Loading...
HomeMy WebLinkAboutSW8000612_HISTORICAL FILE_20091119STORMWATER DIVISION CODING SHEET POST -CONSTRUCTION PERMITS PERMIT NO. DOC TYPE ❑CURRENT PERMIT ❑ APPROVED PLANS HISTORICAL FILE ❑ COMPLIANCE EVALUATION INSPECTION DOC DATE- YYYYMMDD iA NCDENR North Carolina Department of Environment and Natural Resources Beverly Eaves Perdue Governor November 19, 2009 Mr. Jeffrey L. Zimmer, Manager Z-1 Commercial Properties, LLC 111 Princess Street Wilmington, NC 28402 Division of Water Quality Coleen H. Sullins Director Subject: Session Law 2009-406 — Permit Extension Stormwater Permit #SW8 000612 High Density -- Kinkos Retail Store New Hanover County Dear Mr. Zimmer: Dee Freeman Secretary On August 5, 2009, the Governor signed Session Law 2009-406. This law impacts any development approval issued by the Division of Water Quality under Article 21 of Chapter 143 of the General Statutes, which is current and valid at any point between January 1, 2008, and December 31, 2010. The law extends the effective period of any stormwater permit that is set to expire during this time frame to 3 years from its current expiration date. Accordingly, Stormwater Permit # SW8 000612, which was set to expire on July 6, 2010, is now in effect until July 6, 2013. Please resubmit the renewal application and fee at least 180 days prior to July 6, 2013, which would be January 6, 2013. A copy of the Renewal Application can be obtained from the following website: http://h2o.enr,state.nc.us/su/bmp forms.htm. If you have any questions, please contact the Division of Water Quality in the Wilmington Regional Office at 910-796-7215. Sincerely, Z� S , 6l Georgette Scott Stormwater Supervisor Division of Water Quality S:\WQS\STORMWATER\RENEWAL\SL2009-406\000612.novO9 CC' Wilmington Regional Office Central Files 1617 Mail Service Center, Raleigh, North Carolina 27699-1617 Location: 512 N. Salisbury St, Ralegh, North Carolina 27604 Phone: 919-807.63001 FAX: 919-807-64921 Customer Service: 1-877-623-6748 Internet: www.ncwaterquality.org L An Equal Opportunity 1 Affumalive Action Zmployer NorthCarolina JVaturally P. 1 H FILE MODE 671 ^MEMORY TX * * * COMMUNICATION RESULT REPORT ( 3UL. 6.2000 OPTION REASON FOR ERROR E-1) HANG UP OR LINE FAIL E-3) NO ANSWER ADDRESS (GROUP) --------------- 93429141 9:29AM ) TTI RESULT --------OK - MCDENR WIRO PAGE --- ----- ------ P. 1/1 E--2) BUSY E-4) NO FACSIMILE CONNECTION State of North Carolina Departinent of Environment and Natural Resources Division of Water Quality Wilmington Regional Office James B, Hunt, Governor Bill Holman, Secretary FAX COVER SKEET Date: July 5, 2000 Na. of Pages: 1 To: Mark Hargrove, P.E. From: Linda Lewis .9O,---- Company: Eastwind Engineering Water Quality Section - Stormwater FAX #; 910-342-9141 FAX #: 910-350-2004 Phone #; 910-395-3900 DWQ Stor'mwater Proj ct #SW8 000612 Project Name: K. ko's MESSAGE: Mark, I still don't understand the trench height. The detail indicates that the difference between the trench bottom and the top ofthe pipe should be 2, 8166, but the difference between the trench bottom elevation of 41,29 and the overflow elevation of 43.79 reported on the supplement is 25. Please revise as needed to match up the detail and the supplement, I'll hold onto the original supplement and let you come in to make any necessary changes. State of North Carolina -` Department of Environment and Natural Resources Division of Water Quality Wilmington Regional Office James B. Hunt, Governor FAX COVER SHEET Date: July 5, 2000 To: Mark Hargrove, P.E. Company: Eastwind Engineering FAX #: 910-342-9141 DWQ Stormwater Project #SW8 000612 Project Name: Kinko's MESSAGE: Mark, Bill Holman, Secretary No. of Pages: 1 From: Linda Lewis AO ---- Water Quality Section - Stormwater FAX #: 910-350-2004 Phone #: 910-395-3900 1 still don't understand the trench height. The detail indicates that the difference between the trench bottom and the top of the pipe should be 2.8166', but the difference between the trench bottom elevation of 41.29 and the overflow elevation of 43.79 reported on the supplement is 2.5'. Please revise as needed to match up the detail and the supplement. I'll hold onto the original supplement and let you come in to make any necessary changes. v S:IWQSISTOPMWAT\LETTERS1000612.JLL 127 Cardinal Drive Extension, Wilmington, NC 28405-3845 'telephone (910) 395-3900 FAX (910) 350-2004 An Equal Opportunity ARinuative Action Employer P. 1 COMMUNICATION RESULT REPORT ( LIN.27.20bD 10:12AM ) _ OPTION -- r=..---- ------------------ ADDRESS (GROUP) 9-3429141 NCDENR WIRO P,ESULT PAGE 04C- ----- ---P -3i3 - ------------------- --- - ---------------------------------------- PE.A�:;E; N FOR ERROR -------------- ---- E-1) HANG UP OR LINE FAIL- E-21 BUSS' --....._. _-- . E-?} NO ANSWER E-;) NO FACSIMILE CONNECTION State OfNor h Carolina Departmem of Ea- irctlaiient and Natwai Resources Division of Wwwr Quality -Wilmington Regional Office. James13. Hunt, Governor Bill Holman, Secretary FAX COWER SHICET Date: June 27, 2000 No iPages: 3 To: Mark Hargrove, P.E. F orn: Linda Leers Company: Eashvind Engineering Company `4 ate Quality S Yon - Stormwater FAX 9: 342-9141 (Local) FA 910-350-2004 Phone #: 910-395-3900 DWQ Stor'mwater Project #SW8 060612 Project Name: Kinko's Retail Store �- /1'2 /�- tz-' 6"'e C/ State ofNorth Carolina Department of f iivironment and Natural Resources Division of Water Quality Wilmington Regional Office James 13. Hunt, Governor Bill Holman, Secretary FAX COVER SHV,ET Date: ,tune 27, 2000 No. of Pages: 3 To: Mark Hargrove, P.E. From: Linda Lewis Company: Eashvind Engineering Company' Water Quality Section - Stor-snwater FAX #: 342-91141 (Local) FAX #: 910-350-2004 Phone #: 910-395-3900 DWQ Storm►vater Project #SWR 000612 Project Name: Kinko's Retail Store S:IWQSIS`I'ORMWA'1'1L1 'FTLRS1000612.JUN 127 Cardinal Drive Extension, Wilmington, NC 28405-3845 `I'dephone (910) 395-3900 FAX (910) 350-2004 An Equal Opportunity Affirmative Action Employer State of North Carolina Department of Environment and Natural Resources Wilinim,,lon Re Tonal Office ,lames B. Hunt, Jr., Governor Bill Holman, Secretary Division of, Water Quality .tune 26, 2000 Mr. Jeffrey Zimmer; Manager Z-1 Commercial Properties, Inc. 1 1 I Princess Street \ llminc�ton, NC 28401 Subject: ACKNOWLEDGMENT OF R1 CEIPT AND REQUEST FOR ADDITIONAL INFORMATION Stormwater Project No. SW8 000612 Kinko's Retail Store New Hanover County Dear Mr. Zimmer: The Wilmington Regional Office received a Stormwaier Management Permit Application for 11"inko's Retail Store on .lure 6, 2000. An on -site soils evaluation was conducted on .lone 26, 2000, to determine the suitability of the soils for the proposed underground infiltration system. As reported in the soils S&.ME, Inc, the site was found to have a sandy -clay soil laver that has caused a perched water condition, however, the seasonal high water table was at approximately 6' below existing ground. The soils report indicates that Nvater was hit at 8' below the surface, however, it does not report the Seasonal High Water Table. The application is not compiete at this time. The following information is needed to continue the stormwater review: Delineate all wetlands on site, disturbed or undisturbed, or note on the plans that none exist. 2. There are three roof drains on the adjacent building (two on the side and one in the back) which drain onto this site. Please show how the drains will be redirected, or revise the calculations to account for the offsite drainage. If you choose to account for the runoff, please provide a plan that clearly delineates the offsite drainage area. Please determine the Seasonal High Vllater "rabic Elevation and add this to the report. Some sii[ Ledesion will need to be done in order to raise the bottom elevatio�i orthe trench to meet the 2' separation requirement. 127 Cardinal Dr. Ext., Wilmington, north Carolina 28405) Telephone 910-395-3900 FAX 910-350-2004 An Equal Opportunity Affirmative Action Employer 50'Y11 post -consumer piper Mr. Zimmer .tune 26. 2000 Stormwater Project No. S\V8 000612 ---------------------------------------------- Please note that this request for additional information is in response to a preliminary review. The requested information should be received by this Office prior to July 26, 2000, or the application will he returned as incomplete. The return of a project will necessitate resubmittal of all required items, including the application fee. If you need additional time to submit the information, please snail or fax ),our request for a time extension to the Division at the address and fax number at the bottom of this letter. The request must indicate the state by which you expect to submit the required information. The Division is allowed 90 days from the receipt of a completed application to issue the permit. The construction of any impervious surfaces, other than a construction entrance under an approved Sedimentation Erosion Control Plan, is a violation of NCGS 143-21 5.1 and is subject to enforcement action Pursuant to NCGS 143-215.6A. Please reference the State assiC7ned project number on all correspondence. Any original documents that need to be revised have been sent to the engineer or agent. All original documents must be returned or new originals must be provided. Copies are not acceptable. if you have any questions concerning this matter please feel fi-ee to call me at (910) 395-3900. Sincerely, d" . Linda Levis Environmental En-Ineer RSSlarl: S:\WQSISTORMWAT1ADDINF01000612-.J1.JN cc: Linda Lewis Mark Hargrove, P.E. Dave Mayes, P.E. 127 Cnrdinal Ur. Ext., Wilminl;ton, North Carolina 2R405 Telephone 910-395-3900 FAX 910-350-2004 An Equal opportunity Affirmative Action Crnployer 50'%, recycled/10'%o post -consumer paper Z-1 Commercial Properties, LLC l 11 Princess Street * Post Office Box 2628 Wilmington, North Carolina 28402 (910) 763-4669 RECEIIVEID` June 21, 2000 JU N 2 j 2000 PROJ # RE: Kinkos Oleander Place Wilmington, North Carolina To Whom It May Concern: DWQ .SW5 000Q (L. This is to formally advise you that Z-1 Commercial Properties, LLC, the owner of the above -referenced property, does hereby grant permission to Richard Collier, P.E. to sign any and all applications that may be necessary for obtaining the necessary permits for the development of the above -referenced site, specifically including the application for the Stormwater Management Permit. If I can provide you with any additional information, please feel free to contact me. Sincerely yours, Z-i Commercial Properties, LLC, a North Carolina limited liability company M. JLZ/dld EA.STWIND ENGINEERING COMPANY, LLP ' OLHAND K114 13121VE - IN, II MINGTON, NC �)8403 - (£110):34'2.-£1144- FAN C110) 347:-0141 ZDC # Date July 7, 2000 TO: Ms. Linda Lewis N.C. Department of Environment And Natural Resources Division of Water Quality 127 Cardinal Drive Wilmington, NC 28405 We are sending the following: [ ] Bluelines [ ] Samples [x] Originals [ ] Submittal [ J Specifications [ ] Addenda [ ] Shop Drawings Copy of Letter [ ] Other: Reports VIA: [ ] Mail [ ]Overnight Letter of Transmittal RE: Kinko's Retail Store 4700 Oleander Drive Wilmington, NC Purpose: [xi For Approval [ ]Returned for Approval [ ] Approved as Submitted [ ] For Your Use [ ] Approved as Noted [ jAs Requested [ Other: ] ] 2nd Day [I Other: Quantity Drawing/Spec Latest Date Description 2 7/6/00 Revised Detail Sheet C9, Weir Elevation Remarks: Copy: BY: Robert Balland, Proiect Design Engineer EASTWIND ENGINEERING COMPANY, LLP RECEIVED s u L 0 6 2000 1 f� y .r'4�- '�„ _ it . � � . � -, Jtj EASTWIND ENGINEERING COMPANY, LLP 1f)311-G OLHANDER DR►VE - 1P11 MINGTON. NC 28403 - (910) 342-J144 - FAX (910) :142-0141 Letter of Transmittal ZDC # Date June 22, 2000 TO: Ms. Linda Lewis N.C. Department of Environment And Natural Resources Division of Water Quality 127 Cardinal Drive Wilmington, NC 28405 We are sending the following; [ ] Bluelines [ ] Samples [x] Originals [ ] Submittal [ ] Specifications (] Addenda [ ] Shop Drawings [ ] Copy of Letter [ ] Other: Reports VIA: [ ] Mail [ ]Overnight -. 1.1 - C FIVE JUN 2 2 2000 RE: Kinko's Retail Store 4700 Oleander Drive Wilmington, NC Stormwater Permit Application Purpose: [x] For Approval [ ]Retumed for Approval ( ] Approved as Submitted [ ] For Your Use [ ] Approved as Noted [ ]As Requested [ ] Other: [ ] 2" Day [ ] Other: Ouantity Drawing/Spec Latest Date Description l Original supplement for Underground Remarks: Copy: BY: Mark N. Hargrove, P.E. - Project Manager EASTWIND ENGINEERING COMPANY, LLP Eastwind Engineering Company, LLP Engineering • Planners • Architects 1 I I Princess St. P.O. Box 2628 Wilminaton, North Carolina, 28402 910-342-9144 FAX 910-342-9141 .Tune 29, 2000 Ms. Linda Lewis N.C. Department of Environment and Natural Resources Division of Water Quality Section 127 Cardinal Drive Extension Wilmington, NC 28405 Re: SW8 000612 Kinko's Retail Store New Hanover County Dear Ms. Lewis: F CEIVEUN 2 9 20001 We have addressed your comments in the letter dated June 26, 2000. The following is a response to your comments. 1) A note has been placed on the plans indicating that no wetlands exist on site. 2) Notes have been added to the plan to reflect changes that were required by NCDWQ to divert offsite drainage from gutter downspouts away from the subject property. 3) The infiltration system has been revised and redesigned such that the seasonal high water table was assumed to be 6 feet. Thus the bottom of the infiltration trench was raised 2 feet. Enclosed are the following: • Two (2) copies of revised sheets C-4 and C-9 • Two (2) copies of the revised calculations and page 2 of 4 of the "Underground Infiltration Trench Supplement". Please feel free7to call if you have any questions. Very truly yours, EASTWIND ENGINEERING COMPANY, LLP 14k w, Ay-,w� Mark N. Hargrove, P.E. cc: Jeffrey L. Zimmer — Zimmer Development Frank T. Grzandziel — Zimmer Development Rod Young — Zimmer Development ,, ,. - t' '��- Eastwind Engineering Company, LLP Engineering • Planners • Architects 111 Princess St. P.O. 13ox 2628 Wilmington, North Carolina, 28402 910-342-9144 FAX 910-342-9141 July 5, 2000 Ms. Linda Lewis N.C. Department of Environment and Natural Resources Division of Water Quality Section 127 Cardinal Drive Extension Wilmington, NC 28405 Re: SW8 000612 Kinko's Retail Store New Hanover County Dear Ms. Lewis: We received the original copy of the permit application to revise after we had already re -submitted the revisions of the plans to you last Thursday, June 29, 2000. We are providing you with one original and one copy of the changes. 1 am also including two revised copies of Sheet C9. The elevation of the overflow weir previously shown in detail No. 7 was incorrect. Please feel free to call if you have any questions. Very truly yours, EASTWIND ENGINEERING COMPANY, LLP i44- A Mark N. Hargrove, P.E. cc: Jeffrey L. Zimmer — Zimmer Development Frank T. Grzandziel — Zimmer Development Rod Young — Zimmer Development June 26, 2000 Mr, Jeffrey Zimmer, Manager Z-1 Commercial Properties, Inc. 1 l I Princess Street Wilmington, NC 28401 Subject: ACKNOWLEDGMENT OF RECELPT AND REQUEST FOR ADDITIONAL INFORMATION Stormwater Project No. SW8 000612 Kinko's Retail Store New Hanover County Dear Mr. Zimmer: The Wilmington Regional Office received a Stormwater Management Permit Application for Kinko's Retail Store on June 6, 2000. An on -site soils evaluation was conducted on June 26, 2000, to determine the suitability of the soils for the proposed underground infiltration system. As reported in the soils S&ME, Inc, the site was found to have a sandy -clay soil layer that has caused a perched water condition, however, the seasonal high water table was at approximately 6' below existing ground. The soils report indicates that water was hit at 8' below the surface, however, it does not report the Seasonal High Water Table. The application is not complete at this time. The following information is needed"to continue the stormwater review: Delineate all wetlands on site, disturbed or undisturbed, or note on the plans that none exist. 2. There are three roof drains on the adjacent building (two on the side and one in the back) which drain onto this site. Please show how the drains will be redirected, or revise the calculations to account for the offsite drainage. If you choose to account for the runoff, please provide a plan that clearly delineates the offsite drainage area. 3. Please determine the Seasonal High Water Table Elevation and add this to the report. Some site redesign will need to be done in order to raise the bottom elevation of the trench to meet the 2' separation requirement. Mr. Zimmer June 26, 2000 Stormwater Project No. SW8 000612 --------------------------------------------- Please note that this request for additional linformation is in response to a preliminary review. The requested information should be received by this Office prior to July 26, 2000, or the application will be returned as incomplete. The return of a project will necessitate resubmittal of all required items, including the application fee. If you need additional time to submit the information, please mail or fax your request for a time extension to the Division at the address and fax number at the bottom of this letter. The request must indicate the date by which you expect to submit the required information. The Division is allowed 90 days from the receipt of a completed application to issue the permit. The construction of any impervious surfaces, other than a construction entrance under an approved P pp Sedimentation Erosion Control Plan, is a violation of NCGS 143-215.1 and is subject to enforcement action pursuant to NCGS 143-215.6A. Please reference the State assigned project nuImber on all correspondence. Any original documents that need to be revised have been sent to the engineer or agent. All original documents must be returned or new originals must be provided. Copies are not acceptable. If you have any questions concerning this matter please feel free to call me at (910) 395-3900. 1 Sincerely, 'Linda Lewis JEnvironmental Engineer RSS/arl: S:IWQSISTORMWATIADDINFO\000612.JUN cc: Linda Lewis Mark Hargrove, P.E. Dave Mayes, P.E. EASTWIND ENGINEERING COMPANY, LLP Civil Engineering 1929-G Oleander Drive Land Planning Wilmington, North Carolina 28403 (910) 342-9144 Fax: (910) 342-9141 Stormwater Permit Application KINKO'S RETAIL STORE Oleander Drive/South College Road Wilmington, North Carolina TO R M' V VA T E F1 &iECEIVEI). J U N 0 ' 6 2000 DWQ PROD # SW 8 aooCV r Z Prepared for: Z-1 Commercial Properties, LLC 111 Princess Street Wilmington, North Carolina 28402 tit III \�r CLS.3��}A.e4� February 1, 2000 t � ~ �9� L Z'1(/V 0 Stormwater and Erosion Control Narrative Kinko's Retail Store Oleander Drive/South College. Road Wilmington, North Carolina Property Owner Z-1 Commercial Properties, LLC 111 Princess Place Wilmington, North Carolina 28402 (910) 763-4669 Attn: Mr. Rod Young, Director of Pre -Development Services Civil En ineering and Land Planning Eastwind Engineering Company, LLP 1929-G Oleander Drive Wilmington, North Carolina 28403 (910) 342-9144 Attn: Mr. Mark Hargrove, P.E. Purpose of Land -Disturbing Activity Z-1 Commercial Properties plans to construct a Kinko's retail center located on Oleander Drive near the corner of Oleander Drive and South College Road in Wilmington, North Carolina. The parcel is currently zoned RB, Retail Business. The total parcel size is 0.80 acres. The proposed uses are permitted within the RB zoning and will not require any special use permits. The property is approximately 5% impervious today. The redevelopment of the property will increase the amount of impervious surface to approximately 67%. Project Description The project will consist of a new 5,000 square foot Kinko's retail store. New parking, landscape islands, and landscape verges will be installed to reduce the amount of impervious surface. An additional '17 parking spaces will be constructed on Lot 1 Oleander Place that will be accessed through Kinko's driveway with a cross access agreement. Stormwater Control Devices The project will also provide stormwater treatment by means of an infiltration system designed to store, treat, and infiltrate the difference between the pre and post -development runoff (10-year, 6-hour storm). The infiltration system will provide an emergency outlet for the 50-year storm event. A copy of a soils and infiltration report has been provided as an attachment. The infiltration report states that the existing soils will infiltrate an average rate of 8.7 inches per hour. See the attached construction plans for details. The surface runoff will be collected in a series of City of Wilmington standard drop inlets and dispersed into infiltration pipes, The drop inlets will be designed to have a 3-foot settling pool in the bottom of the inlets. These settling pools will allow for additional stormwater treatment prior to entering the infiltration piping. The overflow from the system in higher frequency storms will outlet into the existing City of Wilmington storm drainage system. Erosion Control Devices The total drainage area of the development is 0.80 acres. The disturbed area of the property will be 0.54 acres. The erosion control devices have been designed to limit the effects of the erosion and sedimentation for the disturbed area. Silt fencing will be installed along the northern and eastern perimeter of the property. This will prevent erosion from exiting the property and entering the surrounding roadways and adjacent properties. Silt fence type inlet protection devices will be installed around the existing and proposed drop inlets within the property boundary. A temporary gravel construction entrance pad will be installed at the entrance. Adjacent Property All surrounding property is zoned RB and is retail in nature. The proposed development should not cause an adverse impact on the surrounding properties. Maintenance Plan 1. The general contractor will check for stability and operation following every runoff - producing rainfall but in no case all erosion and sedimentation control devices less than once every week. Any needed repairs will be made immediately to maintain all devices as designed. 2. Sediment will be removed from behind the sediment fencing when it becomes six to nine inches deep at the fence. The fencing will be repaired as necessary to maintain a sufficient barrier. 3. All seeded areas will be fertilized, re -seeded as necessary, and mulched according to the plans and specifications to maintain a vigorous, dense vegetative cover. 4. See the construction plans for additional notes and details. STORM DRAINAGE DESIGN DATA SHEET PrajersNumber - 2000100 3:1- ..:Designed9y; '.RPB Date: 7121100 " ,.. .., IGnkos Checked By: r MNH _ s Shaet l.of 1 2 yr, 24 hs raln[a� 4 5 n s Storm Frequency - 10 Year E Pipe Type ADS ri 12 ` , - rrVsfue..'=. 0.612 rl value fl.011 .2 '3J. - _ M1 - 1.; 4.- 5 6 7 6 9 10 11 12 13 14 I 15 16 17 1B 19 L H I S I Ti Location Area PIPE DATA DRAINAGE BASIN DATA From" To., Sab.T (acres)- Total - (mores) Inlet Time ^ r.- - Pips Tone 5 TC. Tlmeot -r. Cvnc min w T. ` is 1nte (ki Rnr }r,( ' C , .Runoff �.- :i" "M .OGCIA, ) K S e '-' ) Min P1pe Site ��n) ! C ,rSlzE {in) _Y.3. ,= ;_V ful( .- IfPs) .iE .tLe - (feep : �9nren-,us.-;US s Time - Amin) i. -.x.i} . Invert (ft) -. DS. t Invert {ft } .' To B. fie.}. Besm _-8asln, rie M" In 'S1 IGrpsdt ^8heet+ DI-3 DI-2 0.150 0.150 1.43 0.00 1.43 7.23 0.77 0.6 0.0001 16.0 36 1.0 94 1.53 40.92 40.78 45.44 113 1.25 0.01 1.69 1.43 DI-2 DI-1 0.180 0.330 0.72 1.53 2.96 7.23 0.77 1.8 0,0001 21.5 36 1.0 97 1.58 40.78 40,73 45.30 59 1 0.02 0.87 0.72 DI-1 OUT 0.1ID 0.440 0.87 3.12 4.55 7.23 0.77 2.4 0.0025 13.1 15 2.8 52 0.30 43.75 43.62 45.25 58 0.58 0.01 1.05 a87 Eastwind Engineering Company, LLP Sheet No. 1 of 2 Jab I ko's Subject infgroVQo Svatem Design Job No. Designed by RPB Date !1 12IBo Checked by Date Kinko's Oleander Drive Determine runoff amount: Total area = 0.80 acres < 20 acres, therefore use the rational method Impervious area = 0.54 acres Pervious area = 0.26 acres % impervious = 67% NCDENR DESIGN: (j� 1 • ✓ +' Collect the runoff from the first i 1 inch of rainfall. Determine Composite "C" val e: C (pavement) = 0.95 X 0.67 - 0.64 C (grass) = 0.20 X 0.33 = 0.07 Composite C = 0.71 Volume to store = Runoff = CIA = 2,100 ft3 CITY OF WILMINGTON: Store the volume of runoff minus the volume infiltrated during the storm. Use 10-year design storm, 6 hr duration per City of Wilmington standards. Depth = 4.80 inches = P Use SCS Curve Number Asphalt = 98 Baymeade Soil = 39 CN = (% impervious)(Asphalt C)+ (% pervious) (pery i o us C) CN = 79 Soil storage Capacity, S = 1000ICN-10 = 2.70 Runoff, R = (P-0.2S)2 - 2.6 inches (P+0.8S) Runoff volume = Runoff Depth X Area = 7,573 ft3 Volume to store = 7,573 ft3 Minimum Volume to Store (prior to subtracting infiltrated amount) = 7,573 ft Eastwind Engineering 1117100 Company, LI*P Sheet No. 1 of 4 Job Kinko's Subject lnfitrabon System Design Job No. Designed by RPB Date 1112100 Checked by Date Design Post Development Discharge Rate To Equal Pre -Development Discharge Rate Hydrogra2h Formulation Kinko's Oleander Drive 1.) Estimate Peak Watershed Area = 0.80 acres Pre -Development Discharge Rate Determination, Qp,e Qpre=CIA C= 0 2Qk ` eYk Determine Rainfall Intensity, l Kirpich Method(<20 acres) _04.= sun L H TC I (10 Year) 1 (50 Year) (cfs) (cfs) 185} .2 2 7.23 8.87 1.16 1.42 Post Development Discharge Rate Determination, Q po5t QPosl=CIA C= 0 Z3 Determine Rainfall Intensity, 1 Kirpich Method(<20 acres) g un go-= L H T, I (10 Year) 1 (50 Year) (cfs) (cfs) z...68:...`... D°7 1 7.23 8.87 4.22 5.18 2.) Estimate Volume of Run-off Use 90-year design storm, 6 hour duration. Depth ...' ,4 8© inches Pre Devel. Soil Storage Capacity, S = 10001CN -10 = 15.64 where CN = 9 Pre Devel. Run-off, R=( P - 0.2 S)2l( P + 0.8 S) P = 4.8 R = 0.16 Post Devel. Soil Storage Capacity, S = 10001CN -10 = 2.70 where CN =79 Post Devel. Run-off, R=( P - 0.2 S)2/( P * 0.8 S) P = 4.8 R = 2.61 3.) Set the shape of the hydrograph Pre Devel. Time to Peak, Tp = 43.5 * Area * Runoff - 4.9 min. Qpre10 Post Devel. Time to Peak, Tp = 43.5 * Area * Runoff - 21.5 rain. Qpostl0 4.) Estimate the Required Storage, S S = (Qpost-Qpre) x Tpl Opost x 1.39 x1 5,496 CF 5.) Hydrograph Formulation CAEastwindlkinkosW1_-1 10-Year Hydrograph Eastwind Engineering ill O Company, LLP Shoot No. 2 of 4 Job Kinko's Subject Infitration System Design Job No. Designed by RPB Date 1112100 Checked by Date Discharge (Q) Time(t)min. Post Pre Time Increment= .,Q. :*To 0 0.00 0.00 2.15 0.10 0.47 4.30 0.40 1.12 6.45 0.87 0.89 8.60 1.46 0.50 10.75 2.11 0.28 12.90 2.76 0.16 10-Year Storm Event Inflow Hydrograph 15. 3. 0.09 17.19 19 82 3.82 0.05 --*-Post Devel Inflow -0-- Pre Devel Inflow 19.34 4.12 0.03 5 _ r 21.49 4.22 0.02 4= �v 23.64 4.12 0.01 4 PAL{ 25.70 3.82 0.01 0 3 : L J 27.94 3.38 0.00 c- 3 x r z ra v 30.09 2.97 0.00 F �i L ,f y a 32.24 2.61 0.00 cL irr' 2 t u{ fTXX s 34.39 2.29 0.00 n 36.54 2.01 0.00 0 38.69 1.77 0.00 0 20 40 60 80 100 40.84 1.55 0.00 42.99 1.36 0.00 Time, t (min) 45.13 1.20 0.00 47.28 1.05 0.00 49.43 0.92 0.00 51.58 0.81 0.00 53.73 0.71 0.00 55.88 0.62 0.00 58.03 0.55 0.00 60.18 0.48 0.00 62.33 0.42 0.00 .64.48 0.37 0.00 66.63 0.33 0.00 68.78 0.29 0.00 70.93 0.25 0.00 73.08 0.22 0.00 75.22 0.19 0.00 77.37 0.17 0.00 79.52 0.15 0.00 81.67 0.13 0.00 83.82 0.12 0.00 85.97 0.10 0.00 88.12 0.09 0.00 90.27 0.08 0.00 92.42 0.07 0.00 94.57 0.06 0.00 CAEastwindlkinkosUnfil_-1 10-Year Hydrograph Eastwind Engineering Company, LLP Job Kinko's Subject Infitration System Desiun Job No. Designed by 2E—B Date 1112100 Checkad by Date MM-- 1- - --1- Kinko's Oleander Drive 1.) Determine Trench Volume per linear foot Including stone: pipe inside diameter (in) = 36 clear width between pipes (ft) = 1.57 pipe outside diameter (in) = 42.25 trench width (in) = 61.1 rock void ratio (%) = 40 pipe volume (cf) = 7.07 rock volume (co = 9A8 void volume (cf) = 3.95 Total volume of water per linear foot (cf): 11.02 2.) Determine Infiltration Rate For Full Trench: Use 36" ADS Pipe 5.09 feet From Darcy's Law, q = MA = (k)(h/L)(A), where hIL is the hydraulic gradient. min, distance to SHVVT (ft) = 2 min. depth, EP to top of pipe (in) = 12 depth of stone under pipe (in) = 4 depth to seasonal high water table (ft) = 8 coefficient of permeability, k (cmis) = 0.0061 proposed bottom area of trench (sf) = 891 head loss, h(ft) = -5.85 unit length, L(ft) = -2.00 q (cfsllf) = 0.00298 q (cfs) = 0.52 Check the outflow from the pipe, (ADS Tech Note 2.105). Outflow, Q= 0.02+1.15(h;)+0.052(hi)2 Q = 0.242 cfSlft Therefore infiltration rate of 0.0030 cfs/If is OK. 3.) Approximate Infiltration Time For Full Trench: -1.15 -2.15 -5.67 -6.00 -8.00 h; = 36 > 0.00298 cfs/If Depth of water in trench will vary. Use one half of depth as an average. qw2 (cfsllf) = 0.00149 q (cfs) = 0.26 Time for water to exfiltrate from trench = 8.1 hours cAEastwindlKinkoslinfil_-1lnfiltration-36" pipe Eastwind Engineering Company, LLP 4.) Determine Infiltration Rate during Storm Event Ideally, the trench will completely fill with water at the and of the storm event, The amount infiltrated during the storm will vary with time, based on the driving N Since infiltration rate varies linearly with the driving head as shown below, assum, the trench is half full for the entire storm period as an average to determine amou infiltrated during the storm event. Amount infiltrated during the storm event = 6hrs x infiltration rate at h(ft) = Rate of infiltration qw2 (cfsllf) = 0.00149 7.0 Infiltration Rate vs. Driving Head -' 6.0 5.0 4.0 3.0 2.0 1.0 0.0 " 'mot �r V M M M M M M M M M M W W WW W W W W W W W W W W W N lO M M r N N M M �r le 4' 0 U] in 0 0 o r? u, r rn 7M u� r rn r 0 47 Ih Cn N N N N N 5.) Size The Infiltration System Linear feet required for storage(wlo infiltration): 687 Adjust layout until Runnoff - Q16 = Storage Try 1 rows at 175 feet. End length = 3.5 feet. Linear feet used for infiltration: 175 infiltration Rate, q (cfs) = 0.26 Storage = 2,007 (cf) Amount Infiltrated, Q16 = 5,635 (cf) Runoff - Q16 = 1,938 (cf) < 2,007 (cf) c:lEastwindlKinkoslinfil_-1 Infiltration-36" pipe *4-120Smooth Interior Pipe N_12_has bui an impressive sery ice record in storm water and other drainage applications where hydraulics are important and durabili- ty is critical. The pipe is offered in diameters from 4" through 36", in 20 fl, lengths, Corrugated exterior adds strength The natural toughness of HDPE is enhanced by the corrugated exterior which increases the structural strength of N-12 pipe. It is designed for use under both H2O and E80 live loads, or with fill heights of 50 feet or more. In fact, field research shows the pipe performing well at depths exceeding 100 feet. Even under harsh backfill conditions and shifting soils, N-12 has continued to give out- standing performance. Smooth interior provides superior flow In order to meet the most demanding hydraulic requirements, N-12 is man- ufactured with a smooth inner wall. This design insures maximum flow capacity, and PE`s resistance to abrasion and corrosion will sustain •�,: r��� Wit.,- ae this capacity for years into the future. With its 0.012 rating, the pipe is ideal for applications requiring low Mannings "n" values. Fast, easy joining and installation N-12's light weight leads to a number of job site economies: more pipe per delivery truck, easier handling, small- er crews, less heavy equipment, less pipe damage, and better safety. The pipe cuts easily and requires no beveling for joining, Additional information available from ADS: 1. AASHTO Specification M 252 , 2. AASHTO Specification M 294 3. ASTM D 2412 4. ADS Tech Note 2.115, "Com- parative Pipe Stiffness" 5" ADS Farm# 1 1062193, ADS N-12 Pipe" 6, ADS Tech Note 4.103, "Plastic Pipe Design" by James B. Goddard 7. PennDOT Deep Burial Study 7 . I 200 b , 0 150 , [!l 100LL 04 s cz gtn9ye W a � I 50 c) I 0 i 0.1 0.2 0.3 0.4 0.5 Slope Weight• • •d• Pounds per Foot Pipe Dia. N-12/N-12 HC I Concrete i Corrugated Steel 10" 2.0 50 9.0 12" 3.2 79 10.5 15" 4.6 103 12.9 18" 6.4 131 15.8 24" 11.5 217 19.4 30" 15.4 384 30.4 36" 18.1 624 36.0 42" 26.5 650 57.0 48" 32.0 I 780 65.0 Minimum Cover: H-20 loads: 12" E-80loads: 24" Maximum Cover: Typically 50.60 feet but will vary depending on application and engineering design. Notes: 1. Cover heights are measured from the lop of the pipe. 2. Calculations Gasod on load factor design per AASHTO procedures. 3. Assume soil density of 100 lbs./cu. ft. 4. Backflll compacted to 90% density per AASHTO T-99, S. If a hydro -hammer is used for compaction, at least 48" of cover rnust be provided. N-12 & Std. Corrugated: (Corrugated Pipe Dla. N-12 HC I HDPE Pipe Concrete Steel 4"-15" 010—.012 018 .011—.015 .022—.026 15"-48" .010,012 .020 .011—.015 .022—.026 AASHTO M 294, Standard Specification for Corrugated Polyethylene Pipe AASHTO MP6, Standard Specification for Corrugated Polyethylene Pipe, 1050 and 1200 mm Diameter (42" and 48") ASTM F 667, Standard Specification for large Diameter Corrugated Polyethylene Pipe and Fittings ASTM D 2321, Standard Practice for Underground Installation of Thermoplastic Pipe for Sewers and Other Gravity Flow Application It is the intent of this Technical Note to provide current hydraulic performance data for use by the engineering community. A bibliography is included for the engineer's use if further information or guidance is needed. Manning's "n" values are offered for design purposes based on the best available data assembled from a variety of sources as indicated. Table 1 presents the Manning's "n" values recommended by the A.D.S. engineering staff for use in design. Table 1 Manning's °n" Value For Design (Storm & Sanitary Sewer and Culverts) Pipe IxlQ. _�L A,D.S. Corrugated Polyethylene Pipe 3" - 6" Diameter 0.015 8" Diameter 0.016 10" Diameter 0.017 12" - 15" Diameter 0.018 18" - 36" Diameter 0.020 A.D.S. N-12 0.012 Concrete Pipe 0.013 Corrugated Metal Pipe (2 2/3" x 1/2" corrugation) Annular Plain 0.024 Paved Invert 0.020 Fully Paved (smooth lined) 0.013 Helical Plain 15" Diameter 0.013 Plain 18" Diameter 0.015 Plain 24" Diameter 0.018 Plain 36" Diameter 0.021 Spiral -Rib 0.012 Plastic Pipe (SDR, S&D, Etc.) 0.011 Vitrified Clay 0.013 3300 RIVERSIDI= DRIVE COLUMBUS, OH 43221 (614) 457-3051 http://Www.ADS•Pipe-com TABLE 4 CIRCULAR PIPE FLOW CAPACITY Full Flow (cubic feet r*-r second) Mannings "n 0.012 Dia. lConv. % Slope (feet per 100 feet) (in.) Factor 0.02 0.05 0.10 0.20 0.35 0.50 0.75 1.00 1.25 1.50 1.75 2.0 2.5 5.0 10.0 20.0 3 0.957 0.014 0.021 0.030 0.043 0.057 0.068 0.083 0.096 0.107 0.12 0.13 0.14 0.15 0.21 0.30 0.43 4 2.062 0.029 0.046 0.065 0.092 0.122 0.146 0.179 0.206 0.231 0.25 0.27 0.29 0.33 0.46 0.65 0.92 5 3.738 0.053 0.084 0.118 0.167 0.221 0.264 0.324 0.374 0.418 0.46 0.49 0.53 0.59 0.84 1.18 1.67 6 6.079 0.086 0.136 0.192 0.272 0.360 0.430 0.526 0.608 0.680 0.74 0.80 0.86 0.96 1.36 1.92 2.72 8 13.091 0.185 0.293 0.414 0.585 0.774 0.926 1.134 1.309 1.464 1.60 1.73 1.85 2.07 2.93 4.14 5.85 10 23.74 0.34 0.153 0.75 1.06 1.40 1.68 2.06 2.37 2.65 2.91 3.14 3.36 3.75 5.31 7.51 10.61 12 38.60 0.55 0.'186 1.22 1.73 2.28 2.73 3.34 3.86 4.32 4.73 5.11 5.46 6.10 8.63 12.21 17.26 15 69.98 Q.99 1.56 2.21 3.13 4.14 4.95 6.06 7.00 7.82 8.57 9.26 9.90 11.06 15.65 22.13 31.30 18 113.80 1.61 2.54 3.60 5.09 6.73 8.05 9.86 11.38 12.72 13.94 15.05 16:09 17.99 25.45 35.99 50.89 21 171.65 2.43 3.84 5.43 7.68 10.16 12.14 14.87 17.17 19.19 21.02 22.71 24.28 27.14 38.38 .54.28 76.77 24 245.08 3.47 5.48 7.75 10.96 14.50 17.33 21.22 24.51 27.40 30.02 32.42 34.66 38.75 54.80 77.50 109.60 27 335.51 4.74 7.50 10.61 15.00 19.85 23.72 29.06 33.55 37.51 41.09 44.38 47.45 53.05 75.0 106.1 150.0 30 444.35 6.28 9.94 14.05 19.87 26.29 31.42 38.48 44.44 49.68 54.42 58.78 62.84 70.26 99.4 140.5 198.7 36' 722.57 10.22 16 A 22.85 32.31 42.75 51.09 62.58 72.26 80.79 88.50 95.59 102.19 114.25 161.6 228.5 323.1 42 1089.9 15.41 24.37 34.47 48.74 64.5 77.1 94.4 109.0 121.9 133.5 144.2 154.1 172.3 243.7 344.7 487.4 48 1556.1 22.01 34.80 49.21 69.59 92.1 110.0 134.8 155.6 174.0 190.6 205.9 220.1 246.0 348.0 492.1 695.9 * Comreyance Factor = 0.486 x R2/3 x A) / n Introduction In order to provide guidance to engineers in designing drainage or recharge systems, ADS conducted a series of exfiltration tests on pipe with standard perforations. It should be emphasized that these values are based on a free outlet (no backfill) through the perforations. Infiltration is assumed to equal the measured exfiltration rates. Tests were conducted in accordance with AASHTO standard specification M176 for porous concrete pipe. Although intended for use with porous concrete pipe, the test method is applicable to perforated pipes of all types. Test Procedure A 2-foot-long section was used for each size tested. The level of water in the pipe was measured by means of a floating staff scale accurate to 1/16th of an inch. For small diameter pipes, the flow rate was determined by the time to fill a 21.25 liter bucket. For larger sizes, a V-notch weir was used. Results The results of the tests showed a consistency in the manner in which flow rate increased with increasing height of water in the pipe and were in line with the theory of flow through orifices. Variation in the inlet area of the perforations impacted the flow rates in a linear manner with flow increasing uniformly with increased open area for equal head. A quadratic equation is used to represent the data. The best fit curves by the method of least squares using a logarithmic transformation are shown for each size. The equation constants are included in the graphs and tables. The equation is: Q = Afl --j AIR + A2T12 Where: Q = Quantity of water in GPM/ft. H = Head of water above pipe invert in inches Ao, A1, & A2 are equation coefficients 3300 RIVERSIDE DRIVE COLUMBUS, OH 43221 (614) 457-3051 http://www.ADS-pipe.com OUTFLOWS -ADS PIPE 36" N-12 PIPE TYPE S 1B0 T 160 140 120 LL 100 1 ppn� r n�rn 80 v 0 ^0 `yy 20 0 HEAD (INCHES) FACTORS FOR OUTFLOW CALCULATIONS ADS 36" N-12 PIPE TYPE S OPEN AREA AO Al A2 H2 H Q-GPMIFf 1.2 0.02 1.15 0.052 0 0 0.02 1.2 0.02 1.15 0.052 4 2 2.53 1.2 0.02 1.15 0.052 16 4 5.45 1.2 0,02 1.15 0.052 36 5 8.79 1.2 0.02 1.15 0.052 64 8 12.55 1.2 0.02 1.15 0.052 100 10 16.72 1.2 0.02 1.15 0.052 144 12 21.31 1.2 0.02 1.15 0.052 196 14 26.31 1.2 0.02 1.15 0.052 256 16 31.73 1,2 0,02 1,15 0.052 324 18 37.57 1.2 0.02 1.15 0,052 400 20 43.82 1.2 0.02 1.15 0.052 484 22 50.49 12 0.02 1,15 0.052 576 24 57.57 1.2 0.02 1.15 0.052 676 26 65.07 1.2 0.02 1.15 0.052 784 28 72.99 1.2 0.02 1,15 0.052 900 30 81.32 1.2 0.02 1.15 0.052 1024 32 90.07 1.2 0.02 1.15 0.052 1156 34 99.23 1,2 0.02 1.15 0.052 1296 36 108.81 1.2 0.02 1.15 0.052 1444 38 118.81 1.2 0.02 1.15 0.052 1600 40 129.22 1.2 0.02 1,15 0.052 1764 42 140.05 1.2 0.02 1.15 0.052 1936 44 151.29 1.2 0.02 1.15 0.052 2116 46 162.95 1.2 0.02 1.15 0.052 2304 48 175.03 NOTE: Q = AO + (Al "H) + (A2"H2) UNLOADING AND HANDLING 1. Fallow all OSHA safety requirements. 2. When the truck load of pipe is initially received, it should be inspected for dam- age and quantities should be verified with shipping papers. Any damage or dis- crepancies should be noted on the delivery receipt and the supplier notified. ADS pipe is designed to withstand normal field handling and can be easily un- loaded by hand or with equipment. To avoid damage, the pipe should not be dropped. When using equipment to unload or move the pipe, a fork extension can be used. When unloading by hand, gloves should be worn. 3. Do not use chains or wire rope to lift the pipe. Use nylon slings and do not pickup 20 foot sticks from only one place on pipe. 4. Weight (no coupling): 3300 RIVERSIDE DRIVE COLUMBUS, ON 43221 (0141457.3051 http./Iwww.ADS•pipo.com TRENCHING An excellent reference for trenching practice and bedding materials is ASTM D2321. 1. The trench must be wide enough to accommodate compaction equipment. See table below: �l��i'�t ttif�f2ecorTlmendedi� ���i Diameter p D In - ,,it Arent oMdth In` it 4 4 , `± ,..rlry611 t�4.,l'ti''tJ6�l,t '�10". r •;�j4t77�31��s��1�' 4';�a���``11�;28 �(`�y�,t'•;�'7�'yf,, 12 c <y�, 15 4 j r ", 1 i b5 ;it f ,}�t� �r 3�•4',f �`tl:'. 18 y39 J R - I' l 111 fit ✓�'I A hi 1 • �• 24„ ,28 3t); ,r �w CIF �8 3011 ]�',i3610t •3fi" � ; t�t42 25'�i F�,'�I, 1y�i �'y' ,78 ,,i 3 '° 42 c4 „�',�7 ag.r�l��,�I SC�IInA 83 J A4'i�K h�j% 4Bit.,' 53 00, it al t�' t�3 r� ,ia'•; ;` 2. Excessive groundwater necessitates dewatering. N-12 pipe will float in standing water, requiring immediate haunching and ini- tial backfill to hold line and grade. 3. An unstable trench bottom must be stabilized at the engineer's direction. In such cases install special foundation and bedding materials in 6 inch layers and compact. Excavation from 0 to 12 inches below the pipe should be filled with acceptable bedding material and compacted to a mini- mum 90 percent Proctor density. Fill areas of over -excavation beyond 12 inches with processed stone or gravel. 4. Before installing pipe, bring bedding material to grade along the entire length of the pipe. For a 42" and 48" pipe, a shallow (11 "bell hole" should be dug so the pipe is fully supported. 5. When excavating in Class IV materials (silt, silty clays, and clays), provide a uniform, improved trench bottom. FIELD CUTTING 1. Use a handsaw or power pipe cutoff saw. - 2. Cut in the valley of a corrugation. Do not cut into the side wall of an annular corrugation. For pipe with external spiral corrugations, place a split coupling around it and use the coupling edge as a cutting guide. 3. It is not necessary to bevel the cut pipe edge prior to installing our o-ring gasket joint system (Series 35). 4. Skew or bevel cut ends should be reinforced with concrete slope -collars, headwalls, or mortared rip -rap. 5. If pipe is to be air tested, plug the vent hole to prevent false air test results. I ACTAA fl_1111 Initial Backlill EMBEDmENT Haunching MATERIAL Bedding (0-6"1 Foundation (may not be required) TRENCH CROSS SECTION - .- ' - : �,+<•.�_ � � .. '�=.tom-, LAYING AND JOINING N-12 PIPE: Split couplings (This joint system is used where a soil -tight system is required.) 1. N-12 pipe can be easily carried to the trench and in sizes be- low 24 inches, installed by hand without the use of special equiprnent. This allows equipment to continue digging without costly interruptions. However, we do nor recommend dropping the pipe into the trench. 2. Split couplings are used on pipe up through 36". The sides of these split couplings are "hinged" so they easily open up to accept each end of adjacent pipe sections. There are matching holes at the split in the top of the coupling that are secured for a tight fit with nylon ties. 3. N-1 2 pipe is very easy to install, but there is one "technique" to know about if the pipe has external spiral corruga- tions. There are paint marks on each end of each 20 foot piece. After placing the pipe ends in the coupling, twist or rotate the pipe until the paint marks are opposite each other. This will make any gap between sections smaller. Then close and tighten coupling. LAYING AND JOINING N-12 PIPE; O-Ring joints (Pro -Link Series) and 42" & 48" w/integral bell and spigot joint (These joint systems are available in soil -tight (ST) and water -tight (WT) systems.) 1. Thoroughly clean the bell and spigot ends making sure they are 2. 3. 4 free of mud and grit. If the gasket has been removed, make sure the gasket seat is clean. Reinstall the gasket by stretching it over the spigot end and nesting it into the seat, with marking toward the coupling. Remove 30"-48" shrink-wrap from gasket. Remove shipping collars prior to placing pipe in trench. Use a johnny mop or brush to apply a liberal amount of gasket lube to the gasket and to swab the inside of the bell. Take care to tube the chamfered (leading) edge of the bell ("WT" joint). The "ST" joint system is a lubeless, stab joint. Simply align coupling with cleats at 2, 5, 7, and 10 o'clock positions and insert pipe until cleats "click" twice. Align the joint and push the spigot home. Use a bar and wood block on larger diameters when necessary, making sure the block protects the pipe end from the bar. When pushing the joint home, make sure the bedding material is not pulled into the bell by the spigot. material such as small stones or sand pulled into the bell as the pipe is stabbed can cause leaks. Integral bell pipe should be laid with the green stripe up. Home mark stickers are provided to prevent over insertion. CURVILINEAR INSTALLATION N-12 pipe can be laid on a curved alignment but is actually_aseries-of---- tangents (straight sections) deflected horizontally at each joint. 1D;,i: ia. :'h{az:5 - 'Q a Joint'..., ;• ';toad: (ft) per pipe length (ft) ri' g• ::•„ 10 20 228 4Z". r•; :.3de .: -::96 191 383 48" . _ .: • 3de 1'::'96 `x 191 383 (Vote: Consult your ADS representative for water -tight curvilinear installations. EMBEDMENT FOR BEDDING, HAUNCHING, AND INITIAL BACKFILL (See ASTNI D-2321 for complele reference) Embedment materials Embedment materials are those used for bedding, haunching, and initial backfill. ASTM D-2321 classifies soil materials as: Class I Angular crushed stone or rock, dense or open-graded,with little or no fines ('/4 inch to '11/2 inches in size). Class tl Clean, coarse -grained materials, such as gravel, coarse sands, and gravel/sand mixtures (1'/z inches in size). ASTM D-2321* Class III Coarse -grained materials with fines including silty or clayey grav- els or sands. Gravel or sand must comprise more than 50 percent of Class I 111 materials (1'/2 inches maximum size). Class 1V Fine-grained materials, such as fine sand and soils, containing 50 percent or more clay or silt. Soils classified as Class IVa (ML or CL) have medium to low plasticity and are not recommended in the embedment zone. Soils classified as Class IVb (MH or CH) have high plasticity and are not recommended for embedment materials. Class V Theses materials include organic silts and clays, peat, and other organic materials. They are not recommended for embedment materials. Note: Do not place lumps of frozen soil or ice in the embedment zone. TRENCH CR055 SECTION! Initial Backfill EMBEDMENT NiATERIAL Haunching } Bedding (4°•6"1 Foundation (may not be required) Bedding The bedding material provides uniform support to hold the pipe on fine and grade. A 4 inch compacted bedding thick- ness is usually adequate. Bedding materials under pipe can be Class 1, II, or III and should be firm but not hard. 'This specification is a guide and is not a substitute for local agency/designer standards Haunching Proper haunching provides a major portion of the pipe's strength and stability. Poor workmanship will lead to excessive pipe deflection and grade and alignment prob- lems. Haunching materials can be Class I, II, or I11, and must be compacted to mini- mum 90 percent standard Proctor. Haunching Guide 1. Work enough material under the haunch of the pipe to provide proper compaction and side support. 2. Where trench walls are unstable, prevent loss of side support by controlling slough- ing, etc. 3. Don't let the pipe move when placing material under the haunch of the pipe. 4. Take care not to damage the smalier size pipe with shovels or tamping equipment. 5. Haunching should be in 6 inch lifts. 6. Controlled low strength material (CLSM) slurry is suitable for embedment. Trench width may be narrower if allowed by the engineer. Prevent floating with stakes or other methods. Initial Backfill Initial backfill materials extend from the springline to 6 inches to 12 inches above the pipe to provide the remainder of the pipe support and protect the pipe from stones or cobbles in the final backfill. Class I, 11, 111 or low plasticity Class 1V mate- rials may be used. However: Class I materials must be used in wet trenches if Class I bedding and haunching materials are used. Class If materials must be compacted in 6 inch lifts to 90 percent - standard -Proctor -density. Class I[I materials must be compacted in 6 inch lifts to 90 percent standard Proctor density. See note. Class [Va low plasticity materials (CL-ML) are not recommended since they must be compacted in thin lifts while they are at or near optimum moisture content to provide proper pipe support. These materials may be used only under the direction of the Engineer - High plasticity clays and silts (Class lVb) and ail Class V materials are not recom- mended for initial backfill. Nate: Flooding or jetting as a procedure for compaction should only be used with the Engineer's approval and never with initial backfill material such as aggregate base. MANHOLE CONNECTIONS (Sanitary Sewer and/or air tested installation) 1. ADS HDPE manholes: Use standard connection or adaptors as recommended by ADS. 2. Concrete manholes: At manholes, flexible manhole connections, Pike rubber boots, A-Loks, etc. are recommended. With rubber boot manhole connectors, use an "A-Lok" sized for SDR-35 PVC pipe. Insert an ADS N-12/SDR-35 adaptor into the 'A-Lok." 3, if the N-1 2 pipe is run straight through a poured -in -place manhole, place an ADS fofnt gasket in a pipe corrugation at the approximate center of each manhole wall, to act as a water -stop. MANHOLE CONNECTIONS (Storm/Culvert) 1. ADS HDPE manholes: Couple the N-12 pipe to the N-12 pipe stubs on the manhole with split couplings. 2. Concrete manholes: Grout the N-12 pipe into the manhole wall using non -shrink grout. CONSTRUCTION LOADS 2. R 4. ADS N-1 2 pipe is designed to carry H-20 live loads (32,00ft axle - legal load) with 12 inches of cover. This assumes well - compacted embedment. During construction, avoid heavy equipment wheel loads over the pipe or place additional cover at vehicle crossings. If a hydro -hammer or hoe-pak is to be used to compact the trench at least 48 inches of cover must be provided. When connections to structures, laterals, deep laterals, risers, or drop manholes are required, the installation must be de- signed to ensure thatthe pipe and fittings are not damaged by loads generated due to soil settlement, dragdown, and/or poor installation practices. Generally, as depths increase and/or em- bedment quality declines, additional attention must be given to these loads to ensure a satisfactory installation. When removing sheeting or other trench protection, don't disturb the embedment material. if sheeting or trench protection most be used below the top of the pipe, consider leaving it in place so as not to jeopardize side support for the pipe. REPAIRS - N-12 CULVERT AND STORM SEWER PIPE (SPLIT COUPLING JOINT SYSTEM) 1. If the damage is a hole or crack in the corrugated waH only, and is less than one -quarter the pipe diameter in area and the pipe is not under pavement, clean the pipe and center a split coupling over the damaged area and secure snugly with nylon ties. 2. If the damage exceeds the above criteria or if the pipe is under pavement, cut out the damaged pipe, cut a replace- ment piece to fit, lay a spilt coupling under each exposed end, place the new pipe section in the trench and secure the couplings. NOTE: The above are guidelines. The final repair decision should be determined by the project engineer. REPAIRS - N-12 "PRO -LINK" WT OR ST JOINT SYSTEM Cut out the damaged section. Cut a replacement piece. Clean the first corrugation of the remaining pipe ends and insert a lubricated o-ring gasket in the two end corrugations. Slide an ADS repair coupling onto each end back beyond the joint. Place the replacement pipe in the trench and slide each repair coupling forward until centered over each cut end. Other methods may be suitabie. Consult your local ADS safes engineer. TESTING THE INSTALLED N-12 SANITARY SEWER PIPE' I. Leakage test - when required After the pipe has been laid and backfilled, each section of pipeline between manholes may be tested by a low pressure air test or a water infiltration or exfiltration test. All caps and end plugs should be blocked by a stake or other means prior to air testing. This will prevent dislodging of the end cap or plug and prevent failure of the air test. Air testing criteria is up to the engineer but is typically at 4-5 p.s.i. with an allowable drop over a designated time. 2. Deflection test - when required An odd -leg mandrel (go -no-go) is pulled through the installed pipe. We recommend an initial allowance of 5 percent, per table below; testing to be done within iQ days of installation. 'Tests on storm drain pipes are normally not required. •"fit Pe ,r�� rcent Defection Criteria'or` ys^,. 4 inch, 48 inch diameter N l2 S Wiii'Qipe . fitt:nr�;�yv:�i,t;j�a I]tame ter {tn 1't � r; 5 ercenti trtt eft°}V��Z �rtat '-'i FFi�%r�{I�t ,.: y�i �h sip ct�� tt� �l1Yh1� S l5 V1 3,6 9 Yi. 1:hr�t9�lApl�'fC!�`����,. Y 4T �'�, y.y• "�RI}, - tt; �d'i<,eased on"jndusfry standards �1y��!'�'lf �^ k�s.tr r ..h fM'k'dt'IY.,rii,... :il .r8 .S.R�iI Y...• k The suggestions contained herein are based on our experience and observations. They are not intended to replace project specifications prepared by qualified engineers. Installation practices encountered throughout the country are many and varied. Those described here are considered sound, although it is recognized that there may be other equally satisfactory methods. Technical data presented are considered reliable, but no guarantee is made or liability assumed. I_rAim ADVANCED DRAINAGE SYSTEMS, INC. Geotechnical Report Proposed Kanko's Store Oleander Drive Wilmington, North Carolina Job No. 1061-99-492 S&ME :•�.. Zimmer Development Company Post Office Box 2628 Wilmington, North Carolina 28402 Attention: Mr. Rod Young Reference: Geotechnical Report Proposed Kinko's Store Oleander Drive Wilmington, North Carolina Job No. 1061-99-492 Dear Mr. Young: S&ME, Inc. has completed the authorized geotechnical study at the proposed Kinko's store located on the south side of Oleander Drive and cast of South College Road in Wilmington, North Carolina. Subsurface conditions at the site were investigated with eight test borings which were drilled at the approximate locations shown in Figure 1. Four borings (Borings B-1 through B- 4) were drilled to a depth of 15 feet below the existing ground surface at the proposed building site, and four borings (Borings B-5 through B-8) were advanced to a depth of 10 feet in the proposed pavement areas. Soil samples were obtained by the standard penetration test method (ASTM D-1586) to determine the consistency of the subsurface soils. This report presents the findings of our study with recommendations for support of the facility based on these findings. PROJECT DESCRIPTION The project site is located in a heavily commercialized area of Wilmington. A small shopping center is located west of the site and a medical office is located east of the site. A fast food restaurant, which had been on this site, has been razed. What appears to be a walk-in freezer was noted near the center of the property. It is our understanding that the proposed Kinko's store will have plan dimensions of approximately 50 feet by 100 feet. Although structural detailing of the proposed building has not been completed at this time, we have assumed that the building will be supported by load -bearing walls and interior columns with design loadings on the order of 2 to 3 kips per lineal foot and 40 kips, respectively. We have also assumed that final grade at the building site will be approximately one to two feet higher than existing grade in order to provide positive surface water runoff away from the building. S&ME, Inc. (910) 799-9945 6409 Amsterdam Way, Building B-3 (910( 799-9958 fax Wilmington, North Carolina 28405 www smeinc.com Zimmer Development Company January 4, 2000 Page Two SUBSURFACE CONDITIONS The subsurface conditions encountered at the test boring locations generally consisted of the following: Depth Ft. Soil Description 0-1 Clean Sand and Base Course Stone 1-6 Loose to Medium Dense Clean SAND or Clayey SAND 6-1 S Medium Dense to Dense Clean SAND or Silty SAND Penetration Resistance Values (Blows/Ft. 7to14 11 to 47 Water was noted during the drilling operations at a depth of approximately 8 feet below the existing ground surface. The site water level will fluctuate with climatic and seasonal changes, however, and might be higher at other times of the year. The resence of the near -surface clayey sands could cause a perched water condition to occur after periods of heavy or extended rainfall. Perched water would adversely affect the site preparation and foundation construction work during wet weather. A generalized subsurface profile, which has been prepared from the subsurface data to graphically illustrate the subsurface conditions encountered at the test borings, is attached to tlus report as Figure 2. Variations from the generalized subsurface profile described above and a snore detailed description of the subsurface conditions are presented in the attached Test Boring Records. RECOMMENDATIONS This report has been prepared in accordance with generally accepted geotechrucal engineering practice for specific application to tl-iis project. The conclusions and recommendations contained in this report are based upon applicable standards of our practice in this geographic area at the time this report was prepared. No other warranty, express or implied, is made. Zimmer Development Company January 4, 2000 Page Tlu•ee The analyses and recommendations submitted herein are based, in part, upon the data obtained from the subsurface exploration. The nature and extent of variations between the borings will not become evident until construction. If variations appear evident, then we will re-evaluate the recommendations of this report. In the event that any changes in the nature, design, or location of the building are planned, the conclusions and recommendations contained in this report will not be considered valid unless the changes are reviewed and conclusions modified or verified in writing. We strongly recommend that S&ML be provided the opportunity to review the final design plans and specifications in order that earthwork and foundation recommendations are properly interpreted and implemented. Foundation Support. Following site preparation as discussed below, the structure may be supported on shallow foundations designed for a soil contact pressure of 2000 pounds per square foot (psf). All shallow foundations should bear at least 18 inches below exterior grade to develop the allowable foundation bearing pressure. In addition, all wall footings and interior column footings should have a minimum width of 18 inches and 24 inches, respectively. The use of this allowable foundation bearing pressure should limit total foundation settlements to approximately one inch or less with differential settlements on the order of '/2 inch or less. This magnitude of movement is typically considered acceptable for structures such as the one proposed on this site; however, this should be confirmed by either the project structural engineer or the architect. The floor slabs should be constructed on a minimum 6-inch thick layer of clean sand overlain with a polyethylene vapor barrier. The floor slabs may be designed for an assumed subgrade modulus value of 150 pounds per square inch per inch. Site Preparation. Site preparation should be initiated by removing the existing abandoned freezer and clearing the proposed building and pavement areas of any construction debris. In addition, any underground utilities located beneath the proposed building should be relocated. After the required site stripping work has been completed, we recommend that the exposed subgrade sands be proofrolled with a 10-ton vibratory steel -wheeled roller to densify the exposed sands and to locate any areas of soft or otherwise unsuitable surface conditions. However, the roller should maintain a distance of at least 15 feet from existing buildings to reduce the level of ground vibration at those structures. Compaction within 15 feet of the existing structures should be accomplished with hand-held vibratory compactors. Any area which pumps or ruts excessively should be undercut and replaced with a granular structural backfill as described below. The contractor should be prepared to undercut any loose sands encountered at the proposed footing locations and backfill with either No. 57 stone or compacted sand as discussed below. Zimmer Development Company January 4, 2000 Page Four Where structural fill is required to reach finished grade, we recornrnend that a clean sand, slightly silty sand, or slightly clayey sand having a Unified Soil CIassifcation of SP, SP-SM, or SP-SC be used. The fill should be placed in 6 to 8-inch thick lifts and should be compacted to at least 95 percent of the standard Proctor maximum dry density (ASTM D-698); however, the compaction of the upper 12 inches of subgrade in the building and pavement areas should be increased to at least 98 percent of the standard Proctor maximum dry density. To confirm that the specified degree of compaction is being obtained, field density testing should be performed in each fill lift by a soils technician. At those areas where no structural fill is placed on site, we recommend that the upper 12 inches of the in -place subgrade materials be compacted to at least 98 percent of the standard Proctor maximum dry density. In order to verify that the soils encountered in the foundation excavations are similar to those encountered in the soil test borings, we recommend that all footing subgrade surfaces be evaluated by an experienced soils technician or engineer using a dynamic hand cone penetrometer prior to concrete placement. The purpose of this testing is to confirm that the foundation subgrade soils consist of suitable bearing material. The foundations should be constructed as soon as possible after any excavation has been completed to prevent degradation of the exposed soils due to inclement weather. Pavement Construction. The near surface sands and compacted sand fill will provide adequate support for properly designed and constructed pavement sections. After the site preparation work has been completed as discussed above, the prepared subgrade should exhibit a design CBR value on the order of 8 to 10. An actual pavement design cannot be made until traffic loadings and volurnes are provided; however, the following pavement designs have been used for similar projects. For areas subject to only car parking, a minimum of 6 inches of base course stone overlain by 2 inches of NCDOT 1-1 asphaltic concrete is often used. In areas subject to channelized car traffic or occasional heavy truck traffic, the pavement structure is often thickened to include 3 inches of asphalt over 8 inches of base course stone. Material gradations and placement densities should meet the minimum requirements presented by the North Carolina Department of Transportation. Infiltrometer Testin . S&ME personnel conducted one double -ring infiltrometer test at a randomly -selected location between Borings B-7 and B-8. This test was conducted at a depth of approximately 8 inches below the existing ground surface in general accordance with the American Society for Testing and Materials (ASTM.) procedure D-3385 entitled, "Infiltration Rate of Soils in Field Using Double -Ring Infrltrometer". Zimmer Development Company January 4, 2000 Page Five The subsurface soils encountered at the test location generally consisted of intermittent layers of clean sand, slightly clayey sand, and clayey sand that extended to the completed hand-augered boring depth of 10 feet. However, a layer of weakly -cemented silty sand was noted from a depth of about 7 to 8'/2 feet. No water was observed in the borehole at the time of our site visit. After the double -ring infiltrometer test had been in progress for 10 minutes, the measured infiltration rates at the test location ranged from about 7.5 to 10 inches per hour with an average infiltration rate of approximately 8.7 inches per hour. Laboratory Soils Testing. Selected soil samples obtained during this geotechnical study were selected for gradation testing and moisture content determinations. The results of this laboratory testing are presented in Table 1. CLOSING REMARKS S&ME appreciates having the opportunity to be of service to you during this phase of the project. If you have any questions or comments after reviewing this report, or if we can be of additional service to you, please do not hesitate to contact us at your convenience. Very truly yours, S&ME, INC. Steven e ly, P.E. N. C. Registr tion No. 17638 TAIL 1-/- 3rA --, Michael W. Behen, P.E. N.C. Registration No. 8384 SDK:MWB/jns Attaclunents TABLE 1 Laboratory Test Results Proposed Kinko's Store Oleander Drive Wilmington, North Carolina Job Number 1063-99-492 A. Moisture Content Boring Number: B-6 B-6 B-7 B-7 Depth (Feet): 6-T5 8.5-10 1-2.5 3.5-5 Percent Moisture: 15.1 16.8 4.3 12.5 B. Gradation Sample Location: B-6 B-7 Depth: 6-7.5 3.5-5 Soil Description: Dark Brown Nine to Medium Tan -Brown Fine to Medium SAND — Trace of Clay SAND — Some Clay Percent Moisture: 15.1 12.5 Sieve Size Percent Passing, By Weight #4 100.0 99.7 #10 100.0 99.6 #20 99.5 98.7 #40 96.0 93.5 460 68.4 76.7 #200 4.8 17.8 I! B-5 M"M FEWL B- 2 r �I � I � � I B"3 If ------- U-661 I T I . I B-4 r dew 0- B-8 B-7 I xw O EAMER DRIVE .. Note: Site plan provided to S&ME by Zimmer Development personnel. PROJECT PROPOSED KINKO'S OLEANDER DRIVE WILMINGTON, NORTH CAROLINA LEGEND 0B-1 APPROXIMATE BORING LOCATION SUE 041 t . SCALE'.Not to Scale J Q B NO: 1061-99-492 F IG NO'. 1 DEPTH (FT.) GENERALIZED SUBSURFACE PROFILE B-2 B-a 13-4 B-5 S-8 B-7 B-8 13 20 B io 28 9 a 15 13 It is B 7 32 7 7 17 li B 11 14 10 25 22 19 15 21 LL 47 21 29 22 22 t2 29 NOTE: See Legend and attached Test Boring Records for soil descriptions. The subsurface conditions may vary intermediate of the soil test boring locations. PROJECT MF SCALE' Not to Scale . PROPOSED KINKO'S I OLEANDER DRIVE * J 0 B NO. 1061-99-492 WILMINGTON, NORTH CAROLINA I Vr I F IG NO'. 2 LEGEND TO SOIL CLASSIFICATION AND SYMBOLS IFS. (Shown in Graphic Log) Asphalt/Concrete Topsoil Gravel Sand silt JFSTVE SOILS STD. PENETRATION RESISTANCE 8I-QW51F00T .051SIEUCY Very Soft 0 to 2 Soft 3 to 4 Firm 5 to 8 Stiff 0 to 15 Very Stiff 10 to 30 Hard 31 to 50 Very Hard Over 50 Clay Organic RELATIVE DENSITY Very Loose Loose Sandy Medium Dense Dense Very Dense Silty Clayey Silty Sand Clayey Sand Sandy Silt Clayey Slit Sandy Clay Silty Clay Partially Weathered Rock Cored Rock WATER LEVELS (Shown in Well Diagram .Area) Water Level Al Termination Of Boring Water Level Taken After 24 Hours Loss Of Drilling water Hole Cave STD. PENETRATION RESISTANCE BLOW5(FOOT 0to4 5to10 1t to 30 3t to 50 Over 50 SAMPLER TYPES (Shown in Samples Column) Shelby Tube ® split Spoon I Rock Core 0 No Recovery Standard _ The Number of Blows of 140 ib. Hammer Penetration Falling 30 in. Required to Drive 1.4 in. Resistance I.D. Split Spoon Sampler I Foot. (SPR) As Specified in ASTM 0-1586 AEC - Total Length of Rock Recovered in the Core Barrel Divided by the Total Length of the Core Run Times 100%. ROD - Total Length of Sound Rock Segments Recovered that are Longer Than or Equal to 4" (mechanical breaks exluded) Divided by the Total Length of the Core Run Times IOOX. OVlf - Organic Vapor Meter. ELEVATION - Refers to Ground Surface at Location of Well Environmental S&ME Testing PROJECT: PROPOSED KINKO`S FACILITY TEST BORING RECORD B-1 WILMINGTON. N.C. PROJECT NO.: 1001-99-492 ELEVATION: o NOTES: LOGGED BY- PB BORING DEPTH: 15 FEET DATE DRILLED: 12-29-09 WATER LEVEL: 8' DRILLING METHOD: WASH BORING DRILL RIG: CHE45 a ; a o Soil Description c a L Gray Fine Sand and Base Course Stone Medium Dense Gray Fine SAND (SP) Loose Brown Fine SAND] — Some Clay 5 (SC) Medium Dense Dark Brown Fine SANE) — Trace of Silt (SP--SM) 10 Medium Dense Brown and Tan Fine SAND (SP) Boring completed at 15'. w a 7 Standard Penetration Test Data "' SBiaws/1t1 m � � w 10 30 50 T08 —10 —f5 —25 Page :laf1 $WE Engineering x Testing 13 s 20 22 it Pago:IDfI $&ME Engineering rt Testing PROJECT: PROPOSED KINKO'S FACILITY WILMINGTON, N.C. TEST BORING RECORD B-3 PROJECT NO 1061-99-492 ELEVATION: 0 NOTES: LOGGED BY: PB BORING DEPTH: 15 FEET DATE DRILLED: 12-29-99 WATER LEVEL: 8' DRILLING METHOD: WASH BORING DRILL RIG: CME46 wW V a v Sall Description n CL W o w -' w Gray Fine Sand and Base Course Stone Loose Tan Fine SAND (SP) Loose Brown Fine SAND - Trace of Clay 5 (SP-SC) -5 Medium Dense Brown Fine SAND - Some Clay (SC) 10 —10 Medium Dense Gray Fine SAND (SP) 15 —15 Boring completed at 15'. ft* 1 25--� 1 1 1 1 f -25 1 3 Standard Penetration Test Data (Blows/it) 10 30 50 Page., i at Environmental ServieeS Engirteering * Testing 9 B 15 15 12 PROJECT! PROPOSED KINKO'S FACILITY WILMINGTON, N.C. TEST BORING RECORD 13-4 PROJECT NO 1061-99-492 ELEVATION: 0 NOTES: LOGGED BY. PB BORING DEPTH: 15 FEET DATE DRILLED: 12-29-99 WATER LEVEL: 8' DRILLING METHOM WASH BDRINS DRILL RIG: CHE45 U_ _ CL n o Sail Oescriptlon y ¢ Lo cn Gray Fine Sand and Base Course Stone Medium Dense Brown Fine SAND (SP) 5 —5 Medium Dense Dark Brown Fine SAND - Trace of Slit (SP--SM) 10 —10 Medium Dense Brown and Tan Fine SAND (Sp) 15 -15 Boring completed at 15'. 1 20 1 25-1 1 1 1 1 1 —25 Standard Penetration Test Data (Blows/it) 10 30 50 TO Page :fof1 $WE Englneering * Testing a m 13 11 19 21 29 PROJECT: PROPOSED KINKO'S FACILITY TEST BORING RECORD B--5 WILMINGTON, N.C. 7 d ' lt781-99-492 ELEVATION: 0 NOTES: PROJEC N .., LOGGED BY: PB BORING DEPTH: 10 FEET DATE DRILLED: 12-29--99 WATER LEVEL: 6• DRILLING METHOD: WASH BORING DRILL RIG: CHE45 zt� E w LU a y a. - a o Sail Description o v w Ui ¢CC �LU LD Gray Fine Sand and Base Course Stone Loose Gray and Tan Fine SAND (SP) 5- D ense Dark Brown Fine SAND - Some SIR (SM) 1 10— Boring completed at 10'. I is- 120 1 25 -10 -25 -3 Standard Penetration Test Data (Blows/it) io 30 ! Pooe:foff Environment a# Services Engineering x Testing LL a m a 7 32 47 PROJECT: PROPOSED KINKO'S FACILITY bfIL.MINGTON. N.C. TEST BORING RECORD 6-6 PRO1ECT NO ' I061-99--492 ELEVATION• 0 NOTES: LOGGED BY: PB BORING DEPTH: 10 FEET DATE DRILLED: 12-29-99 WATER LEVEL: a' DRILLING MEfHOEt WASH BORING DRILL RIG: CH 45 z aUjo Soil Description a n w Q 7 •� .�1 n `" J Q J U] III 1 20 1 25 1 36 0.-�� Gray Flne Sand and Base Course Stone i Loose Gray and Tan Fine SAND (SP) Medium Dense Dark Brawn Fine SAND (SP) Medium Dense Black Fine SAND - Some Silt (SM) Boring completed at 10'. --15 -25 Standard Penetration Test Data (Blows/it) 10 30 50 Papa:lnfI $&ME Engineering x Testing PROJECT: PROPOSED KINKO'S FACILITY WILMINGTON, N.C. TEST BORING RECORD B-7 PROJECT NO.: 1061-99-492 ELEVATION: 0 NOTES: LOGGED BY• PB BORING DEPTH: 10 FEET DATE DRILLED: 12-29-99 WATER LEVEL: 8' DRILLING METHOi3: WASH BORING DRILL RIG: CME45 oQ o Sall Oescriptlan ra Gray Fine Sand and Base Course Stone Medium Dense Gray Fine SANG (SP) Loose Brown Fine SAND - Some Clay s (SC) Medium Dense Tan and Gray Fine SAND (SP) 10 Boring completed at 10'. 25 Standard Penetration Test Data w a (Blows/it) a w `n 10 30 -10 -15 -25 -3 Page : ! n1 1 $WE Engineering * Testing 11 29 PROJECT: PROPOSED KINKO'S FACILITY WILAIINGTON. N.C. TEST BORING RECORD B-S Pan IC7rT NO 1081-98-482 ELEVATION: 0 NOTES: LOGGED BY: PB BORING DEPTH: f0 PEEr DATE DRILLED: 12-29-99 WATER LEVEL: 8' DRILLING NETNOD: WASH BORING DRILL RIG: CHE45 w a o Sall Description > e w y a > 4- w Ui ^' < O ..r � W L.;2�4 Gray Fine Sand and Base Course Stone Medium Dense Brown Fine SANG (SP) Loose Tan Fine SAND - Trace of Clay 5 (Sp -SC) mom Medium Dense Black Fine SAND - Some Slit (SM) Boring completed at 10'. -25 Standard Penetration Test Data (Blows/it) 10 30 ! page: J of $&ME Engineering )r Testing U- a m 14 10 25 22 RECEIVED Eastwind Engineering Company, LLP JUN 2 12000 Engineering • Planners • Architects BY• 11 l Princess St. P.O. Box 2628 Wilmington, North Carolina, 28402 910-342-9144 FAX 910-342-9141 June 21, 2000 Ms. Linda Lewis N.C. Department of Environment and Natural Resources Division of Water Quality Section 127 Cardinal Drive Extension Wilmington, NC 28405 Re: SW8 000612 Kinko's Retail Store New Hanover County Dear Ms. Lewis: We have addressed your comments in the fax dated June 20, 2000. The following is a response to your comments. 1) A letter designating Mr. Collier as an authorized signing agent for Mr. Zimmer is attached. 2) The infiltration calculations have been revised for the 1.5-inch storm. 3) The invert of the overflow weir has been changed as well as the invert of the infiltration culvert. The detail of Drop Inlet No. 1 has also been revised to reflect the changes on sheet C-4. 4) Detail No. 1 on sheet C-9 has been revised to reflect the changes to the plans. The trench height of 4.52 feet is the correct height of the infiltration trench. Details No. 5 & 6 have also been revised. 5) The 36" infiltration pipe has been labeled and the overall trench width has been shown on Detail No. 1 of sheet C-9. Enclosed are the following: • Two (2) copies of revised sheets C-4 and C-9 • Two (2) copies of the revised calculations Supplement". Please feel free to call if you have any questions. Very truly yours, EASTWIND ENGINEERING COMPANY, LLP /AkkN, Ayc� Mark N. Hargrove, P.E. cc: Jeffrey L. Zimmer -- Zimmer Development Frank T. Grzandziel — Zimmer Development Rod Young — Zimmer Development and the revised "Underground Infiltration Trench 5- . P. 1 \/ rt COMMUNICATION RESULT REPORT ( JUN.20.2000 11:50AN ) TTI NCDENR WIRO €= 1'..E. MODE OPTION ADDRESS (GROUP) ESULT PACE -------------------------- L122 €•iEMOR`t T-' ' 9-3429141 0€C P. 1/1 a --____________________ F,En50N FOR ERROR E-1) HANG UP OR LINE FAIL F--3) NO +INSWEP, E-2) BUSY E-4) NO FACSIMILE CONNECTION State of North Carolina Department of Environment and Natural Resources Division of Water Quality Wilmington Regional Offioe Jam cs B. Htult, Governor Bill Holman, Secretary FAX COVER SHEET Dee: June .20, 2000 To: Mark Hargrove, P.E. Company: Eastivind Engineering Company FAX : 342-9141 (Local) DWQ Stormwater project #SWS 000612 Project Name: Kinko's Retail Store M SSACE: Mark: Upages: 1 In: Linda L,ewi AQL-- Wa eetion - Stormwater E.A.X #: 910-350-2004 Phone #: 910-395-3900 I have doge a quick review of the project. The following items must be provided by July 20, 2000, in order to continue the review. 1: please provide a signed agent authorization from Mr. Zimmer for Mr. Collier to sign the application, or have Mr. Zimmer sign the application. . ` State ofNorth Carolina Department of I-Ltn7ironment and Natural Resources Division of Water Quality Wilmington Regional Office James B. HUM, Governor Bill Holman, Secretary FAX COVER SHEET Date: .tune 20, 2000 No. of Pages: 1 To: Mark Hargrove, P.E. From: Linda Lewis Company- Eastwind Engineering Company Water Qwdity Section - Stormwater FAX #: 342-9.14.1 (Loeal) FAX #: 910-350-2004 Phone #: 910-395-3900 DWQ Stormwater Project #SWS 000612 Project Name: Kinko's Retail Store MESSAGE: Mark: I have done a quick review of the project. The following items must be provided by July 20, 2000, in order to continue the review. Please provide a signed agent authorization from Mr. Zimmer for Mr. Collier to sign the application, or have Mr. Zimmer sign the application. 2. The classification of Hewletts Creek is SA, therefore, the design storm is 1.5", but the calculations use a 1" storm. The required volume to store is closer to 2,800 cubic feet, not.2,100. 1 f you can provide a chlorides test, taken at least 3 days after a rainfall event, which indicates that the chlorides concentration is less than 500 ppm at a point in the receiving stream that is at least 1/2 mile downstream from the proposed discharge point, then you will be allowed to use a l" design storm. 3. If the invert of the 15" overflow pipe is 43.75, and the bottom of the trench is 40,25, then the trench height is only 3.5% not 4.85' as reported on the supplement. The overflow invert must be raised to 45.1, or you need to put in a smart weir to separate the overflow from the trench. You'll need to show a revised D1- I detail, if you choose the latter. In order to make this system truly offline, as required by the rules, each catch basin must have it's own overflow pipe. 4. The trench detail on sheet C9 indicates that the trench height is 4.52'. Where did the 4.85' used in the calculations and shown on the supplement come from? Please revise the detail as needed to show the correct height. 5. Please label the 36" pipe diameter and the overall trench width on the trench detail. S:1WQSISTORMWA'r1LI'-TTERS1000612.JUN 127 Cardinal Drive Extension, Wilmington, NC 28405-3845 Telephone (910) 395-3900 FAX (910) 350-2004 An l;qual Opportunity Affirmative Action Employer 5 I � ri T T � T T�� T , EAS l « IN D LN GINS+ ERIN G COMPANY, LLP OLEANDER DRIVE - 1VIIAIINGTON. N(; 28403 - (910)34_-9144 - FAX (S)IM 84'_-IJ141 ZDC # Date June 5, 2000 TO: Ms. Linda Lewis N.C. Department of Environment And Natural Resources Division of Water Quality ] 27 Cardinal Drive Wilmington, NC 28405 We are sending the following: [ ] Bluelines [ ] Samples [x] Originals [ ] Submittal [ ] Specifications [ ] Addenda [ ] Shop Drawings [ ] Copy of Letter [ ] Other: Reports VIA: [ ] Mail [ ]Overnight Letter of Transmittal Kinko's Retail Store 4700 Oleander Drive Wilmington, NC Stormwater Permit Application Purpose: [x] For Approval [ ]Returned for Approval [ ] Approved as Submitted [ ] For Your Use [ ] Approved as Noted [ ]As Requested [ ] Other: [ ] 2"d Day [ ] Other: Quantity Drawing/Specl Latest Date Description 2 sets 5/22/00 Preliminary Construction plans for Kinko's Retail Store. 2 application 5/22/00 Permit Applications I check $420.00 Application Fee J Ads 4.0. T 1JF Remarks: I have provided two sets of plans and one original and one copy of the permit application. If I can be of any assistance, please call so we can discuss the project. Thank you. Copy: 70,11IN 'VE BY: Robert P. Balland, Desi=n Engineer 2000 EASTWIND ENGINEERING COMPANY, LLP