Loading...
HomeMy WebLinkAboutSW8000918_COMPLIANCE_20001207STORMWATER DIVISION CODING SHEET POST -CONSTRUCTION PERMITS PERMIT NO. SWIZ911�5 DOC TYPE El CURRENT PERMIT ❑ APPROVED PLANS ❑ HISTORICAL FILE ZP COMPLIANCE EVALUATION INSPECTION DOC DATE 2zop /�e2 Z YYWMMDD i DETENTION POND ANALYSIS FILE NAME: S:IWQSIPOND1000918.WK1 PROJECT #: SW8 000918 PROJECT NAME: Hampstead Center REVIEWER: arl DATE: 07-Dec-2000 Receiving Stream: Mill Creek Class: SA Chlorides: 12 mg/I Drainage Basin: Cape Fear Index No. 18-87-14 Site Area 27.70 acres Drainage Area [„209210 00Isquare feet needs to be verified Area in Acres 27.76 acres IMPERVIOUS AREA Lots Street Common Area TOTAL % IMPERVIOUS 59.75% SURFACE AREA CALCULATION 642206.00 square feet 80241.00 square feet 0.00 square feet square feet square feet square feet �„ 72244700' Des. Depth Rational C-list beside each item below in Ell to E20 0.98 0.98 Cc= 7.5 TSS: 0.67 Rational ? { 1.00 Ilf Rational is used put a SA/DA 1.89% "1" in box E26. If not, leave it blank. Req. SA 22852 square feet Prov. SA I 27787'1square feet [From plan Contours] VOLUME CALCULATION Perm. Pool Volume= 98094 Req. Forebay Volume= 19618.8 Bottom 32.50 MSL Provided Volume= 19619 Perm. Pool 40'00#MSL Percent= [ 2000' Design Pool 42.20 MSL Desin SA g 36 233 square feet Des. Storm 1<OQ. inches Req. Volume 671>13: cubic feet Rv= 0.59 Prov. Volume 70422.cubic feet SA @ _ Elevation= ORIFICE CALCULATION Avg. Head = 1.04 ft Flow Q2, cfs 0.388 Area, in' 11.40 Flow Q5, cfs 0.155 , Area, in' 4.56 No. of Orifices 1' Diameter, in 3 00. Area = 7.069 in2 Q, cfs - 0.241 Drawdown = 3 2?jdays COMMENTS Surface Area , Volume and Orifice are within Design Guidelines.