HomeMy WebLinkAboutSW8011102_CURRENT PERMIT_20140728PERMIT NO.
DOC TYPE
j DOC DATE
STORMWATER DIVISION CODING SHEET
POST -CONSTRUCTION PERMITS
CURRENT PERMIT
:D APPROVED PLANS
❑ HISTORICAL FILE
❑ COMPLIANCE EVALUATION INSPECTION
YYYYMMDD
NCDENR
North Carolina Department of Environment and Natural Resources
Pat McCrory
Governor
July 28, 2014
Mr. David T. Clancy, President
Clancy & Theys Construction Company
516 W. Cabarrus St.
Raleigh, NC 27611
Subject: Stormwater Permit No. SW8 011102
Name 1 Ownership Change and Permit Extension
Clancy & Theys Gordon Road Facility
High Density Commercial Project
New Hanover County
Dear Mr. Clancy:
John E. Skvarla, III
Secretary
Effective August 1, 2013 the State Stormwater program has been transferred from the Division of Water
Quality (DWQ) to the Division of Energy, Mineral and Land Resources (DEMLR). All previous
references to DWQ will remain in older stormwater permits issued prior to August 1, 2013 until they are
modified. Please note that any updated pages or addendums to the permit will now reference DEMLR
as the Division responsible for issuance of the permit.
On August 5, 2009, the Governor signed Session Law 2009-406. This law impacts any development
approval issued by the Division of Energy, Mineral and Land Resources under Article 21 of Chapter
143 of the General Statutes, which is current and valid at any point between January 1, 2008, and
December 31, 2010. The law extends the effective period of any stormwater permit that was set to
expire during this time frame up to three (3) years from its current expiration date. On August 2, 2010,
the Governor signed Session Law 2010-177, which granted an extra year for an extension of up to four
(4) years.
On May 12, 2014, the Division of Energy, Mineral and Land Resources (DEMLR) received a complete
permit Name/Ownership Change Form from Clancy & Theys Construction Company for the subject
project. A file review and site inspection was performed on July 25, 2014 by DEMLR staff and as noted
in the enclosed inspection report, the site is currently in compliance with the terms and conditions of the
current state stormwater permit. As indicated on the Name/Ownership Change form, you have
acknowledged that you have not received copies of the permit, which includes the application and
supplement forms, the approved plans and copy of the required Operation and Maintenance agreement
from the previous permittee. By signing the Name/Ownership Transfer form, you have accepted the
responsibility for complying with the terms and conditions outlined in this permit. The Division is hereby
notifying you that permit SW8 011102 has been transferred on July 28, 2014 and to remind you that
this permit shall be effective until February 20, 2016, which includes the extensions. For your records,
please find enclosed a copy of the a copy of the original permit issued with an updated page 2, a copy
of the inspection report, a copy of the Name/Ownership Change form, a copy of the original application
form, and a copy of the wet detention pond supplement with the operation and maintenance
agreement. If you wish to obtain a copy of the plans, please contact the Division and copies can be
made at your expense.
This permit is subject to the conditions and limitations as specified in the previously issued permit.
Please pay special attention to the conditions listed in this permit regarding the Operation and.
Maintenance of the BMP(s), recordation of deed restrictions, procedures for changes of ownership,
transferring the permit, and renewing the permit. - Failure to establish an adequate system for operation
and maintenance of the stormwater management system, to record deed restrictions, to transfer the
permit, or to renew the permit, will result in future compliance problems.
Division of Energy, Mineral, and Land Resources
Land QuaSity Section — Wilmington Regional Office
127 Cardinal Drive Extension, Wilmington, North Carolina 28405 • (910) 796-72151 Fax: (910) 350-2004
If any parts, requirements, or limitations contained in this permit are unacceptable, you have the,
right to request an adjudicatory hearing by filing a written petition with the Office of
Administrative Hearings (OAH). The written petition must conform to Chapter 150B of the North
Carolina General Statutes, and must be filed with the OAH within thirty (30) days of receipt of
this permit. You should contact the OAH with all questions regarding the filing fee (if a filing fee
is required) and/or the details of the filing process at 6714 Mail Service Center, Raleigh, NC
27699-6714, or via telephone at 919-431-3000, or visit their website at www.NCOAH.com.
Unless such demands are made this permit shall be final and binding.
If you have any questions, need additional copies of the permit or approved plans, please
contact Christine Nelson with DEMLR in the Wilmington Regional Office at (910) 796-7215.
Sinc ely,
Tracy DI vDirector
Division of Energy, Mineral and Land Resources
enclosures
GDS/can: 111Stormwater\Permits & Projects120011011102 HD12014 07 permit 011102
cc: Brad Murr, President, Merrifield Patrick Vermillion, LLC, original permittee
Wilmington Regional Office Stormwater File
Page 2 of 9
State Stormwater Management
Permit # SW8 011102
STATE OF NORTH CAROLINA
DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES
DIVISION OF ENERGY, MINERAL AND LAND RESOURCES
STATE STORMWATER MANAGEMENT PERMIT
HIGH DENSITY DEVELOPMENT
In accordance with the provisions of Article 21 of Chapter 143, General Statutes of North
Carolina as amended, and other applicable Laws, Rules, and Regulations
PERMISSION IS HEREBY GRANTED TO
Clancy & Theys Construction Company
Clancy & Theys Gordon Road Facility
6636 Gordon Road, Wilmington, New Hanover County
FOR THE
construction, operation and maintenance of wet detention pond in compliance with the
provisions of 15A NCAC 2H .1000 (hereafter referred to as the "stormwater rules') and the
approved stormwater management plans and specifications and other supporting data as attached
and on file with and approved by the Division and considered a part of this permit.
This permit shall be effective from the date of issuance until February 20, 2016, and shall be
subject to the following specified conditions and limitations:
1. DESIGN STANDARDS
This permit is effective only with respect to the nature and volume of stormwater
described in the application and other supporting data.
2. This stormwater system has been approved for the management of stormwater runoff as
described on page 3 of this permit, the Project Data Sheet. The stormwater control has
been designed to handle the runoff from 53,611 square feet of impervious area.
3. Approved plans and specifications for this project are incorporated by reference and are
enforceable parts of the permit.
4. The tract will be limited to the amount of built -upon area indicated on page 3 of this
permit, and per approved plans.
5. All stormwater collection and treatment systems must be located in either dedicated
common areas or recorded easements. The final plats for the project will be recorded
showing all such required easements, in accordance with the approved plans.
6. The runoff from all built -upon area within the permitted drainage area of this project
must be directed into the permitted stormwater control system. A permit modification
must be submitted and approved prior to the construction of additional built -upon area
from outside of the approved drainage area.
Page 3 of 9
State Stormwater Management
Permit # SW8 011102
DIVISION OF ENERGY, MINERAL AND LAND RESOURCES
PROJECT DESIGN DATA SHEET
Project Name: Clancy and Theys Gordon Road Facility
Permit Number: SW8 011102
Location: New Hanover County
Applicant: Mr. David T. Clancy, President
Mailing Address: Clancy & Theys Construction Company
516 W. Cabarrus Street
Raleigh, NC 27611
Original Application Date: January 31, 2002
Name of Receiving Stream/Index #: Cape Fear / Smith Creek / 18-74-63
Classification of Water Body: "C Sw"
Pond Depth, feet: 6.5
Permanent Pool Elevation, FMSL: 41.25
Drainage Area acres: 2.85
a
Total Impervious Surfaces, ftz:
Offsite Area entering Pond, ftz:
Required Surface Area, ftz:
Provided Surface Area, ftz:
Required Storage Volume, ft':
Provided Storage Volume, ft3:
Temporary Storage Elevation, FMSL:
Controlling Orifice:
53,611
None, per engineer
2,433
2,543
5,643
5,818
43
1.0119 pipe
Page 4 of 9
State Stormwater Management
Permit # SW8 011102
I1. SCHEDULE OF COMPLIANCE
The stormwater management system shall be constructed in its entirety, vegetated and
operational for its intended use prior to the construction of any built -upon surface.
2. During construction, erosion shall be kept to a minimum and any eroded areas of the
system will be repaired immediately.
3. The permittee shall at all times provide the operation and maintenance necessary to.
assure the permitted stormwater system functions at optimum efficiency. The approved
Operation and Maintenance Plan must be followed in its entirety and maintenance must
occur at the scheduled intervals including, but not limited to:
a. Semiannual scheduled inspections (every 6 months).
b. Sediment removal.
C. Mowing and revegetation of side slopes and vegetated filter.
d. Immediate repair of eroded areas.
e. Maintenance of side slopes in accordance with approved plans and specifications.
f. Debris removal and unclogging of outlet structure, orifice device, flow spreader,
catch basins and piping.
g. Access to the outlet structure must be available at all times.
4. Records of maintenance activities must be kept and made available upon request to
authorized personnel of Division. The records will indicate the date, activity, name of
person performing the work and what actions were taken.
Decorative spray fountains will not be allowed in the stormwater treatment system.
6. The facilities shall be constructed as shown on the approved plans. This permit shall
become voidable unless the facilities are constructed in accordance with the conditions of
this permit, the approved plans and specifications, and other supporting data.
7. Upon completion of construction, prior to issuance of a Certificate of Occupancy, and
prior to operation of this permitted facility, a certification must be received from an
appropriate designer for the system installed certifying that the permitted facility has been
installed in accordance with this permit, the approved plans and specifications, and other
supporting documentation. Any deviations from the approved plans and specifications
must be noted on the Certification. A modification may be required for those deviations.
8. If the stormwater system was used as an Erosion Control device, it must be restored to
design condition prior to operation as a stormwater treatment device, and prior to
occupancy of the facility.
9. The permittee shall submit to the Director and shall have received approval for revised
plans, specifications, and calculations prior to construction, for any modification to the
approved plans, including, but not limited to, those listed below:
a. Any revision to any item shown on the approved plans, including the stormwater
management measures, built -upon area, details, etc.
b. Project name change.
C. Transfer of ownership.
d. Redesign or addition to the approved amount of built -upon area or to the drainage
area.
C. Further subdivision, acquisition, or sale of the project area. The project area is
defined as all property owned by the permittee, for which Sedimentation and
Erosion Control Plan approval was sought.
f. Filling in, altering, or piping of any vegetative conveyance shown on the
approved plan.
Page 5 of 9
State Stormwater Management
Permit # SW8 011102
10. The permittee shall submit final site layout and grading plans for any permitted future
areas shown on the approved plans, prior to construction. If the proposed BUA exceeds
the amount permitted under this permit, a modification to the permit must be submitted
and approved prior to construction.
11. A copy of the approved plans and specifications shall be maintained on file by the
Permittee for a minimum of ten years from the date of the completion of construction.
12. The permittee shall notify the Division of any name, ownership or mailing address
changes within 30 days.
13. Prior to the sale or lease of any portion of the property, the permittee shall notify the
Division and provide the name, mailing address and phone number of the purchaser or
leasee. An access/maintenance easement to the stormwater facilities shall be granted in
favor of the permittee if access to the stormwater facilities will be restricted by the sale or
lease of any portion of the property.
14. The permittee is responsible for verifying that the proposed built -upon area does not
exceed the allowable built -upon area.
15. The Director may notify the permittee when the permitted site does not meet one or more
of the minimum requirements of the permit. Within the time frame specified in the notice,
the permittee shall submit a written time schedule to the Director for modifying the site to
meet minimum requirements. The permittee shall provide copies of revised plans and
certification in writing to the Director that the changes have been made.
III. GENERAL CONDITIONS
1. This permit is not transferable. In the event there is a desire for the facilities to change
ownership, or there is a name change of the Permittee, a formal permit request must be
submitted to the Division accompanied by an application fee, documentation from the
parties involved, and other supporting materials as may be appropriate. The approval of
this request will be considered on its merits and may or may not be approved.
Responsibility for compliance with all permit conditions remains with the Permittee until
such time as the Division approves the formal permit request.
2. Failure to abide by the conditions and limitations contained in this permit may subject the
Permittee to enforcement action by the Division, in accordance with North Carolina
General Statute 143-215.6A to 143-215.6C.
3. The issuance of this permit does not preclude the Permittee from complying with any and
all statutes, rules, regulations, or ordinances which may be imposed by other government
agencies (local, state, and federal) which have jurisdiction.
4. In the event that the facilities fail to perform satisfactorily, including the creation of
nuisance conditions, the Permittee shall take immediate corrective action, including those
as may be required by this Division, such as the construction of additional or replacement
stormwater management systems.
The permittee grants DENR Staff permission to enter the property during normal
business hours for the purpose of inspecting all components of the permitted stormwater
management facility.
6. The permit may be modified, revoked and reissued or terminated for cause. The filing of
a request for a permit modification, revocation and reissuance or termination does not
stay any permit condition.
Page 6 of 9
State Stormwater Management
Permit # SW8 011102
7. Unless specified elsewhere, permanent seeding requirements for the stormwater control
must follow the guidelines established in the North Carolina Erosion and Sediment
Control Planning and Design Manual.
Permit transferred and re -issued this the 28th day of July, 2014.
NORT CAROLINA ENVIRONMENTAL MANAGEMENT COMMISSION
racy Davie, P.E., Director
Division of Energy, Mineral and Land -Resources
By Authority of the Environmental Management Commission
Page 7 of 9
State Stormwater Management
Permit # SW8 011102
Bolton Parking Expansion
Stormwater Permit No. SW8 011102
New Hanover County
Designer's Certification
1, , as a duly registered
in the State of North Carolina, having been authorized to
observe (periodically/weekly/full time) the construction of the project,
(Proj ect)
for (Project Owner) hereby state that, to the best of
my abilities, due care and diligence was used in the observation of the project construction such
that the construction was observed to be built within substantial compliance and intent of the
approved plans and specifications.
The checklist of items on page 2 of this form is included in the Certification.
Noted deviations from approved plans and specification:
Signature
Registration Number
Date
SEAL
Page 8 of 9
State Stormwater Management
Permit # SW8 011102
Certification Requirements:
1. The drainage area to the system contains approximately the permitted acreage.
2. The drainage area to the system contains no more than the permitted amount of
built -upon area.
3. All the built -upon area associated with the project is graded such that the runoff
drains to the system.
4. The outlet/bypass structure elevations are per the approved plan.
5. The outlet structure is located per the approved plans.
6. Trash rack is provided on the outlet/bypass structure.
.7. All slopes are grassed with permanent vegetation.
8. Vegetated slopes are no steeper than 3:1.
9. The inlets are located per the approved plans and do not cause short-circuiting of
the system.
.10. The permitted amounts of surface area and/or volume have been provided.
_11. Required drawdown devices are correctly sized per the approved plans.
12. All required design depths are provided.
_13. All required parts of the system are provided, such as a vegetated shelf, and a
forebay.
14. The overall dimensions of the system, as shown on the approved plans, are
provided.
Page 9 of 9
North Carolina Department of Environment and Natural Resources
Dlvlabn of water Quality
Beverly Eaves Perdue Colson M. sumne Dee Freeman
Governor .01rector Secretary
STATE STORMWATER PERMIT NAMElOWNERSHIP CHANGE FORM
I. CURRENT PERMIT INFORMATION
1. Stormweter Management Permit Number: SW8 011102
2. Project Name. Bolton Parking Expansion
3. Current Permit Holder's Company Name/Organization: Merrifield Patrick Vermillion, LLC
4. Signing Offtcfal's Name: Bred Murr Title: President
5. Mailing Address: 521 East Morehead Street, suite 400
City: Charlotte State: NC Zip: 28202
6. Phone: 71 04 248-2100 Fax:( ,mil
IL PROPOSED PERMIITEE I OWNER / PROJECT / ADDRESS INFORMATION
This request Is for: (please check all that apply)
❑ Name change of the owner (Please complete Items 1, 2 and 3 below)
Name change of project (Please complete Item 5 below)
Change In ownership of the property/company (Please complete Items 1, 2, 3, and 4 below)
Mailing address / phone number change. (Please complete Item 4 below)
Other (please explain):
1. Proposed permittee's company name/organization: Clancy & Theys Construction Company
2. Proposed permfttee's signing officiaf's turns: David T. Clancy
3. Proposed permt tee's title: President
4. Mailing Address- 516 W. Cabarrus Street
City: Raleigh State: NC zip; 27611
Phone: gi 19 l834-3601 Fax: 19 836-0918
5. New Project Name to be placed on penrdt: Clancy & Theys Gordon Rd Facility
Please check the appropriate box. The proposed permittee listed above is:
❑ HOA or POA (Attach documentailon showfng that the HOA or POA owns, controls, or has a
recorded easement for all areas ghat contain stormwater system features. Print name of HOA or
POA In #1 above and provide name of HOAMCA's authorized representative In #2 above)
�] The property owner
❑ Loom (Attach a copy of the lease agreement and complete Property Owner Information on
page 4)
❑ Purchaser (Attach a copy of the pending sales agreement Final approval of this transfer wffP be
prattled upon recept of a copy of the recorded deed).
❑ pevefoper (Complete Property Owner 10mmadon on page 4)
S5W'fV/0 Change Rev15l=eb2011 Page 1 of 4 �•x�.TE
Ucl j 5 a12
13Y
III. REQUIRED ITEMS
A 'request to transfer a permit will not be approved by the Division of Water Quality (DWQ) unless all
of the applicable required items listed below are included with the submittal. Failure to provide the
listed items may result in processing delays or denial of the transfer.
1. This completed and signed form. iTfiis certification must be comple#ed and signed by both the
current permit }folder and the new applicant if this is a change of ownership f
2. Legal documentation of the property transfer to a new owner.
3. A copy of any recorded deed restrictions, covenants, or easements, if required by the permit.
4. The designer's certification (DWQ Engineer and Designer Certification Forms are available from
each DWQ Regional office), if required by the permit and if not already submitted to DWQ.
5. If the proposed permittee is a firm, partnership, association, institution, corporation, limited liability
company, or other corporate entity, provide documentation showing the authority of the named
representative to act on behalf of the proposed permittee.
6. The $40.00 processing fee. If this is an initial transfer from the original permittee the processing
fee is not required. Subsequent ownership transfers will require the $40.00 processing fee.
IV. CURRENT PERMITTEE'S CERTIFICATION
Please check one of the following statements and fill out the certification below that statement:
❑ Check here if the current permittee is only changing his/her/its name, the project name, or mailing
address, but will retain the permit. I, , the current
permittee, hereby notify the DWQ that I am changing my name and/or I am changing my mailing
address and/or I am changing the name of the permitted project. I further attest that this application
for a name/ownership change is accurate and complete to the best of my knowledge. I understand
that if all required parts of this application are not completed or if all required supporting information
and attachments listed above are not included, this application package will be returned as
incomplete.
)Check re if urrent permittee is transferring the property to a new owner and will not retain
ownershi of thq permit.
I, , the current permittee, am submitting this application
fora transfer of ownership for permit # Ol oa . I hereby notify DWQ of the sale or
other legal transfer of the stormwater system associated with this permit. I have provided a copy of
the most recent permit, the designer's certification for each BMP, any recorded deed restrictions,
covenants, or easements, the DWQ approved plans and/or approved as -built plans, the approved
operation and maintenance agreement, past maintenance records, and the most recent DWQ
stormwater inspection report to the proposed permittee named in Sections II and V of this form. I
further attest that this application for a name/ownership change is accurate and complete to the best
of my knowledge. I understand that if all required parts of this application are not completed or if all
required supporting information and attachments listed above are not included, this application
package will be returned as incomplete. I assign all rights and obligations as permittee to the
proposed permittee named in Sections 11 and V of this form. I understand that this transfer of
ownership cannot be approv d by the DWQ unless and until the facility is in compliance with the
permit.
Signature: Date: 10 5 '1
L , a Notary Public for the State of
�acM eatre Ct n 0. , County of _ '72�[�',�t,c brarc� , do hereby certify that
_:Zca A -_V I'r personally appeared before me this the
_ day of �('_4-eber - , 20 , and acknowledge the due execution of the
foracirna instrument. Witness my hand and official seal, (Nplary,Sgal)
t.. �G. PUR
No ary Signature . _ ��„ e'�c,P'•••�•••.SF�4-
apTgR y
.40. A 1G : 2
SSW N/0 Change Rev24Sept2012 Page 2 UBL ,
'o •,... ••' cj
V. PROPOSED PERMITTEE CERTIFICATION: (This section must be completed by the
Proposed Permittee for all transfers of ownership)
I, David T. Clancy , hereby notify the DWQ that I have acquired
through sake, lease or legal transfer, the responsibility for operating and maintaining the permitted
stormwater management system, and, if applicable, constructing the permitted system. I
acknowledge and attest that I have received a copy of: (check all that apply to this permit)
Bthe most recent permit
the designer's certification for each BMP
❑ any recorded deed restrictions, covenants, or easements
❑ the DWQ approved plans and/or approved as -built plans
❑ the approved operation and maintenance agreement
Epast maintenance records from the previous permittee (where required)
DWQ stormwater inspection report showing compliance within 90 days prior to this transfer
I have reviewed the permit, approved plans and other documents listed above, and I will comply with
the terms and conditions of the permit and approved plans. I acknowledge and agree that I will
operate and maintain the system pursuant to the requirements fisted in the permit and in the
operation and maintenance agreement. 1 further attest that this application for a name/ownership
change is accurate and complete to the best of my knowledge. 1 understand that if all required parts
of this application are not completed or if all required supporting information and attachments listed
above are not include this applicati package will be returned as incomplete
Signature: Date: a
I, ,_f . C2n�t S _ T a Notary Public for the State of
day of
forgoing instrument. Witness my hand and offici
otary Signature
t.3 _, do hereby certify that
personally appeared before me this 149............
20—LL, and acknowledge the dgdQ uAt�o'� ot'the
al seal, � �fi
(Notary
'��O0UB LI Gy =
oouN �•
rx-pi ry-5
31,ZI
Additional copies of the original permit and the approved Operation and Maintenance agreement can
be obtained from the appropriate Regional Office of the Division of Water Quality.
This completed form, including all supporting documents and pprocessing fee if required), should be
sent to the appropriate Regional Office of the North Carolina Department of Environment and Natural
Resources, Division of Water Quality, as shown on the attached map.
Please note that if the Proposed Permittee listed above is not the property owner, the property owner
must complete and sign page 4 of this document. Both the lessee /developer and the property
owner will appear on the permit as permittees.
EC E IVE
SSW N/0 Change Rev15Feb2011 Page 3 of 4 SEP 11 2012
BY:
1 R •
VI. PROPERTY OWNER CONTACT INFORMATION AND CERTIFICATION
1f the Proposed Permittee listed in Sections 11 and V of this form is not the Property Owner, the
Property Owner must provide his/her Contact Information below and sign this form:
Printed Name:
Organization:
Title within the Organization:
Street Address:
City:
Mailing Address:
city:
Phone:
Email:
State:
(it different from street address)
State:
Fax:
Zip:
Zip:
I certify that I own the property identified in this permit transfer document and have given permission
to the Proposed Permittee listed in Sections it and V to develop and/or, lease the property. A copy
of the lease agreement or other contract, which indicates the party responsible for the construction
and/or operation and maintenance of the stormwater system, has been provided with the submittal.
As the legal property owner I acknowledge, understand, and agree by my signature below, that I will
appear as a permittee along with the lessee/developer and 1 will therefore share responsibility for
compliance with the DWQ Stormwater permit. As the property owner, it is my responsibility to notify
DWQ by submitting a completed Name/Ownership Change Form within 30 days of procuring a
developer, lessee or purchaser for the property. I understand that failure to operate and maintain the
stormwater treatment facility in accordance with the permit is a violation of NC General Statute
(NCGS) 143-215.1, and may result in appropriate enforcement action including the assessment of
civil penalties of up to $25,000 per day, pursuant to NCGS 143-215.6.
Signature of the property owner
Date:
a Notary Public for the State of
County of , do hereby certify that
personally appeared before me this the
day of , 20 , and acknowledge the due execution of the
forgoing instrument. Witness my hand and official seal,
otary Signature
SSW N/0 Change Rev15Feb2011 Page 4 of 4
(Notary Seal)
C-UIVIE
.
SEP 1 1 20i2
13Y:
State of North Carolina
Department of Environment and Natural Resources
Division of Water Quality
STORMWATER MANAGEMENT PERMIT APPLICATION FORM
T his form may be photocopied for use as an original
GENERAL INFORMATION
1. Applicants name (specify the name of the corporation, individual, etc. who owns the project):
Harriss-Murr Association
2, Print Owner/Signing Official's name and title (person legally responsible for facility quid compliance):
Brad Murr, President
3. Mailing Address for person listed in item 2 above:
122 Cherokee Road
City: Charlotte State: NC Zip: 28207
Telephone Number; 704-377-6224
4. Project Name (subdivision, facility, or establishment name — should be consistent with project name on
plans, specifications, letters, operation and maintenance agreements, etc.):
Bolton Parking Expansion _
a. Location of Project (street address):
6636 Gordon Road _
City; Wilmington County: New Hanover
6. Directions to project (from nearest major intersection):
From the intersection of Gordon Road and Market Street travel northwest towards Kings Grant 0.4 miles.
Site is on left.
7. Latitude : N 340 16' 00" Longitude: W 770 50' 00" of project
8. Contact person who can answer questions about the project:
Name: Charles Cazier Telephone Number: 910-763-5 100
11. PERMIT INFORMATION:
1. Specify whether project is (check one): X New Renewal Modification
Fonn SWU-101 Version 3.99 Pagel of4
1
2. If this application is being submitted as the result of a renewal or modification to an existing permit, list
The existing permit number and its issue date (if known)
3. Specify the type of project (check one):
Low Density X_ High Density Redevelop — General Permit Other
4. Additional Project Requirements (check applicable blanks):
CAMA Major Sedimentation/Erosion Control 404//401 Permit NPDES Storrnwater
Information on required state permits can be obtained by contacting the Customer Service Center at
1-877-623-6748.
Ill. PROJECT INFORMATION
1, In the space provided below, summarize how stormwater will be treated. Also attach a detailed narrative
(one to two pages) describing stormwater management for the project.
on -site stormwater detention and
2. Stormwater runoff from this project drains to the Cape Fear River basin,
3. Total Project Area: 2.85 acres
4. Project Built Upon Area: 43.2 %.
5. How many drainage basins does the project have? —I-
6. Complete the following information for each drainage area. If there are more than two drainage areas in the
project, attach an additional sheet with the information for each area provided in the same format as below.
% U
R
Receiving Stream Name
Smith Creek
Receiving Stream Class
C-SW
Drainage Basin Area
2.85 ac
Existing Impervious * Area
39,870 sf
Proposed Impervious * Area
53,611 sf
% Impervious* Area (total)
42.9%
. .... ..
P
............
On -site Buildings
15,547 sf
On -site Streets
21,457 sf
On -site Parking
12,961 sf
On -site Sidewalks
3,646 sf
Other on -site
-
Off -site
Total:
E=53,611 sf
Y_
Impervious area is defined as the built upon area including, but not limited to, buildings, roads, parking
areas sidewalks, grovel areas, etc.
Form SWU-101 Version 3.99 Page 2 of 4
7. How was the off -site impervious area listed above derived`?
IV. DEED RESTRICTIONS AND PROTECTIVE COVENANTS
The following italicized deed restrictions and protective covenants are required to be recorded for all
subdivisions, outparcels and future development prior to the sale of any lot. If lot sizes vary significantly, a
table listing each lot number, size and the allowable built -upon area for each lot must be provided as an
attaclunent.
The fdllowing covenants are intended to ensure ongoing compliance with state stormwater management permit
number as issued by the Division of Water Quality. These covenants may
not be changed or deleted without the consent of the State.
2. No more than square feed of any lot shall he covered by structures of impervious materials.
Impervious materials include asphalt, gravel, concrete, brick, stone, slate or similar material but do not include wood
decking or the water surface of s wimming pools.
3. Swales shall not he filled in, piped or altered except as necessary to provide driveway crossings.
4. Built -upon area in excess ofthe permitted amount requires a state stormwater management permit modification prior
to construction.
5 Allpermilled runofffr{gym outparcely or future development shall be directed into the permitted stormwater control
.system. These connections to the stormwater control system shall be performed in a manner that maintains the
integrity and performance of the system as permitted
By your signature below, you certify that the recorded deed restrictions and protective covenants for this project
shall include all the applicable items required above, that the covenants will be binding on all parties and
persons claiming under them, that they will run with the land, that the required covenants cannot be changed or
deleted without concurrence from the State, and that they will be recorded prior to the sale of any lot.
V. SUPPLEMENT FORMS
The applicable state stormwater management permit supplcment fonn(s) listed below must be submitted for
each BMP specified for this project. Contact the Stormwater and General Permits Unit at (910) 733-5083 for
the status and availability of these forms.
Form SWU-102 Wet Detention Basin Supplement
Form SWU-103 Infiltration Basin Supplement
Form SWU-104 Low Density Supplement
Form SWU-105 Curb Outlet System Supplement
Form SWU-106 Off Site System Supplement
Form SWU-107 Underground Infiltration Trench Supplement
Form SWU-108 Neuse River Basin Supplement
Form SWU-109 Innovative Best Management Practice Supplement
Form SWU-101 Version 3.99 Page 3 of 4
VI: SUBMITTAL REQUIREMENTS
Only complete application packages will be accepted and reviewed by the Division of Water Quality (DWQ).
A complete package includes all of the items listed below. The complete application package should be
submitted to the appropriate DWQ Regional Office.
l . Please indicate that you have provided the following required information by initialing in the space
provided next to each item.
Applicant's Initials
• Original and one copy of the Stormwater Management Permit Application Form tm
• One copy of the applicable Supplement Form(s) for each BMP Jcm
• Permit application processing fee of $420 (payable to NCDENR) _ x
• Detailed narrative description of stormwater treatnient/management 4M
• Two copies of plans and specifications, including: Cps_
- Development/Project name
- Engineer and firm
- Legend
- North arrow
- Scale
- Revision number and date
Mean high water line
- Dimensioned property/project boundary
- Location map with named streets or NCSR numbers
- Original contours, proposed contours, spot elevations, finished floor elevations
- Details of roads, drainage features, collection systems, and stormwater control measures
- Wetlands delineated, or a note on plans that none exist
- Existing drainage (including off -site), drainage casements, pipe sizes, runoff' calculations
- Drainage areas delineated
- Vegetated buffers (where required)
V11. AGENT AUTHORIZATION
If you wish to designate authority to another individual or firm so that they may provide information oa your
behalf, please complete this section.
Designated agent (individual or firm):
Mailing Address: 419 Chestnut Street
City: Wilmington State: NC Zip
Phone: (910) 763-5100 Fax: (910) 763-5631
VI11. APPLICANT'S CERTIFICATION
28401
I, (print or type name of person listed in General Information, item 2) Brad Murr
certify that the information included on this permit application form is, to the best of my knowledge, correct and
that the project will be constructed in conformance with the approved plans, that the required deed restrictions
and protective covenants wil be recorded, and that the proposed project complies with the requirements of 15A
NCAC 2H .1000.
Signature: Date:
Form SWU-101 Version 3.99 Page 4 of 4
Permit No.
(to be provided by DWQ)
State of North Carolina
Department of Environment and Natural Resources
Division of Water Quality
STORMWATER MANAGEMENT PERMIT APPLICATION FORM
WET DETENTION BASIN SUPPLEMENT
This form may be photocopied jar use as an original
DWQ Stormwater Management Plan Review:
A complete Stormwater management plan submittal includes a wet detention basin supplement for each basin,
design calculations, plans and specifications showing all basin and outlet structure details, and a signed and
notarized operation and maintenance agreement.
1. PROJECT INFORMATION (please complete the following information):
Project Name: Bolton ParkingExpansion
Contact Person: Charles Cazier Phone Number: 910 7635100
For projects with multiple basins, specify which basin this worksheet applies to:
elevations
Basin Bottom Elevation 34.75 ft.
Permanent Pool Elevation 41.25 ft.
Temporary Pool Elevation 43.0 ft.
(floor of the basin)
(elevation of the orifice)
(elevation of the discharge structure overflow)
areas
Permanent Pool Surface Area 2,543 sq.ft. (water surface area at the orifice elevation)
Drainage Area 2.85 ac. (on -site and off -site drainage to the basin)
Impervious Area 1.23 ac. (on -site and off -.site drainage to the basin)
volumes
Permanent Pool Volume _8,295 cu.ft. (combined volume of main basin and forehay)
Temporary Pool Volume 5,818 cu.ft. (volume detained above the permanent pool)
Forebay Volume 1,676 cu.ft. (approximately 20% of total volume)
Other parameters
SA/DA` 1.96 (surface area to drainage area ratio from DWQ table)
Diameter of Orifice 1.0 in. (2 to 5 day temporary pool draw -down required)
Design Rainfall 1.0 in.
Design TSS Removal2 90 % (minimum 85% required)
Form SWU-102 Rev 3.99 Page 1 of 4
Footnotes:
I . When using the Division SAMA tables, the correct SA/DA ratio for permanent pool sizing should be computed based upon the
actual impervious °/. and permanent pool depth. Linear interpolation should be employed to determine the correct value for non-
standard table entries.
2. 1n the 20 coastal counties, the requirement. for a vegetative filter may be waived if the wet detention basin is designed to provide
90%. TSS removal. The NCDENR BMP manual provides design tables for both 85%TSS removal and 90°/0 TSS removal.
II. REQUIRED ITEMS CHECKLIST
The following checklist outlines design requirements per the Stormwater Best Management Practices Manual
(N.C. Department of Environment, Health and Natural Resources, February 1999) and Administrative Code
Section: 15 A NCAC 2H .1008.
Initial in the space provided to indicate the following design requirements have been met and supporting
documentation is attached. If the applicant has designated an agent in the Stormwater Management Permit
Application Form, the agent may initial below. If a requirement has not been met, attach justification.
Applicants Initials
CM a. The permanent pool depth is between 3 and 6 feet (required minimum of 3 feet).
LQL b. The forebay volume is approximately equal to 20% of the total basin volume.
CP'. c. The temporary pool controls runoff from the design storm event.
Crd[ d. The temporary pool draws down in 2 to 5 days.
Nb e. If required, a 30-foot vegetative filter is provided at the outlet (include non -erosive flow
calculations).
GC�L- f. The basin length to width ratio is greater than 3:1.
g. The basin side slopes above the permanent pool are no steeper than 3.1.
G h. A submerged and vegetated perimeter shelf with a slope of 6:1 or less (show detail).
Cyr_ i. Vegetative cover above the permanent pool elevation is specified.
a(aCX. j. A trash rack or similar device is provided for both the overflow and orifice.
4::CC. k. A recorded drainage easement is provided for each basin including access to nearest right-
of-way.
1. if the basin is used for sediment and erosion control during construction, clean out of the
basin is specified to be performed prior to use as a wet detention basin
G� m. A mechanism is specified which will drain the basin for maintenance or an emergency.
III. WET DETENTION BASIN OPERATION AND MAINTENANCE AGREEMENT
The wet detention basin system is defined as the wet detention basin, pretreatment including forebays and the
vegetated filter if one is provided.
This system (check one) ❑ does X does not incorporate a vegetated filter at the outlet.
This system (check one) ❑ does X does not incorporate pretreatment other than a forebay.
Form SWU-102 Rev 3.99 Page 2 of 4
Maintenance activities shall be performed as follows:
I . After every significant runoff producing rainfall event and at least monthly:
a. Inspect the wet detention system for sediment accumulation, erosion, trash accumulation,
vegetated cover, and general condition.
b. Check and clear the orifice of any obstructions such that drawdown of the temporary pool occurs
within 2 to 5 days as designed.
2. Repair eroded areas immediately, re -seed as necessary to maintain good vegetative cover, mow vegetative
cover to maintain a maximum height of six inches, and remove trash as needed.
3. Inspect and repair the collection system (i.e. catch basins, piping, swales, riprap, etc.) quarterly to
maintain proper functioning.
4. Remove accumulated sediment from the wet detention basin system semi-annually or when depth is
reduced to 75% of the original design depth (see diagram below), Removed sediment shall be disposed
of in an appropriate manner and shall not be handled in a manner that will adversely impact water quality
(i.e. stockpiling near a wet detention basin or stream, etc.).
The measuring device used to determine the sediment elevation shall be such that it will give an accurate
depth reading and not readily penetrate into accumulated sediments.
When the permanent pool depth reads 4,875 feet in the main pond, the sediment shall be removed.
When the permanent pool depth reads _2.25 feet in the forebay, the sediment shall be removed.
BASIN DIAGRAM
(fill in the blankv)
Permanent Pool Elevation 41.25
Sediment moval El. 39.0 75 /°
________ Sediment Removal Elevation 36.375 75%
Bottom ovation 3R.25 5'Y---------------------------------------------- ----
Bottom Elevation 34.75 251%I
FOREBAY MAIN POND
5. Remove cattails and other indigenous wetland plants when they cover 50% of the basin surface. These
plants shall be encouraged to grow along the vegetated shelf and forebay berm.
b. if the basin must be drained for an emergency or to perform maintenance, the flushing of sediment
through the emergency drain shall be minimized to the maximum extent possible.
Form SWU-102 Rev 3.99 Page 3 of 4
7. All components of the wet detention basin system shall be maintained in good working order.
acknowledge and agree by my signature below that I am responsible for the performance of the seven
maintenance procedures listed above. I agree to notify DWQ of any problems with the system or prior to any
changes to the system or responsible party.
Print name: Brad M
Title: President
Addres
Phone
Signatu
Date: l0
Note: The legally responsible party should not be a homeowners association unless more than 50°/, of the lots have been sold and
a resident of the subdivision has been named the president.
I,rr, e, Sm a Notary Public for the State of i A r yam,
County of do hereby certify that Zrmck Ma-ek-
personally appeared before m is day of IDC46 jqr,Y; _200I , and acknowledge the due
execution of the forgoing wet detention basin maintenance requirements. Witness my hand and official seal,
SEAL
My commission expires P,'d'N b�
j alrt�
Form SWU-102 Rev 3.99 Page 4 of 4
,� R
.h
�-
L.
F
���
���,
�
.-.
\+�
-.
a�.
�k
r
..
_,
!_..
.--�
_..�
.•-�
F-
t
i
..^
�.
Micnael F. Easley, Governor
OY
co
4
WAT-
QG
R�IA"IA IA Y
Mr. Brad Murr, President
Harriss-Murr Association
122 Cherokee Road
Charlotte, NC 28207
Dear Mr. Murr:
William G. Ross, Jr., Secretary
North Carolina Department of Environment and Natural Resources.
Gregory J. Thorpe, Ph.D., Acting Director
Division of Water Quality
Wilmington Regional Office
February 20, 2002
Subject: Permit No. SW8 011102
Bolton Parking Expansion
High Density Stormwater Project
New Hanover County
The Wilmington Regional Office received a complete Stormwater Management Permit Application for Bolton
Parking Expansion on January 31, 2002. Staff review of the plans and specifications has determined that the project,
as proposed, will comply with the Stormwater Regulations set forth in Title 15A NCAC 2H.1000. We are
forwarding Permit No. SW8 011102 dated February 20, 2002, for the construction of Bolton Parking Expansion.
This permit shall be effective from the date of issuance until February 20, 2012, and shall be subject to the conditions
and limitations as specified therein. Please pay special attention to the Operation and Maintenance requirements in
this permit. Failure to establish an adequate system for operation and maintenance of the stormwater management
system will result in future compliance problems.
If any parts, requirements, or limitations contained in this permit are unacceptable, you have the right to request an
ad judicatory hearing upon written request within thirty (30) days following receipt of this permit. This request must
be in the form of a written petition, conforming to Chapter 150B of the North Carolina General Statutes, and filed
with the Office of Administrative Hearings, P.O. Drawer 27447, Raleigh, NC 27611-7447. Unless such demands
are made this permit shall be final and binding.
If you have any questions, or need additional information concerning this matter, please contact Noelle Lutheran,
or me at (910) 395-3900.
Sincerely,
Rick Shiver
Water Quality Regional Supervisor
RSS/nml: S:IWQSISTORMWATIPERMI7101I102.FEB
cc: Charlie Cazier
Tony Roberts, New Hanover County Inspections
Beth E. Wetherill; New Hanover County Engineering
Division of Coastal Management
Noelle Lutheran
Wilmington Regional Office
Central Files
A.
NME NR
N.G. Division of Water quality 127 Cardinal Drive EAension Wilmington, N.C. 28405 (910) 395-3900 Fax(910) 350-2004 Customer Service
800-623-7748
State Stonnwater Management S)ovems
Permit No. SW9 011102 ,
STATE OF NORTH CAROLINA
DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES
DIVISION OF WATER QUALITY
STATE STORMWATER MANAGEMENT PERMIT
HIGH DENSITY DEVELOPMENT
In accordance with the provisions of Article 21 of f Chapter 143, General Statutes of North Carolina as amended, and
other applicable Laws, Rules, and Regulations
PERMISSION IS HEREBY GRANTED TO
Harriss-Murr Association
Bolton Parking Expansion
New Hanover County
FOR THE
construction, operation and maintenance of wet detention pond in compliance with the provisions of 15A NCAC 2H
.1000 (hereafter referred .to as the "stormwater rules') and the approved stormwater management plans and
specifications and other supporting data as attached and on file with and approved by the Division of Water Quality
and considered a part of this permit.
This permit shall be effective from the date of issuance until February 20, 2012, and shall be subj ect to the following
specified conditions and limitations:
1. DESIGN STANDARDS
1. This permit is effective only with respect to the nature and volume of stormwater described in the application
and other supporting data.
2. This stormwater system has been.approved for the management of stormwater runoff as described on page
3 of this permit, the Project Data Sheet. The stormwater control has been designed to handle the runoff from
53,611 square feet of impervious area.
Approved plans. and specifications for this project are incorporated by reference and are enforceable parts
of the permit.
4. The tract will be limited to the amount of built -upon area indicated on page 3 of this permit, and per approved
plans.
5. All stormwater collection and treatment systems must be Iocated in either dedicated common areas or
recorded easements. The final plats for the project will be recorded showing all such required easements, in
accordance with the approved plans.
6. The runoff from all built -upon area within the permitted drainage area of this project must be directed into
the permitted stormwater control system. A permit .modification must be submitted and approved prior to
the construction of additional built -upon area from outside of the approved drainage area.
Pa
f
State Storrnwatcr Management Systems
Permit No. SW8 011102
Project Name:
Permit Number:
Location:
Applicant:
Mailing Address•:
Application Date:
Name of Receiving Stream/Index #:
Classification of Water Body:
Pond Depth, feet:
Permanent Pool Elevation, FMSL:
Drainage Area, acres:
Total Impervious Surfaces, ft2:
Offsite Area entering Pond, ft2:
Required Surface Area, ft2:
Provided Surface Area, ft2:
Required Storage Volume, ft':
Provided Storage Volume, ft':
Temporary Storage Elevation, FMSL:
Controlling Orifice:
DIVISION OF WATER QUALITY
PMECT DESIGN DATA SHEET
Bolton Parking Expansion
SW8 011102
New Hanover County
Mr. Brad Murr, President
Harriss-Murr Association
122 Cherokee Road
Charlotte, NC 28207
January 31, 2002
Cape Fear / Smith Creek / 18-74-63
"C Sw"
6.5
41.25
2.85
53,611
None, per engineer
2,433
2,543
5,643
5,818
43
1.0" cp pipe
3
State Stormwater Management Sy.}tems
Permit No. SW8 01 1 102
II. SCHEDULE OF COMPLIANCE
1. The stormwater management system shall be constructed in it's entirety, vegetated and operational for its
intended use prior to the construction of any built -upon surface.
2. During construction, erosion shall be kept to a minimum and any eroded areas of the system will be repaired
immediately.
3. The perm ttee shall at all times provide the operation and maintenance necessary to assure the permitted
stormwater system functions at optimum efficiency. The approved Operation and Maintenance Plan must be
followed in its entirety and maintenance must occur at the scheduled intervals including, but not limited to:
a. Semiannual scheduled inspections (every 6 months).
b. Sediment removal.
C. Mowing and revegetation of side slopes and vegetated filter.
d. Immediate repair of eroded areas.
e. Maintenance of side slopes in accordance with approved plans and specifications.
f Debris removal and unclogging of outlet structure, orifice device, flow spreader, catch basins and
piping'.
g. Access to the outlet structure must be available at all times.
4. Records of maintenance activities must be kept and made available upon request to authorized personnel of
DWQ. The records will indicate the date, activity, name of person performing the work and what actions
were taken.
5. Decorative spray fountains will not be allowed in the stormwater treatment system.
6. The facilities shall be constructed as shown on the approved plans. This permit shall become voidable unless
the .facilities are constructed in accordance with the conditions of this permit, the approved plans and
specifications, and other supporting data.
7. Upon completion of construction, prior to issuance of a Certificate of Occupancy, and prior to operation of
this permitted facility, a certification must be received from an appropriate designer for the system installed
certifyingthat the permitted facility has been installed in accordance with this permit, the approved plans and
specifications, and other supporting documentation. Any deviations from the approved plans and
specifications must be noted on the Certification. A modification may be required for those deviations.
8. If the stormwater system was used as an Erosion Control device, it must be restored to design condition prior
to operation as a stormwater treatment device, and prior to occupancy of the facility.
9. The permitf ee shall submit to the Director and shall have received approval for revised plans, specifications,
and calculations prior.to construction, for any modification to the approved plans, including, but not limited
to, those listed below:
a. Any revision to anyitem shown on the approved plans, including the stormwater management
measures, built -upon area, details, etc.
b. Project name change.
C. Transfer of ownership.
d. Redesign or addition to the approved amount of built -upon area or to the drainage area.
e. Further subdivision, acquisition, or sale of the prof ect area. The project area is defined as all property
owned by the permittee, for which Sedimentation and Erosion Control.Plan approval was sought.
f. Filling in, altering, or piping of any vegetative conveyance shown on the approved plan.
10. The permittee shall submit final site layout and grading plans for any permitted future areas shown on the
approved plans, prior to construction. If the proposed BUA exceeds the amount permitted under this permit,
a modification to the permit must be submitted and approved prior to -construction,
4
State Stormwater Maiiacement Systems
Permit No. SW8 011102
11. A copy of the approved plans and specifications shall be maintained on file by the Permittee for a minimum
of ten years from the date of the completion of construction.
t.
12. The permittee shall notify the Division of any name, ownership or mailing address changes within 30 days.
13. Prior to the sale or lease of any portion of the property, the permittee shall notify DWQ and provide the
name, mailing address and phone number of the purchaser or leasee. An access/maintenance easement to the
stormwater facilities shall be granted in favor of the permittee if access to the stormwater facilities will be
restricted by the sale or lease of any portion of the property.
14. The permittee is responsible for verifying that the proposed built -upon area does not exceed the allowable
built -upon area.
15. The Director may notify the permittee when the permitted site does not meet one or more of the minimum
requirements of the permit. Within the time frame specified in the notice, the permittee shall submit a written
time schedule to the Director for modifying the site to meet minimum requirements. The permittee shall
provide copies of revised plans and certification in writing to the Director that the changes have been made.
III. GENERAL CONDITIONS
1. This permit is not transferable. In the event there is a desire for the facilities to change ownership, or there
is a name change of the Permittee, a formal permit request must be submitted to the Division of Water
Quality accompanied by an application fee, documentation from the parties involved, and other supporting
materials as maybe appropriate. The approval of this request will be considered on its merits and may or may
not be approved. Responsibility for compliance with all permit conditions remains with the Permittee until
such time as the Division -approves the formal permit request.
2. Failure to abide by the conditions and limitations contained -in this permit may subject the Permittee to
enforcement action by the Division of Water Quality, in accordance with North Carolina General Statute 143-
215.6A to 143-215.6C.
o
3. The issuance of this permit does not preclude the Permittee from complying with any and all statutes, rules,
regulations, or ordinances which may be imposed by other government agencies (local, state, and federal)
which.have• jurisdiction.
4. In the event that the facilities fail to perform satisfactorily, including the creation of nuisance conditions, the
Permittee shall take immediate corrective action, including those as may be required by this Division, such
as the construction of additional or replacement stormwater management systems.
.5. The permittee grants.DENR Staff permission to enter the property during normal business.hours for the
purpose of inspecting.all components of the permitted stormwater management facility.
6. The perm it -may be modified, revoked and reissued or terminated for cause. The.filing of a request for a
permit modification, revocation and reissuance or termination does not.stay-any permit condition.
Unless specified elsewhere, permanent seeding requirements for the stormwater control must follow the
guidelines established in the North -Carolina Erosion and Sediment Control Planning and.Design Manual.
;Permit issued this the 20th day of February, 2002.
NORTH CAROLINA ENVIRONMENTAL MANAGEMENT COMMISSION
Gregory J. Thorpe, Ph.D., Acting Director
�� Division of Water Quality
By Authority of the Environmental Management Commission
5
State Stormwater Management S!'�items
Permit No. SW8 01 1 102
Bolton Parking Expansion
Stormwater Permit No. SW8 011102
New Hanover County
Designer's Certification
as a duly registered in
the State of North Carolina, having been authorized to observe (periodically/weekly/full time) the construction of
the project,
(Project)
for {Project Owner) hereby state that, to the best of my abilities, due care
and diligence was used in the observation of the project construction such that the construction was observed to be
built within substantial compliance and intent of the approved plans and specifications.
The checklist of items on page 2 of this form is included in the Certification.
Noted deviations from approved plans and specification:
Signature
Registration Number
Date
SEAL
2
State Stormwater Management Systems
Permit No. SW8 011102
Certification Requirements:
1. The drainage area to the system contains approximately the permitted acreage.
2. The drainage area to the system contains no more than the permitted amount of built -upon area.
3. All'the built -upon area associated with the project is graded such that the runoff drains to the system.
4. The outlet/bypass structure elevations are per the approved plan.
5. The outlet structure is located per the approved plans.
6. Trash rack is provided on the outlet/bypass structure.
7. All slopes are grassed with permanent vegetation.
8. Vegetated slopes are no steeper than 3:1.
9. The inlets are located per the approved plans and do not cause short-circuiting of the system.
10. The permitted amounts of surface area and/or volume have been provided.
11. Required drawdown devices are correctly sized per the approved plans.
12. All required design depths are provided.
13. All required parts of the system are provided, such as a vegetated shelf, and a forebay.
14. The overall dimensions of the system, as shown on the approved plans, are provided.
cc: NCDENR-DWQ Regional Office
Tony Roberts,.New Hanover County Building Inspector
7
TE 00000'
State,Stormwater Management' Systems
PermiVNo. SW8'0V 102'
Bolton Parking` Expansion
Stormwater Pr0ject,N0'. SW8.011102
New.Hariovee County
Engineer's Certification
I, R>iillip G: Tripp , as'a duly registered Professional•Engineer in the State of
North C&o.Iin0,'h0ving tie"en authorized to observe (periodicall, 10f l yl# e) . the
construction of the project,,
Bolton Parking Expansion, .(Project)
for 'Haeriss-Murr Association (Project` Owner) hereby" state.that; .to the best of my
abilities, "due.care and diligence was -used -in -the .observbtior< af'ihe�pepject construction such
thatAhe construction was observed to'be built within'substantial .compliance and "intent ofithe
-apgroved plans-and;specifications:
The checklist.of items on�page 2'of this"'form.is included in the Certification.
.Noted deviations from approved, plans:a66specifications
,.
Signature
Registratic
Date -��7, ! ` • : j� _
SEAL
` tAL
s-o '17374'
..�'� jpt. ,DINE••, 't _,��
%ECEIVE
SAY 12 20%
BY:
State `Stormwater. Management Systems
Permit'No. SW8-0!`IiO2
<Eertification Requirements: 'Page° 2 -of 2,
I,. The.drainage area'to the.system contains.approximately, the,.permitted acreage.
2. The.drainage.area to the -system contains no mdrbe than the perrriitted'amount.
of built=upon.area.
3. All the built=upon area..associated with the project is graded..such that'ihe runoff
drains -to the -system..
4.. The outletlbypass structdre,efevations,are perctlie approved plan..
5: The outlet structure is located,pbr:the approved:plans..
6: Trash rack is: provided .on the outlet7bjipass'structure:
7. All slopes are,grassed with pernianent..vegetatibm.
a:. Vegetated slopes are no steeper than,3:1.
9, The inlets�are.located per the:approved.plans ;and{do not, cause, short=circuiting
of.the system`. '
10}. The permitted aYnounts.ofsurface area, andlor,volume,.have been provided.
11. Required`.drawdown devices are correctiy,s zed per the,approiled.pfaris:
'12: All requir6d design.depths are provided:
13'._ All mgdired. parts. of•the•'system are, provided; such as'a�vegetated shelf, and a
forebay:
Z1.4:. The overall dirriension of the system, as shown_'on'thelapproved plans .are.
provided.
Nelson, Christine
From: Nelson, Christine
Sent: Monday, May 12, 2014 9:38 AM
To: 'Tripp Engineering ', deanabass@clancytheys.com
Cc: t.mcguan@ctwilmington.com; Scott, Georgette; Phil Tripp'
Subject: RE: Bolton Parking Expansion - SW8 011102
Thank you!
Email correspondence to and from this address is subject to the North Carolina Public Records Low
and may be disclosed to third parties unless the content is exempt by statute or other regulation.
From: Tripp Engineering [mailtoarippeng@ec.rr.com]
Sent: Friday, May 09, 2014 10:01 AM
To: Nelson, Christine; dean abassoclancytheys.com
Cc: t.mcquan(abctwilmington.com; Scott, Georgette; 'Phil Tripp'
Subject: Bolton Parking Expansion - SW8 011102
Attached please find the Engineer's Certification for the Bolton Parking Expansion stormwater system (SW8 011102).
Please let us know if you need any additional information.
Thank you.
Della Baird
Tripp Engineering, P.C.
(p) 910.763.5100
(f) 910.763.5631
trippeng@ec.rr.com
NOTICE: This electronic correspondence and all attachments may contain privileged information intended only for the use of the
addressee. Any information contained within this correspondence is provided for your convenience. No assertion of accuracy is
made by Tripp Engineering, P.C. unless physical documents are obtained, sealed AND signed. User assumes all responsibility for use
of this digital information.