HomeMy WebLinkAbout20180866 Ver 1_As-Built Baseline and Record Drawings_20210329Strickland, Bev
From: Crocker, Lindsay
Sent: Monday, March 29, 2021 7:57 AM
To: Tugwell, Todd J CIV USARMY CESAW (US); Davis, Erin B; Kim Browning; Wilson, Travis
W.; Haywood, Casey M CIV (USA); Davis, Erin B
Cc: Baumgartner, Tim; Raymond Holz (rholz@restorationsystems.com); John Hamby
(jhamby@restorationsystems.com); Stanfill, Jim; Harmon, Beth; Allen, Melonie
Subject: As -Built Baseline and Record Drawings / NCDMS Shaw's Run / Columbus Co /
SAW-2018-01169
Attachments: Shaws Run_100055_LU 03_STR_RW_Initial Release.pdf
Follow Up Flag: Follow up
Flag Status: Flagged
All,
The final baseline (as -built) report and record drawings were uploaded to the DMS/IRT SharePoint (and DWR Laserfiche)
for IRT review:
2021 will be Monitoring Year 1 for this project. The credit ledger for the 30% release was also posted and is attached for
your review.
Name: Shaw's Run Mitigation Site
USACE ID: SAW-2018-01169
DWR ID: 2018-0866
DMS Project #: 100055
RFP: 16-007337 — Issued 09/8/2017
Institution: 04/20/2018 — Full Delivery
CU#: Lumber 03040203
County: Columbus
Mitigation Plan Assets:
2,285.000 SMUs/5.862 WMUs
As -Built Assets:
2,285.000 SMUs/5.862 WMUs
Mitigation Plan Lengths/ Acreages:
2,285.000 linear ft./5.955 Acres
As-Built-MY0 Lengths/ Acreages:
2,278.000 linear ft./5.955 Acres
Please note:
Stream construction and planting was completed in December 2020. Deviations from the construction plans included
the following:
• Easement was updated from the construction plans. Construction plans had an older easement that was not the
proper (recorded) easement boundary.
i
• Woody material was placed in the channel riffles. This material consisted of brush, limbs, branches, etc. that
were placed in the riffles and covered with sand substrate to enhance instream habitat.
• Several log cross vanes were not installed due to Site conditions, including low slope causing the vanes to not be
necessary for bank stabilization. Log vanes removed from the project include stations 0+30, 7+20, 7+85, and
9+10 along UT1, and stations 0+30, 0+80,1+10, 1+75, 2+05, 2+40, and 4+05 along UT2.
FD Provider: Restoration Systems; Contact: John Hamby <jhamby@restorationsystems.com>Tel. 919-801-4754
DMS PM: Kelly Phillips, kelly.phillips@ncdenr.gov, 919-723-7565
IRT-DMS SharePoint Page:
https://ncconnect.sharepoi nt.com/sites/I RT-DMS/SitePages/Home.aspx
Let us know if you have any questions,
Lindsay
Lindsay Crocker
NC DEQ Division of Mitigation Services
217 West Jones St., Raleigh, NC 27603
919.594.3910
lindsay.crocker@ncdenr.gov
Email correspondence to and from this address is subject to the North Carolina Public Records Law and may be disclosed to third
parties unless the content is exempt by statute or other regulation.
2
Mitigation Project Name Shaw's Run Stream & Wetland Site USACE Action ID 2018-01169
DMS ID 100055 DWR Permit 2018-0866
River Basin Lumber Date Project Instituted 4/20/2018
Cataloging Unit 03040203 Date Prepared 2/26/2021
County Columbus Stream/Wet. Service Area Lumber 03040203
Signature of Official Approving Credit Release
1 - For NCDMS, no credits are released during the first milestone (Site Establishment).
2 - For NCDMS projects, the initial credit release milestone occurs when the as -built report (baseline monitoring report) has been approved by the NCIRT and posted to the
NCDMS Portal, provided the following criteria are met:
1) Approval of Final Mitigation Plan;
2) Recordation of the preservation mechanism, as well as a title opinion acceptable to the USACE covering the property;
3) Completion of all physical and biological improvements to the mitigation site pursuant to the mitigation plan;
4) Receipt of necessary DA permit authorization or written DA approval for projects where DA permit issuance is not required.
3 - A 10% reserve of credits is to be held back until the bankful event performance standard has been met.
Credit Release Milestone
Warm Stream Credits
Project Credits
Scheduled
Releases %
Estimated
Scheduled
Release #
Proposed
Released #
Not Approved
# Releases
Approved
Credits
Anticipated
Release
Year
Actual
Release
Date
1 - Site Establishment
N/A
N/A
N/A
N/A
N/A
N/A
N/A
2 - Year 0 / As -Built
30.00%
685.500
685.500
0.000
685.500
2021
2/26/2021
3 - Year 1 Monitoring
10.00%
228.500
2022
4 - Year 2 Monitoring
10.00%
228.500
2023
5 - Year 3 Monitoring
10.00%
228.500
2024
6 - Year 4 Monitoring
5.00%
114.250
2025
7 - Year 5 Monitoring
10.00%
228.500
2026
8 - Year 6 Monitoring
5.00%
114.250
2027
9 - Year 7 Monitoring
10.00%
228.500
2028
Stream Bankfull Standard
10.00%
228.500
2025
Totals
Total Gross Credits
2,285.000
Total Unrealized Credits to Date
0.000
Total Released Credits to Date
685.500
Total Percentage Released
30.00%
Remaining Unreleased Credits
1,599.500
Credit Release Milestone
Riparian Credits
Project Credits
Scheduled
Releases %
Estimated
Scheduled
Release #
Proposed
Released #
Not Approved
# Releases
Approved
Credits
Anticipated
Release
Year
Actual
Release
Date
1 - Site Establishment
N/A
N/A
N/A
N/A
N/A
N/A
N/A
2 - Year 0 / As -Built
30.00%
1.759
1.759
0.000
1.759
2021
2/26/2021
3 - Year 1 Monitoring
10.00%
0.586
2022
4 - Year 2 Monitoring
10.00%
0.586
2023
5 - Year 3 Monitoring
15.00%
0.879
2024
6 - Year 4 Monitoring
5.00%
0.293
2025
7 - Year 5 Monitoring
15.00%
0.879
2026
8 - Year 6 Monitoring
5.00%
0.293
2027
9 - Year 7 Monitoring
10.00%
0.586
2028
Stream Bankfull Standard
.00%
0.000
2025
Totals
Total Gross Credits
5.862
Total Unrealized Credits to Date
0.000
Total Released Credits to Date
1.759
Total Percentage Released
30.01%
Remaining Unreleased Credits
4.103
Page 1 of 2
Mitigation Project Name Shaw's Run Stream & Wetland Site USACE Action ID 2018-01169
DMS ID 100055 DWR Permit 2018-0866
River Basin Lumber Date Project Instituted 4/20/2018
Cataloging Unit 03040203 Date Prepared 2/26/2021
County Columbus Stream/Wet. Service Area Lumber 03040203
Notes
Contingencies (if any)
Project Quantities
Mitigation Type
Restoration Type
Physical Quantity
Warm Stream
Restoration
2,285.000
Riparian
Restoration
5.852
Riparian
Preservation
0.103
Debits
Warm Stream
Restoration
Credits
Riparian
Restoration
Riparian
Restoration
Equivalent
Credits
Beginning Balance (mitigation credits)
2,285.000
5.852
0.010
Released Credits
685.500
1.756
0.003
Unrealized Credits
0.000
0.000
0.000
Converted Credits
0.000
0.000
0.000
Owning Program
Req. Id
TIP #
Project Name
USACE Permit
#
DWR
Permit #
DCM Permit
#
Remaining Balance (Released credits)
685.500
1.756
0.003
Remaining Balance (Unreleased credits)
1,599.500
4.096
0.007
Total Remaining Balance (Released and Unreleased credits)
2,285.000
5.852
0.010
Page 2 of 2