Lewis,Linda
From: Lewis,Linda
Sent: Wednesday, October 18, 2017 8:46 AM
To: 'Phil Tripp'
Subject: RE: [External] SW8000419 Landmark Industrial Park Lot 9 ((301 Raleigh Street)
Good morning, Phil. Thank you, I am doing well and I hope you are, too.
As part of the certification and ownership change documents, you will need to include 2 sets of
revised plans -and a signed minor mod application form. The revised plans need to show the extent of
the proposed #57 stone area and a cross section detail of that #57 stone area with the 4" stone depth
and the location of the filter fabric labeled. Please also note on the detail that the #57 stone must be
washed and that no substitution for the #57 stone is allowed.
We'll process the ownership change first and the minor mod second, so when Mr. Miller completes
the minor mod application form, please make sure he completes it in the name of the LLC that will
receive this transferred permit, 301 Raleigh, LLC.
The renewal application should be submitted next year, 180 days before it expires. We can't accept a
renewal any sooner than 1 year before it expires. Submitting it sooner doesn't gain any additional
time — the next expiration date after the 2018 renewal will be September 20, 2026 regardless of
whether the renewal is submitted early or late.
I've got this in my rather large pile of projects to be inspected, hopefully early next week.
Linda
From: Phil Tripp ]mailto:ptripp@ec.rr.com]
Sent: Tuesday, October 17, 2017 6:48 PM
To: Lewis,Linda <linda.lewis@ncdenr.gov>
Subject: [External] SW8000419 Landmark Industrial Park Lot 9 ((301 Raleigh Street)
,CAUTION: This email originated from outside of the organization. Do not click links or open attachments unless you verify that the
attachment and content are safe. Send all suspicious email as an attachment to report.spam@nc.gov.
Hi Linda,
Hope you are well,
We are in receipt of your October 5, 2017 correspondence for the above site. After reviewing the letter and site we offer
the following:
1. It appears the owner has been parking on the green area beside the pond. We propose adding 4" No. 57 stone
on top of a filter fabric in the parking area.
2. We are obtaining measurements of the existing stormwater pipes and pond for certification purposes.
3. We will assist the owner with providing the correct paperwork.
Please let us know if this would address the three items form the letter.
Thank you,
Phil
2.t Provide two sets of sealed plans that show:
a. The layout of the existing BUA;
b. Existing drainage (i.e. BMPs, swales, pipes, buffer areas)
c. Sufficient existing contours and spot elevations
d. The layout of the proposed BUA, dimensioned
e. The proposed grading plan
f. Any proposed stormwater measures.
Calculations of the existing and proposed amount of BUA. These may be incorporated into the narrative if
desired.
4. Current impervious surfaces that are closer than 30' to surface waters and are requesting a redevelopment
exemption can not be any closer to the surface waters with the new redeveloped BUA then what was previously
established.
5. A request for an exemption can be reviewed under the Express or the Standard program. There is no fee under
the Standard program, but the timeline is longer than in Express.
If the information above is insufficient for you to submit this package to Express, please let us know and we will schedule
a scoping meeting. Once we receive and review the package and determine that the site is exempt, then you will
receive a written exemption for the area. This should be kept on file to show you are not required to get a stormwater
permit as long as you meet the definition of redevelopment for that area.
Let me know if you have any questions about the requirements to receive an exemption from the stormwater
permitting requirements.
Georgette Scott
State Stormwater Program Supervisor
Department of Environmental Quality
Office (910) 796 7215
Fax (910) 350-2004
G eorgette. Scotto ncd en r. c�ov
127 Cardinal Drive Ext.
Wilmington, NC 28405
<f Nothing Compares..._
Email correspondence to and from this address is subject to the
North Carolina Public Records Law and may be disclosed to third parties.
From: Weaver, Cameron
Sent: Thursday, September 28, 2017 3:10 PM
To: Blake, Mark <Mark.Blake nc orts.com>; waIto n, todd <todd.walton nc orts.com>
Cc: Scott, Georgette <georRettescott nc enr. ov>; Ray Marconi <rmarconi@tbiilm.com>._,.,.
Subject: FW: scoping meeting request for stormwater - NC Ports
Hi Mark
I've talked with Georgette Scott, Stormwater Supervisor for DEQ, about this project. She will be responding directly to
you about the meeting request that Ray sent in on the Port's behalf. Bottom line from State Stormwater's view, based
on whet Ray explained to me, is that there needs to be some measure of improvement in Stormwater Controls on the
site in order for Redevelopment to be pursued as a permitting option.
Let me know if there are ways I may assist.
Cameron
Cameron Weaver
Environmental Assistance Coordinator -Wilmington Regional Office
NCDEQ-Division of Environmental Assistance and Customer Service
127 Cardinal Drive Ext.
Wilmington, NC 28405
910-796-7303
NCDEQ NEW WEBSITE: http://deg.nc.gov/
DEACS NEW WEBSITE: htt de .nc. ov about divisions environmental -assistance -customer -service
E-mail correspondence to and from this address may be subject to the North Carolina Public Records Law and may be
disclosed to third parties.
From: Weaver, Cameron
Sent: Thursday, September 28, 2017 2:54 PM
To: Ray Marconi <rmarconi@tbiilm.com>
Cc: Amy McLane <amciane@tbiilm com>; Eric Stumph <estumph@tbiilm.com>; Scott, Georgette
<georgette.scott@ ncdenr.gov>
Subject: RE: scoping meeting request for stormwater - NC Ports
Hi Ray
Christine Hall is on vacation this week; she is the primary Express Reviewer and needs to be aware of the project. We
are extremely scheduled out for ail meetings at this point, so do as i just suggested in our phone conversation and I'll let
Georgette know that she will be hearing from the Port to get a meeting as quickly as possible.
Cameron
Cameron Weaver
Environmental Assistance Coordinator -Wilmington Regional Office
NCDEQ-Division of Environmental Assistance and Customer Service
127 Cardinal Drive Ext,
Wilmington, NC 28405
910-796-7303
NCDEQ NEW WEBSITE: http://deg.nc'gov/
DEACS NEW WEBSITE: http://deq.nc.gov/about/divisions/environmental-assistance-customer-service
E-mail correspondence to and from this address may be subject to the North Carolina Public Records Law and may be
disclosed to third parties.
From: Ray Marconi [maiIto: rmarconi@tbiilm.com]
Sent: Wednesday, September 27, 2017 8:37 AM
To: Weaver, Cameron <cameron.weaver@ncdenr.gov>
Cc: Arty McLane <amclane@tbiilm.com>; Eric Stumph <estumQh@tbiilm.com>
"Subject: RE: scoping meeting request for stormwater - NC Ports
Cameron,
Is there any update on date/time for a scoping meeting for the NC Ports projects?
Representatives from the Ports have indicated that Wednesday, Oct. 4 in the morning or Thursday, Oct. 5 in the
afternoon would be good opportunities to meet.
Thanks
Ray Marconi, PE
Talbert & Bright
From: Ray Marconi
Sent: Friday, September 22, 2017 4:18 PM
To: 'cameron.weaver@ncdenr.gov' <cameron.weaver@ncdenr.gov>
Cc:'Amy McLane' <amclane@tbiilm.com>; Eric Stumph (estumph@tbiilm.com) <estumph@tblilm.com>
Subject: scoping meeting request for stormwater - NC Ports
Cameron,
Please see the attached scoping meeting request for stormwater. Please let us know when some dates and times are
available.
If you have any questions or concerns, please let me know.
Thank you,
Ray Marconi, PE
Talbert & Bright
4810 Shelley Drive
Wilmington, NC 28405
(910) 763-5350 / Phone
(910) 762-6281 / Fax
4
Corporations Division
-.
Wage 1 of 1
North Carolina
Elaine F. Marshall DEPARTMENTOF THE
Secretary SECRETARYOF STATE
PO Box 29622 Raleigh, NC 27626-0622 019A07-2000
Click Here To:
View Document Filings File an Annual Report Amend a Previous Annual Report
Print a Pre -Populated Annual Report form
Corporate dames
Legal: 301 Raleigh, LLC
Limited Liability Company Information
5osld:
0804089
Status:
Current -Active
Annual Report Status:
Current
Citizenship:
Domestic
Date Formed:
912212005
Fiscal Month:
December
Registered Agent:
Miller, James D.
Corporate Addresses
Mailing:
301 Raleigh Street
Wilmington, NC 28412
Principal Office:
704 Pilots Ridge Road
Wilmington, NC 28412
Reg Office:
704 Pilots Ridge Road
Wilmington, NC 28412
Reg Mailing:
704 Pilots Ridge Road
Wilmington, NC 28412
Company Officials
All LLCs are managed by their managers pursuant to N.C.G_S. 57D-3-20.
Manager: James D Miller
704 Pilots Ridge Road
Wilmington NC 28412
Member. Sandra B Miller
704 Pilots Ridge Road
Wilmington NC 28412
Account
Login
Create
Site
Account
https://�N,A,w.sosnc.gov/Search/profcorp/7825 822
5/31 /2017
r ► SOSH): 0804089
I)ate Filed-. 2/15/2017 11:59:00 PNI
Blaine F� Marshall
���� .,�_t , �\orth Carolina Secretary of State
s, LIMITED LIABILITY COMPANY ANNUAL REP CA2017 046 01967
NAME OF LIMITED LIABILITY COMPANY: 301 Raleigh, LLC
SECRETARY OF STATE ID NUMBER: 0$04089
STATE OF FORMATION: NC Fift Office Use Only
REPORT FOR THE YEAR: 2017
SECTION A: REGISTERED AGENTS INFORMATION Changes
1. NAME OF REGISTERED AGENT: James D. Miller
2. SIGNATURE OF THE NEW REGISTERED AGENT:
SIGNATURE CONSTITUTES CONSENT TO THE APPOINTMENT
3. REGISTERED OFFICE STREET ADDRESS 8 COUNTY 4. REGISTERED OFFICE MAILING ADDRESS
704 Pilots Ridge Road 704 Pilots Ridge Road
Wilmington, NC 28412 New Hanover Wilmington, NC 28412 New Hanover
I SECTION B: PRINCIPAL OFFICE INFORMATION
1. DESCRIPTION OF NATURE OF BUSINESS: lessor of real estate
2. PRINCIPAL OFFICE PHONE NUMBER: (910) 799-4857 3. PRINCIPAL OFFICE EMAIL:
o a
4. PRINCIPAL OFFICE STREET ADDRESS & COUNTY 5. PRINCIPAL OFFICE MAILING ADDRESS
704 Pilots Ridge Road 301 Raleigh Street
Wilmington, NC 28412 New Hanover Wilmington, NC 28412 New Hanover
SECTION C: COMPANY OFFICIALS (Enter additional Company Officials in Section E.)
NAME: James D. Miller NAME: Sandra B Miller
TITLE: Manager TITLE: Member
ADDRESS:
ADDRESS:
704 Pilots Ridae Road 704 Pilots Ridge Road
Wilmington, NC 28412 New Hanover Wilmington, NC 28412
NAME:
TITLE:
ADDRESS:
SECTION DECERTIFICATION OF ANNUAL REPORT. Section D must be completed in its entirety by a person/business entity.
i
SIGNATURE DATE
Fo must be signed by a Company Official listed under Section C of this form_
r `f ,Cr P�
Print or Type Name of Company Official Print or Type he itle of the Company Official
SUBMIT THIS ANNUAL REPORT WITH THE REQUIRED FILING FEE OF $200 ❑
MAIL TO: Secretary of State, Corporations Division, Post Office Box 29525• Raleigh, NC 27626-0525 ❑
0
,SPp Q.ti 04 04:30p Phillip TriPP 910--763-5631 P. 1
ma V
as
TRIPP ENGINEERING, P.C.
0 a 19 0letitnut 5ti� et
\Vilmington. North C:srolin.t 28-�01
11hone: (910) 76'-5100 - FAX: (910) 763-7631
August 31, 2004 a
NCDENR
1 '
Division Water Quality
127 Cardinal Drive
Wilmington, NC 28405-3845
Attn: Cameron Weaver
Re: Landmark Industrial Park, Lot 9
New Hanover County, NC
TE 04076
Dear 1••1r. Weaver:
We are requesting the above referenced project be scheduled for the express
review process (stormwater). Landmark Industrial Park, Lot 9 is a vacant lot in an
existing industrial park. The site is proposed as high density. Stormwater runoff will be
handled by wet detention. The Developer is:
James D. Miller, Owner
704 Pilots Ridge Road
Wilmington. NC 28412
910-471-9026
Our application package will be ready at your convenience. Please inform us of
the time which fits into Linda's schedule. Thank you.
Sincerely,
Tripp Engineering, P.C.
of► ntt�A4L
Jennifehde
JLR:dcb
.bap° N 04 04:30p
Phillip Tripp
910-763-5631
p.2
L!a DN1yR INDL)S-fX1AL , LOT �
SITE
LANDMARK
LAND
CAROLINA BEACH ROAD U.S HWY 421
�Q.
VICINITY -MAP_
State Stormwater Management Systems
Permit No. SW8 permit#
STATE OF NORTH CAROLINA
DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES
1. DIVISION OF WATER QUALITY
STATE STORMWATER MANAGEMENT PERMIT
HIGH DENSITY DEVELOPMENT
In accordance with the provisions of Article 21 of Chapter 143, General Statutes of
North Carolina as amended, and other applicable Laws, Rules, and Regulations
PERMISSION IS HEREBY GRANTED TO
James D. Miller
Landmark Industrial Park Lot 9
301 Raleigh Street, New Hanover County
FOR THE
construction, operation and maintenance of a wet detention pond in compliance with
the provisions of 15A NCAC 2H .1000 (hereafter referred to as the "stormwater rules")
and the approved stormwater management plans and specifications and other
supporting data as attached and on file with and approved by the Division of Water
Quality and considered a part of this permit.
This permit shall be effective from the date of issuance until September 20, 2014, and
shall be subject to the following specified conditions and limitations:
1. DESIGN STANDARDS
1. This permit is effective only with respect to the nature and volume of stormwater
described in the application and other supporting data.
2. This stormwater system has been approved for the management of stormwater
runoff as described in Section 1.6 on page 3 of this permit. The stormwater
control has been designed to handle the runoff from 39,741 square feet of
impervious area.
3. The tract,will be limited to the amount of built -upon area indicated on page 3 of
this permit, and per approved plans.
4. All stormwater collection and treatment systems must be located in either
dedicated common areas or recorded easements. The final plats for the project
will be recorded showing all such required easements, in accordance with the
approved plans.
5. The runoff from all built -upon area within the permitted drainage area of this
project must be directed into the permitted stormwater control system.
Page 2 of 7
State Stormwater Management Systems
Permit No. SW8 permit#
The following design criteria have been provided in the wet detention pond and
must be maintained at design condition:
a. Drainage Area, q.cres:
Onsite, ft :
Offsite, ft2:
b. Total Impervious Surfaces, ft2:
C. Design Storm, inches:
d. Pond Depth, feet:
e. TSS removal efficiency:
f. Permanent Pool Elevation, FMSL:
g. Permanent Pool Surface Area, ft2:
h. Permitted Storage Volume, ft3:
Temporary Storage Elevation, FMSL:
j. Controlling Orifice:
k. Permitted Forebay Volume, ft3
I. Receiving Stream/River Basin
M. Stream Index Number:
n. Classification of Water Body:
II. SCHEDULE,OF COMPLIANCE
2.05
89,298
rerouted
39,741
1"
5.0
90%
33.0
3,856
6,517
34.50
1"O pipe
2,195
Cape Fear River 1 Cape Fear
CPF17 18-71
"SC"
1. The stormwater management system shall be constructed in its entirety,
vegetated and operational for its intended use prior to the construction of any
built -upon surface.
2. During construction, erosion shall be kept to a minimum and any eroded areas of
the system will be repaired immediately.
3. The permittee shall at all times provide the operation and maintenance
necessary to assure the permitted stormwater system functions at optimum
efficiency. The approved Operation and Maintenance Plan must be followed in
its entirety and maintenance must occur at the scheduled intervals including, but
not limited to:
a. Semiannual scheduled inspections (every 6 months).
b. Sediment removal.
C. Mowinq and revegetation of slopes and the vegetated filter.
d. Immediate repair of eroded areas.
e. Maintenance of all slopes in accordance with approved plans and
specifications.
f. Debris removal and unclogging of outlet structure, orifice device, flow
sp"reader, catch basins and piping.
g. Access to the outlet structure must be available at all times.
Page 3of7
State Stormwater Management Systems
Permit No. SW8 permit#
4. Records of maintenance activities must be kept and made available upon
request to authorized personnel of DWQ. The records will indicate the date,
activity, name of person performing the work and what actions were taken.
5. Decorative spray fountains will be allowed in the stormwater treatment system,
subject to the following criteria:
a. The fountain must draw its water from less than 2' below the permanent
pool surface.
b. Separated units, where the nozzle, pump and intake are connected by
tubing, may be used only if they draw water from the surface in the
deepest part of the pond.
c. The falling water from the fountain must be centered in the pond, away
from the shoreline.
d. The maximum horsepower for a fountain in this pond is 1/8 horsepower.
6. The facilities shall be constructed as shown on the approved plans. This permit
shall become voidable unless the facilities are constructed in accordance with
the conditions of this permit, the approved plans and specifications, and other
supportirg data.
7. Upon completion of construction, prior to issuance of a Certificate of Occupancy,
and prior:to operation of this permitted facility, a certification must be received
from an appropriate designer for the system installed certifying that the permitted
facility has been installed in accordance with this permit, the approved plans and
specifications, and other supporting documentation. Any deviations from the
approved plans and specifications must be noted on the Certification. A
modification may be required for those deviations.
8. If the stormwater system was used as an Erosion Control device, it must be
restored to design condition prior to operation as a stormwater treatment device,
and prior.to occupancy of the facility.
9. Access to the stormwater facilities shall be maintained via appropriate
easements at all times.
10. The permittee shall submit to the Director and shall have received approval for
revised plans, specifications, and calculations prior to construction, for any
modification to the approved plans, including, but not limited to, those listed
below:
a. Any revision to any item shown on the approved plans, including the
stormwater management measures, built -upon area, details, etc.
b. Project name change.
C. Transfer of ownership.
d. Redesign or addition to the approved amount of built -upon area or to the
drainage area.
e. Further subdivision, acquisition, lease or sale of all or part of the project
area. The project area is defined as all property owned by the permittee,
for which Sedimentation and Erosion Control Plan approval or a CAMA
Major permit was sought.
f. Filling in, altering, or piping of any vegetative conveyance shown on the
approved plan.
11. The permittee shall submit final site layout and grading plans for any permitted
future areas shown on the approved plans, prior to construction.
12. A copy of the approved plans and specifications shall be maintained on file by
the Permittee for a minimum of ten years from the date of the completion of
construction.
�i
Page 4 of 7
State Stormwater Management Systems
Permit No. SW8 permit#
13. The Director may notify the permittee when the permitted site does not meet one
or more of the minimum requirements of the permit. Within the time frame
specified' in the notice, the permittee shall submit a written time schedule to the
Director for modifying the site to meet minimum requirements. The permittee
shall provide copies of revised plans and certification in writing to the Director
that the changes have been made.
III. GENERAL CONDITIONS
This permit is not transferable except after notice to and approval by the Director.
In the event of a change of ownership, or a name change, the permittee must
submit a formal permit transfer request to the Division of Water Quality,
accompanied by a completed name/ownership change form, documentation
from the parties involved, and other supporting materials as may be appropriate.
The approval of this request will be considered on its merits and may or may not
be approved. The permittee is responsible for compliance with all permit
conditions until such time as the Division approves the transfer request.
2. Failure to abide by the conditions and limitations contained in this permit may
subject the Permittee to enforcement action by the Division of Water Quality, in
accordance with North Carolina General Statute 143-215.6A to 143-215.6C.
t
3. The issuance of this permit does not preclude the Permittee from complying with
any and all statutes, rules, regulations, or ordinances, which may be imposed by
other government agencies (local, state, and federal) having jurisdiction.
4. In the event that the facilities fail to perform satisfactorily, including the creation
of nuisance conditions, the Permittee shall take immediate corrective action,
including; those as may be required by this Division, such as the construction of
additional or replacement stormwater management systems.
5. The permittee grants DENR Staff permission to enter the property during normal
business hours for the purpose of inspecting all components of the permitted
stormwater management facility.
6. The permit may be modified, revoked and reissued or terminated for cause. The
filing of a request for a permit modification, revocation and reissuance or
termination does not stay any permit condition.
7. Unless specified elsewhere, permanent seeding requirements for the stormwater
control must follow the guidelines established in the North Carolina Erosion and
Sediment Control Planning and Design Manual.
8. Approved plans and specifications for this project are incorporated by reference
and are enforceable parts of the permit.
9. The permittee shall notify the Division any name, ownership or mailing address
changes within 30 days.
Permit issued this the 20th day of September, 2004.
NORTH CAROLINA ENVIRONMENTAL MANAGEMENT COMMISSION
V � Alan W. KlimeK, N.t., Director
.Division of Water Quality
By Authority of the Environmental Management Commission
r=
Page 5 of 7
L
9/9/04
TE 04076
Storm water Narrative
Lot 9, Landmark Industrial Park
New Hanover County, NC
Landmark Lot #9 is a 2.05 acre site which is undeveloped at this time. We propose to
construct a 11,900 sf office retail building with 26,672 sf of asphalt parking and access
with 1169 sf of concrete sidewalk. Total impervious proposed for the site is 39,741 sf or
44.5 %.
A wet detention pond is designed for this site. The design will meet the states 1"
requirement with 90% TSS removal as well as the City's pre -post standard. This pond
will outflow to an unknown tributary of the Cape Fear River classified C-SW.
9/16/2004
CDC
Total Drainage) rea
s . ft. acres
89.298 2.05
Landmark Industrial Park, Lot 9
Stormwater Calculations
Impervious Area
Land Use
SO, ft,
acres
buildings
11,900
0.27
arkin las halt
26,672
0.61
future
1,169
0.03
Total
39.741
0.91
Stormwater Calculations:
Time of Concentration:
Hydraulic Length (L) = 360 ft,
change in Height (H) = 14 ft,
To = (C 1H)''"' 1 128
2,54 min,
Flow for 2 year, 6 hour Storm (Q�:
QPRE _ (CARE) x (I,o) x (Area)
3.01 cfs
Q POST(CPosT) x (I 10) x (Area)
6.87 cfs
oou otora a _apacny Tor z Xear zwrm.
CN = (98)(% imp.) + (60)(1-0% imp,)
77
P = 3.30 in. for2yr, 6 hr storm
S = I0001CN - 10
2.99
Depth (D)= [P-(0.2)(S)]7 !(P+(0.8)(S)1
1.28 in.
Time to Peak Flow:
TP = [(43.5)(D)(Area)) 1 Q2,P057
= 16.66 min.
Detention Pond Design:
Pond Size:
Elevation
ft.)
Surface Area
(sq. ft.)
Normal Pool
33.00
3,856
Flood Pool
34.50
4,833
Top of Bank
38.00
9,733
Bottom of Pool
28.00
572
Provided Storage Volume:
Vol. _ ((Normal pool SA + Flood Pool SA) 1 21
x (F.P, elev. - N.P. elov.)
= 6,517 cu.ft.
°% impervious = 0,445
= 44.5°%
say 45.0°%
CPRE = 0,25
CPosT = (°% imp.)(.95)+(1-0% imp.)(.25)
= 0,57
Iz = 5.88 Whir
Ito = 7.23 inlhr
Flow for 10 year, 6 hour Storm (Q,o):
QPRE a (CPRe) X (IY5) x (Area)
= 3.71 cfs
QPOST = (CPosT) x (Izs) x (Area)
= 8.45 cfs
. " • 04676
oou otora a L_apacny Tor iu year Jtorm:
CN = (98)(% imp.) + (60)(1-D% imp.)
— 77
P = 4,82 in. for 10 yr, 6 hr storm
S = 10001CN - 10
= 2,99
Depth (D)= [P-(0.2)(S)f 1 [P+(0.8)(S)1
= 2.47 in.
Time to Peak Flow:
TP = [(43.5) (D) (Area)] 1 Q1o,POST
= 26.10 min.
estate ounce Area Ne uuement at nermai poor
Pond side slopes = 3 :1
Depth below N.P. = 5 ft.
SAlDA = 0.0315
(Chart for 90%'TSS Removal for Wet Detention
Pond without Vegetative Fiiterl
j Required SAY (SAIDA) x (Total Drainage Area)
2,813 sq. ft.
State Volume Required for Storane of first 1" of runoff:
/�v
?gOFSEAL
17374
GREGOQ`�`����`��\
11t11[111
Rv = .05+ .009(% imp)
= 0.450534
V= (Design rainfali)(Rv)(Drainage Area)
= 3,353 cu. ft.
RECEIVED
SEP 17 2004
DWQ
PROJ # SW f W 4 i
04076Pond 1 of 3
9/16/2004 Landmark Industrial Park, Lot 9 04076
CDC Stormwater Calculations
Pond Volume;
Bottom SA = 572 sq. ft.
Normal Pool SA = 3,856 sq. ft.
Vol. = ((N.P. SA + Bottom SA) 121 x (N,P, el, - Bottom el.)
— 11,070 cu. ft.
Forebay:
Required Volume
Vol. = 20% of storage volume
= 2,214 cu. ft.
Outlet Structure Oesign:
Flow for 2-day drawdown:
for 1st 1" of stormwater,
Q = Required Vol. / 172,800 sec. (2-days)
0,019 cfs
Required Area of Pipe for 2-day drawdown:
A= O! [Cd x SQRT(2 x g x h)]
Cd = 0.6
g = 32.2 ft.ls'
h = (F.P, elev.- N,P. elev.) 12
= 0.75 ft.
A = 0.0047 sq. ft.
Diameter of Pipe for 2-day drawdown:
01A, = SQRT[(A x 4) / pi]
= 0.0770 ft.
0.92 in.
Use:.75 in diameter pipe
Outlet Structure Check:
Using a 4' x 4' Basin,
Perimeter L = 16 ft,
Q = CIA
C = (°k imp.)(.95) + (1-% imp.)(25)
= 0.57
1 = 7.23 in. for a 25 yr. Storm
A = 2.05 Acres
8.45 cfs
Q= CwxLxH"5
H = [Q ! (Cw x L)]2"
Cw = 3
= 0.31 ft.
Peak elevation = flood pool elevation + H
34.81 ft.
Provided Volume
Bottom SA =
263 sq. ft.
Normal Pool SA =
1,200 sq. ft.
Vol. =
[(N.P. SA+ Bottom SA)12] x (N.P. el. - Bottc
=
2,195 cu. ft.
depth =
3 ft.
Flow for 5-day drawdown:
for 1st 1" of stormwater,
O = Required Vol. 1432,000 sec. (5-days)
0.008 cfs
Required Area of Pipe for 5-day drawdown:
A= Q l [Cd x SQRT(2 x g x h)j
Cd = 0.6
g = 32.2 ft.ls"
h = (F,P. elev. - N.P. elev.) 12
= 0,75 ft,
A = 0.0019 sq. ft.
Diameter of Pipe for 5-day drawdown:
DIA, = SQRT[(A x 4) 1 pi)
0.0487 ft.
0.58 in.
04076Pond 2 of 3
TRIPP ENGINEERING, P.C.
419 Chestnut Street
Wilmington, North Carolina 28401
Phone: (910) 763-5100 - FAX: (910) 763-5631
September 17, 2004
NCDENR
Division Water Quality
127 Cardinal Drive
Wilmington, NC 28405-3845
Attn: Ms. Linda Lewis
Re: Landmark Industrial Park, Lot 9
Project No. SW8 000419
TE 04076
Dear Linda:
RE,( ,
$Ep 17 2004
BY:
In response to your comments dated September 10, 2004, we offer the following:
l . Note has been added stating that no wetlands exist on site.
2. Bypass swales have been extended.
3. The vegetated shelf area is now labeled and wetland species specified.
4. Building and parking have been Iabeled.
5. Existing drainage system and pond was built prior to State regulations,
therefore this is not a State permitted pond.
6. Address has been added to the plan.
7. The provided forebay volume is now 20% of the permanent pool volume.
New calculations are provided.
Please review for approval and contact us with any questions, comments or if you
need additional information. Thank you.
Sincerely,
Tripp Engineering, P.C.
t'k w4
Jennifer Rohde
JLR:dcb
Eric.
Michael F. Easley, Govemor
^� pG
Y
4
� Y
September 10, 2004
Mr. James D. Miller
704 Pilots Ridge Road
Wilmington, NC 28412
William G. Ross, Jr., Secretary
North Carolina Department of Environment and Natural Resources
Subject: Request for Additional Information
Stormwater Project No. SW8 000419 Mod.
Landmark Industrial Park Lot 9
New Hanover County
Dear Mr. Miller:
Alan W. Klimek, P.E. Director
Division of Water Quality
The Wilmington Regional Office received an Express Stormwater Management Permit
Application for Landmark Industrial Park Lot 9 on September 10, 2004. A preliminary review of
that information has determined that the application is not complete. The following information
is needed to continue the stormwater review:
1. Please either delineate all wetlands on site, disturbed or undisturbed, or note on
the plans that none exist.
2. Please extend the bypass swales that catch the offsite runoff farther up the side
of the driveway pavement to avoid all possibility of that runoff entering the pond.
3. Please label the vegetated shelf area on the pond detail and specify the wetland
species to be planted on it.
4. Please dimension the building and the rear parking area including radii.
5. Please verify that the existing drainage system, which this pond will outlet into, is
-not ultimately draining to -a permitted state stormwater pond.
6. Please provide the street address of this property.
7. The provided forebay volume is only 15% of the permanent pool volume. Please
increase the volume so that it is within the range. of 18%-22%.
North Carolina Division of Water Quality 127 Cardinal Drive Extension Phone (910) 395.3900 Customer Service 1-877-62M748
Wilmington Regional Office Wilmington, NC 25405-3845 FAX (910) 350-2004 Internet: h2o.enr.state.nc.us
One
e10ri
An Equal Opportunity/Affirmative Action Employer - 50°% Recycied110°% Post Consumer Paper �Vaturauna ll� lff
.
Mr. Miller
September 10, 2004
Stormwater Application No. SW8 000419 Mod.
Please note that this request for additional information is in response to a preliminary
review. The requested information should be received by this Office prior to September
17, 2004, or the application will be returned as incomplete. The return of a project will
necessitate resubmittal of all required items, including the application fee.
If you need additional time to submit the information, please mail or fax your request for
a time extension to the Division at the address and fax number at the bottom of this
letter. The request must indicate the date by which you expect to submit the required
information. The Division is allowed 90 days from the receipt of a completed
application to issue the permit. For express applications, action on the permit
application is generally taken within 2-3 business days.
The construction of any impervious surfaces, other than a construction entrance under
an approved Sedimentation Erosion Control Plan, is a violation of NCGS 143-215.1 and
is subject to enforcement action pursuant to NCGS 143-215.6A.
Please reference the State assigned project number on all correspondence. Any
original documents that need to be revised have been sent to the engineer or agent. All
original documents must be returned or new originals must be provided. Copies are not
acceptable. If you have any questions concerning this matter please feel free to call me
at (910) 395-3900.
Sincerely,
Linda Lewis
Environmental Engineer
RSSlad: S:1WQSlSTORMWATIADDINFO120041000419.sep04
cc: Phil Tripp, P.E., Tripp Engineering, via fax 763-5631
Linda Lewis
r
r Page 2 of 2
State of North Carolina
Department of Environment and Natural Resources
Wilmington Regional Office
Michael F. Easley, Governor
Date: 9- 0-U 4-
To: Phi( ri pp
CO: Tripp En('Al neer'
FAX -S&SI
REMARKS: /<2
FAX CO
William G. Ross Jr-, Secretary
SHEET
No. Of Pages: 3
From: bnd wi 5 -
CO: Dwo
FAX#: 910-350-2004
6- �i'6701'I m
127 Cardinal Drive Extension, Wilminggon, N.C.28405-3845 Telephone (910} 395-3900 Fax (910) 350-1004
An Equal Opportuniry Aftirmauve Action Employer
-ILE MODE _
753- MEMORY TX
P. 1
COMMUNICATION iRESULT REPORT t1SEP.'10.2004 13 zSPM TTINCDENR WIRO
R� PAGE
nPTION
ADDRESS (GROUP)
97635631
P. 3/3
REASON FOR ERROR E-2) BUSY _
E-1) HANG UP OR LINE FAIL E_q) NO FACSIMILE CONNECTION
E-3) NO ANSWER
State of North Carolina
Department of Environment and Natural Resources
Wilmington Regional'office
Michael F. Easley, Go'vemor William C. Ross Jr., Secretary
FAX COVER SHEET
bate: 9-10-04- _ No. QfPages: .�
to: in n co:; D�n1C - -
FAX #: 1- S&51 FAX#: 910'-350--2004
REMARKS:
' tibial «ma
121 Cardinal Arivc Extension, Wilmingtnn, N.C. 38405-3845 Telephone (910) 39W900 Fax (910) 350"004
An Equal Opportunitr' Afl;rmative Action Imployer
^M
TRIPP ENGINEERING, P.C.
419 Chestnut Street
Wilmington, North Carolina 28401
Phone: (910) 763-5100 • FAX: (910) 763-5631
4 �Ci)
September 9, 2004
NCDENR
Division Water Quality
127 Cardinal Drive
Wilmington, NC 28405-3845
Attn: Ms. Linda Lewis
Re: Landmark Industrial Park, Lot 9
New Hanover County, NC
TE 04076
Dear Linda:
DECEIVED
S E P 10 Z004
BY4/8'000 q-19L
Enclosed please find two (2) sets of plans, one (1) signed original and one (1)
copy of the application form with narrative, one (1) wet detention basin supplement, two
(2) sets of calculations and one check for the application fee.
Please review for approval and contact us with any questions or comments.
Thank you.
Sincerely,
Tripp Engineering, P.C.
Jennifer Rohde
JLR:dcb
Enc.
State of North Carolina
,)eparitment of Environment
and Natural Resources
Wilmington Regional Office
James B. Hunt, Jr., Governor
Bill Holman, Secretary
Division of Water Quality
July 28.2000
Mr. Chris Stephens, Member/Manager
Landmark Commercial
PO Box 4127
Wilmington, NC 28406
Subject: Permit No. SW8 000419
Landmark Industrial Lot 9
High Density Stormwater Project
New Hanover County
Dear Mr. Stephens:
The Wilmington Regional Office received a complete Stormwater Management Permit Application for Landmark
Industrial, Lot 9 on .tune 29, 2000. Staff review of the plans and specifications has determined that the project, as
proposed, will comply with the Stormwater Regulations set forth in Title 15A NCAC 2H.1000. We are forwarding
Permit No. SW8 000419 dated July 28, 2000, for the construction of Landmark Industrial Lot 9.
This permit shall be effective from the date of issuance until July 28, 2010, and shall be subject to the conditions
and limitations as specified therein. Please pay special attention to the Operation and Maintenance requirements
in this permit. Failure to establish an adequate system for operation and maintenance of the stormwater management
system will result in fixture compliance problems.
If any parts, requirements, or limitations contained in this permit are unacceptable, you have the right to request an
adjudicatory hearing upon written request within thirty (30) days following receipt of this permit. This request must
be in the form of a written petition, conforming to Chapter 150B of the North Carolina General Statutes, and filed
with the Office of Administrative Hearings, P.O. Drawer 27447, Raleigh, NC 27611-7447. Unless such demands
are made this permit shall be final and binding.
If you have any questions, or need additional information concerning this matter, please contact Scott Vinson, or
me at (910) 395-3900.
Sincerely,
Rick Shiver
Water Quality Regional Supervisor
RSS/sav: S:IWQSISTORMWATIPERMIT1000419.JUL
cc: Phillip Tripp, P.E.
Tony Roberts, New Hanover County Inspections
Beth Easley, New Hanover County Engineering
Scott Vinson
Wilmington Regional Office
Central Files
127 Cardinal Dr. Ext., Wilmington, North Carolina 28405 Telephone 910-395-3900 FAX 910-350-2004
An Equal Opportunity Affirmative Action Cmplover 50% recveled/10% post -consumer paper
State Stormwater Management Systems
Permit No. SW8 000419
STATE OF NORTH CAROLINA
DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES
DIVISION OF WATER QUALITY
1
STATE STORMWATER MANAGEMENT PERMIT
HIGH DENSITY DEVELOPMENT
In accordance with the provisions of Article 21 of Chapter 143, General Statutes of North Carolina as amended, and
other applicable Laws, Rules, and Regulations
PERMISSION IS HEREBY GRANTED TO
Landmark Commercial
Landmark Industrial Lot 9
New Hanover County
WOR"14
construction, operation and maintenance of a wet detention pond in compliance with the provisions of 15A NCAC
2H .1000 (hereafter referred to as the "stormwater rules') and the approved stormwater management plans and
specifications and other supporting data as attached and on file with and approved by the Division of Water Quality
and considered a part of this permit.
This permit shall be effective from the date of issuance until July 28, 2010 and shall be subject to the following
specified conditions and limitations:
I. DESIGN STANDARDS
1. This permit is effective only with respect to the nature and volume of stormwater described in the
application and other supporting data.
2. This stormwater system has been approved for the management of stormwater runoff as described on page
3 of this permit, the Project Data Sheet. The stormwater control has been designed to handle the runoff from
72,650 square feet of impervious area.
3. Approved plans and specifications for this project are incorporated by reference and are enforceable parts
of the permit.
4. The tract will be limited to the amount of built -upon area indicated on page 3 of this permit, and per
approved plans.
I
5. The built -upon area for the future on -site development is limited to 10,899 square feet.
6. The built -upon area for the future off -site development is limited to 18,295 square feet.
PJ
Project Name:
Permit Number:
Location:
Applicant:
Mailing Address:
State Stormwater Management Systems
Permit No. SW8 000419
DIVISION OF WATER QUALITY
PROJECT DESIGN DATA SHEET
Landmark Industrial, Lot 9
SW8 000419
i
New Hanover County
E
Mr. Chris Stephens
Landmark Commercial
PO Box 4127
Wilmington, NC 28406
Application Date: June 29, 2000
Name of Receiving Stream/Index #: UT Cape Fear River / 18-71
Classification of Water Body: "SC"
If Class SA, chloride sampling results: n/a
Pond Depth, feet: i
Permanent Pool Elevation, FMSL:
Drainage Area, acres:
Total Impervious Surfaces, ft2:
Buildings, ftz:
Parking, ftz:
Sidewalks, ft2:
On -Site Future, ft2:
Off Site @ 70%, ftz:
Offsite Area entering Pond, ftz:
i
Required Surface Area, ftz:
Provided Surface Area, ftz:
Required Storage Volume, W:
Provided Storage Volume, ftl-
Temporary Storage EIevation, FMSL:
Controlling Orifice:
i
,k
6.50
32.00
3.14
72,650
12,600
29,420
1,436
10,899
18,295
18,295 (70% of Adjacent Tract)
3,402
4,276
6,019
7,876
33.55
1.25" � pipe
N
State Stormwater Management Systems
Permit No. SW8 000419
I
`Il. SCHEDULE OF COMPLIANCE
The stormwater management system shall be constructed in it's entirety, vegetated and operational for its
intended use prior to the construction of any built -upon surface.
2. During construction, erosion'shall be kept to a minimum and any eroded areas of the system will be repaired
immediately.
The permittee shall at all times provide the operation and maintenance necessary to assure the permitted
stormwater system functions at optimum efficiency. The approved Operation and Maintenance Plan must
be followed in its entirety and maintenance must occur at the scheduled intervals including, but not limited
to:
i
a. Semiannual scheduled inspections (every 6 months).
b. Sediment removal.
C. Mowing and revegetation of side slopes.
d. Immediate repair of eroded areas.
e. Maintenance of side slopes in accordance with approved plans and specifications.
f. Debris removal and u!clogging of outlet structure, orifice device and catch basins and piping.
g. Access to the outlet structure must be available at all times.
4. Records of maintenance activities must be kept and made available upon request to authorized personnel
ofDWQ. The records will indicate the date, activity, name of person performing the work and what actions
were taken.
5. Decorative spray fountains will not be allowed in the stormwater treatment system.
1
6. The facilities shall be constructed as shown on the approved plans. This permit shall become voidable unless
the facilities are constructed in accordance with the conditions of this permit, the approved plans and
specifications, and other suppor
ting, data.
7. Upon completion of construction, prior to issuance of a Certificate of Occupancy, and prior to operation of
this permitted facility, a certification must be received from an appropriate designer for the system installed
certifying that the permitted facility has been installed in accordance with this permit, the approved plans
and specifications, and other 'supporting documentation. Any deviations from the approved plans and
specifications must be noted on the Certification.
8. If the stormwater system was used as an Erosion Control device, it must be restored to design condition prior
to operation as a stormwater-treatment device, and prior to occupancy of the facility.
1
9. The following items will require a modification to the permit:
a. Any revision to the approved plans, regardless of size.
b. Project name change.
C. Transfer of ownership.
d. Redesign or addition to the approved amount of built -upon area.
C. Further subdivision, ac4uisition, or sale of the project area. The project area is defined as all property
owned by the permittee, for which Sedimentation and Erosion Control Plan approval was sought.
f. Filling in, altering, or piping of any vegetative conveyance shown on the approved plan.
10. The Director may determine that other revisions to the project should require a modification to the permit.
11. A copy of the approved plans and specifications shall be maintained on file by the Permittee for a minimum
of ten years from the date of the completion of construction.
2
State Stormwater Management Systems
Permit No. SW8 000419
12. Prior to the sale of any portion of the property, an access/maintenance easement to the stormwater facilities
shall be granted in favor of the permittee if access to the stormwater facilities will be restricted by the sale
of any portion of the property.
l 3. The permittee is responsible; for verifying that the proposed built -upon area does not exceed the allowable
built -upon area.
14. The runoff from all built -upon area on the project must be directed into the permitted stormwater control
system.
15. The Director may notify the permittee when the permitted site does not meet one or more of the minimum
requirements of the permit. Within the time frame specified in the notice, the permittee shall submit a written
time schedule to the Director for modifying the site to meet minimum requirements. The permittee shall
provide copies of revised plans and certificationin writing to the Director that the changes have been made.
16. The permittee shall notify the Division of any mailing address changes within 30 days.
III. GENERAL CONDITIONS
This permit is not transferable. In the event there is a desire for the facilities to change ownership, or there
is a name change of the Permittee, a formal permit request must be submitted to the Division of Water
Quality accompanied by an application fee, documentation from the parties involved, and other supporting
materials as may be appropriate. The approval of this request will be considered on its merits and may or
may not be approved.
, 2. Failure to abide by the conditions and limitations contained in this permit may subject the Permittee to
enforcement action by the Division of Water Quality, in accordance with North Carolina General Statute
143-215.6A to 143-215.6C. '
3. The issuance of this permit does not preclude the Permittee from complying with any and all statutes, rules,
regulations, or ordinances which may be imposed by other government agencies (local, state, and federal)
which have jurisdiction.
4. In the event that the facilities fail to perform satisfactorily, including the creation of nuisance conditions,
the Permittee shall take immediate corrective action, including those as may be required by this Division,
such as the construction of additional or replacement stormwater management systems.
5. The permittee grants DENR Staff permission to enter the property for the purpose of inspecting all
components of the permitted stormwater management facility.
6. The permit may be modified, revoked and reissued or terminated for cause. The filing of a request for a
permit modification, revocation and reissuance or termination does not stay any permit condition.
7. Unless specified elsewhere, permanent seeding requirements for the stormwater control must follow the
guidelines established in the North Carolina Erosion and Sediment Control Planning and Design Manual.
I
Permit issued this the 28th day of July,;2000.
NORTH CAROLINA ENVIRONMENTAL MANAGEMENT COMMISSION
i
y' ~
Kerr T. Stevens, Director
Division of Water Quality
By Authority of the Environmental Management Commission
Permit Number SW8 000419
5
State Stormwater Management Systems
Permit No. SW8 000419
Landmark Industrial, Lot 9
Stormwater Permit No. SW8 000419
New Hanover County
Designer's Certification
as a duly registered in
the State of North Carolina, having been authorized to observe (periodically/weekly/full time) the construction of
the project, r
(Project)
for I (Project Owner) hereby state that, to the best of my abilities, due care
and diligence was used in the observation of the project construction such that the construction was observed to be
built within substantial compliance; and intent of the approved plans and specifications.
The checklist of items on page 2 of this form is included in the Certification.
Noted deviations from approved plans and specification:
Signature
Registration Number
I
Date
SEAL
6
i
State Stormwater Management Systems
Permit No. SW8 000419
Certification Requirements: '
l . The drainage area to the system contains approximately the permitted acreage.
2. The drainage area to the system contains no more than the permitted amount of built -upon area.
3. All the built -upon area associated with the project is graded such that the runoff drains to the system.
4. The outlet/bypass structure elevations. are per the approved plan.
5. The outlet structure is located per the approved plans.
6. Trash rack is provided on the outlet/bypass structure.
7. All slopes are grassed with permanent vegetation.
S. Vegetated slopes are no steeper than 3:1.
9. The inlets are located per the approved plans and do not cause short-circuiting of the system.
10. The permitted amounts of surface area and/or volume have been provided.
11. Required drawdown devices are correctly sized per the approved plans.
12. All `required design depths are provided.
13. All required parts of the system are provided, such as a vegetated shelf, and a forebay.
t
14. The overall dimensions of the system, as shown on the approved plans, are provided.
CC'. NCDENR-DWQ Regional Office
Tony Roberts, New Hanover County Building Inspector
7
I
TE 98123
.{ ,E� •�� ,, a 3 ;� �;�a it's= ,:`, a i °� a f g 1
s.x OFFICFUSE'ONLY
Date Received Fee Paid Permit Number
State of North Carolina
Department of Environment and Natural Resources
I Division of Water Quality
STORMWATER MANAGEMENT PERMIT APPLICATION FORM
This form may be photocopied for use as an original
1. GENERAL INFORMATION
1. Applicants name (specify they name of the corporation, individual, etc. who owns the project):
Landmark Commercial
2. Print Owner/Signing Official's name and title (person legally responsible for facility and compliance):
I
Chris Ste hens member/Manalzer
l
3, Mailing Address for person listed in item 2 above:
P.O. Box 4127
City: Wilmin ton i State: NC "Lip: 28406
Telephone Number: ! 910-392-7201
�i
4. Project Name (subdivision, facility, or establishment name — should be consistent with project name on
plans, specifications, letters, operation and maintenance agreements, etc.):
Landmark Industrial Lot 9
i -
5. Location of Project (street address):
330 Raleigh Street
City: Wilmi nton County: New Hanover
I
6. Directions to project (from nearest major intersection):
Approx. 1/4 mile on West Raleigh_Street from the intersection of Hwy 421-and Raleigh Street,
7. Latitude : N 340 12' 00" 1 Longitude: W 770 56' 00" of project
8. Contact person who can answer questions about the project:
Name: Charles Cazier Telephone Number: 763-5100
I
1I. PERMIT INFORMATION:
1. Specify whether project is (check one): X New Renewal Modification
i
Form SWU-101 Version 3.99 j Page I of
If this application is being submitted as the result of a renewal or modification to an existing permit, list
The existing permit number') NA and its issue date (if known)
3. Specify the type of project (check one):
Low Density _ X ` High Density Redevelop General Permit Other
Additional Project Requirements (check applicable blanks):
LAMA Major X Sedimentation/Erosion Control 4048401 Permit NPDES Stormwater
Information on required state permits can be obtained by contacting the Customer Service Center at
1-877-623-6748.
III. PROJECT INFORMATION
1. In the space provided below,�summarize how stormwater will be treated. Also attach a detailed narrative
(one to two pages) describing stormwater management for the project.
wet detention i
2. Stormwater runoff from this project drains to the Cape Fear River basin.
i (6,'75
3. Total Project Area: 2.54 acres 4. Project Built Upon Area: -49-1� %.
5. How many drainage basins does the project have? —I
—
Complete the following information for each drainage area. If there are more than two drainage areas in the
project, attach an additional sheet with the information for each area provided in the same format as below.
I
8�isin Informatio`n`� ,"-': �,,;,
IDrafiiage Basni:;l ¢
��:�; F, sDiairiae+Basin,2E 1�,:y
Receiving Stream Name
Unnamed trib to Cape Fear River
Receiving Stream Class
C-sw- G
Drainage Basin Area
3.14 ac
Existing Impervious * Area
-
Proposed Impervious * Area
1.67 ac
% Impervious* Area (total) 4
53.1 ac
Imper� pops Surface Area
Dia►naae Basmzl` x `;, eE,
b
_ 6� "+;.
Drainag §i �, a
On -site Buildings
12,600 sf
On -site Streets
-
On -site Parking
29,420 sf
On -site Sidewalks
1,436 sf
Stier en site Future
10,899 sf
Off -site @ 70% (.06 acre)
18,295 sf
Total:'k
Y-w72,650 sf
E=
* Impervious area is defined as the built upon area including, but not limited to, buildings, roads, parking
areas sidewalks, gravel areas, etc.
Dorm SWU-101 Version 3.99 1 Page 2 of 4
How was the off -site impervious area listed above derived? county topography maps
IV. DEED RESTRICTIONS AND PROTECTIVE COVENANTS
The following italicized deed restrictions and protective covenants are required to be recorded for all
subdivisions, outparcels and future development prior to the sale of any lot. If lot sizes vary significantly, a
table listing each lot number, size, and the allowable built -upon area for each lot must be provided as an
attachment.
1. The following covenants are intended to ensure ongoing compliance with state stormwater management permit
number as issued by the Division of Water Quality. These covenants may
not be changed or deleted without the consent of the Slate.
2. No more than square feet of airy lot shall be covered by structures of impervious materials.
Impervious materials include av�)halt, gravel, concrete, brick, stone, slate or similar material but do not include wood
decking or the water surface of twit arcing pools.
3. Swales shall not be filled in, piped or altered except as necessary to provide driveway crossings.
i
4. Built -upon area in excess of the permitted amount requires a state stornnvater management permit modification prior
to construction.
3. AllperInitledrunoffftom outparcels or future development shall be directed into the permitted stormwater control
system. These connections to the stormmvater control system shall be performed in a manner that maintains the
integrity and performance of the system as permitted
By your signature below, you certify that the recorded deed restrictions and protective covenants for this project
shall include all the applicable items required above, that the covenants will be binding on all parties and
persons claiming under them, that they will run with the land, that the required covenants cannot be changed or
deleted without concurrence from the State, and that they will be recorded prior to the sale of any lot.
V. SUPPLEMENT FORMS
The applicable state stormwater management permit supplement form(s) listed below most be submitted for
each BMP specified for this project. Contact the Stormwater and General Permits Unit at (910) 733-5083 for
the status and availability of these forms.
Form SWU-102
Wet Detention Basin Supplement
Form SWU-103
Infiltration. Basin Supplement
Form SWU-104
Low Density Supplement
Form SWU-105
Curb Outlet System Supplement
Form SWU-106
Off -Site System Supplement
Form SWU-107
Underground Infiltration Trench Supplement
Form SWU-108
Neuse River Basin Supplement
Form SWU-109
Innovative Best Management Practice Supplement
Form SWU-101 Version 3.99 Page 3 of
VI. SUBMITTAL REQUIREMENTS
Only complete application packages will be accepted and reviewed by the Division of Water Quality (DWQ).
A complete package includes all of the items listed below. The complete application package should be
submitted to the appropriate DWQ Regional Office.
l . Please indicate that you have provided the following required information by initialing in the space
provided next to each item.
AnNiaant:s Initials
• Original and one copy of the Stormwater Management Permit Application Form VV t:D
• One copy of the applicable Supplement Form(s) for each BMP
• Permit application processing fee of $420 (payable to NCDENR)
• Detailed narrative description of stormwater treatmentlmanagement 0
• Two copies of plans and specifications, including:
- Development/Project name
- Engineer and firm
- Legend
- North arrow
- Scale
- Revision number and date
- Mean high water line
- Dimensioned property/project boundary
- Location map,with named streets or NCSR numbers
- Original contours, proposed contours, spot elevations, finished floor elevations
- Details of roads, drainage features, collection systems, and stormwater control measures
- Wetlands delineated, or a note on plans that none exist
- Existing drainage (including off -site), drainage easements, pipe sizes, runoff calculations
- Drainage areas delineated
- Vegetated buffers (where required)
VIt. AGENT AUTHORIZATION
If you wish to designate authority; to another individual or firm so that they may provide information on your
behalf, please complete this section.
Designated agent (individual or firm): Tri En ineerin 7 P.C.
Mailing Address: 419 Chestnut Street
City: Wilmington State: NC Zip: 28401
Phone: 910 763-5100 Fax: (910) 763-5631
VIII. APPLICANT'S CERTIFICATION
1, (print or type name ofperson listed in General Information, item 2) Chris Stevens ,
certify that the information include on this permit application form is, to the best of my knowledge, correct and
that the project will V construct in formanc th the approved plans, that the required deed restrictions
and protective co e nts r re d lie proposed project complies with the requirements of 15A
NCAC 21-1 .100 .
Signature: Date: 3 /K °-V
Form SWU-101 Version 3.99 Page 4 of
TE 98123
Permit No._�/
fto be provided by DWQ)
State of North Carolina
Department of Environment and Natural Resources
I Division of Water Quality
STORMWATER MANAGEMENT PERMIT APPLICATION FORM
,f
WET DETENTION BASIN SUPPLEMENT
This form may be photocopied for use as an original
DWQ Stormwater Management Plan Review_
A complete stormwater management plan submittal includes a wet detention basin supplement for each basin,
design calculations, plans and specifications showing all basin and outlet structure details, and a signed and
notarized operation and maintenance agreement.
1. PROJECT INFORMATION (please complete the following information):
Project Name: Landmark Industrial Park Lot 9
Contact Person: Charles Cazier Phone Number: ( 910 ) 763-5100
For projects with multiple basins, specify which basin this worksheet applies to: 1
elevations
Basin Bottom Elevation 25.5 ft.
Permanent Pool Elevation 32.0 ft.
Temporary Pool Elevation 33.55 ft.
areas
Permanent Pool Surface Area 4,276 sq.ft.
Drainage Area _ 3.14! ac.
Impervious Area
volumes
Permanent Pool Volume
Temporary Pool Volume
Forebay Volume
Other parameters
SA/DAI
Diameter of Orifice
Design Rainfall
Design TSS Remova12
1.67' ac
14,060
cu_ft.
7;876
cu.ft.
i
2,51.1
cu.ft.
(floor of the basin)
(elevation of the orifice)
(elevation of the discharge structure overflow)
(water surface area at the orifice elevation)
(on -site and off -site drainage to the basin)
(on -site and off -site drainage to the basin)
(combined volume of main basin and forebay)
(volume detained above the permanent pool)
(approximately 20% of total volume)
2.48 (surface area to drainage area ratio from DWQ table)
1.25. in. (2 to 5 day temporary pool draw -down required)
1.0 in.
90 ' % (minimum 85% required)
Form S W U-102 Rev 3.99 i Page 1 of 4
rootnotes:
1. When using the Division SAIDA tables, the correct SA/DA ratio for permanent pool sizing should be computed based upon the
actual impervious %and permanent pool depth. Linear interpolation should be employed to determine the correct value for non-
standard table entries.
2. In the 20 coastal counties, the requirement for a vegetative filter may be waived if the wet detention basin is designed to provide
90% TSS removal. The NCDENR BMP manual provides design tables for both 85% TSS removal and 90% TSS removal.
H. REQUIRED ITEMS C14ECKLIST
The following checklist outlines design requirements per the Stormwater Best Management Practices Manual
(N.C. Department of Environment,' Health and Natural Resources, February 1999) and Administrative Code
Section: 15 A NCAC 2H .1008.
Initial in the space provided to indicate the following design requirements have been met and supporting
documentation is attached. If the applicant has designated an agent in the Stormwater Management Permit
Application Form, the agent may initial below. If a requirement has not been met, attach justification.
Appli and is Initials
v-Vw'4�
a. The permanent pool depth is between 3 and 6 feet (required minimum of 3 feet).
b. The forebay volume is approximately equal to 20% of the total basin volume.
c. The temporary pool controls runoff from the design storm event.
d. The temporary pool draws down in 2 to 5 days.
e. If required, a 30 foot vegetative filter is provided at the outlet (include lion -erosive flow
calculations).
f The basin length to width ratio is greater than 3: 1.
g. The basin side slopes above the permanent pool are no steeper than 3: 1.
Ii. A submerged and vegetated perimeter shelf with a slope of 6: l or less (show detail).
i. Vegetative cover above the permanent pool elevation is specified.
j. A trash rack or similar device is provided for both the overflow and orifice.
k. A recorded drainage easement is provided for each basin including access to nearest right-
of-way.
1. If the basin is used for sediment and erosion control during construction, clean out of the
basin is specified to be performed prior to use as a wet detention basin
t4�et m. A mechanism is specified which will drain the basin for maintenance or an emergency.
III. WET DETENTION BASIN OPERATION AND MAINTENANCE AGREEMENT
The wet detention basin system is defined as the wet detention basin, pretreatment including forebays and the
vegetated filter if one is provided.
This system (check one) ❑ does X does not incorporate a vegetated filter at the outlet.
This system (check one) ❑ does X does not incorporate pretreatment other than a forebay.
Form S W U- l 02 Rev 3.99 Page 2 of 4
Maintenance activities shall be performed as follows:
1. After every significant runoff producing rainfall event and at least monthly:
a. Inspect the wet detention system for sediment accumulation, erosion, trash accumulation,
vegetated cover, and general, condition.
b. Check and clear the orifice of any obstructions such that drawdown of the temporary pool occurs
within 2 to 5 days as designed.
2. Repair eroded areas immediately; re -seed as necessary to maintain good vegetative cover, mow vegetative
cover to maintain a maximum height of six inches, and remove trash as needed.
3. Inspect and repair the collection system (i.e. catch basins, piping, swales, riprap, etc.) quarterly to
maintain proper functioning.
4. Remove accumulated sediment from the wet detention basin system semi-annually or when depth is
reduced to 75% of the original design depth (see diagram below). Removed sediment shall be disposed
of in an appropriate manner and shall not be handled in a manner that will adversely impact water quality
(i.e. stockpiling near a wet detention basin or stream, etc.).
The measuring device used to determine the sediment elevation shall be such that it will give an accurate
depth reading and not readily penetrate into accumulated sediments.
When the permanent pool depth reads 4.875 feet in the main pond, the sediment shall be removed.
When the permanent pool depth reads 2.25feet in the forebay, the sediment shall be removed.
BASIN DIAGRAM
(fill in the blanks)
Permanent Pool Elevation 32.0
Sediment R moval EI. 29.75 75 °
------ Sediment Removal Elevation 27.125 75%
Bottomkevasion 29.0 %-----�----------------------------------------- ----
i " Bottom Elevation 25.5 25°/
FOREBAY MAIN POND
5. Remove cattails and other indigenous wetland plants when they cover 50% of the basin surface. These
plants shall be encouraged to grow along the vegetated shelf and forebay berm.
6. If the basin must be drained for an emergency or to perform maintenance, the flushing of sediment
through the emergency drain shall be minimized to the maximum extent possible.
Form SWU-102 Rev 3.99 Page 3 of 4
7" All components of the wet detention basin system shall be maintained in good working order.
I acknowledge and agree by my signature below that I am responsible for the performance of the seven
maintenance procedures listed above. I agree to notify DWQ of any problems with the system or prior to any
changes to the system or responsible party.
Print name: Chris Stephens
Title: Member/manager
Addre
Phone
Signa'
Date:
Note: The legally responsible party should not be a homeowners association unless more than 50% of the lots have been sold and
a resident of the subdivision has been named the president.
I, a Notary Public for the State of
County of LtW, do hereebby—certify that Z;!V. J o
personally appeared before me this / day of ,
execution of the forgoing wet detention basin maintenance requirements.
i O . �•�.. •��`.
•' NOTARY
r
z ' PUBLIC 2
•�'. ' I •
114481811000
SEAL
My commission expires
i
vo , and acknowledge the due
Witness my hand and official seal,
Form S W U-102 Rev 3.99 Page 4 of 4
p
1
i
i
State Stormwater Management Systems
Permit No. SW8 000419
STATE OF NORTH CAROLINA
DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES
DIVISION OF WATER QUALITY
i
STATE STORMWATER MANAGEMENT PERMIT
HIGH DENSITY DEVELOPMENT
In accordance with the provisions of Article 21 of Chapter 143, General Statutes of North Carolina as amended, and
other applicable Laws, Rules, and Regulations
PERMISSION IS HEREBY GRANTED TO
Landmark Commercial
Landmark Industrial Lot 9
New Hanover County
FOR THE
construction, operation and maintenance of a wet detention pond in compliance with the provisions of 15A NCAC
2I-I .1000 (hereafter referred to as the "stormwater rules') and the approved stormwater management plans and
specifications and other supporting data as attached and on file with and approved by the Division of Water Quality
and considered a part of this permit.
This permit shall be effective from the date of issuance until July 28, 2010 and shall be subject to the following
specified conditions and limitations;
L DESIGN STANDARDS
1. This permit is effective only with respect to the nature and volume of stormwater described in the
application and other supporting�data,
2. This stormwater system has been approved for the management of stormwater runoff as described on page
3 of this permit, the Project Data Sheet. The stormwater control has been designed to handle the ninoff from
72,650 square feet of impervious area.
3. Approved plans and specifications for this project are incorporated by reference and are enforceable parts
of the permit.
4. The tract will be limited to the amount of built -upon area indicated on page 3 of this permit, and per
approved plans.
5. The built -upon area for the future'on-site development is limited to 10,899 square feet.
6. The built -upon area for the future off -site development is limited to 18,295 square feet.
2
Project Name:
Permit Number:
Location:
State Stormwater Management Systems
Permit No. SW8 000419
DIVISION OF WATER QUALITY
PROJECT DESIGN DATA SHEET
Landmark Industrial, Lot 9
SW8 000419
New Hanover County
Apphcant:
Mailing Address:
Application Date:
i
Name of Receiving Streaari/Index 9:
Classification of Water Body:
If Class SA, chloride sampling results
Pond Depth, feet:
Permanent Pool Elevation, FMSL:
Drainage Area, acres:
Total Impervious Surfaces, ft2: '
Buildings, ft2:
Parking, ft2:
Sidewalks, ft2:
On -Site Future, ft2:
Off -Site @ 70%, ft2:
Offsite Area entering Pond, ft2:
Required Surface Area, ft2:
Provided Surface Area, ft2:
Required Storage Volume, ft3:
Provided Storage Volume, ft3:
Temporary Storage Elevation, FMSL:
Controlling Orifice:
Mr. Chris Stephens
Landmark Commercial
PO Box 4127
Wilmington, NC 28406
June 29, 2000
UT Cape Fear River / 18-71
"SC"
n/a
6.50
32.00
3.14
72,650
12,600
29,420
1,436
10,899
18,295
18,295 (70% of Adjacent Tract)
3,402
4,276
6,019
7,876
33.55
1.25" � pipe
3
State Stormwater Management Systems
Permit No. SW8 000419
i
It. SCHEDULE OF COMPLIANCE
The stormwater management, system shall be constructed in it's entirety, vegetated and operational for its
intended use prior to the construction of any built -upon surface.
2. During construction, erosion shall be kept to a minimum and any eroded areas of the system will be repaired
immediately.
The permittee shall at all times provide the operation and maintenance necessary to assure the permitted
stormwater system functions at optimum efficiency. The approved Operation and Maintenance Plan must
be followed in its entirety and maintenance must occur at the scheduled intervals including, but not limited
to:
a. Semiannual scheduled inspections (every 6 months).
b. Sediment removal.
C. Mowing and revegetation of side slopes.
d. Immediate repair of eroded areas.
C. Maintenance of side slopes in accordance with approved plans and specifications.
f. Debris removal and unclogging of outlet structure, orifice device and catch basins and piping.
g. Access to the outlet structure must be available at all times.
4. Records of maintenance activities must be kept and made available upon request to authorized personnel
of DWQ. The records will indicate the date, activity, name of person performing the work and what actions
were taken. .
Decorative spray fountains will not be allowed in the stormwater treatment system.
6. The facilities shall be constructed as shown on the approved plans. This permit shall become voidable unless
the facilities are constructed in accordance with the conditions of this permit, the approved plans and
specifications, and other supporting data.
7. Upon completion of construction, prior to issuance of a Certificate of Occupancy, and prior to operation of
this permitted facility, a certification must be received from an appropriate designer for the system installed
certifying that the permitted facility has been installed in accordance with this permit, the approved plans
and specifications, and other supporting documentation. Any deviations from the approved plans and
specifications must be noted on the Certification.
8. If the stormwater system was used as an Erosion Control device, it must be restored to design condition prior
to operation as a stormwater treatment device, and prior to occupancy of the facility.
1
9. The following items will require a modification to the permit:
a. Any revision to the approved plans, regardless of size.
b. Project name change.
C. Transfer of ownership.
d. Redesign or addition -to the approved amount of built -upon area.
e. Further subdivision, acquisition, or sale of the project area. The project area is defined as all property
owned by the permittee, for which_ Sedimentation and Erosion Control Plan approval was sought.
f. Filling in, altering, or piping of any vegetative conveyance shown on the approved plan.
10. The Director may determine that other revisions to the project should require a modification to the permit.
H . A copy of the approved plans and specifications shall be maintained on file by the Permittee for a minimum
of ten years from the date of the"completion of construction.
4
State Stormwater Management Systems
Permit No. SW8 000419
12. Prior to the sale of any portion of the property, an access/maintenance casement to the stormwater facilities
shall be granted in favor of the permittee if access to the stormwater facilities will be restricted by the sale
of any portion of the property.
13. The permittee is responsible for verifying that the proposed built -upon area does not exceed the allowable
built -upon area.
14. The runoff from all built -upon area on the project must be directed into the permitted stormwater control
system.
15. The Director may notify the permittee when the permitted site does not meet one or more of the minimum
requirements of the permit. Within the time frame specified in the notice, the permittee shall submit a written
time schedule to the Director for modifying the site to meet minimum requirements. The permittee shall
provide copies of revised plans and certification in writing to the Director that the changes.have been made.
16. The permittee shall notify the Division of any mailing address changes within 30 days.
III. GENERAL CONDITIONS
This permit is not transferable! In the event there is a desire for the facilities to change ownership, or there
is a name change of the Permittee, a formal permit request must be submitted to the Division of Water
Quality accompanied by an application fee, documentation from the parties involved, and other supporting
materials as may be appropriate. The approval of this request will be considered on its merits and may or
may not be approved. ,
Failure to abide by the conditions and limitations contained in this permit may subject the Permittee to
enforcement action by the Division of Water Quality, in accordance with North Carolina General Statute
143-215.6A to 143-215.6C.
3. The issuance of this permit does not preclude the Permittee from complying with any and all statutes, rules,
regulations, or ordinances which may be imposed by other government agencies (local, state, and federal)
which have jurisdiction. 1.
4. In the event that the facilities fail to perform satisfactorily, including the creation of nuisance conditions,
the Permittee shall take immediate corrective action, including those as may be required by this Division,
such as the construction of additional or replacement stormwater management systems. .
5. The permittee grants DENR Staff permission to enter the property for the purpose of inspecting all
components of the permitted stormwater management facility.
b. The permit may be modified, revoked and reissued or terminated for cause. The filing of a request for a
permit modification, revocation and reissuance or termination does not stay any permit condition.
7. Unless specified elsewhere, permanent seeding requirements for the stormwater control must follow the
guidelines established in the North Carolina Erosion and Sediment Control Planning and Design Manual.
Permit issued this the 28th day of July, 2000,
NORTH CAROLINA ENVIRONMENTAL MANAGEMENT COMMISSION
Kerr T. Stevens, Director
Division of Water Quality
By Authority of the Environmental Management Commission
Permit Number SWS 000419
5
TE 98123
yi"<l�Y'iF�si?.el�til •����"i_SS'5���.13:��.�aii��y�9 ) F V' � �y J�°4-°]r��'G1d'J�: "7 ix'�:'FJ�I�4Ls"�''iW{'
Date Received
Fee Paid
Permit Number
P=
y;�9.60 zTYI
I soy oe")
State of North Carolina
i Department of Environment and Natural Resources
Jc Division of Water Quality
TORMWATER MANAGEMENT PERMIT APPLICATION FORM
-� I This form may be photocopied for use as an original
I. GENERAL INFORMATION
i
1. Applicants name (specify the name of the corporation, individual, etc. who owns the project):
Landmark Commercial
f
2. Print Owner/Signing Official's name and title (person legally responsible for facility and compliance):
Chris Stephens, Member/Manager
3. Mailing Address for person listed in item 2 above:
P.O. Box 4127 �
City: Wilmingion State: NC Zip: 29406
Telephone Number: � 910-392-7201
4. Project Name (subdivision, facility, or establishment name -- should be consistent with project name on
plans, specifications, letters, ! ope ration and maintenance agreements, etc.):
Landmark Industrial Lot 9
5. Location of Project (street address):
330 Raleigh Street
City: Wilmi nton County: __ New Hanover
i
6. Directions to project (from nearest major intersection):
A rox.'/4 mile on West Raleigh Street from the intersection of HM 421 and Raleigh Street
Lot 99 is on the right
7. Latitude : N 340 12' 00" . Longitude: W 770 56' 00" of project
8. Contact person who can answer questions about the project:
Name: Charles Cazier Telephone Number: 763-S 100
II. PERMIT INFORMATION:
1. Specify whether project is (check one): X New
i
Renewal Modification
Form SWU-101 Version 3.99 i Page l of 4
II
s
1
2. If this application is being submitted as the result of a renewal or modification to an existing permit, list
The existing permit number' _ _ NA and its issue date (if known)
3. Specify the type of project (check one):
Low Density X High Density Redevelop
4. Additional Project Requirements (check applicable blanks):
CAMA Major X Sedimentation/Erosion Control
General Permit
404//401 Permit
Other
NPDES Stormwater
Information on required state, permits can be obtained by contacting the Customer Service Center at
1-877-623-6748.
V
Ill[. PROJECT INFORMATION
1. In the space provided below, 'summarize how stormwater will be treated. Also attach a detailed narrative
(one to two pages) describing stormwater management for the project.
wet detention
i
2. Stormwater runoff from this project drains to the Cape Near River basin.
3. Total Project Area: 2.54 acres 4. Project Built Upon Area: 49.13 . %.
5. How many drainage basins does the project have? 1
6. Complete the following information for each drainage area. If there are more than two drainage areas in the
project, attach an additional sheet with the information for each area provided in the same format as below.
K "�.6 C '4 i3
-13asiri Inforrria#ionCj �.;9�t
... L'.
y ;,' r�{G il} 'K-fS sr—i� !� Y j, ,', MV' °d
nramage Basin.l,.�,.�,
._➢..n ..- �!^. "&..eLs
'YSa1roy :�:. 4 s I `to
Drainage�Basih 2 t
e ,e...v � ,.�...( ..i .. s._e,.....b:PL,;.«e. P"�....reu1E. r
Receiving Stream Name
Unnamed trib to Cape Fear River
Receiving Stream Class
C-SW
Drainage Basin Area I
3.14 ac
Existing Impervious * Area
-
Proposed Impervious * Area
1.67 ac
% Impervious* Area (total)
53.1 ac
Iinpe►vous�*Surface Areal
TDrainae8asin �ll,;a '
��`IJra�na "e Basin 2
On -site Buildings
12,600 sf
On -site Streets
-
On -site Parking
29,420 sf
On -site Sidewalks
1,436 sf
lltherar site Future
10,899 sf
Off -site @ 70% (.06 acre)
18,295 sf
Total:
E=72,650 sf
E=
* Impervious area is defined as the built upon area including, but not limited to, buildings, roads, parking
areas sidewalks, gravel areas, etc.
I
Form SWU-101 Version 3.99 Page 2 of
1II
~ � Vr'
• I
7. How was the off -site impervious area listed above derived? county topography maps
IV. DEED RESTRICTIONS AND PROTECTIVE COVENANTS
The following italicized deed restrictions and protective covenants are required to be recorded for all
subdivisions, outparcels and future development prior to the sale of any lot. If lot sizes vary significantly, a
table listing each lot number, size and the allowable built -upon area for each lot must be provided as an
attachment.
The following covenants are intended to ensure ongoing compliance with state stormwater management permit
number I as issued by the Division of Water Quality. These covenants may
not be changed or deleted without the consent of the State.
2. No more than ` square feet of any lot shall be covered by structures of impervious materials.
Impervious materials include asphalt, gravel, concrete, brick stone, slate or similar material but do not include wood
decking or the water surface of swimming pools.
3. Swales shall not be filled in, piped or altered except as necessary to provide driveway crossings.
4. Built -upon area in excess of the permitted amount requires a state stormwater management permit modication prior
to construction. '
I
.i. Allperrnittedrunoffftom outparcels or future development shall be directed into the permitted stormwater control
system. These connections to the stormwater control system shall be performed in a manner that maintains the
integrity and performance of the system as permitted.
,I
By your signature below, you certify that the recorded deed restrictions and protective covenants for this project
shall include all the applicable items required above, that the covenants will be binding on all parties and
persons claiming under them, that they will run with the land, that the required covenants cannot be changed or
deleted without concurrence fromithe State, and that they will be recorded prior to the sale of any lot.
V. SUPPLEMENT FORMS
The applicable state stormwater management permit supplement form(s) listed below must be submitted for
each BMP specified for this project. Contact the Stormwater and General Permits Unit at (910) 733-5083 for
the status and availability ofthese,forms.
I
Form S WU-102
Form SWU-103
Form SWU-104
Form SWU-105
Form SWU-106
Form SWU-107
Form SWU-108
Form SWU-109
Wet Detention Basin Supplement
Infiltration Basin Supplement
Low Density Supplement
Curb Outlet System Supplement
Off -Site System Supplement
Underground Infiltration Trench Supplement
Meuse River Basin Supplement
Innovative Best Management Practice Supplement
Form SWU-101
Version 3.99 Page 3 of 4
VI. SUBMITTAL REQUIREMENTS
Only complete application packages will be accepted and reviewed by the Division of Water Quality (DWQ).
A complete package includes all,of the items listed below. The complete application package should be
submitted to the appropriate DWQ Regional Office.
1. Please indicate that you have provided the following required information by initialing in the space
provided next to each item.
App i nt's Initials
• Original and one copy of the Stormwater Management Permit Application Form
• One copy of the applicable Supplement Form(s) for each BMP
• Permit application processing fee of $420 (payable to NCDENR)
• Detailed narrative description of stormwater treatment/management
• Two copies of plans and specifications, including:
- Development/Project name
- Engineer and firm
- Legend
- North arrow
- Scale
- Revision number and date
- Mean high water line
- Dimensioned property/project boundary
- Location map with named streets or NCSR numbers
- Original contours, proposed contours, spot elevations, finished floor elevations
- Details of roads, drainage features, collection systems, and stormwater control measures
- Wetlands delineated, or a note on plans that none exist
- Existing drainage (including off -site), drainage easements, pipe sizes, runoff calculations
- Drainage areas delineated
- Vegetated buffers (where required)
VII. AGENT AUTHORIZATION
If you wish to designate authority to another individual or firm so that they may provide information on your
behalf, please complete this section.
Designated agent (individual or firm): Tripp En ing eerina, P.C.
Mailing Address:
City:
Wilmington
State:
NC
Zip: 28401
Phone:
(910) 763-5100 i
Fax:
(910)
763-5631
VUL APPLICANT'S CERTIFICATION
I, (print or type name of person listed in General Information, item 2) Chris Stevens ,
certify that the information includ on this permit a ication form is, to the best of my knowledge, correct and
that the project will a constructAlinformaric1he
th the approved plans, that the required deed restrictions
and protective cove nt7/"Y
rfZ? proposed project complies with the requirements of 15A
NCAC 2H .100e. /
Signature:
Date:
31
Form SWU-101 Version 3.99 1 Page 4 of
TRIPP ENGINEERING, P.C.
419 Chestnut Street
Wilmington, North Caroiina 28401
Phone: (910) 763-5100 • FAX: (910) 763-5631
I A%�
v'
LETTER OF TRANSMITTAL
To: N�c n �- T Date: Zs� 00 _
CD v.-.. jG 1
Attention: �Sc Subject: f::> L- -CTT `P)
FAX TRANSMITTAL: NUMBER OF PAGES INCLUDES COVER
I
I am sending you: ( } ATTACHED { ) UNDER SEPARATE COVER
I
( {
) Prints ( ) Tracings I ( } Copy of letter ( ) Specifications ( ) Other
Item Na Ik Description Copies _ -.. _p_ � ., -. .. _._.. ...
2 Gl Sl P1�
These are transmitted as checked below:
( or Approval ( ) Far Your Use ( ) Sign & Return ( Review
/ w
Rema�
cc:
TO /�i'eD[)/� .' / �.qU,Z C� /G' TZ-f.
Signed:
,
• e
4117/00 Landmark Industrial Lot#9 98123
CDC l Stormwater Calculations
or ba
R29ulted Volume
Vol. = 20% of pond storage volume
= 2,812 cu. ft.
Outlet Structure Design:
Flow for 2-day drawdown:
for 1st 1" of stormwater,
Q = Required State Vol, 1172,800 sec. (2-days)
— 0.041 cfs
Required Area of Pipe for 2-day drawdown:
A- Q 1 [Cd x SQRT(2 x g x h)]
Cd = 0.6
9 = 32.2 R.IS2 j
h = (F.P. elev.- N.P, elev.)/2
= 0.775 ft.
A = 0.0097 s ,ft,
Diameter of Pipe for 2-day drawdown:
DiA. = SQRT((A x 4) 1 pi]
= 0,1113 ft. i
1.34 in.
USE 1,25" ORIFICE
lure Chock
Using a W x 4' Basin,
Perimeter L = 16 ft.
Q = CIA I
C = (% imp.)(.95) + (1-% imp.)(.25)
0.63
1 = 7.23 in. for a 10 yr, Storm
A = 3.14 Acres
14.30 cfs
Q= CwxLxH"5
H = [Q 1 (Cw x L)i2/
Cw = 3
0.45 ft.
Peak elevation - flood pool elevation + H
= 34.85 R. I
Provided Volume
Bottom Pool SA =
264 sq. ft.
Normal Pool $A =
1,410 s , ft.
Vol. =
((N.P. SA + F.P. SA) 12] x (F.P. el. - N.P. el.)
=
2,511 cu. ft,
depth =
3 ft,
Flow for 5-day drawdown:
for 1 st 1" of stormwater,
Q = Required State Vol. 1432,000 sec. (5-days)
0.016 cis
Required Area of Pipe far 5-day drawdown:
A= QI(CdxSQRT(2xgxh)]
Cd = 0.6
9. 32.2 ft./32
h = (F.P, elev. - N.P. efev.)1 2
0.775 ft.
A = 0.0039 s . ft.
Diameter of Pipe for 5-day drawdown:
❑IA. = SQRT((A x 4)1 pi]
0.0704 ft.
0.84 in.
CityPONDlindaoffsite.As 1
1 2 of 2
4117100
CDC
Landmark Industrial Lot#9
Stormw2ter Calculations
98123
Drainage Area
s . ft.
acres
proposed development
110,642
i 2.54
affsite drainage area
26,136
0.60
Total
136.778
' 3A4
% impervious a 0.531
Use 53.0%
I
Stgr[rwater Calculations;
Tlmo of Concentration: E
Hydraulic Length (L) - 500 ft.
change in Height (H) - 6 ft.
TL = (L21H) "1126
5.13 min.
Flow for 10 year, 6 hour Storm (010):
Q PRE _ (CPR x (I,o) x (Area) 1
= 5.68 cfs
EQPOS _ (C�) x (11n) x (Area)
14.30 cfs
son storage uapacrty ror 1u year storm:
CN = (90)(°% imp.) + (50)(1-% imp.)
72
P - 4.60 in. for 10 yr, 6 hr storm
S= 1000/CN-10
= 3.89
Depth (0)= [P-(0.2)(S)]21 [P+(0-6)(S))
= 2.05 In.
Time to Peak Flow:
TP = [(43.5)(0)(Area)] 1 010,PosT
= 19,53 min.
QMQatian_Pond Design:
Pnnrl Si7n-
Elevation
ft.
Surface Area
(sq. ft. '
Normal Pool
32.00
4,276
State Flood Pool
33.55
5,987
City Flood Pool
34.40
6.810
ITop of Bank
37.00
9.547
Bottom of Pool
25.50
50
Total Provided City Storage Volume:
Vol. _ [(Normal pool SA + Flood Pool SA) 1 2]
x (F.P. ofev. - N.P. elev.)
a 13.303 cu. ft.
Ctv Storsoo Required for 10 Year Storm:
TP = Vol. 1 (1.39)(QP)
Vol. = ( TP)(1.39)(QP)(60 sec.)
OP = Q10,POST - Q 10YRE 1
8.63 cfs
Vol. = 14.051 cu. ft.
I
I
li
CityPONDlindaotfsfte.x[s I
lmF2fviou5 Area
Land Use
sq. R.
acres
Building area
12.600
0.29
Asphalt area
29,420
0.68
Concrete area
1,436
0.03
Future Stone area
10.B99
0.25
offsite area 0%
18,295
0,42
Total
72,650
1.67
CPRE = 0.25
Cog = (% imp.)(.95)+(1-% imp.)(.25)
0.63
11e= 7.23 inlhr
150 = 8.87 inlhr
Flow for 50 year, 6 hour Storm (050):
QPRE _ (CPRE) x (I50) x (Area)
6.96 cfs
QPOST = (CPosT) x (15o) x (Area)
17,55 cfs
Soil Storage Capacity for 50 year Storm:
CN = (90)(% imp.) + (50)(1-%, imp.)
= 72
P = 6.42 in. for 50 yr, 6 hr storm
S= 10001CN-10
3.89
Depth (D)- [P-(0.2)(S))21 [P+(O.B)(S)]
A 3.34 in.
Time to Peak Flow:
TP = [(43.5)(0)(Area)] 1 Osa,Posr
26.00 min.
Area
Pond side slopes - 3 :1
Depth below N.P. - 6.5 ft.
SAIDA = 0.0248
(Chart for 90% TSS Removal for Wet Detention
Required SA = (SAIDA) x (Total Drainage Area)
3,392 sq. ft.
State Volume R uiroment for Storage of first 1" of runoff:
Vol.- [(1112) x (DA) x (% imp.)] +
[(1112) x (DA) x (1-% imp.) x C]
C - 0.2
7,123 cu. ft.
Provided Storage Volume for State Requirement:
State Vol. = 7,876 cu. ft.
Citv Storage Required for 50 vear Storm:
1 of 2
TP = Vol, I (1.39)(0P)
Vol. _ (TP)(1.39)(0P)(60 sec.)
OP = Q50,POST - QSO.PRE
10.58 cfs
Vol. = 22,950 cu. ft.
4/ 17/00 i TE 98123
Stormwater Narrative
Landmark Industrial Lot #9
New Hanover County, NC
Landmark Lot #9 is a -2.54 acre site which is undeveloped at this time. We
propose to construct a 12,600 sf office retail building with 29,420 sf of
asphalt parking and access with 1436 sf of concrete sidewalk and a possible
10,899 sf of future stone storage area. A wet detention pond is designed for
this site. The design will meet the states 1" requirement with 90% TSS
removal as well as the, City's4pre-post standard.
i
A 0.60 acre area from an off -site adjacent tract will also be accommodated
by the design of the pond. A maximum built -out area of 70% impervious
will be allowed for the off -site area draining to the pond. This pond will
outflow to an unknown tributary of the Cape Fear River classified C-SW.
u /
4
ax l �I sa\� '�•, /� ='--� —) --; m 1 I 4 I � rlI I I -4 I
AN
1 =
11�
I
4
N \ �
� � o
o
W �\
u
I T 0 0
o
/ \ W o .
J �
V r W
I � N
W
- o
s
0
O
:rr� - - - - -- - — - - -
x
� U ri�-�O 1 ,•\
\ o
L
iD
�Dt1 1✓ � V U u ' _ N a' i Z� �� m i
I ED !O
N158,000
N159,000
TOPOGRAPHIC MAP
DATE OF MAP
NEW HANOVER COUNTY N. C.
DATE OF RE
KP
FEB.
z
�
DATE OF AERIAL I10r0 1973
NAL
¢ p
MAP NUMBER 65-01
$CA4E I = cON.INr. z FEET
1—! x � 4v r t 1
4 /
a
o
N 16U,000 MATLII SirIEET 65-02 N161.000 N162.000
I-- MAPPING LEGEND PREPARED BY
t ••un iw°i. ��� l a.r.0 �•r—�o^.`•• '"�r �'•r CHICAGO A£RIAl
•—•`+ wcA u. ti� .w.. +•ae. iarw. IN EY - ■
~I —-rru:Ye.c.rr.a` .u.. ■ror w.e. 2140 WOLF RD.
_ .. ..r...�c. ro.r. ...r. rr u•. • •A<< DES PLAINES ILL
N. C. STAli LANE CCORDINATE SYSTEM
•• ELEVATi C..-DATUM=MEAN SEA LEVEL
Tmpp ENGINEERING, P.C.
419 Chestnut Street
Wilmington, North Carolina 28401
Phone: (910) 763-5100 FAX: (910) 763-5631
RECEIVED
April 17, 2000 APR 18 2000
NCDENR
Division of Environmental Management
Water Quality Section
127 Cardinal Drive
Wilmington, NC 28405-3845
Attn: Ms. Linda Lewis
Rc: Landmark Industrial Lot 9
New Hanover County, NC
TE 98123
Dear Linda.
Enclosed please find two (2) sets of plans, one (1) signed original and one (1)
copy of the application form with narrative, one (1) wet detention basin supplement, two.
(2) sets of signed sealed calculations and one check for the application fee.
Please review for approval and contact us with any questions or comments.
Thank you.
Sincerely,
Tripp Engineering, P.C.
&Cazier
Charles D
xOweW9
Enc.