HomeMy WebLinkAbout20210536 Ver 1_PreFiling 30-Day Clock Reached Email_20210409Strickland, Bev
From: laserfiche@ncdenr.gov
Sent: Friday, April 9, 2021 12:01 AM
To: mbutler@res.us
Cc: Homewood, Sue
Subject: Pre -Filing Time Clock has been reached for Tobacco Road - 20210536 Ver 1
Attachments: DWR Pre -Filing Meeting Request Form.pdf
The North Carolina Division of Water Resources has received the Pre -Filing Meeting Request Form for Tobacco Road
that you submitted on 3/9/2021. The ID number for that project is 20210536, Version 1.
Your Pre -Filing Meeting Request has now reached the 30 calendar days' requirement and your application can now be
accepted.
When you submit your application please upload a copy of the attached document in this email.
This email was automatically generated by Laserfiche workflow. Please do not respond to this email address, as
responses are not monitored.
Internal Use only: Non Transportation
i
DWR Pre -Filing Meeting Request Form
ID#*
Regional Office*
Reviewer List*
20210536
Version*
1
Winston-Salem Regional Office - (336) 776-9800
Sue Homewood
Pre -Filing Meeting Request submitted 3/9/2021
Contact Name *
Contact Email Address*
Project Name*
Project Owner*
Project County*
Owner Address:
Matt Butler
mbutler@res.us
Tobacco Road
Environmental Banc & Exchange, LLC
Alamance
Street Address
3600 Glenwood Ave.
Address Line 2
Suite 100
City State / Rovince / Region
Raleigh NC
Fbstal / Zip Code Country
27612 US
Is this a transportation project?* r Yes r No
Type(s) of approval sought from the DWR:
17 401 Water Quality Certification - I— 401 Water Quality Certification -
Regular Express
I— Individual Permit I— Modification
I— Shoreline Stabilization
Does this project have an existing project ID#?*
r Yes (' No
Do you know the name of the staff member you would like to request a meeting with?
Erin Davis
Please give a brief project description below and include location information. *
The Project is located in Alamance County, approximately 13 miles
southwest of Burlington, NC near the intersection of Thom Road and
Highway 54 in the Cape Fear River Basin within Cataloging Unit
03030002, 03030002050040, and NC Division of Water Resources
(DWR) Sub -Basin 03-06-04. The Project consists of two parcels
totaling 46.42 acres of conservation easement. The Project has a
total drainage area of 458 acres and is mainly a mix of forested and
agricultural land including row crop and active pasture; aerial imagery
indicates that the Project area has historically served these land
uses. Stressors currently affecting the Project include row crop,
livestock production and a lack of riparian buffers.
The Project will involve the stream restoration, enhancement, and
preservation of several unnamed tributaries including, TR1 (TR1-A,
TR1-B, TR1-C, TR1-D, TR1-E, TR1-F), TR2, MN1 (MN1-A, MN1-B,
MN1-C), MN2 (MN2-A, MN2-B), MN3, MN4 (MN4-A, MN4-B), MN5
(MN5-A, MN5-B), MN6 (MN6-A, MN6-B), MN7 (MN7-A, MN7-B), and
MN8. Reaches are broken up by treatment type. TR1 flows east to
west towards Mineral Springs Road. MN1, MN2, MN3, and MN7 flow
south before coming to confluences with TR1. MN4, MN5, and MN6
flow north before coming to confluences with TR1. TR2 flows to the
west, paralleling TR1-C before draining to it, just before the
confluence of TR1-D and MN5-B. In addition to the stream reaches,
there are multiple degraded wetland areas within the project area that
have been impacted by livestock access and/or ditching. The
conceptual design presents 12,899 linear feet of stream mitigation
generating 7,074.796 Stream Mitigation Units (SMU) and 0.58 acres
of wetland mitigation generating 0.139 Wetland Mitigation Units
(WMU). In addition to stream and wetland mitigation, the Project also
presents the opportunity to provide up to 44 acres of Riparian Buffer
Mitigation generating 16.05 acres of Riparian Buffer Credits. The
Project will provide critical ecological uplift to aquatic and riparian
corridors that would otherwise be even further degraded by
agricultural uses and continued livestock access.
Please give a couple of dates you are available for a meeting.
4/8/2021
Please attach the documentation you would like to have the meeting about.
Tobacco Road Draft Instrument
Mod_20210308.pdf
pdf only
6.18MB
By digitally signing below, I certify that I have read and understood that per the Federal Clean Water Act Section
401 Certification Rule the following statements:
• This form completes the requirement of the Pre -Filing Meeting Request in the Clean Water Act Section 401 Certification
Rule.
• I understand by signing this form that I cannot submit my application until 30 calendar days after this pre -filing
meeting request.
• I also understand that DWR is not required to respond or grant the meeting request.
Your project's thirty -day clock started upon receipt of this application. You will receive notification regarding meeting location
and time if a meeting is necessary. You will receive notification when the thirty -day clock has expired, and you can submit an
application.
Signature
Submittal Date
(Waz
3/9/2021