Loading...
HomeMy WebLinkAboutSW8000918_APPROVED PLANS_20001207STORMWATER DIVISION CODING SHEET POST -CONSTRUCTION PERMITS PERMIT NO. I 5W VZD?�g DOC TYPE ❑ CURRENT PERMIT APPROVED PLANS HISTORICAL FILE ❑ COMPLIANCE EVALUATION INSPECTION DOC DATEfZZD/a2()2 YYYYMMDD LOCATION MAP I LIMITS OF DISTURBANCE 14.8 acres 8 SILT FENCING TO BE PLACED ---�� JUST OUTSIDE WETLANDS LINE SF N/F W1Lk-,N D,f LE ch Get � SEE SHEET 2 FOR OUTLET STRUCTURE DETAIL 10 CY CL II RIPRAP 1.5' DEEP sr ' SILT FENCING TO BE PLACED ALONG LIMITS OF DISTURBANCE 13 .. POND DISCHARGE AREA TO BE FLAT AT ELEV. = 39.6 65 CY CL 11 RIPRAP 1 FT DEEP 1 L t PROb1DF I,IINIMUM 80 CY COPHI_ E T PACKAGL COMPAN`i - _ RIPRAP ILLWAY PROTECTION PLACE FITTER FABRIC UNDER STONE 04i E�� ����■ � _ _ _ S 27' 3T_ 30" W _ 1561.75 FT _ _ _ r r �� r r •rrw•�.ew� r r r r r �wrw+we,. r r - _- r ' r.w w r ��-� s r- - ar. .�� 5 s i _�=�� IRON SET _ - --� 0 L0 15 AREA IS �16T�COVERED CJNDER--.._ -_ ..._ . r �pN J z ` �. THIS ERR CONTROL DO NOT - I _ I P.W. i r --BIS17 M LOT %-_SEPAKA_7r------ _11 s �� EROSION TitOL� FOR LOT 5 IIIJSL ____... O r-- ;-.- 1 o p LOT 20 A6 IS NOT COVERED UNDER / _ 6F t _ - _ 9 o I f � ...- � 1} ,1 BE APPR oR To 1CAMIItIEt�AIE�T _r _. r f - -� - C� �` p * ANY ACTT IN LATE-ARE75. - -- 1HIs ON CONTROL PAW. DO NOT r fir_ } / _ ��- r '` "` t\ DISTURB YAWN LOT 20. SEPARATE z, .t . - I Y _ t �' Z t ER061pN TROL PLAN FOR LOT 20 MUST 0 I _k� BE APPRO PRIOR TO COMMENCEMENT PF _ f Z SA S�s 2 rn �- u J - - ` AN ACTIVITY IN LOT 20 AREA. TORMWATER / RETENTION / , DETENTION POND f / Z J /'s _0 I SEE SHEET 2 SILT FENCING TO BE PLA ED FOR POND DETAIL T ' �� r r ALONG LIMITS OF DISTURB CE L1,5 EMERGENCY OVERFLOW SWALE O ` FOR STORMWATER RELIEF OF PUBLIC ROADWAY. SEE SHEET ECP 2 i' ' 3g 3a '♦ �s _ 4RApjrA7�- FOR TYPICAL SWALE CROSS SECTION r .20 1 DE roR c 07' EA I _s� ? i i 1 i `^..{,f 3 r . , \ lam 'T C9-_.__ i : , i '•.r f ' / BB � ` �1 ♦ r♦ . ♦______„__ -`�y� EIFf�i�iF�iEfw�!r�■ "A� + TOTAL AREA of ♦ _ -� �.� ^�: ``. _ -' ♦ ' - - _ _ i rr � ! I /. OF TRACT = 29.03 acres 8 1/ % 5 CY CL 11 RIPRAP * Bonn 1■1♦i1r�111 1, o `- - SF -- - 1 FT DEEP I; * 'AT 11P IS NOT UNDER ��,'�� ,'r • \ = I i * THIS CONTROL DO NOT O / Pf , a IP ► NOT TO SCALE i l L O r DI. YYITHIN LOT SEPARATE __- ♦♦♦ 1 1 S v 4� C? r , EIEOSI TROT PLAN LOT 18 MUS _____ �s r J �. D TEMPORARY SEDIMENT TRAP 1 V a � BI: PRIOR Tn CEMENT � Yv� T ____. - ♦� - _- --___ ____�__ _ J��r _ Y ACTIVITY iN T 19 AREA i DISTURBED AREA DRAINING TO TRAP 0 95 ACRES \ LOT 18 AREA IS QT COVERED UNDER * I / ♦ i . ' MIN. TRAP VOL ffi 1,800 CF/ACRE DISTURBED AREA �S EROSION TROL PLAN. DO NOT ` . �� _ ` MIN. TRAP VOL. 1,710 CIF DI TUI S TFIiN LOT 8. SEPARATE _. L ^^ I ERO�aliNQL PLAN LOT- a MUST P a' * zc'' E V rl % \ s- / �: -�. \ ;. / (SEDIMENT MUST BE REMOVED TWICE A YEAR) 1 1 LOT 1a NOT COVERED UNDER ■ _ 1 `�0■ �- MINIMUM WEIR LENGTH 4 FT l� �a BE APPItOV'ID PRIOR 110 MENCEIIR;i+1T OF •, THIS CONTROL PLAN. DO NOT - - �� •� 1 MAXIMUM DEPTH - 5 FT 41 41 e, 41 G 1 ANY ACTIVITY IN LO 18 AREA �; DISTUR8 YYITM LOT I& SEPARATE- - ! �. CONTROL PLAN FOR 1'.S MUST / _ - \. �zV� "� r, 1 r( \ BE OVER PRIOR TO CEMENT OF,` MINIMUM SURFACE AREA - 855 SF U # I ANY ACTIVITY INW 16 AREA I 1 c- r a 04 r' T t t QTp r CONSTRUCTION SCHEDULE - I �QT 1 T�IRE�4 lS INi1.11N_ \ 1.8 i / S 00 -09 NOT > H \� i -`� ` 1 C �' /1 / / r SILT FENCING TO PI ACFJ " I ! / �`' (- J / I r,_. JUST OUTSIDE WE1t.ANll:S' LINE i- c i � �. T 7. sEPAl1ATE-- - - - r - 1 _ 4� Q 1. Dbtnln approval of !'Ian and any necessary permits, and hold +- � EX. AT // I 1,Y I y ( ► a pre -construction conference pr I or to comment I ng any work. W civil. FOR -1'r ir4li5F _ 7 _ iE ORrW eOMM�r1ENT OF � - - _� - EASEMENT �� I G. 1 ANY A TIVITY LOT 17 AREA. -- - - - - _ - - - - - - - _ - - - _ _ _ _ _ _ IP IP �. / 2. Flag work limits and stake -out roadway and Sediment Basin - �_ y \ - T and swa t es for preliminary grading. i ` LD� \- ��� w7F 3. Install Gravel Construction Entrances. i �-'- - �� - 9 ` � �4j� ` F 4. Ins to l l Ted I men Bus h and s I It fenc i rig as shown on P Ian pr i or �_ \ 20'bE I - - - - - - to clrurI g and g ubbI g sIte. - 2D'DE� - 3C)- ti n I r -- - N �/^5' ~ ~~ \ \ l I, ��� -� - - S other sediment con tr ,2 t ill -or t 1 ce h w - / y - - - LJ�=1-�- T_ Ti 1, r; r __ _ - -__ � - l �. r � -� Construct swales rtempnrnry divers>ons, sediment trg3s, and any S ' ; - - - " ; I�Ar Fart_ s s o n> prior to rough grading a' \ ;! I - __... F r roadways and site, stockpiling material and topsoil as necessary. ;, ���� i I' , �� y 1 D �� -- - ��?,F - - _:�-- 6: Install utl l ltles In roadway, establish flrial road grades and stabilize road with stone base course, \ l\ / \ \\ e�rQ rii 7. FInat grade, Install non-munIcIpat utIt1t1es as needed, and { 1 r1,iO Q vegetatively stabilize areas where building construction is i F� --� ,\ I I , % - `\_--- _ \ -•... �Gbh not Imminent. All erosion and sediment control Practices are to ue ' � Insected week pty and of ter any rainfall, and repaErv4 as IP I l ' f \` \ d /A` / necessary, STORM DRAIN DESIGN COMPU M PON , LOCA TION RUNOFF PIPS' DC: FiC;:N TIME OF CONC. MIN, r. FROM TO Q.A. PIPE TNT. DlSCH. ELEV. ELEV. , Sr_01'E � C , �. AP• VEL. MCA INLET FLOW DESIGN POINT POINT ACRES (L) (I) Q INL. OUTL. MIN% IN, c.F.s. fp.s. TIME TIME TIME ...... 1.A 1.8 0.95 8.21 194 5 - 31.0 4.2 58.3 38.80 38.20 .00'i 79.9 4.8 1.6 1.GG 0.85 0.43 20 5 - 5.0 7.2 3.1 42.40 42.30 J0,150 '$ 7.4 3.8 1.8 1.0 0 7.31 193 5 - 27.8 4.4 52.8 39.40 J&80 .0031 43 80, 1 4,2 1. C 1. D 0 7.31 165 5 - 25.0 4.6 52.8 39.90 39.40 .0030 { 48 79:1 4.2 1.D 1.E 0.20 7.31 227 5 - 21.3 4.9 52.8 40.60 39.70 .0031 48 79.9 4.2 1.E 1.N 0.25 2,84 35 5 16.3 5.5 20.5 41.4C 41.20 .G058 30 31.2 4,2 1.N 1.0 0.10 1.49 36 5 - 15.7 5.5 10.8 42.10 41.90 .0055 24 17.0 3.4 1.0 1. P 0.10 0.07 35 5 - 5.0 7.2 0.5 43,20 43.00 .0058 18 8.0 0.3 1,0 1. Q 0.20 1.35 215 5 - 12.1 6.0 9.8 42.80 42.10 .0032 24 12.9 3.1 i.Q 1.R 0.15 1,21 35 5 - 11.5 6.1 8.8 43.00 42.80 .0058 24 17.2 2,8 1. R 1. S 0.10 0.07 86 5 - 5.0 Z 2 0.5 43. 80 43.50 .0035 18 6.2 0.3 1. R 1. T 0.30 0. 36 60 5 - 6.1 7.0 2.6 43.20 43.00 .0034 18 6.1 1.5 1. T 1. U 0.50 0.22 67 5 - 5.0 7.2 1.6 43.40 43.20 .0030 18 5.7 0,9 1. R 1. V 0.45 0.68 71 5 - 10.3 6.3 4.9 43.30 43.00 .0042 24 14.7 1.6 1. V 1. W 0.85 0.50 171 5 - 7.5 6.7 3.6 43.90 43.30 .0035 18 6.2 2.0 1, W 1. X 0.35 0,16 149 5 5.0 7.2 1.1 44. 40 43.90 .0034 18 6.1 0.6 1. E 1. F 0.10 4.33 132 5 - 19.1 5.2 31.3 47.00 40.60 .0030 48 79.2 2.5 1, F 1.13 0.10 2.56 35 5 - 18.5 5.2 18.4 41.15 41,00 .0042 30 26.7 3.8 1. G 1. H 0.20 2.49 46 5 - 17.7 5.3 I Z 9 41.30 41.15 .003J 30 23.6 3.7 i.H 1.1 0.25 2.35 36 5 - 17.1 5.4 16.9 41.40 41.30 .0028 30 2 1. 8 3.4 1.1 1. J 0.20 0.42 345 5 - 9.1 6.4 3.0 42. 50 41.40 .003? 24 12. 9 1.0 1. J 1. L 0.10 0,14 184 5 - 6.1 7.0 1.0 43.10 42.50 .0033 18 6. 0 0.6 1.L 1.M 0.10 0.07 64 5 - 5.0 7.2 0.5 43.30 43.10 .0031 18 5.::' 0,3 1.J 1.K 0.20 0.14 48 5 - 5.0 Z2 1.0 43.70 43.50 .0042 18 6. '1 0,6 1.F 1. Y 0.15 1.71 170 5 - 9.5 6,4 12.3 41.50 41.00 .0029 36 36. ' 1.7 1. Y 1. Z 0.15 0.11 35 5 - 5.0 Z 2 0.8 42.80 42.60 .0050 18 8. U 0.4 1. Y 1-AA 0.25 1.50 169 5 - 6.7 6.9 10.8 42. 10 41.50 .0035 24 13.5 3.4 I.AA 1.88 3.30 1.3.2 100 5 - 5.0 7.2 9.5 42.40 42.10 .0030 24 124 3.0 1.1 1. CC 1.00 1.75 162 5 - 14.4 5.7 12.7 41.90 41.40 .0037 30 226 2.6 1. CC 1.00 0.70 1.27 166 5 - 11,7 6.1 9.0 42.40 41.90 .0030 24 12.4 2.9 1.00 1. EE 0.80 0.90 223 5 - Z 9 6.7 6.5 43.10 42.40 .0031 24 12.7 2.1 1, EE 1. FF 1.00 0.50 177 5 - 5.0 7.2 3.6 43.70 43.10 .003.1 18 6.1 2.1 1,N 1.HH 2,60 1.17 40 5 - 5.0 7.2 6.5 42.10 41.90 .0050 24 16.0 2.7 2.A 2.8 1 POND OUTLET 1 130 1 - 1 51.0 1 40.00 39,60 1 .00JO (2)-36 73.2 3.6 PLANNED ER❑SI❑N AND SEDIMENT CONTROL PRACTICES O1. TEMPORARY GRAVEL CONSTRUCTION ENTRANCE tPractice 6,06 Shutt be Installed at the entrances to the project from an existing roadway, Drainage should be away from the road and erosion will be controlled with downstream practices. During wet weather It may be necessary to wash truck tires at these locations. 2. LAND GRADING Practice 6,02 Grading should be limited to areas as shown on the Plans. Cut and Pitt slopes shall be 3€1 or flatter except Where specifically Indicated. Care shall be taken during Land grading activities not to damage existing trees that are identified as 'to be preserved'. SF 3. SEDIMENT FENCE Practice 6.62 Sediment fencing should be Installed as shown on the Plan, to delineate and protect wetlands and specified areas, and around any temporary stockpile areas as necessary to prevent any graded interior areas from eroding onto adjacent lands or roadway, or Into Inlets, or as directed by Engineer or Pender County Erosion Control personnel, GC 4. GRASS -LINED CHANNELS Practice 6.30 All overflow swales to be graded to design configuration, seeded, and stab lllzed If necessary with temporary straw -net liners to collect and convey site water to the Sediment Basin as shown on Plan. After final project stabilization, swales to be re -graded and cleaned of siltation as needed to establish original contours for stormwater conveyance. ` _~ `w IP ��� / t 11 / \ \ i, / '\ / 9. Upon completion of construction, the roadway Is to be paved s 1�� `���`11♦ O \ j \ * and a I. l areas permanent ly vege tot l ve ly s tah ( l l zed, After /SON �� 1.F t I -fr i \ \/ �+ vY" s i to stab I l I zat I on, temporary measures are to be removed and SET ♦�. f , �' the Sed I meat Basin c i vaned -to Its or i g I no l ties i gn contours, � I \ ']�' �J + :,; if necessary, and riser structure or I faces opened, so os to I ► .` 1.E 1.G Ip 20' DE j ( \ \ \\ j \ function as a stormwa'ter management i wats €^ qua t I ty f re tendon pond, ��� SILT FENCING TO BE PLACED ► / f \\ / ,qi .ALONG LIMITS OF DISTURBANCE CIE.I.iv111 R. fvi(3H�_EY AF�I.) � � IP 1.N � G�-'"7r / � / •� 2 ' �7r' �-11 MAINTENANCE - ` Ir CNAN E PLAN 1 IR1N1, . Iv1. NC3RfiIS l \�� 1.H IP !' I! r \ . ► 071 14 LOT 1 AREA %1NOTL UNDIDISTUitB OT 14. SEPA EROSION DONTROLI PLAN LOT 14 BE PRIOR TO E] l Y AC7IVItY IN LO 14 AREA. ! I f 1 I' % \ 1 i -:77 0-9EE PLACED ALONG LIMITS OF DISTURBANCE @F� 5, OU1Lti STABILIZATION �- � - Practice 6.41 `J Riprop aprons will be located at the downstream end of w `� 'l!� ♦ SF -� ---- - __�__✓L_�_,_ -_�-' ,� \ �� all d1scharge pipes to prevent scour. Moo ~` ~ 6. Frr�nct€ceT6. BOROAD STABILIZATION 7EN MARK M in In � f 1.M 'upon reaching Final grade and after utilities have been 4� 53' �� �� �1 'QS 5�- - IP �L ` Installed, roadway areas are to be stablllzed by ptacIn s sub-l;-ise course of approved 4' mart stone or 6' ABC, cisshown\ E In tlrr typical street cross-section detalL on the Plan, to • 17 reduce erosion and dust during the remainder of building S. 11-7 cons t,'uct I on: j --/ I 101 IP 7. INLET PROTECTIONPracPUBLIC ROAD 1 •�••�lost 46 'storm sewer Inlet barriers of silt fencing or block and •, grave l I n let protect I on are to be constructed to he 1p prevEit sediment from entering the storm sewer system. ST 8 1E'IH �?ARY SEDIMENT TRAP IP A All measures to Toe Inspected weekly and after any rainfall , \ '• c-vent an,, ncedr -I r �•.,.I a .ir 'rmedlat+ ly: O•,/M� 1 \\ l '� 2. Sediment Basin to be [leaned out when the level of sediment reaches 3. 2' be (ow or 1 face o er, I np. R I ser, structure to be 1 E f r 11f.i IF,f: P .,9=,11A ijD cleaned IF excess water above design surrace no longer I drains property. n /i 3. Sediment to be removed from any swnles when they are t J a approx l maty ty 50% f t l l ed or sediment Level Ts within 1' of \ top of swale bank, I V t Sediment to be removed frog behind any Slit Fence and \ !J L ! !� I r : O I n let protect I on dev I ces whe ; I -t beccr.Ls 0, 5' deep, Fencing € 8 I 7 I J 1 �J and Inlet pratectson to ba repaiced as needed to malntain , burr- I er: �� 12 I'M ter' \ i 5: ra l : Sweden' ar vas sha t t be rer-t I I t zed, mu i ehed, arJ.1 re -seeded I as necessary, accord I ny to ;per- ! F i ca t I or,s €-ov I ded, -to j / I maintain a suitable vegetn?ive cover: �. 6. Construction entrance to be maintained in such a manner a to I L O ]` 1 I Q � prevent mud or sediment fron leaving the construction siteI` Periodic topdressirg with 2-Inch stone may be required, \ I Inspect after each rainfall and Immediately remove all objectionable materials sptlled, washed, or tracked onto public roadways. 7, Inspect temporary sediment traps after each period of significant ;' rainfall. Remove sediment and restore the trap to lts original /1 ! dimenslons when the sedlnent has accumulated to 1!2 the design 4 +• F Jl y.J �,. depth of the trap. Place the sediment that Is removed In the ` 1.FF rr w i1 H D designated disposal area and replace the contaminated part of the / 20' DE + +� rA_ E14Vi;'JHIAEIiT�I; grave l foc i ng: Check the structure for damage from erosion or I +r �e piping: Period lcally check the depth of the spillway to ensure it / t � 1 fit ' �`I�' I�i� I s a m i n i mum of 1. 5 ft bellow the low pain nt of the embankment, OF 1'iATft QiJAL! �'/ p � Immediately fill any settlement of the embankment to slightly above design grade. Any riprap disptaced from the spillway must be r r,,_ ~c 2cx( replaced IminedIately. After atl sediment producing areas have /,� f been permanently stablllzed, remove the structure and all unstable !! I I sediment. Smooth the area to blend with the adjoining areas and "., :' FBTtTsil N0, , '�Y �i stabilize properly, / r r 20' DE 1.V �` I r' 1.0 IP VEGETATIVE PLAN - �/ IEM�'s�;:�tZY SEDIMENT TRAP 2 (jl$TURC?ED AREA DRAINING TO TRAP s 1.7 ACRE$ 1 Permanent vegetation to be estab t i shed in accordance with 'North Carolina Eroslon and Sediment Control Planning and MIN. TRAP VOL = 1.800 CF'/ACRE DISTURBED AREA Design Manual', Sect s on 6, 11, latest version. See Sheet 3. MIN. TEZAP VOL - 3,060 CIF (SEDIMENT MUST BE REMOVED TWICE A YEAR) MINIMUM WEIR LENGTH _ 6 FT :��--� � RECEIVED MAXIMUM DEPTH - 5 FT �vX j MINIMUM SURFACE AREA = 1,530 SF } OCT 2 T 2000 60 30 0 60 120 1' 180 DWQ PROJ# SCALE IN FEET 1 " = 60 NOTE - THIS PLAN TO BE UTILIZED AND NOTE WELL: ANY AREAS ON SITE WITHOUT ACTIVITY IN A 15 DAY PERIOD REVIEWED ONLY IN CONJUNCTION SHALL BE TEMPORARILY STABILIZED AS PER THE SPECIFICATIONS. WITH THE WRITTEN NARRATIVE, ANY AREAS ON SITE WITHOUT ACTIVITY IN A 30-DAY PERIOD WHICH IS AN INTEGRAL PART OF THIS EROSION AND SEDIMENT SHALL BE TEMPORARILY STABILIZED AS PER THE SPECIFICATIONS. CONTROL PLAN. NOTE. ALL BUILDING ROOF DRAINS MUST 8E L `� Prac Ice 6,60 y DIRECTED INTO THE STORAf DRAINAGE ctlLLFCiIarT `, . d i nent traps are to be Installed as Indicated on plan 6' MINIMUM SYSTEM OR INTt7 THE S7REET/PARKING LOT: at t :e downstream end of swales as shown. THICKNESS�� si rJ® 2"-3" COARSE_ 9, �Jil .-NT BASIN AGGREGATE Fr•,;ciIce 6.61 GRAVEL CONSTRUCTION NOTE: SEE NARRATIVE ENTRANCE, WIDTH 1, Ie Sediment Basin is to be constructed first (see FOR MORE DETAIL 12'MINIMUM AS REQUIRED Ccnst--uctIan Schedu(e) and Is the prlmaryy Practice to p•eve,,t sediment from leaving the site, Detalled design and s�Ill4ay conflguratlons are specified In the CALCULATIONS AS 5v-ct,on of the narrative The PVC outlet Is to be blocked 2 REVISED PER COMMENTS FROM NCDENR / DIVISION OF WATER QUALI I f 1 REVISED PER COMMENTS FROM NCDENR / LAND QUALITY SECTION REV. NO, REVISIONS during sed I mentat I an function Lor not Installed) until e,} i € r - watershed is permanent l stab I l I zed and pond 15 r ENIRMCE/EW CaPNOt R Ninon Deelge Sovkm% RA, Atf riots resenad Reproduction or use or the conimts of this doavment or cddrw•,s w ddz s fa t,M 1 r onvc. rted to permanent stormwa er management detention I on / Ciw doovment; ih wrote OF ycrk withwrt srfttwr conerrt of the tmd Sur.., or tnyrrser, to probbited. arty c w. fi- rm the or h,a' or this iw morked sfth the afykrd tlpwtws and "Ind ssd of the Su ,ivw ar Enphser• shag be cmetdered to be vdld and Lue dates. reteh�tlon function. Practice 6.06 EROSION & SEDIMENT CONTROL and WATER QUALITY PLAN Date: H"PSTEAD CENTER LOCATED IN TOPSAIL TOWNSHIP PENDER COUNTY, NORTH CAROLINA i A `,��111rrere�flrf,' � �H CRp! SSr�ti�!' _ L •Q ttf SEAR. t� 025483 - i�R} OWNER: WILLIAM R. HOWARD 8104 BALD EAGLE LANE WILMINGTON, NC 28411 HANOVER DESIGN SERVICES, P.A. LAND SURVEYORS, ENGINEERS & LAND PLANNERS 319 WALNUT STREET WILMINGTON, N.C. 28401 PHONE: (910) 343-8002 9-1-00 Scal e: 1" =60' Drawn: I HSR Checked: HSR 1 Project No: 6723ecp 1 HSR Sheet No: Of: _�_ L Z OCA PON MAP SURFACE AREA 0 EL= 40.0 = 27,787 SURFACE AREA 0 EL= 42.2 = 36,233 3: I DRY SIDE SLOPE - STEEPER SLOPES ARE REQUIRED TO BE ARMOURED WITH RIP -RAP, 10 FT MAINTENANCE -� ACCESS WITH SLOPE FLATTER THAN 5:1 OUTLET STRUCTURE SEE DETAIL THIS SHEET 10 CY CL 11 RIPRAP 1.5 FT DEEP AV77-SEEP COLLAR SEE DE TAIL (2) 130 LF ` CL III RCP' S FLARED END SEC77ONS I EMERGENCY / l 5 -__-SPILLWAY SPILLWAY EL= 45.0 Vm w+lt--w CY -- STONE SPILL YW11Y`----. �(`�PROIEC77ON r Y �{ 1I f{ W= 70' , Depth= 1.5' 0 - PLACE FILTER FABRIC t:` UNDER STONE Storm wotelr Retelntiia Detea#din Pant! BOUd ELEVA7I0N= 315 5 36 37 0 NOTE: PORTABLE PUMP TO BE USED TO DRAIN POND W CASE OF EMERGENCY. } PUMP TO BE PLACED ON TOPi_,TLET BERM j INTH SCREEN ATTACHED TO HINLET AND jf COVERED WITH STONE. HOSE TO DRAIN DIRECTLY INTO POND OUTLET,STCTURE. ( - 1 � FOREBAY BOTTOM ELEV. = 33.0 (� FOREBAY OVERFLOW' /SPILLWAY ELEV. = 40.0 , 7 POND DETAIL SCALE: 1 " = 30' 2' X 4' FRAME AROUND CREST OF OVERFLOW STAKED 2" X 4' 1.5' MAXIMUM HEIGHT WOODEN FRAME 3' LENGTH SEE NARRATIVE FOR MINIMUM MORE DETAIL AND 3' SPACING ALTERNATE METHODS, GATHER EXCESS FILTER FABRIC TT AT CORNERS EXTENSION MI FABRIC 1' MIN/ INTO TRENCH4'CRUSHED STONE OR12' COMPACTED SOIL ,) JFA O FILTER FABRIC; PERVIOUS SHEET OF NYLON, POLYESTER, OR DROP INLET ETHYLENE YARN, EXTRA WITH GRATE STRENGTH ( 50 PSI MIN.) WITH ULTRAVIOLET RAY IN14181TORS AND STABIUIERS ISOMETRIC _VIEW IP BRIC INLET INSET PRO�C3DN -,DROP NTS PRACTICE 6.51 'A LE TO rCO�RDINAJET W AT&T `tt ri IE = 39.FROM 36' FLARED END SEC S POND OSCHARGE A EA TO � FLAT A T ELE = 39.6 65%CY CL II RIPRAP 11FT DEEP c Lo=19' p c 0 1 7- � a O 12' It IaV11 V111 � .+g• a a � o 48' RCP d50 = 3" SIDNE 41 dMAX - 5' V OUT- 4.7 fps La - 19' w O OUTLET PIPE APRON THICKNESS - V F OUTLET PROTECTION DETAIL OUTFALL INTO POND NOT TO SCALE OUTLET PROTECTION DETAIL NOTE: FILTER FABRIC IS TO (.SIDE VIEW) BE PLACED UNDER ALL STONE OUTLET PROTECTION. NOT TO SCALE 18' a . e r•"�•r��re�J. 4• NOT TO SCALE NOTE: FILTER FABRIC IS TO OP BE PLACED UNDER ALL STONE OUTLET PROTECTION. COMPACTED FILL OR/ --'' GRAVEL, EXTENSION OF FABRIC AND WIRE - -•:•_ INTO THE TRENCH NOTE: ='=' SEE NARRATIVE FOR MORE DETAIL. ISOMETRIC VIEW_ FILTER FILTER FABRIC FABRIC EXTENSION OF BACKFILL FABRIC AND WIRE MINIMUM 8" INTO THE TRENCH THICK LAYER WIRE COMPACTED WIRE OF GRAVEL FILL 8" MINIMUM/ 8" MINIMUM V_-TRENCH �--f 14" MINIMUM 4" MINIMUM SF. T� SE.QIIIZ sF SEDIMENT FENCE SILT FENCE Practice 6.62 NTS 8" I CONTINUOUS CONCRETE COPING 3/4' If» - jl/ / FRAME do GRATE FRAME AND GRATE DEWEY BROS.Na.CH-8N-3A 4" 1 1 1 1OR EQUAL PRECAST CONCRETE CATCH BASIN 4' j' 4" 6" I 8� 2.-0' I REINFORCING 4'-0" SECTION VIEW #4 BARS O 12.00 EW Pla yl CATCH BASIN DETAIL NTS i ,i i i IE - 38.2 i 1 5 CY CL It RIPRAP 1 FT DEEP- NOTE: ALL BUILEING ROOF DRAINS MUST BE DIRECTED INTO THE STORM DRAINAGE COLLEC71ON SYSTEM OR INTO THE STREETAPARKING LOT. HAMPSTEAD CENTER Additional Calculation Summary for DWO - NATER QUALITY CONSIDERATIONS -• Impervious area calculations, See Project Data Sheet w No offslte areas drain to pond TOTAL IMPERVIOUS = 722,447 sf TOTAL AREA DRAINING TO POND = 1 209,210 sf w Retention of first V of run-off, 1,209,210 sf total - 722,447 sf impervious = 486,763 green area SA REQUIRED, (722, 447 x 0" 98 + 486, 763 x O. 20) / 1, 209, 210 = 0. 666, or 66. 6% At 7.5' depth, 90% TSS removal, from chart - SA factor = 2, 16 1, 209, 210 x O. 01 x 2, 16 = 0. 60 acres = sb, 119 sF SA REQUIRED At Elev, = 40. 0 SA = 27,787 sf SA PROVI-nD VOLUME REQUIRED, (722, 447x 0. 98 + 486, 763 x 0. 20) x 1/12 = 67. 113 67,113 ,-r REQUIRED STORAGE At Elev. = 42.2 70, 375Lt PROv1AED STORAGE Average head from storage elevation to orifice - 42" 2 - 40, 0 / 2 = 1, 10' 3' PVC drain to draw -down pond, Orifice equation, Q = CA(2gh)^1/2 Q = 0, 6( 0. 04909) ( 64, 4 X 1. 10) ^ 112 = 0.2479 cfs T = 267, 547 sec. = 3. 1 days OKAY FOREBAY REQUIREMENTS - Minimum capacity = 98,094 X 20% = 19,619 tf Provided capacity = 19,619 cf M= 5 GRASS LINED nominal s= 0.18Z CAPACITY = 75+cfs ® 2.1 fps GRASSED CHANNEL NOT TO SCALE STD.CURB 4' - 6" 1111. 4' SECTION 0 I r,-_11014 IV1=YGG OVERFILL 6" FOR SETTLEMENT �rti 4' MINIMUM EMERGENCY �f� •� \\��� \ BYPASS 6" BELOW x,\ 2; 1. SIDE SETTLED TOP OF DAM //� </\OP M X. FILTER' NATURAL 'FABRIC \� GROUND SECTION VIEW 3' MINIMUM WASH5TONE 7 NOTE: THICK ON FACE SEE NARRATIVE FOR FROM TOE OF DAM 5' MINIMUM MORE DETAIL. TO WEIR. \ c` TRANSITION SECTION zz w NCDOT CATCH BASIN - F J STD.840.02 5' - 0- a- w G� Z a PLAN VIEW w OV z '.FRAME, GRATE AND HOOD CURB NORMAL GUTTER FLOW LINE 7 NCDOT STD. 840.03E 1 _ FRAME & GRATE _.... _ OPENING d I DEPRESSED GUTTER PRECAST I CONCRETE CATCH BASIN a w i I W I OUTLET I^ I -d 1 �1 PIPE to SEE NCDOT STDS. 852.05 840.02 SECTION VIEW 840.03E FRONT SECTION FOR FURTHER DETAIL PRECAST CURB INLET N.T.S. 1 800 CIF / ACRE 2: 1 SIDE SLOPE MAX. CROSS SECTION ST TEMPORARY SEDIMENT TRAP Practice 6.60 N.T.S. WETLANDS VEGETATION NOTE: 7HE FOLLOWING SPECIES OF WE71ANDS VEGETATION ARE SUITABLE FOR PLAN71NG ALONG THE 6: 1 V>=GETA TED SHELF.- - SAGITTARIA LA77FOUA (COMMON ARROWHEAD) - SAGITTARIA LANCIFOLIA (DUCK POTATO) - SAURURUS CERNUUS (LIZARDTAIL) - PELTANDRA WRGINICA (ARROW ARUM) IF ONE OR MORE OF THE SUGGESTED SPECIES IS UNAVAILABLE, APPROPRIATE WETLANDS VEGETATION COMMON TO THE COASTAL NORTH CAROLINA REGION MAY BE SUBSTITUTED. NOTE. • t71R1RCE TO BE TEMPORARILY COVERED WTH MORE AND 57 STONE UN17L SITE IS STABLE EL=42.2 GRATE' TOP 1 90, ELBOW DO*N 8" 6EL0W OUSEL ¢ (2) - 36 " RCP OUSEL= MIN. 8 INV= PCIFE ON` 40.0 4O 0 I !NY 40.0 J 1 r 58 6 r2' corn. or GROUT 1 ' 5014 3" PERFORATED for c EANOUr PVC W/ GRAVEL AND FABRIC FIL TER EL= 38.0 =BASE PONO BOTTOM ELEV 32.5 SECTION VIEW 7 4' x 10' Precast Canc.Box, 77NDALL UV0410 OR EQUIVALENT OUTLET STRUCTURE DETAILS NOT TO SCALE -�` La-15' ­00 ti a o u°u°o a u 8" 000ta,o(o, >I,atlol�l 48" ao°o 48" RCP d5a - 6' STAVE OVAX - 9' V OUT- 4.6 fps La - is' APRON THICKNESS - 1.5' b r� T TAIL V-11 IT NOT TO SCALE rA K n n tj Of -3 3/� FAM S I IGHT >°11 FRAME 195 LBS. a b NOTEI^iRATT.R tORWE TO SECTION 'A-Ao BE PLACED UNDER ALL STONE OUTLET PROTECTION- q b 0'-51/4" 1"-1 1/2" Id- 0'-5 1/4' d- 0'1-3 3/4711 t_ 0 t7 o a 0'-3 3/4' ` 4 k A F a' -0 1 /2" N b SECTION "B-B" 0' -8 1 /4' 1' -4 1/8" 0' -8 1 /4 o 2'-8 5/8' PLAN VFW GRILL BASIN CASTINGS NTS NOT TO SCALE FOUR STANDARD 2'X3' GRATES NCDOT OR EQUIVALENT GRATE PLAN VIEW � � 1111:1 ii aaa..i r.rttTl�■1��� a -- �I LA Imo--- 2' TYP. 10, -J" h a I 4 PI AN LIFW 5" E!QND- SUMMA-Y: OUTLET STRUCTURE DETAILS 1. FOREBAY VOLUME: NOT TO SCALE Volume Required = 98,094 X 20% = 19,619 cf Volume provided = 19,619 cf STA`:E WATER QUALITY POND CONSIDERATIONS - o Surface Area required = 25,811 sf o I Surface Area provided = 27,787 sf c { Storage Volume required = 66,325 cf ALL SLOPES ° { Storage Volume provided = 70,375 cf 11 MAXIMUM # � Storage Volume Drawdown Time = 3.1 days t l POND SEDIMENTATION CONSIDERATIONS - min. 12' ruin. SEE PLAN c j 3 Storage Volume required = 27,7 X 1800 = 49,860 cf II 1 Storage Volume provided = 70,375 cf POND y volume OUSEL 20%Foreo 20% of required p f storage, typical w ^.� - u-i 1- _ a OUTLET Plf _� OUTLET 5. PROTECTION AS ON PLANS FORMA Y SECTION DETAIL TYPICAL AT ALL STORM OUTFALLS TO POND NOT TO SCALE h�4 VARIES 10' 13.5' 15.0' (0 16' I II EMBANKMENT TOP= 47.0 SETTLED = 47.25 CONSTRUCTED P STATE STORAGE _ 10D- AR WSEL= 43.7 EMERGENCY SPILLWAY EL = 45.0 70,375 CF ! 0 10-YEAR WSEL= 42.2 w lil op o (2) 36" , S 6. NORMAL WSEL= 40.0 TOP OF 6:1 SHELF EACH 1 BOTTOM OF 6: 1 SHELF EL= 39.0 BOTTOM 3:1 SWM STRUCTURE EL= 38.0 ANTI --SEEP COLLAR, EL= 37.0 ANTI -SEEP COLLAR, IE=40.0 SEE DETAIL - T M - 19' 6' WIDE 6: 1 SHELF NOTE COLLAR TO BE POURED AFTER I �� PIPES ARE IN PLACE. V 1 15' 29' REINFORCING AS NECESSARY. I f f I Ij NOTE: SEE CONSTRUCTION DRAWINGS FOR DETAILED LOCATIONS AND ELEVATIONS ON ALL INLETS, CULVERTS, AND OUTLETS. SEE SHEET 3 OF 3 FOR EROSION CONTROL SPECIFICATIONS FOR THIS PLAN. DETAILS SHOWN ARE TYPICAL OF INSTALLATIONS REQUIRED BY THE STATE. THIS SHEET DOES NOT PURPORT TO SHOW ALL REQUIRED CONSTRUCTION DETAILS, BUT RATHER SERVES AS A GUIDE. THE CONTRACTOR IS RESPONSIBLE FOR ADHERING T4 ALL MORE GENERAL NOTES: 1. ALL CONSTRUCTION TO APPLICABLE STATE AND LOCAL CODES. 2. CONTRACTOR TO COORDINATE ANY REQUIRED TRAFFIC CONTROL WITH NCDOT. 3. CARE SHALL RE TAKEN DURING FINAL GRADING TO ENSURE POSITIVE DRAINAGE AWAY FROM BUILDINGS AND TO RECEIVING STRUCTURES. 4. CONTRACTOR IS RESPONSIBLE FOR COORDINA77ON OF ANY RELOCATIONS, RE -ALIGNMENTS, DISCONNECTIONS OR CONNEC77ONS OF EXISTING U7I07IES MTH APPLICABLE AUTHORITIES. 5. CLEARING AND GRUBBING OF SITE TO INCLUDE REMOVAL OF EXIS77NG CURB, ASPHALT, INLETS, ANO ANY OTHER STRUCTURES INCLUDING TREES, STUMPS AND DEBRIS EXISTING ON SITE. TREES NOT REQUIRED TO BE CLEARED FOR CONSTRUCTION SHALL REMAIN UNLESS OTHERWISE OIRECT.M. 30 15 0 30 60 90 SCALE IN FEET 1 " = 30 2 REVISED PER COMMENTS FROM NCDENR DIVISION OF WATER QUALITY 10/26/00 1 REVISED PER COMMENTS FROM NCDENR / LAND QUALITY SECTION 10/16/00 ER EV. NO. REVISIONS DATE E Cowy"t 1% Hwovr D000 srtHna P.A„ 'w rfphte reerved ReprooUetlon or uw of the contents of this dommw?k a' oddlt)v,s or dvdotlpe to 10 document to chafe or part" wfftut eHthn caneent of the Land Swwyr or Engkm r; tr prahbtted lily capAw hem the orlyr,d of urle dmonaet marked with 8re wiod Npnat" and arigkwl wd of the Su )4w or Ehgher, shall be a &Nerd to be wild and (me apple& EMBANKMENT SECTION NOT TO SCALE NOTE WELL, ANY AREAS QN-SITE WITHOUT ACTIVITY IN A 30 DAY PERIOD SHALL BE TEMPORARILY STABILIZED AS PER THE SPECIFICATIONS. No geotechnlcal testing has been performed on site. No warranty Is made for suitability of subgrode, end undercut and any required replacement with suitable material shall be the responsibility of the contractor. SEE SHEET 1 FOR ADDITIONAL DETAILS EROSION & SEDIMENT CONTROL and WATER QUALITY PLAN 11"PSTEAD CENTER LOCATED IN TOPSAIL TOWNSHIP PENDER COUNTY, NORTH CAROLINA ��tit ffi H CARO O eeeeNe�eee ' isss O-%,r �- J q4 2 5q 3 J'y ti,�Fy 4. A ` Ia�z</v0 NOTE: THIS PLAN TO BE UTILIZED AND REWEWED ONLY IN CONJUNCTION WITH THE WRITTEN NARRATIVE, WHICH IS AN INTEGRAL PART OF THIS EROSION AND SEDIMENT CONTROL PLAN. Date: 9- 1-00 Scale: 1 " = 3O' prawn: � 1-i.SK Checked: LG/? Projec' 'Jo! f 6Z?Jecp2HSR H AN OVER DESIGN SERVICES, P.A. S"'} No: LAND SURVEYORS, ENGINEERS & LAND PLANNERS er� 319 WALNUT STREET WILMINGTON, N.C. 28401 PHONE: (910) 343-8002 Of: OWNER: WILLIAM R. HOWARD 8104 BALD EAGLE LANE WILMINGTON, NC 28411 $ Construction Road Stabilization Specification # 6.80 - Construction Specifications 1. Clear roadbed and parking areas of all vegetation, roots and other objectionable material. 2. Ensure that road construction follows the natural contours of the terrain if It is possible. 3. Locate parking areas on naturally flat areas if they are available. Keep grades sufficient for drainage but generally not more than 2 to 3'X 4. Provide surface drainage, and divert excess runoff to stable areas by using water bars or turnouts (References: Runoff Control Measures). 5. Keep cuts and fills at 2:1 or flatter for safety and stability and to facilitate establishment of vegetation and maintenance. 6. Spread a 6-inch course of " ABC" crushed stone evenly over the full width of the road and smooth to avoid depressions. 7. Where seepage areas or seasonally wet areas must be crossed, install subsurface drains or geotextile fabric cloth before placing the crushed stone (Practice 6.81, Subsurface Drain). 8. Vegetate all roadside ditches, cuts, fills and other disturbed areas or otherwise appropriately stabilize as soon as grading is complete (References: Surface Stabilization). 9. Provide appropriate sediment control measures to prevent off -site sedimentation. Maintenance Inspect construction roads and parking areas periodically for condition of surface. Topdress with new gravel as needed. Check road ditches and other seeded areas for erosion and sedimentation after runoff -producing rains. Maintain all vegetation In a healthy, vigorous condition. Sediment -producing areas should be treated Immediately. CE Temporafy Gravel Construction Entrance/Exit 5peclflcatlon # 6.06 - Construction Specifications 1. Clear the entrance and exit area of all vegetation, roots and other objectionable material and properly grade It. 2. Place the gravel to the specific grade and dimensions shown on the plane and smooth it. 3. Provide drainage to carry water to a sediment trap or other suitable outlet. 4. Use geotextile fabrics because they improve stability of the foundation In locations subject to seepage or high water table. Maintenance Maintain the gravel pad In a condition to prevent mud or sediment from leaving the construttion site, This may require periodic topdressing with 2--Inch stone. After each rainfall, Inspect any structure used to trap sediment and clean it out as necessary. Immediately remove all objectionable materials spilled, washed, or tracked onto public roadways. Temporary Seeding Specification # 6.10 - Specifications Complete grading before preparing seedbeds and install all necessary erosion control practices, such as dikes, waterways and basins. Minimize steep slopes because they make seedbed preparation difficult and increase the erosion hazard. If soils become compacted during grading, loosen them to a depth of 6-8 inches using a ripper, harrow, or chisel plow. Seedbed Preparation Good seedbed preparation is essential to successful plant establishment. A good seedbed is well -pulverized, loose and uniform. Where hydroseeding methods are used, the surface may be left with a more irregular surface of large clods and stones. Liming - Apply lime according to soil test recommendations. If the pH (acidity) of the soil Is not known, an application of ground agricultural limestone at the rate of 1 to 1 1/2 tons/acre on coarse --textured soils and 2-3 tons/acres on fine -textured soils is usually sufficient. Apply limestone uniformly and Incorporate into the top 4-5 inches of sell. Soils with a pH of 6 or higher need not be limed. Fertilizer- Base application rates on sell tests. When these are not possible, apply a 10-10-10 grade fertilizer at 700-1,000 lb./acre. Both fertilizer and lime should be incorporated into the top 4-6 inches of soil. If a hydraulic seeder 1s used, do not mix seed and fertilizer more than 30 minutes before application. Surface roughening- If recent tillage operations hove resulted In a loose surface, additional roughening may not be required except to break up large clods. If rainfall courss the surface to become sealed or crusted, loosen It just prior to seeding by disking, raking, harrowing, or other suitable methods. Groove or furrow slopes steeper than 3:1 on the contour before seeding (Practice 6:03, Surface Roughening). Plant Selection Select on appropriate species or species mixture from Table 6.10a, for seeding In late winter and early spring, Table 6.10b for summer, and Table 6.10c for fall. Seeding Evenly apply seed using a cyclone seeder (broadcast), drill, cultlpacker seeder, or hydroseeder. Use seeding rates given in Table 6.10a-6.10c. Broadcast seeding and hyroseeding are appropriate for steep slopes where equipment cannot be driven. Hand broadcasting is not recommended because of the difficulty in achieving a uniform distribution. Small grains should be planted no more than 1 inch deep, and grasses and legumes no more than 1/2 inch. Broadcast seed must be covered by raking or chain dragging, and then lightly firmed with a roller or cultipocker. Hydroseeded mixtures should include a wood fiber (cellulose) mulch. MUIrtlDa The use of appropriate mulch will help ensure establishment under normal conditions and Is essential to seeding success under harsh site condition (Practice 6.14, Mulching). Harsh site conditions include: -seeding in fall for winter cover (wood fiber mulches are not considered adequate for this use), -slopes steeper than 3:1, -excessively hot or dry weather, -adverse solls(shoilow, rocky, or high in clay or send), and -areas receiving concentrated flow. If the area to be mulched is subject to concentrated waterflow, as In channels, anchor mulch with netting (Practice 6.14. Mulching). Table 6.10a - Temporary Seeding Recommendation for Late Winter and Early Spring Seeding mixture Species- Rye(graln), Annual lespedeza (Kobe in Piedmont and Coastal Plain Rate (lb/acre)- 120 Omit annual lespedeza when duration of temporary cover Is not to extend beyond June Seeding dotee-Coastal Plain - Dec. I - Apr. 15. Soil amendments- Follow recommendations of soil tests or apply 2,000 lb/acre ground agricultural limestone and 750 lb/acre 10-10-10 fertilizer. Mulch -Apply 4,000lb/acre straw. Anchor straw by tacking with asphalt, netting or a mulch anchoring tool. A disk with blades set nearly straight can be used as a mulch anchoring tool. Maintenance - Refertilize if growth Is not fully adequate. Reseed, refertillze and mulch Immediately following erosion or other damage. Table 6.10b - Temporary Seeding Recommendations for Summer Seeding mixture Specles-German millet Rate(lb/acre)- 40 Seeding dates -Coastal Plain- Apr. 15-Aug. 15 Soil amendments -Follow recommendations of soil tests or apply 2,000 lb/acre ground agricultural limestone and 750 lb/acre 10-10-10 fertilizer. Mulch -Apply 4.000 lb/acre straw. Anchor straw by tacking with asphalt, netting or a mulch anchoring tool. A disk with blades set nearly straight can be used as a mulch anchoring tool. Main tan ance-Refertlllze if growth is not fully adequate. Reseed, refertlRze and mulch immediately following erosion or other damage. Table 6.10c - Temporary Seeding Recommendation for Fall Seeding mixture Species- Rye(graln) Rate(lb/ocre) - 120 Seeding dates - Coastal Plain and Piedmont -Aug 15 - Dec, 30 Sell amendments - Follow sell tests or apply 2,000 !b./acre ground agricultural limestone and t,000 lb/acre 10-10-10 fertilizer. Mulch- Apply 4.000 Ib/ocre straw. Anchor straw by tacking with asphalt, netting, or a mulch anchoring tool. A disk with blades set nearly straight can be used as a mulch anchoring tool. Maintenance- Repair and refertilize damaged areas immediately. Topdress with 50 lb/acre of nitrogen in March, if it is necessary to extend temporary cover beyond June 15, overseed with 50 lb/acre Kobe (Piedmont and Coastal Plaln) Permanent Seeding specifications # 6.11 - Specifications Seedbed Requirements Establishment of vegetation should not be attempted on sites that are unsuitable due to Inappropriate soil texture (Table 6.11a), poor drainage, concentrated overland flow, or steepness of slope until measures have been taken to correct these problems. To maintain a good stand of vegetation, the soil must meet certain minimum requirements as a growth medium. The existing soil should have these criteria: - Enough fine-grained (slit and clay) material to maintain adequate moisture and nutrient supply (available water capacity of at least .05 Inches water to 1 inch of soil). - Sufficient pore space to permit root penetration. - Sufficient depth of soil to provide on adequate root zone. The depth to rock or impermeable layers such as hardpans should be 12 Inches or more, except on slopes steeper than 2:1 where the addition of soil is not feasible. - A favorable pH range for plant growth, usually 6.0-6,5. - Freedom from large roots, branches, stones, large clods of earth, or trash of any kind. Clods and stones may be left on slopes steeper than 3:1 if they are to be hydroseeded. If any of the above criteria are not met-I.e., if the existing sell Is too coarse, dense, shallow or acidic to foster vegetation -special amendments are required. The soil conditioners described below may be beneficial or, preferably, topsoil may be applied in accordance with Practice 6.04. Topsafling. Soil Conditioners In order to improve the structure or drainage choracteristles of a soil, the following material may be added. These amendments should only be necessary whern soils have limitations that make them poor for plant growth or for fine turf establishment (see Chapter 3, Vegetative Considerations). Peat Appropriate types are sphagnum moss peat, hypnum moss peat, reedsedge peat, or peat humus, all from fresh -water sources. Peat ,should be shredded and conditioned In storage piles for at least 6 months after excavation. Sonc -dean and free of toxic materials Vermicullte-horticultural grade and free of toxic substances. Rotted manure -stable or cattle manure not containing undue amounts of straw or othe• bedding materials. Thor:,ughly rotted sawdust- free of stones and debris, Add 6 lb. Of nitrogen to each cubic yard. Slud•je-Treated sewage and Industrial sludges are available in various forms: thean should be used only In accordance with local. State and Federal regui atlons. I Spek ies Selection Use the key to Permanent Seeding Mixtures (Table 6.11b) to select the most appropriate seeding mixture based on the general site and maintenance factors. A listing of species, Including scientific names and characteristics, is given in Appendix 8.02. Seedbed Preparation install necessary mechanical erosion and sedimentation control practices before seeding, and complete grading according to the approved plan. Lime and fertilizer needs should be determined by soil tests. Soil testing Is performed free of charge by the Noah Corollno Deportment of Agriculture soil testing laboratory. Directions, sample cartons, and information sheets are available through county agricultural extension offices or from NCOA. Because the NCDA soil testing lab requires 1-6 weeks for sample turn -around, sampling must be planned well in advance of final grading. Testing Is also done by commercial laboratories. When soil test are not available, follow rates suggested on the Individual specification sheet for the seeding mix chosen (Tables 6.1111c through 6.1111v). Applications rates usually fall into the following ranges: - Ground agricultural limestone I Light -textured, sandy soils; 1-1 1/2 tons/acre Heavy textured, clayey soils 2-3 tons/acre - Fertilizer: Grasses 800-1200 lb/acre of 10-10-10 (or the equivalent) Gross -legume mixtures: 800-1200 lb/acre of 5-10-10 (or the equivalent) Apply lime and fertilizer evenly and incorporate Into the top 4-6 Inches of soil by disking or other suitable means. Operate machinery on the contour. When using a hydroseeder, apply lime and fertilizer to a rough, loose surface. I Roughen surfaces according to Practice 6.03, Surface Roughening. Complete seedbed preparation by breaking up large clods and raking into a smooth, uniform surface (slope less than 3:1) Fill In or level depressions than can collect water. Broadcast seed Into a freshly loosened seedbed that hoe not iii been sealed by rainfall. 1 Table 6.11 s - Seeding No. 4CP for. Well -Drained Sandy looms to Dry Sands, Coastal Plain; Low to Medium -Care Lawns Seeding mixture Species - Centlpedegrass - Rate - 10-20 lb/acre (seed) or 33 bu/acre (sprigs) Seeding dates - Mor. - June, (Sprigging can be done through July where water is available for irrigation.) Soil amendments - Apply lime and fertilizer according to sell test, or apply 300 lb/acre 10-10-10. Sprigging - Plant sprigs In furrows with a tractor -drown transplanter, or broadcast by hand. Furrows should be 4-6 inches deep and 2ft apart. Place sprigs about 2 ft. apart in the row with one end at or above ground level (Figure 6.11d). Broadcast at rates shown above, and press sprigs Into the top 1 1/2 Inches of soil with a disk set straight so that sprigs are not brought bock toward the surface. Mulch - Do not mulch Maintenance - Fertlllze very sparingly- 20 lb/acre nitrogen in spring with no phosphorus. Centlpedegross cannot tolerate high pH or excess fertilizer. Table 6,11t - Seeding No. 5CP for. Well -Drained Sandy Looms to Dry Sands; Low Maintenance Seeding mixture Species Rate (lb/acre) Pensacola Bahlogross 50 Sericea lespedezo 30 Common Bermudograss 10 German millet 10 Seeding notes 1. Where a neat appearance ie desired, omit serlceo 2. Use common Bermudograss only on Isolated sites where It cannot become a pest Iiermudograss may be replaced with 5 lb/acre centipedgraee. Set ling dotes - Apr. 1 - July 15 Sot amendments - Apply lime and fertilizer according to soil tests, or apply 3,000 ib/acre ground agricultural limestone and 500 Ib/ocre 10-10-10 fertilizer. Mui,:h Apply 4,000 Ib/ocre grain straw or equivalent cover of another suitable mulch. Anchor by tacking with asphalt, roving and netting or by crimping with a mulch oncrioring tool. A disk with blades set nearly straight can be used as a mulch anchoring tool. Maintenance - Refertilize the following Apr. with 50 Ib/ocre nitrogen. Repeat as growth requires. May be moved only once a year. Where a neat appearance is desired, omit sericeo and now as often as needed. Table 6.11v - Seeding No. 7CP for. Grass-11ned Channels; Coastal Plain Seeding Mixture Species - Common Bermudogress - Rote - 40-80 (1/2 Ib/1,000 ft ) Seeding dates - Coastal Plain; Apr - July Soil amendments - Apply lime and fertilizer according to soil tests, or apply 3,000 Ib/ocre ground agricultural limestone and 500 lb/acre 10-10-10 fertilizer. Mulch - Use jute, excelsior matting, or other effective channel lining material to cover the bottom of channels and ditches. The lining should extend above the highest calculated depth of flow. On channel side slopes above this height, and In drainages not requiring temporary Innings, apply 4,000 lb/acre grain straw and anchor straw by stapling netting over the top. Mulch and anchoring materials must be allowed to wash down slopes where they can clog drainage devices. Maintenance -A minimum of 3 weeks Is required for establishment. Inspect and repair mulch frequently. Refertilize the following Apr, with 50 lb/acre nitrogen. Refer to Appendix 0.02 for botanical names Grass --Lined Channels Specification # 6.30 - Construction Specifications 1. Remove oil trees, brush, stumps, and other objectionable material from the foundation area and dispose of properly. 2. Excavate the channel and shape it to neat lines and dimensions shown on the plans plus a 0.2 ft overcut around the channel perimeter to allow for bulking during seedbed preparations and sod buildup. 3. Remove and properly dispose of all excess soil so that surface water may enter the channel freely. 4. The procedure used to establish gross in the channel will depend upon the severity of the conditions and selection of species. Protect the channel with mulch or a temporary liner sufficient to withstand anticipated velocities during the establishment period (Appendix 8,05). Maintenance Dur€ng the establishment period, check grass -lined channels after every rainfall. After grass Is established, periodically check the channel; check it after every heavy rainfall event. Immediately make repairs. It Is particularly lmportont ko check the channel outlet and all road crossings for bank stability and evidence of piping or scour holes. Remove all significant sediment accumulations to maintain the designed carrying capacity. Keep the grass In a health, vigorous condition at all times, since It Is the primary erosion protection for the channel (Practice 6.11. Permanent Seeding). Outlet Stabilization Structure Specification # 6.41 - Construction Specifications 1. Ensure that the subgrade for the filter and rlprap follows the required lines and grades shown In the plan. Compact any fill required in the subgrade to the density of the surrounding undisturbed material. Low areas In the subgrade on undisturbed soil may also be filled by increasing the rlprap thickness. 2. The rlprap and gravel filter must conform to the specified grading limits shown on the plans. 3. Filter cloth, when used, must meet design requirements and be properly protected from punching or tearing during Installation. Repair any damage by removing the rlprap and placing another piece of filter cloth over the damaged area. All connecting joints should overlap a minimum of I ft. if the damage is extensive, rep+acs the entire filter cloth. 4. Riprop may be placed by equipment, but take care to avoid damaging the fil ter. 5. The minimum thickness of the riprop should be 1.5 times the maximum stone diameter, 6. Rpprop may be field stone or rough quarry stone. It should be hard, angular, highly weather-reslstant and well graded. 6. Construct the apron on zero grade with no overfall at the end. Make the top of the riprop at the downstream end level with the receiving area or slightly below It. B. Ensure that the apron is properly aligned with the receiving stream and preferably straight throughout its length. if a curve Is needed to fit site conditions, place it in the upper section of the apron. 9. Immediately after construction, stabilize all disturbed areas with vegetation (Practice 6.10, Temporary Seeding, and 5.11, Permanent Seeding). Maintenance Inspect riprop outlet structures ,yfter heavy rains to see if any erosion around or below the rlprap has taken place or if stones have been dislodged. Immediately make all needed repairs to prevent further damage. Fabric Drop Inlet Protectirrn_LT� oror}' Specillcatlon # 6.51 - Construction Specifications 1. As synthetic fabric, use a pe•vious sheet of nylon, polyester, or ethylene yam-extro strength (50 lb/1 Inch minimum) -that contains ultraviolet ray Inhibitors and stabilizers. Fabric should be sufficiently porous to provide adequate drainage of the temporary sediment pool. Burlap may be used for short-term applications. It must be replaced every 60 days. 2. Cut fabric from a continuous roll to eliminate joints. 3. For stakes, use 2 x 4 Inch ­aod (preferred) or equivalent metal with a minimum length of 3 ft. 4. Space stakes evenly around the perimeter of the Inlet a maximum of 3ft. apart, and securely drive them Into the ground, approximately 18 Inches deep. 5. To provide needed stability t, the installation, frame with 2 x 4-inch wood strips around the crest of one overflow area at a maximum of 1.5 ft above the drop inlet crest. 6. Place the bottom 12 Inches of the fabric in a trench and backflll the trench with at least 4 Inches of crushed stone or 12 Inches of compacted soil. 7. Fasten fabric securely to the stakes and frame. Joints must be overlapped to the next stake. 8. The top of the frame and fabric must be well below the ground elevation down slope from the drop Inlet to keep runoff from bypassing the inlet. It may be necessary to build a temporary dike on the down slope side of the structure to prevent bypass flow. Material from within the sediment pool may be used for diking. Maintenance - Inspect the fabric barrier after each rain and make repairs at needed. Remove sediment from the pool orea as necessary to provide adequate storage volume for the next rain. Take care not to damage or undercut the fabric during sediment removal. When the contributing drainage area has been adequately stabilized, remove all materials and any unstable sediment and dispose of them property. Bring the disturbed area to the grade of the drop inlet and smooth and compact it. Appropriately stabilize all bare areas around the inlet. Land Grading Specification # 6.02 - Construction Specifications 1.Conetruct and maintain all erosion and sedimentation control practices and measures in accordance with the approved sedimentation control plan and construction schedule. 2.Remove good topsoil from areas to be graded and filled, and preserve it for use in finishing the grading of all critical areas. 3.Scarify areas to be topeolled to a minimum depth of 2 Inches before placing topsoil (Practice 6.04, Topsofling). 4.Clear and grub areas to be flied to remove trees, vegetation, roots, or other objectionable material that would affect the planned stability of the fill. 5.Ensure that fill material is tree of brush, rubbish, rocks, logs, stumps, building debris, and other moierials Inappropriate for constructing stable fills. 6.Place all fill In layers not to exceed 9 inches In thickness, and compact the layers as required to reduce erosion, slippage, settlement, or other related problems. 7,0o not Incorporate frozen material or soft, mucky, or highly compressible materials Into fill slopes. S.Do not place fill on a frozen foundation, due to possible subsidence and slippage. 9.Keep diversions and other water conveyance measures free of sediment during all phases of development. 10.1-landle seeps or springs encountered during construction in accordance with approved methods (Practice 681. Subsurface Drain). 11.Permanently stabilize all graded areas Immediately after final grading is completed on each area In the grading plan. Apply temporary stabilization measures on all graded areas when work Is to be Interrupted or delayed for 30 working days or longer. 12.Ensure that topsoil stockplles, borrow areas, and spoil areas are adequately protected from erosion with temporary and final stabilization measures, Including sediment fencing and temporary seeding as necessary. Maintenance Periodically check off graded areas and the supporting erosion and sedimentation control practices, especially after heavy rainfalls. Promptly remove all sediment from diversions and other water -disposal practices. If washouts or breaks occur, repair them immediately. Prompt maintenance of small eroded areas before they become stgntflcant gullles is an essential part of an effective erosion and sedimentation control pion. NOTE WELL: EROSION CONTROL DETAILS AND SPECIFICATIONS ARE AS PER THE "EROSION AND SEDIMENT CONTROL PLANNING AND DESIGN MANUAL" OF THE STATE OF NORTH CAROLINA, DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES, LATEST EDITION. PRACTICE NUMBERS REFER TO THIS MANUAL. CONTRACTOR IS RESPONSIBLE FOR MAINTAINING A COPY OF THIS MANUAL ON -SITE AND ENSURING THAT ALL SUPERVISORS ARE FAMILIAR KITH THE STANDARDS AND SPECIRCA71ONS SHOWN IN THE MANUAL AND ON THE PLAN. SFSediment Fence (Silt Fence) Specification 6,62 - Construction Specifications MATERIALS 1.Use a synthetic filter fabric or a pervious sheet of polypropylene, nylon, polyester, or polyethylene yarn, which Is certified by the manufacturer or supplier as conforming to the requirements shown in Table 6.62b. Synthetic filter fabric should contain ultraviolet ray inhibitors and stabilizers to provide a minimum of 6 months of expected usable construction life at a temperature range of 0 to 120 F. 2.Ensure that posts for sediment fences are either 4-inch diameter pine, 2-inch diameter oak, or 1,33 lb/linear ft steel with a minimum length of 4 ft. Make sure that steel posts have projections to facilitate fastening the fabric. 3.For reinforcement of standard strength filter fabric, use wire fence with a minimum 14 gauge and a maximum mesh spacing of 6 inches. Table 6.62b Specifications For Sediment Fence Fabric Physical Property Requirements Filtering Efficiency - 85X (mm) Tensile Strength at Standard Strength- 30 lb/Inn In (min) Extra Strength- 50 Ib/lln in (mm) Slurry Flow Rate - 0.3 gal/sq ft/min (min) CONSTRUCTION 1.Construct the sediment barrier of standard strength or extra strength synthetic filter fabrics. 2-Ensure that the height of the sediment fence does not exceed 18 inches above the ground surface. (Higher fences may impound volumes of water sufficient to cause failure of the structure.) 3.Construct the filter fabric from a continuous roll cut to the length of the barrier to avoid joints. When joints are necessary, securely fasten the filter cloth only at a support post with overlap to the next post. 4.Support standard strength filter fabric by wire mesh fastened securely to the up slope side of the posts using heavy duty wire staples at least 1 Inch long, or tle wires. Extend the wire mesh support to the bottom of the trench. 5.When a wire mesh support fence Is used, space posts a maximum of 8 ft op.-irt. Support posts should be driven securely into the ground to a minimum of 18 inches. 6.Extra strength filter fabric with 6ft post spacing does not require wire mesh support fence. Staple or wire the filter fabric directly to posts. 7.Excavate a trench approximately 4 inches wide and 8 inches deep along the proposed line of posts and upslope from the barrier (f' jure 6.62a). S.Backfill the trench with compacted soil or gravel placed over the filter fabric. 9.Do not attach filter fabric to existing trees. Maintenance Inspect sediment fences of least once a week and after each rainfall. Make any required repairs immediately. Should the fabric of a sediment fence collapse, tear, decompose or become Ineffective, replace It promptly. Replace burlap every 60 dot's. Remove sediment deposits as necessary to provide adequate storage volume for the next rain and to reduce pressure on the fence. Take care to avoid undermining the fence during cleanout. Remove all fencing materials and unstable sediment deposits and bring the area to grade and stabilize It after the contributing drainage area has been properly stabilized. Sediment Basin Specifications # 6.61 - Construction Specifications 1.Site preparations -Clear, grub and strip topsoil from areas under the embankment to remove trees, vegetation, roots and other objectlonable materlol. Delay clearing the pool area until the dam €s complete and then remove brush, trees and other objectionable materials to facilitate sediment cleanout. Stockpile all topsoil or soil containing organic matter for use on the outer shell of the embankment to facilitate vegetative establishment. Place temporary sediment control measures below the basin as needed. 2.Cut-off trench -Excavate o cut-off trench along the centerline of the earti fill embankment. Cut the trench to stable soil material, but in no case make it less than 2 ft. deep. The cut-off trench must extend into both abutments to at least the elevation of the riser crest. Make the minimum bottom width wide enough to permit operation of excavation and compaction equiprent but !;� ra case less than 2 ft. Make side slopes of the trench no steeper than 1:1. C:ompo.:tlun requirements are the some as those for the embankment. Keep the trench d y during backfilling and compaction operations. 3.Fmbankment--Take fill material from the approved areas shown on the plonr. it should be clean minerol soil, free of roots, woody vegetation, rocks and ogler objectionable material. Scarify areas on which fill Is be placed before placing fill. The fill material must contain sufficient moisture so It can be formed by hand into a ball without crumbling. If water can be squeezed out of the ball, it Is too wet for proper compaction_ Place fill material In 6 to 8-Inch continuous layers over the entire length of the fill area and then compact it. Compaction may be obtained by routing the construction hauling equipment k /ef the fill so that the entire surface of each layer Is traversed by at least errs wheel or tread track of the heavy equipment, or a compactor may be used. Construct the embankment to an elevation 10% higher than the design height to allow for settling. 4.Condult spillways -Securely attach the riser to the barrel or barrel stub to make a watertight structural connection. Secure all connections between bc,.-J sections by approved watertight assemblies. Place the barrel and riser on a firm, smooth foundation of impervious soil. Do not use pervious material such as sand, gravel, or crushed stone as backflll around the pipe or anti -seep collars. Place the fill material around the pipe spillway 1n 4-Inch layers and compact it under and around the pipe to at least the some density as the adjacent embankment. Care must be taken not to raise the pipe from firm contact with Its foundation when compacting under the pipe haunches. Place a minimum depth of 21t. of hand -compacted backfill over the pipe sp iway before crossing it with construction equipment. Anchor the riser In place by concrete or other satisfactory means to prevent flotation. In no case should the pipe conduit be Installed by cutting a trench through the dam after the embankment is complete. 5.Emergency spillwoy-install the emergency spillway in undisturbed soil. The achievement of planned elevations, grade, design width, and entrance and ex:: channel slopes are critical to the successful operation of emergency spillway. 6.Inleta-Discharge water into the basin in a manner to prevent erosion. Use diversions with outlet protection to divert sediment -laden water to the upper end of the pool area to improve basin trap efficiency (References: Runoff Control Measures and Outlet Protection). 7.Erosion control -Construct the structure so that the disturbed area is minimized. Divert surface water away from bare areas. Complete the embanF'nent before the area Is cleared. Stabilize the emergency spillway embankment any all other disturbed areas above the crest of the principal spillway immediately after construction (References: Surface Stublllzatlon). 8.Sofety-Sediment basins may attract children and can be dangerous. Avoid steep side slopes, and fence and mark basins with warning signs If trespassing is likely. Follow all state and local requirements. Maintenance Check sediment basins after periods of significant runoff. Remove sediment and restore the basin to Its orlglnol dimensions when sediment accumulates to one- half the design depth. Check the embankment, spillways, and outlet for erosion damage, and Inepe;t the embankment for piping and settlement. Make all necessary repairs €mmedlatl4y. Remove ail trash and other debris from the riser and pod area. NOTE: DETAILS SHOWN ARE TYPICAL_ OF INSTALLATIONS REQUIRED BY NEW HANOVER COUNTY. THiS SHEET DOES NOT PURPORT TO SHOW ALL REQUIRED CONSTRUCTION DFTAILS, BUT RATHER SERVES AS A GUIDE. THE CONTRACTOR IS RESPONSIBLE FOR ADHERING TO ALL COUTY AND STATE CODES AND CONSTRUCTION STANDARDS. 1 MODIFIED PER COMMENTS FROM NCDENR / LAND QUALITY SECTION 10/16/00 REV. NO. � REVISIONS i DATE Capyrgtlt R Hanowr Design Swvk*k P.A., All rights nmwrwd. Rprocuetkn or ues of the aaetnts of thM doaim.nt or a0ltlmi .r delatkfu to thfe downwt, h mWe ar pot without wttter cma.nt of the Lrnd Surwyw or b7 isPrdrmlted Orx marled with &a orfghd aknature end arfghd and of the Surreyw orErghesr, � be mrraldwwd to be�es rout d and ftWn om* coplim or n+r dotumant. T m r ry ,5&diment Tr - continued Protection from piping - Place filter cloth on the foundation below the rlprap to prevent piping. An alternative would be to excavate a keyway trench across the riprop foundation and up the sides to the height of the dam. Weir length and depth - Keep the spillway weir at least 4 ft long and sized to pass the peak discharge of the 10-yr storm. A maximum flow depth of 1 ft, a minimum freeboard of 0.5 ft. and maximum side slopes of 2:1 are recommended. Weir length may be selected from Table 6.60o shown for most site locations In North Carolina. Table 6.60a Design of Spillways Drainage Area Weir Length(1) (acres) (ft) 1 4.0 2 6.0 3 8.0 4 10.0 5 12.0 (1) Dlmenslons shown are minimum Construction Specifications 1. Clear, grub, and strip the area under the embankment of all vegetation and root mot. Remove all surface soil containing high amounts of organic matter and stockpile or dispose of It properly. Haul oil objectionable material to the designated disposal area. 2. Ensure that fill material for the embankment is free of roots, woody vegetation, organic matter, and other objectionable material. Place the rill in lifts not to exceed 9 Inches and machine compact it. Over fill the embankment 6 inches to allow for settlement. 3. Construct the outlet section in the embankment_ Protect the connection between the r€prop and the soil from piping by using filter fabric or a keyway cutoff trench betweee the riprop structure and the soil. (Place the fitter fabric between the riprap and soil. Extend the fabric across the spillway foundation and sides to the top of the dam; or (Excavate a keyway trench along the centerline of the spillway foundation extending up the sides to the height of the dam. The trench should be at least 2 ft deep and 2 ft wide with 1:1 side slopes. 4. Clear the pond area below the elevation of the crest of the spillway to facilitate sediment cleanout 5. All cut and fill slopes should be 2:1 or flatter. 6. Ensure that the stone (drainage) section of the embankment has a minimum bottom width of 3 ft and maximum side slopes of 1:1 that extend to the bottom of the spillway section. 7. Construct the minimum finished stone spillway bottom width, as shown on the plans, with 2:1 side slopes extending to the top of the over filled embankment Keep the thickness of the sides of the spillway outlet structure at a minimum of 21 Inches. The weir must be level and constructed to grade to assure design capacity. 8. Material used In the stone section should be a well -graded mixture of stone with a d50 size of 9 Inches (class B erosion control stone Is recommended) and a maximum stone size of 14 inches. The stone may be machine placed and the smaller stones worked into the voids of the larger stones. The stone should be hard, angular, and highly weather -resistant. 9. Ensure that the stone spillway outlet section extends downstream post the toe of the embankment until stable conditions are reached and outlet velocity is acceptable for the receiving stream. Keep the edges of the stone outlet section flush with the surrounding ground and shape the center to confine the outflow stream (References: Outlet Protection). 10. Direct emergency bypass to natural, stable areas. Locate bypass outlets so that flow will not damage the embankment. 11. Stabilize the embankment and all disturbed areas above the sediment pool and downstream from the trap Immediately after construction (References: Surface Stabilization). 12. Show the distance from the top of the spillway to the sediment cleanout level (one-half the design depth) on the plans and mark It In the field. Maintenance Inspect temporary sediment traps after each period of significant rainfall. Remove sediment and restore the trap to Its original dimensions when the sediment has accumulated to one-half the design depth of the trap. Place the sediment that is removed in the designated disposal area and replace the contaminated part of the gravel facing. Check the structure for damage from erosion or piping. Periodically check the depth of the spillway to ensure it Is a minimum of 1.5 ft below the tow point of the embankment. Immediately fill any settlement of the embankment to slightly above design grade. Any riprop displaced from the spillway must be replaced immediately. After all sediment -producing areas have been permanently stabilized, remove the structure and all unstable sediment. Smooth the area to blend with the adjoining areas and stabilize properly (References: Surface Stabilization). 1GENERAL EROSION CONTROL SPECIFICATIONS and ADDITIONAL DETAILS for .9"PSTMW CENTER LOCATED IN TOPSAIL TOWNSHIP FENDER COUNTY, NORIN CAROLINA r �yllittnffryf, N� •"�� � S S/U ' _ ; e ( i'a 2 ��t' 017. : t = SEAL _ = = • 025483 e - i t j tiFA 6. . '3 -I' l0 /1 00 OWNER: WILLIAM R. HOWARD 8104 BALD EAGLE LANE WILMINGTON, NC 28411 HANOVER DESIGN SERVICES, P.A. LAND SURVEYORS, ENGINEERS & LAND PLANNERS 319 WALNUT STREET WILMINGTON, N.C. 28401 PHONE: (91C) 243-8002 I t Dote: 91-00 Scale: AS SHOWN Drown: HSR ZZ Checked: HSR Project No: 6723ecp3HSJ� Sheet No: i i! Of GENERAL NOTES: 1. Boundary and Topography surveyed in October 1997. 2. This map is not for conveyance, recordation, or sales. 3. No portion of this property is located within a special flood hazard area according to Flood insurance Rate Map Community Pcnel #370344 0527 C, revised Sept 1992, 4. Build:,-: layout and dimensions by others. 5. This property is zoned Pender County PD. 6. Water to be private by wells. Sewer to be private by septic. MORE GENERAL NOTES: 1. ALL CONSTRUCTION TO CONFORM TO APPLICABLE STATE & LOCAL CODES. 2. CONTRACTOR TO COORDINATE ANY REQUIRED TRAFFIC CONTROL WITH NCDOT. 3. CARE SHALL BE TAKEN DURING FINAL GRADING TO ENSURE POS177VE DRAINAGE AWAY FROM BUILDINGS AND TO RECEIVING STRUCTURES. 4. CONTRACTOR IS RESPONSIBLE FOR COORDINATION OF ANY RELOCATIONS, RE -ALIGNMENTS, DISCONNECTIONS OR CONNECTIONS OF EXISTING JTIL177ES WITH APPLICABLE AUTHORITIES. CONTRACTOR MUST COORDINATE WITH AT&T FOR. CROSSINGS OF FIBER OPTIC CABLE DURING INSTALLATION OF STORM DRAINAGE. 5. CLEARING AND GRUBBING OF SiTE TO INCLUDE REMOVAL OF EXISTING CURB, ASPHALT, INLETS, AND ANY OTHER STRUCTURES INCLUDING TI?t ES, STUMPS AND DEBRIS EXiS17NC ON SITE. TREES NOT REQUIRED TO BE CLEARED FOR CONSTRUCTION SHALL REMAIN UNLESS OTHERWISE DIRECTED. 6. MINIMUM SEPARATION SHALL BE MAINTAINED AS FOLLOWS: a. HORIZONTAL CLEARANCE OF 10 FEET BETWEEN SANITAR,' SEWER AND WATER MAINS. b. WHERE VERTICAL CLEARANCE 1S LESS THAN 18" BETWEEN SANITARY SEWER AND WATER OR WHERE SEWER LINE CROSSES ABOVE WATER MAIN, BOTH PiPES SHALL BE DUCTILE IRON PiPE FOR A MINIMUM OF 10' EITHER SIDE OF CROSSING. c. WHERE VERTICAL CLEARANCE IS LESS THAN 12" BETWEEN SANITARY SEINER AND STORM DRAIN, SANITARY SEWER SHALL BE DUCTILE IRON PIPE FOR A MINIMUM CF 10' EITHER SIDE OF CROSSING. d. WHERE VERTICAL CLEARANCE IS LESS THAN 12" BETWEEN WATER MAIN AND STORM DRAIN, WATER MAIN SHALL BE DUCTILE IRON PIPE FOR A MINIMUM OF 10' EITHER SIDE OF' CROSSING. LorA TION MAP NOT TO SCALE / STORM DRAiN DESIGN COMPUTATIONS ^_01',PE LOCA TION RUNOFF DESIGN FROM TO D.A. PIPE TIME OF CONC. MIN. 1NT. DISCH. ELEV. ELi is SLOPE DIA. CAP. VEL. INLET FLOW DESIGN POINT POINT ACRES mCA (L} (1) q lNL. OU7I MIN. 1N. c.Fs. fp.s. TIME TIME TIME 38, -C 1.A 1.8 0.95 8.21 194 5 - 31.0 4.2 58.3 38.80 .0031 48 79.9 4.8 1.8 1. GG 0.85 0,43 20 5 - 5.0 72 3.1 42.40 42. 3C .0050 18 7.4 3.8 1.6 1.0 0 7.31 193 5 - 2Z8 4.4 52.8 39.40 38.8,,' .0031 48. 80.1 4.2 1. C 1.0 0 7.31 165 5 - 25.0 4.6 52.8 39.90 39- 4 ,. . 0030 48 79.1 4.2 1.D 1.E 0,20 7.31 227 5 - 21.3 4.9 52.8 40.60 39.�-O 003I 48 79.9 4.2 1. E 1. N 0.25 2.84 35 5 - 16.3 5.5 20.5 41.40 11. 26 .0058 30 31.2 4.2 1.N 1.0 0,10 1.49 36 5 - 15.7 5.5 10.8 42.10 41.90 .0056 24 17.0 3.4 1.0 1. P 0,10 0.07 35 5 - 5.0 7.2 0.5 43.20 4.3. E?C. .0058 18 8.0 0.3 1.0 1. Q 0.20 1.35 215 5 - 12.1 6.0 9.8 42.80 4 2. 1 i_', .0032 24 12.9 3.1 1.0 1.R 0.15 1.21 35 5 - 11.5 6.1 5.8 43.00 42.8,1 _0058 24 172 2.8 I.R 1.S 0.10 0.07 86 5 - 5.0 7.2 0.5 43.80 43.50 .0035 18 6.2 0.3 1.R 1. T 0.30 0.36 60 5 - 6.1 7.0 2.6 43.20 43. f1) .0034 18 6.1 1.5 1.T 1.0 0.50 0.22 67 5 - 5.0 72 1.6 43.40 43,20 .0030 18 5.7 0.9 1. R I, V 0.45 0.68 71 5 - 10.3 6. 3 4.9 43.30 4 J. 0;,' .0042 24 14.7 1.6 1. V 1. W 0.65 0.50 171 5 - Z 5 6.7 3.6 43. 90 43. 3t' .0035 18 6.2 2.0 1.W 1.X 0.35 0.16 149 5 - 5.0 7.2 1.1 44.40 43.9J .0034 18 6.1 0.6 1.E 1.F 0.10 4.33 132 5 19.1 5.2 31.3 41.00 40.60 .0030 48 79.2 2.5 1.F 1.G 0,10 2.56 35 5 - 18.5 5.2 18.4 41.15 41.00 .0042 30 26.7 3.8 1. G 1. H 0.20 2.49 46 5 - 17.7 5.3 179 41.30 4 1. 1 r; .0033 30 23.6 3.7 ] . H 1.1 0.25 2.35 36 5 - 17.1 5.4 16.9 41.40 41. a'. 7 .0028 30 21.8 3.4 1 J I'll 0.20 0.42 345 5 - 9.1 6.4 3.0 42.50 41.40 .0032 24 12.8 1.0 1.11 I . L 0.10 0.14 184 5 - 6.1 7.0 1.0 43.10 42.50 .0033 18 6.0 0.6 1.L 1.M 0.10 0.07 64 5 - 5.0 7.2 0.5 43.30 43.10 .0037 18 5.9 0.3 1.J 1.K 0.20 0.14 48 5 _ 5.0 7.2 1.0 43.70 43.50 .0042 18 6.8 0.6 i.F 1. Y 0.15 1.71 170 5 - 9.5 6.4 12.3 41.50 41.00 .0029 36 36.1 1.7 1. Y 1. Z 0.15 0.11 35 5 - 5.0 Z 2 0.8 42.80 42.50 .0056 18 8.0 0.4 1. Y 1.AA 0.25 1.50 169 5 - 6.7 6.9 10.8 42.10 41.5) .0035 24 13.5 3.4 I. AA 1.66 3.30 1.32 100 5 - 5.0 7.2 9.5 42,40 42.10 .0030 24 12.4 3.0 I J 1. cc 1,00 1.75 162 5 -- 14.4 5.7 12,7 41.90 41.49 .0031 30 22.8 2.6 1. CC 1. DD 0.70 1.27 166 5 - 11.7 & 1 9.0 42.40 41. 90 .0030 24 12.4 2.9 T . DD I. EE 0.80 0.90 223 5 - 7.9 6.7 6.5 43.70 42.40 .0031 24 12.7 2.1 I .EE 1. FF 1,00 0.50 177 5 - 5.0 7.2 3.6 43. 70 43.11) .0034 18 6.1 2.1 I .N 1. HH 2.60 1.17 40 5 - 5.0 7.2 8.5 42.10 41.E 0 .0050 24 16.0 2.7 2.A 2BrOND OUTLET 130 - - - - 51.0 40.00 39.60 0030 (2)-36 I 73.2 i 3.6 _ -.0 PLANS and PROFILES of LOCATED IN TOPSAIL TO WNSHIP FENDER COUNTY, NORTH CAROLINA I BENCHMARK LOCATIONS Ai`dD ELF":4 /1 TIONS LOCATION: ! ELEVATION 1 U.S.G.S. MONUMENT LOCATED JUST SOUTH OF I 4J ✓3 REID ROAD ENTRANCE IN U.S. 17 RIGHT- -- 4.------ INDEX TO DRAWINGS SHEET No. DESCRIPTION DRAWING No. 1 OF 4 COVER SHEET 6723COV 2 OF 4 PLANS and PROFILES _ 3 OF 4 PLANS and PROFILES -6723PPI I 6723PP2 LEGEND _ 4 OF 4 PLAN AND DETAILS 6723DETI E!P EXISTING IRON PIPE � � STORM SEWER & CURB INLET _ ECM EXISTING CONCRETE 1 OF 2 GRADING PLAN 6723GP1 MONUMENT r 3� �� CONTOUR LINE &ELEVATION 2 OF 2 STORM DRAINAGE UTILITY PLAN --.-..,- l 6723SD1 L\P LIGHT POLE 1 OF 3 EROSION and SEDIMENT CONTROL & WATER QUALITY I 6723ECPI P P POWER POLE 2 OF 3 POND DETAIL & EROSION CONTROL DETAILS } �6723ECP2 G\W GUY WIRE 3 OF 3 STANDARD EROSION CONTROL SPECIFICATIONS---': �6723ECP3 S\D STORM DRAIN 0\H OVERHEAD POWERLINE GV GATE VALVE ��- FH FIRE HYDRANT BO BLOW OFF 2 REVISED PER COMMENTS FROM NCDENR / DIVISION OF WATER QUALITY _ 10/26/00 1 REVISED PER COMMENTS FROM NCDOT, PENDER COUNTY OFFICE 9/15/00 - _. .-D REV. NO. REVISIONS I A IL�:j LbpXlyh! � ffanwar DIeJ¢, $erYky4 pA., Aft rjg/rts reeurrvd RepreduaHan ar use p/ the aantente 0/ thla dOe.'wriart, ar oaeRln ,E '� �•'a!%maenf, fo t, Ja daaan�+t, h ehda ar pQl, •tN,au! wrfflen wnaert} of the Lmd SLrwyw a Figk,es, !a tilted p,l �Oh Y a4lea hwrr tl,e ar'-rmi c: 'b docu.n marked with the hd at,me and lF,d seW o! the SLna �9 >� arty rx' ar FnQlnes, ehaf! be rnnsidered !o be wdhi and Wa taCae. f - _-- - -�--' I . STANDARD NOTES: 1. Information concerning underground utilities was obtained from available records. It shall be the responsibility of the Contractor to determine the exact elevations and locations of all existing utilities at all crossings prior to commencing trench excavation. If acl.ucl clearances ore less thar; indicated on Plan, the Contractor shall contact the Design Engineer before proceeding with construction. Any condition discovered or existing that would necessitate a modification of these plans sho11 be brought to the cttention of the Dc'siry Erg&,eer he'tar. Eirnc<' �ri,?g with construe'':', 7. 2. NO CON' TRC1CTiGN IS TO RE'GIN BEFORE LOCA 110N OF EAISilNG U71Ll7i�S HAS L?L:rTN L)ETLfZivflNCD. !FALL "NC C'P�IE--CALL" AT LEAST 48 HOURS DTI=CI?C COMMENCINC CGNS7PVCTiCN. J. All trees which are not required to be c'::are-' for constuction sl-,ali be preserved whcrever r �.�.'bl�, unJc c,s otherwise dit cted. 4. Contractor shall adjust all manholes, vai%e and curb bOA',;-.r to the final grade upon completion of a// construction. Any boxas damaged or otherwise disturbed by the Contractor shell be repaired at the expense of the Contractor. 5. The Contractor is responsible for controlling dust and erosion during construction at his expense. Roads sholl be watered to control dust when ordered by the Engineer. 6. No geotechnical testing has been performed on site. No warranty is made for suitability of subgrode, and undercut and any required replacement with suitable material shall be the responsibility of the controctor. 7. Extreme core shall be token to ensure minimum separations at all utility crossings. 8. Contractor to ensure that pavement is placed so as to drain positively to the curb inlets and catch basins. 9. Contractor is responsible for obtaining all required permits. 10. This plan is for site grading, siting, and storm drainage only. 11. Contractor and Builders are responsible for coordinating Finished Floor Elevation of all buildings with the Owner. 12. No encumberances in r/w. 13. All roads to be constructed to NCDOT standards and specifications. All roads to be public. S -k� �{v2 COVER SHEET RECEIVED OCT 2 7 2000 DWQ HAMPSTEAD CENTER LOCATED IN TOPSAIL TOWNSHIP PENDER COUNTY, NORTH CAROLINA fib. •. SEAL - t 02 83 /O��ffoa PROD # OWNER: WILLIAM R. HOWARD 8104 BALD EAGLE LANE WILMINGTON, NC 28411 HANOVER DESIGN SERVICES, P.A. LAND SURVEYORS, ENGINEERS & LAND PLANNERS 319 LI WALNUT STREET WLM 1MfNGTON, N.C. 28401 PHONE: (910) 343-8002 Date: 9-- 1-_-ov Scoie: 1 " = 200' Dra wn:_ r=-iSR. i Checked: 4Sr Pre y4ct (Jo; 672- oliIR Sheet No: 1 4 J 7 SWALE EASSEMENT CY FOR SNTg4MWAE 1ER OVEJ?OREllff OF / �. PUBLIC ROADWAY SE SHEET CTI 2 1� FOR TYPICAL SWALE CROSS BECKON. % I 1 00 QLQ v (� 45.16 � 30' a re RCP 10•x 70' I 0+70.53 / NNCOOT STD. 84002 / Cg - 1.H N000T SIGHT I / STA. = 8+20.00 COOT SKI. 84Q02 mlANcus SEE MOREY LANE PLAN / 0/S Id00 LT / STA. +9 LT DRAINAGE NEW SHEET 3 FOR / / FOUNTAIN DRIVE OA LT EASEMENT ADDITIONAL STORM DRAINAGE / 1G = 46.30 / / 40' DRAINAGE FOUNTAIN DRIVE �4/Nq� IE = 46.3 (36' d 24') / SEMENT �TG = 46.5Q \ f����t,��� 1¢7.0/LF 36'a Irl RCP d = 4260 (18') IE 41.30 \" 7 10'+ 70' CB - I.AA ., / ' ��NCDOT 9Gf7 //, T NT71T)T S10 R4002 O/S 18.00 RT FOUNTAIN DRIVE TO = 46.30 IE = 42.80 I uAW D I P OFLE too Fric $= 4!5t< 55.0 8�g - FJOSKNG z_ a n POITI SETA -1 0N i - - - [ W Hm -do IIC ER 1915 AU. -350 S' _ _K 28.57_. jam... -- - --� - ---- 50.0 - n s - - --a- - - - FINISIED INIMNI 45.0 18' - 18ftr - _ - 40.0 _ - 35.0 - - -- - 7n - ------- ---------- TT I - - - EI - V, d VI NN � 06 .} it to t[; 0"yD to 1 +00 2+00 3+00 LINE TABLE LINE BEARING DISTANCE 1 N48' 54' 42" W 121.58 2 N86' 05' 18" E 178.84 3 N57' 53' 32" W 213.75 CURVE TABLE CURVE DELTA RADIUS ARC CHORD TANGENT CHORD BRG 1 45' 00' 00" 310.00 243.47 23T26 128.41 N71' 24' 42" W 2 36' 01' 10" 330.00 207.46 204.06 1 107.29 1 S75' 54' 07" E cC' coo ^ u+ i 4+00 5+00 6+00 7+00 • �, STATION 0+00.00 THROUGH 9+68.04 FOUNTAIN DRIVE 100.0 LF 24' a 19 RCP STUB -OUT PIPE ENO 1.BB IF = 42.40 PLUG PIPE END d BURY FOR FUTURE CONNEC71ON STAKE AND FLAG PIPE END LOCA71ON r 10+00 2 REVISED PER COMMENTS FROM NCDENR / DIVISION OF WATER QUALITY 10/26/00 1 REVISED PER COMMENTS FROM NCDOT, PENDER COUNTY OFFICE 9/15/00 REV. NO. REVISIONS DATE Cepylght 4 waoowr De•ly1 swNAoee, P.A, Ae debt. .w .. R.prodacwan or ae• or Me m,tMte o/ thle d mt, w- ookff r• a d•'atkne to mi. mN .tte Me u'ghd aploNn and tcrfgNaf ewe aI Me' . 0 er, ahan be cmNCaeC ttoo'tbe and ew c Aee cI N JocvmnE NOTES- 1. NO ENCUMSERANCES IN AIR. 2. ALL ROADS TO BE CONSTRUCTED TO NCDOT STANDARDS AND SPECIFICATIONS ALL ROADS TO BE PUBLIC. 3. ALL DRAINAGE STRUCTURES TO MEET H-20 LOADING REQUIREMENTS 4. CROSSINGS OF FIBER OPDC CABLE TO BE COORDINATED WIN AW 5. REQUIRED NCOOT DRIVEWAY ENTRANCE AND ENCROACHMENT AGREEMENT PERMITS TO BE OBTAINED BY THE CONTRACTOR. I50 25 0 50 100 150 ' SCALE IN FEET, • 1 " = 50' PLANS & PROFILES MMPSTEAD CENTER LOCATED IN TOPSAIL TOWNSHIP PENDER COUNTY, NORTH CAROLINA ``1111nunGq CARP N • FOSS/�••9 4 - s SEAL 025483 S 't" i OWNER: WILLIAM R. HOWARD 8104 BALD EAGLE LANE WILMINGTON, NC 28411 HANOVER DESIGN SERVICES, P.A. LAND SURIEYORS, ENGINEERS & LAND PLANNERS 319 WALNUT STREET WILMINGTON, N.C. 28401 PHONE: (910) 343-8002 Date: 9-1-00 Scale: HORZ: I'= 50' VERT.: 1 " = 5' Drawn: HSR Checked: HSR Project No: 6723pp 1 HIT Sheet No: 2 0 - 4 i I U u Lai w - _ w 4 n; C8� lQSEE C8 - f R NCDOT SID.; �40.02 STA. _; 2+30.15 MNOI�EY LANE PLAN NEW KS WEFT FOR 1 NCDOT SID. &0.02 2+30.15 STA0/5 0, 1a00 LT ADDITIONAL SIiJIRRAI DRAINAGE ra00 RT REED LANE 4 10' x 70''L. REED LANE 1� NCDOT ywtT NCDOT TO = 46'70 IE = 43.00 i TG = 46.70 IE = 42.80 -� t0'x HT 'COOT sc rT MANGLE30' 2 QQ r` AD LANE 34.D LF 24•a m RCP , -,"REED 2120 LF 24•a III RCP � 32.0 LF 24e a m RCP 32.0 LF 18e Cl. m RM r8e a rIr RCP - 10 O I O O Ur O O O O CB r 5 RAD NCDOT STD._01 �_�- f STA 1 44.51 j OA 18.00 RT',\ \ ~ C8 - 1. r ` REED UNE f + PRECAST BOX 1 10' x 70 '..7C = 4a20 O LF T8 OL 8! RCR ;ni �� ; IE = 43�20 N�TRIANGLE SEE PRIVATE U71UTY � j = 4180 1 72.0 LF 24 ` a m RCF' / k FOR AODI710NAL 10' x 70' `` �� _ �5T AINAGE NCDOT SfGHT ��I i TRIANGLE ED - .V PRECAST X {{ IE = 43 PRIVATE UITU IFOR ADDITIONAL STORLI DRAINAGE,, I �� IS �. FA C8 - 1.0 NCDOT STD. 840.02 STA. = 4+45 53 011S 1800 LT REED LANE TC = 46.80 IE = 4210 (24') !E = 43.00 (18" ) STA 4+94.77 REED LANE - STA 1+30.61 MOBLEY LANE CB - 1 P NCDOT STD. 840.02 STA. = 4+4a53 OA fa00 RT REED UNE TC = 46.80 IE - 43.20 NOTES• 1. NO ENCUMBRANCES IN RIV.. 2 ALL ROADS TO BE CONSTRUCTED TO NC.00T STANDARDS AND SPECFICATIQNS ALL ROADS TO BE PUBLIC 3. ALL ORAINAGt: STRUCTURES TO MEET H-20 LOADING REQUIREMENTS 4. CROSSINGS OF FIBER OP71C CABLE TO BE COORDINA TO MTN AT&T a REQLRRED NCDOT DRIVEWAY ENTRANCE AW BKROA90EYT AGREEMENT PERMf1TS TO BE OBTAINED 9Y IHE CONIRACTOR -LANE PROFIL,(" - 60.0 $ `� 014 70 IC x POINT i PQWr LEV= 51.17_ A = 0+ 75 - g g P1R STA = 0+75 "' PIN Emy A.ff. _ all. -4.00 o �' 100 Fr - K . 7.50 r - f: 55.0 ... - ._ Low Poo - 47.2 ri ., x .. LOIN' NT STA = 2+3Ot 1 a ..... - m P STA = +8265 .*,i �2 A.D._ .00 50.0 K = 25 00 Q FTNI WIEV CLW I 9mr. ac col 45.0 DOS mwty 24 RCP f 40.0 _ 35.0 30.0 - - � tf r'� 00 � � LO cn^ COS COri co^ 1 +00 2+00 3+00 4+00 LINE TABLE LINE BEARING DISTANCE 4 NI 40' 22" E 70.53 5 N 40` 09' 37" E 185.77 6 N49' 50' 23" W 25.00 7 N48' 54' 42" W 494.77 CURVE TABLE CURVEJ DELTA I RADIUS I ARC I CHORD I TANGENT CHORD BRG 3 1 26' 29' 16LL 330.00 1 152.56 1 151.20 1 77.67 N26. 54' 59" E rt SEE FOUNTAIN DVBVE PUN NEW SHEET 2 FOR ADMIlONAL STORM DRAINAGE STA 0+0000 M06LEY LANE = STA 6+4a 17 FOUNTAIN DRIVE 32.0 LF 30e a m RCP- 10 x 70 �� - - - n U5U T LANL / 00 L NCdaT SIGHT 0/S 1&00 R TG = 46.70 MANGLE M10BLEY LANE IE = 40.60 (48 IE = 41.00 ' N 1+30.61 MOBLEY'lANE = STA �+94.77 WED LANE \ \ J3- I.D� PRECAST BOX TOr w 20' T�TT ' ACCOM1MfODATE URGER PIPE$' STA, = 4+ 12.14 1$2.D LF 48\ - 4i III RCP Fj0 T - _ .\ TV4a45 _ _ - - Sr DRMAGF-{WALL 00 �1 - �_ jd- _ _ __-- _SEE PUN vrEw sIrEET -4FOT- -Q, AMI11SNAL STOIR,11 DRAINAGE 50 25 0 50 100 150 SCALE IN FEET,- 1 " = 50' CaU) m`� .CFi 1 � )0) 0+00 1 +00 2+00 STA TTON 0+00.00 THROUGH 4+94.77 REED LANE STA T70N 0+00. 00 THROUGH 4+27.89 MOBLEY LANE 2 REVISED PER COMMENTS FROM NCDENR / DIVISION OF WATER QUALITY 10/26/00 1 REVISED PER COMMENTS FROM NCDOT, PENDER COUNTY OFFICE 9/15/00 REV. NO. REVISIONS DATE Cgp~t 4 Stara- pwfpr Swriaee, P.A. M .ryhd rewrNa. Reprodactian a uee a1 me anhnte 01 thtr doca wk w oddtlo.e m "Otioni to this dSca W4 h •+rate er port, etNSaut Wmm ecrnent o/ the turid Srne�ar or En=-W h prohtbtted Only eopTee 8vtn tM wV*16 o1 Iris aocwne"t. morW wtfh Me ort " 20wbee and a Wid Seat or the Skrne,"r or &Vikiew. ehaa be oamfdaed to be mmW and true ow" fi U 3+ 00 PLANS & PROFILES 4+00 t C' -t HAMPSTEAD CENTER LOCATED IN TOPSAIL TOWNSHIP PENOER COUNTY, NORTH CAROLINA ♦.o�`�\A CAROB ♦ eN•Ue % i ,' rt f a4t~SS/p��9 SEAL _ i 025463 r 46�GlNE�4'ra OWNER: WILLIAM R. HOWARD 8104 BALD EAGLE LANE WILMINGTON, NC 28411 HANOVER DESIGN SERVICES, P.A. LAND SURVEYORS, ENGINEERS & LAND PLANNERS WALNUT STREET WUAINGTON, N.C. 28401 PHONE: (910) 343-0002 Dnte: 9 r« 1-- 00 Sca HORZ: 1"= 50' VERT.: 1 " = 5' Drown: HSR Checked: HSR Pro fact No: 6723pp2HR F Sheet No: i 4 Of: PFE END 1.GG ,' U i_ IE = 4245 PtU 'PIPE END & Bar OCR FOR,FU7W UOWCIM ' STAKE AND II1 PIPE END LOCAAON ' i 00 i 24..0 iF//1� a m RCP DE1EN11pY P111m STUB -0[IT SEE 91EI T ECP 2 FOR .A*MAGE POND DlUIN51ONS AND DLWILS !' EASEMENT ' 192.0 LF 48' a N RCP rr PRECAST BOX TO A LARGER PIPES TG = i49.0 TG aEV. T[J BE I SET DURING FUTURE. CONSTRUCTION) .aBD 48" (,)'4 ' ' ^ PIPE END 1.A i 20'DRAWAGE o !E = X20 O EASE ^ % MENT SEE S�IE CP 2 FOR WIFAu RIP RAP TECIM )r k `'/J I W O LF 48" a IN RCP ;10'.ORAINA�E ' EA$Ei11ENT 20'DRAINAGE EASEMENT / i PRECAST BOX 1 ACCOAINODATE GER PIPES SEE HOMEY LANE' '� l TG = f490 (R ELEV. TO BE - DURING FUTURE CTION ' NEW SHEET 3 F SET ; 1 ' If = 39.40 ADDIIMAL ST00 rA?GE 20' A rA•� I62 0 LF 48" a N RCP ' EASEMENT STORM DRAINAGE OU TFALL SCALE: 1 " = 50' UPON (XJII RInON OF PROPOSED ENIRANCES REMOVE EXISTING DR14E AND REPLACE CURB AND aim PER NCDOT STANDARD EXISTING DRIVEWAY REMOVAL SCALE. 1 " = 50' �� NOTES: 1. ALL AWAG,E CTURES TO MEET > H- LOADING NREAIE1riTS 2 GS OF FTBER OIPTlG CABLE TO BE COOROiNATED 107H AT&T $" CONTINUOUS CONCRETE COPING 3/4" / US & GRATE FRAME AND GRATE DEWEY BR05.No.CH-BN-3A 4" OR EQUAL, PRECAST j CONCRETE j ` � CATCH I ; BASIN W z g � 4" 4" 6"8" 2' - 0' 8" REINFORCING 4' -0" SECTION VIEW #4 BARS 0 12" OC EW PLAN VIEW CATCH BAM DETA� NOTE: RTa * USE FOR CATCH BASINS PRECAST CONCRETE CATCH BASIN IN PRIVATE LOT AREAS. TO BE SIZED AS NECESSARY TO ACCOMMODATE LARGER PIPES, OR MAY BE CONSTRUCTED OF BLOCK OR BRICK. MODIFIED VALLEY CURB CIL 60' R\W 18' is' 16' 16' FT. /FT. 3^ I 2 4" /FT. B" ABC � MODIFIED MODIFIED VALLEY CURB (COLLECTOR ROAD 60' R/W) VALLEY CURB TYPICAL STREET DETAIL NOT TC SCALE /L 50- R\W 25' 25' 16' 16' 3:1 1 /2" / FT. V /FT. 3- I 2 1 " /FT. 1 /2" / FT. .1 8", ABC MODIFIED MODIFIED VALLEY CURB (5J'RIW) VALLEY CURB TYPICAL STREET DETAIL NOT TO SCALE 32' 30' 3" 1--2 CAL 100' R\W 50' 32' 30' 6' 6' nM;VALLEY CURB (INVERTFD PITCH) (1"o, RIO ENTRANCE CROSS SECTION NOT TO SCALE r-ar DEHEY BROS. NO. CH-SN-JA of -3 3/1V >e MINIMUM A 6RAGE WFICHT FRAME 195 LBS. GRATE 145 LBS. SECTION "A -A" q b � 0' -5 1/4 ;1' -1 1 /2" 0' -5 1 /4' 0'{-3 3/4 B o I n 0 1 c _ ` b L 0'-8 1 /4" 1' -4 1/W" ao SEC]]ON "B—B" 2'-8 5/8" b PLAN 14EW GFI.L BMM CASMW N.T. MODIFIED VALLEY CURB TYPICAL CUL-DE-SAC 60' R\W NOT TO SCALE O I NCDOT CATCH BASIN STD.840.02 = 10' TAPER Z 10 Q d J w J J w Z V O ZQ NORMAL GUTTER FLOW LINE TYPICAL OFFSET CUL-DE-SAC 50' R W NOT TO SC,'iLE STORM DRAINAGE OUTFALL & DETAILS 2 REVISED PER COMMENTS FROM NCOENR / DIVISION OF WATER QUALITY 10/26/00 1 REVISED PER COMMENTS FROM NCDOT, PENDER COUNTY OFnCE 9/15/00 REV. NO. REVISIONS DATE C*jf%lrt R Hmover DwIgn SwvtorR p.rl, AN rights rrowwd Ryrnduot/an or um of the omimfs of this doaumdnt; or addFUM" a•Wetians to thie doarnwrf, N of or part; rMout wtttwr oanant of the Land gwwp r or Fngbvsw, Is prahbrtsd. O rry cops" rrwn the arigird or tW d..t, marked rHh tlw orlghd mwgrretin and orphrd esd or the Surw)ar or Englhser, shaA' bs cons Owed to be wild and true copr*x 1' —O 11 STD.CURB 1' —0" SECTION 3' —1 1 /2" PLAN VIEW 10' TAPER FRAME, GRATE AND HOOD CURB NCDOT STD. 840.038 FRAME & GRATE 1- - .�----- .�� --- 4 L �... — — OPENING — — — FSEDDEPRES d I I I k I GUTTER PRECAST I I CONCRETE f CATCH f I I E BASIN LLJ ZI. 1 ��-- m a ,d E I I . v1 OU TLET PIPE 5EQTION VIEW ------ SEE NCDOT STDS. 852.05 840.02 840.03B FRONT SECTION FOR FURTHER DETAIL PRECAST CUR INLET N.T.S. 12' 12- 7"6 1/2 - MODIFIED VALLEY CURB PLANS & PROFILES TT A 1 &1"l rVM LOCATED IN TOPSAIL TOWNSHIP PENDER COUNTY, NORTH CAROLINA �0 111� �•'40(% CARpl''% � 4�FESST��tiy �� t SEAL _ 025M J C�`: /D/Z �/0 0 NOT TO SCALE OWNER: WILLIAM R. HOWARD 8104 BALD EAGLE LANE WILMINGTON, NC 28411 HANOVER DESIGN SERVICES, P.A. LAND SURVEYORS, ENGINEERS & LAND PLANNERS 319 WALNUT STREET WIL WILAIlNGTON, N.C. 28401 PHONE: (910) 343-8002 9-1-00 sole: HORZ.: 1 " = 50' VERT.: 1 " = 5' Drawn: HSR Checked: HSR Project No; 6723pp 1 HR sheet 1. r. 4 .s .i...._ L-2, . . 1 __ ..._ ... _ _ .. _ __ _— _.._.. . ' - — L01 GRADING NOTES KEY 1. CONTRACTOR TO MAKE SMOOTH TRANSITION FROM INVERTED TC — TOP OF CURB CROWN TO SHEET FLOW IN DESIGNATED AREAS GL — GUTTER LINE 2. CONTRACTOR TO ENSURE POSI TI VE DRAINAGE IN ALL FINISHED FS --- FINISHED SURFACE AREAS. BW — BACK OF WALK EP — EDGE OF PA IVEMEN T J. ALL ROOF DRAINS MUST BE DIRECTED TO STORM DRAINAGE HP — HIGH POINT COLLECTION SYSTEM OR TO STREET/PARKING LOT. REV. N0. REVISIONS L4lE CIL VARIES 4.5' 1.5' 29.0' 29.0' 1.5' 4.5' VARIES FF ELEVATION .�--' -----. _..._ 3 1 4AY 1-1 L2' TYPE ' A" /iim%L w=n oirrw 12" ASPHALT F ELEVATION y.5 Mpy. ... F.. .. T —1 vr% 6" ABC STONE _TYPICAL STREET DETAIL NOT TO SCALE ABC STONE CLASS "A" CONCRETE CURB AND MM SEC77 N.T.S. 12" 6" WHERE REVERSE CROWN IS REQUIRED GUTTER SHALL 1 ..R \ SLOPE AWAY AS SHOWN 1-2 PAVING 1 —1 /4"R 6" 1-1 /2,r A. Aa 12" a CLASS •CONCRETE ABC STONE FOR REVERSE Ci at► '10 -FLU :lE SIDEWALK RECEIVED OCT 2 7 2000 DWQ r 15 . , 40 ., r SITE GRADING PLAN If4MPSTEAD CENTER LOCATED IN TOPSAIL TOWNSHIP FENDER COUNTY, NORTH CAROLINA oH CARO, Q4 < SEAS. L 0254$3 = . 0�eti'%GlNS�4+ PROJ # OWNER: WILLIAM R. HOWARD 8104 BALD EAGLE LANE WILMINGTON, NC 28411 Oale: Scale: 026-00 r " = 30' Drown: HSR Checked: HSR Prot No: 6 723gp 1 HSR HANOVER DESIGN SERVICES, P.A. Sheet"°: LAND SURVEYORS, ENGINEERS & LAND PLANNERS 319 WALNUT STREET WILMINGTON. N.C. 28401 ' PHONE: (910) 343-8002 Oop~t R tlarowr Dmkm Srvbwt P.A. AM ruts nwmrved ReproolwHon Or uss or tho contents of this dwwrmnt or od0tiorre or ddeUons ttih doownart h shcls or part. of hoW W*tr+ owrserrt of the land Smn ,w or Engkrsr, i prowtsd oily cq*. fora the wow of th) do<vme: m&* rich the aipiwf o/grwt� ard r1pbw1 sod of Cho SUrm or or Enpiroer, shill be consfdsred to be clld and 6w c.pf.. —. Ci PRECAST BOX TO = 4 7. 00 i IE-=- -43. f a 'BUILDING14 PAD=47 FF==48:f5 % B WING AD=4 7.8 FF=48 5 OB - 1.DO / PRECAST BOX 10'DRAINAGE TG = 46.50 / EA5EAIEN� IE = 42.4 1 ,ram BUILDMG • /to PAD=4,.8 FF=48, 5 164.0 LF 24' CL N RCA �- BUILDING 20 Tdc EA E PAD=47.8 - LFF - `- PRECA TG = 47.30 — 17a0 LF 1s"cx Ar RCP 7_ IE = 4J 70 EAq WENT �~ -` -- --- ---- NG - PAD= FF=49 0 �~ BUILDING T-'IV BUILDING PAD= .3 , BUILDING PAD-4a8 BUILDING , FF=49.5 \, PAD=48.8 8 FF=49.5 `� 149.0 Lp r "a- 11I RCP BUILDING OV C8 - r.X 20 DRAINAGE \ PRECAST BOX 1�2 \ — _ - - BOX EASEMENT \ TG = 47.00 IE = 4LT90 PAD=4a5 O --� rE -4.40 FF=49.2 O \ ~ CB - 1SHEET 2 FAR STORY PRECASTT Box SEE PLAN & PROFILE X B'� DRAINAGE LOCATED IN = 4OUNTAIN DRIVE NCDOT / \ �1 1 !E ,90 `` PUBLIC RIW` BUILDING _ PAD=48.5 1 20'DRAINAGE \` 1�------------ EASEMENT FF 49 2 ,__ -- SEE PLAN & PROFILE i ' / BUILDING \ - SHEET 2 FOR STORM D 12 DRAINAGE LOCATED IN O ' FOUNTAIN DR1VE NCDOT PAD-49.3Ln _ X � PUBLIC R/W FF � O v R \euIONG ,1I3 PAD=f8.8 zo'DRAINA � FF=49.5-" ASEMENT SEE PLAN k PROFILE PRECAST Box ce - 1. T SHEET 3 FOR STORM TO = 47.30 6�O PRECAST BOX DRAINAGE LOCATED IN to IE = 4.140 ` TO = 47.10 REED LANE NCDOT 1 - - 26' DRAINAGE B Q /ii \ IE = 43.20 PUBLIC R/W r EASEMENT j 2O'DRAlNAGE / PRECAST BOX EASEMENT TG = 4Z 10 IE = 4J.30 0 1 0 SEE PLAN i PROFILE } , E CDM CD DRAINAGE LOCATED -f- REED ,LANE 0" NCDOT �� PUBLIC R/W I + `� REED LANE CB - I E N E PLAN FOR USTORM 1 �',- " - ' ------- SEE PLAN � PROFILE i- i SHEET 3 FOR STORM ! DRAINAGE LOCATED IN DRAINAGE LOCATED IN REED LANE NCDOT REED LANE NCOOT PUBLIC R/W PUBLIC R/W NOTE. ALL BUILDING ROOF DRAINS MUST BE DIRECTED INTO THE STORM DRAINAGE COLLECTION SYSTEM OR INTO THE STREET/PARKING LOT. CB I. S SEE PLAN & PROFILE SHEC 3 FOR STORM DRAINAGE LOCATED IN REELLANE NCOOT PUBIC R/W REV. NO. REVISIONS )ATE Copy "t 4 Hmo`er Do&* SwVco% P.A.. All rots reserved Rspredratton or aee of the contents of thtr doovmsn4 or addilfons or ds4tlpnr to th4 doorsnen4 it shota or part, want Witten cons"t Of the Land Svr )w or EirPOW, h prohtbtted Only ocpAs ftm the oro a at We doornan4 n—*sd efth the mfphd sknetres and migi el sed or tM &H-ftjar or Enovw,, shdl be ooneNwed to be wdld and true cap)&& r tr DEN'FY BROS. NO CH-BN-JA or -0 o-, 1/r d-] 3/e t; MINIMUM AVERAGE !HEIGHT FRAME 195 LBS. b b GRATE 145 LBS. s; SECNON 'A -A' 4 >5 0'-51/4" 1'-1 1/2' 0'-51/4- 0'-3Ir 3 A4' A - b ' L e� o' -e 1 4 0o SECTION AB-B" / a PLAN KEW NTS 8" CONTINUOUS CONCRETE COPING 3/4- FRAME & GRATE FRAME AND GRATE 4' DEWEY BROS.No.CH-BN-3A OR EQUAL, PRECAST CONCRETE CATCH BASIN d r 4" REINFORCING 4 Oy SECTION VIEW 4 BARS O 12'OC EW PLAN VIEW CATCH BASIN DETAIL NTS i 15 i 30 40 •1 STORM DRAINAGE UTILITY PLAN H"PSTEAD CENTER LOCATED IN TOPSAIL TOWNSHIP FENDER COUNTY, NORTH CAROLINA OWNER: WILLIAM R. HOWARD 8104 BALD EAGLE LANE WILMINGTON, NC 28411 -- HANOVER DESIGN SERVICES, P.A. LAND SURVEYORS, ENGINEERS & LAND PLANNERS 319 WALNUT STREET WILMINGTON, N.C. 28401 PHONE: (910) 343-8002 J I Date: 10-26---00 Scale: — 1 Drawn: HSR Checked: HSR Project No: 6723up 1 HSR r Sheet No: 2 Of. 2 r r 0 DIMENSION NO TE,• 1. FINAL BUILDING FOOTPRINTS TO BE PROWDED BY ARCHITECT. CURRENT BUILDING FOOTPRINTS REPRESENT MAXIMUM ALLOWABLE IMPERVIOUS SURFACE FOR BUILDINGS AND ARE NOT ACTUAL BUILDING FOOTPRINTS, REV. NO, REVISIONS L DATE eappight a, Haro`er Design Srytom P.A., AN rights hser+ed Reprodeetka or use, of Me contents of tWe doovmrt. r additions anL h or dshrtkre to thb daawnehah orpart afthart Witten oonaent of the Land SWoeyw orEngine. Isprohbitd. Arty eopMs "m the wvkw of thin eoc �L mo *d PM tM mlyhof sfgnotve and arig" sea of the 9rynr wwor Engineer, awl be aoneMred to bs �dM and hue eapbf, RECEIVED OCT 2 7 20M DWQ PROJ # r 15 r 30 40 •r PRELIMINARY HORIZONTAL DIMENSIONING 1!"PSTEAD CENTER LOCATED IN TOPSAIL TOWNSHIP FENDER COUNTY, NORTH CAROLINA OWNER: WILLIAM R. HOWARD 8104 BALD EAGLE LANE WILMINGTON, NC 28411 HANOVER DESIGN SERVICES, P.A. LAN) SURVEYORS, ENGINEERS & LAND PLANNERS 319 WALNUT STREET WILMINGTON, N.C. 28401 PHONE: (910) 343-8002 Date_ 10-26--00 Scale -- Drawn: HSR Checked: _.'ISR Project. tan: 6723gc 'HSR Sher No: Qfi i