Loading...
HomeMy WebLinkAbout20180063 Ver 1_Meeting Minutes_20210329Strickland, Bev From: Kichefski, Steven L CIV USARMY CESAW (USA) <Steven.L.Kichefski@usace.army.mil> Sent: Monday, March 29, 2021 4:57 PM To: Davis, Erin B; Leslie, Andrea J; Tugwell, Todd J CIV USARMY CESAW (US); Wilson, Travis W.; Kim Browning; Haywood, Casey M CIV (USA); Bowers, Todd; Youngman, Holland J; Hamstead, Byron A Subject: [External] FW: Carolina Bison Year 1 Monitoring Report Attachments: French Broad - Carolina Bison - Stream Ledger 111320.pdf; USACE_Bank Credit Release Template_Bison_12.18.2020.xlsx; Bison MY1 Site Visit Memo.pdf; 20210305 CarolinaBisonMYlVisit Photo3-SeditmentlnReachPB1- A_FacingUpstreamReducedjpg; 20210305_CarolinaBisonMYlVisit_Photos-ReachPB1- A_FarthestU pStreamSwale-FacingDownslopeTowardStreamReducedjpg Follow Up Flag: Follow up Flag Status: Flagged CAUTION: External email. Do not click links or open attachments unless you verify. Send all suspicious email as an attachment to Report Spam. Good Morning, Forwarding the minutes that RES provided from the March 5, 2021 site visit, please reply this week with any revisions you wish to make. I have also copied the comments provided by the DWR and the EPA after their review of the MY1 report. I am moving forward with issuing the MY1 credit release this week. Overall the site looks good, but I have concerns over the amount of sediment that is reaching the channel from the adjacent land use via the rock swales in a couple of locations. The modifications RES made to add hay bale check dams to the rock swales were capturing sediment, but had already been overwhelmed in the 3 weeks they were installed. Not all rock swales were a concern, issues focused mainly on the rock swales on PB1-A and have attached two pictures from our visit. There was also a small encroachment on UT1 that was being addressed. Regards, Steve Kichefski Regulatory Project Manager U.S. Army Corps of Engineers Wilmington District, Asheville Field Office 151 Patton Avenue, Suite 208 Asheville, NC 28801 (828)-271-7980 Ext. 4234 (828)-933-8032 cell The Wilmington District is committed to providing the highest level of support to the public. To help us ensure we continue to do so, please complete the Customer Satisfaction Survey located at our website at http://corpsmapu.usace.army.mil/cm apex/f?p=136:4:0 to complete the survey online. From: Bradley Breslow <bbreslow@res.us> Sent: Friday, March 12, 2021 2:14 PM To: Kichefski, Steven L CIV USARMY CESAW (USA) <Steven.L.Kichefski@usace.army.mil> 1 Cc: Ryan Medric <rmedric@res.us> Subject: [Non-DoD Source] RE: Carolina Bison Year 1 Monitoring Report Hi Steve, Please see the attached meeting minutes from our site visit last week. At this time, RES would like to request the MY1 credit release of 495.70 SMUs. Also, for your convenience I am re -sending the credit release schedule and stream ledger. Please let me know if you would like to discuss or require any additional information to process the release in March. Hope you have a great weekend. Thanks, Brad Breslow Regulatory Manager RES I res.us Direct: 919.209.1062 I Mobile: 847.774.8404 From: Kichefski, Steven L CIV USARMY CESAW (USA) <Steven.L.Kichefski@usace.army.mil> Sent: Tuesday, January 26, 2021 4:54 PM To: Bradley Breslow <bbreslow@res.us> Subject: [EXTERNAL] RE: Carolina Bison Year 1 Monitoring Report Brad, To follow up on our recent Carolina Bison conversation, I sent the MY1 out to the IRT for comment. Andrea and I intend to visit the site in the near future, but it is doubtful if the remainder of the IRT will be able to join. You mentioned planning to visit and oversee work in the coming weeks out there, I have several open dates in February, so let me know your thoughts on scheduling. In general, Mondays, Thursdays and Fridays are better field days for me at this time. Regards, Steve Kichefski Regulatory Project Manager U.S. Army Corps of Engineers Wilmington District, Asheville Field Office 151 Patton Avenue, Suite 208 Asheville, NC 28801 (828)-271-7980 Ext. 4234 (828)-933-8032 cell The Wilmington District is committed to providing the highest level of support to the public. To help us ensure we continue to do so, please complete the Customer Satisfaction Survey located at our website at http://corpsmapu.usace.army.mil/cm apex/f?p=136:4:0 to complete the survey online. From: Bradley Breslow <bbreslow@res.us> Sent: Tuesday, January 19, 2021 5:52 PM To: Kichefski, Steven L CIV USARMY CESAW (USA) <Steven.L.Kichefski@usace.army.mil> Subject: [Non-DoD Source] FW: Carolina Bison Year 1 Monitoring Report 2 Brad Breslow Regulatory Manager, Southeast RES I res.us Direct: 919.209.1062 I Mobile: 847.774.8404 From: Ryan Medric <rmedric@res.us> Sent: Friday, December 18, 2020 12:23 PM To: Kichefski, Steven L CIV USARMY CESAW (USA) <Steven.L.Kichefski@usace.army.mil> Cc: Bradley Breslow <bbreslow@res.us> Subject: Carolina Bison Year 1 Monitoring Report Steve, Please find attached the Carolina Bison Year 1 Monitoring report along with the cover letter, credit release schedule, and stream ledger. We will also mail a hardcopy to you. Happy Holidays! Thanks, Ecologist RES I res.us Office: 919.741.6268 I Mobile: 703.424.6313 3 RES FRENCH BROAD 05 UMBRELLA MITIGATION BANKING INSTRUMENT CAROLINA BISON STREAM CREDIT LEDGER (HUC 06010105) Friday, November 13, 2020 Transaction Credits Released Credits Debited Number To Bank From Bank Current Credit Balance Credits Reserved Purchaser Project Permit Number Date HUC 1 687.15 2 687.15 Total 1,374.30 0.00 1,374.30 0.0 Credits Released: Task 1 10/21/19 Credits Released: Task 2 9/30/20 Project Name: Sponsor Name: USACE Action ID: NCDWQ Action ID: Wilmington District Mitigation Bank Credit Release Schedule Carolina Bison Stream Mitigation Project EBX SAW-2016-02357 County: 8-Digit HUC: Year Project Instituted: Date Prepared: Buncombe 6010105 2019 12/18/2020 Total Potential Credits Credit Classification Stream Credits Forested Wetland Credits Non -Forested Wetland Credits Warm Water Cool Water Cold Water Riparian Riverine Riparian Non-Riverine Non -Riparian Coastal Potential Credits from Mitigation Plan 4,675 Potential Credits from As -Built Survey 4,675 Current and Future Credit Releases Credit Release Milestone Scheduled Releases 15% Stream Warm Water Credits Base SMUs 687.150 WQ SMUs Projected Release Date Actual Release Date 10/21/2019 1 (Bank/Site Establishment)1' 2 2 (Year 0/As-Built)3 15% 687.150 8/15/2020 9/29/2020 3 (Year 1 Monitoring) 10% 458.100 37.600 3/15/2021 4 (Year 2 Monitoring) 10% 458.100 9.400 5 (Year 3 Monitoring) 10% 458.100 9.400 6 (Year 4 Monitoring) 5% 229.050 4.700 7 (Year 5 Monitoring) 10% 458.100 9.400 8 (Year 6 Monitoring) 5% 229.050 4.700 9 (Year 7 Monitoring) 10% 458.100 9.400 Stream Bankfull Standard4 10% 458.100 9.400 Varies4 Contingencies (if any): None Signature of Wilmington District Official Approving Credit Release 1 The first credit release milestone is based on the potential credits stated in the approved mitigation plan. 2 The first credit release shall occur upon establishment of the mitigation bank, which includes the following criteria: 1) Execution of the MBI or UMBI by the Sponsor and the USACE; 2) Approval of the final Mitigation Plan; 3) Mitigation bank site must be secured; 4) Delivery of the financial assurances described in the Mitigation Plan; 5) Recordation of the long-term protection mechanism and title opinion acceptable to the USACE; 6) 404 permit verification for construction of the site, if required. 3 - The second credit release is based on the credit totals from the as -built survey, and may differ slightly from the credit totals stated in the mitigation plan. 4 - A 10% reserve of credits to be held back until the bankfull event performance standard has been met. Date Project Name: Sponsor Name: USACE Action ID: NCDWQ Action ID: Wilmington District Mitigation Bank Credit Release Schedule Carolina Bison Stream Mitigation Project EBX SAW-2016-02357 County: 8-Digit HUC: Year Project Instituted: Date Prepared: Buncombe 6010105 2019 12/18/2020 Total Potential Credits Credit Classification Stream Credits Forested Wetland Credits Non -Forested Wetland Credits Warm Water Cool Water Cold Water Riparian Riverine Riparian Non-Riverine Non -Riparian Coastal Potential Credits from Mitigation Plan 4,675 Potential Credits from As -Built Survey 4,675 Current and Future Credit Releases Credit Release Milestone Scheduled Releases 15% Stream Warm Water Credits Base SMUs 687.150 WQ SMUs Projected Release Date Actual Release Date 10/21/2019 1 (Bank/Site Establishment)1' 2 2 (Year 0/As-Built)3 15% 687.150 8/15/2020 9/29/2020 3 (Year 1 Monitoring) 10% 458.100 37.600 3/15/2021 4 (Year 2 Monitoring) 10% 458.100 9.400 5 (Year 3 Monitoring) 10% 458.100 9.400 6 (Year 4 Monitoring) 5% 229.050 4.700 7 (Year 5 Monitoring) 10% 458.100 9.400 8 (Year 6 Monitoring) 5% 229.050 4.700 9 (Year 7 Monitoring) 10% 458.100 9.400 Stream Bankfull Standard4 10% 458.100 9.400 Varies4 Contingencies (if any): None Signature of Wilmington District Official Approving Credit Release 1 The first credit release milestone is based on the potential credits stated in the approved mitigation plan. 2 The first credit release shall occur upon establishment of the mitigation bank, which includes the following criteria: 1) Execution of the MBI or UMBI by the Sponsor and the USACE; 2) Approval of the final Mitigation Plan; 3) Mitigation bank site must be secured; 4) Delivery of the financial assurances described in the Mitigation Plan; 5) Recordation of the long-term protection mechanism and title opinion acceptable to the USACE; 6) 404 permit verification for construction of the site, if required. 3 - The second credit release is based on the credit totals from the as -built survey, and may differ slightly from the credit totals stated in the mitigation plan. 4 - A 10% reserve of credits to be held back until the bankfull event performance standard has been met. Date Wilmington District Credit Release Schedule and Milestones for Streams Credit Release Total Released Total Released With Release Activity Interim Release Without Bankfull Bankfull Standard Milestone Standard Met Met2 1 Bank Establishment' 15% 15% NA 2 Completion of all initial physical and biological improvements 15% 30% NA made pursuant to the Mitigation Plan Year 1 monitoring report demonstrates that channels are 3 10% 40% NA stable and interim performance standards have been met Year 2 monitoring report demonstrates that channels are 4 10% 50% NA stable and interim performance standards have been met 5 Year 3 monitoring report demonstrates that channels are 10% ° 60% NA stable and interim performance standards have been met 6 Year 4 monitoring report demonstrates that channels are 5% ° 65% 75% stable and interim performance standards have been met 7 Year 5 monitoring report demonstrates that channels are 75% 10% ° 85% stable, performance standards have been met 8 Year 6 monitoring report demonstrates that channels are 5� ° 80% 90% stable, performance standards have been met 9 Year 7 monitoring report demonstrates that channels are 10% 90% 100% stable, performance standards have been met ° 1- The first credit release shall occur upon establishment of the mitigation bank, which includes the following criteria: 1) execution of the MBI or UMBI by the Sponsor and the USACE; 2) approval of the final Mitigation Plan; 3) the mitigation bank site must be secured; 4) delivery of the financial assurances described in the Mitigation Plan; 5) recordation of the long-term protection mechanism and title opinion acceptable to the USACE; 6) 404 permit verification for construction of the site, if required. 2 - A 10% reserve of credits to be held back until the bankfull event performance standard has been met (4 bankfull events in separate years). Wilmington District Credit Release Schedule and Milestones for Forested Wetlands Credit Release Release Activity Milestone 1 Site Establishment' Completion of all initial physical and biological improvements 2 made pursuant to the Mitigation Plan Year 1 monitoring report demonstrates that interim 3 performance standards have been met Year 2 monitoring report demonstrates that interim 4 performance standards have been met Year 3 monitoring report demonstrates that interim 5 performance standards have been met Year 4 monitoring report demonstrates that interim 6 performance standards have been met Year 5 monitoring report demonstrates that interim 7 performance standards have been met Year 6 monitoring report demonstrates that interim 8 performance standards have been met Year 7 monitoring report demonstrates that performance 9 standards have been met Interim Release Total Released 15% 15% 15% 30% 10% 40% 10% 50% 15% 65% 5% 70% 15% 85% 5% 90% 10% 100% 1 The first credit release shall occur upon establishment of the mitigation bank, which includes the following criteria: 1) execution of the MBI or UMBI by the Sponsor and the USACE; 2) approval of the final Mitigation Plan; 3) the mitigation bank site must be secured; 4) delivery of the financial assurances described in the Mitigation Plan; 5) recordation of the long-term protection mechanism and title opinion acceptable to the USACE; 6) 404 permit verification for construction of the site, if required. Wilmington District Credit Release Schedule and Milestones for Coastal Marsh Wetlands Credit Release Release Activity Milestone 1 Site Establishment' Completion of all initial physical and biological improvements 2 made pursuant to the Mitigation Plan Year 1 monitoring report demonstrates that interim 3 performance standards have been met Year 2 monitoring report demonstrates that interim 4 performance standards have been met Year 3 monitoring report demonstrates that interim 5 performance standards have been met Year 4 monitoring report demonstrates that interim 6 performance standards have been met Year 5 monitoring report demonstrates that performance 7 standards have been met Interim Release Total Released 15% 15% 15% 10% 15% 20% 10% 15% 30% 40% 55% 75% 85% 100% 1 The first credit release shall occur upon establishment of the mitigation bank, which includes the following criteria: 1) execution of the MBI or UMBI by the Sponsor and the USACE; 2) approval of the final Mitigation Plan; 3) the mitigation bank site must be secured; 4) delivery of the financial assurances described in the Mitigation Plan; 5) recordation of the long-term protection mechanism and title opinion acceptable to the USACE; 6) 404 permit verification for construction of the site, if required. MEMOR ANDUM res 3600 Glenwood Ave., Suite 100 Raleigh, North Carolina 27612 1 919.209.1055 tel. 919.212.6990 fax TO: NCIRT FROM: Brad Breslow — RES DATE: March 12, 2021 RE: French Broad Umbrella Bank, Carolina Bison Mitigation Bank Site, Monitoring Year 1 Credit Release Site Visit Attendees: Steve Kichefski, USACE Byron Hamstead, USFWS Holland Youngman, USFWS Date & Time 9:00 am, March 5th, 2021 Andrea Leslie, NCWRC Brad Breslow, RES Ryan Medric, RES Attendees met on -site to discuss the Year 1 monitoring report of the Carolina Bison Mitigation Site (the "Site"). Construction and planting of the Site was completed in March of 2020, and a virtual Site visit was held on August 6th, 2020 with the IRT. As constructed, the Carolina Bison Mitigation Project is proposed to provide 4,675 stream mitigation units (SMUs). - Crossing near the corral on PB 1 showed erosion. A general note that double culverts are not preferred. - Both rock swales on PB1-A had haybale check dams added on February 15, 2021. However, it was determined that the haybale check dams were not functioning properly. Increasing the size of the check dams was discussed to ensure the runoff from the pasture is slowed down and sediment is trapped with minimal maintenance. RES leaning towards replacing haybale check dams with engineered sediment packs (RES can provid typical detail and examples of implementation at other sites). - IRT emphasized that they preferred any "BMPs" to be installed outside of the easement. - Sedimentation was observed in PB1-A but was less noticeable moving downstream. RES shared that any excessive sedimentation would be shown in cross section monitoring. - IRT requested photo stations at all rock swales and crossings. - A few small bare -herbaceous areas were observed mainly along the Priority II areas of UT1. RES agreed to re-seed/straw these areas. - Some minor encroachment was observed along the "junk yard" on UT1. RES will install additional t-posts with signage and horse tape. - Fencing is still not complete. RES has additional site work to perform outside of the easement and the landowner agreed to finish the fence once that work is complete. RES will complete the additional work once the site is dry enough — preferably this summer. - At this time, RES is requesting the MY! credit release of 495.70 SMUs 4_ ctu adt, �r 9.J • - jj. / 7 w" a �: 4 - +t �wr 1-At y r1� r