HomeMy WebLinkAboutSW8020637_COMPLIANCE_20030429STORMWATER DIVISION CODING SHEET
POST -CONSTRUCTION PERMITS
I
PERMIT NO. SW
DOC TYPE ❑CURRENT PERMIT
❑ APPROVED PLANS
❑ HISTORICAL FILE
COMPLIANCE EVALUATION INSPECTION li
DOCOATE {JJJ�jO�a`�'
YYYYMMDD
INFILTRATION BASIN ANALYSIS
FILENAME: G:IDATAIWPDATAIWQS1lNBASIN102063
PROJECT NUMBER: SW8 020637-B
DATE: 29-Apr-03
PROJECT NAME: Progress Point Master Plan
DRAINAGE BASIN: Cape Fear
REVIEWER: L. Lewis
RECEIVING STREAM: Bradley Creek
CLASS: SC #
Index No.: 18-87-24-4-(2)
SITE AREA: 11.83 acres
DRAINAGE AREA: :>::>2021'18` SF
IMPERVIOUS AREA CALCULATION
Rational C
Lot 3
'-44535 1
Lot 2
r�
630591
Lot 1
1
lacr�ase-
1
TOTAL
9392 C
Place a "1" here if Rational
% IMPERVIOUS, 1= 69'0°fo
RV= .05+.009 (!) _ 0 67>
ELEVATION OF SEASONAL HIGH WATER TABLE
>`€<2 FEET MSL
Minimum bottom elevation = 24
fmsl
REPORTED INFILTRATION RATE
;;:;:<6 INCHES/HOUR
or 0.000139 FPS
SURFACE AREAS AND ELEVATIONS
Elev. (ft) Area, sq ft
Inc. Volume Acc. Volume
BOTTOM 24 2636
0
TOP 26.37 6854.35
11246
VOLUME 1 DEPTH 1 DRAWDOWN CALCULATION
DESIGN STORM, INCHES
:1!
DESIGN VOLUME
#.125
CUBIC FEET
TOTAL VOLUME AVAILABLE
:1246
CUBIC FEET
STORAGE MET AT ELEVATION
:;::: <.;26:46:
FEET
ELEVATION REPORTED ON PLANS>2637:
FEET OK
TIME TO DRAWDOWN
:.:$',5.:
HOURS MUST BE <120
25 YEAR 24 HOUR STORM NIA
Intensity, i = .33 inches 1 hour
Qr= C i A =
CFS
Qp through the bottom of the basin=
CFS Must be n Qr
Intensity, i = 3 inches 1 hour, which is
a typical summer thunderstorm
Volume for 17 min. event @ 3 in 1 hr =
10673,27 CF < 11246.06475 CF
COMMENTS
Volume and drawdown are within Design Requirements.
Cl=rlKmi"-Hom
and Aswc In Inc.
Project Information
WET DETENTION BASIN -
Project Name: Progress Point Master Plan
KHA Project #: 011038043 T
Designed by: BJM Date: 8/27/2002
Revised by: BJM Date: 11/19/2002
H YR
SEAL < e . "s
v -
9
a
- s
Site Information�.�
GfNEEP` ��
Sub Area Location:
A °'••'°°� f
fi
Drainage Area (DA) =
7.71
Acres (335,858 sf) Z
Impervious Area (IA) =
3.91
Acres (170,320 sf) 7
Percent Impervious (1) =
51
%
Required Surface Area
Permament Pool Depth:
6.0
ft
SAIDA =
2.77
% (90% TSS Removal - No Vegetated Filter Required)
Min Req'd Surface Area =
9303
sf (at Permanent Pool)
Required Storage Volume:
Design Storm =
1
inch (Project Does Not Drain to SA waters)
Determine Rv Value =
0.05 +.009 (1) = 0.51 inlin
Storage Volume Required =
14173
cf (above Permanent Pool)
Elevations
Bank Elevation =
27.5
It
Weir Elevation =
26.1
ft (1' Freeboard)
Temporary Pool Elevation =
24.42
ft (Invert of First Drawdown Orifice above Perment Pool Elevation)
Permanent Pool Elevation =
23.5
ft
Shelf Ending Elevation =
21.5
it
Bottom Elevation =
17.5
it
Permanent Pool Area;
9794
sf
Side Slopes of Pond (above shelf) =
3 : 1
Side Slopes of Shelf =
6 : 1
Side Slopes of Pond (below shelf) =
3 : 1
Is Permenant Pool Surface Area Sufficient (yes./no)?
Forebay Volume
Permanent Pool Volume =
25451
cf
Forebay Volume Required =
5090
cf
Top of Forbay Weir Elevation =
23.25
ft
Forebay Volume Provided =
5531
cf
Side Slopes of Forebay Weir =
3 : 1
1." Rainfall Temporary Storage Volume Provided
Temporary Pool Elevation =
24.42
ft
Temporary Pool Area =
18483
sf
Storage Depth =
0.92
ft
Volume Provided = 14236 cf
yes ( 9794 > 9303 ) sf
(Forebay depth = 5.75 ft) RECEIVED
FEB 2 0 2003
DWQ
PROJ# 5(ti80Z063-7H0C/
Is Storage Volume Provided Sufficient (yes/no)? yes ( 14236 > 14173 ) cf (Elevation 23.5 to 24.42)
u
C'•/1 1Gmfey-Horn
and Anwate% Inc.
WET DETENTION BASIN
Project Information
c Project Name: Progress Point Master Plan
KHA Project #: 011038043
Designed by: BJM Date: 8/27/2002
Revised by: BJM Date: 11/19/2002.
Site Information
Sub Area Location:
A
Drainage Area (DA) =
7.71
acres
Impervious Area (IA) =
3.91
acres
Percent Impervious (1) =
51
%
Emergency Spillway
Runoff Coefficient (C) =
0.63
Rainfall Intensity (I100) =
10.5
in/hr
Drainage Area =
7.71
acres
Flow Rate (q,00) =
51.0
cfs
qw =
51.0
cfs (Crest Elevation = 26.1)
h =
0.5
ft G
Cw =
2.7
L =
52
ft
Orifice Sizing
I N CA IV.
?�Q' o_Ess1°�%
QQ SEAL�9< 9
a •
a
J, M
. ►1 Zz�a L
02 can = 0.0820 cfs (Flowrate required for a 2 day drawdown) .
Qs Dav3 = 0,0328. cfs (Flowrate required for a 5 day drawdown). .
Orifice Size = 1.5 in. (Diameter)
O orfte = 0.050 cfs
Drawdown Time = 3.275 days
less than 5 days (yes/no) ? yes
greater than 2 days (yes/no) ? ems_ .
Anti -Flotation Device
36" Riser
Area:
10.6
st
Volume:
42.2
cf
Weight:
2636
Ibs
Factor of Safety
1.1
r Req'd of Anti -Flotation Device:
2899.
Ibs
Volume of Concrete Req'd:
19.3
cf
Volume Provided:
21.1
cf
(Outside Dimension = 44", Inside Dimension = 36")
(Water Displaced - Bottom Riser to Top of Bank)
(Unit WT of Concrete = 150 pcf)
(36" Dia. Pipe filled 2.0' deep with condrete)
Orday-Horn
and Associates, Inc,
WET DETENTION BASIN
Project Information
Project Name: Progress Point Master Plan
KHA Project 4: 011038043
Designed by: BJM Date: 11/19/2002
Wet Detention Basin Elevation/Area[Volurrie
Bank Elevation =
Temporary Pool Elevation =
Permanent Pool Elevation =
Forebay Weir Elevation =
Bottom Elevation =
�o•.•��lrssroy.�ti�
9Qe LgCAI 9<
V J ¢W1U '00
Elevation
fr
Area
sf
Volume
LC
Volume
Above Perm Pool
Volume
Below Perm Pool
Foreba
Area
(sf)
Volume
(cf
Sum Volume
cf
27.5
25332
12363
88409
--
--
--
--
27
24118
22928
76046
-
--
--
-
26
21737
20579
53119
--
--
--
-
25
19420
18304
32540
--
--
-
--
24.42
18483
7491
14236
--
--
-
--
24
17188
6746
6746.
--
--
-
--
23.5
9794
4530
0
25451
--
--
--
23.25
9059
2173
--
23095
3045
721
5531
23
8324
7032
--
20922
2724
2127
4810
22
5739
4935
--
13890
1529
1220
2683
21
4131
3649
--
8955
910
742
1464
20
3166
2739
--
5307
573
444
722
19
2311
1909.
--
2568
314
225
279
18
1507
659
--
659
136
54
54
17.5
1130
0
-
0
79
0
0
► ®�,Kimley-Horn
and Associates, Inc.
INFILTRATION BASIN "B"
RECEIVED
FEb 2 0 NO
B oa # 5(Iifo2C*3-7
Project Information
Project Name:, Progress Point Basin "B"
KHA Project #: 011038043
Designed by: BJM Date: 02-/11/03
Site Information
Sub Area Location: B
Drainage Area (DA): 4.64, Acres ( 202,118 sf)
Impervious Area (IA): 3.20 Acres ( 139,392 sf)
Percent Impervious (1): 69 %
Soils Report
Soil Type: Leon Sand (Le) and Murville Fine Sand (Mu)
Infiltration Rate: 6 in/hr ; 0.5 ft/hr
SHWT Elevation: 22 feet
Required Volume:
Design Storm = 1 inches (Project Does not Drain to SA waters)
Determine Rv Value=. 0.05 + .009 (1) = 0.67 in/in
Volume Required= 11297 CF
Volume Provided
Storage Depth = 2.37 feet
Surface area @ Bottom = 2636 sq. feet
Surface Area @ Storage = 6854.35 sq. feet (Elevation = 26.37)
Bottom Elevation = 24 feet (at least 2' above SHWT)
Storage Erlevation,= 26.37 feet
Volume Provided = 11329 CF
Is Volume Sufficient (yes/no)? yes ( 11,329 > 11,297)
Drawdown
Drawdown Time = total volume / Bottom Surface Area / infiltration
= 8.60 Hours
less than 5 days (yes/no) ? yes
State of North Carolina
Department of Environment
and Natural Resources
Wilmington Regional Office
Division of Land Resources
Land Quality Section
Michael F. Easley, Governor
William G. Ross Jr., Secretary
October 8, 2002
�, 90 a-/ o V /
NOTICE OF RECEIPT OF EROSION & SEDIMENTATION CONTROL PLAN
Progress Point One, LLC
Mr. James E. Mennifield, Manager
125 Sculey Bark Road
Charlotte, NC 28209
Dear Mr. Mennifield:
This office has received a soil erosion and sedimentation control plan for the project listed below which was
submitted as required by the North Carolina Sedimentation Pollution Control Act (NCGS 113A-57(4)).
Please be advised that this Act requires that all persons disturbing an area of one or more acres of land must obtain
approval of a soil erosion control plan prior to the commencement of said land -disturbing activity (NCGS 113A-54(d)(4)).
The Act further states that this plan must be filed a minimum of 30 days prior to the activity and the approving authority must
approve or disapprove the submitted plan within 30 days of receipt. Failure of the approving authority to approve or
disapprove the submitted plan within the 30 day period will be deemed approval of the plan if the submitted plan is complete.
Commencement or continuation of a land -disturbing activity under the jurisdiction of this Act prior to the approval of an
erosion & sediment control plan is.a violation of the Act.
A copy of any erosion and sediment control plan which could involve the utilization of ditches for the purpose of
dewatering or lowering the water table is forwarded by this office to the Division of Water Quality (DWQ). It is suggested that
you contact the Division of Water Quality at (910) 395-3900 if any ditches shown on your plan will lower the water table.
We have performed a preliminary review of your submitted plan and have determined that additional information
will be necessary before a final review can be completed. Enclosed is a checklist of items that must be submitted before
we can complete the review process. Failure to provide the additional information may result in disapproval of your plan.
The approval of an erosion and sediment control plan is condition on the applicant's compliance with Federal and
State water quality laws, regulations and rules.
If you have questions or need additional information, please do not hesitate to contact this office. Your cooperation
in this matter is appreciated and we look forward to working with you on this project.
Sincerely,
Carol N. Miller, CPESC
Assistant Regional Engineer
CNMlbfr
cc: Mike Davidson; Kimley-Horn & Associates, Inc.
PROJECT NAME: Mixed Use Site @ Progress Energy Point
PROJECT NO.: NH-03089
LOCATION: Eastwood Road - New Hanover County
RIVER BASIN: Cape Fear
SUBMITTED BY: Kimley-Horn & Associates, Inc
DATE RECEIVED BY L.Q.S.: October 7, 2002
127 North Cardinal Drive, Wilmington, N.C. 28405-3845 • Telephone 910-395-3900 a Fax 910-350-2004
An Equal Opportunity Affirmative Action Employer
Klm
CIm®® andlAssociates.Inc.
INFILTRATION BASIN "B"
Project Information
Project Name:
KHA Project #:
Designed by:
Site Information
Sub Area Location:
Drainage Area (DA):
Impervious Area (IA):
Percent Impervious (1):
RECEIVED
SrP 0 5 ?170?'
DWr%
PROJ # 56u8 020603�
Progress Point Basin "B"
011038043
BJM Date: 06/02/02 (Revised 08/29/02)
C
4.48 Acres (195,128 sf)
2.72 Acres (118,484 sf)
61 %
Soils Report (provide the following elements, at a minimum)
Soil Type: Leon Sand (Le) and Murville Fine Sand (Mu)
Infiltration Rate: 6 in/hr = 0.5 ft/hr
SHWT Elevation: 22 feet
Required Volume: (Simple Method - prefered)
Design Storm = 1 inches(Project Does not Drain to SA waters)
Determine Rv Value= 0.05 + .009 (1) = 0.60 in/in
Volume Required= 9699 CIF
Volume Provided
Storage Depth =
1.4 feet
Surface area @ Bottom =
8921 sq. feet
Surface Area @ Storage =
10923 sq. feet
Bottom Elevation =
24 feet (at least 2' above SHWT)
Storage Elevation =
25.4 feet
Volume Provided =
14044 CF
Is Volume Sufficient (yes/no)? yes ( 14044 > 9699 )
Drawdown
Drawdown Time = total volume / Bottom Surface Area / infiltration
3.15 Hours
H�CAR
less than 5 days (yes/no) ? yes �Q��'pftglOO�i�
21450
R
4
CI, Kimley-Horn
li and Associates, Inc.
WET DETENTION BASIN /'
Project Information
Project Name: Progress Point Master Plan
KHA Project #: 011038043
Designed by: BJM Date: 8/27/2002
Site Information
Sub Area Location: A
Drainage Area (DA) = 7.71 acres
Impervious Area (IA) = 3.91 acres
Percent Impervious (1) = 51 %
Emergency Spillway
Runoff Coefficient (C) =
0.63
••Q.0` ---'�,N s,9
Rainfall Intensity (11co) =
10.5
inlhr
S g
Drainage Area =
7.71
acres
274 a
Flow Rate (q,00) =
51.0
cfs
e
o�
Q
qw =
51.0
cfs (Crest Elevation = 26.1)
In =
0.5
ft
Cw =
2.7
L =
52
ft
epF/0' OG
Orifice Sizing
02Days =
0.0820
cfs (Flowrate required for
a 2 day drawdown) yjW 2
05cays=
0.0328
cfs (Flowrate required for
a 5 day drawdown)
Orifice Size =
1.5
in. (Diameter)
V
0 Orifice =
0.050
cfs
Drawdown Time =
3.275
days
less than 5 days (yes/no) ? yes
greater than 2 days (yes/no) ? yes
Anti -Flotation Device
36" Riser
Area:
10.6
sf
Volume:
42.2
cf
Weight:
2636
Ibs
Factor of Safety
1.1
f Req'd of Anti -Flotation Device:
2899
Ibs
Volume of Concrete Req'd:
19.3
cf
Volume Provided:
21.1
cf
(Outside Dimension = 44", Inside Dimension = 36")
(Water Displaced - Bottom Riser to Top of Bank)
(Unit WT of Concrete = 150 pcf)
(36" Dia. Pipe filled 2.0' deep with concrete)
if
r - i
ad'
C)CI, KpNey-Ham
and Assoaates, Inc.
Project Information
WET DETENTION BASIN
Project Name: Progress Point Master Plan _
KHA Project #: 011038043
Designed by: BJM Date: 8/27/2002
Site Information
Sub Area Location:
A
Drainage Area (DA) =
7.71
Acres (335,858 sf)
Impervious Area (IA) =
3.91
Acres (170,320 sf)
Percent Impervious (1) =
51
%
Required Surface Area
Permament Pool Depth:
6.0
ft
SAlDA =
2.77
% (90% TSS Removal - No Vegetated
Filter Required)
Min neq'd Surface Area =
9303
st (at Permanent Pool
Required Storage Volume: (Simple Method - prefered)
Design Storm =
1
inch (Project Does Not Drain to SA
waters)
Determine Rv Value =
0.05 + .009 (1) = 0.51 in/in
Storage Volume Required =
14173
cf (above Permanent Pool)
Elevations
Bank Elevation =
Temporary Pool Elevation
27.5
ft
ft Freeboard)
=
-244
(1'
Permanent Pool Elevation =
23.5
ft
0�"off
Shelf Ending Elevation =
Bottom Elevation =
21.5
17.5
ft
ft
ee°QO
Wet Basin Size
Top of Bank =
Temporary Pool =
Permanent Pool =
Shelf Ending =
Bottom =
Side Slopes of Pond (above shelf) _
Side Slopes of Shelf =
Side Slopes of Pond (below shelf) _
Area sf
25332 17,
21975 —`► 2Co CAr 'Z�14
9794
4968
1159
Ii
I --
Is Permenant Pool Surface Area Sufficient (yes/no)?
yes ( 9794 > 9303) sf
Forebay Volume
Permanent Pool Volume = 25636
ci
Forebay Volume Required = 5127
ci
Forebay Volume Provided = 5658
cf
( Forebay depth = 5.75 ft)
Side Slopes of Forebay Weir = 3
: 1
1" Rainfall Storage Volume Provided
Z
1" Temporary Pool Elevation = 24.41
ft
01-5— 5A
Permanent Pool = 9794
sf
Storage Depth = 0.91
ft
,L
Volume Provided = 14251
cf
Is Storage Volume Provided Sufficient (yes/no)?
yes ( 14251 n 14173) cf (Elevation 23.5 to 24.41)
+h.
INFILTRATION BASIN ANALYSIS
FILENAME: G:IDATAIWPDATAIWQSIINBASIN102063'
PROJECT NUMBER: SW8 020637-B
DATE: 15-Nov-02
PROJECT NAME: Progress Point Master Plan
DRAINAGE BASIN: Cape Fear
REVIEWER: L. Lewis
RECEIVING STREAM: Bradley Creek
CLASS: SC#
Index No.: 18-87-24-4-(2)
SITE AREA: 11.83 acres
DRAINAGE AREA: >s«1951'28' SF
IMPERVIOUS AREA CALCULATION
Rational C
Lot 3
44535 1
Lot 2
63059 1
Lot 1
10890 1
1
TOTAL
18484: C
Place a "1" here if Rational €s
% IMPERVIOUS, I= a 0.7Ia'
RV= .05+.009 (I)
ELEVATION OF SEASONAL HIGH WATER TABLE
22' FEET MSL
REPORTER INFILTRATION RATE
s<<6! INCHES/HOUR
:.......: .:: . ........ .
or 0.000139 FPS
SURFACE AREAS AND ELEVATIONS
Elev. (ft) Area, sq ft
Inc. Volume Acc. Volume
BOTTOM 24 8921
0
25 10335
9628 9628
TOP 25.4 10923
4251.6 13879.6
VOLUME ! DEPTH 1 DRAWDOWN CALCULATION
DESIGN STORM, INCHES
.................. .
DESIGN VOLUME
><>>9899<
CUBIC FEET
TOTAL VOLUME AVAILABLE
$;
CUBIC FEET
STORAGE MET AT ELEVATION
FEET
ELEVATION REPORTED ON PLANS
25 4C1:>
FEET OK
TIME TO DRAWDOWN
3, it
HOURS MUST BE <120
25 YEAR 24 HOUR STORM N/A
Intensity, i = .33 inches 1 hour
Qr=CiA=
1.01 CFS
Qp through the bottom of the basin=
1.24 CFS Must be > Or
10 YEAR 10 MIN HIGH INTENSITY EVENT
Intensity, i = 6.3 inches 1 hour
Volume for 10 yr. 10 min. event =
11611.85 CF < 13879.6 CF
COMMENTS
Volume and drawdown are within Design Requirements.
SHWT is too high. Either raise bottom or revise to wet pond.
DETENTION POND ANALYSIS FILE NAME: G:IDATAIWPDATAIWQSIPOND1020637.WK1
PROJECT #: SW8 020637 REVIEWER: L. Lewis
PROJECT NAME: Progress Point Master Plan
DATE: 22-Nov-02
Receiving Stream: Bradley Creek Class: SC #
Drainage Basin: Cape Fear Index No. 18-87-24-4-(2)
Site Area 12.32 acres
Drainage Area35:8 00'. square feet Area = 7.71 acres
IMPERVIOUS AREAS
Rational C
Part of Lot 3 56046.00 square feet
Lot 5 48065.00 square feet
Lot 6 48913.00 square feet
Allens Lane 17296.00 square feet Offsite
square feet
square feet
TOTAL 170320;flp; square feet Rational Cc= 0.10
SURFACE AREA CALCULATION
% IMPERVIOUS 50.71 %
Des. Depth 6
TSS: 90
SA/DA Ratio 2.75%
Req. SA 9236 sf
Prov. SA J794 sf
VOLUME CALCULATION * place a "1" in the box if Rational is used
Rational ?*
Des. Storm
1..04
inches
Rv=
0.51
Bottom
17.5 msl
Perm. Pool
23> msl
Design Pool
24.42 msl
Design SA
18483 sf
Req. Volume
14.1
cf
Prov. Volume
1.423fi<
cf
ORIFICE CALCULATION
Avg. Head =
Flow Q2, cfs
Flow Q5, cfs
No. of Orifices
Diameter, inches
Drawdown =
,weir H x W
days
Perm. Pool Volume= 25451
Req. Forebay Volume= 5090.2
Provided Volume= 5531.00
Percent= 21.7°la
SA@24 = 17188
Elevation= 24
COMMENTS
Surface Area , Volume and Orifice are within Design Guideline:
.3.75 sq. in.
1.50 sq. in.
1.77 sq. in.
0.039 cfs
x 17TT
in
►l
❑®r, Kimsey -Horn
and Associates, ft.
Project Information
Site information
WET DETENTION BASIN
Project Name:
Progress Point Master Plan
KWA Project #:
011038043
Designed by:
BJM
Date: 8/27/2002
Revised by:
BJM
Date: 11/19/2002
Sub Area Location:
A
Drainage Area (DA) =
7.71
Acres (335,858 sf)
Impervious Area (IA) =
3.91
Acres (170,320 sf)
Percent Impervious (I) =
51
%
Required Surface Area
Permament Pool Depth: 6.0
SAIDA = 2.77
Min Req'd Surface Area = 9303
RECEIVED
NOV 2 0 2002
DWO
p of # Sw L U LyCo3 --
ft
% (90% TSS Removal - No Vegetated Filter Required)
sf (at Permanent Pool)
Required Storage Volume:
Design Storm = 1 inch (Project Does Not Drain to SA waters)
Determine Rv Value = 0.05 + .009 (1) = 0.51 in/in
Storage Volume Required = -14173 of (above Permanent Pool)
Elevations
Bank Elevation =
27.5
it
Weir Elevation =
26.1
It (1' Freeboard)
Temporary Pool Elevation =
24.42
It (Invert of First Drawdown Orifice above Perment Pool Elevation)
Permanent Pool Elevation =
23.5
It
Shelf Ending Elevation =
21.5
It
Bottom Elevation =
17.5
ft
Permanent Pool Area = 9794 st
Side Slopes of Pond (above shelf) = 3 : 1
Side Slopes of Shelf = 6 : 1
Side Slopes of Pond (below shelf) = 3 : 1
Is Permenant Pool Surface Area Sufficient (yes/no)? yes ( 9794 > 9303 ) sf
Forebay Volume
Permanent Pool Volume = 25451 of
Forebay Volume Required � 5090 cf
Top of Forbay Weir Elevation = 23.25 ft
Forebay Volume Provided = 5531 cf (Forebay depth = 5.75 ft)
Side Slopes of Forebay Weir = 3 : -
1" Rainfall Temporary Storage Volume Provided
Temporary Pool Elevation = 24.42 It
Temporary Pool Area = 18483 sf
Storage Depth = 0.92 ft
Volume Provided = 14236 cf
Is Storage Volume Provided Sufficient (yes/no)? yes ( 14236 > 14173 ) cf (Elevation 23.5 to 24.42)
JIIIIP�=Fj Kimley-Horn
kkkb— and Associales, Inc.
WET DETENTION BASIN
Project Information
Project Name: Progress Point Master Plan
KHA Project #: 011038043
Designed by: BJM Date: 8/27/2002
Revised by: BJM Date: 11/19/2002
Site Information
Sub Area Location: A
Drainage Area (DA) = 7.71 acres
Impervious Area (IA) = 3.91 acres
Percent Impervious (1) = 51 %
Emergency Spillway
Runoff Coefficient (C) =
Rainfall Intensity (1100) _
Drainage Area =
Flow Rate (g100) _
qw =
h�
CW =
L=
Orifice Sizing
10.5
inlhr
7.71
acres
51.0
cfs
51.0
cfs (Crest Elevation = 26.1)
0.5
ft
2.7
52 ft
02 Days= 0,0820 cfs (Flowrate required for a 2 day drawdown)
05 Days= 0.0328 cfs (Flowrate required for a 5 day drawdown)
Orifice Size = 1.5 in. (Diameter)
0 orifice = 0.050 cfs
Drawdown Time = 3.275 days
less than 5 days (yes/no) ? yes
greater than 2 days (yes/no) ? yes
Anti -Flotation Device
36" Riser
Area:
10.6
sf
Volume:
42.2
cf
Weight:
2636
Ibs
Factor of Safety
1.1
F Req'd of Anti -Flotation Device:
2899
lbs
Volume of Concrete Req'd:
19.3
cf
Volume Provided:
21.1
cf
(Outside Dimension = 44", Inside Dimension = 36")
(Water Displaced - Bottom Riser to Top of Bank)
(Unit WT of Concrete = 150 pcf)
(36" Dia. Pipe filled 2.0' deep with concrete)
KinnleyHorn
�..— and Associates, Inc.
Project Information
Project Name
KHA Project #
Designed by:
WET DETENTION BASIN
Progress Point Master Plan
011038043
BJ M Date: 11 /19/2002
Wet Detention Basin Elevation/Areallolume
Bank Elevation =
Temporary Pool Elevation =
Permanent Pool Elevation =
Forebay Weir Elevation =
Bottom Elevation =
Elevation
iY
Area
Sf
Volume
(cf)
Volume
Above Perm Pool
cf
Volume
Below Perm Pool
cf)
Foreba
Area
Sf
Volume
cf
Sum Volume
(cf)
27.5
25332
12363
88409
--
--
--
--
27
24118
22928
76046
--
-
-
--
26
21737
20579
53119
--
-
-
--
25
19420
18304
32540
-
--
--
-
24.42
18483
7491
14236
--
--
--
-
24
17188
6746
6746
--
--
--
--
23.5
9794
4530
0
25451
--
--
--
23.25
9059
2173
--
23095
3045
721
5531
23
8324
7032
--
20922
2724
2127
4810
22
5739
4935
--
13890
1529
1220
2683
21
4131
3649
--
8955
910
742
1464
20
3166
2739
--
5307
573
444
722
19
2311
1909
-
2568
314
225
279
18
1507
659
-
659
136
54
54
17.5
1130
0
-
0
79
0
0
4,
RECEIVED
PROJ #
SEP 0 5 2002 PRELIMINARY
DwQ NOT FOR CONSTRUCTION
GRAPHIC 4
i
I
t
INFILTRATION BASIN ANALYSIS
FILENAME: G:IDATAIWPDATAIWQSIINBASIN102063
PROJECT NUMBER: SWE 020637-B DATE: 22-Aug-02
PROJECT NAME: Progress Point Master Plan
DRAINAGE BASIN: Cape Fear REVIEWER: L. Lewis
RECEIVING STREAM: Bradley Creek CLASS: SC #
Index No.: 18-87-24-4-(2)
SITE AREA: 11.83 acres DRAINAGE AREA:
IMPERVIOUS AREA CALCULATION
Lot 3
Lot 2
Lot 1
TOTAL
% IMPERVIOUS, 1= $9:S°o'.
ELEVATION OF SEASONAL HIGH WATER TABLE
REPORTED INFILTRATION RATE
SURFACE AREAS AND ELEVATIONS
SF
Elev. (ft) Area, sq ft
Inc. Volume
Acc. Volume
BOTTOM 24 8921
0
25 10335
9628
9628
TOP 26 11806
11070.5
20698.5
VOLUME 1 DEPTH 1 DRAWDOWN CALCULATION
DESIGN STORM, INCHES
DESIGN VOLUME
;::::>9438.>'
CUBIC FEET
TOTAL VOLUME AVAILABLE
20698`96
CUBIC FEET
STORAGE MET AT ELEVATION
FEET
TIME TO DRAWDOWN
:<:::::<::4s$::
HOURS MUST BE <120
25 YEAR 24 HOUR STORM NIA
intensity, i = .33 inches 1 hour
Or-- C i A =
0.92
CFS
Qp through the bottom of the basin=
1.24
CFS Must be > Qr
10 YEAR 10 MIN HIGH INTENSITY EVENT
Intensity, i = 6.3 inches 1 hour
Volume for 10 yr. 10 min. event =
10523.59
CF < 20698.5 CF
COMMENTS
Volume and drawdown are within Design Requirements.
S - �res�iss•-to-�nrad .
Project Name: e res5 P���fi Location: Gl� f�1Il-
_,__V
DIVISION OF WATER QUALITY
INFILTRATION SYSTEM INVESTIGATION
1. The minimum bore depth: /T
Existing ground elevation: 96.0 0(0.0
Proposed Bottom elevation: Z3 5 Z4-
Add 2' +2 +2 +2 +2
Depth: .15
2. The type of soil: Le — f tin
3. The expected infiltration rate:_ h 1'3Y
4. The depth to the Seasonal High Water Table:_ 01- 5 F M 5(,
5. Additional comments: 1 0/� T
reCoknM enc/, l.:!7 25 WPa- r�?r5C �-�
Signature of Regional Office Personnel:
Linda Lewis, DWQ Vincent Lewis, Soil Scientist
Permit Application No. 90 ZO&2 Date /(P
S:CWQSISTORMWAY&ORMSIINFIIWST.FOR