Loading...
HomeMy WebLinkAbout20210536 Ver 1_PreFiling 30-Day Clock Reached Email_20210409Strickland, Bev From: laserfiche@ncdenr.gov Sent: Friday, April 9, 2021 12:01 AM To: mbutler@res.us Cc: Homewood, Sue Subject: Pre -Filing Time Clock has been reached for Tobacco Road - 20210536 Ver 1 Attachments: DWR Pre -Filing Meeting Request Form.pdf The North Carolina Division of Water Resources has received the Pre -Filing Meeting Request Form for Tobacco Road that you submitted on 3/9/2021. The ID number for that project is 20210536, Version 1. Your Pre -Filing Meeting Request has now reached the 30 calendar days' requirement and your application can now be accepted. When you submit your application please upload a copy of the attached document in this email. This email was automatically generated by Laserfiche workflow. Please do not respond to this email address, as responses are not monitored. Internal Use only: Non Transportation i DWR Pre -Filing Meeting Request Form ID#* Regional Office* Reviewer List* 20210536 Version* 1 Winston-Salem Regional Office - (336) 776-9800 Sue Homewood Pre -Filing Meeting Request submitted 3/9/2021 Contact Name * Contact Email Address* Project Name* Project Owner* Project County* Owner Address: Matt Butler mbutler@res.us Tobacco Road Environmental Banc & Exchange, LLC Alamance Street Address 3600 Glenwood Ave. Address Line 2 Suite 100 City State / Rovince / Region Raleigh NC Fbstal / Zip Code Country 27612 US Is this a transportation project?* r Yes r No Type(s) of approval sought from the DWR: 17 401 Water Quality Certification - I— 401 Water Quality Certification - Regular Express I— Individual Permit I— Modification I— Shoreline Stabilization Does this project have an existing project ID#?* r Yes (' No Do you know the name of the staff member you would like to request a meeting with? Erin Davis Please give a brief project description below and include location information. * The Project is located in Alamance County, approximately 13 miles southwest of Burlington, NC near the intersection of Thom Road and Highway 54 in the Cape Fear River Basin within Cataloging Unit 03030002, 03030002050040, and NC Division of Water Resources (DWR) Sub -Basin 03-06-04. The Project consists of two parcels totaling 46.42 acres of conservation easement. The Project has a total drainage area of 458 acres and is mainly a mix of forested and agricultural land including row crop and active pasture; aerial imagery indicates that the Project area has historically served these land uses. Stressors currently affecting the Project include row crop, livestock production and a lack of riparian buffers. The Project will involve the stream restoration, enhancement, and preservation of several unnamed tributaries including, TR1 (TR1-A, TR1-B, TR1-C, TR1-D, TR1-E, TR1-F), TR2, MN1 (MN1-A, MN1-B, MN1-C), MN2 (MN2-A, MN2-B), MN3, MN4 (MN4-A, MN4-B), MN5 (MN5-A, MN5-B), MN6 (MN6-A, MN6-B), MN7 (MN7-A, MN7-B), and MN8. Reaches are broken up by treatment type. TR1 flows east to west towards Mineral Springs Road. MN1, MN2, MN3, and MN7 flow south before coming to confluences with TR1. MN4, MN5, and MN6 flow north before coming to confluences with TR1. TR2 flows to the west, paralleling TR1-C before draining to it, just before the confluence of TR1-D and MN5-B. In addition to the stream reaches, there are multiple degraded wetland areas within the project area that have been impacted by livestock access and/or ditching. The conceptual design presents 12,899 linear feet of stream mitigation generating 7,074.796 Stream Mitigation Units (SMU) and 0.58 acres of wetland mitigation generating 0.139 Wetland Mitigation Units (WMU). In addition to stream and wetland mitigation, the Project also presents the opportunity to provide up to 44 acres of Riparian Buffer Mitigation generating 16.05 acres of Riparian Buffer Credits. The Project will provide critical ecological uplift to aquatic and riparian corridors that would otherwise be even further degraded by agricultural uses and continued livestock access. Please give a couple of dates you are available for a meeting. 4/8/2021 Please attach the documentation you would like to have the meeting about. Tobacco Road Draft Instrument Mod_20210308.pdf pdf only 6.18MB By digitally signing below, I certify that I have read and understood that per the Federal Clean Water Act Section 401 Certification Rule the following statements: • This form completes the requirement of the Pre -Filing Meeting Request in the Clean Water Act Section 401 Certification Rule. • I understand by signing this form that I cannot submit my application until 30 calendar days after this pre -filing meeting request. • I also understand that DWR is not required to respond or grant the meeting request. Your project's thirty -day clock started upon receipt of this application. You will receive notification regarding meeting location and time if a meeting is necessary. You will receive notification when the thirty -day clock has expired, and you can submit an application. Signature Submittal Date (Waz 3/9/2021