HomeMy WebLinkAbout20210392 Ver 1_Pre-Filing Meeting Information_20210406DWR Pre-Fil ing Meeting Req u est Form
ID#*Ve rsion *
Re gional Office *
Re v ie we r List *
Contact Name *
Contact Email Addre ss *
Proje ct Name *
Proje ct Owne r *
Proje ct County *
Owne r Addre ss:
Is this a transportation proje ct?*
Type (s) of approv al sought from the DWR:
Doe s this proje ct hav e an e xisting proje ct ID#?*
Do you know the name of the staff me mbe r you would like to re que st a me e ting with?
Ple ase giv e a brie f proje ct de scription be low.*
20210392 1
Winston-Salem Regional Office - (336) 776-9800
Dave Wanucha
Pre-Filing Me eting Reque st submitte d 2/18/2021
NCDOT Division 11 - Kevin Hining
kjhining@ncdot.gov
Justus Road Improvement Project - SR1137
NCDOT
Watauga
City
North Wilkesboro
State / Province / Region
NC
Postal / Zip Code
28659
Country
United States
Street Address
801 Statesville Rd
Address Line 2
Yes No
401 Water Quality Certification -
Regular
401 Water Quality Certification -
Express
Individual Permit Modification
Shoreline Stabilization
Yes No
Dave Wanucha
Road widening and paving project, 1.3 miles in length. Will involve the
replacement and extension of pipes on jurisdictional streams.
Dave - no meeting needed on my end at this time, but more than
happy to meet with you if needed. Might be a couple months before I
have all the necessary information and the PCN completed.
Please give a couple of dates you are available for a meeting.
Ple ase attach the docume ntation you would like to hav e the me e ting about.
Signature
Submittal Date
3/3/2021
3/4/2021
SR1137_ErosionPlans_021721.pdf 4.62MB
SR1137_JustusRd_EC Submittal to DEO.pdf 31.96KB
pdf only
By digitally signing below, I certify that I have read and understood that per the Federal Clean Water Act Section
401 Certification Rule the following statements:
· This form completes the requirement of the Pre-Filing Meeting Request in the Clean Water Act Section 401 Certification
Rule.
· I understand by signing this form that I cannot submit my application until 30 calendar days after this pre-filing
meeting request.
· I also understand that DWR is not required to respond or grant the meeting request.
Your project’s thirty-day clock started upon receipt of this application. You will receive notification regarding meeting location
and time if a meeting is necessary. You will receive notification when the thirty-day clock has expired, and you can submit an
application.
2/18/2021