Loading...
HomeMy WebLinkAboutSW8000529_APPROVED PLANS_20000825STORMWATER DIVISION CODING SHEET POST -CONSTRUCTION PERMITS PERMIT NO. SW riULZ?�Ja�I DOC TYPE ❑CURRENT PERMIT rAPPROVED PLANS ,_, HISTORICAL FILE ❑ COMPLIANCE EVALUATION INSPECTION DOC DATE YYYYMMDD N/F GA & UNDA PETERSON D.B. 1245-005 ZONING: R-15 N/F GEORGE W, PEEMRSON, SR. ETUX D.B. 1278-293 ZONING: R-15 0 --1;URVEY IRU'E". fry 0 L C) N/F JIMMIE L. JR. & JANICE E. SUGGS D.B. 1760-185 ZONING: R-15 EXISTING POND N/F JEAN A. KRUEGER D.B. 1331-1703 ZONING: R-15 N > N 49'21'03" E 14.37 1 x S j 36*26'3,3,, CL 7 sift EIP: 17. JE Il I P Con Poi tK' Con 61 Poin T 7 7 7 —1— F F 7 T S 10' 14'06" E " " \xi 2020 ;., II 43*53'04" TE 56 55. 12, o ru 29 IN /F EXISTING BUILDING 1,920 SF OR F00ERLY BROWN H00e 474YAGE 62! N/F JOHNNY E. BROWN D.B. 474-621 ZONING: R-15 JACKSON INVESTMENTS, INC. -915 D.B. 2454II ZONING: B-2(CD) F_ 2, ----------- 0 F_ 7 O EXISTING _ BUILDING U-) 2,784 SF S]42-30'FWJ2' E 3 17. 7 ? b; Oak C14 PROPOSED SUIL LING 3,000 SF 36.5 rF ;z L > 10' ' Mft, 94 Irr-%6 k " A �0 i ri. N/F WILUE & LENA, CAMPBELL D.S. 673-659 ZONING: R-15 LIMITS OF DISTURBANCE TST NO. I 15* FES INV. 31,8 5'X1O'X120 ED SAWCUT AND REMOVE EXISTING C&G, PROVIDE NEW NCDOT TYPE C&G W/30'R FOR 36' DRIVEWAY EXPANSION (TYP) — NCDOT DI NO. I RIM 34.0 INV. 32.0 SOMH NO.1 RIM 34.5 INV. 32.25 BYPASS OUTLET STRUCTURE RIM 34.5 INV. 32.9 —15"FES INV. 32.75 W/5'X10'12-ED REVISIONS Description I By FROM THE CEWER LINE OF ALEXANDRIA RD. *5M' NORTM ON NC Hkwy 17. VICINITY MAP LEGEND EXISTING CONTOUR EX!STING TREES 7 EXISTING SPOT ELEVATION PROPOSED SPOT ELEVATION DROP INLET w/INLET PROTECTION Ty, CURB INLET w/INLET PROTECTION STORMWATER RUNOFF DIRECTION • CONCRETE AREA Q7 D5) Q-4 LANDSCAPING w/AREA LIMITS OF DISTURBANCE 0 (A ENERGY DISSAPATOR TEMPORARY SEDIMENT TRAP DITCH LINE Development Data: PROJECT AREA. EXISTING- 42,387 SF (0.97 AC.±) PROPOSED- 21,873 SF (0.50 AC.±) TOTAL- 64,260 SF (1.48 AC.±) BUILDING AREA: H EXISTING- 4,704 SF PROPOSED- 3,000 SF V) TOTAL- 7.704 SF • PARKING - (0 1 SP/400 SF - 20 SP REQ'D) EXISTING- 17 SPACES PROPOSED- 15 SPACES 0 TOTAL- 32 SPACES (2 H/C)L Itiq IMPERVIOUS SURFACES. C\2 EXISTING- 15,326 SF Z PROPOSED- 12,240 SF TOTAL- 27,566 SF (42.9%) 0 LAND SCAPE AREAS. PROPOSED- 1,245 SF z Q) 0 4 (::) ce) LIMITS OF DISTURBANCES- -4 0 PROPOSED- 24,000 SF Lo Lb 0 1 C� Z 1 z co ce) <5 3 Lai 4-) 0 0O z 4j LLI 114 Q) GENERAL NOTES: 134 L) 1. NEW HANOVER COUNTY PARCEL NO.: C4 r 4 0 3169(09) - 07 - 3178 -r-4 4 0 @ E—4 t *F4 a. rx, 2. TRACT A7EA_- 21,873 SF (0,50 AC.±) 3. ZONING DISTPICT: 0&1 CONDITIONAL USE (W/ S.H.O.D.) - 1 _40 - 4. NO WETLANDS ON SITE. S E A L 1 RE CEIVED _u 1 17374 L AZ A P P in I AUG 2 5 2000 NORTH CAROLMA MANAGEMENT CC1n­11;-;sIjK DWQ DIVISION OF WATER QUALI[Y PROD# _'3_,0 CY-V S 2- L7 v#,.Z'5A0G Z000 DATE 08-24-00 Stormwew powSZc( DATE PRINTE� DESIGN PGT AUG 24 2000 DRAWN KAP C Property Address. 7735 Market Street, Wilmington, NC 28405 SHEET I OF 2 00015 j 1 r -� a • 1+L >��iM,■lt; :ii ►�S-i-�--��i3 ice=-F-+ �■`_ _�-A _A 1�-:l ltb l� Y9R .1::r 2 REVISIONS to I Description I By w P16N WITH COPING REMOVED eev+v nnaun GENERAL NOTES: ALL DROP INLETS OVER 3'-6" IN DEPTH TO BE PROVIDED WITH STEPS 1'-2" ON CENTERS. STEPS SHALL E IN ACCORDANCE WITH STD. 840.66. CLASS "B' CONCRETE TO BE USED. ALL MORTAR JOINTS ARE TO BE 1/2 t 1/8' FORMS ARE TO BE USED FOR THE CONSTRUCTION OF r THE BOTTOM SLAB. BRICK MASONRY DROP INLET NOT TO BE USED IN LOCATIONS SUBJECT TO TRAFFIC. JUMBO BRICK WILL BE PERMITTED. CONCRETE BRICK OR 4' SOLID CONCRETE BLOCKS MAY BE USED IN LIEU OF CLAY BRICK. IF REINFORCED CONCRETE PIPE IS SET IN BASE SLAB OF BOX, ADD TO BASE AS SHOWN ON STANDARD 840.00. FOR 8'-0' IN HEIGHT OR LESS USE S' WALL OVER 8'-0' IN HEIGHT USE 12" WALL TO 6'-0' FROM TOP OF WALL AND 8' WALL FOR THE REMAINING 6'-0'. QUANTITIES TO BE ADJUSTED ACCORDINGLY. t DIMENSIONS AND QUANTITIES DIMENSIONS OF BOX & PIPE CONC. IN BASE TOTAL BRICK MASONRY DEDUCTIONS FOR ONE PIPE PIPE SPAN WIDTH HEIGHT PER Fr. HEIGHT BRICK COPING MIN. H D A B N MIN CU. YDS. C.M. R.C. 12' 3'-0" 2'-0' 2'-8" 0.267 0,313 0,037 0.871 0.020 0.032 15" 3'-0' 2'-0' 3'-0" 0.267 0,313 0.037 0.976 0.031 0.047 18' 3'-0' 2'-0' 3'-S" 0.267 0.313 0.037 1.108 0.044 0. 24' 3'-0' 2'-0' 4'-0' 0.267 0.313 0.037 1.289 0.078 0.113 30' 3'-0" 2'-0" 4'-3- 0.267 0,313 0.037 1.367 0.122 0.170 NCDOT STD. NO. 840.15.0 OR APPROVED EQUAL FRAME AND GRATE DEWEY BROS, MODEL CH-BN-2001 OR EQUAL ASPHALT PAVEMENT z lk2. CURB NOTES: 1. SIDEWALK THICKNESS SHALL BE 4" UNLESS NOTED OTHERWISE, 2. CONTRACTION JOINTS (C.J.) SPACE SAME AS SIDEWALK WIDTH. 3. THICKEN SIDEWALK TO 6' AT DRIVEWAYS. 4. THICKEN SIDEWALK TO 6' IN LAST 3' WHERE IT ABUTS PAVEMENT WFTH NO CURB. 5. 1/2' EXPANSION JOINT (E.J.) REDUIRED AT 50' MAX- AT SIDEWALK JUNCTIONS, AT STRUCTURES, AND AS NOTED ON SAE PLAN. 6. PROVIDE A LAYER OF 15/ BLDG. FELT BETWEEN WALK AND ADJACENT PARALLING CURB OR STRUCTURE. 7. REINFORCE w/6x6-10/10 W.W.A. 50' MAX. SPACING 4. 44 4. PLAN BLDG.-STRUCTURE 1/8-R TOOLED 1/4'x1' DEEP w/AN JOINT 1/8"R TOOLED JOINT IF y I- 1 /2' EXPANSION JOINT MATERIAL EXPANSION JOINT (E.J.) CONTRACnON JOINT (C.J.) SIDEWALK JOINT DEAILS ws EL 34.3 Mr I EL 3C5 STD. MH. RINO & COV1174 UIH WEIGHTS LATE WINTER &EARLY SPRING • FPAM':-208 LOS COVE-I-I2l) M TEMPORARY GRASSING DETAIL PRE -CAST CONIC. (20) �i4 REAR SEEDING MIXTURE EL 34 zs -•,t SPECIES �( �/aCrB� 15 P ' �iL.faSiC1M�. Rye (grain) 120 EL. 32.9 ,. ELL32.25 \_-0. Annual lespedeza (Kobe In EL 32.0 DIP OVERFLOW PIPE Piedmont and Coastal Ploin, ; Korean in Mountains) 50 Omit annual kmpedeza when duration of temporary cover is not to extend 3000 Ps CONC. beyond June. SEEDING DATES: BYPASS STRUCTURE D ETAI L Mountoins - Above 2500 ft: Feb. 15-May 15 NTS Below 2500 ft: Feb. 1-May 1 Piedmont - Jan. 1-May 1 Coastal Plain - Dec. 1-Apr. 15 SOIL AMENDMENTS Follow recommendations of soil tests or apply 2,000 lb/acre ground agricul- tural limestone and 750 lb/acre 10-10-10 fertilizer. SPRING -SUMMER MULCH PERMANENT GRASSING DETAIL APPLY 4.000 LB/ACRE STRAW. ANCHOR STRAW BY TACKING WITH ASPHALT, NETTING, OR A MULCH ANCHORING TOOL A DISK MATH BLADES SET NEARLY STRAIGHT CAN BE SEEDING MIXTURE USED AS A MULCH ANCHORING TOOL (Ibl=re1 MAINTENANCE 50 SER� PE� 30 Refertilize if growth Is nd iutly adequate. Reseed, referUlize and mulch im- COMMON BERMUOAGRASS 10 GERMAN MILLET 10 medlatey following erosion or other damage. TALL FESCUE 50 TEMPORARY SUMMER GRASSING DETAIL SEEDING NOTES SEEDING MIXTURE EA 1• WHERE A NEAT APPEARANCE Is DESIRED, OMIT SITES 2. USE COMMON BERUDAGRASS ONLY ON ISOLATED SITES WHERE IT CANNOT BE- RATE (Ib/acres COME A PEST. BERMUDAGRASS MAY BE REPLACED WITH 5 Lb/acre CENT,PEDEGRA55. ,ZMES, cERwN MILLET 40 SEEDING DATES IN THE PIEDMONT AND MOLWTAINS, A SMALL -STEMMED SUNDANGRASS MAY BE APRIL 1 - JULY 15 SUBSTITUTED AT A RATE OF 50 LB/ACRE. SEEDING NOTES SOIL AMENDMENTS MOUNTAINS - MAY 15-AM1G. 15 APPLY LIME AND FERTILIZER ACCORDING TO SOIL TESTS, OR APPLY 3,XXF) lb/acre 3 PIEDMONT - MAY 1-AUG. 15 GROUND AGRICULTURE LIMESTONE AND 500 lb/acre 10-10-10 FERTILIZER. COASTAL PLAN - APR, 15-AU& 15 i0IL AMENDMENTS MULCH FOLLOW RECOMMENDATIONS OF SOIL TESTS OR APPLY 2,000 LB/ACRE GROUND AGRICUL- TURAL LIMESTONE AND 750 LB/ACRE 10-10-}0 FERTILIZER.MULCH APPLY 4,000 1b/acn GRAN STRAWOR EQUIVALENT COVER OF ANOTHER SUITABLE . ANCHOR BY TACKING METH ASPHALT, ROVING, OR NETTING OR B1 CRIMPING WITH A MULCH ANCHORING 700L A DISK WITH BLADES SET NEARLY STRAIGHT CAN K MULCH USED AS A MULCH ANCHORING TOOL APPLY 4.ODO LB/ACRE STRAW. ANCHOR STRAW BY TACKING WITH ASPHALT, NETTING, OR A MULCH ANCHORING TOOL A DISK WITH BLADES SET NEARLY STRAIGHT CAN BE MAINTENANCE USED AS A MULCH ANCHORING TOOL REFERI LIZE THE FOLLOWING APRIL WITH 50 lb/acre NITROGEN. REPEAT AS CPO" MAINTENANCE REQUIRES,A YEAR. WHERE OFTEN AS NEEDED. NEAT APPEARANCE IS MIRED, OMIT SERICEA AND MOW AS ONCE REFERTIUZE IF GROWTH IS NOT FULLY ADEQUATE. RESEED, REFERTILIZE AND MULCH IM- MEDIATELY FOLLOWING EROSION OR OTHER IIAMUAGE. FALL --WINTER PERMANENT GRASSING DETAIL TEMPORARY FALL GRASSING DETAIL SEEDING MIXTURE SEEDING MIXTURE SPMES RATE ll6/cffi), TALL FESCUE BLEND OF TWO OR SPECIE THREE IMPROVED VARIETIES) 200 Rye (grain) 120 R'E (GRAIN) 25 SEEDING DATES SEEDING NOTES JANUARY - APRIL MOUNTAINS - AUG. 15-DEC. 15 AUGUST - DECEMBER COASTAL PLAN and PIEDMONT - AUG, 15-DEC 30 SOIL AMENDMENTS SOIL AMENDMENTS APPLY LIME MO FERTILIZER ACCORDING TO SOIL TESTS, OR APPLY 3.000-5.000 Ibjx-re GROUND AGRICULTURAL LIMESTONE (USE THE LOWER RATE ON SANDY S0 _S) AND FOLLOW SOIL TESTS OR APPLY 2,000 LB/ACRE GROUND AGRICULTURAL 1,000 lb/acre 10-10-10 FERTILIZER, LIMESTONE AND 1.000 LB/ACRE 10-10-10 FERTILIZER. MULCH MULCH APPLY 4,000 lb acre GRAIN STRAW OR EOUIVALENT COVER OF ANOTHER ;UITABU APPLY 4.000 LB/ACRE STRAW. ANCHOR STRAW BY TACKING WITH ASPHALT, NETTING, MULCH' ANCHOR STRAW BY TACKING WITH ASPHALT, ROVING, OR NETTING OR BY CRNR- �' WITH A MULCH ANCHORING TOOL. A DISK WITH BLADES SET NEARLY ';TRAIGHT CAN OR .MULCH ANCHORING TOOL A DISK WITH BLADES SET NEARLY STRAIGHT CAN BE BE USED AS A MULCH ANCHORING TOOL USED AS A MULCH ANCHORING TOOL MAINTENANCE MAINTENANCE ltepak d refertilize damagedea areas Immediately. Topdress with 50 lb/acre of n8roganen In March. W It is necessary to extend temporary cover be nd FMUZE ACCORDING TO SOL TESTS OR APPLY 40 lb/acre NITROGEN IN JANUMN OR FEBRUARY, 40 lb IN SEPTEMBER AND 40 lb IN NOVEMBER, FROM A 12-4-8. ree June 15. oveed with 50 Ib/acre Kobe (Piedmont and Coastal Plain or Korem (Mountains) leipedeza In late February or early March. 16-4-8. OR SIMILAR TURF FERTILIZER AVOID FERTILIZER APPLICATIONS DJRING WARM WEATHER, AS THIS INCREASES STAND LOSSES TO DISEASE. RESEED, FEMXIM AND MULCH DAMAGED AREAS IMMEDIATELY. MOW TO A HEIGHT OF 2.5-3.5 INCHES AS NEEDED. WHERE RUNOFF IS DfRECTED X4 WOOD FRAME x�OP INLET GRAM 'H. �.� GATHER EXCESS AT CORNERS WOOD OR S1EEL STAKE FABRIC w/JtUiMGIYi --� --_••""'vas SEDIMENT J BURIED FABRIC SKIRT AS DIRECTED BY ENO BURIED FABRIC SKIRT WOOD OR STEEL STAKE NOTES: 1. AS "THEM FABRIC. USE A PERVIOUS SHEET OF NYLON, 5. TO PROVIDE NEEDED STABILITY TO THE INSTALLATION, FRAME WITH POLYESTER, OR ETHYLENE YARN -EXTRA STRENGTH 2x4-WH MOOD STRIPS AROUND THE CREST OF THE OVERFLOW (50 LB/ 1INCH MIN.) -THAT CONTAINS ULTRAVIOLET RAY AREA AT A MAXIMUM OF 1.5 FT ABOVE THE DROP INLET CREST, INHIBITORS AND STATIUZERS. FABRIC SHOULD BE SUFFICIENTLY THE BOTTOM 12 INCHES OF THE FABRIC IN A TRENCH AND POROUS TO PROVIDE ADEQUATE DRAINAGE OF THE TEMPORARYPLACE SmIMIQNT POOL, BURLAP MAY BE USED FOR SHORT-TERM BACI[t LL THE TRENCH WITH AT LEAST 4 INCHES OF CRUSHED STONE APPLICATIONS. IT MUST BE REPLACED EVERY BO DAYS. OR 12 INCHES OF COMPAICTM SOIL. 2. CUT FABRIC FROM A CONTINUOUS ROLL TO ELIMINATE JOINTS. 7. FASTEN FABRIC SECURELY TO THE STAKES AND FRAME JOINTS MUST BE 3. FOR STAKES, USE 2x4-INCH WOOD(PR!E ERRED)OR EQW&ENT OVEkAPPED TO THE NEXT STAKE. METAL WITH A MINIMUM LENGTH OF 3 FT. 8 THE TOP OF THE FRAME AND FABRIC MUST BE WELL BELOW THE GROUND 4. SPACE STAKES EVENLY AROUND THE PERIMETER OF THE INLET ELEVK" DDWNSLOPE FROM THE DROP INLET TO KEEP RUNOFF FROM A MAXIMUM OF 3 FT APART, AND SECURELY DRIVE THEM INTO BYPASSING THE INLET. IT MAY BE NECESSARY TO BULLS A TEMPORARY THE GROUND, APPROXIMATELY 18 INCHES DEEP. DIKE ON THE DOWNSLOPE SIDE OF THE STRUCTURE TEMPORARY FABRIC DROP INLET EROSION CONTROL ws AWAY FROM CURB, GUTTER 2'-0" SHALL SLOPE AWAY AS SHOWN �'-6" 6" CLASS A CONC.---,, ASPHALT SLOPE `� 3" 'L3R -�S-L--- .. T O f ` �- ��/8''R -` DRAINAGE AWAY FROM CURB 2,-On t - WI, CLASS A CONC. I ASPHALT_ SPHALT `r 2"R SLOPE f, .. ; A ., 1� R S• a +fir 4 DRAINAGE TOWARD CURB CURB S NTS CTION. SEE IN ACCORDANCE WITH GRASSING DETAIL z i i -1=1 I II io SEE SITE PLAN FOR INVERT ` I - TYPICAL GRASS SWALE NTS TOP 35.0 SPILLWAY INV. 34.25 II BOTTOM 32.75 �I1=III�II ��III��II INFILTRATION BASIN - D ETAI L NTS SITE WORK NOTES 1. THE CONTRACTOR SHALL VISIT THE SITE AND BECOME FAMILIARIZED WITH EXISTING CONDTIONS BOTH ON AND IMMEDIATELY ADJACENT TO THE SITE. 2. CLEARING: CONTRACTOR SHALL REMOVE ALL TREES AND VEGETATION WITHIN LIMITS OF CONSTRUCTION UNLESS OTHERWISE DESIGNATED TO REMAIN. 3. GRUBBING AND STRIPPING: CONTRACTOR SHALL RAKE AND REMOVE ROOTS, STUMPS, VEGETATION, DEBRIS, EXISTING STRUCTURES ABOVE AND BELOW GRADE, ORGANIC MATERIAL OR ANY OTHER UNSUITABLE MATERIAL WITHIN LIMITS OF CONSTRUCTION. 4, MUCKING: CONTRACTOR SHALL COORDINATE WITH OWNER AND THEIR GEOTECHNICAL A A REPRESENTATIVE TO COORDINATE REMOVAL OF ANY SOFT AREAS. Z 5. DISPOSAL: CLEARED, GRUBBED, STRIPPED OR OTHER WASTE MATERIAL SHALL BE _ - REMOVED FROM SITE AND DISPOSED OF IN A PROPERLY PERMITTED FACILITY. 0- 6. FILL AND COMPACTION SHOULD COMPLY WITH GEOTECHNICAL REPORT. 7. THE CONTRACTOR SHALL NOTE THAT THE GRADING PLAN MAY NOT REPRESENT A BALANCED w EARTHWORK CONDITION. THE CONTRACTOR SHALL BE RESPONSIBLE FOR CUT AND V) FILL QUANTITIES AND COMPLETE INSTALLATION TO SPECIFIED GRADES. 8. THE CONTRACTOR SHALL FURNISH SUITABLE BORROW MATERIAL FROM AN OFF -SITE PROPERLY PERMITTED FACILITY AS REQUIRED. 9. THE CONTRACTOR IS RESPONSIBLE FOR THE LOCATION AND PROTECTION OF ALL EXISTING UTILITIES DURING CONSTRUCTION. BEFORE COMMENCING ANY EXCAVATIONS IN OR ALONG ROADWAYS OR RIGHT-OF-WAYS, PUBLIC AREAS OR IN PRIVATE EASEMENTS, THE: CONTRACTOR SHALL NOTIFY ALL APPROPRIATE PERSONNEL OF THEIR INTENT TO EXCAVATE, IN WRITING, NOT LESS THAN 10 DAYS PRIOR TO EXCAVATING. SEE PLAN 10. THE CONTRACTOR SHALL BE RESPONSIBLE TO COORDINATE DISCONNECTION/ RECONNECTION AND/OR THE RELOCATION OF ALL EXISTING UTILITIES WITH APPROPRIATE PERSONNEL. 11. SHERWIN CRIBS EXISTING SURVEYING PERFORMED BY AND SUPPLIED BY THE OWNER. j� 12, THE CONTRACTOR SHALL FIELD VERIFY ALL DIMENSIONS AT THE SITE. FURTHERMORE SEE PLAN THE CONTRACTOR SHALL REPORT ALL DISCREPANCIES OR QUESTIONS TO THE ENGINEER PRIOR TO INSTALLATION. 13. THE CONTRACTOR SHALL PROVIDE ANY AND ALL LAYOUT REQUIRED TO CONSTRUCT FILTFABRIC HIS WORK UNLESS OTHERWISE DIRECTED BY OWNER. SECTION A - A (MIAFI 100 X Q 14. ALL PVC UTILITY MAINS SHALL BE INSTALLED WITH A MINIMUM OF 36" COVER APPROVED EQUAL) AT FINAL GRADE. 15. ALL SERVICE CONNECTIONS SHALL BE INSTALLED TO MEET ALL LOCAL AND STATE CODES. ANSHIPAWITHAALLFREQUIREMENTS. THE RESPONSIBILITY EES SHALL BE IANDTAPS, MATERALS� L{COMP ENERGY DISSIPATOR OFTTHE� CONTRACTOR SHALL Y 16. ALL PAVEMENT, BASE AND SUBGRADE SHALL COMFORM TO NCDOT STANDARDS INCLUDING NTS WORKMANSHIP, MATERIALS AND EQUIPMENT. APPROPRIATE BARRICADES, SIGNS, LIGHTS OR OTHER TRAFFIC CONTROL DEVICES SHALL BE PROVIDED IN ACCORDANCE WITH NCDOT TO MAINTAIN SAFETY AND TWO WAY TRAFFIC. 17. ALL AREAS SHALL BE GRADED FOR POSITIVE DRAINAGE. THE CONTRACTOR SHALL REPORT ANY DISCREPANCIES TO THE ENGINEER PRIOR TO INSTALLATION. ALL AREAS SHALL BE SLOPED TO DRAIN AWAY FROM BUILDINGS AT ALL TIMES. 18. CONCRETE STORM DRAINAGE PIPE SHALL BE CLASS III WITH RUBBER GASKETED JOINTS AND INSTALLED IN ACCORDANCE WITH MANUFACTURER'S REQUIREMENTS. 19. USE WHITE LANE MARKING PAINT FOR ALL PAVEMENT MARKINGS. PAINT SHALL BE A CHLORINATED RUBBER ALKYD, FS TT-P-115, TYPE III, FACTORY MIXED, QUICK DRYING, NON BLEEDING. REFLECTIVE MATERIAL MAY BE ADDED AT OWNER'S OPTION FOR NIGHT REFLECTING. 20. DUCTILE IRON SHALL BE CLASS 50. 21. CONCRETE FOR WALKS, CURBS AND DRIVES SHALL HAVE A MINIMUMN COMPRESSIVE STRENGTH OF 3000 PSI CAD 28 DAYS - AIR ENTRAINED. 22. FIELD TESTING SHALL BE DONE BY AN INDEPENDENT TESTING LABORATORY PAID FOR BY THE OWNER. FURTHER TESTING REQUIRED DUE TO A FAILED TEST WILL BE PAID FOR BY THE CONTRACTOR. 23. SEE GEOTECHNICAL REPORT NO. _ DATED _��,, BY FOR ADDTIONAL REQUIREMENTS CONSTRUCTION SEQUENCE 1. NO CUT SLOPE OR FILL SLOPE SHALL EXCEED A RISE OR FALL OF ONE FOOT FOR EVERY RUN OF 3 FEET (1 VERTICAL TO 3 HORIZONTAL). 2. NO SEDIMENT WILL BE ALLOWED TO EXIT THE SITE. ALL EROSION SHALL BE CONTROLLED INCLUDING SIDE SLOPES DURING AND AFTER CONSTRUCTION, 3. INSTALL PRIMARY EROSION CONTROL MEASURES BEFORE BEGINNING CONSTRUCTION INCLUDING BUT NOT LIMITED TO GRAVELLED CONSTRUCTION ENTRANCE, SILT FENCE, CHECK DAMS, ETC. INSTALL ALL SECONDARY EROSION CONTROL MEASURES AS SOON AS POSSIBLE AFTER BEGINNING CONSTRUCTION. 4. ALL EROSION CONTROL MEASURES TO BE INSPECTED AFTER EACH RAIN. SILT FENCE, SILT TRAPS, AND INLET PROTECTION TO BE CLEANED WHEN HALF FULL. 5. IF APPLICABLE, CONSTRUCT PROPOSED RETENTION POND TO ACT AS A SEDIMENT BASIN DURING CONSTRUCTION, REMOVE ACCUMULATION OF SILT AS REQUIRED TO ALLOW PROPER FUNCTIONING. RESTORE POND TO DESIGN LEVELS AT THE COMPLETION OF CONSTRUCTION. 6. IF APPLICABLE, INSTALL DROP INLETS WITH INLET PROTECTION TO ACT AS SILT TRAPS DURING CONSTRUCTION. REMOVE ACCUMULATED SILT AS NEEDED TO PREVENT SILT FROM ENTERING STORM DRAIN PIPING. 7. A 4" LAYER OF TOPSOIL SHALL BE APPLIED TO ALL NEW AREAS TO BE GRASSED. 8. ALL DISTURBED AREAS SHALL BE SEEDED IN ACCORDANCE WITH SEEDING SCHEDULE AS SOON AS POSSIBLE BUT NO LATER THAN 30 DAYS AFTER DISTURBANCE. ALL SLOPED AREAS TO BE SEEDED NO LATER THAN 15 DAYS. 9. MAINTAIN ALL EROSION CONTROL MEASURES UNITL PROJECT IS COMPLETE. 10. MORE STRINGENT MEASURES MAY BE REQUIRED TO HALT EROSION IF THOSE ON THIS PLAN PROVE TO BE LESS EFFECTIVE. 11, REMOVE ALL TEMPORARY EROSION CONTROL MEASURES UPON COMPLETION OF CONSTRUCTION. ALL PERMANENT MEASURES SHALL BE WELL ESTABLISHED PRIOR TO PROJECT COMPLETION. MAINTENANCE REQUIREMENTS 1. CONSTRUCTION ENTRANCE MUST BE MAINTAINED TO PREVENT MUD OR SEDIMENT FROM LEAVING SITE. PERIODIC TOP DRESSING WITH TWO INCH STONE MAY BE REQUIRED. 2. ALL EROSION AND SEDIMENT CONTROL PRACTICES WILL BE CHECKED FOR STABILITY AND OPERATION FOLLOWING EVERY RUNOFF -PRODUCING RAINFALL, BUT IN NO CASE LESS THAN ONCE EVERY WEEK. ANY NEEDED REPAIRS WILL BE MADE IMMEDIATELY TO MAINTAIN ALL PRACTICES AS DESIGNED. 3. SEDIMENT BASINS WILL BE CLEANED WHEN THE LEVEL OF SEDIMENT REACHES 2,0 FEET BELOW THE TOP OF THE RISER. #57 GRAVEL WILL BE CLEANED OR REPLACED WHEN THE SEDIMENT POOL NO LONGER DRAINS PROPERLY. A 4. SEDIMENT WILL BE REMOVED FROM BEHIND THE SEDIMENT FENCE WHEN IT BECOMES ABOUT 0.5 FEET DEEP AT THE FENCE. THE SEDIMENT FENCE WILL BE REPAIRED AS NECESSARY 2' TO MAINTAIN A BARRIER. SPILLWAY 5, ALL SEEDED AREAS WILL BE FERTILIZED, RESEEDED AS NECESSARY, AND MULCHED ACCORDING TO SPECIFICATIONS IN THE VEGETATIVE PLAN TO MAINTAIN A VIGOROUS, DENSE VEGETATIVE COVER. �vlrl, U HANNLL UQI IUM BOTTOM CROSS SECTION STONE SECTION A -'A NOTES: 1. SEDIMENT TRAP WILL BE CONSTRUCTED FIRST, SUMP SECONDLY. 2. SEDIMENT TRAP HEIGHT TO BOTTOM OF SPILLWAY IAIILL BE NQ LESS THAN TWO FEET. 3. SPILLWAY DEPTH SHALL BE ONE FOOT. 4. STONE FACE SHOULD BE NO LESS THAN 6 INCHES MEASURED PEP,PENDICUL.ARLY FROM THE FACE OF THE LARGE STONE. 5, SUMP DIMENSIONS SHOULD ALLOW FOR A MINIMUM OF oll TVDr I-') (Klr r)nT% )OT) �J z �_IIIII4 z 0 U) W W Z z TW 0 0 I.1 Fq WwA x O 0 Z E4 Z 0 134 W �,} 0 A� Z �w �0 A U� E4z w0 A � 1� �--I r �w 00 V c\l r-I W o W �U Z � o co a'' ;-I LO v� 0 I 11i Cr)to CO Z � 0 006 P4 0 o M� E-y aw" NOTE: PAVEMENT SECTION MAY VARY - DEPENDING UPON FIELD CONDITIONS. CONTRACTOR SHALL COORDINATE w/OWNER & GEOTECHNICAL - -- ENGINEER TO DETERMINE ACTUAL PAVEMENT SECTION. :� ``YYILIIIIIIIrY,,�� PAVEMENT SECTION NTS S E A L i 17374 • t e ���� :; rC; I Nth:•' ����� CREG4���`��� TEMPORARY S=DIM ENT TRAP TABLE NO. DISTURBED AREA (Ac) REOT Wu LENGTH ( WIDTH ( DEPTH ( PROVIDED VOLUME 1 .11 1.98 20 5 2 200 900 CF OF SEDIMENT STORAGE. 6. DEPTH OF SEDIMENT IN SUMP WILL BE CHECKED AFTER EACH STORM AND CLEANED AS NECESSARY (MIN. ONCE EACH 6 MONTHS). 7. REMOVAL OF SEDIMENT TRAP WILL BE DONE IN SUCH A WAY AS TO LIMIT SILTATION. TEMPORARY SEDIMENT TRAP DETAIL NTS �r�IIIIILLIA��� . DATE 08-24-00 DESIGN PGT �T DRAWN KAP DATE PRINTED AUG 24 2000 k. 4 SHEET 2 OF 2 00015