Loading...
HomeMy WebLinkAboutSW8001019_HISTORICAL FILE_20001013STORMWATER DIVISION CODING SHEET POST -CONSTRUCTION PERMITS 7PERMITNO. DOC TYPE ❑CURRENT PERMIT ❑ APPROVED PLANS HISTORICAL FILE C ❑ COMPLIANCE EVALUATION INSPECTION DOC DATE- �Jl> WYYMMDD == Andrew & Kuske CONSULTING ENGINEERS, INC. John R. Andrew, P.E: J.A. Kuske, P.E. J. Phillip Norris, P.E. 902 Market St. • Wilmington, North Carolina 28401-4733 • Telephone 910/343-9653 • Fax 910/343-9604 • okengnrs®wilmington.net October 13, 2000 Ms. Linda Lewis NC DENR Division of Water Quality 127 Cardinal Drive Extension Wilmington, NC 28405-3845 RECEIVED OCT 16 2000 BY: Re: The Office Building at Third & Grace New Hanover County State Stormwater Permit Submittal A&K Project No. 00191 Dear Ms. Lewis: Enclosed are two sets of plans for the subject project, one set of calculations, the original Division of Water Quality stormwater management permit application, and one copy, one copy of the SWU-107 supplement form, one copy of the stormwater narrative and a $420.00 check for the processing fee. Please review this information for approval and contact us with any questions or comments you may have. Thank you for your assistance on this project. Sincerely, ANDREW & KUSKE CONS G ENGINEERS INC. J. Phillip Norris, P. N/cif 00191-101300swl Enclosures cc: R. Bertram Williams, III Dan Saltrick / Boney Architects ®gy�pp NCDENR North Carolina Department of Environment and Natural Resources Division of Water Quality Beverly Eaves Perdue Charles Wakild, P. E. Governor Director September 14, 2012 R. Bertram Williams, III, Manager Third & Grace, LLC 2134 Gloucester Place Wilmington, NC 28403 Subject: State Stormwater Management Permit Reference Notice of Deficiency NOD-2012-0037 The Office Building at Third and Grace Stormwater Project No. SW8 001019 New Hanover County Dear Mr. Williams: Dee Freeman Secretary As of this date, the deficiencies outlined in the subject Notice of Deficiency NOD-2012- 0037, dated August 6, 2012, have been resolved. The Division received the required Designer's Certification on August 13, 2012, and processed an owner name change and mailing address change on September 14, 2012, to Third & Grace, LLC, as reflected in the 2012 Tax Records for New Hanover County. All terms and conditions of the permit issued on January 29, 2001, attached, remain in full force and effect. As a reminder, on August 5, 2009, the Governor signed Session Law 2009-406. This law impacts any development approval issued by the Division of Water Quality under Article 21 of Chapter 143 of the General Statutes, which is current and valid at any point between January 1, 2008, and December 31, 2010. The law extends the effective period of any stormwater permit that is set to expire during this time frame to three (3) years from its current expiration date. On August 2, 2010, the Governor signed Session Law 2010-177, which grants an extra year for a total of four (4) years extension. Please note that the expiration date of the permit is now January 29, 2015, which reflects this four year extension. Please submit your renewal application and fee at least 180 days prior to the expiration date, which will be July 29, 2014. Please note that the permit is not transferable to any person or entity except after notice to and approval by the Director. Please submit a completed and signed Name/Ownership Change Form, accompanied by the supporting documentation as listed on the form, to the Division of Water Quality at least 60 days prior to any one or more of the following events- a. An ownership change including the sale or conveyance of the project area in whole or in part, except in the case of an individual lot sale that is made subject to the recorded deed restrictions; b. The sale or conveyance of the common areas to a Homeowner's or Property Owner's Association. A permit transfer to an HOA or POA can only be approved under the following conditions: i. The Association is legally formed and financially able to carry out the maintenance requirements of the permit; ii. The project is in compliance with the permit, as determined by a DWQ file review and inspection. Wilmington Regional Office 127 Cardinal Drive Extension, Wilmington, North Carolina 28405 One Phone: 910-796-72151 EAK 910-350-20041 DEN Assistance: 1-877-623-6748 NprthCarolina Internet, www.ncwaterquality.org ']►'antral _. (% V "� State Stormwater Management Systems Permit No. SW8 001019 C. Bankruptcy; d. Foreclosure; e. Dissolution of the partnership or corporate entity; f. A name change of the current permittee; g. A name change of the project; h. A mailing address change of the permittee; If you have any questions, please do not hesitate to call Linda Lewis at (910) 796-7301 or email at linda.lewis.(U)ncdenr.gov_. Sin rely, Z � CYCC�4 eorgette Scott Stormwater Supervisor GDSlarl: SAWWStormwaterTermits & Projects120001001019 HD12012 09 permit 001019 cc: Phil Norris, P.E., Norris & Tunstall City of Wilmington Public Services Karen Higgins, WSBCU Wilmington Regional Office Stormwater File Page 2 of 9 New Hanover County - 4.- Page 1 of 1 PARID.R04817-002-012-000 THIRD & GRACE LLC Parcel Alt ID Address Unit City Zip Code Neighborhood Class Land Use Code Living Units Acres Zoning Legal Legal Description Tax District Owners Owner City State Country Zip 300 3RD ST N 311708.Sg.6812,000 300 N 3RD ST WILMINGTON CHBBO COM-Commercial 601-Finance Banks 1.8261 CBD-CENTRAL BUSINESS DIS PT OF LTS 1 2 3 ALL OF 4 5 BLK 206 WILMINGTON (1.63 AC) WM THIRD & GRACE LLC WILMINGTON NC 28403 THE DATA IS FROM 2012 VA, m http://etax.nhcgov.com/Forms/llrintDatalet.aspx?pin=R04817-002-012-000&gsp=PROFILE... 8/3/2012 North Carolina Secretary of State Page I of I North Carolina Elaine F. Marshall DEPARTMENT OF THE Secretary SECRETARY OF STATE PO Box 29622 Raleigh, NC 27626-0622 (919)807-2000 Date: 8/3/2012 Click here to: View Document Filings I File an Annual Report JPrint a Pre -populated Annual Report Fillable PDF Form I Amended A Previous Annual Report I Corporation Names Name Name Type NC THIRD & GRACE, LLC LEGAL Limited Liability Company Information SOSID: 0572758 Status: Current -Active Effective Date: 12/6/2000 Annual Report Due Date: Citizenship: DOMESTIC State of Inc.: NC Duration: 12/31/2050 Annual Report Status: CURRENT Registered Agent Agent Name: WILLIAMS, R. BERTRAM, III Office Address: 2134 GLOUCESTER PLACE WILMINGTON NC 28403 Mailing Address: 2134 GLOUCESTER PLACE WILMINGTON NC 28403 Principal Office Office Address: 2134 GLOUCESTER PLACE WILMINGTON NC 28403 Mailing Address: Officers 2134 GLOUCESTER PLACE WILMINGTON NC 28403 Title: MANAGER Name: R BERTRAM WILLIAMS III Business Address: 2134 GLOUCESTER PL WILMINGTON NC 28403 This website is provided to the public as a part of the Secretary of State Knowledge Base (SOSKB) system. Version: 3268 http://www.secrctary.state.nc.us/corporations/Corp.aspx?PltemId=5295349 8/3/2012 atv"atnrey LIMITED LIABILITY COMPANY ANNUAL REPORT NAME OF LIMITED LIA1311,ITY COMPANY: Third & Grace, LLC REPORT FOR THE— YEAR: 2011 SECRI, I'ARY OF STATE L.L.C. ID NUMBER: 0572758 NATURE OF BUSINESS; Commercial Office Building REGISTERED AGENC Williams, R. Bertram, III KEG1S'1'I:RED OFFICE MAILING ADDRESS: 2134 Gloucester Place Wilininglon, NC 28403 1'-Filed Annual Report -1-0-5295349 Do not data enter manually. STATE OF INCORPORATION: NC 1tEGIS"1'ERI3D OFFICE S'I'REE"r ADDRESS: 2134 Gloucester Place Wilmington, NC 28403 New Hanover County PRINCIPAL OFFICE TELEPHONE NUMBER: (910) 763-7107 PRINCIPAL OFFICE MAILING ADDRESS PRINCIPAL, OFFICE STREET ADDRESS: MANAGI�RS/M EMBERS/ORGANI/_ERS: Name: R Bertram Williams III Tille: Manager Address: 2134 Gloucester PI IVilmin,g,ton, NC 28403 2134 Gloucester Place Wilmington, NC 28403 2134 Gloucester Place Wilmington, NC 28403 CERTIFICATION OF ANNUAL REPORT MUST 13E COMPLF."rED BY ALL LIMITED LIABILITY COMPANIES R Bertram Williams III FORM MIDST BE SIGNED BY A MANAGEWMEMBEIR R Bertram Williams III 03/09/2012 DATE, Manager TYPE OR PRINT NAME TYPE OR PRINT TI77,E" ANNUAL REPORT FEE: S200 MAIL TO: Secretary of State • Corporations Division • Post Office Box 29525 • Raleigh, NC 27626-0525 NORRIS & TUNSTALL CONSULTING ENGINE Brunswick Office: 1429 I\ V J. Phillip Norris, P.E. John S. Tunstall,. P.E. NC 28420 910-287-5900 (office) 910-287-5902 (fax) ER OF TRANSMITTAL To: Ms. Georgette Scott V V XZ1, IFDat;.7 August 9, 2012 IlJob No. 00191 NC DENRIDiv of Wt Ql urface Wtr Protection subject: Office Building at Third and Grace 127 Cardinal Drive Extension Stormwater Permit No. SW8 001019 Wilmington, NC 28405-3845 11 WE ARE SENDING YOU VIA MAIL ® ATTACHED ❑ UNDER SEPARATE COVER ❑ SHOP DRAWINGS ❑ PRINTS ❑ TRACINGS ❑ SPECIFICATIONS ❑ DISKS ❑ COPY OF LETTER ❑ FAX TRANSMITTAL: NUMBER OF PAGES INCLUDING THIS TRANSMITTAL Call 910-287-5900 if you have any difficulty receiving this message. COPIES DATE NO. DESCRIPTION 1 08-09-12 Designer's Certification AUGIz [�OZ� AS REQUESTED ❑ FOR REVIEW AND COMMENT ❑ FOR APPROVAL FOR YOUR USE ❑ FORBIDS DUE ❑ YOUR PRINTS LOANED TO US 3� iWV2 CC: SIGNED Phillip Nor Is, P.E. 1 neh CONFIDENTIAL AND PRIVILEGED: Information contained in this document is privileged and confidential, intended for the sole use of the addressee. If you are not the addressee or the person responsible for delivering it to the addressee you are hereby notified that any dissemination, distribution or copying of this document is strictly prohibited. If you have received this document in error please immediately notify the sender and return to the address above. August 6, 2012 Office Building at Third and Grace Stormwater Permit No. SW8 001019 Designer's Certification 1,l as a duly registered is ti in the State of North Carolina, having been authorized to observe (periodically Aie #y 1 iu#4WF"e construction of the project, (Project) I - for 0e• &W&tl (Project Owner) hereby state that, to the best of my abilities, due care and diligence was used in the observation of the project construction such that the construction was observed to be built within substantial compliance and intent of the approved plans and specifications. Required Items to be checked for this certification to be considered complete are on page 2 of this form. Noted deviations from approved plans and specifications: Signature Registration NumkerZ J1q&G SEAL Date 0 CA 1i966 N P Page 3 of 4 w August 6, 2012 Office Building at Third and Grace Stormwater Permit No. SW8 001019 Certification Requirements: Page 2 of 2 1. The drainage area to the system contains approximately the permitted acreage. The drainage area to the system contains no more than the permitted amount of built -upon area. All the built -upon area associated with the project is graded such that the runoff drains to the system. The outlet/bypass structure elevations are per the approved plan. The outlet structure is located per the approved plans. Trash rack is provided on the outlet/bypass structure. All slopes are grassed with permanent vegetation. Vegetated slopes are no steeper than 3:1. The inlets are located per the approved plans and do not cause short- circuiting of the system. The permitted amounts of surface area and/or volume have been provided. Required drawdown dgyit9 'drGYb91TPctly sized per the approved plans. All required design','depths are royJded�, ; All required parts of `he system are,proVided, such as a vegetated shelf, and a forebay.;'''�a';t;t'�� The dimensions of the syste_m"44 shown on the approved plans, are provided. cc: NCDENR-DWQ New Hanover County Building Inspections Page 4 of 4 Bj'A NCDENR North Carolina Department of Environment and Natural Resources Beverly Eaves Perdue Governor March 29, 2011 R. Bertram Williams, III c/o Wheat First Union 102 South Second Street Wilmington, NC 28402 Division of Water Quality Coleen H. Sullins Director Subject: Permit Extension, Session Laws 2009-406 and 2010-177 Stormwater Permit #SW8 001019 High Density — Office Building at Third & Grace New Hanover County Dear Mr. Williams: Dee Freeman Secretary On August 5, 2009, the Governor signed Session Law 2009-406. This law impacts any development approval issued by the Division of Water Quality under Article 21 of Chapter 143 of the'Generai Statutes, which is current and valid at any point between January 1, 2008, and December 31, 2010, The law extends the effective period of any Stormwater permit that is set to expire during this time frame to three (3) years from its current expiration date. On August 2, 2010, the Governor signed Session Law 2010- 177 which grants an extra year for a total of four (4) years extension. Accordingly, Stormwater Permit # SW8 001019 which has already expired on January 29, 2011, is now in effect until January 29, 2015. Please resubmit the renewal application and fee at least 180 days prior to January 29, 2015, which would be July 29, 2014. A copy of the Renewal Application can be obtained from the following website: http://portal.ncdenr.org/web/wq/ws/su/statesw/forms—docs. If you have any questions, please contact the Division of Water Quality in the Wilmington Regional Office at 910-796-7215. .Sincerely, Georgette Scott Stormwater Supervisor Division of Water Quality S:WQSISTORMWATERIRENEWALSISL2009-406 2010-1771001019.mar11 cc: Wilmington Regional Office Wilminotnn Reainnal nifice 127 Cardinal Drive Extension, Wilmington, North Carolina 28405 O0e 1 Phone: 910-796-72151 FAX: 910-350-20041 Customer Service: 1-877-623-6748 N Orth C aril l n a Internet: www.ncwaterquahty.or9 Aawrally An Lqual Opporlunily 1 Alpnnative Action Ermploya Beverly Eaves Perdue Governor February 4, 2010 Afflj'A NCDENR North Carolina Department of Environment and Natural Resources Division of Water Quality Coleen H. Sullins Director R. Bertram Williams, III c/o Wheat First Union 102 South Second Street Wilmington, NC 28402 Subject: PERMIT RENEWAL REQUEST Stormwater Permit No. SW8 001019 Office Building at Third & Grace New Hanover County Dear Mr. Williams: Dee Freeman Secretary The Division of Water Quality issued a Coastal Stormwater Management Permit, Number SW8 001019 to Office Building at Third & Grace for a High Density Project on January 29, 2001. This permit expires on January 29, 2011, Per 15A NCAC 2H.1003(h) (the stormwater rules), applications for permit renewals shall be submitted 180 days prior to the expiration of a permit and must be accompanied by a processing fee, which is currently set at $505.00. If this is still an active project please complete and submit the enclosed renewal application prior to July 29, 2010. If this project has not been constructed and a permit is no longer needed, please submit a request to have the permit rescinded. If you have sold. the.project,.or are,no longer;the permittee,,please provide the name, mailing address and phone number of the person or entity that is now responsible for this permit. Enclosed is a form for change of ownership, which should be completed and submitted if the property has changed hands. Your permit requires that upon:completion of construction and prior to operation of the permitted stormwater treatment system, a certification of completion be submitted to the Division from an appropriate designer for the type of system installed. This is to certify that the permitted facility has been installed in accordance with the permit, the approved plans, specifications and supporting documentation. Please include a copy of the certification with your permit renewal request and processing fee. Enclosed is a copy of a sample certification. Also enclosed is a new Operation and Maintenance agreement that should be completed and submitted along with your renewal application. You should be aware that failure to provide the Designer's Certification and the operation of a stormwater treatment facility without a valid permit, are violations of NC General Statute 143-215.1 and may result in appropriate enforcement action including the assessment of civil penalties of up to $10,000 per day. If you have any questions, please feel free to contact David Cox at 910-796-7318. Sincerely, eorgette cott, Stormwater Supervisor:„ Surface Water Protection Section. Wilmington Regional Office Enclosures"iK'.. 'GDSldwe S:\WQS\Stormwater\Renewal\Requests\2001\001019.feb10;; -Wilmington, Regional .Office'File Wilmington Regional Office 127 Cardinal Drive Extension, Wilmington, North Carolina 28405 One Phone: 910-796-72151 FAX:.910-350-20041 Customer Service: 1.877-623-6748 North Carolina Internet: www.ncwaterquality.org �atululllq An Equal Opportunity 1 Affirmative Action Empioyer NCDENR North Carolina Department of Environment and Natural Resources Division of Water Quality Bdveriy Eaves Perdue Coleen H. Sullins Governor Director February 4, 2010 R. Bertram Williams, III c/o Wheat First Union 102 South Second Street Wilmington, NC 28402 Subject: PERMIT RENEWAL REQUEST Stormwater Permit No. SW8 001019 Office Building at Third & Grace New Hanover County Dear Mr. Williams: Dee Freeman Secretary The Division of Water Quality issued a Coastal Stormwater Management Permit, Number SW8 001019 to Office Building at Third & Grace for a High Density Project on January 29, 2001. This permit expires on January 29, 2011. Per 15A NCAC 2H.1003(h) (the stormwater rules), applications for permit renewals shall be submitted 180 days prior to the expiration of a permit and must be accompanied by a processing fee, which is currently set at $505.00. If this is still an active project please complete and submit the enclosed renewal application prior to July 29, 2010. If this project has not been constructed and a permit is no longer needed, please submit a request to have the permit rescinded. If you have sold the project, or are no longer the permittee, please provide the name, mailing address and phone number of the person or entity that is now responsible for this permit. Enclosed is a form for change of ownership, which should be completed and submitted if the property has changed hands. Your permit requires that upon completion of construction and prior to operation of the permitted stormwater treatment system, a certification of completion be submitted to the Division from an appropriate designer for the type of system installed. This is to certify that the permitted facility has been installed in accordance with the permit, the approved plans, specifications and supporting documentation. Please include a copy of the certification with your permit renewal request and processing fee. Enclosed is a copy of a sample certification. Also enclosed is a new Operation and Maintenance agreement that should be completed and submitted along with your renewal application. You should be aware that failure to provide the Designer's Certification and the operation of a stormwater treatment facility without a valid permit, are violations of NC General Statute 143-215.1 and may result in appropriate enforcement action including the assessment of civil penalties of up to $10,000 per day. If you have any questions, please feel free to contact David Cox at 910-796-7318. Sincerely, eorgette cott, Stormwater Supervisor Surface Water Protection Section Wilmington Regional Office Enclosures GDSldwc S:1WQS1Stormwater\RenewallRequests120011001019.feb10 cc: . Wilmington Regional Office File Wilmington Regional Office 127 Cardinal Drive Extension, Wilmington, North Carolina 28405 One Phone: 910-796-72151 FAX: 910-350.20M k Customer Service: 1-877-623-6748 North Carolin a fnternet: www.ncwaterquality.org 'J�■ atmrall , An Equal Opportunity 1 AtfirmaGve Action Employer 1/K K l `[✓� State Stormwater Management Systems 4 Permit No. SW$ 00 10 19 STATE OF NORTH CA11OLINA DEPARTMENT OF ENVIRONMENT AND NATUIZAL RMSOURCES DIVISION OF WATER QUALITY STATE STORMWATER MANAGEMENT PE111MIT HIGH DENSITY DEVELOPMENT In accordance with the provisions ofAi-ticle 21 of Chapter 143, Gencral Statutes ofNorth Carolina as amended; and Other applicable Laws, Rules, and Regulations PERMISSION IS GRANTED TO R. Bet -tram Williams, III Office Building at Third & Grace New Hanover County FOR THE construction, operation and maiutcnance of an underground infiltration trench system in compliance with the provisions of 15A NCAC 21-1 .1000 (hereafter referred to as the "slnrinwciler rules") and the approved stormwater management plans and specifications and other Supporting data as attached and on file with and approved by the Division of Water Quality and considered a part of this permit. This permit shall be effective from the date of issuance until January 29, 2011 and shall be subject to the following; specified conditions and limitations: 1. DI+.SIGN STANDARDS '['his permit is effective only with respect to the nature and volume of stormwater described in the application and other supporting data. 2. This stormwater system has been approved for the management of stormwater runoff as described on page 3 of this permit, the Project Data Sheet. The stormwater control has been designed to handle the runoff from 67,800 square feet of impervious area. 3. Approved plans and specifications for this project are incorporated by refercnce and are enforceable parts of the permit. 4. The tract will be limited to the amount of built -upon area indicated on page 3 of this permit, and per approved plans. 5. The runoff from all onsite and offsitc built -upon area permitted with this project must be directed into the permitted stormwater control system. 2 State Stormwater Management Systems Permit No. S W8 00 10 19 Project Name: Permit Number: Location: Applicant: Mailing Address: Application Date: Name of'Receiving Stream/Index #: Classification of Water Body: If Class SA, chloride sampling results: Trench Dimensions, L,xWxl-I ,feet: Trench Bottom Elevation, FMSL: Pipe Dimensions, LxD, feet: Drainage Area, acres: 'Dotal Impervious Surfaces, ftz; Buildings, ft2: Parking, W: Concrete, flz: Off -Site, ft2: Offsite Area Entering Trench, ft2: Required Storage Volume, ft3: Provided Storage Volume, W: Overflow Elevation, I,MSL: Type of Soil: Expected Hydradlic Conductivity: Seasonal High Water "fable: Time to Drawdown: IVISION OF WATER QUALITY 30JECT DESIGN DA'rA SHEET Office Building at Third & Grace SW8 001019 New Hanover County Mr. R. Bertram Williams, III, Owner R. Bertram Williams, III 102 South Second Street Wilmington, NC 28402 January 10, 2001 Cape (sear River / 18-71 "SC" n/a 1015' x 3' x 3' 41.00 1015' x 2.5' of perforated pipe 1.95 67,800 12,490 48,150 6,460 700 700, per Engineer 5,439 6,643 46.10 Kureb 5 5 " per hour 37 FMSL 1 hours 3 State Stormwater Management Systems Permit No. SW$ 00 10 19 IL SCHEDULE OF COMPLIANCE l . The stormwater management system shall be constructed in it's entirety, vegetated and operational for its intended use prior to the construction of any built -upon surface. 2. During construction, erosion shall be kept to a minimum and any eroded areas of the system will be repaired immediately. The permittee shall at all times provide the operation and maintenance necessary to assure the pernlittcd stormwater system functions at optimum efficiency. The approved Operation and Maintenance Plan must be followed in its entirety and maintenance must occur at the scheduled intervals including, but not limited to: a. Semiannual scheduled inspections (every 6 months). b. Sediment removal. C. Mowing and revegetation of side slopes. d. Immediate repair of eroded areas. e. Maintenance of side slopes in accordance with approved plans and specifications. f. Debris removal and unclogging of outlet structure, orifice device and catch basins and piping. b. Access to the outlet structure must be available at all times. 4. Records of maintenance activities must be kept and made available upon request to authorized personnel of D WQ. '['he records will indicate the date, activity, name of person performing the work and what actions were taken. Decorative spray fountains will not be allowed in the stormwater treatment system. 6. The facilities shall be constructed as shown on the approved plans. "['his permit shall beconlc voidable unless the facilities are constructed in accordance with the conditions of this permit, the approved plans and speci fications, and other supporting data. 7. Upon completion of construction, prior to issuance of a Certificate of Occupancy, and prior to operation of this permitted facility, a certification must be received from an appropriate designer for the system installed certifying that the permitted facility has been installed in accordance with this permit, the approved plans and specifications, and other supporting documentation. Any deviations from the approved plans and specifications must be noted on the Certification. f the stormwater system was used as an Erosion Control device, it must be restored to design condition prior to operation as a stormwater treatment device, and prior to occupancy of the facility. 9. A modification must be permitted prior to any constrUCtlOn. ThC following items will require a modification to the permit. The Director may determine that other revisions to the project should require a modification to the permit: a. Any revision to the approved plans; regardless of sire. b. Project name change. C. Transfer of ownership. d. Redesign or addition to the approved amount of built -upon area. e. Further subdivision, acquisition, or sale of the project area. The project area is defined as all property owned by the permittee, for which Sedimentation and Erosion Control Plan approval was sought. f. Filling in, altering, or piping of any vegetative conveyance shown on the approved plan. 10. A copy of the approved plans and specifications shall be maintained on file by the Permittce for a nuninlunl of ten years from the date of the completion of construction. 4 State Stormwatcr Management Systems Permit No. SW8 001019 11. The permittee shall submit final site layout and grading plans for any permitted future areas shown on the approved plans, prior to construction. If the proposed 13UA exceeds the pemitted amount, a modification to the permit must be submitted and approved prior to construction. 12. Prior to the sale of any portion of the property, an access/maintenance casement to the stormwater facilities shall be granted in favor of the permittec if access to the stormwater facilities will be restricted by the sale of any portion of the property. 13. The permittee is responsible for verifying that the proposed built -upon area does not exceed the allowable built -upon area. 14. The Director may notify the permittce when the permitted site does not meet one or more of the minimum requirements of the permit. Within the time frame specified in the notice, the permittce shall submit a written time schedule to the Director for i-nodlfying the site to meet minlmulnn requirements. The permittee shall provide copies of revised plans and certification in writing to the Director that the changes have been made. 15. The Permittee shall notify the Division of any name, ownership or nnailing address changes within 30 days. Ill. GENERAL CONDITIONS This permit is not transferable. In the event there is a desire for the facilities to change ownership, or there is a name change of the Permittee, a formal permit request must be submitted to the Division of Water Quality accompanied by an application fee, documentation from the parties involved, and other supporting materials as may be appropriate. The approval of this request will be considered on its merits and may or may not be approved. 2. Failure to abide by the conditions and limitations contained in this permit may subject the Permittee to erilorcenient action by the Division of Water Quality, in accordance with North Carolina General Statutc 143-215.6A to 143-215.6C. The issuance of this permit does not preclude the Permittee from complying with any and all statutes, rules, regulations, or ordinances which may be imposed by other government agencies (local, state, and federal) which have jurisdiction. 4. In the event that the facilities fail to perform satisfactorily, including the creation of nuisance conditions, the Permittee shall take immediate corrective action, including those as may be required by this Division. such as the construction of additional or replacement stormwater management systems. '['lie Permittee grants DI.,NR Staff permission to enter the property for the purpose of inspecting all components of the permitted stormwater management facility. 6. The permit may be modified, revoked and reissued or terminated for cause. The filing of a request for a permit modification, revocation and reissuance or termination does not stay any permit condition. 7. Unless specified elsewhere, permanent seeding requirements for the stormwater control must follow the guidelines established in the North Carolina Erosion and Sediment Control Planning and Design Manual. Permit issued this the 29th day of January, 2001. NORTH CAROL,INA ENVIRONMENTAL MANAGEMENT COMMISSION 0--,— C AA r �,ti-z—� � ✓1 , Kerr T. Stevens, Director �`'g_� Division of Water Quality By Authority of the Environmental Management Commission Permit Number SW$ 001019 JAN 1 0 2�01 John R. Andrew, P.E. Andrew & Kuske J. A, Kuske, P.E. CONSULTING ENGINEERS, INC. J. Phillip Norris, P-E, 902 Market St. • Wilmington, North Carolina 28401-4733 • Telephone 910/343-9653 • Fox 910/343-9604 • www.andrewandkuske.com January 5, 2001 Mr. Scott Vinson Environmental Engineer DENR 127 Cardinal Drive Extension Wilmington, NC 28405 Re: Office Building at North 3rd Street Stormwater Project No. SW8 001019 A&K No. 00191 Dear Mr. Vinson: Attached for your further review and approval are the revised applications, calculations and plans for the project, and a copy of the storm drainage specifications. We have addressed your comments of December 20th and have the following similarly numbered responses: 1. A note has been added to the plans stating there are no wetlands. 2. The application has been revised to agree with the calculations. The offsite and offsite impervious areas are shown on plan sheet C1. 3. The supplement form has been revised. 4. The sediment storage area on the detail is 1 foot, however the font used on the drawing was not entirely clear, especially on reproductions. We have modified the plan to clarify this. The sediment benchmark has been added to the application, 5. The detail and notes are intended to be used in conjunction with the structure chart on sheet C-1 to provide the information you requested. We revised the notes to clarify the design intent. The chart on C-1 gives the upturned elbow elevations and the upstream infiltration trench pipe invert, as this is the most useful denotation for the contractor to use for construction. The top of trench is 2.67 feet above the invert. Please call us if you need the top of trench added to the chart. 6. A vicinity map is added. Mr. Scott Vinson January 5, 2001 Page 2 7. The plans have been revised to show a 30-inch pipe. The type and grade of pipe, as well as all other materials, are included in the project specifications. We have attached a copy of the storm drainage section for your use. 8. The requested information is included in the chart on sheet C-1. 9. As we discussed by phone, the system is designed such that all runoff is first backwatered into the upstream pipe segment, maximizing the infiltrative capacity of that pipe. If the upstream section surcharges, the flow will pass through the upturned elbow to the downstream trench for infiltration there. If we swap the elbow to the upstream side, the runoff proceeds immediately downstream and we lose any available upstream capacity. Although we have not modeled the elbow swap as it involves substantial changes to the program, we anticipate a significant reduction in the system efficiency with no identified advantages. We will await your decision on this issue. Please call if you have further questions or comments. Sincerely, ANDREW & KUSKE CON51JUTiNC ENGINEERS, J Phillip orris, P.E Enclosure State of_North Carolina Department of Environment and Natural Resources Wilmington Regional Office James 13. Hunt, Jr., Governor Bill Holman, Secretary Division of Water Quality December 20, 2000 Mr. R. Bertram Williams. III, Owner CIO Wheat First Union 102 South Second Street Wilmington, NC 28402 Subject: ACKNOWLEDGMENT OF RECEIPT AND REQUEST FOR ADDITIONAL INFORMATION Stormwater Project No. SW8 001019 Office Building at North 3rd Street New Hanover County Dear Mr. Williams: The Wilmington Regional Office received a Stormwater Management Permit Application for Office Building at North 3rd Street on October 16, 2000. A preliminary review of that information has determined that the application is not complete. The following information is needed to continue the stormwater review: Delineate all wetlands on site, disturbed or undisturbed, or note on the plans that none exist. 2. The calculations note that the drainage 'area for the project is 1.95 acres including the off -site area. Please change the drainage area from 1.83 to 195 on page 2 of 4 of the application. Also, please note the 0.02 acres, 700 sf, of impervious off -site runoff on the application. Give .more details, on the plans, as to the off -site drainage entering the system from the adjacent lot. Show the 0.13 ac. offsite area in addition to the 0.02 ac. of impervious runoff draining from that area. The plans and calculations note that there will be 1,015 linear feet of pipe and trench. The supplement form gives 1',050 feet of pipe and trench. Please verify and make the necessary changes to pages 1 and 2 of the supplement form. 4. The catch basin detail gives only a minimum of a I inch sediment storage area in the bottom of each catch basin. Please increase this minimum to at least 6 inches to provide proper storage area and note the change on the detail on sheet C3._ Please also address the sediment benchmark depth in the Operation and Maintenance Agreement on pauc 3 of 4 of the supplement. Please add to the notes for the catch basin detail whether all catch basins will have the upturned tee section of pipe grouted in place, as preferred, or whether- only the last catch basin, ie. #13 is to have the up turned tee section. Also note on the detail the up turned tee elevations and their corresponding of the upstream infiltration trench top elevations, In chart form it appropriate. 6. A vicinity map is required on all plans, please include one. 127 Cardinal Ur. Ext., Wilmington, North Carolina 28405 Telephone 910-395-3900 FAX 910-3.50-2004 An Equal opportunity Afiirmativc Action Employer 50%. recycled/10 %" post -consumer paper Mr. Williams December 18, 2000 Stormwater Project No. SWS 001019 --------------------------------------------- 7. The pipe is given as 30 inch diameter perforated pipe in the narrative and application. Please make note of the correct diameter and type and/or grade, of pipe to be used on the plans and on the trench detail. As currently.sh own a 24 inch diameter pipe] s proposed to be used. How will the contractor know what kind of pipe to put down if it is not given anywhere on the plans? On the supplement form of the application the bottom elevation for the trench is given in a range from 41.0 - 50.3. At what point will the bottom of the trench be at the elevation of 50.3 fills] and at what point will the bottom of the trench be at 41.0? For each drop inlet and catch basin Live the invert in and out to determine the placement elevations of the infiltration pipe. Per our phone conversation the notion of swapping the elbow section within the catch basin design from one side to the other is still under review with our supervisors in Raleigh. As soon as a decision is handed down, I will be in contact. Please note that this request for additional information is in response to a preliminary review. The requested information should be received by this Office prior to January 18, 2000, or the application will be returned as incomplete. The return of a project will necessitate resubmittal of all required items, including the application fee. If you need additional time to submit the information, please mail or fax your request for a time extension to the Division at the address and fax number at the bottom of this letter..The request must indicate the date by which you expect to submit the required information. The Division is allowed-90 days from the receipt of a completed application to issue the permit. The construction of any impervious surfaces, other than a construction entrance under an approved Sedimentation Erosion Control Plan, is a violation of NCGS 143-215.1 and is subject to enforcement action pursuant to NCGS 143-215.6A. Please reference the State assigned project number on all correspondence. Any original documents that need to be revised have been sent to the engineer or agent. All original documents must be returned or new originals must be provided. Copies are not acceptable. if you have any questions concerning this matter please feel free to call me at (910).395-3900. Sincerely, Scott Vinson — Environunental Engineer RSS/sav: S:IWQSISTORMWATIADDINF01001019.DEC cc: Scott Vinson Phil Norris, P.F. INFILTRATION TRENCH ANALYSIS Filename: S:1WQS11NTRENCH1001019.WK1 Project # 001019 First Union Bank Project Name The Office Building at North 3rd St. Recvng Stream UT Cape Fear River Drainage Basin Cape Fear Site Area 1.83 acres Impervious Area Calculation Buildings 12490 Parking/Asphalt 48150 Concrete 6460 Off -Site 700 Total 67800 Volume/Storage Calculation Required Provided Design Storm RV Volume to,'Store', Pipe Diameter Length Of Pipe Length Of Trench Width Of Trench Height Of Trench Cross -Sectional Area Of Trench Storage In Piping Available Volume (40% voids) Total Volume Elevation Of Bottom Of Trench Elevation Of SHWT Overflow Elevation Exfiltration Rate / Drawdown Reported Hydraulic Conductivity Bottom Surface Area Drawdown'rTimo Date 14-Dec-2000 Reviewer Vinson Classification SC Index # 18-71 Drainage Are 85020 SF 1.95 Acres Rational C Cc= Percent Impervious= 79.7% 1 in 0.77 5�439;�CF ✓ Note: Hydraulic Conductivity was given on appl. as 55 in/hr., Vincent Lewis gave it only 20 in/hr.. Trench system bottom elevation has a range from 50.3 fmsl down to 41.0 fmsl depending on area located on approved plans. Comments: Required volume, storage, and drawdown guidelines are met. STORMWATER MANAGEMENT NARRATIVE FOR OFFICE BUILDING AT THIRD AND GRACE WILMINGTON, NORTH CAROLINA DEVELOPED BY R. BERTRAM WILLIAMS, III C10 WHEAT FIRST UNION 102 SOUTH SECOND STREET WILMINGTON, NORTH CAROLINA 28401 (910) 763-1641 RECEIVED OCTOBER 12, 2000 PROD # A&K#00191 OCT 16 2000 Awe 11966 000 pQ,e ANDREW & KUSKE CONSULTING ENGINEERS, INC. 902 MARKET STREET WILMINGTON, NORTH CAROLINA 28401 (910) 343-9653 k STORMWATER MANAGEMENT NARRATIVE OFFICE BUILDING AT THIRD AND GRACE DESCRIPTION The site is a 1.8-acre tract at the northeast corner of Third Street and Grace Street in Wilmington. The tract is bounded by road rights -of -way to the south, east and west, and residential/commercial/office uses to the north. The site is cleared and grassed, with large oaks and hardwoods in several clusters. Previous buildings have been removed and the site is now used for parking. The tract slopes from a ridge along Fourth Street to the east down to Third Street to the west. Soils are clean fine to medium sands to a depth of at least 9.5 feet. The seasonal high water table is at 9.3 feet at the lower west end and is below 9.5 feet over the remainder of the site. There are no "404" regulated wetlands. Approximately 0.1 acres drains from an adjacent lot to this project. 0 , +w 11..q4 The project is new development consisting of clearing, grading, and construction of a five -story office building, parking areas, st water management system and utilities. Design impervious for the entire site is computed at�o. Approximately 1.9 acres will be disturbed by the construction work. Off -site work includes construction of four drives in the rights -of -way, sidewalks in the southwest corner, and a stormwater outfall from the northwest corner to an inlet in the right-of-way at Third and Walnut. Drainage from the off -site work will discharge to the municipal stormwater system in the streets. 0 "V- Pisw CA 1. 13 6.+— UA b .10 , + s 1. STORMWATER MANAGEMENT MEASURES Runoff will be collected in curb inlets and roof drains. The curb inlets are connected by an infiltration system consisting of 30-inch perforated pipe in a washed gravel trench. The trench system will store the first inch of run-off and infiltrate it into the soil within 20 minutes. Runoff in excess of available storage and infiltration will discharge to the municipal system in the street right-of-way. All inlets will be deeper than the pipe inverts to accommodate sediment settling and storage. Discharge from each inlet will be controlled by an up -turned elbow on the outlet pipe, set at the same elevation as the top of the upstream infiltration trench. This forces water entering the inlet to travel into the upstream trench for infiltration, enhances sedimentation, and maximizes infiltration. Inlets are spaced uniformly around the site to intercept runoff and distribute the infiltrated stormwater over the largest possible area. The grading contractor and developer will provide maintenance during construction. The Owner or his property manager will provide maintenance after occupancy. 2 gar L COMPUTATIONS Manual calculations are attached that provide site data and satisfy state stormwater management criteria. Available storage capacity in the trench system is 6600 cubic feet, which exceeds the 6300 cubic feet required to handle a 1-inch rainfall event. The drawdown time of 29 minutes more than meets the requirement of a five-day drawdown. To demonstrate conformance with the city detention regulations, the system is routed using the Hydrocad software program. The design storm is a ten-year, 24-hour Type III rainfall of 7 inches. The critical period of 11 hours to 15 hours is routed using SCS TR-20 methods. Due to the high infiltration capacity of the soils, the system will handle a continuous 3-inch per hour rainfall rate without discharge off -site. 91 Date Design Andrew and Kuske ;Job eet 902 Market St. CONSULTING ENGINEERS, INC. Wilmington, N.C. 28401 Of Check Job For No. r ;FbE, C*Lc-j �4T10 k S pFF1G� 5vcL'Otoca 14-T '3- e� CPS r c_ cticQ7b &--) / ,11 Cf Y SEAL 11966 p ,'1�111111111��1+` V JAN 10 7001 PRo,l _. k4e- , SIR f a Date Design Andrew and Kuske sheer //I oo Gc S CONSULTING ENGINEERS. INC. 902 Market 5t. Wilmington, N.C. 28401 Of Check Job For Job No. Dr-F cI �l� ?� ���?��'. ERi IVr�`IAt,S — 5 ! ; 'p 11—A I�ccc SF OrTv 5Ysrc 0.13 S So 0 I U TAc. D)zAfr-NA6cz� Afz6A f, 9 S 0 z 0 Ir�lf69Vrovr A}Z4�7n, ;3 u r O r'j e,, -ca . 2 9 121 ¢90 j. 10F3� lso \vALi�s s -PADr oN- s+ram ln.�y6r"v,ovs Oar- SrT� 7a Sr;r r�, O•d2 -7Do 1 O 5'IS 7�' (o 7) 98 rx�fCrtv,ovs _ I,S4 Ac� j, 83 I' s-6 A c 11. SS A So VS+- SSg1MPz-Kvrou; FO}- f,95 AeRkFj Ar D,`:�CN oF;✓-rl-� �zoSL�e' 1�^e'G~r:vuvj �JZ�V�S \vpLr-s j-rQ ZA4d VOZUM,r Fvri I" RA+n! `/; =(L. j,is 14, d 0.85y �) / 6,2) ) (,„)(1A")(43S6o srflA,) G300 cF 5TofilA6e- AvAl CA6 ¢.S CFILr 4a) t 4.s 7 = 0/J- LF 1p%C70 GF > �30o LF oK Y Date Design Andrew and Kuske Market St. CONSULTING ENGINEERS, INC. Wilmington, N.C. 28401 >Sheet902 Check Job For Job No. 0Fr/CL- 2, "?'J ' GfRA: c j-EFZ7 I OaIZ71 L� / I r=IC."rftA, 10rJ 5YtTdr--,r`1. SC—E A c14Eo 5os REroP- K , = S i , 1< 1 = 3 2. g JA-IANL k/ = C82,1 a- 32,5- rA//larz S 5', 7 Wl"4r, VSE JG = Ss� l�v�j!>r_ , 12 ,N Kr 60 nti,N�tr� D, 07r Pr., , �LO�v IS CALL✓LA7-Jv ��SCIJ DrS - zO30 $F VE TiG/.lL l'L 6�V -TN,t �� 1� r10 Rl�OUTAL Am,x - 4 I 10 ISI � TO f yC- SEcT,,,� /-1rzcA = ¢vGo SF Qk,ti = (2o30 SF �Cp.076. FPAti}�1, t = = JS¢ CFM �40Go sF��o,0% FP',%) CJ� _ 3og = Z3/ GGnc pTtAw r)ow T= 6 Goo G7= 2 3 1 GFn\ PEsAK !1./1*1L7lZA-r io,./ CAp,ac,ry _ Z 1 tic rtir ti()Pj, —rhkl6 Ta 5YS7`EN� �/t1P! pnrrl4'7x.'1TE ENi,R,? Fxir-' Data for 00191 FIRST UNION 30" Page 1 TEN YEAR 24-HOUR RAINFALL= 7.00 IN Prepared by ANDREW & KUSKE CONSULTING ENGINEERS, INC. 11 Oct 00 HydroCAD 5.01 000479 (c) 1986-1998 Applied microcomputer Systems WATERSHED ROUTING O O O E--0( A, ,-A3 �O Q QUO O O 5 T e ESQ ,e 0 0 � „ 0 OSUBCATCHMENT ❑ REACH A POND ci LINK v Data for 00191 FIRST UNION 30" Page 2 TEN YEAR 24-HOUR RAINFALL= 7.00 IN Prepared by ANDREW & KUSKE CONSULTING ENGINEERS, INC. 11 Oct 00 HydroCAD 5.01 000479 (c) 1986-1998 Applied Microcomputer_ Systems_ SUBCATCHMENT 1 AREA TO CB #1 PEAK= 1.06 CFS 9 12.12 HRS, VOLUME= .06 AF ACRES CN .19 89 SCS TR-20 METHOD TYPE III 24-HOUR RAINFALL= 7.00 IN SPAN= 11-15 HRS, dt=.02 HRS Method Comment _ Tc (min) DIRECT ENTRY Segment ID: 10.0 SUBCATCHMENT 2 AREA TO CB #2 PEAK= 1.00 CFS Q 12.12 HRS, VOLUME= .06 AF ACRES CN SCS TR-20 METHOD .18 89 TYPE III 24-HOUR RAINFALL= 7.00 IN SPAN= 11-15 HRS, dt=.02 HRS Method Comment Tc (min) DIRECT ENTRY Segment ID: 10.0 SUBCATCHMENT 3 AREA TO CB #3 PEAK= .84 CFS Q 12.12 HRS, VOLUME= .05 AF ACRES CN SCS TR-20 METHOD .15 89 TYPE III 24-HOUR RAINFALL= 7.00 IN SPAN= 11-15 HRS, dt=.02 HRS Method _ Comment T Tc (min) DIRECT ENTRY Segment ID: 10.0 SUBCATCHMENT 4 AREA TO CB #4 PEAK= .45 CFS p 12.12 HRS, VOLUME= .03 AF ACRES CN SCS TR-20 METHOD .08 89 TYPE III 24-HOUR RAINFALL= 7.00 IN SPAN= 11-15 HRS, dt=.02 HRS Method Comment Tc min DIRECT ENTRY Segment ID: 10.0 i. Data for 00191 FIRST UNION 30" Pace 3 TEN YEAR 24-HOUR RAINFALL= 7.00 IN Prepared by ANDREW & KUSKE CONSULTING ENGINEERS, INC. 11 Oct 00 H droCAD 5.01 000479 c 1986-1998 Applied Microcomputer Systems SUBCATCHMENT 5 AREA TO CB #5 PEAK= .95 CFS 0 12.12 HRS, VOLUME= .06 AF ACRES CN SCS TR-20 METHOD .17 89 TYPE III 24-HOUR RAINFALL= 7.00 IN SPAN= 11-15 HRS, dt=.02 HRS Method Comment Tc (min) DIRECT ENTRY Segment ID: 10.0 SUBCATCHMENT 6 AREA TO CB #6 PEAK= 1.45 CFS Q 12.12 HRS, VOLUME= .08 AF ACRES CN SCS TR-20 METHOD .26 89 TYPE III 24-HOUR RAINFALL= 7.00 IN SPAN= 11-15 HRS, dt=.02 HRS Method Comment Tc (min DIRECT ENTRY Segment ID: 10.0 SUBCATCHMENT 7 AREA TO CB 47 PEAK= 1.45 CFS @ 12.12 HRS, VOLUME= .08 AF ACRES CN SCS TR-20 METHOD .26 89 TYPE III 24-HOUR RAINFALL= 7.00 IN SPAN= 11-15 HRS, dt=.02 HRS Method Comment Tc min DIRECT ENTRY Segment ID: 10.0 SUBCATCHMENT 8 AREA TO CB #8 PEAK= .84 CFS 0 12.12 HRS, VOLUME= .05 AF ACRES CN SCS TR-20 METHOD .15 89 TYPE III 24-HOUR RAINFALL= 7.00 IN SPAN= 11-15 HRS, dt=.02 HRS Method Comment Tc min DIRECT ENTRY Segment ID: 10.0 I Data for 00191 FIRST UNION 30" Page 4 TEN YEAR 24-HOUR RAINFALL= 7.00 IN Prepared by ANDREW & KUSKE CONSULTING ENGINEERS, INC. 11 Oct 00 HydroCAD 5 01 000479 (c) 1986-1998 Applied Microcomputer Systems SUBCATCHMENT 9 AREA TO CB #9 PEAK= 22 CFS 0 12.12 HRS, VOLUME= .01 AF ACRES CN SCS TR-20 METHOD .04 89 TYPE III 24-HOUR RAINFALL= 7.00 IN SPAN= 11-15 HRS, dt=.02 HRS Method Comment Tc min DIRECT ENTRY Segment ID: 10.0 SUSCATCHMENT 10 AREA TO CB #10 PEAK= .72 CFS {] 12.12 HRS, VOLUME= .04 AF ACRES CN SCS TR-20 METHOD .13 89 TYPE III 24-HOUR RAINFALL= 7.00 IN SPAN= 11-15 HRS, dt=.02 HRS Method CommentTc_(min) DIRECT ENTRY Segment ID: 10.0 SUBCATCHMENT 11 AREA TO CB #11 PEAK= 61 CFS @ 12.12 HRS, VOLUME= .04 AF ACRES CN SCS TR-20 METHOD .11 89 TYPE III 24-HOUR RAINFALL= 7.00 IN SPAN= 11-15 HRS, dt=.02 HRS Method Comment Tc(min) DIRECT ENTRY Segment ID: 10.0 SUBCATCHMENT 12 AREA TO CB #12 PEAK= .39 CFS @ 12.12 HRS, VOLUME= .02 AF ACRES CN SCS TR-20 METHOD .07 69 TYPE III 24-HOUR RAINFALL= 7.00 IN SPAN= 11-15 HRS, dt=.02 HRS Method Comment Tc (min) DIRECT ENTRY Segment ID: 10.0 I Data for 00191 FIRST UNION 30" Page 5 TEN YEAR 24-HOUR RAINFALL= 7.00 IN Prepared by ANDREW & KUSKE CONSULTING ENGINEERS, INC. 11 Oct 00 H droCAD 5.01 000479 c 1986-1998 Applied Microcomputer Systems SUBCATCHMENT 13 AREA TO CB #13 PEAK= .22 CFS Q 12.12 HRS, VOLUME= .01 AF ACRES CN .04 89 SCS TR-20 METHOD TYPE III 24-HOUR RAINFALL= 7.00 IN SPAN= 11-15 HRS, dt=.02 HRS Method _ Comment T_c imin? DIRECT ENTRY Segment ID: 10.0 Data for 00191 FIRST UNION 30" Page 6 TEN YEAR 24-HOUR RAINFALL= 7.00 IN Prepared by ANDREW & KUSKE CONSULTING ENGINEERS, INC. 11 Oct. 00 HydroCAD 5.01 000479 (c) 1986-1998 Applied Microcomputer Systems T POND 1 TRENCH FROM #1 TO #2, 5 & 13 Qin = 3.64 CFS @ 12.21 HRS, VOLUME= .11 AF Qout= 1.38 CFS @ 12.39 HRS, VOLUME= 11 AF, ATTEN= 62%, LAG= 11.2 MIN Qpri= .15 CFS @ 12.39 HRS, VOLUME= 0.00 AF Qsec= 1.23 CFS @ 12.39 HRS, VOLUME= .11 Al~ Report reflects 73$ open space ELEVATION AREA INC.STOR CUM.STOR (FT) (SF) (CF) (CF)_ 41.9 490 0 0 44.9 980 1610 1610 STOR-IND METHOD PEAK STORAGE = 1580 CF PEAK ELEVATION= 44.8 FT FLOOD ELEVATION= 44.9 FT START ELEVATION= 41.9 FT SPAN= 11-15 HRS, dt=.02 HRS Tdet= 10.9 MIN (.11 AF) # ROUTE INVERT OUTLET DEVICES 1 P 44.8' 12" HORIZONTAL ORIFICE/GRATE Q=.6 Area SQR(2gH) (Limited to weir flow @ low head) 2 S 0.0' EXFILTRATION V= .076 FPM over SURFACE AREA Primary Discharge I I=Orifice/Grate Secondary Discharge 12=Exfiltration POND 1 INFLOW $ OUTFLOL. TRENCH FROM #1 TO #2, 5 & 13 3.6 3.4 STOR-IND METHOD 3.2 3.0 PEAK STOR= 1582 CF 2.6 PEAK ELEU= 44.8 FT 2.6 � 2.4 Oin= 3 64 CFS 2.2 Oout= 1.38 CF5 u 2.13 Opri= .15 CFS 1.8 05ec= 1.23 CF5 3 1.6 LAG= 11,2 MIN O 1.4 J 1 .2 LL 1 .0 .6 6 J 4 2 • �m r if I m In m lf1 0 Ln m TIME (4)cur5) Data for 00191 FIRST UNION 30" Page 7 TEN YEAR 24-HOUR RAINFALL= 7.00 IN Prepared by ANDREW & KUSKE CONSULTING ENGINEERS, INC. 11 Oct 00 Hy_droCAD 5.01 00047.9 (c) 1986-1998 Applied Microcomputer Systems POND 2 TRENCH FROM #2 TO #3 Qin = 1.94 CFS @ 12.14 HRS, VOLUME= .08 AF Qout= 1.55 CFS fl 12.21 HRS, VOLUME= .08 AF, Qpri= 1.01 CFS @ 12.21 HRS, VOLUME= .01 AF Qsec= .54 CFS @ 12.21 HRS, VOLUME= :06 AF Report reflects 73% open space ELEVATION AREA INC.STOR CUM.STOR FT SF(CF) CF 42.3 200 0 0 45.3 400 657 657 ATTEN= 20%, LAG= 4.5 MIN STOR-IND METHOD PEAK STORAGE = 735 CF PEAK ELEVATION= 45.7 FT FLOOD ELEVATION= 45.3 FT START ELEVATION= 42.3 FT SPAN= 11-15 HRS, dt=.02 HRS Tdet= 9.6 MIN (.08 AF) # ROUTE INVERT OUTLET DEVICES 1 P 45.2' 8" HORIZONTAL ORIFICE/GRATE Q=.6 Area SQR(2gH) (Limited to weir flow @ low head) 2 S 0.0' EXFILTRATION V= .076 FPM over SURFACE AREA Primary Discharge 11=Orifice/Grate Secondary Discharge I 2=Exfiltration POND 2 INFLOW & OUTFLOW TRENCH FROM #2 TO #3 1.9 1.6 STOR-IND METHOD 1.7 1.5 PEAK STOR= 735 CF 1.5 PEAK ELEU- 45.7 FT 1.4 , 1.3 I' Qin= 1.94 CFS 10 1,2 Qcut= 1.55 CFS U 1.1 I 'L Qpri= 1.01 CF5 1 Qsec= .54 CFS 3 ,9 .8 u�' LAG= 4.5 MIN O 7 j1t LL. 5 rr •� .4 /r L ` .3 .2 I •1 e. eC!D I 5 Ln m Ln Ln m Ln m - - [V N rr'1 M V V Ln TIME Chours) Data for 00191 FIRST UNION 30" Page 8 TEN YEAR 24-HOUR RAINFALL= 7.00 IN Prepared by ANDREW & KUSKE CONSULTING ENGINEERS, INC. 11 Oct 00 HVdroCAD 5.01 000479 (c) 1986-1996 Applied Microcomputer .SVStemS POND 3 TRENCH FROM #3 TO #4 Qin = 1.28 CFS @ 12.12 HRS, VOLUME= .08 AF Qout= 1.26 CFS @ 12.14 HRS, VOLUME= .07 AF, Qpri= .94 CFS @ 12.14 HRS, VOLUME= .02 AF Qsec= 32 CFS Q 12.14 HRS, VOLUME= .06 AF Report reflects 73% open space ELEVATION AREA INC.STOR CUM.STOR FT SF CF CF 45.2 120 0 0 48.2 240 394 394 ATTEN= 1%, LAG= 1.1 MIN STOR-IND METHOD PEAK STORAGE = 438 CF PEAK ELEVATION= 48.5 FT FLOOD ELEVATION= 48.2 FT START ELEVATION= 45.2 FT SPAN= 11-15 HRS, dt=.02 HRS Tdet= 9.2 MIN (.07 AF) # ROUTE_ INVERT OUTLET DEVICES 1 P 48.1' 8" HORIZONTAL ORIFICE/GRATE Q=.6 Area SQR(2gH) (Limited to weir flow p low head) 2 S 0.0' EXFILTRATION V= .076 FPM over SURFACE AREA Primary Discharge 11=Orifice/Grate Secondary Discharge t2=Exfiltration POND 3 INFLOW & OUTFLOW TRENCH FROM #3 TO #4 1.2 5TOR-IND METHOD 1.i PEAK STOR= 438 CF 1,g ' PEAK ELEU= 46.5 FT 9 411 Oin= I.28 CF5 ' 8 i+ Qout= 1 . 25 CF5 u 7 11 Opr i = .94 CFS - 6 h Usec= 32 CFS 5 i LAG= 1.1 MIN O 5 -J 3 5 2 . 0 .0m i in m in m u s m in m In TIME (hours) Data for 00191 FIRST UNION 30" Page 9 TEN YEAR 24-HOUR RAINFALL= 7.00 IN Prepared by ANDREW & KUSKE CONSULTING ENGINEERS, INC. 11 Oct 00 HydroCAD 5.01 000479 (c) 1986-1998 Applied Microcomputer Systems POND 5 TRENCH FROM #5 TO #6 Qin = 2.26 CFS @ 12.18 HRS, VOLUME= .08 AF Qout= 2.18 CFS 9) 12.21 HRS, VOLUME= .08 AF, ATTEN= 3%, LAG= 1.5 MIN Qpri= 1.79 CFS � 12.21 HRS, VOLUME= .03 AF Qsec= .40 CFS sQ 12.21 HRS, VOLUME= .05 AF Report reflects 73% open space ELEVATION AREA INC.STOR CUM.STOR STOR-IND METHOD (FT) (SF) (CF) (CF) PEAK STORAGE = 569 CF 42.3 140 0 0 PEAK ELEVATION= 46.0 FT 45.3 280 460 460 FLOOD ELEVATION= 45.3 FT START ELEVATION= 42.3 FT SPAN= 11-15 HRS, dt=.02 HRS Tdet= 7.6 MIN (.08 AF) # ROUTE INVERT OUTLET DEVICES _ T 1 P 45.2' 8" HORIZONTAL ORIFICE/GRATE Q=.6 Area SQR(2gH) (Limited to weir flow 0 low head) 2 S 0.0' EXFILTRATION V= .076 FPM over SURFACE AREA Primary Discharge I I=Orifice/Grate Secondary Discharge I- 2=Exfiltraticn POND 5 INFLOW & OUTFLOW TRENCH FROM #5 TO #5 2.2 2.0 5TOR-IND METHOD PEAK STOR= 569 CF ICI PEAK ELEU= 46 FT 1.6 y 41i�1 Qin= 2.26 CF5 ko I.4 tips Oout= 2.18 CF5 L4- v 1.2 I I I ; O r i= 1.79 P CF5 44 Osec= .40 CF5 1.0 j �I'ti LAG= 1.5 MIN 0 I 11 J i �ti LL 6 1 li .4 . 2 4 � e. em I y m Ln m tn 0 Ln m TIME (hours) Data for 00191 FIRST UNION 30" Page 10 TEN YEAR 24-HOUR RAINFALL= 7.00 IN Prepared by ANDREW & KUSKE CONSULTING ENGINEERS, INC. 11 Oct 00 HydroCAD_5_.01_ 000479 (c) 1986-1998 Applied Microcomputer Systems POND 6 TRENCH FROM #6 TO # 7 & 8 Qin = 2.90 CFS 9 12.12 HRS, VOLUME= .17 AF Qout= 2.41 CFS @ 12.20 HRS, VOLUME= .17 AF, ATTEND 17t, LAG= 4.3 MIN Qpri= 1.44 CFS 9 12.20 HRS, VOLUME= .03 AF Qsec= .97 CFS sQ 12.20 HRS, VOLUME= .14 AF Report reflects 73% open space ELEVATION AREA INC.STOR CUM.STOR (FT) (SF) (CF) (CF) 44.4 350 0 0 47.4 700 1150 1150 STOR-IND METHOD PEAK STORAGE = 1364 CF PEAK ELEVATION= 48.0 FT FLOOD ELEVATION= 47.4 FT START ELEVATION= 44.4 FT SPAN= 11-15 HRS, dt=.02 HRS Tdet= 10.2 MIN (.17 AF) # ROUTE INVERT OUTLET DEVICES 1 P 47.31 8" HORIZONTAL ORIFICE/GRATE Q=.6 Area SQR(2gH) (Limited to weir flow @ low head) 2 S 0.0' EXFILTRATION ' V= .076 FPM over SURFACE AREA Primary Discharge I 1=Orifice/Grate Secondary Discharge L-2=Exfi.ltraticn 2.8 2.6 2.4 2,2 2.0 � 1.8 U 1.6 1 . 4 1.2 1.0 .6 .4 2 O.Om POND 6 INFLOW & OUTFLOW TRENCH FROM #6 TO # 7 & 8 II I m [V M TIME (hours) STOR-IND METHOD PEAK STOR= 1364 CF PEAK ELEU= 48 FT Din= 2.93 CFS Rout= 2.41 CFS Dpri= 1 44 CF5 Dsec= .97 CFS LAG= 4.3 MIN LO CD Ln m M V V Ln Data for 00191 FIRST UNION 30" Page 11 TEN YEAR 24-HOUR RAINFALL= 7.00 IN Prepared by ANDREW & KUSKE CONSULTING ENGINEERS, INC. 11 Oct 00 HydroCAD 5.01 000479 _(c) 1986-1998 Applied Microcomputer Systems POND 8 TRENCH FROM #8 TO #9 & 11 Qin = 1.23 CFS @ 12.18 HRS, VOLUME= .06 AF Qout= .61 CFS @ 12.35 HRS, VOLUME= .06 AF, ATTEN= 51%, LAG= 10..1 MIN Qpri= 0.00 CFS @ 0.00 HRS, VOLUME= 0.00 AF Qsec= .61 CFS @ 12.35 HRS, VOLUME= .06 AF Report reflects 73t open space ELEVATION AREA INC.STOR CUM.STOR (FT) (SF) _ (CF) (CF) 44.9 35D 0 0 47.9 700 1150 1150 STOR-IND METHOD PEAK STORAGE = 419 CF PEAK ELEVATION= 46.0 FT FLOOD ELEVATION= 47.9 FT START ELEVATION= 44.9 FT SPAN= 11-15 HRS, dt=.02 HRS. Tdet= 5 MIN (.06 AF) # ROUTE INVERT OUTLET DEVICES 1 P 47.8' 8" HORIZONTAL ORIFICE/GRATE Q=.6 Area SQR(29H) (Limited to weir flow @ low head) 2 S 0.0' EXFILTRATION V= .076 FPM over SURFACE AREA Primary Discharge I I=Orifice/Grate Secondary Discharge 1 2=Exfiltration POND 8 INFLOU 8 OUTFLOW TRENCH FROM #8 TO #9 8 11 1.2 1 i 5TOR--IND METHOD PEAK STOR= 419 CF 1.0 PEAK ELEU= 46 FT .9 s Qin= 1.23 CFS Gout= .61 CF5 U •7 Qpri= 0.00 CFS v Qsec= .61 CFS .6 35 \ LAG= 10.1 MIN 'I � � 4 LL- 3 I .1 0.0m in m in m in m un m Ln TIME (hour5) Data for 00191 FIRST UNION 30" Page 12 TEN YEAR 24-HOUR RAINFALL= 7.00 IN Prepared by ANDREW & KUSKE CONSULTING ENGINEERS, INC. 11 Oct 00 HVdroCAD 5.01 000479 (c) 1966-1998 Applied_Microcomgutersytems POND 9 TRENCH FROM #9 TO #10 Qin = .95 CFS 9 12.12 HRS, VOLUME= .06 AF Qout= .50 CFS @ 12.32 HRS, VOLUME= .06 AF, ATTEN= 47$, LAG= 11.9 MIN Qpri= _07 CFS Cap 12.32 HRS, VOLUME= 0.00 AF Qsec= .43 CFS Q 12.32 HRS, VOLUME= .05 AF Report reflects 73W open space ELEVATION AREA INC.STOR CUM.STOR (FT) (SF) _ (CF) (CF) 47.3 170 0 0 50.3 340 558 558 STOR-IND METHOD PEAK STORAGE = 546 CF PEAK ELEVATION= 50.2 FT FLOOD ELEVATION= 50.3 FT START ELEVATION= 47.3 FT SPAN= 11-15 HRS, dt=.02 HRS Tdet= 10.8 MIN (.06 AF) # ROUTE INVERT OUTLET DEVICES 1 P 50.2' 8" HORIZONTAL ORIFICE/GRATE Q=.6 Area SQR(2gH) (Limited to weir flow @ low head) 2 S 0.0' EXPILTRATION V= .076 FPM over SURFACE AREA Primary Discharge 11=Orifice/Grate Secondary Discharge 1-2=Effiltration POND 9 INFLOW & OUTFLOW TRENCH FROM #9 TO #10 95 50 85 STOR-IND METHOD .60 PEAK STOR= 546 CF .75 PEAK ELEU= 50.2 FT .70 .65 Din= .95 CFS LO .50 Dout= .50 CF5 V 55 Opri- .07 CF5 .50 ,45 Osec= .43 CFS .40 r LAG= 11.9 MIN .35 .30 o .25 .15 10 05 0 .0 0m in m in m in m in m M V' V In TIME (hour5) Data for 00191 FIRST UNION 30" Page 13 TEN YEAR 24-HOUR RAINFALL= 7.00 IN Prepared by ANDREW & KUSKE CONSULTING ENGINEERS, INC. 11 Oct 00 HydroCAD 5.01 000479 (c) 1986-1998 Applied Microcomputer Systems POND 11 TRENCH FROM #11 TO #12 Qin = 1.00 CFS 9 12.12 HRS, VOLUME= .06 AF Qout= .87 CFS Q 12.19 HRS, VOLUME= .06 AF, ATTEN= 13%, LAG= 3.9 MIN Qpri= .51 CFS Q 12.19 HRS, VOLUME= .01 AF Qsec= .36 CFS @ 12.19 HRS, VOLUME= .05 AF Report reflects 73% open space ELEVATION AREA INC.STOR CUM.STOR (FT) (SF) _ (CF) (CF) 46.7 140 0 0 49.7 280 460 460 STOR-IND METHOD PEAK STORAGE = 479 CF PEAK ELEVATION= 49.8 FT FLOOD ELEVATION= 49.7 FT START ELEVATION= 46.7 FT SPAN= 11-15 HRS, dt=.02 HRS Tdet= 10.3 MIN (.06 AF) ROUTE INVERT OUTLET DEVICES 1 P 49.6' 8" HORIZONTAL ORIFICE/GRATE Q=.6 Area SQR(2gH) (Limited to weir flow @ low head) 2 S 0.0' EXFILTRATION V= .076 FPM over SURFACE AREA Primary Discharge 1-1=Orifice/Grate Secondary Discharge 12=Exfiltration 1.0 .9 .8 7 .6 U .5 : 4 Q J 3 .2 .1 0.0m POND 11 INFLOW & OUTFLOW TRENCH FROM #11 TO #12 STOR-IND METHDD PEAK STDR= 479 CF PEAK ELEU= 49.6 FT Gin= 1.03 CFS Gout= .87 CF5 < < Gpri= .51 CFS ` Qsec= .36 CFS I�1 CAG= 3.9 MIN hl I1 _� ti I � I � I \ In m In m In m n m TIME (hours) Data for 00191 FIRST UNION 30" Pace 14 TEN YEAR 24-HOUR RAINFALL= 7.00 IN Prepared by ANDREW & KUSKE CONSULTING ENGINEERS, INC. 11 Oct 00 Hy_droCAD 5.01 000479 (c) 1986-1998 Applied Microcomputer Systems T_ POND 13 TRENCH FROM # 13 TO #14 Qin = .22 CFS @ 12.12 HRS, VOLUME= .01 AF Qout= .12 CFS @ 12.31 HRS, VOLUME= .01 AF, ATTEN= 46%, LAG= 11.0 MIN Qpri= 0.00 CFS @ 0.00 HRS, VOLUME= 0.00 AF Qsec= .12 CFS @ 12.31 HRS, VOLUME= .01 AF Report reflects 73% open space ELEVATION AREA INC.STOR CUM.STOR (FT) (SF) (CF) (CF) 42.1 70 0 0 45.1 140 230 230 STOR-IND METHOD PEAK STORAGE = 84 CF PEAK ELEVATION= 43.2 FT FLOOD ELEVATION= 45.1 FT START ELEVATION= 42.1 FT SPAN= 11-15 HRS, dt=.02 HRS Tdet= 5.1 MIN (.01 AF) ROUTE INVERT OUTLET DEVICES 1 P 45.0' 8" HORIZONTAL ORIFICE/GRATE Q=.6 Area SQR(2gH) (Limited to weir flow 4 low head) 2 5 0.0' EXFILTRATION V= .076 FPM over SURFACE AREA Primary Discharge 1-1=orifice/Grate Secondary Discharge I-2=Exfiltration .22 20 .18 .16 � .14 U .12 10 3 0 0s .06 ,04 .32 0.00m POND 1.3 INFLOW $ OUTFLOW TRENCH FROM # 13 TO #14 STOR-IND METHOD PEAK STOR= 64 CF PEAK ELEV= 43.2 FT m Ln m in TIME (hour5) Din= .22 CFS Gout= .12 CFS Opri= 0.00 CF5 05ec= .12 CFS LAG= 11 MIN m n m V V Ln Data for 00191 FIRST UNION 30" rage 15 FIRTY YEAR 24-HOUR RAINFALL= 9.00 IN Prepared by ANDREW & KUSKE CONSULTING ENGINEERS, INC. 11 Oct 00 HydroCAD 5.01 000479 (c) 1986-1998 A_2plied Microcomputer Seems POND 1 TRENCH FROM #1 TO #2, 5 & 13 Qin = 6.34 CFS @ 12.17 HRS, VOLUME= .19 AF Qout= 4.87 CFS @ 12.26 HRS, VOLUME= .19 AF, ATTEN=. 23%, LAG= 5.2 MIN Qpri= 3.44 CFS @ 12.26 HRS, VOLUME= .06 AF Qsec= 1.44 CFS @ 12.26 HRS, VOLUME= .13 AF Report reflects 73t open space ELEVATION AREA INC.STOR CUM.STOR (FT) (SF) (CF) _ _(CF) 41.9 490 0 0 44.9 980 1610 1610 STOR-IND METHOD PEAK STORAGE = 2118 CF PEAK ELEVATION 45.8 FT FLOOD ELEVATION= 44.9 FT START ELEVATION= 41.9 FT SPAN= 11-15 HRS, dt=.02 HRS Tdet= 9.1 MIN (.19 AF) #ROUTE INVERT _ OUTLET DEVICES 1 P 44.8' 12" HORIZONT&L ORIFICE/GRATE Q=..6 Area SQR(2gH) (Limited to weir flow @ low head) 2 S 0.0' EXFILTRATION V= .076 FPM over SURFACE AREA Primary Discharge 11=Orifice/Grate Secondary Discharge L--2=Exfi1tration POND I INFLOW & OUTFLOW TRENCH FROM #1 TO #2, 5 & 13 6.0 STOR-IND METHOD 5.5 PEAK STOR= 2116 CF 5.0 PEAK ELEV= 45.8 FT 4 5 +' �i Din= 6.34 CFS d1 4.0 I ' Dout= 4.87 CFS �• 3 , 5 i Opr = 3.44 CFS v 3.0 111� Osec= 1.44 CFS I LAG= 5.2 MIN O 2.5 J 2.0 4 rti U- I > > 1 .5 1 .0 I y 0 �m I Ln m Ln m to CD Ln 0 -- - N N r"I M V V' Ln TIME (hours) Data for 00191 FIRST UNION 30" Paae 16 FIRTY YEAR 24-HOUR RAINFALL= 9.00 IN Prepared by ANDREW & KUSKE CONSULTING ENGINEERS, INC. 11 Oct 00 HydroCAD 5.01 000479 (c) 1986-1998 Applied Microcomputer Systems___ POND 2 TRENCH FROM #2 TO #3 Qin = 2.66 CFS 9 12.13 HRS, VOLUME= .11 AF Qout= 2.52 CFS Q 12.17 HRS, VOLUME= .11 AF, ATTEN= 5t, LAG= 2.1 MIN Qpri= 1.95 CFS 9 12.17 HRS, VOLUME= .04 AF Qsec= .57 CFS ® 12.17 HRS, VOLUME= .07 AF Report reflects 73% open space ELEVATION AREA INC.STOR CUM.STOR (FT)_ _ (SF) (CF) (CF)_ 42.3 200 0 0 45.3 400 657 657 STOR-IND METHOD PEAK STORAGE = 829 CF PEAK ELEVATION= 46.1 FT FLOOD ELEVATION= 45.3 FT START ELEVATION= 42.3 FT SPAN= 11-15 HRS, dt=.02 HRS Tdet= 8.4 MIN (.11 AF) ROUTE INVERT OUTLET DEVICES 1 P 45.2' 8" HORIZONTAL ORIFICE/GRATE Q=.6 Area SQR(2gH) (Limited to weir flow @ low head) 2 S 0.0' EXFILTRATION V= .076 FPM over SURFACE AREA Primary -Discharge I -1=Orifice/Grate Secondary Discharge 12=Exfiltraticn POND 2 INFLOW & OUTFLOiJ TRENCH FROM #2 TO #3 2.6 2.4 li STOP-IND METHOD 2 2 I, PEAK STOR= 829 CF PEAK ELEU= 46.1 FT 2.0 .� 1. 8 �I�, O i n= 2.66 CFS 1 I� Oout= 2.52 CF5 C� .6 i II `, I Opp i = 1.95 CF5 v 1.4 �I ,4 05ec= .57 CFS 1,2 �s LAG= 2.1 MIN 1 , _j 4 .4 .2 ` I , 0.0 In 19 In m ,n m In co rn v v In TIME (hours) Data for 00191 FIRST UNION 30" Page 17 FIRTY YEAR 24-HOUR RAINFALL= 9.00 IN Prepared by ANDREW & KUSKE CONSULTING ENGINEERS, INC. 11 Oct 00 HydroCAD 5.01 000479 (c)„1986-1998 Applied Microcomputer Systems _ POND 3 TRENCH FROM #3 TO #4 Qin = 1.69 CFS @ 12.12 HRS, VOLUME= .10 AF Qout= 1.67 CFS @ 12.14 HRS, VOLUME= .10 AF, ATTEN= 1k, LAG= 1.0 MIN Qpri= 1.34 CFS @ 12.14 HRS, VOLUME= .03 AF Qsec= .33 CFS @ 12.14 HRS, VOLUME= .06 AF Report reflects 73k open space ELEVATION AREA INC.STOR CUM.STOR _(FT)_(SF) (CF) (CF) 45.2 120 0 0 48.2 240 394 394 STOR-IND METHOD PEAK STORAGE = 462 CF PEAK ELEVATION= 48.7 FT FLOOD ELEVATION= 48.2 FT START ELEVATION= 45.2 FT SPAN= 11-15 HRS, dt=.02 HRS Tdet= 8.8 MIN (.1 AF) # ROUTE INVERT OUTLET DEVICES 1 P 48.1' 8" HORIZONTAL ORIFICE/GRATE - Q=.6 Area SQR(2gH) (Limited to weir flow @ low head) 2 S 0.0' EXFILTRATION V= .076 FPM over SURFACE AREA Primary Discharge I-1=Orifice/Grate Secondary Discharge I---2=Exfiltration POND 3 INFLOW & OUTFLOW TRENCH FROM #3 TO #4 1.7 1.5 ++ STOR-IND METHOD 1.4 PEAK STOR= 462 CF 1 3 PEAK ELEV= 46.7 FT 1 2 + r, . +r + 'O { n= 1 . 69 CFS 1 I + Qaut= 1.67 CFS u 5 �� + Opr i = 1 . 34 CF'5 Osec= .33 CFS 3 7 +i LAG= 1 MIN � LL 5 ++ 4 � i 0.0m 1 � m Ln m n m +n m In TIME (hours) Bata for 00191 FIRST UNION 30" Pace 18 FIRTY YEAR 24-HOUR RAINFALL= 9.00 IN Prepared by ANDREW & KUSKE CONSULTING ENGINEERS, INC. 11 Oct 00 H droCAD 5.01 000479 c 1986-1998 Applied Microcomputer Systems POND 5 TRENCH FROM #5 TO #6 Qin = 3.62 CFS @ 12.16 HRS, VOLUME= .13 AF Qout= 3.56 CFS @ 12.18 HRS, VOLUME= .13 AF, ATTEN= 2%, LAG= 1.3 MIN Qpri= 3.12 CFS @ 12.18 HRS, VOLUME= .07 AF Qsec= .43 CFS @ 12.18 HRS, VOLUME= .06 AF Report reflects 73% open space ELEVATION AREA INC.STOR CUM.STOR FT SF CF CF 42.3 140 0 0 45.3 280 460 460 STOR-IND METHOD PEAK STORAGE = 664 CF PEAK ELEVATION= 46.6 FT FLOOD ELEVATION= 45.3 FT START ELEVATION= 42.3 FT SPAN= 11-15 HRS, dt=.02 HRS Tdet= 6 MIN (.13 AF) # ROUTE INVERT OUTLET DEVICES _ _ �- 1 P 45.2' 8" HORIZONTAL ORIFICE/GRATE Q=.6 Area SQR(2gH) (Limited to weir flow @ low head) 2 S 0.0' EXFILTRATION V= .076 FPM over SURFACE AREA Primary Discharge 1 -1=Orifice/Grate Secondary Discharge 1 2=Exfiltration POND 5 INFLOW & OUTFLOW TRENCH FROM #5 TO #6 3.6 3.4 + STOR-IND METHOD 3 0 PEAK STOR= 664 CF 2.8 ,i �� PEAK Ei_.EU= 46.6 FT 2.6 �t 2.4 'it Qin= 3.62 CFS to Cl-2.2 Gout= 3.56 CF5 U 2.0 15 Gpri= 3.12 CFS ` 1.8 + Gsec= .43 CF5 1 .6 ��ti �s LAG= 1.3 MIN p 1 .4 �r -1 1 .2 1i 1 .0 .8 + �t 6 ti4 L z' ~ � 0.0 Y @ if 1 � m In c ll l m In 0 rn v v Ln TIME (hours) Data for 00191 FIRST UNION 30" Page 19 FIRSY YEAR 24-HOUR RAINFALL= 9.00 IN Prepared by ANDREW & KUSKE CONSULTING ENGINEERS, INC. 11 Oct 00 HydroCAD 5.01 000479 (c} 1986-1998 Applied Microcomputer Systems POND 6 TRENCH FROM #6 TO # 7 & 8 Qin = 3.83 CPS Q 12.12 HRS, VOLUME= .23 AF Qout= 3.49 CPS @ 12.17 HRS, VOLUME= _23 AF, ATTEN- 9%;, LAG= 2.9 MIN Qpri= 2.45 CFS 0 12.17 HRS, VOLUME= .06 AF Qsec= 1.04 CFS Q 12.17 HRS, VOLUME= .17 AF Report reflects 73% open space ELEVATION AREA INC.STOR CUM,STOR (FT) (SF)- (CF) (CF) 44.4 350 0 0 47.4 700 1150 1150 STOR-IND METHOD PEAK STORAGE = 1541 CF PEAK ELEVATION= 48.4 FT FLOOD ELEVATION= 47.4 FT START ELEVATION= 44.4 FT SPAN= 11-15 HRS, dt=.02 HRS Tdet= 9.6 MIN (.23 AF) # ROUTE INVERT OUTLET DEVICES 1 P 47.3' 8" HORIZONTAL ORIFICE/GRATE Q=.6 Area SQR(2gH) (Limited to weir flow s@ low head) 2 S 0.0' EXFILTRATION V= .076 FPM over SURFACE AREA Primary Discharge 11=Orifice/Grate Secondary Discharge t-2=Exfiltration POND 6 INFLOW & OUTFLOW TRENCH FROM #6 TO # 7 & 8 3.8 3.6 3. STOR-IND METHOD 3.2 + r� PEAK STCR= 1541 CF 3.0 � r PEAK ELEU= 48.4 FT 2.B r 2.6 + gin= 3.83 CFS Z.4 2 i +`+ 5+ Oout= 3.49 CF5 . U 4 Opr i= 2.45 CF5 20 +I ti 05ec= 1.04 CF5 3 1 .6 rr ` ` LAG= 2.9 MIN Q 1 .4 +r LL- 1 .0 .8 .6 .4 ` .2 13.0 +n m rn m Ln m rn m rn v v In TIME (hour5) 'Data for 00191 FIRST UNION 30" Page 20 FIRTY YEAR 24-HOUR RAINFALL= 9.00 IN Prepared by ANDREW & KUSKE CONSULTING ENGINEERS, INC. 11 Oct 00 HydroCAD 5.01 000479 (c) 1986-1998 Applied Microcomputer Systems POND 8 TRENCH FROM #8 TO #9 & 11 Qin = 2.52 CFS @ 12.17 HRS, VOLUME= .09 AF Qout= 1.13 CFS @ 12.34 HRS, VOLUME= .09 AF, ATTEN= 55`k, LAG= 10.0 MIN Qpri= .24 CFS p 12.34 HRS, VOLUME= 0.00 AF Qsec= .89 CFS @ 12.34 HRS, VOLUME= .09 AF Report reflects 73% open space ELEVATION AREA INC.STOR CUM.STOR (FT) (SF) (CF) _ (CF) 44.9 350 0 0 47.9 700 1150 1150 STOR-IND METHOD PEAK STORAGE = 1154 CF PEAK ELEVATION= 47.9 FT FLOOD ELEVATION= 47.9 FT `START ELEVATION= 44.9 FT SPAN= 11-15 HRS, dt=.02 HRS Tdet= 10.8 MIN (.09 AF) # ROUTE INVERT _ OUTLET_ DEVICES _ 1 P _ 47.8' 8" HORIZONTAL ORIFICE/GRATE Q=.6 Area SQR(2gH) (Limited to weir flow Q low head) 2 S 0.0' EXFILTRATION V= .076 FPM over SURFACE AREA Primary Discharge 11=Orifice/Grate Secondary Discharge L--2=Exfiltration POND 8 INFLOW & OUTFLOW TRENCH FROM #8 TO #9 8 11 2.4 STOR-IND METHOD 2 2 PEAK STOR= 1154 CF 2.0 PEAK ELEV= 47.9 FT 1.$ Qin= 2.52 CF5 1.6 flout= 1.13 CFS U 1.4 DPn = .24 CF5 " 1.2 Qsec= .69 CF5 3 LAG= 10 MIS! I 0 CD �5 �\ .6 J 4 1 .2 y 0.0m � 5 n m u') m in m Ln m - - N N r7 r'7 V V in TIME Chour5) Bata for 00191 FIRST UNION 30" Page 21 FIRTY YEAR 24-HOUR RAINFALL= 9.00 IN Prepared by ANDREW & KUSKE CONSULTING ENGINEERS, INC. 11 Oct 00 HydroCAD 5.01„ 000479 (c) 1986-1998 Applied Microcomputer Systems POND 9 TRENCH FROM #9 TO #10 Qin = 1.25 CFS @ 12.12 HRS, VOLUME= .07 AF Qout= 1.09 CFS @ 12.19 HRS, VOLUME= .07 AF, ATTEN= 13%, LAG= 3.8 MIN Qpri= .64 CFS @ 12.19 HRS, VOLUME= .01 AF Qsec= .44 CFS @ 12.19 HRS, VOLUME= .06 AF Report reflects 73% open space ELEVATION AREA INC.STOR CUM.STOR FT SF CF CF 47.3 170 0 0 50.3 340 558 558 STOR-IND METHOD PEAK STORAGE = 594 CF PEAK ELEVATION= 50.5 FT FLOOD ELEVATION= 50.3 FT START ELEVATION= 47.3 FT SPAN= 11-15 HRS, dt=.02 HRS Tdet= 10.2 MIN (.07 AF) _ROUTE INVERT OUTLET DEVICES _ 1 P 50.2' 8" HORIZONTAL ORIFICE/GRATE Q=.6 Area SQR(29H) (Limited to weir flow @ low head) 2 S 0.0' EXFILTRATION V= .076 FPM over SURFACE AREA Primary Discharge I I=Orifice/Grate Secondary Discharge I 2=Exfiltration POND 9 INFLOW & OUTFLOW TRENCH FROM ##9 TO TM10 l.z STOR-IND METHOD 1 1 PEAK STOR= 594 CF 1.0 PEAK ELEV= 50.5 FT , 9 I, Oin= 1.25 CFS 9 r Oout= 1.09 CF5 U 7 �� Dpri� .64 CFS 6 Ir, Qsec= .44 CFS � 5 tl+� LAG= 3.8 MIN p r, LL- I .2 I , 1 I ,n m In m V Q Ln TIME (hours) Data for 00191 FIRST UNION 30" Page 22 FIRTY YEAR 24-HOUR RAINFALL= 9.00 IN Prepared by ANDREW & KUSKE CONSULTING ENGINEERS, INC. 11 Oct 00 HydroCAD 5_._01 000479_ (c) 1986-1998 Applied Microcomputer Systems POND 11 TRENCH FROM #11 TO #12 Qin = 1.32 CFS @ 12.12 HRS, VOLUME= .08 AF Qout= 1.29 CFS @ 12.15 HRS, VOLUME= .08 AF, ATTEN= 2$, LAG= 1.5 MIN Qpri= .92 CFS 0 12.15 HRS, VOLUME= .02 AF Qsec= .37 CFS @ 12.15 HRS, VOLUME= .06 AF Report reflects 73% open space ELEVATION AREA INC.STOR CUM.STOR (FT) (SF) (CF) (CFS 46.7 140 0 0 49.7 280 460 460 STOR-IND METHOD PEAK STORAGE = 509 CF PEAK ELEVATION= 5C"0 FT FLOOD ELEVATION= 49.7 FT START ELEVATION= 46.7 FT SPAN= 11-15 HRS, dt=.02 HRS Tdet= 9-5 MIN (.08 AF) # ROUTE INVERT OUTLET DEVICES 1 P 49.6' 8" HORIZONTAL ORIFICE/GRATE Q=.6 Area SQR(2gH) (Limited to weir flow @ low head) 2 S 0.0' EXFILTRATION V= .076 FPM over SURFACE AREA Primary Discharge I I=Orifice/Grate Secondary Discharge 12=Exfiltration POND 11 INFLOW & OUTFLOW TRENCH FROM #11 TO #12 1 3 1.2 STOR-IND METHOD I I ' PEAK STOR= 509 CF PEAK ELEV= 50 FT I.0 III •9 I ICI Gin= 1.32 CF5 0 6 i I� II II Gout= 1 . 29 CFS u 7 11 Qpri z. 92 CF5 S t Qsec= .37 CF5 6 t LAG= 1.5 MIN d I 4 � �Is .3 .Z / I 5 � 4 e 11M . lf7 @ Ln m Ill @ l[l m — N SU r7 Ln TIME (hours) 'Data for 00191 FIRST UNION 30" Page 23 FIRTY YEAR 24-HOUR RAINFALL= 9.00 IN Prepared by ANDREW & KUSKE CONSULTING ENGINEERS, INC. 11 Oct 00 HydroCAD 5.01 000479 (c) 1986-1998 Applied Microcomputer Systems _ POND 13 TRENCH FROM # 13 TO #14 Qin = .29 CFS @ 12.12 HRS, VOLUME= .02 AF Qout= .14 CFS Q 12.34 HRS, VOLUME= .02 AF, Qpri= 0.00 CFS O 0.00 HRS, VOLUME= 0.00 AF Qsec= .14 CFS @ 12.34 HRS, VOLUME= .02 AF Report reflects 73% open space ELEVATION AREA INC.STOR CUM.STOR FT SF CF CF 42.1 70 0 0 45.1 140 230! 230 ATTEN= 51%, LAG= 12.9 MIN STOR-IND METHOD PEAK STORAGE = 144 CF PEAK ELEVATION= 44.0 FT FLOOD ELEVATION= 45.1 FT START ELEVATION= 42.1 FT SPAN= 11-15 HRS, dt=.02 HRS Tdet= 7.8 MIN (.02 AF) _ ROUTE INVERT_ OUTLET DEVICES _ 1 P 45.0' 8" HORIZONTAL ORIFICE/GRATE Q=.6 Area SQR(2gH) (Limited to weir flow © low head) 2 S 0.0' EXFILTRATION V= .076 FPM over SURFACE AREA Primary Discharge I 1=Orifice/Grate Secondary Discharge i 2=Exfiltration .28 .26 24 22 r, .20 Ln .18 U .16 .14 3 .12 0 10 tl .08 .0b .04 .02 O.eOm POND 13 INFLOW & OUTFLOW TRENCH FROM # 13 TO #14 STOR-IND METHOD PEAK STOR= 144 CF PEAK ELEU= 44 FT Ln m Ln m In N N rn M TIME (hours) Gin= .29 CF5 Oout= .14 CF5 Opri= 0.00 CF5 Qsec= .14 CF5 LAG= 12.9 MIN V V Ln A Date Design Andrew and Kuske 902 Market St. CONSULTING ENGINEERS, INC. Wilmington, N.C. 28401 Sheet Of Check Job For Job No, f:bz- orr IC6 5ult,010ca W I vq t nu co; b &--) y C*t-c-v LA-TI n A,,) S SEAL (\V z r l 966 ��• \ •• y�CLlP N A& , onIR / RECEIVED OCT 16 2000 DWQ PROP # Date Design Andrew and Kuske 902 Market St. CONSULTING ENGINEERS, INC. Wilmington, N.C. 28401 >�� Check Job For Job No. -7 I OFr1 /aT S'C -5' 4'9A1:C_ G �6�f \V/LL.1At--.S 1 S 1 E li is %A AS, Slr� A zf-A I S 3 7I�$Zo OFF- srrG "Tv S YSr4" O • !3 5/ So 0 f3S,0Z0 It�P�Rviovs AP-6. A T3uIL-D,NG -ca.z5 1z, 490 F'AR,ICINJC S OXIVGS I I gI ISO �vA L K S- -Pa-ns ON- Srr� 1��PERvipvl 1,r4 67/ too OFF-SrT� To SY.STe-ni, 0.02 %00 To 7A4- 1Mr'&fLVf0 yr ro s'iS7L`�';- i, 5G (0'7/ go 0 90 rxns'6rtv�ovtl _ I.r4 Ac/ I, 8? 64" ON-sI;G g� rupExv�uur� �.5-6 A,-/1.4'sA4 V5E SSy rN,P ��fa�r CDR ],9S ACROJ Ar IA4rs,c.N OFF-pr•ojc-r— !nr'Er�v.ays �TLiV�S + wALkS G,/3 4G S i ORai'C VOLUP,L Fort I" 'RAfn/ A 0,0Sr f1 + (1.srA, f o•ly/ 6,2) � ��„ f� l/2 }/4jr,;o 63Un GF STir.AGC 4vAlcgfILd 7T-( 1, zs' ')2 ( (14- 4.4 r-Fle-r �C�l ors Z-r fir = G • CFI ` r- < 1 a 1S L F 00 cF 7 (p300 C-F: pK Date Design Andrew and Kuske Sheet C ' 3 902 Market St. CONSULTING ENGINEERS, INC, Wilmington, N.C, 28401 V Of Check Jab For Job No. 0" INS r-rLTIZA-rl0,.J SYST4c rt• 'rJC ri' Go��i'Ic/4N' C7r �CIZ!`�c!'iTll�lYy $G-E p-r;�craCa Sp,LS `�CPaT�T r nE AF+,z K 1 = 3 2. 9 1,v/N1z- ve = C82r1 r 32,s+ Ss,l) ln//il,z ,' 3 7 Ll 5 6' K Cod titi, N/yti 0,07(, F PM rL0\v FLA7&- rL.O'v IS C/14G✓LA7c'tC - Z�3V SF 13/3SE0' Owl VElzr,'e-4C, 1�46\v -r4XtU414 ¢apR, ours+c FlMA{ = 4"( ]ol.s' (2 '1701� yC- SL�GT.,./ Arza-A 4060 SF Qkr,, (2030 3F �C p,07C. FPJ,ti)(r1 154 C FM 4kAX = �406o sr)(0,07t. F�^•� �r) 30g CPtA QA v! _ (1 Ss- e-F^t f 3 o S 1D 1Z A w r3 0 \-,,, r✓ T = (o Coop cF7 7-'3 f GFn� 4 Z '7 A4 i r.1 P6.AK 1Nr-IL7"rZA-r16 / CApACrTy �Y EM CArJ 1NFJL7k.JTE ENTrfZ�-D1-Cj4f-1;zCC Fra,.) p45-jr.J":9 'n{-11J' - d,33:�j'-' '5.4. �, o 3, ry 4 SEc art . wvt Data for 00191 FIRST UNION 30" Page 1 TEN YEAR 24-HOUR RAINFALL,= 7.00 IN Prepared by ANDREW & KUSKE CONSULTING ENGINEERS, INC. 11 Oct 00 HydroCAD 5.01 00047.9 (c) 1986-1998 Applied Microcomputer Systems WATERSHED ROUTING O O O / \ Q 0�� � 0 ,1, 13 O O II , 12 OSUBCATCHMENT ❑ REACH Q POND Q] LINK Data for 00191 FIRST UNION 30" Page 2 TEN YEAR 24-HOUR RAINFALL= 7.00 IN Prepared by ANDREW & KUSKE CONSULTING ENGINEERS, INC. 11 Oct 00 HydroCAD 5.01 000479 (c)__1986-_1998 Applied Microcomputer Systems SUBCATCHMENT 1 AREA TO CB #1 PEAK= 1.06 CFS 9 12.12 HRS, VOLUME= .06 AF ACRES CN SCS TR-20 METHOD .19 89 TYPE III 24-HOUR RAINFALL= 7.00 IN SPAN= 11-15 HRS, dt=.02 HRS Method _ _ _ Comment _ Tc (mial DIRECT ENTRY Segment ID: 10.0 SUBCATCHMENT 2 AREA TO CB #2 PEAK= 1.00 CFS @ 12.12 HRS, VOLUME= .06 AF ACRES CN SCS TR-20 METHOD .18 89 TYPE III 24-HOUR RAINFALL= 7.00 IN SPAN= 11-1S HRS, dt=.02 HRS } Method _ _ Comment _ Tc (min)„ DIRECT ENTRY Segment ID: 10.0 SUBCATCHMENT 3 AREA TO CB #3 PEAK= .84 CFS @ 12.12 HRS, VOLUME= .05 AF ACRES CN SCS TR-20 METHOD .15 89 TYPE III 24-HOUR RAINFALL= 7.00 IN SPAN= 11-15 HRS, dt=.02 HRS Method Comment Tc min DIRECT ENTRY Segment ID: 10.0 SUBCATCHMENT 4 AREA TO CB #4 PEAK= .45 CFS 0 12.12 HRS, VOLUME= .03 AF ACRES CN SCS TR-20 METHOD .08 89 TYPE III 24-HOUR RAINFALL= 7.00 IN SPAN= 11-15 HRS, dt=.02 HRS Method _ _ _ Comment TC (min) DIRECT ENTRY Segment ID: 10.0 Data for 00191 FIRST UNION 30" Page 3 TEN YEAR 24-HOUR RAINFALL= 7.00 IN Prepared by ANDREW & KUSKE CONSULTING ENGINEERS, INC. 11 Oct 00 HydroCAD 5.01 _000479 {c) 1986-1998 Applied Microcomputer Systems SUBCATCHMENT 5 AREA TO CB #5 PEAK= .95 CFS @ 12.12 HRS, VOLUME= .06 AF ACRES CN SCS TR-20 METHOD .17 89 TYPE III 24-HOUR RAINFALL= 7.00 IN SPAN= 11-15 HRS, dt=.02 HRS Method _ w Comment - _ _ Tc (min) DIRECT ENTRY Segment ID: 10.0 SUBCATCHMENT 6 AREA TO CB #6 PEAK= 1.45 CFS @ 12.12 HRS, VOLUME= .08 AF ACRES CN .26 89 SCS TR-20 METHOD TYPE III 24-HOUR RAINFALL= 7.00 IN SPAN= 11-15 HRS, dt=.02 HRS Method _ Comment Tc (min) DIRECT ENTRY T - - Segment ID: �^ 10.0 SUBCATCHMENT 7 AREA TO CB #7 PEAK= 1.45 CFS @ 12.12 HRS, VOLUME= .08 AF ACRES CN SCS TR-20 METHOD .26 89 TYPE III 24-HOUR RAINFALL= 7.00 IN SPAN= 11-15 HRS, dt=.02 HRS Method Comment Tc min DIRECT ENTRY Segment ID: 10.0 SUBCATCHMENT 8 AREA TO CB #8 PEAK= .84 CFS @ 12.12 HRS, VOLUME= .05 AF ACRES CN SCS TR-20 METHOD .15 89 TYPE III 24-HOUR RAINFALL= 7.00 IN SPAN= 11-15 HRS, dt=.02 HRS _Method _ _ Comment Tc__(minL DIRECT ENTRY Segment ID: 10.0 Data for 00191 FIRST UNION 30" Page 4 TEN YEAR 24-HOUR RAINFALL= 7.00 IN Prepared by ANDREW & KUSKE CONSULTING ENGINEERS, INC. 11 Oct 00 HydroCAD 5.01 000479 (c) 1986-1998 Applied Microcomputer Systems SUBCATCHMENT 9 AREA TO CB #9 PEAK= .22 CFS Q 12.12 HRS, VOLUME= .01 AF ACRES CN SCS TR-20 METHOD .04 89 TYPE III 24-HOUR RAINFALL= 7.00 IN SPAN= 11-15 HRS, dt=.02 HRS Method _ _ _ Comment _ Tc (min) DIRECT ENTRY Segment ID: 10.0 SUBCATCHMENT 10 AREA TO CB #10 PEAK= .72 CFS ® 12.12 HRS, VOLUME= .04 AF ACRES CN SCS TR-20 METHOD .13 89 TYPE III 24-HOUR RAINFALL= 7.00 IN SPAN= 11-15 HRS, dt=.02 HRS Method _ Comment _ - Tc (min) DIRECT ENTRY Segment ID: 10.0 SUBCATCHMENT 11 AREA TO CB #11 PEAK= .61 CFS 0 12.12 HRS, VOLUME= .04 AF ACRES CN SCS TR-20 METHOD .11 89 TYPE III 24-HOUR RAINFALL= 7.00 IN SPAN= 11-15 HRS, dt=.02 HRS Method - Comment _ _ Tc „(min DIRECT ENTRY Segment ID: 10.0 SUBCATCHMENT 12 AREA TO CS #12 PEAK= .39 CFS @ 12.12 HRS, VOLUME= .02 AF ACRES CN SCS TR-20 METHOD .07 89 TYPE III 24-HOUR RAINFALL= 7.00 IN SPAN= 11-15 HRS, dt=.02 HRS Method_ Comment _ Tc (min) DIRECT ENTRY Segment ID: 10.0 Data for 00191 FIRST UNION 30" Page 5 TEN YEAR 24-HOUR RAINFALL= 7.00 IN Prepared by ANDREW & KUSKE CONSULTING ENGINEERS, INC. 11 Oct 00 HydroCAD 5.01 000479 (•c) 1986-1998 Applied Microcomputer Systems SUBCATCHMENT 13 AREA TO CB #13 PEAK= .22 CPS 3 12.12 HRS, VOLUME= .01 AF ACRES CN .04 89 SCS TR-20 METHOD TYPE III 24-HOUR RAINFALL= 7.00 IN SPAN= 11-15 HRS, dt=.02 HRS Method _ _ Comment TC (min) DIRECT ENTRY Segment ID: 10.0 Data for 00191 FIRST UNION 30" Page 6 TEN YEAR 24-HOUR RAINFALL= 7.00 IN Prepared by ANDREW & KUSKE CONSULTING ENGINEERS, INC. 11 Oct 00 H droCAD 5.01 000479 c 1986-1998 Apl2lied Microcomputer Systems POND 1 TRENCH FROM #1 TO #2, 5 & 13 Qin = 3.64 CFS @ 12.21 HRS, VOLUME= .11 AF Qout= 1.38 CFS @ 12.39 HRS, VOLUME= .11 AF, ATTEN= 620, LAG= 11.2 MIN Qpri= .15 CFS @ 12.39 HRS, VOLUME= 0.00 AF Qsec= 1.23 CFS 0 12.39 HRS, VOLUME= .11 AF Report reflects 73sk open space ELEVATION AREA INC.STOR CUM.STOR (FT) (SF) (CF) (CF) 41.9 490 0 0 44.9 980 1610 1610 STOR-IND METHOD PEAK STORAGE = 1580 CF PEAK ELEVATION= 44.8 FT FLOOD ELEVATION= 44.9 FT START ELEVATION= 41.9 FT SPAN= 11-15 HRS, dt=.02 HRS Tdet= 10.9 MIN (.11 AF) # ROUTE INVERT OUTLET DEVICES 1 P 44.8' 120 HORIZONTAL ORIFICE/GRATE Q=.6 Area SQR(2gH) (Limited to weir flow @ low head) 2 S 0.0' EXFILTRATION V= .076 FPM over SURFACE AREA Primary Discharge L-1=Orifice/Grate Secondary Discharge I 2=Exfiltration POND 1 INFLOW & OUTFLOW TRENCH FROM #1 TO #Z, 5 & 13 3.6 3.4 STOR-IND METHOD 3 2 PEAK STOR= 1580 CF 3-0 2.8 PEAK ELEV= 44.6 FT 2'S � 2.4 Qin= 3.64 CF5 c 2.2 Oout= 1.38 CF5 u 2.0 Opri= .15 CFS 1.8 Osec= 1.23 CFS 1.6 LAG= 11.2 MIN 3 O 1 .4 J 1 .2 tz 1 .0 5 4 2 r 0 00 Ln m n m n m Ln m - - (V N M M v V lP TIME (hours) Data for 00191 FIRST UNION 30" Page 7 TEN YEAR 24-HOUR RAINFALL= 7.00 IN Prepared by ANDREW & KUSKE CONSULTING ENGINEERS, INC. 11 Oct 00 HydroCAD 5.01 000479 (c) 1986-1998 Applied Microcomputer Systems POND 2 TRENCH FROM #2 TO #3 Qin = 1.94 CPS @ 12.14 HRS, VOLUME= .08 AF Qout= 1.55 CPS @ 12.21 HRS, VOLUME= .OB AF, ATTEN= 20%, LAG= 4.5 MIN Qpri= 1.01 CPS @ 12.21 HRS, VOLUME= .01 AF Qsec= .54 CPS @ 12.21 HRS, VOLUME= .06 AF Report reflects 73t open space ELEVATION AREA INC.STOR CUM.STOR _ (FT) (SF) (CF) (CF) 42.3 - 200 0 0 45.3 400 657 657 STOR-IND METHOD PEAK STORAGE = 735 CF PEAK ELEVATION= 45.7 FT FLOOD ELEVATION= 45.3 FT START ELEVATION= 42.3 FT SPAN= 11-15 HRS, dt=.02 HRS Tdet= 9.6 MIN (.08 AF) # ROUTE INVERT OUTLET DEVICES �1 P 45.2'� 8" HORIZONTAL ORIFICE/GRATE Q=.6 Area SQR(2gH) (Limited to weir flow 0 low head) 2 S 0.0' EXFILTRATION V= .076 FPM over SURFACE AREA Primary Discharge I I=Orifice/Grate Secondary Discharge I 2=Exfiltration POND 2 INFLOW & OUTFLOW TRENCH FROM #2 TO #3 1.9 1.8 STOR-IND METHOD 1.7 PEAK STOR= 735 CF 1.6 1.5 PEAK ELEV= 45.7 FT ^ 1.3 i' Din= 1.94 CF5 1 .2 i ' Oout= 1,55 CF5 u 1.1 i '4 ppr'i= 1.01 CF5 1.9 '' osec= .54 CFS uyi + LAG= 4.5 MIN , .7 �� 6 n LL.. 5 u -t 4 .3 .2 � i 1 a.em Ln m Ln M m n m TIME (hours) Data for 00191 FIRST UNION 30" Page 8 TEN YEAR 24-HOUR RAINFALL= 7.00 IN Prepared by ANDREW & KUSKE CONSULTING ENGINEERS, INC. 11 Oct 00 HydroCAD 5.01 000479 (c) 1986-1998 Applied Microcomputer Systems POND 3 TRENCH FROM #3 TO #4 Qin = 1.28 CFS @ 12.12 HRS, VOLUME= .08 AF Qout= 1.26 CFS @ 12.14 HRS, VOLUME= .07 AF, Qpri= .94 CFS Q 12.14 HRS, VOLUME= .02 AF Qsec= .32 CFS @ 12.14 HRS, VOLUME= .06 AF Report reflects 73t open space ELEVATION AREA INC.STOR CUM.STOR (FT) (SF) (CF)_ (CF) -- 45.2 120 0 0 48.2 240 394 394 ATTEN= 10, LAG= 1.1 MIN STOR-IND METHOD PEAK STORAGE = 438 CF PEAK ELEVATION= 48.5 FT FLOOD ELEVATION= 46.2 FT START ELEVATION= 45.2 FT SPAN= 11-15 HRS, dt=.02 HRS Tdet= 9.2 MIN (.07 AF) ROUTE INVERT _ OUTLET DEVICES 1 P 48.1' 8" HORIZONTAL ORIFICE/GRATE Q=.6 Area SQR(2gH) (Limited to weir flow @ low head) 2 S 0.0' EXFILTRATION V= .076 FPM over SURFACE AREA Primary Discharge E--1=Orifice/Grate Secondary Discharge I2=Exfiltration 1 .2 1.1 1.0 � B c.. u .7 .6 5 -� 4 L.L .3 2 1 0.0m in POND 3 INFLOW & OUTFLOW TRENCH FROM #3 TO #4 STOR-IND METHOD PEAK STOR= 436 CF PEAK ELEU= 48.5 FT I =li I; M ti M I ti ti F 4 II l I; ti I � 1 � m n m N N M fh TIME (hours) Qin= 1.28 CFS Qout= 1.26 CFS Opri= .94 CFS Qsec= .32 CF5 LAG= 1.1 MIN m n v v Ln Data for 00191 FIRST UNION 30" Page 9 TEN YEAR 24-HOUR RAINFALL= 7.00 IN Prepared by ANDREW & KUSKE CONSULTING ENGINEERS, INC. 11 Oct 00 HydroCAD 5.01 000479_ (CL1986-1998 Applied Microcomputer Systems POND 5 TRENCH FROM #5 TO #6 Qin = 2.26 CFS i� 12.18 HRS, VOLUME= .08 AF Qout= 2.18 CFS @ 12.21 HRS, VOLUME= .08 AF, ATTEN= 3%, LAG= 1.5 MIN Qpri= 1.79 CFS @ 12.21 HRS, VOLUME= .03 AF Qsec= .40 CFS @ 12.21 HRS, VOLUME= .05 AF Report reflects 73t open space ELEVATION AREA INC.STOR CUM.STOR (FT) (SF) (CF) (CF) T 42.3 140 0 0 45.3 280 460 460 STOR-IND METHOD PEAK STORAGE = 569 CF PEAK ELEVATION= 46.0 FT FLOOD ELEVATION= 45.3 FT START ELEVATION= 42.3 FT SPAN= 11-15 HRS, dt=.02 HRS Tdet= 7.6 MIN (.08 AF) # ROUTE INVERT OUTLET DEVICES 1 P 45.2' 8" HORIZONTAL ORIFICE/GRATE Q=.6 Area SQR(2gH) (Limited to weir flow @ low head) 2 S 0.0' EXFILTRATION V= .076 FPM over SURFACE AREA Primary Discharge L--1=Orifice/Grate Secondary Discharge I 2=Exfiltration 2.2 2.0 1.8 1.6 r-. In 1.4 u 1.2 :3 1 .0 CD 8 LL- .6 ,4 .2 0.0m to POND 5 INFLOW & OUTFLOW TRENCH FROM #5 TO #6 5TOR-IND METHOD PEAK STOR= 569 CF PEAK El EU= 46 FT r5 4ti 4 iy ti I tt I tt I it 1 y I rt I tt I tr 1 l4 �l5 i � t r t m to m to fV N M rn TIME (hours) Qin= 2.26 CFS Gout= 2.18 CF5 Opri= 1.79 CFS 05ec= .40 CF5 LAG= 1.5 MIN m to C!D v v In Data for 00191 FIRST UNION 30" Page 10 TEN YEAR 24-HOUR RAINFALL= 7.00 IN Prepared by ANDREW & KUSKE CONSULTING ENGINEERS, INC. 11 Oct 00 HydroCAD 5.01 000479 (c) 1986-1998 Applied Microcomputer Systems POND 6 TRENCH FROM #6 TO # 7 & 8 Qin = 2.90 CFS @ 12.12 HRS, VOLUME= .17 AF Qout= 2.41 CFS ® 12.20 HRS, VOLUME= .17 AF, ATTEN= 17$, LAG= 4.3 MIN Qpri= 1.44 CFS @ 12.20 HRS, VOLUME= .03 AF Qsec= .97 CFS 9 12.20 HRS, VOLUME= .14 AF Report reflects 73% open space ELEVATION AREA INC.STOR CUM.STOR (FT) _(SF) ICF) (CF) 44.4 350 0 0 47.4 700 1150 1150 STOR-IND METHOD PEAK STORAGE = 1364 CF PEAK ELEVATION= 48.0 FT FLOOD ELEVATION=. 47.4 FT START ELEVATION= 44.4 FT SPAN= 11-15 HRS, dt=.02 HRS Tdet= 10.2 MIN (.17-AF) ## ROUTE_ INVERT OUTLET DEVICES 1 P 47.3' 8" HORIZONTAL ORIFICE/GRATE Q=.6 Area SQR(2gH) (Limited to weir flow O low head) 2 S 0.0' EXFILTRATION V= .076 FPM over SURFACE AREA Primary Discharge 1-l=Orifice/Grate Secondary Discharge J2=Exfiltration POND 6 INFLOW & OUTFLOW TRENCH FROM #6 TO # 7 8 8 2.8 2.6 STOR-IND METHOD 2 4 PEAK STOR= 1364 CF PEAK ELEU= 48 FT 2.2 I, 2.0 i Din= 2.90 CF5 1.8 + , Oaut= z.41 CFS L. U I .6 I ' Gpr'i = 1.44 CFS 1.4 i�� `s Osec= .97 CF5 3 1.2 II, , LAG= 4.3 MIN O If 4 l LL .4 I , 0m Ifl m Ln {Zl Lfl m to m rn v Ln TIME Chours) Data for 00191 FIRST UNION 30" Page 1_. TEN YEAR 24-HOUR RAINFALL= 7.00 IN Prepared by ANDREW & KUSKE CONSULTING ENGINEERS, INC. 11 Oct DO HydroCAD 5.01 000479 (c) 1986-1998 Applied_ Microcomputer Systems POND 8 TRENCH FROM #8 TO #9 & 11 Qin = 1.23 CPS @ 12.18 HRS, VOLUME= .06 AF Qout= .61 CFS 0 12.35 HRS, VOLUME= .06 AF, ATTEN= 51$, LAG= 10.1 MT_`� Qpri= 0.00 CFS @ 0.00 HRS, VOLUME= 0.00 AF Qsec= .61 CFS @ 12.35 HRS, VOLUME= .06 AF Report reflects 730 open space ELEVATION AREA INC.STOR CUM.STOR (FT) (SF) (CF) (CF) 44.9 350 0 0 47.9 700 1150 1150 STOR-IND METHOD PEAK STORAGE = 419 �F PEAK ELEVATION= 46.0 FT FLOOD ELEVATION= 47.9 FT START ELEVATION= 44.9 FT SPAN= 11-15 HRS, dt=.02 HRS Tdet= 5 MIN (.06 AF) ROUTE INVERT OUTLET DEVICES 1 P 47.8' 8" HORIZONTAL ORIFICE/GRATE Q=.6 Area SQR(2gH) (Limited to weir flow @ low head) 2 S 0.0' EXFILTRATION V= .076 FPM over SURFACE AREA Primary Discharge I1=Orifice/Grate Secondary Discharge I2=Exfiltraticn POND $ INFLOW & OUTFLOW TRENCH FROM #8 TO #9 & 11 1.2 I.I STOR-IND METHOD PEAK STOR= 419 CF 1.0 PEAK ELEU= 46 FT .9 e Din= 1.23 CFS Rout= .61 CFS u .7 Opri= 0.00 CFS L 6 05ec= .61 CFS 3 5 LAG= 10.1 MIN O l J 4 3 .2 1 ` 0. em in m U, m U'� m Ln 0 - - N N rn M V V lf1 TIME Chour5) Data for 00191 FIRST UNION 30" Page 12 TEN YEAR 24-HOUR RAINFALL= 7.00 IN Prepared by ANDREW & KUSKE CONSULTING ENGINEERS, INC. 11 Oct 00 HydroCAD_ 5.01 000479 (c) 1986-1998 Applied Microcomputer Systems POND 9 TRENCH FROM #9 TO #10 Qin = .95 CFS @ 12.12 HRS, VOLUME= .06 AF Qout= .50 CFS @ 12.32 HRS, VOLUME= .06 AF, ATTEN= 47%, LAG= 11.9 MIN Qpri= .07 CFS @ 12.32 HRS, VOLUME= 0.00 AF Qsec= .43 CFS @ 12.32 HRS, VOLUME= .05 AF Report reflects 73W open space ELEVATION AREA INC.STOR CUM.STOR (FT) (SF) (CF) (CF) 47.3 170 0 0 50.3 340 558 558 STOR-IND METHOD PEAK STORAGE = 546 CF PEAK ELEVATION= 50.2 FT FLOOD ELEVATION= 50.3 FT START ELEVATION= 47.3 FT SPAN= 11-15 HRS, dt=.02 HRS Tdet= 10.8 MIN (.06 AF) J_ ROUTE INVERT OUTLET DEVICES _ 1 P 50.2' 8" HORIZONTAL ORIFICE/GRATE Q=.6 Area SQR(2gH) (Limited to weir flow @ low head) 2 S 0.0' EXFILTRATION V= .076 FPM over SURFACE AREA Primary Discharge I1=Orifice/Grate Secondary Discharge 12=Exfiltration 95 90 85 .80 .75 .70 .65 .60 4 .55 v .50 .45 .40 O .35 -J .30 � .25 .20 .15 .10 .05 POND 9 INFLOW & OUTFLOW TRENCH FROM #9 TO #10 STOR-IND METHOD PEAK 5TOR= 546 CF PEAK ELEU= 50.E FT In m Ln m Ln N N M rn TIME (hours) Oin= .95 CFS Oout= .50 CF5 Opri= .07 CFS Osec= .43 CFS LAG= 11,9 MIN m Ln m v v Ln Data for 00191 FIRST UNION 30" Page 13 TEN YEAR 24-HOUR RAINFALL= 7.00 IN Prepared by ANDREW E KUSKE CONSULTING ENGINEERS, INC. 11 Oct 00 HydroCAD 5.01000479 (c)__1986-1998 Applied -Microcomputer Systems POND 11 TRENCH FROM #11 TO #12 Qin = 1.00 CPS @ 12.12 HRS, VOLUME= .06 AF Qout= .87 CPS @ 12.19 HRS, VOLUME= .06 AF, ATTEN= 13%, LAG= 3.9 MIN Qpri= .51 CFS @ 12.19 HRS, VOLUME= .01 AF Qsec= .36 CFS @ 12.19 HRS, VOLUME= .05 AF Report reflects 730 open space ELEVATION AREA INC.STOR CUM.STOR _ (FT) (SF) (CF) (CF) 46.7 140 0 0 49.7 280 460 460 STOR-IND METHOD PEAK STORAGE = 479 CF PEAK ELEVATION= 49.8 FT FLOOD ELEVATION= 49.7 FT START ELEVATION= 46.7 FT SPAN= 11-15 HRS, dt=,02 HRS Tdet= 10.3 MIN (.06 AF) # ROUTE INVERT OUTLET DEVICES _ ^1 P� 49.6' 8" HORIZONTAL ORIFICE/GRATE ^ Q=.6 Area SQR(2gH) (Limited to weir flow @ law head) 2 S 0.0' EXFILTRATION V= .076 FPM over SURFACE AREA Primary Discharge L-i=Orifice/Grate Secondary Discharge 12=Exfiltration POND 11 INFLOW & OUTFLOW TRENCH FROM #11 TO #12 STOR-IND METHOD PEAK STOR= 479 CF PEAK ELEV= 49.8 FT Din 1.00 CFS Qout= .57 CFS Qpri= .51 CFS Qsec= .36 CFS LAG= 3.9 MIN n m In m n m rn m N N 11 rz V V In TIME (hovr5) Data for 00191 FIRST UNION 30" Page 14 TEN YEAR 24-HOUR RAINFALL= 7.00 IN Prepared by ANDREW & KUSKE CONSULTING ENGINEERS, INC. 11 Oct 00 HydroCAD 5;_01 000479 (c) 1986-1998 Applied Microcomputer Systems POND 13 TRENCH FROM # 13 TO #14 Qin = .22 CFS @ 12.12 HRS, VOLUME= .01 AF Qout= .12 CFS @ 12.31 HRS, VOLUME= .01 AF, ATTEN= 46%, LAG= 11.0 MIN Qpri= 0.00 CFS @ 0.00 HRS, VOLUME= 0.00 AF Qsec= .12 CFS 9 12.31 HRS, VOLUME= .01 AF Report reflects 73% open space ELEVATION AREA INC.STOR CUM.STOR (FT) (SF) _ _(CF) (CF) 42.1 70 0 0 45.1 140 230 230 STOR-IND METHOD PEAK STORAGE = 84 CF PEAK ELEVATION= 43.2 FT FLOOD ELEVATION= 45.1 FT START ELEVATION= 42.1 FT SPAN= 11-15 HRS, dt=.02 HRS Tdet= 5.1 MIN (,01 AF) ROUTE INVERT OUTLET DEVICES 1 P 45.0' 8" HORIZONTAL ORIFICE/GRATE Q=.6 Area SQR(2gH) (Limited to weir flow @ low head) 2 S 0.0' EXFILTRATION V= .076 FPM over SURFACE AREA Primary Discharge t-1=Orifice/Grate Secondary Discharge I 2=Exfiltration 22 .20 .18 r-, 16 L 14 U .12 v .10 3 o .08 LL- .06 .04 02 0.00m POND 13 INFLOW $ OUTFLOW TRENCH FROM # 13 TO #14 STOR-IND METHOD PEAK STOR= 84 CF PEAK ELEU= 4.3.2 FT Gin= .22 CFS Qcut= .12 CFS Opri= 0.00 CF5 05ec= .12 CF5 LAG= 11 MIN N N r'] M v v Ln TIME (hours) Data for 00191 FIRST UNION 301, Page 15 FIRTY YEAR 24-HOUR RAINFALL= 9.00 IN Prepared by ANDREW & KUSKE CONSULTING ENGINEERS, INC. .11 Oct 00 HydroCAD 5.01 000479 c) 1986-1998 Applied Microcomputer Systems„ POND 1 TRENCH FROM #1 TO #2, 5 & 13 Qin = 6.34 CFS @ 12.17 HRS, VOLUME= .19 AF Qout= 4.87 CFS @ 12.26 HRS, VOLUME= .19 AF, ATTEN= 23t, LAG= 5.2 MIN Qpri= 3.44 CFS @ 12.26 HRS, VOLUME= .06 AF Qsec= 1.44 CFS Q 12.26 HRS, VOLUME= 13 AF Report reflects 73W open space ELEVATION AREA INC.STOR CUM.STOR (FT) (SF) (CF) (CF) 41.9 490 0 0 44.9 980 1610 1610 STOR-IND METHOD PEAK STORAGE = 2118 CF PEAK ELEVATION= 45.8 FT FLOOD ELEVATION= 44.9 FT START ELEVATION= 41.9 FT SPAN= 11-15 HRS, dt=.02 HRS Tdet= 9.1 MIN (.19 AF) # ROUTE INVERT OUTLET DEVICES _ 1 P 44.8' �12" HORIZONTAL ORIFICE/GRATE Q=.6 Area SQR(2gH) (Limited to weir flow @ low head) 2 S 0.0' EXFILTRATION V= .076 FPM over SURFACE AREA Primary Discharge I 1=Orifice/Grate Secondary Discharge 1---2=Exfi1tration POND 1 INFLOW & OUTFLOW TRENCH FROM #1 TO #2, 5 & 13 6.0LEK STOR-IND METHOD 5.5A STOR= 2118 CF 5.0AK ELEU= 45.8 FT r 4.5 Qin= 6.34 CF5J1 4.0 Gout= 4.67 CFS` Qpri= 3.44 CFS3.0 v3.5j 0.ec- 1.44 CF5LAG= 5.2 MIN2.5 -J z.0i.51 .0 0 .0� m In m In m In m .- - N N rn r) V Q In TIME Chour5) Data for 00191 FIRST UNION 30" Page 16 FIRTY YEAR 24-HOUR RAINFALL= 9.00 IN Prepared by ANDREW & KUSKE CONSULTING ENGINEERS, INC. 11 Oct 00 HydroCAD 5.01 000479 (c} 1986-1998 Applied Microcomputer Systems POND 2 TRENCH FROM #2 TO #3 Qin = 2.66 CFS @ 12.13 HRS, VOLUME= .11 AF Qout= 2.52 CFS @ 12.17 HRS, VOLUME= .11 AF, ATTEN= 50, LAG= 2.1 MIN Qpri= 1.95 CFS @ 12.17 HRS, VOLUME .04 AF Qsec= .57 CFS @ 12.17 HRS, VOLUME= .07 AF Report reflects 73t open space ELEVATION AREA INC.STOR CUM.STOR (FT) (SF) __ (CF) (CF) 42.3 200 0 0 45.3 400 657 657 STOR-IND METHOD PEAK STORAGE = 829 CF PEAK ELEVATION=. 46.1 FT FLOOD ELEVATION= 45.3 FT START ELEVATION= 42.3 FT SPAN= 11-15 HRS, dt=.02 HRS Tdet= 8.4 MIN (.11 AF) # ROUTE INVERT OUTLET DEVICES 1 P 45.2' 8" HORIZONTAL ORIFICE/GRATE Q=.6 Area SQR(2gH) (Limited to weir flow @ low head) 2 S 0.0' EXFILTRATION V= .076 FPM over SURFACE AREA Primary Discharge L-1=Orif ice/Grate Secondary Discharge I 2=Exfiltration POND 2 INFLOW & OUTFLOW TRENCH FROM #2 TO #.3 2.6 2.4 i STOR-IND METHOD 2.2 PEAK $TOR= 829 CF i� PEAK ELEV= 46.1 FT 2.0 1.8 ��+ Oin- 2.66 CF5 � 1 �� +I�+ Dout= 2.52 CF5 .6 i ri= 1.95 CFS 1.4 f+t Osec= .57 CFS 1.2 + i+ LAG= 2.1 MIN 8 1� � 4 .2 9.0m u� m to m in m U) m - - N ru v lIl TIME (hours) Data for 00191 FIRST UNION 30" Page 17 FIRTY YEAR 24-HOUR RAINFALL= 9.00 IN Prepared by ANDREW L KUSKE CONSULTING ENGINEERS, INC. 11 Oct 00 HydroCAD 5.01 000479 (c) 1986-_1998 Applied_ Microcomputer Systems POND 3 TRENCH FROM #3 TO #4 Qin = 1.69 CFS @ 12.12 HRS, VOLUME= .10 AF Qout= 1.67 CFS 0 12.14 HRS, VOLUME= .10 AF, ATTEN= 1%, LAG= 1.0 MIN Qpri= 1.34 CFS @ 12.14 HRS, VOLUME= .03 AF Qsec= .33 CFS @ 12.14 HRS, VOLUME= 06 AF Report reflects 73% open space ELEVATION AREA INC.STOR CUM.STOR FT SF CF CF 45.2 120 0 0 48.2 240 394 394 STOR-IND METHOD PEAK STORAGE = 462 CF PEAK ELEVATION= 48.7 FT FLOOD ELEVATION= 48.2 FT START ELEVATION= 45.2 FT SPAN= 11-15 HRS, dt=.02 HRS Tdet= 8.8 MIN (.1 AF) # ROUTE INVERT OUTLET DEVICES 1 P 48.1' 8" HORIZONTAL ORIFICE/GRATE Q=.6 Area SQR(2gH) (Limited to weir flow @ low head) 2 S 0.0' EXFILTRATION V= .076 FPM over SURFACE AREA Primary Discharge L---1=Orifice/Grate Secondary Discharge � 2=Exfiltration POND 3 INFLOW & OUTFLOW TRENCH FROM #3 TO #4 1.7 1'6 1.5 ' STOR-IND METHOD 1.4 PEAK STOR= 462 CF 1 , PEAK ELEV= 48.7 FT .3 +, 1.2 ,� 4 Qin= 1.69 CFS � L.- 1.1 1. � ! Gaut= 1.67 CFS U 9 ! ! Qpr'i= 1.34 CFS 8 r! !! 05cc= .33 CFS LAG= I MIN O 6 i! . 2 .1 1 \ - - N N !''I M v v Ln TIME (hours) Data for 00191 FIRST UNION 30" Page 18 FIRTY YEAR 24-HOUR RAINFALL= 9.00 IN Prepared by ANDREW & KUSKE CONSULTING ENGINEERS, INC. 11 Oct 00 HydroCAD 5.01 000479 (c)^1986-1998 Applied Microcomputer Systems POND 5 TRENCH FROM #5 TO #6 Qin = 3.62 CFS @ 12.16 HRS, VOLUME= .13 AF Qout= 3.56 CFS @ 12.18 HRS, VOLUME= .13 AF, Qpri= 3,12 CFS @ 12.18 HRS, VOLUME= .07 AF Qsec= .43 CFS @ 12.18 HRS, VOLUME .06 AF Report reflects 73t open space ELEVATION AREA INC.STOR CUM.STOR (FT) (SF) _ (CF) (CF) 42.3 140 0 0 45.3 280 460 460 ATTEN= 2%, LAG= 1.3 MIN STDR-IND METHOD PEAK STORAGE = 664 CF PEAK ELEVATION= 46.6 FT FLOOD ELEVATION= 45.3 FT START ELEVATION= 42.3 FT SPAN= 11-15 HRS, dt=.02 HRS Tdet= 6 MIN (.13 AF) ## ROUTE INVERT OUTLET DEVICES _ 1 P 45.2' 8" HORIZONTAL ORIFICE/GRATE Q=.6 Area SQR(2gH) (Limited to weir flow @ low head) 2 S 0.0' EXFILTRATION V= .076 FPM over SURFACE AREA Primary Discharge I1=Orifice/Grate Secondary Discharge L--2=Exfi1tration 3.6 3.4 3.2 3.0 2.8 2.6 2.4 LO ,- 2.2 u 2.0 " I.B 1.6 0 1.4 J 1.2 � 1.e .a .6 .4 .2 S.", Ln POND 5 INFLOW & OUTFLOW TRENCH FROM #5 TO #6 STDR-IND METHOD PEAK STDR- 664 CF PEAK ELEV= 46.6 FT 5 m in m in N N r) M TIME Chour5) Oin- 3.62 CF5 Oout= 3.56 CFS Opr!= 3.12 CFS 05ec= .43 CFS LAG= 1.3 MIN as in m v v in Data for 00191 FIRST UNION 30" Page 19 FIRTY YEAR 24-HOUR RAINFALL= 9.00 IN Prepared by ANDREW & KUSKE CONSULTING ENGINEERS, INC. 11 Oct 00 HydroCAD 5.01 000479 (c) 1986-1998 Applied Microcomputer Systems POND 6 TRENCH FROM #6 TO # 7 & 8 Qin = 3.83 CFS @ 12.12 HRS, VOLUME= .23 AF Qout= 3.49 CFS @ 12.17 HRS, VOLUME= .23 AF, ATTEN= 90, LAG= 2.9 MIN Qpri= 2.45 CFS @ 12.17 HRS, VOLUME= .06 AF Qsec= 1.04 CFS @ 12.17 HRS, VOLUME= .17 AF Report reflects 730 open space ELEVATION AREA INC.STOR CUM.STOR (FT) _ (SF) (CF) _ (CF) 44.4 350 0 0 47.4 700 1150 1150 STOR-IND METHOD PEAK STORAGE = 1541 CF PEAK ELEVATION= 48.4 FT FLOOD ELEVATION= 47.4 FT START ELEVATION= 44.4 FT SPAN= 11-15 HRS, dt=.02 HRS Tdet= 9.6 MIN (.23 AF) ROUTE INVERT OUTLET DEVICES 1 P 47.3' 8" HORIZONTAL ORIFICE/GRATE Q=.6 Area SQR(2gH) (Limited to weir flow @ low head) 2 S 0.0' EXFILTRATION V= .076 FPM over SURFACE AREA Primary Discharge L--1=Orifice/Grate Secondary Discharge 12=Exfiltration 3.8 3.6 3.4 3.2 3.0 2.6 r, 2.6 LO 2.4 2.2 2.0 1.8 3 1.6 d 1 .4 1 .2 IL 1 .0 .6 .6 4 .2 SO POND 6 INFLOW 8 OUTFLOW TRENCH FROM #6 TO # 7 & 8 Ul) STOR-IND METHOD PEAK STOR= 1541 CF PEAK ELEU= 48.4 FT Oin= 3.83 CFS Ocut= 3.49 CFS Opri= 2.45 CFS Qsec= 1.04 CFS t % LAG= 2.9 MIN � s ti in m un N r1 M TIME (hours) m in m v v Ln Data for 00191 FIRST UNION 30" Page 20 FIRTY YEAR 24-HOUR RAINFALL= 9.00 IN Prepared by ANDREW & KUSKE CONSULTING ENGINEERS, INC. 11 Oct 00 HydroCAD 5.01 000479_ (c) 1986-1998 Applied Microcomputer Systems POND 8 TRENCH FROM #8 TO #9 & 11 Qin = 2.52 CFS @ 12.17 HRS, VOLUME= .09 AF Qout= 1.13 CFS @ 12.34 HRS, VOLUME= .09 AF, ATTEN= 550, LAG= 10.0 MIN Qpri= .24 CFS @ 12.34 HRS, VOLUME= 0.00 AF Qsec= .89 CFS @ 12.34 HRS, VOLUME= .09 AF Report reflects 73% open space ELEVATION AREA INC.STOR CUM.STOR (FT) (SF) (CF) (CF) 44.9 350 0 0 47.9 700 1150 1150 STOR-IND METHOD PEAK STORAGE = 1154 CF PEAK ELEVATION= 47.9 FT FLOOD ELEVATION= 47.9 FT START ELEVATION= 44.9 FT SPAN= 11-15 HRS, dt=.02 HRS Tdet= 10.8 MIN (.09 AF) _# ROUTE INVERT OUTLET DEVICES 1 P 47.8' 8" HORIZONTAL ORIFICE/GRATE Q=.6 Area SQR(2gH) (Limited to weir flow @ low head) 2 S 0.0' EXFILTRATION V= .076 FPM over SURFACE AREA Primary Discharge 11=Orifice/Grate Secondary Discharge -2=Exfiltration 2.4 2.2 2.e I.e kn 1 . 6 U I A " 1.z O 1.0 -i S LL- .a 2 POND 8 INFLOW & OUTFLOW TRENCH FROM #8 TO #9 & 11 5TOR-IND METHOD PEAK STDR= 1154 CF PEAK ELEU= 47.9 FT Oin= 2.52 CFS Qout= 1.13 CFS Opr'i= .24 CFS Osec= .89 CF5 LAG= 10 MIN U) M Ln m N N r1 f7 TIME (hours) CD LD V V Ln Data for 00191 FIRST UNION 30" Page 21 FIRTY YEAR 24-HOUR RAINFALL= 9.00 IN Prepared by ANDREW & KUSKE CONSULTING ENGINEERS, INC. 11 Oct 00 HydroCAD 5.01 _000479 (c)_1986-1998 Applied -microcomputer Systems POND 9 TRENCH FROM #9 TO #10 Qin = 1.25 CFS ® 12.12 HRS, VOLUME= .07 AF Qout= 1.09 CFS @ 12.19 HRS, VOLUME= .07 AF, ATTEN= 13t, LAG= 3.8 MIN Qpri= .64 CFS @ 12.19 HRS, VOLUME= .01 AF Qsec= .44 CFS @ 12.19 HRS, VOLUME= .06 AF Report reflects 73% open space ELEVATION AREA INC.STOR CUM.STOR FT SF CF CF 47.3 170 0 0 50.3 340 558 558 STOR-IND METHOD PEAK STORAGE = 594 CF PEAK ELEVATION= 50.5 FT FLOOD ELEVATION= 50.3 FT START ELEVATION= 47.3 FT SPAN= 11-15 HRS, dt=.02 HRS Tdet= 10.2 MIN (.07 AF) # ROUTE INVERT OUTLET DEVICES 1 P 50.2' 8" HORIZONTAL ORIFICE/GRATE Q=.6 Area SQR(2gH) (Limited to weir flow @ low head) 2 S 0.0' EXFILTRATION V= .076 FPM over SURFACE AREA Primary Discharge 11=Orifice/Grate Secondary Discharge L----2=Exfiltration POND 9 INFLOW & OUTFLOW TRENCH FROM #9 TO #10 STOR-IND METHOD 1L AK STOR= 594 CF 1.0 K ELEU= 53.5 FT. Din= 1.25 CFSDout= 1.03 CFSu 7 Dpr'i= .64 CFS6 Dsec= .44 CFSLAG= 3.8 MIN O5J .4LL .2 1 2m 1 )n m rn m rn ll7 m - - N CV fn In TIME (hours) Data for 00191 FIRST UNION 30" Page 22 FIRTY YEAR 24-HOUR RAINFALL= 9.00 IN Prepared by ANDREW & KUSKE CONSULTING ENGINEERS, INC. 11 Oct 00 HydroCAD_5.01 000479. (c) 1986-1998 Applied Microcomputer Systems POND 11 TRENCH FROM #11 TO #12 Qin = 1.32 CFS @ 12.12 HRS, VOLUME= .08 AF Qout= 1.29 CFS @ 12.15 HRS, VOLUME= .08 AF, Qpri= .92 CFS @ 12.15 HRS, VOLUME= .02 AF Qsec= .37 CFS @ 12.15 HRS, VOLUME= .06 AF Report reflects 73% open space ELEVATION AREA INC.STOR CUM.STOR (FT)_ (SF) (CF) - (_CF) 46.7 140 0 0 49.7 280 460 460 ATTEN= 20, LAG= 1.5 MIN STOR-IND METHOD PEAK STORAGE = 509 CF PEAK ELEVATION= 50.0 FT FLOOD ELEVATION= 49.7 FT START ELEVATION= 46.7 FT SPAN= 11-15 HRS, dt=.02 HRS Tdet= 9.5 MIN (.08 AF) # ROUTE INVERT OUTLET DEVICES _ T 1 P 49.6' 8" HORIZONTAL ORIFICE/GRATE Q=.6 Area SQR(2gH) (Limited to weir flow @ low head) 2 S 0.0' EXFILTRATION V= .076 FPM over SURFACE AREA Primary Discharge 11=Orifice/Grate Secondary Discharge I 2=Exfiltration POND 11 INFLOW & OUTFLOW TRENCH FROM #11 TO #12 �.3 k.2 I STOR-IND METHOD i I PEAK STOR= 509 CF PEAK ELEU= 50 FT 1.0 r` . 9 I I' �i O i n= 1 . 32 CF5 6 I� �� Oout= 1.29 CFS u 7 5 y OPr i= .92 CF5 1 I Osec= .37 CFS 6 i s LAG= 1.5 MIN O .5 -j 4 I Ll- 3 1 _ I e.em 0 m Ln W L m L, m rn M IT Q to TIME (hours) Data for 00191 FIRST UNION 30" Page 23 FIRTY YEAR 24-HOUR RAINFALL= 9.00 IN Prepared by ANDREW & KUSKE CONSULTING ENGINEERS, INC. 11 Oct 00 HydroCAD 5.01 000479 (c) 1986-1998 Applied Microcomputer Systems POND 1.3 TRENCH FROM # 13 TO #14 Qin = .29 CFS @ 12.12 HRS, VOLUME= .02 AF Qout= .14 CFS 0 12.34 HRS, VOLUME .02 AF, ATTEN= 51%, LAG= 12.9 MIN Qpri= 0.00 CFS @ 0.00 HRS, VOLUME= 0.00 AF Qsec= .14 CFS @ 12.34 HRS, VOLUME= .02 AF Report reflects 730 open space ELEVATION AREA INC.STOR CUM.STOR (FT)-- ASF) (CF) `((CF) 42.1 70 0 0 45.1 140 230 230 STOR-IND METHOD PEAK STORAGE = 144 CF PEAK ELEVATION= 44.0 FT FLOOD ELEVATION= 45.1 FT START ELEVATION= 42.1 FT SPAN= 11-15 HRS, dt=.02 HRS. Tdet= 7.8 MIN (.02 AF) # ROUTE INVERT OUTLET DEVICES 1 P 45.0' 8" HORIZONTAL ORIFICE/GRATE Q=.6 Area SQR(2gH) (Limited to weir flow @ low head) 2 S 0.0' EXFILTRATION V= .076 FPM over SURFACE AREA Primary Discharge 11=Orifice/Grate Secondary Discharge L-2=Exfiltration .28 .26 .24 .22 ,� 18 U .16 .14 :3 .12 0 19 LL- .08 .06 .04 .02 0.00m POND 13 INFLOW & OUTFLOW TRENCH FROM # 13 TO #14 Ul) STOR-IND METHOD PEAK STOR= 144 CF PEAK ELEV= 44 FT m in m in N N M rn TIME (hours) Gin= .29 CFS Gaut= .14 CF5 OPr!= 0.08 CFS ❑sec= .14 CFS LAG= 12.9 MIN m u) m v v in J A N 10 Mi.. SECTION 02720 STORM DRAINAGE SYSTEMS 1.01 RELATED DOCUMENTS A. The Drawings and provisions of the General Conditions, Supplementary Conditions, and the Sections included under Division 1, General Requirements, are included as a part of this Section as though bound herein. 1.02 DESCRIPTION OF WORK A. Extent of storm drainage systems work is indicated on drawings and schedules, and by requirements of this section. B. Refer to Division-2 section "Earthwork" for excavation and back -fill required for storm drainage systems; not work of this section. C. Refer to Division-3 sections for concrete work required for storm drainage systems; not work of this section. D. Refer to Division-15 for interior building systems including conductors, horizontal branches, and connections to roof and deck drains; not work of this section. E. The Owner will not accept the storm drainage system if it is filled or partially filled with sediment or debris.The Contractor is responsible for removing sediment and debris from storm system prior to acceptance and payment by the Owner. F. The contractor is responsible for installing and maintaining erosion control measures necessary and is required to prevent sediment and debris accumulation in storm drainage systems. This may include modifications of measures shown on the approved plans or additional measures not indicated on the approved plans. 1.03 QUALITY ASSURANCE A. MAmfacturer's Qualifications. Firms regularly engaged in manufacture of storm drainage system's products of types, materials, and sizes required, whose products have been in satisfactory use in similar service for not less than 5 years. B. Installer'sQualifications: Firm with at least 3 years of successful installation experience on projects with storm drainage work similar to that required for project. BWOB/9943 STORM DRAINAGE SYSTEMS 02720-1 C. Codes and Standards: 1. Plumbing_ Code Compliance: Comply with applicable portions of National Standard Plumbing Code pertaining to selection and installation of storm drainage system's materials and products. 2. Environmental Compliance: Comply with applicable portions of local Environmental Agency regulations pertaining to storm drainage systems. 1.04 SUBMITTALS A. Product Data: .Submit manufacturer's technical product data and installation instructions for storm drainage system materials and products. B. Shop Drawings: Submit shop drawings for storm drainage systems, showing piping materials, size, locations, and inverts. Include details of underground structures, connections, and manholes. Show interface and spatial relationship between piping and proximate structures. 10 C. Record Drawings: At project close-out, submit record drawings of installed storm drainage piping and products, in accordance with requirements of Division 1. D. Maintenance i-ata: Submit maintenance data and parts lists for storm drainage system materials and products. include this data, product data, shop drawings, and record drawings in maintenance manual; in accordance with requirements of Division 1. F 2-ERODUCTS 2.01 IDENTIFICATION A. - : Manufacturer's standard permanent, bright - colored, continuous -printed plastic tape, intended for direct -burial service; not less than 6" wide x 4 mils thick. Provide green tape with black printing reading "CAUTION SEWER LINE BURIED BELOW". 2.02 PIPES AND PIPE FITTINGS A. General. Provide pipes of one of the following materials, of weight/class indicated. Provide pipe fittings and accessories of same material and weight/class as pipes, with joining method as indicated. B. Reinforced Concrete Pine: ASTM C 76, Class II unless otherwise indicated. B WOB/9943 STORM DRAINAGE SYSTEMS 02720-2 C. FittinQs: Reinforced concrete, same strength as adjoining pipe, tongue -and -groove gasketed joints complying with ASTM C 443, D. PolyyinylChloride (PVC) Sewer Pine: ASTM D 3033, Type PSP, SDR 35; or ASTM D 3034, Type PSM, SDR 35. E. Fiffing : PVC, ASTM D 3033 or D 3034, solvent cement joints complying with ASTM D 2855 using solvent cement complying with ASTM D 2654; or elastomeric joints complying with ASTM D 3212 using elastomeric seals complying with ASTM F 477. 2.03 STORM SEWER MANHOLES A. General: Provide pre -cast reinforced concrete storm sewer manholes as indicated, complying with ASTM C 478. B. �: Pre -cast concrete, of concentric cone, eccentric cone, or flat slab top type, as indicated. C. Base: Pre -cast concrete, with base riser section and separate base slab, or base riser section with integral floor, as indicated. D. Sep_ : Ductile -iron or aluminum, integrally cast into manhole sidewalls. E. FEame and Covg : Ductile -iron, 26" diameter cover, heavy-duty, indented top design, with lettering cast into top reading "STORM SEWER". F. Pine Connections: Resilient, complying with ASTM C 923. 2.04 CATCH BASINS A. General: Provide pre -cast reinforced concrete catch basins as indicated. B. Frame and Grate: See Drawings. C. Pine QonaecWrs: Resilient, complying with ASTM C 923. 2.05 OUTFALLS A. General: Construct of cast -in -place concrete as indicated, with reinforced headwall, apron, and tapered sides. Provide rip -rap as indicated to prevent washout of outfall discharge. BWOB/9943 STORM DRAINAGE SYSTEMS 02720-3 A 3.01 INSTALLATION OF IDENTIFICATION A. Qgneral: During back- f.Ilingltop-soiling of storm drainage systems, install continuous underground -type plastic line marker, located directly over buried line at 6" to 8" below finished grade. 3.02 INSTALLATION OF PIPE AND PIPE FITTINGS 1 A. raj: Install piping in accordance with governing authorities having jurisdiction, except where more stringent requirements are indicated. B. Inspect piping before installation to detect apparent defects. Mark defective materials with white paint and promptly remove from site. C. Lay piping beginning at low point of system, true to grades and alignment indicated, with unbroken continuity of invert. D. Place bell ends or groove ends of piping facing upstream. E. Install gaskets in accordance with -manufacturer's recommendations for use of lubricants, cements, and other special installation requirements. F. Cucrete Pine: Install in accordance with applicable provisions of ACPA "Concrete Pipe Installation Manual". G. S`Qppsr Tube: Install in accordance with applicable provisions of CDA "Copper Tube Handbook". H. Plastic Pipe: Install in accordance with manufacturer's installation recommendations, and in accordance with ASTM D 2321. I. Cleaning Pivine: Clean interior of piping of dirt and other superfluous material as work progresses. Maintain swab or drag in line and pull past each Joint as it is completed. J. In large accessible piping, brushes and brooms may be used for cleaning. K. Place plugs in ends of uncompleted conduit at end of day or whenever work stops. L. Flush lines between manholes if required to remove collected debris. M. Joint Adapters: Make joints between different types of pipe with standard manufactured adapters and fittings intended for that purpose. BWOB19943 STORM DRAINAGE SYSTEMS 02720-4 N. Closing Abandoned Utilities: Close open ends of abandoned underground utilities which are indicated to remain in place. Provide sufficiently strong closures to withstand hydra -static or earth pressure which may result after ends of abandoned utilities have been closed. 0. Close open ends of concrete or masonry utilities with not less than 8" thick brick masonry bulkheads. P. Close open ends of piping with threaded metal caps, plastic plugs, or other acceptable methods suitable for size and type of materials being closed. Wood plugs are not acceptable. Q. Interior Ins eta ctio: Inspect piping to determine whether line displacement or other damage has occurred. 1. Make inspections after lines between manholes, or manhole locations, have been installed and approximately 2' of back -fill is in place, and again at completion of project. 2. If inspection indicated poor alignment, debris, displaced pipe, infiltration or other defects, correct such defects, and re -inspect. 3.03 PRECAST CONCRETE MANHOLES A. General: Place precast concrete sections as indicated. Where manholes occur in pavements, set tops of frames and covers flush with finish surface. Elsewhere, set tops 3" above, finish surface, unless otherwise indicated. B. Install in accordance with ASTM C 891. C.- Provide rubber joints gasket complying with ASTM C 443 at joints of sections. D. Apply bituminous mastic coating at joints of sections. 3.04 CATCH BASINS A. General: Construct catch basins to sizes and shapes indicated. B. Set frames and grates to elevations indicated. 3.05 OUTFALLS A. raj: Construct of concrete which will attain 28-day compressive strength of not less than 3000 psi. BWOB/9943 STORM DRAINAGE SYSTEMS 02720-5 ;4 :V .... rr I lY' 3.06 TAP CONNECTIONS A. Make connections to existing piping and underground structures, so that finished work will conform as nearly as practicable to requirements specified for new work. B. Use commercially manufactured wyes for branch connections. Field cutting into piping will not be permitted. Spring wyes into existing line and encase entire wye, plus 6" overlap, with not less than 6" of 3000 psi 28-day compressive strength concrete. 1. Branch connections made from side into existing 4" to 21" piping shall have wye sprung into existing line, and entire wye encased with not Iess than 6" of 3000 psi 28-day compressive strength concrete. 2. For branch connections from side into existing 24" or larger piping, or to underground structures, cut opening into unit sufficiently large to allow 3" of concrete to be packed around entering connections. Cut ends of connection passing through pipe or structure wall to conform to shape of and be flush with inside wall, unless otherwise indicated. On outside of pipe or structure wall, encase entering connection in 6" of concrete for minimum length of 12" to provide additional support or collar from connection to undisturbed ground. 3. Provide concrete which will attain minimum 28-day compressive strength of 3000 psi, unless otherwise indicated. 4. Use epoxy bonding compound as interface between new and existing concrete and piping materials. 5. Take care while making tap connections to prevent concrete or debris from entering existing piping or structure. Remove debris, concrete, or other extraneous material which may accumulate. 3.07 BACKFILLING A. General: Conduct back -fill operations of open -cut trenches closely following laying, jointing, and bedding of pipe, and after initial inspection and testing are completed. B. To minimize local area traffic interruptions, allow no more than 100' between pipe laying and point of complete back -filling. 3.08 FIELD QUALITY CONTROL A. Testing: Perform testing of completed piping in accordance with local authorities having jurisdiction. END OF SECTION 02720 BWOB/9943 STORM DRAINAGE SYSTEMS 02720-6 ANDREW & KUSKE CONSULTING ENGINEERS, INC. RECEIVED 902 Market Street DEC 15 2000 Wilmington, NC 28401-4733 LETTER`OF-TRANSMITTAL John R. Andrew, P.E. J.A. Kuske, P.E. J. Phillip Norris, P.E. 910-343-9653 / FAX 910-343-9604 11 To: Mr. Scott Vinson 11 Date: December 14, 2000 11 .lob No. 00191 11 11 NCDENR 11 subject: The Office Building 11 II 127 Cardinal Drive Extension II II Wilmington, NC 28405-3845 WE ARE SENDING YOU VIA Mail FA) ® ATTACHED ❑ UNDER SEPARATE COVER C ❑ SHOP DRAWINGS El PRINTS [I TRACINGS IX ❑ SPECIFICATIONS ❑ DISKS ❑ COPY OF LETTER ❑ call MI 11 :f-ecelvm :tnlS:m�ssa e COPIEST DATE I NO. DI"SCRIPTION 11 1 1 10/05/00 1 1 S&ME Soils Report P IElAS REQUESTED ❑ FOR REVIEW AND COMMENT ❑ FOR APPROVAL II ® FOR YOUR USE ❑ FORBIDS DUE ❑ YOUR PRINTS LOANED TO US REMARKS: The soils report was inadvertently ommitted from the State stormwater permit application submitted to your office. Please include it with the permit package for your review and approval. SIGNED J. Phillip Norris, P. E. / cjf CONFIDENTIAL AND PRIVILEGED: Information contained in this document is privileged and confidential, Intended for the sole use of the addressee. If you are not the addressee or the person responsible for delivering it to the addressee you are hereby notified that any dissemination, distribution or copying of this document is strictly prohibited. If you have received this document in error please immediately notify the sender and return to the address above. �� ..'r '� ,��. • ,' _ s .( .. .. r 1. .. �. yi � l �.. � _ � { .. .. - � i .. r Er`EIVED October 5, 2000 0 C 1 6 2000 i+iV11h'LW P.��T WSHE Andrew & Kuske Consulting Engineers 902 Market Street j Wilmington, North Carolina 28401 Attention: Mr. Phil Norris, P.E. I 1 Reference: Double Ring infiltrometer Testing Proposed First Union Bank Site Wilmington, North Carolina Job No. 1063-00-367 Dear Mr. Norris: As requested. S&MEI, personnel have recently conducted double -ring infiltrometer testin; of the siiriiciai soils at the subject site at the approximate locations shown in Figure 1. Specifically, our representatives performed the following work items: I i. Conducted three double -ring infiltrometer tests in the upper six inches of site grade. This testing was conducted in general accordance with American Society for Testing and Materials (ASTM) procedure D-3385 entitled, "Infiltration Rate of Soils in Field Using Double -Ring Infiltrometer". 2. Advanced one hand -angered boring near each infiltrometer test location in order to visually classify the in -place soils. A Munseli Soil Colo,- Gran '..'as used to c - ,roc the hue/valuc u:r� chroma of the recovered soil samples. i Based on our field classifications of the excavated soils at the hand -angered boring locations, the in -place soils consist of fine to medi Urn sands with smali amounts of fines extending to the completed boring depths, approximately 9'/z feet below the existing ground surface, No groundwater was encountered in any of the boreholes; however, soil coloration indicated a seasonal high water level of 9.3 feet below grade at Location #3. At the other two locations, the seasonal high water level appears to be deeper. I I S&ME, Inc. I (910) 799-9945 6409 Amsterdam Way, Building B-3 19101 799-9958 fax Wilmington, North Carolina 28405 I www.smeinc.com I Andrew & Kuske Consulting Engineers October 5, 2000 Page Two I 1 The average infiltration rates at the test locations ranged from about 33 to 82 inches per hour. A summary of the field test results is presented in Table 1. i S&ME appreciates the opportunity to provide our services during this phase of the project. Should you have any questions after reviewing this letter, or if we can be of additional assistance, please do not hesitate to contact us at your convenience, Very truly yours, S&ME, INC. j Steven y, P.E. Branch Mana, er i f /U-- II Michael W. Behen, P.E. i Senior Geotechnical Engineer SDK:M WB/jns Attachments TABLE l Double Ring Infiltrometer Testing Proposed First Union Bank Site I Wilmington, North Carolina Job No, 1063-00-367 Location Depth Hue/Value Chroma Soil Description 1 0-16.5" 2.5Y �3/1 Very Dark Gray Fine to Medium SAND, Little Silt w/Rock 16.5"-21.0" 10YR A/3 Brown Fine to Medium SAND, Little Silt 21.0"-55.5" 10YR j5/4 Yellowish Brown Fine to Medium SAND, Trace of Silt 55.5"- l 15" 2.5Y '.7/4 Pale Yellow Fine to Medium SAND, Trace of Silt 1 15"- 2.5Y ,6/3 Light Yellowish Brown line to Medium SAND, Trace of Sih No groundwater was encountered to depth investigated. I 2 0-.1 1" 2.5Y 3/1 Very Dark Gray Fine to I\vledium SAND, Little Silt w/Rock Fra�a 11 "-28" 2.5Y 4/2 Dark Grayish Brown Fine to Medium SAND, Little Silt 281'-41" 2.5Y 16/3 Light Yellowish Brown Fine to Medium SAND. Tract of Silt 41"-52" 10YR 4/6 Dark Yellowish Brown Fine to Medium SAND. Little Silt 52"-87" 2.5Y 6/6 Olive Yellow Fine to Medium SAND, Trace of Silt 87"-112.5'i 2.5Y 7/6 Yellow Fine to %—ledium SAND, ']'race of Silt 1 12.5"- 2.5Y 5/6 Light Olive Brown Dine to Medium SAND, "Trace ol'Silt No groundwater was encountered to depth ini-cstigated. I 3 0-20" 2.5Y 3/1 Very Dark Gray Fine to Medium SAND, Little Silt w/Rock Fra4 20"-39" 2.5Y 5/6 Light Olive Brown Fine to Medium SAND, "Trace of'Silt 39"-77" 2.5Y 6/4 Light Yellowish Brown Fine to Medium SAND, Trace o1'Silt 77"-11 1" 2.5Y 6/8 Olive Yellow Dine to Medium SAND, Trace of Silt 11 1% 2.5Y 4/2 Dark Grayish Brown Fine to Medium SAND. Little Silt No groundwater was encountered to depth investigated. i TABLE 2 Double Ring Infiltrometer Testing Proposed First Union Bank Site Wilmington, North Carolina Job No. 1063-00-367 TEST #1 TEST #2 TLST R3 Time Increment (min.) Loss In inner Ring (in.) Incremental Infiltration Velocity (in./hr.) Time Increment (min.) Loss In Inner Ring (in.) incremental Infiltration Velocity (in./hr.) Time Increment (min.) Loss In Inner Ring (in.) I Incremental Infiltration Velocity (in./hr.) 5 4.9 59 5 4.9 59 5 2.5�� 5 5.1 61 5 3,4 41 5 4.7 5 8.5 102 5 3.8 46 5 3.2 5 7.5 90 5. 4.5 54 5 6.4 5 5.0 60 5 4.2 50 5 4.6 5 5.3 64 5 2.6 31 5 4.6 5 6.8 82 5 2.0 24 5 5.0 5 7.3 88 5 3.7 44 5 3.3 5 5.3 64 5 3.1 37 5 4.0 5 6.0 72 5 2.3 28 5 4,2 5 10.3 124 5 1 1.5 1 l8 5 4.0 1 5 8.9 107 5 3.2 38 5 4.5 5 7.1 85 5, 3.6 43 5 j 4.5 5 7.2 86 5. 1.9 23 5 4A 5 5.3 64 5. L6 19 5 3.9 5 6.9 83 5 2.3 28 1 5 4.2 5 7.8 94 5, 1.9 23 5 4.3 5 11.0 132 5!, 1.9 23 5 5.6 5 6.2 74 5: TO 24 5 3.1 5 5.0 60 5 2.8 34 5 4.3 5 7.1 85 51 1.9 23 5 4.9 5 5.7 1 68 51 1.8 22 5 4.6 51 2.1 25 5 4.3 5: 2.8 34 5 5.1 Overall Infiltration Rate: 82.1 in/hr Overall Infiltration Rate: 32.9 in/hr' Overall Infiltration Rate: 52.1 in/hr Notes: l . All tests conducted on smooth -graded soil in upper 6 inches of site grade. 2. Inner ring diameter: 11 5/8" i Outer Ring Diameter: 22"