Loading...
HomeMy WebLinkAboutSW8010216_COMPLIANCE_20010314STORMWATER DIVISION CODING SHEET POST -CONSTRUCTION PERMITS PERMIT NO. SW D IOC ((O DOC TYPE I ❑ CURRENT PERMIT ❑ APPROVED PLANS ❑ HISTORICAL FILE COMPLIANCE EVALUATION INSPECTION DOC DATE YYYYMMDD DETENTION POND ANALYSIS FILE NAME: S:IWQSIPOND1010216.WK1 PROJECT #: SW8 010216 PROJECT NAME: Clarendon Office Park REVIEWER: Lewis DATE: 14-Mar-2001 Receiving Stream: Woodward Branch Class: C Sw HQW Chlorides: n/a Drainage Basin: Lumber Index No. 15-25-2-8 Site Area 2.97 acres Drainage Area 101713 O;Isquare feet Area in Acre 2.34 IMPERVIOUS AREAS Rational C Building 4992.00 square feet Parking 28000.00 square feet Sidewalks 5340.00 square feet Future 26560.00 square feet square feet square feet TOTAL �_..... ;:64892 Q0 square feet Rational Cc= 0.07 SURFACE AREA CALCULATION % IMPERVIOUS 63.80% Des. Depth 5 TSS: 90 SA/DA Ratio 4.57% Req. SA 4644 sf Prov. SA 477.2` sf VOLUME CALCULATION * place a "1" in the box if Rational is Used Rational ?" Des. Storm ':' 1'`!001 inches Rv= 0.62 Bottom 10 msl Perm, Pool 15 00 msl Design Pool 16.1 msl Design SA 5828 sf Req. Volume 5291 cf Prov. Volume ! 5830 cf ORIFICE CALCULATION Avg. Head = Flow Q2, cfs Flow Q5, cfs No. of Orifices Diameter or Weir Dimensions FOREBAY Perm. Pool Volume= Req. Forebay Volume= Provided Volume= Percent= SA @ - Elevation= Q2 Area = 1.26 in2 Q5 Area = 0.50 in' Orifice Area 0.99 in' Q= 0.024 cfs 10847 2169.4 1996.00 18.4 6, :..:.....................::I Drawdown> „2 5.days COMMENTS Surface Area , Volume and Orifice are within Design Guidelines