HomeMy WebLinkAbout20201842 Ver 2_EC00-Cleveland Bluffs_Pond_ESC_CD_20201202_20210405EROSION & SEDIMENT CONTROL PLAN for
f PLANNED EROSION CONTROL PRACTI CES\
CE TEMPORARY GRAVEL CONSTRUCTION ENTRANCE
SHALL BE INSTALLED AT 1HE ENTRANCES TO THE PROLECT
FROM AN DOSING ROADWAY. DRAINAGE SHOULD BE AWAY FROM
1HE ROAD AND EROSION WILL BE CONTROLLED WITH DOWNSTREAM
PRACTICES DURING WET WEATHER IT MAY BE NECESSARY TO WASH
TRUCK TIRES AT THESE LOCATIONS
LAND GRADING
GRADING SHOULD BE LIMITED TO AREAS AS SHOWN ON 1HE
PLANS CUT AND FILL SLOPES SHALL BE 3:1 OR FLATTER EXCEPT
WHERE SPEOFlCALLY INDICATED. CARE SHALL BE TAKEN DURING
LAND GRADING ACT1W1IES NOT TO DAMAGE EXISTING TREES THAT
ARE IDENIIFlED AS 'TO BE PRESERVED'.
SILT FENCE
SEDIMENT FENCING SHOULD BE INSTALLED AS SHOWN ON THE
PLAN, TO DELINEATE AND PROTECT WETLANDS AND SPE F7ED AREAS
AND AROUND ANY TEMPORARY STOOP/LE AREAS AS NECESSARY TO
PREVENT ANY GRADED INTERIOR AREAS FROM ERODING ONTO ADJACENT
LANDS OR ROADWAY, OR INTO INLETS OR AS DIRECTED BY ENGINEER
OR JOHNSTON COUNTY EROSION CONTROL PERSONNEL
CONSTRUCTION ROAD STABILIZATION
UPON REACHING F1NAL GRADE AND AFTER U17U11ES HAW
BEEN INSTALLED, ROADWAY/PARKING AREAS ARE TO BE
STABILIZED BY PLACING SUB -BASE AS SHOWN IN THE TYPICAL
STREET CROSS-SECTION DETAIL ON 1HE PLAN, TO REDUCE
EROSION AND DUST DURING THE REMAINDER OF CONSTRUCTION.
SEDIMENT BASIN
THE SEDIMENT BASIN IS TO BE CONSTRUCTED F1RST (SEE
CONSTRUCTION SCHEDULE AND IS THE PRIMARY PRACTICE TO
PREVENT SEDIMENT ROM LEAVING THE SIZE DETAILED DESIGN AND
SPILLWAY CONF1GURATIONS ARE SPE F1ED IN THE DETAIL SHEET.
SKIMMER
BAFFLE
A SEDIMENTATION BASIN DEWATERING CONTROL DEVICE THAT WITHDRAWS
WATER FROM THE BASINS WATER SURFACE THUS REMOVING THE HIGHEST
QUALTY WATER FOR DELIVERY TO 1HE UNCONTROLLED ENVIRONMENT.
A POROUS BARRIER INSTALLED INSIDE A TEMPORARY SEDIMENT TRAP,
SKIMMER BASIN OR SEDIMENT BASIN TO REDUCE THE VELOCITY AND
TURBULENCE OF WATER FLOWING THROUGH THE MEASURE AND TO FACILITATE
THE SETTLING OF SEDIMENT FROM WATER BEFORE DISCHARGE
OUTLET STABILIZATION
RIPRAP APRONS WILL BE LOCATED AT THE DOWNSTREAM END O"
ALL DISCHARGE PIPES TO PREVENT SCOUR.
TEMPORARY EROSION CONTROL MATTING
TEMPORARY MATING SHALL BE PLACED IN IN NEWLY CONSTRUCTED CHANNELS
AND ALONG SLOPES
PERMANENT SOL RBNFORCILWBVT MATTING
PSRM SHALL BE PLACED IN CHANNELS AND NEAR OU7FALLS
TEMPORARY SLOPE DRAIN
SLOPE DRAINS ARE FLEXIBLE 111BING OR CONDUIT EXTENDING TEMPORARILY
FROM TOP TO THE BOTTOM OF CUT OR F7LL SLOPE TO CONVEY CONCENTRATED
RUNOFF DO # THE FACE OF THE SLOPE WITHOUT CAUSING EROSION.
TEMPORARY DIVERSION
TEMPORARY DIVERSIONS ARE A RIDGE OR EXCAVATED CHANNEL (OR CCBINATION)
CONSTRUCTED ACROSS SLOPING LAND ON EXISTING GRADE 1D PROTECT WORK
AREAS OR SENSITIVE AREAS FROM UPSLOPE RUNOFF, AND TO DIVERT SEDIMENT
LADEN WATER TO SEDIMENT TRAPS OR APPROPRIATE OUTLETS
CLEVELAND BLUFFS SUBDIVISION
JOHNSTON COUNTY, NORTH CAROLINA
PROJECT /D. JC# 19-096-P
O/
o
V ; , FUTURE DEVELOPMENT
/
/
/
CHANEY DRIVE
� I
CLUBHOUSE & OQL1
I
I
YELLOW PINE CT `I
PHASE 2
\
IROQUOIS COURT �\
POND 1
09L
°o
E 38
\
0
0
0
\ n
' 1
\� 1
\ , \� \
PHASE 3A ' �,
1 n
G
vo
P
Nccs
G
'PROJECT DATA AND GENERAL NOTES
PROJECT NAME AND LOCATION
CLEVELAND BLUFFS SUBDIVISION
CLEVELAND TOWNSHIP
JOHNSTON COUNTY, NORTH CAROLINA
LAT 35.5905 LONG: —78.5426
PROJECT OWNER / DEVELOPER
KG PLAZA
RELDS CARLISLE
8640 RIVER ROAD
WILMINGTON, NC 28412
PHONE: (919) 514-8353
PROJECT CONSULTANT / ENGINEER
CSD ENGINEERING
JOHN F. OGLESBY, PE
3 N. MAIN STREET, STE D / PO BOX 1250
WENDELL, NC 27591
(919) 624-0997
JOHNSTON COUNTY STORMWATER MANAGER
JESSICA BATTEN
309 E. MARKET STREET
SMITHFIELD, NC 27577
PHONE: (919) 938-4717
GENERAL NOTES
1. TOTAL DISTURBED AREA = 29 ACRES.
2. PROPOSED LAND USE IS RESIDENTIAL.
3. NEXT AND FUTURE PHASE CONSISTS OF DEVELOPING LOTS FOR
SINGLE—FAMILY HOMES; STREETS, WATER, SEWER, SEWER FORCE MAIN;
AND STORMWATER CONTROL MEASURE.
4. ALL SLOPES SHALL BE 3:1 OR FLATTER.
5. JURISDICTIONAL STREAM EXIST WITHIN THE PROJECT BOUNDARY AND
HAS BEEN SURVEYED; BUFFER DETERMINATIONS HAVE BEEN COMPLETED.
6. ELEVATION DATUM IS NAND 88.
7. STREETS ARE DESIGNED TO NCDOT STANDARDS AND ARE PROPOSED TO
BE ADDED TO 1HE STATE ROAD SYSTEM.
8 THE DEVELOPER IS RESPONSIBLE FOR MAINTENANCE OF THE
STORMWATER CONTROL MEASURE UN11L 1HE HOMEOWNER'S ASSOCIATION
TAKES IS FORMED AND LEGAL.
ESC PLAN LEGEND
C
EXISTING BOUNDARY
LM 117S OF CONSTRUCTION/
DISTURBANCE
EXISTING CULVERT
CONSTRUCTION ENTRANCE
SILT fENCE/SKT MICE OUTLET
PROPOSED CULVERT
WATTLE
STANDARD ROCK CHECI( DAM
SEDIMENT BASIN SKIMMER
ROCK NNLET PROTECTION
ROCK PIPE INLET PROTECTION
TEMP. DIVERSION
TEMP. CLEAN -WATER DIVERSION
TEMP. EC MATTING
PERMANENT SOIL
RENFORCEMENT MATING
TEMP. SLOPE DRAIN
J
INDEX TO DRAWINGS
SHEET No.
DESCRIPTION
DRAWING No.
1 OF 6
OVERALL SITE LAYOUT WITH SHEET INDEX
EC1.0
2 OF 6
ESC PLAN DETAILS
EC2.0
3 OF 6
ESC PLAN DETAILS & SPECIFICATIONS
EC2.1
4 OF 6
NCGO1 DETAILS & SPECIFICATIONS
EC2.2
5 OF 6
ESC PLAN (1) — DEMOLITION, CLEAR & GRUB — NEXT PHASE
EC3.0
6 OF 6
WET POND PLAN & CONSTRUCTION DETAILS
EC4.0
J
Vl
CSD
ENGINEERING
LICENSE # C-2710
ENGINEERING
LAND PLANNING
COMMERCIAL / RESIDENTIAL
P.O. BOX 1250
WENDELL, NC 27591
(910) 791-4441
EROSION & SEDIMENT CONTROL PLAN
OVERALL SITE LAYOUT & SHEET INDEX
J
CONSTRUCTION DRAWINGS FOR
N
co
CI N
W Q . corn
(-3n f Z CD
:11
NU.2d-
c
ca.." ca oc: c-- ---,17-6-
U
U
CARa1
032721
C
lll ...............
►►11111112/2/20
PLAN NOT RELEASED
FOR CONSTRUCTION
F-
0
0
w
DA TE: 12/2/2020
HORZ SCALE: 1” = 200'
DRAWN B Y. JFO
CHECKED BY: HSR
PROJECT NO.: 18-0454
Sheet
Sheet No.
EC1.0
1 of 5
r
COMPACTED FILL OR
GRAVEL, EXTENSION
OF FABRIC AND WIRE
INTO THE TRENCH
BACI(F1LL
MINIMUM 8'
THICK LAYER
OF GRAVEL
8'MINIMUM
V-1RENCH
FILLER
FABRIC
14'MINIMUM
FTLIER
FABRIC
24'
NOTE
SEE NARRATIVE
FOR MORE DETAIL
ISOMETRIC WEW
SEC11ON
6pr � cootie
DCIENSION OF
FABRIC AND WIRE
INTO THE TRENCH
COMPACTED
FILL
8'MINIMUM
FILTER
FABRIC
4'MINIMUM
SECTION
sF SEDIMENT FENCE ( SILT FENCE )
NTS
STEEL POST
36' ABOVE
24' BELOW
CDOT OR 7
WASED HSTONE'
19-GAUGE
HARDWARE CLOTH
(1/4 MESH OPENINGS)
NGVOT 15 OR 157
WASHED STONE
STEEL POST
2'
IP u u
HARDWARE CLOTH & GAVEL
DROP INLET PROTECTION
NOT TO SCALE
J
J
CON FIBER BAFFLE MATERIAL PROPERTY REQURREM EATS
MATERIAL 100% COCONUT FIBER
THICKNESS 0.30 IN MIN.
TENSILE STRENGTH (WET) 900 X 680 LB/FT MIN
ELONGATION (WET) 69% X 34% MAX
FLOW VELOCITY 10-12 FT/SEC
WEIGHT 20 oz/SY (680 G/M"2) MIN
MINIMUM WIDTH 6.5 FT
OPEN AREA 50% MAX
STEEL POST
EARTHEN EMBANKMENT
OUTLET, CLASS 11 RIPR
STEEL POST SHOULD BE APPROX 1-3/8' WIDE MEASURED PARALLEL
TO FENCE AND HAW A MIN. WEIGHT OF 1.25 LB/LINEAR FT AND BE
EQUIPPED WITH AN ANCHOR PLATE WITH MINIMUM AREA OF 14.0 IN'7
STEEL POST SHOULD BE INSTALLED AT MAX 4 FT SPACING AND
DRIVEN INTO GROUND MIN. OF 2 FT
TEMPORARY BAFFLES
NOT TO SCALE
INLET ZONE
25X OF SURFACE AREA
BAFFLE (TYPICAL)
FIRST CHAMBER
25% OF SURFACE AREA
SECOND CHAMBER
25% OF SURFACE AREA
OUTLET ZONE
25% OF SURFACE AREA
OVERFILL 6'
FOR SETTLEMENT
EMERGENCY
BYPASS 6' BELOW
SETTLED TOP OF DAM
NOTE
SEE NARRATIVE FOR
MORE DETAIL
SEC11ON VIEW
WASHSTONE 1'
THICK ON FACE
FROM TOE OF DAM
TO WEIR.
3600 CF /
3'MIMMUM
5111NIMUM
741 21
ws
BAFFLES (TYPICAL)
Pratice 6.65
SIDE
�E MAX
•
:' i•••••••
:_�••••••••t
•••••••••
••2•••••
4444444
•••••••••
,
;••••••••••••••*
BAFFLES (TYPICAL)
Pratice 6.65
2:1 SIDE
SLOPE MAX.
CROSS SECTION
TEMPORARY SEDIMENT TRAP
NOT TO SCALE
�n
IC)
a
40'
(24' MIN.)
T
TREE
PROTECTION
DO
NOT
ENTER
AREA
PARA
ZONA
ARBOLES
DE
PROTECSION
-
NO
ENTRE
5'-0' o/c Max
TREE PROTECTION AREA
DO NOT ENTER
ZONA DE PROTECSION
PARA ARBOLES - NO ENTRE
Posts may be either 4' dia. pine,
2' dia. oak, or 1.33Ib/LF steel.
NOTES:
{
Weatherproof sign as shown
above; See notes below for
construction and spacing
data.
Orange, UV -Resistant,
High -Tensile Strength,
Poly Baricade
Fabric
1. INSTALL TREE PROTEC11ON FENCE AND SIGNAGE PRIOR TO
CALLING FOR THE IN111AL ON -SITE INSPEC11ON.
2. WARNING SIGNS TO BE MADE OF DURABLE, WEATHERPROOF
MATERIAL.
3. LETTERS ARE TO BE 3" HIGH MINIMUM, CLEARLY LEGIBLE AND
SPACED AS DETAILED.
4. SIGNS ARE TO BE PLACED NO GREATER THAN 150' ON -CENTER.
5. PLACE SIGN AT EACH END OF LINEAR TREE PROTEC11ON AREAS
AND 150' ON -CENTER THEREAFTER
6. ATTACH SIGNS SECURELY TO FENCE POSTS AND FABRIC.
7. MAINTAIN TREE PROTEC11ON FENCE THROUGHOUT DURA110N OF
PROJECT.
PUBLIC ROAD
6' MINIMUM
THICKNESS
2'-3' COARSE
AGGREGATE
NOTE: SEE NARRATIVE
FOR MORE DETAIL
12 MINIMUM
s
GRAVEL CONSTRUCTION
ENTRANCE WID1H
AS REQUIRED
c E TEMPORARY GAVEL CONS1RUCRON
ENTRANCE/EXIT DETAIL
NTS
La
3 X Do
oU1LET PIPE DIAMETER (Do) -
o'o"o"
O <>o<>o<>o
00
00000
)<°>C>>(C)
OVOVOc
0 0
d50 = 9 INCHES (A759
dMAX =12 INCHES (1.09
La = LENGTH OF APRON
W = WITH OF APRON
D = MIN. APRON THICKNESS
NOTE GEOIEX NONIVWN FILTER FABRIC TO
BE PLACED UNDER ALL STONE
OUTLET PROTEC11ON.
RIP RAP
DIMENSIONS
DESCRIPTION
LaXWXD
GLASS
QUANTITY
POND 2
10'X65'X1.7'
12 TANS
1
o P OUTLET PROTECTION DETAIL
NOT TO SCALE
- BAFFLES TO BE INSTALLED PER TEMPORARY BAFFLES DETAIL
TAP OF EMBANKMENT EL
INSTALL POLE
WITH CLEAN OUT
DEPTH MARKED.
CANNOT BE TOP
OF POLE
TOP OF
BERM
EMERGENCY SPILLWAY EL ' •• "•
, A EMERGENCY
SPILLWAY
4FT
BASIN.
BOTTOM EL
CLASS B STONE
(4' X 4' X 1' MIN)
(SEE ETAIL THIS SHEET)
1FT
so* '`
,%*0%°-%
4%%%0°1\
4' HOPE OUIFALL
OUIFALL EL
row- Vri%
et)i
TEMPORARY SEDIMENT BASIN
EMBANKMENT CROSS SEC11ON
NOT TO SCALE
RIPRAP
(
J
EXISTING TERRAIN
FILTER BAG FOR DEWATERING
DRAINAGE
GEOTEXTILE
NOTES
20.0' to 25.0'
1. PROVIDE STABILIZED OUTLET.
2. WOOD PALLETS MAY BE USED IN LIEU OF STONE
3. AND GEOTEXTILE AS DIRECTED. A SUFFICIENT NUMBER
4. OF PALLETS MUST BE PROVIDED TO ELEVATE THE ENTIRE
5. FILTER BAG FOR DEWATERING ABOVE NATURAL GROUND.
8" OF NO. 5 OR 57 STONE
SPECIAL STILLING BASIN
NTS
PVC END
CAP
PVC TEE
PVC ELBOW
PVC END
CAP
PVC PIPE
Yt' HOLES IN
UNDERSIDE
WA TER SURFACE
FLDOBLE
HOSE
PVC VENT
PIPE
SCHEDULE 40
PVC PIPE
L
SCHEDULE 40
PVC PIPE
ORIFICE
PLATE
PVC TEE
BOTTOM SURFACE
END VIEW
SLIMMER SEDIMENT BASINS ARE NEEDED WHERE DRAINAGE
AREAS ARE 100 LARGE FOR TEMPORARY TRAPS DO NOT LOCATE
THE SKIMMER SEDIMENT BASIN IN INTERMITTENT OR PERENNIAL
STREAMS
ARM ASSEMBLY
\
PERSPECTIVE VIEW
FRONT VIEW
"C" ENCLOSURE
WATER MIRY
UNIT
SEE DENR STANDARDS & SPECS.
FOR COMPLETE DESIGN CRITERIA & MAINTENANCE
SKIMMER
NOT TO SCALE
J
INSTALLATION
1. WHEN CLEARING THE LOCATION FOR THE DIVERSION, ONLY CLEAR ENOUGH ROOM FOR
CONSTRUCTION AND MAINTENANCE EQUIPTMENT ACCESS. DO NOT CLEAR ANY ADDTIONAL
AREA UNTIL ALL EROSION CONTROL DEVICES ARE IN PLACE
2. REMOVE ALL STUMPS, ROOTS AND OTHER DEBRIS AND DISPOSE OF THEM PROPERLY.
3. INSTALL DIVERSION AND COMPACT AS SHOWN IN DETAIL INSURE POSITIVE DRAINAGE
DURING CONSTRUCTION OF BERM.
MINIENANCE
INSPECT TEMPORARY DIVERSIONS ONCE A WEEK AND AFTER EVERY RAINFALL IMMEDIATELY
REMOVE SEDIMENT FROM THE FLOW AREA AND REPAIR THE DIVERSION RIDGE CAREFULLY
CHECK OUTLETS AND MAKE TIMELY REPAIRS AS NEEDED. WHEN THE AREA PROTECTED IS
PERMANENTLY STABUZED, REMOVE THE RIDGE AND THE CHANNEL TO BLEND WITH THE
NATURAL GROUND LEVEL AND APPROPRIATELY STABUZE IT.
COMPACTED
SOIL
2'
MIN.
18' MIN.
FLOW
-III-III-III-III-III-III-III-I I -III -III -III -III -I 1I-
6' TYPICAL
TD TEMPORARY DIVERSION
N TS
TOP ELEVATION OF STORMWATER
15 WASHED
STONE
alleiw":21111
_I " IIII IIjIIIII�I
a B RIP -RAP
VARIES
SIDE VIEW
CONSTRUCTION NOTES:
HEIGHT & WIDTH DETERMINED BY
DOSING TOPOGRAPHY AND
SEDIMENT STORAGE REQUIRED.
KEY RIP RAP INTO THE DAM
FOR STABUZA110N.
FRONT VIEW
STEP SEQUENCE
NOTE REMOVE SEDIMENT ACCUMULATION FROM BEHIND CHECK DAMS TO PREVENT
DAMAGE TO CHANNEL VEGETATION. FLOW SHOULD BE MAINTAINED THROUGH THE
DAM.
STANDARD CHECK DAM
N TS
J
Vl
CSD
ENGINEERING
LICENSE # C-2710
ENGINEERING
LAND PLANNING
COMMERCIAL / RESIDENTIAL
P.O. BOX 1250
WENDELL, NC 27591
(910) 791-4441
EROSION It SEDIMENT CONTROL PLAN
ESC PLAN DETAILS
J
Ccn
CONSTRUCTION DRAWINGS FOR
,N vC A Ra 1
•`,,off/off %
a� E
032721
q-:ate
�U'y .tiG C
I N E���,�
►►iiiiii12/2/20
PLAN NOT RELEASED
FOR CONSTRUCTION
>-
m
O
I4J
DATE:: 12/2/2020
HORZ SCALE: N/A
DRAWN BY: JFO
CHECKED BY: HSR
TP TREE PROTECTION FENCE
N TS
PROJECT NO.: 18-0454
Sheet
Sheet No.
EC2.0
2
6
A
FUTURE E.O. E.O.P. - - - - - -
INLET PROTECTION
SUMP LOCATION
TEMP. EARTH SHOULDER BERM
EARTH BERM
DITCH BLOCK
TEMP. SLOPE DRAIN
INLET PROTECTION
OPTION #1
EARTH BERM
DITCH BLOCK
ANCHOR STAKES
TEMP. SHOULDER
BERM DITCH
12"
MIN.
•
• 12"
•
•
NATURAL GROUND LINE
MIN.
EARTH BERM DITCH BLOCK
TEMP. SHOULDER BERM DITCH -/
STAGE BUILDUP OF FILL
NOTES
1_
L5'
CLASS "B" STONE FOR
a"�EROSION CONTROL
ss�.
LA
TEMP. EARTH SHOULDER BERM
ANCHOR STAKE
EXTEND DRAIN AS REQUIRED TO
COINCIDE WITH HEIGHT OF
FINISHED EMBANKMENT
•
•
MIN.
NOTE:
ANCHOR STAKES 30" LONG
AND SET MINIMUM 12" DEEP.
TEMPORARY SLOPE DRAIN
SECTION A -A
•
ELBOW
TEMP. EARTH SHOULDER BERM
r___ 10' MAX.
TEMPORARY SLOPE
ANCHOR
STAKE
TOE OF FILL
A
FUTURE E.O.P.
INLET PROTECTION
TEMP. EARTH SHOULDER BERM
DRAIN
ANCHOR STAKE
ELBOW
CLASS "B" STONE FOR
EROSION CONTROL. SEE NOTES.
1. OPEN END PIPE WITH SUMP AND MINIMUM SETBACK AND PROPER COMPACTION IS AN ACCEPTABLE
INLET TREATMENT FOR STAGED CONSTRUCTION WHEN NOT LEFT IN PLACE FOR MORE THAN 30 DAYS.
2. AT INLETS A STANDARD T-SECTION MAY BE INSTALLED FOR MULTI -DIRECTION FLOW AND ELBOWS
FOR SINGLE -DIRECTION FLOW AS DIRECTED.
3. EXTEND SLOPE DRAINS TO BOTTOM OF SLOPE, SEDIMENT BASINS AND EROSION CONTROL MEASURES.
4. USE CLASS B STONE FOR EROSION CONTROL AT OUTLET LOCATIONS.
5. USE MAXIMUM SLOPE DRAIN SPACING OF 200 FT MEASURED ALONG TOP OF SLOPE.
INLET PROTECTION
OPTION #2
TEMP. SLOPE DRAIN
CLASS "B" STONE FOR
o EROSION CONTROL
o� gss�qr �o
•
LA
FUTURE PAVEMENT
EARTH BERM DITCH BLOCK
FUTURE E.O.P
SHOULDER
POINT
TEMP. EARTH SHOULDER BERM
syo0
,0FR
ISOMETRIC VIEW
OPTION #1
FILL
MATERIAL
TOE -
OF FILL
z
CI)
H }
<<
H°CCx�v
LLJ0_Hz
00rr
CC z
W < LI_
1-06200
-.' 1 1i
H
c/) H CS
CC 0 <
z H cc
ll o
W
ROADWAY STANDARD DRAWING FOR
GUIDE FOR TEMPORARY BERMS
AND SLOPE DRAIN
SHEET 1 OF 1
1622.01
-L
NOI1V11V1SNI 9NI11WW
HOi JNIMVHG GHVONVIS HSI19N3
SHEET 1 OF 1
11631 .01
=III 11=III-=
-I I1-1I1-1
STAPLE
CHECK
MATTING IN DITCHES
IIHEHEIIIM
lo" /
A
/
/ 4" , 1 30'
H H 4'
Staple
% Check
/ T
MATTING ON SLOPES
_I_I I-111
18"
(MIN.)
BACKFILL
MATTING SHALL BE
PLACED IN TRENCH
AND BACKFILLED
EXISTING
GROUND
STAPLES ON
1' CENTERS
IN TRENCH
6" MIN
STAPLES ON
1' CENTERS
IN TRENCH
DIAGAv
6
X
X
N
f X
3'
Staple
X
X
3'
X
X
DIAGAN
NOTES:
THIS DETAIL APPLIES TO STRAW, EXCELSIOR, AND PERMANENT SOIL REINFORCEMENT MAT (PSRM) INSTALLATION.
STAPLES SHALL BE N0. 11 GAUGE STEEL WIRE FORMED INTO A "U" SHAPE WITH A MINIMUM THROAT WIDTH OF 1
INCH AND NOT LESS THAN 6 INCHES IN LENGTH.
Staple Check Pattern
99
Staple
99
AGAM
NOT TO SCALE
r
ENGLISH STANDARD DRAWING FOR
INSTALLATION
SHEET 1 OF 1
1631.01
SOIL STABILIZATION GUIDELINES
SEEDBED PREPARATION
1. CHISEL COMPACTED AREAS AND SPREAD TOPSOIL THREE INCHES DEEP OVER ADVERSE SOIL
CONDITIONS IF AVAILABLE
2 RIP THE EN71RE AREA TO SIX INCHES DEEP.
3. REMOVE ALL LOOSE ROCK, ROOTS AND OTHER OBSTRUCTIONS LEAVING SURFACE
REASONABLY SMOOTH AND UNIFORM.
4. APPLY AGRICULTURAL LIME; FERTILIZER AND SUPER -PHOSPHATE UNIFORMLY AND MIX 1,11H
SOIL (SEE MIXTURE BELOW).
5. CONTINUE TILLAGE UNTIL A HELL -PULVERIZED, FIRM, REASONABLY UNIFORM SEEDBED IS
PREPARED FOUR TO SIX INCHES DEEP.
6. SEED ON A FRESHLY PREPARED SEEDBED AND COVER SEED LIGHTLY 1,11H SEEDING
EQUIPMENT OR CUL11-PACK AFTER SEEDING.
Z MULCH IMMEDIATELY AFTER SEEDING AND ANCHOR MULCH.
8. INSPECT ALL SEEDED AREAS AND MAKE NECESSARY REPAIRS OR RESEEDINGS WITHIN THE
PLANTING SEASON, IF POSSIBLE IF STAND SHOULD BE MORE THAN 60X DAMAGED,
RE-ESTABLISH FOLLOWING THE ORIGINAL LIME; FERTILIZER AND SEEDING RATES
9. CONSULT S&EC ENVIRONMENTAL ENGINEERS ON MAINTENANCE TREATMENT AND FERTILIZATION
AFTER PERMANENT COVER IS ESTABLISHED.
la CONSULT S&EC ENVIRONMENTAL ENGINEERS FOR ADDITIONAL INF0RMALION CONCERNING
OTHER ALTERNATIVES FOR VEGETATION OF DENUDED AREAS. THE BELNV VEGETATION RATES
ARE THOSE THAT DO WELL UNDER LOCAL CONDITIONS; OTHER SEEDING RATE COMBNALIONS
ARE POSSIBLE
MIXTURE
AGRICULTURAL LIMESTONE
FERTILIZER
SUPERPHOSPHALE
MULCH
ANCHOR
SEEDING SCHEDULE
2 TONS/ACRE (3 TONS/ACRE IN CLAY SOILS)
1,000 LBS/ACRE - 10-10-10
500 LBS/ACE - 20X ANALYSIS
2 TONS/ACRE - SMALL GRAIN STRAW
ASPHALT EMULSION AT 300 GALS/ACRE
FOR SHOULDERS SIDE DITCHES SLOPES (3:1 MAX):
pA1E
AUG 15-NOV 1
NOV 1-MAR 1
MAR 1-APR 15
APR 15-JUN 30
JUL 1-AUG 15
TYPE
TALL FESCUE
TALL FESCUE & ABRUZZI RYE
TALL FESCUE
HULLED COMMON BERMUDAGRASS
TALL FESCUE AND
BROWNTOP MILLET OR
SORGHUM-SUDAN HYBRIDS***
FOR SHOULDERS SIDE DITCHES SLOPES (3:1 TO 2:1):
STATE STORAGE = X CF
PLANTING RATE
300 LBS/ACRE
300 LBS/ACRE
00 LBS/ACRE
25 LBS/ACRE
125 LBS/ACRE
35 LBS/ACRE
30 LBS/ACRE
pA1E TYPE PLANTING RATE
MAR 1-JUN 1 SERICEA LESPEDEZA (SCARIFIED) 50 LBS/ACRE
AND USE THE FOLLOWING
COMBINAfONS
MAR 1-APR 15 ADD TALL FESCUE 120 LBS/ACRE
MAR 1-JUN 30 OR ADD WEEPING LOW GRASS 10 LBS/ACRE
MAR 1-JUN 30 OR ADD HULLED COMMON
BERMUDAGRAS 25 LBS/ACRE
JUN 1-SEPT 1 TALL FESCUE AND 120 LBS/ACRE
BROWNTOP MULLET OR 35 LBS/ACRE
SORGHUM-SUDAN HYBRIDS*** 30 LBS/ACRE
SEPT 1-MAR 1 SERICEA LESPEDEZA
(UNHULLED - UNSCARIFIED) AND 70 LBS/ACRE
TALL FESCUE 120 LBS/ACRE
NOV 1-MAR 1 AND ABRUZZI RYE 25 LBS/ACRE
***TEMPORARY RESEED ACCORDING TO OPTIMUM SEASON FOR DESIRED PERMANENT
VEGETATION. DO NOT ALLOW TEMPORARY COVER TO GROW MORE THAN 12' IN HEIGHT
BEFORE MOWING OTHERWISE FESCUE MAY BE SHADED OUT.
FOR WELL -KEPT HIGH -VISIBILITY AREAS (INCLUDING BUT NOT UMILED TO DRY
DETENTION BASINS LAWS AND/OR SIDEWALK BERMS:
DAZE
AUG 15-NOV 1
APR 15-JUN 30
TYPE
CENIIPEDEGRASS
HULLED COMMON BERMUDAGRASS
PLANTING RATE
10-20 LBS/ACRE
25 LBS/ACRE
SPRIGGING. PLANT SPRIGS IN FURROWS 1,11H A TRACTOR -DRAWN 1RANSPLANTOR, OR
BROADCAST BY HAND. FURROWS SHOULD BE 4-6 INCHES DEEP AND 2 FEET APART.
PLACE SPRIGS ABOUT 2 FEET APART IN THE ROW 1,11H ONE END AT OR ABOVE GROUND
LEVEL BROADCAST AT RAZES SHOWN ABOVE; AND PRESS SPRIGS INTO THE TOP
ONE-HALF TO 21NCHES OF SOIL W11H A DISK SET STRAIGHT SO THAT SPRIGS ARE NOT
BROUGHT BACK TOWARD SURFACE DO NOT MULCH. FERTILIZE VERY SPARINGLY 1,11H
20 LBS/ACRE MIROGEIN IN SPRING W11H NO PHOSPHORUS SODDING IS ANOTHER
OPI►ON.
LEMPO?ARY SEEDING
1. COMPLETE GRADING BEFORE PREPARING SEEDBEDS AND INSTALL ALL NECESSARY
EROSION CONTROL PRACTICES, SUCH AS DIKES WATERWAYS AND BASINS
2 MINIMIZE STEEP SLOPES BECAUSE THEY MAKE SEEDBED PREPARATION DIFFICULT
AND INCREASE THE EROSION HAZARD.
3. IF SOLS BECOME COMPACTED DURING GRADING, LOOSEN THEM TO A DEPTH OF
6-8 INCHES USING A RIPPER, HARROW, OR CHISEL PLOW. SEEDBED PREPARA 11ON
GOOD SEEDBED PREPARATION IS ESSENTIAL TO SUCCESSFUL PLANT
ESTABLISHMENT. A GOOD SEEDBED IS WELL -PULVERIZED, LOOSE AND UNIFORM.
WHERE HYDROSEEDING METHODS ARE USED, THE SURFACE MAY BE LEFT W11H A
MORE IRREGULAR SURFACE OF LARGE CLODS AND STONES.
4. LIMING - APPLY LIME ACCORDING TO SOIL TEST RECOMMENDATIONS IF THE PH
(ACIDITY) OF THE SOIL IS NOT KNOW, AN APPLICATION OF GROUND
AGRICULTURAL LIMESTONE AT THE RAZE OF 1 TO 1 1/2 TONS/ACRE ON
COARSE -TEXTURED SOILS AND 2-3 TONS/ACRES ON FINE -TEXTURED SOLS IS
USUALLY SULTICIENT. APPLY LIMESTONE UNIFORMLY AND INCORPORATE INTO THE
TOP 4-6 INCHES OF SOIL SOLS 1,11H A PH OF 6 OR HIGHER NEED NOT BE
LIMED.
5. FERTILIZER- BASE APPLICATION RAZES ON SOIL TESTS WHEN THESE ARE NOT
POSSIBLE APPLY A 10-10-10 GRADE FERTILIZER AT 700-L,000 LB./ACRE BOTH
FERTILIZER AND LIME SHOULD BE INCRPORAIED INTO THE TOP 4-6 INCHES O-
SOIL IF A HYDRAULIC SEEDER IS USED, DO NOT MIX SEED AND FERTILIZER MORE
THAN 30 MINUTES BEFORE APPLICATION.
6. SURFACE ROUGHENING- IF RECENT TILLAGE OPERATIONS HAW RESULTED IN A
LOOSE SURFACE ADDITIONAL ROUGHENING MAY NOT BE REQUIRED EXCEPT TO
BREAK UP LARGE CLODS IF RAINFALL CAUSES THE SURFACE TO BECOME SEALED
OR CRUSTED, LOOSEN IT JUST PRIOR TO SEEDING BY DISKING, RAKING HARROWING
OR OTHER SUITABLE METHODS GROOVE OR FURROW SLOPES STEEPER THAN 3:1
ON THE CONTOUR BEFORE SEEDING (PRACTICE 6:03, SURFACE ROUGHENING).
Z PLANT SELECTION SELECT AN APPROPRIATE SPECIES OR SPECIES MIXTURE FROM
TABLE 6.10A, FOR SEEDING IN LAZE WWN1ER AND EARLY SPRING, TABLE 610B FOR
SUMMER, AND TABLE 6.10C FOR FALL
8. SEEDING - EVENLY APPLY SEED USING A CYCLONE SEEDER (BROADCAST), DRILL,
CULIIPACKER SEEDER, OR HYDROSEEDER. USE SEEDING RAZES GIVEN IN TABLE
6.10A-6.10C. BROADCAST SEEDING AND HYROSEEDING ARE APPROPRIATE FOR
STEEP SLOPES WHERE EQUIPMENT CANNOT BE DRIVEN. HAND BROADCASTING IS
NOT RECOMMENDED BECAUSE OF THE DIFFICULTY IN ACHIEVING A UNIFORM
DISTRIBUTION. SMALL GRAINS SHOULD BE PLANTED NO MORE THAN 1 INCH DEEP,
AND GRASSES AND LEGUMES NO MORE THAN 1/2 INCH BROADCAST SEED MUST
BE COVERED BY RAKING OR CHAIN DRAGGNNG AND THEN LIGHTLY FIRMED W11H A
ROLLER OR CULIIPACKER. HYDROSEEDED MIXTURES SHOULD INCLUDE A WOOD
FIBER (CELLULOSE) MULCH.
9. MULCHING - THE USE OF APPROPRIATE MULCH WILL HELP ENSURE ESTABLISHMENT
UNDER NORMAL CONDITIONS AND IS ESSENTIAL TO SEEDING SUCCESS UNDER
HARSH SIZE CONDITION (PRACTICE 6.14, MULCHING). HARSH SIZE CONDITIONS
INCLUDE SEEDING IN FALL FOR WINTER COVER (WOOD FIBER MULCHES ARE NOT
CONSIDERED ADEQUATE FOR THIS USE); SLOPES SLEEPER THAN 3:1;
EXCESSIVELY HOT OR DRY WEATHER; ADVERSE SOLS (SHALLOW, ROCKY, OR HIGH
IN CLAY OR SAND); AND AREAS RECEIVING CONCENTRATED FLOW. IF THE AREA
TO BE MULCHED IS SUBJECT TO CONCENTRATED WAIERFLOW, AS IN CHANNEL%
ANCHOR MULCH WITH NETTING (PRACTICE 6.14, MULCHING).
MAINTENANCE PLAN
1. ALL MEASURES ARE TO BE INSPECTED WEEKLY AND AFTER ANY
RAINFALL; REPAIRS MADE IMMEDIATELY IF NECESSARY.
2. SEDIMENT IS TO BE REMOVED FROM SWALES AND DIVERSIONS WHEN
THEY ARE APPROX. 50% FILLED OR WHEN SEDIMENT LEVEL IS WITHIN
1.0' OF TOP OF BANK.
3. SEDIMENT IS TO BE REMOVED FROM SILT FENCE AND INLET PROTEC11ON
MEASURES WHEN 0.5' DEEP; FABRIC AND STONE TO BE REPAIRED AS
NEEDED TO MAINTAIN A SEDIMENT BARRIER
4. SEEDED AREAS SHALL BE FERTILIZED, MULCHED, AND RE -SEEDED AS
NECESSARY, ACCORDING TO THE SPECIFICA11ONS PROVIDED, TO
MAINTAIN A SUITABLE VEGETA11VE COVER.
5. 1HE CONSTRUC11ON ENTRANCE SHALL BE MAINTAINED IN SUCH A
MANNER AS TO PREVENT MUD OR SEDIMENT FROM LEAVING THE
CONSIRUC11ON SITE; TOP DRESSING WITH 2-INCH STONE MAY BE
REQUIRED.
6. IMMEDIATELY REMOVE SEDIMENT SPILLED, WASHED, OR TRACKED ONTO
PUBLIC ROADWAYS.
7. INSPECT SKIMMER BASINS AS DIRECTED; REMOVE SEDIMENT FROM
EN11RE BASIN AND RESTORE BASIN TO ORIGINAL DIMENSIONS WHEN
SEDIMENT ACCUMULATES TO ONE-HALF THE BASIN DEPTH; INSPECT
SKIMMER TO ENSURE IT IS PROPERLY FUNC110NING.
8. IF SKIMMER IS CLOGGED WITH TRASH, DISLODGE BY JERKING 1HE ROPE
UP AND DOWN OR PULL SKIMMER TO SIDE OF BASIN AND REMOVE
DEBRIS BY HAND; INSPECT ORIFICE.
9. REMOVE SEDIMENT FROM BEHIND BAFFLES ONCE ACCUMULA11ON HAS
REACHED ONE-HALF 1HE HEIGHT OF 1HE FIRST BAFFLE REPLACE
BAFFLES PROMPTLY IF THEY COLLAPSE, TEAR, DECOMPOSE, OR BECOME
INEFFEC11 VE
10. INSPECT INLETS AS DIRECTED AND CLEAR MESH WIRE OF DEBRIS AND
ACCUMULATED SEDIMENT; TAKE CARE NOT TO DAMAGE OR UNDERCUT
1HE WIRE MESH DURING SEDIMENT REMOVAL; REPLACE STONE AS
NEEDED.
11. REFER TO MAINTENANCE SPECIFFCA11ONS AND REQUIREMENTS IN THE
NORTH CAROLINA "EROSION AND SEDIMENT CONTROL PLANNING AND
DESIGN MANUAL"
STOCKPILE NOTES
1. A 25-FOOT TEMPORARY MAINTENANCE AND ACCESS EASEMENT SHALL
BE MAINTAINED AROUND ALL PROPOSED STOCKPILES; EROSION CONTROL
MEASURES SURROUNDING THE STOCKPILE SHALL BE SHOWN AT THE
OUTER LIMIT OF THE EASEMENT.
2. STOCKPILE FOOTPRINTS SHALL BE SETBACK A MINIMUM OF 25' FROM
ADJACENT PROPERTY LINES.
3. STOCKPILE HEIGHT SHALL NOT EXCEED 35 FEET.
4. STOCKPILE SLOPES SHALL BE 2:1 OR FLATTER.
5. APPROVED MEASURES SHALL BE USED TO CONTROL SEDIMENT LOSS
FROM STOCKPILE.
6. STOCKPILING OF MATERIALS ADJACENT TO A CHANNEL, DRAINAGEWAY,
WATERCOURSE, WETLAND, STREAM BUFFER, OR OTHER BODY OF WATER
SHALL BE AVOIDED UNLESS AN AL TERNA 11 VE LOCA11ON IS
DEMONSTRATED TO BE UNAVAILABLE.
7. ANY CONCENTRATED FLOW LIKELY TO AFFECT THE STOCKPILE SHALL BE
DIVERTED TO AN APPROVED MEASURE.
8. OFF -SITE SPOIL OR BORROW AREAS MUST BE IN COMPLIANCE WITH
JOHNSTON COUNTY ORDINANCES AND STATE REGULA110NS; ALL SPOIL
AREAS OVER ONE ACRE ARE REQUIRED TO HAVE AN APPROVED
SEDIMENT CONTROL PLAN. 1HE DEVELOPER/CONTRACTOR SHALL NOTIFY
JOHNSTON COUNTY OF OFFSITE DISPOSAL OF SOIL PRIOR TO DISPOSAL
FILL OF FEMA FLOODWAYS AND NON -ENCROACHMENT AREAS ARE
PROHIB111ED EXCEPT AS OTHERWISE PROVIDED BY JOHNSTON COUNTY
UNIFIED DEVELOPMENT ORDINANCE (CERI1FICA110NS AND PERMITS
REQUIRED).
'SOIL STABILIZATION NOTES
1. SOIL STABILIZATION 11MEFRAMES:
S11E AREA DESCRIPTION
STABILIZATION
71MEFRAME EXCEPTIONS
PERIMETER DIKE%SWALES
DITCHES AND SLOPES
7 DAYS
NONE
HIGH QUALITY ZONES (HQW)
7 DAYS
NONE
SLOPES SLEEPER THAN 3:1
7 DAYS
IF SLOPES ARE 10 FT OR LESS IN LENGTH
AND ARE ARE NOT STEEPER THAN 2:1,
14 DAYS ARE ALLOWED
SLOPES 3:1 OR FLATTER
14 DAYS
7 DAYS FOR SLOPES GREATER THAN
50 FT IN LENGIH
ALL OTHER AREAS W11H SLOPES
FLATTER THAN 4:1
14 DAYS
NONE EXCEPT FOR PERIMETER AND
HOW ZONES
2. DENUDED AREAS MUST BE STABILIZED WITHIN FIFTEEN (15) WORKING
DAYS OF CEASE OF ANY PHASE OF AC11 VI TY. ALL SLOPES MUST BE
STABILIZED WITHIN TWENTY-ONE (21) CALENDAR DAYS OF CEASE OF
ANY PHASE OF AC1114TY. THIS INCLUDES SLOPES, SWALES, CHANNELS
AND STOCKPILES
3. THIS PLAN IS TO BE U11L1ZED AND REVIEWED ONLY IN CONJUNC110N
W11H 1HE WRITTEN NARRA11VE, WHICH IS AN INTEGRAL PART OF THIS
EROSION AND SEDIMENT CONTROL PLAN.
4. ALL FINISHED SLOPES SHALL BE 3:1 OR FLATTER.
5. NO WETLANDS EXIST WITHIN LIMITS OF DISTURBANCE.
6. SEE STABILIZA 11ON GUIDELINES ON SHEET EC-.
VJ
CSD
ENGINEERING
LICENSE # C-2710
ENGINEERING
LAND PLANNING
COMMERCIAL / RESIDENTIAL
P.O. BOX 1250
WENDELL, NC 27591
(910) 791-4441
EROSION & SEDIMENT CONTROL PLAN
ESC PLAN DETAILS & SPECIFICA 11ONS
J
CONSTRUCTION DRAWINGS FOR
,77.77110
- E
032721
C
�U'y .tiG C
I N E�� ►►11111012/2/20
PLAN NOT RELEASED
FOR CONSTRUCTION
F-
0
>-
m
DATE:: 12/2/2020
HORZ SCALE: N/A
DRAWN BY: JFO
CHECKED BY: HSR
PROJECT NO.: 18-0454
Sheet
EC2.1
3 of 6
Sheet No.
GROUND STABILIZATION AND MATERIALS HANDLING PRACTICES FOR COMPLIANCE WITH
THE NCGO1 CONSTRUCTION GENERAL PERMIT
Implementing the details and specifications on this plan sheet will result in the construction
activity being considered compliant with the Ground Stabilization and Materials Handling
sections of the NCGO1 Construction General Permit (Sections E and F, respectively). The
permittee shall comply with the Erosion and Sediment Control plan approved by the
delegated authority having jurisdiction. All details and specifications shown on this sheet
may not apply depending on site conditions and the delegated authority having jurisdiction.
SECTION E: GROUND STABILIZATION
Required Ground Stabilization Timeframes
Stabilize within this
Site Area Description
many calendar
Timeframe variations
days after ceasing
land disturbance
(a) Perimeter dikes,
swales, ditches, and
perimeter slopes
7
None
(b) High Quality Water
7
None
(HQW) Zones
(c) Slopes steeper than
If slopes are 10' or less in length and are
3:1
7
not steeper than 2:1, 14 days are
allowed
-7 days for slopes greater than 50' in
length and with slopes steeper than 4:1
(d) Slopes 3:1 to 4:1
14
-7 days for perimeter dikes, swales,
ditches, perimeter slopes and HQW
Zones
-10 days for Falls Lake Watershed
(e) Areas with slopes
-7 days for perimeter dikes, swales,
ditches, perimeter slopes and HQW Zones
flatter than 4:1
14
-10 days for Falls Lake Watershed unless
there is zero slope
Note: After the permanent cessation of construction activities, any areas with temporary
ground stabilization shall be converted to permanent ground stabilization as soon as
practicable but in no case longer than 90 calendar days after the last land disturbing
activity. Temporary ground stabilization shall be maintained in a manner to render the
surface stable against accelerated erosion until permanent ground stabilization is achieved.
GROUND STABILIZATION SPECIFICATION
Stabilize the ground sufficiently so that rain will not dislodge the soil. Use one of the
techniques in the table below:
Temporary Stabilization
Permanent Stabilization
• Temporary grass seed covered with straw or
other mulches and tackifiers
• Hydroseeding
• Rolled erosion control products with or
without temporary grass seed
• Appropriately applied straw or other mulch
• Plastic sheeting
• Permanent grass seed covered with straw or
other mulches and tackifiers
• Geotextile fabrics such as permanent soil
reinforcement matting
• Hydroseeding
• Shrubs or other permanent plantings covered
with mulch
• Uniform and evenly distributed ground cover
sufficient to restrain erosion
• Structural methods such as concrete, asphalt or
retaining walls
• Rolled erosion control products with grass seed
POLYACRYLAMIDES (PAMS) AND FLOCCULANTS
1. Select flocculants that are appropriate for the soils being exposed during
construction, selecting from the NC DWR List of Approved PAMS/Flocculants.
2. Apply flocculants at or before the inlets to Erosion and Sediment Control Measures.
3. Apply flocculants at the concentrations specified in the NC DWR List of Approved
PAMS/Flocculants and in accordance with the manufacturer's instructions.
4. Provide ponding area for containment of treated Stormwater before discharging
offsite.
5. Store flocculants in leak -proof containers that are kept under storm -resistant cover
or surrounded by secondary containment structures.
EQUIPMENT AND VEHICLE MAINTENANCE
1. Maintain vehicles and equipment to prevent discharge of fluids.
2. Provide drip pans under any stored equipment.
3. Identify leaks and repair as soon as feasible, or remove leaking equipment from the
project.
4. Collect all spent fluids, store in separate containers and properly dispose as
hazardous waste (recycle when possible).
5. Remove leaking vehicles and construction equipment from service until the problem
has been corrected.
6. Bring used fuels, lubricants, coolants, hydraulic fluids and other petroleum products
to a recycling or disposal center that handles these materials.
LITTER, BUILDING MATERIAL AND LAND CLEARING WASTE
1. Never bury or burn waste. Place litter and debris in approved waste containers.
2. Provide a sufficient number and size of waste containers (e.g dumpster, trash
receptacle) on site to contain construction and domestic wastes.
3. Locate waste containers at least 50 feet away from storm drain inlets and surface
waters unless no other alternatives are reasonably available.
4. Locate waste containers on areas that do not receive substantial amounts of runoff
from upland areas and does not drain directly to a storm drain, stream or wetland.
5. Cover waste containers at the end of each workday and before storm events or
provide secondary containment. Repair or replace damaged waste containers.
6. Anchor all lightweight items in waste containers during times of high winds.
7. Empty waste containers as needed to prevent overflow. Clean up immediately if
containers overflow.
8. Dispose waste off -site at an approved disposal facility.
9. On business days, clean up and dispose of waste in designated waste containers.
PAINT AND OTHER LIQUID WASTE
1. Do not dump paint and other liquid waste into storm drains, streams or wetlands.
2. Locate paint washouts at least 50 feet away from storm drain inlets and surface
waters unless no other alternatives are reasonably available.
3. Contain liquid wastes in a controlled area.
4. Containment must be labeled sized and placed appropriately for the needs of site.
5. Prevent the discharge of soaps, solvents, detergents and other liquid wastes from
construction sites.
PORTABLE TOILETS
1. Install portable toilets on level ground, at least 50 feet away from storm drains,
streams or wetlands unless there is no alternative reasonably available. If 50 foot
offset is not attainable, provide relocation of portable toilet behind silt fence or place
on a gravel pad and surround with sand bags.
2. Provide staking or anchoring of portable toilets during periods of high winds or in high
foot traffic areas.
3. Monitor portable toilets for leaking and properly dispose of any leaked material.
Utilize a licensed sanitary waste hauler to remove leaking portable toilets and replace
with properly operating unit.
EARTHEN STOCKPILE MANAGEMENT
1. Show stockpile locations on plans. Locate earthen -material stockpile areas at least
50 feet away from storm drain inlets, sediment basins, perimeter sediment controls
and surface waters unless it can be shown no other alternatives are reasonably
available.
2. Protect stockpile with silt fence installed along toe of slope with a minimum offset of
five feet from the toe of stockpile.
3. Provide stable stone access point when feasible.
4. Stabilize stockpile within the timeframes provided on this sheet and in accordance
with the approved plan and any additional requirements. Soil stabilization is defined
as vegetative, physical or chemical coverage techniques that will restrain accelerated
erosion on disturbed soils for temporary or permanent control needs.
NORTH CAROLI NA
I/ Environmental Quality
EADIRDADE MR/
OR DOPLER
CLEARLY MAIM MODE
vAOGur IOIYG EVICE WNW IS O
I I
Mak
ONSITE CONCRETE WASHOUT
STRUCTURE WITH LINER
IR MARES
. INIE A -A
Imo
L AC71 AL LOCATION DEM MER DI FIELD
R. 11E fAlrri:1E imam, STECILMED OWL
E MDEADED NEE DE LOOM NOM
f E E/OED M 6 M OOCIIES
CAPACITY.
&WQTE VAEDYT SnweruE ODE TO E
arAEY MAR® VIM D®YL HOMO REVEL
I
MOP./
OR STAPLER
MODE E'VE'DL�� MW
i. Kif AL LOCATION EIflY•ED N
Fm.D
L M COOKIE sao,T
SIGCICED •V L E M5NTA0®
WHEN TIE LMM NO/CI mM
REAMS IDD OF TIE mDCIIDE0
CMACEY 19 PROVIDE ADEE AIE
It wet rr mow%
STRUCTURE
Ism E CLDE IVA= WITH
MIRE NOT= EV=
BFI nW ORA . SHITIIT STRIICTIIac ABOVE GRAD 41 SHUT STRUCTURE
CONCRETE WASHOUTS
1. Do not discharge concrete or cement slurry from the site.
2. Dispose of, or recycle settled, hardened concrete residue in accordance with local
and state solid waste regulations and at an approved facility.
3. Manage washout from mortar mixers in accordance with the above item and in
addition place the mixer and associated materials on impervious barrier and within
lot perimeter silt fence.
4. Install temporary concrete washouts per local requirements, where applicable. If an
alternate method or product is to be used, contact your approval authority for
review and approval. If local standard details are not available, use one of the two
types of temporary concrete washouts provided on this detail.
5. Do not use concrete washouts for dewatering or storing defective curb or sidewalk
sections. Stormwater accumulated within the washout may not be pumped into or
discharged to the storm drain system or receiving surface waters. Liquid waste must
be pumped out and removed from project.
6. Locate washouts at (east 50 feet from storm drain inlets and surface waters unless it
can be shown that no other alternatives are reasonably available. At a minimum,
install protection of storm drain inlet(s) closest to the washout which could receive
spills or overflow.
7. Locate washouts in an easily accessible area, on level ground and install a stone
entrance pad in front of the washout. Additional controls may be required by the
approving authority.
8. Install at least one sign directing concrete trucks to the washout within the project
limits. Post signage on the washout itself to identify this location.
9. Remove leavings from the washout when at approximately 75% capacity to limit
overflow events. Replace the tarp, sand bags or other temporary structural
components when no longer functional. When utilizing alternative or proprietary
products, follow manufacturer's instructions.
10. At the completion of the concrete work, remove remaining leavings and dispose of
in an approved disposal facility. Fill pit, if applicable, and stabilize any disturbance
caused by removal of washout.
HERBICIDES, PESTICIDES AND RODENTICIDES
1. Store and apply herbicides, pesticides and rodenticides in accordance with label
restrictions.
2. Store herbicides, pesticides and rodenticides in their original containers with the
label, which lists directions for use, ingredients and first aid steps in case of
accidental poisoning.
3. Do not store herbicides, pesticides and rodenticides in areas where flooding is
possible or where they may spill or leak into wells, stormwater drains, ground water
or surface water. If a spill occurs, clean area immediately.
4. Do not stockpile these materials onsite.
HAZARDOUS AND TOXIC WASTE
1. Create designated hazardous waste collection areas on -site.
2. Place hazardous waste containers under cover or in secondary containment.
3. Do not store hazardous chemicals, drums or bagged materials directly on the ground.
NCGO1 GROUND STABILIZATION AND MATERIALS HANDLING
EFFECTIVE: 04/01/19
SELF -INSPECTION,
SECTION A: SELF -INSPECTION
PART III
RECORDKEEPING AND REPORTING
normal business hours in accordance with the table
site conditions would cause the safety inspection
the ins ection
may be delayed until the next business day on
In addition, when a storm event of equal to or
of normal business hours, the self -inspection shall be
of the next business day. Any time when inspections
Inspection Record.
Self -inspections are required during
below. When adverse weather or
personnel to be in jeopardy, the inspection
which it is safe to perform the inspection.
greater than 1.0 inch occurs outside
performed upon the commencement
were delayed shall be noted in the
Inspect
Frequency
(during normal
business hours)
Inspection records must include:
(1) Rain gauge
maintained in
good working
order
Daily
Daily rainfall amounts.
If no daily rain gauge observations are made during weekend or
holiday periods, and no individual -day rainfall information is
available, record the cumulative rain measurement for those un-
attended days (anc this will determine if a site inspection is
needed). Days on which no rainfall occurred shall be recorded as
"zero." The permittee may use another rain -monitoring device
approved by the Division.
(2) E&SC
Measures
At least once per
7 calendar days
and within 24
hours of a rain
event > 1.0 inch in
24 hours
1. Identification of the measures inspected,
2. Date and time of the inspection,
3. Name of the person performing the inspection,
4. Indication of whether the measures were operating
properly,
5. Description of maintenance needs for the measure,
6. Description, evidence, and date of corrective actions taken.
(3) Stormwater
discharge
outfalls (SDCs)
At least once per
7 calendar days
and within 24
hours of a rain
event > 1.0 inch in
24 hours
1. Identification of the discharge outfalls inspected,
2. Date and time of the inspection,
3. Name of the person performing the inspection,
4. Evidence of indicators of stormwater pollution such as oil
sheen, floating or suspended solids or discoloration,
5. Indication of visible sediment leaving the site,
6. Description, evidence, and date of corrective actions taken.
(4) Perimeter of
site
At least once per
7 calendar days
and within 24
hours of a rain
event > 1.0 inch in
24 hours
If visible sedimentation is found outside site limits, then a record
of the following shall be made:
1. Actions taken to clean up or stabilize the sediment that has left
the site limits,
2. Description, evidence, and date of corrective actions taken, and
3. An explanation as to the actions taken to control future
releases.
(5) Streams or
wetlands onsite
or offsite
(where
accessible)
At least once per
7 calendar days
and within 24
hours of a rain
event > 1.0 inch in
24 hours
If the stream or wetland has increased visible sedimentation or a
stream has visible increased turbidity from the construction
activity, then a record of the following shall be made:
1. Description, evidence and date of corrective actions taken, and
2. Records of the required reports to the appropriate Division
Regional Office per Part III, Section C, Item (2)(a) of this permit.
(6) Ground
stabilization
measures
After each phase
of grading
1. The phase of grading (installation of perimeter E&SC
measures, clearing and grubbing, installation of storm
drainage facilities, completion of all land -disturbing
activity, construction or redevelopment, permanent
ground cover).
2. Documentation that the required ground stabilization
measures have been provided within the required
timeframe or an assurance that they will be provided as
soon as possible.
NOTE: The rain inspection resets the required 7 calendar day inspection requirement.
SELF -INSPECTION, RECORDKEEPING
SECTION B: RECORDKEEPING
PART III
AND REPORTING
deviation shall be kept on the site. The
throughout the coverage under this permit.
plan shall be kept on site and available for
hours.
1.
2.
3.
E&SC Plan Documentation
The approved E&SC plan as well as any approved
approved E&SC plan must be kept up-to-date
The following items pertaining to the E&SC
inspection at all times during normal business
Item to Document
Documentation Requirements
(a) Each E&SC measure has been installed
and does not significantly deviate from the
locations, dimensions and relative elevations
shown on the approved E&SC plan.
Initial and date each E&SC measure on a copy
of the approved E&SC plan or complete, date
and sign an inspection report that lists each
E&SC measure shown on the approved E&SC
plan. This documentation is required upon the
initial installation of the E&SC measures or if
the E&SC measures are modified after initial
installation.
(b) A phase of grading has been completed.
Initial and date a copy of the approved E&SC
plan or complete, date and sign an inspection
report to indicate completion of the
construction phase.
(c) Ground cover is located and installed
in accordance with the approved E&SC
plan.
Initial and date a copy of the approved E&SC
plan or complete, date and sign an inspection
report to indicate compliance with approved
ground cover specifications.
(d) The maintenance and repair
requirements for all E&SC measures
have been performed.
Complete, date and sign an inspection report.
(e) Corrective actions have been taken
to E&SC measures.
Initial and date a copy of the approved E&SC
plan or complete, date and sign an inspection
report to indicate the completion of the
corrective action.
Additional Documentation to be Kept on Site
In addition to the E&SC plan documents above, the following items shall be kept on the
site and available for inspectors at all times during normal business hours, unless the
Division provides a site -specific exemption based on unique site conditions that make
this requirement not practical:
(a) This General Permit as well as the Certificate of Coverage, after it is received.
(b) Records of inspections made during the previous twelve months. The permittee shall
record the required observations on the Inspection Record Form provided by the
Division or a similar inspection form that includes all the required elements. Use of
electronically -available records in lieu of the required paper copies will be allowed if
shown to provide equal access and utility as the hard -copy records.
Documentation to be Retained for Three Years
All data used to complete the e-NOI and all inspection records shall be maintained for a period
of three years after project completion and made available upon request. [40 CFR 122.41]
PART II, SECTION G, ITEM (4)
DRAW DOWN OF SEDIMENT BASINS FOR MAINTENANCE OR CLOSE OUT
Sediment basins and traps that receive runoff from drainage areas of one acre or more shall use outlet structures that withdraw water from the surface when these devices need to be drawn down
for maintenance or close out unless this is infeasible. The circumstances in which it is not feasible to withdraw water from the surface shall be rare (for example, times with extended cold weather).
Non -surface withdrawals from sediment basins shall be allowed only when all of the following criteria have been met:
(a) The E&SC plan authority has been provided with documentation of the non -surface withdrawal and the specific time periods or conditions in which it will occur. The non -surface withdrawal
shall not commence until the E&SC plan authority has approved these items,
(b) The non -surface withdrawal has been reported as an anticipated bypass in accordance with Part III, Section C, Item (2)(c) and (d) of this permit,
(c) Dewatering discharges are treated with controls to minimize discharges of pollutants from stormwater that is removed from the sediment basin. Examples of appropriate controls include
properly sited, designed and maintained dewatering tanks, weir tanks, and filtration systems,
(d) Vegetated, upland areas of the sites or a properly designed stone pad is used to the extent feasible at the outlet of the dewatering treatment devices described in Item (c) above,
(e) Velocity dissipation devices such as check dams, sediment traps, and riprap are provided at the discharge points of all dewatering devices, and
(f) Sediment removed from the dewatering treatment devices described in Item (c) above is disposed of in a manner that does not cause deposition of sediment into waters of the United States.
PART III
SELF -INSPECTION, RECORDKEEPING AND REPORTING
SECTION C: REPORTING
1. Occurrences that Must be Reported
Permittees shall report the following occurrences:
(a) Visible sediment deposition in a stream or wetland.
(b) Oil spills if:
• They are 25 gallons or more,
• They are less than 25 gallons but cannot be cleaned up within 24 hours,
• They cause sheen on surface waters (regardless of volume), or
• They are within 100 feet of surface waters (regardless of volume).
(c) Releases of hazardous substances in excess of reportable quantities under Section 311
of the Clean Water Act (Ref: 40 CFR 110.3 and 40 CFR 117.3) or Section 102 of CERCLA
(Ref: 40 CFR 302.4) or G.S. 143-215.85.
(d) Anticipated bypasses and unanticipated bypasses.
(e) Noncompliance with the conditions of this permit that may endanger health or the
environment.
2. Reporting Timeframes and Other Requirements
After a permittee becomes aware of an occurrence that must be reported, he shall contact
the appropriate Division regional office within the timeframes and in accordance with the
other requirements listed below. Occurrences outside normal business hours may also be
reported to the Department's Environmental Emergency Center personnel at (800)
858-0368.
Occurrence
Reporting Timeframes (After Discovery) and Other Requirements
(a) Visible sediment
deposition in a
stream or wetland
• Within 24 hours, an oral or electronic notification.
• Within 7 calendar days, a report that contains a description of the
sediment and actions taken to address the cause of the deposition.
Division staff may waive the requirement for a written report on a
case -by -case basis.
• If the stream is named on the NC 303(d) list as impaired for sediment -
related causes, the permittee may be required to perform additional
monitoring, inspections or apply more stringent practices if staff
determine that additional requirements are needed to assure compliance
with the federal or state impaired -waters conditions.
(b) Oil spills and
release of
hazardous
substances per Item
1(b)-(c) above
• Within 24 hours, an oral or electronic notification. The notification
shall include information about the date, time, nature, volume and
location of the spill cr release.
(c) Anticipated
bypasses [40 CFR
122.41(m)(3)]
• A report at least ten days before the date of the bypass, if possible.
The report shall include an evaluation of the anticipated quality and
effect of the bypass.
(d) Unanticipated
bypasses [40 CFR
122.41(m)(3)]
• Within 24 hours, an oral or electronic notification.
• Within 7 calendar days, a report that includes an evaluation of the
quality and effect of the bypass.
(e) Noncompliance
with the conditions
of this permit that
may endanger
health or the
environment[40
CFR 122.41(I)(7)]
• Within 24 hours, an oral or electronic notification.
• Within 7 calendar days, a report that contains a description of the
noncompliance, and its causes; the period of noncompliance,
including exact dates and times, and if the noncompliance has not
been corrected, the anticipated time noncompliance is expected to
continue; and steps taken or planned to reduce, eliminate, and
prevent reoccurrence of the noncompliance. [40 CFR 122.41(1)(6).
• Division staff may waive the requirement for a written report on a
case -by -case basis.
r,=
`y NORTH CAROLINA
1; Environmental Quality
VJ
CSD
ENGINEERING
LICENSE # C-2710
ENGINEERING
LAND PLANNING
COMMERCIAL / RESIDENTIAL
P.O. BOX 1250
WENDELL, NC 27591
(910) 791-4441
EROSION & SEDIMENT CONTROL PLAN
NCGO1 DETAILS & SPECIFICA 110NS
CONSTRUCTION DRAWINGS FOR
02.
Li 1Z
*" CAR VI
- EA
032721
►►111111 12/2/20
PLAN NOT RELEASED
FOR CONSTRUCTION
ME
>-
m
co
Oc
ZE
Lu
Oc
DATE:: 12/2/2020
HORZ SCALE: N/A
DRAWN BY: JFO
CHECKED BY: HSR
PROJECT NO.: 18-0454
NCGO1 SELF -INSPECTION, RECORDKEEPING AND REPORTING
EFFECTIVE: 04/01/19
Sheet
Sheet No.
EC2.2
4 OF
6
ESC PLAN LEGEND
re e (Apoop
---
(2)
EXISTING BOUNDARY
LMI115 OF CONS1RUcnaV/
DISTURBANCE
£XIS11NG CULVERT
C WS1RUC11ON ENTRANCE
SJL T MICE/SILT MICE CUTLET
TREE PROTECTION FENCE
PROPOSED CULVERT
WATTLE
STANDARD ROCK CHECK DAM
SEDIMENT BASIN SKIMMER
BAFFLES
ROCK INLET PROTECTION
ROCK PIPE INLET PROTEC1ION
TEMP. DIVERSION
TEMP. CLEAN-WA1ER DIVERSION
TEMP. EC MATTING
PERMANENT S121L
REINFORCEMENT MATTING
TEMP. SLOPE DRAIN
J
i
/
50' RIPARIAN BUFFER LIMITS
/
EXIS11NG PROPERTY BOUNfiAR 7
/
/
/
/
/
/
/
/
50' RIPARIAN BUFFER LIMITS
/
SKIM R BASIN 3
WIDTH = 50
L NGTH = 100.0 FT
DEPTH 2.0 FT
WEIR GTH — 13 FT
SKIM RSIZ'=2.5IN
SKIMMER 0r FICE = 1.8 IN
EXIS11NG PROPERTY BOUNDARY
290
/
/
SKIMMER BASIN 1
WIDTH = 83.
LENGTH = 6.0 FT
DEPTH —2.OFT
WEI LENGTH = 8 FT
SKIMMER SIZE = 3IN
SKIMMER ORIFICE = 2.9 1N
60 30 0 60
120
180
SCALE IN FEET: 1"= 60'
1
Vl
CSD
ENGINEERING
LICENSE # C-2710
ENGINEERING
LAND PLANNING
COMMERCIAL / RESIDENTIAL
P.O. BOX 1250
WENDELL, NC 27591
(910) 791-4441
EROSION & SEDIMENT CONTROL PLAN
ESC PLAN (1) - POND 2 & NEXT PHASE
J
CONSTRUCTION DRAWINGS FOR
N
N
ULo
Lo
z
oo
z
O
z
CARa1
•
032721
coC
G I N �
I �t�� 0 G ,,,,,
H� 12/2/20
PLAN NOT RELEASED
FOR CONSTRUCTION
0
>-
m
1
DA TE: 12/2/2020
HORZ SCALE: 1” = 60'
DRA WN B Y. JFO
CHECKED BY: HSR
PROJECT NO.: 18-0454
Sheet EC3.0
Sheet No.
5
OF 6
RIM 264.80
INV. IN 261.80 (E - 18")
INV. IN 261.80 (NW - 24")
261.80 (S - 24"),
RIM 267.00
INV. OUT 262.60 (SE - 24")
RIM 264.80
INV. IN 260.40 (N - 24')
INV. IN 260.40 (SE - 18")
INV. OUT 260.40 (W - 30")
PROPOSED WET POND 2
1" = 40'
r
VARIES
10'
VARIES
6'
EMBANKMENT TOP= 265.0 (COMPACTED)
amjamj\�
EMERGENCY SPILLWAY = 264.0
78LF
18" R.C.PIPE
INV = 247
PIPE DIAPHRAGM
(AS RECOMMENDED BY S11E GEOTECHNICAL ENGINEER)
VARIES
INV =2554
36'
LOP OF GRAZE (WEIR) = 262.5
NWSEL = 259.0
12'
72'
\-\\\
\\ BOTTOM EL - EXISI1N \/ \r
BOTTOM OF 6:1 SHELF = 259.0
PE DIAPHRAGM BOTTOM EL = 255 +/-
BOTTOM SWM CONTROL STRUCTURE EL = 252.9
EL-259.0
STONE 1.5'mn.
5FT
ALL SLOPES
2:1 MAXIMUM BELOW WATER SURFACE
10 FT
FOREBAY VOLUME
OF REQUIRED
STORAGE; TYPICAL
1 3 FT (MIN.)
NON WOVEN FLIER FABRIC UNDER STONE
pIPE
SEDIMENT CLEANOUT
BOTTOM = 254 ELEV. = 257
OUTLET
PROIECION
AS ON PLANS
EMBANKMENT & FOREBAY SECTION DETAIL
NOT TO SCALE
100YR WSEL = 264.4
25YR WSEL = 263.5
10YR WSEL = 2628
1YR WSEL = 261.2
pNORMAL POOL WSEL = 259.0
J
�ESC PLAN LEGEND
CE
SF)( x
TP 0-p
(2)
EMYISING BOUNDARY
LIMITS OF CONS1RUCHON/
DIS1URBANCE
E.k1SING CULVERT
'ONS1RUc11AN E1VIRANCE
SILT fENCE/SYLT fENCE OUTLET
TREE PR0IECNON MICE
PROPOSED CULVERT
WATTLE
STANDARD ROCK CHECK DAM
SEDIMENT BASIN SOAR
BAFFLES
ROCK INLET PR01EC11AN
ROCK PIPE INLET PRO1ECHON
1EMP. DIVERSION
1EMP. CLEAN-WA1ER DIVERSION
1EMP. EC MATTING
PERMANENT SOIL
REINIFOROEMENT MATING
1EMP. SLOPE DRAIN
r
J
FABRICATED GRATE TOP
4'' -n 11
- n -
4"
4"
4"
-WEIR -
:CUT :
=1-
4
4"
X FT
X FT
WELDED BARS,
GALVANIZED, OR
EQUIVALENT
FABRICATED GRATE TOP DETAIL
NOT TO SCALE
f
100 FT
1 TOP OF
EMBANKMENT
ELEVAION = 265.0
ARICULATED BLOCK OUTSIDE OF PATH
EMERGENCY SPILL WA Y
FRONT VIEW - POND
NOT TO SCALE
"WET POND NOTES
1. PORTABLE PUMP TO BE USED TO DRAIN POND DURING CONSTRUCTION.
PUMP TO BE PLACED ON TOP OF BERM WITH SCREEN ATTACHED TO
HOSE INLET AND COVERED WITH STONE. HOSE OUTLET TO DRAIN
SPECIAL STILLING BASIN AS SHOWN ON PLANS.
2. PIPE FILTER DIAPHRAGM AND PIPE CRADLE FOR POND OUTLET PIPE
SHALL BE UTILIZED IN LIEU OF SEEP COLLAR; TO BE DESIGNED AND
SPECIFIED BY GEOTECHNICAL ENGINEER.
3. POND SIDESLOPES TO BE PERMANENTLY STABILIZED WITH TURF GRASS.
4. BASIN TO BE RECORDED IN A DRAINAGE EASEMENT.
5. TEMPORARY EROSION CONTROL MAT71NG TO BE PLACED ON ALL SLOPES.
6. BASIN TO BE SKIMMER BASIN DURING CONSTRUCTION.
EROSION CONTROL NOTES
1. SEE SHEET C2.1 FOR SOIL STABILIZATION 11ME FRAMES AND SOIL
STABILIZATION GUIDELINES
2. UPON INSTALLATION OF CLEAN WATER DIVERSIONS, THE EXCAVATED
MATERIAL SHALL BE IMMEDIATELY STABILIZED WITH TEMPORARY EROSION
CONTROL MATTING.
3. UPON INSTALLATION OF TEMPORARY DIVERSIONS, THE EXCAVATED
MATERIAL SHALL BE STABILIZED WITH STRAW NETTING AS SPECIFIED FOR
NORTH AMERICAN GREEN S150 EROSION CONTROL BLANKET OR
EQUIVALENT ROLLED EROSION CONTROL PRODUCT.
4. UPON REACHING FINAL GRADE FOR PERMANENT SWALES/CHANNELS,
STABILIZE PER PERMANENT SEEDING & MULCHING GUIDELINES AND LINE
WITH TEMPORARY MA171NG AS SPECIFIED FOR NORTH AMERICAN GREEN
S150 EROSION CONTROL BLANKET OR EQUIVALENT ROLLED EROSION
CONTROL PRODUCT. J
NO1E&
1. TEMPORARY SKIMMER TO BE INSTALLED ON PRIMARY OUTLET STRUCTURE BOX
AND TO REMAIN IN PLACE UN71L SITE IS PERMANENTLY STABILIZED PER NCDEQ/LQS
SEDIMENTA710N AND EROSION CONTROL PERMIT. SEE SKIMMER DETAILS FOR INSTALLA710N.
2. RIP RAP TO BE PLACED AROUND THE PERIMETER OF OUTLET BOXES
3. 6 FT x 6 FT PRECAST CONCRETE BOXES OR EQUIVALENT HAND -BUILT.
4' FAIRCLOTH SKIMMER
OR EQUAL
ORIFICE DIA. = 3.7"
C_
4" PVC SCREW PLUG
4" ORIFICE ASSEMBLY
4" TEE
SKIMMER CONNEC110N
TO BE CAPPED ONCE
SKIMMER IS REMOVED
4' CAP TO REMAIN UNTIL SKIMMER
IS REMOVED. THEN DRILL 3' HOLE IN CAP
12"
TOP OF STONE = 255'
TOP OF BOX AT
BACK OF BOX EL= 263.5
EL= 262.5 °°CA19
EL= 253.4
RECTANGULAR ORIFICE
IN RISER
6
SMOOTH STONE (D50=9') W/
NONWOVEN FILTER FABRIC
(TO SURROUND EN71RE
OUTLET STRUCTURE)
24' RCP
OUTLET PIPE
6"BASE EL = 2529
f
POND
OUTLET STRUCTURE DETAILS
•eltittft
bv./a�i■iiiiiiie�I
� E■■■■■■■■■ �
I��iiiiiiiiii /a
-J■■■■■■■■■■�
- ■■■■■■■■■■: ��
■■■■■■■■■■
A.
��■■■■■■■ ,.
APO Oilieli•O
NENNEN
&MA
4.0' ORIFICE ASSEMBLY
Vl
CSD
ENGINEERING
LICENSE # C-2710
ENGINEERING
LAND PLANNING
COMMERCIAL / RESIDENTIAL
P.O. BOX 1250
WENDELL, NC 27591
(910) 791-4441
EROSION It SEDIMENT CONTROL PLAN
POND 2 CONSTRUCTION DETAILS
1
CONSTRUCTION DRAWINGS FOR
**0. vC A Ra l
E
032721
�U'y .tiG CO C
I N E..
►►������ 2/2/20
PLAN NOT RELEASED
FOR CONSTRUCTION
F-
0
co
cc
W
O
W
DATE:: 12/2/2020
HORZ SCALE: 1” = 40'
DRAWN BY: JFO
CHECKED BY: HSR
PROJECT NO.: 18-0454
Sheet EC4" 0
NOT TO SCALE
J
Sheet No.
6 OF 6