Loading...
HomeMy WebLinkAbout20210664 Ver 1_Pre-Filing Meeting Information_20210409DWR Pre-Fil ing Meeting Req u est Form ID#*Ve rsion * Re gional Office * Re v ie we r List * Contact Name * Contact Email Addre ss * Proje ct Name * Proje ct Owne r * Proje ct County * Owne r Addre ss: Is this a transportation proje ct?* Type (s) of approv al sought from the DWR: Doe s this proje ct hav e an e xisting proje ct ID#?* Do you know the name of the staff me mbe r you would like to re que st a me e ting with? Ple ase giv e a brie f proje ct de scription be low.* 20210664 1 Asheville Regional Office - (828) 296-4500 Kevin Mitchell Pre-Filing Me eting Reque st submitte d 3/31/2021 Yates Allen ryallen@ncdot.gov 17BP.13.R.194 NC DOT McDowell City Asheville State / Province / Region NC Postal / Zip Code 28801 Country US Street Address 55 Orange St Address Line 2 Yes No 401 Water Quality Certification - Regular 401 Water Quality Certification - Express Individual Permit Modification Shoreline Stabilization Yes No Kevin Mitchell Replace bridge #108 on SR 1560 Old Linville Rd over North Fork Catawba River. Impacts include existing bent removal and bank stabilization. Still trying to determine if project will qualify as non-notifying project. Awaiting answer whether trees will be cut and/or piles driven (NLEB issues). Please give a couple of dates you are available for a meeting. Ple ase attach the docume ntation you would like to hav e the me e ting about. Signature Submittal Date 4/21/2021 17BP.13.R.194_SF- 580108_Permit_Plans_and_Impact_20210329… 3.65MB pdf only By digitally signing below, I certify that I have read and understood that per the Federal Clean Water Act Section 401 Certification Rule the following statements: · This form completes the requirement of the Pre-Filing Meeting Request in the Clean Water Act Section 401 Certification Rule. · I understand by signing this form that I cannot submit my application until 30 calendar days after this pre-filing meeting request. · I also understand that DWR is not required to respond or grant the meeting request. Your project’s thirty-day clock started upon receipt of this application.  You will receive notification regarding meeting location and time if a meeting is necessary.  You will receive notification when the thirty-day clock has expired, and you can submit an application. 3/31/2021