HomeMy WebLinkAbout20210664 Ver 1_ePCN Application_20210409 I I DWR
Division of Water Resources
Pre-Construction Notification (PCN) Form
April 4,2021 Ver 4
Initial Review
Has this project met the requirements for acceptance in to the review process?*
✓ Yes
✓ No
Is this project a public transportation project?*
0 Yes r No
Change only if needed.
BIMS#Assigned* Version#*
20210664 1
Is a payment required for this project?*
✓ No payment required
G Fee received Reviewing Office*
✓ Fee needed-send electronic notification Asheville Regional Office-(828)296-4500
Select Project Reviewer*
Kevin Mitchell:eads\rkmitchell
Information for Initial Review
1a.Name of project:
Bridge 580108 on SR 1560 Old Linville Road
1a.Who is the Primary Contact?*
Yates Allen
lb.Primary Contact Email:* 1c.Primary Contact Phone:*
ryallen@ncdot.gov (828)250-3002
Date Submitted
4/9/2021
Nearest Body of Water
North Fork Catawba River
Basin
Catawba
Water Classification
Class B,Trout
Site Coordinates
Latitude: Longitude:
35.802639 -82.017743
A. Processing Information U
County(or Counties)where the project is located:
McDowell
Is this a NCDMS Project
✓ Yes G No
Is this project a public transportation project?*
6 Yes r No
Is this a NCDOT Project?*
(7 Yes r No
(NCDOT only)T.I.P.or state project number:
17BP.13.R.194
WBS#(?)
17BP.13.R.194
Pre-Filing Meeting Information
Is this a courtesy copy notification?*
✓ Yes G No
ID# Version
20210664
Pre-fling Meeting or Request Date*
4/21/2021
Attach documentation of Pre-Filing Meeting Request here:*
Click the upload button or drag and drop files here to attach docurrent
DWR Pre-Filing Meeting Request Form.pdf 56.1KB
Rle type Host be FCF
1a.Type(s)of approval sought from the Corps:
[7 Section 404 Permit(wetlands,streams and waters,Clean Water Act)
r Section 10 Permit(navigable waters,tidal waters,Rivers and Harbors Act)
Has this PCN previously been submitted?*
✓ Yes
s No
lb.What type(s)of permit(s)do you wish to seek authorization?
7 Nationwide Permit(NWP)
r Regional General Permit(RGP)
r Standard(IP)
1c.Has the NWP or GP number been verified by the Corps?
t: Yes r No
Nationwide Permit(NWP)Number: 13-Bank Stabilization
NWP Numbers(for multiple NWPS):
Id.Type(s)of approval sought from the DWR:
17 401 Water Quality Certification-Regular r 401 Water Quality Certification-Express
r Non-404 Jurisdictional General Permit r Riparian Buffer Authorization
r Individual 401 Water Quality Certification
le.Is this notification solely for the record because written approval is not required? *
For the record only for DWR 401 Certification: r Yes 6 No
For the record only for Corps Permit: r Yes 6 No
1f.Is this an after-the-fact permit application?*
✓ Yes ( No
1g.Is payment into a mitigation bank or in-lieu fee program proposed for mitigation of impacts?
r Yes GNo
1g.Is payment into a mitigation bank or in-lieu fee program proposed for mitigation of impacts?
✓ Yes rNo
Acceptance Letter Attachment
lh.Is the project located in any of NC's twenty coastal counties?
✓ Yes GNo
1j.Is the project located in a designated trout watershed?
6 Yes r No
B. Applicant Information
1d.Who is applying for the permit?
I7 Owner r Applicant(other than owner)
le.Is there an Agent/Consultant for this project?*
✓ Yes f No
2.Owner Information
2a.Name(s)on recorded deed:
NC Department of Transportation
2b.Deed book and page no.:
2c.Contact Person:
2d.Address
Street Address
55 Orange Street
Address Line 2
Oty Slate/Rovince/Region
Asheville NC
Postal/Zip Code Country
28801 USA
2e.Telephone Number: 2f.Fax Number:
(828)250-3002
2g.Email Address:*
ryallen@ncdot.gov
C. Project Information and Prior Project History
1. Project Information
1b.Subdivision name:
('rf appropriate)
1c.Nearest municipality/town:
Woodlawn
2. Project Identification
2a.Property Identification Number: 2b.Property size:
2c.Project Address
Street Address
Address Line 2
Oty State/Province/Region
Postal/Zip Code Country
3.Surface Waters
3a.Name of the nearest body of water to proposed project:*
North Fork Catawba River
3b.Water Resources Classification of nearest receiving water:*
Class B,Trout
3c. What river basin(s)is your project located in?*
Catawba
3d.Please provide the 12-digit HUC in which the project is located.
030501010202
4. Project Description and History
4a.Describe the existing conditions on the site and the general land use in the vicinity of the project at the time of this application:*
Existing bridge on paved road surrounded by forested land and commercial and residential properties
4b.Have Corps permits or DWR certifications been obtained for this project(including all prior phases)in the past?*
r Yes r No r Unknown
4d.Attach an 8 1/2 X 11 excerpt from the most recent version of the USGS topographic map indicating the location of the project site.(for DWR)
Bridge 108 topo.pdf 703.38KB
4e.Attach an 8 1/2 X 11 excerpt from the most recent version of the published County NRCS Soil Survey map depicting the project site.(for DWR)
4f.List the total estimated acreage of all existing wetlands on the property:
0
4g.List the total estimated linear feet of all existing streams on the property:
60
4h.Explain the purpose of the proposed project:*
Replace existing substandard bridge
4i.Describe the overall project in detail,including indirect impacts and the type of equipment to be used:*
Replace existing 4-span concrete bridge and its approaches with 3-span cored slab bridge measuring 172.25'long by 36'wide.Project includes changes to 2 adjacent roads,
Alignments-Y-and-Y1-.Bank stabilization will result in permanent impacts of 49 LF under the bridge and 8 LF at a pipe outlet.Temporary impacts of 12 LF and 13 LF,respectively,
may occur while permanent impacts are installed.Two unnamed tributaries to the river are present but will not be impacted.
Equipment used includes track hoe,crane,and dump trucks.
4j.Please upload project drawings for the proposed project.
17BP.13.R.194_SF-580108_Permit_Plans_and_Impact_20210329.pdf 3.85MB
5.Jurisdictional Determinations
5a.Have the wetlands or streams been delineated on the property or proposed impact areas?*
a Yes r No r Unknown
Comments:
Site visit by NC DOT personnel and contractors
5b.If the Corps made a jurisdictional determination,what type of determination was made?*
r Preliminary r Approved r Not Verified r Unknown a N/A
Corps AID Number:
5c.If 5a is yes,who delineated the jurisdictional areas?
Name(if known): Yates Allen
Agency/Consultant Company: NC DOT
Other:
5d1.Jurisdictional determination upload
6. Future Project Plans
6a.Is this a phased project?*
C Yes (cNo
Are any other NWP(s),regional general permit(s),or individual permits(s)used,or intended to be used,to authorize any part of the proposed project or related activity?
LD. Proposed Impacts Inventory
1. Impacts Summary
1a.Where are the impacts associated with your project?(check all that apply):
r Wetlands fJ Streams-tributaries r Buffers
r Open Waters r Pond Construction
3.Stream Impacts
3a.Reason for impact(?) 3b.Impact type* 3c.Type of impact* 3d.S.name* 3e.Stream Type* 3f.Type of 3g.S.width* 3h.Impact
(?) Jurisdiction* length*
S1 bank stabilization Permanent Bank Stabilization North Fork Catawba River Perennial Both 45 49
Average(feet) (linear feet)
S2 installation of bank Temporary Bank Stabilization North Fork Catawba River Perennial Both 45 12
stabilization Average(feet) (linear feet)
S3 pipe outlet protection Permanent Bank Stabilization North Fork Catawba River Perennial Both 45 8
Average(feet) (linear feet)
S4 installation of outlet Temporary Bank Stabilization North Fork Catawba River Perennial Both 45 13
protection Average(feet) (linear feet)
3i.Total jurisdictional ditch impact in square feet:
0
3i.Total permanent stream impacts: 3i.Total temporary stream impacts:
57 25
3i.Total stream and ditch impacts:
82
3j.Comments:
Temporary impacts are at same location as permanent impacts
E. Impact Justification and Mitigation
1.Avoidance and Minimization
1a.Specifically describe measures taken to avoid or minimize the proposed impacts in designing the project:
Bank stabilization is minimal amount needed to protect river banks
lb.Specifically describe measures taken to avoid or minimize the proposed impacts through construction techniques:
No impacts during construction of the bridge
2. Compensatory Mitigation for Impacts to Waters of the U.S. or Waters of the State
2a.Does the project require Compensatory Mitigation for impacts to Waters of the U.S.or Waters of the State?
✓ Yes rNo
2b.If this project DOES NOT require Compensatory Mitigation,explain why:
Mitigation not required for bank stabilization
F. Stormwater Management and Diffuse Flow Plan (required by DWR) L)
1. Diffuse Flow Plan
1a.Does the project include or is it adjacent to protected riparian buffers identified within one of the NC Riparian Buffer Protection Rules?
✓ Yes r No
If no,explain why:
2.Stormwater Management Plan
2a.Is this a NCDOT project subject to compliance with NCDOT's Individual NPDES permit NCS000250?*
( Yes r No
Comments:
G. Supplementary Information U
1. Environmental Documentation
1a.Does the project involve an expenditure of public(federal/state/local)funds or the use of public(federal/state)land?*
( Yes rNo
1b.If you answered"yes"to the above,does the project require preparation of an environmental document pursuant to the requirements of the National or State(North Carolina)
Environmental Policy Act(NEPAISEPA)?*
✓ Yes ( No
Comments:*
Falls within State Minimum Criteria Checklist(MCCL)
2.Violations(DWR Requirement)
2a.Is the site in violation of DWR Water Quality Certification Rules(15A NCAC 2H.0500),Isolated Wetland Rules(15A NCAC 2H.1300),or DWR Surface Water or Wetland Standards or
Riparian Buffer Rules(15A NCAC 2B.0200)?*
✓ Yes ( No
3. Cumulative Impacts(DWR Requirement)
3a.Will this project result in additional development,which could impact nearby downstream water quality?*
✓ Yes ( No
3b.If you answered"no,"provide a short narrative description.
4.Sewage Disposal(DWR Requirement)
4a.Is sewage disposal required by DWR for this project?*
✓ Yes rNor N/A
5. Endangered Species and Designated Critical Habitat(Corps Requirement)
5a.Will this project occur in or near an area with federally protected species or habitat?*
6 Yes rNo
5b.Have you checked with the USFWS concerning Endangered Species Act impacts?*
✓ Yes f No
5d.Is another Federal agency involved?*
✓ Yes f No r Unknown
5e.Is this a DOT project located within Division's 1-8?
✓ Yes F No
5f.Will you cut any trees in order to conduct the work in waters of the U.S.?
6 Yes r No
5g.Does this project involve bridge maintenance or removal?
✓ Yes r No
5g(1).If yes,have you inspected the bridge for signs of bat use such as staining,guano,bats,etc.?
6 Yes r No
If you answered"Yes"to 5g(1),did you discover any signs of bat use?
✓ Yes G No r Unknown
5h.Does this project involve the construction/installation of a wind turbine(s)?*
✓ Yes f No
Si.Does this project involve(1)blasting,and/or(2)other percussive activities that will be conducted by machines,such as jackhammers,mechanized pile drivers,etc.?
✓ Yes G No
5j.What data sources did you use to determine whether your site would impact Endangered Species or Designated Critical Habitat?
https://vwwv.fws.gov/raleigh/species/cntylist/mcdowell.html
Consultation Documentation Upload
6. Essential Fish Habitat(Corps Requirement)
6a.Will this project occur in or near an area designated as an Essential Fish Habitat?*
✓ Yes f No
6b.What data sources did you use to determine whether your site would impact an Essential Fish Habitat?*
Current maps and data bases
7. Historic or Prehistoric Cultural Resources(Corps Requirement)
7a.Will this project occur in or near an area that the state,federal or tribal governments have designated as having historic or cultural preservation status?*
✓ Yes 6 No
7b.What data sources did you use to determine whether your site would impact historic or archeological resources?*
https://nc.maps.arcgis.com/apps/webappviewer/index html?id=79ea671 ebdcc45639f0860257d5f5ed7
7c.Historic or Prehistoric Information Upload
8. Flood Zone Designation(Corps Requirement)
8a.Will this project occur in a FEMA-designated 100-year floodplain?*
✓ Yes ( No
8c.What source(s)did you use to make the floodplain determination?*
https://fris.nc.gov/fris/Index.aspx?FIPS=1118ST=NC&user=General Public
Miscellaneous
Comments
Miscellaneous attachments not previously requested.
Bridge 108 McDowell photos.pdf 641.71KB
Bridge_108_McDowell_cover_letter_signed.pdf 267.92KB
Signature
FJ By checking the box and signing below,I certify that:
• The project proponent hereby certifies that all information contained herein is true,accurate,and complete to the best of my knowledge and belief;and
• The project proponent hereby requests that the certifying authority review and take action on this CWA 401 certification request within the applicable reasonable period of time.
• I have given true,accurate,and complete information on this form;
• I agree that submission of this PCN form is a"transaction"subject to Chapter 66,Article 40 of the NC General Statutes(the"Uniform Electronic Transactions Act");
• I agree to conduct this transaction by electronic means pursuant to Chapter 66,Article 40 of the NC General Statutes(the"Uniform Electronic Transactions Act");
• I understand that an electronic signature has the same legal effect and can be enforced in the same way as a written signature;AND
• I intend to electronically sign and submit the PCN form.
Full Name:
Robert Yates Allen
Signature
YAT6 ALLOW
Date
4/9/2021