Loading...
HomeMy WebLinkAboutSW8000918_CURRENT PERMIT_20001207STORMWATER DIVISION CODING SHEET POST -CONSTRUCTION PERMITS PERMIT NO. SW DOC TYPE � CURRENT PERMIT ❑ APPROVED PLANS ❑ HISTORICAL FILE ❑ COMPLIANCE EVALUATION INSPECTION DOC DATE I �g A,72Z/2ad7 YYYYMMDD tir-,tte of Nordl cal—ohli':t Depar4meht of Environment and Natural Resources Wilinin0on Regional Office .lames R. !-hint, Jr., Governor Bill Holman, Secretary Division` of Watei- Qualify December 7, 2000 Mr. William R. Howard 8104 Bald EaLle Lane Willlllnc.-'ton. NC 2S41 1 Subject: Permit No. SW8 000918 I ]arnpstead,Ccnter High Density Subdivision Stornlwater Project. Pender County Dear Mr. Howard: The Wilrilin4oton Regional Office received a complete Storrnwater Management Permit Application for 1-1ampstcad Centel- oil October 27, 2000. Staff review of the plans and specifications has determined that the project, as 1)1'01-)O, ed: Will comply With the Siormwater ReouIatioils set forth in "Title 15A NCAC 2H.1000. We are forwal-ding Permit No. SW8 000918, dated December 7. 2000, for the construction of the project, Hampstead Center. This permit shall he effective from the date of issuance until December 7, 2010, and shall be subject to the conditions and ]imitations as specified therein. Please pay special attention to the Operation and Maintenance requirements in this permit. f ailure to establish an adequate system for operation and maintenance ofthe storrnwater rllanagcilient system will result in future compliance problems. If any parts; requirements, or limitations contained in this permit are unacceptable; you have the right to request an adjudicatory hearing upon written request within thirty (30) days following receipt of this permit. This request must be in the form of a written petition, conformings to Chapter 150B of the North Carolina General Statutes; and filed with the Office of Administrative Hearings, P.O. Drawer 27447, Raleigh, NC 2761 1-7447. Unless such demands are made this permit shall be final and binding. I f you have any questions, or need additional information concerning this matter, please contact Linda Lewis, or nle at (910) 395-3900, Sincerely' Rick Shiver j1 Water Quality Regional Supervisor ItSSi:arl S:1WQS',S'f'ORMWATIIIERMT1000918.1DEC cc: Howard Resnick, P.E. Rodney Scruggs, Pender County Inspections Linda Lewis Wilmington 1Zealonal Office Central files 127 Cardinal Ur. Bi- Wimington, north Carolina 2840� 'telephone 9t(1-395-3900 FAX 910-350-2004 An Ecpml Opportunity Affirmative Action Employer SM.. recycledII(M., past -consumer paper Statc- Storillwater ManasacEilent Systems Permit No, SW8 000918 STATE OF NORTH CAROLINA DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES DIVISION OF WATER QUALITY STATE STORMWATER MANAGEMENT PERMIT HIGH DENSITY DEVELOPMENT In accordance with the provisions of Artiche 21 of Chapter 143, General Statutes ofNorth Carolina as amended, and other applicable Laws, Rules, and Regulations PERMISSION IS HEREBY GRANTED TO M,•. William Howard, Owner Hampslead Center Pender Counly FOR THE I construction, operation and maintenance of a high density commercial subdivision, with runoff to be treated in a wet detention pond in compliance with the provisions of 15A NCAC 2H .1000 (hereafter referred to as the "slorna 'vier rules') and the approved stormwater management plans and specifications and other supporting data. as attached.and on file with and approved by the Division of Water Quality and considered a part of this permit. I This permit shall be effective from the date of issuance until December 7, 2010 and shall be subject to the following specified 'conditions and limitations: 1. DESIGN STANDARDS i 1. Tliis permit is effective only with respect to the nature and volume of stormwater described in the application and other supporting data. 2. This stormwater system has been approved for the management of stormwater runoff as described on page 3 of this permit, the Project Data Sheet. i 3. Approved plans and specifications for this project are incorporated by reference and are enforceable parts of;the permit. I i 4. I he subdivision is permitted for 20 lots, each allowed a maximum amount of built -upon area as described oni the attachment to the application. . 5. lots 14, 15, and 17-20 are limited to a maximum built -upon area equivalent to 80% of the individual lot area. 7 Sate Stus-mWatcr Manal-MnIcnt Svstcins f'umii No. SMIS 000918 DIVISION OF WATER QUALITY PROJECT DATA SHEET 11r6iect Name: Hampstead Center Permit Number: SVl'8 000918 Location: Pender Count)- Applicant: Mr. William R. Howard Mailing Address: 9104 Bald Eagle Lane WO nin-ton, NC 28411 Application Dale: October 27. 2000 Name of Receiving Stream / Index 4: Mill Creek / (CFR 18-87-14) Classification of Water Body: "SA" If Class SA, chloride sampling results: 12 Design Storm: 1" Pond Depth, feet: 7.5 Permanent fool Elevation, FMSL: 40 Drainage Area, acres: 27.76 Total Impervious Surfaces, ft2: 722,447 20 lots, ft2: 642,206 Roads/Parking, ft2 80,241 Other, flz n/a Offsite Area entering Pond, ft-: None, per Engineer Required Surface Area. ft2: 22,952 Provided Surface Area., ftz: i 27,797 Required Storage Volumc, ftl: 67,113) I'roviciccl Storagc Volume, ft': 70,422 Temporary Storage Elevation, FMSL: 42.2 Controlling-, Orifice: pipe 3 State stormwater Managcnient Systems Permit No. S W 8 000918 11. SCHEDULE OF COMPLIANCE No homeowner/lot owner/developer shall fill in, alter, or pipe any drainage feature (such as swales) shown on the approved plans as part of the stormwater management system without submitting a revision to the permit and recei\,ing approval from the Division. ?. The permittee is responsible for verifying that the proposed built -upon area for the entire lot, including driveways and sidewalks, does not exceed the allowable built -upon area. Once the lot transfer is complete, the built -upon area may not be revised without approval from the Division of Water Quality, and responsibility for meeting the built -upon area limit is transferred to the individual property owner. �. I f;an Architectural Review Committee (ARC) is required to review plans for compliance with the BUA linlit, the plans reviewed must include sidewalks and driveways. Any approvals given by the ARC do not relieve the homeowner of the responsibility to maintain compliance with the permitted BUA limit. The following items will require a modification to the permit: a. Any revision to the approved plans, regardless of size. b. Project name change. C. Transfer of ownership. d. Redesign or addition to the approved amount of built -upon area. C. Further subdivision, acquisition, or sale of the project area. The project area is defined as all property owned by the permittee, for which Sedimentation and Erosion Control Plan approval was sought. f billing in, altering, or piping of any vegetative conveyance shown on the approved plan. The Director may determine that other revisions to the project should require a modification to the permit. 6. The Director may notify the permittee when the permitted site does not meet one or more of the minimum rccluirements ofthe perrnit. Within the time frame.specified in the notice, the permittee shall submit a written time schedule to the Director for modifying the site to meet minimum requirements. The permittee shall provide copies of revised plans and certification in writing to the Director that the changes have been made. Tile stormwater management system shall be constructed in it's entirety, vegetated and operational for its intended use prior to the construction of any built -upon surface. During construction, erosion shall be kept to a minimum and any eroded areas of the system will be repaired immediately. Upon completion of construction; prior to issuance of a Certificate of Occupancy, and prior to operation of this permitted facility, a certification must be received from an appropriate designer for the system installed certifying that the permitted facility has been installed in accordance with this permit, the approved plans and specifications, and other supporting documentation. Any deviations from the approved plans and specifications must be noted on the Certification. 10. Decorative spray fountains will not be allowed in the stormwater treatment system. 11. If the stormwater system was used as an Erosion Control device, it must be restored to design condition prior to operation as a stormwater treatment device, and prior to occupancy of the facility. 12. Unless specified elsewhere. permanent seeding requirements for the stormwater control must follow the guidelines established in the North Carolina Erosion and Sediment Control Planning and Design Manual. 9 State StormN,,ater Manatiemcnt Systems Permit No. SWS 000918 13. Prior to transfer of the permit, the pond must be inspected by DWQ personnel, and determined to be in compiiance with all permit conditions. Any items not in compliance must be repaired or replaced to design condition prior to the transfer. Records of maintenance activities performed to date will be required. i 14. The permittce shall at all times provide the operation and maintenance necessary to assure the permitted stormwater system functions at optimum efficiency. The approved Operation and Maintenance Plan must be followed in its entirety and maintenance must occur at the scheduled intervals including, but not limited to: a., Semiannual scheduled inspections (every 6 months). b. " Sediment removal. C. Mowing and revegetation of side slopes. d. Immediate repair of eroded areas. e. Maintenance of side slopes in accordance with approved plans and specifications. is ; Debris removal and unclogging of outlet structure, orifice device and catch basins and piping. g. Access to the outlet structure must be available at all times. 15. Records of maintenance activities must be kept and made available upon request to authorized personnel of DWQ. The records will indicate the date, activity, name of person performing the work and what actions were taken. 16. Prior to the sale of any lot, deed restrictions must be recorded which limit the built -upon area per lot to the amount as shown on the Project Data Sheet, per Section 1, Part 2. The recorded statements must follow the forn}: a. "The maximum built -upon area per lot is _*_ square feet. This allotted amount includes any built - upon area constructed within the lot property boundaries, and that portion of the right-of-way between the front lot line and the edge of the pavement. Built upon area includes, but is not limited to, structures, asphalt, concrete, gravel, brick, stone, slate, coquina and parking.areas, but does not I include raised, open wood decking, or the water surface of swimming pools." b. "The covenants pertaining to stormwater regulations may not be changed or deleted . without concurrence of the State." C. 1 "Alteration of the drainage as shown on the approved plan may not take place without the concurrence of the State." Cl. "Lots within CAMA's Area of Environmental Concern may be subject to a reduction in their allowable built -upon area due to CAMA regulations." C. "All runoff on the lot must drain into the permitted system. This may be accomplished throu�ph providing roof drain gutters which drain to the street, grading the lot to drain toward the street, or grading perimeter swales and directing them into the pond or street. Lots that naturally drain into the system are not required to provide these measures." I *The permittee 17711st fill in the blank with the appropriale number based on the BUA allach177ent to the appl ical ion. 1 17. A copy of the recorded deed restrictions must be submitted to the Division within 30 days of the date of recording==the plat, and prior to selling lots. The recorded copy must bear the signature of the Permittee; the deed book number and page, and stamp/signature of the Register of Deeds. E State Stormwater Management Systems Permit No. S W 8 000919 18. This permit shall become voidable unless the facilities are constructed in accordance with the conditions of this permit, the approved plans and specifications, and other supporting data. 19. A copy of the approved plans and specifications shall be maintained on file by the Permittee for a minimum of ten years from the date of the completion of construction. 20. Built upon area includes, but is not limited to, structures, asphalt, concrete, gravel, brick, stone, slate, coquina and parking areas, but does not include raised, open wood decking, or the water surface of swimming pools. 111. CENERAL CONDITIONS Tliis permit is not,transferable. In the event there is a desire for the facilities to change ownership, or there is'a name change of the Permittee, a "Name/Ownership Change Form" must be submitted to the Division of Water Quality accompanied by appropriate documentation from the parties involved, such as a copy of the deed of trust. Other supporting materials, such as a signed Operation and Maintenance plan in the case of engineered systems, will also be required. The project must be in good standing with DWQ. Tlie approval of this request will be considered on 'its merits and may or may not be approved. 2. Failure to abide by the conditions and limitations contained in this permit may subject the Permittee to enforcement action by the Division of Water Quality, in accordance with North Carolina General Statute 14l3-215.6A to 143-215.6C. The issuance of this permit does not preclude the Permittee from complying with any and all statutes, rules, regulations, or ordinances which may be imposed by other government agencies (local, slate, and federal) which have jurisdiction. 4. ln;the event that the facilities fail to perform satisfactorily, including the creation of nuisance conditions, the Permittee shall take immediate corrective action,'including those as may be required by this Division, such as the construction of additional or replacement stormwater management systems. The permit may be modified, revoked and reissued or terminated for cause. The filing of a request for a permit modification, revocation and reissuance or termination does not stay any permit condition. 6. Permittee grants permission to staff of the DWQ to access the property for the purposes of inspecting the stormwater facilities during normal business hours. 7. The permittee shall notify the Division of any name, ownership or mailing address changes within 30 days. Permit issued this the 7th day of December. 2000. NORTH CAROLINA ENVIRONMENTAL MANAGEMENT COMMISSION Kerr T. Stevens, Director Division of Water Quality By Authority of the Environmental Management Commission Permit Number SW8 000918 L State Storm%vatcr Management Systems Permit No. SW8 000918 i Hampstead Center Page l of 2 Stornnwaier Permit No. SW8 000918 Pender County I i Desigricr;s Certification i I' as a duly registered in the State of North Carolina, having been authorized to observe (periodically/weekly/full time) the construction of the project; i i (Pro.ject) for (Project Owner) hereby state that, to the best of my abilities, due care and diligence was used in the observation of the project construction such that the construction was observed to be built within substantial compliance and intent of the approved plans and specifications. i The checklist of items on page 2 of this form are a part of this Certification. I Noted deviations fi-om approved plans and specifications: I Signature; I Registration Number Date SEAL 7 State Stormwater Management Systems Permit No. SW8 000918 Certification ltcquiremcnts: I 2, 4. 3 6. 1 I 7. 8. 9. ' i 10. 14 Page 2 of 2 The drainage area to the system contains approximately the permitted acreage. The drainage area to the system contains no more than the permitted amount of built -upon area. All the built -upon area associated with the project is graded such that the runoff drains to the system. The outlet/bypass structure elevations are per the approved plan. "[ he outlet structure is located per the approved plans. Trash rack is provided on the outlet/bypass structure. All slopes are grassed with permanent vegetation. -Vegetated slopes are no steeper than 3:1. The inlets are located per the approved plans and do notcause short-circuiting of the system. The permitted amounts of surface area and/or volume have been provided. Required drawdown devices are correctly sized per the approved plans. All required design depths are provided. All required parts of the system are provided, such as a vegetated shelf, a forebay, and the vegetated filter. The overall dimensions of the system, as shown on the approved plans, are provided. cc: NCDENR-DWQ regional Office Rodney Scruggs, Pender County Building Inspector .`,rt '�k:o-.�.. .✓e�+�`` �a.3.'.?. O�'.1`1r:!`-USE NY:X >�r..+."" „w }•*a+ Date Received Fee Paid Permit Number • — 3 -- Luc �,.o , � � � 33 �g OC�D � ! State of North Carolina Department of Environment and Natural Resources Division of Water Quality STORMWATER MANAGEMENT PERMIT APPLICATION FORM r This form may be photocopied for use as an original I I. GENERAL INFORMATION 1. Applicants name (specify the name of the corporation, individual, etc. who owns the project): f r N ( 7� , Ro wc,_ 2. Print Owner/Signing Official's name and title (person legally responsible for facility and compliance): 721 3. Mailing Address for person listed in item 2 above: 8104- I& Id Qtdje_ Laoe- City: State: Zip: � 84-/ ! Telephone Number: O i 6 2 6— 7 7 4. Project Name (subdivision, facility, or establishment name - should be consistent with project name on plans, specifications, letters, operation and maintenance agreements, etc.): ITQI pts cac! �r?nfPr 5. Location of Project (street address): E. City: TO Sctj To A_J-h 1 County: P8 n e-le r Co cu 4 f Directions to project (from nearest major infersection): 7. Latitude: 34 Z ! DD Longitude: 7 7"4Z '30 -" of project 8.Y Contact person who can answer questions about the project: Name:_ ; Aue•L L Akw-lP a a __ Telephone Number: ( 9/0 ) z 70 -. ! DO II. PERMIT INFORMATION: 1. Specify whether project is (check one) New w Renewal Modification 7, Ir( Form SWU-101 Version 3.99 ,IV Page 1 of 4 2. 1f'this application is being submitted as the result of a renewal or modification to an existing permit, list the existing permit number &/ and its issue date (if known) 3. Specify the type of project (check one): Low Density High Density Redevelop General Permit Other 4, Additional Project Requirements (check applicable blanks): CAMA Major X Sedimentation/Erosion Control _404/401 Permit NPDESStorinwater Information on required state permits can be obtained by contacting the Customer Service Center at 1-877-623-6748. III. - PROJECT INFORMATION 1. In the space provided below, summarize how stormwater will be treated. Also attach a detailed narrative (one to two pages) describing stormwater management for the project. r/m r.';It � �%/v fr�a-fed 11<1,na one- d'el�/ 0A- - _Dflr]d GI ���r_1y� �� 7'�f g/t �/S� 1`/ m O ✓d f f �l✓�Gt �o 2. Stormwater runoff from this project drains to the Ca DC reocr River basin. 3. Total Project Area: 7_7 9 acres 4. Project Built Upon Area: 7 % 5. How many drainage areas does the project have?- 6. Complete the following information for each drainage area. If there are more than two drainage areas in the project, attach an additional sheet with the information for each area provided in the same format as below. 'SasfinInfi7iaiatio .<"jDzairia a Area 1 °" Drama 'e Areafi2 Receiving Stream Name �' l Receiving Stream Class Drainage Area Z S Existin Impervious - Area sf Proposed Irn ervious"Area 715 % Impervious* Area (total) j�, 7 r•x� -:_- &Fk �, ..v,6`� im erVlousSllrface AreaD 9 I �`b' `IGA MSG 4^. ai g rea 1 M -v: n:v.+eh +'�" ahY�' ^eC:' •. s'@a`2. F:;1r�ainageArea ?� ` g On -site Buildings f On -site Streets << << On -site Parking �' « On -site Sidewalks Other on -site ff Off -site Total: -7Z Z ¢4-7 Total: * Impervious area is defined as the built upon area including, but not limited to, buildings, roads, parking areas, sidewalks, gravel areas, etc. t, Form SWU-101 Version 3.99 Page 2 of 4 HAMPSTEAD CENTER CALCULATIONS FOR DWQ: AREAS DRAINING TO POND: LOT AREA (so ASSOCIATED DRAINFIELD (so ASSOC LAI ED WELL AREA (so TOTAL LOT AREA (sf) TOT. AREA DRAINING TO POND IMP. SURFACE BREAKDOWN: BUILDINGS (so STREETS I PARKING (so SIDEWALKS (so OTHER I DUMPSTERS (so EXISTING IMP. SURFACE (sf) TOTAL IMP. SURF. PER LOT (sf) INDIVIDUAL IMP. PERCENTAGES TOT. NEW IMP. SRFACE AREA TOTAL IMP. SURFACE AREA TOTAL IMP. PERCENT TOTAL GREEN AREA LOT # 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 12,978 17,117 19.350 11,808 12.314 10,780 16,261 11,088 16,393 15,406 15.172 74.922 35,692 104,285 249.142 37.767 34,391 34,507 33,090 144.504 3.304 3.304 3.304 3,304 3,608 3,631 3.389 3,360 5,321 5,404 5.320 11,267 --- --- --- --- -- 1,198 1,292 16,282 20,421 23,852 16,404 15.922 14,411 19,650 14,448 21,714 20,810 20,492 86,189 35.692 104,285 249.142 37,767 34.391 34,507 33,090 144.504 = 1,209,210 sf COMMON NCDOT AREA ROW 127,439 117,798 127.439 117,798 3.000 3,000 3,000 3,000 3.000 3,000 3.000 3,000 3,000 3,000 3,000 4,000 6,000 83,428 199,314 5,246 27,513 27,606 26.472 115,603 --- 4,153 4.135 3.715 3,443 1.172 3,221 5.851 1,500 7,202 4,853 10,283 31,577 11,661 (60% OF (80% OF 12.237 (80% OF (80% OF (80% OF (80% OF 80,241 273 705 737 481 497 492 755 250 686 746 686 1,004 720 TOTAL TOTAL TOTAL TOTAL TOTAL TOTAL --- 220 --- 220 220 --- --- --- --- --- 220 AREA) AREA) 110 AREA) AREA) AREA) AREA) --- - --- --- --- - -- 7,352 7,426 8,060 7,452 7,144 4,889 6,713 9,606 4,750 10,888 8,599 13,969 36,581 18,601 83,428 199,314 17,593 27,513 27,606 26,472 115,603 80,241 46% 39% 31% 44% 31% 47% 49% 33% 50% 41% 68% 42% 52% 80% 80% 47% 80% 80% 80% 80% 0% 68% = 715.095 sf = 722,447 sf = 59.7 % = 486,763 sf REQUIRED SURFACE AREA: (722,447 x 0.98) + (486,763 x 0.2)1 1,209,210 = 0.656 = 66.6% FROM 90% TSS REMOVAL CHART, AT DEPTH OF 7.5' AND 66.6% IMPERVIOUS SURFACE, SAIDA = 2.16% MINIMUM SURFACE AREA = 0.0216 x 1,209.210 = 26,119 sf SURFACE AREA PROVIDED AT ELEVATION 40 = 27.787 sf REQUIRED 1" STORAGE VOL.: MINIMUM STORAGE VOLUME=((722,447 x0.98) +(486.763 x 0,2) 11,209,210) x 1112 = 67,113 cf STORAGE VOLUME PROVIDED AT ELEVATION 42.2= 70,375 cf (SEE ATTACHED STAGE -STORAGE TABLE) FORBAY VOLUME: MINIMUM FOREBAY VOLUME = 20% OF PERMANET POOL VOLUME (SEE ATTACHED STAGE -STORAGE TABLE) MINIMUM FOREBAY VOLUME = 98,094 x 0.2 = 19,619 cf FORBAY VOLUME PROVIDED = 19,619 cf RECEIVED OCT 2 =l 2000 DWQ - - - _ - KIWOVM DERI N SIDES, PA - 319 WALNUT K FEET NUMOTON iti faM J 7. How was the off -site impervious area listed above derived? IV. DEED RESTRICTIONS AND PROTECTIVE COVENANTS The following italicized deed restrictions and protective covenants are required to be recorded for all subdivisions, outparcels and future development prior to the sale of any lot. If lot sizes vary significantly, a table listing each lot number, size and the allowable -built -upon area for each lot must be provided as an attachment. 1. The following covenants are intended to ensure ongoing compliance with state stormwater management permit number as issued by the Division of Water Quality. These covenants may not be changed or deleted without the consent of the State. AllKK_D spZE4D_5fYCET 2. No more than S square feet of any Iot shah be covered by structures or impervious materials. Impervious materials include asphalt, gravel, concrete, brick, stone, slate or similar material but do not include wood decking or the water surface of swimming pools. 3. Swales shall not be filled in, piped, or altered except as necessary to provide driveway crossings. 4. Built -upon area in excess of the permitted amount requires a state stormwater management permit modification prior to construction. 5. All permitted runoff from outparcels or future development shall be directed into the permitted storm water control system. These connections to the stormwater control system shall be performed in a manner that maintains the integrity and performance of the system as permitted. By youi signature below, you certify that the recorded deed restrictions and protective covenants for this project shall include all the applicable items required above, that the covenants will be binding on all parties and persons claiming under them, that they will run with the land, that the required covenants cannot be changed or deleted without concurrence from the State, and that they will be recorded prior to the sale of any lot. V. SUPPLEMENT FORMS The applicable state stormwater management permit supplement form(s) listed below must be submitted for each-.BMP specified for this project. Contact the Stormwater and General Permits Unit at (919) 733-5083 for the status and availability of these forms. Form SWU-102 Wet Detention Basin Supplement Form SWU-103 Infiltration Basin Supplement Form SWU-104 Low Density Supplement Form SWU-105 Curb Outlet System Supplement Form SWU-106 Off -Site System Supplement Form SWU-107 Underground Infiltration Trench Supplement Form SWU-108 Neuse River Basin Supplement Form SWU-109 Innovative Best Management Practice Supplement Form SWU-101 Version 3.99 Page 3 of 4 VI. , SUBMITTAL REQUIREMENTS Only complete application packages will be accepted and reviewed by the Division of Water Quality (DWQ). A complete package includes all of the items listed below. The complete application package should.be submitted to the appropriate DWQ Regional Office. i 1. Please indicate that you have provided the following required information by initialing in the space provided next to each item. Initials • Original and one copy of the Stormwater Management Permit Application Form d-, g • One copy of the applicable Supplement Form(s) for each BMP _ f .1< . • Permit application processing fee of $420 (payable to NCDENR) • Detailed narrative description of stormwater treatment/management • Two copies of plans and specifications, including: - Development/Project name - Engineer and firm -Legend - North arrow - Scale - Revision number & date - Mean high water line - Dimensioned property/project boundary - Location map with named streets or NCSR numbers - Original contours, proposed contours, spot elevations, finished floor elevations - Details of roads, drainage features, collection systems, and stormwater control measures - Wetlands delineated, or a note on plans that none exist - Existing drainage (including off -site), drainage easements, pipe sizes, runoff calculations - Drainage areas delineated i - Vegetated buffers (where required) VII. AGENT AUTHORIZATION If you wish to designate authority to another individual or firm so that they may provide information on your behalf, please complete this section. Designated agent (individual or firm): an o U er De SLI FA ►i -s2I- lzl` c e [ P, /1 Mailing Address: 319 W a /o U:t .S+re �e-� City: �i�r►?ir _ State: /UCH Zip: Z g { Phone: ( 9 ra ) 3.¢.q - PQQ �—' Fax: 910 3-43 --aD¢ VIII. APPLICANT'S CERTTFICAT71ON 1, (print or type name of person listed in General Information, item 2) _ W IW AA O WAA D certify that the information included on this permit application form is, to the best of my knowledge, correct and that the project will be constructed in conformance with the approved plans, that the required deed restrictions and protectiv covenants will be recorded, and that the proposed project complies with the requirements of 15A NCAC 2H . i 2[/ Signature: � Date:0"y Form SWU-101 Version 3.99 Paae 4 of Permit No. (to be provided by DIV& State of North Carolina Department of Environment and Natural Resources Division of Water Quality STORMWATER MANAGEMENT PERMIT APPLICATION FORM WET DETENTION BASIN SUPPLEMENT This form may be photocopied for use as ari origituzl DWQ Stormwater Management Plan Review: A complete stormwater management plan submittal includes an application form, a wet detention basin supplement for each basin, design calculations, and plans and specifications showing all basin and outlet structure details. I. PROJECT INFORMATION Project Name: Contact Person: Phone Number: (,9/0_ ) 7-70 — 5/00 For projects with multiple basins, specify which basin this worksheet applies to: elevations Basin Bottom Elevation 3z.S ft. Permanent Pool Elevation 40. a ft. Temporary Pool Elevation 4-Z, Z_ ft. (floor of the basin) (elevation of the orifice) (elevation of the discharge structure overflow) areas Permanent Pool Surface Area ZZ 787 sq. ft. (water surface area at the orifice elevation) Drainage Area 1 Z03 ZID Z7 ac) (on -site and off -site drainage to the basin) Impervious Area 77_Z1 ¢4 7s ac.) (on -site and off -site drainage to the basin) volumes Permanent Pool Volume 09 cu. ft. (combined volume of main basin and forebay) Temporary Pool Volume M375" cu. ft. (volume detained above the permanent pool) Forebay Volume 613 cu. ft. (approximately 20% of total volume) Other parameters SAIDAI Z,1 C (surface area to drainage area ratio from DWQ table) Diameter of Orifice 3,0 in. (2 to S day temporary pool draw -down required) Design Rainfall f, 0 in. Design TSS Removal 2 —90 % (minimum 85% required) Form SWU-102 Rev 3.99 Pagel of 4 Footnotes: 1 When using the Division SA/DA tables, the correct SA/DA ratio for permanent pool sizing should be computed based upon the actual impervious % and permanent pool depth. Linear interpolation should be employed to determine the correct value for non- standard table entries. Z In the 20 coastal counties, the requirement for a vegetative filter may be waived if the wet detention basin is designed to provide 90% TSS removal. The NCDI NR BMP manual provides design tables for both 85% TSS removal and 90% TSS removal. II. REQUIRED ITEMS CHECKLIST The following checklist outlines design requirements per the Stormwater Best Management Practices Manual (N.C. Department of Environment, Health and Natural Resources, February 1999) and Administrative Code Section: 15 A NCAC 2H .1008. Initial in the space provided to indicate the following design requirements have been met and supporting documcn:tation is attached. If the applicant has designated an agent in the Stormwater Management Permit Application Form, the agent may initial below. If a requirement has not been met, attach justification. Applicants Initials a. The permanent pool depth is between 3 and 6 feet (required,minimum of 3 feet). .e. b. The forebay volume is approximately equal to 20°l0 of the basin volume. Ot12 . c. The temporary pool controls runoff from the design -storm event. ,R . d.-The temporary pool draws down in 2 to 5 days. e: _ If required, a 30-foot vegetative filter is provided at the outlet.(include non -erosive flow calculations) f. The basin length to width ratio is greater than 3:1. 19Z, g.. ' The basin side slopes above the permanent pool are no steeper than 3: 1. h: A submerged and vegetated perimeter shelf with a slope of 6:4 or less (show detail). i. Vegetative cover above the permanent pool -elevation is specified. j. A trash rack or similar device is provided for both tlie-overflow and orifice. k. A recorded drainage easement is provided for each basin including access to nearest right - of -way' - AL -_ 1. if the basin is used for sediment and erosion control during construction, clean out of the basin is specified prior to use as a wet detention basin. r in. A mechanism is specified which will drain the basin for maintenance or an emergency. s III. WET DETENTION BASIN OPERATION AND MAINTENANCE AGREEMENT The wet detention basin system is defined as the wet detention basin, pretreatment including forebays and the vegetated filter if one is provided. This system (check one) O.does does not incorporate a vegetated filter at the outlet. - This system (check one) 0 does does not incorporate pretreatment other than a forebay. Form SWU-lot Rev 3.99 Page 2 of 4 I I I - I Maintenance activities shall be performed as follows: 1. After every significant runoff producing rainfall event and at least monthly: a. Inspect the wet detention basin system for sediment accumulation, erosion, trash accumulation, vegetated cover, and general condition. I b. Check and clear the orifice of any obstructions such that drawdown of the temporary pool occurs within 2 to 5 days as designed. 2. Repair eroded areas immediately, re -seed as necessary to maintain good vegetative cover, mow vegetative - cover to maintain a maximum height of six inches, and remove trash as needed. 3. Inspect and repair the collections stem(i.e. catch basins, piping, swales, ri ra , etc.) quarterly to maintain proper functioning. I I 4. Remove accumulated sediment from the wet detention basin system semi-annually or when depth is reduced to 75% of the original design depth (see diagram below). Removed sediment shall be disposed of in an appropriate manner and shall be handled in a manner that will not adversely impact water quality (i.e. stockpiling near a wet detention basin or stream, etc.). I .4 - _ The .measuring device used to de"terzriine the.secliment elevation shall be such that it will give an accurate depth reading and not readily penetrate into accumulated sediments. When the permanent pool depth reads. 5.i Z5 feet in the main pond, the sediment shall be -removed. _ When the permanent pool depth reads s: Z ` - feet in the forebay, the sediment shall be -removed. BASIN DIAGRAM r (fill in the blanks) _.- 0 Permanent Pool Eleva6o❑ 40,0 Sediment Re oval El. a4,27,r 75 v _ - -- Sediment Removal Elevation 34,375 75% BottomEIe ation - 334 % ------_--------------------------------------- -------------------------------------. _751/ � Bottom Elevation 3z ,,� 25%v FOREBAY MAIN POND i I i 5. Remove cattails and other indigenous wetland plants when they cover 50% of the basin surface. These plants shall be encouraged to grow along the vegetated shelf and forebay berm. 6. If the basin must be drained for an emergency or to perform maintenance, the flushing of sediment through the emergency drain shall be minimized to the maximum extent practical. I Form SWU-102 Rev 399 Page 3.of 4 - r 7. All components of the wet detention basin system shall be maintained in good working order. I acknowledge and agree by my signature below that I am responsible for the performance of the seven maintenance procedures listed above. 1 agree to notify DWQ of any problems with the system or prior to any changes to the system or responsible party. Print name: W i u-(AM L bwpjjz�) Title: Vw,) e,r Address: (� QOD Phone: 1 (0 �g Signature: �- Date-. V 2KO-0 fAPC LAVE ? 7fs- fl? Note: The legally responsible part}' should not be a homeowners association unless more than 50GIo of the lots have been sold and .a resident of the subdivision has been named the president. a Notary Public for the State of ,YC jj�, C I _ l Trr'I s.lf� tflq,_.._., County of seu) Romder do hereby certify that personally appeared before me this day of LAm USI:, and acknowledge the due exectition of the forgoing wet detention basin maintenance requirements. Witness my hand and official seal, SEAL My commission expires to Form SWU-102 Rev 3.99 Page 4 of 4