HomeMy WebLinkAbout20210664 Ver 1_Pre-Filing Meeting Information_20210409DWR Pre-Fil ing Meeting Req u est Form
ID#*Ve rsion *
Re gional Office *
Re v ie we r List *
Contact Name *
Contact Email Addre ss *
Proje ct Name *
Proje ct Owne r *
Proje ct County *
Owne r Addre ss:
Is this a transportation proje ct?*
Type (s) of approv al sought from the DWR:
Doe s this proje ct hav e an e xisting proje ct ID#?*
Do you know the name of the staff me mbe r you would like to re que st a me e ting with?
Ple ase giv e a brie f proje ct de scription be low.*
20210664 1
Asheville Regional Office - (828) 296-4500
Kevin Mitchell
Pre-Filing Me eting Reque st submitte d 3/31/2021
Yates Allen
ryallen@ncdot.gov
17BP.13.R.194
NC DOT
McDowell
City
Asheville
State / Province / Region
NC
Postal / Zip Code
28801
Country
US
Street Address
55 Orange St
Address Line 2
Yes No
401 Water Quality Certification -
Regular
401 Water Quality Certification -
Express
Individual Permit Modification
Shoreline Stabilization
Yes No
Kevin Mitchell
Replace bridge #108 on SR 1560 Old Linville Rd over North Fork
Catawba River. Impacts include existing bent removal and bank
stabilization.
Still trying to determine if project will qualify as non-notifying project.
Awaiting answer whether trees will be cut and/or piles driven (NLEB
issues).
Please give a couple of dates you are available for a meeting.
Ple ase attach the docume ntation you would like to hav e the me e ting about.
Signature
Submittal Date
4/21/2021
17BP.13.R.194_SF-
580108_Permit_Plans_and_Impact_20210329…
3.65MB
pdf only
By digitally signing below, I certify that I have read and understood that per the Federal Clean Water Act Section
401 Certification Rule the following statements:
· This form completes the requirement of the Pre-Filing Meeting Request in the Clean Water Act Section 401 Certification
Rule.
· I understand by signing this form that I cannot submit my application until 30 calendar days after this pre-filing
meeting request.
· I also understand that DWR is not required to respond or grant the meeting request.
Your project’s thirty-day clock started upon receipt of this application. You will receive notification regarding meeting location
and time if a meeting is necessary. You will receive notification when the thirty-day clock has expired, and you can submit an
application.
3/31/2021