Loading...
HomeMy WebLinkAbout20210633 Ver 1_SAW-2021-00431 B-5985 JD tearsheet.doc_20210401 U.S. ARMY CORPS OF ENGINEERS WILMINGTON DISTRICT Action Id. SAW-2021-00431 County: Robeson County U.S.G.S.Quad: Southwest Lumberton NOTIFICATION OF JURISDICTIONAL DETERMINATION Applicant: North Carolina Department of Transportation Environmental Analysis Unit Attn:Mr.Jason Dilday jldilday@ncdot.gov Address: 1598 Mail Service Center Raleigh,North Carolina 27699 Telephone Number: 919-707-6111 Size(acres) 46 acres Nearest Town Lumberton Nearest Waterway Lumber River River Basin Lower Pee Dee USGS HUC 03040203 Coordinates Latitude: 34.6193 Longitude:-79.0121 Location description: The project area is located along the Lumber River,and adjacent to two existing bridges located on W 5th Street and W 2nd Street which traverse over the Lumber River in Lumberton,Robeson County,North Carolina.NC DOT project: TIP B-5985 Indicate Which of the Following Apply: A. Preliminary Determination X There are waters,including wetlands, on the above described project area, that may be subject to Section 404 of the Clean Water Act(CWA)(33 USC& 1344)and/or Section 10 of the Rivers and Harbors Act(RHA)(33 USC§403). The waters,including wetlands, have been delineated,and the delineation has been verified by the Corps to be sufficiently accurate and reliable. Therefore,this preliminary jurisdiction determination may be used in the permit evaluation process,including determining compensatory mitigation. For purposes of computation of impacts,compensatory mitigation requirements,and other resource protection measures,a permit decision made on the basis of a preliminary JD will treat all waters and wetlands that would be affected in any way by the permitted activity on the site as if they are jurisdictional waters of the U.S. This preliminary determination is not an appealable action under the Regulatory Program Administrative Appeal Process(Reference 33 CFR Part 331). However,you may request an approved JD., which is an appealable action,by contacting the Corps district for further instruction. _ There are wetlands on the above described property, that may be subject to Section 404 of the Clean Water Act(CWA)(33 USC§ 1344)and/or Section 10 of the Rivers and Harbors Act(RHA)(33 USC §403).However,since the waters,including wetlands, have not been properly delineated,this preliminary jurisdiction determination may not be used in the permit evaluation process. Without a verified wetland delineation,this preliminary determination is merely an effective presumption of CWA/RHA jurisdiction over all of the waters,including wetlands, at the project area,which is not sufficiently accurate and reliable to support an enforceable permit decision. We recommend that you have the waters of the U.S. on your property delineated. As the Corps may not be able to accomplish this wetland delineation in a timely manner,you may wish to obtain a consultant to conduct a delineation that can be verified by the Corps. B. Approved Determination There are Navigable Waters of the United States within the above described property subject to the permit requirements of Section 10 of the Rivers and Harbors Act(RHA)(33 USC §403)and Section 404 of the Clean Water Act(CWA)(33 USC § 1344). Unless there is a change in law or our published regulations,this determination may be relied upon for a period not to exceed five years from the date of this notification. Page 1 of 2 SAW-2021-00431 There are waters of the U.S.,including wetlands, on the above described project area subject to the permit requirements of Section 404 of the Clean Water Act(CWA)(33 USC§ 1344). Unless there is a change in the law or our published regulations, this determination may be relied upon for a period not to exceed five years from the date of this notification. _ We recommend you have the waters of the U.S. on your property delineated. As the Corps may not be able to accomplish this wetland delineation in a timely manner,you may wish to obtain a consultant to conduct a delineation that can be verified by the Corps. _ The waters of the U.S.,including wetlands, on your project area have been delineated and the delineation has been verified by the Corps. We strongly suggest you have this delineation surveyed. Upon completion,this survey should be reviewed and verified by the Corps. Once verified,this survey will provide an accurate depiction of all areas subject to CWA jurisdiction on your property which,provided there is no change in the law or our published regulations,may be relied upon for a period not to exceed five years. _ The waters of the U.S.,including wetlands, have been delineated and surveyed and are accurately depicted on the plat signed by the Corps Regulatory Official identified below on .Unless there is a change in the law or our published regulations,this determination may be relied upon for a period not to exceed five years from the date of this notification. There are no waters of the U.S.,to include wetlands,present on the above described project area which are subject to the permit requirements of Section 404 of the Clean Water Act(33 USC 1344). Unless there is a change in the law or our published regulations,this determination may be relied upon for a period not to exceed five years from the date of this notification. The property is located in one of the 20 Coastal Counties subject to regulation under the Coastal Area Management Act(CAMA). You should contact the Division of Coastal Management in Morehead City,NC,at(252) 808-2808 to determine their requirements. Placement of dredged or fill material within waters of the US,including wetlands,without a Department of the Army permit may constitute a violation of Section 301 of the Clean Water Act(33 USC § 1311). Placement of dredged or fill material,construction or placement of structures,or work within navigable waters of the United States without a Department of the Army permit may constitute a violation of Sections 9 and/or 10 of the Rivers and Harbors Act(33 USC§401 and/or 403).If you have any questions regarding this determination and/or the Corps regulatory program,please contact Sarah Hair at(910)251-4049 or Sarah.E.Hair@usace.armv.mil. C. Basis For Determination: N/A.An Approved JD has not been completed. D. Remarks: E. Attention USDA Program Participants The delineation included herein has been conducted to identify the location and extent of the aquatic resource boundaries and/or the jurisdictional status of aquatic resources for purposes of the Clean Water Act for the particular site identified in this request. This delineation and/or jurisdictional determination may not be valid for the Wetland Conservation Provisions of the Food Security Act of 1985,as amended. If you or your tenant are USDA program participants,or anticipate participation in USDA programs,you should discuss the applicability of a certified wetland determination with the local USDA service center,prior to starting work. F. Appeals Information for Approved Jurisdiction Determinations (as indicated in Section B.above) If you object to this determination,you may request an administrative appeal under Corps regulations at 33 CFR Part 331. Enclosed you will find a Notification of Appeal Process(NAP)fact sheet and Request for Appeal(RFA)form. If you request to appeal this determination you must submit a completed RFA form to the following address: US Army Corps of Engineers South Atlantic Division Attn: Mr.Philip A. Shannin Administrative Appeal Review Officer 60 Forsyth Street SW,Floor M9 Atlanta,Georgia 30303-8803 AND PHILIP.A.SHANNIN@USACE.ARMY.MIL Page 2 of 2 SAW-2021-00431 In order for an RFA to be accepted by the Corps,the Corps must determine that it is complete,that it meets the criteria for appeal under 33 CFR part 331.5,and that it has been received by the Division Office within 60 days of the date of the NAP. Should you decide to submit an RFA form,it must be received at the above address by N/A. It is not necessary to submit an RFA form to the Division Office if you do not object to the determination in this correspondence. Corps Regulatory Official: Liz Hair 1-1 576- Date: April 1,2021 Expiration Date: N/A The Wilmington District is committed to providing the highest level of support to the public. To help us ensure we continue to do so,please complete our Customer Satisfaction Survey,located online at http://corpsmapu.usace.army.mil/cm_apex/f?p=1 3 6:4:0. Copy Furnished: Ms.Joanne Steenhuis-NC DEQ,DWR Mr.Chris Rivenbark-NC DOT,EAU Page 3 of 2 SAW-2021-00431 NOTIFICATION OF ADMINISTRATIVE APPEAL OPTIONS AND PROCESS AND REQUEST FOR APPEAL Applicant: North Carolina Department of File Number: SAW-2021-00431 Date: April 1,2021 Transportation,Environmental Analysis Unit;Attn: Mr.Jason Dilday Attached is: See Section below INITIAL PROFFERED PERMIT (Standard Permit or Letter of permission) A [ PROFFERED PERMIT (Standard Permit or Letter of permission) B PERMIT DENIAL _ C [ APPROVED JURISDICTIONAL DETERMINATION D E PRELIMINARY JURISDICTIONAL DETERMINATION E SECTION I - The following identifies your rights and options regarding an administrative appeal of the above decision. Additional information may be found at http://www.usace.army.mil/Missions/CivilWorks/RegulatoryProgramandPermits.aspx or Corps regulations at 33 CFR Part 331. A: INITIAL PROFFERED PERMIT: You may accept or object to the permit. • ACCEPT: If you received a Standard Permit,you may sign the permit document and return it to the district engineer for final authorization. If you received a Letter of Permission(LOP),you may accept the LOP and your work is authorized. Your signature on the Standard Permit or acceptance of the LOP means that you accept the permit in its entirety,and waive all rights to appeal the permit,including its terms and conditions,and approved jurisdictional determinations associated with the permit. • OBJECT: If you object to the permit(Standard or LOP)because of certain terms and conditions therein,you may request that the permit be modified accordingly.You must complete Section II of this form and return the form to the district engineer. Your objections must be received by the district engineer within 60 days of the date of this notice,or you will forfeit your right to appeal the permit in the future. Upon receipt of your letter,the district engineer will evaluate your objections and may: (a)modify the permit to address all of your concerns,(b)modify the permit to address some of your objections,or(c)not modify the permit having determined that the permit should be issued as previously written. After evaluating your objections,the district engineer will send you a proffered permit for your reconsideration,as indicated in Section B below. B: PROFFERED PERMIT: You may accept or appeal the permit • ACCEPT: If you received a Standard Permit,you may sign the permit document and return it to the district engineer for final authorization. If you received a Letter of Permission(LOP),you may accept the LOP and your work is authorized. Your signature on the Standard Permit or acceptance of the LOP means that you accept the permit in its entirety,and waive all rights to appeal the permit,including its terms and conditions,and approved jurisdictional determinations associated with the permit. • APPEAL: If you choose to decline the proffered permit(Standard or LOP)because of certain terms and conditions therein,you may appeal the declined permit under the Corps of Engineers Administrative Appeal Process by completing Section II of this form and sending the form to the division engineer. This form must be received by the division engineer within 60 days of the date of this notice. C: PERMIT DENIAL: You may appeal the denial of a permit under the Corps of Engineers Administrative Appeal Process by completing Section II of this form and sending the form to the division engineer. This form must be received by the division engineer within 60 days of the date of this notice. D: APPROVED JURISDICTIONAL DETERMINATION: You may accept or appeal the approved JD or provide new information. • ACCEPT: You do not need to notify the Corps to accept an approved JD. Failure to notify the Corps within 60 days of the date of this notice means that you accept the approved JD in its entirety,and waive all rights to appeal the approved JD. • APPEAL: If you disagree with the approved JD,you may appeal the approved JD under the Corps of Engineers Administrative Appeal Process by completing Section II of this form and sending the form to the division engineer. This form must be received by the division engineer within 60 days of the date of this notice. Page 4 of 2 SAW-2021-00431 E: PRELIMINARY JURISDICTIONAL DETERMINATION: You do not need to respond to the Corps regarding the preliminary JD. The Preliminary JD is not appealable. If you wish, you may request an approved JD (which may be appealed), by contacting the Corps district for further instruction. Also you may provide new information for further consideration by the Corps to reevaluate the JD. SECTION II -REQUEST FOR APPEAL or OBJECTIONS TO AN INITIAL PROFFERED PERMIT REASONS FOR APPEAL OR OBJECTIONS: (Describe your reasons for appealing the decision or your objections to an initial proffered permit in clear concise statements. You may attach additional information to this form to clarify where your reasons or objections are addressed in the administrative record.) ADDITIONAL INFORMATION: The appeal is limited to a review of the administrative record, the Corps memorandum for the record of the appeal conference or meeting, and any supplemental information that the review officer has determined is needed to clarify the administrative record. Neither the appellant nor the Corps may add new information or analyses to the record. However, you may provide additional information to clarify the location of information that is already in the administrative record. POINT OF CONTACT FOR QUESTIONS OR INFORMATION: If you have questions regarding this decision and/or the If you only have questions regarding the appeal process you may appeal process you may contact: also contact: District Engineer,Wilmington Regulatory Division, US Army Corps of Engineers Attn: Sarah Hair South Atlantic Division 69 Darlington Avenue Attn: Mr.Philip A.Shannin Wilmington,North Carolina 28403 Administrative Appeal Review Officer 60 Forsyth Street SW,Floor M9 Atlanta,Georgia 30303-8803 PHILIP.A.SHANNIN(a,USACE.ARMY.MIL RIGHT OF ENTRY: Your signature below grants the right of entry to Corps of Engineers personnel,and any government consultants,to conduct investigations of the project site during the course of the appeal process. You will be provided a 15 day notice of any site investigation,and will have the opportunity to participate in all site investigations. Date: Telephone number: Signature of appellant or agent. For appeals on Initial Proffered Permits send this form to: District Engineer,Wilmington Regulatory Division,Attn: Sarah Hair,69 Darlington Avenue,Wilmington,North Carolina 28403 For Permit denials,Proffered Permits and approved Jurisdictional Determinations send this form to: Division Engineer,Commander,U.S.Army Engineer Division,South Atlantic,Attn: Mr.Philip Shannin, Administrative Appeal Officer,CESAD-PDO,60 Forsyth Street,Room 10M15,Atlanta,Georgia 30303-8801 Phone: (404)562-5137,PHILIP.A.SHANNIN@USACE.ARMY.MIL Page 5 of 2