Loading...
HomeMy WebLinkAbout20210664 Ver 1_ePCN Application_20210409 I I DWR Division of Water Resources Pre-Construction Notification (PCN) Form April 4,2021 Ver 4 Initial Review Has this project met the requirements for acceptance in to the review process?* ✓ Yes ✓ No Is this project a public transportation project?* 0 Yes r No Change only if needed. BIMS#Assigned* Version#* 20210664 1 Is a payment required for this project?* ✓ No payment required G Fee received Reviewing Office* ✓ Fee needed-send electronic notification Asheville Regional Office-(828)296-4500 Select Project Reviewer* Kevin Mitchell:eads\rkmitchell Information for Initial Review 1a.Name of project: Bridge 580108 on SR 1560 Old Linville Road 1a.Who is the Primary Contact?* Yates Allen lb.Primary Contact Email:* 1c.Primary Contact Phone:* ryallen@ncdot.gov (828)250-3002 Date Submitted 4/9/2021 Nearest Body of Water North Fork Catawba River Basin Catawba Water Classification Class B,Trout Site Coordinates Latitude: Longitude: 35.802639 -82.017743 A. Processing Information U County(or Counties)where the project is located: McDowell Is this a NCDMS Project ✓ Yes G No Is this project a public transportation project?* 6 Yes r No Is this a NCDOT Project?* (7 Yes r No (NCDOT only)T.I.P.or state project number: 17BP.13.R.194 WBS#(?) 17BP.13.R.194 Pre-Filing Meeting Information Is this a courtesy copy notification?* ✓ Yes G No ID# Version 20210664 Pre-fling Meeting or Request Date* 4/21/2021 Attach documentation of Pre-Filing Meeting Request here:* Click the upload button or drag and drop files here to attach docurrent DWR Pre-Filing Meeting Request Form.pdf 56.1KB Rle type Host be FCF 1a.Type(s)of approval sought from the Corps: [7 Section 404 Permit(wetlands,streams and waters,Clean Water Act) r Section 10 Permit(navigable waters,tidal waters,Rivers and Harbors Act) Has this PCN previously been submitted?* ✓ Yes s No lb.What type(s)of permit(s)do you wish to seek authorization? 7 Nationwide Permit(NWP) r Regional General Permit(RGP) r Standard(IP) 1c.Has the NWP or GP number been verified by the Corps? t: Yes r No Nationwide Permit(NWP)Number: 13-Bank Stabilization NWP Numbers(for multiple NWPS): Id.Type(s)of approval sought from the DWR: 17 401 Water Quality Certification-Regular r 401 Water Quality Certification-Express r Non-404 Jurisdictional General Permit r Riparian Buffer Authorization r Individual 401 Water Quality Certification le.Is this notification solely for the record because written approval is not required? * For the record only for DWR 401 Certification: r Yes 6 No For the record only for Corps Permit: r Yes 6 No 1f.Is this an after-the-fact permit application?* ✓ Yes ( No 1g.Is payment into a mitigation bank or in-lieu fee program proposed for mitigation of impacts? r Yes GNo 1g.Is payment into a mitigation bank or in-lieu fee program proposed for mitigation of impacts? ✓ Yes rNo Acceptance Letter Attachment lh.Is the project located in any of NC's twenty coastal counties? ✓ Yes GNo 1j.Is the project located in a designated trout watershed? 6 Yes r No B. Applicant Information 1d.Who is applying for the permit? I7 Owner r Applicant(other than owner) le.Is there an Agent/Consultant for this project?* ✓ Yes f No 2.Owner Information 2a.Name(s)on recorded deed: NC Department of Transportation 2b.Deed book and page no.: 2c.Contact Person: 2d.Address Street Address 55 Orange Street Address Line 2 Oty Slate/Rovince/Region Asheville NC Postal/Zip Code Country 28801 USA 2e.Telephone Number: 2f.Fax Number: (828)250-3002 2g.Email Address:* ryallen@ncdot.gov C. Project Information and Prior Project History 1. Project Information 1b.Subdivision name: ('rf appropriate) 1c.Nearest municipality/town: Woodlawn 2. Project Identification 2a.Property Identification Number: 2b.Property size: 2c.Project Address Street Address Address Line 2 Oty State/Province/Region Postal/Zip Code Country 3.Surface Waters 3a.Name of the nearest body of water to proposed project:* North Fork Catawba River 3b.Water Resources Classification of nearest receiving water:* Class B,Trout 3c. What river basin(s)is your project located in?* Catawba 3d.Please provide the 12-digit HUC in which the project is located. 030501010202 4. Project Description and History 4a.Describe the existing conditions on the site and the general land use in the vicinity of the project at the time of this application:* Existing bridge on paved road surrounded by forested land and commercial and residential properties 4b.Have Corps permits or DWR certifications been obtained for this project(including all prior phases)in the past?* r Yes r No r Unknown 4d.Attach an 8 1/2 X 11 excerpt from the most recent version of the USGS topographic map indicating the location of the project site.(for DWR) Bridge 108 topo.pdf 703.38KB 4e.Attach an 8 1/2 X 11 excerpt from the most recent version of the published County NRCS Soil Survey map depicting the project site.(for DWR) 4f.List the total estimated acreage of all existing wetlands on the property: 0 4g.List the total estimated linear feet of all existing streams on the property: 60 4h.Explain the purpose of the proposed project:* Replace existing substandard bridge 4i.Describe the overall project in detail,including indirect impacts and the type of equipment to be used:* Replace existing 4-span concrete bridge and its approaches with 3-span cored slab bridge measuring 172.25'long by 36'wide.Project includes changes to 2 adjacent roads, Alignments-Y-and-Y1-.Bank stabilization will result in permanent impacts of 49 LF under the bridge and 8 LF at a pipe outlet.Temporary impacts of 12 LF and 13 LF,respectively, may occur while permanent impacts are installed.Two unnamed tributaries to the river are present but will not be impacted. Equipment used includes track hoe,crane,and dump trucks. 4j.Please upload project drawings for the proposed project. 17BP.13.R.194_SF-580108_Permit_Plans_and_Impact_20210329.pdf 3.85MB 5.Jurisdictional Determinations 5a.Have the wetlands or streams been delineated on the property or proposed impact areas?* a Yes r No r Unknown Comments: Site visit by NC DOT personnel and contractors 5b.If the Corps made a jurisdictional determination,what type of determination was made?* r Preliminary r Approved r Not Verified r Unknown a N/A Corps AID Number: 5c.If 5a is yes,who delineated the jurisdictional areas? Name(if known): Yates Allen Agency/Consultant Company: NC DOT Other: 5d1.Jurisdictional determination upload 6. Future Project Plans 6a.Is this a phased project?* C Yes (cNo Are any other NWP(s),regional general permit(s),or individual permits(s)used,or intended to be used,to authorize any part of the proposed project or related activity? LD. Proposed Impacts Inventory 1. Impacts Summary 1a.Where are the impacts associated with your project?(check all that apply): r Wetlands fJ Streams-tributaries r Buffers r Open Waters r Pond Construction 3.Stream Impacts 3a.Reason for impact(?) 3b.Impact type* 3c.Type of impact* 3d.S.name* 3e.Stream Type* 3f.Type of 3g.S.width* 3h.Impact (?) Jurisdiction* length* S1 bank stabilization Permanent Bank Stabilization North Fork Catawba River Perennial Both 45 49 Average(feet) (linear feet) S2 installation of bank Temporary Bank Stabilization North Fork Catawba River Perennial Both 45 12 stabilization Average(feet) (linear feet) S3 pipe outlet protection Permanent Bank Stabilization North Fork Catawba River Perennial Both 45 8 Average(feet) (linear feet) S4 installation of outlet Temporary Bank Stabilization North Fork Catawba River Perennial Both 45 13 protection Average(feet) (linear feet) 3i.Total jurisdictional ditch impact in square feet: 0 3i.Total permanent stream impacts: 3i.Total temporary stream impacts: 57 25 3i.Total stream and ditch impacts: 82 3j.Comments: Temporary impacts are at same location as permanent impacts E. Impact Justification and Mitigation 1.Avoidance and Minimization 1a.Specifically describe measures taken to avoid or minimize the proposed impacts in designing the project: Bank stabilization is minimal amount needed to protect river banks lb.Specifically describe measures taken to avoid or minimize the proposed impacts through construction techniques: No impacts during construction of the bridge 2. Compensatory Mitigation for Impacts to Waters of the U.S. or Waters of the State 2a.Does the project require Compensatory Mitigation for impacts to Waters of the U.S.or Waters of the State? ✓ Yes rNo 2b.If this project DOES NOT require Compensatory Mitigation,explain why: Mitigation not required for bank stabilization F. Stormwater Management and Diffuse Flow Plan (required by DWR) L) 1. Diffuse Flow Plan 1a.Does the project include or is it adjacent to protected riparian buffers identified within one of the NC Riparian Buffer Protection Rules? ✓ Yes r No If no,explain why: 2.Stormwater Management Plan 2a.Is this a NCDOT project subject to compliance with NCDOT's Individual NPDES permit NCS000250?* ( Yes r No Comments: G. Supplementary Information U 1. Environmental Documentation 1a.Does the project involve an expenditure of public(federal/state/local)funds or the use of public(federal/state)land?* ( Yes rNo 1b.If you answered"yes"to the above,does the project require preparation of an environmental document pursuant to the requirements of the National or State(North Carolina) Environmental Policy Act(NEPAISEPA)?* ✓ Yes ( No Comments:* Falls within State Minimum Criteria Checklist(MCCL) 2.Violations(DWR Requirement) 2a.Is the site in violation of DWR Water Quality Certification Rules(15A NCAC 2H.0500),Isolated Wetland Rules(15A NCAC 2H.1300),or DWR Surface Water or Wetland Standards or Riparian Buffer Rules(15A NCAC 2B.0200)?* ✓ Yes ( No 3. Cumulative Impacts(DWR Requirement) 3a.Will this project result in additional development,which could impact nearby downstream water quality?* ✓ Yes ( No 3b.If you answered"no,"provide a short narrative description. 4.Sewage Disposal(DWR Requirement) 4a.Is sewage disposal required by DWR for this project?* ✓ Yes rNor N/A 5. Endangered Species and Designated Critical Habitat(Corps Requirement) 5a.Will this project occur in or near an area with federally protected species or habitat?* 6 Yes rNo 5b.Have you checked with the USFWS concerning Endangered Species Act impacts?* ✓ Yes f No 5d.Is another Federal agency involved?* ✓ Yes f No r Unknown 5e.Is this a DOT project located within Division's 1-8? ✓ Yes F No 5f.Will you cut any trees in order to conduct the work in waters of the U.S.? 6 Yes r No 5g.Does this project involve bridge maintenance or removal? ✓ Yes r No 5g(1).If yes,have you inspected the bridge for signs of bat use such as staining,guano,bats,etc.? 6 Yes r No If you answered"Yes"to 5g(1),did you discover any signs of bat use? ✓ Yes G No r Unknown 5h.Does this project involve the construction/installation of a wind turbine(s)?* ✓ Yes f No Si.Does this project involve(1)blasting,and/or(2)other percussive activities that will be conducted by machines,such as jackhammers,mechanized pile drivers,etc.? ✓ Yes G No 5j.What data sources did you use to determine whether your site would impact Endangered Species or Designated Critical Habitat? https://vwwv.fws.gov/raleigh/species/cntylist/mcdowell.html Consultation Documentation Upload 6. Essential Fish Habitat(Corps Requirement) 6a.Will this project occur in or near an area designated as an Essential Fish Habitat?* ✓ Yes f No 6b.What data sources did you use to determine whether your site would impact an Essential Fish Habitat?* Current maps and data bases 7. Historic or Prehistoric Cultural Resources(Corps Requirement) 7a.Will this project occur in or near an area that the state,federal or tribal governments have designated as having historic or cultural preservation status?* ✓ Yes 6 No 7b.What data sources did you use to determine whether your site would impact historic or archeological resources?* https://nc.maps.arcgis.com/apps/webappviewer/index html?id=79ea671 ebdcc45639f0860257d5f5ed7 7c.Historic or Prehistoric Information Upload 8. Flood Zone Designation(Corps Requirement) 8a.Will this project occur in a FEMA-designated 100-year floodplain?* ✓ Yes ( No 8c.What source(s)did you use to make the floodplain determination?* https://fris.nc.gov/fris/Index.aspx?FIPS=1118ST=NC&user=General Public Miscellaneous Comments Miscellaneous attachments not previously requested. Bridge 108 McDowell photos.pdf 641.71KB Bridge_108_McDowell_cover_letter_signed.pdf 267.92KB Signature FJ By checking the box and signing below,I certify that: • The project proponent hereby certifies that all information contained herein is true,accurate,and complete to the best of my knowledge and belief;and • The project proponent hereby requests that the certifying authority review and take action on this CWA 401 certification request within the applicable reasonable period of time. • I have given true,accurate,and complete information on this form; • I agree that submission of this PCN form is a"transaction"subject to Chapter 66,Article 40 of the NC General Statutes(the"Uniform Electronic Transactions Act"); • I agree to conduct this transaction by electronic means pursuant to Chapter 66,Article 40 of the NC General Statutes(the"Uniform Electronic Transactions Act"); • I understand that an electronic signature has the same legal effect and can be enforced in the same way as a written signature;AND • I intend to electronically sign and submit the PCN form. Full Name: Robert Yates Allen Signature YAT6 ALLOW Date 4/9/2021