HomeMy WebLinkAbout20200402 Ver 2_SAW-2021-00226 NWP-12_20210401U.S. ARMY CORPS OF ENGINEERS WILMINGTON DISTRICT Action Id. SAW-2021-00226 County: Brunswick County U.S.G.S. Quad: Funston GENERAL PERMIT (REGIONAL AND NATIONWIDE) VERIFICATION Permittee: Aaron Weldon Duke Energy Address: 4720 Piedmont Row Drive Charlotte NC, 28210 Telephone Number: (704) 731-4153 E-mail Address: aaron.weldon@duke-energy.com Size (acres) 94 acres Nearest Town Winnabow, NC Nearest Waterway Dews Creek River Basin Cape Fear USGS HUC 03030005 Coordinates Latitude: 34.10861 Longitude: -78.03858 Location description: The transmission line originates at a station site west of Mt. Misery Road NE, Leland, Brunswick County, NC (34.281303, -78.053152) the line then runs south for 28 miles, ending on the east side of the ADM facility in Southport, NC. (33.938997, -77.991502). Description of projects area and activity: This project will use a NWP 12 to widen the existing 20’ easement an additional 30’ for a new easement width of 50’. The easement was originally permitted in 1992 under SAW-1992-01128. Mitigation is required to offset the permanent conversion of 5.653 acres of Forested Wetlands to Emergent Wetlands, credits will be purchased at a 1:1 ratio at the Lower Cape Fear Umbrella Mitigation Bank. (LCFUMB). Applicable Law: Section 404 (Clean Water Act, 33 USC 1344) Section 10 (Rivers and Harbors Act, 33 USC 403) Authorization: Regional General Permit Number and/or Nationwide Permit Number: 12 (Transmission Line) SEE ATTACHED RGP or NWP GENERAL, REGIONAL AND/OR SPECIAL CONDITIONS Your work is authorized by the above referenced permit provided it is accomplished in strict accordance with the attached conditions and your submitted application and attached information dated March 23, 2021 Any violation of the attached conditions or deviation from your submitted plans may subject the permittee to a stop work order, a restoration order, a Class I administrative penalty, and/or appropriate legal action. This verification will remain valid until the expiration date identified below unless the nationwide and/or regional general permit authorization is modified, suspended or revoked. If, prior to the expiration date identified below, the nationwide and/or regional general permit authorization is reissued and/or modified, this verification will remain valid until the expiration date identified below, provided it complies with all requirements of the modified nationwide permit. If the nationwide and/or regional general permit authorization expires or is suspended, revoked, or is modified, such that the activity would no longer comply with the terms and conditions of the nationwide permit, activities which have commenced (i.e., are under construction) or are under contract to commence in reliance upon the nationwide and/or regional general permit, will remain authorized provided the activity is completed within twelve months of the date of the nationwide and/or regional general permit’s expiration, modification or revocation, unless discretionary authority has been exercised on a case-by-case basis to modify, suspend or revoke the authorization. Activities subject to Section 404 (as indicated above) may also require an individual Section 401 Water Quality Certification. You should contact the NC Division of Water Resources (telephone 919-807-6300) to determine Section 401 requirements. For activities occurring within the twenty coastal counties subject to regulation under the Coastal Area Management Act (CAMA), prior to beginning work you must contact the N.C. Division of Coastal Management in Wilmington, NC. This Department of the Army verification does not relieve the permittee of the responsibility to obtain any other required Federal, State or local approvals/permits. SAW-2021-00226 If there are any questions regarding this verification, any of the conditions of the Permit, or the Corps of Engineers regulatory program, please contact Gary Beecher at (910) 251-4694 or Gary.H.Beecher@usace.army.mil. Corps Regulatory Official: __________________________________________ Date: March 23, 2021 Expiration Date of Verification: March 22, 2026 A. Determination of Jurisdiction: 1. There are waters, including wetlands, on the above described project area that may be subject to Section 404 of the Clean Water Act (CWA) (33 USC § 1344) and/or Section 10 of the Rivers and Harbors Act (RHA) (33 USC § 403). This preliminary determination is not an appealable action under the Regulatory Program Administrative Appeal Process (Reference 33 CFR Part 331). However, you may request an approved JD, which is an appealable action, by contacting the Corps district for further instruction. Please note, if work is authorized by either a general or nationwide permit, and you wish to request an appeal of an approved JD, the appeal must be received by the Corps and the appeal process concluded prior to the commencement of any work in waters of the United States and prior to any work that could alter the hydrology of waters of the United States. 2. There are Navigable Waters of the United States within the above described project area subject to the permit requirements of Section 10 of the Rivers and Harbors Act (RHA) (33 USC § 403) and Section 404 of the Clean Water Act (CWA) (33 USC § 1344). Unless there is a change in the law or our published regulations, this determination may be relied upon for a period not to exceed five years from the date of this notification. 3. There are waters, including wetlands, within the above described project area that are subject to the permit requirements of Section 404 of the Clean Water Act (CWA) (33 USC § 1344). Unless there is a change in the law or our published regulations, this determination may be relied upon for a period not to exceed five years from the date of this notification. 4. A jurisdiction determination was not completed with this request. Therefore, this is not an appealable action. However, you may request an approved JD, which is an appealable action, by contacting the Corps for further instruction. 5. The aquatic resources within the above described project area have been identified under a previous action. Please reference the approved jurisdictional determination issued 1992. Action ID: SAW-1992-01128. B. Basis For Jurisdictional Determination: An approved JD was not issued with this permit. C. Remarks: A pre-application and scoping meeting for this project took place on August 12, 2020. Agencies in attendance included: USACE, NCDWR, NCDMLR, CAMA & consultants from S&ME. D. Attention USDA Program Participants This delineation/determination has been conducted to identify the limits of Corps’ Clean Water Act jurisdiction for the particular site identified in this request. The delineation/determination may not be valid for the wetland conservation provisions of the Food Security Act of 1985. If you or your tenant are USDA Program participants, or anticipate participation in USDA programs, you should request a certified wetland determination from the local office of the Natural Resources Conservation Service, prior to starting work. E. Appeals Information for Approved Jurisdiction Determinations (as indicated in A2 and A3 above). If you object to this determination, you may request an administrative appeal under Corps regulations at 33 CFR Part 331. Enclosed you will find a Notification of Appeal Process (NAP) fact sheet and Request for Appeal (RFA) form. If you request to appeal this determination you must submit a completed RFA form to the following address: US Army Corps of Engineers South Atlantic Division Attn: Philip Shannin, Appeal Review Officer 60 Forsyth Street SW, Room 10M15 Atlanta, Georgia 30303-8801 Phone: (404) 562-5137 SAW-2021-00226 In order for an RFA to be accepted by the Corps, the Corps must determine that it is complete, that it meets the criteria for appeal under 33 CFR part 331.5, and that it has been received by the Division Office within 60 days of the date of the NAP. Should you decide to submit an RFA form, it must be received at the above address by N/A. It is not necessary to submit an RFA form to the Division Office if you do not object to the determination in this correspondence. Corps Regulatory Official: ______________________________________________________ Gary Beecher Date of JD: March 23, 2021 Expiration Date of JD: PJD Does not expire The Wilmington District is committed to providing the highest level of support to the public. To help us ensure we continue to do so, please complete our Customer Satisfaction Survey, located online at http://corpsmapu.usace.army.mil/cm_apex/f?p=136:4:0. Copy furnished via e-mail to: Consultant: Joey Lawler S&ME, Inc. 2016 Ayrsley Town Blvd, Suite 2-A Charlotte NC, 28273 (704) 604-6474 jlawler@smeinc.com SAW-2021-00226 SPECIAL CONDITIONS 1.401 Water Quality Certification: If a 401 Water Quality Certification from the North Carolina Division of Water Resources is required, then the permittee shall provide the Corps with a copy of the required certification or waiver of certification from the state prior to proceeding with the work in waters of the U.S. The permittee shall comply with all conditions of the state certification. 2.Erosion Control: The permittee shall employ all sedimentation and erosion control measures necessary to prevent an increase in sedimentation or turbidity within waters and wetlands outside the permit area. This shall include, but is not limited to, the immediate installation of silt fencing or similar appropriate devices around all areas subject to soil disturbance or the movement of earthen fill, and the immediate stabilization of all disturbed areas. Additionally, the project must remain in full compliance with all aspects of the Sedimentation Pollution Control Act of 1973 (North Carolina General Statutes Chapter 113A Article 4). 3.Work Limits: All work authorized by this permit shall be performed in strict compliance with the attached permit plans dated March 23, 2021 which are a part of this permit. The Permittee shall ensure that the construction design plans for this project do not deviate from the permit plans attached to this authorization. Any modification to the attached permit plans must be approved by the U.S. Army Corps of Engineers (Corps) prior to any active construction in waters or wetlands. 4.Temporary Impacts Restoration Measures: Within thirty (30) days of the date of completing the authorized work, the Permittee shall remove all temporary fills in waters of the United States and restore the affected areas to pre-construction contours and elevations. The affected areas shall be re-vegetated with native, non-invasive vegetation as necessary to minimize erosion and ensure site stability. Follow the proposed Restoration Plan that was submitted with this application. 5. Mitigation: In order to compensate for impacts associated with this permit, mitigation shall be provided in accordance with the provisions outlined on the most recent version of the attached Compensatory Mitigation Responsibility Transfer Form. The requirements of this form, including any special conditions listed on the form, are hereby incorporated as special conditions of this permit authorization. Action ID Number: SAW-2021-00226 County: Brunswick County Permittee: Aaron Weldon Duke Energy Project Name: PNG Line 99 Easement Acquisition Project Date Verification Issued: March 23, 2021 Project Manager: Gary Beecher Upon completion of the activity authorized by this permit and any mitigation required by the permit, sign this certification and return it to the following address: US ARMY CORPS OF ENGINEERS WILMINGTON DISTRICT Attn: Gary Beecher Please note that your permitted activity is subject to a compliance inspection by a U. S. Army Corps of Engineers representative. Failure to comply with any terms or conditions of this authorization may result in the Corps suspending, modifying or revoking the authorization and/or issuing a Class I administrative penalty, or initiating other appropriate legal action. I hereby certify that the work authorized by the above referenced permit has been completed in accordance with the terms and condition of the said permit, and required mitigation was completed in accordance with the permit conditions. _______________________________________ ______________________ Signature of Permittee Date