Loading...
HomeMy WebLinkAboutSW8000534_APPROVED PLANS_20000825STORMWATER DIVISION CODING SHEET POST —CONSTRUCTION PERMITS PERMIT NO. SW DOC TYPE ❑CURRENT PERMIT APPROVED PLANS HISTORICAL FILE ❑ COMPLIANCE EVALUATION INSPECTION DOC DATE YYYYMMDD e utq ylj 00-t I ee-rgne rna aar�erm ■isrsroc TYPICAL SIDEWALK AND WHEEL CHAIR RAMP DETAIL i• CT I-K SEE PLAN ''�,Tt:N.a I Nei • - A •ENERGY DISSIPATOR- mom 1. SIDEMTALIO THIOKw" SftL BE r III N01'rm OTHE F I5E, 2. CONIIRACIION JONT'S (U.) SPACE SAME AEI SID NX 11VIT L 3. TFMCKEN SIDEWALK TO d" AT DRIVI MIAYS, 4. THICLCEN SIDEWALK TO e` IN LAST 3' NR'IERE IT ABUTS PA%%IIENT WITH N0 CURET. E1 1 2/ AN5IM DINT RE U AT 50' Aux. Al SIDEWALK .Il S, AT AND AS NOTED ON SITE PLAN. e. PROVIDE A LAYER OF 15 BLM FELT BEnVEEN WALK AND ADJACENT PAR04LUNG CURS OR STR CTURL 7. REINFORCE w/Bxs-10/10 W.W.AL BW MAX. SPACM �.W U U Q / / .T%- PLAN J41NT TOOLED T 1�'R TTxV ED J/WrIT E VANSION \ JOINT MATERIAL EXPANSION JOINT (E.J.) ONTRACTION J01NT C.J. 51Q.E ALK JOINT DE I HTS b 3/8" AIRCRAFT CABLE, CONT- ASPHALT I-- 4 PEBAR 0 0 O.C. x 12" EXTRUDED R NTS 0' TO 1' 4'PAVED SHOULDER 2" 1-2 (NCDOT) EXISTING PAVEMENT 2' H-BINDER 1 4" PER FOOT - - - - - -- 4X A,n LATE WINTER do EARLY SPRING TEMPORARY GRASSING DETAIL "'4F �- ,. ,.';.,.. • -. • .r.•F,,_.�ti;.;:.;.^: 1:1 SLOPE SEEDING MIXTURE a- ABC STONE I DTI I I I -SPSM grain NOTE- "pp�NT yT� �p gE nua lespedeza (Kobe in 120 1' DONE BY N:�07SFORCES. Piedmont and Coastal Plain. Korean in Mountains) soTYPICAL PAVEMENT WIDENING SECTION �� ^Tara! Isapedexo when durvtlon of temporary cover Is not to extendJune. NTS SEEDING DATES: AEourtdrn - Aban 2500 ft: Feb. 15-May 15 Below 2500 1t< Feb. 1-4ky f Piedmont - Jon. I -May I Coastal Plain - Dec. I -Apr. 15 SOIL AMENDMENTS Follow recommendations of soli Note or Y,000 rb/core ground agrtvul- tural I.I.I a and 750 lb/ccre 10-10-10 I&VIIII MULCH '� MAN PERMANENT GRASSING DETAIL ,00 APPLY 40 LE/AdtE srltAw. ANCHOR STRAW BY TACKING WW rHI ASPHALT, NEKi, TTN OR A MULCT ANCHORING TOOL A DISK MIRH BLADES 5ET NEAIRLY STRAIGHT CAN BE SEEDING MIXTURE USED AS A MULCH ANCHORING TOOL. RATE [la/acre, MAINTENANCE M Rderfte IT growth Is not fully odequabs Reeled. refertiNze and rnuich inn- GERMAN 11ERANJDAGRM 10 111 10 medlotely following erosion ar Other d*nwge IIALL FESCUE 50 SEEDING NOTES TEMPORARY SUMMER GRASSING DETAIL 1. WHERE A NEEAiT APPEWJ MCE IS DESIRED. OMIT SEER1CFA SEEDING FIXTURE L USE COMMON BERUDAMASS ONLY ON ISOLATED SITES WHEFIE IT CANNOT FIE - BA4 (Iblacrel CONE A PEST. 6ERAAJDACRASS MAY BE: REPLACED WTrH 5 lb/acre CENTIPEDEC RASS. a°" M""ET 40 SEEDING DATES IN THE PIEDMONT AND MOUNTAINS, A SMMJ--STEMMED SUNDANGRASS WAY BE NI I - JULY 15 SUMMUTED AT A R;AM OF 50 LB/ACRE. SEEDING NOTES SOIL AMENDMENTS MOUNTAINS - MAY 15-AUG. 15 APPLY LIME 00 FERTILIZER ACCORDINO: TO SOIL 755T5, OR APPLY 3,000 lb/rare PIEDMONT - MAY 1-AIM 15 GROUND AGRICULTURE LIN67ONE AND 500 tb/acre 10-10-10 FERi1LII COIASTAI. PLAN - APR 13-AIG. 15 SOIL AMENDMENTS MULCH FOLLOW REMMMENDATTONS OF SOIL TESTS OR APPLY 2.000 L S/ACRE GROUND AGRICIJI- RURAL LIMESTONE MD 750 LB/ACRE 10-10-10 FEAItiJ2ER APPLY 4,000 6 oars GRAIN SERAWYOR ER1111+ALEINT COVER OF ANOTHER SUrT1MEI E MULCH. WTM30N0 WIN ASPIULT. ROHHO• OR NETTING OR BY CRIMPING W IH A MULCH ANCHORING TO%L. A DISK WITH BLADES SET NEARLY STRAIGHT CAN B6 MULCH USED AS A MULCH ANCHORING TOOL. APPLY 4,0130 LB/MORE 5TRANf. ANCHOR STRAW BY TACKING W H 1 S' MT. NETTINOti OR A MULCH oRtNc TOOL A DISK W" BLADES SET NEARLY S RAKAiT CAN BE MAINTENANCE USED AS A III ANCHORING TOOL RUMLQE THE FOLLOWING APRIL MOTH eD Ib Dare NITROiE11. REPEAT AS O R M4H MAINTENANCE EAT APPEAI DESIRED, OMITY ►ND MIOW OFOHMATEN AS YEAR. WHERE A" IS REFERIII IF GROWTH 6 NOT FULLY ADEOUATE. Rom, REFEit1t.¢E AND NULCH $1- FALL -WINTER MEMNLY FOLLOWING EROS N OR oTHER DA"E: PERMANENT GRASSING DETAIL TEMPORARY FALL GRASSING DETAIL SEEDING MIXTURE SEEDING MIXTURE SPEM IRATE _[t1b/2Cre1 SPEIM iiATE fib/am) TAIL FE9 E SLENDOF TWIG OR } 1 0 ��) 200 RYE (GRAIN] SEEDING NOTES SEEDING DATES &4NUARY - APRIL MOUNTAINS - MO. 15-DEC. 15 AUG= - DECaMBER COAST& PLAN and PIEDMONT - AW. 15-DEC 30 SOIL AMENDMENTS SOIL AMENDMENTS APPLY UK NO IFER 1lRFR ACCORDING TO SOIL TESTS, OR APPLY SA00-5,01710 b/acre GROUND P0VC LTIJRAI. UAESIONE THE LOWER RATE ON SANDY SONS) P ND FOLLOW SOIL TEST'S OR APPLY 2.000 LB/ACRE GROUND AIGRICUL7URAL 1,000 b/acre 10-10-10 FERTILIZER. LIMESTONE AND 1.000 LB/ACRE 10-10-10 FEriTILIZER. MULCH MULCH APPLY 4,000 lb/me GRAIN STIR0 OR E=WLE NT COVER OF AIORIER SURAU CRIMP APPLY 4,000 L!4/AO:RE STRAW. MIGFI4R STRAW BY TACNOfNO WITH ASPHMT, NETi1N0, APPLY A MUULCH ANGHORI NG TOOL, A DISK UTH DLADES SET NFASRLY STRA III. CAN BE MCH• M 01,10R STRW BY TACKING WITH ASP►OALT, ROVING. OR NEITIVG OR ErY - IIIBE WIN A MULCH CH N CHOF i'OQL. A OrSK WITH BLADES SET NEARLY SfRA01HT GW BE EJSm AS A MULCH ANCHORING TOOL USED AS A MULCH AINCHORM TOOL MAINTENANCE MAINTENANCE Re"I a d refertAize damaged areas dnmecIlWely. Topdrees with 50 lb/core It nitrogen In March. N R le necessary to extend temporary *over red F�J2E ACCORDING 10 901L 7EST9 OR APPLY 40 b/arn NRROO,fN IN JANNL WRY OR FEBRIYNOY, 40 b IN SEPTEMBER AND 40 b IN NOVEAMEER. FROM A 12-4--Q or orKarean ountnTr lespedem M Klattee Fe or early March. Coo WARM WEATHER, AS 10-4-6. OR SMM TURF STAND L' q ' T TO DISEASE. RESEED, EER ITUZE, AND fNEEDEA DAUOED AREAS MNIIIATEL.Y. MOW TO A HEIGHT OF 2.5-3.5 PC CS SITE WORK NOTES e' 1. THE CONTRACTOR SHALL VISIT THE SITE AND BECOME FAMILIARIZED WITH EXISTING j TOP OF BANK EMBANKMENT CONDTIONS BOTH ON AND IMMEDIATELY ADJACENT TO THE SITE. EL 2. CLEARING: CONTRACTOR SHALL REMOVE ALL TREES AND VEGETATION WITHIN LIMITS I 'd OF CONSTRUCTION UNLESS OTHERWISE DESIGNATED TO REMAIN. FLOOD POOL EL 52.5 3. GRUBBING AND STRIPPING: CONTRACTOR SHALL RAKE AND REMOVE ROOTS, STUMPS, i I VEGETATION, DEBRIS, EXISTING STRUCTURES ABOVE AND BELOW GRADE, ORGANIC ■ Z MATERIAL OR ANY OTHER UNSUITABLE MATERIAL WITHIN LIMITS OF CONSTRUCTION. NORMAL POOL NORMAL POOL. EL. 51.0 4. MUCKING: CONTRACTOR SHALL COORDINATE WITH OWNER AND THEIR GEOTECHNICAL EL. 51.0 REPRESENTATIVE TO COORDINATE REMOVAL OF ANY SOFT AREAS. 5. DISPOSAL: CLEARED. GRUBBED. STRIPPED OR OTHER WASTE MATERIAL SHALL BE 1 6 REMOVED FROM SITE AND DISPOSED OF IN A PROPERLY PERMITTED FACILITY. INV. 49.E ! I 6. FAIL AND COMPACTION SHOULD COMPLY WITH GEOTECHNICAL REPORT- I FOREBAY 3 7. THE CONTRACTOR SHALL NOTE THAT THE GRADING PLAN MAY NOT REPRESENT A BALANCED ! I 1 BOTTOM EL 48.0 MAIN POOL EARTHWORK CONDITION. THE CONTRACTOR SHALL BE RESPONSIBLE FOR CUT AND 1 FILL QUANTITIES AND COMPLETE INSTALLATION TO SPECIFIED GRADES. ! 8. THE CONTRACTOR SHALL FURNISH SUFTARLE BORROW MATERIAL FROM AN OFF -SITE 3' . BOTTOM PROPERLY PERMITTED FACILITY AS REQUIRED, 1 1.0'7 EL. 46.0 9. THE CONTRACTOR IS RESPONSIBLE FOR THE LOCATION AND PROTECTION OF ALL 75 4� S 2'35'09" W EXISTING UTILITIES DURING CONSTRUCTION. BEFORE COMMENCING ANY EXCAVATIONS CN`�'J'"" W I IN OR ALONG ROADWAYS OR RIGHT-OF-WAYS, PUBLIC AREAS OR IN PRIVATE �(� �C QAY (�T�(� EASEMENTS, THE CONTRACTOR SHALL NOTIFY ALL APPROPRIATE PERSONNEL OF .u•. ,I` QUENN_ POND EQ- DEB J.? 3EMION 10. THE CONTRACTOR SR INTENT TO XHAIL BE RESPONSBLE TO COORDINATECAVATE, IN WRITING, NOT LESS THAN 1 DISCONNECTION/ ONNYS ECTION/ IOR TO EXCAVATING. � �'� NTS RECONNECTION AND/OR THE RELOCATION OF ALL EXISTING UTILITIES WITH 75' � { APPROPRIATE PERSONNEL �-'--�--+I 759 Q 11. EXISTING SURVEYING PERFORMED BY AND SUPPLIED BY THE OWNER. ! I C+ 12. THE CONTRACTOR SHALL FIELD VERIFY ALL DIMENSIONS AT THE SITE. FURTHERMORE; I J THE CONTRACTOR SHALL REPORT ALL DISCREPANCIES OR QUESTIONS TO THE ENGINEER y I1 Q PRIOR TO INSTALLATION. 13. THE CONTRACTOR SHALL PROVIDE ANY AND ALL LAYOUT REQUPEO TO CONSTRUCT ;I BAH HIS WORK UNLESS OTHERWISE DIRECTED BY OWNER. I lit 14. ALL PVC UTILITY MAINS SHALL BE INSTALLED WITH A MINIMUM OF 36" COVER I T „ AT FINAL GRADE. 15. ALL SERVICE CONNECTIONS SHALL BE INSTALLED TO MEET ALL LOCAL AND STATE CODES. 1 I 6 M! II : �I+�Q I ' en METERS, TAPS, MATERIALS, WORKMANSHIP AND ALL FEES SHALL BE THE RESPONSIBILITY " - OF THE CONTRACTOR AND SHALL COMPLY WITH ALL REQUIREMENTS. I , 2 - 3 !�\a• I- 16, ALL PAVEMENT, BASE AND SUBGRADE SHALL COMFORM TO NCDOT STANOARDS INCLUDING COARSE AGGREGATE WORKMANSHIP, MATERIALS AND EQUIPMENT. APPROPRIATE BARRICADES, SIGNS, LIGHTS ea z ! I 1� OOR OTHER AI TRAFFIC CONTROL AND DE YE7PSHALL H LL BE PROVIDED IN ACCORDANCE WITH NCDOT r ! Lki TYPICAL GRASS SWALE 17. ALL AREAS SHALL BE GRADED FOR POSITIVE DRAINAGE. THE CONTRACTOR SHALL REPORTANY i lilt! Ly TEMPORARY GRAVELLED SLOPEDCREPANCIES TO TO DRAIN AWAY FiROMENGINEER BUILDINGS AT ALL TIMES, INSTALLATION. ALL AREAS SMALL BE M Q ! I I 18. CONCRETE STORM DRAINAGE PIPE SHALL BE CLASS III WITH RUBBER GASKETED JOINTS Q- C O N STR U CTI O N ENTRANCE URER`S AND INSTALLED IN ACCORDANCE WITH MANUFACTREQUIREMENTS. O I I 19, USE WHITE LANE MARKING PAINT FOR ALL PAVEMENT MARKINGS. PAINT SHALL BE A I OLL NTS CHLORINATED RUBBER ALKYL), FS TT-P-115, TYPE III, FACTORY MIXED, QUICK DRYING, NON BLEEDING. REFLECTIVE MATERIAL MAY BE ADDED AT OWNERS OPTION FOR LJ I I : 20. NIGHT REFLECTING. DUCTILE IRON SHALL BE CLASS 50. 6 I Q) i 0.75 21. CONCRETE FOR WALKS, CURBS AND DRIVES SHALL HAVE A WNIMUMN COMPRESSIVE I 11e STEEL PI E A 22. STRENGTH OF 300D PSI O 28 DAYS - AIR ENTRAJNED. FIELD TESTING SHALL BE DONE BY AN INDEPENDENT TESTING LABORATORY PAID FOR 0 l I CD 18" R I BY THE OWNEP,. FURTHER TESTING REQUIRED DUE TO A FAILED TEST WILL BEi I PAID FOR BY THE CONTRACTOR. I _ I 23, Sri GEOTECHNICAL REPORT NO. ___ , DATED ___. BY L` t I FOR ADDTICNAL REQUIREMENTS. t,_I CONSTRUCTION SEQUENCE l ! 1. NO CUT SLOPE OR FILL SLOPE SHALL EXCEED A RISE OR FALL OF ONE FOOT FOR 4 I I EVERY RUN OF 3 FEET (1 VERTICAL TO 3 HORIZONTAL).) WILL ALLOWED TO EXIT THE SITE. ALL EROSION SHALL BE CON -ROLLED 2. NO SEDIMENT BE INCLUDING SIDE SLOPES DURING AND AFTER CONSTRUCTION. $$s PLAN 3. INSTAL. PRIMARY EROSION CONTROL MEASURES 9EFORE BEGINNING CONSTRUCTION INCLUDING BUT NOT LIMITED TO GRAVELLED CONSTRUCTION ENTRANCE, SILT FENCE, CHECK DAMS, ETC. r INSTALL ALL SECONDARY EROSION CONTROL MEASURES AS SOON AS POSSIBLE AFTER BEGINNING j ! GALV. BAR GRATING - 1" x 1/8' BEARING BARS. FASTEN WITH CONSTRUCTION. MEASURES TO 13E INSPECTED AFTER EACH RAJN. E _ TYPE J CLIPS. ATTACH TO 1-1/4' x 1-1 4- x1 /4' GALVANIZED / ATTACH GALVANIZED WIRE 4. ALL EROSION CONTROL FULL ANGLE FRAME. MIRROR FRAME TO TOP OF 3 OUTLET STRUCTURE. CLOTH OVER SMALL DIAMETE 5• SILT FENCE, SILT TRAPS, AND INLET PROTECTION TO BE CLEANED WHEN HALF IF APPLICABLE, CONSTRUCT PROPOSED RETENTION POND TO ACT AS A SEDIMENT IN BAS I TOP OF BANK 1 ORIFICE (B MESH .020 WIRE DURING CONSTRUCTION. REMOVE ACCUMULATION OF SILT AS REQUIRED TO ALLOW PROPER Ln 54 O L ' FUNCTIONING. RESTORE POND TO DESIGN LEVELS AT THE COMPLETION OF CONSTRUCTION. + I FL, 0D POOL 52.5 6. IF APPLICABLE, INSTALL DROP INLETS WITH INLET PROTECTION TO ACT AS SILT TRAPS; r DURING CONSTRUCTION. REMOVE ACCUMULATED SILT AS NEEDED TO PREVENT SILT FROM t 18"C 7. ENTERING STORM DRAIN PIPtNG. A 4" LAYER OF TOPSOIL SHALL BE APPLIED TO ALL NEW AREAS TO BE GRASSED. !� , I I S. ALL DISTURBED AREAS SHALL BE SEEDED IN ACCORDANCE WITH SEEDING SCHEDULE AS I I SOON AS POSSIBLE BUT NO LATER THAN 30 DAYS AFTER DISTURBANCE.' { ALL SLOPED AREAS TO BE SEEDED NO LATER THAN 15 DAYS. 9. MAINTAIN ALL EROSION CONTROL MEASURES UNITL PROJECT IS COMPLETE, u, INY�5.1„2 1&ORMAL Pool 5]. INVa���• 10. MORE STRINGENT MEASURES MAY BE REQUIRED TO HALT EROSION IF THOSE ON THIS ! � PLAN PROVE TO BE LESS EFFEGT'IVE. a 1 ` IN-=�g• 11. REMOVE ALL TEMPORARY EROSION CONTROL MEASURES UPON COMPLETION OF CONSTRUCTION. „ I 1 ALL PERMANENT MEASURES SHALL BE WELL ESTABLISHED PRIOR TO PROJECT COMPLETION.V3 TEMPORARY MAINTENANCE REQUIREMENTS I + GRAVEL T. CONSTRUCTION ENTRANCE MUST BE MAINTAINED TO PREVENT MUD OR SEDIMENT FROM LEAVING SITE. PERIODIC TOP DRESSING WITH TWO INCH STONE MAY BE REQUIRED. FILTER 2• ALL EROSION AND SEDIMENT CONTROL PRACTICES WILL BE CHECKED FOR STABILITY AND 1 I I -� OPERATION FOLLOWING EVERY RUNOFF -PRODUCING RAINFALL, BUT IN NO CASE LESS THAN ONCE EVERY WEEK. ANY NEEDED REPAIRS WILL BE MADE IMMEDIATELY TO MAINTAIN ALL ! Il �O70M6,0 PRACTICES A5 DESIGNED.SECTION THE SEDIMENT REACHES 2.0 FEET A - : A 3. SEDIMENT BASINS WILL BE CLEANED WHEN LEVEL OF BELOW THE TOP OF THE RISER. #57 GRAVEL WILL BE CLEANED OR REPLACED WHEN THE I DETENTION POND OUTLET STRUCTURE 4• SEDIMENT POOL NO LONGER DRAINS PROPERLY, SEDIMENT.5EEEP AT THE FENCE. SEDIMENTTHE ABOUT FEN E SEDIMENT FENCE BE EPA♦ DIT AS�NECESSSSARRY E f ! � TO MAINTAIN A BARRIER. NTS 5. ALL SEEDED AREAS WILL BE FERTILIZED, RESEEDED AS NECESSARY, AND MULCHED ACCORDING x TO SPECIFlCATIONS IN THE VEGETATIVE PLAN TO MAINTAIN A VIGOROUS, I ! DENSE VEGETATIVE COVER. �.."�^"7A '�°"-. q•#�'i ! I �,Irre,.:,..no4s.r�xieoc?a. hag „i£ t 4 p�ao1J�oo�'y r�, � I `� V'V� trnorr•..,-,�pr.- ..�.•.yf� Jf9�r-•'.rn1,Wp�.s=•� p.�..• f l4 I POSSIBLE WELL y A vpT 1 j SITE I W I I I r tKbin CL r- (350) h STREETYARD : I ` jr . I I ! + - s Rx I:K� to ! � N7 00 5 y +; 45' hex 55, R.4 5:1 OPEN GRASS SWALE �h �- 9-, _ �� Q htK. ! I IN 50.15 ,H o (1300) 14.5 6" SEWER SERVICE N BURGAW ST. HELENA 0 r , Q 72 Ld s Z S. R 141 VICINITY MAP NTS LIMITS OF DISTURBANCE CLEAN EXISTING ROADSIDE SWALE NOTE NO WETLANDS ON THIS SITE. SITE DATA DISTURBED AREA 3.15 ACf ZONING 92 BUILDING AREA 7,425 SF PARKING SPACES REQUIRED 15 PARKING SPACES PROVIDED 15 ASPHALT AREA 27,080 SF CONCRETE AREA 1.200 SF LANDSCAPING AREA REQUIRED 2,000 SF LANDSCAPING AREA PROVIDED 2,000 SF 4 1 50GRAVELED CONSTRUCTION 305 ��S ± ! i ENTRANCE f ��-MATCH EXISTING ASPHALT 0 1.0% MIN. to � �� I � � GRADE 55. I I x MIN. 36" BURY (4 CLEANOUTS 0 75 MAX.) + • 5"s CONCRETE CONCRETE -~ -- , I EXTRUDED FLUME - o + CURB :. Y ~52.7 _ �. 2000 GALLON SE ;'TIC TANK-, _ • -�.�� - _ - ��,a� v °`o~ h�0 + PURAFLO PEAT BIOFILTE ,RS g°` _ . _ , ��r _ - C F�U.�p 004a Q +�' I 1 20' EXISTING 18" RCP A 10 NOTE: SANITARY SEWER SYSTEM DISCHARGE PUMP BASIN I I INV. 50.3 DESIGN BY OTHERS SHOWN 1 hti �� I FOR INFORMATION ONLY. III ' I + �y cc o I UV ENCLOSURE 20 WELDED WIRE FENCE w/-,r,Ir:IA1•.. �, T-POST 0 10' O.C. C,I I I ' OUTLET I �I ! I I '� STRUCTURE....' o o r `- - 0400 ! BACKWASH VALVE tx tK' ,� 0000 ! I f DRIP IRRIGATION FIELD-' >lrlT""'I18 LF LI• R`� {' 6.I! f !fy , �� ..,,.•.arl'pgc?is7i�nv..''?'+"7� - rl,�•,.msg lot 18" F.E.S. ! I �lb MAWOLD 500.00' ,.. I NV. 50.5Oj r Br2'00" `N 15'X15'X18" E.D. I SDMH NO. 1TOP I i r NV. 54.9 PROPOSED DETENTION POND ! TOP OF BANK 54 O j g' VAW FLOOD POOL 52.5 ! ! 1 =40 NORMAL NORMAL POOL 51.0 j EXISTING DITCH ! I r ��',- - ,--- -.tom i _sa �_ - a-�aa. +•_La ..l .. Y . - - . _ , rs �i-----ai- APPnOVED NORTH CAROLINA EIvVi' :'IJEr'>iTAL MANAGE1.1ENT CCa"MISSION DIVISION OF YiATER QUALITY Date25,4UG2CG`d �(-�- Stormwater Pemit No C ZQ O i REVISIONS Date Description By H W A w A 0 L) z U p.I W z 0 z-- � I--H :1 P4��0 w F-1 w w W z z [] o z A w Z o WW z w 4 W z V3 V L 100 a as t'I w ° w �U III 1►4 4-) 1�1 ti Ins I I� -A-A z C0 co Z w Z N CIA a oa 0� N E--+ co r t5 a w M>L1IlII/, X20 X12 E.D. " RECEIVED JUL 2 8 2000 ' SEAL DWQ PROD # 5u; z� CY�U SZ�( i 17374 •: �s �� Eli GEND .........., - - ;; - -- - EXISTING CONTOUR ,`AIJJrtIItMIM�Vr EXISTING SPOT ELEVATION DATE 07-27-00 PROPOSED SPOT ELEVATION DESIGN PGT DRAWN KP -- �- STORMWATER RUNOFF DIRECTION •' CONCRETE AREA (175) LANDSCAPING w/AREA C 1 " " '' LIMITS OF DISTURBANCE^ I DATE P1�NT'1E,'A SHEET 1 OF 1 00023 Z NOTES: 1. SIDEWALK THOCNEZ SHALL BE C UNLESS NOTED OTHERWISE. 2 OWM CTION AMM (C.J.) SPACE SAME AS SIDEWALK WNDTH. loom 3. THICKEN SIDEWALK TO 6' AT DRN8MIAY& 4. THO(EN SIDEWALK TO 6' IN LAST 3' WHERE T ABUTS PAVEMENT WITH 140 CURB. 5. 1/2' EXPANSIOiV� .) REQUIRED AT 'SO• MAY. AT SIDEWALK J NS, AT AND AS NOTED ON SITE PLAN. 0. PROVIDE A LAYER OF 15f BLDG, FELT BETMEEN WALK AND ADJACENT PARALUNG CURB OR 7. REINFORCE w/8M6-10110 W.W.M. CURB 50• Mm SPACM T 4: 0 v CUK m ar-W+e esrr ��I w!!!L ^^CWil1 RIW� TYPICAL SIDEWALK AND WHEEL CHAIR RAMP DETAIL A 02- SEE- PUN -1♦��.�:wii�B�� .�BifEE PLAN 5LJ%FABRIC, ENERGY , rA, s 1/S'R TOOLED II PL�MiAI BLDG.-ST't X rURE 1/4'xl' DEEP w/AN 1 /a-R TOOLED JOINT w JOINT MATERIAL EXPANSION JOINT (E.J.) CONTRACT104 -JOINT (C.J) I T 7:L F� NTS 3/8" AIRCRAFT CABLE, CONT ASPHALT T 4 R,EBA.R 0 -0 O.C. x 12" XTR I--D CURB NTS 0' TO 12' 4' PAWD OLILBE r--2' 1-2 (NCDOT) E%)STING PAVEIUENT--� 2" H-BINDER T ,1 4" PER FOOT LATE WINTER do EARLY SPRING - - - - ` - - �� Mr X TEMPORARY GRASSING DETAIL " ` _~ y ° ': s `_ ," 1:1 SLOPE SEEDING MIXTURE 8" ABC STONE: T� I ,�- RATE f1b/29ne =rain NOTE. uag lespedezo (Kobe In 12i3 1. RIP)NG IS TO gE Piedmont and Coastal Plain, DONE 6`" NCD07 FORCES. Korean In Mountains) d TYPICAL PAVEMENT WIDENING SECTION Crnit annual leepedeza s!hen duration of temporary cover Is not to extend beyond Jun.. SEEDING DATES: Mourtolm - Above 2500 It: Fsb. 15-May 15 Below 2500 it: Feb. 1--IIay 1 Piedmont - Jon. 1-May 1 Coastal Plain - Dec. 1-Apr. 15 SOIL AMENDMENTS Follow reconxnendabone of sag tests or app[�r 2.000 lb/son ground agrioul- turol Arnestmet and 750 Ib/psis 10-10-10 fi1 Uft r. SPRING -SUMMER MULCH PERMANENT GRASSING DETAIL APPLY 4,000 LB/ACRE Sr W. ANCINOR STRAW BY TACKING MIRH ASPiNALT, NE171i10, OR A MULCH ANCHORING TOOL A DISK MM BLADES SET NEARLY STRAIGHT CAN BE SEEDING MIXTURE USED AS A MULCH ANI }IORMNG TOOL RATE ab n MAINTENANCE 30 RefwMze If growth Is not nd fully adequate. Reseed, refertiffm amu" ten- COMIAION BfRMIJDAGRISS 10 modlately following erosion or other dorrlage. T FESCI�IE� 50 SEEDING NOTES TEMPORARY SUMMER GRASSING DETAIL 1. NH ERi A NEAT APPEARANCE IS DESiRM OMT SEEDING MIXTURE 2. USE COMMON BERUDAGRASS ONLY ON ISOLATED STES **FE T C►mn SE- - MM COME A PEST, BERWDAGRASS MAY BE REPLACED MTH 5 Ib/ass CENTIP DEMOSS. -spem- CERI" 'LET 40 SEEDING DATES IN THE PIEDMONT AND MOUNTAINS. A SMALL STEI,AIED St1NDANORASS MAY BE SUM MIMED AT A 810E OF 50 LB/ACRE. APRL 1 - DULY 15 SEEDING NOTES SOIL AMENDMENTS MOUNTAINS - W 15-AM 13 APPLY LIVE NO FEIM20t ACODRDMIC TO SIN. iE5T5, OR APPLY 3,cm Ib/nen PIEDMOW - MAY 1-AM 15 CROUHS AGRICULTURE LIMESTONE AND 5D0 lb/acm 10-10-10 FERTILIZEF. COASTAL. PLAN - APR 15-AM 15 SOiL AMENDMENTS MULCH FOLLOW REOOMMJENDA GNIS OF SOIL TESTS OR APPLY 2,ODD LS/ACRE GROUND Ac1RICUL- 1LNtAL LIMESTONE AND 780 LB/ACRE 10-10-10 FERTILZER. APPLY 4,D00 IbJoas MMSTfTANOR ECUVALENT CM OF ANOTHER Sl1TABlE gyp{, ANCHOR BY TACKING MRH ASPHALT, ROWIG, OR NETTING OR BY ' RINPN0 MAT14 A MULCH ANCHORING TOOL.. A DISK WnH BLADES SET IlIWLY STRAI NIT CAN BE MULCH USED AS A MULCH ANCHORING TOOL APPLY 4,000 LB/ACRE STRAW. MQCHDR STRAW BY TAMNG WITH ASPHALT, NETTING. OR A MULCH ANCHORING TOOL A DISK WITH BLADES SEf NEARLY S wiw CAN BE MAINTENANCE USED AS A MULCH ANCFIOWQ TOOL. RFFERTILCM THE FOLLOWNG APRIL WITH 50 b/mm NTiROf M REPEAT A; GROWiH MAINTENANCE REQUIRM � SANDONLY OMM 0 EN AS M "EAT APPEARM CE iS KOM REFFRI LIZE IF GRONRH IS NOR FULLY AOEOUXM RESEED. RI}E7if117ZE AND MULCH Mi- ��--�+• FALL -WINTER MEDIATELY FOLLOWING MSION OR OTHER DAMAGE PERMANENT GRASSING DETAIL 'TEMPORARY FALL GRASSING DETAIL SEEDING MIXTURE SEEDING MIXTURE APE= BAV ( all TALL FESCUE (BED of TWO OR = Rye (grain) 120 M (CIAN)PRDvED VARIETIES) 25 SEEDING DATES SEEDING NOTES JANNUARY - AF°RIL MOUNTAINS - AM 15-DEC. 15 ALKM - DECEMM COASTAL PLAN and PIEDMONT - AUG. 15-DEC 30 SOIL AMENDMENTS SOIL AMENDMENTS APPLY LIW AA FifRT1LIMR ACCORDING TO Sal TEsrs Olt APPLY 3.000•-5.000 b/mm FOLLOW SOIL TESTS OR AMPLY 2.000 LB/ACRE GROUND AGRICULTURAL GROUND A0RaXTURAL LIMESTONE THE LOWER RATE ON SM13Y SONS) AND 1A00 b/am 10-10-10 FUMZEFL LIMESTONE AND 1.000 LB/ACRE 10-10-10 FE"UZER. MULCH MULCH APPLY 4,000 b ass OUR STRAW OR EOIVOILENr COVER OF ANOTHER !UITABL.E APPLY 4,000 LB/AMSTRAW. ANCIHOR STRAW 8Y TACidHfi WITH A5P►tA1T, NETTING, OR A WJDH ANCHORMNG TOOL A DISlc WITH BLADES SET NE/RI.Y STRAIGHT CAN BE ORAS MULCH STRAW BY TIiCKiNO VW ASPHALT. ROIANG, OR NETTTIG � )R BY CRM4P- WED AMANCHORING TOOL A DISK WITH BLADES SET NEARLY . TRAXAHT CM A M LIUM ANCHORNVG TOOL E USED AS A IA ANc:IKIRING iAOL A AICFi BE MU MAINTENANCE MAINTENANCE Rap* and referifte dwagstl areas Irnme"91y. Topdress with 50 Ib/oon In Mardi. M R Ts p - to tentomy FtRTf1M ACODRDMIO M SOiL MM OR APPLY 40 b/acn MfROGE7N IN JNNU/Af M AND 40 IN NCOVF tR" FROiI A i 7A-"V a. If nitrogen I ry extend ov-Pl. nd OR FTD3RL1A1[!T. 40 Ib SUgUBER b or Korean (Mou�ptaL�lespedem In Klaus Febbnnwryyor eeorif MMarrcand dL WNW a'MIW.AI�fiM AS SWAII �MVCREktO STAND L OISEASAVOID MMILIZER �tT:D FERIILIM N �M AREILS NMEDMTELY. W* TO A HEIGHT OF 2 5-J 5 INCH) S NMULC . SITE WORK NOTES N 6' 1. THE CONTRACTOR SHALL VISIT THE SITE AND BECOME FAMIUAPIZED WITH EXISTING I I TOP OF BANK EMBANKMENT CONDTIONS BOTH ON AND IMMEDIATELY ADJACENT TO THE SITE. EL. 54.0 2. CLEARING: CONTRACTOR SHALL REMOVE ALL TREES AND VEGETATION WITHIN LIMIT'S I OF CONSTRUCTION UNLESS OTHERWSE DESIGNATED TO REMAIN. SIt FLOOD POOL EL 52.5 3, GRUBBING AND STRIPPING: CONTRACTOR SHALL RAKE AND REMOVE ROOTS, STUMPS, I I VEGETATION, DEBRIS, EXISTING STRUCTURES ABOVE AND BELOW GRADE, ORGANIC • Z MATERIAL OR ANY OTHER UNSUITABLE MATERIAL WITHIN LIMITS OF CONSTRUCTION. 1 NORMAL POOL tD NORMAL POOL EL. 51.0 4. MUCKING: CONTRACTOR SHALL COORDINATE WITH OWNER AND THEIR GEOTECHNICAL i j i BURGAW EL. 51.0 VIC EL 50- - R€PRESENTATME TO COORDINATE REMOVAL OF ANY SOFT AREAS. i1 -�11_�5. DISPOSAL: CLEARED, GRUBBED, STRIPPED OR OTHER WASTE MATERIAL SHALL BE i 6 REMOVED FROM SITE AND DSPOSED OF IN A PROPERLY PERMITTED FACILITY. INV. 49.1 I j 6. FILL AND COMPACTION SHOULD COMPLY WITH GEOTECHNICAL REPORT. FOREBAY 3 7. THE CONTRACTOR SHALL NOTE THAT THE GRADING PLAN MAY NOT REPRESE4T A BALANCED 1 BOTTOM EL 48.0 MAIN POOL EARTHWORK CONDITION. THE CONTRACTOR SHALL BE RESPONSIBLE FOR CUT AND I j FILL QUANTITIES AND COMPLETE INSTALLATION TO SPECIFIED GRADES. I 3 8. THE CONTRACTOR SHALL FURNISH SUITABLE BORROW MATERIAL FROM AN OFF-STrE 3 BOTTOM PROPERLY PERMITTED FACILITY AS REQUIRED. i 1 1 ,02' EL 46.0 9. THE CONTRACTOR IS RESPONSIBLE FOR THE LOCATION AND PROTECTION OF ALL 75.0�' 2.35'09" �, EXISTING UTILITIES DURING CONSTRUCTION: BEFORE COMMENCING ANY EXCAVATIONS r N 89 ` �v IN OR ALONG ROADWAYS OR RIGHT-OF-WAYS, PUBLIC AREAS OR IN PRIVATE 0: s. nA' DC cC jnA� EASEMENTS. THE CONTRACTOR SHALL NOTIFY ALL APPROPRIATE PERSONNEL OF Ayr .TENTION PV l V D�EC� 1 \ L�A�JL..�TI V I i 10. THETHER INTENT TO EXCAVATE, IN WRITING, CONTRACTOR SHALL E RESPONSIBLE TO COORDINATET LESS THAN ) Di CONNECTION/All 0 DAYS PRIOR TO EXCAVATING 1 NTS RECONNECTION AND/OR THE RELOCATION OF ALL EXISTING UTILITIES WITH 75' L� I i APPROPRIATE PERSONNEL i' 75' I ST. HELENA 11. EXISTING SURVEYING PERFORMED BY AND SUPPLIED BY THE OWNER. 12. THE CONTRACTDR SFNLL FIELD VERIFY ALL DIMENSIONS AT THE SITE. FURTHERMORE ' )' THE CONTRACTOR $HALL REPORT ALL DISCREPANCIES OR QUESTIONS TO THE ENGINEER I� PRIOR TO INSTALLATION. I tJ • ,(� 13 THE CONTRACTOR SHALL PROVIDE ANY AND ALL LAYOUT REQUIRED TO CONSTRUCT 1'--`= O � r Q rd 0 �2 Ld W y z 7 � S. R 141 !H HIS WORK UNLESS OTHERWISE DIRECTED BY OWNER. I r VICINITY TT �� 14. ALL PVC UTILITY MAINS SHALL BE INSTALLED WITH A MINIMUM OF 36' COVER 1 s I I rl 1 I jT�T T „ AT FINAL GRADE. 15. ALL SERVICE CONNECTIONS SHALL BE INSTALLED TO MEET ALL LOCAL AND STATE CODES. i i I NTS METERS, TAPS, MATERIALS, WORKMANSHIP AND ALL FEES SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR AND SHALL COMPLY WITH ALL REQUIREMENTS. i Q" _ 3" 16. ALL PAVEMENT, BASE AND SUBGRADE SHALL CONFORM TO NCDOT STANDARDS INCLUDING COARSE AGGREGATE WORKMANSHIP, MATERIALS AND EQUIPMENT. APPROPRIATE BARRICADES, SIGNS, LIGHTS ` r 0� I- OR OTHER TRAFFIC CONTROL DEVICES SHALL BE PROVIDED IN ACCORDANCE WITH NCDOT i ; jlp W , w TYPICAL GRASS +7WALE TO MAINTAIN SAFETY AND TWO WAY TRAFFIC. 17. ALL AREAS SHALL BE GRADED FOR POSITIVE DRAINAGE. THE CONTRACTOR SHALL REPORT { LIJ z I TEMPORARY GRAVELLED ANY DISCREPANCIES TO THE ENGINEER PRIOR TO INSTALLATION. ALL AREAS SHALL BE I E > i� SLOPED TO DRAIN AH'AY FROM BUILDINGS AT ALL TIMES. � .�, Q I � CONSTRUCTION ENTRANCE 18, CONCRETE STORM DRAINAGE PIPE SHALL BE CLASS III WITH IREMEN GASKETED JOINTS AND INSTALLED IN ACCORDANCE WITH MANUFACTURER'S REQUIREMENTS. I 19. USE WµITE LANE MARKING PAINT FOR ALL PAVEMENT MARKINGS. PAINT SHALL BE A L`p i I 0 NTS CHLORINATED RUBBER ALKYD, FS TT-P-115, TYPE III, FA,TORY MIXED, QUICK DRYING, NON BLEEDING, REFLECTIVE MATERIAL MAY BE ADDED AT OWNER'S OPTION FOR f : NIGHT REFLECTING- 20. DUCTILE IRON SHALL BE CLASS 50. ; � 21. CONCRETE FOR WALKS, CURBS AND DRIVES SHALL HAVE A MiNIMUMN COMPRESSIVE LL A I 0.75 c STRENGTH OF 3000 PSI 0 28 DAYS - AIR ENTRAINED. I CD � I STEEL PIPE A 22. FIELD TESTING SHALL BE DONE BY AN INDEPENDENT TESTING LABORATORY PAID FOR Z ( 7 18" R - _ I BY THE OWNER. FURTHER TESTING REQUIRED DUE TO A FAILED TEST MALL BE i iI r PAID FOR BY THE CONTRACTOR. ; 0 I i F- 23. SEE GEOTECHNICAL REPORT NO. , DATED _. BY FOR ADDTICNAL REQUIREMENTS. LL I 1 x j e CONSTRUCTION SEQUENCE I` 1. NO CUT SLOPE OR FILL SLOPE SHALL EXCEED A RISE OR FALL OF ONE FOOT FOR I I EVERY RUN OF 3 FEET (1 VERTICAL TO 3 HORIZONTAL). •f' 4 I I 2. NO SEDIMENT WILL BE ALLO'NED TO EXIT THE SITE. ALL EROSION SHALL BE CONTROLLED ; I PLAN 14CLUDING SIDE SLOPES DURING AND AFTER CONSTRUCTION. I 3. INST.ALL PRIMARY EROSION CONTROL MEASURES BEFORE BEGINNfNG CONSTRUCTION INCLUDING I I I �- LIMITS OF DISTURBANCE BUT NOT LIMITED TO GRAVELLED CONSTRUCTION ENTRANCE. SILT FENCE, CHECK DAMS, ETC. I I . INSTALL ALL SECONDARY EROSION CONTROL MEASURES AS SOON AS POSSIBLE AFTER BE..INNING _- GALV. BAR GRATING - 1' x 1 /8" BEARING BARS. FASTEN WITH CONSTRUCTION I i TYPE J CLIPS. ATTACH TO 1-1/4' x 1-1/4" x1 /4" GALVANIZED 4. ALL EROSION CONTROL MEASURES TO BE INSPECTED AFTER EACH RAIN. ANGLE FRAME. MORTOR FRAME TO TOP 0 OITTL9 STRUCTURE.-71,10D ATTACH GALVANIZED WIRE SiLT FENCE, SLT TRAPS, AND INLET PROTECTION TO BE CLEANED WHEN HALF FULL. _ r I i 3 CLOTH OVER SMALL DIAiVIE E 5. 1- APPLICABLE, CONSTRUCT PROPOSED RETENTION POND TO ACT AS A SEDIMENT BASIN TOP OF BANK _I:- 1 - ORIFICE (8 MESH .020 WIRE DURING CONSTRUCTION. REMOVE ACCUMULATION OF SILT AS REQUIRED TO ALLOW PROPERto I j 54 0LC-T - FUNCTIONING. RESTORE POuD TO DESIGN LEVELS AT THE COMPLETION OF CONSTRUCTION. 'n r � I FL POOL 52.5 6. IF APPLICABLE, INSTALL DRCP INLETS WMA INLET PROTECTION TO ACT AS SILT TRAPS f" DURING CONSTRUCTION. REMOVE ACCUMULATED SILT AS NEEDED TO PREVENT SILT FROM ENTERING STORM DRAIN PIPING. " 7. A 4' LAYER OF TOPSOIL SHALL BE APPLIED TO ALL NEW AREAS TO BE GRASSED. 18 �C 8. ALL DISTURBED AREAS SHALL BE SEEDED IN ACCORDANCE WITH SEEDING SCHEDULE AS I s, rrrr SOON AS POSSIBLE BUT NO LATER THAN 30 DAYS AFTER DISTURBANCE, I I ALL SLOPED AREAS TO BE SEEDED NO LATER THAN 15 DAYS. I 9. MAINTAIN ALL EROSION CONTROL MEASURES UNITL PROJECT IS COMPLETE, i RMAL POOL 51 . 10, MORE STRINGENT MEASURES MAY BE REQUIRED TO HALT EROSION IF THOSE ON THIS I I I INV INV• 51. PLAN PROVE TO BE LESS EFFECTIVE. cc 11, REMOVE ALL TEMPORARY EROSION CONTROL MEASURES UPON COMPLETION OF CONSTRUCTION. INV��Q• ALL PERMANENT MEASURES SHALL BE WELL ESTABLISHED PRIOR TO PROJECT COMPLETION. N �a�•;E I - 3 C TEMPORARY �^ITENANCE REQUIREMENTS 1 I f 1. CONSTRUCTION ENTRANCE MUST BE MAINTAINED TO PREVENT MUD OR SEDIMENT FROM LEAVING ---CLEAN EXISTING I GRAVEL SiTE, PERIODIC TOP DRESSING WITH TWO INCH STONE MAY BE PEOUIRED. I E"` ' � � I o ROADSIDE SWALE " w " 2. ALL EROSION AND SEDIMENT CONTROL PRACTICES WILL BE CHECKED FOR STABILITY AND + FILTER OPERATION FOLLOWING EVERY RUNOFF-PPOOUCING RAINFALL, BUT IN NO CASE LESS THAN ONCE EVERY WEEK. ANY NEEDED REPAIRS WILL BE MADE IMMEDIATELY TO MAINTAIN ALL I' _ �07OM5,Q PRACTICES A5 DESIGNED.SECTION A A 3 BESEDIOW THE TMENT OP QF THE RSER/SWILL BE D7 GRAVEL WILWHEN THE L BE CLEANED OR RVEL OF SEDIMENT EPLACEDWHEN THE I I i SEDIMENT POOL NO LONGER DPAINS PROPERLY. I DETENTION POND OUTLET STRUCTURE 4. 51IIA WILL BE FROM HE SEDIMENTEFSEDIMENT ENCE WILL FENCE WHEN IT RED AS NECESSARY I I I I I 5. ALL SEEDED AREAS WILL BE FERTILIZED, RESEEDED AS NECESSARY, AND MULCHED ACCORDING NTS TO SPECIFICATIONS IN THE VEGETATIVE PLAN TO MANTAIN A VIGOROUS, I f i I DENSE VEGETATIVE COVER, ? I I I HOLE NO WETLANDS ON THIS SITE. I 9> _ 00, ram + �r�r �.� i� �Y rr r� �..�r,r^ + .ilk. I If� W, N 88,30 00 E 1T 'I'' F� ,;.g�., �,,, ��:.• +� I i S ITE DATA POSSIBLE WELL `' Vp1r vas- ' ! i DISTURBED AREA 3.15 ACt SITE4I I I ZONING 82 F. c� - `SUS ° j i; I i I I BUILDING AREA 7,425 SF � W N. =� qtn PARKING SPACES REQUIRED 15 In � 4� �°c' � ��� I �- PARKING SPACES PROVIDED 15 I ASPHALT AREA 27,080 SF o(0) h� STREETYARD : I I ¢ CONCRETE AREA 1.200 SF • �,Le5� s �° r I LANDSCAPING AREA REQUIRED 2,000 SF I I r j LANDSCAPING AREA PROVIDED 2,000 SF 5 5:1 OPEN GRASS SWALE � t- s ✓°� y y� R� x i�IN 50.15 8 2j I j-- -50 GRAVELED CONSTRUCTION f , 305 I � --� ENTRANCE 6" SEWER SERVICE 0 1.0% MIN. N' MIN. 36" BURY + (4" CLEANOUTS ® 75' MAX.) ,1 .I 2000 GALLON SE' .TIC TANK PURAFLO PEAT B10FILTE. ?s (1300) 714.5or / `�S• I --MATCH EXISTING, ASPHALT GRADE 55.17± Q CONCRETE CONCRETE EXTRUDED FLUME � + CURB �' - •--�---�s - o a J52.7 +h 0 a a SO NOTE: SANITARY SEWER SYSTEM DISCHARGE PUMP BASIN-,, �• DESIGN BY OTHERS SHOWN FOR INFORMATION ONLY. UV ENCLOSURE ; 4H WELDED WIRE FENCE w/ T-POST 0 10' O.C. II ;r I OUTLET I --� STRUCTURE) BACKWASH VALVE DRIP IRRIGATION FIELD m >,fr tK- % r�� 1y� MANIOLD-/ +x - - 500.00 .ram• SDMH NO. 1 TOP 54.5 INV. 50.9 AL =4U EXISTING DITCH 141►�. 5YTEi' LF P will 11 h�.. - 18" F.E.S. INV. 50.5 15'X15'X18" E.D. �-- PROPOSED DETENTION POND TOP OF BANK 54.0 FLOOD POOL 52.5 NORMAL POOL 51.0 BOTTOM 46.0 �o0o CIO 0 0 REVISIONS Description I By i-)A TE PWN' 1 0 JUL 2 7 2000 TV RECEIVED'O JUL 2 8 2000_.<f Q �_ _ 5 E A L PROd # _V534- _ 17374 3 LEGEND<<i•-'•�i1a�.`••' �� EXISTING CONTOUR //fllORE ,i��'��� EXISTING SPOT ELEVATION PATE 07--27-00 PROPOSED SPOT ELEVATION DESIGN PGT DRAWN KIP +- �- STORMWATER RUNOFF DIRECTION j CONCRETE AREA j C(l75) LANDSCAPING w/AREA " LIMITS OF DISTURBANCE C 1 SHEET 1 OF 1 =00023 j 20' EXISTING 18" RCP I 20'X20'X12" E.D, I I