Loading...
HomeMy WebLinkAboutWQ0042439_Application (FTSE)_20210329DocuSign Envelope ID. 27561DI Q-7AEA-453C-8OA9-BaB290297A6B State of North Carolina Department of Environmental Quality JWR Division of Water Resources 15A NCAC 02T •0300 — FAST TRACK SEWER SYSTEM EXTENSION APPLICATION Division of Water Resources FTA 04-16 & SUPPORTING DOCUMENTATION Application Number:_�e(o be completed by DWR) All items must be completed or the annlication will be returned 1. APPLICANT INFORMATION: 1. Applicant's name: CITY OF SANFORD (company, municipality, HOA, utility, etc.) 2. Applicant type: ❑ Individual ❑ Corporation ❑ General Partnership ❑ Privately -Owned Public Utility ❑ Federal ❑ State/County ® Municipal ❑ Other 3. Signature authority's name: PAUL WEEKS, PE per 15A NCAC 02T .01 06(b) Title: CITY ENGINEER 4. Applicant's mailing address: PO Box 3729 City: SANFORD State: NC Zip: 27331-3729 5. Applicant's contact information: Phone number: (919) 777-1119 Email Address: paul.weeks(rsanfordnc.net 0 w C 11. PROJECT INFORMATION: c 1. Project name: THE PARK AT SOUTHPARK PHASE 111 F cur, 2. Application/Project status: ® Proposed (New Permit) ❑ Existing Permit/Project ; c- If a modification, provide the existing permit number: WQ00 and issued date: W c co If new construction but part of a master plan, provide the existing permit number: WQ00160$6 a 3. County where project is located: LEE U 4. Approximate Coordinates (Decimal Degrees): Latitude: 33.5691 Longitude: - 58 5667 z 5. Parcel ID (if applicable): Lee County Pin # : 9661-00-5390-00 (or Parcel ID to closest downstream sewer) III. CONSULTANT INFORMATION: I. Professional Engineer: KEN W BRIGHT, PE License Number: 17585 Firm: KEN BRIGHT ASSOCIATES PLLC Mailing address: PO BOX 553 City: SANFORD State: NC Ziip. 27331-0553 Phone number: (919) 776-3444 Email Address: KWBRIGHI@KENBRIGHTENGINEERING.COM IV. WASTEWATER TREATMENT FACILITY (WWTF) INFORMATION: 1. Facility Name: BIG BUFFALO WASTEWATER TREATMENT PLANT Permit Number: 0024147 Owner Name: CITY OF SANFORD V. RECEIVING DOWNSTREAM SEWER INFORMATION (if different than WWTF): 1. Permit Number(s): W OQO 1380 Downstream (Receiving) Sewer Size: $ inch System Wide Collection System Permit Number(s)lifapplicable): WQCS200,_47 Owner Name(s): CITY OF SANFORD FORM: FTA 04-16 Pagel of5 VI. GENERAL REQUIREMENTS 1. If the Applicant is a Privately -Owned Public Utility, has a Certificate of Public Convenience and Necessity been attached? ❑ Yes ❑No ®NIA 2. If the Applicant is a Developer of lots to be sold, has a Developer's Operational Agreement (FORM: DEV) been attached? ❑ Yes ❑No ®NIA 3. If the Applicant is a HomefPronerty Owners' Association, has an Operational Agreement (FORM: HOA) been attached? ❑ Yes ❑No ®NIA 4. Origin of wastewater: (check all that apply): ® Residential Owned ❑ Retail (stores, centers, malls) ❑ Car Wash ❑ Residential Leased ❑ Retail with food preparationlservice ❑ Hotel and/or Motels ❑ School / preschool I day care ❑ Medical / dental / veterinary facilities ❑ Swimming Pool /Clubhouse ❑ Food and drink facilities ❑ Church ❑ Swimming Pool/Filter Backwash ❑ Businesses I offices 1 factories ❑ Nursing Home ❑ Other (Explain in Attachment) 5. Nature of wastewater: 100 % Domestic/Commercial _„% Commercial % Industrial (See 15A NCAC 02T .0103(20)) -ls there a Pretreatment Program in effect? ❑ Yes [:]No 6. Hasa flow reduction been approved under 15A NCAC 02T .0114()? []Yes ® No If yes, provide a copy of flow reduction approval letter 7. Summarize wastewater generated by project: Establishment Type (see 021.01140 Daily Design Flow'° No. of Units Flow RESIDENTIAL - 4 BEDROOM HOMES 480 gal/UNIT 23 11,040 GAD gall GPD gal/ GPD gal/ GPD gal/ GPD gall GPD Total 11,040 GPD a See 15A NCAC 02T .01 14(b)t (d), (e)(! and ,) for caveats to wastewater design flow rates (i.e., minimum flow per dwelling; proposed unknown non-residential development uses; public access facilities located near high public use areas; and residential property located south or east of the Atlantic Intracoastal Waterway to be used as vacation rentals as defined in C.F.S. 42A4). b Per 15A NCAC 02T .0114(c), design flow rates for establishments not identified [in table 15A NCAC 02T.0114) shall be determined using available flow data, water using fixtures, occupancy or operation patterns, and other measured data. S. Wastewater generated by project: 11.040 GPD (per 15A NCAC 02T_.4114) Do not include future flows or previously permitted allocations If permitted flow is zero, indicate why: ❑ Pump Station or Gravity Sewer where flow will be permitted in subsequent permits that connect to this line ❑ Flow has already been allocated in Permit Number: ❑ Rehabilitation or replacement of existing sewer with no new flow expected ❑ Other (Explain): FORM: FTA 04- l6 Page 2 of 5 DocuSign Envelope Id: 27561DFo-7ASA-453C-aoA9-808290297A66 V11. GRAVITY SEWER DESIGN CRITERIA (If Applicable) - 02T .0305 & MDC (Gravity Sewers): 1. Summarize gravity sewer to be permitted: Size (inches) Length (feet) Material 8 1197 PVC ➢ Section 11 & Ill of the MDC for Permitting of Gravity Sewers contains information related to design criteria ➢ Section Ill contains information related to minimum slopes for gravity sewer(s) ➢ Oversizing lines to meet minimum slope requirement is not allowed and a violation of the MDC VIII. PUMP STATION DESIGN CRITERIA (if Applicable) —02T .0305 & MDC (Pump Stations/Force Mains): COMPLETE FOR EACH PUMP STATION INCLUDED IN THIS PROJECT 1. Pump station number or name: 2. Approximate Coordinates (Decimal Degrees): Latitude: Longitude: - 3. Design flow of the pump station: millions gallons per day (firm capacity) 4. Operational point(s) of the pump(s): gallons per minute at feet total dynamic head (TDH) 5. Summarize the force main to be permitted (for this Pump Station): Size (inches) Length (feet) Material 6. Power reliability in accordance with 15A NCAC 02T .0305(h)CD: ❑ Standby power source or pump with automatic activation and telemetry - 15A NCAC 02T .0305(h)(1)(13);. ➢ Required for all pump stations with an average daily flow greater than or equal to 15,000 gallons per day D Must be permanent to facility Or if the pump station has an average daily (low less than 15,000 gallons per day: ❑ Portable power source with manual activation, quick -connection receptacle and telemetry - 15A NCAC 02T .0305(h)(1)(C) or ❑ Portable pumping unit with plugged emergency pump connection and telemetry - 15A NCAC 02T .0305(h)(1)(C): ➢ It shall be demonstrated to the Division that the portable source is owned or contracted by the applicant (draft agreement) and is compatible with the station. ➢ If the portable power source or pump is dedicated to multiple pump stations, an evaluation of all the pump stations' storage capacities and the rotation schedule of the portable power source or pump, including travel timeframes, shall be provided in the case of multiple station power outage. FORM: FTA 04-16 Page 3 of 5 DocuSign Envelope ID: 27561 DFO-7AEA-453C-8oA9-808290297A68 IX. SETBACKS & SEPARATIONS — (02B .0200 & 15A NCAC 02T .0305(f)): 1. Does the project comply with all separations found in 15A NCAC 02T .0305(f) & (g) ➢ 15A NCAC 02T.0305 contains minimum separations that shall be provided for sewers stems: ® Yes ❑ No Setback Parameter* Se aration Required Storm sewers and other utilities not listed below vertical 24 inches Water mains vertical -water over sewer including in benched trenches 18 inches Water mains horizontal 10 feet Reclaimed water lines vertical - reclaimed over sewer 18 inches Reclaimed water lines(horizontal - reclaimed over sewer 2 feet **Any private or public water supply source, including any wells, WS-I waters of Class I or Class If impounded reservoirs used as a source of drinking water 100 feet "Waters classified WS (except WS-I or WS-V), B, SA, ORW, HQW, or SB from normal high water or tide elevation and wetlands see item IX.2 50 feet **Any other stream, lake, impoundment, or ground water lowering and surface drainage ditches 10 feet Any building foundation 5 feet An basement 10 feet Top slope of embankment or cuts of 2 feet or more vertical height 10 feet Drainage systems and interceptor drains 5 feet Any swimming -pools 10 feet Final earth grade vertical 36 inches ➢ 15A NCAC 0270305(e) contains alternatives where separations in 02T.0305(f1 cannot be achieved. ➢ **Stream classifications can be identified using the Division's NC Surface Water Classificatioais webpa�e ➢ If noncompliance with 02T.0305(f) or (g), see Section X of this application 2. Does the project comply with separation requirements for wetlands? (50 feet of separation) ❑ Yes ❑ No ® NIA ➢ See the Division's draft separation requirements for situations where separation cannot be meet ➢ No variance is required if the alternative design criteria specified is utilized in design and construction ➢ As built documents should reference the location of areas effected 3. Does the project comply with setbacks found in the river basin rules per 15A NCAC 02B .02001 ❑ Yes ❑ No ® NIA ➢ This would include Trout Buffered Streams per 15A NCAC 2B.0202 4. Does the project require coverage/authorization under a 404 Nationwide or ❑ Yes ® No individual permits or 401 Water Quality Certifications? ➢ Information can be obtained from the 401_& Buffer Permitting Branch 5. Does project comply with 15A NCAC 02T.M05(c)(6) (additional permits/certifications)? ® Yes ❑ No Per 15A NCAC: 02T_01U5(c] 6,1, directly related environmental permits or certification applications are being prepared, have been applied for, or have been obtained. Issuance of this permit is contingent on issuance of dependent permits (erosion and sedimentation control plans, stormwater management plans, etc.). 6. Does this project include any sewer collection lines that are deemed "high -priority?" Per 15A NCAC 02T.0402, "high -priority sewer" means "any aerial sewer, sewer contacting surface waters, siphon, or sewer positioned parallel to streambanks that is subject to erosion that undermines or deteriorates the sewer. []Yes ® No ❑ N/A ➢ If yes, include an attachment with details for each line, including type (aerial line, size, material, and location). High priority lines shall be inspected by the permittee or its representative at least once every six -months and inspections documented per 15A NCAC 02T.0403(a)(5) or the permitee's individual System -Wide Collection permit. FORM: FTA 04-16 Page 4 of 5 DocuSi n Envelope ID. 27561DFO-7AEA-453C-SOA9-80B290297A68 X. CERTIFICATIONS: 1. Does the submitted system comply with 15A NCAC 0 the Minimum Design Criteria for the Permitting_gf Pump Station and Force Mains latest voloal and the Gravigy Sewer Minimum Desigg Criteria latest version as applicable? ®Yes ❑No IfNo, complete and submit the Variance/Alternative Design Request application (VADC 10-14) and supporting documents for review. Avoroval of The reguestri r to submittal of the Fasl Tmck Avolleatlos. and luvoortiag documents, 2. Professional Engineer's Certification: 1, Ken W. Bright P.E. The Park at Souths arks re from Application Item III.1.) that this application for has been reviewed by me and is accurate, complete and consistent with the information supplied in the plans, specifications, engineering calculations, and all other supporting documentation to the best of my knowledge. I further attest that to the best of my knowledge the proposed design has been prepared in accordance with the applicable regulations, Gravity Sewer Minimum Design Criteria for Gravity Sewers (latest version), and the Minimum Design Criteria for the Fast Track Permitting of Pump Stations and Force Mains (latest version). Although other professionals may have developed certain portions of this submittal package, inclusion of these materials under my signature and seal signifies that I have reviewed this material and have judged it to be consistent with the proposed design. NOTE — In accordance with General Statutes 143-215.6A and 143-215.613, any person who knowingly makes any false statement, representation, or certification in any application package shall be guilty of a Class 2 misdemeanor, which may include a fine not to exceed $10,000, as well as civil penalties up to $25,000 per violation. North Carolina Professional Engineer's seal, signature, and date: �Q .oFssrQ;.. - 17585 - 3. Applicant's Certification per 15A NCAC 02T .0106(b): 8+Ali 14 10 I, Paul M. Weeks, Jr. P.E. The Park at name III & title from Application item I.3.) that this application for has been reviewed by me and is accurate and complete to the beat of my knowledge. I understand that if all required parts of ties application are not completed and that if all required supporting documentation and attachments are not included, this application package is subject to being returned as incomplete. I understand that any discharge of wastewater from this non - discharge system to surface waters or the land will result in an immediate enforcement action that may include civil penalties, injunctive relief, and/or criminal prosecution. I will make no claim against the Division of Water Resources should a condition of this permit be violated. I also understand that if all required parts of this application package are not completed and that if all required supporting information and attachments are not included, this application package will be returned to me as incomplete. NOTE — In accordance with General Statutes 143-215.6A and 143-215.6B. any person who knowingly makes any false stabcmont, rcprosentation, or certification in arW application package shall be guilty of a Class 2 misdemeanor, which may include a fine not to exceed $10,000 as well as civil penalties up to $25,000 per violation. Docu8igned by: At. Ups Jr. F. f . 3/26/2021 seraeFW578"89 Signature: Date: FORM: FTA 04-16 Page 5 of 5 DocuSign Envelope ID: 41B47ElG-3373-4FA3-9727-r-ASA55E297D5 State of North Carolina Department of Environmental Quality Division of Water Resources Flow Tracking for Sewer Extension Applications )Ivislon of Water Resources (FTSE 10-18) Application Number: I FT-324 -� Entity Requesting Allocation: City of Sanford Project Name for which flow is being requested: The Park @ South Park Ph. 3 More titan one FTSE maybe required for a single project if the owner of the WWTP Is not responsible for all pump stations along Ilse route of the proposed wastewater flow. 1. Complete this section only if you are the owner of the wastewater treatment plant. a. WWTP Facility name: Big Buffalo Wastewater Treatment Plant b. WWTP Facility Permit #: NCO024147 AII, flows are in MGD c. WWTP facility permitted flow: 12.0000 d. Estimated obligated flow not yet tributary to the WWTP: 1.0461 e. WWTP facility's actual average flow: 5.7330 f. Total flow for this specific request: 0.0110 g. Total actual and obligated flows to the facility: 6.7902 h. Percent of oermitted flow used: 57% I1. Complete this section for each pump station you are responsible for along the route of this proposed List pump stations located between the project connection point and the WWTP. (A) (B) (C) (D) a (B+C) (E)=(A-D) Pump Pump Finn Design Approx. obligated, Total Current Available Station Station Capacity' Average Current Not Yet Flow Plus Capacity` (Name or Permit Daily Flow2 Avg. Daily Tributary Obligated Number) Number (Firm{nf) Flow, Daily Flow, Flow MGD A1GD MGD MGD MCD MGD Gaster_Creek #002 4.0291 1.6114 1.0195 0.2307 1.2502 0.3611 zBig_Buli'alo MA MA #NIA #NIA #NIA #NIA x #N.-A #N'A #NIA #NIA #NIA #NIA x #NSA #NIA #NIA #NIA #NIA #NIA x #N1A MIA #NIA #NIA #NIA #NIA x MA MA #NIA #NIA #NIA #NIA 1. The Firm Capacity (design flow) of any pump station is defined as the maximum pumped flaw that can be achieved with the largest pump taken out orservice. 2. Design Average Flow is the firm capacity of the pump station divided by the peaking factor (pf) not less than 2.5, per Section 2.02(A)(4)(c) of the Minimum Design Criteria. 3. A Planning Assessment Addendum shall be attached for each pump station located between the project connection point and the WWTP where the Available Capacity is S 0. Downstream Facility Name (Sewer): Downstream Permit Number: City of Sanford Collection System WQCS00047 Page 1 of 6 FTSE 10-18 a m w 2 a a w KEN BRIGHT ASSOCIATES, PLLC Consulting Engineers March 26, 2021 Mr. Ted Cashion North Carolina Division of Environmental Management Division of Water Quality 1628 Mail Service Center Raleigh, NC 27699-1628 Re: The Park Phase III Sewer Extension Lee County Dear Ted: Enclosed please find the following documents: 1. The fast track sewer application. 2. Form FTSE 04-16 3. A check for the amount of $ 480.00. 4. A Color copy of a USGS Topographic map. 5. A Street level map. NC Dept of Environmental Quality MAR 2 9 202, Raleigh Regional OffiCe The project consists of the extension of approximately 1,187 LF of 8" PVC pipe to serve new 23 residential lots. If you have any questions please feel free to contact me. would appreciate your reviewing these as soon as possible. If you have any questions please feel free to contact me. Sincerely, Jam., V. /R Ken W. Bright, PE File. project2020/The Park Phase YESewer :`Letter sewer appl.doc P.O Box 553 2305 Carthage Street Sanford, NC 27330 Phone: (919) 776-3444 e-mail; kwbright@kenbrightengineedng,com