Loading...
HomeMy WebLinkAboutSW8010424_HISTORICAL FILE_20100624STORMWATER DIVISION CODING SHEET POST -CONSTRUCTION PERMITS PERMIT NO. SW-6QIU`t�� DOC TYPE El CURRENT PERMIT ❑ APPROVED PLANS I� C HISTORICAL FILE ❑ COMPLIANCE EVALUATION INSPECTION DOC DATE WYYMMDD �� ����.... NCDENR North Carolina Department of Environment and Division of Water Quality Beverly.Eaves Perdue Coleen H. Sullins Governor Director June 24, 2010 Mr. Elbert Dean Robbins Southeast Burgaw Properties, LLC 204 North Dickerson Street Burgaw, NC 28425 Subject: PERMIT RENEWAL REQUEST Stormwater Permit No. SW8 010424 Southeast Burgaw Properties Pender County Dear Mr. Robbins: Natural Resources Dee Freeman Secretary The Division of Water Quality issued a Coastal Stormwater Management Permit, Number SW8 010424 to Southeast Burgaw Properties for a High Density project on August 27, 2001. This permit expires on August 27, 2011. Per 15A NCAC 2H.1003(h) (the stormwater rules), applications for permit renewals shall be submitted 180 days prior to the expiration of a permit and must be accompanied by a processing fee, which is currently set at $505,00. If this is still an active project please complete and submit the enclosed renewal application prior to February 27, 2011, If this project has not been constructed and a permit is no longer needed, please submit a request to have the permit rescinded. If you have sold the project, or are no longer the permittee, please provide the name, mailing address and phone number of the person or entity that is now responsible for this permit. Enclosed is a form for change of ownership, which should be completed and submitted if the property has changed hands. Your permit requires that upon completion of construction and prior to operation of the permitted stormwater treatment system, a certification of completion be submitted to the Division from an appropriate designer for the type of system installed. This is to certify that the permitted facility has been installed in accordance with the permit, the approved plans, specifications and supporting documentation. Please include a copy of the certification with your permit renewal request and processing fee. Enclosed is a copy of a sample certification. Also enclosed is a new Operation and Maintenance agreement that should be completed and submitted along with your renewal application. You should be aware that failure to provide the Designer's Certification and the operation of a stormwater treatment facility without a valid permit, are violations of NC General Statute 143-215.1 and may result in appropriate enforcement action including the assessment of civil penalties of up to $10,000 per day. If you have any questions, please feel free to contact David Cox at 910-796-7318. Sincerely, d=Eer Supervisor Surface Water Protection Section Wilmington Regional Office Enclosures GDSldwc S:IWQSIStormwaterlRenewal\Requests120011010424,jun10 i cc: Wilmington Regional Office File Wilmington Regional Office 127 Cardinal Drive Extension, Wilminglon, North Carolina 28405 One 1 Phone: 910-796-72161 FAX: 910-350-20041 Customer Service: 1-877-623-6746' NQ rt[L 1 Carol i n a internet:www.ncwaterquality.org ;Va` L uri "J l , An Equal Opportunily 1AflinnaliveAolion Employer I State Stormwater Management Systems Permit No. SW8 010424 STATE OF NORTH CAROLINA DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES DIVISION OF WATER QUALITY STATE STORMWATER MANAGEMENT PERMIT HIGH DENSITY DEVELOPMENT In accordance with the provisions of Article 21 of Chapter 143, General Statutes of North Carolina as amended, and other applicable Laws, Rules, and Regulations PERMISSION IS HEREBY GRANTED TO Southeast Burgaw Properties, LLC Southeast Burgaw Properties Pender County FOR THE construction, operation and maintenance of a wet detention pond in compliance with the provisions of 15A NCAC 2H .1000 (hereafter referred to as the "stormwater rules') and the approved stormwater management plans and specifications and other supporting data as attached and on file with and approved by the Division of Water Quality and considered a part of this permit. This permit shall be effective from the date of issuance until August 27, 2011 and shall be subject to the following specified conditions and limitations: 1. DESIGN STANDARDS This permit is effective only with respect to the nature and volume of stormwater described in the application and other supporting data. 2. This stormwater system has been approved for the management of stormwater runoff as described on page 3 of this permit, the Project Data Sheet. The stormwater control has been designed to handle the runoff from 106,263 square feet of impervious area. This pond must be operated with a vegetated filter. Approved plans and specifications for this project are incorporated by reference and are enforceable parts of the permit. 4. The tract will be limited to the amount of built -upon area indicated on page 3 of this permit, and per approved plans. 5. The built -upon area for the future development is limited to NIA. 6. The runoff from all built -upon area within the permitted drainage area of this project must be directed into the permitted stormwater control system. A permit modification must be submitted and approved prior to the construction of additional built -upon area from outside of the approved drainage area. 2 State Stormwater Management Systems Permit No. SW8 010424 Project Name: Permit Number: Location: Applicant: Mailing Address: DIVISION OF WATER QUALITY PROJECT DESIGN DATA SHEET Southeast Burgaw Properties SW8 010424 Pender County Application Date: Name of Receiving Stream/Index #: Classification of Water Body: If Class SA, chloride sampling results: Pond Depth, feet: Permanent Pool Elevation, FMSL: Drainage Area, acres: Total Impervious Surfaces, ft2: Offsite Area entering Pond, ft2: Required Surface Area, ft2: Provided Surface Area, ft2: Required Storage Volume, ft': Provided Storage Volume, ft3: Temporary Storage Elevation, FMSL: Controlling Orifice: Mr. Elbert Dean Robbins, President Southeast Burgaw Properties, LLC 204 N. Dickerson Street Burgaw, NC 28425 July 12, 2001 Cape Fear IUT Turkey Creek / 18-74-54 "C Sw" nla 5.5 20 5 1063263 None, per Engineer 6,594 12,276 10,714 11,538 21 1.25"tp pipe 3 State Stormwater Management Systems Permit No. SW8 010424 I1. SCHEDULE OF COMPLIANCE The stormwater management system shall be constructed in it's entirety, vegetated and operational for its intended use prior to the construction of any built -upon surface. 2. During construction, erosion shall be kept to a minimum and any eroded areas of the system will be repaired immediately. The permittee shall at all times provide the operation and maintenance necessary to assure the permitted stormwater system functions at optimum efficiency. The approved Operation and Maintenance Plan must be followed in its entirety and maintenance must occur at the scheduled intervals including, but not limited to: a. Semiannual scheduled inspections (every 6 months). b. Sediment removal. C. Mowing and revegetation of side slopes. d. Immediate repair of eroded areas. C. Maintenance of side slopes in accordance with approved plans and specifications. f. Debris removal and unclogging of outlet structure, orifice device and catch basins and piping. g. Access to the outlet structure must be available at all times. 4. Records of maintenance activities must be kept and made available upon request to authorized personnel of DWQ. The records will indicate the date, activity, name of person performing the work and what actions were taken. 5. Decorative spray fountains will not be allowed in the stormwater treatment system. 6. The facilities shall be constructed as shown on the approved plans. This permit shall become voidable unless the facilities are constructed in accordance with the conditions of this permit, the approved plans and specifications, and other supporting data. 7. Upon completion of construction, prior to issuance of a Certificate of Occupancy, and prior to operation of this permitted facility, a certification must be received from an appropriate designer for the system installed certifying that the permitted facility has been installed in accordance with this permit, the approved plans and specifications, and other supporting documentation. Any deviations from the approved plans and specifications must be noted on the Certification. 8. If the stormwater system was used as an Erosion Control device, it must be restored to design condition prior to operation as a stormwater treatment device, and prior to occupancy of the facility. 9. A modification must be permitted prior to any construction. The following items will require a modification to the permit. The Director may determine that other revisions to the project should require a modification to the permit: a. Any revision to the approved plans, regardless of size. b. Project name change. C. Transfer of ownership. d. Redesign or addition to the approved amount of built -upon area. C. Further subdivision, acquisition, or sale of the project area. The project area is defined as all property owned by the permittee, for which Sedimentation and Erosion Control Plan approval was sought. f. Filling in, altering, or piping of any vegetative conveyance shown on the approved plan. 10. A copy of the approved plans and specifications shall be maintained on file by the Permittee for a minimum of ten years from the date of the completion of construction. CI State Stormwater Management Systems Permit No. SW8 010424 I i . The permittee shall submit final site layout and grading plans for any permitted future areas shown on the approved plans, prior to construction. If the proposed BUA exceeds the pemitted amount, a modification to the permit must be submitted and approved prior to construction. 12. Prior to the sale of any portion of the property, an access/maintenance easement to the stormwater facilities shall be granted in favor of the permittee ifaccess to the stormwater facilities will be restricted by the sale of any portion of the property. 13. The permittee is responsible for verifying that the proposed built -upon area does not exceed the allowable built -upon area. 14. The Director may notify the permittee when the permitted site does not meet one or more of the minimum requirements of the permit. Within the time frame specified in the notice, the permittee shall submit a written time schedule to the Director for modifying the site to meet minimum requirements. The permittee shall provide copies of revised plans and certification in writing to the Director that the changes have been made. 15. The permittee shall notify the Division of any name, ownership or mailing address changes within 30 days. Ill. GENERAL CONDITIONS This permit is not transferable. In the event there is a desire for the facilities to change ownership, or there is a name change of the Permittee, a formal permit request must be submitted to the Division of Water Quality accompanied by an application fee, documentation from the parties involved, and other supporting materials as may be appropriate. The approval of this request will be considered on its merits and may or may not be approved. Failure to abide by the conditions and limitations contained in this permit may subject the Permittee to enforcement action by the Division of Water Quality, in accordance with North Carolina General Statute 143-215.6A to 143-215.6C. The issuance of this permit does not preclude the Permittee from complying with any and all statutes, rules, regulations, or ordinances which may be imposed by other government agencies (local, state, and federal) which have jurisdiction. 4. In the event that the facilities fail to perform satisfactorily, including the creation of nuisance conditions, the Permittee shall take immediate corrective action, including those as may be required by this Division, such as the construction of additional or replacement stormwater management systems. The permittee grants DENR Staff permission to enter the property for the purpose of inspecting all components of the permitted stormwater management facility. 6. The permit may be modified, revoked and reissued or terminated for cause. The filing of a request for a permit modification, revocation and reissuance or termination does not stay any permit condition. 7. Unless specified elsewhere, permanent seeding requirements for the stormwater control must follow the guidelines established in the North Carolina I"rosion and Sediment Control Planning and Design Manual. Permit issued this the 27th day of August, 2001, NORTH CAROLINA ENVIRONMENTAL MANAGEMENT COMMISSION Gregory J. Thorpc, Ph.D., Acting Director Division of Water Quality By Authority of the Environmental Management Commission Permit Number SW8 010424 5 Entity Names http://www.secretary.state.nc.us/Corporations/Corp.asp?5033976 OF STATE Corporations Date: 8/27/2001 Document Filings Corporation Names Name Name Type SOUTHEAST BURGAW PROPERTIES, LLC Legal NC Limited Liability Company Information SOSID: 0499659 Status: Current -Active Name Date Formed: 7/12/1999 Citizenship: Domestic State of Inc.: NC Duration: JUN 2049 Registered Agent Principal Office Agent Name: YATES, JOHN M Address: Registered Office 402 N. Mcneil Street Principal Mailing Address: Burgaw NC 28425 Address: Registered Mailing PO Box 368 Address: Burgaw NC 28425 No Address Listed No Address Listed I of 1 8/27/2001 4:37 PM JOSEPH S. HILL, JR. AND ASSOCIATES CONSULTING ENGINEERS and PLANNERS 1602 HARBOUR DRIVE WILMINGTON, NORTH CAROLINA 28401 TELEPHONE 910-799-1544 FAX 910-799-1551 July 11, 2001 Ms. Linda Lewis NCDENR Division of Water Quality 127 Cardinal Drive Extension Wilmington, North Carolina 28405 Subject: Additional Information Stormwater Project No. SW8 010424 Southeast Burgaw Properties Pipe Storage Yard Pender County Dear Ms. Lewis: R E k". 7"]" " I V E D JUL 1 �'.2001 DWQ PROJ 0 SW Fo to 42.4- 1 In response to your letter of June 25, 2001, regarding the subject project, we submit the following information: 1. All pond contour dimensions (top, temporary pool, permanent pool) are shown inside parentheses interrupting the contour lines. A typical dimension is shown on the legend. The permanent pool dimensions are 60' x 180'. 2. The wetland species (smartweed) to be planted on the 6:1 shelf is shown on the stormwater pond detail on sheet #2. 3.. Ebert Dean Robbins is shown to be president of the LLC on the application and supplement. 4. The full name of the responsible contact person is Ebert Dean Robbins, as typed on the application and supplement. 5. Sediment removal depths on the supplement form have been corrected. Enclosed are three (3) copies of the plans and the revised application and supplement form. Please do not hesitate to contact me if you have any questions. Sincerely, JOSEPH S. HILL, JR. and ASSOCIATES ' JSH/pat Jos ph S. Hill, Jr., P.E. Attachments LEWIs.071101.doc North Carolina Department of Environment and Natural Resources Division of Water Quality Wilmington Regional Office Michael F. Easley, Governor William G. Ross, .Jr., Secretary June 25, 2001 Mr. Dean Robbins Southeast Burgaw Properties, LLC 204 N. Dickerson Street -Burgaw, NC '28425 NCDENR NORTH CAROLINA DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES Subject: REQUEST FOR ADDITIONAL INFORMATION Stormwater Project No. SW8 010424 Southeast Burgaw Properties Pipe Storage Yard Pender County Dear Mr. Robbins: The Wilmington Regional Office received a Stormwater Management Permit Application for Southeast Burgaw Properties Pipe Storage Yard on April 23, 2001. A preliminary review of that information has determined that the application is not complete. The following information is needed to continue the stormwater review: l . Please dimension the permanent pool contour. 2. Please specify (by name) the wetland species to be planted on the 6:1 shelf. 3. Please be accurate in reporting your title within the LLC. Most LLC's have presidents or managing members. The title of Partner/Owner indicates that the company is either set up as a partnership or a sole proprietorship. Please correct and revise on the application and supplement. 4. Your signature has another name in front of Dean. Please add this name to the name typed on the application and supplement. 5. The sediment removal depths reported on the supplement form exceed the pond's design depth. It appears that they have been reported as elevations rather than actual depths. Please revise. 127 Cardinal Dr. Ext., Wilmington, North Carolina 28405 Telephone 910-395-3900 FAX 910-350-2004 !1A An Equal Opportunity Affirmative Action Employer 50% recycled110% post -consumer paper Mr. Robbins June 25, 2001 Stormwater Project No. SWS 010424 ------------------------------------------- Please note that this request for additional information is in response to a preliminary review. The requested information should be received by this Office prior to July 25, 2001, or the application will be returned as incomplete. The return of a project will necessitate resubmittal of all required items, including the application fee. If you need additional time to submit the information, please mail or fax your request for a time extension to the Division at the address and fax number at the bottom of this letter. The request must indicate the date by which you expect to submit the required information. The Division is allowed 90 days from the receipt of a completed application to issue the permit. The construction of any impervious surfaces, other than a construction entrance under an approved Sedimentation Erosion Control Plan, is a violation of NCGS 143-215.1 and is subject to enforcement action pursuant to NCGS 143-215.6A. Please reference the State assigned project number on all correspondence. Any original documents that need to be revised have been sent to the engineer or agent. All original documents must be returned or new originals must be provided. Copies are not acceptable. If you have any questions concerning this matter please feel free to call me at (910) 395-3900. Sincerely, Linda Lewis Environmental Engineer RSS/arl: S:IWQSISTORMWATIADDINFOI0I04243UN cc: Linda Lewis Joseph Hill, P.E. SOUTHEAST BURGAW PROPERTIES, L.L.C. PENDER COUNTY STORMWATER MANAGEMENT CALCUALTIONS April 2001 RECEIVED APR 2 12001 PROJ # DG10 - 5. < Prepared Sy: JOSEPH S. HILL, JR. and ASSOCIATES CONSULTING ENGINEERS and PLANNERS 1602 Harbour Drive Wilmington, North Carolina 28401 (910)799-1544 TABLE OF CONTENTS 1. Detention Pond Calculations 2. Forebay Calculations 3. Outlet Protection Design - 18" 0 & 30" 0 4. Drainage Channel Calculations C:\My Qocuments\SE BURGAW PROPERTIES\STWTR CALC.doc SOUTHEAST BURGAW PROPERTIES, L.L.C. Stormwater Detention Pond Calculations Stormwater runoff from the project will be retained in a wet detention pond. This pond will store the runoff generated by 1 inch of rainfall. The stored runoff will be discharged over a period of 4.6 days. The pond area required to remove 90% of total suspended solids was calculated using the SA/DA Percentage Chart (see chart) for North Carolina coastal regions. Runoff Calculations Impervious Surfaces - Building Rooftop = 3,600 SF Gravel Street, parking, pipe Storage yard 102,663 SF Total Impervious Surfaces = 106,263 SF Total Area = 5.00 Ac. = 217,800 SF Total Pervious Area = 115,537 SF 1" Runoff from Impervious Surfaces = 0.0833' x 106,263 SF = 8,851 CF 1" Runoff from Pervious Surfaces = 0.2 x 0.0833` x 115,537 SF = 1.925 CF Total runoff to be stored in pond = 10,776 CF = 80,820 Gal. Detention Pond Calculations Pond Surface area @ Temporary Pool Elev. Of 20.0' = 12,276 SF Pond Surface area @ Permanent Pool Elev. Of 21.0' = 10,800 SF Average Pond Surface Area = 11538 SF Pond Storage Volume = 11,538 SF x 1.0' Depth = 11,538 CF 10,776 CF = 111538 CF = 0.93 Pond Storage Depth Required (use 1.0`) Total Watershed Area = 5.00 Ac. = 217,800 SF Impervious % = 106,263 SF = 217,800 SF = 48.8% Pond Depth = 5.5' C:\My Documents\SE BURGAW PR0PERT1ES\STWiR CALC.doc Southeast Burgaw Properties, L.I__.C. Stormwater Detention Pond Calculations Page.2 SA/DA % required for 90% solids removal @ 5.0' Depth (see chart) = 3.1% 3.1% x 5.00 AC. = 0.155 AC. = 6,752 SF Pond surface area @ Permanent Pool Elev. Of 20.0' = 10,800 SF Pond is therefore adequate for 90% TSS removal. Orifice Discharge -Rate Calculations Use 1.25" diameter orifice for outlet Calculate average discharge rate and time to lower orifice head from 1.0' to 0.9': 0.1' pond height x 11,538 SF average pond area x 7.5 ga/ft3 = 8,654 Gallons Storage Average head on orifice from 1.0' to 0.9' = 0.95' Average discharge rate @ 0.95' head: Q(GPM) = (449)c A-/2gh Q(GPM) = Volume discharge in gallons per minute c = discharge coefficient = 0.6 A = orifice area in square feet g = gravity = 32.2 h = head above center of gravity Q(GPM) _ (449)(.6)(.0085)-/(2)(32.2)(0.95) Q = 17.0 GPM Time required to lower pond 0.1' @ 0.65' average head: T = 8,564 Gal. 17.0 GPM = 478 17.9 GPM vs 478 minutes plotted on curve (see discharge curve). C:\My Documents\SE BURGAW PROPERTIES\STWTR CALC.doc Southeast Burgaw Properties, L.L.C. Stormwater Detention Pond Calculations Page 3 Discharge rate and time to lower head from 0.9' to 0.8': Q = 16.9 GPM T = 8,654 Gal. = 16.9 GPM = 512 minutes 16.9 GPM vs 990 minutes plotted on curve. Discharge rate and time to lower head from Offto 0.7': Q = 15.9 GPM T = 8,654 Gal. _ 15.9 GPM = 544 minutes 15.9 GPM vs 1,534 minutes plotted on curve. Discharge rate and time to lower head from 0.7' to 0.6': Q = 14.8 GPM T = 8,654 Gal. = 14.8 GPM = 585 minutes 14.8 GPM vs 2,119 minutes plotted on curve. Discharge rate and time to lower head from 0.6' to 0.5': Q = 13.6 GPM T = 8,654 Gal. = 13.6 GPM = 636 minutes 13.6 GPM vs 2,755 minutes plotted on curve. Discharge rate and time to lower head from 0.5' to 0.4': Q = 12.3 GPM T = 8,654 Gal. = 12.3 GPM = 703 minutes 12.3 GPM vs 3,458 minutes plotted on curve. Discharge rate and time to lower head from 0.4' to 0.3': Q = 10.9 GPM T = 8,654 Gal. = 10.9 GPM = 794 minutes 10.9 GPM vs 4,342 minutes plotted on curve. Discharge rate and time to lower head from 0.3' to 0.2': Q = 9.2 GPM T = 8,654 Gal. = 9.2 GPM = 940 minutes 9.2 GPM vs 5,282 minutes plotted on curve. Discharge rate and time to lower head from 0.2' to 0.1': Q = 7.1 GPM T = 8,654 Gal. = 7.1 GPM = 1,219 minutes 7.1 GPM vs 6,501 minutes plotted on curve. C:\My Documents\SE BURGAW PROPERnES\STWTR CALC.doc Southeast Bur_ ag w Properties, L.L.C. Stormwater Detention Pond Calculations Page 4 Discharge rate and time to lower head from 0.1' to 0.0': Q=4.1GPM T = 8,654 Gal. �- 4.1 GPM = 2,111 minutes 4.1 GPM vs 8,612 minutes plotted on curve. The outlet structure will discharge the total calculated runoff volume of 80,820 gallons in approximately 4.6 days (see Orifice Discharge Curve). C:�My Documents\SE BURGAW PROPERTIES\STWTR CALC.doc SA/DA - 85% TSS REMOVAL WITH 30' VEGETATIVE FILTER IMPER.% 3.OFT 3.5FT 4.OFT 4.5FT 5.OFT 5.5FT 6.OFT 6.5FT 7.OFT 7.5FT 10% .9 .8 .7 .6 .5 20% 1.7 1.3 1.2 1.1 1.0 .9 .8 .7 .6 .5 30% 2.5 2.2 1.9 1.8 1.6 1.5 1.3 1.2 1.0 .9 40% 3.4 3.0 2.6 2.4 2.1 1.9 1.6 1.4 1.1 1.0 50% 4.2 3.7 3.3 3-.0 2.7 2.4 2.1 1.8 1.5 1.3 60% 5.0 4.5 3.8 3.5 3.2 2.9 2.6 2.3 2.0 1.6 70% 6.0 5.2 A.5 4.1 3.7 3.1 2.9 2.5 2.1 1.8 80% 6.8 6.0 5.2 4.7 4.2 3.7 3.2 2.7 - 2.2 2.0 90% 7.5 6.5 5.8 5.3 4.8 4.3 3.8 3.3 2.8 1.3 100% 8.2 7.4 6.8 6.2 5.6 5.0 4.A 3.8 3.2 2.6 SA/DA - > 90% TSS REMOVAL FOR WET DETENTION WITHOUT VEGETATIVE FILTER IMPER A 3.OFT 3.5FT 4.OFT 4.5FT 5.OFT 5.5FT 6.OFT 6.5FT 7.OFT 7.5FT 10% 1.3 1.0 .8 .7 .6 .5 .4 .3 .2 .1 20% 2.4 2.0 1.8 1.7 1.5 1.4 1.2 1.0 .9 .6 30% 3.5 3.0 2.7 2.5 2.2 1.9 1.6 1.3 1.1 .8 40% 4.5 4.0 3.5 3.1 2.8 2.5 2.1 1.8 1.4 1.1 50% 5.6 5.0 4.3 3.9 3:5 3.1 2.7 2.3 1.9 1.5 60% 7.0 6.0 5.3 4.8 4.3 3.4 2.9 2.4 1.9 70°% 8.1 7.0 6.0 5.5 5.0 14.5 3.9 3.4 2.9 2.3 80% 9.4 8.0 7.0 6.4 5.7 5.2 4.6 4.0 3.4 2.8 90% 10.7 9.0 7.9 7.2 6.5 5.9 5.2 4.6 3.9 3.3 100% 12.0 10.0 8.8 8.1 7.3 6.6 5.8 5.1 4.3 3.6 5R 20 16 WA 9 D L I -rv N Pr) f 7. Q C- PPIOT79 MIN, 6, 9 C-Pllq CO) 17 q 0 m I 1q, 0 C, P 11 C'v 2- 1! C, m 11,;' 6 q C- P-'('; 0G '14 1 I'v, ell 7.) 6: pm CI 6 -5-0/ am, DAY I pAY2 1) A 31 PAY 9 /.1 y 5- Op- 1 pie E. plsCH4fzc-c goo a.41-. 5rOR--'b ?0 GAL R UAI Ogr 11V 1/—. 6 1>4 L? 5 1,0 0 D Z' 3 1) 0 Southeast Burgaw Properties, L.L.C. Stormwater Detention Pond Calculations Page 7 Forebay Calculations Provide approximately 20% of Total Pond volume including area of forebay construction and temporary pool volume: Permanent Pool Volume: Permanent Pool Area @ Elev. 20.0' = 10,800 SF Pond Area @ Elev. 14.5' = 1,300 SF Pond Average Area — 6,050 SF 6,050 SF x 5.5' depth = 33,275 CF Permanent Pool Volume Temporary Pool Volume = 11,538 CF Total Pond Volume = 44,813 CF Forebay Volume: Forebay Area @ Elev. 21.0' = 3,300 SF Forebay Area @ Elev. 17.0' = 11344 SF Forebay Average Area = 2,322 SF 2,322 SF x 4.0' Depth -- 9,288 CF Forebay Volume 9,288 CF = 44,813 CF = 20.7% Forebay = 20.7% of Permanent Pond Volume C:\My Documents\SE SURGAW PROPERTIES\STWT'R CALC.doc SOUTHEAST BURGAW PROPERTIES, L.L.C. Erosion Control Plan Outlet Protection Design 18" 0 Pipe Outlet Use attached Nomographs to determine Rip Rap size and Rip Rap apron configuration for 18" 0 RCP discharging'to detention pond. Design Criteria: 1. Flow = 12 CFS; 18" 0 outlet pipe 2. Assume minimum tailwater conditions; no defined channel. Pipe Diameter = Do = 1.5' Apron Length = La = 12' (from Nomograph) Upstream Apron Width = W„ = 3 x Da = 3 x 1.5' = 4.5' Downstream Apron Width = Do + La = 1.5' + 12' = 13.5' Min. Median Stone Size = D5o = 0.2' Min. (from Nomograph) (See attached Rip Rap Blanket Configuration - Plan View) Select "Class B" Stone (minimum) 5" - 15" Apron Thickness = 1.5 x dmax = 1.9' C:\My DocumenLs\SE BURGAW PR0PERTIE5\ER0SI0N\ER0S CALC.doc - 5 - 7.54 Erosion and Sediment Control Handbook I ' 1 I Outlet Y^I- . OIPe � � _"', aPt°' 25 diameter 0. Prot �\\- �m\erg °t-0. 70 20 _\e a9�r Fn `gym- t5 50 1.4 m 40 v chi a 1.3 4 1.2 7 10 30 � I o-In- a •° t.l n � y r I IZ r 5T20 Lq m G.7 0� 0 ¢' i n tia 5° 2.N 0.6 EL -0 5 0.4 x� a n SD V I I I I ! I I I f I I I 1 I I 0 3 5 220 5G too 200 Soo 1000 006� I Discharge,h3lsec �. O.t 0.2 0.30.4 0.6 0.8 1 2 3 4 5 6 7 8 10 15 20 25 0+scharge, m3/sec Fig. 7.45 Design of riprap outlet protection from a round pipe flowing full; minimum tailwater conditions. (6, 14) t i to find the riprap size and apron length. The apron width at the pipe end should j be 3 times the pipe diameter. Where there is a well-defined channel immediately downstream from the apron, the width of the downstream end of the apron j should be equal to the width of the channel. Where there is no well-defined char- nel immediately downstream from, the apron, minimum tailwater conditions i apply and the width of the downstream end of the apron should be equal to the s pipe diameter plus the length of the apron. i i EXAMPLE 7.4 Riprap Outlet Protection Design Calculation for Minimum t Tailwater Condition Given: A flow of 6 ft'/sec (0.17 m'/sec) discharges from a 12-in (30-cm) pipe onto a 2 percent grassy slope with no defined channel. i Find: The required length. width, and median stone size dso for a riprap apron. Water Conveyance and Energy Dissipation 7.57 ment. However, to simplify our calculations, we will assume that both i and A remain constant. Therefore, the postdevelopment runoff is 0.6 ( 0.6 0.3 (20 ft3/sec) = 40 ft3/sec 0.3 (0.57 m3/sec) — 1.14 m3/sec This Sow will exceed the natural capacity of the stream. it may erode the streambank and cause flooding problems. STEP 3. Determine how to accommodate the postdevelopment flow in a nonerasive man- ner. There are several ways we could handle the increased flow. We could further divide the subdivision so that approximately one-half drains into the stream and one-half Do _ /. W (max. TM W (min. TW) Fig. 7.47 Riprap blanket configuration for outlet protec- tion; see the reference for design details. (2) 1 FIGURE 6 SIZES FOR RI?PAP ANO EROSION CONTROL STONE - N.C. Departmenc of Transportation Specifications - C'_ass 1 to 200 lbs. 30: weigh a minimum of 60 lbs. each - No more than 10z shall weigh less than 15 lbs. ea. Class 2 25 to 250 lbs. - 60Z shall weigh a minimum of 100 lbs. each No more than 5z shall .weigh less than 50 lbs. each. *Notan NC -DOT Standard Specification (Sur9G ��ont' Class Class A B I .2et to b„ 5" to 1 5„ �1 S, J tL { S1 300 _.: s i I -10z tolerance top b bottom sizes - No grada- -No grada- tion tion specified specified NORTH CAROLINA AGGREGATES ASSOCIATION P. 0. 80X 30601 • RALEIGH• NC I762z PHONE 1914} 787.7055 T Percen Passin.. Or use No. G scone, i.e., 1�" to 3 / y 11 Also, Class 2-6", ma e c Page 17 SOUTHEAST BURGAW PROPERTIES, L.L.C. Erosion Control Plan Outlet Protection Design 30" 0 Pipe Outlet Use attached Nomograph to determine Rip Rap size and Rip Rap apron configuration for 30" 0 pipe outlet to offsite drainage. (Q = 26 CFS) Design Criteria: 1. 30" 0 RCP outlet pipe with 26 CFS discharge. 2. Assume maximum tailwater conditions; well-defined channel. Pipe Diameter = Do = 2.5' Apron Length = La = 12' (from Nomograph) Upstream Apron Width = Wu = 3 x Do = 3 x 2.5 = 7.5' Downstream Apron Width = Do + .44 = 2.5 + 4.8 = 7.3' min. Median Stone Size = d5o = 0.2' min. (from Nomograph) (See attached Rip Rap Blanket Configuration - Plan View) Select "Class B" Stone (minimum) 5" - 15" Apron Thickness = 1.5 x dmax = 19" C:\My Documents\SE BURGAW PROPERTIES\EROSION\EROS CALC.doc - 6 - r Water Conveyance and Energy Dissipation 30. Outlet pipe 5 ; wy ' 0, + 0.4 L, diameter OL L, -' 30 �` 1 �aQ `6c 90 o Q 25 ova SO �� as 60 r 15 r- 50 40 10 30 120 a" 10 m 7.55 jry C) m I CO e o w^��ri n 11.0 h n, u CO rrv-p-rr I'r -� a � 5 I 1 E a I 213 i 0.6 0.4 N fl.5 .N b—p.�}� c��'ro��oV1��0 of��i`O , ♦J.3 a 70,1 3 5 10 2r l 50 100 200 500 loco F j " Discharge, ,t3/sec .1 .2 .3 ,4 .S.o.;.8.9t 2 3 a 5 6 73 10 15 20 25 Discharge, mJ/sec Fig. 7.46 Design of riprap outlet protection from a round pipe flowing full; maximum tailwater conditions. (6, 14) Solution_ Since the pipe discharges onto a flat area with no defined channel, a mini- mum tailwater condition"ian be assumed. By Fig. 7.45. the apron length L, and median stone size d,a are 10 ft (3 m) and 0.3 ft (9 cm), respectively. The upstream apron width Wu equals 3 times the pipe diameter D,. W =3XD, s 3(1 it) = 3 ft (3(0.3 m) = 0.9 mj The downstream apron width Wd equals the apron length plus the pipe diameter: W,,j = D, + L, alft-Loft=11ft (0.3 m + 3.0 m — 3.3 m) Note: When a concentrated flow is discharged onto a slope (as in this example), gul- lying can occur downhill from the outlet protection. The spreading of concentrated flow 30 "'4 z c Water Conveyance and Energy Dissipation 7.57 meat. However, to simplify our calculations, we will assume that both i and A remain constant. Therefore, the postdevelopment runoff is 0.6 0.3 (20 ff/sec) - 40 ft'/sec l 0,3 0.6 (0.57 m'/sec) — 1.14 m'/sec k This flow will exceed the natural capacity of the stream. It may erode the streambank and cause flooding problems. STEP 3. Determine how to accommodate the postdevelopment flow in a nonerosive man- ner. There are several ways we could handle the increased flow. We could further divide the subdivision so that approximately one-half drains into the stream and one-half �.. F W {max. TW] = �. 3' W (min. TW) Fig. 7.47 Riprap blanket configuration for outlet protec- tion; see the reference for design details. (2) -:;5 0 // 1Z4 P OCAS �; � :7J�RINf�GE CH.f-!✓1JEL TRAPEZOIDAL CHANNEL ANALYSIS RATING CURVE COMPUTATION February 2, 2001 PROGRAM INPUT DATA DESCRIPTION VALUE Channel Bottom Slope(ft/ft)................................ 0.0005 Manning's Roughness Coefficient (n-value)................... 0.02 Channel Left Side Slope (horizontal/vertical)............... 2.0 Channel Right Side Slope (horizontal/vertical).............. 2.0 Channel Bottom Width(ft).............0.....4............... 2.0 Minimum Flow Depth(ft)...................................... 0.2 Maximum Flow Depth(ft)..................................... 2.2 Incremental Head(ft)....................................... 0.2 COMPUTATION RESULTS Flow Flow Flow Froude Velocity Energy Flow Top Depth Rate Velocity Number Head Head Area Width (ft) (cfs) (fps) (ft) (ft) (sq ft) (ft) ---------------------------------------------------------------------- 0.2 0.24 0.5 0.214 0.004 0.204 0.48 2.8 0.4 0.83 0.74 0.233 0.008 0.408 1.12 3.6 0.6 1.76 0.92 0.245 0.013 0.613 1.92 4.4 0.8 3.08 1.07 0.253 0.018 0.818 2.88 5.2 1.0 4.82 1.21 0.26 0.023 1.023 4.0 6.0 1.2 7.03 1.33 0.266 0.028 1.228 5.28 6.8 1.4 9.73 1.45 0.271 0.033 1.433 6.72 7.6 1.6 12.97 1.56 0.276 0.038 1.638 8.32 8.4 1.8 16.18 1.66 0.28 0.043 1.843 10.08 9.2 2.0 21.2 1.77 0.284 0.048 2.048 12.0 10.0 2.2 26.26 1.86 0.288 0.054 2.254 14.08 10.8 HYDROCALC Hydraulics for Windows, Version 1.2a Copyright (c) 1996 Dodson & Associates, Inc., 5629 FM 1960 West, Suite 314, Houston, TX 77069 Phone: (281) 440-3787, Fax: (281) 440-4742, Email:software@dodson-hydro.com All Rights Reserved. F L 0 ;;.72,Gc7, r 0/F9'�-157`����; DRA1A1r?GE Gti.=,(j,1)E�- (ZC, Cr-5 ?o57--D6+lEL�PMFA)7- gul1oFr) ,2-00-FI UII'1/,' P,40766F evN 0FF 4 JOSEPH S. HILL, JR. AND ASSOCIATES CONSULTING ENGINEERS and PLANNERS 1602 HARBOUR DRIVE WILMINGTON, NORTH CAROLINA TELEPHONE 910-799-1544 `f./ O / April 17, 2001 Ms. Linda Lewis N.C.D.N.R. 127 Cardinal Drive Extension Wilmington, North Carolina 28405 Subject: Stormwater Management Plan Southeast Burgaw Properties, L.L.C. Pender County Dear Ms. Lewis: MAILING ADDR.Mi POST OFFICE BOX 5592-STA I WILMINGTON, NC 28403-4155 RECEIVED APR 2 3 2001 DWQ PROD # _1f� a.�a_� Enclosed are three (3) copies of the Stormwater Management Plan, calculations and specifications, a permit application, and a check in the amount of $420.00 for the application fee for Southeast Burgaw Properties, L.L.C. Please review the plan as soon as possible. Please do not hesitate to contact me if you have any questions. Sincerely, JOSEPH S. HILL, JR. and ASSOCIATES Akw JSH/pat Jose S. Hill, Jr., P.E. Attachments LEWISO41701.doc SOUTHEAST BURGAW PROPERTIES, L.L.C. Stormwater and Erosion Control Plan Project Description Southeast Burgaw Properties, L.L.C., is a proposed storage yard for storm drainage pipe. The site is an industrial tract approved by Pender County and comprises a relatively flat former farm field of 5.0 acres. Offsite runoff crosses the site from the adjacent 5.0 acre tract, which will be developed to a lower density than the project according to conversations with the owner of the adjacent tract. The existing ditch across the project will be piped to accommodate this offsite drainage. All offsite drainage will be excluded from the stormwater/sediment control pond. The site will be covered by one building and a compacted gravel street, parking, and pipe storage area. Total impervious area is 2.44 acres. All flow from impervious surfaces, as well as pervious surfaces, is routed into a pond for treatment and settling prior to discharging from the site. Pipes and drainage structures routing flow to the pond are sized for the 10-year event. Outfall pipes and structures are sized for the 100-year event. The pond will serve as a temporary sediment control pond during construction, then as a permanent Stormwater management pond. The pond water control structure will allow storage of 1" rainfall on the site and release the stored rainfall over a period of approximately 4.6 days. RECEIVED APR 2 3 '2001 DWQ PROJ # C:\My aocuments\SE BURGAW PR0PERnES\\PR0J OESC.doc