL DEBMS SHALL SE RQNDM • FROM THE SIRE ON A GAILY BASES. E �L. ti T I r'., r S 11, FINAL ACCEPTANCE OF WORK BY THE LOCAL WAN" AIJTFORITY SHALL NOT BE MADE INTL ALL H. l 3 IIORK 6HOrIN ON THE APPROVED PLAN IS COMPLETED EIP A _ a r 12• CONTRACTOR SHACALL "11ORURS 1H CAROLINA ONE CALL' AT LEAST 46 MOM Ill TO BE5NIING TIOM CONSTRUCTION OR EXCAVAON SITE TO HAZE VITSIING UTLI11E8 LOCATEM CONTRACTOR TO CONTACT • z LL � f ANY LOCAL UTILITIES THAT III THEIR OWN 1110961 LOCATOR SERMCE. ODNIRACTOR SNAIL • 1 MI IEDIATELY REPORT ANY AlOISGEPTO THE ENGINEER • z j ° 'r` $ I& ANY MAVr11KN MUST DE FETED N AMC TAMPED AT THE CONCLUSION OF EACH ROIL PERIM AND Suj outL �r f Fti , . • � ti ; euA , -v;; � EQUIPMENT AHD 10.1PPt.lEb NHE7TRINFD TO THE CONSTLUC7101 sTAOMG AREA. . ,! SIGNAGE, STRIPING, AND MARKING NOTES 1: ALL SIONAOE SHALL COIiORM 70 ST47E DOT STANDARDS. SIONAOE SIAL BE INSTALLED BY ' 91 CONTRACTOR, I I EIP ;� , ; z 2. ALL LOT STRIPING AND DAL IRECl10NAflRON$ ;HALL BE LIME REFLECTVE PANT AND SHALL CONFORM • O T: '7 _,•...--_ 7 ''T .i ,�. :.' 1n STATE DOT STANDARDS AND SPECIFICATIONS. • V '13 ,�� �,-..� 'S7 — • /77 � J! '`-- .. - D: HANDICAP SIMUOLS SIDIMN M THESE PLANN5 ARE FOR LOCATION AND !F'pWAT10N10. P1JgPQSNS ONLY. ` •, _ - - - . ^ 4.ALL TRAFFIC GON7ROLAGTUAI PAVEMENT MARIDNIG:B, 9pN$ ANDFD SIGNALS g1A1L BE OE901EE0. • IDUAL SHEET FOR 4. W97ALLID AND MAINTAINED N CONFORMANCE IM7H 711E STANDARDS SET FOI IN THE MANUAL ON N - ' � � � •-•-_-„- �,: UNIFORM TRAFFIC CONTROL DEVICES. • " WAYNE WEST BLDG. , . �;,..... • "� /c rm FFE z2.0o 2z.o o q / 0S 81c _;H i` r-.."�''�-•-- CONCRETE AND SIDEWALK NOTES • w. 71N �/tiny: THE ARCHITECTURAL. 1d I =''�'Ol,II i. $ Un ,' P;. -i j CONC "'v ..._ - VECTFICAIIONS PROYI OOOONS�ETR VIOLA JOPM IN WALNMAYYS EYETFY 10` (YAfMW��OR AS INDICATED N � t� N 74'97 .,5'N! Q a _ ARCIOTECTURAL PLAN SHEETS, <p r j - PAO wood 1V r • o __.�.` ; P T dI r YCONNCRETE PADS AND wALKWAyS; UNLESS OTHERMISE MOTED. ARE 30D0 PSI, OF 4' T omm LATH : W " � _/ ._____.�. 7 ,. CHAIN .I I x1 wto x will ■Lam VIBE FABRIC THROUpDUT. • O iU.ipion,:ui,uiutr .u:Tll ii,.fY. 4 w S.t f., 1. FENCE • P �U l.,,, hi.: .. ,. 3. DIIMPSTER PAD SHAH SE 30M PSI (2I DAYS STREMGTHA M THNCaMS, MTI 11' x I' RF4.0 X W4.0 -:.- lEL0E0 1r1E FABRIC THROUGHOUT, • N e(y NO2'56'76'E �' - �^ !°My+,�M.'u, 1 ,a� w 1, DEIIAW AND EPEON:NCAITKtN6 Or` CONCRETE PAD FDII PROPANE TA■KS PROYpEp �� • Z t I 9.72 27.6E ,� r%LY,r '� SEILMCE OF MORTI Q682ma (EMIL • p j Ad,:: $ CONSTRUCTION NOTES w ` _o g - � ® _ '• - ASPHALT A7 AR1dtIO SPACES AND ACCESS AISLES SHALL r 7J 67 u�,, k :, Q7 SLOPER PE HANDICAPPED P N4 EXCEED 1/4" 2500 3r 07'),. M87'13't9"W f , � r ® � : 1J7 70 �" u ACCESSIBILITY NOTES DECK I. ALL REQUIRED 001E •NIL NEED TO BE TREATED AS AN ACCESSBLE DI:RANC.E AS PER SECTION 0.2.1.2 • m r VOL. 1-C AND TIM DOTS MOT MEET ALL REQIAREMOITS OF VOL. 1-C. • z > �? 2. STANDARD R7-66 RESERVED PARIOIG AM MAXIMUM PENALTY SnO 111 20-37.6 SIGNS MUST BE : w�R Y z -jjCONC PAID PRPa'OY ED IN FRONNTO FVANN SPACETHE HANIVICAPPED R IG !PACES. VAN ACCESSIBLE /1011(!� MUST BE a r • d- I O� r A + GAS NOTES . y PAD `i `- t ems.:`6 .. 1_ CONTRACTOR TO oOOROINAIE GAS UTIJTY IMSTALLATIDN TI7M CAMPUS PHYSICAL PL.ANr PERSONNEL • AS- TIDS w•k`� Y - r - • ^ • 4 rat o x P;: :z • FENCE ._. ...... :„> sea; -,;�.. y _ �+ ,-� • .� rIr-7D 5 ..� / 1 Y �I. \ • I ECM S I ® 5'FJR1� JND ' I MARINE TECHNOLOGY BL G.� Q► 'a 111 Z FFE 14,50 . RAMP zzz RUCnrj : �. ®'TtI�� .. i iii KEC • U ARCA DIN • ma _....._ -_ r • It r ® a � f➢C CONSTRUCTION NOTES �l m All MCA SEE SIDEWALK NOTE, ANsPECs+rAnows : V r m I l MCA COARSTT1VC710N NIEMI$ AND MI • M INSTALL W NOE CONCRETE SDEWALK : INSTALL 6' TIDE CONCRETE SIDEWALK CONC n ® INSTALL NY WSW CONCRETE SIDEWALK ® INSTALL 1W LADE CONCRETE S"WALK • • ® IN57ALL 12' WE CONCRETE SIDEWALK : ® NSTALL GRASSPAVEDAl- SEE DETAIL 5,Id • • INSTALL 1 Q�-HEAVY DUTY OONCRETE SIDEWALK : ®(10 ® INSTALL 20` WIDE HEAVY DUTY CONCRETE SIDEWALK : ® INSTALL CONCRETE H,C, RAMP; SEE DETAIL SHEET C-&I : • • • • : tttt•■� • u • 0 • • • IN F • • z 0 Hd, PARKING DATA : O • 0 DE 0 W ° u PARLOIG REQUIRED : 1 SPACE PER SW 90 FT PLUS • N Hi u r SHADING LEGEND I SPACE PER OFFICE ; - COMM CONCRETE 1IIYdLAR SPATES N.C_ •�A1E9 HEALTH SCNEIICE GO S MARTECH 22 1 • ♦A 2 Z � z f�F EOSTNG SULDING 4ARICULTURE _- 1 - 70T.�— A 5 � / \ • A, z 0 w 0 U 2 u - Ndl LIGIIF DUTY CONCRETE/ CONCRETE SIDETWLMS EXISTING PARKING REQUIRED: 96 SPACES EXISTING PAICND REMOVED: 100 SPACES W R u H L ® �`Y Y.��� Irv-✓ f��� t PARKING NEEDED: 101)-Wi25.136 r �� PARIOLG FRONDED: d • 0 ADOI110NAL • : Co• L 31 -NEW HEAVY DUTY CONCRETE SIDEWALKS , HANDICAP SPACES) 'J✓ Q AH ✓� T . ����J✓ +�J'+✓ - LYlfi OF GOW7RUCIIDN T ® : • d A0 R ® - STANDARD CLRIBMD : ' ®GRAPHIC - FLUSH CURBING SCALE NA : ' - ASPHALT PA•Ell PATCH • N o : G �-2 - GRASSPAVED AREAS I �.: m'FL • ..2 SITE PLAN - PHASE I] • TOTAL N f rN r 0 4 I I 4, WAYNE WEST BLDG. PARKING MARINE TECHNOLOGY BLDG. PARKING f / 00 �i i I Ei r 'Y BLDG. 1 .1 1 f r 1 I .00, © r r. r 9' E' 8' S' g' g' 9' . _.%�i fumm 1 M•eI . 90 n - WAYNE WEST BLDG. H. C. PARKING SHADING LEGEND - CKSTNG CONCRETE MVEMDR - DGSTNG BULOID - NEW 00NCRETE / UDNCRETE . - LIMITS OF CONSTRUCTION ® - STANOMD CURBED - FLUSH CURSING HANKS STREET ASPHALT PAVEMENT - ASPHALT PAVDENT PATCH - LIGNNT DUTY ASPHALT _ HEWf DUTY ASPHALT SHEET NOTES 1. ALL DENOU110N. ANp ANY SUBSTOLIEIIT Hy(IISTRUCTICN, SHILL BE PERFORMED N ACCORDANCE WITH THESE PLAINS AND SPELI7CA110N5 APPROVED IY THE LOCAL ODVEIININO AUTHORITY, 2. ALL OEMOLETON AND SUISO ENNT 0ONSTRUC110N TO TIE IN ACCORDANCE WITH PERMITS 19911EL AND APPLICABLE STATE, COUNTY. AND LOCAL COOES 3. THE OONTRACTOR SMALL OBTAIN AND PAY FOR ALL INSPECTIONS. CERTIICATDMI6 EQUIPMENT. ETC, THAT MAY BE RECTUM. 4. F DEPARTIIES FROM THE SPECIFrAlIONS OR DRAEINOS ARE DEEMED NECESSARY BY THE CONTRACTOR. DETAILS OF SUCH DEPARTURES AND REASONS THEREOF OVAL BE SUBMITTED TO THE OILER FOR REVIEW. NO DEPMAM FROM THE CONTRACT DDCUMDITS SHALL It MADE NIRIOUT 1IE I ITTDN PERMISSION OF TE OWNER. a EXISTING IMPROVEMENTS DAMAGED OR DESTROYED OIJRIID CONSTRUCTION SHALL BE AEPL.AM OR RESTORED TO THEIR ORIGUL MOTION. AND TO THE SATISFACTION OF THE OWNER OF THE NPROVE}EINTS, L CONTRACTOR SHALL REFER TO ARCHITECTURAL FLANS FOR DETAILS OF BUICNGS AND BUILDING DIENSIONS 7. ENOIEOL A O/OR OWMER MICLAIM MY TOME N THE CONSTRUCTION MEANS AND/Olt METHODS • SEAL ASSOCAIED PITH 111E PROJECT AS SET FORTH N THESE PLANS, _ I66M A CONTRACTOR SHALL MAINTAIN AN 'AS IULT' SIT OF DRAWINGS TO RECORD THE ACTUAL IACArm OF • ,qq,, ALL PINING PRIOR TO CONCEALMENT. DRANIMDS SHALL IE 43YE N TO THE OEM UPOM COMPLETION OF THE Ir'"•N;ryl l N�',� PROJECT WITH A COPY OF THE TRANSMITTAL LETTER (FOR RECORD KEEPING) TO INE ENGINEER. • • •��"r�i3 T,% 9. THE CoNTRAOTCIt IS NESPONLSDLE FOR FIELD WEPIFMN6 THE ACTUAL AID E%ACT LOCATION, sm AID + MATERIAL COMPLNTION OF ANY DGSING WATER OR SEVER SERVICE PROPOSED FOR CONBECAON OR USE • ON THIS PRO,EOT'. THE VALDCATK;NI OF ANY UIIXTN SUM ES ROMID 10 COMPLETE ANY PORIM OF THESE CONSTRUCTION PLANS SHALL BE THE Y OF THE CONTRACTOR. 10, THE OONTRACTOR MUST, AT ALL TINES, I� THE PREMISES FREE FROM 4CCUHIJLATOMS OF WASTE • MATERIALS OR RUBBISH CAUSED BY HIM. HIS EMPLOYEES. OR HIS WORK. ALL. OEDR19 SHILL IE REMOVER FROM THE SIZE ON A DALY BASIS.} • U II. FINAL ACCEPTANCE OF WORK BY THE LOCAL SOYERNING AUTHORITY SHALL NOT BE MADE urn ALL WORK $NOUN ON THE APPROVED PLAN IS C OWPLETED. �1yi IL CMTRACIM SHALL CALL 'NORTH CAROLNA ONE CALL! AT LEAST 46 HOURS PRIOR M BEGINNING CLNSTRIX110M OR EXCAVATION ON SITE TO HAVE DOSING UTILITIES LACANI, COW7MIGR TO CONTACT • w AMY LOCAL VILMES THAT PROVIDE THEN OWN I DEPDODNT LOCATCR SERVICE, CONTRACTOR SHALL • _ IrEdAIELT REPORT ANY DISCREPANCIES TO 111E ENgNQR. : W fE!rX 13, ANY MOCAVATION MUST SE FILLED N AND TAMPED AT THE CONKT.MSIOM OF EACH WORK PERIOD, AND + & ! { EQUIPMENT AND SUPPLIES RETURNED TO THE CONSTRUCTION STAGING AREA. : f SIGNAGE, STRIPING, AND MARKING NOTES z 1. ALL SWAM 90AL CQMFOR M TO STALE GOT STADARDS. 1APNAGE SHALL BE NSTALLFD III • OZ CONTRACTOR 2. ALL LOT SIRTPIIO AND ONECTDMAL ARROWS SHALL BE IRIIE RDlECTVE PANT AND SMALL CONFORM • 'S I( TO STATE DOT STANDARDS AND SPECPIC*11O LS, a 0 • 3. HANDICAP SIMMS SHOW N THESE PLANS ARE FOR LOCA110N AND INFORMATIONAL PURPOSES ONLY. SEE DETAIL SHEET FOR ACTUAL CONSTIUUCTDN REAMS. MERHODA AND MARKNOS. • • 4. ALL TRAFFIC CONTROL DEUCES, PAVEMENT MA I(NK SIGNS, AND SIOIAS SHALL BE DESIGNED, • NSTALLM AND MAINTAINED N COWORMANCE WITH THE STANDARDS SET FORTH N THE MANUAL ON UNIFORM TRAFFIC CGMTROL OEVNCES. • • CONCRETE AND SIDEWALK NOTES : • 1. CONTRACTOR SMALL IEFDENCE 'WE MOYIECMAL PLANS IN DIHEN SIONN3, JMTS AND PLAY • IY AS CIFICAI M PLAN � 7RMTM ,DINTS N LIAUNWAYS EVERY 10' (MAXMW). OR AS INDICATED N : w • o 2. CCNCREN PADI AND WALKWAYS: UNLESS CTBTIIMSE NOTED, ARE 3000 PST, OF 4- THICKNESS WITH • 12'•IY w1.9 • w1.9 WELDED TIRE FABRIC THROUGHOUT. w • D. 3. DUMPSIER PAD SHALL M: 3000 PSI (m DAYS STRINGTH), 6' TMICpNEBL M1H 6' ■ 6" Wk0 K WN.D • MELDED WIRE FAMC THROUGHOUT. P� 4, OEM AND SPECIFICATIONS OF CONCRETE PAD FOR PROPANE TANKS TO BE MVM S,Y n= : o O sFRurx aF NnwWH c.•rn r. rY • O \ CONSTRUCTION NOTES ! w o 1, SLOPE OF ASPHALT AT HADICAPPFD PAWN SPACES AND ACCESS AMU SHALL NOT DKCEED 1/4- PER FOOT. • ACCESSIBILITY NOTES : L ALL REOURED COTS ILL NEED TO BE TREATED AS AN ACCEIMI DURANCE AS PER SECTION S.L1,2 : O m VOL. I-C A* THESE DOTS MUST MEET ALL REQUIKDENTS Or YCL. I-C. • Z } 2. STANDARD R7-90 RESEIM PARKED AND MANN M PENALTY *= NODS W-S7.6 SIM MUST BE • w C4 Y Z INSTALLED N FRONT OF THE HANIXAPPED PARKING SPACES. VAN AOISBLE SOKS) MUTT IE W We y Z PROWDED M "ANT OF VAN •!YY� E SPACES. • O w r q O GAS NOTES a� 1. CONTACTOR TO COOROMATE GAS NIT ITV INSTALLATION WITH CAMPUS PHYSICAL PLANT PERSONNEL. • • : CONSTRUCTION NOTES SEE SDEWALX NOTES FOR SPECIFICATHM • AND CONSTRUCTION MEANS AND METHODS • m CONSTRUCT S' WIDE CONCRETE WALK : IN CONSTRUCT 6' WIDE CONCRETE WALK • CONCRETE DkMPSIS PAD,, SEE OCTAL &IC : ® ILI INSTALL STEPS; SEE ARCS. _j Z IHSTALL IS' TID 6' HODWRE'TE SIDEWALK TRANSITION. • A 0 C ® INSTALL 10' WIDE ODNCREIE SIDEWALK ; z ® INSTALL HE TIDE CONCRETE SDEMWX ; O ® INSTALL IV AIDE CONCRETE SIDEWALK ® INSTALL CONC. SIDEWALK TO MATCH EXISTING ® CONCRETE SLAB; SEE STRUCTIRAL OCTAL 2 ON SHEET S-B : `r U M 24' CONCRETE CURB AM GUTTER,, SEE OCTAL SHEET C-5.1 • [ O ® FLUSH CURB AND CUTTER • fff y E INSTALL CONCRETE H.C. RAMP. SEE OCTAL SHEET C-S.I : Z Z z ® INSTALL H.C. RAMPI SEE ARCH. Z W ® TRANSITION TO FLUSH CURB • (E/ ® TURN DORM SIDEWALK TEE DETAIL .9.IR EL ® INSTALL 24' VALLEY GUTIM SEE DETAIL 5AS • ® MATCH STYLE AND WIDTH OF CURBNG; CONSTRCCT CURBING INSTALL LIGHT DUTY PAVEMENT. SEE DETAIL S.IH • ® INSTALL HEAVY DUTY PAVEMENT, SEE DETAIL 3.11 E ASPHALT PAVEMENT REPAE� SEE DETAIL *.IA • �.J U ® INSTALL CONG PAVEMENT • • ® BANKS STREET ASPHALT PAVEMENT REPAIR; SEE OCTAL SAY I� INSTALL VAN ACCESSIBLE H.C. SIGN; SEE DETAIL &ID • aaE INSTALL H.C. SIGHT, SEE DETAL 6.1D • _� NOT USED : INSTALL CONCRETE BOLLARDS W Q O INSTALL 'VAN/CAR POOL PREFERRED PARKING' SIGN; SEE OCTAL 3AM • } - Q ® INSTALL CONCRETE WAEELSTOPS, SEE OCTAL SLIP • • ® PANT 4' EDGE STRIPING • ® PAINT 4' WIDE STRIPING AT 4W APERE : INSTALL CHAIN LINK FENCE • • REFER TO DUMPSTE7R PAD DETAIL CS,1C : �1 ® INSTALL ONE S LOOP IN -GROUND MTD. WAVE -TYPE BICYCLE RACK • 42' HIGH • E MECHANICAL YARD, SEE ARCITECTURAL FOR DETAIL • • • • • • • • • • • • z Yi • • W an • h �iB� • a `" z • • u hJ D �I • O n oa • P _V � a hz • • Uh • • WO • • z Z a M 0U w o uz U h 4 • v n • R Z SNODMNKS • w w k • L 31 • 8 0 h : k 0 3 • c a AO • �ry GRAPHIC SCAEE • • • REPAIR r • • N w : CID : O • IIW�90 B. • � GEOMETRY PLAN • TOTAL • � J n v 1 f J SHEET NOTES r, ;:� /...... .._ .. _......... ..........._.-.._- W +,rirg rr „. ! • TEL r 1, ALL DEMOLITION. AND ANY sueEaENr mismucnGI�c SHALL BE r+�FONaMEo IN ACCORDANCE wM 1 +.• f nlaal THEE RAINS AND SPECIFICATIONS APPROVECAL D BY THE LOOOVERNN6 AUTHORITY, I -- Pp OCO COP Z ALL DEMOLITION Ally SLNEOUDIT CON511WC11pN TO E N AOOOROMfE A01H PUM15 ISSUED AND • 1 '!,^,( EOP APPLICABLE STATE. cOuNTY, AND LOCAL CODES. THE CWTRAOI R SHALL MAN AMD PAY FOR ALL OP s NSPEC71oNeO, CEIIEf1C+L1ICN3 EgRry1DNT, ETC • - ...._.. - w W 24 OFFSITE MAY �. ' ` W� rn ''rr 'I' ,ulrr OON7RACTON, REOIIIRED. • m r + 'RCP 0 EUP 4 F DEPARTURES FROM THE SPECIFICATIONS OR DRAWINGS ARE DEEMED N I)M ARY SY THE • --..-._-- .. • w� +rr rra+n DE ! TALS OF SUCH DEPARTURES AND REASONS TiIFIEW SHALL RE SUBMITTED TO THE OMER FOR KWW. EDP NO D• W DEPARTURES FROM 1HE OONTRAOT DOCUMESH NTS ALL BE MADE MIHOUT THE NIRTEN PEAIISSION OF • WH THE DMEA1. • i — • RI BENCH 20 35' I 5. Oft-FNG 6ilPROYEIE11T5 DIWAOED OR DESTROYED DNRMNG COWTMXTIOII SNNl RE REPLACED OR / Ex. DI w_ _-w M. TO THEIR ORIGINAL oONDRTHON. AND TO THE SATSTACIICM Di THE 1TNlER OF THE IPROVEMENiS, INV. F6.44' MH p * TEL : tN ~ 6 Pvc WV r w e1T 5. CONTRACTOR SHALL REFER TO ARCHITECTURAL PLAITS FOR DETAILS OF BUILDINGS AND OURARIO MH RIM : 23r66' _ W ~ ` BENCH -k 16.57' _' ONE 7. ENGINEER AND/OR OWNER DISCLAM ANY ROLE N 1LE CONSTRUCTION MEANS AND/OR Mrmm • INV- 16.16' / 1 /wv w„ ASSOCIATED WITH THE PROJECT AS SET FORTH N THESE PLANS, - 166l4 ° • • ` & CONTRACTOR SHALL BANTAM AN 'AS BULr SET OF DRATMIG$ TO RECORD THE ACTUAL LOCATION OF : D _. wm f - _ .: w M ALL PRND PRIOR TO DDIIC ..WIT. ORAVNGS SMALL E GIVEN TO THE OMNER UPON COMPLETION OF THE • '''�„�VI'• `•�„ - 1 Ss-- ` PROJECT VAIN A CDPT OF IHE TIWNSITTAL TITTER (FOR NEWER) KEEPING) TO THE EmGNW, • .3/.Mr3 THE CONTRACTOR IS RtlPCHONI,E FOR FIELD VEIKYNa THE ACTUAL AND EXACT LOCATION. SIZE AND • SIGN MATERIAL ODMPOO11pN OF ANY OUTING WATER OR BEARER SEBATACE PROPOSED FOR CONNECTION OR UK � \3 1 I a , A �� .'�--.... _..'._. ON THIS PROJECT. THE RELOCATION OF ANY UTILITY 29AV10F5 NIEQlIAE6 1O COMPLETE ANY POI110N OF THEE COgTRUCTION PLANS SMALL E THE RESPON9RLITY OF WE CONTRACWR. � • 1 / y 10. TIE CONTRACTOR wMr. AT ALL TIES• KEEP Tam$ HE PFREE FROM AWTE UMULATKM OF WAS • 3. D!MC '' - MATERIALS OIE RUBBISH CAUSED BY HHM, HIS DMPLO"m OR IRS IYORK. ALL OEM SNARL E oDwy O .•a.r. et' I ��D23 A Y AL722 r . _ ® ® A TEt ' FROM THE SITE OM OAL OARS. ® +I I f j y;, {•a-Il,uulllll¢'-nl;. :..I' illiIIIIIF` CU4B I - W FINAL A91 ON HE OF APPROVED BY L THE LOCAL OOVEIIAIIG NIBIORIIY SHALL NOT E MADE UNITE ALL k i"-: FlR$ EiYD 1 WORK $HHOIN ON THE IIPPROMFD PLAN IS COMPLETED. 4.,/ IL CONTRACTOR SHALL CALL 'NORTH CAROLINA ONE CAW AT LEAST 48 HOURS PRIOR TO BEGINNING �F it f 1 CONSWAX ON OR DrAVATLON ON STE TO HAVE EIOOTMiG WIINS LOCAED. CONTRACTOR TO CONTACT • w A 1 = 1 ANY LOCAL UNIM THAT PROVIDE TIER ON wOO DDFNT LOCATOR SERVICE. CONTRACTOR SHALL • ! TEL RRIEDIA1ELY REPORT ANY OSMIPANLTES 10 THE DKI EER. w III RIIA . 2o.6a' f r 1 -ti p{STURBA C� _ SSINH A m II sP IS ANY EXCAVATION MUST E RILED N AND TAMPED At 1HE CONCLUSION OF EACH WORN PERIOD. AND 1.1 ii 1!':'ni .'A- i;f d ,• I. ! S BENCH 1a.Oz' a - ._ I ¢ tINLITS d ® I I EQIIPIENr AM sARPLIEs RERRIIED ib THE cOISTRLICtION STAGING AREA, Ala III Co. �.. _-... iT !Bn�l.ulmm'�Irll lar.aa'anI-II ENV. ISS3'FXIuIM1 1 l:Id.nllV,r.:1.,uflkL' / _ • ? 1 � � urlurlr NOTES Z � �F It, - S 1 H 2 NC •, - © SSMH 6 0 SSMia 6 ® r #6 V APPROX. LOCATION I f � � N71� M I. UNIDEROROLND UTILITIES SHOWN ON TM PLAN SHALL E NSTALLm PRIOR TO ANY OONSIRUC110N OF OHE ` .L) SEE SHEET C3.3 FOR RUNE RI1H 6 PROFILE ® MH 4 ® ® :. - I -- - __-- OF TELECOM i i = AREA; %! CIR B AND GUTTER, CR CO OMM WALNR9 PADS. UTU1E5 1RRCH CANNOT BE • �'{ 1 _ - CONDUITS E INSTALLED PRIOR TO OONSSIJCROI OF BTE NPRIDAD"18 SMA1 E PwA m WTH COIDIAT$ MERE TEY • 0 . • WO pp r.:P.. ).. ..JN....�.. -••• • _ (TOP ELEU15.30) _ CROSS SUOR I PROVEIEIIIS FOR INSTALLATION WU SUCH MVOOVIE 4MM ARE N PLACE. � ZO �]'I n �1 TEL 3 / _ 6:- an IDUTSi16 ikDO. - • •••»•• _ TION. LALATIOM TAKEN FROM FAX 9EIk J _ li.l Ill,.il�ll igll ill pp - �...54 ..• •....... ..® / ', 2. WATERLINE LOCATION STREET •IT; AIRILT BY $1ROUD ENQIEERRIQ OONIRACIOR TO FIELD 1B1IF'F lJ1CAl10N. wM z'iTA SHALL COORDINATE UTILITYRVI UTILITY SERVICES VAIN THE BUILDINGMECHAMCAL PLANS, m 1 y... s CON ACTDIF / - 4. CONTRACTOR SHALL E RESPONSIBLE FOR INSTALLM SERVICES TO WITHIN 5 FEET OF THE BULONO • WMECIION POINT OR AS NOTFA N TE PLANS, TRAFFIC OONTROL$ FOR ANY unuw um WT IN THE PUBLIC RIGHT —OF —SAY SHALL BE IN COMPLIANCE NTH WAYN ST BLDG. N r _ ' / / - I E «00FFE 22.0 i ® ®moo' mi m r - STANDARDS OF TE MANUAL ON UNIFORM TRAFFIC CONTROL DEVM (wTCD), w_ - w !r'I I -�. ':'. utll ilil', J # v AD28 f _ & A L1CJ:NSED uTLITY CONTRACTOR MUST PERFORM ALL DIMITY MIRK INVOLVED IN CONSTRUCTN T#S PROJECT / FI ® 2,t',Bi:�_ wry r CONC L'NZJJ • Z / WV OPTICS - $.Bali ...is.•, 11LAlAI! PAO r - • 3 ® Y _ 7. ALL OAS LINES N E LOCATED PER PYE OAANNMiB BY SAS UTILITY PROUDER. • PQST A CONTRACTOR TO NSTALL TAPPING SLEEVE AND VALVE FOR THE CITY 10 PERFORM THE ACTUAL BORING INTO x FENCE A.n. r r„ TTHE HE 041ID C. WATER LFE THE C!"ACTOR VLL TOM INSTALL THE REMAINING WAN= LINE FOR SEANCE TO yJ {D ... ... ` _ / r........ .w.. ....Ta...............a• ..i.. ._.. ................ ... .x.i... - \ ...... L? / - ®• ® ® -•�•• d d:,." y 7 A PROVIDE A 2' SERVICE CONDUIT TO PADING FOR TELEPHONE LIE NSTALLATIONL r� . . ......... aw- / /•� - HFlLTRAT N BASIN \ MH34 - �' f M ONW4070 SHALL E RESPONSIBLE FOR NSTALLATDN OF METER BOX AND METER SETTER, METER 94ALL • � 6 3, / f'- AD49 ��n---OS---05-OS---OS---OS ^\ MFT3D•� TEL LAc I E PURCHASED FROM THE UTIITY PROVTOER BUT VILL E NSTAlm BY TIE GENERIAL CONTHGCTCII. � p � �,, / / F m �/ @ © Sox Etc `9 11. THE CONTRACTOR SHALL CONTACT THE LOCAL DEPARAENT OF PUBLIC UTILITY NSPECTON DIVA" AT : 1n � O HOURS PRIOR WMS�1RUCTION ACTVIIE$ OF WhIll AND / OR SE E1F IPROVEIgRS TO • LA�.I � AI50 LP ERENM Of �/ / ^ • Slsj -4 ® r ... ~ - pp TEL IAT� E MLIT INSTALLATIONS SHALL WIFOIM MS 70 THE TOOF MOREHHEAD CITY ENGINEER1W STANDARDS 1r sox W ILL Lp ,..®� /,. r, I ®MH31 _ ONE PP P WATER NOTES z m DOMESTIC PHASE I: POND 13 I © TH T}COO A/C 1. WA 12' AND SMALLER, $HALL BE DUCTILE IRON PRE LEETNG THE REOUIRDENTS OF AM9-AWWA • >_ WATER / / 7 OUTLET 5 C151 �E CLASS ,TOO Olt PVC PPE MEEIMG TE REQURpenS. OF AWWA C-Oft CLAM 200, � V N Qw m�N`I, VAULT ' w rN ®� // fr7 TEL - I I ..,.... ... I ® a0 3, WA SHALL MATERIAs: ' f CONC ` 2, ALL WATDIJIE$ SHALL HAVE MINIMUM! OF S $ :NET OF COVEN _ � , P 542 Is r`, ;'1 TER SERMCtS FOR IM PRO.EC7 E OONSTRuCTED OF TE Fd10WNG `•' _a I 31 1 1 P _ __. I 2 CONC %� paE ISWING • FPRDTEC710N SEANCE DUCTILE MZON PPE t PVC C900o} I lrn. '. e i I I 5 � . �}' E G7.1 — - r' } - .. ^ • !! If 4. BACN FLEW DEVICE FOR FIRE 0001EC71ON, DOMESTIC SERVICE. AND II IGATOI SHALL BE A DOUBLE CHECK i _ VALVE ASSEMOLY FROM THE CHECK VALVE APPWM LIST MEETNP 10(JIL IC71011 REpuIELIpNI$ Alp • __ i 3E / _ •� •— •� •� •� •� T �v PLACED NODE AN IRDEMOM VALT AS ID"TIED IN THESE PLAN& • ' 2' i _ �I I �� I 1 Y, _ ��° / C Ir ` c6 A FINE PArANIION BACKFLOW PREVENTER SHALL E INSTALLED N A VAULT. PER OETAL. ; !r II AU72 f9 I f7 P ;�( RWN LIIV • I 2 1 ,� j I ' r I' * 6G' / W _ K FENCE ! / PcRmm STORM DRAINAGE LINE, CONTRACTOR SMALL PROVIDE A MONWAM 1W INV. / ® FiVY39 1 w 1 • aIr .........II .�.r,l�., nIImIII�F j \ 4'Mt�AL Nv. e" E., . (LENGTHr l SFWFP NOTES 71 ' �r;,,T^Numm6mmllMmRu�nr�Vhwui�_ 1l i 11 Aril Irlllrl<�7'--II�--II- CONC ..r : 'M7fi�li•Llylll lllfi -M- -- � •�- OHS �Mo-e ETC - - _ - SS A- - SS- W5/S PP 65_ pp FXDI3 r f LP ��� iT \ tI ON = 6.20' RIM DROP NLET BOTTOM = -0.95'BENCH = 9.27 04V 3.92' . GRATE: 8HW NIN 4.50 W v,41* -� LP (t CROP kNLEN QC, !I GRATE = 6.4' G ATE = 4.88 INV. _ 1.9, IN = 1.16' •. JL,I II'Ih iu' 1 -"--�- .��....;�CONC o \ ofV._ - \ WOOD p(CKET F - 1 HONE ENCE'"--� - ... 1' LC w- EXOUTL Ln 21 O � t + V T CONC 1 aovur 1 30" RCP 1 N INSTALL 6' ROOF OWN LINE AT MIN. IX SLOPE • { 1 UNLESS OTHERME HIM 0 V ® INSTAL. STOW OWN SADDLE ® INSTALL PVC CUMIN PPE � ® N$TALL CUSTOM MANHOLE • ® INSTAL SUBMF1 sioLE PIRP N wmtDLL SEE DETAIL 3.7E ®�I wpALL STORM WATER LET SrA11O1: SEE DEAL &m • TIE ALL STIORY OIIANAGE LIES TO NEW MAMIKU Y W INSTAL 12" PVC PIPE TO OWN OF WWI ENSURE • POWIVE DRAINAGE NHO POND ® INSTAL 2" SCH 40 • i ® INSTALL CONCRETE DDWAL PER Nmw Sm S!&01: • SEE OETAL 5AN INSTALL FLOW 01$71EUFION DEVICE: • SEE DETAL 5.4J ® 16ML FLOW SPREADER; SEE DETAIL ON SHFff G-•,31 i • m INSTAL a' PVC SANRARY MER LIE ® INSTALL SANRARY SEWER MANHOLE ® • i z INSTALL 6' PVC SA6TARY SENER SERVICE A ` 0 V1 > INSTALL Bwmr ETHER CLEAMOUT ® INSTALL 4' CONCRETE MANHOLE NTH AIM EL EOTIOI 1415 • i W 4 N I- INSTALL 2' COW WATERLAW • • 4 4 z ® INSTALL 2 1/2' GOOD NATIMINE • u I- ® INSTALL r COW WATERIM ; D a It 4 MARICULTURE �i BLDG.r.�-� � _ 3.4� $ FIRE HYDRANT 1 VIES SD MANHOLE VIEW 1 m s C3.1 1 inch 30 ft. PRESIURE 12SI: STATIC a5 PSI SCALE W INSTALL 6' CM WATERLINE ® INSTAL 2' DOMESTIC WATER METERI SEE MAIL 5,2N � O � 0 U t F pf Nt: SCALE - C3,t 1 inch - 20 ft.• Dl REM AL 46 PSI® NSTAL 3' DOMESTIC MUTER METER SEE DUAL 5:20 ® INSTALL 1' CROD VNTEALLLE • • L U = 4.62' m STATIC 62 PSI iR 1DRQONTAL OENp6; DECREES vPAIES • • C'f W 0 - ? 's INV 4 D.21' RESIDUAL56 POI AND 161WE z z E) INSTALL 6'kb iAPPNO BLEEYE : ` Z UG METER ELC Box O r m,�liT l I,NINn�1rt' g �MrN tx ' OPE °DMH ELEC 11 MH 0 G MH ® MH soa LP CONC O END MH OUTLET p PIPE m MH ® PIPE PAD INV= -1.21 Q MH FUTURE WORK MH AtiVIN . (NOT IN L__jC saw CONTRACT)WATM TOB SYSTDI PUMP UTLITIES NORTH OF MARINE TECH• HOUSE C1,T SCALE I inch = 10 ft. AMMO VIIWE 0 INSTALL 6' DOUBLE DETECTOR CNECN ASODSLY, SEE DETAIL 5,2D • z U w 0 z IMSTALL FIRE HYDRANT ASSEMBLY, SEE OETAL $.211 INSTAL r VALVE • • M v B • � • W WI • • • L � I oN JJJ F � a] M • • L 0 r " i<' o GRAPHIC SCALE g S • W • M M • • O s i1NtI . m h � a UTILITY PLAN - PHASE I • TOTAL SHEET NOTES 1, ALL I CO"llZM9=WKft= ACCORDANCE NTH AND A'X� V • 2. ALL DEMOLI'TION AND SUIPSOMM CONSTRUCTION 70 K IN ACCORDANCE NTH PER197S ft" AND Epp cop APPLICABLE STATE, COUNTY. AND LOCAL COOEL w- S. THE CONTRACTOR SMALL OBTAIN AND PAY FOR ALL INSPECTIONS, CERTOICAUNK EQUIPMENT, ETC, THAT MAY BE REQUIREM Eop 4 IF DEPARTURES FROM THE SPECWATIQNS OR DRANIM ARE DEFIED NECESSARY BY THE CONTRACTOR. DETAILS OF A" DEPARTURES AND REASONS THEREOF SHALL K SUBMITTED TO THE OWNER FOR REMEW Zop 140 DEPARTURES rmow THE CONTRACT DOCUMENTS 94ALI, BE MADE WITHOUT THE *bTflDd K1111141111ION OF • w- Sri THE S, DOS7W WW,8� DANAGED OR 10,0010 DURING C14� SHALL BE REPLACED OR • -4r FEN,: I e IJS w- RESTORED TO THEIR ORIGINAL COMOITICIM, AND TO THE SAWFACTM OF THE ORNER OF THE NPWMMNM • 44• GI CONTRACTOR SHALL REFER 70 ARCHITECTURAL PLAINS FOR DETAILS OF PUR.0005 AND BUILDNG ING DIMENSIONS. 7. DMM SOLARI ANY ROLE IN THE CONSTRUCTION MEANS ANDI METHODS TMZOI 01 ASSOCIATED PROJECT AS SET FORTH IN THERE PLANS, & 00147WTOR 90ALL MAINTAIN AN *AS K4Lr SET OF DRANNOIS TO RECORD THE ACTUAL LOCATION OF io ALL PF94 PRIM TO CONCEALMENT. DRAWINGS SHALL BE GrYIN 'TO THE OWNER UPON COMPLETION (W THE PROJECT WITH A COPY OF THE TRANSWIFFTAL, UuDI LETTER (FOR RECORD Kpwa) TO THE ....... �f six V"t I'\ 1 t THE CONTRACTOR 15 RESPOUll" FOR HELD VERlIFYING TIME ACTUAL AM D(ACT LOCATION. SIZE AM SIGN MATERIAL COMPI OF ANY COSTM WAIN OR SEWER MOM PROPI FOR CONNECT" OR UK PUT ANY POR110114 OF `7- ON TOM PROJECT T94E RIELOCATION OF ANY UTILITY SERVICES REQUIRM TO CON WICSE DONSTRUCIMIN PLANS MOLL RE THE RESP0001111111,11Y OF THE CONTRACT40C 0� 10 THE CONTRACTOR MUST, AT ALL TINES, KEEP THE PREMISES FREE FROM ACCLIMULAWNS OF WASTE • MATERIALS OR RIAWW 0403M BY HIM, HIS DI OR HIS *W ALL DEBRIS SHALL BE REMOVED AD22 j FROM THE SITE ON A DALY WAS, AD23 I 11. FINAL ACCEPTANCE OF WM BY THE LOCAL GOVERNING AUTHOIM SHALL NOT K MADE UNIT. ALL Ff SHOWN ON WE APPROM PLAN IS COMPLETED. CU46 fi It CONTRACTOR SMALL CALL "NORTH CAROLINA ONE CALL" AT LEAST 46 HOLM PRICK TO BECINMING • Lu I C014SIRUCTION OR EXCAVATION ON STE TO HAW DOMM UW= LOCATED. CONTRACTOR TO CONTACT IMMEDIATELY REPORT ANY ANCIES TO THE ENGINEER, ANY LOCAL unum THAT PROYIDE TIMM OVIN INOCKNOENT LOCATOR SERVICE. CONTRACTOR STALL A= 13, ANY EXCAVATION MUST K FILLED IR AND TAMPED AT THE CONCLUSION OF EACH WORIC PERJCD, AND EQUIPMENT AND SUPPLIES REIUIRNED M THE CONSTRUCTION STAGING AREA UTILITY NOTES z 41 1 UNDERGROUND UTILITIES SHOWN ON 143. " SMALL BE INSTALLED PRIOR TO ANY CONSTRUCTION 0 r PAIIIiii = T&MAND QUTTEk OR CQM=TE =�EP%aITIE MJ Qi iki�ll IA 4.17. ..................... NITS MCH CANNOT SET IHEY INSTALLED TION OF SITE IMPROVID"IS CONDUITS WHERE Jr - CROSS SUCI4 IMPROVEMIDIR FOR INSTALLATION AFTER SUCH IMPINhe"Ill AM IN RAM •Z 0 ... . .... TION ON BANG STREET 15 AN APPROONATE LOCATION. C) Z WATERLINE LOCA LOCATION TAM FROM FAX SENT 7T/ib r IA ;7 IT By STROUD mNomcERiNM CONTRACTOR To FIELD VERIFY LOCA 1ION. 7 0 0 CONTRACTOR WALL COORDINATE UTILITY SERVICES INTH THE SIL11LOING MECHANICAL PLANS. C124 CONNECTION PONT OR AS NOTED N THE PLANS. & TRAFI 60111ROU FOR ANY UTILITY WM "THIN THE PUKE MGMT-OF-WAY SHALL BE IN COMPLIANCE WITH 4. CONTRACTOR SMALL Ot RESPORMILE FOR INSTALLING 3UMM TO VITHIN 0 FEET OF THE BUILDING AI)2� c WAYNE WEST BLDG. STANDARDS OF THE MANUAL ON UhWM TRAFM CONTROL DEVICES (MU7CD)6 FFE 22.00 FFE 22. 0 N. C A LICENSED UTILITY CONTRACTOR MUST PEW ALL UTILITY OW INVOLVED IN CON57RUCTM THIS. • PROJECT. 4 cof4c C125 7. ALL GAS UW5 TO BE LOCATED PER POE DRANNOS BY GAS "M PROVIDER, IS POST & & CONTRACTOR 70 IMSTALL TAPPING SLEEVE AND VANE FOR THE CITY TO PERFORM '(HE ACTUAL AD28 • k# T-��OD �111"T DORM INTO CFIAIN IrritTHE EXISTING WATER LOWL THE CONTRACTOR WILL THEN INSTALL THE RINAINING U470 LINE FOR Surma To L FENCE THE BUILOING, rlT4�44 I CLJ41 9. PROMOS A r SERADE CONDUIT TO BUILDING FOR TELEPHONE LINE INSTALLATION. 0 10. CONTRACTOR SHALL K RESPONISINE FOR INSTALLATION OF MIETER Oft AND METER SETTER. METER ?CALL • z K PuRCI FROM THE UTILITY PROVIDER BUT WILL BE INSTALUD BY THE OEMERAL CONTRACTOR. D L U) zeal $1, THE CONTRACTOR SMALL CONTACT THE LOCAL DEPARTMENT OF PUBLIC jTXTTY INSPECTION DrIASION AT 5 LEAST 48 HOURS PRIOR TO ANY CONSTRUCTION ACTIVITIES OF WAWA AND / OR 11 r WPAK94DM TO SCHEDULE A PRECONSTRUCTION CONFERENCE, 12, ALL U71UTY INSTALLATIONS SHALL CONFORM TO THE TOM OF MOREIHEAD CITY ENCINEENHO STANDARDS LATEST EDITION. 00,11 -�.41431 WATER NOTES z AX I. WATERLINE& Ir AND SMALLER. SMALL BE DUCTILE IRON PIPE MEETING THE REQUIREMENTS OF ANSI-AWWA i-- Co La OUTLET 32 C161 PRESSURE CLASS 350 OR PVC PEE MEETING THE RVOIJIMEMENTS OF AWMA 0-9M. MASS 200. • 5, LAJ Z� Lu 'ONC ---- 2. ALL WAIERIA43 SMALL HAVE A MINIMUM OF 3.5 FEET OF WI �rj PAD LL) _j 4 I WATER SERVICES FOR THIS PROJECT SHALL BE OMTRUCTED OF THE FOLLOWS MI 'Zi 4: qDNC �rj f DOMESTIC SERVICE PVC Coco A BRASS • ""PAD SWING FINE PROTECTION 89h4CE PHASE It FINAL POWLL DUCTILE IRON PIPE & PVC C" • 4 BACO'LOW DEVICE FOR FOE PROTECTION. DOMESTIC SERVICE. AND INGATION SMALL BE A OMM CEO( VALVE ASSEMBLY MOW THE alM VALVE APPROVED LIST MEETING LOCAL ANNSINCTION REOMMENTS AM • PLACED NODE AN UNDERGROUND VAULT AS INDICATED IN TmESE PLANS. • 5, FOE PRIVANI 9ACKFL0w PlEvEwfER SMALL BE INSTALLM IN A VAULT, PER DETAIL • FENCE 6 WHERE WATERLINE CROSSES STIORM DRAINAGE UNE, CONTRACTOR 94ALL PWI A MINIMUM le a17J� KTOM PIPM • Al SEWER NOTES OUTLET I. SANITARY SEVER CLE4NOUT3 LOCATED IN PAVEMENT AREAS SMALL K WAVY DUTY TRAFFIC BEARING CASTINGS, m H 2. MAMMOLES LOCATED W PAVEMENT, CONCRETE OR OTHER WAFIFICKEO AREAS SHALL BE SET AT GRAOE MANHOLES LOCATED IN OTHER AREAS (IL GRASS OR W)COED HAVE THEIR RIM RAISED NOES ABOVE THE SURROUNDING GRADE. mAmNcLo IluBJECT10"pal"LILINATER WILTRA1101111 SMALL HAVE WATER`rMT MANHOLE RINGS. lu & MR04M REQUIVIED SLOM FOR SEWER SE e SEINER Soma zoo x SLOPE 5*SEV"WMM I-OOXSLOK KV S' SEWER SERVICE MOO X SLOPE JU 4. LOCATE SANITARY SERVICE CLEANOUTS AT ALL HORIZONTAL OR WRIOCAL CHAN= IN 1011RECTICH. MAXIMUM SPACING KTWEEM CLEANOUTS SMALL BE 75 FEET RAMP METER 0 5, SEWER LINES NTH LESS THAN 3 FEET OF COWER SHALL K Cl SO Owl" ODIN PIPE. SEWER UNm NTH z VAULTS GIRCAIM THAN 3 FEET OF COVER STALL SE AS NOTED BELOW •a sl 4' - SCH 40 %E 61 SOH 40 rLO9 6, WR-35 F 04 ... STORM NOTES z I. DEMOLITION, AND 51USSEQUENT CONSTRUCTION OF STORY DRAINAGE FACIUM SMALL BE PD"amEO IN SUCH •z FOR LONGER THAN 12 HOURS AT A IM PROVISIONS SHALL K MADE TO MAINTAIN SIM WATER A MANNER THAT THE OLD WE AND STRUCTURES ARE ft"I AM NEW 117"AM AND PIPING ARE "I PUT INTO SMICE, CONTRACT= SMALL ENSURE THAT ST40FA DRAINAGE D= NOT REMAIN OUT OF q SERVICE DRAINAGE DURINO CONSTRUCTION, ELECTRICAL NOTES 1. THE CONTRACTOR TALL ATE THE LOCATION W ALL HION-VOLTAGE AND LIWW SYSTEMS ON STE WTH MOREHICAO, CITY ELECTRICAL EN(PlEERING DEPT GAS NOTES O C, 1. CONTRACTOR 10 COOMOINATE GAS UTILITY INSTALLATION 01H CARPUS PI PLANT PERSONNEL • EX JB 30 UTILITY CONSTRUCTION KEY ! V [P INSTALL STORM PIPE AS INDICATED • SEE STORM TABLE FOR NnMI • .. ..... SHADING LEGEND p FX CH 37 EK67M STOW DRAINAGE FE• E A PHASE I SfORMI DRON04E • • PHASE 2 STORM DRAINAGE D UNITS Or CONSTRUCTION 5--i' IN v,• • z 0 0 u '30" u 4 • F D; • U Z 4 b Ws z 0 z Z • • cf) < I • z 1w, z z w W• r L w • 0 Co 21 • • mc GRAPHIC SCALE gi! • C-4 -j• (INMIT) 30 IL UTILITY PLAN - PHASE 11 a TOTAL 0 7 ------------------------------------------U—-y--------- z C_ �1 r h, N C0 a {: o z � M I pm DBmvC910� n m NtlRIH fn r- D _ m cn AII O jrl �•j,r �i f r s, oN oT Ir ••rrrrrrrrrrrrrr�rrrrrrrrr a urrr•rrrrrrrrrrrrrrrrrrrrrr••rrrrr�rrrrr•••rrrrrrrrrrrrrrrrrrrrr�rrrrrrrrrrrrrrrsrrrrrsrrrrrrrrrr�r•rrrrrrrrrrr • PROJECT NO. • REVISIONS • CONSULTANTS 100032 ®10/31/03 PER OWNER WrEWART ENGINEERING INC • CHECKED BY = " RPL -DRAWN BY rr a•znrno F�n•acmac s (10 v SHEET NOTES • "IM_ _.,, 1, ALL DEMDIUTON, AND ANY 9UBSEd.OIT OONSTRUCTIOM. SHALL BE PERFORMED N AOCONOAMCE WITH 71ESE PLANS AND SPECIFICATIONS APPROVED BY THE LOCAL QOVUMG AUTHORITY. s L ALL DEMOLITION AND SUBSEQUENT CONSTRUCTION TO BE N ACCORDANCE VAIN PERMITS ISSIAW AND APPU-&^E • GOP EOP STATE. COUNTY. AND LOCAL COOM y (� �r a :;'; • 3. THE CONIRACT0IT SHALL OBTAIN Alb PAY FOR ALL NSPEC7IONS, CERTk1CA110M15, EQt1PlElIT, ETC. THAT MAY NE • - , REQUIRED, • )04HO 24" RCP OFFSRE EO4. F DEPARTRES FROM THE SPECIFICATONN OR DRAWINGS ARE DEEMED NE�SARY BY TIE CONTRACTOR,OETAL6OF SUCH DEPARTURES AND REA90NIS TEAEOF STALL LE 9UB161TEU 40 1fE OMIET FOR RENEW. NO DEPARTURES EDPFROM TIE CONTRACT DOCUMENTS SHALL BE MADE WITHOUT THE VRITTDI PERMISSION OF THE ONNOLMH 35'0. E*SING I PROVEMENTS DAMAGED OR OES1ROVE0 OU*M CONSTRUCTION MALL BE RENtMFD OR RESSTORED TOREI - 2 16. BENCH - 15.83' THREE ORIOMIAL OONOITION. ANO 14 THE 9A745FACT10N GF TFE 011FEIt OF THEE IIPR4YiMEtfTS.INV. - 16.44' � ,,,,..,.. E1L d.� _ :Ir � - 6. CONTRACTOR SHALL REFER W ANdNT7C7URAL PLANS FOR OETAIS OF NUI.DN69 AND BUILDING OIMQMSIOMS. • MH _ _ _. - I = .+ 7. ENGINEER! AND/OR OWNER D IN INESE ANY N THE CONSTRUCTION MEANS /W0/OR METHODS ASSOCIATED 1M1H L 794b • RIM - 23,88' BENCH = 16.57' 1 _ THE PROJECT AS SET FpRiX 1 •M , , x C ~" ♦ -- / 0. CDNTNACIOR SHALL MANTAN AN 'AS BOLT" SET OF DRAWINGS TO 11E ACTUAL LOCATION OF ALL 4S63s ' INV. - 18.76' s 1 ._ / 7Q �+ a - PIPM PRIOR TO CONCEALIE'NT, ORAMNGS SHALL BE GIVEN TO THE OWNER UPON COMPLETION OF THE PROJECT r ^' R WITH A COPY OF INC IRANb6TTAL LETTER (FOR NEC = KMDVC) TO IRE ENOIEEIL a 9. THE CONTRACTOR I$ RESPOmME FOR FIELD VENm YNo THE ACTUAL AND CI ACT LOCATION, SIZE AND MATERIAL : ',r~N •"!;.r.r C 110N OF ANY EWINGTM TEN OR SEVER SERVICE AM PORTION DOF THESE USE CONSTRUCTIONONISPROJECT . • r r - --- - __ _ THE ,ION a- ANY UTIJ SER1N}C1EE5, REQUIRED To THE EE -te- r Y.SO \ ,-_. ` 1BY N , T EMPLfTIEES. OR HIS PREMISES ALL ACCUMULATIONS OF U47E FROM THE SITE : -y..-.' SHALL BE THE OR NI1BB19H CAUSED lAlST OF.BII9 SHALL • RESPONSIBILITY OF THE CONTRACTOR AT ALL KEEP THE PgEW5ES DAILY BASIS. 17.50 z - '--a--_.� aw.rs Ij. • ��C 17.60 � .� � iL� % � .,. It. FINAL ACCEPTANCE OF MIORK BY THE LOCAL OOVEibNiG AUh10RFtt SHALL NOT BE MADE UNiL ALL Vldll( 9NOVM , 17.50 j- - i ON THE APPROVED PLAN IS COPLEX& • u t{� j •.!.-.d' �,,;,,•,:I., ,,,:I.,,., r ":-� �i - WILED 7, j t IR CONTRACTOR SHALL CALL 'NORTH CARA.NA ONE CALL' AT LEAST 40 HOURS PRIOR M SEGINUM CONSTRUCTIONCONS F _ '+ a M9.47 ... OR EXCAVATION ON SITE TO HAVE EMSTING UTILITIES LOCATED, THAT PROVIDE THEIR ON INDEPENDENT LOCATOR SERVICE. CMMA GR SHALL IMMEDIATELY REPORT ANY UTILITIESIOR TO CONTACT AKY LOCAL LL �. tt _ - j i k - tal DISCREPANCIES 70 THE ENGINEER, • - ■ !.N F ' _ i is .. - 1 I ... rK•. I& ANY EXCAVATION MUST SE FILLED N AND TAMPED AT THE CONCLUSION OF EACH MIOIK I•[NIDD, AND EQUIPMENT • ;` AND SUPPLIES RETURNED TO THE CONSTRICTION STAGTIG AWA n 027 RM 20.84• _ r -f 4.. , t1 cY„dgAlunula!i>F ?' �.,a:. - - - f µ,! r j 4 r 3'rk)*'u•+ ,i!d;I,TI' ,9. • _ I _ NQTE • BENCH = 16.02' - `"�`-'- - - ,' LOAM i+" I GENERAL GRADING S I ,t INV. 7553 - .' r ~. ~. /. n tf.Ol i L ALL DIIJENSIONS AND GRADES 9HDMN ON THE PILAUS SHALL BE FIELD VERIFIED BY 11E OONiRACMR PRIOR t0 • Z r .: CONC oar , yI"n' - 1 'y, - _ _ X ,a^rrryrlEma::i j r - CONSTRUCTION. CONTRACTOR SHALL NOTIFY THE ENGINEER F ANY DISCREPANCIES EXIST PRIOR TO PROCEEOW 11M • C 11,E 11,[I1 „'. - ` t .L, .. '."":.' - VJ D .tl.•O - _ LOCATION = COIMSTRIICTIOM NE PION OR DIENWOMS OR GRADES INCORRECTLY THESE PLANS IF SUCH J APPROX. ��." - OCDND TOM - HAS Y CONTRACTOR FOR ANY 110 GIVEN. TD Y ON M WE ...........a GRAIN v' - - - ,:o�«,.,, _ (TOP ELE 15 } _ • r HIT NOTIFICATION DIME I '�t,iD TO CONDUITS 3D _ O 1 .. ......... .� ..• = 2. WHEN HAND PLANING MULCH (HAY OR STRAIN) SHOULD BE UNIFORMLY SPREAD OVER SEEDED AREA WHAM 24 • U A i it t,74 ...... .' . • •r • J y„"'"" "•. a _ HOURS OF SEEDNG • • li • � j t 7 -� � %L�: ;� 3, DURING UMSIMTABLI CROIMN' SEASONS, WLR,TI WILL BE USED AS A 7[FIPORART COVER d1 SLOPES THAT ARE • J y 0. 4411 OR STEEPER, MULCH VILL BE ANCHORED. 4. EROSION AND SEDIMENT CONTROL DEVICES MUST BE NINSTALLEO AND INSPECTED PRIOR TO ANY GRADING OM 861E • Ix LJ .y:' • /J _ ` ) ,. KEAN CALL FOR AN INSPECTION. • N � TLf* 4. ? tMTr E& unrYyn a CONrF?.,, cRze t . _ ZO .V. . s~ - S, SEdN1ENT/EROBCNI DEVICES MUST BE CFIECIdD AFTER EACH SFORY EVENT. EACH dtMCf IS 10 BE MAINTAINED '21-00` Y'a k i lam ___ rAG)N - OR REPLACED F SEDIMENT A LSALATON HAS REACHED ONE HALF THE CAPACITY OF THE DE1Mi, • V IL.o t1, y 7.2S I. , S -tii - - ,--,D` 6 T A PA ROW • ZZ Z Z 0: BERI.r., / j ".. 1N<c4W6 N;_�.i. `.,y, P ex. C 6 rr : Q W 9P0 ELEV T10N9 SHOWN ARE Wlg1pNT CROtAb OR GU77Q LIE. UNLESS O1HIEkWISE VOTED W � ` p,< _ 7. CONTRACTOR SHALL OBTAIN A COPY OF THE REPORT OF SUBSURFACE NVESTICATION F AYAILABE AND FOLLOW • pp OMICS `* ;+ ). �¢. mom � _ I � �'Wq�'r�'.IM7WYf+,,PA[i y �` ,« _ � THE RECOIIEHDAIOW FOR GRADING AND COMPACTION. ( } � W Q Z O POST CONSTRUCTION _ ya,� d / „.. • a �..r, GRADING CONTRACT R 1 W ERWMSE NOTED. ALL EROSION CONTROL DEVICES ME THE Ii�ONgIBIJT'( OF THE : yW� IW�1 t • 6 PVC k; U FENCE..- ,, • 6. a I- .... a... .......w ......... a .............•.. $... } ...• .........................- -- 0 T BE ON FLb T TE JOB SITE. WW d ••••••• Y...., a • •K ••••••r••••••� _ A COPY OF THE APPROVED EROSION COTIRCL PLAN MUST a D: K d' A 75 INflLTRA N BASIN / - AD 48 / __-_ .__. - _�_.__ ^"` y , in"��+ $ a - • z O H'I 17' I i GOMPACTIONNOTE Z \_ 1. COMPACTION OF THE SOL UNDER PAVED AREAS AND NUILONG AND THE MAINTENANCE OF PROPER MOSIURIE • - \ \ Z 17.7Sx. CONTENT SHALL BE $O AS TO AT/ME' YE SIB% OF THE STANDARD PROCTOR MAUERUM MY DENSITY, : > O o N O 2. WHERE UTILITIES TO BE REMOVED} (FACT THE DFOOTPRNT OF THE NEW BIRJF� CONTRACTOR SNAIL EXCAVATE • € x`- - .. j AND REMOVE AN 71O M 2 FEET OF SOILS 70 1IE7t MOE OF AMID BELOW TO REMOVE Lmml 1TLd • - :r y, �aOS'.. ~- 90LL CLEAN SOILS SHALL SE UTILIZED FOR BAWILL COMPACTIONOFTIESf 90LS SHALL BE PERFORM N • l AOOONDANCE tMM SPECiIGVTEOIS AND SITE PLAN, \ /CID " EROSION CONTROL CONSTRUCTION SEQUENCE r -- -, - - 1. OBTAIN PLAN AL APPLICABLE APPROVAL AND on+ER PEW.TS. .M,Lu �1SI f [ I .` ~3 LDMF / 2, FLAG WORK LIMITS AND NAM TREES M BE SAVED, F ANY; IN PROTECTION : aQ e x ._..._._.__.... I - MEETING WITH IL9PEC10R ON SITE, i LEAST DI'E 1tEFNC POOR TO THE START OF ANY ��. `� � � �' 3. HOLD P�-caNsraucnaN A � � � s3 _._. I INY i. PAD I r - LAND DISTTRBNO ACTIVITY, I6.00 4. INSTALL CONSTAUC110N ENIRAVCES. TREE PROTECTION FENICE AND SILT TOM OTHER TEMPORARY E�EOSION • r Iuuuulllll' NT • e �t COFIROL DEVICES AS REQUIRED. ST ING / t k I°♦ / • S. INSTALL PINE-IAEANENT BASIN AND INFIL1RAl10N BASIN. • 6, N9PEIC1ION BY INSPECTOR. Abi Z r i , _ I d05 ' r,,•.......Z C N�JJNH FENCE sit 7. PERFORM STE CRACK AND INSTALL WO110NAL EROSION CONTROL MATERIAL AS NEEDED, • a )rt r `11 ^' CI4 4hi38 ALL • ' -`w" I IV '� � \®� INY. - - _ � DISTMiBEO AREAS THAT WILL � IDLE FOR t4 GAYS OR LONGER. • r _ .•_. ` (LEN � `�,�.. S. PROVOf TEMPORARY SEWING ON • IHIN- ... • 18 SEIL4tI1 TER PERMANENT CRASS SHALL EE N9TAl1FD FOR ALL AREAS AT FINAL GRADE Alb N FER1rI�. VIA • _ 6. - �:: _ j I f AND RESEED AS REQUIRED TO ESTABLISH AND MAINTAIN VIGOROUS STAND OF GRASS, • . i. a' ,• r „ 4 ADi it I s q; NS S'S R - H BLOCIN' x �Y k Y �` q l ` ' ! _,j' {,''� 10. INSTALL STORY ORAINA.TE SYSTEM AND INLET SEDIMENT TRAPS, ICsI BB INY.'- E t ,`*�•-.„1. 11. INSPECTION BY NSPECTOR, 1._ I INV. ro - t � 8" _ RDP t`k 12. COMPLETE CONSTRUUCRON AND FINAL GRADING. • A.7 BRICK.CT... z ' •. • _ i CONIC ' i iu 1 D"METAL - P✓L, ! DBOX . § / •. • iR;3uL1 PAD 1 7.4 /j)f MH �� INv / NAND RESEED AS REQUITED TO ESTABISHH 1u10 MINT MGOROU9 AD OF MASS. 3, PERMANENT GRASS SIALL BE INSTALLED FOR ALL AREAS AT FINAL GRADE AND IN IrVSON, FERIRJZE VM1ER • �(� rf MARINE E A r+ + J tJ1_.,�- - - RIM - 10.91' --OS� t1.1 ,•f: lALARM.[• �+� =� IXEU"UR I� � L�V 1 BLDG.' IL71.• , I .. _ - ,.,,,'"„' - '�".;�^'^"r$$,sq'.�f! - - BENCH 7.38' �� -` / - - - U14, AFTER OOMFIE110N OF CONSTRUCTION AND THE SITE IS STABILIZED, (A) REDO ALL ACCUMULATED SEDIMENT • �'j Z ORIGINS OF / - INV. 7.09 �- _ 1, S P ,� POST ' FROM PRE-TREATMETNT DETENTION BASINS AND DISPOSE OF ACCORDINGLY, (B) RDK JE ALL TEMPORARY EROSION CONTROL MEASURES. SMOOTH AREAS, APPLY MPROPMAIE GRASS AND (S APPROVAL BY 61SAMIGIR. • ." METAL - -'• •wv ,A `s I 1 NOT a �� ^ RAMP CO - . _ i • Z d M4IT0 I I I DI EROSION CONTROL NOTES: i O O EW O ..... ,. a S FOR 1R" F DRAIN P - _ • Of -1 sP NJ IS AOPOFRKIH OF E f l _ Of 1. FIELD W99MIDOW MAY REQUIRE A001710NAL SEDIMI NTATION AND EROSION COMIRM MEASURES AS: DEEMED ter' • �: - i - BLDG. 208 WAYNE 1 _ PARKING _ ; JJ _ . ... • .. ' BLOCK L RAMP & PARKING 1 fly y \ <; I '° ... L:' - ' Y ♦♦ iC rp, LQf-DING COCK WEST. 4 ! �. - - EOP - ON THE PLW 15 A VIOLAIM)N OF THE STAIE/HMUNTY EROdOM CONTROL O • L` ° ay + OUTLET ♦ T r r I - \ D4 ORDINANCE ERD 11USACBEYOND �T TO Fa LIMITS �N =1 _ .. tV--_W .. MHT6 r?. R.l N� ?p . F C • ,.I y- ,•��a..^M,�, .._ . .....� 1 _ E f _ _ - Mac' NT SHALL BE ALA011a ro RUN OFF SIM F MOU NT I5 TLACIE,D OFF SITE. IT MIDST BE CLEANED ; z >, 7.t 1 � ` O � I S , ln -:I •a. e,. _ ,.AD - t sr« \.tS - J Ci ♦.._ �ra. LVI $ __' .� 6� - - p,, ♦ _ t ) - - 4, MEN NAM PLANIIIO. MULCH (HAY OR STRAND SHOULD SE UNIFODLY SPREAD OVER SEEDED AREA WIN N 24 _I i4.6D ,Fa tVp �- c , a ♦ I TEL_ V •`r _ -✓ . F ° - - ; V.1S ) -r, 111 �y� _ "OURS OF SEEDING. MFi a•,••• �' S ; / / S. SERCSIpN TION TO �SEDI ENT T YOUR EDEVICES MUST 8E INSTALLED AND NEPEC70 W41 H ENOUGH LEAD TIME FOR AN • 4%) .. -� .. _� i s°' ',e• 14 `9"T PROKEN \ • O - �•S„ ° . - .$ - - - F•- CONCRETE AND I I 'I �.�._-.. -_ - ,� f • �` /Y� 8. CONTRACTOR 70 REMOVE ALL CONCRETE PADS. FOUNDATIONS AND UNDERGROUND STR OCTURSS. SEE SURVEY FOR • ■ ` Vl +,••.«. LE HG �' ASP (AL 7 AREA - ! r �' �` sa, 1 ? 917E FEATURES, V z L j =.y ` i ( d - �- s of MAINTENANCE NOTES • r� n sf' a _ f •:.IHI �,.- A':, a - s ILL i )) 1, _ gLK„� m 1. CONSIRUC710M AND MAINTENANCE OF ALL ERQ'uCN CMIF40L DEUCES OWL CONFORM TO THE STANDARDS SET : � O W ' 0 ♦ _ - 7B FORTH N THE NORTH CAROLNA DEPARTMENT OF ENVIRONMENTAL HEALTH AND NATURAL RESOURCES LAND QUALITY • � � �j SECTION EROSION AND SEDIMENT CONTROL PLANINO LAND KO M MANUAL � O \ - \ ...... ........ i .. wtsOO Few, ,� i - :3 J • c , 9 _.._ ._J ._ ' ,, p,` ,/ .�nr ` a' ?J OW OWNER IRES 0 IB E ANCE OF PERMREWON510LE FOR MAINTENANCE ANENT NT EROSION CONTROL EROSION I METHODS AIM COM IWCT*4 is : ��// Q S - ) /EROSION CONIROL DEMO MUST BE CHECKED AM EACH 6TICIRM EVENT. EACH DEVICE IS TO BE • NL S OOMFILEIE F ANY PERMANENT METHODS AM REOIIIED. • HW18 F�(J838 r, ._... f.. .... a' ti .3, SEDIENT _. MAODIIIGNAL DEUCES MUST BE NSTAILEDIF T ACCUMULATION HAS REACHED DINE ADdIIONNI LTHAIIE:LS HAVE MALF THE OEtIELOPED. CAPACITY a THE OEMi>E. • ... • Fi V t --•i - �__ _ 1LAM IS IjRMD DAYS FO M IS COLiLEDAY OF 0RC4RN0 COVEN SHALL BE PRONGED ON DNPOSED SLOPES � ��T ,I.,.IiI171111111tmmT� T CONIC �,>...,..... ANY PHASE Or ORADNO AMID PERMANENT GROUND COVER FCLT ALL OISITU� AREAS 1I11IM 1S WIpRIMO DAYS OR • JRIII�WIIIIIINpIIIIIIIIIIIIIIIIHiI IIIu'II�:I1Jl IIIL:.I 11916NIIIIIIdgg. .". .. _.. ._,,- y.� /�"-' �,�' Tor�r � , -T`-/ - 8+ `,�'^` 70 CALENDAR DAYS iOLLONNB COMPLETION OF CONSTIEVCT10M1 OR DEVELOPMENT FERTILIZE. VNLIER Alb YMITIW r` M1 � A VIGOROUS STAND OF GRASS, i r y /' S. SEGMENT SHALL BE REMOVED FROM 1000 THE MI ENNT FENCE ,MEN It BECOIES 0.S FEET DEEP AT THE • ^ . .. a _ FENCE TIE SEDIMENT FENCE SHALL SE REPAIRED OR REPLACED AS NECESSARY TO MAINTAIN A BARRIER. MH NO WETLANDS EXIST ON -SITE. WHEN THE ELEVATIONS REACH THE-iREATNENT OEMLE9 lD THE DIIpl91pMS INOCA7E0 ON 711E PLAINS. EX DI9 NOTE: 6. SEDNENT SHALL BE REMWEL FROM 1 E PRE : \ RIM = 9,72' -� y P 1 Ll - F1D1MN4T • ,� I I t - •. 6.20' • BENCH I_ 3 9Y7'7 '4 DROP-NLET V BOTTOM - -0.98' PHASE L POW A FL 7.00 USING INB(EL 13,00) AS A BENCIIlAN6C • CRATE - 8-Y PHASE II POD B EL 4,00 USING MHSI(EL 13.2.'O) AS A SENC0MW • I I ` PEASE II FINAL POD EL 7M USING MIDST EL 13,26 AS A KW MARK • a ENV. �'i.l" /(T t ) • y6 w ME M Jl[ �.. - - BE SIAT THE POD ORAVDORN PIPES DO NO NE]COIE ELOCJQ:D BY SEDIMENT, NT, THEY D06 CLEAR SEDIMENT DI RIP RAP OUTLET PROTECTION ♦,:. DROP INLET GATE 4 88' IMMEDIATELY 10 TDIMIEN810NS INDICATED ON THE PLANS Alb CLEAN PIPE OF BEONENT, • = ""�` �. E • GRATE . 6,4' _ INV. - 1.9' IN 1.16'. CONC -. WOOD c LOCATION LENIGIM w1w THONE9S OUTLET 20 10 6 1 24 TWIT 17 12 Y ?A OUTLET 32 10 6 24 TV 36 10 X 24 7. F SIDRNWIATER REMAIN N INFILTRATION BASIN FOR LONGER THAN 6 DAYS FROM THE RAIN EVENT. CLEAN SAM • ' •.>.�� ..r .. TO DIMENSION INDICATED ON THE PLANS, BE SUE 10 REMOVE SOIL TO 4 INCHES DEEPER TIME DESIGN DIMENSIONS • MID REPLACE TAM 4 NICHES OF CLEAN SAND, STORM DRAINAGE NOTES : 0 ; � GRADING LEGEND STORM DRAINAGE COMPLIES vII H ARTICLE 13.3 OF THE UNIFIED DEVELOPMENT ORGwAmm ^i • W h � • • 4 4 OUR - \ �•� - �X . 3 HEIGHT O CHANNELL + 34.50 - PROPOSED SPOT ELEVATION i J ^aa, 1 ♦ CONC a 1n4 2/ \ 1 44.50 - TOP / BOTTOM OF OURS ® : U h O 1� \ 1 D X _ UTILITY CONSTRUCTION KEY + 44,50 • O I a 4 MARICULTURCC DG ' V RCP g r ` BLDG. d INY , h DI id .ESTALL SEDIMENT MFASNtANO STICK GRATE = 4.62' ' 1 % INV 0.21` �t `♦ _rv. ! i - - g < lyl,, EROSION CONTROL LEGEND F 1 yP QINLET PROIECTIOI ,.,.,..--W - SIINTHM MAT MIN 7PSF PON SABLE SHEAR STRESS I t t 10 MH -TIP..- - TREE PROIEC11O1 FENCE - RF RAP ® ura Mnall r IDII I P If \. M11 - , - d MIN TIN O NH OUiLET s r CONIC y r. END - COIS'INUCTION E117RANCE I I.I ' I I - UNITS OF CONSIRU07M • O PIPE i ' PAD PIPE • • • • RIC R _U 4 h I �6 u r I i co 2Z 2 4 0 • • • ♦ W/I Z !T'� 6 FW1 UW O Z VI r O v ^^ • / \ • U, • I� • X 0 N 2 W hl t I ; I D MH O O a. �� �L` INV= -121 } ` % n • L I - O I, $F- SILT FENCE HORSESHOE INLET PROlEC110MMIN Y i AL+4SM y - FUTURENOT I !, SLT FENCE OUTLET GRi1pHIC SCALE : IN :, _..".. r --DO-- - DIVERSION DITCH : t0 0 stOMai CONTRACT)_ cov- CHEW DAM a' SYSTEM tbB .j -- s--"-- • O - 3^, - - ` - - mm J ALL OOVSRNACROW SFMLL BE N ACOORDMICE NI7N ADM CAROLNW 1 t..e • eo !L r'r= EROSIONGRADING IO & EROSION CONTROL PLAN - PHASE I • TOTAL • n - 1zfQ6r!c' 9 23;31;w3 t1 ;L5ph1 I r•- 771T III, Ne • SHEET NOTES 1. ALL DDNDLIar AND ANY SUBPROVED oy HE LOCAL RUC BALL BE PQVipM1EA N ACCORDANCE MIM TERSE PLAINS AND siPeaFlcsTloNs APPROVED er TINE LOCAL Auhldtln. 2. ALL DEMOLITION AND SUBSEQUENT COMSiRUCTIOK TO BE N ACCORDANCE WITH PERMI KSM AND APPLI-QM • f0A SOP STATE, COUNTY, AND LOCAL CODES. 3. THE CONTRACTOR SHALL OBTAIN AM PAY FOR ALL INSPECTION& CERiS1CATION% EQUPMEMT ETG THAT WAY III E A / .�. REQAMRED. • �`--t..... � i I - •,-' EOP 4. IF DEPARTURES FROM THE SPECIFICATIONS OR ORAVI ARE DEEMED NECESSARY BY THE CONTRACTOR. DETAILS • zs _...-" - `. - _ - ... - __.. _ FROM SUCH OCONTRACT AND REASONS THEREOF SHALL BE SUBMITTED TO THE OMER DOCVI SMALL BE WADE **n WRITTEN PERMISSION THE ND OEP � - , / �.. EOP FROM 11E CONTRACT WI THE OF lIE 01IMR R-la .. S. COSTING IMPROVEMENTS DAMAGED OR DESTROYED DURING CONSTRUCTION SHALL BE REPLACED OR RESTORED 70 • THEIR ORIONAL CONDITION, AM TO THE SATISFACTION OF THE OWNER OF THE IMPNOVPrEHrB,INV• ; IL CO NIACTGII SMALL REFER TO ARCMTECTURK PLANS FOR DETAILS OF BULDINGS AND VALOiG DMENOI • , � 7. ENGINEER AND/OR OWNER DISCLAIM MY ROLE IN THE CONSTRUCTION MEANS AD/OR METHODS ASSOCIATED WITH a �,•`r` TIE PROJECT AS SET FORTH IN DOM PLANS. � SEA 4 & CONTRA" SHALL MAINTAIN AN 'AS BUILT' SET OF DRAWINGS TO RECORD THE ACTUAL LOCATION OF ALL i _ Isom/ - ti� .6-Ifi' I 4 ! ', - -.;�:. / - K, •' PIPING PRIOR TO CONCEALMENT, MAIN,= @WALL BE GIVEN TO RIE OWNER UPON COMPLETION OF THE PROJECT • l i MOTH A COPY OF THE TRANSMIT LETTER (FOR NEGOID NKEEPINfi) TO THE ENfiNEERt. 9. THE CONTRACTOR IN RESPONSIBLE FOR FIELD VERFYII6 THE ACIVAL AND EILACT LOCATION, SIZE AND MATERIAL �, COMPOSITION OF ANY EXRSTNC METER OR SEINER SERVICE PROPOSED FOR CONNECTION OR ARSE (N INS PROJECT. • THE RELOCATION OF PAY UTILITY SERVICES NEQLMM TO COMPLETE ANY PORIION OF THESE CONBT0.ICIM PLANS • y -- - .. SMALL BE THE MMPONSWILITY OF THE CONTRACTOR • / ,4 - ALS : - ,' b /! !� - - - -- 't �, •`. z �xs.,cTf� �,--cux -,s. - - ....: - p RUBBLSH CWSEO BY , HIS EMPLOYEES. OR HIS WORK. ALL DENNIS SMALLREMOVED FROM THE TEON A ALL IS" KEEP THE PMRSES FREE FROM ACCUMULATIONS OF WASTE ». CONTRACTOR MU9� AT Y BASM _conic • 1 £ \ `.M..:. j II!. FINK ACCON THE IFPROEPTANCE OF WIXZN BY THE LOCAL CQVFISWIIG AUTHORITY SHALL NOT BE WIDE WRITE ALL 7IDMIK SOW '�� - . - - ADS ¢ i _ 'VFD PLAN IS OOLpLET D, ! • I� ta1.1 h fr � + 11 � r 12, CONTRACTOR SHALL CALL "MONTH CAROLNA ONE CAW AT LEAST 48 HOURS PRIOR TO BEGINNING CONSTRUCTION • - �ll C ! 1 ; ..:r:.3.x: rz.�cz-,zz���sw rvl.>_ .ss�ms>.:�s�c�szc�i:yam- -• IT,s,.,x.a. sxY>=,��u�,.>;G�c»+c== xs�.. W `. { To HAVE E=TNo UTRITEB LOCATED. CONTRACTOR TO CCNTACT ANY LOCAL UTILITIES -zz- ` _ _ ._ ? - +y- - `.. - �! _ . THAT PROVIDE THOR OWN DISCREPANCIES TOO THE ENGINEER. INCEPINIDENT LOCATOR SERAI CONTRACTOR SHALL MEGIA1lLT REPORT ANY : � v 13. ANY EXCAVATION MUST SE FILED N AND TAN I AT THE CONCLUSION OF EACH WORK PERIOD, AND EOUPRENT � c9 19f _ -, _ AND SUPPLIES. RETURNED TO THE COMSTRUCDOM STA004 AREA. • W L r L' I --_' _ s r'- a.• AD� 1 a H 4 1/ .xiL-.� c `ti tiL tiy3J/ `r I i GENERAL GRADING NOTES za, -__ } i,,. 5 _ �� / - _ _ 1. ALL DIMENSIONS MO GRADES SHONNN THE PLANS SMALL BE FELD ti BY I E CONTRACTOR PRIOR W � A � i .r Cps �=° ` //,�- - _ -, - -- ._ '�"'\\ DOFLSTRIICTTOM, CONTRACTOR SHALL Fp RITE ENGIAE'E1R P ANY OISfP PNOR TO PROC®NG WITH : •1 p' �Ii f� WOOS:' - - I �. OONSMLICTTON FOR NECESSARY MAN OR OADE CHANCES No EXTRA OO FEMSATIOi SMALL BE PAD TO • �L s r • • - MH 47 ! ....... _.. _.. ... _ - _.. Mr_ _ �• _ 7 CONTRACTOR FOR ANY WORK DOE OL E ro ONENSIOUS OR GRADES SHOWN INGO REWLY ON THESE PLANS F SUCH 15 - _ riF • li NOTIFICATION HAS NOT SEEM GIVEN. V)• !�[I a SOIL DR .•".. '•��--'- , % J •.,,.• • ' na " ` ,,.�,�, 1' t' +i 3 2. RHEA HAND PLANTING, MULCH (HAY OR STRAIN) SHOULD SE LRIFORMLYSPREAD OVER SEEDED AREA WITHIN 24 � � �. ��LI E MH -_ _ / /r Yi////iii //.. .. zr iL /i.y n y ,,. °`�. , �,,, -- ._ HOURS OF SEEDED. • III. i • S. OVRIW UNSUITABLE MOVING SEASONS, "CH WILL USED AS A TEMPORARY COVER ON OWN THAT ARE EEPER. MOLCI W L SE ANCHORED. - ° 4;1 OR ST� # j • 4. EROSION AND SEDIMENT CONTROL DEVICES MUST SE INSTALLED AND INSPECTED AW TO ANY GRADING ON SITE. • Ry Lu PLEASE CALL FOR AN INSPECTION. • is = ...' 1i f AD29 x ♦ ' yl WAYNE WEST BLOC. r - C126 f _, _ .�'d S. sEDINErT oEv( MUST BE CiQO4D AFTER EACH STORM EVENT. EACH DEVICE Is ro llE MAINTAINED • 3 - W�ONE HALF THE CAPACITY OF /E �.QD i/ �'0 j y ADS-���-g^- -_. \� 6. SPOT ELEVA11pNS SFIORNT AA�ELIEH DRONING OR 01lTTER FROM' LINE.LNAESS OTfRRRSf TIDIED. • W 2cc / �1'.:``, F �IiIIPoWlllkillllltllih III I. "' _'/f CONC i O W W .PIED POST At _.___- "' 7. CONTRACTOR SHALL OBTAIN A DOPY OF THE REPORT OF 91J6$LNlFAGE MVE8110A710N (F AVAILABLE) AND Fd10K • t] ,d / THE A FOR W f 3 ! RECOMMERO TONS GRA1N0 AND OOPACTION. • Oc ` tr CHAIN 1 ELI ALL ER090N CON1R0. DEVICES ARE NNE IHESP0N18>BLIiY OF THE • W FENCE9 A COPY OF 71E APPROVED EROSION COMIIROL PLAN MIST BE ON FTI.E AT TIE .GIB SITE. 6 • (V COMPACTION NOTE Z qq 'r _ - - COMPACTION OF THE SOL UNOFA PAVED AREAS AND BOLDING AD THE HANTENAMCE OF PROPER IIDIBTUE � j � \ N \ YAIDMIM SHALL 1E So As ro ACHIEVE Is1l OF THE STANDARD PROCTORDRY DENSITY. • O V4 O o - - Ar gil,amlp,j t WHERE UTIIITES (WTI REMO�) IMPACT THE FOOTPRINT OF THE AND 1 SENOR SHALL EICCATATE �. ...-. - ADDITIONALABLE SOILS. CLEAN SOILS SHALL B[ V11LRW FOR BACfflli. COMPACTION OF THESE SOILS SHALL ME PERFORM N � / 1 - _ ACCORDANCE WITH SPECIFICATIONS AD SITE PLAN. joy r F ; e. Y;eEROSION CONTROv CONSTRUCTION o m 1 OBTAIN DAL PERK� r w - _7 - 1:' 1 ', I �/J £r+�:.\--'•_�f I � t;9tJi; `- � 2. FLAG NONE LY15 AND MARK TREES TO BE SAVED. F ANY. FOR PR61EC110N. PAD ,r. dr- :Q. �15 3. HOLD P RE -CONSTRICTION hWI NG WITH IIPECTOR ON DIE AT LEAST ONE VM FRIER TO I E START OF AIY •CC C3LAD D4ILMANN ACTIVITY. • _ '?-' ..;'PAD \ i a �: I • • - �-. „� - ` _�,y • I j ° 4 7RAFICE4, TREE PROTECTION FENCE AND SLT FENCE; OTIEA TEMPORARY MOON A A INSTALL PILE -TREATMENT BASIN AND INFILTRATION BASIN. C INSPECTION BY NSPECTR. FE1VC£ 7, PERFORM SITE G RAOING, AND INSTALL AOOTIONAL ER0810M CONTROL MA70M AS i O 8. PROVIDE TEMPORARY SELOMQ ON ALL DISTLINSED AREAS THAT RILL BE ION FOR 14 DAYS OR LONGERR. 9. PERMANENT GRASS SHALL BE INSTALLED FOR ALL AREAS AT FINAL GRACE AND IN SEASON. FERn'� RATER � AND RESEED AS REQINRED TO ESTABLISH AND MAINTAIN VTCOOIS STAND OF GRASS, • "mac"""'** 10, INSTALL STORM DRAINAGE SISTEM AND INLET SEDIMEXT TRAPS. 1, WJWECTOON BY CON iSPECON • j( 1: 4 It S AND FINAL GRACING. • W - [Sox I& PERMANENT GRASS SHALL BE INSTALLED FOR ALL AREAS AT FINAL GRADE AND M SEASON. �� METIER • _ - iur J AND RESEED AS REMARED TO ESTABLISH AND RAMGOROUS STAND OF GRASS. : W Q14 - 1C AFTER COMPLETION OF CONSTRUCTION AM INE SITE WI STABILIZED, T(�A)(SR}EMOVE ALL ACCI.WA ATED sEOMENT � � O ' •.... _.. '• + CONTRFROM OL MEAS FART DETENT�BS, INSAPAPPLY APPROPRIATEAND DISPOSE GR AND OBTAIN APPROVAL BY CTM • r`"` sR400TH• _1 _ a • O z EROSION CONTROL NOTES: $- -... 1IgPEt110M5 MAYADDITIONAL SEDIENTATIOH AMID EROSION CONTROL MEASURES AS DEEMED NECESSARY BY THE • V � K INSPECTOR. \l U • • • IE/DOIR'1 • O oil 2. ANY CRADID BEYOND THE LNNIIS SHOWN ON THE PLAN IS A VIOLATION OF THE STA TY EROSION OOtl1TOL ONF OROINANICE AHD N9 9UB.ECT lO A FINE. • OC day C !. NO SEDIMENT SHAH BE ALLOWIED TO RUN OFF SIZE F SEDIMENT IS TRACKED OFF SITE, ITMUST BE CLEANED i G f y1 @'--, IMMEDIATELY. • iL • 4. RHEM HAND PLANTING, MULCH (HAY OR STRAW] 90" BE LINFORLY SPREAD OVER SEEDED AREA W47M 24 Hd1RS OF SEEDING, • a EROSION AaD $EAIIENT CONTROL pE►1GEg MUST SE INSTALLED AND HNBPECIED 1M1H ENOUGH LEAD TIME FOR AN 4 M9BOO � PEC110N 10 MFFT Yp1R RDULL (� SiCONlt FEATREMOVE ALL CONCRETE PADS.FCURDATIONS AND IJNDEROROIJND STRUCTURES. SEE 91MRVEY FOR TRACTOR TO y u L t 1l 1 �o MAINTENANCE NOTES o F O 4 yt^\ 1. CONSTRICTION AND MAINTENANCE OF ALL EROSION CONTROL OEMCES SMALL CONFORM TO THE STANDARDS SET • W ' - - FORTH IN THE NORTH CAR0.DIA OEPARTNEMT OF DNViIRM ENTAL. HEALTH AND MARINA RESQUIOM LAD QLA TY • W ~ SECTION EROSION AND SEDIMENT CONTROL PLANING LAD DESIGN MANUAL.. • � .- 2 THE CONTRACTOR IS RESPONSIBLE FOR MAINTENANCE OF EROSION CONTROL METHODS CITING CONSTRUCTION, AND • 2 ... `2" CANER NS RF,SPOq M FOR MAINTENANCE OF ALL PERMANENT EROSION CONTROL METHODS AFTER OO MTRIC710H WI • Q COMPLETE, F ANY PERMANENT METHODS ARE AEIXARED. i i • = 3. SEOIIENIT/ERp!}ON CONTROL DEVICES MIST BE CHECKED AFTER EACNI STORM EVENT. EAUF DEVICE WI TD SE � ® •.. 'µ4'.,. ��"�"`•:,,.-_ `" - MAINTAINED OR REPLACED F OWBADIT AOLtMULATION HAS REACHED ONE HALF THE CAPACITY OF THE OEWX ADDITIONAL DEVICES MUST BE INSTALLED F AMPONAL CK NMELS NAVE DEVELOPED ' _ ` • V 4. GROUND COVER SHALL BE PROVIDED ON EXPOSED SLOPES WITHIN 16 MORIIIO DAYS FOLLOWING COMPLETION OF • ANY MMWX OF GRAGNG AND PERMANENT GROUND COVER FOR ALL DISTURBED AREAS WPM 13 MGRIOD DAYS OR • 30 CAIDIDAR DAYS FO LOIWID COMPLETION BE CONSTRUCTION OR DEVELOPMENT_ FERUME, V ATER AND MAINTAIN • A MORDLIS STAND OF GRASL S. SEDIMENT SHALL BE REMOVED FROM SEND THE SEDIMENT FENCE WREN IT BECOMES OA FEET DEEP AT THE FENCE. THE SEDIMENT FENCE SHALL BE REPAIRED OR REPLACED AS NECESSARY TO MAINTAIN A BARRIER. • REMOVED FROM THE PRE WIEN THEELEVATIONSBE REACHTHEFOyONRIW-TREATMENT KWM TO THE ONpMMONS IMMATEO ON THE PLANS, SEDIMENT SHALL c PHASE 1: POND A EL 7.0E USING MHB(EL 1&00) AS A BENCHMARK � 4 PHASE 1: POD B EL 4,00 LOW MN31(EL 13.25) AS A BENCHMARK • PHASE F FINE POND EL 7.28 USING MI IA28) AS A BENCHMARK • • BE SURE THAT THE POD ORAIDORN PIPES 00 NOT BECOME BLOCKED BY SEDIMENT. F THEY 00, CLEAN SEDIMENT • IMMDIATELY TO TE DMMSONS INDICATED ON THE PLANS AND CLEAN PPE OF SEDIMENT • 7. F STOTMNAIER REMAIN IN INFILTRATION BAN FOR LONGER THAN a DAYS FROM TIE RAIN EVENT, LEAN BASIN • ,4" �g TO DIMENSION 04NCAlED CM THE PLANS, BE SURE ro REMOVE 90L TO 4 INCHES. DEEPER TwTHANOEM ONENEWd : z n „ AND REPLACE WITH 4 MOMSAND.2 OF CLEAN SA. W STORM DRAINAGE NOTES : /fit o � • W �N NOTE: STOW DRANAOE COMPLIES WITH ARTKIE 13.3 OF THE LINIIED DEVELOPMENT ORDI AWL i < 4 NO WETLANDS EXIST ON-SITE.i - z 5 GRADING LEGEND o U 0 RIP RAP OUTLET PROTECTION • 0 In • I� °v + 34.50 - PROPOSED SPOT FI,EVA110N • 44.50 • 4 OF �oovtl' 44:50 - TOP / BOTTOM OF CURB i W I ..... + Hzz • J : z U • Z . A` O D Z EROSION CONTROL LEGEND W d • R r • /. \ • R wk -INLET PRO11e:CTd1 - SYNIFETIC MAT WITH 2PSF PERMISSIBLE SHEAR STRESS • m IJ E IF L 3m I -11>- - TREE PROTECTION FENCE .Y r}y - RP RAP c n 7 • �0 CONSTRUCTION ENTRANCE - LILTS OF CONSTRUCTION • D r h • -SF- -SILT FENCE -SILT FENCE OUTLET GRAPFIIC SCALE ' • - - CHECK DAM M a s : Gp �- - DIVERSION DITCH i O s •MIA ALL COMSTRIKTDN SMALL BEN 1 1a•! . 40 R. ACCORDANCE RTH MORN 6NOLM • masNON croN►Ra GRADING & EROSION CONTROL PLAN - PHASE It • TOTAL • n LOCATION LONGER WImH TIHIg9NEss IN ouTNET 33 Lo a 24 CU4S 1a a 24 "mac"""'** 10, INSTALL STORM DRAINAGE SISTEM AND INLET SEDIMEXT TRAPS. 1, WJWECTOON BY CON iSPECON • j( 1: 4 It S AND FINAL GRACING. • W - [Sox I& PERMANENT GRASS SHALL BE INSTALLED FOR ALL AREAS AT FINAL GRADE AND M SEASON. �� METIER • _ - iur J AND RESEED AS REMARED TO ESTABLISH AND RAMGOROUS STAND OF GRASS. : W Q14 - 1C AFTER COMPLETION OF CONSTRUCTION AM INE SITE WI STABILIZED, T(�A)(SR}EMOVE ALL ACCI.WA ATED sEOMENT � � O ' •.... _.. '• + CONTRFROM OL MEAS FART DETENT�BS, INSAPAPPLY APPROPRIATEAND DISPOSE GR AND OBTAIN APPROVAL BY CTM • r`"` sR400TH• _1 _ a • O z EROSION CONTROL NOTES: $- -... 1IgPEt110M5 MAYADDITIONAL SEDIENTATIOH AMID EROSION CONTROL MEASURES AS DEEMED NECESSARY BY THE • V � K INSPECTOR. \l U • • • IE/DOIR'1 • O oil 2. ANY CRADID BEYOND THE LNNIIS SHOWN ON THE PLAN IS A VIOLATION OF THE STA TY EROSION OOtl1TOL ONF OROINANICE AHD N9 9UB.ECT lO A FINE. • OC day C !. NO SEDIMENT SHAH BE ALLOWIED TO RUN OFF SIZE F SEDIMENT IS TRACKED OFF SITE, ITMUST BE CLEANED i G f y1 @'--, IMMEDIATELY. • iL • 4. RHEM HAND PLANTING, MULCH (HAY OR STRAW] 90" BE LINFORLY SPREAD OVER SEEDED AREA W47M 24 Hd1RS OF SEEDING, • a EROSION AaD $EAIIENT CONTROL pE►1GEg MUST SE INSTALLED AND HNBPECIED 1M1H ENOUGH LEAD TIME FOR AN 4 M9BOO � PEC110N 10 MFFT Yp1R RDULL (� SiCONlt FEATREMOVE ALL CONCRETE PADS.FCURDATIONS AND IJNDEROROIJND STRUCTURES. SEE 91MRVEY FOR TRACTOR TO y u L t 1l 1 �o MAINTENANCE NOTES o F O 4 yt^\ 1. CONSTRICTION AND MAINTENANCE OF ALL EROSION CONTROL OEMCES SMALL CONFORM TO THE STANDARDS SET • W ' - - FORTH IN THE NORTH CAR0.DIA OEPARTNEMT OF DNViIRM ENTAL. HEALTH AND MARINA RESQUIOM LAD QLA TY • W ~ SECTION EROSION AND SEDIMENT CONTROL PLANING LAD DESIGN MANUAL.. • � .- 2 THE CONTRACTOR IS RESPONSIBLE FOR MAINTENANCE OF EROSION CONTROL METHODS CITING CONSTRUCTION, AND • 2 ... `2" CANER NS RF,SPOq M FOR MAINTENANCE OF ALL PERMANENT EROSION CONTROL METHODS AFTER OO MTRIC710H WI • Q COMPLETE, F ANY PERMANENT METHODS ARE AEIXARED. i i • = 3. SEOIIENIT/ERp!}ON CONTROL DEVICES MIST BE CHECKED AFTER EACNI STORM EVENT. EAUF DEVICE WI TD SE � ® •.. 'µ4'.,. ��"�"`•:,,.-_ `" - MAINTAINED OR REPLACED F OWBADIT AOLtMULATION HAS REACHED ONE HALF THE CAPACITY OF THE OEWX ADDITIONAL DEVICES MUST BE INSTALLED F AMPONAL CK NMELS NAVE DEVELOPED ' _ ` • V 4. GROUND COVER SHALL BE PROVIDED ON EXPOSED SLOPES WITHIN 16 MORIIIO DAYS FOLLOWING COMPLETION OF • ANY MMWX OF GRAGNG AND PERMANENT GROUND COVER FOR ALL DISTURBED AREAS WPM 13 MGRIOD DAYS OR • 30 CAIDIDAR DAYS FO LOIWID COMPLETION BE CONSTRUCTION OR DEVELOPMENT_ FERUME, V ATER AND MAINTAIN • A MORDLIS STAND OF GRASL S. SEDIMENT SHALL BE REMOVED FROM SEND THE SEDIMENT FENCE WREN IT BECOMES OA FEET DEEP AT THE FENCE. THE SEDIMENT FENCE SHALL BE REPAIRED OR REPLACED AS NECESSARY TO MAINTAIN A BARRIER. • REMOVED FROM THE PRE WIEN THEELEVATIONSBE REACHTHEFOyONRIW-TREATMENT KWM TO THE ONpMMONS IMMATEO ON THE PLANS, SEDIMENT SHALL c PHASE 1: POND A EL 7.0E USING MHB(EL 1&00) AS A BENCHMARK � 4 PHASE 1: POD B EL 4,00 LOW MN31(EL 13.25) AS A BENCHMARK • PHASE F FINE POND EL 7.28 USING MI IA28) AS A BENCHMARK • • BE SURE THAT THE POD ORAIDORN PIPES 00 NOT BECOME BLOCKED BY SEDIMENT. F THEY 00, CLEAN SEDIMENT • IMMDIATELY TO TE DMMSONS INDICATED ON THE PLANS AND CLEAN PPE OF SEDIMENT • 7. F STOTMNAIER REMAIN IN INFILTRATION BAN FOR LONGER THAN a DAYS FROM TIE RAIN EVENT, LEAN BASIN • ,4" �g TO DIMENSION 04NCAlED CM THE PLANS, BE SURE ro REMOVE 90L TO 4 INCHES. DEEPER TwTHANOEM ONENEWd : z n „ AND REPLACE WITH 4 MOMSAND.2 OF CLEAN SA. W STORM DRAINAGE NOTES : /fit o � • W �N NOTE: STOW DRANAOE COMPLIES WITH ARTKIE 13.3 OF THE LINIIED DEVELOPMENT ORDI AWL i < 4 NO WETLANDS EXIST ON-SITE.i - z 5 GRADING LEGEND o U 0 RIP RAP OUTLET PROTECTION • 0 In • I� °v + 34.50 - PROPOSED SPOT FI,EVA110N • 44.50 • 4 OF �oovtl' 44:50 - TOP / BOTTOM OF CURB i W I ..... + Hzz • J : z U • Z . A` O D Z EROSION CONTROL LEGEND W d • R r • /. \ • R wk -INLET PRO11e:CTd1 - SYNIFETIC MAT WITH 2PSF PERMISSIBLE SHEAR STRESS • m IJ E IF L 3m I -11>- - TREE PROTECTION FENCE .Y r}y - RP RAP c n 7 • �0 CONSTRUCTION ENTRANCE - LILTS OF CONSTRUCTION • D r h • -SF- -SILT FENCE -SILT FENCE OUTLET GRAPFIIC SCALE ' • - - CHECK DAM M a s : Gp �- - DIVERSION DITCH i O s •MIA ALL COMSTRIKTDN SMALL BEN 1 1a•! . 40 R. ACCORDANCE RTH MORN 6NOLM • masNON croN►Ra GRADING & EROSION CONTROL PLAN - PHASE It • TOTAL • n LOCATION LONGER WImH TIHIg9NEss IN ouTNET 33 Lo a 24 CU4S 1a a 24 ONF OROINANICE AHD N9 9UB.ECT lO A FINE. • OC day C !. NO SEDIMENT SHAH BE ALLOWIED TO RUN OFF SIZE F SEDIMENT IS TRACKED OFF SITE, ITMUST BE CLEANED i G f y1 @'--, IMMEDIATELY. • iL • 4. RHEM HAND PLANTING, MULCH (HAY OR STRAW] 90" BE LINFORLY SPREAD OVER SEEDED AREA W47M 24 Hd1RS OF SEEDING, • a EROSION AaD $EAIIENT CONTROL pE►1GEg MUST SE INSTALLED AND HNBPECIED 1M1H ENOUGH LEAD TIME FOR AN 4 M9BOO � PEC110N 10 MFFT Yp1R RDULL (� SiCONlt FEATREMOVE ALL CONCRETE PADS.FCURDATIONS AND IJNDEROROIJND STRUCTURES. SEE 91MRVEY FOR TRACTOR TO y u L t 1l 1 �o MAINTENANCE NOTES o F O 4 yt^\ 1. CONSTRICTION AND MAINTENANCE OF ALL EROSION CONTROL OEMCES SMALL CONFORM TO THE STANDARDS SET • W ' - - FORTH IN THE NORTH CAR0.DIA OEPARTNEMT OF DNViIRM ENTAL. HEALTH AND MARINA RESQUIOM LAD QLA TY • W ~ SECTION EROSION AND SEDIMENT CONTROL PLANING LAD DESIGN MANUAL.. • � .- 2 THE CONTRACTOR IS RESPONSIBLE FOR MAINTENANCE OF EROSION CONTROL METHODS CITING CONSTRUCTION, AND • 2 ... `2" CANER NS RF,SPOq M FOR MAINTENANCE OF ALL PERMANENT EROSION CONTROL METHODS AFTER OO MTRIC710H WI • Q COMPLETE, F ANY PERMANENT METHODS ARE AEIXARED. i i • = 3. SEOIIENIT/ERp!}ON CONTROL DEVICES MIST BE CHECKED AFTER EACNI STORM EVENT. EAUF DEVICE WI TD SE � ® •.. 'µ4'.,. ��"�"`•:,,.-_ `" - MAINTAINED OR REPLACED F OWBADIT AOLtMULATION HAS REACHED ONE HALF THE CAPACITY OF THE OEWX ADDITIONAL DEVICES MUST BE INSTALLED F AMPONAL CK NMELS NAVE DEVELOPED ' _ ` • V 4. GROUND COVER SHALL BE PROVIDED ON EXPOSED SLOPES WITHIN 16 MORIIIO DAYS FOLLOWING COMPLETION OF • ANY MMWX OF GRAGNG AND PERMANENT GROUND COVER FOR ALL DISTURBED AREAS WPM 13 MGRIOD DAYS OR • 30 CAIDIDAR DAYS FO LOIWID COMPLETION BE CONSTRUCTION OR DEVELOPMENT_ FERUME, V ATER AND MAINTAIN • A MORDLIS STAND OF GRASL S. SEDIMENT SHALL BE REMOVED FROM SEND THE SEDIMENT FENCE WREN IT BECOMES OA FEET DEEP AT THE FENCE. THE SEDIMENT FENCE SHALL BE REPAIRED OR REPLACED AS NECESSARY TO MAINTAIN A BARRIER. • REMOVED FROM THE PRE WIEN THEELEVATIONSBE REACHTHEFOyONRIW-TREATMENT KWM TO THE ONpMMONS IMMATEO ON THE PLANS, SEDIMENT SHALL c PHASE 1: POND A EL 7.0E USING MHB(EL 1&00) AS A BENCHMARK � 4 PHASE 1: POD B EL 4,00 LOW MN31(EL 13.25) AS A BENCHMARK • PHASE F FINE POND EL 7.28 USING MI IA28) AS A BENCHMARK • • BE SURE THAT THE POD ORAIDORN PIPES 00 NOT BECOME BLOCKED BY SEDIMENT. F THEY 00, CLEAN SEDIMENT • IMMDIATELY TO TE DMMSONS INDICATED ON THE PLANS AND CLEAN PPE OF SEDIMENT • 7. F STOTMNAIER REMAIN IN INFILTRATION BAN FOR LONGER THAN a DAYS FROM TIE RAIN EVENT, LEAN BASIN • ,4" �g TO DIMENSION 04NCAlED CM THE PLANS, BE SURE ro REMOVE 90L TO 4 INCHES. DEEPER TwTHANOEM ONENEWd : z n „ AND REPLACE WITH 4 MOMSAND.2 OF CLEAN SA. W STORM DRAINAGE NOTES : /fit o � • W �N NOTE: STOW DRANAOE COMPLIES WITH ARTKIE 13.3 OF THE LINIIED DEVELOPMENT ORDI AWL i < 4 NO WETLANDS EXIST ON-SITE.i - z 5 GRADING LEGEND o U 0 RIP RAP OUTLET PROTECTION • 0 In • I� °v + 34.50 - PROPOSED SPOT FI,EVA110N • 44.50 • 4 OF �oovtl' 44:50 - TOP / BOTTOM OF CURB i W I ..... + Hzz • J : z U • Z . A` O D Z EROSION CONTROL LEGEND W d • R r • /. \ • R wk -INLET PRO11e:CTd1 - SYNIFETIC MAT WITH 2PSF PERMISSIBLE SHEAR STRESS • m IJ E IF L 3m I -11>- - TREE PROTECTION FENCE .Y r}y - RP RAP c n 7 • �0 CONSTRUCTION ENTRANCE - LILTS OF CONSTRUCTION • D r h • -SF- -SILT FENCE -SILT FENCE OUTLET GRAPFIIC SCALE ' • - - CHECK DAM M a s : Gp �- - DIVERSION DITCH i O s •MIA ALL COMSTRIKTDN SMALL BEN 1 1a•! . 40 R. ACCORDANCE RTH MORN 6NOLM • masNON croN►Ra GRADING & EROSION CONTROL PLAN - PHASE It • TOTAL • n LOCATION LONGER WImH TIHIg9NEss IN ouTNET 33 Lo a 24 CU4S 1a a 24 ,4" �g TO DIMENSION 04NCAlED CM THE PLANS, BE SURE ro REMOVE 90L TO 4 INCHES. DEEPER TwTHANOEM ONENEWd : z n „ AND REPLACE WITH 4 MOMSAND.2 OF CLEAN SA. W STORM DRAINAGE NOTES : /fit o � • W �N NOTE: STOW DRANAOE COMPLIES WITH ARTKIE 13.3 OF THE LINIIED DEVELOPMENT ORDI AWL i < 4 NO WETLANDS EXIST ON-SITE.i - z 5 GRADING LEGEND o U 0 RIP RAP OUTLET PROTECTION • 0 In • I� °v + 34.50 - PROPOSED SPOT FI,EVA110N • 44.50 • 4 OF �oovtl' 44:50 - TOP / BOTTOM OF CURB i W I ..... + Hzz • J : z U • Z . A` O D Z EROSION CONTROL LEGEND W d • R r • /. \ • R wk -INLET PRO11e:CTd1 - SYNIFETIC MAT WITH 2PSF PERMISSIBLE SHEAR STRESS • m IJ E IF L 3m I -11>- - TREE PROTECTION FENCE .Y r}y - RP RAP c n 7 • �0 CONSTRUCTION ENTRANCE - LILTS OF CONSTRUCTION • D r h • -SF- -SILT FENCE -SILT FENCE OUTLET GRAPFIIC SCALE ' • - - CHECK DAM M a s : Gp �- - DIVERSION DITCH i O s •MIA ALL COMSTRIKTDN SMALL BEN 1 1a•! . 40 R. ACCORDANCE RTH MORN 6NOLM • masNON croN►Ra GRADING & EROSION CONTROL PLAN - PHASE It • TOTAL • n LOCATION LONGER WImH TIHIg9NEss IN ouTNET 33 Lo a 24 CU4S 1a a 24 u R3. 564'00'00`�" 3.30 • 4.2 � � I o BY Z R,0.7 N N 2�9 z �; m ,44aYs1� & 1' 1N N` es 7' 6 ry ?? R3. 4g N'& 1� k 3.30 PHASE I — POND A . SCALE 1" = 20' TOP OF BERM EL 21.0 —{ �- 2' TIE TO EXISTING ALL FILL MATERIAL SHALL BE CLEAN SAND. EXISTING TOPSOIL SHALL BE REMOVED AND THE FIRST 6" SHALL BE TILLED INTO NATURAL SOILS. 5' O.C. 4"-45• (TYP.) BEND TOP OF BERM EL 21.0 —i �_ 2' t7it C.O. EL 20.50 4'5' 4"7J7 RAL `., 2"PYCFROM PHASE I: POND B 2" PVC FROM �v " 2" 4 PHASE I; POND A REDUCER NOTE; 2" PVC FROM PHASE I; POND A WILL BE REMOVED DURING PHASE II CONSTRUCTION, CAP 45' LATERAL WYE AT THAT TIME. FLOW SPREADER NTS f i Y TIE TO EXISTING rnfl�t 1 — rc�rv[1 0 SCALE 1" = 20' 1.2' 144'1a'59' r 2.25 '00'W �R2.25 R2.25 12.8' 2.6' 4138'46'3,3' R49.75 RIB.13''5 53.3' \ \ 80' ��R4pp9� a''tls 4.5' \ 1 U1'p5 N90'OODa 87 5a" n P 1 is szs's' R18.255 590b0'00"E INFILTRATION BASIN SCALE 1 " = 20' , <$y ® TOP OF BERM TOP OF BERM JEL 12.0 TIE TO NEW EL 12.0 16' i VEGETATED TIE TO EXISTING GRADES y M fivr, ,••.�• ; 1 FILTER DETAIL �����': ��� EL 9.00 STORAGE POOL ' SHEET EL 8 00 NORMAL POOL 12" ON —SITE SOIL GEOSYNTHETIC CLAY LINER WITH PERMEABILITY NO 4 LESS THAN 5x10"-9 CM/SEC NOTE: 9' ON —SITE SOIL — SURFACE SHALL BE SMOOTH, FIRM, AND FREE FROM VOID SPACES, VEGETATION, CONSTRUCTION WITH 9" PREPARED DEBRIS, STICKS, AND ANY OTHER OBJECTS THAT WOULD CAUSE DAMAGE TO THE LINER. ORGANIC SOIL — ON SITE SOIL TO BE PLACED ON TOP OF THE GEOSYNTHETIC CLAY LINER SHALL HAVE ALL PLANTING LEDGES STICKS, STONES AND CONSTRUCTION DEBRIS REMOVED TO PREVENT DAMAGE TO THE LINER. E— FINAL POND 0 VARIES 6" MIN. ------------ j------------- ------------- MIN, 2'---1 1-2' r 2' j VARIES [— 2' 1 STORM DRAIN SADDLE NTS • • • R18 25 — • 293, o • z � • • i • • fill 28' � Z • J 6 Z I��f • o 4 fill • Z • a • U • p QQ O z O • W Z LLj W • 1S• RCP • O \ \ p ao 'p- � • W^s • • • 24 • O > m Z r o m Ld w • MEIR • �$ =a ski • a.- c,oC d> • • A 24" A • • r • • • • MH 31 PLAN 2e RCP ; NTS I • , • • CENTERED ON VAULT • 1 MANHOLE COVER ar bLlV ' W � • • z • • Jo I 4 f O � Z 6" 42" • Q /QQ7 • �xa xcn Q ass W B MH 31 SECTION • uz NTS : p Wo W • wA n 13" RCP • • I • 1S" RCP � 18" RCP : VARIES • A 24" � A • • a • • GRAVEL BED • 0 VARIES 6" MIN. ------------ j------------- ------------- MIN, 2'---1 1-2' r 2' j VARIES [— 2' 1 STORM DRAIN SADDLE NTS • • • R18 25 — • 293, o • z � • • i • • fill 28' � Z • J 6 Z I��f • o 4 fill • Z • a • U • p QQ O z O • W Z LLj W • 1S• RCP • O \ \ p ao 'p- � • W^s • • • 24 • O > m Z r o m Ld w • MEIR • �$ =a ski • a.- c,oC d> • • A 24" A • • r • • • • MH 31 PLAN 2e RCP ; NTS I • , • • CENTERED ON VAULT • 1 MANHOLE COVER ar bLlV ' W � • • z • • Jo I 4 f O � Z 6" 42" • Q /QQ7 • �xa xcn Q ass W B MH 31 SECTION • uz NTS : p Wo W • wA n 13" RCP • • I • 1S" RCP � 18" RCP : VARIES • A 24" � A • • a • • GRAVEL BED • 24 • O > m Z r o m Ld w • MEIR • �$ =a ski • a.- c,oC d> • • A 24" A • • r • • • • MH 31 PLAN 2e RCP ; NTS I • , • • CENTERED ON VAULT • 1 MANHOLE COVER ar bLlV ' W � • • z • • Jo I 4 f O � Z 6" 42" • Q /QQ7 • �xa xcn Q ass W B MH 31 SECTION • uz NTS : p Wo W • wA n 13" RCP • • I • 1S" RCP � 18" RCP : VARIES • A 24" � A • • a • • GRAVEL BED • • • • mow, - z to W 24' RCP • 0 1({ > < n MH 8 PLAN ; o U �i NTS 510. 5' DIA MANNOLE • < I t l41/ /.1LG • • '^ • u Z Z ' z < M 00 Y+ • Z 0m W o z • W q r p N AA0 a IQIO • ca • k 3T 0 a Aar a SM Q a/s � L r t � N • Q d /1 MH 8 SECTION • iV • O • • • �� NTS • < STORMWATER MANAGEMENT GRADING PLAN • TOTAL 1r:ii?611995 71:33,5' ti1105phl FDIC[ F4Br co nwr aWI VMWO () _dAr)= MOM BOLLARD MMDOW TO K V-e AT PAPSIER DICLOW E W-e AFCJIOR PIPE M CONCMIEM oor0� ° rirw-ew-v C91ICRETrem i �I lid I r-o- BOLLARD RE FILL VJWW B MM IOPW L, IRK Ism USE. FIR1 iam AND TOP EI7N SEW a PUP I• BAND RED •• AOOEBAW EASE 41100109CR0 rAEMC #WARM BUBORADE PLASTIC CELLULAR TURFGRID ON AGGREGATE BASE NTS AFq MY/� Ip A OMT PM • O 0 a' ELEVATM PIdM PRECAST CONCRETE WHEELSTOP N.T S. 4 HEOHT OF R7-B RESERVED RSSEHYEO PAmm w4 3mm PARKING � j rs I I I F m O R O : OA�p ppg� NIT 1D IipAFIO�IEl1BpUI�L�IEII' (to) T ' %DRAM fVP) 12" f1E>mt1ED PAAOMO /1P1 O MAIMCM PAIION ON (VAN A OSILE) ?� ■MI 1. PPRO= MMIASET HAS 111E OPIM TO LOWTE HANDICAP AD= SM ON FACE Or THE BUIBOO AT e LOWIDO IN" OCEN IT AUOO4 U BY OOOE Alb APPROPIRATL Z M BL>�VED PAIDOAG SM IS l0 K 0'-r r THE P�IISAN PAIN DOES NOT PASS LMDU OR ARMRO 00M N ACCORDANCE ISM F101RE ♦1.2 OF W NORM C1wRMMA STATE HAIDICAFM ACCENIOUTY CM RR R AMINVED PAR" pm= OF E Sm - N AO OANm "m Fl.T.1.2 I MON7�11 S1AW HA�iDNJWIE6 A007pKBElWAROLE� - N,T.S. ° ,. .. -.. " 5.1D 5.1E 5.11 5.1P e ff OW QRAVEL k�; 41t 3 rlr'1 SLAW IRON-MOU[II .may ROOM 4e,3 FRIDI FANS, FLUSH CURB AT MECHANICAL YARD `mow ■'� r aJ 1' H2 —=T —I -i � I � � r - r 1=—PFIVARm aueaRADe ASPHALT PAVING ON AGGREGATE BASE (HEAVY DUTY) N.T.S 7 ao O LPRS IH M W - r ABC TO K 11"LAFFO I7MI r N-BROE1t ASPNALI r CONNEIE 4' AOOREtiA1t COURSE BASE SIX STANDARD PROC70RR LN. PO20 PORRILA C TO HAVE WININGTH OF 4000 PS ASPHALT TO CONCRETE TRANSITION TRANSITION N.T.S. 5.11 5AN BANKS STREET ASPHALT PAVEMENT REPAIR N.T.S. u 2D.Ow x x x� xo fIMAM� 1p� B MOIIEORRAL FOR BRAES x G x (TRi Q 0 B• O.O. X Y i4m PPE B" CCMC-- �If[6" X 6 TF4.0 x RTM,4 IIR:LDEO YRRE FASW FITTED M/ CONC, N07ES I. FOOTBMOS rW GATE PWT 9ML K S-W DEEP AND I' OW DUMPSTER PAD DETAIL (TYP) NTS ----8• AM T ` � �.rfAilpD IIBCRAOE ASPHALT PAVING ON AGGREGATE BASE (LIGHT DUTY) N,TA VAN CARPOOL RESERVE PARKING gr,. 1MBTOWmpFlOplrpNNpRw (M F1O0N CRAM tT 5.IT 5.1C 5.1H EPAIIBIOM '.. -.- +oao NNOIE; RAW AREA SHALLWIS , Room A OEIECTABIE ' We UP) A UNCAM OOO SLINFACE Mo COUDR TO COMRLAST Im ADJO1MG IWOFACM PEN A04RAMP SIDE a MY RE0IRREMDNIB. ' 70 DCC W 1:1 Plit ADA ImDMBQQMTS # L MOR1H CARORIA CEMI[NAL 874711E 171-•a •• FMOES THAT ALL 9TMET CU1611 BEtMC LOIBIMICI!'D SL RDDOO7RUC1191 FOR MAIMN)" MCE PRO®I0RM TRAFFIC OPERATIONS REARS. CORRECTM Or VIUM OR ALIE01 FOR AM REASON AM SEPTEWSW 1 W3 OLALL PROVIDE ME'd OIAR RAIIB POIM 111E PIIY8ICNLY NANDKAPPED A7 ALL N7ptKC1gNB MHLRE BOM CUR' AM WTIEA Alb 1OENIMXB ARE PRORMD AID AT ODES POBI18 E' PEOESIWAM FLOI, M ADOMCO SECTION 228 Or 7ME 1173 FEDERAL AND MIOMMAY Wm' ACT REOLIOSS PROVISION OF 01116 RAMPS ON ANY CUM WAIRVCTM AFIRE DULY 1 0B79 MlE71ER A WEIWWR IS PNOPOW INIIW.LY OR 12 PIAMIM FOR FUTURE DAIS 2 EMEEL ONAA RAMP• TiVAL SE PROVIDED AT LOGIATNM AS IDIOM ON THE RAND W§Eu* R RAMPS SHALL K LOWED AS IODATED M TIESE OETAIM A MD SOPE ON 1NE INE LEIAM RAID SNAIL DO= 1•/I' (it 1) N IETATIODOW TO W GRADE OF •. AM MOO CASE SIWL TIE WM OF WIEM IAIR RAILS K IFES THAM Ar (s-•7. WIN WAY EXCEED Ar i NECF>t/ARY. SS. UK OIAIS URFACE. 'B' OUNC ETE TRIM A ROEwALR FIRM IN ORDER TO OBTAN A ACWW MOI-M rVE A 0. A 1 ETPAN" ANT fSL K REGUMEO A 1K CONCRETE OREELOINR M MIY ow ►A OR SIRIIC%ft .ODmDBEL_IID>Lfi 7. W NM PEDESTRIAN 01043010IX LIES MAIL RE f:WTABIIlMRD ST BOWNWO INE NTE SECLO1 RAN R1NEE MANBED (SEE MOTE 15� a W *M MAR RAMP INUL BE UXAlED BO THAT TIE REGIM: OF THE IIEE7.OMR RAID TRILL K TOAD FM r FROM 71E RIME PmEESIRIAM CROSPMX e•s. •. IRE IO7N OF THE PEDESTRIAN MBMMX SMALL K +0 FEET LKESS A SLEARR I901M IS REOMRm TO A1000MMODAW TIRE PEDESTRIAN MATH Ia. STOP BARS SHALL K USED OM IT IS IMPORTANT TO 110W1E TIE POINT INDOW IBICH VEN¢CLES ARE IE'ORR D TO STOP M GAIa7JANM 1M7M A 1RAFnC SO A. STOP SON, OR OVER LWAL 11 7lH/LL K ERMNATED A M S M OF 20 FEET BACK OF PEDESTRIAN GMONLX. 1Z ALL PAVVADIT MAIM B'+ARL BE M ACCORDANCE MM TIE L AIEST WT*1 W TIE W MIAAL Or W RIMMIIFURM TRAM BE COW BY 4111ER8 SY THE FEDERAL IROHTMY AD MBIRA10K AM PAVE W REQUEST FOR OLAMIWTIM OR ASSISTANCE ON fPEO1AL PROKM NAY K ORE07ID TOf OEP7, OF TRAMlORTAIM OMSION Or IBGNMVS MM* MAY DERV M GRAMpM Hoom RALMMRWCvv6II DRESSED HA► PICA RAM 5.1E3 gl .• RmN OM ETINaNBNITIN ✓ AT ENSIM ORS.: (I'L WILL vMLK afM. ETC,) +/+• TDDLoo w Roam SEE PIAw pD' BOORENC P-ADM EDpg 1/+" O,C• EBOL) I -11= T 1 r -1-I i- 1i7==ITI�-1L-i'i -L--=7R:�irC== 1144 OWAOM BIRCRAOE aM to Ir 117_ FJ7111MIS�� � Fs a IML NOrE I.10FE!>t GIYE11M9IM7N LIOIICSEIE FORM TIEOIOAFMA J!S<PGAAI UMTM'MMA04 Mq EWAN81ONJWVTAMIA`.OFPO'RC AADIIIRJaYINCOYpETE WALK MWITAIXED OLE=PE OM&M D&Mi:F4 TD. CONCRETE §IDEWALK SECTION + •• BnlNMNlafB EPAISNd1 a Daa71IO OBRICr (LE WLL. WAK CUM. ETC,) ye loom GI D SEE PIM (10' SL'ORIIO M71OM El GM Ve O'C. MWJ t--- I :h �I=�U lil L t DII 13L ca Tim-13T� i. 1 t -J i li1Y�- TIT , N IPPE1 IR IrW SIISORAOE N ].10e�DpDBpL1MQ TVP. M MSOIIOII a u a .NFL Mom AMMOP21JODAYETRUMTNCDNCWMFOR FWWV d6, M EFL" UW f141R7[B•N0UE 00-ANS1CIM JLYIfrA ARK. CF 20'QG AND M1AMWM COEOfIII WALK M WM MW OLL•CM Pe: emn KM WrJ HEAVY CONCRETE SIDEWALK SECTION �4 -._ J �ME 9EE PI SIDI R EAOi f� O O 7 I �%J / STOP C vocm IS , T . j g-G• TWICAL 18-0"-D• NC 6-U• VAIN I 8NC^ YwNy HC PARKING DETAIL N.T.S. Mp' • E TT 1 L NT I. IV MEMId *m EEmm m coms RIUCADN xmm 15' MN> AM KTREEI C006 WXI M JONTS ON SMCHI E POUTS. 2. f/21 DrApoOW a17DTT EYEIPY AO'. J. MW P5f CO METE M IN ABA4 B' 91AW WINRAL R UQW MEIAWW CMW COMPOU O &ALL AREET RUE XORM1 NOM OF SECTION 1026-2 OF AICO" SDWAY 06 i SPOWWAY1004 FW NORM AW SiNUC71ARE'S, S. ALL CDASTRUCROMF JOM SIMLL BE FILM WYK "IT FRIER AMG SEALER M ACIOQRIUN E ww PC" Ro1QRBU7 SpAom DERB. WOL WALL MOM ALL PAWN S1WW S IAM K +' •MDE PA 111 0 LIES US NO INN TRAFFIC MMgNO PART 5.15 5.1G MT. SUB -BASS r AIC 970E ASPHALT PAVEMENT REPAIR � SITE �T OEIION j aDPE I/•• PER fT. —I 1 I A r 1 r Y 1 A I W-r MAX rmm JOINTS FRNR T METE STANDARD 24" CURB AND GUTTER SECTION N.T•S. • • • • • • • • 4N • • • • • a • • • M III i3 �� : • • i VT w I fly' tt E;I 1 -I 1 1f. it • u O 5.1A • • i < • • • • • • N • • z O I� 1 p • • • Vy_1 �Q W V • • • • • • Z } =a Ir 5.1E w w Z JO o� z z Z z z +wt r O •Sa■yLQ < w Q 7 5.1L 5.1K' A • �E z u < n • �/ } <_ �' • • F " U I- of I f, A..' J' V. croxa • 0 o E �� 'r .A"TV r+T'. r • • U h • W E F 4 GRASS y ,L • j c/ J Z Z Z M AWWAL7 ►AVAINT • z 0 M W W • • N Ti rG v • • : D DZ W W E L I r Yir_ A i D F 4 O FLUSH CONCRETE CURB Nrs : • • • GD . • N • . SITE DETAILS •TOTAL 10 1 �r ...'.a ... f•. } s'.. f:. II �q. I .f I) r �..) C1Eu'34e- SWW NVALLATDN LAITS LATERAL SADDLE INSTALLATION DETAIL FOR PVC ANTS ABS COMPOSITE PIPE N,T,S, may%/////'%%/////� wnAL rAIIDLL VNNSTP SOL IY mm: (*K row N rlwg I 110NNInes \ PIE rIAmE r YIaDID oW MLL LREIR Im1w OF FR r GY, OF POE r wow rK *AWN= Ir Q0. Or POE Ir YAmmum at *jA&ja 1, T rrp+IKEftor Irr10i1KrRAKILNLK L YD NMI OR NuAM 4r a LANOR TO BE uND r an & MdIIIL. L ALL IAOIVIIL "MOL rM1LL K WAILE OKWC YATDrA. 4, YKIOILL BULL K TAIOIO r r LAWN N TRAM AEA* Ir r ,IM-,wr0 OmEm L 10 K VIED IM PC AND NL TYPICAL TRENCH BOTTOM DIMENSIONS AND BACKFILLING REQUIREMENTS FOR ABS COMPOSITE, C900-PVC, AND PVC GRAVITY PIPE N.T.S. 5.2E 5.2D 5.2J v P1IOPmTT LrK IrrLr 1F• NOOKpITAL RiAOAA1K r10r AYT DYIYCT. NINNY AARAOE Now IriO NMI PR N7016WT, PUIOrI IIOEII[ To K OCIR Uo91ANIAND PnrrlydLM TO fYIlT. _ o LETTERS a•e•rle Meam NOTE; THREADS TO MATCH LOCAL FIRE " vp or Mot DEPARTMENT STANDARDS. nmoE am K AIo1E •LLOE L �N��� a J /� • •PrTR 0 MOTH Dr 001m VALVEIaL $- r INK coboh4cm Mew" (TAM N or Lrm 4 I r-1 OX .I MGM ow PoLrom aArur KTOmM CUM AID FRANK RAT. Oor an �= am 2002 SPOIL WATERTIGHT MANHOLE RING AND COVER N.T.S. STAMPAM rAr1DIK RID AID OOIR 1 r MANNOIE IOEAM POW 84 VIE FDW V* MEN ANOW I KLTE To NXT FAAK NCY01rC TAm V s 10 SPAGER, UK MWE TOOT lr YAM UAL KTam FAME AND OPAC OL I/AINIDIi zws AAW A 1QIDAL WLL MDT OA IR 1t COIApT OR DAOEIIT POE ALL IFf N0.L4 roll or•CFRLT PD—TE •K "mm MALL K PALO MM MTr- 4' ow Iwomm ONDPr, Carp ATMT aI MM rKeR , C MY E, T.. rOO IO•T r B _ YAi YMT SAW 0r YmTA rum at PIKWT DESERT ---- amemD STANDARD SANITARY SEWER MANHOLE 5.2I a/r r GAM VALVE � THORM *K TK ,L IH � °I'°"�• T'�N 7 ausr, oEUYKn 0"rl. rKr um PVC POE WSTALL oallc. low •LOoIID IIDK11IKm TNIL IQWL FIVE N1000- rwL W LMKLLLH SAM 0111M M 2W AIRFAAN CANINO MARK M THE REmm OYAAsom Q OMIKIWI TIBD1 10L I ANON PPE- r,ALL K UMU RM AIM 0,00-T• OR MACE 100 PVC AMRA W01-0 r GATE VALVE -r1A/L K AMM moo -as am LWT OGYCIKX- MALL ALL K m o Pr wow AMC TRANrT on mg WC PPE WNW MALL 0 O N 10 ETArDND KTAL OI n YOK AND NLTI- ONCE IdMALLID AND W *OIL K WAM IM TO OOAIS W r11AIw m YAK PAW, fR HICWM PAL K IIITALIED N 7MK 10K'ICAL POWN4 A/ K1KX• M THE A Ndw EVE. STANDARD FIRE HYDRANT INSTALLATION DETAIL N,T,S, 5.2C 773 FL61Nllpl sum 1. �wL I� r r Nals ae vrL : is 1 1YA�D� TMLU 41'42" STANDARD TAPPING SLEEVE AND VALVE ASSEMBLY N.T.S. 5.2H STANDARD MANHOLE RING AND COVER N.T.S. now Coum iYE aceDL of Yr 5.213 �_ IRDKL•um } 010JAO! h'Y .{ ��AA. ♦♦ YAIrL LTEARAIICE--� �-- I ................. •••• rL rAAlnloE I , epsarpllaaEaE� •EOION00W w 1nrNlu L0. PrK rlAR � •R• YMT ILMOM AR" YAR fOli, Y LIR FHgiN 'Y II! RIXf, R �. U%TR SEW 11K1R Imm •rAw COLLAR 441) T/KIIOT ODIR011sE 1'-r 11-O' 1'- I =0' H®L 1. XE *mwL CTDN WWWAT*m M *mxT Now* ar no WE. L Ae OTA AND KqL FOR IIIIIPIT ■ M LoOAIDMO, A OWIETE rwL K 2000 PS t TWORT bWM 4 40 =02 YAI MALL K DFRMEY, AND T® TCKIKR. L INEWN 00"W 110014 r "MM OF TWAT rACN(ID WMAKLAIN AMYL K MC ArrO1M WIM AS SCM1 0* ITANDAID CEML L •ACIILL TAWSD ON r LAXRO AS PER mAMYARO DUAL. Y. ro no" MALL K EXPIRED FOR IDM DO0000. L , JAI OCUM MAT K FlonNY NLOM ON NM ODD. THRUST BLOCKING DESIGN DATA DETAIL N.T.S. co"coKTE Ime w sum AT ALL Or OE1101 Nwowr 91111L FLAX I •"Im" Iwu 00 IEOYORLRrR m or ow KID m m "mw 01 mo es MPIrR or RDDO 41310 ! r 7AWO ; Ir 17,111 $ umm 1. OIK N WALKL AID IIOIIT, THE ffM AM AID YOLIE IILAIL K M10 PTM 2 UMIS Or INOW" WE PAW. 2 600MIE INALL ADT CWTACT 01,73 OR ENDS OF MEMMOIOAL ,DDT KADY. STANDARD VERTICAL BEND DETAIL N.T.S. 5.21A ALL POE rNLL K IMPPKXO YT ILOX AY KrIKYI PANT ALL PNCP I1 MAPLT MM OOAL TM •AM PANT 10 K U"10 M M MEL 111MM LDOM TIMM MY P40T R ukim him PII01T ALL POMO 7•ll rAri RPOKY PART O R1DK AK LX rTlm A OIILC•1L A OFADw REAW KMK MALL K Lin 6' DOUBLE DETECTOR CHECK WITH 3' DOMESTIC METER N.T.S. n 5.20 AiYAOY� ltilgp FW OrMWM PAY OEM 111-0 IR' 7 4w-4 4w PAD , •, mOYR . �. f` jr a•-aI— /�- -4 *W WA T -Y".f IRA TAImEY fApOLL-� VALVE BOX INSTALLATION AND EXTENSION DETAIL N.T.S. I till tit 11111111tillItI 7EE MRRICCTOI 5.2G A 09k 1, OOAIPCER DIAL K 2100 PI, L DER MALL Wr OMLAOT IM71 DM DDC OF 119PLUMCAL low "T1I1II. A wis mon *TAIL amworl 10 mNDwD OEM 41 fE[ mANAM MOST MMAt TAKES FOR AREA of 0000" Isoo , L ALL ISOM AND IFIYIEC7DIK KILL HAVE MODRK TMOIIT IIOMM• THOM SLOW AREA V OO' IBD STANDARD THRUST BLOCKING VIEWS N.T.S. KEAVIN KAM* AREAL FOR Noreowft 104m POE KAKI YAi ri TOT POMMNK R IN FAL (ALL AREA Of 00PNK P" rar�������lYr�IYYIK� fI1/7KS•� 1♦��__il•i_t•ii_�_i_if___s Z•�1• — i t— SS r-T•-1•rr•'��7rrrrO�iuYII�KI7•�is �i��TrrOIKw IIIf ,Lr Irrrllm i� I�r � � �A Orry11rII KOOOr1IK EI�R C TFrzsr • • i rr� A OOr� 0rr7� rrri A A �1— t'.iK"1:'Tr rrTi iTi i 1• rrrr7� S ]� rrs_ i'i rrr 1_ f rir',""TREi�i�iT�iirrflRErF�rr1•i�tA� YDfKGIL1+U11[ N 11! IIOgF OK"Ai-w� A1NE we DIY' eYD rALAIe FOR Nsr,ArTE FOR A9rIWAL IAIEr7 FAo1R 5.2L E 04TOMEN TOP 2" METER INSTALLATION N.T.S. • o.,a • • • • W s 1 Tj IA ♦ • ♦ Q6 J l�'i�` 1� c) 1Ar� • • • • • • Z 1n • • • • ' Iiii w UC I{I� I • y • ��I �I r • • o z OS r 07 � L,c w1 QL`j .{1 J : • : d 3 • • • • : 5.2F ? < 5.2K i , , , , , , 5.2N ; UTILITY DETAILS U1 N U] z O _� a_ o v � d r O 1�' j l z iw 40 vz ~ O W L w S i_ • 0 V V EMISSION nnnnnng 0 > ON F Z 0 U F0 orUA M O LUr F ♦^ Vf u ZO I'R Z ( Z - W ° ON0z T� m inY u+ z ca W WK L _ 0 i E • J R F U �N � GD • N I O i • TOTAL • I V T"•` 4 rall•Ilp MIaE � ►NIL EACWtL UNP*0 = SOIL New 0Aarat r pp s1dIE b�woaelmlEo •' nor. or @rE r I.NeM we aLtAeAmm le oar per rm E ter htkv" sell GLE#Ao m 1. MOM aSplsms aNrNNae eN Mtk= C O.lLI M •tILL ell TAM R,aM THE audE FACE r 111E Nlpea Ara MAtag. 2 NO MM OR BWAMa {r OR LARGER 10 all Ulm N ORLAL IIAOgiL 1 ALL Mces" HAMNN. 1grL W Nmm MATIK MAINaa" 4. IIOOaU 04FAL M LVM N r LAIM N 7AMIa At tr N RICH INR10 AREAS TRENCH BOTTOM DIMENSIONS & BACKFILLING REQUIREMENTS FOR DUCTILE IRON, VITRIFIED CLAY & REINFORCED CONCRETE PIPE. N,T.& 5.3D l 01/r 1'-11/Y 6 a O© ©D N 1©1�D s 7;,)v TA39W SPLASTER 1/i' Nwn r Qarc Now CL,w tie e. % n]i CAf7010 eiFe 1 T4itPR[ LAR�R 3,-0, am 4'-4' �� STANDARD DROP INLET AND CASTING N.T.S. SIULLOW TYPE per a tNote N or" _ elp�I No" INTERMEDIATE TYPE (4'X4') O ro s r OWw eru0 �.. ant DEEP TYPE (5'x5') low s nm N avn0 '• a• raA 1*190%a oot• x'. - .,.. NYT s ears. a• %�•iriic ter r is ev ,. err r A aRMa SLAB DETAIL w A■ SLAH DETAIL wI Ta wi�r�i. w�i sldi►� � �--� CONCRETE BLOCK OR BRICK CATCH 6ASIN mm F10 arse NOTES 0 - DEPIN OF ORAI AGE MATERIAL 2' MN .. WM OF ORW404E MATERIAL 2' MN TYPICAL SECTION OF UNDERDRAIN N.T,5. Sm ML 5.3F BULDING MALL (INTERIOR) r wwTVU*400F ELECTRICAL CONDUIT W k.EA ,A»ICTION BOX STRUCTURAL PLASTIC 3" SCREENED WNT 4r DIAMEitm - CaNrnErE wEr 1E1L VARIES 2" INLET PIPE INy. soy 1`- GUIDE PLATE SWW CHECK VALVE • DISCONNECT ASS 'Y. 4'-r BLAU r r Mail VA LT Le toot HA%9 kocE we am r ram• r t i r ter t2v MaLl"y atbaaN A01 APP t DNA � J I r ELAN _"`� • • NaM VA0.T LB MALL • U HLALMMY a2apN IIAtg tocoo am • �Ai Is 0 LOOM* 401IT QUIT • Z #` i • • W II`r •• • + t • J � F 1-I/4• Nary Z { {.,g• • `y ��� in!to • O f)� r-r A IEt# -i z r s r♦ WIN r rf • W F��- ti1Ra >P • tY tY r �� I • p tY tare • 0 W oo I rare vie w4wm M • LLJ 1tlr Non k Nob N' , • z 0 coo ae gd11N1 sw Pan i La N « _ o • W d. Qlalsl M ODiION - OO R 10-I • a • • 2' METER VAULT 6DDA WITH 3" METER VAULT i S. N.T.S. O OG 5.3C 5.3B « 5.3A : s N o Elllll26 GRIM AW SPEaFWADW LEVEL CONTROL& Pump on. of and alarm atle shall M omerdlod by four (4) rneratry tuW Root PULP AMODELk awtal... S. - Old oombt of o m•rary tub• eels► aided i a Pewlp shall be of too oantrlbgd too Nyers mMN W04 20 or •gaol vM an °0ar0•bn-^w•Wnt poypro 00% hou•Wq oleo a minYnw^ or to 2&,iw 2-rk•, gIIPLIX CONTROL PANEL iagrdT•�bunk In prilar unit and asibmwabN type mow, Ine ptidOr unit @Haar SJDW/A iNlWed aaal•. The aline new be a weflctnH INequ a fe sit the ter• oapaea t mwNatig d malarial In normal @harm ••w•g• hckbalq nasaldle i•ttb" be. With ne aplmu TM err eentral..hd be suspended Man stolsow -EY CONDIT SEAL aat foralip objects supoh as - woodmouift as :M atYriy UtOI 1R irony ihrA/�r line PymP @W ntbbar, DIM aaad =.S t e0 that •d}t.NMMII ar repaoarMnt may M aeM ra110Ut aM We of cat w uet•a dlodhaq pine. 0b•db•N'q• Wdf be r PVC. ;u,•uenk OPEItAlIN6 GONDI110N5: mp to tun one lounging cyde Puny •hall ON a ocpooky tt phwtpb dyypat for �2e4�ehena so GPM at a total hood of 45 het shall mp to a far 26 74r BASIN COVER w/LOCKABLE HATCH we a 2 fIP mortar oPeltiYly o ]460 RPM.il cycle for 2 hoUwarVALVE EXTFx9dr NMIOLE PWW meter NINE be of elhe •ubooher•ile type rda0 3 Iwr•p~ at 3450 RPM STALE.. HAMMY lad lot -flow Ep N unm tauAL 1.0 0rr11r MMM a swim In � M Moat ROM! me t to& Molar shd be 460 role. Than OK" matan Old be eIEMA s typ.. .. A am pond "Whin q sta d atlas be pro* Go M - In0*pima, 1M motwtNq staid Mtaa oonwt of minirwwt 2 galgeWd supped stand Wooded to mac .BIN eM I deer m IM eorfr, t.o (21 ate angle to lM TOP GF PLAMP 8rerlpv ELEV, I6.00 States INOLdh shall be of ON qW typo wine Class B Insulation goad for I30• C ( nt•sb•••n •p•r•tlK ompembwe. Ondlq heainq shd be flood whh wpprta W*W •meal POW and itadnleaa ate hord.pn. Tie sugpat sand ad mgla aapparq sfloA pa 000tsd .Ith ..,.a b•••a-•n •p•Ry Debt and dId bar grove green i color, alarm h adoaMb d that Wbrbaae bearings and seals and tralraMa hoot Mom NMI, fW a. ---...., a" +indlrpa and roar to auto rotors Which de non he" NMI• I -Air dln4afbW o d-fs•d -- «.t: ,;.i _._ ,.. . ......:.:.sA"g �.\,...`.,^. •.,.., `t..F.� ..,,,,:.r-m ALA1B,t; �, ti �C%��Y': \� euperlar upablMbas melon aflaR clot bar oaedar•0 equal. The slam shall hM g brlpht aid lash •Nrlq the hip TM .:;�: ,.,� - ' TOP OF FINAL r,RIUrO F3Ev. tB.00 Motor dal have two heavy cAfr Oa11 baaringa to woppo t pur" emn Ina take per water owdiiona alarm Ilpht .i p• out .Moon UM .also and drops. 2e Z3 Imdd aM thrust saw and • slgew yuNs outeWlp alr•atlr above too imw ••d to ids rem bad aid sat are Tame p�h for dmnbr. Bea b•arihpe NwN 14. for SQOOD fN%Nra 0-10 III Sator anal be hoot athYYl itto motor TECHNICAL SPECIFICATIONS 1.2 HORSEPOWER DUPLEX GRINDER PUMP BASIN PACKAGE � RAIL MWNnnO FLANGE A heel semar tTlsTnosol dad bar altaehfd to tap and a motor winding and WITH DIRECT MOUNTED CONTROL PANEL LIFTOUr aM1NN. t/4" rod NaL000w dad be oaNMated On 1MIM .Nth the mWeilo oontastor toll III am" best to gap H mars w tsenpraew r•eaboo 221•F. 7herrw@at to raeM autarhatkdy than molar seals Two Mot ovows. Nell be wood an 3 plea OENERAU Farrah aW sold a sully awnhWatl grindr pimp package oalwisting a aq (2) TISIPHON ntoto+I, vbder pwwg+ end molars, bares awerlWy, Onto dedlsI pli deck vol shut VALuµE P aM .dray quick -connect dk• rd systaws, MR aMhabe, taw (4) lowd eantroa• eiakdue aloof lorfl control trodtok jWCOM box, Dalai IhtYg aW eaMrd p". 2" RISER PIPE TM iOOntan Nmatr poop and grOrWr a1noR dad M a /@Ift aeai+igeS stele owoew to lake Purbro inlodr and griWr bwlpea•r. All agJpm•nt dldl b• toctary istage6 Md=t far npw puknp. llgt fNtiop antral pound mauntYlq hand aid ekarndlyr mantes omual ppnN• TOP OF svtnu (,RQ%Mp ELEV. 1a00 eralar didl a per ," by t110 mCakalled NMda mON M INI lad(% wllh a ne atlanlber b•t.sam too soda. ehanebr Mal Bar d Isla to 1@brtpate sq tea BASH: .. - afN aM to vomm Mat tram daft to auur then, iM basin ehaM M 46' dametr, alto depth a shown in the Plane, Thelar-basin sea fU• rnowa etftergiona anw tnae dire aiaafor rar+aos band bnysh�rwttL 11w baktb;M DISCHARGE INVERT EL£v, 11,50 Bed row shin M oaNpan Ina e@rprnip and lapped to e flabuws a woo Ilght bond. have our % A tteN mil -Boeotian pea anal M msided M eleOVOdg old W tmounted b too as01 dhornbr a an•at my water anteriq we Nurser tMaugh Ow Wvw ad. WW i the do dm shall mauoo g red bnto`en bottom of OHN basin, Mpht to OHMan at the emhe bare 7TNa signal NNIwE not otW molar but afnaM BASH COVERT NIGH WATER 'ALARM' ELEV, t 1.00 • t as a wo IINp aeri indimlYnq ssrrlw b requkdd o6we Hhd be providedMM each basin aMMrrbly. Each oaver WHO have a , ASlUMWbwkk IF wow and alm k� disdoNb,, 1M •owi for Ndtdolbn and rarNtW of too *0 he" a mialomsm of two Pug PURR IItiLLERk and a bark hoW. Conan >I+aM be wrsvNocbd a non-7kid. b'Noa� pqa ate NIRh a dud be a the on open � ed type mlrsrnrn 11dol sN a I". The, aevar ekd haw a alrve for mamtinq eM oanTral tie og unabotnxIM passige lhrou¢n gr's•W b+P t Mal be a coat lam Ina afloll M 1lremded onto SwInlM@ stele shaft pone rnounthq stand Ina an sib for jnoeae boa manum ants to ran d nN . iron the jLmiion bar■ to too penal momaq slang, Carers did be ooaoa with a baked -den spp000xkyy paint and shd be On oo1w. Cows did be bated to the basin with grog grow •obnlr• Steel erg ear4wa. Zino plotad nuts OWN be wnb•dded In too upper fang• of &"aDER oalaBTwlcTfat, too f wglw• bode for asi •arm reebm anae OW to WorOu". i Grinder -- - 111 dad moat a grbdar 'IV I aM shndphp rkq erW Old be 1NNI Oreaty gkhdr ....,. °...... R b•bw the .mute anon inPdbr mbar threaded ants etdden Malt aW " be looked The RAL ASSEMBLES: TM ., . � .. ^0•w„ wow oat and water, +may �_b1 shab be p4aasd Into ban haldaa M1alg• br am Nwnovd. = If t-art era tots n oaeaNrkeA altar I* Vol easy fag and Installation of too puNga and lower ehatlk valves wittut need of pasomd onia�Srq too basYt Sbuatlwd j 607TQM HOLDDOM . ` dirt are Mraddad with tapped bo&1-aH noise oo dwt aaewe em be Yana push a flog �hg � Winding a salty OM too cd•n opoYMt gale MaMata with guide yaks of suffbanl bowing atrwpth a p i i t bindin dial bdt to sash pump. TM yoke dad mots own quit nab o} ".minimum of 1 bth Ibergl000 betel LAC PUMP "ON' ELEV. 5.50 Bade grlkr apdaa aM •h+debg rig Mal be a 41% stplNgss sad Pips help m upper rd wpport aW the docmrq• dew, Law w.rnlnan tram the an s odes. and N quitlad Into a ahaMwed � in the y aedkaps cases, A shoulder m each nests •hd bottom m we 44ohagg "ON" hardNh•d to li6-60 RoaM+gll C. mass to fes ro aRlinment for a lack tyht sed. Dud "0' rlwpa etc of eat a h adb sed aramtl eaalh noade R Is In io apsdWp A wwrMvma LEAD PUMP ELEv. 4.50 �- RAILS. I" PIPE s CORROSION PROIECT10MN .Han Position. braW amMy en the oben, Ad of the bAd be pro 'do to lade too parts toaefhr WA to pnewnt bb'M srgss baNn MM OMM 1se and dawig 1•dmga The dedtage shall INN" ` Ag Iia/1 dal M prpdMW III ye-ir•Oted tie phaspgtf aid ahamim rlsg orW to and all RHIGINiAnd sustains; empoised � �� 01M a apertlnq rtw P4ing to Modes'ge owbq .Min ppiq to a IN DI 51s •oupgnq � 1 Ora bOaN mall. 2" DISCHARGE PIPE ,f we" to be Al admNf be 302 etddHi etMLa PUMPS "OFF' ELEY. 2.00 BEARNG ENO CAP: CHECK VALVEL A h" duty op" looded at rubber GOMW type dock valve with ant Oran body dad "goal tppar meter b•a•g map alhd be saprwaa adtbg for gay mom" •IW nptaaentent Ina a loan a too dadwape seal outembau and tR out with too 0-No assmnbbs, TM wow design shall be ath to allow ear oper Nm noon rsgatirs It•w, TM ties dsaa ins aripnrl to Operate of a �DISOiARCf POr1ER Commwpreuthi p Yi too aa.r~wawNta:ad. yaeNoh atatsd by low guilder paleloa, CASE ..,g' .v.. , . Pawn oars and muol mad did be doubts aoaled. 1M paw and range OWAK r Ned be *40 Strata ceded Will, apsey port oempoald aM ohm elirrlped b Wp1ose .Nh rulMr seal buahty to seal alterInj9amM� ogalst and to pro+lde for aoYl pule. Gana• dodo wNhstaW a phN1 a 3G0 pamd• NOV"a A flat set stainless Ste h Sov qt Hardee molded into the BNna N ftAbor gappa Ned too hrnbh•a i order to pnraht ooN•ctbn of do" i the soak V", AM of eHmra and be gtoWm ales. meet UL rowAarnehta. (ELEVATIONS FOR STRUCTURE NORTH OF PHASE I: POND B) insulation a parr end emtrd elude dad be type 90tr/50N-A. Blo4"" oe (DUPLEX) and Per aordo Old haw a grim ="W grand 00"A Nor tat ouo&md to meta /rpm•. RAIL SUPPORT DISCHARGE INWNa Schedule, 40 PVC dsdlapa p*4 Ned 0 Nod to that satanry aborq• 3-10ullc (COVER f70.TS) he•• IM ONW46 O and tambwt• at a r 41sol g ♦♦a" mounted an war 38 1n�2 DIA, B.0 basin at too MLpkt dwen i 1M plus. Tie dlodnage Range did haw a r ECILIALLY 1 ACFD AS SHOO NPi NO (48 bsaia) lion attocl,lp amend dbalrrgs pbPb4 SHUT OFF VALVE& PVC tow union bell ~ of vdwe .ion T•flan •eabH and be furnished48 TOP OF PUMP otTwo an men wm 2 Z• om tMInternal wrha aktahNm yhondlae did he wNppe bd,th bS 424 I.TIAL TOPall and M ehlppsd loose ter R11d I'-6' DIAMETER CONCRETE IM our DIET WELL TJM ilttm Mn Ntg be aom4Vaad of atntbNal ploow for corrakn nrlsanw and f ed thteanw to owukty and maebanioal Thar 5"-3" a quaee wome Junction box atoll hew a lugy, ""Lied now that Is held A peas by �tour .) ••Pliht stanlsss . �....- sue.,.<...,... steel scare with Deft of ade*wrTm alas ao that tray may essby 6e iotrllod aM Tls I1eade -. Y 2• INLET fwro&od %coma too NMs a p@abd tads. a lM arena algid be touft moapsill" go Snot ea rnKd pans are s0•••d iM ogvr gthaa W iatsl•d to Von d0yy a by totdr _ PPE DISCNiAROE N CC00nnTTRR00LL uoO BRACNET, SBT mabk UM jrweNn boa meals or a aorroebn-radetana• tathr to pMnbt`rapp60 we eeutr Owing swwm - INV. 7.15 PLAN An adeq@ate rrwlber at sealing-tWe cad grips ands be supplied for hcwlt nq pump level 1HIe be WATER " 2" BALL vuvE, PVC and anad ore. awd grips shd mode of non-awl"J" macaw. wan a PVC a nylon. and "I wwivo on ethic" Nod wound the wi• jlaiet The cord .: C.O. HIGH TRUE UMMCN, BLOCKED TYPE Orlin Mel seal to per jectlon be. .41. an 0 tkrq r gooks[. :.:^."''. ,,. LAG PUMP " b- llM JNonetMan bark elMb haw PVC solvw veld •a" type mlddt hap a adequata eta@ to a00a1wMlt the NMlnbw at tip r@gLA Tar plug aid " OanOr+f apwatton, LEAD PUMP " line tits end be •@Ned by an addend EY type a•Ia-oR (srgpMl•d by whoa) 48" DUPLEX CONCRETE STORMDRAINAGE GRINDER PUMP STATION w that tam the conwit r gqeroauuMeta will not antr the enalaim TM baits of Now endoevre OM be of odoWdite sic• to oseanwnerlets the .Ise and oermootarw for pump and awl control operation. PUMPS "OFF" N.T.S. PUMP STATION BOTTOM lIw wow runniq Mtwsen too am" po" and tie jnnetlon bark and M a•Ir�odsd E V. OLE 70 aM lartsMd to 1M gulp end NvN canbaa by meem a ed@ -Wr e0ed and iwNlaaa twat ladU r arrrg aarwe%W& The jmtton bm shall be doOrAd to IEMA 6 standIrds far occasional aAwwergmw. (ELEVATIONS FOR PHASE t POND A) 5.3G ^ (SIMPLEX) • • OF W • • • O m z � • • • o w WM m }AI =(] • c ce w • • • CL • • • • • • • • • • • • • i • • • • • V • • z • • J • 0 a z i v • • • Z z • • • i O• • Z U H c _f II LLJ • • ", ^ SI-g u � • Q • • • • • - ` V • • • • • NOTE: • CONSTRUCT A DUPLEX PUMP STATION FOR PHASE LPOND B. ONLY INSTALL ONE OF THE • TWD GRIAIDIER PUMPS N THE PUMP STATION. CONSTRUCT A SIMPLEX MANHOLE FOR PHASE • I.POHID A, INSTALL THE REMAINING PUMP IN • THE SIMPLEX PUMP STATION. WHEN • CONSTRUCTON IS CM2UIt ROAM THE PULP • FROM THE SIMPLEX PUMP STATION AND INSTALL • IT N THE DUPLEX PUMP STATION, THE SIMPLEX MANKII INLL 74M BE CONVERTED INTO A • STORM DRANAOE MANHOLE. • • • a ale a • Z • STATION ELEV, 12.25 U 0 e ] 2 • • GROUND ELEV, 11.25 • • • e • °u Fkill T V • • asc F M9 ♦ ♦ : J Z y Z Z 2 • • ♦ A< 0 � w 0 W Z • W VERT ELEv. 10.00 • m >h e M LL �a m Z M Or iT • •ca 0 ALARM" ELEV. 9.00 F n ] i a IncIT N ON• ELEV. 2,70 : • • GIa • ELEv. 1,70 • � i■i .a� NON O s 5.3E ; UTILITY DETAILS • TOTAL %1 U FRONT NEW 8' NO VARIABLE AS DIRECTED BY THE ENGINEER wow \\\ a 60 MLO ML 17 _ EnLNa ' 1•W1 x NWI1 •AIL / 1 I (PERSPECTIVE VIEW RRDa NO WALE•MIA�.p• r WY EixRI am WAR dent w447 dAa'r F"D 011 10i Me "MOM 4aRK 1N s ■{M1IN APE wan (iul ML. FEW r w M4iaEL r1rE1 •ROIL ~ INNS 1 Wr 40 OLra 6ROSL 1�..tW". AND ms[ Met t1Or SECTION THRU BASIN. FILTER AND CULVERT PIPE NO SCALE GRAVEL & RIP RAP HORSESHOE INLET PROTECTION RT,S. r ?I ::LIB � -:A'�"��'Lk,ilra! �' :i'• lam IIDru= F1410 am SMIIIEINC NAT 1111111 2P5F IG�M00 s SOWNMr N.T.S. 4 - �x: ' r� A �_ FLOW DISTRIBUTION DEVICE N.T.S. NOTES: POSITIVE GRADE MIST BE PROMIM TO ASSUME Dft%KL IF SLOPE EK09M 21L SEED AND MULCH MOWN, TRY NDT TO BI(OEED BaY (WON VVflACRE88_ MFSlIL7� MAXIMUM OA - 5 ACRES WITHOUT SUPPORTING vL:C6: o�aE® AT THE TIP OF SLOPES MIST OWN OM AN APPROVED SLOPE SRAM, BERRt/OIrTN 6 MOST COM101tY USED, O. MW+M COMPACHON OF ALL FILL B REQUIRED, ONERSDNS SUFFICIENT TO UNIMC ALL SEDIM NT-LADEM STOIWWIM INTO A SEDNEM CONTROL DEVICE MUST HE INSTALLED PRIOR TO CLEARING AND GRUBBING OF THE AREA, b. OIVERSDHB SMOUB BE LOCATED TO HeIIUE GARAGE OUWG CONSTRUCTION OPOWICHS d. D WBIBMOKIS SHp.L BE SEEDED, AND MULCTED IF THEY ARE TO RDIAN N RACED OM 30 GOYS. d. CHECK DEVICE AFTER EACH RAN. BUT ONCE A NEB( RBGIR)ENS, REPARt AS NOCE'SSAR'F, TEMPORARY DIVERSION BERM/DITCH DETAIL N.T.S. 5AD 5AH 5.4J REE PROTECTION NOT AT THE START OF MADMNi INVOLVING THE STRIPPING OF TOPSOIL OR LOWERING OF ENSTNG GRADE AROUP0 A TII A CLEAN. SHARP, VElIt AL CUT SHALL BE MADE AT THE EDGE OF THE TREE SAVE AREA THE SAME THE AS OTHER ERO" CONTROL MEASURES ARE INSTALLED. THE TREE PROTECTION FENCING SHALL BE INSTALLED ON THE SIDE OF THE OUT FURTHEST AWAY FROM THE TREE TRUNK. NO STORAGE OF MATERIALS, FILL OR EQUIPMENT SHALL BE PERMITTED NtTIWN THE PROTECTED AREA, AND NO V&SPASSNC SHALL BE ALLOWED VAIM THE BOUNDARY OF THE PROTECTED AREA, AND SMALL IE 8O NOTED ON THE ORADNQ AND EROSION CONTROL PLANS AND POSTED ON THE PROTECTION FENCE A PROTECTION FENCE CONSTRUCTED OF MATERIAL RESISTANT 10 DEGRADATION BY SUN. VIND. AND MOISTURE FOR THE DURATION OF THE CONSTRUCTION SMALL IE INSTALLED AT 1HE SAME TIME AS THE EROSION CONTROL MEASURES, AND SHALL REMAIN N PLACE UNTIL ALL CONSTRUCTION IN THE TACIRTY OF THE TREES HAS SEEM COMPLETED. 90 MAIFIOALS ,SHALL BE STOO(PLED, NOR EQUIPMENT PARKED tit REPLAMED. NOR OIL OR GASOLINE DUMPED MTHN THE DRIP NE OF A TREE SCHEDULED TO REMAIN. IF WORT( IS REOUM(ED TO TAKE PLACE WITHHRN 1HE ORIPLI6E OF A TREE. THE CONTRACTOR PERFORYIO SUCH WOAX YA L BE REQUIRED TO COORDINATE PLACEMENT OF A PROlEO11YE BANNER OVER THE AFFECTED PORTON OF THE TREES ROOT SYSTEM CONSISTNO OF 4 INCHES OF HARDWOOD MULCH BELOW WOW LOGGING MAYS THAT ARE TOPPED OF VAIN 4 ADDITIONAL INCHES OF HARDWOOD MULCH. THIS BARRIER SHALL BE SO4MXLM 10 BE REMOVED WEDIATELY UPON COMPLETION OF WORK N THE AREA TREES DANA= BY CONSTRUCTION OPERATIONS OR AS A RESULT OF NEGLIGENCE ON THE PART OF ANY CONTRACTOR SHALL BE REPLACED BY AN APPROVED TREE SURGEON WITH ALL COSTS BORNE BY THE CONTRACTOR THAT CAUSED THE DAMAGE ANY TREE DAMAGED BEYOND SATISFACTORY REPAIR SHALL BE RDKhW AND REPLACED AT THE EIWEENSE OF THE FEStO14IBLE CONTRACTOR, REPLACCINNENT TREES SHALL BE COMPARABLE MARKET COST AND OF A SPECIES SELECTED BY THE ARCHITECT, �. DUSTINGTREE TREE PROTECTION AREA B^ y DO NOT ENTER PROTECTORA PARA LOSS ARBOI£5 J - - SIGN DETAIL POST MAY Of EITHER 4'DIA PINE. 2' DIN. OAK, OR 1.33 LB/LF STEEL M_ATHERPRODF SIGN O/C MAX.. As sHDxN ABOVE ' ORANGE, UV RESISTANT, i HKi1-TENSILE STRENGTH, POLY BARRICADE FABRIC OY Q1RggADIE INSTALL TREE PROTECTION FENCE r SIGNAGE PRIOR TO CALLWG FOR THE INITIAL ON -SITE INSPECTION BY THE TOWN OF MOREHEAD CITY ZONING INSPECTOR. NOTES; - WARNING SIGNS 10 BE MADE OF DURABLE, 'WEATHERPROOF MATERIAL. LETTERS ARE TO BE 3' HIGH MIN., CLEARLY LEGIBLE AND SPACED AS DETAILED. - SIGNS ARE TO BE PLACED NO GREATER THAN 75' ON CENTER - PLACE SIGN AT EACH END OF LINEAR TREE PROTECTION AREA AM 75' ON CENTER THEREAFTER. FOR TREE PROTECTION AREAS LESS THAN 200' IN PERK ETEH, PROMDE NO LESS TxA ONE SIGN PER PROTECTION AREA. - ATTACH SIGNS SECURELY TO FENCE POSTS AND FAERC. - MAINTAIN TREE PROTECTION FENCE POSTS AND FABRIC. - ADDITIONAL SIGNS MAY BE REWIRED BY THE TOWN OF MOREHEAD GTY INSPECTION DEPARTMENT BASED ON ACTUAL FIELD CONpT1ONS TREE PROTECTION FENCE .. 4' TRMPFHRAIZY SEEDING SCHEDULE AND DATES Ff]R THE COASTAL PLAIN ' 1N ND PRPAILL10eM 2 TWAC '16Q >INAPeOs Is 0-20--0� HJN�.iAQ (AFIDI ASPHALT TAM Pm GAL/ESL or Nam � ' 3 Al�IMY E - IIIS 01 .•t: {D CCIA !0 LRL/AC. Y AC. NOMW OR ROES LEWAEWE2A (..M 80QNIA Y WR sl) i FEN= s0 L•L/^IL rOWN iu OR OK1LFWAfiA (WOAAtR01 Net �� .. � 1 NAE•IARY SIi Y TAILIeWGI '> EKaamm a NOW uLPam (LwOMBHBO) m In Arc, ROE MW 20 W./AG ' FM •OM EI OR 91EM ADD 20 LN./AO. WWWA LEPOM4 PERMANENT SEEDING SCHEDULE FOR THE COASTAL PLAIN' IOL2AM61 1LEARMIDlA/RAWW 10 uVA0. A fAN1M01dn >b LRR/AQ 41MOM GIMW t1eE[f 10 i0[/AL AARL I - L15 ; `'*� ,.,.�! „• .,,.,,,os�? ,,.ter � ' ,. ." 7 FIYNN t SLOPE E (p an FILL ORO R . MOPED COMPACTED FILL (TERM 1W ELEVATION OF STOBNWMLTER S?OM V DESIGN OF 5PILWAY5 �3 DWSTNO SLOPE ORARIAAE AIEA TOR LENGTH (AGIEWI � CLASS 1 RP -RAP fEIER FAING 2 6A s u Izo SIDE VIEW D•EN5 SOWN ARE .MRRI HEIGHT t WID7N DEIFJTMPRFB BY COST" TOPOGRAPHY AM SMWEMIT STORALE REDOUND. KEY RIP RAP 1111111) Tie DAM FOR STABILIZATION. 4P FRONTME IGNORE xOPE STEP SEQUENCE CHECK DAM N.T.S. 5.4C 5.4G i r SIDE VIEW SIEEE POST 1104111111 RM FABIC UGE SILT FEOICC ONLYY���RIWHEN OV= AIWA (ieD1EXTI.E FABRIC SILT FENCE AM AND �0 IN O TW FLOW.. OEM N 0 OF SILT FENCE MIST BE TUIM UFFRL" 36' s flllF SLOPE 2d" uRID16TIMED FVIRRH IL- �R B e1N COYNDI OVER wa 24" AMICIIOR RIaR'T AS OPENED BY ENGINEER FCR NEPAIIR OF SLY MCC FAL'00 UM /O7 WISHED 210N[ FOR ANCHOR %HEIR ELT FENCE S VRP7M:W OA7CN DAM SILT FENCE FOR SMALL DRAINAGE AREAS LESS THAN ONE ACRE N.T.S. � ® m®©�R RO INN 23p" � �i�'31 f^"il TOtCSS1 ROIIO si3TltEL31 <L'J1 R� [i3TT fu^31IE"f[:,1 E(�1 �L3TT• � � fag�NERIM KMElm mo�fa'nilRDat�I NMI ®�TIIF]71TI�®�B1Z�BOEt�I�i�I�]®TITi➢'� IRRfE�IRR�;'!L-"�a�IRF3I7 ®�7����>��iZ1Cl�TTD�I�mIL•�i��l�® 11MM®11MA nimmaT?.lIER �01CLEi1��® gym®���NMI EUED11IRS ��II�iF1B����IITRIiEaC]R7���®�mIII�EI��=i '1^11�®dimlll[ f 7 111:121111MIl lMI®�[M©emui•�[El �����II�IIIIIIIIIEIIIIIIIIIIIIII•����111111EIIIIIIIE����� IIIT�� I�� �NErF'� IIIT� IITT�Im � 0 � IIIIIFi l�a1 � � F�9IIERIIIIF7b7Gr�r IIII�mTnllll■®QE]1Ei7tT'� � ti��'1iERI1iG7[7iifrlsOVHlI ]I F'J IGTTaonus 1G1� �' 6Gi• [> 71m1 ROC f iFE?i 11lm � � 1T7531 EIF 1 FT32T lLTT IM51 7��aDFERR7WW-1Rrl[HIDEE''3FMI WIN t'T:'r.7TT XV21 mmr.T,7i�>•EmEmmismsIi�mETlT•�Ff�k7.c;,7 .. LL7"aiFl:'.�[R3B 11ET+11 1� 'i.7GT�aWIF-7 �p3RgEmm .Fillmm FEED" "B" 0 0M ®�Tm mum[= � Ei• i IDEA mOmMEMO �MF E".7KIM FFM®m®N;l I NV m ��������O��Itlt:_•I�®�®��7�ri � �nr*xTlmITCLLIIII7 FN41IIMITIONOHKa gr ni. SF® mom ® � [1R7iA7mm®�®���Elm[ KEME 4:1121 0[3Clmm®��llRT7wQ T �1 Fri;] UK] 1119GM, 100 �IZII'T�O�®��ki7L71simm Amssmssmss ffj3: m�il7lid]I I 7m�0 �® mEIS im 3' JMEN mff;p4n 115M NEER MFX,-MmEKM�@EMRP11:'3I FEE IFUTI®MImNEZ"M�fE7 m 4 �IIIIAXEEE2!11KII� pqrnm OUR Fw�Ew7 owl ®mF.T17 MEN Emam W" ��mM�1G.lIEm�����®�F�➢mF3SJ��EZi m�m�omm mmrx.TF�MI� NE11511 0 M MFOIDEFNmn El Pnrt DevelonTn•nt Phase II �r+3Tri i.,ltiO Mr�lMraW dll♦ruSTIfwII R'7 ri31E'"wlR r'^77 MrI'SWBwII r,�TI� _Owe EI5;7m� E:ECRR l'7 7�7 �{ 7 Ri<'3 iTi <7F_S7fi«i m ff-mrwm ��:TFJ� .. lei x T7ET•^�]ilM�:f�_1l'iLi Ems �7C5F71 UM, ME11r K00 �BwL[�I D��tmM�Mm����®mm UM-u .rl•IM Lro S2C C) TOT CDO mmz rn 0ro IT C P _ C, U xIT=o r IT 5.4P NOTE. STRUCTURAL STONE SHALL BE ({LASS "B-) STONE FOR EROSION CONTROL PURPOSES. SEDIMENT CONTROL STONE SHALL BE NO, 5 OR NO. 57 STONE. CULT Me1K - a" MIN 1• Y A% 1� TOP VIEW FRONT VIEW SILT FENCE STONE OUTLET DETAIL NIS 5.413 5.4F +� moms : . NWOT A 5 D7 E67 4Mr•1 :71w tlNwl K UNG FAO 70 E f01 x 20'W x W10 AT APlNGM[ AT ALL PQNS # NPEW6 • IM 9 LW& NS Ii OTTI 1p A 11FIWmK 11N&Y Ir Ae1,7lf # M 0L11R AM L T4MW W *ADM WUIFKNW 10 I/iLY 1NAMwOMMNR WANT •L pplq[p • AOODOMI AX LARGE IV= N 10 N : mQWoe°I'm R 0 eiAYM�MLQuM IAN.INO t� uwl 4 MUST K NARIIMEO N A OM"M 0 X, let WNGE WILL MmplT 111Ap•S ER KWpT pIF • lW011[#1WmIL�O 0019uiL n b • ` -� NLRWWARTI KMv mdNE xA1Wtr. )b EORM THE NImMTRy, MAT K CLEARED UP • 02 •• � / H. CULT RM 1R 1111111 PMVNC N FLAIR S HALL K : Z "FL0 um SO Law OSY� Me IYm A 9"Mumm SIOW ��p1� _ • 1Ra� EMRMIfY # WAMPeOR AREE3 BII�ITMTIE ri7iM! OR M rrW1') • Peet ROOMY, • ALp/�7R • *ft1 D ONE PN21%110R�0.1pA %OMaEMIC ,"•,Ir:•� i} FWIA11pWLY RLS'UI•WIL F9O01MRT An ioomim 04 • Z II 71E AHNAWGK KWASLrmutY PEE( Sa1sp lOIIDNT • :EDUJ • C ?S TI FAMM WIW 1e01E W } 1 CROSS SECTION • z • E W it., TEMPORARY CONSTRUCTION ENTRANCE /EXIT 0 N.T.S. • za 1�tf • Q � i.- 1 5.4Ai ,r sl; 1 1 tI1BL FDIR 1 1 1 i POST (To.) yTy ps # 1 IOeM GRAM R otDlrLoln 1 AaON PIE PERTM �y}�'`'R ''.;�' i'' E•14■Llat N' 1 A "'Y •'r �,. � , 1 1 l l JL ! i t 1 1 j( ICI' 1 j 'l1I j{ IL1I Ni1gW1� M1E I 1 1 1 � 01•WIIO• 1 1 1 r 1 1 . L IA FEE 1 ma P4TIIMLY oOePLM STORM I N I L K MROIECID 4T M 90 OF EAOI DAY ON AOOORWAR[ WIN Ml[ 0914111.111. 10YEAR Locallm AmA 'A' INANIity T RAbX1QI 'C Diets Sub 1LY T Rmgh1NRR .1 Largp Rm Ela, QpW 1. Loxes Ifnrert Slope Flux Vd. Flax Da. PIE Mn, 51 REMARKS I:oxar Flom T6 Aa - eft IN - O CU40 MH47 0100 7.9 0.5 2.T7 2.77 0 W 3 d 5 21.00 10 13.06 A111W1 10. 695 15 0,1 Claw N RCP 4.75 MFN7 MFI4B 0D00 7.0 Q OD0 2.77 p.419 9B 21.30 12.9E 12.5E 1.053 4.34 IO.BO 75 - MRCP 7.O MH40 DA00 79 D OM 2.77 0.013 113 21.00 12AS 11.3 1 1B 4.ZB 10.87 15 0,1 HOPE 7.3 A049 Mi50 0230 T9 DA O.7S 3.4a O.D13 15 15.50 112 11.0E 1.OW 4.51 11.90 15 Q.29% HDPE 305 LIR50 MH51 ODDO 79 0 OA0 5.40 O.D73 50 17.75 10.9E 103E JOSS 4.57 TIA2 15 02B1L ROPE 6.55 MH51 MH7 04100 7.9 0 BAD 3.49 0.D73 !i0 16.50 10.25 8.6E 1.000 4.51 IFFO 15 02 HOPE 5 Fixn NOTE: THE SEGMENT OFAD43 TO THE NORTH WEST CORNER OF WAYNE WEST HAS BEEN ; REMOVED. THE REMAINING PORTION OF THE PIPE RUN E SHALL REMAIN THE SAME. /ati)n Aa [NEfIGATEa IN PLANS BELL END of PIPE TO FACE OF IVdL PLAN FOOTIMa IMF GON4T. J03NT I8 U5E0O DONE Q N 0 END ELEVATION '„Xn t� OCWE 8 IN NIpe:LLL NITH AEINPORGED Ca 11- PIPE T�\ ��T� PIPE slNc E P1rt n6Ue E PICK -- ,r , 1 I Qu 15' ,e E4 ao ae" w^ b a Ie :� oo ae AR"_-- 45"_ "S„ Y 3 ..2 5 .8 n3n n`n ^4 t Y .5: Yt _1_.1 9fY- - `R 2 1 I a Y Y Y Y 3 Y OWL a PILL a 2 a a 4 s a 3 L ] A 5 +• TOTAL ENS. 9 9 14 14 19 • 55 a B5 tY IY la 19 t8 4 TT 9Y C... GPT1- G RTANGTIO Jo1017 OINENaIN• Asa CaGETE QUAI.TITIm ELEVATION Uellq co gxm rTPE _......._..-_...__ -_ LLagN GIESIEM6 6I UOLE PIP OOINLE PIPE P x 6 - a T �8 roe N L ION 16" 9' 3" 1' 9" Y' 9" 214" • PT2• 1-6" 0.7x• 2" ]'. F" 1.0 1a" a'-]" ,• o�^ a'Y".�NiS^• io" -a-.' 1.o s'-7'. N'-11^: 1.a 4'-6" 8" to" ' a':o^ 1.6 5'a" 1 r-S RA ..80„ 4'-0' -ar-a•, 4'-]^ 41�" 11 Yt' S-2" a.a 4'-a" _sn W. 15'-5" 2'-6'I 6'.6^ 4$L 14 .1 -0°- a.4 5'-0. 11'-01, 4.5 42" a'-T• 9'-1 e'.4^ !ly" 1111'x'-a^ ,.a s'-t0" Id'-a•1 6.0 4B' 7L2• a134" _ 11W,.-A" 6_0 6'-a" •-0° z1. 6.0 •NEE ■EEr a - - n ®R AD AREA [RAIN CI CURB INLET ru CULVERT HW HFAOWALL JR JUNCTION BW( MH MANHOLE TW TAILwALL 5.4L STONE FILTER OR PLYWOOD INLET PROTECTION N,T,S, 1. LAY M SOCK 04 LION WINE OF INS SVLCLM ON /q SD[ 00 1r SOTMON NOW 10 ALLOW POOL ORNNOWL 1E FOUNDATION "" W DEAYAIM AT L[AV G RICH ODAN 1E OW OF M /TOIM DRA•L FLAK SHE NOTION ROW OF M ■M AGOW M M # INE ORION DRAM MR IAIERAL 11/POIT AND 70 AVOID "WHOM Wd OEERFIAN OOOIIRL / 1ETDM• OKE LASFAL pYEAILY Af NAMDMK QOM pK OWAKLR(,Ep00 [IIID[ 11Nd10N aDOK OFD110L I CURE MEIN IBM I/2-RGN me2r�L OM ALL KM WON* 10 HOLD CuvR M FLAG[ K00( = MM 4 RAT$ W1O MORROW IT 1) AN EEVI PLACED I � 0�07 li f D O E III[ IIOEDF 1p/p1ARY smomwT FOOL DENBO M6 I%N WILNx. BLOCK AND GRAVEL DROP INLET PROTECTION N.TS. GENERAL NOTES: CHAMFER ALL CORNERS 1" OR HAVE A RADIUS OF 1". PLACE 2 MB "Y" BARS IN THE TOP OF ALL ENDWALL FOR PIPE CULVERTS 42' AND OVER WITH A MINIMUM OF V COVER AND A LENGTH OF B" LESS THAN ENDWALL LENGTH. CONSTRUCT BOTTOM SLAB WITH FORMS. 00 NOT INTERPRET WALL THICKNESS (T) SHOWN FOR THE THICKNESS ACCEPTABLE, BUT IS USED IN COMPUTING ENOWALL QUANTITIES. WHEN THE CONTRACTOR ELECTS TO USE A CONSTRUCTION JOINT AT THE BOTTOM OF THE PIPE, PLACE BAR "X" DOWELS IN THE BASE AS SHOWN ON PLANS. SPACE BARS APPROXIMATELY ON 12" CENTERS UNLESS OTHERWISE DIRECTED BY THE ENGINEER. WHEN THE CONTRACTOR ELECTS TO USE A CONSTRUCTION JOINT AT THE BOTTOM OF THE PIPE AND POUR THE BASE SEPARATELY LEAVE THE POUR ROUGH. USE CLASS "B" CONCRETE. ' NOTE: ENDWALL LENGTHS SPECIFIED ON UTILITY PLAN 5.4E 5AK o l+l A !111i • Ill= O U 3 z � o c Lul w 1 O 0. 0. w a T L?n W a O a o m z >_ F- mLJ 0M U 3\ O U0. O C, • N �r Z~u, L3 • • • 0�211 i i�oCp IS • • ` �_�Zw wHwC • �M Z riww1 M #i • Z u Fa DU�� • O R UU G7 E N}L,} • D � • 4 F • • U r LUL DO �L z J ° .40�� • W__I W 0 • ! Z •CO 4M0N,. LLLs j Z a J 6 Lu OM : A � 0 Z W a¢ CL d D U HO � (3 • R D Z z J't TA Wmg= • M N W • L ;i i Lu o Ic I � 0 i E '0 x to v3 wz�� •mc • F�,m i • • i p SHEET a a • ; G -5.4 • 5ANr 'a • • ,o DETAILS • TOTAL • BaB.oT & EROSION CONTROL 1i �i ) ti' i ', 11t •. , 3 11 1 � `, '4 :,ti i 1 ;' ; 3 i I I 1 . 'I'fCl.�it9rti 23:C':2i ;~SC:Sde u EOP Il t4 " PI ANT LIST: PLANTING NOTES: . ALL PLANTS SHALL MEET OR ERCEED THE MINIMUM STANDARDS SET BY THE U,S.0A4. STANDARD • EOP FOR NURSERY STOCK SPONSORED BY THE AMERICAN ASSOCIATION OF NURSERYMEN INC„ i WASHINGTON, D.C. • MULCH ALL TREES AND PLANRNG BEDS As NOTED ON DRAWING, ALL PLANT ORouPPM ARE EDP CONSIDERED PLANAMO BEDS. • • EOP LANDSCAPED CONTRACTOR SHALL VERiY UTLITY AND STORM DRAINADE LOCATIONS IN THE i FIELD PRIOR TO BEGYINNG CONSTRUCTION, • • LANDSCAPE CONTRACTOR WALL SEED AREAS DEPWATID ON PLAN PER SPECIFICATIOM sEcnON 02920, 1� LANDSCAPE CONTRACTOR SHALL INSTALL PLANTS DESIGNATED ON PLAN PER SPECIFICATION EISECTION 02831, OSTING VEGETATION MUST DE PROTECTED, NO EMW EMT OR • Y , = "' i� DISTURBANCE MiATSOEVER IS PERMDTED INSIDE THE DRp LINE OF THE TREE e'AWAW PI r&%r err a A&M FM I rATM 11F TRFF PROTECIM AlWAi. 1200 — _ ? CROwN OF ROOT BALL SHALL BEAR SAME RELATION ((OR SLIGHTLY ABOVE TO R ED GRADE AS R • m�•.�r.AAn AOfiE TO PREvgVS PLACE ON SUBORAOE PEDESTAL PNE BARK MULCH 75nMn (3") MIN. CREATE SOl SAAICER Wlhi TOPSOIL 150mm (6) YIN. • • • FOLD DOWN OR OUT AND REMOVE TOP I r]� OF BURLAP • ���•ar.i� IF NON-B100ECRAMBLE WRAP IS USED. fAEMOW TOTALLY. TOPSOIL w OR CLEAN SUBSOL BACKFlLL PREPARED SUBSOIL PEDESTAL i o� DOUBLE SHRUB aLANTNO 30 0 MIN, i (12") : u i1 F] CONIFEROUS TREE PLANTING - HEAVY DUTY • G ' 4 N.T.S. 0 e V U • MC + F L L V� KEY IND. IMIENVIC NNE NAME ISM SPACING I ROOT PtEMMM N 6 p— *gI^k• RW Gods r Ga Ir H mR so M"C wd ay IS Olk r ovs Is N miK Bes MWWAd !p"Maw AD 16 AM Tdo"t •a, M N mR w N•LSIAd PC 16 ohtu•nAla Plotoul p •• lamrMM b SM& lo••.r Mc µ OArll•ra IN 11•r1AE11 i 330 OWN RaM1 ry 100 ft >W 176 a u 300 .< ro•me••• 'AxnaW Dosimbbit • • • • ♦ • • WO zz J Z (yaN _ i • /i� o • W z aW W D z P : • 0� F6 R o i n • •Cd W N W a L W ;i a 8 • .c F It �4 S � N GRAPHIC SCALE If plant counts on drawing differ from plant counts on plant list, than plant count on drawing shall govern. Mont height/caliper requirement governs over container size. • L Imb . to R • PLANTING PLAN •TOTAL • A • CIVIL AND STRUCTURAL ENC I NEER: STEWART ENGINEERING, P.A. CONSULTiN6 ENGINEERS Morrisville, North Carolina (CIM) 380-D-150 hayes I howell PRCFESSIONAL ASSOCIATION ARCS 7C.,75 SOUTHERN PINES, NOR7H CAROL I NA 910-b�i2-'7316 MECHANICAL, PLUMBING ENGINEER: PROFE5510NAL EN&NEERIN6 A550CIATION CONSULTIN6 ENGINEERS Charlotte, North Coroiira (704) ?Id4-g5OO G-O.i EXISTING CONDITIONS G-I.I DEMOLITION PLAN - PHASE I C-1.2 DEMOLITION PLAN - PHASE II G-2.1 SITE PLAN - PHASE 1 G-2.2 SITE PLAN - PHASE II G-2.3 GEOMETRY PLAN G-3.1 UTILITY PLAN - PHASE I G-3.2 UTILITY PLAN - PHASE II G-3.3 SANITARY SEWER PLAN & PROFLE G-4.1 6RADINC 8 EROSION CONTROL PLAN - PHASE 1 G-4.2 GRADING & ER05ION CONTROL PLAN - PHASE 11 6-4.3 570RMWATER MANAGEMENT 6RAD1N6 PLAN G-5.1 SITE DETAILS 6-5.2 UTILITY DETAILS G-5.3 UTILITY DETAILS G-5.4 6RADIN6 e ER0510N GONTROL DETAILS L-I PLANTING PLAN DEGEMBER 15, 2002 ELECTRICAL ENGINEER: HAAS AND KENNEDY ENGINEERING, P.A. CONSUL7IN6 ENGINEER5 Charlotte, North Coroiino (104) 333-65clO C�'�F��'�kFT uC)Iu�I�"�L�iIT�' u()LL1�,C��{;ADDITIONS & RENOVATIONS MOREHEAD CITY, NORTH CAROLINA NORTH GARCLfNA LINV; . "!.4`ATAL MANAGE1;4ENT CGtc':''I �iVN DIV151ON OF WATER ULIALITX -A 1 Z - Fe6 zcv_5 RECEIVED DEC 19 2002 DWQ PROD # `♦�� U Div L? Projact No. G1005 STOR.MVNIATER MANAGEMENT PLAN CART SET NO. I O h,14 Co I - O O O C Cur c OFPIP 3 3 rd RIM - 2^ W\' <. RIM ?3186' LIENCM ! 16.97' - -- NV - 7 v6' ! iC wRL OAF �s WIN P ss- IN LP COONC. ! TEL rs - 1 RM BENC.�t 1 t G2� � , r'� � _ ` 1 i Q 1 Ji'. Iva- 15.53' Mk r j CONC ~+ ��r !x - I OHE '� ! TEL IrQOD ELC / NRICII / r et cove ), PAo WM la x f t P oPTc UNDER .-OCR AD I_Jx 1 P �r cHou ND L� TANK I� f TEL / l '•1 /� \ I S rlrD PP �r I LI _ _ __...... .-.. I� r_, jlrlj�J� f ,, ra. i � . -- _ - lil I EP IC BO ELC I ... TEL L �- c�• 0Gb SP MII I I X I ! `+ I,1 � LPG r r !! ` V �l j U `7A` 21' 24'METAL PIPE {\\ SCN aI r _ _ ORIGINS OF METAL 12' RCP �_2 _ G _ PP , / - 4 I NOT KNOWN-SD---� - � _- -50--' - 50'--Sp INV- 1E�T: \ j _12•RCP D. 1rw5v. o"F FFP T ✓ i!$ fI '} 6.6 Al I- Irl,C, RL. •EHA'�NZ L!Nn, CDO Qp/C '>' - �iri,� .,, L . \ � I . I :v. / WOOD . r.,P i. DRIVE �1• i�l r� '"�� 1 TRANING +.u=; II PAD D TEL STRUC CURES Ix INV. LIGH � +� RCP r �- { I PAO - I '� ! ,, j; �"l �. b�• _ '' - INV. � 21 _ _ � 6"METAL IVY. B' / 11l 8.6 pVC z - -{ LP 1 INV. E. 10"RBUBBLR _ T� INV. _ ! -, HEADWALL ORIOrNS III -OS- � �,r NOT KNOWN 1NY. LP 1 LP Wr .I J ... a-7 L1111'A VY, f F `OSd" ROP 1J L❑ --- CONIC 10"META L ~Q - I PAD �xI7.a/!NV I1j/ Gov �' r I li I i R'M _ tC 91 �Q TEL ALARM / BENCH - 7.36' �� ri p �I �R G1i9S OF + $ l Nr 7.0? �S �I La POST 's- -- _i a METk 1I- _ CCNC� TrI Tom_. NPP OT xr:owN ' _ _ !t Mc - =� i 2 f lI ! 1 1 r �, -- •� i I' o'� PAP�IyG I � ff li CO, 1 I I Q S FOR 1 O META, PIPE �G y O Lp - E� - IS _ II i n4l i f L �� QI ISsI ROOF ION OF URA PORTION CF BLDG- 208 WAYNE + ASrnA T i - t.,,.. eLeC� LP WEST- PARNIk �. G v I} T I CONCRETE / I L Ell I .... �� INv� 9.0' i E'`L O +i LJ J 'yV A I� IL '���` --..._ • \\\ \\ ,� O`O� 2 HYD fIfLimr / V M �6°PVC -� 'w >_ �-i--7 COr i cx Ct7eL.E I I 30" RCP - _ `M - _ _ M - -M _ \ __—-�� _ kl ! yn `INV 4.8' / r PP / $'PVC ,'z-55- r' f WVS uc ELc �-�n - ---ss PP Ss-- SS- Sg- I MH - LI- ON I RIM = 9.7?' - f BENCH = 4.�T rr `Lp / - __-_ DROP INLET .-._� = 0.20' / INV. = 3.92 I��'r '_/ C GRATE - 8-3'MIS 1 p BOTTOM -0.9b' INV, = 4.1' - I _ ©4 �{ h LP \ DNop INLET G 4TF = 4.88' n ` fc r 1 GRaTz = 6 A WOOD -_ `���'CK'T rENCt / LP �, I TIZANS \ lr..DtiC 1 YYY 30" RCP -` INV 3.4' � nI i GR.NIE = 4,62' / - - INV -- 0-21' )? MH O U6 I METER ELC Box r I Il' MH •._-_.__-_. ____-__...- - � _. _--__. I In �5 MN 8 P 601 ELEC N �� DIID �ND ��� MH I it LP MH MH OUTLET 1 �DN(- P PIPE o i fJJ FAD PIPIPEMM MH III INV= -1.11 O MH `/�h� "-' ALARM I MH STORM WATER r _ T„5 SYSTEM iii �\ , V rT l "r 7 r rj r� - 1 5 Ash STROUD ENGINEERING, P.A. 181-A NO HIGHWAY 24MOREHEAP CITY• NC 28657 (252) 247-7479MollJOSEPH T. CHANCE, P.L.S. ill! TOPOGRAPHICAL AND LOCATION SURVEY • CARTERET COMMUNITY COLLEGE MOREHEAD TOWNSHIP, CARTERET COUNTY. NORM CAROLINA • : • • No. NAME TYPE • : • 109 HRD BLOC- - ASBESTOS SIDED OFFICE • 115 STRUCTURE - MASONITE SIDED OFFICE PR PROGRAM OFFICE • {n 208 D_ wq F WEST - TIN METAL BLDG. • G • VOCATI(1I SHOP Al CLASSROOM BLDG. : 7 • 210 MAINTENANCE BLDG. - BLOCK BLDG. • X 2t2 MARIICULTURE BLOC- - TIN METAL BLDG. 301 ROBERT B 1H]WARD - BRICK BLDG- CLASROOM BLDG • • 3705 LAW ENFORCEMENT BLDG. - VINYL SDED k BRICK • C' W • Z 3801 MOBIL CLASSROOM ; UN I�'' , Lu 3901 MOBILE CLASROOM • LSO C Z \ • "-o = a r` � SETBACKS • 15' FRONT (ALONG R/w OE • US HWY 70, • WALLACE RD. ar BANKS ST.) • 15' REAR • C 7' SIDES • • : W Z -A LEGEND J O a EIR IRON ROD ZJ EXISTING Ell EXISTING JRON PIPE • ; EPK EXISTING PK NAIL ECM EXISTING CONIC. MON- ERRS EXISTING I SPIKE SIR SET IRON ROD • ` U • r • CP CALCULATED POINT I HIGH IT - ± O O'- MEAN WATER %F NOW OR FORMERLY • Z' Z M MAP BOOK PG PAGE Do DEED BOOK z ; W PP POWER POLE • LP LJGHi POLE • SIR SERVICE POLE ONE OVERHEAD ELECTRIC • • EEC ELECTRICAL PEDESTAL TRANS ELEC. TRANSFORMER TEL TELEPHONE PEDESTAL • O • ,n r CTV CABLE TV PEDESTAL WNI WATER METER • V , r -y WV WATER VALVE U • L I HYDRANT c0 Cl OUT • O EOP EDGE OF PAVEMENT • " ` Li! C) • � ^ p • u � • � Q • • V • • • • : • • • • • • • • • • • �Itl • r >ry • - a • d d Z � • 0 N Ud • ,9 _ U z • d I • 1 C—' z : =� J A , 1 ;ca o • C n `. • � • � q C • U GRAPHIC SCALE : p t5 ,]C • • GP • N O • 1 incL - 30 It . 4 • EXISTING CONDITIONS 0TiiTFL .���--.�'}.--� f 'ri; _ �Ir _._.`°�'''i��'�i4,''1•'•.1'ii.. _ _ 'I'• �.�..«.� _1._ s_.�.__.��r- {"�_,_._i-�`F_L�•s" •° :II. '.yam__ �..� _1 . . MH RIM = 20,64' BENCH = 16 02 INV. = I5-5S' �'�—'�- OHE _ CP y/� 99Z� / O/ PP - :i'F' 2 - &VI ,. , / ore / / 3 / , / -M, //� q// / / i I _ / / a i; K / i C o"" / i A �y �O t A, 2 A �� SIGN } / OLP ESTIC �iER /%. \UST II,II+II-I i TEL KA ffib . 40 V ! __ ShIEETNOTES _� a ! `- ` r - _ r £r _ -- G' i1 I - 1 I r' I f 1_ ALL DEMOLITION, AN➢ ANY SUBSEQUENT CONSTRUCTION, SHALL BE PERFORMED IN ACCORDANCE WITH r - _ CO 7 -�`- - ! !S I! , I l + THESE PLANS AND SPECIFICATIONS APPROVED BY THE LOCAL GOVERNING AUTHORITY. • VI' .`� PP O C 1 l,lrl 11}1!!@:diHr II U?,1IrAlggil frl-,- ---- _� _ 1 - � l ' 1 j 2. ALL OEMOL!ADN AND ST 65£NU£NOCA COD£5.� Tb BE IN ACCORDANCE WITH PERM€T£ ISSUED AND I - j I I APPLICABLE S7 TE, COUN Y. D L o 7 .. uuluri!'f In,+lr! _aa �: r'_OP m - ! 1 3 i - i.� r _ _ r I'i;31;!/f Ilf'N717f1!!I'! =�.6_ '•!IN4A .lU I GGY I - 5 ��� j - A, lAfrrlv,,;,91 �_ ~�--�.- f J r 3- THE CONTRACTOR SHALL OBTAIN AND PAY FOR ALL WSPECTIO^15. CERTIFICATIONS, EQUIPMENT, ETC- • i 1 I THAT MAY BE REQUIRED. i - _ _ J - _ __ - W ,N,l Il i,.'j"i;lifNrN l rN:i 11:;-�-=�_,yl .` .. - �' /,,... : - p aI ._ - w �. „rrlO,p, r F PP -.:..-• .11 I . -' r �` w _ IIII�;L"j?"II rH; lily F-op 4. IF DEPARTURES FROM THE SPECVFIREASONS OTH REOWF NSHALLRRE SUBMITTED ETO THE OWNER OR RENEWR i - - - , l� _ / DETAILS OF SUCH DEPARTURES ANO -�--' �-w f lilr 1.. f,lll}�Ip1 rl rrr r, EOp �'/ NO DEPARNRES FROM THE CONTRACT DOCUMENTS SHALL BE MADE WITHOUT THE WRITTEN PERMISSION OF g�� w._ l r'1tI:NlAllf Mr,' / THE OWNER. 3' O+c'�"'� I, �-_. -W_ if1!!1l ll_ - HIM 7_035 /'_1' a I � O� - 9 f-`.3 , , _ -- W--l'!'llrlll llllCrrl in; ;r >3CNC,1 1 6 65' _ 5. EXISTING IMPROVEMENTS DAMAGED OR DESTROYED DURING CONSTRUCTION SHALL BE REPLACED OR • } _ „If, L -a RESTORED TO 111EIR ORIGINAL CONOkT10N, ANO TO THE SATiS�ACT€ON OF THE OWNER OF THE IMPROVEMENTS. • Pp Q ! I f F - ,f�l! �__� �t TEL �'' 1��: �lll r fly NV_ = ib_S4' 1 '- ` r H 3 I I _- `I! - _ 6 P, , _ WV 't / \ 6. CONTRACTOR SHALL REFER TO ARCHITECTURAL PLANS FOR DETAILS OF BUILDINGS AND BUILDING • / MH i V I _ :G 1lj '.E PP _ W:r3 r t DIMENSIONS. FCC RIM - 231R8 L ` - - v'li . __, 7. ENGINEER AND/OR OWNER DISCLAIM ANY ROLE IN THE CONSTRUCTION MEANS ANG/OR METHODS r 4 '4 , - OHE h7 s f _ DENCH ! 16-°a7' � _ -- -` ' , L, '� 1, _ ASSOCIATED NTH THE PROJECT AS SET FORTH IN THESE PLANS. • - S Iwu I _ INV = T}6., 5' 1 WELLN ® p �� y w 8, CONTRACTOR SHALL MAINTAIN AN -AS BUILT" SET OF DRAWINGS TO RECORD THE ACTUAL LOCATION OF O `ti.,,,�,,..r'��'- i :: , � I W'M - _ 'Am WM ALL PIPING PRIOR TO CONCEALMENT. DRAWINGS SHALL BE GIVEN TO THE OWNER UPON CCMPLETION OF THE • '',p'4(/L La ,•` 1 _ 1 ='sz �Ws f - _ PROJECT WITH A COPY OF THE TRANSMITTAL LETTER (FOR RECORD KEEPING) TO THE ENGINEER. i,°r.r ! I > ''l �� - - I f,r ( _ SS' - SS_ 9. THE CONTRACTOR 15 RESPONSIBLE FOR FIELD VERIFYING THE ACTUAL AND EXACT LOCATION, SIZE AND ! � '� �` A'' - 1 'I I MATERIAL CDMPO51110N OF ANY EXISTING WATER OR SEWER SERVECE PROPOSED FOR CONNECTION OR VSE • \\\ I �- y `- _-_ _ 11�, - 1 SfG^1 ll1 ON THIS PROJECT. 1HE RELOCATION OF ANY UTfUTY SERVICES REQUIRED TO COMPLETE ANY PORTION OF • \ - N ' - _ _ i ,f THESE CONSTRUCTION PLANS SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR • , ? LP . �� • ' '� _ ! I'L _ Jl 10- THE CONTRACTOR MUST. AT ALE- TIMES, KEEP THE PREMISES FREE FROM ACCUMULATIONS OF WASTE r r CONC i�j �"I, $. I' " I MATERIALS OR RUBBISH CAUSED BY WIM. HIS EMPLOYEES. OR HIS WORK, ALL DEBRIS SHALL 8E REMOVED l `> T = TELL? If I FROM THE SITE ON A DAILY 8A$IS. • rL CA „ RETi CO, 1�J Opp 1 --=T- �'- �� _= " ,. iJ.af - Li'�I)} . C ING AVTFEORITY SMALL NOT BE MADE UNITL ALLm^ fI1 _i. y + 11 11. FfNAL ACCEPTANCE OF WORK BY THE LOCAL GOVERN Z O� lIJ ,. .f .'.::. - --.:' :' ::: .J!, ,6T `P'U.'': "()u l,'.. -ft. �, ! WORK StkOWN ON THE APPROVED PLAN !s cOMPLETED. � z RA EII r i •, 3 N b2 LL ; Y .. Sri +i - - ' --:' , .. - - ' - _ r j 12- CONTRACTOR SHALL CALL "NORTH CAROLINA ONE CALL' AT LEAST 48 HOURS PRIOR TO BEGINNING • w a h ur . s._ �; C',^f T; F �� ! ! 11 1IffJ CONSTRUCTION OR EXCAVATION ON SITE TO HAVE EXISTING UTlLIT1E5 LOCATED, CONTRACTOR TO CONTACT • lyl �A $°f OJd ! -' \1, - (i `. r \'- - _ I f11� it T E THEIR OWN INDEPENDENT LOCATOR SERVICE. CONTRACT R SHA I I �� / I f I i� ANY LOCAL U ILITIES h1AY PROYIO 0 LL : _ $i• �� - +- f:;a;:; - - _ - ! P l .1 Il !I IMMEDIATELY REPORT ANY DISCREPANCIES TO THE ENGINEER. • 0 F1 - 3 I':, - g' _): < `��\` 1/ !'. l a 4 • ,Z Y3t'e o la ; - ,tt:_- r �Q� i C'!� �" I 13- ANY EXCAVATION MUST BE FILLED IN AND TAMPED A7 THE CONCLUSION OF EACH WORK PERIOD, ANO a '�ANCE n,,:alrgA / . � sP w st B i '"U " RD-�a'aI611V1 I:< ,N ,+. '.' I EQUIPMENT AND SUPPLIES RETURNED TO THE CONSTRUCTION STAGING AREA_ gl `~ �� _ °'''� O� D15T M ITS 'I',Ald:'0.'vNlllNliVL.P ,I IY IhGV4t tAAi,�:. /; l r ,- .— - L1M nnulhul,u, n: p� I \y i} �u� nll �\\ rf SEQUENCE OF CONSTRUCTION ACTIVITIES z II uno, - 1 ¢ Alt ;�� I CCN �1Jf41� 'I;IAplq,l}Il �d nV -1C111 ;i!::l ' f' r 'f CONTRACTOR SHALL INSTALL CONSTRUCTION FENCING TO ROUTE PEDESTRIAN ACCESS AWAY FROM • < p Eg g �'°� C WC" t �� _ Ci'? F l\\ - it CONSTRUC710N ACTIVITi£S FOR EACH AREA SUBSURFACE, NEW WALKWAYS, BUIiDkNC FOOTP121NT, ETC- UNDER • ra L•r,'- 1 TEL Vfl _ _ -` -- II - ( CONSTRUCTION, WHICH WILL REMIAN DISTURBED FOR MORE THAN 48 HOURS. ) • J"� _r` • n I _ PP L_P I _ U = �=�� 1- OBTAIN ?LAN APPROVAL ANp OTHER APPLICABLE PERMITS. O fF{ % G - / - .� �, - 1. i, ;.�. 1= ,. g �' f� 'J I' n _"i - 2. FLAG WORK LIMITS AND MARK TREES TO BE SAVED, IF ANY, FOR PROTECTION. • ®_, :,- _ �.�. 4' ' / /'Tun TI I 'Llnl fill! T `� ,` `,fi:., a'. : i .� rill fi x .:. .' ".: .>, �5 ,,.. l _ % / T /y1r:. ;—.-" „ ' - 3- HOLD PRE -CONS RUCTION MEETING PITH INS?ECTOR ON SITE. AT LEAST ONE WEEK PRIOR TO THE START OF _/ = / / / / / / i -. , ; ..._ - ... '' ^.jcL- - 1 illy!';;'. lr lr I ,�� - ANY LAND DISTURBING ACTIVITY. +/ -, .t /' , .. g O r ~ITN, !III,!Ir., - bc /" S? ss - - / •' // a - 4-IN TA N TRU TI NTRAN ES TREE PROTECTION FENCE AND SILT FENCE' OTHER TEMPORARY EROSION �)1 i . � / i, / / � � - �� BRICK 1 - l E 5 LL CO S C ONE G , I i / / Ir- - CONTROL DEVICES n5 R£QUERER - i % / _ - -,"m ' TAN{ I - i n i r i �'' I ! - I+[iA; - IN TA P -TIT ATM 7 A NANO INFILTRATION BASIN. /�/ , % ii k : �" H.,",X _ s. s u RE E EN B s� ;.% • T / // / /" . - b; J.� 'r"L rt- �Ai,L �'.�4.. - I 6. I S ECnON BY 1NSPEC OR. / ���� (V / / LYE:= 1 Z HAR ANY T!M R 7r'I ,1 i / L: _: ,;4 _ I - VEST SE . :]Iry ih91. / - / / - i rr _ L, f, /Y a ! rl.. - / 7P '-=':..1tti.3t3 ,.... B ua;rr Irs J o A R / i- ...ICI 1 - t 1 P F a TALL ADDITIONAL EROSION CONTROL MATERIA A N - 9E $ - l- 8. ER ORM S11E GRADING. ND INS L S EEDED _ /1 Lea! .!Y`W:;� PAt� I / �r. 10 G'S1-.r. , �',fl f I - OPiIC / /' / UNDER TM+MI '� x '•T - / a: i / 00 - nr ' ,/ / i - _ _ .4i z +9PIiG;nn , - PR VI MP N ALL DISTllRB AREAS THAT W I F 14 A R R l' / - - - _: ,.. GRGUNb ;3 '.;--', ..If 1.lTI:I'PI - & I� D Y IN L L r 11.�1 9 0 E 7E ORAR SEED G 0 Ep LL BE D E OR U YS I] ONCE i / -: 1 l / i :-... .:: ..,`. - ;:. I_P TANK = c r,G' ~::: , AYNifl L-�I - • / - - .: _ ' ,,ELL. 1,l11' ,ih.. - 10. PERMANENT GRASS SHALL BE INSTALLED FOR ALL AREAS AT FINAL GRADE AND IN SEASON. FERTILIZE. L,l O ".� / / ' i / , '.. e .. - lr: ,5L, .,_r �_ r ��. 11,.!,:Ir;,r: WATER AND RESEED AS REQUIRED TO ESTABLISH AND MAINTAIN VIGOROUS STAND OF GRASS. HYD PP _ .. / _ -. - ' G SEPTIC::�:T: fro' E f _ .////�f/ ir. i . "_.: ' -- - ,f_,.�_��J� j 1 11. INSTALL STORM DRAINAGE SYSTEM AND INLET SEDIMENT TRAPS. • •I ': 9 _ ,�I - / / - - I I �� 12- INSPECTION Br INSPECTOR- ✓I .w, t 1 ..-.,I . / /, / "" / /i / i i n __ _ _ _ ____ _ -. ,� TEL uC ! :I a! - ' i 1,' COMPLETE CONSTRUCTION AND FINAL GRADING. • 0 / II I -I - IA I III I... i! - 1 • n I - /-,-�: i '.(III IIIN+h='IIINIH>EHIN:.IIIIIINIIIMI911H'HIIHI IHk A IA IWlgL - / : H 6' - / / - _ 1,- 1LPl 14. PERMANENT GRA55 SHAll BE INSTALLED FOR ALL AREAS AT FINAL GRAf7£ AND 1N SEASON. FERTILIZE, ..x, % /i f - =E z O I, WATER AND RESEED AS REQUIRED TO ESTABLISH AND MAINTAIN VIGOROUS STAND OF GRASS. rT ''/ :f:J °.✓ / --tNVZ+t,•' 2:.? :AL:PIR� '=y I,:. _... i' { J / / - � � -I--� T "' 4..M T £ - `iro '" 1'l 11 AFTER COMPLETION OF CONSTRUCTION AND TH£ SITE 15 STABIL€ZED A REMOVE ALL ACCUMU ATE / ��yrrr / - 1 ORIGINS OF . - M -f - '� ( ) L R • �� / _ -I 7:2 _ - -_ DPP -- ��� f �,� SEDIMENT FROM PRE-TREATMENT DENTIDN BASENS AND DISPOSE OF ACCORDINGLY, (1?) REMOVE ALL • / / , // r�:{{ 12" RCP j� - ll h TEMPORARY EROSION CONTROL MEASURES, SMOOTH AREAS, APPLY APPROPRIATE GRA55 AkD OBTAIN • m, ill' " ,.' / / / / -l. I OT KNOWN ".gyp - , _ _ !For w - - v Cl:r,;' W, SV�� APPROVAL BY INSPECTOR- • .. '. 3 -, i( / / % / / /' . / `'N I l ENV. ,.. , ,. ::. ) ���, 1 I� r --' /' / `/ / / _ �1 12°RCP �' Q} NQTE: INV. V .,T --��� - g - PP 'i l 1 p NOTE: INSPECT AND MAINTAIN ALL EROSION CONTROL MEASURES EVERY 7 DAYS AND AFTER EACH • Z } =i -,T, / j i _ . 1;5� C* jjA/C - _� , d SIGNIFICANT RAINFALL (0.5 INCHES OR GREATER) AND DOCUMENT WITH INSPECTION REPORTS. • r. �; . , ALL Ft,dC„_ ARE CHAIN LINK_ ,T _ c ___ x • UJ _ // / ` > , I!Ih.djF' �. :� // /� / / % �% WOOD .+. ' - - - r. r. Ol. L?RIVry ,-re +Jo Y z� / / �1 DEMOLITION NOTES / Y) TRAINING ✓ tiF - !1"r,, F D �� ` ' ~~ _ I �Y TIT . Opp w Q V ' ••Y� % STi2lICTURE� '� I l } 1- NO GRADING IS 70 OCCUR IN YHE TREE CONSTRUCTION AREAS OR TREE CRITICAL RQOT ZONES. tr p ` 0. EX - L'r /\ - - mil- - r - :� : 1.1 .1 x - ,�IA �/ � j/ / - - €' U = _ __ _=\\GONG ril LIGHT o I, �' t'+ 1} 2. CLEANWTS LOCATED IN AREAS OF DEMOLITION QR SUBSEQUENT CONSTRUCTION SHALL BE PROTECTED FROM al j // / '` 7 a _ _ PAD POLE "" " l C I +tit, , ❑AMAGE AND RAISED TO RUSH WITH NEW GRADE. f IluEllirr�� 4u - ' JJ I '// 1 5 / / 1 £ -_-?' ? '>•": Cr,-: - II 3. ALL ITEMS AND EQUIPMENT REMOVED BY COT1RACTOR SHALL REVERT TO OWNER FOR REUSE OR DISPOSAL- • _;I 11 =E. Ar ADD AL.T�•,Frt��NATE �!' ' - - bt � 1 / , _ - - -' I f- I< '' 4. REMOVE EXISTING CONCRETE (WHERE REQUIRED) TD FERST COLG JOINT OR SAW CUT TO OBTAIN A CLEAN ff , r = I ',sF, :. �` r _. _ ! TQ--�L H �� Il� {�EE N 1V, �g EDGE FDR NEW CONSTRUCTION. - - /,, .fR�2,t 'S _ v Lrh,{ FL NCI._ �; ��j 5� WHERE ASPHALT SECTION IS REMOVED, CONTRACTOR SHALL USE A SAW GIJT AT THE LIMITS OF DEMOLfTION rg -A L I� - } d n W / 7 ,� ; � BEL0 ', ` TO OBTAIN A CLEAN EDGE. • - r I e. 31 ��- - S :.q.",1J �L C ,,' L• _ _ li 1 /� V 1 I'1lI- �i •. II EI_ _.i - jI I . - i� / } 6, CONTRACTOR SHALL RESTIDRE THE LAY DOWN AND STAGING AREA TO ORIGINAL CONDITIONS ANp TO THE ' - 3) INN. - ~` Y 1 r � - , � t-i' f } SATISFACTION OF 1NE OWNER. PRIOR TO DEMOBILIZATION AT THE CONCLUSION OF THE PROJECT. • a , .. e. .-. - - a x,� ! ! �'R': ! �� 7. CONSTRUCTION Oi- UTILITIES OUTSIDE THE LIMITS OF CONSTRUCTION FENCING SHALL BE COORDINATED YIITH a IIk� r _ �' _ c .. • -� 2j.� - ��_ x �j ,13 tfi 11,' � � f, vo �- sckob. INV, _� 1 IN _ __ x��� - �� ,i I �� 8 & DEM�JTION, AND SUBSEQUENT CONSTRUCTION OF STORM DRAINAGE FACILITIES SHALL BE PERFORMED IN • =� _ .. 10.5' - w - - _ _ _ t 11 0��1 SUCH A MANNER THAT THE OLD PIPE AND STRUCTURES ARE REMOVEC AND NEW STRUCTURES AND PIPING ARE _ ,u1 U :.'1 - . _ + i I- '_=1--.,--.--..�. 7 1 6R:CTK� �TC'Rh' �� ` , PLIND %LP IMMEDIATELY PUT INTO SERVCE. CONTRACTOR SHALL ENSURE THAT STORM DRAINAGE DOES NOT REMAIN OUT • -. � ",r _ , iP _ -!� 4 LP 1'� ': '�. NIit IIIiIIAIIIhLgHpf111ffHIHlilHllllEf.-I f `�0Y -`e•• DROP - r j!�r ,+- ram/ OF SERVICE FOR LONGER ITfAN 12 1HOU RS AT A TIME. PROmS10N5 SHALL BE MADE TO MAINTAIN STORM WATER o'f 4D '2 Qi- n_ .a Q _Q_ 3Q _.��-� € I'.� Fj i CP LC - o Q LP ti ` / 90X I I fy,k / y>Y plj -�.. :.. _/ DRAINAGE DURIIyG CONSTRUCTION, • lJ i . �� 1 O\\\�, 4RE`I- I'.. E - - ! I - RIM = 10 ,' V OS ' 1 -1 ;'/ \r�G / C' S. REMOVAL OF ELECTRICAL UTILITIES SHALL BE DONE BY THE LOCAL POWER COMPANY- _�� I 11I` _� :'-: f -F -- / f ° TEL ALARM r a . - ! ilfl IIN'I .I H!ry;f�Jr BENCH-= 7-36' / oe' !v WV 1 • _ a _ ,I pS` Lp' 1, P POST 10. RELOCATION OF EXISTING UTELI71E5 TO BE COORDINATED N7TH THE LOCAL UTILITY PROVIDER(S}. • INV. 7.Oa � / I� -•y •d. - 1' © L�I __. _.. _. ._�_ ��I i� ,(/��\>`}`�' \ LP I� 11. OVERHEAD ELECTRICAL SERVICFS TO BE RELOCATED OUT OF THE LIMITS OF DISTURBANCE BY THE • -1 Q 'i _ CONCRET6� - . •'! _ _� - - R:II I Ili .. ''I- - _ RAMP i� C� F \\ "" �Q / (�/ �/` == APPROPRIATE U7ILVTY PROVIDER- • O Z PP _ _ - - I E • _ , METER �J -/ - :PARKING av '�' - r ..f h f�'��-_ = - �, ' 1/3 _ - _ - L� _ _ I-- J a l SF ! - - i n LP __� `/ iz`'LIS FiYr3 12. WATER, SEWER, ELECTRICAL AND GAS UTILITY SERVICES TO BE REMOVED TO THE PUBLIC R/W ANO PLUGGED 1 L - I - ��: - � ,1 V" f � I - : 1"j z SIGNS - .. CP � - _ OR TERMINATED AT A METER (AS APPROPRIATE)- GENERAL CONTRACTOR TO SCHEDULE AND COOROINATE THIS , q a ?`. ���= s �r '.r -.. :I ASPHALT o °_ ELELp':i = �tl - _ _ - - _�_� WORK KITH UELITY PROVtOER. {�/ CJ I.' �6- o - VIAL Pl � - ... PARICIryG I i-7' _ - +' - ��` • . , - a ' i'. •� n _ _ O aP L. . - .. - , 8 , - _ 1NDICA } ����_ 1• f\ ,¢; �_' Z A - EEL _ �� l 13. ELECTRICAL OR GAS iJTILETY SLR14CES TO BE REMOVED SHALL SE REMOVED AND RELOCATED (AS TED � -�-- --- i " .- � { .El' ! F �`'�?O BY THE UTILITY PROVIDER. CONTRACTOR SHALL SCHEDULE AND COORDINATE THIS WORK WITH THE u- ® Of { 'T" 1 } `'- C-':u-__'" TC - - � _ _ 1`F �' APPROPRIATE SERVICE PROVIDER. ALL SERVICES SHOULD 8E INSTALLED PRIOR TO TkE INSTALLATION OF • -y O ' 'J' � 1 - I: R - E : 4 -T \ 27 C PAVEMENT SIDEWALKS CURB AND GUTTER OR INSTALLATION OF OTHER PERMANENT FEAT R - • - Z Z 4 �, _ -�' z ,�? J CaDNCRETE ., _ ,rf�h " } i _ - „1 � _ ., _ `��� 14, WHERE UTILITIES (TO BE REMOVED) IMPACT THE FOOTPRINT OF THE NEW BUILDING, CONTRACTOR • �/ AREA; = C - - f �� 1 • of -J r �_, - - !{iGf • 6 a - - ! - 1 .t i - -�`:: �t� �f� SHALL EXCAVATE AND REMOVE AN ADDITICNAL 2 FEET OF SOILS TO EITHER SIDE OF PIPE, AND ! F00T • f _ - , I l- - a ,+_ -/ - - -� BELOW TO REMOVE UNSUITABLE SOILS. CLEAN SOILS SHALL BE UTILIZED FOR BACKFILL- COMPACTION OF TEL O ,' I' INN-= 9.0' .y�, _. _ bye, q �- '" -- ' }; .!ti-"-- THESE SOILS PERFDRMEU IN ACCORDANCE Hfl TH SPEC+FiCATI0N5 AND SITE PLAN. M I'i _i1 f J ��,.'• { �- = � j `.-" _ \ 15- 711E ASSUMPTION IS THAT THE 12' RCP SERVICES ROOF DRAIN LINES FOR BUILDING 2T0. CONTRACTOR ' 4 Pl L4 ! ,I � \, - SHALL DISCONNECT SUBSURFACE DRAINAGE AND DIVERT STORMWATER TO BASIN- ALL SUBSURFACE PIPE AND • > �. =JI i ' "I .. - _. � , G .I, - 1. _ ! a f I' _ ! l \ !� i� STRUCTURES SHAIi BE REMOVED. r \ U 1 H I osc z r rvtA a ' l f �� 1_ f l • �J U j -' -''�'' 1 n f , �� Ii `o,� TREE PROTECTION NOTES i Z o �I I EE -� ., ,a F a I _ jt} f o I.. •�' I- 4- ! c V `'��` rr _ _ 111 vn� S, 1. AT THE START OF GRADING INVOLVING THE STRIPPING OF TOPSOIL OR LOWERING OF EXISTING GRADE • !fl f O LEI 11 - !I f - I -�i t A I +r+ , AROUND A TREE, A CLEAN, SHARP. VERTICAL CUT SHALL BE MADE AT TH£ EDGE OF THE TREE SAVE AREA • ll-1 2 "' o = j' f y' ; �,1 �6'r THE SAME TIME AS OTHER EROSION CONTROL MEASURES ARE INSTALLED. THE TREE PROTECTION FENCING �I _ � I =`� _3 r [4 {' ' \ SHALL B£ INSTALLED ON THE SIDE OF THE CUT FURTHEST AWAY FROM THE TREE TRUNK. • [� , __ jI ` . . ' .Y _ n / 2. NO STORAGE OF MATERIALS, FILL, OR EQUIPMENT SHALL BE PERMITTED WTHIN THE PROTECTED AREA, Q �i` ._� ,y1p' _ 1 w AND NO TRESPASSING SHALL BE ALLOWED WITHIN THE BOUNDARY OF THE PROTECTED AREA. AND SHALL BE • ., - (9 { I _1 - "f Y = TF` -' //// IV/ SO NOT£0 ON THE GRADING AND EROSION CONTROL PLANS AND POSTED ON THE PROTECTION FENCE. A Gij/t � JJ "'� !I 1 / // E j��-'t PROTECTION FENCE CEINSTRUCTED OF MATERIAL RESISTANT TO DEC-RADATf�I BY SUN, wlNp, AND MOISTURE • fl, L�� � __ o - 'G 7i,,j /.� „1 hH:., IY (. j_��;Ir FOR THE DURATION OF THE CONSTRUCTION SHALL BE INSTALLED AT THE SAME TIME AS THE EROSION 77i//„ M -,PVC - ,I �- \� M n: V / CONTROL MEASURES, AND SHALL REMAIN Ik PLACE UNTIL ALL CONSTRUCTION IN THE VICINITY OF THE TREES fir HAS BEEN COMPLETED. e \ -�" -_ ;tU''G''ECHOTllllll lIl - `"..R - �`- -r . Q-� a -�_ CONC 'N^ '� SAFETY NOTES 3. TREE PROTECTION FENCING SHALL BE INSTA>-LED PRIOR TO DEMOLITION OPERATIONS iN SUCH A MANNER �� _ 1 - �° I �I;II€III {II r'�:i FhIATrHU II' 111L11: • m'TIRItliryYYXCIHHH'�TNN-` �I AS TO CLEARLY AND ADEQUATELY SEPARATE ALL TREES TO BE REMOVED FROM REMAINING VEGETATION- • I TI!hIIIIIHII IPIHI� INV 48` -m-�-:-u-- ,-�--�� I / I. COhISTRUGTION OUTSIDE ;HE TEMPOgtARY CONSTRUCTION FENCE SHALL BE COORDINATED WITH SCHOOL f !-+-er,� \ T� - E"��•- � � ` 6'.pVC 7 HOURS. ANY EXCAVATION MUST BE FILLED IN AND 'AMPED AT THE CONCLUSION OF EACH WORK PERIOD, - I ?.I - _ - A` _P '- -_ �M ' -- {. �a --� ,w I - pp ,( AND EQUIPMENT AND SUPPLIES RETURNED TO THE CONSTRUCTION STAGING AREA. Ir' = ij / H�� - -!-{ ` fl PYC �- 55 " f 0 -'Y�� 2. ALL MATERIALS AND CONSTRUCT ON Sd ALL REMAIN W HIN T fE BOUNDARIES OF TH£ CONSTRUCTION I = UG ELC _ - ` - SS 55- - 55- W7 S FENCING. IF NECESSARY, CONSTRUCTION FENCING 'HITCH IS REMOVED TO FACILITATE ACCESS BY THE _ T P v ` - SS- CONTRACTOR FOR CONSTRUCTION MUST BE REPLACED AT THE END OF EACH WORK PERIOD TO DIRECT • o - Pa _ / % / f I I LP�a: �L-___ J`L[_),`-Y 1 / - LF "UN PEDESTRIAN TRAFFEC AWAY FROM HAZARDOUS AREAS. �(II' Ijilif MN �i�. f - 6.20' l _ N RIM = g,72' :' / '� r'C U. CONSTRUCTION FENCING MALL BE PLACED AROUNC BUILDINGS TO PROVIDE CONTINUED ACCESS TO THE • I _ aP MV CH_ `92, ___.. DROF INLET - \� - I30TTOM -0.3E' FACILITIES CLASSROOMS DURING CONSTRUCTION- NEW CONSTRUCTION {N THESE AREAS SHALL BE 1 f F m G . _ = 5."' / - �__ COCIRDlNATED WITH SCHOOL ADMINISTRATION, AND WORK SHALL BE PERFORMED AS DIRECTED BY THE • _ . -AP N� l III CY.EC' INV. = 4.? �j i�l "� 1� r SCHOOL, OR DURWC OFF-SC{lDOL HOUR$, WEEKENDS, 4WD EXTENDLp BREAKS. l I li 1 11 �y �t 4. CONSTRUCTION SHALL 8E DONE IN SUCH A MANNER TO MAINTAIN ACCESS TO ALL BU401NG5 DURING �� g, LP & jj DRCF INLET SCHOOL HOURS- \ c / i! _ GATE = 4.88 Q v v �� �� III �.. - 6 \ --- ca c �c gs�� u1 Lil it®in lr� - _ 11_ / Ili Nti. a 40 DEMOLITION LEGEND 2 NI1 . -. ! 1 I- to ,b / \ f_ C� T --.. --,- _ - _- - - E%TIEING CQNGAETE AIG'N = NONE 4'�rJOD I(jcC EI FENCE t �' III �1 CONSTRUCTION AREA DEMOLITION KEY ¢ n `% ti w W L ` 1 ' - w- I' o $ REMOVE Wb%D TRA NENG 57RUC7URE5 `EXISTING CONCRETE (70 BE REMOVED) : Q HJPKH ll.. 1xL . e DO NOT ENTER n - " -`- T#"ANS CONC i1 - 1� U REMOVE EXISTING CONCRETE ><'.,: .'.'� I"a J - EXISTNG ASPHALT {TO BE REMOVED) • C 10 rDli I REMOVE EX15T3NG STORM DRAINAGE PIPET`" - • ♦� C t 30" RCP = "' �` , � REMOVE EXISTING -CHI POLE V I� `' �_ `' -( INN J.4' ''I III 1 POST 35ALL 6E L33 LB / FT STEFl r5] COORDINATE WITH UTILITY PROVIDER Tp RELOCATE EXISTING - EXISTING BUILDING (TO BE REMOVED) a : C - 1 .i : 6 UI wEAniERPrtoDF stew LP TANK (ABOVE / BELOW GROUND} 0 • , - .!` 1 ('iR /-!'TF - 4,E A' J DEMOLISH E%STING BUILDING '_ - EXISTING UTILITY {TO BE REMOVED} / III AS THORN ABOVE Z • '� L _ f l„'i c r L.. J s'-o" o/C Mnx. r Z L f N a INV 0.21' R' Q EXISTING M 8LE -ASSROOM TO BE RELOCATED BY OWNER Cep REMOVE Ex DYING WOOD DECK : L 7 I� l �1' o o - I I 5 9 REMOVE EXIST NG - C7RICAL UTILITY SERVICE - EXISTING ITEMS {TO BE REMOVED) \ • co d c U _ r .O UG _ 1 METER ORANGE. SI RESISTANT, REMOVE Ex TNG 'VICE • U'�� I 1 o 1 5 HIGH BARR C STRENGTH. Z Q `* POLY BARRICADE FABRI4 / • p 2 �MH O �' ELC f Box `E EXISTING 1 CTATrOV TO BE REMOVED • 2 I y : "al - EXISTING TREES (TO BE REMOVED) am +l �/l �kfcrr'INdr4 Ur .�� (� I1 /.,, 1..Ii11 �IVIIIJECird-'__- " ,Jii�,f, MH (�} ---_-_... I �.-_.._ 1 o REMOVE EX STIVG JRB dt GUFfFJ2 • MH i/�//�7n�//%f ill!. Ills rl; lr L-I'kr ELEC I �� sUa�ADE -` z �) REMOVE Exc-ING WATER LINE _ • u Up H - }dd-'I1,IIIAllBr Lp 1 � u g w i/ O /' \ I ADD ALTERNATE: ,`��4 REMOVE E%STING-�'HgLT PAVEMENT Ili L1411411 iulll LIMITS OF CONSTRUCTION I` • P' I Dl MH 509 LP ,! Il CONC _N[r - WARNING SINS TD SE MADE OF DURABLE; WEATHERPROOF MATERIAL. `a RELOCATE EXISTING FIRE HYDRANT ________ - SAWCUT Q • O w F MH MH 011TLET WALiAGE ROAD REMOVAL: PIPE - LITTERS ARE TO BE 3' HIGH ON_ CLEARLY LEGIBLE AND SPACED AS DETAILED. • r, PIPE PAD - SIC-NS ARE TO BE PLACED NO GREATER THAN 50' ON CENTER. t SEE DEMCLITIDN NOTE 15 • r< 7, MH MH 0 1 j f ! 1. DEMOL€SH AND REMOVE EXISTING BROKEN ASPHALT ANU INV- - ).23 _ PLACE Slily AT EACrf END OF LINEAR CONSTRUCTION FENCING AND 50' ON CENTER THEREAFTER- I, - EXISTING FENCE {TO BE REMOVED} • 1 JJ IJ GRAVEL SUBBASE IN AREA SHOWN ABOVE. FILL N7TH TOPSOIL, - FOR OONSTRUCID N AREAS LESS THAN 100' IN PERIMETER, PROVIDE NO LESS THAN ONE yv,yd REMfIVE A FORTIOh OF POSE AND CF4NN FENCE • MH ® I I I GRADE TO PROVIDE POSITIVE DRAINAGE AND SEED PER SPECS. SIGN PER AREA L7 REMOVE EXISTING UCMESTIC WATER METER �/�/� f - ATTACH SIGNS SECURELY TO FENCE POSTS AND FABRIC. 9 CAP EXISTING DOM=STIC WATERLINE 10' OUTSIDE BUILD€NG GRAPHIC SCALE' • OO ALARM I 2. PROVDE VALLEY GUTTER PER DETAIL ON SHEET CS 1 - FENCING uUST BE (MAINTAINED THROUGHWT CON -LOTION. TORN OR WFATi1FTEED FENCING Sl A BE Go • I i__ RESTRIPE ADJACENT PAR3SING SPACES AS SHOWN TO DELINEATE MH III REpLACEO IMMEDiATEEr TO MAINTAIN ADEWATE SAFETY BPRR€ERS FDR NON -CONSTRUCTOR PERSONNEL � REMOVE 5' OF EX:c ''NCI WATERLINE AND CAP DN a aA Im • O STORM DRIVEWAY CONNECTION. - ADDITIONAL SIGNS OR FENCING MAY BE REWIRED BY LOCAL AUTHORITIES / PUBLIC UnUTIES WATER I TOg BASED ON ACTUAL FIELD CONDITIONS- DOMESTIC SIDE 0' METERS. • d SYSTEM __ _ _ 3. EXTEND EXISTING SOIL ORIVE TO EXISTING PARKING LOT- ', I !REMOVE EXISTING WALK • PROVIDE 4" CABC WITH WOVEN GEOTEXTILE BETWEEN SUB -BASE ( Dg FEE,) • cl - I I • (j -`, _--r PUhllfl _ AND CABC. WOVEN GE07EXPLE FABRIC TO BE MIRAFI 60OX, CONSTRUCTION FENCING � REMOVE EXISTING ?'LOCI( HEADWALL • ! .: HOUSE �7 AMOCO 2002, EXXON GTE--200 OR APPROVED EQUAL. OE7AIL 1 3Tvch = 30 it : Q • 1O DEMOLITION PLAN - PHASE I ; • -CTAL l -'_- --__ t •P7 r 1 , 'I _'1 r - �� ' t ,l t I', I.y. fi � `�ir� 1 T f I Y 1 1 ' i' ° 'L it ! 'y 1 r . . 1 w %' ---------- I �_ I - _ _ wr w _- -_ -�_ a I 7 f� 3 :x L ~ `_ EOP - i J , �r :�1 �~mow~•_' ~~_ '_'� /fJ /y> g z y- / j -ti3 0/,p ' l_ - EIP , I 25 3 1 1 / / _757.gg .._. ci 1m „_ It, n f / ��� N�9'3+ 47 WELL , I .f' . , ' I - - _ P vJ �1 � _ r: n I:�. / o f`, _ , -- -. - _ _ - - - -- c am - -7`3z'� ,, _-w....._._,�.,._...__.._ ° LL - Il7g"3 t 4 t .W�_-4 3 1 a �,. rllr /rt a y' e,' ; CDNc 11. 1 j3 ',/- v1. .._I _ / r yy t.e�Li' v'�- m.,-a,..,-�:e '1 , }: t a s ff h „ r 11 1 �1:' s..tiz' L 3 7 C1 -�. ! r 1 EIP E(' t ,; _ I !' a t _ _ t ._I, I ._ Fla } _ l R1e1 F,- if . , _ �� _- __ ` - a, - lI - 313.67 - z Y - f .. GNC !n _I ,. _� f : li .. _ -- -- �_.:.- _ ----_-- -r _...- .. - I - -_. _.�. �,»,...: ^"per �, _ . ��� '- -. _- . - 1. 3f� SOIi_ DRjVF �- -_ �" a - -- -- - �� .�. 1L� �/ T__ 11 / ! : I I >.I �Y ��-_ r i ° % i �� ?�,_,�,� / . I� ,; , .; Iw WAYNE WEST BLDG. ! -_ ," 1 , i" 1 FFE 22.00 ' FFE 22.0 /0-!V - '3 L'rhL w--:11 4 '_ Ta l; .::?, ?8 -Iil I IL',,. 6. i I li . �; 8 IllliEllkl IIIEIRI II. III I IA��I' ITITl I �', 71 L' P�: 31;.c le�l ,i _ I.P _. ____ _ _ __ _-_ - ___ _ _ _ _ - -47 . / i~:t I Inrlllem,mnr; ilmlim! in , Cmi : ikamllmklm.I �, �{ PBRi pm mmmmNmmmp = �IIn P�.luilraullli olllu€ililiuUilAM�,. / f-.63 � �.�.:,.. - �fiElllli:11111!lMIIhEI IL 111I�%II'allfl1111111 illli':VIIIIII Ilf IIII�,IIIR :,I ,I III hI�Hlll � 4' / 1 �, .. I IF' �.;z�'i,.w _tee. . =�cu ,a= .., _ r =an.". i - ....,.. w"., ....�- -.. �. ,M _ ; -" u J y ...: ; y-_- , I /F wa3ss'4a'h 1r6-ns~ y y 71 $ 3 -.f''F. �: ,'U 1 ah .r T_ ,+ SOE331'3'H'W h02'S6'16"E °\. ' l - 7 p "t E 3 i £-, Fib ..€ a, f. :/ , , / a i _ :�_ 7 I s �s ,.1! - -O 1 I / ."� / ... 11 I \\ j\\\} / ! i dt sa .I F.. * N7q 5r,07,W N8Ta3'19'W ''d7 25.Op- I 1, 1! I � lCP i r\ 4, .. r 13 \\ I * i � \ , � _ � f M M - M - m W' _. W i 1 1 k - i 4. gf , ',.. fI i ,. J,,11 PHASE I: POND IR 41 - t <` 1 i 1 r iW. , s : . 1 a II I �s II.11I i1 O I�' I - I' /,... P 4 I CUB I \.; I 4 I - , ? -�`� V i I : 7 ,I �� I �i _ �,? i 2 - N86-2�%-,, I f ) r /�_ . �., R I � �� f .. a �o` p -t'�--- - --x r ' i i� , A .. Graz-w.�n .� .,[ -'�i - �' 47i."" -'. O 7 3 - - --- 4-N'---�'-- - -iu - ': \� c I <'p. _. -_- i ,LL. _ ril➢IIIIGEIi€III, . r"': �1 .., i ( _- cM.; o�� 6 W-` ,I LIY '1 I F, a °...- - - i. IN- - a 16, . f .- ---- .. ., T > fj! it - ti:r.11 I T; .: IF +. / `I`:T -. i1.' - - �I. LBL©CI KI ` .." 6. _ / :F. To I' i I M,,, ° _ .:i... -FUEL .ANC I. f jI i ( 3 _. � I ;f I :� - _ 'i ��.Ali FJ1 'BALL. _ . j+Ilf i _I _ .1�1 1 - I £ �" _ - I I j l . i I i7t-ter. ) I{�_�._' '' -r u 9 'v'-I F .._ / 1 ;I,` #, MARINE TECHNOLOGY BLDG. I c ;c1) - ---- f FFE 14.50 [ PHASE I: - I1 L) �r 1 1!' 1 N POhlp A ° -..- .. �j, / RAMP !' I I - i s '. - a' F - -- - -.i = 5 . ' Y i_ -- a i ,", 1 �, 0 i all _ j4RI .1 1. Hl k A__.. h RarMF & i1 I �� - f __ i 4 t I& I% a e� ,.,., v ? r 3 ,4. i c 0 <'' a,,I u 1 I 1 ii, __. _ .,. . -, - - j �_ `hG krs.-.-- 1 _r. _ I ___] .. �. _ -r 1 rw r - / ` _ oY. _ _ g _ _ r y1 " NCR', Ir - - 9 \ - -� i .:.. :.................... =y ., T \ ✓ F4. / 17 / 1. i a - W. - - r K?.: 1. -__ _ n, f � _ = I j o a__ - / .1 a l uI �I1p l! A11 Iyryl �\ �<:: cONC-__ ) /f_,. {- IYrFIAAIHYIINfH11tMN -r. `-7-... '~ I, f.'.' ? f iM[ n9lmnrnT w - -L_ Z - f TS OF D157U nlrl I Cj .� fir.. I I T ram`..- -.__ ..;,:r Nfngl , m n M _ 1� :a u - - _ D, -, - f, m �%,,-:, I , I A e� ,/- I - F\ �, -11, - ' � j ,�z / \ - 1i..,_. "' .;-. --I, _ rr!l fllNRlff,. r -.. -'� " _. .. mil -. 111,:�.', . : Qmnp- < " � ,I, f I n7, -.__.. DROP F "�� ..� 1 ",6h-, IIHIDff�klhl!likll,111111'I II II,Vk1-t�9V 11 :pdF / i -. k ram, - - e 4' N-t f ` I I1' 1 t ! \ n.1 _ / T,, \ I, �/ 1] !i O \ \,.I / S86'55'09'E ,/ ��,I I. i N 7 _ 1� 'd�I, , ,� _ 1... T _ -- �� 23I 34 1 t '''� G - _ _ t y _ CONC / LLD" f \ w �� WOO!] ,p C "' _,�_;,4_11_______] / I.- \'A- IN L. r l ET EIVCF ? .CONSTRUCTI ' DO NOT E I 1 Y ' - f I^' - 1 f 3,` RKfF ` MARICULTURE BLDG_ j - "' 1 t n r.T) / �,._� � 11 , I :, 1 jj 1, �r1 'F7 "l.rn _ L d r 13' 0' 0/O MAIL ml I ,r. O SHEET NOTES . i j IF-1 L-L I I i Y---- , , I 1. ALL DEMOLITION, AND ANY SUBSEQUENT CONSTRUCTION, SHALL BE PERFORMED iN ACCORDANCE WITH I ; 't� r r THESE PLANS AND SPECIFICATIONS APPROVED BY THE LOCAL GOVERNING AUTHORITY- • f -IL--___ � _�- -fj� I I 2. ALL DEMquTION AND SUBSEQUENT CONSTRUCTION TO SE !N ACCORDANCE WITH PERMITS ISSUED AND • �� OP I �' if `�' j li APPLICABLE STATE, COUNTY. AND LOCAL CODES. s jL f--r 1 , i I � II _ 3. THE CONTRACTOR SHALL OBTAIN AND PAY FOR ALL INSPECTIONS, CERTIFICATIONS, EQUIPMENT. ETC. • ___ THAT MAY $E REQUIRED. ----�._______ 4. IF DEPARTURES FROM ISE SPECIFICATIONS OR DRAWINGS ARE DEEMEO NECESSARY BY THE CONTRACTOR, • - �r2 DETAILS OF SUCH DEPARTURES AND REASONS THEREOF SHALL BE SUBMITTED TO THE OWNFR FOR REVIEW. • `- ��- - - __ EDP NO DEPARTURES FROM THE CONTRACT DOCUMENTS SHALL BE MADE WITHOUT THE WRITTEN PERMISSION OF ``-- THE OWNER. )*`_� - � _ 5. EXISTING IMPROVEMENTS DAMAGED OR DESTROYED DURING CONSTRUCTION SHALL BE REPLACED OR • ~��1�- - / RESTORED TO THEIR ORIGINAL CONDITION, AND TO THE SATISFACTION OF THE OWNER OF THE IMPROVEMENTS. : ` I /- • 3 T �'1 qJ N 1 ,�" 6. CONTRACTOR SHALL REFER TO ARCHITECTURAL PLANS FOR DETAILS OF BUILDINGS AND BUILDING . . 1.`i Yam,- DIMENSIONS_ • '*_1' 11 t'': !! P _ y ; �``` r1'�► - Ir it - ' r'- ,yam 7. ENGINEER AND/CR OWNER DISCLAIM ANY ROLE IN THE CONSTRUCTION MEANS AND/OR METHODS - i � y@� l $ --~-Pi--'!Ir - - T/ W, ASSOCIATED WITH THE PROJECT AS SET FORTH IN THESE PLANS- ♦ = i }SB;Sq IyT� . • A 5 /. �r F c_ :o • N J @ f e 8. CONTRACTOR SHALL MAINTAIN AN 'AS BULLY SET OF DRAWINGS TO RECDRU THE ACTUAL LOCATION OF ♦,,,,s'V I ' �'� '- _ ALL PIPING PRIOR TO CONCEALMENT- DRAWINGS SHALL BE GIVEN TO THE OWNER UPON COMPLETION OF THE • �����4* L _._-- _ 3 I - 'f T PROJECT WITH A COPY OF THE TRANSMITTAL LETTER (FOR RECORD KEEPING) TO THE ENGINEER. • nlnm .,- I'� o iIi j ' ? ! r " 9. THE CONTRACTOR IS RESPONSIBLE FOR FIELD VERIFYING THE ACTUAL AND EXACT LOCATION. SIZE AND I' r - i i i ! MATERIAL COMPOSITION OF ANY EXISTING WATER OR SEWER SERVICE PROPOSED FOR CONNECTION OR USE • j �`?. Ii f _ i - 1 SIGN f1 ON THIS PROJECT. THE RELOCATION OF ANY UTILITY SERVICES REWIRED TO COMPLETE ANY PORTION Of • . `\ s ILA® ljjj1 THESE CONSTRUCTION PANS SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR. • �1 ' _ 1;i' ., i�,I� fr „ , it 10- THE CONTRACTOR MUST. AT ALL TIMES, KEEP THE PREMISES FREE FROM ACCUMULATIONS OF WASTE • I I II j1 I, -j 1f MATERIALS OR RUBBISH CAUSED BY HIM, HIS EMPLOYEES, OR HIS WORK. ALL DEBRIS SHALL BE REMOVED r , .�-�N �g ? , I, (r ,j .. _:l f 1 f FROM THE SITE ON A DAILY BASIS. : �wp .� eTyi' ��. , 1 t' ° I f.;,--z k4-._;- {;,'.'., �1 IL FINAL ACCEPTANCE OF WORK BY THE LOCAL GOVERNING AUTHORITY SHALL NOT BE MADE UNiTL ALL • z g �E' f1 F__i!t I' r q + Ir WORK SHOWN ON THE APPROVED PEAK IS COMPLETED. w `I I}' a 3 ^' %" `- dr' r' i 1,' :1 f i 12- CONTRACTOR SHALL CALL 'NORTH CAROLINA ONE CALL AT LEAST 4$ HOURS PRIOR TO BEGINNING • �= L f j 1, I+', , I ) ! CONSTRUCTION OR EXCAVATION ON SITE TO HAVE EXISTING UTILITIES LOCATED. CONTRACTOR TO CONTACT • LLI w F t''�i r JJ 'I f ANY LOCAL UTILITIES THAT PROVIDE THEIR OWN INDEPENDENT LOCATOR SERVICE. CONTRACTOR SHALL ?it } �:___ i �I .1 � f -_ Ij IMMEDIATELY REPORT ANY DISCREPANCIES TO THE ENGINEER. • 0 Y�I / 3 ; .1 I f w ( ''-,� 13. ANY EXCAVATION MUST BE FILLED IN AND TAMPED AT THE CONCLUSION OF EACH WORK PERIOD, AND aG I 11 f 1- If f �. ' i) J! EQUIPMENT AND SUPPLIES RETURNED 70 THE CONSTRUCTION STAGING AREA •11 ., ii IIx, fJ ff SEQUENCE OF CONSTRUCTION ACTIVITIES ; � j F� im �s I f c l/ • f f -t ✓,, a / - I jJ li CONTRACTOR SHALL INSTALL CONSTRUCTION FENCING TO ROUTE PEDESTRIAN ACCESS AWAY FROM • � i� ; FF ��4,., / 1 - - I�1' :_'f - I r CONSTRUCTION ACTIVITIES FOR EACH AREA (SUBSURFACE, NEW WALKWAYS, BUILDING FOOTPRINT, ETC) UNDER 1 'I # -� _ e _ � /J CONSTRUCTION, WHICH WELL REMAAN DHSTURBEO FOR MORE THAN 48 HOURS. r v7 ~ � f; ( '" `f F T. OBTAIN PLAN APPROVAL AND OTHER APPLICABLE PERMITS. • p r EI1 -� 1.-. " 4'� iii • ! c / � _ r it y ' -. --- - - I ).i 2. FLAG WORK LIMITS ANU MARK TREES TO BE SAVED, IF ANY, FOR PROTECTION, s A tE;, 11 1.'; I.,? 1 _ ! 3. HCLD PRE -CONSTRUCTION MEETING WITH INSPECTOR ON SITE, AT LEAST ONE WEEK PRIOR TO THE START OF • // \,1 -/ _��s - _ .� ANY LAND DISTURBING ACTIVITY_ • °'� �d mx I 0-g I I' 4. INSTALL CONSTRUCTION ENTRANCES, TREE PROTECTION FENCE AND SILT FENCE; OTHER TEMPORARY EROSION • f „� _ i, CONTROL DEVICES AS REQUIRED. • I ;.#- 6. `� 5. INSTALL PRE-TREATMENT BASIN AND INFILTRATION BASIN. • -_ ..__ F' t ! V • 3 __ _ A I 5_ INFECTION BY INSPECTOR- • J. r �-r [. NC i� jr 7. HARVEST ANY TIMBER. ,rN1V! fr1 _ p I !,[_ s S. PERFORM Si TE GRADING, AND INSTALL ADDITIONAL EROSION CONTROL MATERIAL AS NEEDED, rr r' 1ud, ryl j �WDOO f T- _ i 0 t`�"` ~-w�_/ i !9 'DST & r II+W, - 9. PROVIDE TEMPORARY SEEDING ON ALL DISTURBED AREAS THAT WILL BE IDLE FOR 14 DAYS OR LONGER. i I I -_1A3N I l r II, _ 10. PERMANENT GRA55 SHALL BE INSTALLED FOR ALL AREAS AT FINAL GRADE AND IN SEASON. FERRDZL, • I + �u F,1 CE +J r li+ "`� WATER AND RESEED AS REQUIRED TO ESTAIRLISH AND MAINTAIN VIGOROUS STAND OF CRASS. 3f 'rr,.~�J 1c l 1 i�____�r� 1, i 14 i j 11_ INSTALL STORM DRAINAGE SYSTEM AND INLET SEDIMENT TRAPS _ IIu1'�i;fKrurrr�le,r Ilf,r I FAIN !i 12. INSPECTION BY INSPECTOR. 1 �� T3_ COMPLETE CONSTRUCTION AND FINAL GRADING. Z s �_ A rNrr y'Nli; .47rWq i Ij i C, _ I f - !ld�fi J/ �,f -r +I V p.l' 14. PERMANENT GRASS SHALL HE INSTALLED FOR ALL AREAS AT FINAL GRADE AND !N SEASON, FERTILIZE, Lr' 1. ,1. i ' 1 t.V ,-,I::bU ,1Vl - WATER AND RESEED AS REQUIRED TO ESTABLISH AND MAINTAIN VIGOROUS STAND OF GRASS- Lj �� _ `ds . ,•'4'V l rG (:Hl1 LY,"M ,rZ if pV;AA,01 ,,.b Y- • jV � 15, AFTER COMPLETION OF CONSTRUCTION AND THE SITE IS STASIUZfD, (A) REMOVE ALL ACCUMULATED ~ '-~'_ ! �/!/ SEDIMENT FROM PRE-TREATMENT DETENTION BASINS AND DISPOSE OF ACCORDINGLY, (B) REMOVE ALL • 71AY,P.itT1'�IFFifi' I ; ' _ 1 I'- j " TEMPORARY EROSION CONTROL MEASURES. SMOOTH AREAS, APPLY APPROPRIATE GRASS AND OBTAIN • `'YY II91 fl N! 1 Jflr;1 ` _. I+ i r 1Vl, 1, APPROVAL BY INSPECTOR • :_�:!.:11 ri r I rllr!II',`w A r, r 1- p �t` _r . _ - ECT OSION CONTROLjDA/C H,N✓✓.IL� :I �f 1�y- SIG I !C N N Lt (0.5 I CHES E TE) ND DOCUMENT WITH INSPECTION REPORTS. • - 0 O U N Lu LU 'ice DEMOLITION NOTES . �`"1 y SJ GON'C , • 4\ _ O0 I��JJ 4` C LL [ jj PAp i I. NO GRADING IS TO OCCUR IN THE TREE CONSTRUCTION AREAS OR TREE CRITICAL ROOT ZONES. : '� O CJ j p 1 'I p SWIM, Ir ' I 5 �^ 2. CLEANOUTS LOCATED IN AREAS OF DEMOLITION OR SUBSEQUENT CONSTRUC7EDN SHALL BE PROTECTED FROM • • • • 14 L e I - 't'" DAMAGE AND RAISED TO FLUSH OATH NEW GRAPE. ± - it f," ,t - __ t 3. ALL ITEMS AND EQUIPMENT REMOVED BY CONTRACTOR SHALL REVERT TO OWNER FOR REUSE OR DISPOSAL- s ��� 1 I" 1 4. REMOVE EXISTING CONCRETE (WHERE REQUIRED) TO FIRST COLD JOINT OR SAW CUT TO DETAIN A CLEAN • I I � EDGE FOR NEW CONSTRUCTION. • r,:, DHA N ! I. IL%„� • cL'r- I INK Ff-MCA. ? I � � _- S. WHERE ASPHALT SECTION IS REMOVED, CONTRACTOR SHALL USE A SAW CUT AT THE LIMITS OF DEMOLITION ez I 4 - I � 1 � �,�- TO OBTAIN A CLEAN EDGE. • 11-.. 1 y /-- :f � --� ~ , 6. CONTRACTOR SHALL RESTORE THE LAY DOWN AND STAGING AREA TO ORIGINAL CONDITIONS AND TO THE • z , - L = I j -i� �� SATISFACTION OF THE OWNER, PRIOR TO DEMOBILIZATION AT THE CONCLUSION OF THE PRO,iECT. Z 1 - `I r 7 - � y ' r (4 7. CONSTRUCTION OF UTILITIES OUTSIDE T}iE LIMITS OF CONSTRUCTION FENCING ALL BE COORDINATED 'MTl-i 0 / X"-` --� �I / -i I II I •I SCHOOL 0 \ -cq-�� I 11 8_ DEMOLITION. AND SUBSEQUENT CONSTRUCTION OF STORM DRAINAGE FACILITIES SHALL BE PERFORMED IN '� !f' _ II I N. SUCH A MANNER THAT THE OLD PIPE AND STRUCTURES ARE REMOVED AND NEW STRUCTURES AND PIPING ARE - �� \,-J/ III:. IMMEDIATELY PUT INTO SERVICE. CONTRACTOR SHALL ENSURE THAT STORM DRAINAGE DOES NOT REMAIN OUT • '(I Ili, OF SERVICE FOR LONGER THAN 12 HOURS AT A TIME. PROVISIONS SHALL BE MADE TO MAINTAIN STORM WATER : tu f 00 j'~ I DRAINAGE DURING CONSTRUCTION. • 0 1 Q�vvaL% \ 9. REMOVAL OF ELECTRICAL UTILITIES SHALL BE DONE BY THE LOCAL POWER COMPANY. W A , : kD Q 1., 10_ RELOCATION OF EXISTING UTILITIES TO BE COORDINATED WITH THE LOCAL UTILITY PROVIDERS}" • -1 Z P� J PQ'T / � � - 11. OVERHEAD ELECTRICAL SERVICES TO BE RELOCATED OUT OF THE LIMITS OF DISTURBANCE BY THE O O Z I I F R 1 L) _ APPROPRIATE UIIUTr PROVIDER, �� j i I-dAL-TS Yt, - _ O _��i I / 12. WATER, SEWER- ELECTRICAL, AND GAS UTILITY SERVICES TO HE REMOVED TO THE PUBLIC R/W AND PLUGGED I�`a K -'- - `1; I _ _�`� OR TERMINATED AT A METER (AS APPROPRIATE), GENERAL CONTRACTOR TO SCHEDULE AND COORDINATE THIS � `" Q } \t /, _ _ � - //�--= WORK WITH UTILITY PROVIDER. ♦ U t` _r �Y r! 13. ELECTRICAL OR GAS UTILITY SERVICES TO BE REMOVED SHALL BE REMOVED AND RELOCATED AS INDICATED • F_ { ) • F _ `-\�0 ;,{ BY THE UTILITY PROVIDER, CONTRACTOR SHALL. SCHEDULE AND COORDINATE THIS WORK NTH THE O tr N � F O - APPROPRIATE SERVICE PROVIDER. ALL SERVICES SHOULD BE INSTALLED PRIOR T THE IN l - C ` �L O E INSTALLATION OF � - O PAVEMENT. SIOEWALKS, CURB AND GUTTER. OR INSTALLATION OF OTHER PERMANENT FEATURES. • Z k kI "Fs\ _ j, Ztu a , r� ,- \ � 1a. WHERE DTiLIRES TO BE REMOVER IMPACT THE FOOTPRINT of THE NEWBUILDING, ' J , ( } E OFCONTRACTOR n/ `� �iL . j I � 11 1; smell SHALL EXCAVATE AND REMOVE AN ADDITIONAL 2 FEET OF SOILS TO EITHER SIDE OF PIPE, AND f FOOT �/f - - ,, I - _- BELOW TO REMOVE UNSUITABLE SOILS. CLEAN SOILS SHALL BE UTILIZED FOR BACKFILL. COMPACTION OF • ` � ',I �,JTHESE SOILS PERFORMED IN ACCORDANCE WITH SPECIFICATIONS AND SITE PLAN. : y .d -_-�- 15. THE ASSUMPTION IS THAT THE 12" RCP SERVICES RDOF DRAIN LINES FOR BUILDING 210. CONTRACTOR • r� , SHALL DISCONNECT SUBSURFACE DRAINAGE AND DIVERT STORMWATER TO BASIN. ALL SUBSURFACE PIPE AND • O V ! } I// STRUCTURES SHALL Bf REIMOVED. • z ~ r %` <o :2F TREE PROTECTION NOTES • O Q ) � , & I. AT THE START OF GRADING INVOLVING THE STRIPPING OF TOPSOIL OR LOWERING OF EXISTING GRADE • S J 9, AROUND A TREE, A CLEAN, SHARP, VERTICAL CUT SHALL BE MADE AT THE EDGE OF THE TREE SAVE AREA LLI M CONTROL A T THE SAME TIME AS OTHER EROSION CON OL MEASURES ARE INSTALLED. THE TREE PROTECTION FENCING s - O /F } SHALL BE INSTALLED ON THE SIDE OF THE CUT FURTHEST AWAY FROM THE TREE TRUNK, • � � � J 2. NO STORAGE OF MATERIALS, FILL, OR EQUIPMENT SHALL BE PERMITTED 'WITHIN THE PROTECTED AREA, • AND NO TRESPASSING SHALL BE ALLOWED WITHIN TYRE BOUNDARY OF THE PROTECTED AREA, AND SHALL BE � \'/ f 50 NOTED ON THE GRADING AND EROSION CONTROL PLANS AND POSTED ON THE PROTECTION FENCE. A • LST C1 i PROTECTION FENCE CONSTRUCTED OF MATERIAL RESISTANT TO DEGRADATION BY SUN, WIND, AND MOISTURE • f7 i�!!IXJNI: 1. ILLS- FOR THE DURATION OF THE CONSTRUCTION SHALL BE INSTALLED AT THE SAME TIME AS ME EROSION + CONTROL MEASURES, AND SHALL REMAIN IN PLACE UNTIL ALL CONSTRUCTION IN THE VICINITY OF THE TREES ` HAS BEEN COMPLETED. ♦ k) SAFETY MOTES 3. TREE PROTECTION FENCING SHALL BE INSTALLED PRIOR TO DEMOLITION OPERATIONS IN SUCH A MANNER • AS TO CLEARLY AND ADEQUATELY SEPARATE ALL TREES TO BE REMOVED FROM REMAINING VEGETATION_ • 1. CONSTRUCTION OUTSIDE THE TEMPORARY CONSTRUCTION FENCE SHALL BE COORDINATED 'WITH SCHOOL • HOURS. ANY EXCAVATION MUST BE FILLED IN AND TAMPED AT THE CONCLUSION OF EACH WORK PERIOD, 4- REMOVE EXISTING ASPHALT WITH LIGHT DUTY EQUIPMENT IN ORDER TO REDUCE THE RISK OF IMPACTING . AND EQUIPMENT AND SUPPLIES RETURNED TO THE CONSTRUCTION STAGING AREA, THE 36" OAK TREE. IMMEDIATELY AFTER ASPHALT IS REMOVED, OLL WITH DIRT TO BRING GROUND UP TO • 2. ALL MATERIALS AND CONSTRUCTION SHALL REMAIN WITHIN THE BOUNDARIES OF THE CONSTRUCTION EXISTING GRADE AND PLACE TREE PROTECTION FENDING AROUND TREE AT DRIP LINE. • FENCING IF NECESSARY, CONSTRUCTION FENCING WHICH IS RLMOVEO TO FACILITATE ACCESS BY THE CONTRACTOR FOR CONSTRUCTION MUST BE REPLACED AT THE END OF EACH WORK PERIOD TO DIRECT • PEDESTRIAN TRAFFIC AWAY FROM HAZARDOUS AREAS- • • • 3- CONSTRUCTION FENCING SHALL BE PLACED AROUND Bll€LCINGS TO PROVIDE CONTINUED ACCESS TO THE FACILITIES CLASSROOMS DURING CONSTRUCTION. NEW CONSTRUCTION IN THESE AREAS SHALL BE • COORDINATED 071i SCHOOL ADMINISTRATION, AND WORK SHALL BE PERFORMED A$ DIRECTED BY THE • SCHOOL, OR DURING OFF SCHOOL HOURS, WEEKENDS, AND EXTENDED BREAKS. • • 4. CONSTRUCTION SHALL BE DONE IN SUCH A MANNER TO MAINTAIN ACCESS TO ALL BUILDINGS DURING • SCHOOL HOURS, • • . z r DEMOLITION LEGEND rjf}f ' • U s _ m QrJ PIKER -EXISTING CONCRETE H r Q N 113- • d Ley i NTER DEMOLITION KEY • - - - EXISTING CONCRETE (TO BE R£Mgv£p) `7 DEMOLISH EXISTING BUILDING + O 0 r 0 - FXVS7ING ASPHALT (TO OF REMOVED) (] REMOVE EXISTING CONCRETE AND WALK ; N r , POST SHALL BE 1.33 LB / FT STEEL �j REMOVE EXISTING STORM DRAINAGE PIPE • P I T I y U '' - EXISTING BUILDING (FO 8E REMOVED) $) REMOVE WATEREXISTING LIGHT POLE Q F� k- T WFAIHERPRpDF SIGN REMOVE WATER LINE AND CAP i D 7 AS SHOWN ABOVE 7 REMOVE EXISTING ASPHALT PAVEMENT + L ZI EXISTING UTILITY (TO 6E REMOVED} • Z '� REMOVE EXISTING BLOCK WALL • z C) REMOVE METAL RAMP * < Z iORANGE, UV RESISTANT, l� � • 0) 0 r!, I` _I - , 'POLY aRPoCAOE FABRIC EXISTING ITEM ( BE REMOVED) ) R£MRVE SGEXISTING / \ • C � (, z \`f� z S TO ED ELECTRICAL UTILITY SERVICE ... \1\ -- I �..1- �� , .� �� REMOVE FORCE MAIN AS INDICATED AND CAP T In ? TOB I 1 i �� CONIC I PAD f I j I _______j PUMP ITQusE � C s118GRADE na I �, 1 - EXISTING TREES (70 BE REMOVED) - BOTH ENDS • �• L.; P% ; L 4 �' SEE TREE PROTECTION NOTE 4 - : iif�, s ' -WANOTES - WARNING SIGNS TO BE MADE OF LE MATERIAL. tllEl ':I I:I - LIMOS OF CONSTRUCTION �� REMOVE GRAVEL DRIVE • : D IT API 1 IGH .. CLEARLY LEGIBLE AND LETTERS ARE TO BE A HIGH MIN.. CLEARLY LEGIBLE AND SPACED AS DETAILED. SIGNS ARE TO BE PLACES NO GREATER THAN 50' ON CENTER. ._ --- _ SAWCUT • L `�11, O _ N - PLACE SION AT EACH END OF LINEAR CONSTRUCTION FENCING AND 50' ON CENTER THEREAFTER. - FOR CONSTRUCTION AREAS LESS THAN ITIO iN PERIMETER, PROVIDE NO LESS THAN ONE Fz�q- EXISTING FENCE (70 BE REMOVED) • SIGN PER AREA - ATTACH SIGNS SECURELY TO FENCE POSTS AND FABRIC- t'.�wc.' T` GRAPHIC SCALE - FENCING MUST BE MAINTAINED 7HR000HOUT CONSTRUCTION. TORN OR WE4TNERED FENCING SHALL RE =- - DRIVE • • GIB 0 ED REPLACMMEDIATELY TO MAINTAIN ADEQUATE SAFETY BARRIERS FOR NON -CONSTRUCTION PERSONNEL �GRAVEL o cI rI - ADDITIONAL SIGNS OR FENCING MAY BE RE001RED BY LOCAL AUTHORITIES / PUBLIC UTILITIES : N BASED ON ACTUAL HELD CONDITIONS. • O CONSTRUCTION FENCING ( IIK FEET ) • �j I DETAIL 1 inch 3D t't • _ 4 DEMOLITION PLAN - PHASE I I : • • 70-rA_ - _ .,_._ ._. - _ __ --___ _..._._ �', w LL i . .. V f SHEET NOTES ; ALL DEMOUTION, ANp ANY SUBSEQUENT COr15TRUCTION, SHALL BE PERFORMED IN ACCORDANCE NTH THESE PLANS AND SPECIFICATIONS APPROVED BY THE LOCAL GOVERNING AUTHORITY- ,r Pll rr.,rnnrf.;hrr~ _ ' f 1 i • J i i i 2. ALL DEMOLITION AND SUBSEQUENT CONSTRUCTION TO BE IN ACCORDANCE wIYH PERMITS ISSUED AND • j r T i i1 �'!��+' hl rlflfir;l; ri;,[i flrrll r; + Ir I1'+rr:r;rS. lh 711(U'Y1'lA1lNrll{:I ��r] + f - �+ 3APPLICABLE COUNTY. R CAL THE CONTRACTOR OBTAIN AND PAY Y FOR ALL INSPECTIONS, CFRTIFICATIONS, EAUIPMENT, ETC • f j f • THAT MAY BE REQUIRED. : - EnA J _��J P - _ - rlp7lli-:'ia,grlrrl rl;~ -_---~~- 4. IF DEPARTURES FROM THE SPECIFICATIONS OR DRAWINGS ARE DEEMED NECESSARY BY THE CONTRACTOR, • '�J� DETAILS OF SUCH DEPARTURES AND REASONS THEREOF SHALL 6E SUBMITTED TO THE OWNER FOR REVIEW. • ryfhr,r;llr lrrllHlF lHlHr';r �~~�EGP NO DEPARTURES FROM THE CONTRACT DOCUMENTS SHALL BE MADE WITHOUT THE WRITTEN PERMISSION OF l,l:r fY a<i!'lill T"hPr �� / THE OWNER. 5. EXISTING IMPROVEMENTS DAMAGED OR DESTROYED DURING CONSTRUCTION SHALL BE REPLACED OR • RESTORED 70 THEIR ORIGINAL CONDITION, AND TO THE SATISFACTION OF THE OMMER OF THE IMPROVEMENTS. 6. CONTRACTOR SHALL REFER TO ARCHITECTURAL PLANS FOR DETAILS OF BUILDINGS AND BUILDING DIMENSIONS. • _��F� 7. ENGINEER ANO/CR OWNER DISCLAIM ANY ROLE IN THE CONSTRUCTION MEANS AND/OR METHODS • =z ASSOCIATED WITH THE PROJECT AS SET FORTH IN THESE PLANS. • 1'S834 _ it = j a - N79'31'4i n \ 8. CONTRACTOR SHALL MAINTAIN AN A$ BUILT SET OF DRAWINGS TO REGARD THE ACTUAL LOCATION OF • �'� A Q�E C�^.�� ALL PIPING PRIOR TO CONCEALMENT. DRAWINGS SHALL BE GIVEN TO THE OMER UPON COMPLETION OF THEEB � �''•,',4UC L�•`` I / - ,`'22 - _� I PROJECT WITH A COPY OF THE TRANSMITTAL LETTER (FOR RECORD KEEPING) TO THE ENGINEER. • """ I ) 9. THE CONTRACTOR IS RESPONSIBLE FOR FIELD VERIFYING THE ACTUAL AND EXACT LOCATION, SIZE ANDi • i-, SIGN MATERIAL COMPOSITION OF ANY EXISTING WATER OR SEWER SERVICE PROPOSED FOR CONNECTION OR USE • 28 SPACES n J¢ ,II ON THIS PROJECT. THE RELOCATION OF ANY UTIU7Y SERVICES REQUIRED TO COMPLETE ANY PORTION OF IE! THESE CONSTRUCTION PLANS SHALL BE THE RESPONUBILJTY OF THE CONTRACTOR_ ; 1 10- THE CONTRACTOR MUST, AT ALL TIMES. KEEP THE PREMISES FREE FROM ACCUMULATIONS OF WASTE • �' J ■ i MATERIALS OR RUBBISH CAUSED BY HIM, HIS EMPLOYEES, OR HIS WORK. ALL DEBRIS SHALL BE REMOVED • _ "l'-'1 Epp j`TYP- 12 SPACESF3l �il 111'i, Irr J FROM THE SITE ON A DAILY BASIS. • wv�.poum .�. !jj 11. FINAL ACCEPTANCE OF WORK BY THE LOCAL GOVERNING AUTHORITY SHALL NOT BE MADE UN€TL ALL • i� O w r i WORK SHOWN ON THE APPROVED PLAN IS COMPLETED. • T IS- \ it I •i N6• rr �z ' �.�� �EIF '- 12. CONTRAC70R SHALL CALL "NORTH CAROLINA ONE CALL" AT LEAST 48 HOURS PRIOR TO BEGINNING • w �,. E1J -�--r i �I f +f r+ +I (I CONSTRUCTION OR EXCAVATION ON SITE TO HAVE EXI51ING UTILITIES LOCATED. CONTRACTOR TO CONTACT • w oc ! I I I I 1 I r r' li i I ■ + fj ANY LOCAL UTILITIES PEAT PROVIDE THEIR OYM INDEPENDENT LOCATOR SERVICE. CONTRACTOR SHALL • -�U, LL IMMEDIATELY REPORT ANY DISCREPANCIES TO THE ENGINEER. • Z27 SPACES is r o t - _ D1S�URBA�C� © y f 13. ANY EXCAVATION MUST 9E RETURNED IN AND TAMPED AT THE CONCLUSION OF EACH WORK PEfi1DD, AND • M' - L „ Iyu�Vlur,!n0ntuiLlul;uNPIu1I nilVllil,lull lwln c„r;nlla,uulnn cl :�P 27 SPaCE.S` I 5 f 1 C 7_� ■■ I J EQUIPMENT AND SUPPLIES RETURNED TO THE CONSTRUCTION STAGING AREA. • f J '.1AL,I^r,Illrin.,.1 3'3'6„_I r o� ,,� _ ����� ', hA �MI?1eY '�r:i�:1E11!I IIH�J''UV li IIIII lhnlHlil fi-I'. ! WOOD BE INSTALLED BY • 11 I 51GNAGE, STRIPING: AND MARKING NOTES / ? 2 I�+' 1. ALL SIGNAGE SHALL CONFORM TO STATE DOT STANDARDS SIGNAGE SHALL • e 11�\\ L� - J f. CONTRACTOR. • In" 1 L ICAf AL LOT STRIPING AND DIRECTIONAL ARROWS SHALL RE WHITE REFLECTIVE PAINT AND SHALL CONFORM • O ,F5F5p55� TO STATE DOT STANDARDSSPECIFICATIONS.•1� 2 STAN AkD U Orr A b - �• M E !III f rP.I - 1 _ '.-,:7r sue, a4 4..:�.a+ i' � '3a., � - • d. Ilff.:IIN' - .. ,_.,:"�r� a;.� --� - v. / .lcl,rll - J� fA IIWI,rII - '`Sr+'�aT' 3. HANDICAP SYMBOLS SHOWN IN THESE PLgN$ ARE FOR LOCATION AND INFORMATIONAL PURPOSES ONLY. • SEE DETAIL SHEET FOR ACTUAL CONSTRUCTION MEANS, METHODS, AND MARKINGS. • I � � / w�s"Y<} p5 _ �; - / / / / / / I -:,>> �; ., ,d', .4 1 ♦j:. L ..,1.i + 1; f rI I':r" - _,,��\. _ • O / / /� :, '� � r •?,r '+VA 4. ALL TRAFFIC CONTROL DEV3CE5 PAVEMENT MARKING SIGNS AND SIGNALS SHALL BE DESIGNED, '' INSTALLED AND MAINTAINED IN CONFORMANCE WITH THE STANDARDS SET FORTH IN THE MANUAL ON (1F ��0 �-- / // i �//. i / / ! ,ry I`--,: C .;.. f, `.. =,. `.,r K3" "eFT ,. '�°• F-' - f � UNIFORM TRAFFIC CONTROL DEVICES. • � m� `� n.r., , / // / .�� •€� _ ' S^ ��;fa t x �; 7 a; 1;���. ,uu!r! -�:-. 2, r � - r t �� .i... -, ,� i i �r� �� / / / .,� � ,ice ''�. i% �- ,fir>a 'ti -:/-� 4 `e, ^� � x �.�, �' t r, \� �7h,A f,.l� _ _ �' 1 • � i k CONCRETE AND SIDEWALK NOTES • .- / •.: , / / ' it 'ate ` ® in;.:., '�'.` ,y„ ;xkn 1i l t;. _ - - � / ` / / � � ,T ,,,. "`:;�:.., , k<,.'�! •s,._ ',�- ,,gr 1. CONTRACTOR SHR LL REFERENCE THE ARCHITECTURAL PLANS FOR DIMENSIONS JOINTS AND INAw r., i s tY.-:.�.,.. t.. - - IINIrIN'li I�;i I;rp - / i I* ,:U*f °,, :y r�s'A, y3 S =? c. 7 -r. - r:,;. , - r SPECfFICATi0N5. PROVIDE CONSTRUCTION JOINTS IN WALKWAYS EVERY 10' MAXIMUM OR AS INDICATED IN ` • jieONe rZ _ (MAXIMUM), ,f - �/ , / / / / i / DOUBL`c c"-� '�I -"`-?; `H .51 �"u„- - , •*-l-q Yg p',' , r1 !u_''.trq:r;;W PAT J J _ �f ARCHITECTURAL PLAN SHEETS. : ❑ / WIDE GATES ® J ; n, _ ;I" L o M,rl i / emu' i _ m • a:JT & 2. CONCRETE PADS AND WALKWAYS: UNLESS O7HERWSE NOTED ARE 3000 PSI OF 4" THICKNESS WITH 0' 4f Al / / LC" ll. f� LJ - • W / a.'.,:'. _ �,'W&itlJ'�I! 'Ifll;' 12"x12" x1.9 >< w1.9 WELDED WIRE FABRIC THROUGHOUT. • R F_Ilrflllifl • �� LNCF , � Ail rrrl;f';'Ii�rJr � / !P N8J'73'ECM - ;_1 - "� - j1 Jpy "-.-''� 3. DUMPSTER PAD SHALL BE MOD PSI (2$ DAYS STRENGTH), 6- THICKNESS, WITH 6" x 6" WA.O X W4.0 • 3+"W" �:_ 1 WELDED WIRE FABRIC THROUGHOUT. • 35W N 4a'\ 118. a5 = N 11 1 %� /lam INP TRATICN ITANIN NO2'S6'16"E j(J _ 1 ary 1i i 1` 4. DESIGN AND SPECIFICATIONS OF CONCRETE PAD FOR PROPANE TANKS TO BE PROVIDED BY PUBLIC • z \ 9.72 27.80 SERVICE OF yPA,,�, CAROLINA�PSNCI. Cj k f _ ' / / �'AIHI♦Eul]NIU�{IIn1111!I�uNINIuhlllifNlnlI3GI NIUNIIIWIInJll3lul Illlnll� � i k I • V7 \ \\������a •, , � / / � / / / �j - I I; i ., �� l � � 1 , I' I � l' CONSTRUCTION NOTES z j [f _ ■� /',X 1. SLOPE OF ASPHALT AT HANDICAPPED PARKING SPACES AND ACCESS AISLES SHALL NOT EXCEED 1/4" Q i _ _ I PER FOOT. • SIGN / / /. - .� V7 -` 25,00 - �T�1 / - f -� / / .,' 'L7^W `� N6T43' 99"W _ z._.J i I / _ i / _ _ 137.7C 1 I ACCESSIBILITY NOTES - CP I' _ I J �` "'�_ i. AL REQUIRED EXITS 1NL NEED 70 BE TREATED AS AN ACCESSIBLE ENTRANCE AS PER SECTION 6-2-1-2 • O m / i ,% �,• / % I -.-� I _ II f ` VOL. 1-C AND THESE EXITS MUST MEET ALL REQUIREMENT$ OF VOL. I-C. • Z } // f i PHz�E !: POND 6 � • ❑ ,�.� 2. STANDARD 117-110 RESERVED PARKING AND MAXIMUM PENALTY E250 NCGS 20-37.6 SIGNS MUST BE 1-1 nI Y L T II II II-'.1,1l1ifl /; �I m� f I 1� CDNC i 1 INSTALLED IN FRONT OF THE HANDICAPPED PARKING SPACES. VAN ACCESSIBLE SIGNS) MUST BE • j CD U z "I G / `-, o '� li PROVIDED IN FRONT OF VAN ACCESSIBLE SPACES. • U W J \ ;G f/ Ej PAD � • �Q TL �u cokc E waft i! GAS NOTES ; - • PAp STING I `�"�� 111 1. CONTRACTOR TO COORDINATE GAS UTILITY INSTALLATION WITH CAMPUS PHYSICAL PLANT PERSONNEL. ._Y / I �ul��yj4luu''I L'I(t SPACES N86'72'r 1 "W T E7 SPACES � � I rJ-_- J I INKZ.. I Ll'.�I �-`j _r .\ 11 I -. r, I / • A LA z �F Vy .SO•' 1J Ir k';,S s r F,,.y1+J, I ; s i , `�."x i - -li 1 � � t �.. � �'. t,`�, � "� �^ 7ff»> � � �f ..:.IIIII-���38��--���` x � � ' i I � ! • CONSTRUCTION NOTES • AD ALTERNATE I P,..,. 1 i� ��� _ �y _ r .��+,�-.- r _ � � �I NI!T11 l��l�rlll paIIIIIINiIh� SEE SIDEWALK NOTES FOR SP£CIFICATYONS � .� �i 1-r� AND CONSTRUCTION MEANS ANp METHODS / (SEE NOTE - vs r- -.� PAD I' ! x r lr C) CONSTRUCT s' WIDE CONCRETE WALK 1 i I h �T� I BE10 FAI CONSTRUCT 6' WIDE CONCRETE WALK • j _`C x 4 +i , - BRA NJNHI 7IIIY �i / i `( 4- k. j � _ � � QpR � 1 [I� CONCRETE DUMPSTER PAD, SEE DETAIL 5.10 WHERE NEW ©€NS7ALL srEPs; SEE ARCH. -I CURBING IS ;4 = yll ;t ��_ RAMP, COO Q �_ i iD INSTALL 5 TO fi CONCRE� SIDEWALK TRANSITION. �,J� 1 KE INSTALL 10' WIDE CONCRE� SIDEWALKINSTALLED. 'ri]I a PHASE a - ~~ i t ; a v I ©F INSTALL 1$' WIDE CONCRETE SIDEWALK ` ROADWAY WIDTH TO V [TIT73 �� INSTALL 15' WIDE CONCRETE SIDEWALK • Q BE 24' FACE TO^` % T . I ASPHALT k- H INSTALL CDNC_ SIDEWALK TO MATCH EXISTING V 'r I - SIJ. t ,T'? ` I 2i . B';:=r WALE RAYF - 'y z PARKING _ r _ \ FACE. li _ © a ,D-c ,U -, .cr. ( �f _ pP % � 9 CONCRETE SLAB: SEE STRUCTURAL DETAIL 2 ON SHEET S-8 • } J = _ �• gip- > srs r :. ! \ ! i / - +r 0 24" CONCRETE CURB AND GUTTER; SEE DETAIL SHEET C-5.1 tI \�O/v it "" FA FLUSH CURB AND GUTTER ! a INSTAL CONCRETE H_C. RAMP; SEE DETAIL SHEET C-5-i SEE AR,CHIT�,CTURAL. � X _ W = W IB� � INSTALL H.C. RAMP; SEE ARCH. • I - (� iJ L - - li- =;I® ° PLAN,FOR DETAILS . ' z '�.i !j �� TRANSITION To PLUSH CURB -� TURN DOWN SIDEWALK; SEE DETAIL 5.1R • I IN THIS, AREA a - Q - -�� TEL 1 ®` f v � � T P �_ h� --- z �11 �I _ - - ® INSTALL 24- VALLEY GUTTER: SEE DETAIL 5.1S MH - f - i _ _ i MATCH STYLE AND WIDTH OF CURBING: CONSTRUCT CURBING INSTALL FLUSH CURB AT MECHANICAL YARD SEE DETAIL 5-1U • V INSTALL LIGHT DUTY PAVEMENT; SEE DETAIL 5.111 ,, ll (� INSTALL HEAVY DUTY PAVEMENT- SEE DETAIL 5.11 • V ACFHr �OiSl�f NSTAASPHALLTCONC. PAVEMENT PAVEMENT SEE DETAIL S.IA 71 a f JJ� O !� '.1� ��, <'' Ld BANKS STREET ASPHALT PAVEMENT REPAIR; SEE DETAIL 5-i T ♦ _ INSTALL TEMPORARY GRAVEL DRIVE LU �� �C�A ADD ALTERNATE: [I INSTALL VAN ACCESSIBLE H_C. SIGN; SEE DETAIL 5.11) � p aga� _ FA INSTALL H.C. SIGN: SEE DETAIL 5.10 g ,. a':•- '� : d ---� / .`-. NOT USED t 1NALLACE ROAD REMOVAL: • INSTAL CONCRETE $OLLARDS 1 DEMOLISH AND REMOVE EXISTING BROKEN ASPHALT AND • GRAVEL SU® INSTALL VAN/CAR POOL PREFERRED PARKING SIGN: SEE DETAIL 5.1M • iri�yrr� I➢ IA-';:,`�;,! ,�,: ,; I Ini / GRADE TO PROVIDEBBASE IN AREA SHOWN ABOVE. FILL WITH TOPSOIL. POSITIVE DRAINAGE AND SEED PER SPECS. INSTALL CONCRETE WHEELSTOPS; SEE DETAIL 5.TP • 7i/iy,Fii i _ r Q y / PAINT 4" WIDE STRIPING • ` PROVIDE VALLEY GUTTER PER DETAIL ON SHEET C9.3. • j � PAINT 4" WIDE STRIPING AT 45' ANGLE r LJ"ml'IT!FIfi17;,„ryl,L'1. P ,'I, Illllllli ,I IIIII fn.-lfil�"16 - \ RR VEW Y CONNECTION. SPACES AS SHOWN TO DELINEATE INSTAL CHAIN LINK FENCE J IUnhpP119f141..illl lrlNllll;';p;111+fllllflul� _\ V-� �� __ J INSTALL ONE 5 LOOP IN --GROUND MTD. WAVE -TYPE BICYCLE RACK �A -C _7E7ufIIIIIIIaII ! r - ®/ ��i1111113EllliEllllll{il E \ - \ -` EXTEND EXISTING SOIL OR1VE TO EXISTING PARKING LOT. 42" HIGH • 'ROVIDE 4" CABC WIT'r{ WOVEN GEOTEXTILE BETWEEN SUB -BASE ' .GUN --- 1 ND CABC. WOVEN GEOTEXTILEOFABRIC TO BE MIRAFl 600X. I] MECHANICAL YARD; SEE ARCHITECTURAL FOR DETAILS • '��- -` <MOCO 2002, EXXON GTF-200 R APPROVED EQUAL • o • I = o - I �` '. IIIIIi11II �i�'� I JI ,"r Eop 1 RH t l 231 a. ' 586'55'C9"E • • • 1 I • -��,� • ^� otJ1>� G sfcM NIDOL P. KLT FENCE -- _ _ • s a / ® z 1 'IrN�C II Irl'�1gGihllt«.0 a Iw ul � � ' � � f i • 1 / oNc • V L I I CDNC • O J MARICUL7UR E BLDG. . - t SHADINGLFG£ND d E%(STING CONCRETE PAVEMENT o • L C y r PARKING DATA z25 �1 C+' II - EXISTING BUILDING PARKING REQUIRED : II SPACE PER 600 SPACE PER OFFIC O FT PLUS \ : _ ` _j � 7 Z r�f {rr�j rI��I 0 Ij �N ® iUi € - NEW CONCRETE / CONCRETE SIDEWALK$ BUILDING NAME REGULAR SPACES 3i_C. SPACES ii y�/i MH (O��fau'�A1l7II. r.4 _ f , �. J, -111 iOq tt - 1 -LIMITS OF CONSTRUCTION V a MAR CTMLTURE SCIENCE 08 1 • MAkICOL - 22 1 - STANDARD CURBING TOTAL NEEDED 120 -�- a • W fiJ �I p MH o • I` fi ICI S 7 r EXISTING PARKING REQUIRED, 98 SPACES • i^ f 111Jflll:11911uf I III P.ii6n, IIrE 1 i -FLUSH CURSING c 0 MH ® r jI pI MH 0 - --. j CONC EXISTING PARKING REMOVED: 109 SPACES m r MH UTLEF - MH MH O OPIPE j PAD i PARKING NEEDED: l09-98+125=136 � • _ Q PARKING PROVIDED: 136 SPACES (INCLUDES 6 • 1 J - ASPHALT PAVEMENT PATCH i HANDICAP SPACES)• f �, MH I FUTORE WORT( I O MH ALARM ' (NOT IN 11 GRAPHIC SCALE ® sroRM i (CNTRACT) i =--��J • CID\, WATER iTpO O IN FEL SYSTFM I �- - a L inch = 30 ML • � • SITE PLAN - PHASE I • TCTAL • 711! L; r ' k is _ .._ ,. ♦e ._. .t:� I_�l; :.'t+_. , y_. ---.. ,. -le.' .,_ _ is - ----- I - -• ---- I ` �- ---1 l r ~o�-- 1 j I � FIP 75 .•6 k7g.3� 1 I !iSIGN� c -. 7ff!tfRff�ilTTfifllf - -- /H!l6f11P.Pi(I(if ':I�ttlfm(IlTtliiliolt(�iRpm(to I, , I rirtlimmmnulnimi uthl � c I I .cs � � � �J if�1'�.nitlllllll!,I�IIIIIIPIIlllpld-IllLfnlnllunFFImIIIIIn.7Alll uII,IIIINIliIl1[IifIpIIIG11.7ulillfliTlf�iililG¢o-nfl)tlllllfifllflc�lAlf � I iL / l w •: _ [ter- f`d17Au i4:^.. � � 'l unl! ItV,4 I '-s � l\ SIGN 1 r7q•�., __ 25.00 1s6 743.r y..N GR z� Lj—A/Cw k CCNC 11 1 b'27'Sl 147. iC �!.`.,: - - - ._'"n I �O - 1 4 ' ...... -77 ;! J MARINE TECHNOLOGY BLDG.' 1' -----� !� �.��� ''' .] FFF 14.50 RAMP. SIGNS �.-il�llll! I 4,11, I;;II!Nll fl!!I IL �;-_i II If r 1 COLLEE C C3F,ctE OF DfSitl '�llp� \ �J I 7 f AX 4 Caws I G vv oE, P KF FENCE �Ir MARICULTURE BLDG, • A SHEET NOTES 1_ ALL DEMOLITION, AND ANY SU95E9UEN7 CONSTRUCTION, SHALL BE PERFORMED IN ACCORDANCE WITH • • THESE PLANS AND SPECIFICATIONS APPROVED BY THE LOCAL GOVERNING AUTHORITY. • • 2. ALL DEMOLITION AND SUBSEQUENT CONSTRUCTION TO BE IN ACCORDANCE WITH PERMITS ISSUED AND • APPLICABLE STATE, COUNTY. AND LOCAL CODES. : 3. THE CONTRACTOR SHALL OBTAIN AND PAY FOR ALL INSPECTIONS. CERTIFICATIONS, EQUIPMENT, ETC THAT MAY BE REQUIRED. • 4_ IF DEPARTURES FROM THE SPECIFICATIONS OR DRAWINGS ARE DEEMED NECESSARY BY THE CONTRACTOR, : DETAILS OF SUCH DEPARTURES AND REASONS THEREOF SHALL BE SUBMITTED TO THE OWNNER FOR REVIEW. • NO DEPARTURES FROM THE CONTRACT DOCUMENTS SHALL BE MADE WATHOUT THE WRITTEN PERMISSION OF • THE OWNER. • • 5. EXISTING IMPROVEMENTS DAMAGED OR DESTROYED DURING CONSTRUCTION SHALL BE REPLACED OR RESTORED TO THEIR ORIGINAL CONDITION, AND TO THE SATISFACTION OF THE OWNER OF THE IMPROVEMENTS. • ,/,y'• 6. CONTRACTOR SHALL REFER TO ARCHITECTURAL PLANS FOR DETAILS OF BUILDINGS AND BUILDING DIMENSIONS_ • QY_ y '_ 7. ENGINEER AND/OR OWNER DISCLAIM ANY ROLE IN THE CONSTRUCTION MEANS AND/OR METHODS • t 7agJc ASSOCIATED EWTH THE PROJECT AS SET FORTH 1N THESE PLANS. A 15834 ` • ?Ol f,MgNE �y�: B CONTRACTOR SHALL MAINTAIN AN 'q5 BUILT $[T OF (DRAWINGS TO RECORD THE ACTUAL LOCATION OF ALL PIPING PRIOR TO CONCEALMENT. DRAWINGS SHALL BE GIVEN TO THE OWNER UPON COMPLETION OF THE • q H' ` • '"•,'4UL PROJECT WITH A COPY OF THE TRANSMITTAL LETTER (FOR RECORD KEEPING) TO THE ENGINEER. 9. THE CONTRACTOR IS RESPONSIBLE FOR FIELD VERIFYING THE ACTUAL AND EXACT LOCATION, SIZE AND MATERIAL COMPOSITION OF ANY EXISTING WATER OR SEWER SERVICE PROPOSED FOR CONNECT+ON OR USE • ON THIS PROJECT. TkE RELOCATION OF ANY UTILITY SERVICES REQUIRED TO COMPLETE ANY PORTION OF • THESE CONSTRUCTION PLANS SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR - 10- THE CONTRACTOR MUST, AT ALL TIMES. KEEP THE PREMISES FREE FROM ACCUMULATIONS OF WASTE MATERIALS OR RUBBISH CAUSED BY HIM, HIS EMPLOYEES, OR HIS WORK. ALL DEBRIS SHALL BE REMOVED FROM THE SITE ON A DAILY BASIS. 11. FINAL ACCEPTANCE OF WORK BY THE LOCAL GOVERNING AUTHORITY SHALL NOT BE MADE UNITL ALL WORK SHOWN ON THE APPROVED PLAN IS COMPLETLO. • =U' �R ! • 12. CONTRACTOR SHALL CALL -NORTH CAROLINA ONE CALL' AT LEAST 46 HOURS PRIOR TO BEGINNING CONSTRUCTION OR EXCAVATION ON SITE TO EXISTING E HAVE UTILITIES LOCATED. CONTRACTOR TO CONTACT ANY LOCAL UTILITIES THAT PROVIDE THEIR OWN INDEPENDENT LOCATOR SERVICE. CONTRACTOR SHALL s = IMMEDIATELY REPORT ANY DISCREPANCIES TO THE ENGINEER. • E4r. • W 13. ANY EXCAVATION MUST BE FILLED IN AND TAMPED AT THE CONCLUSION OF EACH WORK PERIOD, AND EQUIPMENT AND SUPPLIES RETURNLO TO THE STAGING R tl{f CONSTRUCTION AREA. • es SIGNAGE, STRIPING, AND MARKING NOTES I_ ALL SIGNAGE SHALL CONFORM TO STATE DOT STANDARDS. SIGNAGE SHALL BE INSTALLED BY CONTRACTOR. • UI �` 2. ALL LOT STRIPING AND DIRECTIONAL ARROWS SHALL BE WHITE REFLECTIVE PA PAINT AND AND SHALL CONFORM TO STATE STANDARDS AND SPECIFICATIONS.I•�f1 • C) DOT 3- HANDICAP SYMBOLS SHOWN IN THESE PLANS ARE FOR LOCATION AND INFORMATIONAL PURPOSES ONLY. : SEE DETAIL SHEET FOR ACTUAL CONSTRUCTION MEANS, METHODS, AND MARKINGS. • 4. ALL TRAFFIC CONTROL DEVICES, PAVEMENT MARKINGS, SIGNS, AND SIGNALS SHALL BE DESIGNED, • INSTALLED AND MAINTAINED IN CONFORMANCE WITH THE STANDARDS SET FORTH IN THE MANUAL ON N UNIFORM TRAFFIC CONTROL DEVICES. • • CONCRETE AND SIDEWALK NOTES 1. CONTRACTOR SMALL REFERENCE THE ARCHITECTURAL PLANS FOR DIMENSIONS, JOINTS AND INLAY Q SPECIFICATIONS. PROVIDE CONSTRUCTION JOINTS IN WALKWAYS EVERY TO- (MAXIMUM), OR AS INDICATED IN s ARCHITECTURAL PLAN SHEETS. • 4 • 2- CONCRETE PADS AND WALKWAYS; UNLESS OTHERIWSE NOTED, ARE 3000 PSI" OF 4' THICKNESS WITH • r F T T2 xl2 •I 9 w 1.3 WELDED WIRE FABRIC THROUGHOUT . Li D. • 3 DUMPSTER PAD SHALL BE 3000 PSI (28 DAYS STRENGTH). 6' THICKNESS, PATH 6" x 6' W4.0 X W4.0 WELDED WIRE FABRIC THROUGHOUT. • N 4 DESIGN AND SPECIFICATIONS OF CONCRETE PAD FOR PROPANE TANKS TO BE PROVIDED BY PUBLIC • \ O RVJ_f'.E OF KORTH CAROLINA (PSNCI. • ! r LT \ CONSTRUCTION NOTES • o I:L 1. SLOPE OF ASPHALT AT HANDICAPPED PARKING SPACES AND ACCESS AISLES SHALL NOT EXCEED 1/4' • PER FOOT. • ACCESSIBILITY NOTES 1. ALL REOUkRED EXITS WWLL NEED TD BE TREATED AS AN ACCESSIBLE ENTRANCE AS PER SECTION 6.2.1.2 • J } 7' L VOL. 1-C AND THESE EXITS MUST MEET ALL REQUIREMENTS OF VOL. 1-C, • H. If, W 2. STANDARD R7-Bq RESERVED PARKING AND MAXIMUM PENALTY $250 NCGS 20-37.6 SIGNS MUST BE • U IN y Z � INSTALLED IN FRONT OF THE HANDICAPPED PARKING SPACES. VAN ACCESSIBLE SiGN(S) MUST BE PROVIDED IN FRONT OF VAN ACCESSIBLE SPACES. • • Y 2D. CC GAS NOTES -' n > I. CONTRACTOR TO COORDINATE GAS UTILITY INSTALLATION WITH CAMPUS PHYSICAL PLANT PERSONNEL. • : • • • • • • • • • W � • W • Z = �O a . • o �tl • J - • a • J = • �- 0 . zz • �w • 0 .F� • 1, V, F- • • • O T • • I� W jtu CONSTRUCTION NOTES : SEE SIDEWALK NOTES FOR SPECIFICATIONS ANp CONSTRUC17ON MEANS AND METHODS • 1 INSTALL 5' WIDE CONCRETE SIDEWALK INSTALL 6' WIDE CONCRETE SIDEWLKKc • LI�@i INSTALL B' WIDE CONCRETE SIDEWALK : �j INSTALL 10' WIDE CONCRETE SIDEWALK • Op] INSTALL 12' WIDE CONCRETE SIDEWALK • • INSTALL GRASSPAVED AREA', SEE DETAIL 5.,J j INSTALL CONCRETE H_C- RAMP; SEE DETAIL SHEET C-5.1 - • • • : • EEEEEEEEEIN Z li N Cl • c � • < a ;o 'j a v La O PARKING DATA r c C PARKING REQUIRED = 1 SPACE PER 600 SO FT PLUS PER EE • 7 p • H 7 1 SPACE OFFICE NAME REGULAR SPACES H-C. SPACES � fBUILDING n SHADING LEGEND HEALTH SCIENCE MARTECH 90 3 — 22 1 / \ • w U '" Z ' EXISTING CONCRETE MARICULTURE TOTAL NEEDE 06 1 120 5 s u PARKING - EXISTING BUILDING EXISTING EXISTING REQUIRED: EXISTING PARKING REMOVER 9$ SPACES 109 SPACES • • • pl r°1% w P DWI _ NEW CONCRETE / CONCRLTL SIDEWALKS PARKING NEEDED: 109-98+125-136 • co '-, 1 11 1 i 1 iI 1 -LIMITS OF CONSTAUC ION PARKING PROVIDED: 136 SPACES (INCLUDES 6 HANDICAP SPACES) • • c �' �' �1 - STANDARD CURBING I ` J CCU--��- EE - FLIJSN CURBING GRAPHIC SCALE '0 • C� - ASPHALT PAVEMENT PATCH • • • N O //•�� • { IN FEET) • C7 E2 - GRASSPAVEp AREAS inch = W 1 tE • • Q 10 SITE PLAN - PHASE II • -OTC- • a WWIE i x I. DOILI WIDEBCATES �b352 C6' 53.33 WAYNE WEST BLDG.8G'94 FFE 22.00 15 -j PJ 7g•3 � �-�__ 17 j'TYP. 12 SPACES 53.67' 72,94' FFE 22.0 PIT rr-1 u E ff1r` fl I vX �V J / 4 27' N83'29'31 CM :Off •S / W 3548 ' S3831 34"W NO2°55161 a -9 72 27,80 ' [h / WAYNE WEST BLDG. PARKING Z. 00, .1 I l / I H I �dl� 1 P1 I' ? ° MART E TECHNOLOGY BLDG.Li �. FFE 14.50 MARINE TECHNOLOGY BLDG. PARKING :7 9' [ 1 i FLUSH CURB I inch - 20 fL WAYNE `:VEST BLDG. H. C. PARKING irx FIST I-' CtAIP: 1 I I FENCE t P [, I j O I ?A SHADING LEGEND - EXISTING CONCRLTE PAVEMENT -- EXISTING BUILDING - NEW CONCRETE / CONCRETE SIDEWALK - LIMITS OF CONSTRUCTION - STANDARD CURBING - FLUSH CURBING BANKS STREET ASPHALT PAVEMENT RE - ASPHALT PAVEMENT PATCH �61 LLL LIGHT DUTY ASPHALT - HEAVY DUTY ASPHALT SHEET NOTES 1- ALL DEMOLITION, AND ANY SUBSEQUENT CONSTRUCTION, SHALL BE PERFORMED IN ACCORDANCE WITH • THESE PLANS AND SPECIFICATIONS APPROVED BY THE LOCAL GOVERNING AUTHORITY. • • 2- ALL DEMOLI TIOH AND SUBSEQUENT CONSTRUCTION TO BE IN ACCORDANCE WITH PERMITS ISSUED AND • • APPLICABLE STATE, COUNTY, AND LOCAL CODES- • 3. THE CONTRACTOR SHALL OBTAIN AND PAY FOR ALL INSPECTIONS, CERTIFICATIONS. fQUIPMEN 7, ETC. THAT MAY BE REQUIRED. + • 4_IF DEPARTURES FROM THE SPECIFICATIONS OR DRAWINGS ARE DEEMED NECESSARY BY THE CONTRACTOR, : DETAILS OF SUCH DEPARTURES AND REASONS THEREOF SHALL BE SUBMITTED TO THE OWNER FOR REVIEW. • NO DEPARTURES FROM THE CONTRACT DOCUMENTS SHALL BE MADE WITHOUT THE WRITTEN PERMISSION OF • THE OWNER- • • 5. EXISTING IMPROVEMENTS DAMAGED OR DESTROYED DURING CONSTRUCTION SHALL BE REPLACED OR : RESTORED TO THEIR ORIGINAL CONDITION, AND TO THE SATISFACTION OF THE OWNER OF THE IMPROVEMENTS. fi_ CONTRACTOR SHALL REFER TO ARCHITECTURAL PLANS FOR DETAILS OF BUILDINGS AND BUILDING • DIMENSIONS. • a 7. ENGINEER AND/OR OWNER DISCLAIM ANY ROLE IN THE CONSTRUCTION MLANS AND/OR METHODS SEAL : E TSB34 Iy ASSOCIATED WITH THE PROJECT AS SET FORTH IN THESE PLANS. S. CONTRACTOR SHALL MAINTAIN AN 'AS BUILT' SET OF DRAWINGS TO RECORD THE ACTUAL LOCATION OF PIPING SHALL BE GIVEN TO THE OWNER THE • �., p ��,.� ALL PRIOR TO CONCEALMENT- DRAWINGS UPON COMPLETION OF PROJECT WITH A COPY OF THE TRANSMITTAL LETTER (FOR RECORD KEEPING) TO THE ENGINEER. 9. THE CONTRACTOR {S RESPONSIBLE FOR FIELD VERIFYING THE ACTUAL AND EXACT LOCATION, SIZE AND • MATERIAL COMPOSITION OF ANY EXISTING WATER OR SEWER SERVICE PROPOSED FOR CONNECTION OR USE • ON THIS PROJECT. TIE RELOCATION OF ANY UTLiTY SERVICES REQUIRED TO COMPLETE ANY PORTION OF THESE CONSTRUCTION PLANS SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR. • 10- THE CONTRACTOR MUST, AT ALL TIMES, KEEP THE PREMISES FREE FROM ACCUMULATIONS OF WASTE MATERIALS OR RUBBISH CAUSED BY HIM, HIS EMPLOYEES. OR H15 WORK. ALL DEBRIS SHALL BE REMOVED--arw 8j FROM THE SITE ON A ONLY BASIS- pal 11- FINAL ACCEPTANCE OF WORK BY THE LOCAL GOVERNING AUTHORITY SHALL NOT BE MADE UNITL ALL a U z df €1 u WORK SHOWN ON THE APPROVED PLAN !S COMPLETED. ♦ Zg ix¢! 12. CONTRACTOR SHALL CALL "NORTH CAROLINA ONE CALL" AT LEAST 48 HOURS PRIOR TO BEGINNING ix P4 CONSTRUCTION OR EXCAVATION ON SITE TO HAVE EXISTING UTILITIES LOCATED. CONTRACTOR TO CONTACT ANY LOCAL UTILITIES THAT PROVIDE THEIR OWN INDEPENOFNT LOCATOR SERVICE- CONTRACTOR SHALL • z ;• IMMEDIATELY REPORT ANY DISCREPANCIES TO 7H£ ENGINEER. w 4E 13. ANY EXCAVATION MUST BE FILLED 1N AND TAMPED AT THE CONCLUSION OF EACH WORK PERIOD, AND CONSTRUCTOR STAGING AREA. F $ 1 �s EQUIPMENT AND SUPPLIES RETURNEO TO THE • x° SIGNAGE, STRIPING AND MARKING NOTES T. ALL SIGNAGE SHALL CONFORM TO STATE DOT STANDARDS. SIGNAGE SHALL BE INSTALLED BY CONTRACTOR. • -Ci : t 2. ALL LOT STRIPING AND DIRECTIONAL ARROWS SHALL BE WHITE REFLECTIVE PAINT AND SHALL CONFORM •€ { TO STATE DOT STANDARDS AND SPECIFICATIONS. • v 1 EI. 3. HANDICAP SYMBOLS SHOWN IN THESE PLANS ARE FOR LOCATION AND INFORMATIONAL PURPOSES ONLY, SEE DETAIL SHEET FOR ACTUAL CONSTRUCTION MEANS. METH005, AND MARKINGS. • 4. ALL TRAFFIC CONTROL DEVICES, PAVEMENT MARKINGS, SIGNS, AND SIGNALS SHALL BE DESIGNED, • • INSTALLED AND MAINTAINED IN CONFORMANCE WITH THE STANDARDS SET FORTH IN THE MANUAL ON UNIFORM TRAFFIC CONTROL DEVICES. + CONCRETE AND SIDEWALK NOTES : T CONTRACTOR SHALL REFERENCE THE ARCHITECTURAL PLANS FOR DIMENSIONS. JOINTS AND INLAY • SPECIFICATIONS_ PROVIDE CONSTRUCTION JOINTS IN WALKWAYS EVERY 10' (MAXIMUM), OR AS INDICATED IN ARCHITECTURAL PLAN SHEETS- • 2. CONCRETE PADS AND WALKWAYS; UNLESS OTHERWISE NOTED, ARE 3000 PSI, OF 4" THICKNESS WITH • 12"x12' w1.9 x w1.9 WELDED WERE FABRIC THROUGHOUT, 3. DUMPSTER PAD SHALL BE 3000 RD (28 DAYS STRENGTH), 6" THICKNESS. WITH 6' x 6" W4.0 X W4.0 WELDED WIRE FABRIC THROUGHOUT. • 4. DESIGN AND SPECIFICATIONS OF CONCRETE PAD FOR PROPANE TANKS TO BE PROVIDED Y@ -� I� • �' z SER1gCE OF NORTH CAROLINA (PSNOI, • • J CONSTRUCTION NOTES 1. SLOPE OF ASPHALT AT HANDICAPPED PARKING SPACES AND ACCESS AISLES SHALL NOT EXCEED 1/4' PER FOOT. • ACCESSIBILITY NOTES : 1, ALL REQUIRED EXITS WILL NEED TO BE TREATED AS AN ACCESSIBLE ENTRANCE AS PER SECTION 6.2-1.2 • VOL. I-C AND THESE EXITS MUST MEET ALL REOUIREMENTS OF VOL. 1-C. • Z } • Go 2- STANDARD R7-8n RESERVED PARKING AND MAXIMUM PENALTY $250 NCGS 20-37.b SIGNS MUST BE C) N w INSTALLED IN FRONT OF THE HANDICAPPED PARKING SPACES. VAN ACCESSIBLE SIGNS) MUST BE • LOJn Y w R. PROVIDED IN FRONT OF VAN ACCESSIBLE SPACES. • C� p J LL GAS NOTES • o u D a� _LD' E T CONTRACTOR TO COORDINATE GAS UTILITY INSTALLATON WITH CAMPUS PHYSICAL PLANT PERSONNEL, • r • • CONSTRUCTION NOTES • SEE 90EWAUK NOTES FOR SPECIFICATIONS AND CONSTRUCTION MEANS AND METHODS • ,h [] CONSTRUCT 5' WIDE CONCRETE WALK : v 1A CONSTRUCT 6' WDE CONCRETE WALK 11 f 1B CONCRETE DUMPSTER PAU; SEE DETAIL 5.IC • 6L-i 1C INSTALL STEPS; SEE ARCH. -A O 15 INSTALL 5' TO S' CONCRETE SIDEWALK TRANSITION- • C 1LE] INSTALL 10' WIDE CONCRETE SIDEWALK • ©F INSTALL 18' WIDE CONCRETE SIDEWALK IG INSTALL 15' WIDE CONCRETE SIDEWALK • EO, : v _p IH INSTALL CONC. SIDEWALK TO MATCH EXiS71NG • Q U ® CONCRETE SLAB; SEE STRUCTURAL DETAIL 2 ON SHEET S-8 : `r 24" CONCRETE CURB AND GUTTER; SEE DETAIL SHEET C-5.1 O VQl FLUSH CURB AND GUTTER • Z Z VQl INSTALL CONCRETE H.C. RAMP; SEE DETAIL SHEET C-5.1 : 0 INSTALL H.C. RAMP; SEE ARCH- W TRANSITION TO FLUSH CURB + N rl TURN DOWN SIDEWALK; SEE DETAIL 5.1R • !�- INSTALL 24- VALLEY GUTTER; SEE DETAIL S.1S : MATCH STYLE AND WIDTH OF CURBING; CONSTRUCT CURBING [3J INSTALL LIGHT DUTY PAVEMENT; SEE IIETAIL 5.1H O INSTALL HEAVY DUTY PAVEMENT; SEE DETAIL 5.11 • (n L_ H ASPHALT PAVEMENT REPAIR; SEE DETAIL 5AA + z ® INSTALL CONC. PAVEMENT IUD PAVEMENT • O BANKS STREET ASPHALT REPAIR: SEE DETAtL 5-IT INSTALL VAN ACCESSIBLE H.C. SIGN; SEE DETAIL 5,10 'y�` l a Q w 9k INSTALL H.C. SIGN; SEE DETAIL 5.ID : R/ NOT USED • • lL 0 4 INSTALL CONCRETE BOLLARDS 7 1{ INSTALL 'VAN/CAR POOL PREFERRED PARKING" SIGN; SEE DETAIL 5-1M • `-- (� 15� INSTALL CONCRETE WFlEELSTOPS; SEE DETAIL 5.1P 4i • 59 PAINT 4" WIDE STRIPING PAINT 4" WIDE STRIPING AT 45- ANGLE • : IN57ALL DUMPSTER SCREEN j INSTALL ONE 5 LOOP IN -GROUND MTD, WAVE -TYPE BICYCLE RACK : v 42' HIGH • • • : : • • : • : • • • • � Z �I�y' I x • W • iN a a • � _ z r � D y • • t U a _ U >z • • Q F = Zu r 0L E • • �I W Zf. z t/1 • Vj Q z 0 N - o • tj % w o z • W • i N F L V a � N Z S o : w wrt s U • L 0 ` m • • ti r • c • 0 GRAPHIC SCALE • : PAIR m o GD • N o j 7N TEST) • • 1 inch = 20 R • • Q GEOMETRY PLAN • • TMAL LID v ----- PIE MH MH HIM BENCH 3 16,57 INV. = 1:E. 16, f WELL 3 ' \ r \\i g f CONC - 31 AD22 O kiJ r I r `tea MH C. ;r SSMH 4 i L1ullI5 0 DIS3URSA� u1, RIM 20-64' 3 - 'iitlpriiV111A N',V`iNViJ11i-III k11 !,I ,I:`Ii11AV 1,1"`W BENCH = 16.02' ^�iILL fI;I [!11':O„SIfd,LVLI'1.:1gW,11 INV. - 15.53'EXMHi I 1'w d,Lw ! ! rVlnNlei!;,,i,I,hW. / S �p0� SMH 2 Coil" lii; [I 4NOQ� F1 9r 55 6 55 OHE � 11W,1k1t1` - r } I> 7 TEL SSMH 3 SEE SHEET C3.3 FOR SEWERLINE RUN & PROFILE , Qi U IN a .. UN - DRAIN - O. .. ......... PP / � •r r• / nryuuu 1I,n1.au I'• a $a wl,l TaI AVM X3 /� f j SHEET NOTES ; i � ,. ALL DEMOLITION, AND ANY SUBSEQUENT CONSTRUCTION, SHALL BE PERFORMED IN ACCORDANCE PITH • THESE PLANS AND SPECIFICATIONS APPROVED BY THE LOCAL GOVERNING AUTHORITY • ) � V 2. ALL DEMOLITION AND SUBSEQUENT CONSTRUCTION TO BE IN ACCORDANCE WITH PERMITS ISSUED AND • FOP W V f , 7 APPLICABLE STATE, COUNTY, AND LOCAL CODES. • 0 I i • 3. THE CONTRACTOR SHALL OBTAIN AND PAY FOR ALL INSPECTIONS, CERTIFICATIONS. EQUIPMENT, ETC. • - THAT MAY BE REQUIRED- • -----� 1 4.IF DEPARTURES FROM THE SPECIFICATIONS OR DRAWINGS ARE DEEMED NECESSARY BY THE CONTRACTOR, r DETAILS OF SUCH DEPARTURES AND REASONS THEREOF SHALL BE SUBIMlTTED TO THE OWNER FOR REVIEW- E(P _ NO DEPARTURES FROM THE CONTRACT DOCUMENTS SHALL BE MADE WITHOUT THE WRITTEN PERMISSION OF • f17111_11r1;'!fl'lI'.0'71 roIL, ,~ �� MII ~ THE OWNER- r_n1ir, RIM 20,35' • EENCH = i6.85' - 1 / 5- EXISTING IMPROVEMENTS DAMAG£p OR DESTROYED DURING CONSTRUCTION SHALL BE REPLACED OR • A,f 11v4, _ `6.44' CJ 1 RESTORED TO THEIR ORIGINAL CONDITION. AND TO THE SATISFACTION OF THE OWNER OF THE IMPROVEMENTS. • TLL • PP a ° PVC W-1 r 6. CONTRACTOR SHALL REFER TO ARCHITECTURAL PLANS FOR DETAILS OF BUILDINGS AND BUILDING 'Ck/. DIMENSIONS. • _ "gV `9 _ • i �- ---- fI SE OHf w 7 ENGINEER AND/OR OWNER DISCLAIM ANY ROLE IN THE CONSTRUCTION MEANS AND/OR METHODS _ u y,�✓ W-- ASSOCIATED NTH THE PROJECT AS SET FORTH IN THESE PLANS- • 'yp �1�7`'=" P'i 8. CONTRACTOR SHALL MAINTAIN AN 'AS BUILT- SET OF DRAWINGS TO RECORD THE ACTUAL LOCATION OF �O�q "wl WVM ALL PIPING PRIOR TO CONCEALMENT. DRAWINGS SHALL BE GIVEN TO THE OWNER UPON COMPLETION OF THE • "''•,'i� LOW`.``" f - PROJECT WITH A COPY OF THE TRANSMITTAL LETTER (FOR RECORD KEEPING) TO THE ENGINEER 11O ` 55 S. THE CONTRACTOR IS RESPONSIBLE FOR FIELD VERIFYING THE ACTUAL AND EXACT LOCATION, SIZE AND _ O f' SkGN �r MATERIAL COMPOSITION OF ANY EXISTING WATER OR SEM'ER SERVICE PROPOSED FOR CONNECTION OR USE • ON THIS PROJECT. THE RELOCATION OF ANY UTILITY SERVICES REQUIRED TO COMPLETE ANY PORTION OF THESE CONSTRUCTION PLANS SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR. 111 THE CONTRACTOR MUST, AT ALL TIMES. KEEP THE PREMISES FREE FROM ACCUMULATIONS OF WASTE • r MATERIALS OR RUBBISH CAUSED BY HIM, HIS EMPLOYEES, OR HIS WORK. ALL DEBRIS SHALL BE REMOVED • wwIa TEL i y f FROM THE SITE ON A DAILY 6ASI5. • tls1 AD23 _ 1 f II. FINAL ACCEPTANCE OF WORK BY THE LOCAL GOVERNING AUTHORITY SHALL NOT BE MADE JNITL ALL R 3Ei V! it ME HYD 1 WORK SHOWN ON THE APPROVED PLAN IS COMPLETED. • 0IK a�I � �� � r • z j+I V f 12. CONTRACTOR SHALL CALL 'NORTH CAftOLINA ONE CALL' AT LEAST 48 HOURS PRIOR TO BEGINNING ILI • ¢ W I ` I 7 CONSTRUCTION OR EXCAVATION ON SITE TO HAVE EXISTING UTILITIES LOCATED. CONTRACTOR TO CONTACT riI I! I ANY LOCAL UTILITIES THAT PROVIDE THEIR OWN INDEPENDENT LOCATOR SERVICE_ CONTRACTOR SHALL • Z ¢1'., 11�■ P7'- rIII IMMED'ATELY REPORT ANY DISCREPANCIES TO THE ENGINEER. • z gl> 13, ANY EXCAVATION MUST BE FILLED IN AND TAMPED AT THE CONCLUSION OF EACH WORK PERIOD, AND • FFq ! f EQUIPMENT AND SUPPLIES RETURNED TO THE CONSTRUCTION STAGING AREA_ ♦ i$ a{ UT[L1TY NOTES � m{:{ i H71f.rd'IrFr! (, r - M f g- UNDERGROUND UTILITIES SHOWN ON THIS PLAN SHALL BE INSTALLED PRIOR TO ANY CONSTRUCTION OF • S� T �� f I - PARKING AREAS, DRIVES, CURB AND GUTTER, OR CONCRETE WALKS/ PADS. UTILITIES WHICH CANNOT BE ♦ �' 'x Jam' INSTALLED PRIOR TO CONSTRUCTION OF SITE IMPROVEMENTS SHALL BE PROVIDED WITH CONDUITS WHERE THEY • U�ig CROSS SUCH IMPROVEMENTS FOR INSTALLATION AFTER SUCH IMPROVEMENTS ARE IN PLACE- • I_ P t - 1 • 2. WATERLINE LOCATION ON BANKS STREET IS AN APPRO%1MATE LOCATION. LOCATION TAKEN FROM FAX SENT g f - � 1 s - I'TBrT�"-• _ BY STROUD ENGINEERING- CONTRACTOR TO FIELD VERIFY LOCATION- � • �-'• \\\�� 3- CONTRACTOR SHALL COORDINATE UTILITY SERVICES WITH THE BUILDING MECHANICAL PLANS. • 4- CONTRACTOR SHALL BE RESPONSIBLE FOR INSTALLING SERVICES TO WITHIN 5 FEET OF THE BUILDING NOTE i CONNECTION POINT OR AS NOTED IN THE PLANS- / • 5. TRAFFIC CONTROLS FOR ANY UTILITY WORK YITHIN THE PUBLIC RIGHT-OF-WAY SHALL BE IN COMPLIANCE W+TH STANDARDS OF THE MANUAL ON UNIFORM TRAFFIC CONTROL DEVICES (MUTCD), • PIP ,' r, M � _ �_ ' ��'/ i 'fY / ' �. ,' , /, / ; / FEE 22 0 � W�,� � ,J f • AD20 1 = 6- A LICENSED UTILITY CONTRACTOR !MUST PERFORM ALL UTILITY WORK INVOLVED IN CONSTRUCTING THIS • IeT lT z-w PROJECT. • / rlg / / / i /� ,' ;�' ,L t • s fa .A`7 ❑ rlwu!-1•Ui.`L%:; ,,r Ci LC 1 - P OPTICS ® N= z_ _' : 7. ALL GAS LINES TO BE LOCATED PER ME DRAWINGS BY GAS UTILITY PROVIDER. I� , i ' 3g '�,< �` Es : k-*"5 `�s � u ,d ,e £zs.: tq 's• I•, ' ! -r-�C'''V:IyT� r x _ • �.k"4fgh'Iflr'„'.,. I! _ • � - % / �,.. rr•>c s r - f - .. 5 & - �-, ,F-„ _ &CONTRACTOR TO INSTALL TAPPING SLEEVE AND VALVE FOR THE CITY TO PERFORM THE ACTUAL BORING INTO �� LBO G O :......-::: ..�...,.�..., ,.,c -�t:.�ai,, d.,Y .V=,. •,:" a�>.,,,,: "an<':,. .4 '.. ^I �_. WYrIYdIW':.:Ir; f- - / 1 _ �/ / // / / ---•- - - - ®,- .III. Idr 1 ),r r �6r i - THE N WATER LINE. THE CONTRACTOR WILL THEN INSTALL THE REMAINING WATER LINE FOR SERVICE TO • _ Jr............i..r...... ....:a ................ e.. ":�:...i...... . .:?. :�. �............i ..i i.........,�.a....... , � '�= FENCv If j r ilk': 0!i:: l V E EXISTING / - THE BUILDING_ • Y ••I'LC��� f 1r lI'f� 9. PROVIDE A 2• SERVICE CONDUIT TO BUILDING FOR TELEPHONE LINE INSTALLATION. i INFI LTRAT N BASIN \ '/ , ,// / i J _-0 -GS---asp MH34 I -...:! "tf q! f111L_ 10- CONTRACTOR SHALL BE RESPONSIBLE FOR INSTALLATION OF METER BOX AND METER SETTER- METER SHALL • z } / / c // TEL f BE PURCHASED FROM THE U77LITY PROVIDER BUT WILL HE INSTALLED BY THE GENERAL CONTRACTOR. • V by / / r idk'hH11rtINII!!tl1111�WdiNitl kN,uNId1WIllhNji{kN!11lIN4PV10111lIlIIIIIN iI � Sou rli� JC{ C 7/ © MH30� BOX ELC f I 11. THE CONTRACTOR SHALL CONTACT THE LOCAL DEPARTMENT OF PUBLIC UTILITY INSPECTION DIVISION AT o`' - - {I� 4r � `"7 ® _ = rli LP LEAST 48 HOURS PRIOR TO ANY CONSTRUCTION ACTIVITIES OF WATER AND / OR SEWER IMPROVEMENTS TO • %L ! rI r SCHEDULE A PRECONSTRUCTION CONFERENCE, • Wx SIGN _ / / / / c, _ --� - pP fl I 12. ALL UTILITY INSTALLATIONS SHALL CONFORM TO THE TOWN OF MOREHEAD CITY ENGINEERING STANDARDS V i - / ;_ �/ / / f / / / riP g� U a TEL fI� a LATEST EDITION • ,- (��.r-r/ % /r / / /i / y/� MH31 �, WELL - II 'L� �}, / , i o ; oHE - WATER NOTES + o } UOPJ I.�TC LP - - ®_..- -,/ I -f _/ ./ / // / _ _! 1 f PHASE I. POND B B C `''IA C. _yP-Py- lP Z Q } j� /.-.I .�6_r (iENGTH=25FF) --✓-,- / \ `vf �' 1. WATERLINES, 12' AND SMALLER, SHALL BE DUCTILE IRON PIPE MEETING THE REQUIREMENTS OF ANSI-AWWA • Q 14'ATER // I / r i OUTLET 32 I P'X,E l C151 PRESSURE CLASS 350 OR PVC PIPE MEETING THE REQUIREMENTS OF AWWA C-900; CLASS 200. • ~? g W VAULT TI19n,rnllll , Irl = �:z / i S f i2 // / / ��\ / /J LONG " `. y.€ _ 2 ALL WATERBNES SHALL HAVE A MINIMUM OF 3-5 FEET OF COVER • b ' PAD UO T0- U T£Ls,,� / _ -I - �` Ls.:1 3. WATER SERVICES FOR THIS PROJECT SHALL BE CONSTRUCTED OF THE FOLLOWING MATERIALS: ♦ i J / j S' =T I f r7 _v CCNC ,�r.d LIGHT !� V DOMESTIC SERVICE PVC C900 & BRASS PAD '? SWINC r `'{ FIRE PROTECTION SERVICE DUCTILE IRON PIPE dl PVC C900 • POLL 3 !I - I i / / 1 5 / j Q, / I; it - C3,t .a �1 1 41 - • '{� WI 4. BACKFLOW DEVICE FOR FIRE PROTECTION, DOMESTIC SERVICE, AND IRRIGATION SHALL BE A DOUBLE CHECK � - / „ ^- r� W� VALVE ASSEMBLY FROM THE CHECK VALVE APPROVED LIST MEETING LOCAL JURISDICTION REQUIREMENTS AND oQ 11EI1II - !� /' - 'i4W1 PLACED INSIDE AN UNDERGROUND VAULT AS INDICATED IN THESE PLANS- m& - 3 �!*.• N1` "� = J ` to I a r� / W 'I ! frf 111 5. FIRE PREVENTION SACKFLOW PRE VENTER SHALL BE INSTALLED IN A VAULT DI D• --- _ C�Aln7 _rNit Ff:VCE-- �il �I !f ' / � CB 6. WHERE WATERLINE CROSSES STORM DRAINAGE LINE, CONTRACTOR SHALL PROVIDE A MINIMUM 1EI • _ CLEARANCE BETWEEN PIPES. ® 5 _ T - 6 �MH .. .� % si INV. ® I''N39 _ \\\\\`�I „III; b;IIdrP9rydll IL{fl'.I r(Fi - _-METAL INV. 8" (LENOT H=25FT) 0b , , SEWER NOTES • l _ PVC _ INV. 6.4 x-��__ f LP _ tl'1 ill, EIIIII' r' j ( ) - 1. SANITARY SEWER CLEANOUTS LOCATED IN PAVEMENT AREAS SHALL BE HEAVY DUTY TRAFFIC BEARING CASTINGS- o - D3 fix. sl 10"RUBBER - Mom, z • ••:,C4gV ••+•6 f Y-."p ~< P -4j, • AD1 ! ''' = 8.5 g1 0-. BLOCK __ram x f f I 1r 2- MANHOLES LOCAL IN PAVEMENT, CONCRETE OR OTHER TRAFFICKED AREAS SHALL BE SET AT GRApE. o 1 \�1'I1 _ HEADWALL �� K`-�- II • �`? A02 ��• „ -.-.TS,;, "'�„'', O•••• I Yi,,.',_ �y 1 =I ORIGINS RU BEER_�_tx-�_� ! MANHOLES LOCATED IN OTHER AREAS (I.E. GRASS OR WOODED AREAS) SHALL HAVE THEIR RIMS RAISED SIX Ir . _ _ NOT NOWN INv, r _ x_s� ! l� INCHES ABOVE THE SURROUNDING GRADE. MANHOLES SUBJECT TO POSSIBLE WATER INFILTRATION SHALL HAVE • _ H r. - '. �.- D -.- ! 4,7 `�oS 8'• DRIGP ~ I l~�-� /..._ ! WATERTIGHT MANHOLE RINGS. • ° _- I"= IT III;'W II!1111111i1P1 MILPOIflaRIIII INV. -_\ W _ L FORCE MAIN - LV iK' cON 1al,1ETAL O LP -r, / BOx 1 \II _/I �f 3. MINIMUM REQUIRED SLOPES FOR SEWER SERVICES. • ,n ` f( - �� MH7- `5 '' AREA PA[T - 7.4�/If Iti MHO` INV 1 .� PP GJR 4 4' SEWER SERVICE - 2-00 "1• SLOPE �J �(► I� _7/ Irma 11� 1t.W� 1 ,a' 6" SEWER SERVICE - 1.00'Z SLOPE • V1 5t _ 3 r. I� - 3lillf.HPjid111 :,Ifri:I E3CNCH = 7-36' �� P¢Y' TEL '+'r'✓ ALARM 8" SEWER SERVICE - 0.50 X SLOPE • AD1' ,' i C, p "I' n , x/-...:'A-'� q Ch:,GJNS :OF �;: 9, INV. = 7.09 � � - �� LP � P r�l POST • J 6 =, r r /fin. 7 ; T,,.,, 4, rhEThL - P�, _ LP 4. LOCATE SANITARY SERVICE CLEANOUTS AT ALL HORIZONTAL OR VERTICAL CHANGES IN OIRECTION. MAXIMUM ' . FEET. It ,;T W '+- i 1 PHASE I:l'; ! NOT KryGVrk - - - �- RAMPI r CC± 1 P� PP / + Z I' T - - </ - ���� - I �� �� �� AW ��� 5. SEWER LINES WITH LESS THAN 3 FEET OF COVER SHALL BE CLASS 50 DUCTILE IRON PIPE, SEWER LINES WITH • A e �l I. 0 O L _ DI 0 '12CTE: 10" METAL PIPE b o LP - _ , I VAULTS �'�� O " ' 3 � 4 .. • thy` I I IS�FOR ROOF DRANAGE { ` 1 ���� - GREATER THAN 3 FEET OF COMER SHALL BE AS NOTED BELOW: • • 1 'FOR A PORTION DF I - ASP1+.A1.: SIGNS i P ��-.. I W ���/// 4_ $GN 4D V a -I _ 4 CK WALL I k!A�. -PAi2KiN„ �~ $CN 40 • \ O _„c7,tiC OG:K - WEST- SDR-35 ) BLDG. 26S WAYNE T Z TLET 20 - ¢' y� / __ E c L I ` \`cr, I k STORM NOTES ; Oly ? :ita:. v.• ti MH15 - o ��\O\,. n1 l h - b/R ` _ r J / IG f C, l + O h 8 X 1, DEMOLITION, AND SUBSEQUENT CONSTRUCTION OF STORM DRAINAGE FACILITIES SHALL BE PERFORMED IN SUCH r .. ...s }T,• A�9 - E•�••, ` ,J - L!J ,�\- A MANNER THAT THE OLD PIPE AND STRUCTURES ARE REMOVED AND NEW STRUCTURES AND PIPINIS ARE �. 6[],° A010 e••• ,:3 _ .9� Ci )SIMMEDIATELY PUT INTO SERVICE CONTRACTOR SHALL ENSUREFIAT STORM DRAINAGE p0E5 NOT REMAIN OUT OF } _ - ' III = SERVICE FOR LONGER THAN 12 HOURS AT A TIME PROVISIONS SHALL BE MADE TO MAINTAIN STORM WATEREv 0 �- Q MHB \ _ 1 t"_ it _ - _ 'r y } __ - - - DRAINAGE DURING CONSTRUCl10N. • •� . TEL r s? p� eye �' �Y ILL f MH = ' N . •:' .jw ....., .; \ I �'1 "SHADING LEGS D ELECTRICAL NOTES - - -- - - _ - -• - / _ __ 7 1 I _ +r-1' V 1. THE CONTRACTOR WILL COORDINATE THE LOCATION OF ALL HIGH -VOLTAGE AND LIGHTING SYSTEMS ON SITE - • �• ° F .:.E c �� '-C :L • ! a ,!, �.... \ ... / WITH MOREHEAD CITY ELECTRICAL ENGINEERING DEPT_ • t , V l H- _i°y'• EXISTING STORM DRAINAGE • V LENGTH=2CIFTJ - f- ,I y �� . ro GAS NOTES • � Lt I ! I� \W r,. \ - PHASE 1 STORM DRAINAGE 1- CONTRACTOR TO COORDINATE GAS UTILITY INSTALLATION WITH CAMPUS PHYSICAL PLANT PERSONNEL • W _O 1 ' d k�1 `::°r ,� - y�S d 4�v Y is $ t'� \ - N'ci f 1- 'ST • W 1 ill - LIMITS OF CONSTRUCTION l il� UTILITY GONSTRUCTION KEY : o i . , • tu O �,.. p,�'. s •�Esi;7t ��Tr�- �� ' - SYNTHETIC MAT WITH 2PSF PERMISSIBLE SHEAR STRESS © INSTALL STORM PIPE AS INDICATED • FIRE HYDRANT - ••"•• •••• •£ -P 3 n;P - f �: / SEE STORM TABLE FOR INFORMATION P� o V LE meµ. -RIP RAP ® INSTALL 4• PRECAST MANHOLE • 1� ® INSTALL CURB INLET H8 t_i EX JB 36 ma -� /�� ® INSTALL AREA DRAIN (LENGT• - r r 1-� .. _ !; PIilIlmllolPrlr,IFllfo IaT11� T4ulla'.IP:,;IT,aldvM '� � o �.` ��1T1F{1��''4477�� ' 11A111711!:II!fNIMNIfkIM1lHkfil4WF�T � _ 1 �?AlII11IIIIIdJILLIlIIT& , - �.---ram' - �'� -M 6•P,� __--M 1 `.� Vp: y PP DOE /I! ti' g a P .'I ELC PP EX DI 3 ss- $ O 11 P W �� LIF ANTI ! IIIIi1!ll!IlIFT RI1q (I Lp - _ - c f RIM 9 , 2' C.O. �_� _ 1 = s 20' / BENCIH - 4,27 DROP INLET P.O.--•V _-0.96' GRA_= ! 5' OUTSIDE BLDG. i \ i NEW INV IN 4.50 C INV 5.15 fl �VEL INV4! =48,3' --I LP I I'' [A f' " Fs V`L,�... I _ 1 1 JROP INLET G*ATE _ 4. Fj3 s' 4Y f l } I' RA s-4' I'R = 16 .9' IN'� � _ 1.16' t ...-7,7 WOOD ff?IC E HONE ---tf K� I F ENOL p- -'. FnIIITPiHIdrIIHTi ArIfNFllltl x 1 ! u+ i - w I E7L DL7TL 21 uTi� O ELC } oVy C l C�`JC I In LP V I T�f"ANS` i JEED INSTALL 6" ROOF BRAIN UNE AT MIN. 1% SLOPE • `, UNLESS OTHERWISE NOTED • V INSTALL STORM DRAIN SADDLE INSTALL PVC DRAIN PIPE INSTALL JUNCTION BOX INSTALL CUSTOM MANHOLE • ENJ INSTALL SUBMERSIBLE PUMP IN MANHOLE: SEE DETAIL 5.3E INSTALL STORM WATER LIFT STATION; SEE OETAIL 5.3E TIE ALL STORM DRAINAGE LINES TO NEW MANHOLE INSTALL 12• PVC PIPE TO ORIGIN OF 12'RCP; ENSURE POSITNE DRAINAGE INTO POND INSTALL 2" SCH 40 • P INSTALL CONCRETE ENDWALL PER NCOOT STD 038-01: SEE DETAIL SAN INSTALL FLOW DEMOLITION DEVICE; SEE DETAIL 5,4J INSTALL FLOW SPREADER; SEE DETAIL ON SHEET C-4.3 E7j INSTALL a- PVC SANITARY SEWER LINE rrrr INSTALL SANITARY SEWER MANHOLE • z W N INSTALL 6" PVC SANITARY SEWER SERVICE A ` 0 INSTALL SANITARY SEWER CLEANOUT 8 INSTALL 4' CONCRETE MANHOLE WITH RIM ELEVATION 14.15 fl • "%w - Q tV H INSTALL 2' C900 WATERLINE • 4 a z ® INSTALL 2 1/2" C900 WATERLINE • U U I. INSTALL 3' C900 WATERLINE O M R I C/-` I ! I TI I 1 30 RCP I 0 INSTALL 6- C900 WATERLINE • 0 :J Q ql UL I URE I INv 3.a' G FIRE HYDRANT 1 VIEW SD MANHOLE VIEW H 1O 2® INSTALL 2' DOMESTIC WATER METER; SEE DETAIL 5-2N •����'ff�I PRESSURE TEST. 5TATIC 65 PSf SCALE 1 inch = 3O ft. RESIDUAL 46 PS C3.1 SCALE ! inch = 20 ft. INSTALL 3' DOMESTIC WATER METER; SEE DETAIL 5.20 • L•.� r ' .W F III J GRATE .-- 4.62 €9 INSTALL I' C900 WATERLINE : L ., Y !ij 1 5TATIC 62 PSI ® HORIZONTAL BENDS; DEGREES VARIES 1111 ` 0 �R�z '_-- - IjviV = �.�J RESIDUAL 58 PS '� INSTALL 2 1/2' TAPPING SLEEVE AND VALVE • �/� Z Z � INSTALL 6"XS" TAPPING SLEEVE AND VALVE • V ■ - }I " METER 1 0 I zi ELC Box 0 MH / - ro 11\ MH �]. ELEC l \ © �z l-rl IE1lLfl'r ly, y,d Il ,IIII IF.'r Lp MH OF O MH gp6 LP i � .. MIT MH OUTLET --.... , :,o'V(. I 0 END 1pO0 MH O PIPE 0 f PA(: I V/F'�F).�? MH `^h� ALARM I FUTURE WORKMH v I . (NOT IN +1f STORM CONTRACT) _ WATER -- rDe SYSTEM _ - p U V p e UTLITIES NORTH OF MARINE TECH. s - HOE 5E SCALE I inch 10 ft. ,I T f Ili T. i 1 Tom, . j fS(1 h< I- a IW� •iYy IF' ''} +4 11 Il 17a (4.1 r 5!� I �I 1_l \ W � �fhl. �'(g �1d91 el'I 1 1111t � �1•• � I 1 S I z�ll �. i it Y1-�. /1 N INSTALL 6" DOUBLE DETECTOR CHECK ASSEMBLY: SEE DETAIL 5-2U z : Z 0 �, 0 ` z CY INSTALL FIRE HYDRANT ASSEMBLY; SEE DETAIL 5-215 INSTALL 2" VALVE • • - y7 • � L7 )) I1 2 pp 3L ro • Ca m • C s N 0 o GRAPHIC SCALE r • � � • GA • � N O ( RI FEET } • • C7 L-h=sG n . a UTILITY PLAN - PHASE I • To -A( • ./ �ONC� 3 AD22 �.. �....... , f 4 - 1 t: hl [, / _.... - P O ON� WAYNE WEST BLDG, fi FIFE 22,00 ��� �I � W ch�(� -' W---'� -- w.- � IIIiIIIII!IIIIIIII!7piVIIlllllllllll - IILW"..' '� a�� I i � � rliri�%nlm�Il�rll��e�,4rlTm�mta€Ifi«II nfilrhlultmfi�rmli�fmli�i�� 1 1 I r / ! CU44 -- , f SIGN '' I CU45 4 EX INLET 13 PHASE H' FINAL POND II AD12 .M 6 'FDp B O WL_L OUTLET 32 1 FFE 22.0 SHEET NOTES ALL DEMOLITION, AND ANY 5UB5LOUENT CONSTRUCTION, SHALL BE PERFORMED IN ACCORDANCE WITH THESE PLANS AND SPECIFICATIONS APPROVE) BY THE LOCAL GOVERNING AUTHORITY. ' 2. ALL DEMOLITION AND SUBSEtlUEN7 CONSTRUCTION TO BE IN ACCORDANCE WITH PERMITS ISSUED AND SOP r� r f APPLICABLE STATE, COUNTY, AND LOCAL CODES. , I l ~�ION ~"'------ �-1 j + 3. THE CONTRACTOR SHALL OBTAIN AND PAY FOR ALL INSPECTIONS. CERTIFICATIONS, EQUIPMENT, ETC. f� THAT MAY BE REQUIRED. � • E.Op 4. IF DEPARTURES FROM THE SPECIFICATIONS OR DRAWINGS ARE DEEMED NECESSARY BY THE CONTRACTOR. EOP _ -- DETAILS OF SUCH DEPARTURES AND REASONS THEREOF SHALL BE SUBMITTED TO THE OWNER FOR REVIEW. - _ NO DEPARTURES FROM THE CONTRACT DOCUMENTS SHALL BE MADE VATHOUT THE WRITTEN PERMISSION Cr THE OWNER. 5EXISTING IMPROVEMENTS DAMAGED OR DESTROYED DURING CONSTRUCTION SHALL BE REPLACED OR w-f RESTORED TO THEIR ORIGINAL CONDITION. AND TO THE SATISFACTION OF THE OWNER OF THE IMPROVEMENTS. 6- CONTRACTOR SHALL REFER TO ARCHITECTURAL PLANS FOR DETAILS OF BUILDINGS AND BUILDING • '� f...-..- N� c. DIMENSIONS.'Ij �``` ¢� 7. ENGINEER ANO/OR OWNER DISCLAIM ANY ROLL IN THE CONSTRUCTION MEANS AND/OR METHODS S i �� ASSOCIATED WITH THE PROJECT AS SET FORTH IN THESE PLANS. • O 1W34 + • : A��•....�: Ey 8. CONTRACTOR SHALL MAINTAIN AN 'AS BUILT" SET OF DRAWINGS TO RECORD THE ACTUAL LOCATION OF ♦ � "`TINE ALL PIPING PRIOR TO CONCEALMENT, DRAWINGS SHALL BE GIVEN TO THE OWNER UPON COMPLETION OF THE •"•,RbL 4lJ;•``�`` %'-I - - PROJECT WITH A COPY OF THE TRANSMITTAL LETTER (FOR RECORD KEEPING) TO THE ENGINEER. THE CONTRACTOR IS RESPONSIBLE FOR FIELD VERIFYING THE ACTUAL AND EXACT LOCATION, SIZE AND MATERIAL COMPOSITION OF ANY EXISTING WATER OR SEWER SERVICE PROPOSED FOR CONNECTION OR USE ON THIS PROJECT. THE RELOCATION OF ANY UTILITY SERVICES REQUIRED TO COMPLETE ANY PORTION OF THESE CONSTRUCTION PLANS SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR. • 10. THE CONTRACTOR MUST, AT ALL TIMES, KEEP THE PREMISES FREE FROM ACCUMULATIONS OF WASTE y 1 + irrII 1 1 MATERIALS OR RUBBISH CAUSED BY HIM, HIS EMPLOYEES. OR HIS WORK. ALL DEBRIS SHALL BE REMOVED ...j ij I I FROM THE SITE ON A DAILY BASIS. R T M23 1 ,� 1 . - I� • o� Z gm 11. FINAL ACCEPTANCE OF WORK BY THE LOCAL GOVERNING AUTHORITY SHALL NOT BE MADE UNITE ALL • as WORK SHOWN ON THE APPROVED PLAN IS COMPLETED.Ir i1 !1+ III 12. CONTRACTOR SHALL CALL "NORTH CAROLINA ONE CALL" AT LEAST 49 HOURS PRIOR TO BEGINNING I 1r �'l1 CONSTRUCTION OR EXCAVATION ON SITE TO HAVE EXISTING UTILITIES LOCATED. CONTRACTOR TO CONTACT • s4 F ! _ , 1 .-- 1)I ANY LOCAL UTILITIES THAT PROVIDE THEIR OWN INDEPENDENT LOCATOR SERVICE. CONTRACTOR SHALL • ZU-,a �27 I - If W Ifs IJ: IMMEDIATELY REPORT ANY DISCREPANCIES TO THE ENGINEER. : z :€s� I 13. ANY EXCAVATION MUST BE FILLED IN AND TAMPED AT THE CONCLUS}ON OF EACH WORK PERI00, AND F 5i d EQUIPMENT AND SUPPLIES RETURNED TO THE CONSTRUCTION STAGING AREA. ♦ �m &I $11 _ * I UTILITY NOTES • z : r 1 I. UNDERGROUND UTILITIES SHOWN ON THIS PLAN SHALL BE INSTALLED PRIOR TO ANY CONSTRUCTION OF • !- �' ap ' PARKING AREAS, DRIVES, CURB AND GUTTER. OR CONCRETE WALKS/ PADS. UTILITIES WHICH CANNOT BE'qq{ jfj I� INSTALLED PRIOR TO CONSTRUCT1pN OF Si TE IMPROVEMENTS SHALL 8E PROVIDED WITH CONDUITS WHERE THEY • (n ;•€k r ' R CROSS SUCH IMPRCVEMEN7S FOR INSTALLATION AFTER SUCH IMPROVEMENTS ARE IN PLACE. • Z 1 gg :A I 11 • - I s f U �I • f +Ig kf 2. WATERLINE LOCATION ON BANKS STREET IS AN APPROXIMATE LOCATION. LOCATION TAKEN FROM FAX SENT g'j�'y I 6eE• _.am-� ,` -- _- - - r ,: } -_ s Ely STROUD LNGINLERING CONTRACTOR TO FIELD VERIFY LOCATION. 3, CONTRACTOR SVI HALL COORDINATE UTILITY SERVICES NTH THE BllILO1NG MECHANICAL PLANS. r -i^ VeU GI2a \ -.y -. - __ r I -r (I 4, CONTRACTOR SHALL BE RE5PONSIBi.E FOR INSTALLING SERVICES TO WWTHIN 5 FEET OF THE BUILDING CONNECTION PONTEOR AS NOTED IN THE PLANS. • / AD24 @" �.� ::,s .� 0I26 II 5- TRAFFIC CONTROLS FOR ANY UTILITY WORK WITHIN THE PUBLIC RIGHT-OF-WAY SHALL BE IN COMPLIANCE WITH fl y1 t � _ _ -- �— STANDARDS OF THE MANUAL ON UNIFORM TRAFFIC CONTROL DEVICES (140CD). • k l AD 26 .-` -:: J 6. A LICENSED UTILITY CONTRACTOR MUST PERFORM ALL UTILITY •rORK INVOLVED IN CONSTRUCTING THIS J / at y111+�!11lhpl1llfl'+fy' - CI25 { PROJECT- - - r yy0 Pi"' / + L"' OL7 ji I ( - 1+ 2 ALL GAS LIVES TO BE LOCATED PER PME DRAWINGS SY GAS UTILITY PROVIDER- TiZs WALK f 1 - I ;? 1 f'+ {� S. CONTRACTOR TO INSTALL TAPPING SLEEVE AND VALVE FOR THE CITY TO PERFORM THE ACTUAL BORING INTO liwllllilllH41111 ti ,fr f FENCE I I THE EXISTING WATER LINE. THE CONTRACTOR WILL THEN INSTALL THE REMAINING WATER LINE FOR SERVICE TO THE BUILDING. eg-3:T CU41 !� �1 =L--�J`>✓ fIr E ��rIj F Ij 9, PROVIDE A 2' SERVICE CONDUIT TO BUILDING FOR TELEPHONE LINE INSTALLATION. "+IT u xf 1 f 1 10. CONTRACTOR SHALL HE RESPONSIBLE FOR INSTALLATION OF METER BOX AND METER SETTER- METER SHALL BUT BE INSTALLED BY THE • • Z MH36».:�'11uIG-j `rJrW,id7 I Ijl - _ BE PURCHASED FROM THE UTILITY PROUDER ALL GENERAL CONTRACTOR. O _.lfr +++q{r!+ - 11 I 11. THE CONTRACTOR SHALL CONTACT THE LOCAL DEPARTMENT OF PUBLIC UTILITY INSPECTION DIVISION AT • -- iiI r i I {I, }, n1,I1'�I',"''v- LEAST 48 HOURS PRIOR TO ANY CONSTRUCTION ACTIVITIES OF WATER AND / OR SEWER IMPROVEMLNTS TO • ,�„J :1r1,'ilr1V1'J SCHEDULE A PRECONSTRUCTION CONFERENCE_ 1 4Z_ — �- - A111L11,1.1hI' 12. ALL UTILITY INSTALLATIONS SHALL CONFORM TO THE TOWN OF MOREHEAD CITY ENGINEERING STANDARDS • J1i4T*C'q'IT'G'A" ) -� LATEST EDITION. ' ual++t WATER NOTES . ((, U;allka�rel0,,,.n. A/ 4EIIL �11 :'11I„'' l _1j1 I. WATERLINES, 12' AND SMALLER SHALL BE DUCTILE IRON PIPE MEETING THE REQUIREMENTS OF ANSI-AWWA • m HW39vW1 / - -:.T vY�� k' =`,d't -vVE, - _ i.�5-' OUTLET33 MH40 �f - • III III - _ w`A03 Ate.. MH ''t"I'k!NHNkh'i:rW'rtry v � , MH32 _ Ant F �B 471 MARINE TECHNOLOGY LDG I Ie / `A FFE 14.50 Ilpj` _ RAMP, ly l a I `� ,' CD CC 1 SWING _ '{x r 5 I F j II ! C151 PRESSURE CLASS 35D OR PVC PIPE MEETING TIIIE REQUIREMENTS OF AWWA C-900, CLASS 200. 2 ALL WATERLINES SHALL HAVE A MINIMUM OF 3.5 FEET OF COVER. 3- WATER SERVICES FOR THIS PROJECT SHALL BE CONSTRUCTED OF THE FOLLOWING MATERIALS: W1 DOMESTIC SERVICE PVC C90O & BRASS FIRE PROTECTION SERVICE DUCTILE IRON PIPE & PVC C900 � • • • U N O O E 5-, Ua- w Offj 4 BACKFLOW DEVICE FOR FIRE PROTECTION, DCMESTC SERVICE, AND IRRIGATION SHALL BE A DOUBLE CHECK )I f ii VALVE ASSEMBLY FROM THE CHECK VALVE APPROVED LIS7 MEETING LOCAL JURISDICTION REQUIREMENTS AND PLACED INSIDE AN UNDERGROUND VAULT AS INDICATED IN THESE PLANS. 5. FIRE PREVENTION RACKFLOW PREVENTOR SHALL BE INSTALLED IN A VAULT, PER DETAIL. � w tiHAl1 6- WHERE WATERLINE CROSSES STORM DRAINAGE LINE, CONTRACTOR SHALL PROwD£ A MINIMUM 1B" CLEARANCE BETWEEN PIPES. z I I 1 SEWER NOTES I r 1 SANITARY SEWER CLEANOUTS LOCATED IN PAVEMENT AREAS SHALL BE HEAVY DUTY TRAFFIC BEARING CASTINGS. z 2- MANHOLES LOCATED IN PAVEMENT, CONCRETE OR OTHER TRAFFICKED AREAS SHALL BE SET AT GRADE. MANHOLES LOCATED IN OTHER AREAS (LE. GRASS OR WOODED AREAS) SHALL HAVE THEIR RIMS RAISED SIX INCHES ABOVE THE SURROUNOING GRADE. MANHOLES SUBJECT TO POSSIBLE WATER INFILTRATION SHALL HAVE • WATERTIGHT MANHOLE RINGS. � 3. MINIMUM REQUIRED SLOPES FOR SEWER SERVICES: • ul 'R 4" SEWER SERVICE 2,00 % SLOPE • v aC' 6" SEWER SERVICE - 1.00 % SLOPE 8" SEWER SERVICE 0,50 X SLOPE ptiS f 4. LOCATE SANITARY SERVICE CLEANOUTS AT ALL HORIZONTAL OR VERTICAL CHANGES IN DIRECTION. MAXIMUM F SPACING BETWEEN CLEANOUTS SHALL BE 75 FEET. O 6 ? 5. SEWER LINES WITH LESS THAN 3 FEET OF COVER SHALL BE CLASS 50 DUCTILE IRON PIPE. SEWER LINES WITH • O ' nP GREATER THAN 3 FEET OF COVER SHALL BE AS NOTED BELOW' �- 4" - SCH 40 6' -- SCH 40 • U \"°4F i STORM NOTES O o 1. DEMOLITION, AND SUBSEQUENT CONSTRUCTION OF STORM DRAINAGE FACILITIES SHALL BE PERFORMED IN SUCH • Z Z A MANNER THAT THE OLD PPE AND STRUCTURES ARE REMOVED AND NEW STRUCTURES AND PIPING ARE • _ f IMMEDIATELY PUT INTO SERVICE. CONTRACTOR SHALL ENSURE THAT STORM DRAINAGE DOES NOT REMAIN OUT OF SERVICE FOR LONGER THAN 12 HOURS AT A TIME_ PROVISIONS SHALL BE MADE TO MAINTAIN STORM WATER • 1 DRAINAGE DURING CONSTRUCTION. • ELECTRICAL NOTES _ 1. THE CONTRACTOR WILL COORDINATE THE LOCATION OF ALL HIGH -VOLTAGE AND LIGHTING SYSTEMS ON SITE O >- WITH MOREHEAD CITY ELECTRICAL ENGINEERING DEPT. �~ 2 • V z U i,W oy GAS NOTES o F 1. GONTRAC70R TO COOR0INATE GAS UTILITY INSTALLATION WITH CAMPUS PHYSICAL PLANT PERSONNEL. W 9s • � f � UTILITY CONSTRUCTION KEY INSTALL STORM RIPE AS INDICATED � SEE STORM TABLE FOR INFORMATION • SHADING LEGEND - EXISTING STORM DRAINAGE • • ,'- - PHASE 1 STORM DRAINAGE • • ® - PHASE 2 STORM DRAINAGE • • 1 i I I E - LIMITS OF CONSTRUCTION • • • • • •+MEI•Ir • 7 U • • � 0 � N • r r ' G • Q y • EEE 2 G I- a ff 0 D 0 � w �Q WI�,T Q .T • � OF • ,Y ZO � � Z 7 • 4 o r1 2 w tj 1 a ° z • W �l a • � vI m N • Iy t 1 13 W CO • F°� I GRAPHIC SCALE GD o � • 0 0 (IN FEm S • W s? T inch = 30 R • 6D U'17IL1TY PLAN — PHASE I 0 TC'TAi- • i PLAN VIEW �i er Q z 0 m a SEWER STA 0+00 TO STA 5+36.06 HORIZONTAL SCALE 1" = 40' VERTiCAL SCALE 1"=4' b tp li} NCO Nh mh ^phi W Pin +p+Nz Y -> =ao y -- _._.---._�-- i----------_ 72.50 2.39 88.18 t t9.40 0 49% 8 ;n. OIA DI 8 ;n. �iR SIP 0.5b% 8 in DIA 91Q - �i fn. OIA WC 207-45 I5> i I .SIR --8 -- i j II I i I I i I i w � a = o a z rn IT z 0o F Vlw N M VIK N CJ � f3 N CA T d y 6, W 0+D6 0+50 +00 1+50 2,00 2+50 3+60 _•50 41.1)(1 4F50 5+00 PROFILE VIEW �Tra- Tn I -- SHEET NOTES ; 1. ALL DEMOLITION, AND ANY SUBSEOUENT CONSTRUCTION, SHALL BE PERFORMED IN ACCORDANCE WITH THESE PLANS AND SPECIFICATIONS APPROVED BY THE LOCAL GOVERNING AUTHORITY- • 2. ALL DEMOLITION AND SUBSEQUENT CONSTRUCTION TO BE IN ACCORDANCE WIPH PERMITS ISSUED AND APPLICABLE SOP STARL, COUNTY, AND LOCAL CODES. 7 _.- - - - - - 0j '�I• fJ SLR ti } T1l j ✓I (lam 6!1 j Ii j II N11111 HtVlilkl t EK OiPEL - I 1 � GCti'C MARICULTURE BLDG.- ; lflN _R:4' � m I MIT \\\\ \\ \ YHQ /No,/�i',a�MiN z;I OP�_` .. _ 9' \ �> �n -, II IP.T„',ril'.l.r., •f .I.I'K . I 1 tT MH 1 a DI �� O MH CONIC, T / MIR MH OUTLET I - /'/ If PrTD i' / •� YH MH r.� s f j c MH FUTURE WORK 4 NOT IN f i r, MIi C SmkM CONTRACT) -._._N. WATER SYSTEM 1 1 O r71ti PIPE INV= -1 21 ---- - - 3. THE CONTRACTOR SHALL OBTAIN AND PAY FOR ALL INSPECTION5. CERTIFICATIONS, EQUIPMENT, ETC- THAT MAY BE REWIRED. • • - -` LGP 4. IF DEPARTURES FROM THE SPECIFICATIONS OR DRAWNQ$ ARE DEEMED NECESSARY BY THE CONTRACTOR, DETAILS • -- _ OF SUCH DEPARTURES AND REASONS THEREOF SHALL BE SUBMITTED TO THE OWNER FOR RENEW. NO DEPARTURES - --' --- 1_ MIi FROM THE CONTRACT DOCUMENTS SHALL BE MADE WITHOUT THE WRITTEN PERMISSION OF THE OWNER- • RN :-203 ' � 5- EXISTING IMPROVEMENTS DAMAGED OR DESTROYED DURING CONSTRUCTION SHALL BE REPLACED OR RESTORED TO THEIR ORIGINAL CONDITION, AND TO THE SATISFACTION OF THE OWNER OF THE IMPROVEMENTS, Ic 64' / 1 6, CONTRACTOR SHALL REFER TO ARCHITECTURAL PLANS FOR DETAILS OF BUILDINGS AND BUILDING DIMENSIONS. 7. ENGINEER ANO/OR OWNER DISCLAIM ANY ROLE IN THE CONSTRUCTION MEANS ANO/OR METHODS ASSOCIATED WITH THE PRO,ECT AS SET FORTH THESE PLANS. • • �,{+� �� �'��:_ IN • = Q SEAL -_ I - B. CONTRACTOR SHALL MAINTAIN AN "AS BUILT SET OF DRAWINGS TO RECORD THE ACTUAL LOCATION OF ALL PIPING PRIOR TO CONCEALMENT. DRAWINGS SHALL BE GIVEN TO THE OWNER UPON COMPLETION OF THE PR CT • �7A• �'FCIN$_. �lZ� \ WITH A COPY OF THE TRANSMITTAL LETTER (FOR RECORD KEEPING) TO THE ENGINEER. • ��j- ��j''; I 9 THE CONTRACTOR IS RESPONSIBLE FOR FIELD VERIFYING THE ACTUAL AND EXACT LOCATION. SIZE AND MATERIAL • '"•. �r,L�s;..+'�• - _+ COMPOSITION OF ANY EXISTING WATER OR SEWER SERVICE PROPOSED FOR CONNECTION OR USE ON THIS PRO.ECT- • - _ THE RELOCATION OF ANY UTILITY SERVICES REQUIRED TO COMPLETE ANY PORTION OF THESE CONSTRUCTION PLANS p-_' r' \ \ S}4ALL BE THE RESPONSIBILITY OF THE CONTRACTOR. • - / +' 10. THE CONTRACTOR MUST, AT ALL TIMES, KEEP THE PREMISES FREE FROM ACCUMULATIONS OF WASTE MATERIALS OR RUBBISH CAUSED BY HIM, HIS EMPLOYEES, OR HIS WORK. A-L DEBRIS SHALL BE REMOVED FROM THE SITE ON A • i DAILY BASIS, • 11. FINAL ACCEPTANCE OF WORK BY THE LOCAL GOVERNING AUTHORITY SHALL NOT BE MADE UNITL ALL WORK SHOWN •� �!. f� ON THE APPROVED PLAN IS COMPLETED. 6 1 kkI��• r 12. CONTRACTOR SHALL CALL "NORTH CAROLINA ONE CALL" AT LEAST 48 HOURS PRIOR TO •�'� Sh6, BEGINNING CONSTRUCTION OR EXCAVATION ON SITE TI HAVE EXISTING UTILITIES LOCATED. CONTRACTOR TO CONTACT ANY LOCAL UTILITIES Z RR _ THAT PROVIDE TttE3R OWN INLOCATOR SERVICE. CONTRACTOR SHALL IMMEDIATELY REPORT ANY ] DISCREPANCIES TO THE ENGINEER_ I'H jrIa. lijl 13. ANY EXCAVATION MUST BE FILLED IN AND TAMPED AT THE CONCLUSION OF EACH WORK PERIOD, AND EQUIPMENT • �F I ,11 AD27 AND SUPPLIES RETURNED TO THE CONSTRUCTION STAGING AREA. • w . -...cl GENERAL GRADING NOTES • < xK 1�,1 1908 1. ALL DIMENSIONS AND GRADES SHOWN ON THE PLANS SHALL BE FIELD VERIFIED BY THE CONTRACTOR PRIOR TO • Z $w !�' CONSTRUCTION. CONTRACTOR SHALL NOTIFY THE ENGINEER IF ANY DISCREPANCIES EXIST PRIOR TO PROCEEDING NTHif CONSTRUCTION FOR NECESSARY PLAN CR GRADE CHANGES. NO EXTRA COMPENSATION SHALL BE PAID TO CONTRACTOR FOR ANY WORK DONE DUE TO DIMENSIONS OR GRADES SHOWN INCORRECTLY ON THESE PLANS IF SUCH • • , f r F�I1 NOTIFICATION HAS NOT BEEN GIVEN. • \ - T WHEN HAND PLANTING. MULCH (HAY OR STRAW) SHOULD BE UNIFORMLY SPREAD OVER SEEDED AREA WITHIN 24 HOURS OF • r`y gIII NNN - AT7I71r�11 SEEDING. • 977E f Irr 1750 I : Mil I.T - 3. DURING UNSUITABLE GROWING SEASONS, MULCH WILL BE USED AS A TEMPORARY COVER ON SLOPES THAT ARE • • I -66 -_ ys-7 ,K+f _ ` 4� 1 OR STEEPER, MULCH WILL BE ANCHORED. • n J `P CQjy)r II 17.6517451 f7-�51 4- EROSION AND SEDIMENT CONTROL DEVICES MUST BE INSTALLED AND INSPECTED PRIOR TO ANY GRADING ON SITE. PLEASE CALL FOR AN INSPECTION_ • W OU STAG! GI2B - NGA 5. SEDIMENT/EROSiON DEVICES MUST BE CHECKED AFTER EACH STORM EVENT. EACH DEVICE IS TO BE MAINTAINED DR REPLACED THE • d l _ } }}VV IF SEDIMENT ACCUMULATION HAS REACHED ONE HALF CAPACITY OF THE DEVICE. • 2, 0' -/IP I7. 6, SPOT ELEVATIONS SHOWN ARE PAVEMENT, GROUND OR GUTTER FLOW LINE, UNLESS OTHERWISE NOTED, • w � 012 UIL �,,,� a utuD lr� rl'Wi%h3fy-,yyrp4 7 IN CONTRACTOR SHALL OBTAA COPY OF THE REPORT OF SUBSURFACE INVESTiGAnON (IF AVAILABLE) AND FOLLOW THE RECOMMENDATIONS FOR GRADING AND COMPACTION. • • w O U LLi G Z e ' } `I -" B. CONSTRUCTON, MAINTENANCE AND REMOVAL OF ALL EROSION CONTROL DEVICES ARE THE RESPONSIDILTY OF THE • N !: •.,• = GRADING CONTRACTOR UNLESS OTHERWISE NOTED. a 0- E r'y 9. A COPY OF THE APPROVED EROSION CONTROL PLAN MUST RE ON FILE AT THE JOB SITE. • r TNC� 1 I r 4°. • N O N 1a•.- z �r COMPACTION NOTE \ 1j( 1. COMPACTION OF THE SOL UNDER PAVED AREAS AND BUILDING AND THE MAINTENANCE OF PROPER MOISTVRE CONTENT SHALL BE SO AS TO ACHIEVE 982 OF THE STANDARD PROCTOR MAXIMUM DRY DENSITY. • � `=� \ >i 01 Or N I O O _ -- di 2. WHERE UTILITIES (TO BE REMOVED)IMPACT THE FOOTPRINT OF THE NEW BUILDING, CONTRACTOR SHALL EXCAVATE • • Q A • R ` ~ �__ ----_- - AND REMOVE AN ADDITIONAL 2 FEET OF SOILS TO EITHER SIDE OF PIPE, AND 1 FOOT BELOW TO REMOVE UNSUITABLE SOILS. Cl SOILS SHALL BE UTILIZED FOR BACKFILL- COMPACTION OF THESE SOILS SHALL BE PERFORMED IN • • ___ '`.-' I +r I ''S' - ACCORDANCE WITH SPECIFICATIONS AND SITE PLAN. al a A EROSION CONTROL CONSTRUCTION SEQUENCE • z r_ - OBTAIN PLAN APPROVAL AND OTHER APPLICABLE PERMITS.Li • " -� -'11I FLAG UV 2, WORK LIMITS AND MARK TREES TO RE SAVED, IF ANY, FOR PROTECTION. 0p0 CJ QU 11 PAL F•I 3. HOLD PRE -CONSTRUCTION MEETING WITH INSPECTOR ON SITE, AT LEAST ONE WEEK PRIOR TO THE START OF ANY • a Or J ? � n, j LAND DSTUR81NG ACTIVITY. • PAD • 4. INSTALL CONSTRUCTION ENTRANCES, TREE PROTECTION FENCE AND SILT FENCE; OTHER TEMPORARY EROSION CONTROL DEVICES AS REWIRED- • �`r 5- INSTALL PRE-TREATMENT BASIN AND INFILTRATION BASIN. • �• 6 INSPECnO BY a • RIP RAP OUTLET PROTECTION LOCATION LENGTH (FT) WIDTH (FT) THICKNESS (1N) OUTLET 20 10 6 24 TV 17 12 x 24 OUTLET 32 10 6 24 TW 38 10 X 24 X = 213 HEIGHT OF CHANNEL UTILITY CONSTRUCTION KEY EIIJI INSTALL SEDIMENT MEASURING STICK EROSION CONTROL LEGEND - INLET PROTECTION - SYNTHETIC MAT WITH 2PSF PERMISSIBLE SHEAR STRESS 177 - TREE PROTECTION FENCE [,;T, .�I - RIP RAP - CONSTRUCTION ENTRANCE LL==IIIIII I - LIMITS OF CONSTRUCTION _ CB IS INSPECTOR. ' sy i MK 'ACE 'I + "� �7- PERFORM SITE GRADING, AND INSTALL ADDITIONAL EROSION CONTROL MATERIAL AS NEEDED. • �: • / ~'rri 8, PROVIDE TEMPORARY SEEDING ON ALL DISTURBED AREAS THAT WILL BE IDLE FOR 14 DAYS OR LONGER- • 9, PERMANENT GRASS SHALL BE INSTALLED FOR ALL AREAS AT FINAL GRADE AND IN SEASON. FERTILIZE. WATER W Lr 1 +�• J - AND RESEED AS REWIRED TO ESTABLISH AND MAINTAIN VIGOROUS STAND OF GRASS. 10. INSTALL STORM DRAINAGE SYSTEM AND INLET SEDIMENT TRAPS- • < i I .L-., eft, 17, INSPECTION BY INSPECTOR- • • 12. COMPLETE CONSTRUCTION AND FINAL GRADING. II 1 -- ' _ / • +WTI V 13. PERMANENT GRASS SHALL BE INSTALLED FOR ALL AREAS AT FINAL GRADE AND IN SEASON- FERTILIZE, WATER AND RESEED AS REQUIRED TO ESTABLISH AND MAINTAIN VIGOROUS STAND OF GRASS. ALARM / 14- AFTER COMPLETION OF CONSTRUCTION AND THE SITE IS STABILIZED, (A) REMOVE ALL ACCUMULATED SEDIMENT : Z FROM PRE-TREATMENT DETENTION BASINS AND DISPOSE Or ACCORDINGLY- (B) REMOVE ALL TEMPORARY EROSION CONTROL MEASURES. SMOOTH AREAS, APPLY APPROPRIATE GRASS AND OBTAIN APPROVAL BY INSPECTOR. O C �- EROSION CONTROL NOTES: I FIELD INSPECTIONS MAY REWIRE ADDITIONAL SEDIMENTATION AND EROSION CONTROL MEASURES AS DEEMED • Q NECESSARY BY THE INSPECTOR. • j 2- ANY GRADING BEYOND TILE LIMITS SHOWN ON THE PLAN IS A VIOLATION OF THE STATE/COUNTY EROSION CONTROL ORDINANCE AND IS SUBJECT TO A FINE. • �-- O x _ 1 O C 3. NO SEDIMENT SHALL BE ALLOWED TO RUN OFF SITE -IF SEDIMENT IS TRACKED OFF SITE, IT MUST BE CLEANED Z Z Z IMMEDIATELY- • WHEN HAND PLANTING, MULCH (HAY OR STRAW) SHOULD BE UNIFORMLY SPREAD OVER SEEDED AREA WITHIN 24 H • HOURS OF SEEDING. • \ •)I` { 5. EROSION AND SEDIMENT CONTROL DEVICES MUST BE INSTALLED AND INSPECTED WITH ENOUGH LEAD TIME FOR AN • +kT _ INSPECTION TO MEET YOUR SCHEDULE. G. CONTRACTOR TO REMOVE ALL CONCRETE PADS, FOUNDATIONS AND UNDERGROUND STRUCTURES, SEE SURVEY FOR O V R I}- {�\ SITE FEATURES. • V c ti� MAINTENANCE NOTES 0 oQ 1. CONSTRUCTION AND MAINTENANCE OF ALL EROSION CONTROL DEVICES SHALL CONFORM TO THE STANDARDS SET • tu w 9q FORTH IN THE NORTH CAROLINA DEPARTMENT OF ENVARONMENTAL, HEALTH AND NATURAL RESOURCES LAND QUALITY • _ r \ of SECTION EROSION AND SEDIMENT CONTROL PLANNING LAND DESIGN MANUAL- • • O J 2. THE CONTRACTOR IS RESPONSIBLE FOR MAINTENANCE OF EROSION CONTROL METHODS DURING CONSTRUCTION, AND W C� OWNER IS RESPONSIBLE FIN OR MAINTENANCE OF ALL PERMANENT EROSION CONTROL METHODS AFTER CONSTRUCtION IS • F- Q COMPLETE, IF ANY PERMANENT METHODS ARE REQUIRED- • 3. SEDIMENT/EROSION CONTROL DEVICES MUST BE CHECKED AFTER EACH STORM EVENT- EACH DEVICE 15 TO BE • MAINTAINED OR REPLACED IF SEDIMENT ACCUMULATION HAS REACHED ONE HALF THE CAPACITY OF THE DEICE. • ADDITIONAL DEVICES MUST BE INSTALLED IF ADDITIONAL CHANNELS HAVE DEVELOPED. V 4. GROUND COVER SHALL BE PROVIDED ON EXPOSED SLOPES WITHIN 15 WORKING DAYS FOLLOWING CCMPLET70N OF • ^ ANY PHASE OF GRADING AND PERMANENT GROUND COVER FOR ALL DISTURBED AREAS WITHIN 15 WORKING DAYS OR • �! \ 30 CALENDAR DAYS FOLL-OWINC COMPLETION OF CONSTRUCTION OR DEVELOPMENT FERTILIZE. WATER AND MAINTAIN ® A VIGOROUS STAND OF GRASS. • • 5. SEDIMENT SHALL BE REMOVED FROM BEHIND THE SEDIMENT FENCE WHEN IT BECOMES 0.5 FEET DEEP AT THE • FENCE. THE SEDIMENT FENCE SHALL BE REPAIRED OR REPLACED AS NECESSARY TO MAINTAIN A BARRIER. • • NOTE: 5. SEDIMENT SHALL Of REMOVED FROM THE PRE-TREATMENT DEVICES TO THE DIMENSIONS INDICATED ON THE PLANS, j NO WETLANDS EXIST ON -SITE. WHEN THE ELEVATIONS REACH THE FOLLOWING: + PHASE I; POND A EL 7,00 USING MH8(EL 13.00) AS A BENCHMARK • \\` PHASE I: POND B EL 4.00 USING MH31(EL 13.25) AS A BENCHMARK PHASE 117 FINAL POND EL 7-25 USING MH31(EL 13.25) AS A BENCHMARK • ` • Y IMMEDIATELY SURE THAT THE POND DRAWS INDICATED PIPES DO NOT BECOME HOCKED BY SEDIMENT. IF THEY 00, CLEAN SEDIMENT IMMEDIATELY TO THE DIMENSIONS iNpfCATEp ON THE PLANS AND CLEAN PIPE OF SEDIMENT. • 7. IF STORMWATER REMAIN IN INFILTRATION BASIN FOR LONGER THAN 5 DAYS FROM THE RAIN EVENT, CLEAN BASIN • TO DIMENSION INDICATED ON THE PLANS. BE SURE TO REMOVE SOIL TO 4 INCHES DEEPER THAN DESIGN DIMENSIONS AND REPLACE WWTH 4 INCHES OF CLEAN SAND. • Illlllllllllllllr Z �n STORM DRAINAGE NOTES /� G CIO > n GRADING LEGEND STORM DRAINAGE COMPLIES WITH ARTICLE 13.3 OF THE UNIFIED DEVELOPMENT ORDINANCE. • Q l ti -I- 34.50 - PROPOSED v=- LLEvanoN4450 - r %44.50 LL TOP / BOTT Y 7F CURB a a I^. • 4 EH a • W 0 • J � � 7 • 1 O • y Z Z co i UZ • w � 5 o \ • r rn • r � o I` • - SILT FENCE .. -HORSESHOE INLET PROTECTION 0 - SILT FENCE OUTLET GRAPHIC SCALE - DIVERSION DITCH z e x 40 : Cif • - CHECK DAM • : o ( IN PEST) • s • C� I ALL CONSTRUCTION SHALL BE IN L inch 30 ttn • T . S ACCORDANCE WITH NORTH CAROLINA : Q EROSION CONTROL SPECIFTGATIONS 10 GRADING & EROSION CONTROL PLAN - PHASE 1 • 1 =- L • H '�I4 � •'I �( 4 �1� tiCY y; r � H.i i 71 1 LN T e.'. L Hj -+, .1 �, I.I•. '-II , . WWII /, l _ SHEET NOTES ALL DEMOLITION, AND ANY SUBSEQUENT CONSTRUCTION. SHALL BE PERFORMED IN ACCORDANCE WITH THESE PLANS AND SPECIFICATIONS APPROVED BY THE LOCAL GOVERNING AUTHORITY 2. ALL DEMOLITION AND SUBSEQUENT CONSTRUCTION TO BE IN ACCORDANCE WTH PERMITS ISSUED AND APPLICABLE Fop - _ _ LOP. - - STATE. COUNTY, AND LOCAL CODES_ z • 3. THE CONTRACTOR SHALL OBTAIN AND PAY FOR ALL INSPECTIONS, CERT1FlCATi0N5. EQUIPMENT, ETC- THAT MAY BE tI- , _ - _.._ REQUIRED. _ : - �s -" i _ - r- - _"4' `�� -� .I DEPARTURES FROM THE SPECIFICATIONS OR ORAWNGS ARE DEEMED NECESSARY BY THE CONTRACTOR, DETAILS �- ! „�. ..�•' i __ . -._ - DEPARTURES ---- ~~ ~� r� FROM THE CONTRACT DOCUMENTS SHALL BE MADE WITHOUT THE WRITTEN PERMISSION OF THE OWNER- �...+� -_✓24�.._ �.�-., "- :' -->� `�� EDP GPI - � O SUCH DEPARTURES AND REASONS THEREOF SHALL BE SUBMITTED TO THE OWNER FOR REVIEW 0 -� E E L N k; .. 5. EXISTING IMPROVEMENTS DAMAGED OR DESTROYED DURING CONSTRUCTION SHALL BE REPLACED OR RESTORED TO _. THEIR ORIGINAL CONDITION, AND TO THE SATISFACTION OF THE OWNER OF THE IMPROVEMENTS. 6. CONTRACTOR SHALL REFER TO ARCHITECTURAL PLANS FOR 13ETAJLS OF BUILDINGS AND BUILDING DIMENSIONS. N CONSTRUCTION MEANS A S ASSOCIATED WTH ENGINEER A OWNER DISCLAIM ANY RpIF Y THE CONSTRUC ON EA S METHODS � ", THE PROJECT AS FORTH IN THESE PLANS. ND/OR • Q`Fr$9/' _ :!:F)E, f SEAL _.. 'TE C'H -F,.57 { I �, i ' ! ,'✓� "_-- - --- _ `, -r ~�q„ - I 8. CONTRACTOR SHALL MAINTAIN AN "A5 BUILT- SET OF DRAWINGS TO RECORD THE ACTUAL LOCATION OF ALL • s 151134 c ....... PlPTNG PRIOR 7O CON EALMEN7- DRAWINGS SHA L BE GVEN TO THE OWNE UPON C PLETIDN OF THE PROJECT #� � ~�'` NTH A COPY OF THE TRANSMITTAL LETTER (FOR RECORD KEEPING) TO THE ENiANLER- • �: A 'K!.YNC+V�� THE CONTRACTOR IS RESPONSIBLE FOR FIELD VERIFYING THE ACTUAL AND EXACT LOCATION, SIZE AND MATERIAL • '�U� L.:`"'� - '! COMPOSITION OF ANY EXISTING WATER OR SEWER SERVICE PROPOSED FOR CONNECTION OR USE ON THIS PROJECT • THE RELOCATION OF ANY UTILITY SERVICES REQUIRED 70 COMPLETE ANY PORTION OF THESE CONSTRUCTION PLANS SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR. a - / II 10. THE CONTRACTOR MOST, AT ALL TIMES, KEEP THE PREMISES FREE FROM ACCUMULATIONS OF WASTE MATERIALS OR RUBBISH CAUSED 8Y HIM, HIS EMPLOYEES, OR HIS WORK. ALL DEBRIS SHALL BE REMOVED FROM THE SITE ON A DAILY BASIS 11 FINAL. ACCEPTANCE OF WORK BY THE LOCAL GOVERNING AUTHORITY SHALL NOT BE MADE UNIT ALL WORK SHOWN • e�' _ ON THE APPROVED PLAN IS COMPLETED. i I ADa2 r .=+ww ! AD2 F. yff�f I I '�fi 1) ( 1 12. CONTRACTOR SHALL CALL 'NORTH CAROLINA ONE CALL' A7 LEAST 48 HOURS PRIOR TO BEGINNING CONSTRUCTION • ZIP f 2 } - I If �f } OR EXCAVATION EI SITE TO HAVE EXISTING UTILITIES LOCATED. CONTRACTOR L CONTACT ANY LOCAL UTILITIES a '};Y Ii I If j THAT PROVfDE THEIR OWTI INDEPENDENT LOCATOR SERVICE- CONTRACTOR SHALL IMMEDIATELY REPORT ANY I _ _ �q�. - _..._,_- ...__. _, ;-.. � j ', � f DISCREPANCIES TO THE ENGINEER- � ,t r ZLL I 13. ANY EXCAVATION MUST BE FILLED IN AND TAMPED AT THE CONCLUSION OF EACH WORK PERIOD, AND EQUIPMENT • _ AND SUPPLIES RETURNED TO THE CONSTRUCTION STAGING AREA_ • Z 3t+' AD27 - �! j �i- •�I' IA: k f.+>. i. Y_t' f .11 -2t" - f ! -� ^n L _ i __r _ Y 1 I ' f `�+ • F $ jp z F G ! .`i GENERAL GRADING NOTES _ s �,� �"- ' _ T + _ It 1. ALL DIMENSIONS AND GRADES SHOWN ON THE PLANS SMALL BE FIELD VERIFIED BY THE CONTRACTOR PRIOR TO • Z I %/A _ �`^� _ I `I CONSTRUCTION. CONTRACTOR SHALL NOTIFY THE ENGINEER IF ANY DISCREPANCIES E7(VST PRIOR TO PROCEEDING Wl?I • ? gs lut t' 8 oNc�-' f y' �" - - € _ CONSTRUCTION FOR NECESSARY PLANORTGRADE CHANGES- NO EXTRA COMPENSATION SHALL BE PAIDTo S IF SUCH • J �� ,.' �K _ E O DIMENSIONS OR GRADES SHOWN INCORRECTLY ON THESE LAN • NOTIFICATION HAS NOT BEEN GIVEN • sIg ' � � + CONTRACTOR FOR ANY WORK DONE D 2 WHEN HAND PLANTING, MULCH (HAY OR STRAW) SHOULD BE UNIFORMLY SPREAD OVER SEEDED AREA WITHIN 24 • U_i _- - \ -. /r ✓'/-. /T "r �,, ,:%l'�✓• i.:: ."aq. ..,. . ..R ..,. .. !' F •93 DRIVE -�- I` �� r/, ....: ... T:i../, ;%< i... ,..,,,i/s'/r /:•!� - - `^ ,s HOURS tl SEEDING. • • /iG�, I.i, �� .` ✓�. . �.. ,r/, ,. l 1'-.� 3. DURING UNSUITABLE GROWING SEASONS, MULCH ALL BE USED AS A TEMPORARY COVER ON SLOPES THAT ARE • r / i c ,l / ✓j 4' .' "* "-r�: - - FI Lo 4:1 OR STEEPER, MULCH WILL BE ANCHORED. • O z 4. EROSION AND SEDIMENT CONTROL DEVICES MUST BE INSTALLED AND INSPECTED PRIOR TO ANY GRADING ON SITE • 0-' W PLEASE CALL FOR AN INSPECTION. N i Z Rt ii I pAIY19 1 CI25?--' ,rd 5. SEDiMEN7/ER0510N DEVICES MUST BE CHECKED AFTER EACH STORM EVENT EACH pEV10E IS 1'D BE MAINTAINED • oU m U WAYNE WEST BLDG. /= r - - - - OR REPLACED IF SEDIMENT ACCUMk1LA710N HAS REACHED ONE HALF THE CAPACITY OF THE DEVICE- E , FFE 22.00 FrE 22.0 .;' I:'''=` c r ti • z Q AD26Ln LLI • o z ELEVATIONS SHOWN ARE PAVEMENT, GROUND OR CUTTER FLOW LINE, UNLESS OTHERWISE NOTED. W II hV�11101lfsi:ll!LvII{II Tk ; , �yll •`'dllgrl - I.ON.. C� � - "tY` 7. CONTRACTOR SHALL OBTAIN A COPY OF THE REPORT OF SUBSURFACE INVESTIGATION (IF AVAILABLE AND FOLLOW • a 0 U l�nlfryl:y;F�IJJ r PAD �. A� 1 - I - . S+ THE RECOMMENDATIONS FOR GRADING AND COMPACTION. ) • I Q Z _ N MAINTENANCE 0. REMOVAL OF ALL EROSION CONTROL DEVICES ARE p f% , o�/ >>r -� �� //l 1�L .<£!4.�� ) 8 DI G CONTRA MA UNL CE AND RE OL DE CES E THE RESPONSIBILITY OF THE _ I r f N I - - A I EI1 113Sf1 GRADING CONTRACTOR UNLESS OTHERWISE NOTED ohil1li�nioTfif - >(�Rffi�'r�T � I �` "' r I!k I I uu lu!I ICI ululi!!hH _ • � /' j.-•/ }''. ,•. __ i � t � ,��� 11{'I IJIIIM1T11YlIIIIII{ 1.IiIIIIIIIINlIE11.lIIIH€ll1�.11111111.LH�11!Elllllli!il�fll ll EIEIN I I� - � FFiJCE' I � I � 0. d ��� / _ _ ��_••-'•• '•�'- I - 9 A COPY OF THE APPROVED EROSION CONTROL N M y � _ C 1 - _ � � :I-- - - L PLAN UST BE ON FILE AT THE JOB SITE. _ - - I&ufAi;'B�iNrIfIff __.,ie'_.i -)}....- • • N N - _-,.d�,:�. - .PIT I II j ,.. ..! p - COMPACTION NOTE z V +IG:I,Jfudlll'Gil�l,l.Nld! II. f1 , - _ • O O 0 m }I;;,.,, iI L� 1. COMPACTION OF THE SOIL UNDER PAVED AREAS AND BUILDING AND THE MAINTENANCE OF PROPER MOISTURE • - A \ \ _ CONTENT SHALL BE SO AS TO ACHIEVE 98% OF THE STANDARD PROCTOR MAXIMUM DRY DENSITY. nNtidp!,ed. '_ O O S _ r ,i1� ! N I. 2. WHERE UTILITIES (TO BE REMOVED) IMPACT THE F04TP3?IN? OF THE NEW BUILDING, CONTRACTOR SHALL EXCAVATE • / I - - _- � \ _ ;>. � � _ !: "' AND REMOVE AN ADDITIONAL 2 FEET OF SOILS TO EITHER SIDE OF PIPE, AND 1 FOOT BELOW TO REMOVE UNSUITABLE SOILS. CLEAN SOILS SHALL BE UTILIZED FOR BACKFILL. COMPACTION OF THESE SOILS SHALL BE PERFORMED IN / y-, II 1 ,\ / /. F..: ,•� f ; ' �U'16r4ni,Fry NIvIII,,sr A II I ACCORDANCE NTH SPECIFICATIONS AND SITE PLAN. • 4� 5 I.�iT?, h !I m m - _ �- - r` 5 �1 - - - - - - - y n: � z A/c �m � ,Iel:a r,,{v,.: EROSION CONTROL CONSTRUCTION SEQUENCE z � 4 - I i- OBTAIN PLAN APPROVAL AND 01i1ER APPLICABLE PERMITS- • OT i..I COL f I 2 FLAG WORK LIMITS AND MARK TREES TO BE SAVED, IF ANY, FOR PROTECTION - I - �..aL.-_,... / ( - -_ / - 1 .f�•; I I - I :.fE `ir:; PAD cc S Y ,i,_f 3 Hal) PRE -CONSTRUCTION MEETING WITH INSPECTOR ON SITE, AT LEAST ONE WEEK PRIOR TO THE START OF ANY ,.--.. ....-.... ._._.__ 1 - ,, I LAND DISTURBING ACTIVITY 4. INSTALL CONSTRUCTION ENTRANCES. TREE PROTECTION FENCE AND SILT FENCE, OTHER TEMPORARY EROSION CONTROL DEVICES AS REQUIRED. F+-.1• j ff • 5, INSTALL PRE-TREATMENT BASIN AND INFILTRATION BASIN. J / o _ • �T � ���'t, � , / _, 1 - 6, INSPECTION BY INSPECTOR � 7. PERFORM SITE GRADING, AND INSTALL ADDITIONAL EROSION CONTROL MATERIAL AS NEEDED. 8. PROVIDE TEMPORARY SEEDING ON ALL DISTURBED AREAS THAT VALE BE IDLE FOR 14 DAYS OR LONGER, 9. PERMANENT GRASS SHALL BE INSTALLED FOR ALL AREAS AT FINAL GRADE AND IN SEASON. FERTILIZE, WATER may`' AND RESEED AS REQUIRED TO ESTABLISH AND MAINTAIN VIGCROUS STAND OF GRASS. 10- INSTALL STORM DRAINAGE SYSTEM AND INLET SEDIMENT TRAPS. < m !1- INSPECTION BY INSPECTOR- • �. 12. COMPLETE CONSTRUCTION AND FINAL GRADING a� 13. PERMANENT GRASS SHALL BE INSTALLED FOR ALL AREAS AT FINAL GRADE AND IN SEASON. FERTILIZE, WATER • WV AND RESEED AS REQUIRED TO ES7ASUSH AND MAINTAIN VIGCROUS STAND OF GRASS. 14. AFTER COMPLETION OF CONSTRUCTION AND THE SITE IS STABILIZED, (A) REMOVE ALL ACCUMULATED SEDIMENT 3 _ I / r FROM PRE-TREATMENT DETENTION BASINS AND DISPOSE OF ACCORDINGLY, (B) REMOVE ALL TEMPORARY EROSION ��.�T CONTROL MEASURES, SMOOTH AREAS, APPLY APPROPRIATE GRASS AND OBTAIN APPROVAL BY INSPECTOR- y / „RAMP EROSION CONTROL NOTES: �- o Y •Of I. FIELD INSPECTIONS MAY REQUIRE ADDITIONAL SEDIMENTATION AND EROSION CONTROL MEASURES AS DEEMED a ! - NECESSARY BY THE INSPECTOR- U I, op 1 2. ANY GRADING BEYOND THE LIMITS SHOWN ON THE PLAN I$ A VIOLATION OF THE STATE/COUNTY EROSION CONTROL • F- � ORDINANCE AND 15 SUBJECT TO A FINE. r O Of tj J.l 0 NE C V 3. NO SEDIMENT SHALL BE ALLOWED TO RUN OFF SITE. IF SEDIMENT IS TRACKLV OFF SITE, IT MUST BE CLEANED • � O IMMEDIATELY. z tu 4- WHEN HAND PLANTING, MULCH (HAY OR STRAW) SHOULD BE UNIFORMLY SPREAD OVER SEEDED AREA WITHIN 24 HOURS OF SEEDING. • - 5. EROSION AND SEDIMENT CONTROL DEVICES MUST BE INSTALLED AND INSPECTED WITH ENOUGH LEAD TIME FOR AN INSPECTION TO MEET YOUR SCHEDULE. • O �F� 8. CONTRACTOR TO REMOVE ALL CONCRETE P0.05, FOUNDATIONS AND UNDERGROUND STRUCTURES SEE SURVEY FOR SITE FEATURES. • • \ ill V -7 H U c MAINTENANCE NOTES o p UJ 9 I- CONSTRUCTION AND MAINTENANCE OF ALL EROSION CONTROL DEVICES SHALL CONFORM TO THE STANDARDS SET FORTH IN THE NORTH CAROLINA DEPARTMENT OF ENVIRONMENTAL, HEALTH AND NATURAL RESOURCES LAND QUALITY _ - SECTION EROSION AND SEDIMENT CONTROL PLANNING LAND DLSIGN MANUAL. • t.t 1•, 2. THE CONTRACTOR 15 RESPONSIBLE FOR MAINTENANCE OF EROSION CONTROL METHODS DURING CONSTRUCTION . AND OWNER IS RESPONSIBLE FOR MAINTENANCE OF ALL PERMANENT EROSION CONTROL METHODS AFTER CONSTRUCTION 15 COMPLETE, IF ANY PERMANENT METI+005 ARE REQUIRED. • Q - • • e 0 - 3. SEI MEN7/EROSION CONTROL DEVICES MUST BE CHECKED AFTER EACH STORM EVENT. EACH DEVICE IS TD BE MAINTAINED OR REPLACED IF SEDIMENT ACCUMULATION HAS REACHED ONE HALF THE CAPACITY OF THE DENC£_ ADO1710NAL DEVICES MUST BE INSTALLED IF ADDITIONAL CHANNELS HAVE DEVELOPED_ • r C� 1 ' 1 s 4. GROUND COVER SHALL BE PROVIDEO ON EXPOSED SLOPES WITHIN 15 WORKING DAYS FOLLOWING COMPLETION OF ANY PHASE OF GRADING AND PERMANENT GROUND COVER FCR ALL DISTURBED AREAS *THIN 15 WORKING DAYS OR 30 CALENDAR DAYS FOLLOWING COMPLETION OF CONSTRUCTION OR DEVELOPMENT_ FERTILIZE, WATER AND MAINTAIN • • A VIGOROUS STAND OF GRASS. 5. SEDIMENT SHALL BE REMOVED FROM BEHIND THE SEDIMENT FENCE WHEN IT BECOMES 0.5 FEET DEEP AT THE FENCE, THE SEDIMENT FENCE SHALL BE REPAIRED OR REPLACED AS NECESSARY TO MAINTAIN A BARRIER. &. SEDIMENT SHALL BE REMOVED FROM THE PRE-TREATMENT DEVICES TO THE DIMENSIONS INDICATED ON THE PLANS, WHEN THE ELEVATIONS REACH THE FOLLOWING. PHASE I: POND A EL 7.00 USING MH8(EL 13.00) AS A BENCHMARK PHASE f- POND B EL 4.00 USING MH31(EL 13.25) AS A BENCHMARK PHASE It FINAL POND LL 7,25 USING MH31(EL 1&25) AS A BENCHMARK BE SURE THAT THE POND DRAWDOWN PIPES DO NOT BECOME BLOCKED BY SEDIMENT IF THEY DO. CLEAN SEDIMENT IMMEDIATELY TO THE DIMENSIONS INDICATED ON THE PLANS AND CLEAN PIPE OF SEDIMENT. 7. IF STORMWATER REMAIN IN INFILTRATION BASIN FOR LONGER THAN 5 DAYS FROM THE RAIN EVENT, CLEAN BASIN TO DIMENSION INDICATED ON THE PLANS. BE SURE TO REMOVE SOIL TO 4 INCHES DEEPER THAN DESIGN 0!MEN5EON5 1 AND REPLACE WITH 4 INCHES OF CLEAN SAND- Z W m STORM DRAINAGE NOTES . � 0 > NOTE. STORM DRAINAGE COMPLIES WITH ARTICLE 13.3 OF THE UNIFIED DEVELOPMENT ORDINANCE. • < ¢ C • I NO WETLANDS EXIST ON -SITE. GRADING LEGEND RIP RAP OUTLET PROTECTION i � 0 34,�= - PROPOSED SPOT ELEVATION O ♦ �• ¢ r T. TOP / BOTTOM OF CURB /a W n coa z V, Z � o ERO`ICN CONTROL LEGEND � c Z • N ` / I- d �a! w z - INLET PRO'E --'.ON � ,SYNTHETIC MAT WITH 2PSF PERMISSIBLE SHEAR STRESS / � • N ,� f< L �p z I ca----TP-�---- - TREE PRO = TON f7ENCE ''':', .:. / _ ` - RIP RAP - • �( NF • eI4 ♦ R h U �- NH - CONSTRUC .JN ENTRANCE 1:'I i!!::III.{I - LIMITS OF CONSTRUCTION • d^: 1� - SILT FENCE OUTLET _SF_- SILT FENCE GRAPHIC SCALE • GD - CHECK DAM 15 • • N - DIVERSION CIRH • O ( IN FELT ALL CONSTRUCTION SHALL BE IN 1 rood = 30 tt, • • Q ACCORDANCE WITH NORTH CAROLINA EROSION CONTROL SPECIFICATIONS GRADING & EROSION CONTROL PLAN - PHASE II ; • TMAL • LOCATION LENGTH (FT) WIDTH (FT) THICKNESS (IN) OUTLET 33 10 s za cu4s 1s B za ht_..--�--'-- '-. ... _..;1.1.i:'!�,�1':•1'r'�'r[:se-G`_, ,..a .._ _�_�;1„_..._ ii! ,I :i_' .'1 ......:a'a:_:..:��i�i.�J._iS#��1'„".•_'•i.'n.l.�.L.i::j:�.�a�._�__.. 9 u iA PHASE I — POND A SCALE t" = 20' TOP OF BERM EL 21.0 TIE TO EXISTING 2' ALL FILL MATERIAL SHALL BE CLEAN SAND. \ 4' CLEAN SAND EXISTING TOPSOIL SHALL BE REMOVED AND \` THE FIRST B' SHALL BE TILLED INTO NATURAL SOILS. TOP Or BERM EL 21.0 —I 1— 2' i�5. +i �Typ-i C.O. EL 20.50 4'-45' _ 4"DiP LATERAL Y PVC FROM ' 4" TEE M PHASE I: POND B (TYP.) " 2' PVC FROM 4 2 ?H7LE i; POI+i'v A REDUCER! NOTE: 2", PVC FROM PHASE I: POND A MILL BE REMOVED vRING PHASE II CONSTRUCTION. CAP 45' LATERAL WYE AT THAT TIME. FLOW SPREADER WIT — m N 1 1 2" SCH STORAGE POOL NORMAL POOL GEOSYNTHETIC CLAY LINER 1NTH PERMEABILITY NO LESS THAN 5xW-9 CM/SEC INFILTRA77ON BAST SCALE 1" = 20' TOP OF BERM 12.0 —EL �l B' VEGETATED TIE TO EXISTING ai. r.w-L� :1 FILTER :1 y ` „`•• \-12• V J--SITE SOIL fu ic: - SURFACE SHALL BE SMOOTH, FIRM, AND FREE FROM VOID SPACES, VEGETATION. CONSTRUCTION DEBRIS, STICKS. AND ANY OTHER OBJECTS THAT YYOULD CAUSE DAMAGE TO THE LINER. - ON SITE SOIL TO BE PLACED ON TOP OF THE GEOSYNTHETiC CLAY LINER SHALL HAVE ALL STICKS, STONES AND CONSTRUCTION DEBRIS REMOVED TO PREVENT DAMAGE TO THE LINER. FINAL 'RT RN 9' ON-SITL SOIL MATH 9' PREPARED ORGANIC SOIL PLAbl])NG -LEDGES RECEIVED FEB 0 4 2003 DWQ PROS # SLI.I 4YC: 20 `l fig 6" MIN. 6- MIN. 2' 2' 6' MIN. 2' -1 VARIES r 2' I 2 , 1 VARIES I I I 2' I I ,..,•. L� 1 I 1 1 PLAN VIEW STORM DRAIN SADDLE NTS • • • • N • • • • • • • • • • • • • • • • 1. 3r 03 Q° /le- c !ia 1 R79.90 i Z� Q } l o �� s� � + � F • V rc � • • • • 1 +Ir Rcp r • ' is $ �,��.i'I� • • 24'm }} - - -Rcpr- • z m • w • w W 3 • >rdlt •' : acis$ of • • A 24" A • I • ! Per MH 331 PLAN N15 2s' Rf� • [ ; CENTERED ON VAULT SM. MAKINOLE COVER • w • W • W • • AO • O z • zz • • : MH 31 _SECTION VZ a NTS �y wv.. `` a • U • • VARIES 1s" NICA \ `l• �� 1r!' 11Cp 2,C A A • • • • iED I • 0 �f j f 2'r RCA l ii Yee`z I TT 11 MH 8 PLAN ; NTS I : 0 u ►?f 0 V �r SIG. S' MANHOLE • r 0 r r :� txo� • : • w 0 �z T 1 • � F6 • v bT a JIM 01/') aZ 141048 c • AgN4a ALM9 : � t 0 a Ae� � • � Gp • • s MH 8 SECTION [� 4.3 • • • SCORMWATER MANAGEMENT GRADING PLAN ; •TOTAL 40 • - 4 4 4 4 4 4 . __ . ____ La _ .. _ -. ._ l '. '1l•}1�-� r: - ---T---•^7. •� � 1 � � 1 1. J' r Ihprf , I'1 -1 .� �•" � [�.1 �t ' azrzr�av�q r•;czs;e4 c1��sp�s I -r MAR)CULTURE BLDG, PLANTING NOTES. • ' ALL PLANTS SHALL MEET OR EXCEED THE MINIMUM STANDARDS SET BY THE U.S.D.A. STANDARD • FOR NURSERY STOCK SPONSORED BY THE AMERICAN ASSOCIATION OF NURSERYMEN INC-. : WASHINGTON. D-C • --- - _ MULCH ALL TREES AND PLANTING BEDS AS NOTED ON DRAWING. ALL PLANT GROUPINGS ARE : �' --- ------ -- - CONSIDERED PLANTING BEDS. • ------- LANDSCAPED CONTRACTOR SHALL VERIFY UTILITY AND STORM DRAINAGE LOCATIONS W THE FIELD PRIOR TO BEGINNING CONSTRUCTION- stn LANDSCAPE CONTRACTOR SHALL SEED AREAS DESIGNATED ON PLAN PER SPECIFICATION • • / - - SECTION 02920. / • t��y Mr-n------_° r- eEMa LANDSCAPE CONTRACTOR SHALL INSTALL PLANTS DESIGNATED ON PLAN PER SPECIFICATION /f CAR. --- -- ----- --- SECTION 02931. ;•`yU�H i _ EXISTING VEGETATION MUST BE PROTECTED. NO EQUIPMENT OR DISTURBANCE Wi1AYSOEVER IS PERMITTED INSIDE THE GRIP LINE OF THE TREE CANOPY. PLEASE SEE PLANS FOR LOCATION OF TREE PROTECTION AREAS- 0 - 1200 �? - •_ �-+_ CO ZLEILE SHRUB PLANTING PLANT LIST: KEY No. SCIENT19C NAME jCOMMON NAME SIZE I SPACING ROOT REMARKS .ry 6 Junip•rus virginlona Eastern Red C•dar 2" col. 18' H min-) BIB Matched Specenrns ov I Ouercus vlrginiana Live Oak 2' col (8 H mIP Bk8 MatC'xd specMnens Matd-d Specimens os shorn m Ion relative 'I- Cla . Ma1or•s AB 18 Acer bum Branum ITid,t Maple 2" cd. (S' H min-) B&9 PC 16 Pistacla chfnensis lChinese Pistachio Bh8Si,— 2• col. ' H min. Mc 44 Myrica ceritwo 'Wm M tie 4" ht- B&B Mddlr d ecimms 2 Tree Iorm c ens in Morlecn Court rd No 18 Neriump d r JE 350 Iuneus eftusus JSoft Rush 3• ne. IV 700 Iris vir iniana Blue Flog Iris Sc 175 Scirpus cypefinus Woolgross 3' ht. LR 3OC Leucothee recemosa 'AxAlons CaOstal Dogbobble It plant counts or drawing differ from plant counts on plant list, then plant count on drawing shall govern. Plant height/caliper req_:-ement governs over container size, z30 Y;N- i CONIFEROUS TREE PLANTING - HEAVY DUTY N.T S, MULTI -STEM TREE PLANTING (WINDY SITES) N, r.5 DECIDUOUS TREE PLANTING - HEAVY DUN N. T... • i • • • Z • i • a �- i : z ue 5 i w r �! • z � �� iii� • ? rA $ ti • i . L {11 11 • • • : : r • • • RUBBER HOSE ON EACH Ma10R STEM- ALL MAJOR STEMS SHOULD BE WIRED TOGETHER. • `C z SET TREE AT ORIGINAL GRADE • _ • MULCH PINE BARK OR WOOD CHIPS 75mm (3") MIN • SOIL SAUCER: USE PREPARED TOPSOIL 150mm (6•) MIN. • • CC WOOD STAKES (3) IN FIRM SOIL • • ROPES AT TOP OF BALL SHALL BE CUT- REMOVE • TOP 1/3 OF BURLAP. NON -BIODEGRADABLE MATERIAL SHALL BE TOTALLY REMOVED • O } z u PREPARED ADMIXTURE BACKFILL • '=J PREPARED SUBCRADE PEDESTALLJ : M s 7 • p J �\ • • z� rF [ ? : • • : • • : • • W RUBBER HOSE AT BARK : w,, V GUY WIRES (3), WHITE FLOG ON EACH TO INCREASE -A O VISIBILITY. • Q Z TURNBUCKLE (3). GALVANIZED OR DIP -PAINTED • `` J SET TREE AT ORIGINAL GRADE O• V q � MULCH. PINE BARK OR WOOD CHIPS SO— (3") MIN, • r SOIL SAUCER USE PREPARED SOIL 150mm (6') MIN- J U WOOD DEAOMEN (3) • O • ROPES AT TOP OF BALL SHALL BE CUT. REMOVE : — Z Z TOP 1/3 OF BURLAP. NON -BIODEGRADABLE MATERIAL • Z SHALL BE TOTALLY REMOVED • PREPARED SUBSOIL TO FORM PEDESTAL TO PREVENT V SETTLING • • tZ • > • Z r� • • � O p • a — w Ed • �Q RUBBER HOSE AROUND WIRE AT TREE • LOCATE ANCHOR STAKE 450mm(18-) AWAY ``ROM TREE TRUNK • ON SIDE OF PRFVA{LING WIND. T-RAIL IRON STAKE OR • ACCEPTABLE WOODEN SUBSTITUTE. ANCHOR FIRMLY. • : CROWN OF ROOT BALL SHALL BEAR SAME RELATION • (OR SLIGHTLY ABOVE) TO FINISHED GRADE AS B • BDRE TO PREVIOUS GRADE- PLACE ON SVBGRADE PEDESTAL. • PINE BARK MULCH 75mm (3-) MIN, • CREATE SOIL SAUCER WITH TOPSOIL 150mm (6') MIN. • FOLD GOWN OR CUT AND REMOVE TOP 1/3 OF BURLAP IF NON -BIODEGRADABLE WRAP IS USED. REMOVE TOTALLY, • T6PSOiL MIX OR CLEAN SUBS011, BACKFlLL • PREPARED SUBSOIL PEOFSTAL ♦ ••ICI••. Z • A% 0 >1Z • a � a o V 0 N U a _ a w c' • cl L Z I1�1 • H z � � 4 o • C LZ 6^ I o • � � F • GRAPHIC SCALE ; GR • • N non • q ( IN rr.ST) • � s I • f.7 • 1 inch - 30 [L • G PLANTING PLAN c . L • "CC POST CAP ---- NOTE: DTOLLARD HEIGHT TO BE 5'-D" AT DOMPSTER ENCLOSURE I 6TO STEEL PIPE- I FILL WITH CONCRETE ANCHOR PIPE IN CONCRETE PAINT OSHA YELLOW FOOTING 2'-0'x2'-0'x2'-8" Sjl DEEP CONCRETE CURB III I II - I _I I lI- --III I 2'-07A BOLLARD N'Es --- FILL RIRFGRIDS WITH TOPSOIL, LAI% WITH LIME, FERTILIZER, AND TOP MTH SEED AS SPECIFIED PLASTIC CELLULAR TURF=D T" SAND BED - 4' AGGREGATE BASE REINFORCING FABRIC PREPARED SUBGRADE I }- I I PLASTIC CELLULAR TURFGRID ON AGGREGATE BASE NTS - ANC 9%a CIA D5RIEf PIN T -6,'- 6' PLAN I ELLl/AT1DN 0 0 2 a4%5'9' PRECAST CONCRETE WHEELSTOP NTS. 4- OF 057 C NON -WOVE GEOTEXTILL FILTER FAB 51 l E 5.IJ 5.1P 1 0 FLUSH CURB AT MECHANICAL YARD NTS 5.1U RESERVED PARKING HEIGHT OF R7-8P RESERVED PARKING SIGNS AS PRESCRIBED BY N-C. DEPARTMENT OF TRANSPORTATION MANUAL ON UNIFORM TRAFFIC CONTROL REVILES, SECTION 2A-23, PART 11. CCE�IB I NGI'FNR O 250 O I 4.4 TREATED POST - PAINT TO MATCH BUILDING SLOPE TO' OF CONCRETE FOOTING TO DRAIN G" 0-D. X 5' HIGH PIPE FILLED W/ CONC. RESERVED PARKING SIGN pm (V HANDICAP PARKING SIGN (VAN ACCESSIBLE) HA%MUM PENALTY $.250 NOTE: PROJECT MANAGER HAS THE OPTION TO LOCATE HANDICAP ACCESS SIGNS ON FACE OF THE BUILDING AT LOCATIONS THEY DEEM IT ALLOWABLE BY CODE AND APPROPRIATE. POST MOUNTED HANDICAP SIGN N.T.S. -1" 1-2 ---2'ASPHALT H-BINDER T J PREPARED SUBGRADE -.P ASPHALT PAVING ON AGGREGATE BASE (HEAVY DUTY) N.T.S -IF WIDTH IS LESS THAN 5' - 8' ABC TO BE REPLACED NTH 4' H-BINDER ASPH 6' CONCRETE 4' AGGREGATE COURSE BASE SUBGRADE TO )ARD PROCTOR NOTE: PORTLAND CEMENT CONCRETE TO HAVE A 2$ DAY STRENGTH OF 4000 PSI ASPHALT TO CONCRETE TRANSITION N T.S, 5AD 5.11 OIL! TYPE 1-2 10' ASPHALT REPLACEMENT TYPE I 2 H 0' t D I Q MILTED TRANSITION 0 EXEsr. SUB -RASE n . / �a ..__�_0• B' ABC STONE BAC1cFILL, TAMPEQ UNDISTURBED SOIL IN 6' LAYERS / \ PIPE 4'-6" S57 STOP£ � ---r- UNDER PIPE BANKS STREET ASPHALT PAVEMENT REPAIR N T.S. x x x� 4 O x Q E ) pINN 11NK FENCE ARCPATECTVRAL FOR CET" t X 1 ° x x x k n Q Q 6' CONC- W/6" X fi4-0 X W4-0 WELDED WIRE FABRIC NOTES T. FOOTINGS FOR GATE POST SHALL BE 3--6" DEEP AND T' DIA. DUMPSTER PAD DETAIL (TYP) VAN CARPOOL RESERVED PARKING 4.4 TREATED POST PAINT TO MATCH BUILDING (t4 SLOPE TOP OF CONCRETE FOOTING TO DRAIN (t)p) SLIT I POST MOUNTED VANICARPOOL SIGN N-S- aGpQ PSI CONCRETE NOTE: RAMP AREA SHALL RECEIVE A DETECTABLE DEPRESSED CURB WARNING SURFACE OF {3/8" UP)TRUN€CATED DOMES AND COLOR TO CONTRAST MATH Al"NING SURFACES PER _ ADA REQUIREMENTS _ RAMP SIDE ROPES NOT Tn ExcEEo i:iz PER PI ADA REQUIREMENTS LOCATiQJV OF WHEELCHAIR RAMP 7. NORTH CAROUNA CENTRAL STANf 136-44 44 REQUIRES THAT ALL STREET CURBS BEING CONSTRUCTED OR RECONSTRUCIEO FOR MANTNAN,a PROC£pURrr, TRAFFIC OPERATIONS REPAIRS, CORRECTION OF UTILITIES OR ALTERED FOR ANY REASON AFTER SEPTEMBER t 1973 SHALL PROVIDE WHEEL AIR RAMPS FOR T CH AE S 0 1E PHYSICALLY HANDICAPPED 4 ALL INTERSECTIONS OW, I BOTH CURB AND GUTTER AND SIbEWALKS ARE PRDVIOED AND AT TI-EEfl A NTS F PEDESTRIAN F IN ! O 0 0 EDESTIR LOW. ADDITION SECTION B C OF THE 1573 FEDERAL AND HIGHWAY SAFETY ACT ALK IRIS PROVfED I OF CURB RAMPS ON ANY CURB CONSTRUC110N AFTER JULY 1 1976 WNEhIER A 40EWALK IS PROPOSED INITIALLY OR h5 PLANNED FOR FUTURE HATE. 21. WELL CHAIR RAMPS SHALL BE PRONO£D AT LOCATIONS AS SHOWN ON THE PLANS. WHEELCHAIR RAMPS SHALL BE LOCATED AS INDICATED IN THESE DETAILS. �MSMCTION NOTES 3. NO SLOPE ON THE WHEELCHAIR RAMP SHALL EXCEED 1'/I' (12:7) IN RELATIONSHIP TO THE GRACE OF THE STREET. 4- IN NO CASE SHALL THE W{DTH OF WHEELCHAIR RAMPS BE LESS THAN 40' (3-47). WIDTH MAY EXCEED 40- IF NECESSARY. PAVTMENT OR STRUCTURE. 5. USE CLASS "H' CONCRETE WITH A SIDEWALK FINISH IN ORDER TO OBTAIN A ROUGH NON-SKID TYPE SURFACE- 6 A 1/2" EXPANSION JOINT WILL BE REWIRED WHERE THE CONCRETE WHEELCHAIR JOINS ANY RIOD ADDITIONAL NOTES 7. T1•E INSrDE PEDESTRIAN CROSSWALK UNES SHALL BE ESTABLISHED BY BISECTING THE INTERSECTION RADII WHERE MARKED (SEE NOTE 15). a- THE WHEELCHAIR RAMP SHALL BE LOCATED 50 THAT THE BEGINNING OF THE WHEELCHAIR RAMP WALL BE TWO FTET FROM THE INSIDE PEDESTRIAN CROSSWALK LINE. 9 THE AWTH OF THE PEDESTRIAN CROSSWALK SHALL BE 10 FEET UNLESS A GREATER WIOTH IS REQUIRED TO ACLOAIMODATE THE PEDESTRAN TRAFFIC. 10. STOP BARS SHALL BE USED WHERE IT IS IMPORTANT TO INDICATE THE POINT BEHIND WHICH VEHICLES ARE RECUIRED TO STOP IN COMPLIANCE WITH A TRAFFIC SIGNAL, STOP SIGN. OR OTHER LEGAL REOU, REMiNT. 11. PARKING SHALL BE ELIMINATED A MINIMUM OF 20 FT ET BACK OF PEOE57RIAN CROSSWALK. 12. AL PAVEMENT MARKINGS SHALL BE IN ACCORDANCE WITH THE LATEST EDITION OF THE MANUAL OF UNIFORM -RAF FIC CONTROL DEVICES PUBUSHED BY THE FEDERAL HIGHWAY ADMINISTRATION- ALL PAVEMENT MARKINGS SHALL BE DONE BY OTHERS. REGUES- FOR CLARIFICATION OR ASSISTANCE ON SPECIAL PROBLEMS MAY BE DIRECTED TO: DE PT. GE TRANSPORTATION OIMSION Or HIGHWAYS HjCHwA- DESIGN BRANCH HI GHWA" BUILDINGS R ALEi G'I. NC 27611 DEPRESSED HANDICAP RAMP NJ S i 1/4' BITUMINOUS EXPANSION JOINT AT EXISTING OBJECT (I.E. WALL, WALK, CURB, ETC.) -, 1/4' TOOLED CJ SEE PLAN (10' If TOCLED 1 S..CRING PATTERN EDGES tI4 O.C.MAX.) I 1 �I I •. mil. � I � I I .L- I �i 1 4T"_ III :I II 98.5 COMPACTED Sll8(J2ADE IN UPPER 32" YP CONTROL JOINT TYP. EXPANSION JOINT F.J- A WA! L NOTE: 3000 PSI 28 DAY STRENGTH CONCRETE FOR THICKNESS, SEE PLAN USE 3/4' BITUMINOUS EXPANSION JOINT A MAX. OF 20' O.C. AND WHENEVER CONCRETE WALK MEETS FIXED OBJECTS (IE. CURBS. BLDG. ECT.) CONCRETE SIDEWALK SECTION 5.IH, HANDICAP PARKING SIGN B EACH SPACE SEE PLAN FLUSH CURTI WHEEL WHEEL f/a WHEEL STOP STOP STOP P t 9 -%. - t' 4 I I,, 6,- p.--. I 8' O" k HC 0. IS R. O� VAN I R. O. I HC �` y. O. ' TYPICAL PACE SPACE ACCESSIBLE SPACE SPACE HC SPACE n NOTE: ALL PARKING STRIPING SHALL BE HC PARKING DETAIL. 4" WIDE PAINTED LINES USING N T WHITE TRAFFIC MARKING PANT i NGrEs EXPANSION AT 1. 10' MAXIM.: V BETWEEN CONSTRUCVON JOINTS. 15' MAXIM'.-M BETWEEN CONS7RUCTION JOINTS ON MACHIN -OURS- 2. 1/2" EXPANSION JOINT EVERY 90'- 3- 3D00 PSf C.: "+CRETE MINIMUM. 4' SLUMP MAXIMUM. 4. LQUIU MEMBPANE CURING COMPOUND SHALL MEET THE REQUIREMENTS OF SECTION P026-2 OF NCDOT STANDARDS & SPECIFICATIONS FOR ROADS AND STRUCTURES 5, ALL CONSTPL:TION J01NTS SHALL BE FILLED WITH JOINT F:LLCR AND SEALER IN ACCORDANCE WITH NCDOT ROADWAY STANDARD DETAIL 546-01. VALLEY GUTTER N.T.S. { 5. Is NOTE: BASIC DESIRED D•AENSIONS ARE INOCATEp. CONSTRUCTION SHALL CYMAPLY w/ LOCAL AND STATE p.0-T. DETAILS AND SPEq ACAT10N5. ��N��OTES 55gg q{L 5T'Iq�FR pTE NOi L� 5 B &Re P[q CUBIC YWARp, R PEAR BAG. FORM 4US7 BE ACCEPTABLE TO ENGINEER. GUTTERCURB AND (SPILL N.T.S. A T ftPLhCEMENT ♦ �(fA78a>r TYPE 12 • = r _ SEAL EXIST. SUB -BASE • / -t. \_O• 8' ABC STONE • BAGXFILL, TAMPED / ��- UNDI5TURBED SCNL • IN 6' LAYERS PIPE �\ • Aj° • 4'-6' #57 STONE K3 CC V g! w as ASPHALT PAVEMENT REPAIR : 9 - ; N-1 5. zILI 3$ �111 • = a 8 a @3i� :D • U.•°IE • • • -- ._ 5.1A : : z o • D3 a • N o FOR PAVEMENT DESIGN • O n SEE SITE PLAN : V) 7 01 L? • '�PER FT, • • 1. • • o : O ` 1 Z _ 11 EI • `_ LE Li • �nO Y 7u • Jp L:1� qU • a j • • • • • • • • • • : : tLI ee1111 : • o z • J • O • iJ a : \ U __ 11 III : _z z o! z -I . /a R 111 I • IIII�I�I-III 1 I- I: I .., I ,., I.I.II€ • v Z U SECTION A -A A • + • O Q Q 5. 6 • : ,I { w - L x 7- 1' • tu (� LEA ]� Q A • X. BEN I BETWEEN JOINTS v FRONT VIEW STANDARD 24" CURB AND GUTTER SECTION • N-T S- z� of 70. �Ft�,MA4T J- y ASPHALT PAVEMENT • • • • . AAAAAA� n� W 2 D >m • z L' � F J 0 • O • • Y m Q 4 17 W • CRASS • C 7 1 O 2 L y : • CO • akr� O m � w Z • • W • • ' ` r D r, V N V, Z : 2• • sYJ S l QVl. • c W N O N 1 tt :T 0 D FLUSH CONCRETE CURB • NTS CID • ON • O • 5. R Lo �CiTF T]FTAH S : •Tr;�sl • I I , i Q �pMl Y A n � � VVN�i I ■3'f� 9r :- a a� s A fig" pa Jk Q ps W $ r a tiIjN '�j �t� z8 m o � mom Q a OR 4'-0" P a aQ7;2 N z �O m� r n D s� A� QMN yZLf o�(S� r H J 0 c i mp x -i -- 0 om A 8 i ncpZ 3 fg $ R Nfo VZi R R $ — nz zv �- mlag � R R ~ag m'� z a N n m i m A ' I < V+� jg q a o' 5� ?� O � s Axe •� d I I —T f , I I � i K Z 6� F L i z � � AIR 1R 1A $ At yy Z $ Y z W } m p a p n rfl� i$ m .m� m z a a i { ?, i a ZO .ucco w r I' b O x z •N Pp N p(6\�"S�^?0�,� \� L �' — ". � � i g i m F �h ,.••.�.••►.••.rrrsrssss••srr••r•••r••rr•••••••..•s•rrss ss•ssss•ssss•••s•ssrs•ss••• ••••••••a••as•r.•s•ssss••sssssssssssssss•ssssssssssLs• •s••ssrrs•.srrrrr•r.rr• u•srrsrsr•...r•..•r.•ssssrs.•s•.•..•..�••s•. •••••••••••rrsssssss••ssssssssssssssss•ssssssss•ss•ssssssssssrssss•s• hayes howeil MM NITY •1000 ; . L , ,5 •,oral_ ,r,N , A GARTERET GO U COLLEGE '0°°�2 ................... NC a ?ADDITIONS RENOVATIONS " c� r1 � .w.EN°IN�ERIr+°I RPL R 1 P1:1 c Ij JI. g `-y1 �+ 1E crIF S -DRAWN �YA � �.�'� (so fuavaeon u � •:�C' � 1'l�� ■ V A�.,�� d�,� VJC/LEE a s _ cou MOREHEAD CITY, NORTH CAROLfNA 16 AUG. 02 sow a ti ,�T, oi tiA �e�Hv FlNISNED 4GBaDF --r FINAL BACI(i J uNOESTGR6E0 SAIL 2 d INTIM. 13ACKIXL 6" 167 STONE ' whil Il IS fi' f 0.0- OF PIPE 6' I Melt" st CLEARANCE ENCOUNTERED --'-IE 17 O.D. OF FIFE ,12UAHW14 9DE CLEARANCE Mir." 1. Til"chi REAM SHORING AND BRACING. DMFMlONS SHALL DE TAKEN FROM THE INSIDE FACE ST THE SHORING ANO BRAOING. 2 NO ROCKS OR BOULDERS 4" OR LARGER TO DE USED IN INTIAL B., ALL BAC1alLL MATERIAL SMALL BE SUITABLE NATIVE MATET+A_ 4- BALI(FlLL 51 BE TAMPED W A' -YFRS IN TRAFQC AREAS, Ir IN NON TIEAFFIC AREAS TRENCH BOTTOM DIMENSIONS & BACKFILLING REQUIREMENTS FOR DUCTILE 1RON, VITRIFIED CLAY & REINFORCED CONCRETE PIPE. NJ S- PLASTER 1/2"-- 1•-3" MINI 1 3'-6' STANDARD D 1'-6' MIN. R 81/4'I� I'-4 1/2` I B 3 SECTION B-B� MIGRgTEAWRAGE WEIGHTS FRAME Al CASTING SHALL MEET A S.T.M. CLASS 'C" CDNC - SPFCIRCAr DN FOR t� A$$ 30 t/2 0 OR BETTER NO24. 4 CASTING 11SEp wITH 12' 75"d: IS' PIPE 24 .36 CASTING USED W74 24 PIPE OR LARGER CUSS 'B' CONG- — 3 O" 9 STANDARD DROP INLET AND CASTING N.T.S. SHALLCIN TYPE INTERMEDIATE TYPF (4'X4') DEEP TYPE is rain Or LEi N aF IM) I5 Ffef fa 20 rElr M DE" Ia.ER 2a fE£r W Cenet _ AUFATMTE tAyxiG Ifter,_ SelB 6 YfaAVa sane. REWraeam I CEInER-�__ ... CONeell hi Peati [ SlN1CARP SRPa - 16- all 63nER srwowto t _y STE16` Or< Y- PS - - s. Eo• unaG. OFEL1 IhliT _ _ j T S AT��ERNIrl LkY b' ppLp.- TF•N Lot ii ZfArii Ca 1F 1NPB gWSE-e we 6 I� f .. A, . __.. rwLc w.eE. a twee PEN 0.0at SIG- •W-aTa t r'Rxil; mart, • "D �IkR ao.T. sro. Axi rnurt. ski A si PFR a.aS, spa. W. �x 1_ . YW N)T TO lbcl S f� rnGl 5' ro p' �— Tr _ .,-�-.�. �� Wm 2P In Je - e ! E Mew �lt I �Y yy 6 " 1 axwesi SLAB DETAIL SLAB DETAIL. sus TNCNIibss wro B" RERFPRCEir111r FOR rF Sa AM ANswix"Ill sou Me, TlAl Y 5?J1 DYER 6' N IIEWH, IZ' MIL riLa%NCSS r0 C rl?<M TaP x wALL win C earraN sue sliuL � IALD. �� CONCRETE BLOCK OR BRICK CATCH BASIN FM+µ BAC yaTIA h FINISHED I al URGED SO L NOTES: D DEPTH OF DRAINAGE MATERIAL 2' MIN w = WIDTH OF DRAINAGE MATERIAL 2' MIN TYPICAL SECTION OF UNDEREIRAIN N?. S. BUILDING WALL (INTERIOR} 2" WATERPROOF ELECTRICAL CONDUIT DUPLEX JUNCTION BOX-_....� STRUCTURAL PLASTIC 3" SCREENED VENT 4B' DIAMETER CONCRETE NET WI VARIES • 2' INLET PIPE i INV. B.OS GUIDE PLATE -J i Si CHECK VALVE R DISCONNECT ASS'Y, 1 PUMP STATION aoTTOM _- ELEV. 1.00 CLEAR OPENING ALARM LIGHT DUPLEX CONTROL PANEL -EY CONDUIT SEAL 48" BASIN COVER W LOCKABLE HATCH r VALVE EXTENSION HANDLE 24' RAIL MOUNTING FLANGE LIFTOUT CHAIN, 1/4" Tap HOLDDOwN 2" ANTISIPHON VALVE, PVC 2" RISER PIPE BOTTOM HOLDDOWN fi. 6'-0 i I o PLAN HALUPAY SIILT64O ACCESS DOOR WTTI LOCWNC POST CAST IN TOP EW PL aR APPROVED 901E: VAULT LID SHALL HAVE LOCKI BAR 1". Duty Ruets, / Sedum 1. Jo'm1 4 al G e 12- it ' -- - --A.— -_ - --- --- SUMP PAN kF ND W" CENTER Or 9077M SECTION 5.3C, ;5.3BLJ � III GRINDER PUMP SPECIFICATIONS LEVEL CONTROLS: : Pump on, off and alarm levels shall be controlled by four (4) mercury tube float • PUMP MODEL switches- Switches shall consist of a mercury tube switch sealed in a 122 Pump shop, be of the centrifugal type Myers model WHRH2O or equal with Cr corrosion -resistant polypropylene housing with a minimum of 18 gauge, 2-wire, SJOW/A • } i to oil built i der unit and nlbmersible t otor. The jacketed cable- The cable shall be of sufficient length to reach the junction boa with • n gr y n grin ype m grinder unit shall no splices. The level controls shalt be suspended from stainless steel bracket so that • 7 y a capable of macerating all material in normal storm sewage incWdirubber reasonable adjustment or replacement may be done without the use of any tools. Level controls • r tp amounts of foreign objects such a$ smaE3 woad sticks, plastc, thin , and st,a}I be UL/CSA listed. W the pike to a tine slurry that will pass freely through the p.:mp and 1-F 2 discharge pipe. Discharge shall be 2' PVC. Run Cycle configuration: • OO W 7� -- Allow pump to run are pumping cyd3e • LY C-) OPERATING CONDITIONS: - Delay next pumping cycle fafor 24 hours 7 Pump shill we a copadty of 50 GPM at a total head of 45 feet shall - Allow pump to cycle for 2days • use o 2 HP motor operating of 3454 RPM. _ Delay next pumping cycle for 27 hours • P CONTROL PANEL MOUNTNG STAND' • Pump motor shall be of the submersible type rated 3 horsepower at 3450 RPM. A control panel mounting stand shall be provided as shown in the plans- The mounting • Motor shot! be 460 volts. Three phase motors shall be "E57A B type. stand shall consist of minimum 2 galvanized support stand threaded to mate w7h the Stator winding shag be of the open type with G¢ss B insulation goad for 130' C sleeve on the cover, two (2) steel angle supports to support the control panel and • Top of PUMP STATION ELEV. 1B.bD (266' F) maximum operating temperature. likii g housing shall be filled with stainless steel hardware, The support stand and angle supports shall be coated with • clear high dielectric oil that lubricates bearings and seals and transfers beat from haked-an epoxy point and shelf be grass green in color. windings and rotor to outer shell. Air filled motors which do no( nave the • superior disspating capabilitles of of -filled motors sha11 nu: be considered equal. ALARM: • The alarm shall have a bright glow and Hash during the high water conditions. The • -- TOP of FINAL GROUND FLEV. 181 Motor shall have two heavy duty ball bearings to support it - ; shaft and take alarm light will go out when the water level drops. : radial and thrust loads and a sleeve guide bushing directly can the lower seal • to take radial load and act as name path for seal chambe u9a11 bearings shall • be designed for 50.000 hours 8-10 r£e. Stator shalt be heat shrunk into motor TECHNICAL SPECIFICATIONS • haasing. 2 HORSEPOWER D�JPLEX GRINDER P1JMP BASIN PACKAGE : A heat sensor thermostat shall be attached to top end of motor winding and WITH DIRECT MOUNTED CONTROL PANEL � shall be connected in series with the magnetic contactor coil in central boa to GENERAL W step n motor winding temperature reaches 221'F. Thermostat to reset Furnish and 'rnstalV n fully assembled grinder pump package consisting of two (2) automatically when motor cools Two heat sensors shall be used an 3 phase grinder pumps and motors, basin assembly, internal discharge piping check wives, shut • motors. off valves, • Buick -connect slide rail systems, lift chains, four (4) level controls, stainless • steei level control bracket, junction box, inlet fitting and control panel. The common motor pump and grinder shaft shall be of #A15 stainless steel • threaded to take pump impeller and grinder impeller. • All equipment shall be factory installed except far grinder pump, inlet fitting, control • O Q panel mounting stand and externally mounted control pone]_ • SEALS: • z Maser snail be tested b two mechanical seals mountec tandem with o seal • J 70P OF INITIAL GROUND EEEY. 13.04 pro y BASIN • O chamber between the seals. Seal chamber shall be ail Gres to lubricate seal face The basin stroll be 48" diameter with de th as shown in the Ions. The basin shall be • VY ontl to transmit neat from shaft m ester shell. p p • ^ Q molded of fiberglass reinforced polyester resin manufactured by the ioy-up and spray • „ U Seal face shot] be carbon and ceramic and lapped to a ictless of one light band technique to assure that the interior surface is smooth and resin rich. The basin shall r /S DISCHARGE INVERT ELEV 11.50 have o minimum wall thickness N inch. A steel anti -flotation plate shall be molded a > iota the bottom of to basis • An electrode shall be mounted in the seal chamber to defect any water entering e b s Ir the chamber through the lower seal. Water in the chamoe- snail cause a red — Z O fight to tum an at the coatral box- This signal shall not stag motor but steal! BASIN COVER: • Z Z out as o warning only, indlcoting service is required- Steel basin covers shall be provided with each bosh assembly. Each cover shot heve o • W -- HiGH WATER -ALARM" ELEV _ 11.00 hinged access opening properly srrzed for instotation and removal of the grinder pump • and check valve assemblies- The access opening shall have a minimum of two hinges PUMP IMPELLER: and a lack hasp. Covers shall be constructed of non-skid, tread- plate steel with a The pump impeller shall be of the recessed Myers type to ❑rovide an open minimum thickness of 9i"- The cover shall have a sleeve for mounting the control • unobstructed passage through the volute for the ground sands. impeller shall be panel mounting stand end an elbow for junction box mounting and to run all wires from • of cast Iran and shall be threaded onto stainless steel s^ the junction bav to the pane) maunting stand. Covers shall be coated with a baked -on • epoxy point and shall be gross green In color. Covers shalt be Felted to the basin with t stainless steel cap screws- Zinc plated nuts shall be embedded in the upper Range of • le \ V i r- the fiberglass basin for corrosion resistance and to prevent turning. • lJ U GRINDER CONSTRUCTIONS • Q Grinder assembly shall consist of grinder impeller and shrewd-g ring and shall (� Q be mounted directly below the +wiule passage. Grinder imcd'r to be RAIL ASSEMBLIES: _V Ad onto stainless shaft and shall De locked with screw Gad washer_ The The lift -out rat! system assemblies shall permit easy removal and installation aF thetu shredding ring sh.11 b, pressed into iron holding Range for easy removal. pumps and lower check valves without need of personnel entering the ho tin. Structural • Lrl Flange shall be provided with tapped back --off holes se that xrews can be guide brackets with guide yokes of sufficient bearing strength to prevent binding shall — O used to push the shredding ring from housing. All grinding c' solids sBali be bolt to each pump. The yokes shall mote over guide rai€e of a minimum of I inch • „` ll 0 — LAG PUMP "ON" ELEV. 5.50 from action of the impeller ogorost the shredding ring. fiberglass pipe running between an upper rail support and the discharge case. Lower • W �] discharge nozzles, downstream from the check valves, sholt be guided into a chamfered ll Bath grinder impellers and shredding ring shot be of 440C s:cnless steel cavity in the discharge case. A shoulder on each nozzle shall bottom on the discharge • u hardened to SB-60 Rockwell C. case to insure alignment for a leak tight seal. Dual '0" rings shall effect a hydraulic • eel around each nozzle when it is in its operating position. A brace, earl -- LEAD PUMP "ON' ELEV. 4.50 s Pe 9 P Y removable RAILS I" PIPE from the top of the basin, shall le provided to lock the parts together and to prevent CORROSION PROTECTION: I'v1e surges irnm breaking the seal and allowing leakage. The discharge case shoo have • An koo castings shall be pre-treated with phosphate and chrxlic rinse and to a discharge opening with piping to discharge opening with piping to a discharge coupling • V be painted before machining and all machined surfaces exposed to the sewage through the basin woil. • • 2" DISCHARGE PIPE water to be re -painted. All fasteners to be 302 stainless steel, • CHECK VALVES. -- --- PUMPS "Of F" ELEV. 2.00 SEARING END CAP: A heavy duty spring loaded elf rubber flapper type check valve with cast iron Doily shall • Upper motor bearing cop shall be separate casting for easy "'a..nting be on integral part of -the discharge seal assemblies and lift out with the pump • assemblies- The valve design shall be such to allow for operation when ne rive heads, • and replacement. g" op ga up to 5 feel, are encountered. The valves Shan be designed to operate at all NOTE- • POWER CORDS: pressures in the sewer system created by the grinder pumps. • CONSTRUCT A DUPLEX PUMP STATION FOR -DISCHARGE CASE • ?ewer cord and contra} cord shall be double seated. The po•e• and control A flat eel stainless steel spring, internally molded into the Bull N rubber flapper, shall PHASE [:POND B. ONLY INSTALL ONE 4F THE r conductor shall be single strand sealed wit., epoxy Potting co";curd and then be famished in order to prevent collection of debris in the check valve- All fasteners TWO GRINDER PUMPS IN THE PUMP STATION. • clamped in place with rubber seal bushing to seal outer jock:: against leakage CONSTRUCT A SIMPLEX MANHOLE FOR PHASE • shop be stainless steal. • : i I • I I • I • t j 111 • I I I � I • 16' • HAumar 52R484B , S • I I[ OR APPRavEO EWAL ------��� f • �� SEAL t I • - :D } 16834 PLAN • ®,".,"ham El, NOTE: VAULT LIE SHALL • NAVE Uri BAR ACCESS OM WITH 6 2 m ACCESS DOOR WITH - LOCKING POST CAST Z ® Ee IN TOP DR APPROVED . a z' 4 EgUAL Ch BROOM FlNSH AND EDGE TOOL - 1 • w • z Ift w � e yg¢C 4 5 "" 1-1/4-I BLITYl RUBBER- ._. • J p gr 3 pT SEALANT N Jai T I_ I`r 5_a • ♦ O L, r A c3i �BYg • I 1 .....12'i : co I I • 36' • LIFTERS i _� • O � 1Y I • U 12' S0 % Y OP .IMP OEPRESS1pN ! • f • al z s" LU 4 • Z z Si PAN h TT IN CENTER a BOTTOM PST - CONFORCI a _ REINFORgNG H-2 O IF • � • 6" DDA WITH 3" METER VAULT z N'S CD (ELEVATIONS FOR STRUCTURE NORTH OF PHASE L POND B) (DUPLEX) i s TING i RUL uNiul BLcxL,l TYPE 48" DUPLEX CONCRETE STORMDRAINAGE GRINDER PUMP STATION NTS and to provide far stain pull. Cords sholh withstand o pull o. Cv pounds to meet U.L. requirements. lnsulatron of power and control cards shall be type 50w/50w-4 Both control and power cards shall have a green carrier ground conductor •'ot attached to motor frame. DISCHARGE PIPING. Schedule 40 PVC discharge piping shall connect to the stotior�f discharge (COVER BOLTS)base lift assemblies and terminate nt o 2" discharge Range -red on the DI A. B.C. basin at the height shown in the plans. The discharge flange shall have a 2" aCEO AS SHOWN Ni hub (48 basins) for attaching external discharge piping. SHUT OFF VALVES: PVC true union ball type shut off valves with Teflon seats she. ce fumished os an in tegrol paK of the internal pipe assembly. If the die:^nrge depth is mare than 2 feet from the surface extension handles shaft be s_pi,lied. INLET FITTING A one piece inlet fitting far 2 SCH 40 pipe shall be shipped loose ?or field installation as required by the installation. JUNCTION BOX: Tla junetia box shall be constructed of structural plastic for coresion resistance and of adequate thickness to provide stability and mechanical strengtt. The Junction box shall have a fury gask.bi cover the] is held in place by four i _rlptive stainless steel screws with heads of adequate size so that they may eosita ce Installed and removed Witte ui the use of special toots. The heads of the screws shall be totally encapsulaled so that no metal parts are exposed. The cover shy he fastened to the main body of the junction box by means of a totally corrosion-•esistance tether to prevent dropping the cover during service - An adequate number of sealing --type cord grips shot be supplies Ix incoming pump PLAN and level control cords. The cord grips shall be made of non-arrasive material, such O, PvC or nylon, and shall make on effective seal around the wire jacket. The cord grips shall seal to the junction box with on 0 ring or gasket. The junction box shall hove PVC solvent weld socket type condo.` sub of adequate size to accommodate the number of wires required far pump bird ]eve control operation. The incoming wires shall be sealed by an external EY type eol-c" (supptied by others) o that condensation from the conduit or groundwater will hat el ter the enclosure. The interior of the enclosure shall be of adequate swir III— to oaaurrr-d.te the es and connections for pump and level contras operation. The wires running between the control panel and the junction bee shall he color -coded one fastened to the Pump and level controls by means of adequately sized and insulated twis! lock or crimp Connectors. The FNnction box shall be designed to NEMA 6 standards far occasional submergence. FA L POND A. INSTALL THE REMAINING PUMP IN • THE SIMPLEX PUMP STATION. WHEN CONSTRUCTION IS COMPLETE, REMOVE THE PUMP • For THE SIMPLEX PUMP STATON AND INSTALL • IT IN THE DUPLEX PUMP STATION. THE SIMPLEx MANHOLE WILL THEN BE CONVERTED INTO A • I STORM ORAENAGE MANHOLE. I a � Q 4 • TOP OF PUMP STATION ELEV. 12-25 \] t J v E/ 12 • p r UQ • U d .; ..r✓`_, �^' INITIAL TOP OF GROUND ELEV. 11.25 24'"r • I OF � 7 G • � 1 C v; • • Nw __ - 1i • DISCHARGE INVERT ELEV. 10.00 • N G Z qi hl d - 3w � C O HIGH WATER "ALARM' ELEV 9-50 • a - 1 T LAG PUMP "ON" ELEV. 3 • • • I",-7p - • - LEAD PUMP "ON" ELEV. 2.70 • : GD • ------- PUMPS 'OFF" ELEV. 1.70 • • N _ TTOM �g�.� • 15.3E' Q (ELEVATIONS FOR PHASE E POND A) (SIMPLEX) 7UTILITY DETAILS : • Taut. • - - T" T - - - ;.�; -ter-- -T I r , TREE PROTECTION NOTES e A1s 1 AM RAP(SEE � Ir4At wA, eELD AT THE START OF GRADING INVOLIONG THE STRIPPING OF TOPSOIL OR LOWERING OF \ \\` EXISTING GRADE AROUND A TREE, A CLEAN, SHARP, VERTICAL IF I I CUT SHALL AT THE EDGE THE TREE SAYE AREA THE SAME TIME AS OTHER MADE MADEEROSION CONTROL MEASURR ES ARE INSTALLED- THE TREE PROTECTION FENCING SHALL BE INSTALLED ON THE SIDE OF THE CUT FUR � FURTHESHEST AWAY FROM THE TREE TRUNK. NO STORAGE OF MATERIALS, FILL OR EQUIPMENT SHALL BE PERMITTED WITHIN \g,�_ Sinuu i r STONE - TI.01 . ]-gyp, AW. f THE PROTECTED AREA, AND NO TRESPASSING SHAG_ BE ALLOWED WITHIN THE '�Y luaawE yv,� BOUNDARY OF THE PROTECTED AREA, AND SHALL BE SO NOTED ON THE GRADING AND PROTECTION ONCE CI, PLANS AND POSTED IA THE PROTECTION !! I FENCE. A PROTECTION FENCE CONSTRUC7E➢ OF MATERIAL RESISTANT TO k DEGRADATION BY SUN, WIND, AND MOISTURE FOR THE DURATON OF THE CONSTRUCTION SHALL BE R+[R BF,•I eaw INSTALLED AT THE SAME TIME AS THE EROSION CONTROL MEASURES, AND SHALL REMAIN IN PLACE UNTIL ALL. CONSTRUCTION ITAYEL r wP "1't-R��PEC7!'fE _VI y.W IN THE VICINITY OF THE TREES HAS BEEN COMPLETED WA - NO SCALE RAP ,DI e rcs••n m AwWn Dem..c Pry �>s � NO MATERIALS SHALL BE STOCKPILED, NOR EQUIPMENT PARKED OR REPAIRED, Rut TRAw ID Aa[S a ..e NOR OIL OR GASOLINE DUMPED WITHIN THE DRIPLINE OF A TREE SCHEDULED TO REMAIN. IF WORK IS REQUIRED TO TAKE PLACE WITHIN THE DRIPLINE OF A TREE, THE +. F� in1-T RwAP�,E,lowi, I CONTRACTOR PERFORMIING SUCH WORK WALL BE REQUIRED TO COORDINATE PLACEMENT OF A PROTECTIVE BARRIER OVER THE AFFECTED PORTION OF THE TREE'S ROOT SYSTEM CONSISTING OF 4 INCHES OF HARDWOOD MULCH BELOW WOOD LOGGING MATS THAT ARE TOPPED CC WITH 4 ADDITIONAL INCHES OF R w xo1r. HARDWOOD MULCH. THIS BARRIER SHALL BE SCHEDULED TO BE REMOVED - FArwc .wss 1 RP -RAP IMMEDIATELY UPON COMPLETION OF WORK IN THE AREA. IWAS APE IAINRUIALCIITARE 05] KAsNE, STOVE TUNLESSLQ DTIERNY TREES DAMAGED BY CONSTRUCTION OPERATIONS OR AS A RESULT OF NEGUGLNGE ON THE PART OF ANY CONTRACTOR SHALL BE REPAIRED BY AN _ _ _ APPROVED TREE SURGEON WITH ALL COSTS BORNE BY THE CONTRACTOR THAT SLCTi.,)\_ 7HRJ DASf�`: 'L'�1� AN' �,-_1: R Ff 'I CAUSED THE DAMAGE. ANY TREE DAMAGED BEYOND SATISFACTORY REPAIR NO SCALE SHALL BE REMOVED ARID REPLACED AT THE EXPENSE OF THE RESPONSIBLE CONTRACTOR_ REPLACEMENT TREES SHALL BE COMPARABLE MARKET COST AND OF A SPECIES SELECTED BY THE ARCHITECT. GRAVEL & RIP RAP HORSESHOE INLET PROTECTION N.T.S. d54D TREE PROTECTION AREA IT, EXISTING TREE DO NOT ENTER PROHIBITO ENTRAR / ZONA y PROTECTORA PARA LOS ARSpI_E$ SIGN DETAIL OC3T MA, OE EITHER 4'0IA. NNE. 2" DIA OAK, OR 1 S3 LU/LF STCEL WL AiHF RFRCO% 5 �A+ r �i�i �1Er- - UKANGE UV Fi 111 ANT, n hIGH-TENyLE '•IRENGTti. F,k Y BARRIG0,.F I ABRI^ SUBGRAOE �o z INSTALL THEE PROTECTION fE NCE 31 51GNAGO F PRIOR TALLING FOFT TI It NIT-A� ONSITE INSPECTION 13Y ILL TOMDF UORFHEAD CITY ZONING INSPECTOR. NOTES WARNNC 1414 TO BE NAns OF DURFBLE. NFIa-<RPROI AA1TiPI,1L. FTTTR RE TO BE 3 I'.n IN , DI.LCSLE Nn SPA'EG AS BE SAILED. SIGNS A< IC BE PL CET, NO CR A'ER THAN 15' ON CEN.Ek -- PLACE :iCN AT EA- P END OF LINEAR TREE PROTECTION AREA AND 75' ON (.'ENTER THEREAFTER - FOR TREE PROTECTION AREAS LESS THAN 200' IN PER3METER, PROVIDE NO LESS THAN ONE SI CN PER PPGII.CBON AREA AT741H SIi NS SECLRE-V :° FFNC. PGS'S AN' FABRIC. M t!h AL" RE F`RCT_C'ON FEN E -57.5 ANJ I'sBPC ADDI S NS MAY 5E RECUR O 5� HE TOWN Cr NCRFHFA,,, C; "Y ,I.SPECI!ON OFTIARTMENT ,,D ON ,.,UAL "ILO '.GN)IT`ONS. TREE PROTECTION FENCE -^1I--'I�! �II.NIr�.11 „I'!'I'.""" TEMPORARY NG SCHIADVLZ AND CATESFOR THE COASTAL PLAIN SEED so PRFyMUTIM NOT[- REINFORCE FILTER MN LIME 10-10-20 2 TORS/AG 1.000 LBS/AC. SYNTHETIC MAT AN 2PSF PERMISSIBLE SHEAR STRESS. C-20-0 500 HIS/AC. (AFTER SEEDING) SEED PER SEEDNG SCHLOULE. ASPHALT TACK 200 G /EON OF MULCH SEEDING M%TUFF VEGETATIVE FILTER (FEBRUARY , - APRL 30) TAU. FESCUE 50 LBS/Ac. N.T S- , PEW,.COLA BA,RAQRI 10 LBS/AC. 'S'r4 AM KOREOR KOBE LESPEDE7A (SCNBFED) SO tBS/AG -�L.. 1 TALL FESCUE 50 L8S/AC. OR ROBE LESPE0E2A (SCARIFIED) 50 LBS/AC. SRONWN BROwHTT1P ARMLET 25 LEIS/AG (SEPTEMBER I -- JAMIARY 31) 1� 7 4YV d' 1' MIN S Ni-,ill 11 CONIC 18' 7 sf cCNC FLOW DISTRIBUTION DEVICE Nil - NOTES: POSITIVE GRADE MUST BE PROVIDED TO ASSURE DRAINAGE. IF SLOPE EXCEEDS 2X, SEED AND MULCH DMFRSION. TRY NOT TO EXCEED 5X (HIGH VELOCITIES RESULT). MAXIMUM CA. - 5 ACRES WITHQUT SUPPORTING CALLS. DIVERSIONS AT THE TOP OF SLOPES MUST EMPTY INTO AN APPROVED SLOPE DRAIN. BERM/DITCH IS MOST COMMONLY USED, D. MACHINE COMPACTION OF ALL FILL IS REOu1RED. DIVE R5" 5 SUFFICIENT TO DIRECT ALL SEDIMENT -LADEN STORMWATER SAID A SEDIMENT To DEVICE MUST BE INSTALLED PRIOR TO CLEARING AND GRUBBING OF THE AREA. b, DIVERSIONS SHOULD BE LOCATED TO MINIMIZE DAMAGE DURING CONSTRUCTION OPERATIONS. c. DIVERSIONS SHALL BE SEEDED MID MULCHW 0 THEY ARE TO REMAIN IN PLACED OVER 30 DAYS. 5. CHECK DEVICE AFTER EACH RAIN, BUT ONCE A WEEK REGARDLESS. REPAIR AS NECESSARY. 5.4J TEMPORARY DIVERSION BERM/DITCH DETAIL N.T S TLLL FE�(SIE BO L„S/AC. KOREM OR xaBE IESPE0E2A (1R5G1R61E0) 60 UM/AC.RYE RYE IGRA4I) 25 LB./AC FOR SLOPES 2-1 OR STEEPER ADD 30 Les./AC. SERI LLWEDEZA PERMANENT SEEDINQ SCHEDULE FOR THE COASTAL PLAIN MISEEDING M COMMON BERMUOAGRASS 10 L135./AG. PD494COLA BAHIAGRASS W LBS/AC GERMAN MLJLT 10 L95./AC PLANING DALES APRL , - J , 1S + 2* MIN SLOPE 2:1 / rd6 MAX _ - - ob I z IF/ NATURAL GROUND - Fill OR CUT SLOPES y - - SLOPES COMPACTED FILL BERM TOP ELEVATION OF STORNWATER ii WASHED r{F - T,MAXSTONE z DESIGN OF SPILLWAYS .- ,-�' 7- DRAINAGE AREA WEIR LENGhl1 EXISTING SLOPE - (ACRES) (FT) NI CL455 7 RIP -RAP--~ FILTER FABRIC 1 4,0 1 2 G.0 �.- VARIES 3 &0 4 10.0 s 12-0 LON MENSIgtS SHOWN ARE MINIMUM EXISTING SLOPES NI HEIGHT d WIDTH DETERMINED BY _ - LXISTNG TOPOGRAPHY AND VARIES - - - SEDIMENT STORAGE REGUIREDKEY �... RIP RAP INTO THE DAM 1.1. FOR STAB; 12ATION. TAP FRCNTvl W EU05 TTNG SEOPE EP Eg!,I�?vCr. CHECK DAM Q I f PpSt -Development phase I 5AN FRONT VIEW A' LNk • ' vnH�aei As D�REc rtl:er TyE Era;;,Nr f:H -- • . MIN 10 GA LANE WIRE I T1PIFu xnTEc I .. _. _.... / NOTES: • )I a-f4GoCT 2 5 OR 057 WASHED STONE SHALL SIT E F RIG !I� / - i I � OE USED, PM 70 BE 50L % 20'W X s'R AT EECRI u 4 9TE Is STMIu�E�55 @ • - YM 125 GA A MINIFREQUENT EHEP(S OF THE DEVICE Mu � TERMEDIATE a. RABOlG RADIUS SUFFICIENT TO TNCLT MANTENAHCE YU51 PROV41Ep IN - WE7E5 a - / r / -'I: I•. j ACCCAHWO]AlE LARGE TRl1D(s IS TO BE • \f li 1 POUNDED : Y Y SHOULD BE `1I I I PROVIDE FOR M)AXMIUTILITYOBY CATELLT0 1 / MIN l0 GA ! ` Y �' -.. '�, - , / / �.� / \ FI 3 t EN GRADE CONSTRMSTUCTION VEWCJ.ES. 1A LINE MRE I � ��. REi MILL PREVENT TRACKING ADIRECT CT •01PFLO��ONTG�PERIODICIc WIN, STONEL. RE-G"o • NECESSARY: KEEP SOIF HANDY. . 3 h 70 s° SIDE VIEW 4. ANY MATERIAL RAGCH STILL MAKES IT / • 1 1 ( 6 `FPS • = 15834 �'�� ONTO THE ROAD MUST BE CLEANED UP MMFOIEL AY. 1 ti �M 0 % O � - I t CYF � : l OFNCINEE'� A, STEEL POST 1RlAN(i F $PFixlt ND1F5 6 4 'Y Y . � _. E' • •. 4 t " r N W F i USE SILT FENCE ONLY WHEN DRIUNAGE AFEA I, III FN'GVE RE FABRIC 1 SIT FENCE OR TREE PROIECTgN FENCE SHAtt BE !�b��a �{'v' GEDTEI(TILE FABRIC SILT FENCE USED TO LFAT RWRESS AND EGRESS TO CONSTRUCnON 41� DOES NOT E710EE0 1/4 ACRE ANO NEVER SIN -� ENTRANCE ONLY. p • AREA OF CONCENrA0. ED FLOW. 2' - 3' 57ONE - OP'Q� • e 2 IF CONSTRUCT ION ON SITE IS SUCH GNAT LAI 5 NOT {S'JRCE STONE OR RR BALLAST) Q?O END OF SILT FENCE MUST BE TURNED UPHILL. 3, 1; n REMOVED BY VE ICIRAR TRAVEL CWR THE STONE, THE • FILL SLOPE TIRES MUST BE WASHED PRIOR 10 VEHICLES ENTERING NE • i PUBLIC ROIY. • DEBRIS K CONSII THE P BLIC THCS UG PJu YTH "T"O T, THE PlAX1C 1I1p A ANO IN THE CMEEPIIWc w FIN NpBTT ALL CUM TP1E AREA AF10 s INN TEE FINANCIALLY LLRESPO RESPONSIBILITY PTY FORS) AS b9XCATED DII _... .3C`�__--._ ._ T5 AN A it THE FINANCIAL RESPOISF311TY FORM. Z $ m 1 I I I EA GRADE rX15lING ROADWAY UNDISTURBED EARTH - - 1 _� I - _ LS- YN C9WE3i OVER SKIRT y AFABFaC UNDER STONE • z • J iy 4 I ANCHOR SKIRT AS DiFECTED BY ENGINI j CROSS SECTION • f AS z 1J�It • F J]yy] IIII[[(( .t r FOR REPAIR OF SILT FENCE FAILURES, USE 157 WASHED STONE • o if FOR ANCHOR WHEN SILT FENCE IS PRoTE:'• G CATCH BASIN TEMPORARY CONSTRUCTION ENTRANCE /EXIT • _ }�;I SILT FENCE FOR SMALL DRAINAGE AREAS LESS THAN ONE ACRE NT.. .. _ I 5.4B I NOTE: TOP VIEW STRUCTURAL STONE SHALL BE PM. {CLASS "B-) STONE FOR EROSION SET FENCE sLT FENCE CONTROL PURPOSES, SEDIMENT CONTROL STONE SHALL BE NO 5 OR NO. 57 STONE. SET FENCE x 1 � I I- �V 'b{ 3�n1AX. SEDNACNT CONTROLS STRUCTURAL STONE STORE FRONT VIEW SILT FENCE STONE OUTLET DETAIL N rF. 10 YEAR IpFAM%I Area -A- - I,Bero Y "' II pi6r+, Sub M' TOW RwBM•44 TN' I LA Pin 11B. UDP•' II LP-•T 11-d S1Fw FION V•l. PaAPipe 00. Di. I W. SOM REMARKS CPMT• Fo-T TD A. WVM III - in)R % F I I%) ADI AD2 9.054 79 0.35 0.15 0.15 6.012 43 13.66 11.7 11.50 OA66 1.63 4.09 8 0.01% HOPE 1.13 AD2 A03 0,050 7.9 0.35 0,111 0.29 0.012 31 13.50 11,40 11.25 0.484 196 5.12 8 0,05% HDPE 1.43 AD3 CM 0,060 79 0.35 0.17 %45 O.D12 36 13.50 11,15 10.96 0,526 2.28 0.06 8 0.12% HDPE 1.65 CM M115 D213 7.9 GAD 1.35 1.80 0.013 24 1320 10,85 10.75 OHU? 2.75 1O.E4 15 D.00% RCP 1.10 MI MH6 0.DOD 7.0 0.95 000 160 0013 F9 1420 10,65 1025 0506 2.96 1054 15 006% RCP 230 AD12 MIFFS 0084 7.9 045 030 0.30 0.012 23 T3.50 11.90 11.85 1.087 267 4.52 10 0.02% HOPE 0.77 MFIS MH7 0.149 7.9 .95 112 2.92 0.013 60 14.10 10,15 9.55 UbOD 3.32 12.07 15 0.20% RCP 2.70 AD!1 MH7 0-065 79 0-95 0.49 0.49 OL12 47 14.D0 1200, 11.50 1.064 2.99 3.46 8 0, 14% "DI 1.33 MH7 MH8 0.00D 7.9 0.06 0.D0 3.41 0013 80 13.75 9.75 9.15 0.750 402 1244 15 028% RCP 2.75 ADD AD10 0-277 79 ON 208 1 2.D9 0.013 1 64 1325 10.85 10.50 0.547 3.16 10.97 15 010% CLASS IV RCA I.IS ADiO MHO 0.151 7.9 0.US 1.13 2.08 0013 102 1375 /G40 9.RD 0.4SO 303 IT20 15 0,10% RCP 2.10 MH• OUTLET20 0DOD 7A 0% O.6B 615 4.013 16 13.OD 8.15 8.07 0,5OO 4.01 16.78 18 O.N% RCP 335 M118 TW77 D.D9D 7A 0,% 0.68 I B.18 0A13 15 1300 7.00 6.50 3333 616 11.75 24 0,0T% RCP 4OQ EX MET 13 MH14 3.532 7.9 0.55 15.36 15.35 0,013 7 11.5 11.27 32H 10.20 18.59 18 212% RCP MH14 MI 0.000 7.9 0.06 CM 15.36 0013 04 14-10 10.67 750 4953 1190 15,36 24 046% RCP As MH15 WAS 0,000 7.9 0,95 Con 15.35 0.013 125 13.90 7.40 6.80 OASD 4.96 23.79 24 0.40% RCP 4.50 NI TWl7 O,OW 7.9 0,95 0.00 f5.35 0.013 44 14D0 6.70 6.49 DAT7 4.96 23.61 24 046% RCP 530 MIS MM19 1-13D 7.9 0.75 6.70 M20 0013 45 5.50 4.81 1-533 0.92 24.04 30 0.47% RCP LB.00 MH19 E%WTLET 21 0.000 7.9 0.96 0.00 2B.20 0.013 111 19,17 471 34 I190 6-09 25.25 30 047% RCP 11,96 AD22 AD23 0.548 7.9 0.66 2.81 2.81 0.013 239 17,50 1500 11.75 136P 679 10.36 95 0.19% RCP 125 ACO C124 1A42 79 1 0 W 7 40 10.22 0,013 102 16.50 11.85 10.30 1.324 6.55 16,89 16 0.94% CLASS IV RCP Iss CL26 C126 (072 7.0 0.115 0.54 054 0.013 23 16.00 13.DD 1245 DAM241 6.40 15 091% FLASS IV RCP 1.75 ON CQ4 0.100 7.9 0ISO C.53 1,17 OA13 130 15.W 12.75 1295 0.515 2.87 435 15 0.03% CLAW N RCP 2.00 AD27 CA24 DIET 79 0.55 0, 0,79 0013 81 11140 1540 1495 0542 247 7B3 15 0.01% CIASSN RCP 1.75 AD25 CI0,084 7.% ELSE 0.43 0,43 0012 51 1725 1425 14.00 0.490 2.17 6.02 10 0.03% HOPE 2-17 C124 AD29 0,105 79 0.80 0.66 13.27 0,013 37 17.00 1030 10.10 0.$41 5.00 22.03 24 034% RI 4.70 AM MH30 0,1W 1.0 0.90 1.16 14.41 0.013 73 IL15 10.00 950 0.686 5.S8 21.14 24 0.40% RCP 4.76 DAH30 W31 0.072 79 0." 054 14,95 0013 57 17 SO 040 SETS 1140 601 20Q3 24 0.43% RCP 640 AD43 JB33 0.661 7.9 0.96 4.96 4.96 0012 213 20.90 15.00 15.20 1.315 5.79 1251 15 D.50% HDPE 1.85 J= MH34 1 0 070 7.9 0.95 0.53 FS3 0.013 B2 21.66 15 DID 12 75 2A46 3.93 495 12 DAM CLASS N NOR 556 MH34 MEEi1 0.274 7.9 96 206 2.58 0013 140 21.53 12.85 1000 1.9B3 5.31 9.43 15 016% REP 7.83 MH31 ODELET32 0000 7.9 0.% D.DO 1753 0.013 59 1325 8.00 725 127? 7.39 2f183 AI 0.60% RCP 325 MH31 7W36 00001 7.9 095 0.00 17,53 0.013 AO 13.25 7T5 7BD 1.500 7.36 2C 20 Z4 0.60% RCP 350 HW79 MEMO 0464 72 °-95 3A8 17- 0.013 80 6 525 0.936 6.59 22.06 30 0-10% RCP -6SO MF410 MH 35 0.ig6 7,B 0.95 0,06 17.51 0.U13 29 5.15 4.SO 1207 7.24 21.04 30 0.18% RCP -7.65 MN ]5 IXJB 36 OOD6 7,9 085 000 17.5; 0.013 209 4,7 240 1-1DD T 2140 30 0-18% RCP .7.20 EX JB 38 IX DI 37 9.000 7.B 0.95 O.Ip 17.53 0.013 43 2.40 1.90 1.163 714 21.18 30 0.19% RCP A.90 Post Development Phase II [+�1�✓',"3A f�■C6W�:31�E�fL1ltGftE{LT1EI3fR'•9yC1'1121f1t'91�� �11111111111111111R ��i�i� ����� �i ��� �� [L J ��7 mL�7 �I>'� d fi'C7 f EFf •f>0 � �� m �'�� •��7QN^]��RL,��.E��l��iF-7[:L���IO]il:1�F'"� CIS > ��EIE1k151F1�1®wQEAQ9E 21�➢iE Emu iiiiiiiiion ®Tmm�aE� ����®�®lFi9i.61FII@CAE-.L'F-ri 0 0M C� f�12 O mpTAw =-I=D =0P 3 Y _.. 1111011E AS LNDTrnTEO DN PLAN. PLACE 9ISM f DA OWA:L�Iy OLFFPPIPE T�m � CO Z Ozy F 4 LU .�pOU oYcVo O� F- a >-x z'" NzOff¢ 0 0 PLAN _. F e -� 12" 1. - P00TINN T I- -, 0 (IF {uwI =N7 is U3E3 DOWEL W ZA = B ■ D >r.� .. -. --F. EYO ELEVATION BAR - IIS,X Z H 3:�'---- CP I`qW -MMfn-. co IS CE I LE PIPE PEY DOIIX DADS B3•N ENPNALL ITHb E,xfPPCEO,B E36 j. c !'I 16 Ci ED r I. ,. �E L. DIA 1N'-7 1 3 SB x ��BN6 .. 6VSs 16 DS ?' D m ./ ,R,.I:�X. 4. 4 .�. Y• :.4: Y�. "7 A -- �4 SAe'Y...'I, -P b G OTY 2 2 9 3 A A 5 2 2 3 3 -4._ z M- OTY 2 2 2 2 2 f 3 2` G _j IL FY I -I PIT, m r 4 I DOWEL ��G r 2 z 3 D 4 SBS2� 96' �4YT S9x Z m x 14,t4B 5 D eL Les 9 - 1 L �..jt 1 Lam.. Ax m cl O NS OPTIONAL COTRUCTION JO[NT ----- -- N W m 0 C S CCNEvS IONS AND MZf` E WAATITIES - -- - LISIIHO wNcseT1E PIPE = W O rnC �► ELEVATION co- c Ke GI1s NOLB TP@ DO- C FIP. W H m $ ] „J a G= ZLIT W = Z G.T 2 B .0 . iDL D 2] m I 4 24 4' ] 2 1 4' I:3 0 B 0 e D 5 11 5 20' - -. - -'4'7 4l4" Ii44,. 9'.2'� 2.3 4 19'-5" 3,1' 36' S.8•. 2, a- 5.6- 444 1, F5-:11'-0•- ILA . 5'-0, 1 4.5 AY 6'.2'. 3'.1"� 6 a- 514'- ]11R"'12-8"- 4,5 �5't0' 18'-6"i a-0 4E" _ • 9'_ 9 5 T'.2 SA4 �,111't I14'.4"�B.01 B -B 2s'.p.•_. B.0 •SEE OHEET 3 - - _ -- EET 1 OF 3 838A01 SHEET 1 W 3 838.01 r5 4F..'... NOTE' THE SEGMENT OF1 TO THE NORTH wEsr CORNER OF WAYNE WEST HAS BEEN REMOVED. THE REMAINING PORTION OF THE PIPE RUN SHALL REMAIN THE SAME. 1 AD AREA DRAIN Cf CURB INLET CU CULVERT HW HEADWALL JB JUNCTION BOX MH MANHOLE TW TAILWAli I • J r STEEL FENCE : Z Ph POST (TYP-) O ._�TRE+M ENO OFF L) 1 � STORM � E - �� � OVETiFLCAY � Z O Q : v IZI.I WASHED STONE: L,T At --1/3 PIPE O ACROSS PIPE .KEY AR DIETER • W 4 � a a d W N N • o a I� Ll--NARDWnRE ILIN A. • _ UPSTREAM END Or STORM DRAIN •- OVEERFICW • O O 1 /3 PIPE • L CIINTTER • gg��RY BOTTgI �l z J >' OF PLYvm°n - • O W � • .L J ALL PABRAILY COMPLETED STORM DRAINS ...�� 3/-' E-gPKINI RYM000 91ALL BE PROTECTED AT THE END OF EACH • N_: �' "�. 7 DAY IN ACLOR D MICE OATH THESE DETAILS • STONE FILTER OR PLYWOOD INLET PROTECTION N T.S. • • • 5.4E • • C • W CONCRETE BLOQ( • carnfv.,w,c.� OEWATEWNc i : " i I LAY ONE RI.00JC Oft EACH SIDE OF THE STRUCTURE ON [iJ ITS Sim ON TINE BOTTOM NOW TO AGLOW POOL DRAINAGE. NE FOUNDATION SHOULD BE EXCAVATED AT LEAST 2 INCH • - O BELOW THE CREST OF THE sTORM DRAIN. PLACE THE • BOSOM ROW OF THE BLOCK AGAINST THE THE EDGE Or THE Q S STORM DRAWN FOR LATERAL SUPPORT NUS TO AVOID O A O Z WASHOUTS WET} OVERFLOW 0CA2.HRS R NEEDED. GIVE �R2 - . -Tl -~ • I� O LATERAL SUPPORT TO SUBSEQUENT ROWS. BY PLAONG b14 WOOD STJOS THROUGH BLOCK OPENINCS CAREFULLY HIT • v CLOTH OfV HARDWARE CLOOR COAR.EBI_E- _ j]• ` a 2. ARE MESH WITH 1/21 CPENEIG OVER ALL III �- �- • ` / U OPEMNO TO HOLD CA -EL IN PLACE -� • r 3. USE CI.EM ORAVEL-3/h TO 1/2-INCH N OINALTER. Z PLACED Z C MTiR BELOW THE rOP OF 91001H rt TQ O A OR EVEN `� ~~� • GFIADE- DOT $57 WAy1EO STONE IS REWO M iDRIDED. �O (1 �y- -- APZ z cz 2-, MOP& GRAVEL FILTER • � '� • • �! 111 TEMPORARY SFBNARE SCREEN ENT I • POO • OEWATERLNO F- < W t ll1 2 Ed 11NN. 1 • of Of 2'MAX NEI 'S __ • IIIJ 1--i (D • Q • N SEDWi.-7= • v • BLOCK AND GRAVEL DROP INLET PROTECTION • N.T.S • 5.4K GENERAL NOTES: CHAMFER ALL CORNERS 1" OR HAVE A RADIUS OF 1". PLACE 2 86 "Y" BARS IN THE TOP OF ALL ENDWALL FOR PIPE CULVERTS 42" AND OVER WITH A MINIMUM OF 3" COVER AND A LENGTH OF 6" LESS THAN ENDWALL LENGTH, CONSTRUCT BOTTOM SLAB WITH FORMS. DO NOT INTERPRET WALL THICKNESS {T) SHOWN FOR THE THICKNESS ACCEPTABLE, BUT IS USED IN COMPUTING ENOWALL QUANTITIES. WHEN THE CONTRACTOR ELECTS TO USE A CONSTRUCTION JOINT AT THE BOTTOM OF THE PIPE, PLACE BAR "X" DOWELS IN THE BASE AS SHOWN ON PLANS. SPACE BARS APPROXIMATELY ON 12" CENTERS UNLESS OTHERWISE DIRECTED BY THE ENGINEER. WHEN THE CONTRACTOR ELECTS TO USE A CONSTRUCTION JOINT AT THE BOTTOM OF THE PIPE AND POUR THE BASE SEPARATELY LEAVE THE POUR ROUGH. USE CLASS "B" CONCRETE. 4 NOTE: ENDWALL LENGTHS SPECIFIED ON UTILITY PLAN • • • : • • r • O > CIE/ � c • �Q • .c G 1 • Z • • .T V ' • ca L ^ � L • : • : r(ir � Y F • • • N O e3a.D1 5.4N: fN� Q GRADING & EROSION CONTROL DETAILS * • ,o- _ • .,l ,I .. L .i .••1: . 1 ''I M1'71�. Vi .✓i ..I I' , I ��' t., ',V 11 6'iC ,6llt. ti4: -'d«:!2 bGb i; SO%Z! \ i 0. X U o g 0 n i F / i -'4 /\/> m 00 4/ " a C+1 w i1 r t� (p G C1 Z m �q N. N N < Z 2 O O z Z Z ml II II � (m)m A I ODN t �-O �Wo > I F+S\ S r- /Oi/ p vv�vOv O I ri OzCC) �uK < ME _ i II L0 II <K} r� 1 � 4N t i O f� BY. D� o/ CUO I U� 3 Q m I 2l � 04 ZnSp:2(� DB 710 PG 910` I / per»d s1ofe5 eroded - StVeral p1(,,Mes orb / NORTH f3c+- r3uadinp are jn(Clo- con5fY Vc>Soh .in(;Ifrzkcn v'ea l5 R;j(5hed. \ Vey 01 f-a. - h0 9✓2ecfed t ea-ance . •PROJECT N0. •REVISIONS hayes I howell GARTF.R 7 CCYYUN17Y G®LL � � 100032 Il n p�1 71 0�I5 4 RFwN0 X A71 0 5 •CHECKED BY P R O F E S S I O N A L A S S O C I A T I O N A�J;) RPL •DRAWN BY ARCHITECTS *DRAWN 1 3 S WEST CON NECTI CUT A V E. NORTH CAROLINA SOUTH ERN PINES NORTH CA ROLI NA 28387 MOREHEAD CITY 16 AUG. 02 • CONSULTANTS n STEWART ENGINEERING INC PO Box 12054 RTR NC 27709 Tel. 919.380.8750 Fax 919.380.8752 opooax� NI aoo...a mm.Em. memp mmmm. pl., PF..n•..m+w�em P.pPw q s.wi EreF..nm, Im ry Ep en bYin�iP apauFvxl wMw plmGm Y wL� �s. Tay se mE}F M agflpM d [U� goq.ly lYfl lea m0 eM nneF Ma PPM ✓� dEl. 11ry vp mA b M vylep, mbR4 a tlmpN N viY nor MpMgnr mr a W drb b e MMU pgryxlYUApVwlb� PmbM W dbxp� Erptlmlrq.Inc EOP Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y 4 - } ------------ T. ICBB __� _-. __ - . ri'il1 O•' aC i` I s. • x _ r. r„ f T r , t < U45 - • I842aC i , y i v4� • , Z V.21.'38tC 0 6 y' O I ; L.ea 0.015ac w r j �.• _ a�T rlu f J ;r . NeH�iz' x • ,h i • • - a 3 III ;; � : _ r, ,., Ill Q r � 1, ' " -_._ .. _ °� • � t : F 0.173ac x 2 x :s ?,. „, / ? fir, / E.,':d?d �' • ZONE C M1" �• - — _ - 41 ZONE g _ _ - . � _ �,•�• _� �� � � � i.=-' 1G„i � '� � _ -� i `� • t.•' 1r9 _ ti — .. boy i I •. I - - ZONE 13 r .-._.,. __ ... j. ONE A6 (EL 7} - - - _- ... :..._. - _..__... ,.. � � � • • � � n ^j a /f_ m l a { dr.'S`'.. w,'' : n ' sc� j ` �:"=�,'' tt' - - : i • P'1 fl We < t __ A • a u Z - A. r ... �'. ..:'� -4'i.`�-h,..Y..� f.'.. °Tu'b.i!.."s.,s.r > 7 1..:,;Y. -. _ x.W., „.,.......-._ _.-.- ,. O • w �` • � I 8 0 no ! N • • • GRAPHIC SCALE 40 A • N •► • + a • (awar} • 0 i; 1 in" -as R i m STORMWATER DRAINAGE PLAN PHASE I ' •TOTAL v •: Y v V v ,�eo )� go p/ h' i ZONE Afi - _. -- - - — In -- r a u. • • • • • • • • • • • • • • • • • • 1 • • - • 1 • I • • • y gg �`I • • _ c7 LU w Z �1E � I • a J V lit a .z� :z 1 ,Ei r • • • f • M • • • V7 0 • • U1 d' • • • �i • • • O } z m � , o m • WM U 3 asg L o • • • • Ip • • • • • • • ku •V if i • W • • • JO• 4 q r f 1, '• 94,\ 9 • •+Yy � • 0U�� • N • < FT • Z • ON • Z U W �O \ 0 2 'w • ?U�a • > N NZ O • W• • 4 iI •cd0 a ^0 • -N • • • GRAPHIC SCALE : • O l !m• � A IL • ` i STORMWATER DRAINAGE PLAN PHASE 1 • 0TOTAL . � rf 2 0 a oy=D 1 .1 0 Cll T o (� m m20-u z V D n m m ) r'. z. m r n I O O z'z M Fl) m I W m r V I 01 co L 1 N0V 2003 a I O O � m � n ••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••• • PROJECT NO. • REVISIONS y ha es howell CART R 7 C®tvl44L 177 � (S®LL 100032 D -1�1- 9 AC%;) 171 CN5 4RE O A71 CN5 •CHECKED BY P R O F E S S I O N A L A S S O C I AT I O N RPL 1� ARCHITE CTS *DRAWN BY 1 3 5 WE: S T CON NECTI CUT A V E. VJC/LEE 16 AUG 02 SOUTHERN PINES NORTH CA ROLI NA 28387 MOREHEAD CITY, NORTH CAROLINA • CONSULTANTS STEWART ENGINEERING INC 8 a PO Box 12054 NC 2 m � Te1. 919.380.87W Fax Fax 919.390.870.8752 amoz rn amm.n s mwMew. u.iwna mnper nx, a..iw ..0 wm�m em.:.a M sr..i rnne.n,n, i nc. Isele�s Y.wewaaV^>Me0.eee�xMmgniXFM]Hrmftim llvYana�t{clbmy�i�l0.msV�bfiiMYx1 eM Y:elmeln Nepopp1yv19EI.Tq bbmb],mtllleyatl:atgq FenYeenn�Mes-nwm��b a Mro wM rew aor r,m paeeano a s�r...n sro•eena. m� V F- tu w z z w CL �� d 0 tLl Z N U]W 6 Z O ZWnn i p Z V w th th w OzZm i m � lu W � -' O O UvJ d v � lU d d ILA z � z 11 v KI < ju � � � 0 ILI z-um O tY r Cl) (V- z w w w i O z O z°O � �z ttuu� IL ZAZ t ^` _ w-�„ op� a z oos Co lu tu � ® T lu vo to Q flu ul Z Z<�6 tl1�Wo t— was Z tU -S �zzzm w t=- 0 -. dzZ JU } MR LULU z r -r0 ks) z LU��p w �OLCLd D —_ ���, � LUW QLzzZ z T-2 — WWQOOW O �Q-Q-__U p ' ' W W << (3OZ O zzolf� =z -- �fl EddQQzILW00< IWW -J -A[Yd O[LtLrL[LIZzwwWCZ�n � zz Q�� LU-'ww`�� ���<Q����zz3W��Zz ���LUWOJ�zQ<cz pW<d woo��n�»�����»fin — N—cvm-cvm-cvm_cymd: 0==cvcvcvmmcri�t�td UiUnLnUn_ vuvvvvvvuvvvvvvv� o= o O J)-4 0 �_ O m ➢ O O x O = O C �(� m —I �---�`.'J m r 4 f-- ---- I I o � n OD O .9 m C-rn \� r ��:uv � Q \ \SS\� C7 O� 4f, ,S 0 S" SS �\ 7BFR (�CqT S a Oo / n Q� p� O < W OF 6 \ ° (] COP 7NF W Eop ''' C ONOO W v i � zcoXO O � w- < z x \. 'M - M } M 30 Y 3 I CONCRETE PgRKING W W x ro "PVC 1 m O ` %:jII CAC0 W Fop 5' 2 PVC �� r 0) _ W o - W_ Posse I `" — w_ ' — o v v I / �.1 v w- I n � IJJJ ONOO rn v o 0 r-k. �n-w---w--- � O ��� C, zm M— -M- w=M= W=--w---W-- 3 x I c» M---M -M-� _0 m O F O 3 \ m i 0l3 On vo3` RAMP r ~�^ I� L v I 5S" 1 - Q < Lt' J n i 5t 3 I \ I I 52.68 - - '_ _ 76.iJ 7 F` Tl z 9D i \ s } - P II�1 ( �0 Qz� 0 "T (I LI f roe m b p I �� d 11 �� I a�gtico I ��• U ;u< m �co oo � Q G O tI1 I I G � --w'�— \ DzD rrI yps - � r) O 4 ur ( �d ;- O xz m v 0 --I O T F C7CD- f7l <O a v7 S'06' 1 a' 14" o T c> o I m y v� j1 m_ ca W C FrI m 0 3 ➢ mH �. 51.04 m -- r zFFZ A z I �, 4� j ,oD� �i_ 0 �. I-- I i I 3niaa 1lVHdsV �ti I�. ' • v � N2 S mm 7 r 1 U T' �l� ➢ A ➢ 70 ,�{`� o 0 el .. 'O A. A� V� A�✓>� < y I fTl L IiI � (� O �� ➢mroOam 7 � Oo J OJNOO m O �7C m ➢°) mm0 z0➢ DO ( m000 >_z ` -FOc ZHc 1>0 O A, _ -u sti', �DO zyr z zm v�� < �zo z O r zv m �� 0'm z_ c L ONO 0 A� Aso, m�>� Q ,� o 0 �^'0 ) 7 -G�0 rJ I cc)I \SDISO 3 mm \ iocz z�vz � 0 a o 7— S r A �A �VJe a ZZ .Z7 CO m O N ! '`•. 1 rn dwVa lVi3w 3gI80 —s c 2 HODO 1lbHdSV m < O O 00 //OsO� ZOO CO n�q x —SS__— S_ j/yJ V. • � CTJ C3 / os ' d�� .. — I i O o _ > ➢ ° N u ONd.,B i-0n I J s5 S : '�-"` x x x II 0rn II fTl �' vm ➢ m< IT, CD�. 1 <m�x gr x ;) C7C 1 N u z 0 I I o V �.d � / o y0 Q7 �._. �.' 'I z II / r➢'� x tIn ND I- z ` N 2,yIl {9 m N Jt t - 0 V f / I cc W r71 O O I o o. / cb jI v 00o n c3) z b o 2 zOorn rnoS Q' 0-1 UuII/m w o m z , I O m o/ O+ � z U f7 I �. 0 rri n I 73 W « } (7 rn D / cn Cl N z `- �� �7 N i _, h Wpm "' -.r ➢ o o x � CO m x r iI I (ji C) I + �x -u t' x o� � CIDx ➢-' z �, I � oW< of I z O C7m o ;<xT� \ x x __... � cn o �K x 1 ,�- a \l t x \ =Goocf) L G�� 7 C0� — 0 iGA� x T k p _r ` v -0 o O A O r C DRAINgGE FLUME r S C mZ x o�C z z i �I 1i ` z y Co Cm x Lzz� s �Q _� ll cC x —i —1 z r F y 00 n o m I' \ z.l ti� o i t oCID i < 0m ,If 19 O x r � _ CN LINK FENCE 3H0 —�f� m xC r o 1 T r*I S05'�7'57., • o i c F ..� � cc) W m 00 we Y > x m o�v y W �� r z z G' C� c -a rn � T D � G r� I G-<, D D ono ' ire Z [• �sA C �nmZE T Oy yy Z 1 .c �,.O 1 ! c x !1' 1�; y� C) - 9< T C r �':� o x _ �i o O - I c- �' �FifJ �"v,1 `- -T-1 I -0 D ly <° I� ` �-- ---__ ` `_.__`'--.` 0 O o z C� I a $} BRICK WgLK I ( s o 01 j CmM A� I rh s > I }, zzx o, N V �� W 0_-i-- (bCZ 74.67 C)v' z y� O m O O Z �� U m X r O O m R ±q k'L- 4 C> - -M-_ 4 4V D �� z zr- i c m �G� GUY M M _ _ _M S08°46'97��- _ z m _� � 1— m 8'PVC W Ndg 39'05^E c �_ Q< < z x 30.72 rn 98 NOOp — BROKEN �A1P C7 I n No C� 0< -M _ �M _ ASP LT e` m H HA, 20 vo> OEM`-M-,_MEOP� ' aUN M z <\ � C O o> > cf) d- L m(�= *A-i-imowr-TTomzmowmmmr OO�K�rnr?'OM�G�W W �2'0 �1 .TA1��, N Or--<D>DOmm<mA0ODmDODgxXX) m . Qmjm=,-4=<�mrrIo Z�OZZ Z= ooi<K�93K9 MT OX 00 ---1 A��i DH <MMTO Im 1— x 0=00\plc( m m-or x o�z �zl NmAOAm mD0 (J). m -i��m� %OmZ :g r' cn cn c/) D (n m� rri co r zm N ZDJ Zn*�z XM-<A� M V i W (O (N OD W V (W O N — N — N O O O O O N O 00 U (O (r 0 0 3 <O �Zo mm 2 pO_p pO_p ro Nm X Z ODD m�, Om o m Z c� m A=1-➢C A4 Dec W tm�y- O O Km C z �Dm 0 In X ((n m r-= m m O(Nm -n m OO XO z �D 1- o mo1 mm CO m o o 0 n CP < W Z W o � 3 ➢ z z c; CO r A Z r Z m z O z D m 0 NON X to "xa D� tjzo N 0 8"�o O c,x �~-32 C� o Dc�� y N� A „a+ ➢ m z x=o CA CA C)�� O ~�O z L J C'] v) ('Z pa rrl�n {;u I mZ m` W m 0 N 5 x rrI ( o o m x Cyr II M OOD O m O O N m D C� O H O O O v` rt v c T\ m O O mD r N m m m r V l 1 DB 710 PG 910� NORTH • PROJECT NO. • REVISIONS • CONSULTANTS • 100032 ha es howell � �I K I C® ,MuN1I-T (� 1 fie ®N5 I$ RENOVATIONS • CHECKED EY a RPL ® P R O F E S S I CD IN L AS S O C I A T I <:)A�� N ARCHITE CTS *DRAWN BY VJC/LEE 3 5 W E S T CON NECTI CUT A V E. MOREHEAD CITY NORTH CAROLINA 16 AUG. 02 SOUTHERN PINES NORTH CA ROLI NA 26387 '�. r m STEWART ENGINEERING INC hbwb PO Box 12054 Fu NC 27709 � 7e1. 918.380.8750 Fax 918.380.8780.8752 oms. ai aowrnro a mwn.vaa imwm �:w:� nr a:..i roa..:w s.x�muvn w.wl.e W mwn aro�.nro. �z �sapwmen:•:.mmvbv'ur..:.b u:gm.arw a»a:::...e. iM �.:•I.emwrMN�ew.vw•+r�eai•.. s:a even mmalna:epµayW 5aLR2veangb[•wpee, weaee, n�wenm:rmm:mwnawevrmru•Teab . mirc wm Ma:�+� nnor..w:: wnnmwn m amwan a�tl�..na. im WJSOoo i4%, a 000pfeh{140 . I v w � w � , � M O O C m vo C C z v O W S -U O C C � (n m mC o, r O O (� 00 O •: K m o � r (,+ O Qiill<\ O fOP , 0 \\ -\ \ " �C \:\ C\\\\\\\\\\\\\\\�llllllllllllllllilllll/IIIIIIIIII11Hlllllll6 ,\\{ 0,, - �j \\p\p\\\\\� - -w , p' \ IIIIIIIIIIIIIILO ®'\\ - = / _ 1 v-IIIIII - zmA� iJZ� Of I <_�_ �� 1 O II W II II , IIIIIIIIIIIIIIII ., i NNN _�" J I' \1 } / �_ 01-3 On �� i h4 r- zr n \ _ ,� 0 `� m I 1 a D I\ { Z � x= z A --d `I 1 �- �, -- - r -I 77 -I \�\\\\\�i�i SS -0 n �, ���\\\\\\\\ y/ \S .v`'v C VAAA0v0v`\ \O\\\o00\ \\\0\Q\o0 \ \ 'n Cn `1� I \Ss y <) \ \ \\\\\\ \\\\\\o\\o\\o\°° � �\ oRo of � s \ s of///� _ 19, \\\\O\\\\® - \' �(00 \�///////// \ - 0'oT \O\\\\\\\\ 1111111 g /V / ss �1\D\\\\ /_ i - O z �� 111111 11A11\I\I1\\1111111\U C \ W Or �a'3 /////////\\\\\\ a \ ; , \SS I r 1- \ 11111111111111,1ppp111111111 IIIIIIIIIIIRIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIfllllllllllllllllllllllllll!IIIIIIIIfiF \O\\\\i\\\\/ ' °-----------____ �tilllllilflllllllllllllllllllllllllliilll i II _< e'p \R</I ( ___--_ M$IIIIIIIIIIIIIIIIIItlllllllfll O Y7 ----- Q � 0 u jf IllllI,////llllllllit / It O r' ° . ' ° - IIIIIlIl11111111N11F��I I ° e e ` > e.° '--M 3 1 r -,y ° e °e � F� M I e e 9 4 e ° p ��=�__: - .. ° e. a e° e " ,. °�. 0 I I W d: n O � IIIIIIiIIIIIIIfIiIIIIIiIIIIIIIIIIIiI11111 1 I e . e .. q •° e s r e0.. r °°, ..° m ° ° ° e ° O 5 ' ,t ..°`. . lip °� � n Q . °. ON00 e n: ° o ° ° rP -1 I Rl ro D z e>. a ..: // E1 1 1 e . T. -° : e M - - M - - W --- ,� . - • ///0, 1 S,, p M - . � I Tt 11 / /i\: i Nas 5s'4: t //, I I e- m '`� _,.1 �F ////////////� I °... . ` i,- III II e ° 5 $ g I o un c� .& , z - m ! -i I © .. O < � ,dL n I o l_I I I s ° °:, 1� es F. V! II yk ` 0 8�1 z I - I / I -I II I— ° _ ° a9- __ ° ® Z =1 c0 o < i ti O I _ ° e ,. f �, O> 11 AIIIIIA I 1 # v , ® I - t r J 01 b \� 1 ; �_ 1- `,•F c., m r- O ti \O � O v , �� 0 z W _A K < Z C _ II 2 II T Nuo r rn W �D 0 N 11uurmm�nmlnruruuiriiuminiiniFOp yli lH//I1FN1l w� � r'7 °� 1/ E O ill f!l l W- \ W� < W = 2Q Q _ -0 O ° COiNOL7ti pAfi,r, l,'r ' I W- II S II =-- ". L �' I I w m - "�_ , �� _w_ -- - w_ U - w- J - w- - --w_- O O 0 O z z n � O , �I I� r it V :, o �� o f ' ,I 0 ---.__� " . �I RAMP I �f �� i_� 0���� pro m' T'C, \I (n co o r-z,o n > v = M z v �, "I j 7 C> I L . \ C5 , o m C � / I C7 i ���1 HO110 �� - v oz r 9i1111 , I "" I 7 � I ° e O rn n t', - e' C e ms ' k ° -:° . - .. 1: _ �S'J�`p c °' 7 71 _ I °' o. e . o n - z_1 e V �,i �� e°- _ - n ' _ _ _ , l,' ,,, �', Z n C7 °° �` d Q _ = v �.� �, I - e' e p ° ° . LD Z ° , ° . � . 111 S ` 7 . - - -r� $.I _ - - ° _ ° 'e 6 m e' ..-e e '° ° a 1' - �� J A'1 `)7.�4 -� _ �Z -i --i� II II zI> I �, '� ° I° e e °s ° ��' v.AA\ _ _l / / 1 n- A`�_ v, v' I _ ` - e y�,, _ d .. i 1 /// /// 3Af� 0 11VHdSV v N2" / _ -- J A I I n I °////// '- r L .. �. r IIIIIUtAlllllllllllllli/i / � �� z k' o/glfii)Uiil,lillNJltlllUllfNrIH1111111IiIfilN111i(iHllilpl;{IifH)Ilr`ILi11111LrpiYl� QAAAvvvv / ��i�i , r I;: �� 1) s�� vv - -- - - - -- I t \ - "�` DIS 1�✓7/�" I �i 0\\\\\ T 1NI1A1111111111111H11111117F1111fNIH11111111111111tIlYll111111111)14111111INIlN tiolIf�IIdill I1 N11flFt1111AIDII111fl11itlwillli{1111H�11{TNIIffiIlifitililliltl{ : //Oj - o 1 C E D m -0 f\ , �Z r' , \S /i/// o ( 0 4 2gSr % O m v - �' �; r (U O r C1 / n m - /,- . '-0 �' A 2* Z . .v - �. __ I I •mz �� N � I /` %' I I ��* -1 ///, �vSX r�*�� v<m I I ' ��' - 0 0 v� * A O m r m I �-_ O 9 O r 1`0 v �mv OHO D I' %� : ym Cut 0 O A. r N 0 X �2< ��x m —I I M I = y, :��o. `t D Z D D ODD` 1 J' -� / -`-� m0 z r yz �'J m ti .I � _ x<W -1 mnr �mv vv = j `p x m Z n z m o- O _ f' /� ', "-_ � -� z D z - m Z I o < i I RtItRi i ltit1ltllilifltltl im IIiR11RRIIIIIH1114tllllltllil11RnR1iliiillltp" / v n z- c o D p o , ., ,, ,, nRtNlNll{Itllln I{tH1Nt11IIH1R11 IlIII1RfNtHlllllllll111RIIIIIIIRI111111111R 1_i 1 11 n l r \ 0 0 2 g ` A C 0 m 0 C>I> II m r , 1 . `' - _� jN00 _ � m g/// /////I/ NXOO Z;0 �D _ II Z 'I I O �. I :�v. .v y,� T o _c m � A _ Do���^ cmil� c➢imW ,, ( . I \ \ Qz= M n t is - \ x D ^ ] N n_ y9y CC 9 Opmz uz 0' z 3H0 r o cD� �0 x � _ CO c v o-O �_ s z vmm-0 OZ mZI> 0 I v? _ i v � z-) o 1- � 0 0 � `O � f� � �IIIIIIHIIIi� v O z m m r - v 3 ON00, SDI v' m^ x o- m A v f x z I SD AI11t111111U 11HIII 11 z z - v `� rTDI Z 67 0 n r�11 2 � 0 Z �i % � iCl i � I \ \ ` � � j` `30 � c� , O O U7 ,x...'.; _ - _ (� y = oWo (A0O OS T> rm \ \� D jl Q ' 9zZ , __ i A i �D �� i ...., i_ x� m mU $I II m ( I �v< w- "\1 m m In _ SOS d,D,6 "0l- � I I I � u _� _ - 1 M, w r QS I :` \ 3AIb4 1lVHdSb dWV21 �Vl3v SDI HO110 O / a n i i oJ i Z / 0��$ a� <D SS - OAdg ( \ f\ �_o - Q.i`C I __ � S i' r V IIIIIIIIiI � r� . 'I �:' I N �W _ / r,, rDa 0 7OO C 1 N / _ _. v a i , ', o zn t' o f �( -u 0 i it ti N W r q In -I e Vv �p `I 2 I 0 n � �� � o / t C4 M �� Q I o J 8 'iy Av `e I A ° coo i>r / Cb N °� �" i - vv � I I I I I I I I Q _ i \ : 1 - Q a $ - <0 ., �v. D D �vwr�M X v �� , a n�� m e I Dprnz � a ADOm D(mjl II i.�i OD Z C) O A 6 A p / -{�---11 / o t g` i o>Ox �o y�z orn I iv v�� �'z / ��- Dz .I`` v o I ozm mzv_I; o D.) 1 V v, r 47 f_ Dui 30z;S1C �m v o- 1m ,,�Do Ou iv,,vv D / p� I m c v 4 DNZ m N D d O O 11 n n 11 „ 0- C7 C- V �-' p / CS j Z r ! r - OIWr1m oDm � 43 434( � , '• � X -0 > (- - > i I -1 o z ao o � ` C4 fl .� I 1�'IA TD.TCJ D=-umM 00 I` \ m K O\ V�a`n ' u (7 m-n-<zr mmDurn to �L m m--'.r�r- > t c 0 +�' t ''' O O m R D z 2 Z C . - I �• X r / -i, i7 > r- 00 � \ iI oz 0D OO-D m \ C) _.r�. O \ -'Mu) m '* I Z n OZ 1 GAO O (n ..o o mOOxm 0 O Q> r U :n (-) ,.� ... I _ Z��y11 2 r O Z O m D i/1 U, 'z. k C7-: D--` p. oA aJ _� t -Z AA zn D r --; 11 z- O m x y D c g W O W a0 (A a) ZAAI.ID � Z C f, C7 �� � J<00� D O Q o o? D< m O o \� ��, O 11111/11/11/llllllllllllllllllllll D z 508"36 41 I y.w- �` o - I- Z g C- z z� Z r rA M O 4 _ �111180 ,a ." a 5,5 I -n m � o v c � o y --I Z __ - x - o 1- i o1III '1111i11/i/lD/i " - . , W D omA ;u NC g- fll o n a A o °r° m rl D �i ( o o ////i/// CO y - v T, � 1 Z c W z ,c -- --� :0 \�. \ 0 U z; m o ///y„ "i.. � rya D c j me m z v 2�-O 4'_p• I-1-I n n -< D o I /Iw. RAINAGE F�UM ' i o<= n il m m o 0 MIN. MIN. y C4 D \ r o() c'r' /////////,yO� Q �� CDi r� E O - _ /Z Dmz zOz(/7o� -z' rriz "C'�J/ij�,z �pz �'O 1i YJ r DA• -02il16K D < < o � I- /// z m O y A y �.. - ux O ' O / I_ r>7 mA SD mr� O Z� t.�� .a �"' �o� 1 Z ,itillllllll IIIIIIIIIIIIIIIIIIIillllllllllllllllllllli llliflllllllflllilllft�llllllllllllll//O O A rn m 0 >> o ti `1 -1 �\ U) � 4�� 1 s (`\i I D �1 l 1_ -o U r O o tR O -I r,• v� �, ////j// (I _ O Zp r=D = = TI m C I D1 ]>1 O m I m 0 O v I I Z O m D n C7 M �� o - m �A Ir9Z ➢ a)rlm � r OO 3T7 C �) 'D f // r \ Z= N n r � Z C D O (L X �'� z �! O m t, n Y 4 /////////////� i I v I _ �" m m m Cm o m Z O D m WON W � 1----_'__-�,�. \� t. =i r�- v Om 1 �� (fib 1_ C Zv z� mtn0 W M / m 0 x r i, 1 ( �_ () rn n r c TI m D O 1HIflltl1 J I_ " Z DZ W r CtdAtN LINK FENCE 3H0 $�` NAB O O �u m 00 D �2- -i '� . SOS`C"5<'W r = r I ,-O -o� D - m -1 (� C" D- j 0 I r (n ZtA � to tn� NnmW 'On TIN Dx� (/% / / SO y� COZ OO `O v_ 'ax rn -1 n' nOD' mOm' ZO` \ �. r`O a T. '> `�' -1 F= w� Oo OAro U)��� �AO s� I r--� p� O i7 _� � 1- - O O Z O v m z Z r . Z m ,-� �6 7> -A I t1 !Z v O '� rrr .� _ m -0 - ZM rV1 rzm(n _n1g O= -4 / M- o � c ' r+rZ, Z;ti -0 z =� O-Dj�� D1-D �z;CI - DAB C'G o� I q�., '� c_-l-riz' I - m oc Amno zom� c z (n �� ovn� ��z1- zmz Q � SSA �� r- �� n � IIII�{�j jllUl �- ��� �y Ilnlli -, L_- o �f�o Do�� ��Z 0 ti o _ Iv I z O / �� I�lllll ,�� - z z m m G 9 �U �I o 7 � v, c 1= z2� _" ut(^ Dn r" q �' 0 f-_- - o v. � ,2 _ f om nnv,➢ z<o O'I l v yj � O . -C oar ZAz ��� Iry ��- 9 9� �m �� fir- A ,\ z I. - p 0 Z D n Z m ,pad /,�C1� O,\/ / O vC /A,/�-� -�' G` f7_1 �ti, ' Z 1� " �� � - `k ) C ' T tr�-1, C _ ? i _ _ �' N, 1_ l v = y z = Z ? m x ���/ �� ��� o �� p �l� > . m r 0 F- I �1� l� T'llilIIUIIII IIII 111 IIIIIIIIIIIIIiIII_glllllllllllllll - I� % H1f1j�llIIIIIIIIIIIIIiI11lIIIIIIIIIIIIII IIItti111uuulllluunlld Z orb �Zc ��m �O z �, n C D _ �� n _r `�� NIIIIIIIIililHllll� r r W� - ®� ®O®�OOO��OOo®oo o®000 m CA�� D�Z� z�� D� V - m _I � -I m o o � > BRICK ELK ;: , j _ ( n m f�Tl om D m m m m m m m x m m m X pm rO 0 Illl Ill M Ill C (A/I-4Cr W mmD C -0 N = 0 ZZX `" �� KK v K K m r_< K F_� K r- K FA r- O K K K r. O = onc➢l oo„(�D oo_ N = O O m0 O O 0 0 0 0� 0 0 0� 0 y A 0 0 0 0 r �?=Im (OjlAcziF ozn 00� v, ')C. O -C+d�n i1 - .__ < G 0 G m<< p n< G< << G r 0<<< G D ('''I o v (� ! - m m �m X m m�� m m m G) m m m� V) X Z m m m m -I 3 ZzZO Dr-oA zzz � m--1 l i1�00 z.� r c � 1 1 X X nN X➢ m X X X G X X X i-. X X X O Z Zv1?p mn�� (=T70(n m - _ om G,'•Z m � _I c7 ,<,�r O V� D m O Z O c D_ n = (P. _ i" ZzT ,, �_ -�--I 00 czi p N _j � m N O * zj � - o � ; N=oo * 0 Zro'� -ro 4q W = O Dr _r z z p Z A Z Z z Z `� z z z -I g z z z jTl Dip D ��� - _� Cam '.� `1 0 0 0X 0 0 - � 0 0 0 ➢ 0 0 0 m - m 2 G� G) � � -4 Z zW -i- -imo <� rm- 6) _ ,. P < x -1 -M -M-- X - X �©z - I y Z _I Z A "� o o (n 1/15 ur A v z D m G M-_ y r SQ8`46, O7 * N m 0 O D <� m m* C x z "� -� 1 PJC t �v--A_-y_ w -1 g* z m� T m- Z z G� O n G� \ r VI n D x_q r C A -M 7"I,,, _ Z m r -I -I 0 z mDAo m nDm _m \ 6"PV - - ` 8- ' In< . \ o �� -(ni O O m '-� -➢i C z m O ao W O D xrcz �" a �_ C E P 3 �� - OS,E �m Z :U O C_ rn r_-{{ 2 Z z M r 0 C) m = ,ft - - 0. 1 ",ru ? Zt I = �..1 (7 z I� 0 n m Tl M 2 m W 0 M '1 p A r O -C ;fn1 0 � Z W� (n z OG m z 2 C - p 8 7 X � o En _ r W n 0 O-* v p m N z � m Z� v mm (n m cn = M_ BROK N f16� r - I o CD O N --(< m ➢ n A m v m- o O O n= e 0 �=�-� "M - SPN,.(l7 - m rn w m m� v D rzrl C A r T A 0 m D C n WAZA OZ �Z� _0 -0D ��� v -M E n m I �m n 0 X A D➢ < m C � 0 G z 0 n AO-o D v znr 0� Q /n i� ---M,- OP- r 71 I .� D C C z z m r .� O C p �D.l C DAms nD,7Dj 0CW U ��� VJ ' = - -A - z z rn 0 3 00 m - ® "..: - I r- m m A m 0 C ap z A m m vI � m M v = n Im D (n m v (o _ /i/iii/i/i/i/i//o/ _ �1 _ (� z m m 0 'O N -i . 0mm �C(n mZn �G �J M m r ? -M=_ O D O m rn 0 fm D (ATl Z I�1 O DOA r` O J� Q = ® //////////// r _3 'L O n O A Z G 0 m r ut z D 2 m z �1 J r _ ///////////i/ - , o _ * <2 D __4 (mTl n D O W rAr1 Uf rC1I n m n -D-I _ ""'� © /////, sT v vz 'p (n n m m n n D v o m o x my r � ' _ �= � �/iii (,: ,^ I LS> (� rn � 1�,_ g v v o �IlRilmuituuRlulllfullllullliMlliillRflilRRullllllumlllRmmmulRmllumll11111RlIRRR1 IIInlI II III m z ° I � 4 y O M m p > 1- N Z g -0 z m z vrn I n o °° _< m 0 Wmm WA X2 I m I I �— z z z o n m= o o I I I� �O%S '3,0 0 do 0 - v O Q � I o��F\ r r=n r � I � ©A �0 DLI 2nmW(nDN ul D-° -1 ow-' --IW(n- -vD00� *O- D- � <O 00Fw00 NJ u10) �Ut m.4 W ON v �Z D-i Vf� �� � � �� t0 Op V O1 U nA DW N nn() m' �Dn� �� m�� 10�(O �DCO DJ O01 ;OU 1Z0? 1W DN -I' (n DOOAOz 1: X �xf11 =mS? DO�W OAn1 0 ATI-C' n' D' O• O' D' 0 'Ommp yA (4 N , DO O' z' 000 OW ZON OJ ADo xzD' Ar' (n' m x m' =• -0 x' U% -1� V1ZA0 Oz DmOD Cr---i-VIOID- AX--I ��`( � � D�m=O () �n o� mA D �n Z m Z--{ -v30 � � m x2 z- -Cx TI O ZZZ ail C m_<Z � O m 1 Orn Vlm 1�*t (O (nm mO--I- D� �p m = Om Wom��00� WmO m CA�m (n__4 M mA z,1-lcn �r-1' =)2 0 < Gml5�D0 O� n� ym Z� mZ A O Dm DD?r-1* D� m D DA O m m D OD zo GDi D ccn c Z� DOC� =D 2Dm n(f)> �ZA DZ O� rAi� zD(rn0 Dn W� �� m DO C")mOZOf�*1D z"�D-�I (nON O.Z1Dm NI�*tr C�VI (�*iD r Cm{ZO O Zy D(D/1 IZ,1m (n OO -i 00 W_<In OZ m r OD -01 _-I r rOrir OA O -0 ��A Z DO rrOn zn (n0Z ?X0z �0o 00 (nn 00 A�ODz �Z mK Z� Z rA -I ODATiz(n0 VIED O �ZC m<c D mm O O O Am�z? O 'o X N z m �m O Am m O (� Az O n m r 00 (i D C (� -iA-1 -i00-1 �'0� -i O '<Cmi �pC�Z Dm DmmA xZ� ��D� mOj (n�r r0 cm Z m zAom 0 0A (�_ iN D o O yn MOO mz Z -i mm (n D Z �O NI .� D zZW z< A~ZO m rn A Am�� =AO iD O O� MCC WTI --Ir >c: O y_I rA0n2(n0 ry. "� Ill �n1 AOm� �AAO -iD �m O m G)r�AZ Z �7� rrlr n� 0 DO VI Z Z� zN�rA m� O W mz m z W m mz C0 r z ➢= m O� mr" OA OAD 0 DOA 20 2m (nnM An D0 D� .�..I --(< -i Ili+ -< I Vf '0 - O A z O --II ZOZ RINZm�Z" OGDZ r�Z O DVI rT.nOA �- �n �7 m nOZ20 O 2y z� Z� m 0D 1 Z DZ -uo;o 0A N 00 O 0� � R V)2 Wy SDI➢' O CO AmA(A D ZW"I •_I• Vlp nA= \ = RIO -rl=(n .mO0 f*1Z 00 m fO 0nA0g On _i WC— ACz XQ�y ;[0 �� X � ZII�O�� m mrr- mtNT1 -in n r�i O O (r-0 MZm- > � 2 p D A A � Z m �C Z-i (j U nor �1 '0Z -I (nmx CZ c00 O��TI O'(D 20 D Am AO-0 ;0 Z mO (Zj o2?ZD� ?.Tm1Zp Z (A*1W2 CCAO C AC pm,1�' Or Z y 11��2(mn r Zm m0 n? Omz O ITI On .'LOI ZIA*)O A(n n m 2 ;0� z A n m mZ Dn Z ��� O �N j=<n -0O DnC rAOA OOD A5 m F? =A� . Z� n0 r mA D m 2 "��W Sn� min pV) G) r n=SmO my z �m z C N� ��m m➢ O D mx w G� O Zi O n O r rmfD' _'1 O-D(-DiD .T�Im �D�'I-1 Zrmm m0- Om TI Z0 m �' ", D67 2nC0rr mA(A0 Z Oyu ZDOm WOOr D 1Ti (,i C D 0C m �0 _ O� rD D �0 OI- Z 0 m OD (m*) D X) �m GZ Or (n mW r O� C' U10D� �mZ mA m D �= r �W nz r l,,.y.'.c -1 rZ�OmN (0/IDZ O �m2 DOD<Il Z7 >MZI�. ➢r ;D r Ozm02 �m Zm ;0 =m Z nZ CZO cr z xl �r y 0A D fA*1An � 1m n Zr 1<*1 Dm-Di �Z mr-L �- A rD nm� OW V) -D-.I� fT1 Vl r- Z W' (A - Z �1 �1 C A s .i01 V) D O O o D m i i8 �_j , r= (/)O ?7 0-A nm m • A (ny ('0 r ?� -i O A A ^ m D x �-1 (n mW _< m Z W - m X Km0 � AEI -M Z 0T. (n0 D�IT1 vI mz '0 O OD -ziD� D_ vOC ZVl \- -<D -� mZZuO m Om nN C ODDm Dz m m NO�n Ci O'i m L `Li (n -I m - m vm O Vi OW O D m DDZ Zr m 00 W D r0 C0 �Z Dn Z4� Azm m (nC wE,�� ✓ r. ;aA mDr D m '-'I = g 2 .j x 0r OA m z z z -_I -{ O u) C -Z VIW v x r (nr mCO.Z7rr 0 r (ii A� o0Z0 4ir�A -0 U) m w xZm0 u) Am O m O x0 m r DmC -iZ T7 Z %� ZS ci Om f0*7 .Z�1 r0 '< 1_' Zx �Z Vlr D Om DOn z rz W < < -I- O N n � D r r D m z'n Or- TIn1A< DN Or (GTI CrO� �03 (n 0-ImZ < A m m -I Om C---1IO O(n Z OZ Z D m 0 m 2 O A O Z - D (nm Z �D A _IO ) , 0� Dm _ F y'1.•� '0 W D -I N i O O Z z° ➢ n Z7 VI C ;U V) m ...I r m m p Z r7 -I (!1 D z (/) M m C � n -1 Z -i ='.'I W O (n a m 3 n -I X O D n 1 "_"'\ "�^i DAm ZDy- X -1Z;u DZl z�00 mmAm 0� O C x X>Z-I OD O mm m 00 mz0 m> r D �y r O (� A �zn OZ m2mn _I=,) �� mm�0 -OD � = Z.ZO) OmD rD-n �p 1 - f ;�,,--; ,,.,ara•. -I z p m m O n p A :0 (n (� '0 W D v) n v :0 -I v -( m ao m A �_, y) - z z m O (� m D m D A A N D D O i] m 1 - I Dz Zzm O n_1 m-0 nn�- <= ;UC m W r ~ C mO O O "< O I'�10 O Dm G) O Dr r D Z A 2 O ,ZCjDO Z Mz TJ -1A �r x(n �1z r� OV) Z O 1 - �;� �n V) An ODx mr-� y-+ DO n m 0 n Zy _7 m z 2 -I O 2z`r DDW O{ n DO n00 m nu) <Z I = _. -1 "02DO-�{C Crrm D(A m0-0 oor,0 ➢m .Tl m W �AN� r 0�0 Z C DZ WO 17 Wm O m W^ Z O n0 m-< ",7 `< m Z D — rrr—> -zi=-0-ir,0/) OA �ZDn AvrW �� r n m D(ACZ r Wz -4 m Z 00 �n O�O DTI O r �O -I ;u � Vl W n Ocuz 0 ��Dz �D m0 ACf�*lr r�� 2p > O(A ��� -( o� 0C rm nrAAZm _V1 2 r� �(/)m �-< O 0 2n � r A O (T1Z 1 . 0 OVI� =A � O O D V1 TI m- O m A z mC--I 0 n n 0 O �D D .. Z 2 C ;U D WZ 0 =Z<D -pr gm VI A (n e r y z o m Vln W 1 I ( I I I I I I I �O CIWTI�O=-I AC=-0 mums SONS-(ni�mm mm � 0 Z m1— O �p -i 1 A n ZA (1) z� 0 m zD m r Z -� m AAc> �m mOmZ r�n0 02 Z `;0M X:EM �z -0 -4 �.X Z 2.��J m N r m m m M m m m m� (n-a Mo 2A ;O �r mm DCO� zA m Z m m(/) m O O -I 00 D W Or 0 yr O O O m ;(1 zm Xm Om �m vI D� 2 r x vlm0 r C x D R X - XN X x X - m� �ZDr Wx mNrD 67 --IA Cmi�(mT Ir-rr0 mn O D Z A �7 O Or mz �D r K D A 00 m 00 OO Zm�O A m1 COmm� �r0 N2 z mO DOS m _i n _I O W o ;l7- W ��D� O ut O N DZl m DD O D Z O -*1 A Am0 Rl ._ID mzZD z :0 rA`tz O �1 mm VI (1)C r z r o r-� -zl -i _-i -_I In Z Z O r r 0 TI -I O D f l O O D ;v A W O D O ;T7 (n UI f VI (n (n - to O - r -Wi 1 C r D 0 � _ -1 m D m CC O j O Z D = z m Z m N S m• -'I r W - 47 O z z z O G') G7 G7 rr` 00 rr-IDzpm >;umm Am DrOO Omz(n n� -i X S.ZCI A� ( �Z rD- � = m C> NOo Zm �A N Z 1mT1 z .TJ (/� O mOG�r Z m -in n.;0 AmO -0n `1 -I-Iz rx0 N W MZ m D m D -4 Iz0 Z 1 Am 0 OK X ;u u m m m W r r 0 rl .< v -I r 0 Z z 0= O 0 0 i m (n m O 1 O r D 0 K y u u) D U) z (n -- m -I :LI r 0 O u) n W r- D" m zD D-�O K;0 (7 z m - O AA (1 2 n r c M TIC �mN D D0 Z Z � =mC 2 Zc 0(A Vlmx mG)D D Zl mr m r m n A m -o-I W ut O 0 m10T1 nvOO;OA �zDA iD OW(n- O`�nID- W x r z-ImD_ C mD C 0 r m D ZA -00> ZD ➢ Z -+ n m Di 1� -m �r-� c xm O m n % Z(ziI Dn r;u n z = .- n Z m m r ry A cz7 n O mm O m -<m 00(n D2 ZmIOZ '1�Or m 2 On (nDOz 0 nX m o A �m r-mW 5� N 5� D o m m z� Dn per 2 (f) -tm<D ,ZOjZZ !nA m n0 DWm =1 D O- m -I x Z D G) T7 -� m O -I !n r� Gi O m -I '� z m 0 r .. m 0 N -c D A A Z gC (n�ANm; O�Dm Ar C(n0 OmAW nA m =� D (n-I<� O OD C n Z im DOnI G)Z 0T7 Z -D-I A ��0 zz y(nD O fA mCm-1 -( n D OW m m (n n mr .� O- r D 1m m r x m (�mm A m xOOn O ul C Z 000 z O m M 0 �b c o : 0 M Q C-' � pm�vxm �O�A z zoom 2vz =o >00m z n- D O --i =m vTm =D =Z A o r x�m �'n- 0r-�A -I Om c mo0 1 r � - o zm �'z _ O -i m m LTJ ri0 CxD(yT-�1 -Im r- m A r m -I ,'1 m r0 N z -i z A A _0 v 0r OD r O m A 0D� C 0 A nmmD ('') O 0 yr 0C fWr n A m O O q n �. -I ON O- Am m 1Cr� O O r0D m C D � (n ;0 AD. C Cr r 0 D O C� DO AO X-n 0OAr m2 z mn -Imm m O Z 11 pv (�i W W W O 0 = OZ woo r=.1�r=nr W'T1-V-flImmm �Af-I*1 <0< -Ip (� D f�*1 W�On (Zj VI OA `L 0 C A (''1 N{ 0n^D W;u u)0 W 3 � � 1 :TwT> mo (nD� (n A ���y zmfATl O -1 2�O X z L7m Ooy m Z m m W W O m0 O�ZZA� --imm0 NA fTtp=Z AA�m O� O r A mOZ� 0 C A 0 n A -O �A" wO wD m D O m ln�D DZ m� = O DOOv .. O m0 O m m cm 1--I W �-. A-0 Z ;C1 - 1 z Z m (n D UI � _q n z A m 2 D D 0 g0 m W 2 Z c r0 '*1 l v ;Il A (A*1 .0 m m W d rZ mW O= A vA ZW 0mm ��20 VI0 �7 n �Amr'*1 L7 Z -I D `L 1 �n-ID-y-I�r'�n Dm Dm Or ;u Z m O CD O _OOc r rD �OOm �2'O z r � O(n17 D SA 1�1 M a m m m Z -< 2 -I - m '"I 0- .Z7 V) m r m y n Z O O X O m N 1• 4 (7 K m A A D 1 mmZ RIAmz C ma7 zOVID = r Diu) o> D z 0 n 00 mZ ZD OZ on m A Z 0 � O ox 2-i rn -4 � OM ),,,,;� f c < < < O m m0 2�C'00-I -i fm*7O0 D O ➢WNW m Z m Z x m Z 0 O `+l * n m V) m C z 51- m (n O 2 •Z_1m 2 = m u!N D Z O Z D r n 0 mD A D O m < rn --II Z OC Z2�0 vm � _< 0 D D n O Z) 1- 0r< O Z 0 m zm D 0 --I W rOn -i 2 D D O C"1 m m O �z m ZA(`;2 Tl m r- D O C D 10�x r = C u1 D A_<m O 00 O D (+'1 0o n_ -Z-II-0 XC mA-� xCm Z c7 mr Z -I � 0 0 O 0 f<Tl o Z� 5�. 00m Z�-iI r0 Zmr- mm�X mC AW -0 :� 0mnr r mzz f=Ii 0 D 0 MO u('�D mz m A O Z m� OAO m (nr mOr mOD \ AW .Z�_i r2r11 m {Z p O ITI `$R�DV T.02m u) O mz I- O W v- -I A r 0 (nWr Gl 4�z z = -0 0D f zDA (nD 00 mZn O D O ---1I1 W m A v 0 �Z 9 zo;u;u mmX WN rm0 D(n `30 DW Z 5 �OCW m 0=I C O ;(7 r A� yvr Dm DN (m*1 A A OD An K 2='I DZD HOC A ZO �1A (*1�j O - D AC �m o?rj 0mZ CO ran �r2� OA m m Z(n N� O m? -4 W C W �A Z D (NIIN (�/ID D (O+1 O A-f 7 n�-i D r, ZZ W m� �m2 O -( 00 O rZ �m� ZOD 2-p O n m A03 m r(n 'O lz fm _01- _ D m m N A rr,,�� n= mZ D omo mn mo my-Im O\ W Dz m A > m A Z On Z O u/) . 3 zA � r Am m O ✓_ m OAOrTIr1Z Z DO n• z t/I_A O* -< (JI Oz-rl z z A •(mJl D OOmC O O �� m 0O4m-') Z WO OZu) A�00 O r mO moo � m z -ID z00 T1D0 Oz �D� 0rm^ O . z-'IOO Z O O A O W1 C Z ZI A O m0 O N z -1 mm � mD O z Am NAZ C n DB 710 PG 910� I D -I-fin=z z n 1T1z >O> z vyi �z m -1 A D v D 1�1 = >Dr ,l r z m n =off r A> ZZm Z� (� 0 0 (n A� m v m 1 �i =O0rr1 .0r '1 m O O Z(-D m �7 mD O ZZ mZN• DITI O O �D DO0 O zv Om-m O O -i r .TI m DZZ D 3(n O <�1 0m;0 1 D � / NORTH z C'DmD Gzj;u mni --I m p �'o KDZO o -I 0 m O 0 a F A z m --I `� Z rr--�0 1- <m Ocz oz r z<n Oz 1-�+ N m m D DA o0A > 20 DpDz 2 Z D D A m m X 0 � 0 O -i m mm0 x0 N OmX m - Z N m v - m z f 0 O mO 0 N0 rF4�A r K Z 0 A m A m 1- 1 • PROJE--T NO. • REVISIONS ha es howe CART R 7 COWU'N1,�Y CCLLEe 100032 0 D p o _ �I�I®I�IC.� � �I�t® Y'�'��®I�1� •CHECKED BY P R O F E S S I O N A L - A S S O C I AT I O N RPL - ARCHITECTS •DRAWN BY a 0 VJC/LEE l 3 5 W E S T C O N N E C T I C lJ T A V E. 4 / G 1 l^ nn 0, _ u C G 11 �I NI FG Nj,l, ?T H CA ROLI NA 28387 MOREHEAD CITY, NORTH CAROLINA • CONSULTANTS STEWART ENGINEERING INC S '3 PO Box 12(154 RTP, NC 27709 It, Tel. 919.360.8750 Fax 919.380.8752 OXO1:...endecYwlWwnlMUEIN�.I..—M,-9HlatlmM .WSM.sIEnN., I. WIaNI,.wF Ma ompxbd3E 1My we nq N pMv pu wppfloapyipM6ctl,xo�COMYr�tllmw e MLEPd1•.1.,W.odMIdMMdBb 1W: �V�Inmy mervw MWuweemMsUMEb g. N `III""11/111111"", Ji ``.`aa}�.....p� '. _ c °2'� °' r z c� a N "i "_ �.�� ^�2 �� Y°.ii.eee `` J,,,, I II I {�111 %%,% I `_ I 7 .T ; I r , ___ - I __ - - I ____ f i- I � . i - , - - - , ,Z..'_ _.. -T 1- _L�T! ,��._ , � -,: f.-16 1 � �i , : , : -, � !-! �,. , , " - _1, : �t' .I ".. � a - 4 . '. ; , , � .1w;, : I .- - - �- . . � ____ ff1jdfT,1m'j ���f�fl tioc;?./V�,,�,; ; I I -F _U 0 (= c e:_ \/ T. '� T� � . \ � �� -, I 1�__) *1 ,� 11 - , , , 11 11 , -< C) \ 1. I I I- � _1` I > > -K: \ ''I 1, � c 1 - c- _� Fq \ , ,, r-- F7 U) if- 1� I - - . ---i ��u __i I " , T, � I ; , \ -1 ��, .. �5 1 1 �, , 4 � � I � t \ � , N li I 1� , ; ; , I . - 1p , 4 �\ I I . � . 0 �� � �. �� � 1, � I � , , 1� �, � Nj - � I - co ;v Z� . \ TiTTI � 0 \ � 7. � M :� = b 4 ,�, , / � I . 0 T11 ; :�- z . *1� �! , �\ 1, � i n ,� I I 11 It "I ".. 011 , I � I � I � .. 111k ". klo"� (-P ��, 'T, , , ) , , �, I I I I C, - 11 � . X, �, , OA, � , ", , - �, � , -T, C), p . � 1. :E . . . .. . , __ r 40C 1 ,,�, L" ;� o� f 4 /% 4; ,.q 1�ln , , , , - �'. (A. " �, 34 6 - . . ��, - Cf) -1 "/0"', , , � 0 0-11, - - " " \ � I r� . ,/c, , 1, "\ c) :�i 01�_ I I I � , --- / ` - , , z �, W� 61, 1 1 11�., I - 7j I I '�� , ,� � _�, � / 1 14 . � . i I I . " - I I �(14 ,T�!, ,I x . 11 I �. ��", T U_< � � �� I , 1: -_ I . � � -_ I- - I I . I �zl "I I � I I /_ V� - - W - - - yv L 1, : - �_ _____ ________ - --- ____ .-;;--- -_ N I NN - I � I \ 1� � / %\ __W_�__ I I 11 �� .. - �� . . I - W, . .. 11,,, I � I W cop) ,,, 4 X �1 __� � �� � I I * - �� 11 1. J - I . . � � . � � \1 IT I 0 (r---7- 11 � . � i - 5' 1. � ,_� W "I � � 1 I r- - _� � � 11, 11 I � W_ - W� \ � - _:nE 1. I �' � " - r,r7 I 1. - �� , � -_ % z- I , , - - � , � i � 4 -1 , ._______1 I �, "I .1 I'll , I . I , , I , '' , I W � 00 �D < -- � 0 1� - . � W . . z I -1 I ', I I I � 11 ____ - T _Z7 - - I 1. , ,.�:,�., , c� M zt I I 1� ___.P� I - I OD I �, 1 3: � I � I = 1)� . � 11 I I I I I I I W, I 11 _j 0) I z J� \ ,,. � - , , I .1 - 1, �� I I , - ) I I -N ,� � ;I I 1, I n �', " : , 11 , �,., _ � I 1 � :; , !_ . " ? � 1 � I W, n � I/ I . �� M TT , �� I �. C) I � � , I I " :611t-�, �� 0 . ,,, , � , - 11 1: it \T r�3,1: I Z I 11 F? ,; I W , � 1:3 � Ili '* I , 0 _,Y� 'If ", I T I 1, : � :1 �ni!�G ; � - - I % = �_ . . 0 A ! � " . 'I -_ I �� I . � _:� z . � , I �,� � ". � 5� � N11 \ I 1, � T11 :- -:_ � T_', � � � , � �_. -- Co- - W I ML ,,,, ..... I 1; I I 1 1 1 1 11, _-, _ I 1��, . __. ii 00018 t, � 11 I 3: � �' , I 1. � '_�_� , , I � . L _�TITI�11111.1`T,",�,TT,,,Tl :9 �_', " I -,f) - - - 'fi . � \1, I I r " � _'; , _�, � � - ,�: M p L, I - I -___jL , - - , 1�� � I , , I J_ � � 1, - W_ - ., I � 1� I I -1 - __7 � - . f � . T __ I - - I __ - 01 � - W_ ,,,, * � i I '', � , I W I � ,------- - _� � � - J." % I T, r I �� 11 I" - .*3: � i , i � I i �," I - W_ - 1 7� _____ , , I I \ A co ; I -, I -T � 11 �', * I � I I � - - � 11 - I ,� !r� �_: I I I o') - ____ , .� " I i , . I � 0 -,-,---,- 11 V I ,T � I 11 I I I � � �, W_ ��% I 1 i 'I I , : --- ,` I '�_,_,,.� K_ 1�1 � - 0 ,L (� I ni, 0 --- � -1 -1 � I I -1 I I I z �� r i K 1, "I � � � I 0 z , �� I I f", � 11 1 1 � i I -0 - 1� I I I - � � 1'��_ -) � .:T' � T X I 1\ I , , �2 0 1 I ( , :j �_ T, - - I _�� � jI !! 1 I lr� n ,-�- - 4 I I 1" :,� I I "T > I I I f- , , \ _j � I I - - - � I 11� �__' t �I i I I � _1: (PI �, T � F7 � I I \ \ I r1____ I - � � E , - : i I f 11 I I �Iu � I ! I � ." I �_,.__ � I I , T , \7 - , f IK �, - �-_ � i I , � ii 1 � - \ I I � � 1, '1� , , J, \1 I T-, I "��_"" � I 1 � , K -_ T:__ IF-,-, " �, I I , I "\ / I � z 7,,� I - I-) � "I I i i I I I I T;* I I � I * " / I : � I I , 11, i it I , ; . I , I � � ( i F-, 1. 0 1 IT, ,,� I I , -1 , \ i , , :* IT, 4 i -5: � I I . - W - - W W� I I . �= 'O - 1, I , I 11 J, \, \ ), I �� I - - _� W -, I , I I I . I I � r , 1; - - - v - 1/1 _1� � 0 1, I - jl� -\�, s,4____ ___-I 111E.111 I 1� 61- - - ___.___jF-T\ t I 0 ,- : 0 1 " \ \ I 11 \ \ ) I . , � - 9 __ I L , I I I , \ ! F 1, ___1 - �� --- _fT��-- ------I' `!,�1111 :E � � (--) -��_,_'�', -_j , �,Ji , / � I I I - -) T --- --- (� I I ; _�_ � - 1 - q i I � � -ri FT1 - Ill -�__Qr-=;�� =-= --7,m - - - - M - , I � I I I k � -9 n i I I _ - L-L I - - _��M _____ � - : i .I'--- I�T_�_ �, �� ", - , I - � _� � 4� I , ��_ ,�� - -_ _ - - I �% ! I 1, Q_ � ,� _�_77M - I :- 0 1 i,_1 I RAMP �_ �� : 35, � - - - -_ ("n !, �_Ij � I I M " I', I_ - I_ i, I . ', a: Z; " , -,-- --- __ _U ", F, \ , J' I __0 ; I . � -, �r I __ -, No,j��,,S'QQ�� -_ - I � I, I \1 � i � �. , -,--�-111--,----"---,----,---,- - I _ � \ i IT I I I ,�, IN - -_ , < L-\j V ; "' , , T � - I M , ", - , I I � .F� Z IIr � , � " T __ i760i � , f , ,!`V`!� I JZ2 , 68 -------- � - ___ . i I , I � � I ol 0 � M � 2 1 . ., I 13 _�7_ - ,_�, "I � f -_ i I I I I 0 F- ,�,:�:- ,�, - --.,- - -- - � i I", � ', I ! \, I \ i I 11 I I � Tv I Z, I'll �, T,\%, I I , '7�1 V I ��LU I I I � - . ! � � 1�1 - � I,,,,,, I !,\, I r--f - 0 11', [ I I I IT � � :" I I I i � i I / : -) , � T1, LL�] T-) 0 I I , I -.-, cl� -- � I �\ i _�F\_ 2_1�2 G I lit", - 'Z T 11 \1 '\ U! ;0 5 ; ,-, i ", -,- `1 ; . _< L, I 1 i - C-) U ; I I (1), , ;� I I I , I U i I ,11 �' \ _3� ! I , I cTJ i I I T . I � � I I I - � � I I � I L' ' 1111 111111111141111 T1 I i CD 1111�11 (7) > (:-,) � I i , � r- �- ----- - - 1. n (�A _ -_ I 0 f 'I �1� � i -11 1.� j , I , 11, - 1 00 -�) C Z I ! I 4 I I ; - _� IT ��, �,� I __ � , � C) I � � 0 T 01 \ :�s r) 1� ; i I "I I i ____ � f . - . , I � � . - N - I cf) z - ,�.�� - C�v - : ,- -- �,l I- - -11 , . -! ._1 0 F_ I -- -T1 1, ,, ! I , , I I I I < �A � - , - � , L -�� 1 7j_ F � f ; i -0 - < 0 _ 1 :7:�� - ,� � " 0 1 ,, HE �, __T V I � (7) - 0 > i I FTl -1, I � . , I r�� IT 'I -- -- �� T� -- I I IK I , � " . __ 0 - : 11 I I �� � . �, �' :� - v .�, - - \ 1� . I I I , 1 12: 1 71 � ;r\ I u's -- _ , . 'T - I 7 f,6 11 - (10 f � ( \ � I - "': �0 M " I - 11111JI0111 umumm . 116111 I I � i \11 :T 1 ;3 f Lq 0 � (-) \ I I 9 L ill , - �. � (A �j%e 0 If I - - , I _'�) I mmm, m-mummmmmm L,11�11101 ,, \ : � I ! __-I , . i - -mmIIIIIIII11111111111111L iiiiiiiiiiiiiiiiiii�illillillilI 1111111111110 litTilumaulull 1191LUJIM I � " I �, I i � � I I I .�'_ - TV ------------- � � - 1 �e4l 11 , 1'_I,, , ;I I I _1� -,, 1z 11 � I I - - ---------------- � T M��,�W_Tftf:�� - qwawg %_�ift " � I'll, - , (7) � i � _� � W_�,�_� -, I I ", 0 _0 0 , I L � , ( I �===m I 1 �,4p_ � ' _� 7 pl,", \' I 0 I I , , p- __1I - _)i�._." 1--T,-,, I ! " � i M 1 91 I - � ;, 4 , I - 1\ I " ; I Ht � I I " I \ - I I ; ,,T�(��ct \ _�' "q � . - ,� .., ..... �'." � ", ' , z I AT ,1f,lk� I ' t I \-- X�A,, � " \ I i__ - (��, ,,,, �._�?, 11 . 11 � - ,, "--,_ i C) '' \I I 9 N ND 7-4 K � F 11 - `T,�-��`�`\ N `,�, __� " ::= 6 E� I - � I, I I ,,IT - ____ -7 � .. " \, " , \ _____7 . , \ -) M 1 �I - � I 1; * i \ � \, _:t7 r// , �p -_ -0 ( '11 I A . . . . . . . . . [ \"" \ \ \ \, 1, � 1 77---� 1 * i 0 Cl "T ,11`� -n , _\� \' 7- 7\�) '� 00 , , � - > - - . a I . 11 1� , �, ,*,�* 442,5-2 9 __'�, - �, "I "I' \, \, _r�F 1- z T , " 17 - Et f "t . � ) ;.� f ,\ ",\,: \ ,\- � 0 1 <�, . . � . I\ I 7,',,�--_'_� 1 � , " I � I", �,:, \, " I , - \ \ 'I- " 11 -� C) (_) I '� - � j 1�1 , I �, - � � 1, �c (D (_) I I I , 1� " ''I T _�__ \��11 - `-1, 11 11 -- � . I I , � I , , , "' I \ \ I \ - . \ I r- _R ,\\vro- , ,-Ik� I - -0 _U : I I I -, 4�. 6 > . \ 0 a: I 1�, � ''I I \ � �u T, I : 1, I I - . / I 1� "`��, I f I ��), I \1", " 1, \, S06'14'14"' ,-. � �,:T � ,,, z I �_' z > I -, ,. IN :_� 2 . I " I\\ ,�� _'T I I I" \ , , I : z��- --_i 11 �� ') U , I . a LO I S,7!"\"� ,G \1\ \ 1, " M 00 �,,.I I - 1. 1.� < �O �0 v, I Fli 3 . I � m I , I , i \1,11 (n � , � t,, 11 \�,� , I 8 " T I , � M 1:1, . > 0 \ � �A� � \ / > .-. Z I -1, \` , I" 1�1, I \) �, I ,_.� "i "\ - -, F!, - T, 51,0 :5- � I � � --j -Q \ � I , 1 I \ � \� "I'll I 1\ , , I I I I ,,A z :�c , 7 1 , 0 I / `,, I _�, , M I I -"--, - FTI 7 Z, 1, , \ il -6 I . . - , '. I 1, � I I I \ I I 1\ I I" I I ''I I ''I'll -\_�,� ,!�W-Tiit -wir \pu - -_ ------- I I � I . _�,,,/ , r , , I I , - F" 7 I ill I , � I , I I I I I I I __ i I -T I .1 � , , 'I I _�_, I ----I ___I� � ill x _`T� I'll � - - J, I'- I - _ _ _ _ , _ ,� _ ,� _ ,� I , _ ,� 1 , I , ": :,,, I 1, I I I I 1� _T1 TIT I - \ , I I \ , _< 11 , -�, , - 0 4 I / . I I 111 __,� I \ 11 1, 1, � \ , "I \ , I I % 1, f,_T, �() , I , n T, , , \ _�\ ,---- , I I 1, C-) .: �b I\ i _� 11 U) -4 . I TV, I I , \ I 1, \ , , 1 I - �� V � / i _ I I \ C) �, U� � I " "', I- I 'I, 1\ " I ! � 0 �, / ____�_T,_ I-, z . -';I E! 4 f I -'�____� i 13 ; ; .1 � - \ . "; '1P . . .... �,,, N _L� I ,, 00 - 80 � ; , I I- c I . I M -4 i I ... . ... - ,_ � I T 9 ,1� 1 I , I I 1 "6 1 , I , T) � ('+_ = - <" -_ J � � . , L - - I ,. 0 0 I ��, \ �;, 't� .j,- I 111� I I I ,\, 1, 1, - 11 � - I lJLJ " "I I , �:,��,,�,�,',�f�'�,,,� , = I`,�� I I I F_ z " � i I - (t, .1 "', , OTI` , c� -- - 1,g __-I ., , 1 -4 __--� I c� : __� fP el. , I 1, � ... - - _� (er� I 0 0 -, , ";, , T I ,,�_, T11 �,,��, ,,, - __< 1.11 11 , I - I 1, "T, j � M - I FTI z ,T�::,, '' �� �, - ----- C-) 11 "I " �: \1., (A �, - I I - �, _�A I U: " I __ , j rT7 _�� I 1'� - 1, I c� - ::�F -) , ---- � i ;A ,4, � "I j " � ( � � , __ � '. . � T �� I �,�� 1111. I,,�T_, :�� = `� I :�;�, ,% �'. I I'll, � . � I � I � " , � - �� 11 � 11�Twl . � I I I . 11,11. I � ��' 1. - /I 1, I 'O" I . I I � - � ,,� - I M , "'v", '7�1 1 1; I �'.. ". , I - "r," .. I - , , .1"ON F7 : � 11 � I I I.. . �. 11 , I m = r " , � � I . - . I 1, T, " . � . . ": I i I � I � � Ir I - - - - � ____________ 0 - __�_ i , , I . - - �, , _,7- _- - --�7- - _7------7---- , -- - - - --------- - � � �11, ,. " , (14 , � � � � __� , �.. - tf"g, � �'i , _ . � , ,T, '777,, 7 \� , , \ -7 \7, 1 1 1 , , � I �. ��, . . Z�z ,�� """ , I I �_ , , , ", _ \ , , , \ I ", I , 11 � '' , I \, \\� , - I I , , I I I 4z" = � '�,.;, , � I ,T I 11 I - - � 1 .119 � , . I I I I """ \ 1, I �\ I � I : I 11 � , 1 _-, __ 1+ ( , I 16 ....... T�, 7 � I .1 . I I "I I . U) I , 11 11 I "\\�, I \1, , \' T\ I \1 \ �\ \ I --- < ,1 - 1 , � "' v":,� I "T, � " � .. I I . . � �� -0 I" I I , \\ I �, I �\\ 1, � ,T, \ , \ \ I , \ " , �\ \ � \ I - ,,,,\\, � 1, ITTTJ ,),-) 11 , . I . I I I , \ , , \ 1, ,� , , ,� I'll �\ � ''I 1 93 � _TJ `�16 11 I I 1, � � I I � , \ \ \ \ , \ , \1"', I " � I I I I T I T, I . . - - I _T1 -_ 1, I I 1, I \ "I I I "I'', , � I \ I , � 1� I , \ - - ---- I I 'r, '' 9 I 1. . I , , � � 1'\ ��, ,� I � � � I � I I \ ''I , I , \ I " '' , \ , 1, 1�1 I , I I T ��031 '��) I I -� ,� , -� -�, ,- - , I [ , 11 I I I I I I I 1 .2,9 Al,? IT I - ", " - � � � , , I I , (O " I \�, 1, , I I , I I I ___________ I , / fo �_: - -,. g," ." I I I � r> , , I �� I , �'� 1� I , , , I I , - --- ,�� , %, � I � , � ,:", I \ \ , - I—— I � ,,, , �, � � , I , " � , "'. [- _- I �",."�T,_,� , � 1. I � 11 I - I � I I \, \ I , \ �:=j N I -C " - � ., � :1 �, " i., � I I . `% � \ ,\ , , I I �j . � ----- - ____ I ZT� � . ''. - - . � C", bt � I'll 11 7\ 1 \ 1'1'� I , � ,� \:, XX \\\"\\ 1, I I I 1� \ ""��, , , � - I - 46"E 0)4:11� � ,,, � ) j �� �,< , ,,,,,,f`,�T z I -W , I �� I \ IT - , \ " '11\ I � 1, � T j U) � -1 " --- �- I ." ,.. � M z 1,; j, ��� \ , �\, \ \ I , , ), �"_ ... . .. ..... � I � - , , - I 1\\ I " I � , ___, , , --- ----- . I , . � ". I � �� 3:, , � . � I � \ I ; 0 -5 I.',' I _11 I I - 1, I W ------- : � I _1* I'll I I : ",:: ,, , T': ; > 21D 11 I , � " � I T I I 11111 �L �1, ,- I I 9 1111111EIR --------------- / I �, , 1. I �r�-,M,6 � "', , i�� � S �, :1,1� (0 (� 1111M - ____ � (� [I I -----: ��,,,,,,�,.���,',,,',"",�,,"-'��,�--,,, " I T I 1 � � I I . 11 /, , , : I" ,� 1, . I . - ,,� I I � I ,,, \ , *11 , op, - 11 i - I 111\11, """ . I . � I I � , I I I \\, ,., :, T, \ _;:� - , 1 1"� . I _ I I ,11:, �_. , � .1 rl r1l . , � �� " ITO __� _', , I \ (i, I �b .1 - r- I , - � ,,_ , " �/Tfv , . 1 __ I I \ I c� (-q I � , I , -,; � , 1�, � � I - I , ''I �) �P'. I . , � I'll- � .� I ., - ---, \` T ,\ _;`� I , I 900,01) T - I . - "I 11 '' , : , ,,,, , rq Z I . , , � , , � I � �, . , I 1, :1 >� ":-, . I , I r- I , I � �, " , I :g 4 Iq I I I 1:1 "I I . i I � (�; , - - ''Ill z, I � I I V I - I I , � , , AP , I—, �, I , , , �Ij I i E� I , � '�___ ,_ -"-- "`�_ - -_ 11 ,,, I �,:' � � I � I �� 'I, ,T\� 1�' I I I f 1, � - , j ", ; � , � . � I . I . I CP , I � 11 1, , " �, " _� Ij �Tf` ,_� , �, I I � I . � I � I I I > I'll, I \ I , , I -IT, I I I ,. I I � I I � I Q ;Q : , , "''\ I I 11, . I � � �, � : � \ , " 0 , T, I 1, 11 I I 11 � I , ,,#,,-, � I., I e : I I 1 �� �, �� 1�11 � � ': , I : I ,� �,\ , I - I - =:����� I'll _'11 I I .1 (9�w, - :1 t , 1 _ � ., zk �� � \ 11 \�, I I q; I ,, 11 I " 11 � I I 11� I I I . . � , �e, , . : , � 07, 1 '' 81 �, , I � I I", I i , 11 ��. � I I 11 � I � I \ - , x I � - I I 1. , I I . , I I I I . , I\-, L, I : , I � 1. I , I i � - , � 11 , � I , To , � .1 '' .. I � I \ ''\" 1, 11\ 11, I- I- �T ". .. 11 , I � I I I 11 111.1 � � I � '10:7"(� " , , : , ,,, ,:�, � I I \ i I I V>, � 11 I I I . I I I I I .1 (� , \ , I 1, , I : '' - ,I I I 1, , I I I ,� ! � , - �, I , \ \ _� 1, , .� , � . I � I , I . , '( \ I \1 I T� I " \, �,�� , � I .1.1 . - � , , I I I * '�, , . , -4 I I � I T, . , ,.. � : I I I . .(�) :11,11, A � . 11,91 \' """ , I \ I �*' �;,, .8� 1 V, M I � I I 11 - 'I , .,. I ,� . '' , > � ----------,--- � I I I . . 1, I , IT , 1, : � , , , I I I \ I I \ I 1, � \ I I I I , i -, I __�__, 11 11 I I I , \,:\, :" ___Zz � I 1� __111 I \T\ � I I I I I I I \ \, � '' I � I - � fT 115, � I 11, � , � , : , I �:,:�, - - < . I I � :, � 11 I \\�"\,�\' 1'� 1, , � I , ',\ , , , , , � I I �, �! --- - - -_ --I -_ � � - I , � I ", I 1, I \\, , ''I 1, "� ,� : � ',�' I I I , \ \ , , � � , I 2 ��__� / _T) 11 .1 . I , 1, . � \ I , I - , < I ''Ill , I \ I -" , , ,'�\ , \, I _< �_� T I � pl� � '".. '. , I I I . I " I , � , I ,n , � �,- -1 I I � , � I �, , "I , . \ , � ,\ -, I ,I M 1'1�, � "", � � I - : . . I � I I I T , � , __ , I , : , I M � �, I ,I/ ., 1. � , - I I I I e, I 11 I � I I � , , , � ,\" I 1, 1\�, "� \\ , IT , , T , \1T'11, I , I I \ I I I , , , \, \ I I � � � ` I � � , I \�\, I , I \� I I , I I 1� , , I 1� z I I I I � I , i � , "I - __ __ ___ ; 0 � � " : ;� � >9 v ,, � 11 I � I - \ ''I , \\,\ 1\ I I I �� I I I - , ,\ I . �> 2 0 T� . I I �. � I I � � � 11 I 11 I ,�, , . I -� I I "I � , T I I I I , \ I " �! I , �, I I T, .11 �� I I ,\ I 1, 1, 'T, ''I I I \ ID9, I � I 1 - " \ ,\ \\ \, , , , � , , , I I � � i I _-, I - - I I � 1� . � � I "I '' \ '\ `% , , � I ''I I'll �, I \ I'll I ,\ I I I I M J,� � I , --- - I I � \ �,� , , " \ \ N, "\ \1 \ 11 , I I \,, T ", I ,% � �, I I , - I � . "I I I �, I , , I 1, T ,_ , \ I _N p I .11 � , 11 , - - - � , I "_�t \\ \ 0� _T1 V j I - _U � . � " I 11 � I - L, � � I :� - � I "', 11 ;- �'� � ____,_L, ___L I __:t , I , I 11\ M \ "I , 7< ;U ;u T I , �. . � , I 1. � � I I T ,:, \ \ ",\" \ , \ , �\ I I I , , ,% , ,� I I �, _1 / 13, � , > q - ., : : ., � , , � ; I , � , I '. t7:,: _T1 F1 � 1 6111 \1 ,- ,% ,% , I 11 I .1 I , M I I ,,, .1 I . , �, L11 1 '1� L, � � I . , � :Ma, ,�__�__ 1 _ , I I , T3 / � - �_ - , , "� , �;" , I � I' __�" Z� I , K _J�� , 11 I \1', 1, �� I I I . .1 � I � � -- , \ � , , I I I , 9- / " M * I ------ \ I I I , I � \ '\ '\' '� , � I I I I .M W � ;1 f, � ------- �__, ` �\k�,,, -, 11 I 11, I � \ , 'T\'_ T , \ I" \ , , I ,, > 1 � � 7 \ , , , � , 0 11 " � �, 11 \ \1 '', \ �, \� � I , I , 71 � � T, " 0 , 11, , , \"\%,,\,, ,\ \, "' " \ - (9 � [I 2 & I "I � . \ , I I r - � 11 � 11 � - M I 1 2! , \ I , I 11 . "', � I ,T\ 11 11 I tco - r,j Fr-j I : ! _1� M -]� \11 I I I \", "I 1, I_, ", '� ,\�_ , Tm 7 (-) , j 1� I I \ , , 1, 1, � , �,T � I I � I , fl� I � . -4 i �\ 11 I "" 'I 1, T �\ - \, � , ! I , i ! " � I - ,,, , , I , \ ,\� , , � , < "\\ \ , \\\' \ I - � , , � -;./ , �!� \ \\ ''I �4 �n, - - , � ,\ 1, � , � \ " , I 'I, !� �, � �� x , I . _;`-� i (') ,\1 I I I I T�, " , �,��\ \� , , � , ,� " \- \ ,� ,>�� (g �� "'e, N) � �D T I I I , I I,:''\ � � \\�,,�1,1� - "\ " -.�`�\ \, ',\ " -_��_ g 0, �, . i U, -u 1. 9 I \ \ , 4�, I , _ " � I C/) I N� I , I , I I � I \1 � I " , , , \ , \ r V�l ",\\, I � I I 1. - � , __ - �. _ � �� , � Iiii 1) I ,,� C) 1 12 -1 � �,T 11 , \ \, , ,J �, \�,\ ,� " " . o z f : � __-I I � / , �T \ � T � 7 , I i - / \ �� I \ I `,, I 1 �" I \ � - r � I 0 � I "/" \,J� , a I � I 0 ,� . .* �, � � , , - f, I y I A � , � T I 1, I , " , i-, 0 - I � I _ I "I ;�----T�z� I . I , I , I I Q:z � it I , 1��_�' -0. 1� I \ I �\ \ - 1�1�,-, 4,'� � " , �: ., " � I , I . � - <�� 11, 60,x �0 , . , 1, � I I � -1 I \ \ 1, -) , � ,,,, 1. 11 � I , , " f� 611 T�'it '\ , TTN, , I I I V,� -,) T I 11, ( I 11 . � , , � I \ I � I I ( " f I � " - �, � I I __ � I-, � - I I 1\ I .1 . � I I I I I T�� - ! 1 1 � 9 11 . � - - 11 . I -, --� , � � I I I � f,,� -,u -, - 1, , I "I - I 1��, � '1;�q---�_ � _n�� -,, � I - - � I , \ I 0 - - i _` -1, 1, '� \, 11� \ ,�� � �� F 11 . � U I _�__ -1, ___ I'll I \" � � I � , 1%, I , Z ', , " _Z " I , - I <� . � __ - , I - - I I 1, 4, 311, - . I ,q -1 � Alf,41. � I ',,� C- u ''I I I � � I_ I - , 0 I �� if L : 00 1� � _� " I �� - ", N) ,:) �_, ,,,�, , � I , I , �, I 0j � , , I 11 _,_ I ''I \J . �1' - �_ ,,� � 41 \ _-N � -0 I TIT , IT-, ''I T, f, 1� " , , � I , I I � ,,, ,,� I � (A ,\ 7) , - -`f, 1� I 1�1 1, - , �_ _� , � , , I 1� ,�� �' . � I ;_ ", I I \, " ,,An) I, -0 q �: � I , - , '' I-, "', 1 "I � I __; . 1_". :� T A, f 10 If -D �\'(�� I - .- . � _� -', -T,T � �� T� �,,,, \ I I �� � I I", M, c G) I , r ��l - I , � �0 \ "" \ � , , z cq . , , -To � -9: - \,\'�, I "I' _� , . , J" 1 1 � - z 0 1 : . I ; . 1, I I __: H / '6'� 1 , �_, �1. � 10N,w � - 1\ I I 1� 1�\\G , 1. 1; " Q 1, T TT,\,\, , � ,,, ,,I 1N, ,F � 1, �, � , ,,T 1'2 I I , I - s I \ \ _ -, T, - I ,�, , \ "\ , �, z N) <, 11 c� �i - ( ,,,,.(;� 11 - , , . T �T � \_ I �,, ,��, " � � / -,j c� , __,�14 . I- __�� ,,, 1� �� : "I \ I , t_1 � I � - --, 1 , I 'r----- I I rl� -�- � ,%T"',\': 1\ I I , " - /!� , A I , J� T 111 I r#==-- �1� 1 c I � , \ \ I �__, , , U; i � . � I \ � ) - ,\ , I � , 30" -1 " __ I �_,, c1l) .11 , �,,, I :� I : , ) � - . -p 2 ,r) U -,-,, r , I , \� \ 1, ,� I I I I I I , � , I _,�', ,\\\, I \ 7j I I �� OD "I I 1� + 4�), \ <"' I _____ - I �11 I \1 'I'll I , , � - ��, ��Tl I I , I " �Q,> 1, ,,��, �Ia " � , � C), 0) 0 I �� � �� - - /� \ A� \ I I . I � , I \ I I �, \ \ 1, , - - , I -, 7-1 1 1 * ". ,,,-, � � I I , � I , - �n,,,,, _ - � 7U , \4 -,j 11fl . � = , � I \� I I I I 11 _ - � " f " ,� � I I \ I I I , I , �\"\T' "�\", \ I � , , � , \ I 11 Z � �--Tf -��- i " " I.__1 � 1�� i t \, - , � �, � " \ \1 � I I 11, I 1, I I I " \ � \-, \ " � - , , " ri ,, T ! � - � , [ I I 1� I , , '' 1, 11 'I', I -V "\ (I " T I - -1 �R,i 1, , -cs � 1�",, ,,,,,,, � , I I \ � \ ji� ,\ _U " / - - , I I , , 'T � �� , ,&� �, �, T 1- � �� " \ � I \�, � I � ��', I : ',-,, �" "' , , , '' �,,J�� . = ,,� I I �: � �, T t,'T�z , I , T \ I , , "' \ � �, ,\""\,\ , , \" , , , , , 'T , , , , w I I f, T 11 ; I _ - " I -,, � 1�1, I , \ " "I I , , 1, , : \ \ \ \ � I \ , ' ': - "�',' � ,,,, , � � � I > � ., I , , I_ .1 I 1, ,,, I I � -, - 1, ,,, __ � - - I I I I cn 1 $ . A� z .__ I � � � I MEZ `,� f , �,�,,�,; , I I ": \ 1'� 1, - I � I I I ,,\ \ ,,�\" ", ';T� n1f, 17711 , m * ,� . - ,,, I � , , ,�. 'III � I I 11� A I " �, ,/'m, ,,, ,,� � ��:, ,,, 7 ", 11, 1�,\\,.\ 1'1� , , _ ""4, ,� I or, J> = ,,, , " , , , I \' , , , , _ , 1 A �, , T11 I <.,'U-, - 1�,T, , ,�\ '' ''% �, "r ), ""' ] "" \ \ \ �,� /"', � \,\,: , !�,�, � , , - / � , / 117, 3) I I P, 4 // -- "' " ,, M, I : (s , , 11 - ,��f i,_ I � � I 1 _� , _ .I, I , , �-��,-�z 'T, 'A'' I � � I I, , I , e` T�, , , �,T�", I , , . - - , , __ - ,,, " T, �,,,, � Lt �_,,_, I � -7, ,f � Z - \ , I 11�, -, , Ill "t "�, ,�,,T"",.,", ,,�75 1 -, ,,,,�",' % 7" �1� I � I I '11,'�T I �TT,<, _ - ", , ,P�, - 1, hz___.,�,. , , , '' T I , , " T, - , , .11 , , a 17 . , " , __ � � ��%? ,; I i1FII Ru ", " , , pw � " - �_� ___,_ , . C4 1 __ � j �� �"A? - � �1\1111T &*` , , I I � " . . � I , - cz=�-t -,A �: __� � I'll, . .1 ,"11 m 17% � ,,,, ___ _4�1 "I � . .1 � I N . �', i ! - �f I,--- I',, I- 11 1_1� ,,- -,I I � I I - �- �P_11 17� � 11 1, , " - �_,, �so I I � I � � 1 - &) �111 , � � I "" , ni, _� (7, _j�, � I V) I L: - I � �, I � '� I I 1, - r - * zt: 1 , I - �� . -0 , . � 0 , - 7S . � - i I . 4, -_ �W_ - 1, _-, ,--.\f ,�, � _A� , �� '. : , j I - * IMP I'll, I � �, �� � / - \ ���,_ - I - - I <�g 4 :�, - ., 0 ()o 9Z.20N A -, �_ 13 cc I � (O I .. , - "IS' � - � % _4r_/s1 1 . "I - - 0 C) - � -T , �j 5 z " , � I 9 � � \ 1, - I-,- - __ - c,- - 0 ,:-< __1 P � I I '� , , . - � i Z�7 / I , 0 � CIO )L6 1 " L I 9 r. - I tA 1 z 00 I , a :e_1 � , I t, / " z ) - 'I,- __ A0\8 " :�u - @A , 111�� / I - / I-,--- 6- .. , __1j I T, �� � < "I (_) vrvol - M . - �, 1; � I / I I \ / I- ( , . , 1, / I �A IT � > i i1i i � 1_1_ As . Ar � - , I I < � I , ,-- 6s IP ; ,�: T," . = I i .1 I _�j 11 --u n ---I Z � j,_ \ � , z I I 11 III \ 9 - i� :� % � � I I 1, t, I Mr T,-, 1'�, ,,, I§ = T ,f I I _ 71 (,_::�, , _4 I I ! - ; ,:I- -- -A4 ", � r___ .�. � _D z , � I 1, . , = , J',� I, 0 _rl I IT : -, � ,"I I __� 0 I (�" � I'll, ... ,I-, ,� Z W � � � , ;�!_, I - � " -- ,, -, / I I I I �, �, � ,,,�\l '11,��,11'11'11M A I - � ,, ") %_` � \' ;�A . ,� :e - : I I , � ") I I I T\ - 11, � " �ktl'111� to 7 , �:) . � , i - ,1 I M C. _1 "'T 1>' "I" �Ei I Q I <M�E T , \ J�, i, �, �': � \ � , I � I / 6 # z � j � � I I � T,� - \ � �, C-) �� " I � 1� I ,I �� I . . I 2 , f _1� . ; 1i . 01, i . _0 I � I TT . T ,:� 0 1, 1, -711zl .'. . :� = � . ! T, I r�) - � 11 ,- , I � - I z I � ,:-� ''"T I . ."//, -, �� f I \. I I _': IV I - I I , I , - - 0) , , \\\ NJ I . I ��' 'O 1� I " � , � ND - '4� �,� � I \ \ \,,,��\l , I I / � : _�?f��,j �:� --i , 11 -" � 0 I 11 � , �11'lj I � � , -1 11 11 I .,, 0 " I !`�) 11 � .1� I I 11 " � I I i ! I , f - -j �, -1 11� - 11 I I _� ., � _-� 5 �, � ., 'T� � "///// , - I ; � � � I T I . - 4 / . ,T = I T' I T, T �,�. . � � , , cy) " I j I � .� ; r! i k / IT 11 1 7� �:, - ,_ � %11 / I , i c,4 �0 I 0 � . I �', I , 11, ,//// )A C �,j P 1 (),, I � 4 - I � 1, i - N � ; I . - , --f I � I _ \ 1, � � , \\� I '/'// �� QD c,, 1E , , , . = I . U P, � I , " QD (p, � I N, - I * 01 I � , 00 ,,,� 0 \ \ N"'. /I i �1, '1� ,,\ � F, T , M, � ; 11 \ I � , . J I I . I . 0 � , ;A. : / 0) I K I ,IT I 11 � " "a I TT - i , "I 1i - (1� io , , I ,; 1, "z,\ - � = i ', � �1 I � � - I il "I 1, T \ , , �__ �--� � �-,, � 'D � , I < . I I I , �," , "I I . '' T �- ; (i) _ ", 1� 1, 1-1 , I I . / > -�, \ \� � - . � ( 7-:1 1 rk _J = I I X, , , , �� - I I 11 , � ,% 1_,' I ",_1 I �, I ; ,T = I , , �, t ki r T \ T�- � , \\ , . 11 11 - � � i / pi 'k I �� I z . , , 4- - 4, I � I I", I : I ��, " 4 11 -4 11 , I ,�! " � I 11 0 " \ " I : , , , --, \ , � . __\ - � � I I 11. I I I� ------ �, , , , p �n \ .�� . , � . I ,� I \T, I 1, � I i 1�' CD 1# - 0 _U I I \ ,1 �. ,;: �1\11,\, I . "I A I � = [v z - -9 1 \ 6 P I I I I I I I I I z �0 �j ,% '. 11 - 'i / / ,� � ��,� I (0 0 1 ". I I I "\ I 11 N 0) \,," = . I 11 I I , 1, I n (_11 (�p I - * / = --n I * / A M 0 I . , I , 11� 0) � : C1 I - � � I , = �� 0� E� I . f M w > ;O-n > 0 �1,00F;gm \ I �� "I", , , ,\ - \, \ � 'F "I + I �_ (� , M a � i I / � , , I I I I, ,\"" ,V"-, I �_, _-, ,� E � ; , � > 01 M, T :1 a 2 ,> TZ) 1 ;,, �? I 1.11 . * 0 ; z i � W SEM � ', 'Lj��,�,� � , " * - c3i I I i / I M T1 ,�, F) - O?ricnmz \��,, " 7 " 1� f OT�_ M :� =: '_j I , I -N 7� __1 - _U -7, > r,j (O I - 3 >z x -00 ;0 2 , , , I " > 16 i (,-, - / I =T , (_) M . i I I .1 0 1 ;00 , _ , � 0 C. I - - z M - rn I w � 0 0 (XIMMMUM I IT<\ - . � . . :,�,' 1 j > - I I I = Ili - i . I cl; 4 . �� . I I M , 1, - "� 11 , -0 - -P, �T) 6 1 �� . � �, 1 4' z I am W - -1 b?m � K: ;�, I . -) I 0 � 3; 0 Md � I 11 I" I �T - , , 1. \ c� ��T ( I i e � �, �� - I > LA Z , ____�_ � I X, � c 0 > �j z � I I I -1 I � 0 I I R0 n xc>8m, � \ - I , �,,�, -, . I -P, 171 *1 I " = 0 � \, � � I � I", I I =: x � it ze I _1 ( Z \ 0�1 � - � I I 0 0 K M o _, I.-, w NZA-Me , I ; - , ',� I I E�ZMWEA?=1 WO wwwwama � I I � ,�' � , , I Lp 1, v ::�� I I �, I I _0 T , -, , I I � � 11 1�, , , ,T 1� � Tf , � 0 �: M wwwwamn 4; � I . __ �. I 1, 1. �o> 0 z W 8 _3"4" 1 , � . 111>� � 1, I I "' �� . , a - � - T I I �� I I T > U) VM M �4 3'4� 1 � _ - , 1� � ` � / I / \ � � -,i7 � \ X_ - ..., I 11 1� I'll P , -1 - X _ '! '' � 3T �/ I -n ;0 il ,> ;'u (XIMMMIX)MOUM � I I 0 I - - o0r, % 1, ', C, I A >yl CD MWOMDUMN 0� i _,___,� , __� - .. 6" 11 1" � � �� I I I - �_m ;a >(AM wwww(U)MM I - � I � I . , <1 � . T 0 .:,N , I'v I / 0 I" � j I If \ � _., / , _� I , I � 0 m -n _<Z � mo V) uUmmm)(UMM � \ ,:,� ", __�, ,�, / I 1 I 0 ! I 6 rn ,-4 -< > Z fon . T_` I , ,//// . . Wk I T, � ,1 M r. c OOMWWWWODDOM 1� C) M � � I . , I z > 'a =I> M ,�', fl, I . 0 -4 � :� -- CD ;0 �O I Q I%/ "'M 'k" � . �� F, 11 �L 4.03 . / - 0 2 � 00MMMOOMMU 0 :, . . Z C 0 �) - . :!�,, - � 1 -3 Tj 9,,W z 00 50 0 C) -, . 0 %// I 1. /,i I i S08 It (/) ozrmo i0zMM � � I : I - '_1 < X __1 X, z% :1 0 � F , � 0 \ , I I I ; -1 - I MMQ ;0 1XIMM(nowwo C-) -11 _� , 'U ;� , 0 1 I .0 > MWOMOUMM '�_� 0 1 1 �. I - ___ , _U � I I I i �3 F _v I I --j ZO , k M�l (,g , " K. 9 z _.ED_e�_ 1, \ TO/ %1% 11 � "" M K U �111 � i I % � 11 ! I 1.0/ : . i 0 . , 1� 1 I I . � .1 ! �, 1 Z5� z 2;0 Z > cf) 41 \ , � 'SO8 . '36 , I x �ir I A 0 Z -T �� 114141�1 47. 1 , > Zc -0 ;U , -_ , � L�l � I . >M --I M m ., O x --I . )11 J a Z-( Om :c>> c: \ -j ,__� � &� %/, , I .41 V) co 8 z . �9 % "k ------____Lo5 00 I i ,T r . M > 20: 0 0 �u �: w � 0 1, I , i . � r- I "I > ;c F-4 ro >M _p� \ I I ,�- '/, :!k -, (T,I) � � 1" J z (Z 'Xv //% / � 9 (A l i �j � 0 �] F! (.1 7�/ -30,0(5- - �, x - __-I 0 \11 I., I I 7 \ I i , i F�--:� I i � rn i __-I 4 (-) 1, .1 (::7. 1 ft I ,, 31WEffimfifluji .0 > -< I . . > 70/// 0 __ 1 5 M ?6 CC) zi 00 y 5� 1 1 � _Q -1 0 0i -�! � - I 0 Y////////// �:� 0* ,� �_ ill r I i - C M 0 (D > , � � 1.� I I , - t, Ill � I i . I z S= >c) Z> Z z 1. I (') , \_�* --"� 1 �__ I 1.1 r 2 58 Z Fi A K ;:0 �, , - _,4 - - I / 0 \\ 2/// , c) Ift: vv -_ ", I . _: � M --A F 21L 1// - -'Ak,� - - W z� , 1 �, _171 '0 F4 02 a -0 Cc (sp 0 > -) -,-,I . __ - '! F__ ( L 1, I '_ I . rzf:�--E � 7 -1 ,,T, �, I l� I . I % - " - ", m///////,///"/,/, I fl M CAETI M M=j 403� K ---i ,// 1� > M > c- M r , �)\__�, � I __ -_ "I 11 - . . � - I I _< D 22 OZ 0 r'n ';a �101 ;U � I �,r, ,C-- - I ca >�d C I I ,,; I li I , ��I, " �,T,,,__� - - J; �c ;0 ,�_ f " I -::: \, Eft- - .11 I � &I I W � �0 �_ 4v_ 1� y, M M �2'-O� 4'--574 Z �0 . , �_:� \ \7 � . "" lt-� z �! w t� I I � - 0 � -<4 - M Z 7�� 1 ��, - �*k_ V � __ I I _; 0 >;0 M , . 0 11 /,_�� � I I I - Q MIN. --j -', - I � i_�� '. 0 _ -4 ?5 Mr ,ZO MIN. > (14 � � 11 , I , _MN A ��,/ I I - z U0 \ � k1_1 Ix / I I 2 c') 0 X z _9 3 _< \ =�g - � 1, r_T71 G) > W z . 0 �. 1, I ) I lj`� c5T �_ f, -4 SG r � /��---- '� I I > ;,u 4 ;U c)?0 > > � \ _� ,�k � >- -0 2 r n 1, \ j i'\ j / 6 I , 11 L I .d C) - _0 I a I`� 0 H �, 1_3 1� , J, 11T,,�_, % I _0 c F �\ f I I "* ,,, ��, 1/1 n 2 :05 > rcn) M I I , �� I *�, i1 I _� : I - clo >A 0 0 c- � I � I 11 I - 11 ;0Z Oz 0;d En * co i, I x I '��, -- -- -1 e----�,�r j� ) N.) W 0 0 1 I- - -I)o � �� I -_ _1111�,__ "�, , 10 3 - Z 11, I I , \ , %__ I 1� I �__,__, , zz ,,I,- _�[ � I'll - / ! I 0 0 m 5 mo .-- cl) 4 \ 1__� ::� \ I 11� - W_ , � a! F p a ;>a mom. > M: L \,I __ \ , \ I I I , > T . L - , I I I , I -_ WMM# - I � I 4 , , - � Al, � -i I I I W W �� , j, PI -I T, il T 01 00>1 z 0 D -,=c - i " I \ j _� 4 - - - W 4�_t/ /,� 1 �7 ::�, I " =:I ,)R z 0. (>/) � > (, -< I ,- I � I I �-� r I I 1;/;�' ,,,, - I M X 0 - -< XjZ 0 M > X o Fri , � a, � , QM : \ _� 0 - ,�� :.- I co (A ZA i0 ca j4 ron ZE .;ou � 1 I I T 1, :�� )��_ I , \,�,' '/�"- " - �T�__�'_' 71�a� - W 1/j , 1 4 0 > 5� > � ) I - I > 0 - I I 1�;� I 111T, , , I , - � , I I I 0 z I " __ T, _ L�,, " ,,, I �, ;0 - �,,� "\, I , -w- -/ En 0 ;0 zc > 0, CD � - CliMN LINK FENCC �,, I z4111 - - 1 6 Mz z 5� n � � Ln - ZMW xopm El, w \ __ - n r Z - )-�- � ,�W_ I p i 'y' W - - -0 I M M p F < W� M c > --I I -1) r1l �� 1 7__�,_ , IF �,� j - - W QW _0 . I � T, 1�1 , � c 0;0 :;I z p 3 M O'n - --j - > :5 z M � -- M � 6 � "I --- I 100 I I < -- - ___ /V J > ;a 0 I � '07', �a � --' _ V I , c� W, ca ZO rorl M A (J) iA c c: x M r) C I - � , S 05 52 "W (O", --i-I 0 � ,,/� � 3� M O Z) � 0 0 r- 0 z _�qj I 1, 1 � - �, � --, le J 'ell I ,/,�,� '1� f I � � c� " , �, � -1 I I f , ,,��, 0, :-) '�,,� I 0 (A z;0 M U) X --I Z ;0 � .�'1_4�,11�11 . P, i I - -4 _n � z � z m =j 0 ---' 50,0c) � � 1��;, _., '%, I 0 7, ', __,<�_,� - ;0M -nmF1 0 . � � I P I CID _� � _,�' T 1 c 0 �j > Z 00 4 x 0 . I � J� I C' , _ M I CZ z v o z --I � T, 11 / I/' I .�. - / " - I )� - � E�z I - , /11 I I)a; i Y/ �,- -D //Z" � . - I � � W#F _F_ =1 ') Mm W (;) Z 1� Z = -n (1) >> M - V i , I/ I I ,',I s __4 /' � ,_1 -1 " � �//� "" I I_ T7 , 1" ". - c: oL ;0 N j1:.j 0 z 0 1 \ . \ I , , P�v . �j c T I, :d 00 0. O>Z :�:) (-� I � \, I 1, _-, _'_1 ', =1 z rn M a: (1) 0 � , , "/ , �� _____ '� - I I - _ "' . .,% - - . I - - __0 � �, I"11 I - - I �r \ . I q , 4 �0 - m /Z � ,-'%,' #1 ly , (A Z _n > oorz > Z;0 0 (/) =1 Z4 �� > 0 � 0 0 �1 M V) Q < 0 . ., . _1) �, 1, 1, I - / Tr - v ___��__ ___ (f) r * (t): c �;u z ) . ,,C_)�� M_ Z / fl, 4. - , I - -um M r- \ cr) , , i J0 I I � I 1 4, - , �V_:Z;�Z I - � rn > ;0 F1 _0 zo . - , __ " M 4 0� g�; �0 I I" / 1-," - I .. ,,��, j� . - M a) w ,,_ rn (-) :E I N - I --- � I - CD I I I 1 1 �_ f 11 ;0 F . oc " _1�1. \ 1-9 / -� C-) �! 'D I V / , \1 , - I �� '� _�, - I I I � � __ � 0 Z r- 9: foo � (1) > 1 m --I � )/ ) I /y �3) 0 N,T -c z z�z &O - I ::�� §1 /i / IT ; C-) 11 6 . ' � _�u C) - ,� /!,� / I . I 0 a) Fri C x: I Z 1:� 5. r - � :1 I 0 i ��/ -) . . � � "IV I � , 0 P d � " i I zm 0 ��Z� ;U --I (n I , _�, __j r- Fr� 11 I 11 1"' :) (. . . . . r z F I // i I il i � , - I N . I M 0 I � �� -5; 1 ,, I I -I'- I " - � . A I / I - � 0 , I � -I � (D c_ . r- M r- z 0 C 0 M M \�11 1, -- hl, I th" __1 ,I 10 ,j F, -11 - I [,- � I f- -Z . ,, �� -�� 0 - Z� I r- z� 0 ��_� , , \ I - I / I t " 11 K �� 6)", 11 �, ( ) ___tt��_' _i�F ., I j, \, I I U�, _-� __4 , ; . ; _�� )� , 0 T 1, , I ! I E! _n -0 c� -0 /\/ / � __ r- ,/ I .11 I ,-) -< I � \ " 11� 71 _5 �� i Cc: - 0 0 1 INZ �_� 11 ! I 1 4-0 > 4 Z z r-;u I 1 Q> rn - -17 - � T� " I ,f' 11 I I-------------- - I ,To : / W > 1�>) \�� K - I - ;0 ;v ,_ 1;� 0 "I ! I ) 0) , -4 X - -�v __�-� 0 �'/ j � 11 I I ! [-"-----\-, -_ �1_1 � 0 M 0 0;0 ,,, v / -0 Tl, \'I ��, � M 2 0 1 _Z_� TO #; � 11 I I _____ / T,T) I = ct, > [ --7,7-\ -\ -� ( , , ,,, " 11 _< I . z - M - Z_�� i � I �, � ,I * a Z c) \ (-) �_� 0 z # i , 1� , \ \ ,__ -- , \ \\ I - , , 1 171-7 �7_ r, , \\,\I > M 0 � ___1 rri -2 (" 01Z�0) 0 !�ifl� I j� I , \' � , \,\\\, "I I I -_ -_ -_ M>Z -0 Z / . I`J * � h I # i I I I � I"\,, I � ___-�-,_ ''I I I xz* > > r- c);v > 0 \ , I " \ - �, - ", � \i K il , z IT �� � + j", � I 1� I I'' I 11 'I I I [I,,, I -1- 11 1\ > M 0 Z;v 11 W i�_� �, 1 1 1 V , - ��tg z 0 mo*K 1, I BRICk WALK ,f i 11 / ,!I \ 'I, �, , ,,,, z m --I 61 -v -� > I,! \\' 1\ I z�]Vo I , I 11, 1", 11 0 -, ( ) , I',' I f ,I - � , z 1, .1 # 1 , I , ,,,, ,:,,'T- " A T � '"',�,� 0 �, , ill A -1 ----3, ;U I , k " I f,\ � 110A 'I / �,, / K M 1, 4, _ , , t t;�',',,,N_ m / h P, t"N"'p, , 1 X ;0 0 , r) ZKO \ / 7j N�-,� ��' I" I � I ;,,,,,,,, 0 Mg w -V =1 1� I I I I I I - - , � I 1"'k "I 11 11 I > ?� 0 w > U'E� c) -0 J / lif� F I I D I , 4C�, , J " 014� -�, h"I 'I I I I lz� 1'1,"'��_ "T, Z Z -4 - �d M 0 1 �, n 0 I , � _, 1, - I . r 14 8 0 v) w s 0 __4 0 z I __-- C) : I., I J I �_) 11 - �_:i 'I', 'b 'z g>: c/) � R� r"� I - `� M > ;U 0 X z o > -9 74 67 [3�7 -1 J/ 1`,,� :",] I , - MM c \ r:,� --- 0 () - I i T= 1: -q l- �, 1 - > !" `� > xr-CE =J --I M I � ;� , r I =: M Z i I I I = ,,,,�7 r. 5� z "I -,7 rn - - , � T,� _�_z RO I "I / - I - , , 2 M r- o C) m 0 .. � � Z__ L" /I f , I I , "';N \ Z 0 �_? - � _U 1 4 � � , I ; := , 0 , T M - I ,��_� � � , --I Z a) ZI w M z il (') 1-1 - I , I - ----- � , ---- I 111- I - = I , / > OMO 0 A m - , - "'i 1,,,,,�, C, j,' , I i ,I�_ , - Z -4 0 W V) ,; " x \ --- --- - -M - - '�, � N - \ I I I I I Ii I __ z M V) , -77�. - - / - I Tf, Ill \1 I , I\' � , D 0 0-0 0 0 < _ - _� X r I I If -� I I T "', I I E H 10r, f-, f;TN __ - (_T1 x - :y� Il , �__�:,�\T,\\''\\\ \ I I - M 2.0 > M I � � __ M - - -W�_46'- -,,, , � , I T > w ;0 o z Q z r- c __j T' __1 ��, T�! ---- I— = �: f, /J - I \ I I T � -- , - - 1, V) - i I ___i_�L� 1\1 -, , \ � � 1 2 W �u �� 0 -q X m I - 1.14- -1- M I - 1� . , , IT- 1, , I 1, ;0 � M I , 11 Nos �9 \ � < z I 0 M 0 __`l 0 zol 6"bvc - - I I I I I I I I I � � r T/I � " - \ 7, ::� I 0 Z: 0 > -n > C) r- co Ln �0 e I , , - I � 05 [ T---_�___ �,\, ,,,�,\�,�, , � m �� - 130 1 --- _-�? I 1, W M:5 0 >;v c I , , -1 _. Epp - I . I I I (-) >;0 I __.�� - " I . T Z`�--�,, I _T 11 m M w M � __ - � , I I i62,�- 11 , _,_�j I M m M M M rri w xroo Xom > � A4 - _ I ,,, 110 L- L_� It 0 , w c: x x x x x x x pomm �� t � � . It IT, L< � K - - - - - - 2!: -i * F= w x0o �_� � __ 7�� - !� �1 ___ 0 1 If U) - M Z 0 1 _� � I � , I -M I - __ > 0 01 'T10 � " , -M- I 0 <§ E , � � 0� ��,_,_�� I -A I * . ;� m �� 0 -q T4 si 0 > 0 1 En - .j - - - - >;u 0 ;U > 0 . I ��i � , T A - - P - L4 � 1 # � I - - K ; -4 0 c) 0 0 c') 0 . , 11 _�_ �� M , 17' 11: .1 -_�,,_,7-m - - - 1� / r, Z C 2 z z z z z z 0 � . � .�, 0, Ln C) 0 0 17� > U) M z X0 _�_l � / � . - Al __ Eop , C-) _p� �rf , r- > =:j --I 0 IT/ � _- �� � r- -- -0 1 _n � , 1, I I �� � .- 0 -4 r- O T 1, �� � - I , "'I' I . - I X _n =4 c CD __� - W Z > X: MI z I � " �� ,,,",-- �� "i, lf� ,- M - - -A I - 117 x I U M 0 X M _j E_ 0 0 � 00 X c: mom >> I � T( � � § 1-1 � m L/) m a! 0 �1 I - r I! - " T11 __ - � I I ",. " � � - . - , I ; I z 0 m r_ r- z z 0 c: � I _ � I 'i , I < M -0 0 FI I : i .1 - I m 0 U) - 0 7: 0 0 m 0 = ''I - I ;1"IT/ 1 i ;I, , I 1_�� _�� z (/) 0 > ;0 X r, 4 > owo 0 - I 0� I 11 I'); �, -1. - __7 M � j ,I -- m M r- > I �_� I - , - -- W z 2 V) z I 1, _�_ - - - �, - 1 -4 1 [� q q r- 0 r, :E , , � /f, i i -k- Pr� x 1=z ,:4 c') z 0 (n * - - i ill i A q 8 M 171 0 8 cu 0 - I . - # I , " __ c: 0 m W w P 1, .- - Z� § ;,/ , �FD > ,,, ��_7�'. � - _< 58 ;b -4 /1, /1"', 0 0 0 1 IQ U) x Z: _L fj C� � � -1 --I � �� I Tp ,) � - Q C) -< M V C: �, / - P, , j", , I c/1 _, - _0 00 CC) 0 V) � T I I W :�_ a) M W 0 --I M 0 -A V) I r �_� 9� � ,� I �, -- � -0 T, "/ _� < M 5 M M CD co 0 �e c T. --I M M:d M 0 r � � � 'k , C? I z � I - � - I "\1 (3) i`0 I � '75 - ;v X M 0 0 M x __� �� I I-- __ \\ �p x m m ;0 M w U 22 m 0 - ; - �A �� � 5�5%1 m r K M ;0 M z --i Z 50 ,'I'- .5 / �?, --- -` --- 1 5��, m 0 K ;a M ;U 0 --I 00 " -i I _-,�_�,-�j_--_�-_, 0� - c/) 2 2 M K m :c . r- I I �, , (, (D ,.: < F� :/, -3 M M M M z : 10 19 �, 0 0 0 rn 1 � I 0 M M I :� �p_ � I 0 M I 0, � 1%_�p , 0 � a � :1 > 7- _� (j) (J) - --I w (/) - -U > co - ::� 0 - > - - (0 0 0 5; Lf) 00 0,4 (/) (3) 4 CP M -P, L4 0 N) .' 0 (1) Z > _4 (/) _ :E . . . . � _ !D p3 �4 9) (p 0.p� > (A j\) 7_ 00 0 * - �1 r - (9)c Qg(��@9(9*@(�)9(99 C) X � - tn' > 0 0;0 0 z I M M --I M (.A ;0 -9 - c: I C) I > , 01 a, . > , a . 0, z , . 000 U) 0 (A KzOrT0 a.-- ;O>p Z>' ;0 r-, W, K M �L 0 m . -0 * M - m Z;Uo OZ >Mo> X X >, M r- > A -0 --I m M -0 M o 4 o Z --I -vr.Q --I . M s-: T K _< z I X 0--q M x m --I -.4 010 (n M m r) X L/) MX x ;0 ;0 ;v ;U ;0 x x x x 0 K i M � x X = A Z! K M --I x 0 > 12: r- r- w > M �8 z Z M "U m > __q - m 171 Om m m m mr1i m m mt m m m 5 m -V M M x -0 M C) 0 Z! 0om -n �O 56 z ;0 M = 2p M 0 Fn OM m, __l r, I 01 r- 0 m O� 0 .0 E�om (/) --A 9 r 0 Of.- - M > 0 <;Oz -4 M p -n >a T> M 0 W > C) --j - 4 > Z 31 M M > �> z 2 cco --I M r- M z;v 4 M ov > -0 > r) 00 K m --I K _< K r K K _k K K F_ K: k om MR R M =:I r_ .M X;0 0 --i ox z ;U r_ MU 7:0 -4 mM>m _U X ui > coxx -4 - c --I < M 0 F� r- 1: M M - 0 z V z l 0 __q < -4 o c) o o0o o !� o o o r- K a o 0 �d o - o M - > __4;0 54: � p T> XM 0 > ;0 =:I > > 0 > - z z r- x o C) --I ;0 0 M z (7) > > m z x < < < < < < < < < < c: zi ;0 X - z X - ;0 m 0 w r- > r- 0 M r- > =1 a 00 > Z K Z c 0 _j _< _rl 0 Z m 1_4 0 0 ;0 -H -n z m K > V) 0 (1) > __j (A =j Q > m M M M (1) ;0 > c (1) M ff F) M > -4 c -< z C) (1) 01 - -0 00 ;U 0 z m > 0 0;0 - c) --i . X w Z K M rn m m m m mmm m > x rr; ;0 z - oom 0 00--4 c 0 (/)a 0 a: 0 0 0 A c M z M 2 ;0 C M1 FA > x > 0 X K --I � . m X 0 :E > 0 K M C ;v M > --I - > c: Zq C) M 0-9 -n (/) M K M rri 0 (J) z cz om< - -4> cmw -4 0 -0 *X (") C) Z> 5� -0 4 --I Z =J M 0 0 x M _<Mo > o- M m m 4 a: z r- - M r, K M -.4 z (1) I A > zz � _<;u _;0 - X --I -D X _0 (n 0 C 5 x m -0 c: :J r- Z -n W 0 ij z o > =:I L< L< L< L< L< m z =! r- >, --I M > o 4 m 0 X > -0 - 0;0 Z -0 ;v > 000 > 0 (10 0 --A - rl> _< (A --1 X L,) 0 =;U = M M __j --10 - ;0 M 9 r- - (n mo M x z �_) (/) (7) 4 �j (1) Ln x > M M c * ;M0 -u o :� > ;0 r- m o p ,__,Z V) _ r- w z 0 r- --I - M -0 0 W __j > Z w --I =1' - 0 o :r "11 00 ]� --I � . 0 r- -4 0 rim M r- 0 X > Z z > Z -0 0;0 =1 - 58 (1) m r__ - z 0 MzM 0 0 0 >c CO x M 40 X: 56 < X 0 c: . z x X X X _rl _;u M 0 4 -4 M __4 --A - A ZMZ Z 0 'M (A > o M > 8 0 o 10 olm > (/)' r- --i 2 5E 2 �� M 0 0 OZ ils/1000- "I 11 w w z 0 > (1) PK 0 < C) -0 > _n (,) U) 0 O__l l a Z 0 K z M X > M -4 z z z ;0 G) r. a(,) - Mc- xcz w M - > ;U --I Z 0 0 __j V) M r- M m --jo C _-, M �j (t) X m z -U > 0 r- (f) > _0 x > -0 , m > -no > > (/I > > X = �:5; m � 0 K X X () K 0 �?o 0 r- C) C) 0 � _< -0 - > > -n P - " c: ;p 0 - 0 --I -1 0 --I Z W _U , M z FA -< r- r, K _0 0 Z Z -u m 0 M > (n - X (/) W 10 0;0 U) 0 m z � K w m M (n KZO U) 0 0 , r, ?D M __1 X=j C > 0 -0 0 0 ;0 M 0 M v) M Z 0 m R, Go > z r- (n 0 > T C:) z --lo-mm M > > Z ;0 (5 m (/) --I m 0 0 K a a: K -0 - z > K 0 2: c a A 0 K _-, M 0 w 0 ;U _< z mo > -00 > I 00 0 M c Ocmd ox;bc :5� --i 0 r- ::j 0> �d __1 . > - V) 4 0 ;0 5 C) 4 > z 0 - . jv a: Co. 1Z) --i ;v z r- M:r (1) M M 0 0 0 K '12 0 M Z -q Z > 0 X - __4;U - :�� o Z r- -V r- En M �:5 --I 0 M = m .) - m M �j z W * z =:IX M r- c: (1) 01 Z , >-n a r, > Z --I >> m Z W 2: --j W -n W MO > 0- M --I Mm- !9 c ';10 m --I l � -9 r- - _n c z (n 0 r- > mm z _n > - 4 K W --I 0 m Z C > ;:D C. m > X . m 2: 0 Z l c r- r- M z K X om� 0 m __i C =:I 0 > _< --I zi 0 M M Z 0 -0 0 -4 59--i 0 ,MO > 0 0 X a 4 -i X W > > T o o 0 C) ;� > --I > m rn (Mn T?o 0 2 > 0 F_ r- z 0 m c ;0 0 * (A 0 > -V 4 M z 'm ;d -0 00 > Z K �6 r- , r, X -r- 0 z > i 0 r M 0 -A -< U) 4 __j X � C > --I > 0 X x 2 0- i M - r- m > r, 0 C) x 0 a) < X &i C) C . M 0 CO 0 ozo M > x 0 M 0 z ;r� > z --I --I --I >0 > W (n 0 0 >Mz I X M z Z Z M ca > . w ;O� - Ax > M __Tl - > V) a! r- 0 -� z M* 005- --I >r- x _< > :05 =:1 F z - Oz � _U m > 0 0 r- M 0 c 3 --I Q 0 w a) > M - z �0 �d , c: :� . - -4 I I M --I U) Mm _< M z 2: --I -C 2 --I 0 r_ Z -U --I Z J0 ow r- z I m > :E M - 0 --I M 0 ;0 M * M 0 --i 0 ;U x 0 1 > I M 7\ 0 A (A 0 -4 _0 0 mr- - i= r- V) 0 O -n 05mz . T_ (-) m m M En x X K Z 9 2 o M 2 M -< --I -< > m M 0 M >>M z M -4 m (A 0 m z z a 5>Z c z i= -,0:5 z 0 iA- w > X Z> > 00 ;01 m>F z:0 6 0 w > 9: 0 W " 0 -V c - __l > M --I 0 M >OMFM 0 0> -4 > M 0 � � T M C) X > 0 0-0 --I O:r K 2: 0 --I z --I -0 CO w 0 - r- -0 > r- ;0 - o M A = o �i F >O;0 --I ZOO M r- > O X . z C) X Z o M V) M m > -0 > v) F rC-n l r, (j) F9 �1 om C 12 0 � -< _< l r- > 0 M z i Z r- m -0 (/) Fri U) x Z T 0 W ;v M 0 M _q r- > 0 -ii 0 _14. 0 r- Z _U X -n � M . 00 -n 0 As� > N) X C i --I (n 0 --I M z E5 X 0 > m G) M 0 =: > 0 M z - 0 �� X =i a 0 0 --q > M c 2 > 0 2 * a F > i� '0 !-- -00 --I X m M S2- c: --I 0 :� M __4 w 0 =J (A 9 M K 0 - --I;u 5 > -) Yo z 0 --i 5 -U M > U) 0 0 Z (A c:;0 > (A M -4 r- a 0 X X ;0z::1 (n > z 0 M ;0 w10 - --I - - � z I _q M - =� r 0 > > i 0 . ( �5 ->, --I m > x > m m V > > M-4 X rrl 0 ±1 --I M 00 M > .K K C) 0 -0 0 r- 0 m 00 zo> >;0 . � M M ow 0 rTl . m 00 m 0 U) X (n m > > 0 > --I ;p M F r. MIX --q X 4 C) 0 Z 0 M ;d w V) _U > wo x --i _< . M M :E K M --i w r- r- Z 0 > r- r- 9 --I Fji M :;l ,7-;u 0 m 0 > 2 _ X 0 c: = 0 M _< ;0 W O-Z ._j r- --i r- r- _n z M 0 0 Z z __l . 0 --I > W - Z m 0-4 M -V 0 0:� - . <:c x c m r- --A 0 0 0 > 0 00 � * =f 00 r- >0 o M Mo 0 0 C)o 0 m E) >M >r- > _9 m 0 000 _U > -v > 00 C ;d 0 go,= 0 0 > a: m r- - K - > 5 K 0 > Z - com 0 0 -6 co, Z x z --I 0 no FA m _< > - r- c C z z > 0_14 A --I --i --I (/) r, r- M > (/) M 0 -0 0 0 r- 0 =1 ;0 M -Ax 0 --i 0 F M 0 z :b r- T T = > 0 c r- --I K Z r- > a 0 M: c: 00 x W z Z�i -ri 0 X c M r- r- C)l --I rn C z ij:b Z M FI m a) M . 0 C0 0 I M z - c 00 K: w 0 (1) x -4 r 0 0 0;0 W --I r- 0 m >0 c z r T z --I M z 00 V) X > :r 0 - --j:E > Z 9: > M 1`1 0 X M 0 � a ;0 0 -q (A 0 m m In > F F > 3c Z>0 Lf) M . _< 0 0 x � 0 0 ;0 z > ;0 -0 > r- M w 1 r- > __4 --I 0 . � OD z mlM l M O 0 f�- I r- --I 0 -4 0 ::� r- X a (n --I -.4 0 x 0 0 M r- _v -o 0 F .-A l M;0 _< 0 x -00 o 0 > `T-T ;0 I X z z M a ;0 I 0 M mo Z c W ZM > 4 0 U) F� > X =j 2 m 00 _Z4 W �� z --i 0 0 (A - 0 0 > X 0 0 CD -i 0 !` w M R F C -n >Z > 0 c > (A > 0 U) Z m Z r, 0 ;d 0 > C0 (/) r- 0 �, M MIMI --I 0 Z _11 --I o < 2 _U 0 0 q F M z �8 o M z > * > 0 m -U M M 0 -4 -1 ,()s ,:� _v cm- - --I -Z:2 M U) - x __1 z X . X 0 =� 0 x 0 > w 0 F z (-) o M -n (7) r- > c: a -a r- -T, m >c: 0 K m 2 M m (/) 11 0 0 .-I --I 00 0 Or- 0 > -4 X z j:;v M - 0 q - mo> - m z _U M;U z (1) -0 m (/) 2:;u - X M - - . -0 =i - VW , > l M 0 ;0 K M - - I r- =: MM>Z -4;0 M (/) M r- r- (Z 0 ;0 :5 0 > a) -u M (f) -i 0 (J) M 0 (/) - � ;0> - . r- M --i M 0 r- > (Z a C) v) 'r 0 M --I z M > -n:%- r --I 0. O�< 0 :D ;U c: 0 -M, K > > ;U 0 (/) Z: m M V) 0 (/) r- c) z 0 M Z -K QD M on--1 0 ;0 M -0 0 r, 0 9 (/) z m > z Fn z U) (r) r- 2 X 0(/)>;o 0 > (f) ;U co 0 K >0 >;0 > X 0 > 0 _9 M m w C - 0 l >Kz __l W 0 r- U) c a: OM z M (11 (f) K M. - . 00 --I --I -1 (/) c r- > a) __q 0 cm K z > o 0 (A W > W - -m _;v z M (n 0 rTl 0 C) l z m 1 > 22 i- V) 0 z co 0 Z X 0 --I 0 > ;0 -n _9 0 zj- M > z --I Z (-);u MO T 0 _n --I z = V) (f) M _., > > z 0 F) > 0 --I 5! !_� 0 12 > -i :z c: > - 00 M > Z-) �z -n Z _j ;0M 4 0 _< - co > -0 > . - M ;U 0 > r- -n r- X (/) -1 _1 (/) m U) :c , Z C ;U - M 4 X 0 Lf) G) 0 MM m > 0 K ;0 r- 0 l --I Z OX 00 0 * M 0 m a --I 0 � 0 > 0 m r > (A (1) > (A -1 > > z 0 > > Z ;0 'n M r- > m r- z r;u =j r- X > z -I :� 0 x ;0 ;d E� 0 r- C > Mc -0-0--1 - 0 z MO X 2 --i 0 . < = M -n Mm OA-1 zo r- 0 2 r- z --A M > c: m c r- -UO > > = 0 M - t- - -4 - M ;U;0 0 z (f) --I 0 K ::I 0 o -< z > -5 �g M > � > * --A (1) m -4 --I > > (A 0 p 0 0 a O;ID -0 :z r M 0 Z M z > Z M --I F --I c > 0 X C) Z: M 0 M -< m 008 > - z >01 0 L,):c K 2 0 ;U LI) 0 z --I M r- 0 w --A -0 > > 0 _n * > 0 . 00 > co M > 0 > z 'I ;0 X K ;0 -q --I M z M -.-q M __4 0 M X -4 0 (n -<m - :5, 0 :5:-4 -v 0 =:! � M 0 X m ::! z 0 �8 a M z > C) -0 _1 V) r- or-o > M: --I >0� .d om rri E: C) -D . --I z > > 0 -P. > 0 0 n M r1l " Mono 0 w c 4 am o A F tz� - 8 �> l m r 0 - m W M > W --i < F) 0 0 > � 9M C) 4 z --A M co� M =� z 0 ow 0 z m r, ;U c: - Z -4 mom . 0 X a) . c: (/) 0 x m < r) ;0 > 0 r,i oz ):n x 0 T- -u =:E M C) r- --i (/) - OM =1 � �m M F- ;0 o c: > 0 --I rm- ;6 m x > 0 c :E X0 � o > Lf) > X --i 0 > U) 0 0 � �0 M __l M r- M M z z M 0 z 0 l -j M ;Q zm m --I O--j -4 K 'm -4 a z 0 r. c: > (f) 0 01 ;0 ;6 M (') M -U > M 0 W n C *6K X * __l CM M--l-j --I M r- 0 M Z;0 r, _U l --i LI) r- F 0 M ;U (10 c 0 0 1:r Z A3 0 U) a 'rl --i 0 > (/) X 0 :� � r a 2 OM>OMM K ;U > l > C) C _< �j X - 0-4 . 0 -0 > C) -0 0 ;0 x 0 -q r- 0 'O p P > r- r- �n 0 'm z >::i 0 OZ ij. _H 0 0 1_0>> M c > (1) M X c c (/) 0> �: 2 -< 0 F ;0 z 0 -U M;u z M 11 q:E =1 mo = r- X -4 K j� :� c . ) X z Z w 0 * --I --I M 0 , (/j q 0c) w K V) A X V) T _9 0 --i z m 0 11 M =j w o o M -05mo (1) > A MKOO 0 PO V) -00 > X --I --I > mo (A > OD (/) ::I X 0 X -90 M 0 10 W1 z ?> z m --i x K --j 0 --I t-j 0 > z z -u g 5� > 0 -0--4 r, X M i= 0 3;0 M 0 Ill > (A;0 M > _q 0 0 . ;0 M Z: > m Go MZ - Oom ;U -0 Z r __j M 0 �; z Z3 0 (Z 0 -0 ;DO- w 0 - M (Z,n 17� ;0 --j M M * (f);u m Mz ;036 __l A 0 a F-4 m z =j cl) 0 <00 r, r, > (f) 0 � :E > c 0 � __j 0 8 q !p � a om am - __( Oz c (/) 0 0 ;U Mo _M -40 v > M -4 M 0 --A c: k ;d M M 4 0 � ;0 -n M m _n c: 0 0 0 > >0;0 > M 0 l l > oom X V) I I 0 :c;0 � (n K =a (/)a K ;U Fri m E --I --I �� I --I - M Z M ,_ x z m 0 9 > 11 - a M .-I Z z F 0 = 9 �z a) -0 O;U:E --I l 0 0 ;0 iOO 0 > V) 0 �� --i (M/) _, a K - � - --A 0 S r- _7U > 0 :=! 0 > >* U) 0 > > I 0 - _< MZ > 0 M > 0 z 00 M m o (1) z 0(/) �Hr 22 M �� � 0 0 r- > 4 mmz M�mz zo(n> M -.j 2 r- K O_ 0 -n r- > * M z 0 _< z � 0 M ;U =1 -4�0 0 M a r- > z mm 0 ::� -5 rr, Z W (A T --I > 0(f) (:) o 0 z > _9 r- f7l , 5E M > . 0 ;U 3� > 2 1 > 1`11 3 r. �;_ zo MO X > um --I _< > --I as > --I o o X � z or- o Z 0 > A 0_0 --I w C - 00 -1 0 l > z --i 0 M M 2 z>0c z ou > X o V) > ;U -< A o U _v 0 !:_� �n a) E� r- z z;o m -n 0 r_ I c --I 0;0 > r- -4 c 0 M C) (A 0 M K z .00m C T r_ Z c _n T ;0 X z >" �1 - -no ;U L,) LI) M c) Z;u n ;0 M > (1) > ;0 11 X r- _0 X -V z 0 m c l r_ mz :1 --i 0 � A --I w U) c --I M -0 0 V) C0 M -< . 0 .-< 00i > 0 MO w, > z - _n OX 5) M r- m o r- 0 > - 0 W > 0 - > 00 Mzo '�� �� - 2 :!� w * A > -U ZX 0 E� mc a) ;v a) -00 M _v (A 00 l 0 Qz :� Z 0 > z > 0 M X z ;0 -2 M (j) __q ;a l 0 0> �r- X (1) X M _v * > M W z _n 0- Z - __j 2 0;0;u - M rn X c N) - _n > w 9 o l --i M X ;0 Of 0 �g () r I -1 ;U X M * -< 0 0 (A C) - ED - > r- Z < ;0 ;O,n > >m > (/) M - X > 0 0 c :� �10 ZMO--lMo r- 0 __q z F) 0 - > M;u m 0 00 K 0 M W X > w > (AM v 0 0 :8 -< ), 8 > l Z U) 0 . Z)>m 0 --I (A r- -U. --lo � z - K (;) x U) (/) p . 8)> 0 2 (A M N z! i� z > __q x 08 a 0 17� c --I m . --4;0 =1 c - :l: > 0 m m -0 0 M --I a) c rn Mo (A (/) w > M ;0 co M M ;0 < < >z M � ;0 __q 0 (/) 0 1 ;0 Oro , 0 (f) 0 m ;0 m � -0 X M K �0 0 mo 0 5mz -00 z Lf) C) 0 (J) 2,1 1 x m i- (f) 00 m K � M 0 > X r- 0 -,� co ;U --I -D Z Z�l . K -0 ED _0 _-.1 z m IV S > M M 7) 0 �1 C) x M M (;) __l F1 > M x M m 00C z 0 -0 8 x M 08M C a) 0 0-- X r- � 0 l R 0 X -n (-) z (/) > �;_ z --I -n 0 I > 0 > 20 ;D .A> 5� c 0 ;a -n Z M z Z w _j M 0 * _< U) 2 4 Z -r 2 0 - > WA K * T- 0 :-' o ;0 ;0 0 z M -q X 0 ' mo 0 -0 M :-i c �� Z � M I > -noomoo U) C) > 0 0 > , 0 --I 'T-T, z _n z 0 o w --I 0 K - =:1 Z (A _j 0 0 :E 0 coo M z 0 -_ (/) z _9 > �u oz K: --I 0 M > . a 0 z 0 X --I (Z X X M 5 U) o z :� X 9 F� 5 > W X ZA x z a 0 ,T\ I -0 > --I K 0 w M M --I .0 Z X z > M (1) x > 2 > > r- _n > il __4 0 � oom 0 00 o;0 4 m m � I `� w: � > :j > <> X >0> (J) 2z X > 0 M I , /'n,1111000mows� K H: 5 0 = -4 M 2r- > M -n r- ;0 M () . :E: c!K m z;0 X --I ": , : T 1: M Z fn X zm M 0 z =:I � - L cz > Fn > 0 -0 > 0 0 - zo M 0 0 2 ;U M 0 >zz r_ 0 <;0 om > � M > * 0 0 M 9 ;U K -, rr, K r- (A -4 � A -.1 - � 0 r, 0 0 K :5 0 1 -0 z --I l Z>M :5 o 0_1 -n z > 0 M ;U I _< U) _�, > r > w > OZ p z ; I r- --I C z z `0 - :,�� =j �z z --I r- ?I ;0 m --I - 0 0 KL>2, --A M -0 0 0 r_ :j G) M c: M I 0 0 0 x F) c - N - m M M -4 = / C> --A __4 0 0 z > r- <M 0 -i z X m r- r- > 0 - �1 (p 0 M = 8 179 M X M 0 z C) 2 T r- M v 0 () 0 0 _dr!!�, X M w > x _n * 9 M z _n ,,:E M m > z 0 > 0 --I M _j Z W _n M N ;U 0 ;cl 0 � a z 0 >_ W --I --I C) > 0 5� --I I X z 00 mc> M 0 > ;v m , Lf) --I M M . C/) M MM z F 0 . - U) - 9 0 -q -i --I;u K 0 0 X 171 0 U) 0 M m z _rl � � � 4�� oPROJECT NO. a REVISIONS o CONSULTANTS "'0,011111111, �111_1 * 11 1 nnov) Cla % I �� ... IV, --- 01 1k H M y t:: %%wj I H %%J VV qC7 L.et--NM I =Tw*#4= I C..oeLo/I'vrI1'wI NI I T Lo, (.ov ". Lm �- L-7 I.- i 11 0 > - r- U AC�=�171CN5 4 RENOVA71ON5 RPL �j R FR (D F� E S S I C, N A L A S 5 <:) C I � T I (D N *DRAWN BY 0 * 9 AIRC11irlplEcrIps VJC/LEE 1 3 5 W E S T C 0 N N E C T I C U T A V E. 7 MOREHEAD CITY, -- - - � I � T, ,,, - 1-1. I -1 -.1 � I .1 I I � �_��_�_�__ T, I �--,, _'T- I ,1 IT �1, �, � , " " ,�� , �', � _� " "T,jr, ( , - , - , �!, I , I " z ; n�� C 7- �� ,,, , _- , I ,f% , �, %� T � - �, - �,,U, I - _________________"11T 11 I , --------- T,e ,) ��'� r-, - I - , , JEOP - 77 �_ [�', 1, , I , , 7 I "', , I �_, 1� �� I'' �\\� , i� I " . __ 11 \ � �: � I I _', , (:, I-- 1, � 4,�, I , , � " . --,� 1�f�:______ - � ,-� , :�,�,7'\ 1-7<1-- � � "'I", �� , - , ", ,� ,,, , f 1 � I, "I �, I f I -11 ;��, , �\ � 0. �: y � [,,�, , , " , " K '\1 `1 I 0 , , ; - k I I I :��\ , , � � , I I I �i , '� T, \', > , :��\�J , � , �k, - - - . "� ', T-1; 1\11 .;:o I � M - I , fj�,:,,- ,� T,\ I _M__ -_ -M . .� I " [\\ ", -M - b, I� 0 � -M ,q, , "" Ilk" , -e._, " ��� � z I I I I � ,,, 1- c 1� I 1� *1 � I , �� ,\,'� \ 1� 1� 1, 11 I I I - . - I "I, "', r " �kl I � OP , J." ... \,`% 1, � �E , "T" . "I , 4 , I I I 1. I" I . I 11�1 \, " I , 1� 1, I I I .. " TT \�,j I I �,�l, - i" c I I , F_ , T I � � T�\ I 1 7 T I� I I I * :..'� < V\1\ 1�0 \1) / I , I -) J,',� I I "I I r . . . ,\, \ ,1* I / �, M �T I I � .1 � � I, , I I 11 11, I :RCD;�DK I 11� 'M_ 1, " T, : I - ' �-_��Kx I \, \ j �f I 0 ,,, "I., (-) � T:, , _c � 'I - Ill CD �\�:\I, z I � V" �qj � T� 11 - it I [,\-\, � , T F_ \" , f � , > L�Il - " I I . \ , \, * j , 'T. e� "� , �\ I 0 . .. � ,,, �p, 10 � , L�__,�\, I -�\:, \ � I 1 I y - , , , ,, I ,,- 0 ,,�J' � V,;,� - ,\) �, � �' '. -�� � � 11� .. ., --i _1%, \1 . 11", I , .,;,/ � ,�,� � I'll , 11 , . I , 0 , � "", --- A . � -_ -_ � , , " - ,,; � :� I - \ \ '.... �� "., 7- _� , 1� 2:, � I q I , . , 11 I '/ , - � , " . ..,; : f', , I - f;', M ` �1, I " '' If -4 -- i - \� � , , I n �J I , � i �� � " , , , ,�E " ;�, � , .�; , � � , - I I ,� - � . ` " - , , 1+, ,�, ,\, \ T - , , T 1?7 . _r--�D , , I . . __ \ , _____T ," I ,� , - , � I . : __ � \ ,�, ,T%�-N�, T ,,,, " . __ _�) I ,f . I 1� - :�� �_I��_' 1-1 �L�� ,,�, , ,� ,_ , - " �,,, I " - I . , - .. , � . . , c> " , , / �' -_ � . I "IQ - / __,� _�_,+__ I � 11� �J 4 �, _�I,, - c �', 1 e 11 I , , 3 , -J. (11 �- T 11 , - - T 4 , f"', 11 , I ,__T rc� _____1 �' I - , � � w " f __ , * 4 I - .�, , ;�,, 0, I , _, r', A I 1� 11 � � - I c, "� C�: , :". - I � .11 : � \ __ U c ill "-) , I ii � F�. , ,� L� (-n . , I � : , `% ,� 0 . ,�, "I 1, � � , , , T013 \ �'A I "'i I \ I � , � r1i 0. I I '_ z �� ; :1 I I i 11) � Z f � , . � ! T T I - � \ 0 Z.1 �� : 1 . . . I � I __ I 1�' I I * 2 , " ; "; - I �0 j I , � I � � I �_ � � I - -- �b, �r" - --- - I I � �Zb .... .., I b 00 % IX . I x -.00" 11 -- c- r _� 0 _� z - J,L. . = = r- -9 (), - =�O_ " - � . E - - VON F� � t�,%. -p J` I ,-, , 0% e I + .. . " :;��.. �..-- ",IN, j A( lk% I"", ,,% I � I 16 AUG. 02 SCfU7 H ERN F-I N ES NC)R7 H CA FROLI NA 2838 /\ V PP"M STEWART ENGINEERING INC � IIIIIIIIIII11% G 6 i PO Box 12054 RTR NC 27709 M b� 'A Tel. 919.380.8750 FM 919.380.8752 __ . ... _7 �2 Mld��&�wl�vin��p� I "��, ", 4z=-_=% MEI) � l�� W �. .. . . = = ow � . ,,,,, 1�1 -.1, . ,� . .." � .`,` . . . I., .. . ..� . I �,,�.. .-W � . . .. ,q�.. 0. .., 1.�,, . �,t �,.,.,_ I __ 7 il - -1 - � - - . -_ 7__-�;,--F�77' 77 - -7--7-. -,- F, -.,. �, - , . - T , 7 - �, - :� � - . I , , I '. T', , - - - T . , ) � �r I � ,41 - .� .... .'..1 0 11.1... ''. I , �, I T : .� .., �:1 , , , . . V, ,,: " . ! .�,�.�.;, T �; 1 � ',:1 " .., - ; I I � .:... ,,�I!Tf�,, .- :��,i. ,7. ,�,!� !k : "I , v , I . . ., .. I I I - 1,,!i.:!%... - . , . . I I'll �, , - I - , '; , �;�$ T": .(I. , . - - I ': : , . :, , icl ;��,.. - 'I".; ,,, 1, ,� :: �., . ��tl'i)t " 61 ?�, ��-' :�.": , .. .., I I I , , . : .. ",.;. 1 , - � . � :! I. j;j?p if; � .?,. �, :'. � : t,:;� f: 111. I f, : ,.% I -,:t , . f - I : . T . ; -, � I , . � �, * , ,i, 1. �. � 1� i'll, I."; 4 ::!,:��,, :wT,1, , *11 - : ... I'- ,.r� 1: �.:��,�. . . 1; i.,.,� . �. : T..� - , �-: . I � � . " ..'_ .� .. .1 . � 1. 7 . , . �, . I., p . I I . , :� �: �:", i;:- . . ,� ... � s�.11; ,� . T. I . � � � �'. . - I . . F � I .1 . I .1 I O= — vom V S to D D O rrI A ;0 _ O = \\ IIUIIII�IIIIIumumIIIIIIIIIIIUIIIIIImuilllullluumlH o VAAAAAAAAAA`AAA x --1 0j �111111IIIIIIII,fl1 C C)z-5 j; ;1 i 0 � _ O z r 1 (� �uuuupuuuuu� o 1 W 1 Yi 0 Z O Co Dz cm "rl -;b, D � Zl m c �q\ i rnn g f j c) Z i D O S03'37'49 "W \�IIIIIIIIIIIIII,IIIpp11111111_IIIIIIIIIIillllllllllllllllllllllllllllll�ll111IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIuwuuuull»i7� W v� a � =n co i O O= o>00 m 51.04 r*t 15'W E V BUFFER -L J — cWn y \W w D m\ _ ' \\\\ullllilllllllllllllllllllllilillltlllli�� /AI IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIlIIIIIIIIIIIIIIIIIIIIIiIII! M m cmn " \ I IIIIIN1NI11F jfliltlplUNlNlll111112_ I (N 111111IN�tI�NJNIIIINTNIIIIIN�N[11111iNllll I IF, III#IJIfIfSRNfIIIt411111IIliIIIIITI�tltl IiNItfIN11�111 NUIIII ItIN�1110Hto S OF DISTURBANCE �VAApvO"vA F r �, (AC> ,, •��: _ _-1 o o O fopN1203'46.,F FTI � n v I �2 I �0 W I �w V V O T v l p `, �� a�riirunumm�lmalll°rnunuiuuiui EOp // ® COfsGLJE pAR'krvG.:. _7 o j RAMP ro m_ \ m h, \ o ts) 7 F , c„ � F 8 54.03 S0(8 7'7g"W r, iv m �l = D ❑ b b o 0 e Iillllll� �.a _ r-9 l I �NIIIIIIIIIIIII111111111111111111111111I1111111111111111111111111111(Wjjllllllll�j O O L \ \ i j iii/ v _= / � I O � O r O J C}RtN LINK FENCE IIN� ® ® v S05'0(}7'52';M i7 r�' SI y,k r 50.00 , I b. I ® a. y co oil jryl uu±irri a v Xx CID Oti �L ' I A ': + �illllijpllllll pppll` - I ZO m I CO Z o> p t �Illilglllllpllpplllllilllllllllllppglllll HlHlhllllllllllllllllllllllililllllllllll III tt11111111111111111111111111tF -� ' "-- ---.-J N+ BRICK-�.: z� D cnn lK a ' c w � K z ;0 Vi m- AAA Q m O m i o'sx A58; m �� j�a z� c)z� m 1 om �p 0ym O= -o '+44 W N 0 x o v0 < A 00m m —I — x ���`= X �111 '� XOW mnrzq � Sm� �1 m - ��� — nr S08'4g')7��- — a _ i ZZ*o i�� vZm D Z _ _ EOP = 0. _ ` 15= �t m - ; z `_ 7--' r _ 9 p O 0 A 8 >8 A il 10�F zA-I V1mN o�mA o �wm rn VJ -'% EOP _.-ten I I I I I I I V] orzA �m vpVl Q T— m �" Orn0 -0 D�� C �.11 a i �i � z X x 9 A y m �o D O z z y r _ o/Too/ �� �__— -- r � _ z w � C7 t% X rn "0 D 0 CD Dom r" / O z m _ 'o/p0,pp„o„ •.. m D x v 0 z z x m A 0 o o z o `� o� F� o o D m W o Z W z i m m � Z zv m z m z X Z m 0 0 �i rn�v 0= Mr-w "' _ ❑ 4 z7 0 9- m o W \ z m Z p rno r= ® 1flIIIIIIIIIIIIIIIiIIIIIIIiIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIiIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIfIIIIIIIIIII111III 11 n z TO 1L 0 -� z Z 0 D � n 0 O N A=� ITl0000, M I Z m(n C::� r _ _ -{ J S-N G� �' W N DV) Cz{+ (nW �N (�� U) W N A O 2' S' �J Am O ID m n rn. N. Av 0 zN m' O• O' 0. �z00. 0. mDJ �ZDco ��eo �� rn �cn Mzov� Dw DN m S 0 D 01v) rD 0 �� p � r m0 O T01> mx D zD G) m-<Z ;uon 7, O-I m +� O C Nm m(� �m � >- �D z (n o�Z (� 00 Z vvmi o Nz -nz Z A�rr pz yrr Dr Z m yo�z ND �Dm Oinnrn �v? DZ �? �� *v(rnm mm yr �� m Z omv nA m OM fn O v n mn� C� r-- -{ Mg mr 0(A D z -Oc� Sr =r rO z� � OA m- ZD M DO my ry -1 0 O ZOA DJO u_i HO � Omz Arm), f;;mu Can m AOD DD OO HOZ �x �r 0-1D OD N�Z L,X0z - 0 OA 1n(0> �G7 x7��.ZD7 CO2 me z2 Z -i ZO Z- D mA Om AO -i Dz-mn rm OUf �D m Dy CO01n -1�-i �00� �S� O- A(n m 0 D D X X Oyy C D O tll m OA W D C ZZ DZp -I m N H� 0 z AHZ A AO �D O A Nr O x v < o m m A m me -- r _ A (n A m > n O mm -0 r�A ill O 2� m (n v m- o c vD �z -�� 0nA AD D- m OA j -10 r. DD a O m �� �� �r OA Z� Oen 0010� D'O V) SO N m<0< m2� m� �O Z� Ill A O vl �AAD r. A D -1Z 1 (nx D m ;0 iD0 DAN Z �z m0 ZO ➢ vZ xm = D S D A m OA my tno O 00D mm V A V) rA2 0D0 �m DZ S CO Am 0 D z'mH 0 0 2 \ S O Z (n �z MO OH�;(1 O� HO A AO C rC7 � o 0 O-I� f�7 "_ � Z 0n 0= D zOr z--11'� mr O xr mm DMA Z12Z- Or- mA r 0r 3VA M 0Z MD ® A < m rn Z H Z --11D rZ (/)a � HZA O� DD 0 Z mC z�iDr D 02� S W (7 AO Z)Z D� �= OCO nZ G� 0 0 0 m�SN Z 0 Z m �����®®��®������®��®��®���©�����0(]ZI(i i7 O m,nrn x D An 2r rO vI: M)O A-O A Az S O D C rAOA 00K � A G) �A r z(n =O '0 Z 'D '0 m V) Z A () Ci (7 O n1 O 0 D A r O m x O 0 O U) 11 < D D C.') m r 0 U) D m m rn 'l Z D A Z rn W -1 C W D �-1-- TIN (�--- 0 D m 1r '1 O �� m m r n NO A� O-4-_ID <D� zr v! O- �rn m Z0 mC� r <C 0D m D D v A m y m �ii -P Z Z 'O 2 2 Z Z Z Z Z Z Z Z Z Z C A z Z r 0 Z z Z Z Z z 000 (.) (4 Z Z Z S A ut r- -� x Z O C W O D 1 0 rm*1 O o -1 0 D- m m m O r O C" (n O D A m z m A m D 0 A m m D Z m A A mm o mDD 0U)00D0 v)0>0 V)0 Ic n U)(n cn 000 zZ Z00 V1 D mrn ;z m z DZ 0 r ozm ITI OZ< C ZA O D -im N�Z <O coMD OZO mrD 0 A rD ON W DM _i< O T-. O C) IT C 0 Ni �-I �I Z Z � Ni -N1 "1 -� Z -i -I -I -I Z z > > V) Z > -I > > > -1 0 w v) Z r r, O C m cn U) 2 W 'L- v) C� D - O C N D < Z _1 V) N = 0 D D D 0 D➢ D D D D m nx v Rl m m n0 ° mA Dv-1 x� �z -1 0� z ZO O O ZZ m m D=�����ID-rCr>r V)�D��Sr err 20 ArrrrrrA �V)�;n 0y.0 NIO (� AO OCO AD (7 D 00� rZ Z ATI mOOz 07C (n D-m(n �rn DU' O OD HDm D OC ZC �, m0 G7 G7 O D z=rr rrr-mrrr rr-rrNr o r r n Z M rrrrrrr''1C C-1 ram-C D NZ D -n -aO mN Cm O" O N- Zr D 0 W rO r D Z D D oIo*t DO- rZ V) -U D r Z � v0 mr >0z T7 -0 r rZXm zD cnr O Z m rr,AA .. 0 00 0 300S<�-10 Sr -I N� 2(�C(�m(���� V!or 0(�Cx, C7 U) -0X rrnO m n -0 m_. - � m� z= mz O � pm0 zm�= D< U)m z 0- A -O n 0 D O� Dm Im p > ZS�O D 0 nDmm Z D y=-<++Z Z Z AA pu?Oo O m0�-I(� c myz m m O cn WC O A< (ncmn �� D -I- ��� z-1 Z-i m�zm . m� 0 00 �mD z DC) �O O C mD00Z Z Z Z 0M 0 <-Im a0--1 O(7 W--I r0 i'ti O-0 COrn U!0p -1 mm -1m O Z T7Z ZD Z D� -1m > OZ (mn r=*-1HD N rn �DO,ZOI �D mZ � ?� ON6 v rZ oZ 0 m () .. A nD ➢ rn m �� �AV) �D m Z m m N D O O r 2. `L D m O< 0 D 0 0 Z D V) � c) 0 -< G o A A D m D. `S - V) y r m D ..--{{ L A N n frrl C A D A A (n 2 Z O O -0 0 G< M m D U x ;u (70 OD r0 rIDm ZO�p�00 rri m 0) m��ZmZ �Oz �Tl > M m v) On O nZ 0r 1A m �z �A O 00 m<D'-� r`5C A zm cz OH fi �� A A r- r- D--I Z0D V) y ZcC0 r�r-0m OC 0 m�Oaz�Z < oAO A9 T-. m O �� �x m m1 �Z z`{ p Z my OOyz 3D mm AC�r r.rI =o .X O� mNN < me 00 M 0 O z A A m A m 71 ,Zl m< -I m D C U 0 A Ul m 0 0 0 0 m m m m m� z m D m Z � D O V) � in z 3 Z� N U 0 G) 0-4 z D y r m m� A 0 rn _ A O m V) m o C �� � 'D g-0 CO (A ((AA �= m � -<< {�<�= S C W m i Z Z Z Z A (� (7 Z� O 1n D � Q 0 D N O 2 n � D D 0 Z z D m- m r m 2 'O ,=TOG "1 V) V) Z m r O N m 0 A p <� O r mm '� Z Z S 0 0 m W 0 D ,2 2 0 G� .. V) n -i D D 0 0 0 0 D S O o o D x 0 v T- A M N O rn 0 O < A x m ➢W o o m D V) V) m ZmG�01'Ti Or rnrAr mm vD C 0(M I1Z �1 �l A l'1 DZz (n m Z� AD -0 2m Z� Z >A y y --IM zZxm BOG <Mm O m mD =z v = (nm c z0 co c0 V) NOOONO A SA I n r r D 0m➢�-iD<f<T) �I�*1C A AO A� � 2.• n� U) r 0G mV) D O A O >A i� m r Zv �O 4�o-n pfA*1 mm corU)nM� Ar0 m-I D m0 OD r O r� � U) m V) 2 O N D➢ D Gym ➢ co 'O :0 m < 2 m� O A D � m-I m mi . - ;0 ;cl Z IT) D U) K (� ,� m C V) D D 2 n 0 r C A !n VI . z y m� 51 0-0 m 'O D -0 00 A A -i A O M=r D Tl �rn m ,Zm)mmA� 0 n0mm m Nm mOh .0 ZD m z �m x m!n �A m A 01 zrn-ir Z U)� rs`�Z O '� mrn v) NC r Z DD } D n D mm = O O mN Dn rG mz O =� �-I '<��-1 Z D� -1 UI 4� DS U) m m 0 m0C)r z m -i 0 'O WO DA r=0 m m 00 N VI V1 (n m rn rn (� rn N A Z r -i N r O O 0 A '0 0 'TI _I Z N rn (+i -0 0 0 m 0 C (J) 2 TI F. 0 (n Z -{ 0 m C -- m (7 0 Z D D p 2 O D D- w Z H r*) a G� O < rn -1 A '0 r 0 O V) C) m D D" M N m U) M S A -i Z (n m ,"il m-"• C --I A D y 3` w D O z S O x Z C A- GI D m r m r IN*) m pm 0 0 y (� Q :� m z z 0m -1_ID D U) 000m m- Dz A ') rD (7 z VI N V1 U (n N .Zrn)M m 0 D A (.n M m "' � A m D f(1 ;v D -i 0➢ D 2� r mm D v N v0 O D 0 H r r 1 C 2� T1A.Zrnlrn OmZ NV) v D0 A _I 0_ �' � -0,-. II 0 A m W r rn�z `L �G mrr � < Z O) rn D. O� m 0 DO -4 � no mm y pD D- Q0 Z m m pz -i o mtmTl Z O m SDD D D y���2 O Ow 0 rn D �0 vD c)mm 0 23nn 0 0 c rn 0m Dm O r n F�1 (7 Z (,i m o C -1 0 m 0 m m m U 0 (n O r r r r Z D V) D i rn C rn --1 -1 c) � U7 m V) p• z 13•i rn 0 0) ? ?I O :0 0 r :0 -i 0 M m m m m x x x x V) (n D D N r m m -i x A A V) (n O rn Z O O A m -1 Z O O ? O co V) r m m D 0 .. m� X K Z b� r 0 D M < A z Z TI D G) ? -I m Z D O m A m 11 �� 0 fOrtN r 0 D fmn D r 0 m D A -I 0➢ N -I C7) S Ao �m N Z n N Zv r N Ord Am ooxr A O NO OC =mo 0 OD 0-0 O D 0 w O C T. H -� r A C m Z rri O -I A --I D O r m r D (n m vl z O o -1 0 A- C) Z O � A (� P9 m ') D X 0 A D -� (7 r D A _ C I z D 7c T. W rn (n O rn S D �1 0 0 T. O A r rn� Z m 0 H; m rn p y UI (n�-'w v m O < D m _ r Z Cn ..1 N Z Z 0 v N N -I (rn!) o z mz �z -i D mZ u1D x D� -i��z zOn m m xZ �r-1= (l� rn z n rn 0 N A m '�l 1 Z m v D A rn r Z 1- N VI y 0 N N D D < D mM AOO ci 0 C� 1 0 D V) D U -i N S r O x mN D rr*) O Uf S DO �� �O m r O <00 n(>rm A D C rn �0cm) O m iO $ m A 0 U) a m (I) A m z < r z 0 OJ 0 z -i m c D -1 O O rm � 0 Z r O V) H M D S A r m r m -S0 m1 (A O mN n rn X0 SV) z3 D W m A Z 00 O� x O� O D xOU) _1 Om C� C -I '0 S (A S y _ O O C A Z z r O O N C Z 0 O m V) 0 M U) m 0 x) -n D -I m N S .Z-1 D m C) V 0 m S D () I x 2 O C C Z D o> z D O 0 m r 0 0 � x D m r -4 D Z -i F Z m 0 m m r G�W D D A m �O r -I z n zm A� m A H m-m ZO Lnn A xA 0 ;�- (n m O 1 0 1 rn S Z v U) r O 0) y- i t O (n = C) A c -ii m rn< m Z (� N D C ^0 r < a Z x Z D -1 OHO W 0r m0r OD \ D Om 1 rn A :0 (� D v z O X ON mm D z D f ZDA 0D 00 mzc� O z m Om 0 D '< rn co I (A Z N M 0 m -1 A m r O r O n g S =i D z 0 1 0 C A v A z '< C --I 0 r r Z U)I CZ 0 ' 0 DZ Drn C 2 O A D00 O rZ <m- ZOO K m 2A m2 � O ✓✓✓h����- 0 m (T -4 G� -1 O 0) 2 D O "0 U) m A -I� D D O Z z m-0 Z � 0 M 0 0 0) 'D m N z nA rn r0 (70 rn� m c rnr SAm A rn -i rn 4 0 n x i Z _ O C N m r W '0 0 m -0 -1 Z A m r 2 r n .Zrn) m 0 v \ I/ y D N a) M o 0 v rD-z r < rn O0 z m0 OZ(A O0 �v m0 z M D DB 710 PG 910 o m O m m 0 zZ m O o z mm �D v z Am nXZ o O (7 r Z U) z v U) (7 D 0 0 m O 'A aG N O Ut 0 m 1 x (n o o = z rn z ;u -1 0 0 (n I rn "Cy / NORTH v m N a = o< z z o z r-ZC) � < Oc> oZ mA Z<0 o O 3 0 ITT v o O On rn (n CrJ I � I I • PROJECT NO. • REVISIONS • CONSULTANTS • II 7 R 7 C®Y�V IV 17� C®L6� e 100032 0 hayes howell n At:�r;� I iI ®N5 REND A71 ON5 • RPLCKED BY D I� Q P R O F E S S T O N A L A S S O C I A T 1 O N ARCHITECTS •VJC/L B VJC/LEE as jrrN > I� I • • • 'I 3 5 WE: S T CON NECTI CUT A V E. MOREHEAD CITY, NORTH CAROLINA 16 AUG. 02 SOUTHERN PINES NORTH CAROL-INA 28387 I - _ _ C.'e.3. -_i �i.__ _ �!• e ;! ._. _. _. _ 1 _,-_- s-: 11_: e_.1_,� ilia. u S06t 14'74"W h �'9 j 05 N J .Z1 lnN O- D M n m� � NN .Zal NV� zZ� (M ON 0' OW �ZON pJ �y--{0 ZD-{� �lr� >V �O1 mN �Z�� �(N DAN p aD> '� n AO Z 5r0T1 0o -0 m:D0 Z ODr ma �C yr T> 0�00 xM KfT1y 0i4 IT= �A0 OZ ZOo �X m0DT1 �_ �� ND 2 Z 0r D m Z m ry Z! Z rr �r Ar Z z 0 Z mm M xm M O- Om- m m � Z 0"r'0 i�A m Qom (n M0 �' '0 M�-1 0 Km-, M0 �r cn D m z in ➢ 0QI -z D� -1 �� ivvic Km Or rr- m D DOA -1-rn O -u vlz D Q OD m f!) -1 -I Z (n £ A Ay.Z1 017 -4o rnp �o Zm OCR =Or x� pro �Z.A ...1 Z Z OZ m>om <o 03 �0 O .� DO (n O O M yy D y D DD 4 OZ yx �I--O-I> D rn O Z G)D 11T rrnrl D y O W v m m y��x v o I�TI rn 0� W D ZZ �r� cZ0 AZ.*1 0 D {c y�Qz . c� ��m O nm D D X X QDDm C D 0 ZA Zm o mil Wry* Ap-� DDon r� O(n �D Rl DO 00 5n 0OZ NOO-4 m- 0A -4 0 C A Wz m� Z3 Z :ii A N V1 �7 D T7 D % D r 'O ➢ O D O y 2 y D y -i -I Ti V -i0 n ➢ o rn = yA O Vi 0 AHZy p0 �.Z1;u C`-0D 0 0 O- mcny m Nr A � � D--4 o r � � zA I = _ —_1 A_<n Wa f nv v�N m ��O rn� --Iv cn —I y v�oA Zy OCO Oyo� AQ x0 Q x� (n=m mn ao Z� � Zp (nX D rn . DA Z Z X CO xm !n �n ZW� Z Z Z Z rCnx Z Z �0 O❑Om❑n❑�Zm O SOW mm O 'D A0 to rAx 0D0 �W DZ x O-A O O 2 \ m<p rn 0 00 mz 00 m Zrx o 07 O H my -r-1 On O(n OD OZ Q ZO') D AZ yUlmx SZ WO 0���1 O0> =0 D '�r1 Z70TI C� Z ui m� (n Z _ _ _ _ _ _ o '1 O o A cn Z x D z5 0 Z� mr 0 r xa rnn a�� zxo pr mA r OmX OD In y r C-j O D (n -I DD � r N Dmmm mZa m H y (n m :O m n➢ 0� m n V1 Z A Omm X D �("7r 1�70 U10 O ;O T)Z -IDr O=K 'O O O :qm O mfn O D DT7 O DD r rK D or rn rnZ- � r r O K� Z� W Z>> mC Fi Z M Z Z Z Z Z Z Z m D Z yD _ O M A M mm m D O (n V)V!V!(n(n(n < Ul i Z r xmA 0M N O Z mC z a2 >M'1 HmZ A m Dz �� O cW mZ (Zj m D D DDD DDZ� -i z Zxm H O QD AW 0 (m+'10 Tm1 (� om 2 OO O 0(n <2<0 1 DOC rAOA 00$ m A G7 m D Z 00 0 mom Z z 0 m X D r-r- rrrl-r-(n�;p a m �z m n yZ �m 0D +Om m 0� 1 -O+5 av_ z1 - mW gi�� �C i zr N O- om rn z� mcm r <c DZ 1''1 G) O m �..� r r r r r r r -1 D H n O Cm Z m T. fnZ fA'1 C m < ZA p D m cnvor 00 W OZv mA O (n $ A ;u NO �7r n 0) rn En0 O O CO 55D AO C �Z(� DZ v� :(1 A- mVO < (N*)n (nD Q �rD pN Zl ra Om� yN O O D O ;u 00 p V+� T� On -m Z OTC 0 =� rZ y C K Z -v -1 ZQ O M .Q D D rnrn a V% Um C00 C1? mom r O Z �OZ rn fnWH �Z >0 m co mi C Q n Z (n m D O� < m O OD �D D 0c z z D ��Z N V1�.'0 �� Z N r (n Z+ O"'1 �O v Mr- 0 .X �W r 1- ZD (Dnr ZG) :VZp Z rn !nW O C (� (n ��0000 y0y O WO T� 1m0 m O ➢ � OD zm (�D O Z (n= D = �m Z LI) �1 10 O ?1 Oy >M :V m R7 A OZ rn.. O -n -u O= �Z O prn Dm�� r= �r m Zm �yZ D D v0 DO- rZ O A C rnZ �W 0 O N WC Om A NN r N D y ny Z'-1 � co O- o = m3 () �Z70 a O v OOmmmZ OD D m Op ?� O 0 r 1T1 D mm (n z r mA0 am O i-. 'i1r Z Z >rn m Oz Um1m-TI D �f�*1 �70 to yD 2 Op Dn Z r-0 UC fArl m O (70 0 0(T7 Z -i �G D ry n to W n m A D� C-0 >m "1 V1 MD .Zl m 6 O 0Z z m m % -+ D �7 p A r = (n x z y D Z m O (n 0 A Z O { z rz y(n O Or �A = -i D W O 0 O O D A y- O ZL mC r O K(n O Z Z -0 Z 'V 0 O� N (n m� Z(n OO(n 0 00 O r 00 Oz m D r 0y AO A Zm mz D Oc << C O OOC�O!)Z-TO1 O Z C A A -1 (_� m OZ Z Z O Op rn<Hm Z- A DN (Zil < OA1 vy x W O O 000 D C7 D 0 0;u;0 m An m(1) m rnD rn Z D O � O o = DD �� rnm =Jmo m � y rn O Z p (O (O NON (O :0 � � .Z7 1ATI m m � � � D � D (n i1 X O rn O DO N o Z � = .Tn1 (n z rn � O m c) � � (n r y � ' r D 0 Z .'iQ1 O � O W Z CO M .> 2 N Z ��O< --1 OO Zm r o-C �rn � _i <O O N (p N pODNO DD D D O Q r 0) mD '0 m (n x A C A mM a D -aA rn0mz IyT1p Q� O<Am 1'1T xm m N O O �� mmmZrr r z- _ w O Op -O y 0 0 (n (n (n D C N D O `t Z r Z xl rn- O M -< rr1 N D 2 r x (_n m D r C DD D mm > (n� O Q A �O n Cm ZAXM < x z x yz 'o -10 ;0 z O m OD--- C DD x z,'I r 0 c� LO z mA A(nm ...rm m-I n mC p O r� m t M N D (n O O O n D Z Z !n A Z -i m r r m Ul D D N r `L Z O rn m (n (n r Z NV1 N N m mm Mmmm�rG iy Z Om �D m Z 2'0 N(n KO rr1 .'0 in Oy mOor Z mm W<rno �WQ N Z DA r(nz Z y 00 mmIM o x A co _ mZZ (n (n ;v;v m i i D D D= m z D D D H� rnr O O Arn a G) OA mO AO m �Z xo (n W OZ `d > D - fT1 (n D O O z 'p :.� H < Z Z o y `E 2 z C :0 - rn m o D r O co D O D " .. II mO rrT. rT. T.OZ r �'IO O O m ND ➢Z xp = VI Z-1 zli < m-.17 DZ A �O mr rn m r n ro M 0 OWi x O O m D < z Of M �. -1 --I rn y r "➢'1 C x (n Orn Zl A O m (n (n 0 D O 3 ,'La7 o= M N r r T. T� (� (n ('1 O(n o < >� OD (n O_Ir v1m m5D O ZZ z-1 m coo D OD I --I n C (") O D D Z !R r - O -t D m O O D (n 0 z c) O M 2 m H G� y Z aO m O O r �I O D 0W m a m O- rn 4� DO 0=1 H Z X 00 m 11 mQ r Cn y � _W tTl D = m ;u X N0 ➢Z M C Zn DN➢ X fm mcm- O HN O D Z�'1 m(!11O*I (n O Ar (n U-.�W (n L. 'p Op rn Z o �O N ZD r m 47 r- "1r-�i y Qrn ;a C zOy _i r 17 Crn O ZW Wo 'v m (n C I z z W 1+1 (n O Z m C O ;1 O r,1 V D m O Ul C W K O Z m p1 D -1 x Vl m Z O Z D 0 Z O O rn y o O O � x1 N o A rn O -D x Z rn 0 H$ m m O m WO rn rn O Z Z K- --I rn0 In DOD < •� O 0r mH O OA m � to O -1 (n fn O r. ''7 Z y 2 O --A-4 A D Z rn m Orn -_I x� 0 Z o m > C �_ CO� Z (mn OB (n �z Ar a7m m DZ �m2 �� nOOO vQ0 m CO =Z CIMM � O Dm N 0 m N X A -1 C n Z N D to ZO O <00 r D C m y0n O rn �O I O O r0*t (n M � K. x(n EE D m I,Ar1 ;0 Z p0 py 0OX Orn0 N � Ox �ym D � 2K (!n r �W x -u S O C� Zy . -ai Z m➢ 00 O WC �'OOn �= D Z Z1- rnON O 2 Z')m zV N r 0 �1 �O r y (n O 0'O y r � Cm Z 0 mr yD z y0 ^ r O rn ._.- yr O (n = OZa1 '--C mI•'17y m U O N m �2A (n {- r �rn +tl Z x Z D > 0X W (nr M- r O D \ Oo %m-< rn z D ... M Z 0 x Oy rnW D Z D ZAO m D moo MZO O a Om y X 1 K 0 :T1 0 0) 2 '� D Krn r O m X �nA ==1 DZD OC Z11 0 m;0 M!5 0 (aj CZ to O Dz ➢M C m O Z D00 O rZ <fZTl=1 ZOD yrn ZZy C N O A �� 0 n Z �v Cc, v rD- W v oAW rn r(n v�Z rm*1vr W mn M m (n o N WC O m '>7 O N 0z 1-Z o r -< � :000 Z rnrn alp- M 0 2 �M A-r10 Z c ➢ yrn C WO O- Z1r 2 r / 2 m� z O W X N OD 00 m O O V Z y :il =J ={D 0 z .'f�lO VIAZ m O fZr1 co 0) - r_ �< z• (n z O 2D 0Z r my z�rn z� N o Op Ln ZIP m 0 M r m 'N O o 2 O Z Z r.o om QICZ OO �� ZQ<0 n 0 0 r`1* �1Nv m my _ 0 =m -1�A M cn • hayes howell • 100032 PROJECT N0. •REVISIONS O �I D I v �I® A��1'�1®I�l�I 5 � REI�Y A'�1®NS •CHECKED BY P R O F E S S I O N A L A S S O C I A T I O N RPL ARCHITECTS •DRAWN BY VJC/LEE 1 3 5 WEST CON NECTI CUT AV E. NORTH CA ROLI NA 28387 MOREHEAD CITY, NORTH CAROLINA �✓ i �0f Zvi, A % �9 16 AUG. 02 SOUTHERN PINES • CONSULTANTS STEWART ENGINEERING INC PO Box .380 8 Fax NC 27709 � 7e1. 919.380.8750 Fax 919.380.8782 0.87 atroj:,u aoam.ine mxwrtme mmrew.wmrn...a� �..ne.wamn w.p.� W sar..isq�a.me. ice. QaE�Isenmun.inaprtpueaa...b M1eiwa3m ma .>rr^wwbmp>ro�eawwm.erneb w. M WI rtmelnMepgMIy NBFl.11irysa M14bw[M. nNllhi.Ort.Nf]Furymmn&�MtlM�RiKKBNgbOb e WN ArtybCUM1pbxMbn {gm'Kbn NBbxeM1Ergnearl'q, Yrt, Zn3AGR i43 Vdi f•'(1F"1 1 of ..-S.f R#Pifhr.>:1 u I w I ) x I r I D O 0 c c D m 0 T- o m 2 x D H � 1 n x i C+ I i\1 I L\IM T r z m X m X �D Z A X I�* r r C 2 o X W z 0 D O v 2 A co 0 N r.7 O z C Z 0 z 11 O z A m N Z 0 cop r o O Z c) z n A m ➢ K m z Z it iTJ L7 d rn o A m r z 00 00 00 00 CD 5 1.0 4 ,-1 At TYPE "B" BUFFER I Z � � co rp0 cn W 17 E I A N (� D OWN �D > AN n A� w NN A�� n ?N� mw ON ZD pw 7'�ZN .TOIL ODO mZD� Or00 0v �� NU =pm� SW �N � 0 ui <DH r mr O Sim v0 �0 SnO O pD� y Nr �r O D rn Nn 7'-1 mm-I N-Im� c. 0 m m0 m D-i �D m = z Z omz I A m Oo-0 N m� wz ��7z Z Arr pz �r Dr Z �z yo�Z Nz ��rxn mxAm ��O oz ZO 0� OM�o -x -r mn Ill D O OOD nm c Z vm f A C)yA n 3fr*t1 m� �r nN D Z� -I ()C-� 2r xn 0ND ----4 DZ 5-Z1 m-I �TJNm �m Dr TJr Ill zZ0 20 c)C Orn OD ArHr1 m ��n ITI Ac➢ Dn DO OZ O HX rr� 0 gD mN0 Z;DOZT 0 *0D mm (,zilD �� ���n jo W� yo OA fll 2 CJm Oj D C ZZO r'lA �m DZ0 •� TDIom NN �� AO m Zn ,TI�ZH oo ZO A� �mKA MXo �n O O� ANC WA N� mp Z AmA -10 N n 0 mT1 Tl rNA I.71 Z1 n 2 :I7 m o< m- O Om T1D T1 A O O ZO I mm i x -� AN Coo E OD 'DEN D OK0 mr -N-1� N NH 0-j XA Z-1 COCO 0000 DD =0 X;v m2Le)m !A*ln �� Z� r� 0 per° rNi� O c7n nN ON n0D Z OZZ �0 zG) D -0Z A0MX =Z zW0 O�-(� 0�D =0 D -X Avm OA r*1z OZ W ����❑�®®®�®������N'1 ❑!TI®��®❑N ��©�O m O O m m mN Z Z Dom, x D Zsr Z-IX pm0 O r � T1 xD rnc) DMA ZSp- TI Or mA r K 01'*lA .Z-I nn N Z O Om D A �D Z No -iDO A DD r� D�nr m vx mZN �nr r Om ��p mN OZ AD Om O A <�1N x* O "'I Z OD Ar r0 xmA c Azr N Az (� Z f*1C Z D D -O AZ DK ox CO mz NZZDDZ ZZpZZ DZNZZD ZC�ZZ ?pZZZZZZp00(i�Z Z Z=A Nr "'I x O �� OW m� mC)mi Q pmv Ov Z N� -<=GD "00 DDC rAOm 0z AO m Z� =A ZN ='Iv r D N O DD �'� r= N zr mZ s�N-IZZ�N•�N-i���z�A �-N-I��AD�i NiC 'z�-4-Ni-1- Ln N-i-izZ Z00� D mr<,.I �z DTI D 'i DZ nm yr NZ� ill O-m �� n:Sl O V mm (n 'Opr O� {cam N0D� mz mA m DO mA�=,.� r �W yZ SDy -IUD DDCDD XD SDDn DZZDD =n nDDDD DD0UIwZrrI -1 >xo cm (A o Ill N xw z Nm mzn ccz zm A -im c)pZ a <O W1N.1D Nn�0 �D n rD c)m O N err r r rNrr Nr rD-rr r0Nrr mrrr r rr MX ---iI TI -Niv C> Oo `� -1Z =1 Z A 0-� �Z �- -V � ZO ON AA O O rO> � AO Co An it0 nom rZ o K A� O Z O� (D-/! 2� KZ o nK ZN Drri 2 a a �''� (n N O- nZ �CCAr C ZD D Nm -i0 m� Cm D m0N N� Zr m<00 D-mU1 -XIM N O OD -ID OC l) p()OS<-1 (� St_�N�O2C)Cc)I�T ()���V,Nmc)c)CT ((A tNf-1�A �� � Z N r Wiz. O-1 TIO '{ mr >OZA UCO NWT rZX00 -XI VD1r Z,t7 AZn Z vm N� fzTl�ppZ ZZ nZ mZDDSm Az�n Z AW M(nZU10D0��00?U!~Z� C r�nZ -mIW m nZ m ''1 ... ()_ Omy 0= �D 0 vm D�--Ix Z""I {r rm-r Nam? rN*t� n o0 �A() � AO D <C Z z VI Ul r.— Z D Cf)mmn C) C)mG-I GVIO 0 F Dn ON OO DO m O AZ Zm Z Kra -im r N OZ m2 n _ 3 mcu 0 vD -I 2 D ➢ Dn TIC -_I rr1 Tl H m x m zm Op m z N NNA\A (nn D Z r0 TI AA D() (nmm m �`5 ~ O r (Qo D X Ou A C OD n � A m N 2ZOX --ID Z � ZA mN- o r2 O m C) m 0 n C D D O y m z W O CJ O 0 Z m (n m D TI A N (� r D D N f 1 D m -I D A -{ X N D ➢ -/ O Zl r m D (� m v C Z i D r� m c O Zm CTJ DA m =D ��O Nr 2" D 07 O{ () D0 n00 TI ON Z OA��� A m zm �<Z CEO fr�DC-Qm OA NOf)C)C7 ()�NT11j00m Z n�0 Zim AT- m o SN zx m m1 1Z 00 O Z mo 002� 00 N� m{Dm rZC THIA c ZN CZN -< 00X 00 O v� N S m � j � r N S� co m m 0 0 0 0 m A y o Z m D K m-4 Z D A O H- O Z p m m A C r r F 0 3 N A o n AnZZ2 OO mN D� A�T)� L7 .. N' -a mD D O N Tl O� NO ui D N N hD mz<> -0 r� mp Sm O A O Z O = O Z Z z Z 00Z;1 � H UIXD Om O ➢ C `-G� ZD N H O ZH m_ m-A N) ZO 000 �=0 m Nn W0 Z AG)0)m Or Mrr- rmm TIy--I C nm. �D NrCi C)C)nA TIOO(n D x N o Om Z X r-A x N Z K Z<O mO rm m-1O< mNN .Z7 N m m r D O m � Z D< f<TI = �j fNTI c m A M Z A A A A o D Z z V7 Ill r Z A D T1 N X ;n A H 7K m m H N m Z Z X Z -i O< = Z A F1 H Z T1 N m O O H— m D r •D A A O 11 1 1= O () C) n (n y 0 C K V) D p O- Z r Z O � 0- m O A D 2 r 2 0 N m A D Z 2 Z A FAO -I• D 7Km TIA WAS OnQmmmm' Nm MZ) -� NOS Zn m Z -1m rr mfjj (!rO r v rll C) Zm�C) A m mmm-< MI o NS Z o Dmi r -{ mn o' O Z 1 (n Tl 'A m= A m K O m m D D C -i A A Z R1 m A m C VJ D D 2 z o p m m N N N m .. r m H n m x 0 C CO O mrl to r- < N Z :c -i mm� O N A _� Z `ar _ K D D MOO z m -A 0 m nC rN Z O 00 m to cn (n (n m Z z c) m N A (A m z z to A Z p m m N N r z (11 1c m C> �� nrn m r Z <m AW A -p Z O TI 1 D -0 Z N A W ti O A N-m m". mD (n m mmmm �`Lti� ND On z D N 00 .�0 Nm HAD D pm m A rZ Z m0 m,- M D' Z !n _0 z m �N CONr m : � .Zrin�� mDDT� H mr TIO o m ➢ HZ 2n 2 o O N NN2 mmc D mr m co r '� D N A m- D O O Z Z N ZX �zc a O X� �n c<C)n T o m �Z =N N m > --{I m D" -1 r- N A A O f*1 - t1 .. O m 0 O-• mmmZ OU N v rr r r ��OZ Dj <N D m ° "'1 0- rn 0 ➢0 '"( Z NH o AO �Wm D OD �• ^ '•b Z (n m Z� O N m m S D D D D ...I r r 0 0 2 < m z O 0 N O n 1 Vr -1 r --+ c 2 M m m m c) 2 N D C) r :U O Z 2 r m A -1m Om O D 0 OW C) H AZ �Z A Z 0)O OHm x N =D(7n O�0 Z1 -Z DO O m O 0 m D O m "� D A m{ r > rr O*1 = o m Z DND iA mCm� 1 D O mm r az / o �� m mm�� v)tn za D u DB 710 PG 910 v m x_ ro A N D z p N c N o z o r romm A m n r o D no z c1 rn o DD '1 m c>� -{ N - om c z0� � r z; Nm O AA o-3 / NORTH D -) T 0 D 0 r = m r D c 0 I m N w �� rM oz m c or- Am om�y m p p N c Wr A zm ... < D_ O :(1 D r Z V1 NZ z n N mz nZ D N z O O m -�� 0 n N AN n,p '7 Z00 -0 Z O mn 1�rn m o z D AO -< X O Ar m O m r z r !n N D O N TI Nn I N i m O Z Z 3- x m0 ND� N A Z 0 mm rn 1 2-0 X D G)U r' >- r O N g O < r DZ mti ApOZ 0 -Z c) DA n m D N In A (n m r 0 = W D m N ^� Ar A� m r ;Orn2 D �� D�No .Oi00 m W mZ Omm m CTi A A� m SC � 2 N Z n rp C) N m 9 nN 2N ZX D ca O ()0A r n �OOx o10 N r Ofi)x ��m D 2A m N Vl X Z -I r- r 0 n m A 0 O --1O ^ m Z M n m 2 D N I m S x O C 2 D nV) mn ;u -rl> A n 0 -4m0N m ]r/ m m r w H �� ZD •(OA Z D ITt p OC OM = D Z r N O 2 AM W O D C ( m Z V N r p O1 m � r p H C) ZU -1 ;u mA--4 S Cm Z O mr Hn z O n N j i v .. � r z x n A c rn v v N ;0 (n �- n fmrl r W n N D �N rAn Z o x O� CO D Z D Z➢; m ND rno0 mZn O m m� m m z U'I � KO A OH m rn = A �m r O rr- O HO 3 2� DZO Z A z OmA m0� O K D Ln N N m m N z O m 2 '13 rr1 = N m o oo v cz N c) ➢Z Do c X m noo o �z zm� zoD v -1m z c + D D A �� Cxi -< a Z v c: 0) m m co'iAm rN -D�Z mmr -I c mD mArn m in A C) r NO WC p r Tl O m Zpr rD-Z O r -< m ZO~C) Z Wpm AO" �m O O �m Amn Z C D z N O v o �00 m Z U z -i o x D� Z. w O O =0Z r A`2 00m 0-Di N G) 1] NAZ 0 f) frTl 0m0 N O O Z O y rZ� r ON ZAD ZZ 0� 0mD D m I� N 'il O _ r A Zo r� r I<�1m �(C/1 Z0 �O ff**m1i 0 0 o m -I m Z i 0 2 A m •.•.•.....0••••0••••••••0•••••••0•••••••0••••••••••••0••••••0•••••000900•••••••000*00000000••••••000000••••••••••••••••••00•••0••••••••••••••••••••••••000000••••••••••••••••••••••••••••••••••••••••••••••••••••••000000••••••000#00••••••••••••••••••••0•••••00••0•••••0•••••0••••• 1 • hayes howell CART R 7 C®�Il% V Iv (7 I C®1.L. 6 to PROJECT N0. •REVISIONS � 100032 o A T I O N • CHECKED BY a A�� 1 i 1®NIB I$ RENOVA71®N5 RPL P R O F E S S I O N A L A S S O C I ARCHITECTS •DRAWN BY • • • LEE 1 3 5 WEST CON NECTI CUT A V E. MOREHEAD CITY, N PINES NORTH CA ROLI NA 28387 NORTH CAROLINA -cd•r � D -OS�"� A r 16 AUG. 02 SOUT H ER , (t • CONSULTANTS STEWART ENGINEERING INC �y PO Box 12054 RTP. NC 27709 Te1.919.380.8750 Fax919.380.8752 mzwz: noaorm.m.emuuiaao�.im�arommew,a..are..www �nwmc..e nrsu..nEmm..iro. m4 (�E9.�em.eummp apo�muw,e�vm¢hxmamn,men �mn.•ewemgmwgipn�amerpaµvry rpm ien erdswl nman ne prgwly N9e mrymnmmeamgn,,mmbe, craurgm mmymenrerxnauoewrmaspreem anwren��wwr,Mm„remm<y„ asr,.neronwnr¢ *�. u D m 4 cs 0' c aso� z c� a 00 <D- II -U m II m —z I �a O II N N -P N _ rr �-—W---W----W__ M---M--- M --- M n -4SD---LSD-- LSD-i FTI ( } � F9 z0 ir1, S rm Z rr \\\ c \\ Z m o -1 00 Z . I O 00 as S S / Q� - < o�z ()� J G r D b 0 = / C) n / n D II II II F_ OJ /co I v m m Ln Ln A m m (n ON X X(n� �D 00D O =1 O =1 Cn c(� rN r(11 CID TN 0 2-0 "On. ..� <N O�.TD1C '""I cW �-�ZN A� ODD r=rIZDW ��00 NV RO) m(T mC)m D(N N f=HT1J -N-1> (nDZ2 1= UD pr(n (� -,om �r�--I (��ry*= ��n01 OZ Zp -ix pD-'� �= rD tAD OCR c0OA Z< mO 2r mr0 17.1 DwrO '-a S:II DrZ,) z� OZ Z,➢>ov DO WO rO oZ-;D;;u0 Z DC) <COC) Zn 0Oz (A -a MOZ 0 0;0 (n0 --1 .T1CmM W-ZI mO zm Z Z mC Z➢ Z)HZH 0 mA� ,�.m;�l 2A0 g➢ 0 ;I1NC mxl (nr O 0 0O KZND O OD mCOA Z-0 ;0D CO0r ➢OA HZ .Z7 �m mn Tl mD D� D� -I 1 Z0 o=1 0=(A 1 0CC) D OH A 20 Sm mn -40 Z m-Di 0 X:d V% UZ -HNm= =Z zmo O = .x O-4D 0 D M M0-9 DCA mZ OZ in A� <<O�� XD m0 DNA ZO- �0r m'm r 0K ��� A C)z Z !T1 <- rK D Or m mzy <0r r m O m0 0 D I G7z MOV1m me z2Dr -Dp0 D C -0 _0 00; A Nz H�� oD Zp n00 Z ZN (n NH j)d DD Vm rD� zr Tlm mnD 0 m ZN (SitC-{ r �C TI 1 0-I-10(/) 'm -ir <� <C" 00>m �mz mm m D A2 r �m >z ' ZD mcm0 CW Apz a Ax DD_D'I S>{z mr-> 10 A c7z 0(mnN W Dm -D_-1< A� Z0 Z)� m00Z Ox (/> ➢ D—m(n Hm DN O On Dm D 0DC ZC ON SZZZ Orr^ D0ZA T ,C/)Wr rz-m z-4z 0y z ZOO >O� Z oz Dm 0-1 0 Z 0 n -m ZH 2� 000� (n a m� C) = 1;0 D 0H �p i Am D�c= oz N mO m �rn -ID0Z A(Dn HD ?A ODD 0 r0 xrCl1 ! 0� >.: HM =Z '��00 00 (n m<:m n<Dm O-C n Dr0,1 mOZ y 0(n OGZ �m:OV mp OOSr OC) NT �m r2C A.T7 C ZU) cr (AZ(n < OA O i rD Z;OD OH 2Z<D _0r m(ma1 m-4;00 mN : Or D OHx Z-•10 m Nn mz 0z -0�Z ZD m-m r m r < -( O � O i <D m'00(n lnv mzmz �0 r� 0_<;0 m=m A Vl X0 O � r :(1 m (/l Z (� Z m 2 H r- l m '0 O H m Z O X m m< 0{ 2 Z .Z-1 Z'1 ➢ '""I 1= Z r � p (/) X D z = ;) ®® ®a'r ®®®� m ®�®O ®�D�N �® 09REMER ��m® ❑ C D Ornm(n p2 :0 00 z 0r rFwz m m m �D D m mC r- Z--I Z 'mom A(<*7Zr C0 --m0 (n0 OA mm a)mm=5 �wm r0 0m D mp 20➢ r H mC) �{ _a O <z,m0 D N w::E O Z �(n O .Z) Zl a) r zA W r H= G7 �O m0r 0D Zm�➢ Z (n� 'm�Z O 'I mm N VIC rmz 0 r� _ m N CO n O 0 2 rn O� H O H NH m0 m < ;Um --1 X Vlm:[I _-IH mzz Z A rim Am nA rN Z 00 `^ N-VI C i 0 (nCm.� Wrr- Z m0m A Z '"I �xl A C O f'm*1z 0 3 z m zm C O Vl 2 r-- CZ�W O m00) m -i0Z10 m0 -0O m �z SN (n co 0z )� Z N rm^ 2 2 Z 0 (zn (zn (z11 N (z/I (z!f (zA N z (zn (zn (z/) Vzl rm,1 Z m N Z 0 tZA m N fZ/1 Vl Uzl (Zn Z N N (z/1 tZ�! N N z r O m m<< r r S O W m -I r 3< O k, 0 -n D O m Z = V) 0 o =1 r C x � O->I O N m m Z X m , 4) 0 3 < m � r O O 0) D _0 D- d r r r r r 0 r r r r r r r r r r r r r r r r< r r r r r r r r or rr r m r 2 rill --Ir Nmm> m r �0> rrl N D m Nmm �A� O Am m� rO Z rS < <r-00 m m �m �2D D0 ?r-I C N OA 0m Om� v H O D0 �m� ➢ OD •- r r p r r r r r r r r r r r r r r r r O r O r r- r r r r r r r r- 0 r r r r r -a 2 ➢ (� O -I" O `< 00 m ,� m G) =ypZ r A -1�TI VI -i m2D 'OD G m� m �O mm m C Co z0 Ar➢'77, �r�i l' Senn OZUI C m �Z DmO z r r-a z 0 m 2 O 2 vG)Z mV)O m m r -1 =1 0 m� N r 2Z 0 O� v O m 0 N TI D m 0) N -I LW N O W N N? Vl 0) 0 co m D m D O 1`? p N -NI � C C C <��� .-[Dl C� ;0 � 0 ➢ D� Z D D m n D ;0 r O (n m X Z m � m -0 O m 2 2 () C 0 UI - -I r 0 O r (n r Z 0 D V) D Zi G m m C m � 0 D Z m N m (n C) x) a- r a a n a a a a a a D a D ° r r 1= O a I r C) (/1 << D r m X m A G) C m p• �. r'Z'i A X r Z Z O 0 Z a 0 O pp (/) Z (� O 2 A -0 O Z < room to m Mtn Z r- D Dr F$ Z c mA m-:.1 j x ^= O a mW\0 0r Or-N-I-I -I Zm Om;u-0D m 00 <n C i m A �m a--1 < m K 0 A 0... m = Z O ;0 S V) CO < Z m U -C v (� m m 00) 1, 00 v 00\ 0 0.:.I � v f0 00W> XM g �0 XmA m -0 Z m D < 2 � �-+ � D C ;a0 X O Ar m 1 O O m 0 O z r S N � a ^y W O E 0 0 na O Z ."(Dl O N � p Z m= Z n 3 � .Zm7 Z O ,TpI �� 0O O Z � D -i N W A Z y O () w W r0.- D N D :(1 < m O O 2 Z I- W N m H '0 Z C I G) z z -0 �1 (^ 0� N Z O - m m Z O m� 2� 0 70 D c) m W ['J << O coD Z p m m O O O O < -C V y � O O N Z D O r W D 3< (7 y W= D r C r 4� C) '+7 -ri m O (� = 0 ---I p :U G 0 0 - � Z �7 p A) m O (/) D 2 p � -� � z Z n 3 -'�I -i O c -j H Z m 0 3 m y -( O• O = D D� O m m z r� T lrTl D Ul -N-I �-1 i N D N D fZ'1�1 m O m T 37 D W D co m p- rrI rm- - _ n r v r r D M 2 r L D 0 r S O \ m r D O O m 1 2 N- D Z m --I O 0 0 m --I Z C) D D D M Z --I m C 2 m D p VI - C m r m m m : •i D C W S m V) ;i1 1T1 r r- O O m p .� ;a D C O n n m C O -0 •' Z Z r C- (D r m '=1 D r Zm 0 < ..g D r < O <00 r D m Z (� .,, m ii D(� O DD OD r m- m S�Smm ZO'0 ZZ < O.Z)H=1 O O D D X AO 0 O (� Or OZ D m 2 O DOC 100 � v F p= �_ m D x r 9 'Z"I 0� . m m m O m m D A D m W -4 m D A S X � v1 O Z � Q D (n D m D '= m 2 `L =� G O 'O Z O ._ X- rn 0 Z 17 m D H C) 0 r ➢ ra - O A A m A A A 0 r0,i C c r0 m D m z N O HZ�(n m D �D VI < < �In 2 O 00 O D 0 �m� 0 m Z OC O W X O m N 2 zr ON 0 = A� m V r D D r r r D < <"• O D O m p O C 2 D m Z x) < m Z D m O- m 0 n O m O Z) 00 �7m D m m 0- -( 1 ➢ Z m 3 2 0 D O n (n Z m< 2 O O D to m m Z A z (n m D D 0 -( CO r 0 O 2 D CA H m (n A Z m rn 2 2 Z !) Z r O C O Z 0 2 0 r m m r _ID I Z D 1 D m 2 C)HA m �C m y O (n MW 7.1m< m Z rn r m m 0 Cl m m m m= N N r r DC2 O it D c O m Z D� = O Z`5-Z Z rn `22 / <- rrI m m O S G� 0 C m- �) rn -I m O H C) xl H = C m Z 6) m r -( Z -A ,Z0) < m m A 0 m m L I) 0 -0 z ;CO-1 Z N m m m m0 n Z = G) y m r 0 (n � r � D � O r � (D (mn G) �w r� m-4 O r p r z 'L 2 (n < Z x7 O m D m 0 0 m Z CD') O D 0 m � W m ;0 O m v m -i Z D .m n r = 0tnr Z z .Z7m D Om - � H W -i D > >02 .0 0 D D0 0 Z mm ZO K O W m r (n K m Z m Z m 2 m m I'-1 m 5 Vl � > �� n � Z 0 Z r m r�r ml m C) O (n z O ;(1 Z Z D G) 0 C O i C H G �l Rl COW $ O Z rn C) rrl Z m r0 D ➢ () L C) O H 0 2 1 D Z 0 H ."0 ,� rn { D O "rc y < m O A o A X z m (il z Z -I m D W '0 r A m z X z m m� Z m z n > z vl m Z D _� O m ra O Z O A D-m m c c_ r z Z m 0 � A m r0 0O mrr m mr � m X r O O -i 3 D -a D(n rn -I D m m 2 Z m m x 00 v rZ <m- ZOD 0 0 (n C) 0 Z 2 m S D I'!l n Om 0 Z D 2 O (/i 2Z0-p m O .- m DD D DN '_- O Dm Zn Z m VI Z C=N O r 2 C .Zmlm 0 m T, O m .'(1 m O Z 2 Z m { V)O�m m ��1 () O (n NO 0 < (7A mC W m OC A m �0? m�0 H _➢ m�10 Z N D m < (n (n (n < r (n O �1 VS 1�- ;0 0 O M O (n m m O D 0 c :O -I - O G) z W Om Z Z (1) m 0 0 � '0 m K O � C z r D rn m O 0 N rmn m e4 O m OM20 m �O :U1 m 00 � � �- 0m � r 3 NZ =1 m =0Z ram- '0 `t p0m O� m � AOO �:OZ m r m r D (n m 1 p Z m C < �r O D O N r<rl r m Z (n :U p Z �m0;0 m z (nD O D ° Zr Oz D Z �ml (nm W O z O 0- mD Z;0 z 0 �)� H ly 0 z z O m0 2 m O z ➢ZZ D m(/l 0 <.Z) Om D �-( D m m p 0 r 0 0 T Z m m r m N M A 2 m ,l7 �) m O (n v -I Z m Z) ;o 2 r- 0 D r 1 C) r O-{ Z = 2 (mat 0 r O fD�p rpn Z (A r-) I ➢ N A D X XHO Z rD r rlr OCZ 0mz m SC➢j n Z I r m D D m Co mp� m z nzm D r rprl O D= D HD n� N mmm 0 o mEn 0 �� z 0�0 2 N Ln +C r r ra OD Z m p r�, 0 Z Z X = 0. 0 Z m C O O -1 (n m m rn -i 2 1 Tl x co N N Z 0 O c W D (A qA-1 C DX N O� D r OH f z m m UI DB 710 PG 910\ I o z a rrn m r m O 0 Z r o = !' ( " 2 v Crj NORTH cn m • PROJECT NO. • REVISIONS • CONSULTANTS hayes howell ���� ��MMU� I fiY®�� 100032 1 �..,....... STEWART ENGINEERING INC ; �af� ppo. O I� p�IfiI®I�l�I�®Y71®I�l5 *CHECKED BY _�=2= r� m RPL P R O F E S S 1 O N A L A S S O C I AT I O N ARCHITECTS PO Box i2054 RTP, NC 27709 • D RAW N B Y Tel. 919.380.8750 Fax 919.380.8752 VJC/LEE lsEpox.w..m.wa.l..�.i«w..im.ea.eru.o..xm. m.va.wwmoaprlgmaoxwne.H Hama., ,, a�y 1 ,, em wi iwiwnu.aewNase. mer.,wme.mq.e.nes+a, a.asc.e m.eymenawieaarsm.ra�a 11 l l nT 1 3 5 WEST C O N N E C T I C U T A V E. MOREHEAD CITY, NORTH CAROLINA eT tah M9M'AParrtmen P:.,skn .ail EnOM MnY.. 16 AUG. 02 SOUTHERN PINES NORTH CAROLINA 28387 ID C _ - aRALK 1 _= ° I (00 = j. N _ d y� G)G M-- M- r„r- x m -�.. m to m Z Z �m ` GU M-�6FV v O D D e Z� _ LTJ �<-M - �- p _� 0 r> 0 _ v T 0 D 'O (n Z O 7 -n rn r"I m � _= N .r. 0 m n �IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII co m A N �� m pVI�D� L7N tn? W {2�N (n r0 N VGD� W N 0� < r-• (nr� W8 (D �-(00 V ;0 �U 00, C C DN Om' m0 2 ---Il r nmmmv -1 Mw Dr D=z� (n IT1 ➢� nrW '� D S_f D r� r2iN� v v mm0 D on z-+ z0 c p D �2 RI z<pDm Q .DIm 00 2 xrC=D z ` Am m C) D r -( m Nlr CH rnn AZ O mmz r nC DD �Z s Z �m 0 DO-Z� alm-N 1 ZO W0)A- UIOZ D O �rn fll < CX"I - -_ 0mDZ0 a , x� OD x a a� r= m z'T) DS` C m�(� 2 - 9U5 D -1 O- y 0 m;0oz m0 r;0=1 Zl co 000 2m(n0 > X 0m '= N(n0 '60(n D mm c: 0-1 20 DD m Own N V1 �(� OZn C (� =Z om< O Z I I I �r mN mmgmg �COrm < `z m m MKO m 0z Z �r DOZ w0 SZ-I m O -I 0 m mA n C �Z DZ D (*I :CI K 0(n (/( Z W1 m mW* -0 Lo :0 CN 0 0=1 C,ZH) mmH D 000 r O _nO _00 C O rn D H?r--0D� UINUIZ� mZ A.'OADm y 0r m Q m Z r-0 T]--15 r A" ?� -DAD O N ;0 Z z 0;0 0 -0I i 0z__, A22W ZH woo- z=10 A Z<� 00m m mN (DTI 2 mN� �A a >1 �� �(n c 0 _1A Z C)(0*1220 WA?m� 0_< �;0;0M Om0-4 A �n zZ z c;0m 0mw to DD D OE?x mD .Zml AZ D { 1 0r r 0 < Q OA8m(n 00om2 r «<0 m(n_m O m ZO �Am 2 V1z r O r< � r r 00 rr ^'� �=NmW �rrr1 D(Mn mmmm ACWZO m �z n m�0 Z-.x r Np D A'0S 2r 0 Zy W O ZO DW C Ao rnr lil DmOm my O< 0 Z0�1 z mw Z 0� (Am- r U 5 CC)r mm frlr r Z nT (nm 2 00 in cZ;v M Cn 1 1 1 m NcSm 0 (n� r ,Amm m= 2 O2 0 0 r C O 0 -1 rD ZA D x0 -4�n-Uc 00= Z4m (f) OXA � (mil O com < 0 D Or 0 ozo rm Z �y D D 0_< �40 CC < c D.m ON(*1mZ r<,iD �0 Q'Nm Z➢T Vf Zmm 0 A A ;0m N Z<Z �� v m� Z vO G7 rZ zOC)D� xlz =m ODOZ G)Am r -4 <� 00� m O D -0� 2 OC)H -'�0 -0 ZH 0� O 0 C� Z N Z� AZ00 S� rz ,A e1 e�(n �N=( D < f+1 r<m n 3 ()= r Zz--1 '�� 0 Z0 m Zr .�� C Tl m C G)m (n A(n0 Dm OC N<n NA D^ Z rD0 "'I Z 2D 0 mO-I .,..( SW >r A C Z< Sm - _a Z-4 DDA-I r-mi W� rrrr*l O .�fOl fH*1 H�� V1 3 �r O mC2 m W Dm _0 3* mm r r m2 -HOC ZI !n OOO.Z7 Rlz D m ➢ ? 2 c m Z Z0m Om �m m O '00 Am DO�n Wpm 14 Ln> mmm(n 3G),Z01 Z Z Vl lnn r Km 0 mar X0 C:) zm m m �� DA_ L oO = ;a0 DD mH x ZD-mi O D Z-00 r Om mO m Z0 W O �D A m m� wZ r N OD m2Nz !n p< mr n O((/lm < m r n00m 0<m (A co 20 --I Dr �(A m r0 .Z01 C)H m� D O zm �r m r 0 m r DCC� c0 �, o=a O 00i-1 O 2 D C r TO rDm oA 2 (n m0� -K Z m HrnH 0 0 r �rr A < Z � c) r r �z vrA � 0 (I)A m m m m0 -100 m m < V r,r-3 D G) D 0 r t t I = -D O C C K (n 7D F9 N v I x;), r '�;j . \ i \, f 1? , I 1-1, �. r t P 3 —/ -� �� -I' .. , I � _ » � I l I \ , ,I 3 s \ / ,yI - _ -1l , x >�: ,! -� / -M- -M M - - -M / / -M / - -( -. _-- i� C v, / �' ' -i - I_ / is / FOA M --__Qz-_O E�:� \\ I I a —� P I < n Z ! I * � 3i � I „ fff i! \" \r < z q i \1 CID �', 2! ,/ (� I �� If It II .v '' > -I\\ I /' 1 N N U // - ,N I. O � m I . \ I Szf FW -' I — rx. �� _ s,z �.� �- I I �} Iroa � I >. z x * i 11 0 � � � I lil . � �, I \ 1 r t r r --. _ 'I < o f% � F 11t N � ,, , `� , � I II \ A: '/J � O il z I 1) =t I I c� 9 � \ n m :,I ,< . z O O \ ,- � _ o \\ 1 ( It �T I a Co 1 O a _ :.. I �.. _. o a, I ` / 1 __ F n I S `_- �I j , - I. 3 y i a- 1 3 I �11 ro 11 n 7 G)O ` ,I � nc m� 11 II Z I�I) �m� ri0 I ., i 1 n I 3 4 �— r ZOE'``' 0. = - .-1 V II -<, r = I - ... - 61) 1 II - - �! " 11 -- __ .? V�AAISII�I�II = oh : s0� z 0 0 \\ r, < Q y r .' _e,s - -a�� C z O U 6 ,-, < ,1 -> -- I II C) m i! ! 6bA, I � 77 0 11 � N I N -;-P ``, 0-)111V �,/ r-71 1! II I c cn (D N 0) O \ W • ) � �-ia >D� A - f- -1 � � •...•`.F,. n �� I a v .Q ° \ pp� I Z 03 .0 i Q . / J \ 'Y � - � S ° ° \ ox o J__: ,8�NJ � � �a� 1 � � � Q � r0 \ I a qr - c F�� , I Op ��F` �--- - _._� — — It -� -- — _ w = - o'_,%i mow, / ° ,2 EOp °. / I I * \. ems'- I r „_ L- _ -- ���� w I \�-11 �, /� �; 3 O tM1 11 I - — —W -zFT - ° I / , " j / I ��0.ly0QE1..r3,�11 - w- - II T 11 DO 0 � (� ( / / ! g n1 ✓4HUG - w cis 41 � _ v .a..... x.<............... u-, I ! *� I�I 3 O I -ii �.;� =--"�,�''. M s i, w-- . I I(� I Oo I \1. �- _ w - I o O I ti w 1 I. ) i W- . 1 �� I I 11� ';I I I . �� - w_ I,. � 1 i I 1 ao 5 CO - z I .., I i � 3 i j �� . I I F-r-I ,I ' 11 �I I 1 v y ___ I �n �g , ,M-- w ._ 1�1_ ___ I v/ I I �� f f rl \\\.\� �`� i 1 ...-. �'\ J( ,H`- - -M - - -M - - -M - - - I RAMP �� I _ �I r P Z j 1 i �" - _-______- -- rc ' i \ I i O _ �' �- ,; — --- I � � 1' \ f,I X I ' y,\1 f ,ACT) G� \\ II a z� ` v1 ( t7 fi II �� I, , I m \��� \\\�' 1111 III II 11111111111111111111 W It, I �� ,11 P 0 'x ` I I `✓ fl r. iI -Ilk;�. 5 ' 3 z - Q 6 -r - 9 ��� // ^, I. ` /// --'__ _ _ "O/O i \ ao \ m ° . I rI N :n I ' l a n / n C - - 0 a 1 N n 31 11 n = ____ n ' = N \ I 0� rr r' 1 re \ �� \ � V� \ x m 4 \ n a \� �Y , 1... �� v \ \ . �11 m D z � I \ P W • n e \ s I fTl v1 h \ -._ -9 I'llv 8 �, n m _ N � \ 9 . \\ / m \ \ I \s'r�=z fy% \ ° t1. I r- \ \ 2 �-13 r I . 11 x' V) \ O \ I{ �� �- �p _ \ �,,,,,,,jjj/ - '<, gy4 =� . ... ZIf I x�A 'VvV VI.'� �� I / 1? 4 NIUIIIIII//IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII �� �,. � � 1, 0 �,- I d 3 ._ . ,_v �� , .4.az �„ �. v� �'- r � (I ,gip a. W mmmmnnmmnmlui�umrilmriunili� �, - n I i� I , 2 ���� P (rn� °� i _ �� _ iirr _ 3h.�IIIIIII I W v v\\ W a(! r `�v\ � 111111111 a ®1. I '� _ P \ _ m T_ Q \ �,\ $pi II I '•J \ I) . = \ C-) C) `\ I . 1'I !j ' III', 0 11 I 1, � //////////////// O - jjj t" / n I, ..I O;J' 'S� 0 - xI R V I �,��' A Ij, , , , / ki� \ " (A) / ,Tw: "I .7` _ _ W— — -/W_ Y- *// `1 / w-- IJ / 1. ..` �.\\ffi\ �a I 1� jyb ' �, m a a I "h- I ; " y 0 \ I ,; 3 �,co _ I �' 0■ a" g NAmlx\ \\\ #! I, I !II I , ,:4 2, , 1 �- �� 11 / I EE I, ,� I I r. .. !--�// -\ 1 Y 1 1 /// =-= O1) `i a a U 'I o - I z ate/ S ///ip�// oOn _ _ v �G } (1 Qx oo x V, � /O//�/ 00�� , v I i - I 11 � t �j \ ��` Z — , ///p `: . ,, V I I ,` � III // _.r x �� //////// //&6 - vA V i G > I A c /o x 1' v vv vv I---- o o///ioo 5 4" 1 _ t, " I x jf11 I /iiiiiiiiipioiiiiiiiiiiiifl i c W-- zi�-- w It, �1\�\ -, 71�, " agj�, p,L:� . P/ I / r J c � _ ij I \ I E-� bi-, "I , fl-- I'> ip I --� ,�� > I / 5x y 777 - r 1, I --�" , jamm ' - 1 ,iv- — / r III /. 11 Ct�AtN L!. ➢ zzefR 1_ ' \,\" v - w- -:z7 W- �', _ NK FENCE - o n I- M1 I A - w- _ -n / ' --7 �� 1 .a )9 j I - W W._ U= —, r� 11 /I/ I % 1� /I, _ �� 0 " 1 u1 I 1— — a 'n ;� fI �(! a_ m O I l ti z �' 1 I, I �,. °. _ z 1 q i C) o 'I �� vet . _ I (3 q - Z '- � O 11,� P �� �� v I > ° e I _. ` O� �, yp r a-=�._._ of I'' t >t `� �� o �� �`� oti ti �v�; �ti� I __ h� �bFr I � n o C) 11 1; -"_� r I m I `, --1 BRICK h I WALK t ` 1 I�, I j III a R Q) / III I � , f` a -0 111 t a r = n 't d n ' _ �;[:,,; T7 bbr (�D� NIJ/ ci , I 1-1 ;Xi < ` "- � -`� �- M - _ - <1�1 M-- -./ UX c .1 :: A� I T _ C _ C �- ,� �_ _ E�P - -- V�1\11 I z 'I -M - - P I` I M z0 r - - - „ I th -M - _ - Eop I r; - _ a.- _-� i ,.r III _ qq � , I r M lu �. = #1 1 — — �-- 1 - - , I, I 'i j' �Ij i ( M k .',:. _ I 1- c_ t I, `� \ i �� I f 11 �✓ � .Z 1. I I //////////////�VAAVAVAVAVAA� �L -- ! -- z I OU-D-' 0�U UA W �2�N (n 00> U '0<A W N (J� r� Ur m� t0 U . �0 UU 0A (++ mN c�2'0� rnW �DnN �J ,Zm7�0 �0�10 �DW DV 00) AU ZOA �W DN (n -' jTj (n r rD' yN 0m� m0 ��• A' �' O' -<• AUD O. �ZO. O. D. ZD' Ar' U' a m' prn• �• Am A' '0' D0D Ill m ,) Drm D Ni D m 2D MIM D OD D i Zc� c� O-4AC _i C m-<Z A O-1 m OrC) Um m(� Um m -f- D- vD f�1 = 0 D �� i DAI�,1�0 mU ➢r -i2z� U D� 0< r D ➢ IrIU �n O r c. ZA Zp p (n� UyT-.Z D UO T. T1 �I'*I� (n�m� 0 pD') O 3m ci ➢r0*1D20 oeozAnmr�t* �D WOi•P AfmilOZ ? Dm m pmn -DI r -{� MCA �0 5 WX� r 0[r-) >-n n� z �1; U�C)rMrt - m� ➢0AZ (nD ➢m m(nD22 m n�z Op (n2 AU O�trnv �m nr rnrr- i'1l r ill D� m -om fil p z _ -ii (nm �c)c 2r n �-'{ DZ p m� m D O A 2-q Z r n-a A 0 m Am �A A A z -I r rn ZA ➢ Dn mM r- � y Q m0 ;u mOm A= --I a) UUU)R 2W�M .ZDI Mm A NNE :S10U D wz O= m=O DD rr1 Own N �0 z0 0 OZ 0-u>Mj ~X rr➢'-qD �D rnUO zAOZ gG1D pim�i (z/)0 v0 Z�AMD �Z mr- ZK 0 Sz OAS O Z ( I 1 2r 1,1U mmm --10rm -< Z f m m m3m I+1 (nm Z �r Dpz (nC7 ➢ ZZ-4 r m 0 -I -I MM 2�A0 Z Dn �c00 zC) `'�Oz �oo----II �1 � Oi G mH O z� O 'i -i m--{{ C DZ �D mm'O �I'1+ U W-i m mW� -0NA r- CU Z� m0 �0.T01 Z M OZ O.Z07 .ZOI r ODz 0 v< �z0 M mA� r`*1 A �➢ O rA*)C O Ill y.Zl n Zlr�2Z Zr" `LZ :)):0m On m Z O 0 C� OA y `2 m C m ZO �AVIO -I D M-p0 z� .Z)D ."00�n DOO �Z O -0 V)0C .T1A Dr ➢- -I UJ On ZO ➢q> •-I 000 U M--I 0 z-IDp m r A -IS A` -0Ay N 0 -01- O C �D 17 �� ➢ -I -i -i i O�Z-i z i71 �122W Zy C 2 (� (Tl mA O Dim O(t7n m mN ifl 2 mUc� mU U >O U H � 2 m � --I OGO 0�0� A 20 2 m0 2m mO �p z� O -0 O--1M I m� mmm� pA10➢ � mz Z zmn mNcmn fn r, : U O'00 02 M m -I � AO 2 mD A�Mc fll c0 Am = 'iz Zm0 O �� O-i2 �O A< AO OC - OZ (n U U ZO U (n- p-A U U :cO U 0 Ill C 0 �A Z Ox--IA N WAAm2 rr--"< S55M Irn(n-rr In Zm m ZOm �ATI Lr) DD D ZAA �D A2 0 K(rn Arr-- rD- 210 00-� �z �UXD 12T7 C7 DW I Z20_ -0r I2,I.17 Om�. AA nD U` ❑ -'' 0 r-r- O vzi OOC Uoo-Ir D(U*I MMMIn :0 .ZC12O frTl �.Z01 D rM*1�0 o5."i07 D Np r �A= r < rU m D,�1 r r ZZ <�m� '.iDrr' ym 02r -0M Hnr 0 r �m KD0 z0 nZ � <- rg D n ¢ m(n O D Z i rrrlr Ill �DIUTIOW pN ZA r0 Z:VOZ D r�r10 Z :(1�:0 ZM r WU 1 ADD R21m m I?r r Z cA UW O 00 Moo M zz (n U� '<D➢C3 �O I=OU DmMm Mzy oz' rA11 ZN A� Or �U �O - U U C) --I-I 0 ;c) O zj r- A -C U 2 -< c� ➢ i4> m� Z 0n cn Cz;0 M mU On I I I m M0C2� O .(-1 zUn r AAA 1(l 2 UO3 O 00r Cm n r O "i ry Z.TI 0 z U "i ➢ ➢-� Zr CMS m M D m.Z1 r W - rn D D �O 01�n�C 0= �m (n AZD C O Onm A (r) D D z �D �A O O A Z Om p pm UT1A2 �m in�Or O0 m�D U00zo� ArD mA A ry c)mm 0 U DZ r U c� m Z D D O �U Z D c�A Z - m U I U r -I (�A pNMM <y C7 OWN i CS 5 -0 < Or OZ0 r(n O mD C) Z my Z m v-I _ U U <{ •.,C O C r<r1 %0 D DHz �O D ON m Dm --I -< -i c) M y m (n m zDr U U - om•D M A m ;0M U Z-<z {-a c m -i C v0 D .Z�7 ZT. Oct r ;l-9 ;1300Z ox fn 2� V) �mZ U O OD z (n -a ZO O 0U Q 0 r0 Z20D� AZ 2m ODOR 0Am r � A 0A 2 -i O O- O ➢U A= Y Zr 0 m D rOxm Az 0 z0 Z7 Zm m (nG -i 2 0 Z m O O 7C � D -0 D nOD z -i OZ 0 C� z m OZ mr 'OpZA � �nmr Dzn1 D VDir -fD0 2 OG Zm AO D m c0 O UW rD 0DZ c") m < m <U 1- 000 AU 20 zr 2(n n 2z00 0M ➢m(n-I r-< -<r r �1r D�z D D Om Dv- rZ U I I I I A Z U ZD AZMO 2 rz "4X,gU A _-I < D O 1- zZ :0- f*1 =r)- 17J G �U Z O z 2 DN y f+U'I� n �M 0.ZI C) D C)- -Om 3 �r-i* (n-•{Vfz Dm 0 mg DU Z �Dn Z .DD m(n� Om 0(!) O j =r 0-i n m _2 coWOZ 00 m Dc� r `0 m x D -I C z .� (/) C r r r r� (� m�� r C m A A � 0 0 1- -i z m T1 0 m �) O D z r 0 T) 0 -I rm m OHO m O -I -irk 3 r AA Sm m Dr U A m r m ➢mC OZ m2 O �� ----II O OD -i = Z D O C K 2 2 x .> m -d m� DDA� r�-40C mN 000�1 n1r 0 O .Zl m mp = C mr Z mcA M C OI+m-I �'L n 1 -m rUH Um�ZDJ U N SZ A DU mZ rat OUP OZ <O<Z x N N (Di1 C7 mm C �m DOnn m0 (Vl)D mmm(n n Z Z A (nny? ; �W 00 0-Oir AO p O� m � AA r� < O �1Z m2 0 O h0 to m-<Dr1 roc �� � zm cZz D 0Uj m� M m { -I -q 0 A U ITl - )7 m T. D U T U U D O r 2. r- m O O O N- 0 Zr AAO m DD D �Mp r O m 00 c- m D 1- m�AM m r vA 3U0 m U mn 7" �➢ n GAO C� D0 rn :D ZAm 2 Z� m m0 zc� ➢ :0 ',1 Zz '" to Om` OM -i `t DZ �D mm �m r0� 20 .Z1 U'i m -< OC OO m A U - 2 0 r.U)mz (n0 Mm - OtUi D m r AOm <m Zn -1 DD �U m �o D O �� UU 5 02 Z 90AZ ZD ?ZmD cr �m0 (nr �� rr r- �0 Z iA O n Z U U U U OD m2U << << O m W r -I D n Dail U Z O M m-10< 'I (n (n Z r O �A •_I -CU 0 -i -I '-I C" Z Q m-4 D O z fit m r O f�5 r D U C 0 0 U O O 0 � --4 O r '2- 71 C) 2 >, M 0 --I r*1 r�* O O -{ -1 Z .17 A A ')M Z 1-- �O �rDm OA 2 (n (AoA m m W r�It�={ 0 '*i �IrTt -I :1 MT7 rr A �> 0 $ nZ Ir- (A m-u �<OS �m ZMXm m0 OS Z�A�1 ."[m1 D...1 Zz m --I Um:O D Z 2A U(/)�7 �r m� D m 20 U r „1": O (7 r Z A mU �U X A0 z v f) rMZ m 2 = <'0 r'r -1 Ar U r Z--i Z '�� •'Cm1mZr CM G)�UO O.Zi mm Wmm mr0 O D � -I mc) A O O O %. Km IT! Om SZ;)O MD IN U�2 > a A (r-nrUr1 mpUi m0 m f�1�A W� rrri Z m r .XM Gi `-I -<0 UIm;Q �� MZZr z �.'c�l rA Z pmm tUT1f2*1 U D� rUZ Z O 00 D l7 =M -< z > OcXm r- Z c 0;3 m ? ➢ z�< OSAn O mz O UO 2-Z M0 2 Up O � 0-0 M O� n�m mm z AMn a 0 O� �0M AmA rp O mm: V m DZ Z Z Zm0 Om D -I ➢ A r C- O O -IA y. r-�1 O� 0A -0 C) m _1Z 2 w Z cDj � z 1- �m� 0M n M MMM �03M, 0 Sru m� ym m >-I (n OW 0 2 nm U (-Z/1 (n r2*I ?�D D A� OA IM Oro-<'1-<9 ZN AO DO rr.ZD7 _i 0= U .I m r ,� U D a m!'*) m r m D U `z -1 c 2 -1 M m m 2 V2vD (� O DD U 1 m� DD m m DO r . r2 C n m CO Or -u>rH Dc7 O_fr = (n -Im<D AZ0 � m �z Dm O D OD O i G- 32D r- 00 m 0 n 2 D>DD ➢ A 0MT D A Z VGZjz RY UU)M mm mm mmI r �m MA U C ZO 0mNr G)Z 0mrn p SfJnO O U C > (-nI Mm0 z 0 I�rr ,., to ➢ I r z0 U << -0➢Z r D DrM R. z1,-I O A� MI"'I, m I2*1� -1 A U0 O O D CpCm\M 0r-D-IU(Dn A Om mAmC S.O-� r ZA mCrmTl O Zm �, < rUOm U f�i O�m r U ZO- 2 �� A G m:0 _ -1 A �.2 f+t O C pry "i A 0 -u> m 0 O U C gm$ n ;0 rn �.-. ro G O COOrZ-n O � (UM co D NDA < m 0ul 0 = Zm -j -< m� ��-1-11 D A r -< co Z A -i Z o D U A 0 A '< T• -n 0 0 A r m 2 Z O c7 --I m m O Z .7' FLI U D min 0 OD2 D r-- G rp 0 m TI m OC) -IO mo Z C I 0 z rnAD A- t700 2 O Z O V mA 3 O --I5p 20-0 A D 0m II .� 2 M DM(nr C r rr*1 fD'lA+I r2*I V -r� L� C) r0 2 \C r2*1x > 0 < -10 Z000 rn0 Am �-(�D 2 m 03 1 Z m l� >ainc: c� O D D .0 Ap 0 r- � ➢ Dm � O 0 1 � _I U- DZ m-I D A OZ �n z U Z n DA c+J U D m➢Am _i U < O z D r m r O ID 2 m U O 2 D I-� D0V)v �00 m m AZ ��0 ')) m cm GG77 r C- (D r m -� D Z 5 < :0 0 0 r D C O O O �7 Z CU r D m U r Om c) r O n<-)• z O Ohm A O 2 U � � OM I_I 5 O -i C) rn 1 U A O U O Z t O A r fm�1 -D--I rn D 00 A 0 D A m � MO n O m= D r -) m D O _ Z.� U C � (� C) 0 02 Z D D 5 D m y z � -< O m 0 r 1. o r m �l m _ID I < E D O p � D D mOm 2 00.ZU1 O wc: :O�mD m �� O � A� �0U O � Am .wv a i�i r 00C2 G� �mD M O n2 0 nC m m2 Am . D� z 2 m 0 O Z��z 0 Z- :UK rrr,.Zl-i 2Gm z 0 mr �� z r m 2 30Ur z U Z2r D D_ zr D 03 9 �m <)m A= Z r 0 'o -I 1- C) zDA m UD Ff)�00 mZn O m mW m rn Z D � Z -*Im(p m O z O H m 2� DZn z 1 .Tl Z ml) �0� 0 0 D mr H 0r m U :0 O M O r -02 D Om 1 "'� z z �M>CD z rAm Z r Am z m R0 0(n rm � m D A 000=z A yn+-I D DO zZ c�G M m C) OU O T D 07 O �m z C � n - U z A D-m m G c r D z OZ m � 0 z Z rn IT1C -0 OW O rZ 'O =-IZ mvr -4 D m m N O o zoom m AAA OD ➢ �N A Ap �� mo c - m In z MmU Ox m r(n C-)0 mmr m c Ar- -0Am m ,0u i~ N N to -1O�m U 0 0U➢ O rArlO U NO 0 <0 0. OD Z n co A -yn A AOO� z Wpm AZ0 AM0 1- 0 0 rM �M �0c7 i C z O m O.ZI 0 m p Z�1 W 60 �G --1-1 35 Om Ar 0 O r 0 z� 0 woz A`L OON O➢ U z AO UAZ p 0 Z (ten ��03 ? SUS Zm O� Z z0 -1 fU*ip 'i 2 m 20Z DZZ y Ky ZZIm Z� <O� 0m� y i1 2 . mm ND m0 Am O r ZO 2 Z � G) m I - r.\ / M DDm A rrI --I M Nz A i)A = r- 0 D M7 D PVO 1- O-I Oc➢ OZ -< Z<D 0 z f r O -AM m rD-O )' Z U0 I D <- U D x A O Z D r <M TI Uz „ 3 0 O •, il0 z m x 2(nm n Zm 0 0� U Mp (� U �m v =') -zi ')�� z Dzm- r D r v G) 2 D A D z z mm-•1 v 0 m mM p m pm -I 2 I� / Ac R x Mn z x m m 2 m � 1� � c * r m v➢i ➢ 1- 0o i - m g _ = N x . . 000900 ei �" hayes h o w e l l .PROJECT N0 •REVISIONS CAI I R 7 C®�I*1L)N) � C®L-L- eE 100032 i �� n •CHECKED BY U a ADD 1710N5 I$ RENOVA71 ON5 PROFESSIONAL ASSOCIATION RPL ARCHITE CTVJC/LEE S •DRAWN BY 0 0 * 3 5 WEST CON NECTJ CUT A V E. MOREHEAD CITY NORTH CAROLINA ```,N.,I,,,''p11 `,� a1.«..,,. 11 Ci� ns Iy S=rS =_ to'. CA-0\ OTT"',,,,I,I *1100% 16 AUG. 02 SOUTHERN PINES NORTH CA ROLI NA 28387 ' • CONSULTANTS r--qM STEWART ENGINEERING INC � P PO Box 12054 RTP, NC 27709 Ill. Tel. 919.380.8750 Fm 919.380,8752 1 emoz..,..m.a. ..i.a,.mw o..m� ,...w,.n.n.,.aysb s.p�..e.s,,— (sFJ).�. b.e.niwAe N.ol®YmalwNu mmneMtrmw- rnw.s.uOFnwmq.IpM aoewftPo ,— :,E wl—..tlup,,wBEI. m .rem,be.¢9ie4.�W,acMnpW ln.rymywwNWanrror.xp,.Eb Mw,wnonvmllb .,+I— a.[.plm.Ic,.' —- — , '1 I i I f l 1 , , I , t IS 111 f r tl , 1 I I.. 1. .i 9).*.: .. ... ,! ,.�I I, I. f: ,j, .I. ,li' „ Z if34093g L§�SiiLi1 Si:: t'*..: x'.^. 'IUCISVF.. s(1, TOP 20.64 INV IN 15.60 TOP 21.50 INV IN 15.81 INV OUT 15.81 TOP 21.00 INV IN 16.25 INV OUT 16.25 STA 3+38 — WATER TIGHT MANHOLE RING TOP 20.50 INV IN 17.28 INV OUT 17.28 TOP 21.10 INV IN 17.86 INV OUT 17.86 TOP 21.30 INV OUT 18.22 2 m;o > D 4 NO o D r > -i m DD mm D ci 7 (/.) D8710PG910\ I / m iE }C AIN{INK FEN I big a , t O t t '1 yy BI °moo 2 Z m v7, I �1 1---1 I O f() mmT m TI 17TI U N O V z G7 C G7 D z DQ m (.A r m +m co r, o r o) 0000000000*0000*00 • REVISIONS PROJECT NO. • •CONSULTANTS • hayes howeII CART R 7 CC,� UN17Y C®LL 6 100032 STEWART ENGINEERING INCOB R N®Y A71 0NS • CHECKED BY D n� RPL r W' v A S S O C I A T 1 O N PO Box 12054 RTP, NC 27709 ���% ,�Ao P R O F E S S I O N A L Tel.919.380.750 Fax DRAWN By 8F�' , a% ARCHITE CTS . . F/'•4 DRAWLEE omv aiao .ma®wim im ero�M n eA+ ne. a .wwu. eve. a.im tsepue�nmxnameapmlmwm x,MalM•MYIuonNYn rrtp ere.Waarompydeamn.,prtgwgnyn�..:. // 1\ . em.neu mneme. omympa9u.myvanamuewgee, nm`u.orm•:gea muyn�nm.nemoerer.m ®vwam /�! 11111 �111\ '1 3 s W E S T CON NECTI CUT A V E. MOREHEAD CITY, NORTH CAROLINA ,a,�mwM. a•�r.,nm. Wm.aam»ARE�o..„,� —.._-- .. —— n'r ', nA RnI._INA 28387 L83A04386udv'fj b - '!iS'1 1 r:fVlt>U LWA zG�O�/ os II m os 04 os' Os 0' CI �, cc zoo 00 os - a0� � D - 00 II -0 M II m I � 0 O II N N 41 r0 C C ODm V m -D-1 O W N Z N O m z (7) O O N O m v O X O) X O1 rn -i v 2 0 x Z N N N N m A A A A U N z v n ME 00 0 � I I 0 v O \ o r co O O O 0 Zr. O O m r CD O Z I I I I m m � T m N y I K M m O O N id m m --1 59 -I C 0 0 ::1 A z 0 O z -// l\ ___ Ca 2 CC) xK < m _ z ///M80\\\\\\\ 1 i �1 + i 1 � ' =C , =QJ r m m F D - - r N t0 00 V O) U zo* CO O) U D0Z' D>u 00N Urns NO> zU 2A �W ON Z� fll 0m� D� Dt0 OD V O) U 0' W N �1'I 0oz 0 n 0 O �A A(.I 2N Z000� D� O O� O� 00� N o-O — -IV O> HU mOA In. (nN �--' ZO' gym ' �' OZ' vD' O m0 N p• W• m pmA zW N O Z' O' ➢ 00z. O m. m. �' r. O' 00QO zG+ �mN Z. DZ'10 x p. -. x, x. Am. m. H. 1- i/i O m f (n m(n zU 5 <C) 2Z(n H, 0�0 D_ m0 vIn C rriz Dy mT1 X ZO O O •10 Z Z ZZ OS r 0 O ONO z0 O > m Am D L U �0 m 0 m D D 0 0 N Cn m O C �Z Z D Rl O 0D r ymKH m m O 0 D D = O C zm 0m ODMo o r-Mm O Z Z Z 00 mm 00 ZD{ O ��y 0 Z llm .Z�1 U U AN r- D (A W, Am ri3 0 ZZ WZ O m0 NO A.'[Cl VZIi '-1 V1 (nr Z D W-"1m0 "1 T1 <'�"1 r vx z0 z O AX KU�1 Cx Hr ZD X mrn-4 vxv tno OrxO OD- m- z N m D (nv _� Ov-ml m� O m� 'o -1 _ m x- m _ m 0 r- 0z m XO 2Z CM rAOm O x C m Ill mxZ0 1�m DDD rim m OZDZ ZZ� ��N0 z-i Ij D� pp 00Z mm 00 >- O rmm 0K T m D mb < 0 M Or� 0 O Z O Dr-rm �D D 00 O� O� Dm 00 Nz OZ �n 0 jCinj �� D�D� m� m_Wm mO�n nx� Oz p� xx� o(� C�v D1- V) ITl yN� r { Utnln z �z C0m0 rOZ Az �-IC Z �n Zz = r� m� <Z t;1�0 OD r r oZ Om r mr CT�1 O Z nDGOC S_01I { oC �n r 0Z Dz mG) '12 OO��I Y �x z_SDy �y DNO OC)Z O-D mm D C) mOy O Om ZO -I 00; <� mmm m-4 m-i W> \-4 m-1 Ox0 X (n> -fK D Z m m r m O v 0 :Om A r mzm� '� O z0 ;-I m m-I mC V1D z:000Z r m0 0v�0 �0 �Sz ADZ �00 0T7 0 Z_ 0m�7 Z c� Or Z mZD �-D1 =-- m(n. UU lnA�O IOTI ,-(Oj f*1 rnN�l VIm� Z �O OZ MZ Z ZZ cm c'i D%00 Z O V1 Z -I In z x �O W I T. y 0 r DOI- z rn H� mp < O\ y UZ mZ ZZU1 0> m-m0 ;00 2� � <M 1 -1 0m H ZO 2H 0 rn <2 m2 DO f<rl < zoo zoz 0 A 30 Z� 00 =� O .'fC11� tn0 O W Z !n� s w I1 NN Cz-10 r z O `S�OZm rp Z S DZ Dl_n O �7� A0 A-1 Z� (D/1 %D00z O mD '_'ISz� �� C �ZmO mOA (n z0 A 0A Aim 0 <p n� O HOr*t --I= �� DD OD zDO�� 0W0 Z r U p Z 0 Z D Z 2- _ D� 12m yzz zr mr O vU (n-o0 'pW� Z=Z Z O In �0 �Z D UW mN �ZO O� N 2 O 0> pX G� M 0C nU N -0 U0 Wm Z D 1 Z OU O CD 0z SOD Hz OHAZS OZ mp VmZ.T07 �ox m0 x ZO n:ilU 0 Zz '-1Z cn D it Z m C U .-• "'1 O 3 O D (n O D m Z D Z C cc Aim OO r m 2m O•.1-2 ADZ mr- O O A r CO Z C U CU D D (n D 0 �� xt/)_-� (n2 O �D zr Z z- r-r H 0ZZ A V OA D A D K (nm �m m z �m(n O m �� Z r mz ul� O (n�Z V! C to A O V i m� <C y O O m2 10 Om x or 0 _� nm <m�z Z S tn� rm O➢< mZr r v; �cn m �z D. ZoD r,Z Om➢ AA m� 0O0r (nm0 ; (ny� ; Dm 6) mo -0D r ov A Z MN 0 m z �.1 v y mrzm DVI Zm m O zm UZ 0 0 CO�R70 �-1r D r ZX Z 3 O z 2 rn0 Z y0 Z K m0- 00 z FA 0r r �m O U D 0 m0 mm -n;o Woo D'1m mXD M O Cz W O m(n 0 0 m < Z 0Z 0 z < r nD0 Ill xl C� p Zm x 0 mC rn z < N m m0 O 2 r0 �z 20z z zmm y zM �IOD _ ZOm O :O 0 n{ Z pm T1 OS _i D Ox N -I Z p �� r Or Drn V1p O m O�W -I< H �O mAmO.'i01 O O� m 0 O C m<_A >D> Or A Oul OD 0 00 mZ- O Orr D Zm Z Z_-I 2N (nm DrD_ %O m Z 0Z U z (!1 Z �77 00 m0 0 In Wm� Z�� mZr� � y cN"70 C � �rx*1 Om O xZ0 Or Z � m Or m D � � :UZ z X D O DWrA -Ir m NZ D Dm Cm)n �� C ZA>mD Z Om -Z r, �� �� ��Z� (n mz �A m 3v� r rcu Uz W m D �m m O O U 0Z D 0(n O Op:VUm O H mm r 00 00 D A z0 m 0 < < r A0 --i =1Z z 3 �1 z Z N C 0 1 z r LnM 2m m D 2-Di <-� z 1? Z- O> m;0 0 pU D OS- Z➢ rnA�l m InOxx (n Or "'l�Z ZyZ r Sz 0 Or D D to D o o O Z m m A 0 pZ m0 0 < -I a O� -A- v zm 00 m mmm fn r00 20 x0 0A0 woo mz- �0z r 0 `+� D� ZI i/i mz-1 UW m 0 Nm 0 Z Z Ln z m-1 -�� O -4 (Zll zim<O n0 A � pD m KC Z� m x mZ�D m mT �mfT10 'A ND -n H z U O D (nNm y OCZ �V 0D� O�j NcC m0 r0 Ky0 rZ0 �zW 2ym Z r— D O ZN D NDA mN - m m(zn Z 0 ➢ f01 Z ATl 2 DN�o t1� 0 rn z0 D Ni C z> 2 ?mDr2 0r z �1 mr UDW r0D In >2r D Om Z �m COCW Or CO mm m C m m C z -K r 0 mm C zm0`-� G<-0 O AO 0-O << D O 0(Dn > Cz 00 mxx �-1 K mmAm mD? m- 0 O UZ- D z mM DZy Ax ZZ x r, O -im Z ��O Z m < O 2 p D�� V1D D (ny D r O N 0 00 r*1y Z� m _-IW Z Z X2 U r U- -1 SUT-1 -�00 z (nO �� NOC� r0 rnW ��0 0y(JI U0� O� m < O O x(zilz xrr- r z xr r r mK < (nm Z� K Om oz mOOZ (-n{Z ��0 02 r� s m �Z(Dn xD mA rji> 0 O mC DWz 0y ZMCD022 Z mx z02 mnC AOK -0zr V1 N Z z 2 rjDD z0 Z O Z00 0 O T-1 O - O mm-0 000 A Z ZO OO H x= r0*1 M. C) A 00�Z CD p�M r �� zN.ZOt .ZOI z0m D� � DO W.Zm10 T m <Z 9 �N� z0 2m(r 0m AD mC-0 OC �D1 ZOA K Om Z I➢- DODO 0� Z r- 0O C A 0 W 0 r, D vWv a �m O tH* D O A DZ � 3�m= O� 1�Z ➢ Om >A m 0 zr � �A Dp0 C m0 "1 A VI r ;rn 0 (n S m Ir mUr (n.27 C �0 I --I CZ Wr J m ZO rm mrrn Z�10 (n C y Vi x�--�.� A � m O y O m W Dn�S D r oO DA O Ap C 0_ D mm m ZD ArD r m QWv ZD r D y-c 0 z 1�m r�yT1� ",W O� Zoo ��n Dr➢ zZ0 rn N m g OVm ZD N ZD m D O m 0-1 m fJ ?Tx-1mm ij � r m nv Z Dy V1=Z� �� mZ O SH Zrm*1(nm Arm rn r �m O20 A O p-�i y- D m O CO r 00 rA D z "~y �O r O m O y0 zom �-0 0<Z O m U -1 �O� Dr m yr 0 r z A r m UZ r O 2-i m C(n < 2 mA m z rD r 0C �.y A �H rn_NO .il r(nn O DZ m 2 f*1 3 - r - C r�0 2 D D O O 0T1 W X z ZZ 0 .l7 m (nm %il- 0 DA O m D f*1 N m A0 r� C m x m �m� m m m jn x0 z r zA z 0 m m r Dm W"v AO mr r20 PKM D00 z C_ r Z D m zD f�1 ZD A A ➢ Z O T 0Z nm� 10 H O �� _ r O Upm(n Z <r0 A �<� Z 0 2 Z ZO = r 1 r0 o m0 ZQ LA m m3 nA0 0Dm y0 Ozz D N r x Z D IT 0- <M z <m m (00 � z � OAA Zp0 C A O � z W � Om,Zm1N 0y 0R� ? �� OmZ p�m m U OC pmz O 00 QO �� U� vUN Z rZ �,•1m D(n0 1?m m 0 U m(n 5> H 0D D z m D -1 � �(n2 OC N p m 0 Om � m O :O� 2 mDr z Am 0 O <<O mA C 0 Z 00 Om Dm ➢ ➢z OOU Z:O zm 0z O D m m Vn O O➢tn O(n ----II O(n (n Z Z to Z cn Ill -0- Dr Ln C zD y C -9D D-1 -a s 0 �� px xr*Im 0 �1 z --ION W z rT1Am Z D➢ 0 0 ZX ZmM --1:0 N-im Z r m O z D0-I M �1 WD --1 0 m nm �Z W O C _= m m m ZOyr Dm DO-D-I C m �Om 'O H� ON O m0 SWA 0 z z2 nt W m Mm m D----11 O D N m D 0D O D O 2 0 m O z m f*1 r U U ; W 2 m ➢ Z A x m A- u', tn� OO Urm`1Z < Om pD1 r0f*1 mU 0r0 p C m D (no OD C� C� D O m �Om -0 m N A DVl O 0 C pmZCD 0 --ZI1 r 2 rU r zOG) .'IHl m 00 mom D ZD O D r0 > m z 0 D0 Ar 1n2 �1 � � Z m D Z Z < Z :Llr U-r1 UI Um y Z D D O Om 00 CC m r- y X<m z �1 O rm Z O Gar O r=z rnx W02 m Um O z SOm (000 ;x< z D �l -1 0 0 DON Z "1 Z -1 %0 Z :Oy O y Z m 0m rm M-4 �1U C> U O z 0 r r N 'n (n -i O_ O D m x D -{ % f� Dm m2� N m�� D D mn O Z O r m zzm �D �D a r 0v 00 Z z m O -lA z 0 A '�1 0 ➢Z(n - pm OC m� r mA 0m O Dm �--; .- -1U z0 ZED z <<Acp A<00 z0 Zl- C O � fn � W 000 Dr yr r � N m W '1m -1 2 A D x� 0 D � (nD(nm r 0 � ti mm D ➢ -� Im Q p^ iS 0 m O>M m2 f*1-I m1Zx O C N z N r' Z O co:< Z�1 0c) r U Rl 2➢`m osm 0 0 N r- �r 0 �0 N AD SZrn m TIC H Z Cm O U xM;K Om I-C:E rn 0z D� O z r Zl N O<^ 00 00 W -i -� y rn �+S m r- m r m<m Z m 001W*10 N MOM N -A <Or -i p`L Z) z O 0.0i Zp0 mW D �� AD v ;7c mZ Opp 0 of O� r 2 m D O �..� D m - D--11 0 mz r D Z Z 1�1 i 5 C z 1 S O z mm0 0 --{{Z 0 A� `J' �, I•+-1 Z(</1 mm M N� �fW'1� <Do z0 zr C;j M (n Z O z ➢W A Ornm Om0 - FA Ij z mom XK H m f<n m -0� m U U _mz,Zmj =0x r NK 000 :00 m W �z mmm m 1m (7 11 (� 0m OO 7C A mo- frr*�11 �� �r yr A 0-1 M m 0 Z m r X z m O D -I < Ln C D• 0 O O AO 2 AO m D C 2 �l O CJ m� <m -1DG) 0Om Z0 C -OI D 2 Z Dm0 Az ;0 r m 0 Z m D m 0Z0'?7 r➢- Z r➢ OZX G)-0 O N <3 1 2 m- W O ITt m O -i .Zl� 0 0 m y 0 z 0 r R2 x 0 _7 0 -i Zll A 0(nmm m r�� D0 �2m ZCO N r m= wpm D �-y o`y` (/] Uz mZ m HC m0 mom �_ 1z O O m v0� ND U)0 O D m 1—o �z N <n x -< 0 ��mW n �Ov O WC z00 tz*l Ztx*1 z czi �� NIm y z = 0 c.-1 •• O--I 0-i z 03 mDD Pm1�* `� (n_ fn- U O x N-1� OD O D O O_ fm�t2 cn ;m A(n-< 0� mp0 Cm 0 0 D O 'o< Z Z _ H 0 W U 02 �0 O p mzN< 2 30A W mC mp m D O N A OAS VI �-y :i1 0 (--n{{ r O rn D x (n A Z O m 0 m 2- r r T1 0 O W Z < m Z mm Z'I Z DU � m 00 �� A m A m rrr U U A fzrl Zl =fWT70 pm ^ 2m A (<*1 �1 rN�= i D>.Z) m mD OC K0{ :0 z s� m,ZOjW m 0 O Cij MD �-( -ziN tr=r0 nm NC M8 0 z V) \ D rD D D 0 O ..i Z rOZ rn0 m x � m m- O A fn prAm � f�I)'0 � OZ m;u> rD � v Zv � p � 0 [� �Z m 0 Zm mz0 1n D- NO C O m O C W c07 O p < v m iCD � zm m W 0m O m zr 0 r m N mC0 mr m m �r ...I�2 x O Dm < 0 m �...� <2 --I C) CS fA*1 2 mm z '"0 3C Z z U 0 m0� �A m D U <N Z z O WZ1Z m <Zm C 00 Om— Or r (n (D,) m<m t�*7 m O Zc O D D� yUz 00 m Wrn (n 0 C � Vl U-0C O O O O to m C� < N O �m-1 .THJ ;U A<17 Z -r1 O ZO 0 O m m0 z C D rvZ O I1 Wv mf0 Tlm �10 0 m D (n < x00r _9 TI A D 2 mmmA 1m O D Z 710 0 O yxOD O -0rZ -1 Tt Ln N OD O Z O O`2Z -1 rnp 0 ✓yam (mn� 0 0 .ZDl fm*7 �Ap S0 pN ND N O m m .Zml U 0>--Ii M O < m -9K(n �fl z mr O W r�i A mO.Z�I< O �OZ r OD �zm TIO 0 Z m � � ➢ m 0 m m D 0 < `. y r 2 r z m� zZv mm (Z/I DO m m N -I-<m 0 Tr O m N V O Z �D0 r m 02Z mz > O M2 n z0 `5_! O -4 r r z m � A ➢ W ox m m -0 O O s C H Zm z X> 00r 0(n C Zy N ; 0 m ;0 N IV m A D r O r y K z -i DOm.D O yC0 = �F4O p N ;u 2 3 m -� p A m C V7 -i Z D 0 z m 0 p (n 0 D O 0 m O U H p 0 D x OD 2 �O� S-i C0 OA C m m z K p0 ITl m ;il O --II CZm < O D (n pA m <�z O mr Z X n Z U mA 2 y rnz m x DDO 0 0� 0V1 <WC '1 z 0 O �� f O p Z(n Z Z r In M O D ZW m 2<Z mm �Z C f�l A z m O Om D D z �1 CD m -11 0 Om D D Z T1 0.Z7 C m� x �m x0y mr H 0 Z D -1 Ln m a \ I / D m ➢ DU m Cl- DN < O Z Z Z �< r Z N (n H 0 2 ZOTI H o Ew O- r HDTI D r� m D A ,Zmj z z m rn NA m (nC N mOD ➢OX 0r O (z/1 �� D D m zU AO ZZ 0 Z H < r-D O o m 0 �O z - O zr- (n--ID H 21D < DB 710 PG 910 z z z z NORTH N N No A ro mm m i x x + z z y(n r = o umi(ri W m m I --I • PRDJECT NO. • REVISIONS • CONSULTANTS h h II 100032 ayes OWe G/*IRI LmiqI"i GOMMUNI I T GOk.i . � i h n v Afl0171 ON5 I$ RENOYAi 1 ON5 •CH=CKED BY RPL P R O F E S S 1 O N A L ASSOC[ ATIO N AHITE CTs RC •DRAWN BY VJC/LEE 0 1 3 5 WEST CON NECTI CUT A V E. OLI NA 28387 MOREHEAD CITY, NORTH CAROLINA r �NNN....' as J. co to 16 AUG. 02 SOUTHERN PINES NORTH CAR I I FwI STEWART ENGINEERING INC PO Box 12054 RTP, NC 2T709 & Tel. 919.380.8750 Pax 919.380.8752 w {a[p.n ir.e un«,s a cmnmaw ..wu rtwna.a n, an.a. in.r.n wwM m wmoa s awr wr.m,gee 4. ..e.runnmnnaw.aaw.m.r..,auwmq.e.=�.e.aw.u.em..r�..e..n.mn„e,...a..am .mia wroanaww�w.ernaa...n e.gmrme k CI r 2V�<i (3Cki {3:3Y4:;:u �60Z; :Z f!,Fl v b w I Y 4 1 f }> t / / f / J _ i r g Epp l t-" 1} v N � ) l Iipg13111 3 e F-- lG . zto�; r _i; i I 1t;' Sb _ i k - r C :_3 ,� ! p fu { �. co F--` III II i , 5 , - 4`y� o >f 1 CO \ 4I X\ j .X Toe Y\ ` -e_ _ 0 1 Z W `� w{ ,yam t-� t-- �I ! \< li\ , t •I 1t \v-__-_-._ __• A � 1 t � lj i Al mu C) i , t / 0 I Pam! l p D \ ,e I ------ IN �AJ vvv k l � I n-, G<:,0 p 00 G r,<, d�� < D - I! -D m M p II N N G N � 11 Wave o (_n o z • 1 z m -rmi + 0 Z � W D I z 0 O O p O •P -1n n pow I m z 0 0 00 O �A M d � O zoo x m z z Z 9 2 2 � z z O O A -inn o m a -0 o=y m o 0o Q 0 0 n A _ 177 O V oa- R%00 CrJ O450 m d Z_-_ m c < r 1 0�� a. I aY ti� it l +.b .,' zn t I •\ \. � -..- -- W 6� h 1 t l i I 7 v y II \ y i \ I i I x G�. e\ p g \ \ I 1 V r � ✓ \ � i \ j ~\ 1 I `- 1 / i V\ i �J• 1 't tt t I Z A 5 S '`I _ II o ry o� in O Z v ! {•t /? �� I 'J 4`" I -rI o (n r to ? T rn m O v (i + z o M $ I O O z y C H H m A `� z0, �0o g17 m(1 DLw 0Z ➢3W 00N Nm� UIm ZN 2? �W ON z� m 0m-, D� D0 V O U 0A rW N X D(n DN 0' D ;u, H� 0 OU A? .W SN 0000 /� D� D-VO. O >;up TM0O gUOo -I �I 0 �U m p ;OW -A. A� -4 C ZO' m = m• oZ' DD' O m0 -v p• b A• m 00 P ZW N O Z' _ O' D' 00z' O >' x• X' r• O' 0000 i\/ zw 2AIv o 22 O• in -1 M o r :U rn z o- -i MGM D mcl vm c g 0m T7 zo o _ v z- z z� Dom. o' x• 2• 0m m• > r O 2 C C O Dom rnN zm 0U <M-<C) ZN z mZ ➢ RI- -Im> m 0 z U x rn O 0rD Z0 F D D0 rn0 N 0 >m O C 1ZzzD Z O UD Dm "im m f'1 O O D D = ? H 0 '� _ DC Zm ram G7D-U;J dim 'Om2 O=0 O mo 0M p0 ZZ Nr- 0 A m ram O N z ram � A z Z mZ 0� y co 0 O�cn Aye m0 � �O O v �m D.Z7 pC A� �1Hv1 (nr D OHX 2� r�H r 3H 2z0 m A m N=n ----II D N .Zi _D O O O y D r ,Z) m O Z Z m 0 0 VI N N A (n M m !n X-� r Z %0 O '< A 2 p Z p �1 X C S r Z D Z NU I 7c7 Vm-UI �m x2S 2K m frn2C Z-m m- Z-(n -I D �N pZ -D-Im Zp r-;0m �� m y (n� O m D �D O D �m �D D m ow 0� OH ram mO NZ OZ DnCCD m C{ �mO-ZI mD ooWm rrnN 1 DOZ A� Z oin -ino A ' in Ur m m O J� rZ0 m DDD ram m OZNZ Dram mNp mz� fTl 00 m mD O �- 0 mA m m c� r r Z 0 O Dm 00 -Ic7 �1 �-00� ram DO<A Dr DWO DmO O c��� �m � �Z r?2mo oC� coo D m W n03 mmm m� 1 (nD AZ A C Z �n ZZ tnD � mD '<(zil Z ml 0 0Z m -M-I 0z m =� r omr Cm O v Z nDOc i-M-I C) { OOC �n rm- 0Z DZ 2 Z VI VI O m z0 z W Z r WOO Z Z Como r-0Z _ --�i << r OO��m rx SD m O 0p O-D R;0 D C70 DD O O m m mz`< D r �00 Dp\ m1�1� (On120 D m--1 "-IA mZ m Dv wm D�0 Z m 0 0 m Z A mo ;ilm ;O r mZJ'1� DO =I O z0 m-I < 0\ rD -uz MZ Z�IOOZ I'� m0 mD�A mA (lISZ DZZ 'O 00 0A O Z 0mA Z C0 D� Z 0 y O.-� --- <S rNr7S HOm00 mmm1 DAD OZO Z 00 00 00 z pz -<n � (nm� ➢? Z H D� m � m 0Z ZC) � z 0 f!/IDr rZ 0 m Ad z;u D A mz m(n mo M-1 � V7< U1mZ0 Om 0� m00� ��0 HD 0 Dm OmC � ZOr (n0 O �zm -I vv DD �D DDOm 020 ZOO Z Z i� m O �� CDU O W O m W I 0z CEO r -iOz� Z DZ D � -no D mC vm O O D D O02 D rm ZD� D -_t Ar VI 'i O 2 "� -I O H z A -i r (� O Zl V) m O 2 D O D p m -Di 2 'm m -I 0 m z �1 -{ 0 0 ;(Hl O n- m cn r r �-2 ZOO ='rr' �r ojXm mm0- {00 A m p mcn OD S <nW I?O Z mmm '0A Z { K AA p 0 A A z D Z SryU Wm m O' -42 Z 00 �0 � Zr �� ON � p O � � 0 morn N U p m -Oi 0 m O7 m m 0 ram Dzz p rn V1D� 0-00 -O-A ➢-IZ mm Z D m Z -I Om=i mD N _ mD DVl '0 � U m Z � m- m gD c)y �J cz mZ(n oD 00 (nODO -IO2 N0 = O DC DZ O r z AD;O A r00 ZW ZW O D2 rZ mW Z2 Z N-< !n ZO OW ---I1 Z O p y y D ins xJ A 0��� tnS Q D .707D Zr N z Z- W 0zZ-ziD XZ X 2 AZ O� Am-< 20 .ZO7 Z< 0;0 O Z '-1Z -fm In m- �D r- O D r CO Z C A U 0-'I (n O O r 2 ND 0 O O mZr 1 r �m --Irnm T1 OD M. m m� �Z �OJD m �m mpZ➢ c00 Z1 In (n 0 0r. Om Z r WZ �s �-IZ �lU C D �]0 A O -0 �� �C D O O m2D0 Orn Z Nr = 3 _3 Mm Z 1 <mDv Z Z� mo--Ir rm co ZD 0 Or r 00 Z D Orn O 2 no> mo O m.ZJ mil 0rOr �00 ym.� m.Z➢ly m 0 cz ao mo m> r O�00 02 � n Z � j z � pz <M O D r �rOW D(n m .Zl Zm m0 p zm Zz SC) 0 DO*m0 mC ir1*r z' -<� to ZX m m0 OZ D 3 = rD �z 2 Z Z m mrn AO D z N 0 m H (n D M O c -<- OD m .� 20 z ram Dg Z� ZOm O < ;L11 m 0-I 0 Z 0H H D = N H z C� r (� rZm (n0 0 rz 00 g H< AH i0 mA(U/IO.i01 ZZ-i0 m 2(n W !nm DrD ;UZ m ZN �z� r ON z -n 0 (mllzz �� Orr 00 00 020W WTIX z�T mcd —Oz m 00 C D �fSr1 Om 0 =Z0 -ir Z O rM,..l -4 (m*i D A Az Z D Q DCor� 1� m (m/ID A➢ Z DrMri 00 r ZT\D;1➢ Z 0 -zOr N �� rCZT Zmz =m m COS r rCO G (!ID X v -I OD ? V 2< m< 0 m O -a�0 mZrm D 00 r r � O Or A Or o z W m D -jm m O 0 NZ OZ D O(/1 HO r� C � O � 0o ZO r 00 HI= � z--1 � A DO mom O (n DZ m Omz zi r00 -i mO VI0 Om.Zml zmr DZ ZDZ r xZ O O 0r C ➢ moo D N MM Z 0 D O;l m T. 0 O Z m m A .Zl O Oz mo 2 <Oj2(n 2m ITIADZ OX O� Z 0 � yr ZMO W 00 AN A10 -I � z � K A N C 0 z r m D oo _ 0 0 00 2 2 0 O 090 �z- D m-1 2 m ;uZ-O.1 (nm z (nm M D m 7CI mO no X OH DD m C� z� mZ OD m m_ Am (nH Hg�Z! -4' -Z-ii0 C) D m 0 m 0 4 m-n D-n OK< -I;m m-I CO 00Z 0 DA D-1 m (n #,1 D VI Z Z Z d O N-mri Q �0 v cvci O Dm r r --I r OD x _i 0�r r1ag mo c: .. D rm 2 0 xD << zmrr(n (n r Z o r-WI r m(n Dao D 00 �00 2 mim OW V�I Z DZD 0Z Uz2 00K COZ m1Zr70 m'i� FZO vZm -4;00 A ram 0 m= DN-Oi (r-ny y WD D D p O N X d00v rnD z ip D� m ➢w m 20 D vzo� z- o� vS �r S�AI m mD 2 �O r--1 D. ➢ 010 D Ztn =i -Div COO 0-I ram _iZ oy (n00 OHm m < O O -0Z0 xr r D Sr 1— r '�� < (nm z Om < Oz (T10H z "I 0 m m z DO �W c z- m -ud m< m m �rl U 0 ram �� 2 m O-4z O� mA rmD H 0 17 � d m(nZ r Z r r Z A D �mNm cOm 0 m� 00 m z .ZI VI O ;0- r-Z m Om Om ZZ iZ(n A➢ .:.I Zll r2-I o O Wm OD O1 Z D Z 'gym D r m m c O r >M 0 D Dm D m rn o m �0OD 00O O 0 m z = m m. X HO C7{z cD 0OX r AA z(n m0W DZ m (nD mz0 A z -<z ^ DW (/I OSx z m2 ZO 0C AO� AZr (/1 Z z ADD Zv _ ZD g D f•1 _ 'O r•1�-0 o Z 2 :"I 2 o Z 00 Um N 0 D Z N H Z CO Z -m T> ox;0 M DCN m n> r-I A .m O r DZZ D r H- r A W F) b r ;0 H ----II G) !n 2 H m minr Z 1 H H0 �-y �mD Oo �..M .. DD OOx o3'_'I D m D O D Dv 0m v_ Z D-n (n z m Z WVI� OD ;(1 OD 02 0x U c � oyM= 0--10 DGr 0 (nZ >Am�,1 OX C �(n m-n '< .A 2 �/ v CZ O Wrm-r_ m m-i mZ0 arm mrr-i* ZOO .f0ll N g m Z to �0 D� Z DA A z > O m D m ➢MOM HD Or 0O y� O A0 C 0 D c3*Imml2.1 ZD OF> OT nC;0 ZD a r0 > DO owx Om 0 mZ "~ m O ��W -•I Dm ODm O-m +crz zm(� "( `: (A 2 p porn ZD (n zD m D O m < m fJ Z�m 2� v m 0m C m `� 2 w0Z� Ns d0 G) OA < Sr(n _ O m2 A =1 rOtn HO mH r W 0 m 0U1 tZnMO OM ;Z1mZ Msz O W m TO Vl -�r r r O O A C i--i0 m D O o n-n w (n Oy-D >m*I rrl (ranm <O - 'O�m,Zmj m O7� z m 0p r-;u ➢ Z 0� ^ Voo No D zm <Oy DZm m c� r C m 2 !'1 �f/1- D Dr 0 m ZCC) r V1z z OA 2-I m 2 z z2 D A m 0r=n �-� Om D Z �rD r DC yrf Or D WUv A- AP r 0 QKm >00 z � _ r z ram ZD m Z A 0 D Z O Tt m Z O O D0 r? 0� r Z z O z g� A -n c 20o r O rd m .. - O D m D m -1 O _ o (nornv) < 0 A <� O z o `$ QD ' 0 m0 ZO NDD m m� (Cj 'm OO =Dm DO oZz D (z/l r m z D mo- <m Z <m m _m Z OAS 2W O A Z W Om.ZmI V1 0-D-i m0r OA OmZ OC) m N -n pmZ z O00 - �..•.y Z cu �� (nm v�� mZ �rn� >(n0 rn Dm� D o fNn �m(n G)� H L)D ((A 0 ? m (n z N m m-Z D1- to O m C ZD fn y...I a o ;0 MO ZJ<i7Z 0 m mZ C (A (n m m ('`J N N m O.ZmI Z DDD D nH z.Z01 ZmD Zi ;Lml mZ0 Z r, co N Z X0-4 .TOM ;u Z n lj DDH a.70 ", N N .-{ m0 D C W C)2�1r ;OS m �- OXH mZD O O my HOOD O Z Z(n N 0Dr WW m Om OD-�I rnm ram C7�r mO G m D D N0W O� O� x 0 m TI BOO OCZi W z W m x m 0 m D00_DZ ca Dm ODD = rV) rr-0 zOz m o0 2�m 0 �_ 0 (n� 00 Dzz < z mrS Omm x- Z m D Z Z < z �;aF 0-r1 VI Nm -Di Z D D O pm m N .A D(n D C m W 0 Z0m r-n H� v g0 m�m 0 or Z �D r7c 0= m DO rZ m OZ 2< Z D �I O o DEN Z z H A z �D O O x -9 -n y v➢ N'iOm Z AOD O A r1jM -{{(O/1 C N fro Z D _ rz ram COS N Vm <DD_ <Drn In �mn O Z p _ r Zzm U (nZ i D O rnm 0z Z Z m r �1 z U-?i 0 DZV T Om OC T2- 0 D fZnH �0m (n O m 0D 9 OU Z0 ADm --I mm (TI 4 Az= ZO o�(mn Z - 3 � d � r zD zD r O N D O OmZ OH r O m � 'm 0C)0 Dr Dr ;O ram 1 '-1 n g D SDnr C 0 D O O ZJ� W O -OW SZ77. O Om rCg m 0Z DS D z r Z N 0< C) r Vl -4 .� m :02 m O m m ➢ goomo N O��-1 -� ram D g:0 O 01 -ZI 0 A D Sm �I 0 M b .PD m'< �T. mz OMO O N r m D D DM co D g m r z MA w 2Km Z -�� _ �O �0Z Mzm p mOZ X 0 0m << N VI -C co' D .Z7 0 H -4 m 2D m O 0OD �D ZR1 m m- Z Om M -0 CO ju O X Z ram m DH mo- A>O 40 zr 0 0 � Z O z DWG Om Om � m m Z O m007 XD � � � C DO -Zj m 0 -0 zz0� D0C r SD �Zm zC0 Z r mv1 Amf0T1 D m j0 (n 2 D O 0 m W -i z A S -rl II =m OD Z O .TJCO Z Z rm� A Or O m 0 H M Z m C) C7 frrl y O Z N r �Z 2 0 n -O-I .TOJ ;tA7 0(nmm O r�A r D0 ZX z 2 �O I.rJ0 •<m �D0 V Orm Z0 C d D 2 z Dm O yZ Z r g O r O D _ zmD -1 ;D N U m my CH m m m OD(no rn ON r0 '1 ;0 D m z m D m r z r O (n DO z D -n m --ii vg m UOz �m 0 (n m O o�1 m z 0 r m z z 00 DD Om rM z O g m 5l mom O D p m 0c) Z 0 0 MZX-< 0 �0m o� mZ y (n 0 tom 3 0 :0 -I C -i (n - N_ 0 )> M D ;O H D O c 0 m 0 Z � O A O 2 O O. m l�Tff m C-n p m t/1 A .� H. p D D (n O= m X -( 2 O �1 m C O (71 A U1 m mZ m -im rn0 m -ice AO (n -i Or�D N0 NO 2 p oz ` A O -n m O O 0Z- m2- W mot_ ,;t10 OW z m z A x 2 �m o o x m-I x o 3 z <m ram m m frnn --1 VI m U -C Z O m --i m m m m D r Z W .. 2 m .Z<1 S O D D 3 p "� A ;� .ZJ TI [ Q �+ 9 ram z7 z D� d9-n �� 00 r� A -i D ; DDr (n (� a' m m m00 Vi m z Hf*1 A O< m -<M 0 MHO m MD moo n O D r1 00 K D Q U z0 r--1 Do C m rr D 2 < 0m �- m D AG D 0 h--1 %0 D_ �-i Z yU mZO ny V1� rap M O ((n+1 n N Wrn (D D m m •T07 r A ZOm 1�1 m m ,Tmj m0 O 'm (n 0r'_AO x mH0 p 0CZ wed fr*tD zm C U1 O l �Z 2� a Z(m*t �2 �Z O C) O OC G jmc Z Z (n 0 m � W-I0 --0 X < ram D z 0 COAZ m jDW C)0Z r 0 w> xAr2''I � f/l O Z Oo m �1N CO m C ,r -'im 3 Dm 0 M g(n- H0 C� m 2 m � z m z�� � 0 m0-1 �;l m ➢ w <(n z -i m Zlr1 C o0 0m Or � r 0 m< m � D r Z D ➢ 1 D Z O O m Am 0 D C Lf)m !nmC O :0 H A O O N r m 0 -< r O m Z Vl 0 1 C z D (n = -i --J A 47 z m O O m 9 oz p m W0 mg0 m< �0 m(n m D D mZy m m A Z m 0mA m O COz m0 0 O D O>- 0 o mrz m O(n m> 0 CZ) D O m D Z m� O 0 >tmn BOO =0 0(Zn ND U AD m (0 A (n OD-i A O -� m3U S z O � mH OOZ r .17D Zm OD to O Z Z m v m r m m m -I.0m 1 d Z In 002 (n fr*i m W D 0 m -0 0;v D �Dz ➢ KN D Hp m> 0 D 0 Fn Dzz m Z rz D O o r r➢ z 1 DOOM D r� 1- m D SO 0- �z0 Z 2 ,...j\ / 2r D Z mD �Z-0 OV1 0 DD m _i 0 � m m Ir-•i N 1p+i ;u D gmr O W � D r0 Z D r �1+1 ��Z m Uf p0 O � __. m Z Zi C7r <H HC zD VI r O m ram m Zll ra m -i (n O� zCZ ZU 0 z (n 0 2 � v➢ 2Lf) H 3Dm m CO 0m c m m z 3 �0 m A ON -i oZ � o Z 0 D m'O m -<dp O m 0m �m o z m 00 H D m � DDO 0 00 ON m z 0 v 0K g £ 0 O Z(n0 X 0 m --I z z� C ,_I0 N ;0 o D A D A mO7 O m �Z m0 H� CO �1 D m O X C O H 2 O D (n :OT. -D-I A D �D N O -I A m 9 0D m m -40 W 0- rfNl N 0 z z z z m --1-i< ( �1 r, z V ZDI z (n O- A 0m;vC m-K 0.Trn-1 n m m nr m �m m r m Z) 0) z Z ZOO ZD H m D m.D� O 0 I•�*i m N �O Z U0 O r UOX ~ 0 �D > 0 -i m D A A Z P m pD C1 D � N vI Zp co m Z O '< ra m m g 2 z Z D (n r = O trail m m Ir*1 -r H-q • hayes howell CA T R 7 C0YYUN 17 LOLL 100032 • PROJECT N0. REVISIONS � I i II n •CHECKED BY v Ar�17) 1 i1®N5 l$ RENOVA71 CNN T I O N RPL i� ARCHITECTS *DRAWN BY VJC/LEE 'I 3 5 WEST CON NECTI CUT A v E. ES NORTH CA ROLI NA 28387 MOREHEAD CITY, NORTH CAROLINA `,`\`ipi1111l illl m - ao 2 D N a Uu' 0'Z SOUT H ERN PI N I I • CONSULTANTS r1 STEWART ENGINEERING INC e PO Box NC 27709 0.8 .3 � Tel. 919.380.8750 Fax 919.380.8752 Fm .87 n 19Epaq Y•hYmwnd0�3•nwulnMW nlmn]brwrstinne. neYw WpMb wq-0pMpcgppWwyilpM4n eM Mell �w�•I n tlw pgwry at 9EI.11eY en M b Ee mpM, im]pQ w µg"�y M alry mmnr MmYopve. nQ nYyM b B 1My pro NMad plq xMhn pm14.T d SyM• Ervg<•eNp, Inc C 'il.. _.t.L,�'._. I+� -'.l ._-L1.-_�.�..�. .._,_s lt= L'�-':iL',,-` �_-_._I - Zb 0:.093H L+Ri S{if51J ;i i.; 8... z".^ J2C21Vl,/,t; ' V m O m X_ V) --I Z = X r O m N r C� �1 -J -Ti — z F O cOr r0 O_ � K i v rn0D N� m 00 D m \\ W m cn r (n ul D ��; (� z m r D /\\/ r r y,\// 00 --I pp r C N 0 m r � o Z 0 M % a A Oz0 m4: `LD� O m Z ' O o m CN mm� z (n 0 0 XC)l > Z Z 0 N00°00' 0 " >; D c p O II A v / i 9 4.62� I D o / rzg Z 00 rm �Z 0 o D TI r Cn o m r J ��' N S00'0000"E Z -Ti Zl -0 00 °_'- 35.26' m D / W O S00°00'00" �G / w N Z ly Z 26.42' o C 0 = = 0 o� o m =N N� W CC)— — — — w o D = 07 (D/) m C� c/) P q m< m > m _ n -Ti Z j' C o0 ;u C -Ti v 0 m 00 z z m0 z� o / o O v r> 6 o / v \ x / m Z U \ D o m p Ln ' // Nul\ yVAA \ \ o \\j\\j i\\\/�\/ -Tr / / 0 � �VAjAVA/\, \ Oo\A//\�/\� �� O \ O m X T \ v Z v D � U) 26, A A TI (n`r \ A Op O oo I S00'00'00"E <" O 86.62' \ o �o c I Imo �i m m N I N,) r 0 I >�00. 0 J\ 00 �� MZ o o v m \ I Lo _ W -i m \ I /VA:VA/VA/ 0 A \ m m \ 0)N \/\�\// r 0 0) l oO CD N N z IV Z rn 00 \ c, I n rn �6) I o �\ � N I m \ �- is l r r Noo°00'00"W �I \ 41.66' 0 0 — — — — O 0 n cn o o � 0 z T1 I (n can Z 00 D X r C) m O m Z O Z 0 O D r m 0 O r r/ �jVA�/VA jA m \X O \\� O� � N �p /VV//VA O m N Z7 N Fri to m mc) 0 r- m o 00 °� i i e � i i o � �.gZ✓ / m N p N W m / o / w OQ / O IQ < I O �' / 0 0 z x O 7 O ---------T-------T---------- Z I I ' I a N O N I 00 0 CD I I a. I I II—JJ)I O z m O I an n a I y O) 00 O Li i I L < = r D N 2*05'06"E pp � 0) ` z \ _12,93' N D A° 4 O r I D L o ,y P U T U) � a N V � � � � �J•1 n � 00 yya ° O 'D ;Up. � 0 �n 0m 00 a 3. ti m O P A C7 D I DB 710 PG 910\ / "3 Z / d. a ° ^r\t < C / NORTH cn v oo v �^ m— O I O o y U N r 00 �D ••000000****O00000000#000000000000000000000000000000000*000*0000000000000s9eso*0000000000*1000000000oo@*O00000000000000foo00000000000000*0*00**Ooof000000000f*00*00000000000000000s000000essoofooeset000000000*000*00001000000eog00000000*00000000000g000s0000000000000000000000000• • PROJECT NO. • REVISIONS • CONSULTANTS `�,.t� ttl 0 H hayes howell CART R 7 ®,� u,� Y C®LL e 100032 > ......... h r'1 STEWART ENGINEERING INC •'„� �'• D A la! � �I ON5 I$ REND A71 CN5 *CHECKED BY ?r:Z2 cn m Va PO Box 12054 RTP, NC 27709 & �?�z;��P pppppp ,\•a? F P R O F E S S 1 O N A L A S S O C I AT I O N RPL • DRAWN BY Tel.9193 W87s0 Fa 919.380.E7s2 •a,, � •, � ARCHITE CTS W ti VJC LEEa 1 3 5 W E S T CON NECTI CUT A V E. 16 AUG. 02 SOUT H ERN PI N ES NORTH CA ROLI NA 28387 MOREHEAD CITY, NORTH CAROLINA n - r -- T (1 6I Nt r li tl t q ijt pp 777 V r 0 � o z o z W m rn0 x (^ m D 1 A H N W f/ I O W In m i , 0 v m - a. ! ! z v / c� n MI m A ° W 0a v W O V M NO 0 (! r z O M z m z �n �m 1 x Z ED v Dz �A m z c I j u % c Iv o ;0 rn JD i 2 2 � cz c 000 ~nm� m X. Irr,inA �? ��c R'�A o ti 4 • . gAo Fri 5; Zl z � oW • z m�-zlm (n ,Z)� c)'tA m U zi00 y� in •° 00 Dm� (n-n0 A �3i . �An ''zv a A� 00 y • M �o� ornp oN(n c zz o �.• "'oxy << oa l m rn Z QtD Z T r n y g 'Tl Z n D Z v M D r Z O A D 0 9 mD A D�F mDZ Oz0 jj N r0� D 7Ac z z Z N o 0 (n .Dcx Z z r H 0 00 M A O v G) M C z N M 0 z 1_u z D N S —_ III 0o s IIff ' III IM-°°,I o IOoQ O V I�II�I� !j DI (—I oQ !illl i Q III', I i111 Il �i N � S pp :_ Q !i III ijl! I4 Ii a 7 � , rJ Z O 0o i A :1IIIIII Qoo p o m DMZ QO , 0 R01 NAZ�jO OD I °- c Z 0). (00>Z Clio -IIIII Q o. Nn �; z �� >� =11 5�0 vc _;0 - 0) 0 A o A�o mMo zo No .A 0O A� p W m ND -x m'-{. D 000 DX z m ---I+ 8 o> o sM 00 >a A n =o zz N '. 0 W �6m 1 z M 0 M N o m �a :6 0 D O r a W NZ I 0o vM U?, m O = CO N C A $m 00 - C r 0) I O 00 N Z nl 0 Om �r D O r ' Tt i m C)m Ord J 00 mn D m-0 mA zz D 0 (n p z m D x C.P C..1 IS-6-1 5a-0" 1 �1 l AOy + 2D� pO0 v z� MO - A a) N mr M vN mz 0 U: I s N C W O m V AP M m y OT (7 0 A Z N 0 m 2 D m A a M O D CO m a Z a m D m r c ➢ ;u v D zo H OT (A a::j N v m 0 '7 x r -1 r C) AU) m 2 r N m O A V) M 0 OD 2 N c I ➢ m Z- N A 0 v 2 A� 0 N c W A D v M IIIIII�f IIIIII' 0� IIIIII D O IIIIII.". z� (c/1 �r M O o A -O 0 O m 2,0 - m : I" IIIIII° z` �W v0 A ; III s OD 'o-i 0 Z k ii 000 H m00 OC m N M IE "rj m pia0 A I IIIII v = o -III JJ o O IIIII , c� z III N? a W ➢ o _ - III "x Ili. = 0o-11 m pN C1 m N -!II K V 5 r.L� O\ to =) n z A° 111- 2 p c o I— - mm z — FxZ ZO Z X Z in A 0 0 m Cox A W U mmz O ON Z nH0 m v 12" 4" 6' 6" 0000 O ri-IHZ I I I- Cam N00) DA DZN Z m() ca 'y. NC) �W �O .CM r 1i(AC,W O0tn A n ° D Z Dm>Z 0Z0 e v WAra mozo mwa j--' c c WN rrm Nr(Zn CIO- .> r T ACI mt70A zoo arN a m m G)D�N AD2 N� o a ? mm� Ar m-<A i v A nFm A m0 A z Oro Dpo 71 r Dy ADD O 0Z Zr (A a CTt 1� d Z (n DNU z OZ2O N { m D 0 W Z mT3 mn z f m> O T A i Zm� >aFM M Z V 2 A 00� '9Dp D x D Z m m a�z K v A moo o � -D0 v r �o n z OD D z N Z 0 0 T D Z N N N M O O Z Z O D z _D �O D M N N 0 m N N w v z O o m z 1n N 0 0 0 D m v 0 N (n 2 D r r W m I Ot O M _u D Z O O D Z * a m 1 D 0 F1 0-0 > m m p III 1. 11_ II! I �00 o�7D rH III —III- 11_ z n�v mm I1!; Ii II-1 1i1 A0 om mX4 m N z 08 EdIMIi 111 C oo Nm =I I I I I(—i l waa 11�- a ),J CM 'M m 1!1—I fll—I diI l! Nzo CM I 0 M I am o N (n at z I O p ® ® O Bo DK �-0 z� m O> H0 O vAm no ZX m< z0 S(A N Uri 0 NZ .1. A i m �� 0 5a=a" 18, (tYP) �0rv(nx D O D m m ;13zcD(Z5 =p>DH N O Mz ��A Sc mV © O' m?O0 OD m DR p H A 0 zoN 0 0 M <;a ZDX�fT1 ? O N D D 0Hc1� N z Z W �c z 0 10.00, 1 10.00, x0) Q g� O Z 0 Mrn o �x A O) m -n � 6 C0 O n f Q I I> A 22 _v vA;C-' AD'H(O SOD V -0p N(P AA-IW rD'225m0 AZIV ArA*100 O D 0-fx*1 DN5 OZfN'iC 200� Of�OtiN ZAr ➢ �Ay O'Sei mmmm bZ DI.Nj -nZN{o 3032 Zj� m�(zi)0 6'-0" ?«ZM-� 0�r 7A-C m0a0 m 3- ZNI*I ZOAN N'm*t"IC2Ar oxA ZmOMHm N DD Z MF= r0 -i ➢V) ..� e Oom0 X: vWND=Z)O� O O'C--tm/SDA 2>r*10.zlmn p��m7A 0 0m NmD�m DOT NZ➢Z 0 '0 N O_0-Z DTK N vA v Or mm AX N (A M00 ry OOCO055 �D A �ZZ=0r rOz D 1N D-5 z>: N-IZ W ZN z mA mZoOAMprp \m SOW `r O,D-p -a r 02f-I* HDNo AN a:<x m CH mDCA- OD A DA- WO r ..-..11 SAmm C- D rAHA--.11 Mr Z a Mom W -Nir 2 00 O M D CC2DU�AD a zND(� OZD m Or mmmA(�1 yNy yyZ O r m 00r AOmrNrm r A �D p A A -O zD A Cam, z Am --I rx �o0 �� �0 2 O� z A M _00 �mor 0 D AO 0 2 Z �N 03GOMMOM �� vA Zv Zz mOm IC ZC OMM�rp-i*-i* z mz m m m o=DzwaAN-VZ11� °'- -1m WON Z ON(m/1-Nj �2 rA H n DD�DmtAl2AAD p \� i n� m j5N D Om -4 a x Nr yTm m cr o X 0 0 2 � v D a rr ..v N r Z y f7 O r N j'jj l/Dl/11 m0� O D ZZmW f W 0 A �m A�02(mO-.D..II \�\��\ N N�a3 D �� z�m > m D T y DZ raVS '(C SLOPE M D Cm Z mm_'n(A z0 1- m p _0 f�*5 jza> ;a ' z Z rZ `5~-nmoD 2 CC m m N a0 �a>r-or d �/ r D m 2y C =<!I nD Qf� O - .ZI j n 2 zO (02mjAD01 ri%//i.// i//` '*7 O a0 O ZNN = a x y �D 02DDZ1-p� T z 0 D; N N O NO j0 N �A DDO r 2 ? A X -1 mr SDOn.TIDA M D o .D,1-i rx r A N D O O m DmzA D D mm m ci_ CD2� W m-1 v o M� m➢��vamo 2 / r m m mm m F 2 z N- ➢0 A"1 Oz'Oc A M� W Oo O M -4 N m 00 W \ •Ir/IN Dj0D�O(m/f A D o Z 0r D� 0 rO 'T'1 m [ z mA 'r*1 ^. N M�NrAC� m r� T` 0 -4 2 N 0 N N N =m O �D C Z m rA't N 2 DmOrm(m/IH D-IA DDO��AZ 3 2D v O� r Z 0 i�' O O ZpmZ �� DOS DVOC,DTnO < DA O N� (mj) O W '{2 WH z Z Z (n;0;0 0 m(A/I; Ny ;0X ;a ;a nZL W D>m D T m � z O D Z O��0Anm DOM CmOmN➢> - �� y Oz O m 0 2 D i. 2 -DOZO- m.1 m N X000cam M ?0 Z A"i m z D p W Z _0 mS Tm(OMO mJV mAZ0 �.-4 O NZ O 0.�07 D 0 'U C A N rD 0Nr vpC ZyyNV zDA3Oom O DM O '?_ .'tl r -f2 0 x a V Z Zf WDW Vl mimil ~O➢NmHD N 2 M0=jN Pmo D H O N Aa `+� S m N z ~ FNF �O-m2ZW Am 0- > mEn ?m D fr*1 O D z Z a O i rr-ODC-01 r NZof H ma mr rD x r0 A A -< x m m {�v2-Om0 Ax r Z N D yD r5+ m � 0 0 � < D D A>zCSA <r = 0 0 a X m NS Wm- m 0 0 C z A mm M A Ir" A m m O N D Z N 0 m D a T O v F� ~ m a 2 W W zD m rnx x m N r D r i* N c N ; ) •O m D 0 m i o a m M N C zn M Z A v X : C • Z —poQ o Nm C a II Z c4L oa>° m0 0 O (1I poN--ID I 1 A Oe oW 0 Z --ro O D DZ M V N 0 po 1/4" z H O r N Z a(m/-1 m C Tl CS1 6" Z Ui r~ry �r1 hayes howe CAR7ERE7 u,�► Y ® � � • PROJECT NO. • REVISIONS 100032 D/� r ( Ar:%� ) 17I ®I IB 4 R I 0 Y A71 ®N5 • CHE BY P R O F E S S Z O N A L IN S S O C I A T I O RPLCKED ARCHITECTS *DRAWN WY VJCLEE / 16 AUG. 02 1 3 5 w E S T C O IN IN C T I C U T A V E. SOUTH ERN PINES NORTH CA ROLI NA 2S387 MOREHEAD CITY, NORTH CAROLINA • CONSULTANTS STEWART ENGINEERING INC PO Box 12054 T NC 2 70980.87 E F � Tel. 919.360.8750 Fax 919.380.8752 m 9T'. tlmi�ma6ubulatlmeMWlK mmP'a"tllm.tlrvAM aM apatltl®WnPaWm.Y9MM fi81•wMB Me (SEI)an lmWmm4gpMaWmeleyNyg byvp]b,anW miMyan wpai mvq.XpM6 Mrppgnry Xpl,llwn enE aIYI RnuIn Ne gOpNly M 9EI. ThBy Ye M m M mp'M� ,M]M. w dunpe] In My mmnR wM1aUmis M e W pnm m a BiIN WMHWtl pM1x wBYn L.mlaabn W 5Mm�69NMMp M. .x C?2 .z OD -0W, A r O= z t sP53ittS Nei s49'7.0 i1Q^-;%q 2.'1f; V 1 N z 0 � r 0 $Nzz cn Om O �D m0 �D DZ �` m t+A, xO y A-i \// /(n g or mmm �� mm OQ 1m\% DD s .FOv oo� NZm 0� Z AZ 2 S'•�r �r �-. D�my 1�,`:.. (WpZ + Z� <y O N T--.'+ CIS m O �AV • 0\O m X OD A m mO(<'1 2 E oy O D zzi Ncy^N 0_ _ oo go NA V_)— .m D�T�QOp VD A mm yiA1 Z S "'IZ z m7)m Ml0/Y v c m Orn. r O N m0 \/\ Ni w OO>m ?12Y Imn y2 \ \ m m Z / m �� Zlg mD > CD r ccD \ OONm Ar m /\�\ \ A y E ZO M \In 0 CpC V1 D r <� OvZ /Co z m m10- vv/I N g+D mrzz z F� \r z Z A x mA�';/i x OiO N A W N r C v " DZ o zD F oz z� A ➢ b D ci co m I z W A Zz m zzi m iA 2 C c➢i z m m z W z N Az z y n0 v �y son m x A z O� mF s c -00 D D m OC 20 S ylz >D OK n ND D mG pA 2 m 9 v m r N mz F — z A S -m r m a v D m QN= 0Z N m m A OZ N 8 O� N A m z 5 C m �D N OO mZ O O / x •0Z A D A NO O O / m0 71"7 G� N m O zA O 8 O nD Z > W czZ v $ Z� > d c z� m m IN m I 1 � O yp m -1 W C -0> m A z m N N O; n NN cym nA N D y xz AA M0 Z4 m -n r r Q N D z zml'IOA �r N D py C C O>?D CD �— z z F D S 0 r O\ A N //Z^ N V °1 C z smfn�°° 0 CVJ � m m lO.1 m �' oz mFDm 0 0 (c� 2 x (� j�j y�I z + N O C� F> AI A n CD 2 Ly D F; a7 m m S x m m y m n $ A �I c) mIZ yy O N ZmmD -0 D O m 2 ND� A3 m� v x z �C z tzi c m m v(�� m�M, ` my0 m~ mDN AO m� m m Z O OADy O<Ay W Cr rr.1 m yOy r �1 SFA nmz A 2f M ADDOy 2 D A_ y F m v m N p, �y2 O v Z Am z ^5 -I m zo —I N A y -1 O A m U1 �D Z �Fs a' D I z .T n Vi I� zo m N Q D ? z o 0 0 ��O�AA D Y4- sz�Y > 0 Mz y NZ r ➢ y A O 0 ;a,- � Z y C A •° ♦ i. O N S AAN�m "� Z N A m z 60 .. mvv D y m ..,.�: A O s� N D A n r m m m f I ` O N n C .Zl OR 4•-0" z • IFn MF m D Z;r �_ ?�SK m x ' O O rn m¢O m m cyN N Z S> s Z rm D D N WW N D O mQ = so rj o i+ N O Ory O a� D o� A � m m v ZM o D z 1'1 y Z W Z V y D Z 2 $ v O ^i ^ l/ DO O m I W mA m O X R G D s STREET RIGHT OF WAY Z a A U-( o D Sy N= 3 �0zn /ice ? \ Om Dmz •m Om m0 N A ➢ A Z v ° -{ 0 A -1 A t° N_ W A so D nc (7 i> ��a m m ZOr °z A A o 0 o m $� rAn? ON O _ __ is^ o$ 0� A A KA ]mm1W Am N '' I• i Am MO NDz�pmO OM Ay0 y r r r pF oz Z >Z D1my, :, a czjCmOZ1NCZi s a. .,'•' .a.: .. rN0 D~ M;Q ox Am. zFr7* ..... . m A D X Z 0A rF ?� r➢' omo zM a m '� AX go �O mOz O + W �/ 0 cm Zy O c 0 w ': 9 -I Ar ZD N C � /�� o n_ v z / j 0 Z z 0 ➢2 V N z ® N D+ m D O C Z 2 0 \ O rsl .Ds m N 1m Cm `, W OA /1.1 ICI O \ r ml I I I I I I -O n zo m m s' 0 5 0 0°O O mmzA-rWzr m m 4 �Ny Z >' Z ° ° ° vJ>yo�Fvmyv AM � QO � v o .i � ° 0 ° 0 -0 Avf Sy2mrM-6> 1 m r ZM a �, � N n 0° x� 0o ',Z ..�:,, t m r�Qc r c� o \ m A z M F z a> z m I> '' o ,QmzD 50zF 1'v >8ci 8 G T: m mm F Z w `➢'�AD0 nZm "0 mA�m> O D �\ o=O rO;a Z �Ay fZ7Zx IIIG+/Ij e w MIminOZDC r Osmtt r A D W O O m D V O A C %�4•'. OmAZ AIR N O \ m m z D N A I r L< D +sm s•' ;I S �➢ V 5> o i A..: Ala m y m ➢ s N I c z m �N ( x O =zA1 rz��o zw '' mN czi zCJA yo0> Nz1 r mn °; '; m Vy� m\ -Iy N —I W N r x MOT T �m t— A'n rn 2 m + ➢O r F Z O y D D D s S mm z o fn rX .oCcQyOyW //�� ao v r� : Z m z F r F z F cz z .. z mx c 6D mm m_yn �Q��..��D W °i p M N A v z Afm�lm m Am r•. 0 _ 0 m n 11VY� C x 0 z D N z O D O E •• //// ,;'• N C D A � Zi pN A Tv �� �?- n O F 0 D M 0 O> :1 D mc / as : 0 ". O y v Z r Z m ➢ O CD myN A <r< 2 z / )` \ A v, O z D O O m O F D m O O y A O -� A v A p m Al fm+1 tm°I IV( °1J N rrl '; �:,., N z y r N p A N A z V 0� ? O m '" WD !'•, o o m /� :U r-i. W F)=g r v N r Nmm f >r. •T m o & D=m 0 mmA z. rna r5 m= �z a AAj 'A y O N O N •'j•' ° m D co N A W 00 2 C z /. Z fT'I ~N r g yy� 01 z (zn� •'t _ A r5+ Zp ; M D mm m A Fi v_ .^ o '-� D r m N p• p 0 M W coo V Of to p+ w N -• IIIZpy _ m m '�7v`'7' A G7 D z 0 o Z O c I�I�Zsp1, Q � r m m .'T➢1 m D N -m1 fy/i v2i O :,::. S p y x A m O m m E;j O ci v O A y D x O O 11 -1O A O_ m P" m r '-I O p z m y 1.1 y Dt7 .:...'.:. A O D m Z Z m !.1 I.. W- w- A r = i y I D r O Irv'Ij D 0 s < < N O F yZii;.�..;. N fAsl .z-n F C1 p .m'0 y 0 °i m Q Z .9 �Ns z �Vj z D Z m M D D D m m D m y m➢ F W x A m D Z m _� 40-1 < v A p Z Z z + •'.. •..a t c � A1 D O N D D D !+1 D ? Z O F ; ,Q m m . .» O .ZD1 D D 2 �fn y p m� z AFm z°i ➢r A� 0D0 A m --•I m m m m F ° (n z D s c c z Z pzo Z O •c':% D D V m D O m A iQ �j D D {Om� m A z p A (n !n Z -1 m VOi y N tmrl Z 0 0 m D N : O° m 0 z O r O > A p z X A r m v cni� N m C mm°'�� �N�� An'icF F^ D W v`" > 0 -�� mp �z r0A� f N> —L D n yo 0 y oy i Jam+ m Ao z W imm m�1y i-WM oA T '. Q v a 0 zppm m xl N � m b N o r y m N D Z m A p i A 0 2 } 1 Z < m Z 2 -*'I 0 JZrC y m F A N+ m (AAI p 0 A A N 2 0� O y y uzi N� 1 m y yC o m m DA cm m A �1 o N z z � AAA �m o0 oa 0 ;u m D � ; nN D m a Z o w czi� Ul n ^ z -0 r Z mm � N y -1 z 6 >% v ° Ay 2 r r A Q r m 0 � t^:i v 2 0 0 0 � m 0- Amy 1 O a 0 1 m A5 W cmi T"... m m 7C A D r �^ m m e N m D ° W m m m Zx :. O Z O O o r N m m F rm D Z z = ::v: ^�^ O O D y 2 n N y y~ ,SDI 0 zm 0 D m Z y: j. v m r D 2 A O w O A r> z N y O c m D f F + Z I A • D W O STREET RIGHT OF WAY r 0 v A 0 z /r O r :k:: �..; D N r W s / A r m m N A / M u sc c u M s � m-.II ME 1 m <A O Z x o m F8y .r... D r C -t X m N M �0 A2 COO mof C/ C/ .0 OD FZC N C> �� �jNN y NON ` �Cj N DZ AZ<m Iriy A ON ® /v Z<j a MO XNA �C 0 r zO= zD \ y < O y i CrC Z ni D N X \ \ $ m •DU 71 a>� Mz m O m -� ,.., N O 2 O 00 xO ui C< Agg r m SAS Z >; ::S Z A r < c'Im v_v ter' N. O.o9gN00 +•, 5::.'::{: ,.::�`�.: __ A D 1VG �cf Ij`''_•1 In F" i v r rA.O 67 I1DO N ,Y� ln@ .�:';._- N V V V mmNp R-°m Sfq ::Y?.•"'s+'- - - - - m m N\, o —{ zADyxA msz'n" qTC m `' ::;.:'.: -:: _ z = - 03 A 1 a z O WOFD ZO m2 vi1'%j�R ➢ �Y e..'fs''�1 O m s V 00 Zzmt%i -➢1 ": <zc� OS GST� o z -:.;:;�.: :< NzC mA C N z -n -•` N•°:•;.. —I. �_ Z r • W� W + p rim AO (n D ...::' >y�oo "�M zxzm �S%� v x A D %1t //y(\/\y�//d— ySW �Nz 2/b, 54 m A D ~ U m C0 O< A� -V (�� N m v �J I AI Ca) z AIO N C S/ p z 00 2 �l V A i A ym �9.y0 • C, S9. om '" m .Zl Z T \ Ari N D Dm O,pD )�•9gSF o D z C/) o ui s. w N r z D W n ORy <9y �Si v D z cf n r N N z m c� •q v s TAMPED BACKFILL : j I- n x tq =A = DD p .q�� �S �n m> m zFzmzzmzz m z m + <�o mo D 'A �9,y �O '9yy�� 9 W N O D 2 m D N O�1 Z z z X .. D y 2 e \ p r r A D O O m mm °0m m m Z r m W (� m CC y A m N -1 ° mC Om B C7 Z -O r v z o m N �— D 0 N Ai m N O A v — z N D - A A O O 'm y D N _ _— y m m 2 D N O m N S O Z mo qC 9 A mDmAmx ix D A m Z Az o>DMnD is ; p'^ �� •'yY0 '� ,r)R a � - Now ➢F�FF m zr� - z z x v Eq,�S N G_ .Y — a) 0Cr8zOm Z W <y on �S O C m ._ ._ Nmi �p yN n r Xr A O(/)C� �'`�', �P�. z C �``_ _ gz'�Mm AcOo m r `A zu mTT <� ,� — — 0opom0 -1`onv F e• v �) m __ •— NC z OZ ON D M, D y q _ N M m a n m 0 S 0 x M HN VALVE BOX NOT T M Z O 0 2 T CON ACT WATER •e T-0-@0 S O -` - MAIN NOR VALVE C-1 CTI CJl CJI � •••• •••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••• ••••••••••••••••••••••••••••••••••••••••••••••••••• •••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••• • hayes howell CART R MROJ 7 C®YuN 1 • 100032T N0. •REVISIONS •CONSULTANTS o� 1 C®LL e 8TEWART ENGINEERING INC 'z #I�/ \/� ^} 4s/ I ®�� � ® K/ `�I ® � • CHECKED BY(I*�1 c P R O F E S S Z O N A L A S S O C I AT I O N RPL __�-' S (a; 'O Stn I� ARCHITECTS D RAW N BY a PO Box 12054 RTP, NC 27709 Tel. 919.380,8750 Fex 919.380.8752 = F "'., ,0' c • • • 1 35 W E S T C O N N E C T I C U T A V E. VJC/LEE �J. .re»» "�°».°»•.� .» ° mro' ,,. Fly 16 AUG. 02 SOUTHERN PINES NORTH CA ROLI NA 28357 MOREHEAD CITY, NORTH CAROLINA I I N } 4 w Z N � 11 II o lzo D v M rn 00 n Ov O � � Z mm -n n A C >;F 0 n? N IM � ZZ (7 r M A T z z O O m O Z < 0 00 ZO oD Mm O 00 c z DD M 0 (^ r� < --11 z Q yR �g u n O Z C7 Z1 rn 02o z woyy rri£A r z o o (n P Om C% T' D ; ^ CN Q m CO wi n -0 U. r y8pyzy m I D ( xx �N §lRR x _ 0o o �8 Ica D Z M. 9zz bm ;'. EX lz ode 'D AO rt: O"Yi (n 4. D ' uo 0 1 BEGIN 12 M I WALL D THICKNESS gg r A 0 HN ;jl a m U --I m o p im 7.`;:3 c mm \ O a p l -p n 06 ° cz�� �Tnnrr,, Z0 H < D to cc N a D A .\ \\ H C r -u 0 W x jF/. \ CA c � o m D z r m 0 0 n z z r % \. D 0 00 Z a \i \ 0 O D Z M n rr- < 1 A v \% r5, (A W D o T %,T \`\ n x 0 z \ -K o m //\ M o 0 \\ C ZO A W N Z OR cz c= M c v W r S�� m m A En 10_ 10 r= i F 2 0M oAm r m� n M mQ T m W A > IY/ A 6 z O cD O z0 s r N / / / <0 v ,A D P Oo 2 N � _ q oA m 0 m W z i A Opp Opp - Z in D C m 0- X C A D 0 O m o o0 v a De � m %s m m N ayr.♦ �X•' T c>c m POW "0 TD D > z z V N rn N^ m A m R z z Z -n r > p a '1j N CD r c D 2 �, ry z 2 y LL E D m� Om Z o m 0^ r %. / D D zC D OX z � m z m m m -mi mz D M> �cf) C) n r D a r D � r D N n A a O z z0 n n % A W Q 4 \ N A 0, O O o; r w vw �I - K I"OI Z �N z C) ;z ?0 �D Z o vy ODa \ !\ V-2 1�/4" V72 1/4" 8 1/4" r < N NN AVD \ �-F� m(A / O OD m >> SOD H a A H r z mD coo O D "c' Am " cl� � �Z 0 C D Z cc ? rD- 70 Mr- '0 :T7 0 N� AAz r < I D W� rD. rn W n r O COF Mpl> X Wo m H _ N a < a n m n "I m oRu O .TCI �, m CO D Gi v (iy > N O p Z C ITi a { c A m� m a (i -{{I O r- Z 00 X 0 m m o Z = aw Sv rn S o rral ro a N O (n D y (1 Z r'1 V O D X 0 r 3'-9' �7 z rn ':' o A m 2'-11 3/4" 1 1 2" O S Z 1 11/16 7/ " 1 11/16" -4 r A \ = O Z rn �v N DN D Z r r 70 p �/ Ai A D O x 0 O D N A W i VI "�A* Z I- H 3 O m m W D O ^ �� PI � O \; a m W 1 `. r ii �vmvcic / p z �/A v_ o Z I z Z p ,1 /" 1'-0 3/4" 1 �-0 3/4" 9 3/4• c� D O 1", N m 0 % c) Ln rn VAj;, rm Dm O LA m co O > (A _ C7 Z ��c c m r v v �0D cDi = DN 0 C O O O MOO O_ O -0 C > Z ?t T ODO O m (�Tl � D 3 -0 Nm T A D r W.ir y a r N Z c� cn Z 000 r Z Z r < C) A -1 M a D Oc Z 0O Ili L v G Mr Z O Z .• M o m m N m < r o m < m < O (J I j < A 0 0 oD a O O a 0 4' I JW �c?lyrt0'00 Oc31� o-rtD (A o0�(A •""H 30(AvYy J0'-•-+; yF ^(A �v� c�0 n50o'3'-p2 h -1 =0H 0-10 1-4 to OOD-030300 0 jcL ADZ 3ov(A z(T (A0 30E 3000 U-0 OccO Fo-D(7 pp 30OJi O5.;o �n c: .0a MM'm 0 7JpM 1 O.c.OJ 000O0 c=O Nrt oc0 0cm 5 0 30oGC N yao 0 (SD �N 0(JD a y a7 <°.('D3 (O omz Io rrat � y 0c -A0 M 3Ul �aC CD p,07T 0 F � aV D rty .Z07 aJ 3a2&o 3 aZ 0 Q � p•+O N � d30r 0O � O� °O 00 ° 00 (b O'o ON-300 0.0;0 o -c p,qU T C 7 yv o 30 0 7 m 0c� rt S a orTl NTJ (DV p N a v p y Ln a 3 O 7 Jc r 11 D Jc70o O F 0 a S 3 0 C- <_ a 7 U O- a (7 O H 0 7 rt H J a 2 OX o o rt'0 C 0 0 O 7 O O ,� 0 a N c Cn .y+ i C 'A O o l0/ 0 ° 0 0 0 0 0 O '^ N •• t0 y. 0 O 0 S T7 0 3 N y H t0 0 rt 0 0 H 7 m (°A rt ,. p o 7 (A n<° '"' °' c 0 0 o a 7 p o .' c 0 c o c D �. ° o C 0 a .O. p v ^' » 7 rA a �' rt° m 7 a 7 p A c 3 p» .. -, J a 3 = 3 y t� 7 J .... F. J p J Z 0 rty v`< 0 0 o.mv 0 0 S N� O a _-0 S= ,n 0'.. .. (p .Tl r F p 3 O 7 SO rt 0 0'0 3 r O 3 0 00 pa0 a07' 7 O rt Z: O 0 0 0 v N ,0.. d 0 0 O 7. 0 3 : O p C a a o A m 0 "': Z p N H 0 rt 0 .0 0 (rD 7 r'O . R O O 0 0 f*1 O- a 0 0 rt a O c 0 7 0000 0 0 rl F i J 2 0 ° Q o ". p p o 7 0 rt_ .o O- _ .6 O ,., 7 ,S 7 0 0 3 = "Y o -• "< I f rtp 7 0 --'I 7 0 c � 0 .p m O� a 0 Z p 0 7 y 7 a 0 O 7 0 ' r 0 7� 0 S 7 0-r 0 0 0 7 0 d o N a a 30 °: - O �- _ � r - 7 F• a C y at0 O 7 y 7 0 N V O a S N O 0 7 p co 0 N� 7 G 0 N O (p 0 N d-p O 0 0� v 0 J= V l O S 0't0 O a 3 Z O .0 rTl 3 0 0 F A rt O y. 0~ O U fD X. O O N 3 0 0 Q 0 Q" 0 fA 7 O a 0 `S .+ -0 O y, rt X 0 O p D 0 O 0 0 Vl m n 0 7 A Ln -• y, rt (p R Q V) 7 V 0 A . O .+ 0 - 3, F rt O 0 .' 3 y 7 0 O" rtrt7 O-wjF pO- DO�7 �..Vi0 £C Tom.. j 7r a=rj �� a0 c'0O-a 7�c) 00tOO w3 ,.J 000 A a° 77�Q v 7� mo 3_..O.J ' 0Im o,00, J -No Imp (b .3�0 O 0 7 rty .. 0 7 0 C O S O ,.a. r: = r N .0 << p 0 G- =i ..t♦ (+ I 0 I V rt `< y t0 (P 7 0 x p j 0 X I. JY< 0 x 00 0 fT1 QnZ O F 0 a O D �� -I D10 S0�o0.0` c 0� 00- 0 J o o Maa0 a-." �= � O' n0-=1 �° O rt zi Z !n to -0 S O 3 (D F rt o O- 0 ] M 0 0 O r' 0 rt rt 1 "O - N 0 7 2 N 6 D rt 0 to 0 p _ _ 0 C t0 3 o 7 0 to y o o c 0 �* y rt 0 0 p 0 Q- 1 S rt 7 0 C_ � 0 5 J fD a 0 r 3 F O j .. S 0 0 _ 0<-�� J _I O 0 7 iO a O o J 0 c 7 . 3 O O O O rt O O Z 0 C � j 0 Z7 � G Z 0 J� J Jto y. (n K y O 7 0 l 0 7 ° 0 O l . J O. p A O O .. J 0 0 .+ 0 0 3 t0 3 O F 0 0 0 0 O- < J V O O S z O J G J 0O- 3 O SJ ^.700 G o000 0 J �'.•" r 0 00.:0 10 530 r O-0 _0 S 3-0 O O7a p O� 00 O a 2 » 0 0 7 0 0 0 J a a 0 7 ^' p y 0A 0 (D .+ O O rt v 0 O n 0 r7•• rt J J N°- 0 O 0 3• • y = 0 p K J rt r rt 17 C O 0 O a 0 S 0 0 -0 O -1 rt UI N C _ O rt '0 _ 0 0' n' 0 .+ rt y 1J - fD .+ O ♦< O' -• fD O IV S = r, 0 0 Z rt- 0 .. 0 . 7 •S -c F 0 -n p 7 0 y to O 0 0 C a x a 7 J 7 D- . -♦ 0 _a Q• N a O- 7' 3 oO 0 0 p 0 0 ° rt D O 0 n N �° 0 O m M E Y 7 3 o o a �n a z no _adv oo 0 J 3000 o ma .3 0 Jo o c o .p „ 7 C) 0 j p 0- C S 7. + p 0 N 0 '0-" Ort 0- Jto rt o a 0 J 7 C 0 '0 0 lC 7 0 F 0 Q C 7 O 3'O 3 , rt o 0 7< a" S .. -" rt = 0 J .0" c rt G7 11 0 7' 3 j a 0 3° 7 p 0 m 3 O 0 0 K y, rt J F O O O- 0 7 F a 0 7 f (p J 7 O (D _a O 3 y 0- -0 N 0 .+ a♦< - 0 0 N 7 0 0 7 r m O, v C 3a3 < 0 r 3O0 O S o y 0 7 0o mO C a0 0 0 >D"o 0.•'-. Ic K M U 00 i :+� � o H K 0 � O o a 3 0 0 0 =J0 0 rt- 0 .S r 7 -0 *O S -,o n N 0 0 S0 o 0 0 0 7 0 K N D o� S 0 ° S C � 0 -o O rt 0 0 rt 0 .+ O'0 O S 7 C '� 3 rt r a 0 J O _� 0 0 J-^ = 0 0 a S rt a 00 F O C 0 0 -� 0 0 0 Z Z mC c' m-Ir Dx 0 a 0 0 0 -0 r O '-• a 0. •� O O� F a O N p a 0 3 C rt S o° C 3 0 <0 O M c 0 0 0 0 7 a < 7 0 -0 0 3 3 C X 0 y a o < 7 O N C rt rt 0 O - 0 0 p ° p a rt rt () ••Y. 0 O c _ o (p p- p� O° m C) r 0 3 O O t0 rt a O 7 r o (/1 `< (A +-- _+ 0 c rt O Z; c a 0 0 D 0 a (p000 < 7 o0,p 7 00< 0 0 ,F j>7 0, 0.O I Ci 7 7< to rt l M' m 0 00'0 -F 7 < 7 0 O j Z •(A o 7 1 O O' O O.rt .t0 O 0 00. 0 J 0 (DX O 0 0 3 0 7 to S 0. y, S J o- I 0 -n . -O O- = 7 rt a Z7 f� o-' D 7c m C p S O )r 0 1) 0 0. rt M p J 0 a y r 3 -p 0 7 0 0 7 0- 3 (A o D 0 7 0 O O O O 0 O- 0 .« to Y< 0 r 0 0 0 0 rt 0 ° 0 0 0 O n y i -0 » a a� a 0 0 (A X D rt 0 " -I '"• 0 O < S O 7 -0 0 0 0�< C D a 7 <7 O-0 aF•0 O a OOO 0 rt O0 t0 0�O r0p0 a- 0 prt 3 rt 000r+. _� <� 0 O00 as J 3 • p O „`0 J-t CP c) -0 ° l'C-o -0 OD �O < 0 7 X O Y� rt w 0 = 0 '0 0 0 0 7 to 0 a p r J 3 F 00 -0 ' D 0 p 0 O NQ 00 0 C r mZ 00 7 Qa =�O 7,p 'O 0 3.+ 05.+0 0 .0 < 0 0 0 7 0- a 0 -0 3 S0 700 70 N 00 - -�0 ,+ V D• 0 0 0 0 O O O O J °- C 0 0 " 7 0 0 0 0 S t0 0 rt" ,p O y a 0 K v 0 0 N 0 O i 0 C y< F 0 rt a a O A 0 X 0 0 0 0 0 a S o- � 0 a rt C n 0 C 0 0 0 _. 0 0 � K 0 0 7. 3 m ($ C V O O O O 0 0 0 0 .' O X '0 < ,� 7 O 0 7- S a o y 3 7 0 J p 0 =-0 V01 0 L y 7 7 0 N C C 0 1 7 rt� V 0 <. ° 0 0 - rt o 0 0 0 0 a 7 O� 0 '-" � 0 O '-" 3 y J D' 0 0 - 7; D- -r N � 3 0 ♦< O Z I o 'p O rt S -+. 0 O 0 7 N rn .+ 0 p V (p 0 0 °- r J O j O "° £ 10 o 0 O- 0 0 y .- ° O 7 0 0' -. a J 00 y to J ? Q: Ol 0- 0 N 3„ � � < i 0 7� (p � O 4� O 0) O 0 r: (A )< 0 .« _ rp 0 0 0 a 0 0 O 0 N r N CC n M » p pp O 7 0 0 (p 0 0. 0 < 7 7 p 3 0 p 'D F G 0 J 7 S C S 0 0 rt 0 A 0 a 0 0 rty 7 0 (A j £ o N- 0 0 m n -0 0, .0 0 0 a "O 0 N O 0_ :: 0 •t 0 I 0 O a r :t a a _, ..� O 'a a 0 3 0 0 0 a 0 S. N 0 ry .y+ 0 N' 0 r: S s .. S 0 V 0= 0 a 0 tO '30 ° r N _ S y 0 M o o D•t0 3 S 0 3 0 C=) C .+ 3 O 0 0 O 1 7 F 0- 7 S . n O N 7 O ♦G F 3 H D l� c0 x 4 < o t0 + X O 3 '+ O 0 S 7 0- 1 0 0 0 0 0 � a t0 � -. P m 7 � (p t0 . J o 0 S y ' 0 0� -' rt rt r c Vl p 3 t0 � I rt O 0 O rt0a y -] •031 aaC y 7 a00_0 t0 S aJ - a. 0 rt0 77o -0 o -0O 0 0p 0y0 ya 0p 109 m O' 0 rtD O 0 a O D. O O rt O S 3 0 0 O 7 F- N :r ° - p 7 O = rt '* p n -t O O .« p 'rl Z C y (I! 0 p 0 y 0 0 W O to 0 0 3 = O O rt .+ 7 �< 0 0 7 3 0 0 0• 0 .� 0 0 7 7 rt p S a H 0 a 0 1 c '-` "t' 0 O 0 rt O 0 (A D- 7 7 0 � y 0 � I 0 0 (D - 0� 0 0 0 3 � p 0= 0 j. rt O 0 y -0 N n .. .Q. .y-h °' 7 "' a o 0 0 7 0 0 y 0 a J O 0 - 7 �G �, J 0 S 1 7 `.� D o X 0 3 N G '0 (p t0 D O a 10 0 0 0 0 0 a O' 7 0 0,0 y 0 7 0 ° 0 C 0 rt 0 D' t u O rt 0 - F tO o• (D •0 0 p o 0 0 o a a X 0 to y, p O - f0A 0 f 7 0 '-' a 7 r rt 0 3 N 0" y ..-HI .� o C y 0 o.10 0 = °- J t0 '� 8 7 0 J y 0 Rl 0 3 0 0 rtp S (p d 7 t0 o t� 0 O >3 0_ .0-. ° _^ 7 ,p 7 a s 0 0 `� 0 0 .+• O O 0 (A J° 0 0 n� J F 0 J W W 0 S F 3 3= O a 0 ..+ '0 .. 0 0 0- a Z' 0 O -0 0 �, 0 0 '� 0 Vl O C o 0 0 t0 0 tO J 0 N C - S O �. G p S on - S i O J 0 O O' O y O 0 0 0 -t ': C '1 0- ♦< H 0 0 0 rt 0 -w 0 ,�. O O . 0 0 7 0 0 0 O 0 O = 0 N 0 a S o 2 x Z O. D- m rt 0d NOt<0 n 0 0 0 0 to O M '+ 000 ? 70 rt �_ 0 0 drt o 3o, O y.7 y, _n pa a 30,1 0 zp O 0V 0? N N DO 0 c rt 3 C O- O J >7 0 -O 0 -{ -P 0 S rt = 3 0 3 y 7 .+ F. -0 p 7 p 0 O .y♦ J 0 .` -O S J -0 ° 0 C 3 J 0 0 0 7 O 0_ '� p O ' r J p rt Q 0 '^ : 0 �k O O- - 7 7 0 = 0 0 y a o i A 3 ♦< 0 '0 0 0 y �, 7 W \ = t0 0 0 y x a 0 7 J, •� 3 0 0 0 0 rt o (C o. ? J 0 00 a m X 0 0 a 0 to O rn 0 -0 N° O CC y, 0 0 0= 0 p 0 .r O 3 0 to p 0 (A `0 0 0 to 0 0 '0 a a, 0-p y 0 rt 0 m r•�' O O 7 0 .. 7 c 0 0< S'G O r0+ -" 0p, - 0; y t0 7 0 rt 0 0 O 0 0 -0 `< 0 0 0 '"' 0 F 0 a rrt a, rt 0 7 °' = 01 0= 3 o O O 7 y .+ D� c rto --1 p r O 0 p70 ap ,.Jp-0 .00 C O o'0 J O G FO0 .y.(A i " 0�00 7 y 0 00.+ 0 rt c,� p rt O'3 Q aJ0 O U 3 (10 S� p, O< a 0 0 0 7 0 7 '0 O CD 0 0 (p 0 0 0 F 0 0 0 0 < U S 0 0 0 O -O 0 7 .0 O D O _ O 30 7p I (.I1 p 0 a j a O O o rt 0 rt p 0 W< ,= W0 (D 0 o xy O 0 0 M a 7 00 7 O 0 .. 3 0 3 000 0♦<7 •�t0 0 O rw 3"* o 0 7 -0 3 0 0 M Q 0 G I 0• 0 0 0 .ao 0 O 0 0 J D' O -p -t r 3 0 0 art 7 _ 7 7 0 a 0 J o 0 0 0 rto _ -i .0. p rt O� z w i '? rt O y C 1 Q S j `G Ort to 7 0 0 0 F 0 0 j 0 O M 0' p' p� 0 C '-' o 7 J 7 J 0 0 7? c l' 0 - O r 0 C O 3 0 I < .0 a M'" 00 p N O ♦< p C 3 O ♦< _ 0 O X M O-n 0 0 Or M 0 0 `G v J 3 0 -0 tO 0 O rt C O .+ O y a 0 F ,p 3 0 .+ 0 ] 0 7 f. 7 O' J M 0 0 ti. 0 0 '0 "' y 0. 7 0. 7 N 0 0 O 0 ti, S r O N• 0 o' O -" 'O 0 - 0 n o Co -0 _p 7 J .i y 3 0 0' -0 7 0°£ O 0 7 0 "" 7 F 0 0 "' < 0 7. a � d N D O O S a r^ 0 C • O 0 0 0 0 p 't` a (h rt O G 7 °- a to S 7 0 0 0 0 0 p N "t C O 7 0 3 0 0' a _° a 0 r W O F .Z7 = 7 tL O Q 0 0 rt O' 0 O H N a c S 0 rt rt 0 rt y 0< 7' 7 O y 0 0 O W I O _. . 7 0 0 y y, 0 C t0 •'t o y 0 0 o C w<_ V 7. 0 3 O p 7 rt 0 O N a -a a _ 0 0 rt 7 O. < 7' O S a j 0 0 J 7 O (i 0 C 0 �a £ b 7 F 7 0 rt 0 0 N 0' -♦ C S N U 00V �0 (D00 p �0 y <0 .r �' 0 7 0 S y (p a7 0 N OQ 0 rto 7 0 M' O' 0to0 a aaN a O \007 n 0 1 -0O (+ O 0y=00 ,� 0 JS .. t0 00 rtp n 07 0 S 7" 7 J 0 0 o X° 'Al "' fp 0 F W N� y "'j I 0- a0 J(� 0 0 °3 rt.-"0--y y J0 a7 O FJO pa O- p_ 0 S0 (p " 00 0 a 3 N0 F. .o "•O 'O 000 O O% 0 a 0 7 0 a 0 .+ 0 0 - _ a"' O S 0 S 7 3 0 0 0 a -0 0 H rt 7 0 7 0 0 rt 0 0 N rt p 0 to rt 0 0 a] 0. 0 O rtp p 0 c i 7 p S 0 7 0 F O 0- cb D S o to 0 rt d °. ''* 0 ° O O 0 7 0 0 O' - 7• o p 0 0= O p n a J 0 t0 0. O `< p p 0 a� 0 a p. °> > 7 ,p t0 7 p p - 0 0 y m S 0 o Oy 3 .,00E-0 U0 �- 0 3 0 7 CD T. a C v 0 ?� X 0 I��..��•y� a a v 0 M' 0 a W y 0-D -oc acl>0 :°� 0m0 ono0CcTA s•»-0D"03.>>?MW 7o m3Sm 0D �Oi°cM °sr- 01 ^'DO c 7-O.0000 f c M J0 'D00 = na0000 <y 0.+- 0 D 0°.0073 0.Mo%bDA o 0O0 (DA 7 (0-p�73 Z �0 D Fo• 00Z 7 0`c' xi M3 G o ti. N .. m o J M c W 3 0 I S2 N'p - r rt, 3 X �, cD 0 0 m j a 0 0 < a _. M 3 ;rO a 3 < a O H - 0 V 0 0 0� r 0 00 70 n 0 0 `<0 " y �, N`<C 3 00O- Z .+ .0 a Z O N (A;u N o; 00 D 0 Q•"-oN,Nco Jjrt �Z �30 s�0 .�000- rtN m0v73c 0 O(i 0o cdN 3` 0 < D -� ONO 0�O I I I I`m 0 30 p,0 y0 n p0 0 viy 00-'j�G rt0i°0c 70y0oto w-'° I(A -y0 p. r0"•0300° y0 007• Oa m0CD �pr to 7 70- 0 O y S rt 0 N N a D St0 0 7 .. 0 o 7 O rrl to 0 7 C 0 X. 0 << U 3 y. C 3 c 7 = 7 3 O v D 0 D C 7 N 0 7 7 O D a0 7 N i0 rtr< 0 0 y,O a C 0 0� 7N aCi3 N N '-"0 ,7-„S S< y 7 !t'I Ort 3. 0�,a rto 0.0 O h0 N S 0 0 D 0 0 0 0 0 \rt Qm 0� ; j 0 _: O_tG rTi 0--0 00 0 a N 0'0 0 f 3 co y (D ? 0.t70 0T. b 0 G O C° 0 t70 0 ? 0. O N (n £ O X 0 0 7 N r 7 V 7 -O -� (A O 3� .yn �+' o IA IT7 � 0 7 j S O 3 O N V1 0 3 0i. 0 p y 0 's c 0 • RI a n a x 7 -0 0 0 0 3 3 0 t0 S 'Y 7C o .+ 1TI t0 S O 0 r 0 c (D G tO Dry 0 p 3 7 Vl = 0 0 -a 0 -O - 7 S_ p 0 C 3 E• (n r0jt p y N -o C o a 0 p O I 7 O_ C o 7 0< 7r 3 X X _'0 H 7 rD a .. N D (rTl �. CP 0 0l N 0 0 < = 7 J Q 0 7 t0 S j'0 3 p Vy< j V S o 0 0 0 j 0 O� F ry 0 0 0- O- O °. C O O o c. ". o 0 '+� rt-0 0 (A 0< J "^ 0 p Z W < 0 a 0 0 0 O to F to rD 0 0 7 0 a -. S rt y 0 7 0 0 • 0 O 0 y, 7 � 7 ° -i CC 0 3 F" o C C -0 -0 " rt 0 (D 0 -0 I N F 7 O O N 3 to 0 7 to 0 0 0 -rta� O 0� S :7 rt..t O) °-ry 0 7 3 = G .c+ rto ,� -w_»Z G 'wC ^O a 0 0 O 0 0 0 < O- = E >r a N 0 0 F 0 H C 0 O n J < 3 ° 0 rt 7 0 a 0 0 0 0 'S 0 0] O fA W N rt`� O f«_•O 7 S_. � O' - S O 0 rtC M p (D F 3 .d 3 3 0 0 O "ON a 0 r 0 p 7 (p7 O' aDr3 0O'001C� -0 7 0 F O F O_ 7 3� 000'�_3 H Z O C rt S 0 rt 0 F 0 7 rt a 7 p 0 rt O' 7 .t0 Z -0 0 vo D < a 0 CJ A 0 0< 7 dD J O j F O 0 0 <O °A O N p a a y m 0 0 ° X+ Or ° d 0 rt y y O (T1 0 0 a 1 N 3. 0 Gi n j 7+ 7+ 0 O< p rTl Z O y W �, , y 1 0 N, 0 p. -0. �" J o � � F � ♦< < y i � 7 p � � v, 7 S p 3 0 0 (n � 7 7. y M' 3 '-' (A 0 o m .S 7 fD O O Ol (r*i H n m ) < 0 n 10 _a 0 j. 0 5 j 3 ,0D a0C r0A 0 N N N 0 7 Z- p y� 7 0 0 a w •X«♦< 0 13. 0 p N n C= a rt Q 0 y C j -I K 0 0 0 y a 0 O N r Z O H �7H \ 07 3a 0 to O p D :3 0 3 .=0 00 `G O 0 3 0 0 0 0 to -y 0 3 aD 00`�0 ♦<0 7 N 0 mrn 1. y =r - r- i 0 f 0 0t0 3 Q D �0 rO 3 n 1 7 3 I r Z 0 C 0 Z _ J-0 S a J O r_{ �. 0 J rt 0 0 0y O 0 0 m A'0 0 O �. o' - O Q-00 N0O 0 017 (bpm ca a I/ Q r r*7 '� 0 N 0 Q. O O Q rn 0 3 0 7 S f0A n V N C 0 0 0 N 0 7 0 F 0 rt 7- 0 0 rn n F E 0 0 S' W C 0_ 0 S O p i p 3 0J-,pa 0 F03 O p 0p07F < p0 as = o Fi `<0 y 0a X OOtoO O VO3 c •M0 0 °_-O c C-0C0 N.rt7''+Mon 0ryS N O' V' O D 0° to,7 O- n �-0 aQ0y oa O n n a< 0 0 0 a� 7 t0 d 7'D rt o .y. a -'to O7 0 0 0 i+ ? y N a 3 a X 0 t0 C f'- -� a 3 t0 <0 Q N a N j O 0 j 0 10 0 0�. j. 0...; M--,(D 0Q 7= p 7 3.+N-t J C 0 00 0 37 Z� 0�. a.y.0 7.0 ��< ?to 00Cto 30 ^ 7 `< `G 0 0 ° V D a y O 0 0 0 0 '0 0 c rt _ l 0 D o C 3 �G -O O J N = 0 F y -* F 0 n. O Q<C o O rt-•0 770 y''O.0C I 7X 3 a - < Oy N' �O 03 07 rto (A 0 Z 0 to 7C 0 -t 07 a' r rty 3 0'0 m f a„ N 3 0 o• 0» a (�D 0 N O D 0 S 0 0 y` 0 y N 0 a� '0'• _ l O D rn J d� d 0 c c n S 0 0' 3• i i . t 03 Sy 0iD j 00 00 G 03 0 .1o.= 0S rt 70 rt 3V M �- 00-0 0a 1 �0 p77 �O o-q D O 0 JoNrt p<Dop r pT. y W U 70 OO a7 m N 0 0 7; .�i oC �� oa 77� C (dp 0 y c 0-..O .+N _ O as t0 ° 3 -0 _,.• 0<c O-0 aJ 7 m 0=00' N 3 y Op rt r 3 -01 .a^'V a rta_ c o- 0 0 0 S V O to 0 0 0 7 7 0 . 0 7 y 3 0 -0 O O-a -0 O'� 7 0 p 7 0 0-0 t0 •� 0 0 ..=nnO'O O 0 O 7 D 7 7 '0 O C� 7 1 0 3 Q r_ z O N a000N 7 p, DOmOatp p♦< p Jm O X N O J77 rto c F 0i0, to ° °.o ZCD i° 070 Ort0 0ot07 0`G ^ i7"' 0 F 0 0 t0 .. O I`I N rt 0 7 -0O 0 (,D 0 7 0 E p �' O p 7 7 p y a 0 " O t0 S 3 y rt '� s �l j0 po0 F 0 S0 aN 0�'-'7N 0(Dy y 30 1 -a0 n-, 0 a M. n )r ��O 0 0C r0i3 03 c --i'•c 0 rtrt cy,�as 3' m Oamaag.m�D3 m3yycmOX J m o c 7m Jo O y0 00 0y 3 0� S S t0 O 0 0 7 7 O' J J 7 ° rtp rt (D 0 0 p t0 r• Z S C V 7 F rt O S 00 370-G -iV 77 7=,,.0tp 00 rt0op:3 y,a<03 0 705 r'O o C � 0 0(n t0 UO a7 00m O ^ a �.SO j 0 JoI a--70 030 ado C 7 00 0 S �rtrt-. �0 11 m X 0 CO 0aMI "O0 rt O -Q0 S0 C aO- to �D OtG 0 � O'-p 3 •rti^00 D 0 S7 O N0 0p" x D J C O p 0 7 0 0 0 rt 7. p 0 0 0 < 0 t< o v� 7 D (n F rt 3 0 .. 7 0 J OD Vl 0 7 rt ,... a D a a 0 7 7 a 0 3 0 0 -0 0 o N. z 0 0 t< 0 0 3 fTi 0 o O! 'c„ F t0 N rt 0 0,0 0 t0 7 _, O' 7 0 a 3, m 3 17 '0 Z rt 0 0 7 a 0 n 7 .: ,-•0t0 aJ rt•'C n3V d t0700 p-c 17.0E 00 7 0 j n• rn 0 JO 00 OrO+SO .p :Q <z to 'a F S ° 0.0+°p 00 O7 N 77 rtrt0 �, r7+rt 3 0. 0 n 0 70to3 r � p0 a'v O_00� 7 c 0 C n S S 0 ° t0 W 0 3 dt0 3 m 0 '-" 0 a a 0 t0 O C J 0 S ?`O >♦ 0 7� D 0 Q i o 0 y 0 G 0 0 `G r7 Z 00' .+j .+N a0 ""0= 0 c :3 or rt rt3 0 0 O 10 .. O 00 7 rt (7 a 0 0 (A Q 0 c X O . 0 S ,+ 00000 0 0 7 �, 3 O a C O F C rt 0 < C rt 7 0 .+ 3 r 0 rt r♦) a 3 0 0 0 7 0 '+ ^' O D O- N• = U ,+'�' 7 a 0 0�to 0 S-0 0' j � >r rt 0 ,0 p 0 0 O 0 W v D M O 0 's Jy a= S y 0 -1 O JSo 1 7 O- 0 O t0 O< Q D 0 p p rt� m F7 I M a _ o p C 0 O 0 rtK O 0 0 N �' a 7 0 p- O N f a 0 D• j >• to 0 G' 0 ° N O N N y,'0 0 ^! to 0 o Z. a 0 " 7 rt O ^• O- F_ 7 0 'Y o 3 0 a 0 <^ rn 0 F 0 Q 0 00 -1 rz>z p 0 m 30 0D-03a S =to C-.. p7 i .J-p 0•y 7 Ort 0 0w.i H a? SO O00N NO n s 0 ;CKI; I(D �a 0=� j 0° p 0,A0 rt 70 (mD O£-C a7-0 O N 7 F rt ,.O X0 j"c 0 c 0 0 3 F J S 0 0 y 7 y y- =r 3° 0 0 Q a O 3 0 0 1 d rt 3 �p 7 . LD 0 0 0 0 V J m 0a. Q (0D 0 0 n Q. 0 0� G a J♦< 0 c S S .« 0° 3 `L Im O; rA p a o = m .7-" 0 0 0 0a - 0 0 f. O O 0 0 p 0 0 rt 0 " \ nc o. t0 J7 3 0 0 D ci zs m m-r Dx CfrT'I r 2 O Z_ 0 _ -( � � . � Yi-i Cc 0 00D- O T 2 r O Z 0�° I OOO(A � ��� m a C D , C Tl a " ;0 _ O r O � - A � r a z O Z a D r Z m c� N z wr={-n0 0 -0n O < D " Z- rj ZA o O H _�0�-00 =0 r4 A=Z�uzimzuziotDil `oW < rrl r r- r K M c -D-I O (zA r N v-Ic)m Or= �� A.'V- I I zA ITI < < r z v M�rr-- � O W r r*I frl Xmm 00-00 v - f�'1 M Z Z c 0 <c0 rrl r N m D�00 O O <N r,Z �o A 11 , r�<Dy O • R, K*Xn Oo m O DC�OVI AmaX(.n W�Cyx 0 N0 o ti .. �Z UI 2rvK'ODn Z�o�r cm y rr n rnzD�i-z mo �x M=Mvziv r <_ID >0M>w M0=1m ZmcrH NL a D N F m N o�zOMOMTO� E- m N < vTDpz N Hm�m O �] ONzm DOmx a °= y m�� MUI �° o --, x r W • PROJECT NO. • REVISIONS • CONSULTANTS • hayes howellCAR7R7 C®�MuNITY �®LL� 100032 011 �I • CHECKED BY RPL PROFESSIONAL ASSOCIATION • DRAWN BY AR C H I T EC T S VJC/LEE CUT A V E V V V V V V V Y V V V V V .Z D O ''%l�, Pv ''VrIVIII�t"`t 1 3 5 W E S T CON N E C T MOREHEAD CITY, NORTH CAROLINA AUG. 02 SOUTHERN PINES NORTH CA ROLI NA 28387 z n Nm 0 D X In H Z O V) 0 m M 0 M n y U A W N+ z mnm v> _ > F z D rAr1 �I K N O OD (3) P z 00000.''.z T+ 0 r X 11 '" z o Z co m m � D 0 M z O m Ln �I,�II-1 �f1 O " HOME K D I' A I . fnak ov _ z m D o 2 m D v (f N m <v�i a F^ < Aal -r1 N om N m 2 mXm (71 Fn N D m M< v n�, Do ZZ-= �-4 Ws IIII +X D� 000 OZ z0 DA� mDvm m 2 m<� r S31?1Vn O m rm cn I. M o D O A W n Qp m M3)IS o06 3dId „ t, nuHl „5L '0'N 'HO13IVU to SAVMHDIH 30 NOISIAIO ap , S1!l3A1f10 3dId 318f100 ONV NOIlV1U0dSNVU1 30 '1d30 o 31UNIS 80d 11VMON3 313MONOO VNIl0UVO H1UON i W UOd ONIMVUO OUVONVIS HSI19N3 ZO_� d0 31V1S I I N I �I r IM < D oM rIM s z F-1 z -I--- Z z - - - r = --- O I I A A W W N+ m N y 0 A m y 0 W m m N A W W m N m O N V W= l7 W W N N N f+ m cl m m O m c - _ X O z O V y W A A W N 'W !7 0� N A m V O N m a°X0 zz w O D N' N` IV' N, m 00 _ z y m 9 O A 'm r m A CD p ,I R _ _ m r M .me v m M O C m A Z p m A W 6 'O J y m H m N A W N N M 3 (o m p O W m J N O - 9 ti rmll m y A y N++ 0 6 O m+ O W p C1 D r r O D D y m m m N N X m m N N X m y W W X A M m z fit r W A A X = T m y H z'. m ZQ A A X N = a N m D r" - A S m m G N z O ' m o _ p N N X = m - OI O z m m W N W X A W W N W X O 00 m ,m, m M X W ' r m V N - m m N � v N W m X N N � _ ppm ENGLISH STANDARD DRAWING FOR - STATE OF ca CONCRETE ENDWALL FOR SINGLE NORTH CAROLINA + DEPT. OF TRANSPORTATION !R AND DOUBLE PIPE CULVERTS DIVISION OF HIGHWAYS W 15" THRU 48" RIPE - 900 SKEW RALEIGH, N.C. cD m M3NS .06 3d I'd „ev nklHl „51 ' O' N ' HJI31VU W SAVMHDIH d0 NOISIAIO dp W S1a3A1f10 3dId 319f100 ONV NOIlV1U0dSNVU1 d0 '1d30 o 319NIS HOA 11VMON3 313HONOO VNiIoavO H1aoN i W UO3 9NIMVUO OUVONVIS HSI19N3 7n- Ll d0 31VIS M M z m 21 c o:* 030)0 Dv 0 mDm 0 mm -< -a z m c0.)O 008 D z -Iz -Ic»z mz cn � c� c O 0 x xmx vo -1 Dom -n r m -I m m -1 -1 -I M r< m m ca rzN � O ccnn vm mDvrn 0 O � 00 a)c7)-00 m� morn � m0 " m0 - m O7 zH r aD z z D- z z O o -t = = D -1 m y --I W -u -I --I 2< 0 zM my-0ao cz -i 2 _ o 0 O0 �0>0 D0 z � z OD r- ai anD Cz zmz z(nn 00 M -ir, mzr, IM cz • v 2 N � (=71 0 -n -1 0 = -nm 70 03CCD 0 zu) ZO zoo Wo < mo om o N (n M •9 m mcci� �ccn c0 (D <0 D -0m 0CAm -4— �D zl-ID z— M> D m0 0 z = zr -f m c rz cnsz zo Om cn �-Oi cm-4 9z Dv O Dn mc00 r,o mrD- mH vOim1�II 070 G) z = S q z m w mo N-i m=`o -nv °Z C -I N z-4 M 0 m co �m mz_q �- me c -I _v -4 fn co < im mDm _ W �czna) >ED O mo• O z� - 0 0 0 0 ME m a A N A 9 D c C N N y 0 101 S 0 0o So �n•� y O a 3 am a io io • y, 0 0 PP W N (1 A W 0 w W O Ooo O y m to O O m H w N W 00 O A 0 0 0 o c Z W N W W 3 m G W m V m x 0 N N O W 1 N V V J m w x uN o w 0p W H N + N po O N N W A < T O W V F 9? O� < < O O G A 2 A A al V V OO V Z m s0 N ma mn 00� �fUIICQ D0<m0 ADI XO Q M IZ A=t yN �A �3 W� yv_ n X0OM- mD 0 M zxpyOo I -�m cn o z0 00 0-qZ2 Muic:. n5 �0 zo Omzo PO r' mho mM r0)1= OD 0= mp 0 2A0K OmD 0 mOcmm mph D <A Z-rl m a) AI*1 00 co ((*m11 o T`DZ y1 Z --Icow Ow Z tnm 0 r mr Om D m SxK 2 D m r0 C O A-1 r 0 A0 N0 \_00 0 z D O 0 rrI mNz>- 1 0ob2Vj0 W S4 O 13 N AH 20 ; D m 'n 0 Z Z 0 rc- (� Z A rZm O (Dn �mD• U N Y m 0 m V) �Om O A H A �3mpm c (n v Ary 0f o M D ADD �0 -01 A m �Am Z�10m Dry CZc'X 0 p Z ADN0 N'9A NOD �p�O czi z (n z 0 ix M v = O 2 M X932 3 KK�DKD0DD00DD 9 9392 3 3DD3D3DK DDD m D �22�2 S 22� W �2OND ONN00 2 222r 2 2�OS�2�2='000 W A W W W W(D W W NANNONNN 00J m 00 0) O OJ+W N NA W N+ 3 W w UOto +A W Om W N (OO m(TAi 0� W O M o O X 0 X X 3 g ci 3 3 3 3 D 0 0 0 0 0 0 C 3 $ 3 3 1 3 D 3 9 3 3 3 3 0 D D 0�.2 r22(�,W220-----0 W -I2 222 r O p UP NO p2 N 1�A W W N?AA WAN r> »» m W'02Dr O V W W (2l)AOO W W 0 -pp- O P0 +0 Pp0 O80 Pp0 WN OfOO O Or OOO OOOl OD OmA OpO 8S0 Sp0 o AO oO lvooloNNw OO W0 J J J J J J J .A V V io V V V V io V io J J J V J J J J J tD V J J ID J V J ,I io V to V (o J V io J V �? (D y ww w W fo O0 (o Oio OioO OO VJ Oio W Oio O W VJ (D tD V7 OO 0000 000 0000000 00 oOoo 0 .N. . . . . . . . . to <o D o <o G4 J0 NNTN 0, N T N NWooNO N. C.I) O O W O a" O A o O(� + 0 0 0 O O(� V N O W O O O �, O O> N O O> 0 0> O O O U O pO 000 p W O OOOi W O'o)A))i°Om) W CO W AO°D+ 00 888 W W W W W O(AO NOON V 4 0w 0 d V VJJ V GN.P0 0 0CD 9N , >NNW N N 0 O O A O A tNo OW 0+0 >G0 0Ja t0J 0 O OA IV WW U O O W Co>WN00o0O 01O Dm N O U 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 O o o O O O o o O o O o o cc 0000 0 0000000000000 00 0000 0 000000000000 Z'? W W W W W W W W N W (v W N W W W W W W W W W W W W W W w W N W N W W N N 11 N 0 WOka N,p W.Na OI V W 0) W W NO W +A aN W J +Op,0, AO)NJNW A W A j m 07 O O O O N W V W V+ W 0 W n, O U A N A N O ,v A O J O W O m> W Io W W-1.1(O(pp V rn V.A ao Op'm P.14 <>o awa >W W++W w+w,>A a(J A»w W>W G� m._o N N W W O N O O O 0 0 0 0 0 O O 0 0 0 0 0 0 3 O (NP J 0 (VT (N1) (Vl) 0 0 N A U V m+++(p N(T do 00 A(T N + W + +(T? A N d) V >O+> J+ 00+000+Dt. p +NO> +>+0OO JGm V� VIT O0 o A V) O N U OV OUN N(T tr O m > N U WO)O�4N AONI OA) Og f <Oo AOo0Opp fUJ NNO V OCA O OCAP O O O 0 0 N N O(T J O O VtN (>• Ntr O m >>> O +++N+O OO O O O+ >+ OO A W W OO OO+O+O n p (58?• R N W NJ 0 OOOA S 0O 00 410 0 W 0 0VOAOVW J W (nW O Vo W O O W VOW A 0) J JJO) J W 0) W UOT NNNN o)A 9D 90 AA 90 A W WAN W NNN <m OAUOm� 1.JU Uv ON CID (1) OWoN�ppVNo o Q A Oi iOOJVN(V T 0) 0 0) WNtp T O O W -N• N O O O: P N O O r P 0+N N No NJ O N W O O W (T A _ Om 0 O WW U WW NW pp V+ O 0 (A 0 _F(A00O 0000) m W 0000 W W+ A AO)NN A AA00) N U m U 00 AAA OD A OU UN mUOU(T O 0,w 01 3 O O O O O O O. O O p O O O O 9 O O O O O P N O 0 0 0000000. j Oo VV 80= WWONWOO a (n Wwwm e _0 e e e e mm e e -C e e A e a' e OIII +AD 0O4 NO2 a a' e [COD AAA,m A AA02AAA20000A AA AAAA .� AA0A2.'927JA222 0000 0 00 00000 C0 00 0000 0 -u 00M0v000o0 vmv a vmsm'0'o'om v my mmvm mm mmvm��mvm A Nm myyyN N m m mmm 3 < < < < < < D 0 0000 0 y v AAN+IpV+W + (Spp NA+ A W N+N+N 00WNWW(OJIO(J010J(JTO(NT W O W O W oWOJO JO�1 tt W (gyp 2 W X C o 0 -1K�200D DDCrnccA =00<W�" rOrODAz r� mZr'im WO r 1 Z x TI C c z r w 6 CO C 0 Z < m CJt .A '=1 r M 0 X5. a ° w zv_ 310n 2. c N ^ N 9,1° o -' o 3,0 »0 3'oe ao ° s ow o qN 01 3. o pO» S. E = 0 b1 0 �n ow oc 0 o E v oW °o� r0 j q F 0 n E, °off s z MMZO mo cf) M G-) N '� DAWOz � O m , m O m o=�0 ZM _9 Nji13 Tm M =N OM X (n m' CJ1 CT1 d 0 o W N g 3•� Aa oC' 1 p 0 N 3-0 o• 3 0 0, N ci I C. ° w 19 x o» 3 0 ov a o' mo 0 �» n ° w n ° 0 G O F 03. o � v J t 0 0 � c , N \ o 3 w o c + c ° n o v 0 -' U s s oma• ODD 0 O c 3 aWn 'off mn '0- I w 3 �•• X I j °, 3x c 0g3 v 30 »m .no �o 0 S m 02 A w 0 3E O £ 0 S. w J O c c nn S> \ F - G , 0 c n' �n 00 ° ua 3o c oe fD m S_X 0 »m �w c F 0 31 F S o� W Z CO Hr n � rn M Z (7 M V) i 0 z ITT 0 C r M 0 m D � 0 Z < M w _ o91 a 03 D 1 a o°� c w x 00 3 f1 o ° N $ v : o \ Q ° o c a 0 Wo rt Om rn z o /o g O m W (n 0^ U Z mro M M O r -I C) D C Z in M J Z o N �N 01 I r O (� � D ;v O C r Z A L O 0N O Z Z mN r N M M J (n A N i 0 2 r O O O m z Z m M r w l0r1 fTl X O cu z D D x O 0 rri G z N zczg OZzm e!L7i�z X nm CID/) H A� FO � °� FAR cn - �1 z F7 T z O g D T 7 - Fl O m FT C O N A n - 0 zrzOi P v D < m r1 M O < in F 0 C p o v n rn r < mf >_ Z �0 0+ m �A � nz f zA X of �m5 0 rn AfQr -j D29, 20 M A gom O Dm gS Z P z sZ AZ �m yyr D 0 w 0 > z RM*-1 A0= zZ �Z000-10W z -1W>0 > OZDCOZZzOMOV- AOvM mD* ;u�0zc;00-1 O rr'nr70O< O0 2iOVl m.iH1� MOD f=*I�-'ni DfTiZ��.{ SmQNA2 mnWOr*iZ0 -DiO O:Ilm nz Drm Or CDDO�OA (mil �r2*1yZm D pm20m� 00�0 -10 (n ZOX OK0=1 ><m> 5;0 O (n AAm--I D -1 A AD Zm-0A2 00 D M, 0DA M KOMZM CCONOmvm O<n �NZWO4 �rA 00 Dm0mm-I (nDoM;0 0 (0/1z>.TA1XO ZD OIn DCO- M MM OZZm2c) D• O O = ZZ D G)n A m0 U0 O-H O� m 2 zX. M L7 rMz KO 0;0zI vU12omzo OW mZW>Z00 c:m`Lrr'* 0 D:O 1�Z�Oo mzm-<goC8 M_IW H�<ND -0_4 MOZOOZ-4 , 1T1r0�D� v �rA-I �C 3;0;u �111nm 0� (mnDlym�00 Zm --I r_ WAnm=D� Zmm�W=A 'XD SrrzOr-DOr- mWrMO 0 Mmom'-jz �A00�_�D �rZ: M WMIM nmT7� Znr'1o5 VlDD000 *SAm.- Z;um Z. CD�OOADDUTA 1ApZ0 nr�C)OAD ZM ��OZIr �� �� ZZ=�mDO'N7'p �rr^D=D� 2 �0(nD-I ZWm0mr2 0ZMrrloz Z D o�m W t) m =ArrrIz om o 0w3K m M(n mmvWAAVZOi Sn-4 aCO ;00 :M Ac v1a0OOr'nz ZZ m!�1� �OZZm(n0 DI=�Om mXIM Z� �mmADMr rU =>(A D m0co> mcOD mOO;o mZ 0C-1M m0WrD mlr--<r0 ;10D r(n Dma:m �A� 01 -ZlM 0500M rr- 50 >O rW--1UlI2*1WD o��m0z DD rD;0 >co m��Z-7 m2r1 A OZpO�r'1 rWDA2p�1-n OSm(n� ,� �f*1 '1-m{-D.I 20 ➢AOiZvC Wr�0O0 mp 0 ZvIAOm� =T12Ao �(A;j --1 ;0 ZcAOD 00 Z1T1pDOA00K 1'1M r*1.0r mA<Dm0 M02 O;u =A-'nHOm-ztm Z�� OmU)A0 �ZAOI0'i pf211=Z�r'1 MM AN-4 0 :::i � DmA OWAA{ m(nWODm OD OZmO0 r'1n (nrD 0Or --11 rrTlA _I Z �D -mA=y T1O2m2 Om O 2 Kr D Z � M m O z M Z rrl co I I I I I I I I z zz ti(A 00 D 0 ADOHD(n A .. > r uwwwanua O-a ti n Z HmNmZ Or Z O D 2 m A A Z Z H Z Z m m(n ANG) I e1 A 0 mZ x]- C(_nmZAA -Mc) mm r�rN0'DO~N ZQ Z T M m m m (n ti '_1 V' "' O 0mm -VM x F6 D o A o o i Tr mm m Mn OOO�OOOOOOB10U00 0 0 m Z Z D W M -+ O (000wOW00000.V1 U n _I M zW o Amo0=D om W All z �,'�'�••�, 0 o (A a00000009�000 _.. a 1 1 m m O D N Om O= m < m D . �Mf.OdJ- l A -0 O O Z r*1 r r O T _ �V'7 ,(Z/);u m n Vmi Z A' T m 4$ f0*i g D 1 _�.. m N m m O Fi o m N>> O C o V) 8 T 0 W O m S mm1D �Z o l J < ti D �ADm - D ga^j-y i J m Z D o m Z i v;gp 3 4�I 0 Zo o A J m D 0- b 4.: 3- 5 n m ZMu,mi mzl S O 0 A X M _Z -0 Dp .� X �1O5 XznZA 00 " 4�_D„ O -� Z K M moo OD MIN. MIN. 1A T m>z O r ,1 m m� D m D D N Z O W m c (n --I - m D D mm OZm Z 0 Aoo 0� ZA Df -C Z DO Z;u O < 0D �� -0 0 ND o� vr'1 00 ^ ti o� In Zx o0A (n� DK p DZ �-I o < O (n "' < = Z Om O D fTl T7 -I r1l M vZi Oz n cmi nm-I" zv W D DD M r Z 7 m r ;u Z 0 NZ O nF< W m Am f O\ M O o r� DmA oN '= ry 0 Z= ,)mN Z rA wz .� y Oz mczZ �o r_ D w A m -a m > 0 S TI D (n M m N M m m Z Z y A m m r m Dvc Z M 0(A v �0m O 0Z! �1 O r( r H OMM m zxz 000 z z lM O -10 0 Mrn �< O C �10 M o m omz f C C Z D A A O Z CD m Z 6 o v �m C m D A A 2 �1+A+11 N =1 w A Lillll'il li o IIIIIIIiI��! 11 < m G ;I_HE I 32" MIN WIDTH I m f <0 OO - H 1•1 r A M -) =� m z m ,OmA AZ 'I m D f� (no iI. A co F< 0 z r A A 0 m z O A Z mm M(1) (n 0 0 Mm V [7 - r0'Ir O� X m N M T A� O z rm 0 QM z M C)u z V n W 2 2 M WD O N to Z8 z m Z � r ,'-1,1 z C . Ilzz *;u zz II f0 SON Cp 'III- lllm�' A mD 1-T, m> I!1 ■A '■ w M O■ I■ I■ MnorW -ON D >£0OW MW . bo9m �m >nng;;6gm5 ak .lO)nfzn XT €/Wom Tuf z£ �zmz W DSrO �zcm• C,SmT=iM• Z(A/1 ;zn mOf 6 OAS ACo Dmo r y m 3 D W W W m M N m c N - S t=ric0 $ OXAZOomozmo {�mm mZ�Am ry0m Av� moZ m0)oEOc moZ soc 2cz a yyaoD Ez OC~OZ5�~owx aWM s4_NOZ .Mvcoo OOM >�f ymo g`~ �lm mOEMXg soO m rlr mr�r � Acl prSr>mq o 0rD � zF�zy otn y mrm MAX z'(�i rm 01 2 vo'z K• --1 m'SOW aN 0 +�Om--..�1�p$ OA, D£ Dj�O� 80, Jd z=m S jQlm j�COmm OAm D1A yak 0 Z-£--11+ m(mOm(�nODOmOSY(� 00< D rm C £m C rtip ox x mS z N MM OU (Aa 2= �Dm O(rl��f0*IOS Z00 Om mvompjp <£2� �z,y m O> mSOm� ;'_' O O O S DSC(leD Olel£�j m Om yo OzmmZ NCz m� Cl WWO?D 2;mo W.ZI M v\ Dm mOZCVD;npm �Dm mA .0y zWZ28 (=r)>z lim -(n ;OVI m coC mC m(�"Jn .. N c1 mmti.M a �-+r�r m� mz mrrly�ln� vAtn nm m= mrn� o 0 6 5� Of cmgJ2 m0 y00A$ ovDOf1 mM'pppl" � rmi� <zZom ' mryr HF >* r- cm ('(i)z Xm XOmz A C)m m-im�-nI ppSN mz; co; A OZDC-1 oNo rW my Z; OOmQO0 Wn </I -i 0o m m m A >_(o O>r 00 A.-. L)0 <Oa Nz Ox mq$z KD yD £� O zZOO > m,m-ODmmmr ymA . -Z,m mAS y'n co _O0� PO O XZ z g m mmz;PAOM r Ofaic<_<�3�i�i Ao �111m++D+��1i Z (nn�AF fr=�1, Oi m=1 flmi r-I m mm Z ~ XZ Or ZZA -<C)A NDm fn ='n (n rri� O�mC Nm> 00m 0' O DD (- o D, x �N m zc�z I �t Zo -o 0mmv m8K ox O z A (7 z' ��r O n c10 Imo < v W '0 vmSOIa z a ym y o \\ m �7 z Z6 omz0 zm z m ' r z M -( U7 z ^ m 01 m H Z \ Z 0 �1 m > \ Z \ V Z z 0 L OD 0 o Cb O I I I A Z K N W, o � a . O M W z p� ° �� = z zo 2c r m b' eoo Q to oV) a 0 I m z V it A tie m m O 87n0.,� ceb A OD £ 7.Ed D z ; 90 /Zj frl O O ...• 2Z Ai O ` A o O D D m 0 T m o X v �o 0 0 ti rDmr .. m .• • e O O <Coa y W D • ,CM S SVJ�p ' rn m ° m A ? �� = 2n(n� (7 rm � A.p0OFPQ�S Z p ZyC) O 0' n mOx F-mn �v0 0o\ 0 mO i lz� m � AZy my i 22 Ln m m Am rOZ-{ c sTOi(� _ �maDON r I z 'per G/ mmCO mm N a A r 'm AmC2 J X o z oz M Z y v m • PROJECT NO. • REVISIONS • CONSULTANTS h h well I I CAR7ERE7®,�u 7Y®LL 100032 0 ayes Dko U ArlV CNIB REND A71 O 5 •CHECKED BY Y RPL PROFESSIONAL ASSOCIATION ARCHITECTS 'DRAWN EY 16 AUG 02 1 3 5 WEST CON NECTI CUT A V E. SOUTHERN RI N ES NORTH CAROLINA 28387 MOREHEAD CITY, NORTH CAROLINA STEWART ENGINEERING INC s PO Box 12054 NC 27709 H Fu Tel. 919.380.8750 Faz 919.3B0.8752 amn: a1 eounl.:n a ®Iamlbm newre amAner nn a..r re•. w .acanon mau.a M amen eren«nre. In n Issp va In4umarb a o:awelwr ..,.d xmneee w m.0�. �".. myn ww ro mc>~an a ww ra.nr Ma mw w men mnemm•>opwtr asm.mey varlmme. wlaa, I:mxm. o:m.rew na:lr•wll.rwn.vo•�.o:..'Iaieue . mw wm.OUN veo,..mm....Iwmo a sown s:glwna, er. :z co - ll''lII IIII 13II'``` I� I , V Y A , Y w y , lQ � O� n o J 7 y rt O 7 W S Q tQ O < (D 7 n< m n W O< < O n U0p IA Up OD 01 00 U m _. z 9 D O (D 0N O N 0 C 7 C 3 H N ry l 3 O 0. C 7 N N O Q C N C N 0 M 0 M 0 N 0 C N S 0 < R O (D 5 c 0 O rn O N 7 N N :3C p 3 W N C :3O O 0 3 O 7 N O O D x 0 i N I O co O O O • ~ O O N O X J d N CA $ O a CD N 0 .r 3 0 o C A O to 3 l " V K F A O N N O N O S O N Q 3 0 v o a m N N N N 3 3 Y s 0 0 0 0 l^ S O O a O 00 OD 0O 0 OD 2 2 S 3 3 v 'L fc R> R. R> R. 00 OD W W 00 O l7 O O O A Op S S S m O a a a N U (N f/1 (n 10 (0 S N N • 0 O 0 0 0 3 N N • O Z 3 m N O 3 a 0 N � C � N r-r N 0 0 o. 0 0 z m m ;0 0 c V1 m m m I � m Q I m r O O DUX MD M� M ZC >0r- �� z Z z 0C1 �p -0ip 000 00 2 _D (n j1�<Z � o�Z D r-C) �C0Zm�m z ��� WO 80 �n mx p'{= —I z z 00 m Z mD-_I X A Cow zN A0 mOZ 0 0 C)D zZ zj Zf�r� �f<T1C .TOI ;COI ZO cj 'DEl X N z� m y 0 z z—� _ x G7N �Z (nA O (n�W 00D 1 Om r r zr- z mx fTl my r 0 o cn ��0 m Xm W Wm zc � mm Z (A !n D � m "00 rn0 � 2 OAA oz0 c I I I I I I I I I I I I I I I I I Omz m r 0 mz z m A 0 0 0 co 0 O � A D O 0O -� mN� vN> Co U'0 U-I;U (Jl to <0 A �.Zml =Op V1 3 U 3.T1 1 D o C) m ?00 N CO OrZ Dom m �m D00 O O c rIT � (na c r*1m ➢-0-0 00 �W A20 Om O z D� lyl p �_ CO� _O =O rOOZ x ry r- N O crn = -�i Zp m� W DD ��Cmn O _ �m mmC 0 � p z z�i .. `� C x OZ r g Arm mrnS Gzim �c�.ID I,pI C m n A 0m mc''.➢-I c Cm�1 �A TAB D O v VZ W 0 0� (n c� 0 -Do m O m ._.I D 0 m 7, N S "I O --1 T` m z D m 0 A Z f1+'i D p 0 1ro1.� O_ �0 c O 0W� OVA � pmO A rZ*t � m .. t0/1 Mp Omp � .. m Nm �r-� p Z g Ox xr r D-Ci m� J U<W MD1 CO W DCO Z O^ `C"i' rn CW') �W� ^ C> O to nz0 O 0 z =r Cpl1 rcv'm m z Wz * 3 �1r (Dom o �If-n w M X w 0; -< -n v m z OZ OO D O ZIA .. r� 0 (d In m _-i A z T1 (/� 0 O O (n C `-' Z 0 x (A m 'D ;Ll 07 Z Z CT Z m -u Z Z �*1 N cn L` x 3 M x CD A 1 ''0 .0 00 O D ➢ D m M. D X 0 r➢- O D D D O m �f n C _ TID (niU A O m D A r r m ;u r m A n D1 ;a mz G7 r �'Im r $ co > r M ; O a zr -�-iv3 rn �1 �Or y f 0 Z m om O0(n x D X m m X r zj 0 v r�=ao ci 3 A mzx O y N N 0 1 m 0 0 D 01 m N 0 � A= r V7 < N D rn I-rl 1^ C7 1➢ m O p M 0 1— W r U O O m 'm '� (7 Z m m Z W Cm o Z mvX ;0 co A W� v v rn v 0 0r O 1 n rn0 m n m n m0 00(/r Z�`. m m �W O S Z mW 0= 0 0 0 - ACC -n �� UO Z➢➢ 2-� Om 0m r -jj T 0m N V) Om O n 0 0 fm C r mW Cmrn X D p-� p 0D = D� _o 'j m� (� p z -0 zD \ I/ o �(�m 11 n 1 w 3 3 v O rOA v 3 m� C, OB 710 PG 910 m� °; n=1� �n0 O mm 3 3 z z m� 3 oz m cn z / NORTH -4 m z rfml A Do rn W m n� 3 (i x a z m m m ;0 m Z ;u 3 U .il V p Z Z 1••••••••••••••••••••••••••••••••••••��•••••••••••••••••••••••••••••••••���••••••••••••••••••••••••••••��••••••••••••••••••••••••••••••••••••••••••••••••••••1•••••••••••••••••••••••••••••••••••0�•••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••• PROJECT N0. • REVISIONS •��31xN \ O hayes CoAR`7IR�i 7 ®��L)NI7�✓ Ci1 ®LL e •100032 CONSULTANTS `��. z cn O m 0 0 c 0 c m m m v z z 0 I 2 v c 'P c I m m m m m v Z z 0 z D p v A=)r;� I TI CN5 I$ REND ATI ON5 *CHECKED BY PROFESSIONAL ASSOCIATION TMB ARCHITECTS •DRAWN BY 1 3 5 W E S T CON NECTI CUT A V E. VJC/LEE 16 AUG. 02 SOUTHERN PINES NORTH CA ROLI NA 28387 MOREHEAD CITY, NORTH CAROLINA ^ v STEWART ENGINEERING INC lab Its PO Box 12054 R7P, NC 27709 Tel. 919.380.8750 Fax 919.380.8752 OXIC 41 Emmm6 G uluYtlem IM W Iq ^nlpl W flY EmN L , wE af.flACMn ge[eIM EY Fwl ENYw.1nG. lic (SE11 v.1Wuriwib NV�✓®YxM nrvb FbmJSJMmrellmei .TW en ^'!M=b.q,rW 6oYwprmRY�6flrlarn w w++n.m vw nwnb a sEl. moy ee Im m x m W a. Iroam.e, ar mares n enr n.�.e. •n.me+..w mpm a m�a wm -aqe ciwr.,mm, m�lmroo a srwl Elgo..ay.12 �fj�rr5lEREp +.� ' r \ o`7 YCAN ... VFllll11111 I I V V V V V V V V V V V V V 1 V