Loading...
HomeMy WebLinkAbout20201842 Ver 2_EC00-Cleveland Bluffs_Pond_ESC_CD_20201202_20210405EROSION & SEDIMENT CONTROL PLAN for f PLANNED EROSION CONTROL PRACTI CES\ CE TEMPORARY GRAVEL CONSTRUCTION ENTRANCE SHALL BE INSTALLED AT 1HE ENTRANCES TO THE PROLECT FROM AN DOSING ROADWAY. DRAINAGE SHOULD BE AWAY FROM 1HE ROAD AND EROSION WILL BE CONTROLLED WITH DOWNSTREAM PRACTICES DURING WET WEATHER IT MAY BE NECESSARY TO WASH TRUCK TIRES AT THESE LOCATIONS LAND GRADING GRADING SHOULD BE LIMITED TO AREAS AS SHOWN ON 1HE PLANS CUT AND FILL SLOPES SHALL BE 3:1 OR FLATTER EXCEPT WHERE SPEOFlCALLY INDICATED. CARE SHALL BE TAKEN DURING LAND GRADING ACT1W1IES NOT TO DAMAGE EXISTING TREES THAT ARE IDENIIFlED AS 'TO BE PRESERVED'. SILT FENCE SEDIMENT FENCING SHOULD BE INSTALLED AS SHOWN ON THE PLAN, TO DELINEATE AND PROTECT WETLANDS AND SPE F7ED AREAS AND AROUND ANY TEMPORARY STOOP/LE AREAS AS NECESSARY TO PREVENT ANY GRADED INTERIOR AREAS FROM ERODING ONTO ADJACENT LANDS OR ROADWAY, OR INTO INLETS OR AS DIRECTED BY ENGINEER OR JOHNSTON COUNTY EROSION CONTROL PERSONNEL CONSTRUCTION ROAD STABILIZATION UPON REACHING F1NAL GRADE AND AFTER U17U11ES HAW BEEN INSTALLED, ROADWAY/PARKING AREAS ARE TO BE STABILIZED BY PLACING SUB -BASE AS SHOWN IN THE TYPICAL STREET CROSS-SECTION DETAIL ON 1HE PLAN, TO REDUCE EROSION AND DUST DURING THE REMAINDER OF CONSTRUCTION. SEDIMENT BASIN THE SEDIMENT BASIN IS TO BE CONSTRUCTED F1RST (SEE CONSTRUCTION SCHEDULE AND IS THE PRIMARY PRACTICE TO PREVENT SEDIMENT ROM LEAVING THE SIZE DETAILED DESIGN AND SPILLWAY CONF1GURATIONS ARE SPE F1ED IN THE DETAIL SHEET. SKIMMER BAFFLE A SEDIMENTATION BASIN DEWATERING CONTROL DEVICE THAT WITHDRAWS WATER FROM THE BASINS WATER SURFACE THUS REMOVING THE HIGHEST QUALTY WATER FOR DELIVERY TO 1HE UNCONTROLLED ENVIRONMENT. A POROUS BARRIER INSTALLED INSIDE A TEMPORARY SEDIMENT TRAP, SKIMMER BASIN OR SEDIMENT BASIN TO REDUCE THE VELOCITY AND TURBULENCE OF WATER FLOWING THROUGH THE MEASURE AND TO FACILITATE THE SETTLING OF SEDIMENT FROM WATER BEFORE DISCHARGE OUTLET STABILIZATION RIPRAP APRONS WILL BE LOCATED AT THE DOWNSTREAM END O" ALL DISCHARGE PIPES TO PREVENT SCOUR. TEMPORARY EROSION CONTROL MATTING TEMPORARY MATING SHALL BE PLACED IN IN NEWLY CONSTRUCTED CHANNELS AND ALONG SLOPES PERMANENT SOL RBNFORCILWBVT MATTING PSRM SHALL BE PLACED IN CHANNELS AND NEAR OU7FALLS TEMPORARY SLOPE DRAIN SLOPE DRAINS ARE FLEXIBLE 111BING OR CONDUIT EXTENDING TEMPORARILY FROM TOP TO THE BOTTOM OF CUT OR F7LL SLOPE TO CONVEY CONCENTRATED RUNOFF DO # THE FACE OF THE SLOPE WITHOUT CAUSING EROSION. TEMPORARY DIVERSION TEMPORARY DIVERSIONS ARE A RIDGE OR EXCAVATED CHANNEL (OR CCBINATION) CONSTRUCTED ACROSS SLOPING LAND ON EXISTING GRADE 1D PROTECT WORK AREAS OR SENSITIVE AREAS FROM UPSLOPE RUNOFF, AND TO DIVERT SEDIMENT LADEN WATER TO SEDIMENT TRAPS OR APPROPRIATE OUTLETS CLEVELAND BLUFFS SUBDIVISION JOHNSTON COUNTY, NORTH CAROLINA PROJECT /D. JC# 19-096-P O/ o V ; , FUTURE DEVELOPMENT / / / CHANEY DRIVE � I CLUBHOUSE & OQL1 I I YELLOW PINE CT `I PHASE 2 \ IROQUOIS COURT �\ POND 1 09L °o E 38 \ 0 0 0 \ n ' 1 \� 1 \ , \� \ PHASE 3A ' �, 1 n G vo P Nccs G 'PROJECT DATA AND GENERAL NOTES PROJECT NAME AND LOCATION CLEVELAND BLUFFS SUBDIVISION CLEVELAND TOWNSHIP JOHNSTON COUNTY, NORTH CAROLINA LAT 35.5905 LONG: —78.5426 PROJECT OWNER / DEVELOPER KG PLAZA RELDS CARLISLE 8640 RIVER ROAD WILMINGTON, NC 28412 PHONE: (919) 514-8353 PROJECT CONSULTANT / ENGINEER CSD ENGINEERING JOHN F. OGLESBY, PE 3 N. MAIN STREET, STE D / PO BOX 1250 WENDELL, NC 27591 (919) 624-0997 JOHNSTON COUNTY STORMWATER MANAGER JESSICA BATTEN 309 E. MARKET STREET SMITHFIELD, NC 27577 PHONE: (919) 938-4717 GENERAL NOTES 1. TOTAL DISTURBED AREA = 29 ACRES. 2. PROPOSED LAND USE IS RESIDENTIAL. 3. NEXT AND FUTURE PHASE CONSISTS OF DEVELOPING LOTS FOR SINGLE—FAMILY HOMES; STREETS, WATER, SEWER, SEWER FORCE MAIN; AND STORMWATER CONTROL MEASURE. 4. ALL SLOPES SHALL BE 3:1 OR FLATTER. 5. JURISDICTIONAL STREAM EXIST WITHIN THE PROJECT BOUNDARY AND HAS BEEN SURVEYED; BUFFER DETERMINATIONS HAVE BEEN COMPLETED. 6. ELEVATION DATUM IS NAND 88. 7. STREETS ARE DESIGNED TO NCDOT STANDARDS AND ARE PROPOSED TO BE ADDED TO 1HE STATE ROAD SYSTEM. 8 THE DEVELOPER IS RESPONSIBLE FOR MAINTENANCE OF THE STORMWATER CONTROL MEASURE UN11L 1HE HOMEOWNER'S ASSOCIATION TAKES IS FORMED AND LEGAL. ESC PLAN LEGEND C EXISTING BOUNDARY LM 117S OF CONSTRUCTION/ DISTURBANCE EXISTING CULVERT CONSTRUCTION ENTRANCE SILT fENCE/SKT MICE OUTLET PROPOSED CULVERT WATTLE STANDARD ROCK CHECI( DAM SEDIMENT BASIN SKIMMER ROCK NNLET PROTECTION ROCK PIPE INLET PROTECTION TEMP. DIVERSION TEMP. CLEAN -WATER DIVERSION TEMP. EC MATTING PERMANENT SOIL RENFORCEMENT MATING TEMP. SLOPE DRAIN J INDEX TO DRAWINGS SHEET No. DESCRIPTION DRAWING No. 1 OF 6 OVERALL SITE LAYOUT WITH SHEET INDEX EC1.0 2 OF 6 ESC PLAN DETAILS EC2.0 3 OF 6 ESC PLAN DETAILS & SPECIFICATIONS EC2.1 4 OF 6 NCGO1 DETAILS & SPECIFICATIONS EC2.2 5 OF 6 ESC PLAN (1) — DEMOLITION, CLEAR & GRUB — NEXT PHASE EC3.0 6 OF 6 WET POND PLAN & CONSTRUCTION DETAILS EC4.0 J Vl CSD ENGINEERING LICENSE # C-2710 ENGINEERING LAND PLANNING COMMERCIAL / RESIDENTIAL P.O. BOX 1250 WENDELL, NC 27591 (910) 791-4441 EROSION & SEDIMENT CONTROL PLAN OVERALL SITE LAYOUT & SHEET INDEX J CONSTRUCTION DRAWINGS FOR N co CI N W Q . corn (-3n f Z CD :11 NU.2d- c ca.." ca oc: c-- ---,17-6- U U CARa1 032721 C lll ............... ►►11111112/2/20 PLAN NOT RELEASED FOR CONSTRUCTION F- 0 0 w DA TE: 12/2/2020 HORZ SCALE: 1” = 200' DRAWN B Y. JFO CHECKED BY: HSR PROJECT NO.: 18-0454 Sheet Sheet No. EC1.0 1 of 5 r COMPACTED FILL OR GRAVEL, EXTENSION OF FABRIC AND WIRE INTO THE TRENCH BACI(F1LL MINIMUM 8' THICK LAYER OF GRAVEL 8'MINIMUM V-1RENCH FILLER FABRIC 14'MINIMUM FTLIER FABRIC 24' NOTE SEE NARRATIVE FOR MORE DETAIL ISOMETRIC WEW SEC11ON 6pr � cootie DCIENSION OF FABRIC AND WIRE INTO THE TRENCH COMPACTED FILL 8'MINIMUM FILTER FABRIC 4'MINIMUM SECTION sF SEDIMENT FENCE ( SILT FENCE ) NTS STEEL POST 36' ABOVE 24' BELOW CDOT OR 7 WASED HSTONE' 19-GAUGE HARDWARE CLOTH (1/4 MESH OPENINGS) NGVOT 15 OR 157 WASHED STONE STEEL POST 2' IP u u HARDWARE CLOTH & GAVEL DROP INLET PROTECTION NOT TO SCALE J J CON FIBER BAFFLE MATERIAL PROPERTY REQURREM EATS MATERIAL 100% COCONUT FIBER THICKNESS 0.30 IN MIN. TENSILE STRENGTH (WET) 900 X 680 LB/FT MIN ELONGATION (WET) 69% X 34% MAX FLOW VELOCITY 10-12 FT/SEC WEIGHT 20 oz/SY (680 G/M"2) MIN MINIMUM WIDTH 6.5 FT OPEN AREA 50% MAX STEEL POST EARTHEN EMBANKMENT OUTLET, CLASS 11 RIPR STEEL POST SHOULD BE APPROX 1-3/8' WIDE MEASURED PARALLEL TO FENCE AND HAW A MIN. WEIGHT OF 1.25 LB/LINEAR FT AND BE EQUIPPED WITH AN ANCHOR PLATE WITH MINIMUM AREA OF 14.0 IN'7 STEEL POST SHOULD BE INSTALLED AT MAX 4 FT SPACING AND DRIVEN INTO GROUND MIN. OF 2 FT TEMPORARY BAFFLES NOT TO SCALE INLET ZONE 25X OF SURFACE AREA BAFFLE (TYPICAL) FIRST CHAMBER 25% OF SURFACE AREA SECOND CHAMBER 25% OF SURFACE AREA OUTLET ZONE 25% OF SURFACE AREA OVERFILL 6' FOR SETTLEMENT EMERGENCY BYPASS 6' BELOW SETTLED TOP OF DAM NOTE SEE NARRATIVE FOR MORE DETAIL SEC11ON VIEW WASHSTONE 1' THICK ON FACE FROM TOE OF DAM TO WEIR. 3600 CF / 3'MIMMUM 5111NIMUM 741 21 ws BAFFLES (TYPICAL) Pratice 6.65 SIDE �E MAX • :' i••••••• :_�••••••••t ••••••••• ••2••••• 4444444 ••••••••• , ;••••••••••••••* BAFFLES (TYPICAL) Pratice 6.65 2:1 SIDE SLOPE MAX. CROSS SECTION TEMPORARY SEDIMENT TRAP NOT TO SCALE �n IC) a 40' (24' MIN.) T TREE PROTECTION DO NOT ENTER AREA PARA ZONA ARBOLES DE PROTECSION - NO ENTRE 5'-0' o/c Max TREE PROTECTION AREA DO NOT ENTER ZONA DE PROTECSION PARA ARBOLES - NO ENTRE Posts may be either 4' dia. pine, 2' dia. oak, or 1.33Ib/LF steel. NOTES: { Weatherproof sign as shown above; See notes below for construction and spacing data. Orange, UV -Resistant, High -Tensile Strength, Poly Baricade Fabric 1. INSTALL TREE PROTEC11ON FENCE AND SIGNAGE PRIOR TO CALLING FOR THE IN111AL ON -SITE INSPEC11ON. 2. WARNING SIGNS TO BE MADE OF DURABLE, WEATHERPROOF MATERIAL. 3. LETTERS ARE TO BE 3" HIGH MINIMUM, CLEARLY LEGIBLE AND SPACED AS DETAILED. 4. SIGNS ARE TO BE PLACED NO GREATER THAN 150' ON -CENTER. 5. PLACE SIGN AT EACH END OF LINEAR TREE PROTEC11ON AREAS AND 150' ON -CENTER THEREAFTER 6. ATTACH SIGNS SECURELY TO FENCE POSTS AND FABRIC. 7. MAINTAIN TREE PROTEC11ON FENCE THROUGHOUT DURA110N OF PROJECT. PUBLIC ROAD 6' MINIMUM THICKNESS 2'-3' COARSE AGGREGATE NOTE: SEE NARRATIVE FOR MORE DETAIL 12 MINIMUM s GRAVEL CONSTRUCTION ENTRANCE WID1H AS REQUIRED c E TEMPORARY GAVEL CONS1RUCRON ENTRANCE/EXIT DETAIL NTS La 3 X Do oU1LET PIPE DIAMETER (Do) - o'o"o" O <>o<>o<>o 00 00000 )<°>C>>(C) OVOVOc 0 0 d50 = 9 INCHES (A759 dMAX =12 INCHES (1.09 La = LENGTH OF APRON W = WITH OF APRON D = MIN. APRON THICKNESS NOTE GEOIEX NONIVWN FILTER FABRIC TO BE PLACED UNDER ALL STONE OUTLET PROTEC11ON. RIP RAP DIMENSIONS DESCRIPTION LaXWXD GLASS QUANTITY POND 2 10'X65'X1.7' 12 TANS 1 o P OUTLET PROTECTION DETAIL NOT TO SCALE - BAFFLES TO BE INSTALLED PER TEMPORARY BAFFLES DETAIL TAP OF EMBANKMENT EL INSTALL POLE WITH CLEAN OUT DEPTH MARKED. CANNOT BE TOP OF POLE TOP OF BERM EMERGENCY SPILLWAY EL ' •• "• , A EMERGENCY SPILLWAY 4FT BASIN. BOTTOM EL CLASS B STONE (4' X 4' X 1' MIN) (SEE ETAIL THIS SHEET) 1FT so* '` ,%*0%°-% 4%%%0°1\ 4' HOPE OUIFALL OUIFALL EL row- Vri% et)i TEMPORARY SEDIMENT BASIN EMBANKMENT CROSS SEC11ON NOT TO SCALE RIPRAP ( J EXISTING TERRAIN FILTER BAG FOR DEWATERING DRAINAGE GEOTEXTILE NOTES 20.0' to 25.0' 1. PROVIDE STABILIZED OUTLET. 2. WOOD PALLETS MAY BE USED IN LIEU OF STONE 3. AND GEOTEXTILE AS DIRECTED. A SUFFICIENT NUMBER 4. OF PALLETS MUST BE PROVIDED TO ELEVATE THE ENTIRE 5. FILTER BAG FOR DEWATERING ABOVE NATURAL GROUND. 8" OF NO. 5 OR 57 STONE SPECIAL STILLING BASIN NTS PVC END CAP PVC TEE PVC ELBOW PVC END CAP PVC PIPE Yt' HOLES IN UNDERSIDE WA TER SURFACE FLDOBLE HOSE PVC VENT PIPE SCHEDULE 40 PVC PIPE L SCHEDULE 40 PVC PIPE ORIFICE PLATE PVC TEE BOTTOM SURFACE END VIEW SLIMMER SEDIMENT BASINS ARE NEEDED WHERE DRAINAGE AREAS ARE 100 LARGE FOR TEMPORARY TRAPS DO NOT LOCATE THE SKIMMER SEDIMENT BASIN IN INTERMITTENT OR PERENNIAL STREAMS ARM ASSEMBLY \ PERSPECTIVE VIEW FRONT VIEW "C" ENCLOSURE WATER MIRY UNIT SEE DENR STANDARDS & SPECS. FOR COMPLETE DESIGN CRITERIA & MAINTENANCE SKIMMER NOT TO SCALE J INSTALLATION 1. WHEN CLEARING THE LOCATION FOR THE DIVERSION, ONLY CLEAR ENOUGH ROOM FOR CONSTRUCTION AND MAINTENANCE EQUIPTMENT ACCESS. DO NOT CLEAR ANY ADDTIONAL AREA UNTIL ALL EROSION CONTROL DEVICES ARE IN PLACE 2. REMOVE ALL STUMPS, ROOTS AND OTHER DEBRIS AND DISPOSE OF THEM PROPERLY. 3. INSTALL DIVERSION AND COMPACT AS SHOWN IN DETAIL INSURE POSITIVE DRAINAGE DURING CONSTRUCTION OF BERM. MINIENANCE INSPECT TEMPORARY DIVERSIONS ONCE A WEEK AND AFTER EVERY RAINFALL IMMEDIATELY REMOVE SEDIMENT FROM THE FLOW AREA AND REPAIR THE DIVERSION RIDGE CAREFULLY CHECK OUTLETS AND MAKE TIMELY REPAIRS AS NEEDED. WHEN THE AREA PROTECTED IS PERMANENTLY STABUZED, REMOVE THE RIDGE AND THE CHANNEL TO BLEND WITH THE NATURAL GROUND LEVEL AND APPROPRIATELY STABUZE IT. COMPACTED SOIL 2' MIN. 18' MIN. FLOW -III-III-III-III-III-III-III-I I -III -III -III -III -I 1I- 6' TYPICAL TD TEMPORARY DIVERSION N TS TOP ELEVATION OF STORMWATER 15 WASHED STONE alleiw":21111 _I " IIII IIjIIIII�I a B RIP -RAP VARIES SIDE VIEW CONSTRUCTION NOTES: HEIGHT & WIDTH DETERMINED BY DOSING TOPOGRAPHY AND SEDIMENT STORAGE REQUIRED. KEY RIP RAP INTO THE DAM FOR STABUZA110N. FRONT VIEW STEP SEQUENCE NOTE REMOVE SEDIMENT ACCUMULATION FROM BEHIND CHECK DAMS TO PREVENT DAMAGE TO CHANNEL VEGETATION. FLOW SHOULD BE MAINTAINED THROUGH THE DAM. STANDARD CHECK DAM N TS J Vl CSD ENGINEERING LICENSE # C-2710 ENGINEERING LAND PLANNING COMMERCIAL / RESIDENTIAL P.O. BOX 1250 WENDELL, NC 27591 (910) 791-4441 EROSION It SEDIMENT CONTROL PLAN ESC PLAN DETAILS J Ccn CONSTRUCTION DRAWINGS FOR ,N vC A Ra 1 •`,,off/off % a� E 032721 q-:ate �U'y .tiG C I N E���,� ►►iiiiii12/2/20 PLAN NOT RELEASED FOR CONSTRUCTION >- m O I4J DATE:: 12/2/2020 HORZ SCALE: N/A DRAWN BY: JFO CHECKED BY: HSR TP TREE PROTECTION FENCE N TS PROJECT NO.: 18-0454 Sheet Sheet No. EC2.0 2 6 A FUTURE E.O. E.O.P. - - - - - - INLET PROTECTION SUMP LOCATION TEMP. EARTH SHOULDER BERM EARTH BERM DITCH BLOCK TEMP. SLOPE DRAIN INLET PROTECTION OPTION #1 EARTH BERM DITCH BLOCK ANCHOR STAKES TEMP. SHOULDER BERM DITCH 12" MIN. • • 12" • • NATURAL GROUND LINE MIN. EARTH BERM DITCH BLOCK TEMP. SHOULDER BERM DITCH -/ STAGE BUILDUP OF FILL NOTES 1_ L5' CLASS "B" STONE FOR a"�EROSION CONTROL ss�. LA TEMP. EARTH SHOULDER BERM ANCHOR STAKE EXTEND DRAIN AS REQUIRED TO COINCIDE WITH HEIGHT OF FINISHED EMBANKMENT • • MIN. NOTE: ANCHOR STAKES 30" LONG AND SET MINIMUM 12" DEEP. TEMPORARY SLOPE DRAIN SECTION A -A • ELBOW TEMP. EARTH SHOULDER BERM r___ 10' MAX. TEMPORARY SLOPE ANCHOR STAKE TOE OF FILL A FUTURE E.O.P. INLET PROTECTION TEMP. EARTH SHOULDER BERM DRAIN ANCHOR STAKE ELBOW CLASS "B" STONE FOR EROSION CONTROL. SEE NOTES. 1. OPEN END PIPE WITH SUMP AND MINIMUM SETBACK AND PROPER COMPACTION IS AN ACCEPTABLE INLET TREATMENT FOR STAGED CONSTRUCTION WHEN NOT LEFT IN PLACE FOR MORE THAN 30 DAYS. 2. AT INLETS A STANDARD T-SECTION MAY BE INSTALLED FOR MULTI -DIRECTION FLOW AND ELBOWS FOR SINGLE -DIRECTION FLOW AS DIRECTED. 3. EXTEND SLOPE DRAINS TO BOTTOM OF SLOPE, SEDIMENT BASINS AND EROSION CONTROL MEASURES. 4. USE CLASS B STONE FOR EROSION CONTROL AT OUTLET LOCATIONS. 5. USE MAXIMUM SLOPE DRAIN SPACING OF 200 FT MEASURED ALONG TOP OF SLOPE. INLET PROTECTION OPTION #2 TEMP. SLOPE DRAIN CLASS "B" STONE FOR o EROSION CONTROL o� gss�qr �o • LA FUTURE PAVEMENT EARTH BERM DITCH BLOCK FUTURE E.O.P SHOULDER POINT TEMP. EARTH SHOULDER BERM syo0 ,0FR ISOMETRIC VIEW OPTION #1 FILL MATERIAL TOE - OF FILL z CI) H } << H°CCx�v LLJ0_Hz 00rr CC z W < LI_ 1-06200 -.' 1 1i H c/) H CS CC 0 < z H cc ll o W ROADWAY STANDARD DRAWING FOR GUIDE FOR TEMPORARY BERMS AND SLOPE DRAIN SHEET 1 OF 1 1622.01 -L NOI1V11V1SNI 9NI11WW HOi JNIMVHG GHVONVIS HSI19N3 SHEET 1 OF 1 11631 .01 =III 11=III-= -I I1-1I1-1 STAPLE CHECK MATTING IN DITCHES IIHEHEIIIM lo" / A / / 4" , 1 30' H H 4' Staple % Check / T MATTING ON SLOPES _I_I I-111 18" (MIN.) BACKFILL MATTING SHALL BE PLACED IN TRENCH AND BACKFILLED EXISTING GROUND STAPLES ON 1' CENTERS IN TRENCH 6" MIN STAPLES ON 1' CENTERS IN TRENCH DIAGAv 6 X X N f X 3' Staple X X 3' X X DIAGAN NOTES: THIS DETAIL APPLIES TO STRAW, EXCELSIOR, AND PERMANENT SOIL REINFORCEMENT MAT (PSRM) INSTALLATION. STAPLES SHALL BE N0. 11 GAUGE STEEL WIRE FORMED INTO A "U" SHAPE WITH A MINIMUM THROAT WIDTH OF 1 INCH AND NOT LESS THAN 6 INCHES IN LENGTH. Staple Check Pattern 99 Staple 99 AGAM NOT TO SCALE r ENGLISH STANDARD DRAWING FOR INSTALLATION SHEET 1 OF 1 1631.01 SOIL STABILIZATION GUIDELINES SEEDBED PREPARATION 1. CHISEL COMPACTED AREAS AND SPREAD TOPSOIL THREE INCHES DEEP OVER ADVERSE SOIL CONDITIONS IF AVAILABLE 2 RIP THE EN71RE AREA TO SIX INCHES DEEP. 3. REMOVE ALL LOOSE ROCK, ROOTS AND OTHER OBSTRUCTIONS LEAVING SURFACE REASONABLY SMOOTH AND UNIFORM. 4. APPLY AGRICULTURAL LIME; FERTILIZER AND SUPER -PHOSPHATE UNIFORMLY AND MIX 1,11H SOIL (SEE MIXTURE BELOW). 5. CONTINUE TILLAGE UNTIL A HELL -PULVERIZED, FIRM, REASONABLY UNIFORM SEEDBED IS PREPARED FOUR TO SIX INCHES DEEP. 6. SEED ON A FRESHLY PREPARED SEEDBED AND COVER SEED LIGHTLY 1,11H SEEDING EQUIPMENT OR CUL11-PACK AFTER SEEDING. Z MULCH IMMEDIATELY AFTER SEEDING AND ANCHOR MULCH. 8. INSPECT ALL SEEDED AREAS AND MAKE NECESSARY REPAIRS OR RESEEDINGS WITHIN THE PLANTING SEASON, IF POSSIBLE IF STAND SHOULD BE MORE THAN 60X DAMAGED, RE-ESTABLISH FOLLOWING THE ORIGINAL LIME; FERTILIZER AND SEEDING RATES 9. CONSULT S&EC ENVIRONMENTAL ENGINEERS ON MAINTENANCE TREATMENT AND FERTILIZATION AFTER PERMANENT COVER IS ESTABLISHED. la CONSULT S&EC ENVIRONMENTAL ENGINEERS FOR ADDITIONAL INF0RMALION CONCERNING OTHER ALTERNATIVES FOR VEGETATION OF DENUDED AREAS. THE BELNV VEGETATION RATES ARE THOSE THAT DO WELL UNDER LOCAL CONDITIONS; OTHER SEEDING RATE COMBNALIONS ARE POSSIBLE MIXTURE AGRICULTURAL LIMESTONE FERTILIZER SUPERPHOSPHALE MULCH ANCHOR SEEDING SCHEDULE 2 TONS/ACRE (3 TONS/ACRE IN CLAY SOILS) 1,000 LBS/ACRE - 10-10-10 500 LBS/ACE - 20X ANALYSIS 2 TONS/ACRE - SMALL GRAIN STRAW ASPHALT EMULSION AT 300 GALS/ACRE FOR SHOULDERS SIDE DITCHES SLOPES (3:1 MAX): pA1E AUG 15-NOV 1 NOV 1-MAR 1 MAR 1-APR 15 APR 15-JUN 30 JUL 1-AUG 15 TYPE TALL FESCUE TALL FESCUE & ABRUZZI RYE TALL FESCUE HULLED COMMON BERMUDAGRASS TALL FESCUE AND BROWNTOP MILLET OR SORGHUM-SUDAN HYBRIDS*** FOR SHOULDERS SIDE DITCHES SLOPES (3:1 TO 2:1): STATE STORAGE = X CF PLANTING RATE 300 LBS/ACRE 300 LBS/ACRE 00 LBS/ACRE 25 LBS/ACRE 125 LBS/ACRE 35 LBS/ACRE 30 LBS/ACRE pA1E TYPE PLANTING RATE MAR 1-JUN 1 SERICEA LESPEDEZA (SCARIFIED) 50 LBS/ACRE AND USE THE FOLLOWING COMBINAfONS MAR 1-APR 15 ADD TALL FESCUE 120 LBS/ACRE MAR 1-JUN 30 OR ADD WEEPING LOW GRASS 10 LBS/ACRE MAR 1-JUN 30 OR ADD HULLED COMMON BERMUDAGRAS 25 LBS/ACRE JUN 1-SEPT 1 TALL FESCUE AND 120 LBS/ACRE BROWNTOP MULLET OR 35 LBS/ACRE SORGHUM-SUDAN HYBRIDS*** 30 LBS/ACRE SEPT 1-MAR 1 SERICEA LESPEDEZA (UNHULLED - UNSCARIFIED) AND 70 LBS/ACRE TALL FESCUE 120 LBS/ACRE NOV 1-MAR 1 AND ABRUZZI RYE 25 LBS/ACRE ***TEMPORARY RESEED ACCORDING TO OPTIMUM SEASON FOR DESIRED PERMANENT VEGETATION. DO NOT ALLOW TEMPORARY COVER TO GROW MORE THAN 12' IN HEIGHT BEFORE MOWING OTHERWISE FESCUE MAY BE SHADED OUT. FOR WELL -KEPT HIGH -VISIBILITY AREAS (INCLUDING BUT NOT UMILED TO DRY DETENTION BASINS LAWS AND/OR SIDEWALK BERMS: DAZE AUG 15-NOV 1 APR 15-JUN 30 TYPE CENIIPEDEGRASS HULLED COMMON BERMUDAGRASS PLANTING RATE 10-20 LBS/ACRE 25 LBS/ACRE SPRIGGING. PLANT SPRIGS IN FURROWS 1,11H A TRACTOR -DRAWN 1RANSPLANTOR, OR BROADCAST BY HAND. FURROWS SHOULD BE 4-6 INCHES DEEP AND 2 FEET APART. PLACE SPRIGS ABOUT 2 FEET APART IN THE ROW 1,11H ONE END AT OR ABOVE GROUND LEVEL BROADCAST AT RAZES SHOWN ABOVE; AND PRESS SPRIGS INTO THE TOP ONE-HALF TO 21NCHES OF SOIL W11H A DISK SET STRAIGHT SO THAT SPRIGS ARE NOT BROUGHT BACK TOWARD SURFACE DO NOT MULCH. FERTILIZE VERY SPARINGLY 1,11H 20 LBS/ACRE MIROGEIN IN SPRING W11H NO PHOSPHORUS SODDING IS ANOTHER OPI►ON. LEMPO?ARY SEEDING 1. COMPLETE GRADING BEFORE PREPARING SEEDBEDS AND INSTALL ALL NECESSARY EROSION CONTROL PRACTICES, SUCH AS DIKES WATERWAYS AND BASINS 2 MINIMIZE STEEP SLOPES BECAUSE THEY MAKE SEEDBED PREPARATION DIFFICULT AND INCREASE THE EROSION HAZARD. 3. IF SOLS BECOME COMPACTED DURING GRADING, LOOSEN THEM TO A DEPTH OF 6-8 INCHES USING A RIPPER, HARROW, OR CHISEL PLOW. SEEDBED PREPARA 11ON GOOD SEEDBED PREPARATION IS ESSENTIAL TO SUCCESSFUL PLANT ESTABLISHMENT. A GOOD SEEDBED IS WELL -PULVERIZED, LOOSE AND UNIFORM. WHERE HYDROSEEDING METHODS ARE USED, THE SURFACE MAY BE LEFT W11H A MORE IRREGULAR SURFACE OF LARGE CLODS AND STONES. 4. LIMING - APPLY LIME ACCORDING TO SOIL TEST RECOMMENDATIONS IF THE PH (ACIDITY) OF THE SOIL IS NOT KNOW, AN APPLICATION OF GROUND AGRICULTURAL LIMESTONE AT THE RAZE OF 1 TO 1 1/2 TONS/ACRE ON COARSE -TEXTURED SOILS AND 2-3 TONS/ACRES ON FINE -TEXTURED SOLS IS USUALLY SULTICIENT. APPLY LIMESTONE UNIFORMLY AND INCORPORATE INTO THE TOP 4-6 INCHES OF SOIL SOLS 1,11H A PH OF 6 OR HIGHER NEED NOT BE LIMED. 5. FERTILIZER- BASE APPLICATION RAZES ON SOIL TESTS WHEN THESE ARE NOT POSSIBLE APPLY A 10-10-10 GRADE FERTILIZER AT 700-L,000 LB./ACRE BOTH FERTILIZER AND LIME SHOULD BE INCRPORAIED INTO THE TOP 4-6 INCHES O- SOIL IF A HYDRAULIC SEEDER IS USED, DO NOT MIX SEED AND FERTILIZER MORE THAN 30 MINUTES BEFORE APPLICATION. 6. SURFACE ROUGHENING- IF RECENT TILLAGE OPERATIONS HAW RESULTED IN A LOOSE SURFACE ADDITIONAL ROUGHENING MAY NOT BE REQUIRED EXCEPT TO BREAK UP LARGE CLODS IF RAINFALL CAUSES THE SURFACE TO BECOME SEALED OR CRUSTED, LOOSEN IT JUST PRIOR TO SEEDING BY DISKING, RAKING HARROWING OR OTHER SUITABLE METHODS GROOVE OR FURROW SLOPES STEEPER THAN 3:1 ON THE CONTOUR BEFORE SEEDING (PRACTICE 6:03, SURFACE ROUGHENING). Z PLANT SELECTION SELECT AN APPROPRIATE SPECIES OR SPECIES MIXTURE FROM TABLE 6.10A, FOR SEEDING IN LAZE WWN1ER AND EARLY SPRING, TABLE 610B FOR SUMMER, AND TABLE 6.10C FOR FALL 8. SEEDING - EVENLY APPLY SEED USING A CYCLONE SEEDER (BROADCAST), DRILL, CULIIPACKER SEEDER, OR HYDROSEEDER. USE SEEDING RAZES GIVEN IN TABLE 6.10A-6.10C. BROADCAST SEEDING AND HYROSEEDING ARE APPROPRIATE FOR STEEP SLOPES WHERE EQUIPMENT CANNOT BE DRIVEN. HAND BROADCASTING IS NOT RECOMMENDED BECAUSE OF THE DIFFICULTY IN ACHIEVING A UNIFORM DISTRIBUTION. SMALL GRAINS SHOULD BE PLANTED NO MORE THAN 1 INCH DEEP, AND GRASSES AND LEGUMES NO MORE THAN 1/2 INCH BROADCAST SEED MUST BE COVERED BY RAKING OR CHAIN DRAGGNNG AND THEN LIGHTLY FIRMED W11H A ROLLER OR CULIIPACKER. HYDROSEEDED MIXTURES SHOULD INCLUDE A WOOD FIBER (CELLULOSE) MULCH. 9. MULCHING - THE USE OF APPROPRIATE MULCH WILL HELP ENSURE ESTABLISHMENT UNDER NORMAL CONDITIONS AND IS ESSENTIAL TO SEEDING SUCCESS UNDER HARSH SIZE CONDITION (PRACTICE 6.14, MULCHING). HARSH SIZE CONDITIONS INCLUDE SEEDING IN FALL FOR WINTER COVER (WOOD FIBER MULCHES ARE NOT CONSIDERED ADEQUATE FOR THIS USE); SLOPES SLEEPER THAN 3:1; EXCESSIVELY HOT OR DRY WEATHER; ADVERSE SOLS (SHALLOW, ROCKY, OR HIGH IN CLAY OR SAND); AND AREAS RECEIVING CONCENTRATED FLOW. IF THE AREA TO BE MULCHED IS SUBJECT TO CONCENTRATED WAIERFLOW, AS IN CHANNEL% ANCHOR MULCH WITH NETTING (PRACTICE 6.14, MULCHING). MAINTENANCE PLAN 1. ALL MEASURES ARE TO BE INSPECTED WEEKLY AND AFTER ANY RAINFALL; REPAIRS MADE IMMEDIATELY IF NECESSARY. 2. SEDIMENT IS TO BE REMOVED FROM SWALES AND DIVERSIONS WHEN THEY ARE APPROX. 50% FILLED OR WHEN SEDIMENT LEVEL IS WITHIN 1.0' OF TOP OF BANK. 3. SEDIMENT IS TO BE REMOVED FROM SILT FENCE AND INLET PROTEC11ON MEASURES WHEN 0.5' DEEP; FABRIC AND STONE TO BE REPAIRED AS NEEDED TO MAINTAIN A SEDIMENT BARRIER 4. SEEDED AREAS SHALL BE FERTILIZED, MULCHED, AND RE -SEEDED AS NECESSARY, ACCORDING TO THE SPECIFICA11ONS PROVIDED, TO MAINTAIN A SUITABLE VEGETA11VE COVER. 5. 1HE CONSTRUC11ON ENTRANCE SHALL BE MAINTAINED IN SUCH A MANNER AS TO PREVENT MUD OR SEDIMENT FROM LEAVING THE CONSIRUC11ON SITE; TOP DRESSING WITH 2-INCH STONE MAY BE REQUIRED. 6. IMMEDIATELY REMOVE SEDIMENT SPILLED, WASHED, OR TRACKED ONTO PUBLIC ROADWAYS. 7. INSPECT SKIMMER BASINS AS DIRECTED; REMOVE SEDIMENT FROM EN11RE BASIN AND RESTORE BASIN TO ORIGINAL DIMENSIONS WHEN SEDIMENT ACCUMULATES TO ONE-HALF THE BASIN DEPTH; INSPECT SKIMMER TO ENSURE IT IS PROPERLY FUNC110NING. 8. IF SKIMMER IS CLOGGED WITH TRASH, DISLODGE BY JERKING 1HE ROPE UP AND DOWN OR PULL SKIMMER TO SIDE OF BASIN AND REMOVE DEBRIS BY HAND; INSPECT ORIFICE. 9. REMOVE SEDIMENT FROM BEHIND BAFFLES ONCE ACCUMULA11ON HAS REACHED ONE-HALF 1HE HEIGHT OF 1HE FIRST BAFFLE REPLACE BAFFLES PROMPTLY IF THEY COLLAPSE, TEAR, DECOMPOSE, OR BECOME INEFFEC11 VE 10. INSPECT INLETS AS DIRECTED AND CLEAR MESH WIRE OF DEBRIS AND ACCUMULATED SEDIMENT; TAKE CARE NOT TO DAMAGE OR UNDERCUT 1HE WIRE MESH DURING SEDIMENT REMOVAL; REPLACE STONE AS NEEDED. 11. REFER TO MAINTENANCE SPECIFFCA11ONS AND REQUIREMENTS IN THE NORTH CAROLINA "EROSION AND SEDIMENT CONTROL PLANNING AND DESIGN MANUAL" STOCKPILE NOTES 1. A 25-FOOT TEMPORARY MAINTENANCE AND ACCESS EASEMENT SHALL BE MAINTAINED AROUND ALL PROPOSED STOCKPILES; EROSION CONTROL MEASURES SURROUNDING THE STOCKPILE SHALL BE SHOWN AT THE OUTER LIMIT OF THE EASEMENT. 2. STOCKPILE FOOTPRINTS SHALL BE SETBACK A MINIMUM OF 25' FROM ADJACENT PROPERTY LINES. 3. STOCKPILE HEIGHT SHALL NOT EXCEED 35 FEET. 4. STOCKPILE SLOPES SHALL BE 2:1 OR FLATTER. 5. APPROVED MEASURES SHALL BE USED TO CONTROL SEDIMENT LOSS FROM STOCKPILE. 6. STOCKPILING OF MATERIALS ADJACENT TO A CHANNEL, DRAINAGEWAY, WATERCOURSE, WETLAND, STREAM BUFFER, OR OTHER BODY OF WATER SHALL BE AVOIDED UNLESS AN AL TERNA 11 VE LOCA11ON IS DEMONSTRATED TO BE UNAVAILABLE. 7. ANY CONCENTRATED FLOW LIKELY TO AFFECT THE STOCKPILE SHALL BE DIVERTED TO AN APPROVED MEASURE. 8. OFF -SITE SPOIL OR BORROW AREAS MUST BE IN COMPLIANCE WITH JOHNSTON COUNTY ORDINANCES AND STATE REGULA110NS; ALL SPOIL AREAS OVER ONE ACRE ARE REQUIRED TO HAVE AN APPROVED SEDIMENT CONTROL PLAN. 1HE DEVELOPER/CONTRACTOR SHALL NOTIFY JOHNSTON COUNTY OF OFFSITE DISPOSAL OF SOIL PRIOR TO DISPOSAL FILL OF FEMA FLOODWAYS AND NON -ENCROACHMENT AREAS ARE PROHIB111ED EXCEPT AS OTHERWISE PROVIDED BY JOHNSTON COUNTY UNIFIED DEVELOPMENT ORDINANCE (CERI1FICA110NS AND PERMITS REQUIRED). 'SOIL STABILIZATION NOTES 1. SOIL STABILIZATION 11MEFRAMES: S11E AREA DESCRIPTION STABILIZATION 71MEFRAME EXCEPTIONS PERIMETER DIKE%SWALES DITCHES AND SLOPES 7 DAYS NONE HIGH QUALITY ZONES (HQW) 7 DAYS NONE SLOPES SLEEPER THAN 3:1 7 DAYS IF SLOPES ARE 10 FT OR LESS IN LENGTH AND ARE ARE NOT STEEPER THAN 2:1, 14 DAYS ARE ALLOWED SLOPES 3:1 OR FLATTER 14 DAYS 7 DAYS FOR SLOPES GREATER THAN 50 FT IN LENGIH ALL OTHER AREAS W11H SLOPES FLATTER THAN 4:1 14 DAYS NONE EXCEPT FOR PERIMETER AND HOW ZONES 2. DENUDED AREAS MUST BE STABILIZED WITHIN FIFTEEN (15) WORKING DAYS OF CEASE OF ANY PHASE OF AC11 VI TY. ALL SLOPES MUST BE STABILIZED WITHIN TWENTY-ONE (21) CALENDAR DAYS OF CEASE OF ANY PHASE OF AC1114TY. THIS INCLUDES SLOPES, SWALES, CHANNELS AND STOCKPILES 3. THIS PLAN IS TO BE U11L1ZED AND REVIEWED ONLY IN CONJUNC110N W11H 1HE WRITTEN NARRA11VE, WHICH IS AN INTEGRAL PART OF THIS EROSION AND SEDIMENT CONTROL PLAN. 4. ALL FINISHED SLOPES SHALL BE 3:1 OR FLATTER. 5. NO WETLANDS EXIST WITHIN LIMITS OF DISTURBANCE. 6. SEE STABILIZA 11ON GUIDELINES ON SHEET EC-. VJ CSD ENGINEERING LICENSE # C-2710 ENGINEERING LAND PLANNING COMMERCIAL / RESIDENTIAL P.O. BOX 1250 WENDELL, NC 27591 (910) 791-4441 EROSION & SEDIMENT CONTROL PLAN ESC PLAN DETAILS & SPECIFICA 11ONS J CONSTRUCTION DRAWINGS FOR ,77.77110 - E 032721 C �U'y .tiG C I N E�� ►►11111012/2/20 PLAN NOT RELEASED FOR CONSTRUCTION F- 0 >- m DATE:: 12/2/2020 HORZ SCALE: N/A DRAWN BY: JFO CHECKED BY: HSR PROJECT NO.: 18-0454 Sheet EC2.1 3 of 6 Sheet No. GROUND STABILIZATION AND MATERIALS HANDLING PRACTICES FOR COMPLIANCE WITH THE NCGO1 CONSTRUCTION GENERAL PERMIT Implementing the details and specifications on this plan sheet will result in the construction activity being considered compliant with the Ground Stabilization and Materials Handling sections of the NCGO1 Construction General Permit (Sections E and F, respectively). The permittee shall comply with the Erosion and Sediment Control plan approved by the delegated authority having jurisdiction. All details and specifications shown on this sheet may not apply depending on site conditions and the delegated authority having jurisdiction. SECTION E: GROUND STABILIZATION Required Ground Stabilization Timeframes Stabilize within this Site Area Description many calendar Timeframe variations days after ceasing land disturbance (a) Perimeter dikes, swales, ditches, and perimeter slopes 7 None (b) High Quality Water 7 None (HQW) Zones (c) Slopes steeper than If slopes are 10' or less in length and are 3:1 7 not steeper than 2:1, 14 days are allowed -7 days for slopes greater than 50' in length and with slopes steeper than 4:1 (d) Slopes 3:1 to 4:1 14 -7 days for perimeter dikes, swales, ditches, perimeter slopes and HQW Zones -10 days for Falls Lake Watershed (e) Areas with slopes -7 days for perimeter dikes, swales, ditches, perimeter slopes and HQW Zones flatter than 4:1 14 -10 days for Falls Lake Watershed unless there is zero slope Note: After the permanent cessation of construction activities, any areas with temporary ground stabilization shall be converted to permanent ground stabilization as soon as practicable but in no case longer than 90 calendar days after the last land disturbing activity. Temporary ground stabilization shall be maintained in a manner to render the surface stable against accelerated erosion until permanent ground stabilization is achieved. GROUND STABILIZATION SPECIFICATION Stabilize the ground sufficiently so that rain will not dislodge the soil. Use one of the techniques in the table below: Temporary Stabilization Permanent Stabilization • Temporary grass seed covered with straw or other mulches and tackifiers • Hydroseeding • Rolled erosion control products with or without temporary grass seed • Appropriately applied straw or other mulch • Plastic sheeting • Permanent grass seed covered with straw or other mulches and tackifiers • Geotextile fabrics such as permanent soil reinforcement matting • Hydroseeding • Shrubs or other permanent plantings covered with mulch • Uniform and evenly distributed ground cover sufficient to restrain erosion • Structural methods such as concrete, asphalt or retaining walls • Rolled erosion control products with grass seed POLYACRYLAMIDES (PAMS) AND FLOCCULANTS 1. Select flocculants that are appropriate for the soils being exposed during construction, selecting from the NC DWR List of Approved PAMS/Flocculants. 2. Apply flocculants at or before the inlets to Erosion and Sediment Control Measures. 3. Apply flocculants at the concentrations specified in the NC DWR List of Approved PAMS/Flocculants and in accordance with the manufacturer's instructions. 4. Provide ponding area for containment of treated Stormwater before discharging offsite. 5. Store flocculants in leak -proof containers that are kept under storm -resistant cover or surrounded by secondary containment structures. EQUIPMENT AND VEHICLE MAINTENANCE 1. Maintain vehicles and equipment to prevent discharge of fluids. 2. Provide drip pans under any stored equipment. 3. Identify leaks and repair as soon as feasible, or remove leaking equipment from the project. 4. Collect all spent fluids, store in separate containers and properly dispose as hazardous waste (recycle when possible). 5. Remove leaking vehicles and construction equipment from service until the problem has been corrected. 6. Bring used fuels, lubricants, coolants, hydraulic fluids and other petroleum products to a recycling or disposal center that handles these materials. LITTER, BUILDING MATERIAL AND LAND CLEARING WASTE 1. Never bury or burn waste. Place litter and debris in approved waste containers. 2. Provide a sufficient number and size of waste containers (e.g dumpster, trash receptacle) on site to contain construction and domestic wastes. 3. Locate waste containers at least 50 feet away from storm drain inlets and surface waters unless no other alternatives are reasonably available. 4. Locate waste containers on areas that do not receive substantial amounts of runoff from upland areas and does not drain directly to a storm drain, stream or wetland. 5. Cover waste containers at the end of each workday and before storm events or provide secondary containment. Repair or replace damaged waste containers. 6. Anchor all lightweight items in waste containers during times of high winds. 7. Empty waste containers as needed to prevent overflow. Clean up immediately if containers overflow. 8. Dispose waste off -site at an approved disposal facility. 9. On business days, clean up and dispose of waste in designated waste containers. PAINT AND OTHER LIQUID WASTE 1. Do not dump paint and other liquid waste into storm drains, streams or wetlands. 2. Locate paint washouts at least 50 feet away from storm drain inlets and surface waters unless no other alternatives are reasonably available. 3. Contain liquid wastes in a controlled area. 4. Containment must be labeled sized and placed appropriately for the needs of site. 5. Prevent the discharge of soaps, solvents, detergents and other liquid wastes from construction sites. PORTABLE TOILETS 1. Install portable toilets on level ground, at least 50 feet away from storm drains, streams or wetlands unless there is no alternative reasonably available. If 50 foot offset is not attainable, provide relocation of portable toilet behind silt fence or place on a gravel pad and surround with sand bags. 2. Provide staking or anchoring of portable toilets during periods of high winds or in high foot traffic areas. 3. Monitor portable toilets for leaking and properly dispose of any leaked material. Utilize a licensed sanitary waste hauler to remove leaking portable toilets and replace with properly operating unit. EARTHEN STOCKPILE MANAGEMENT 1. Show stockpile locations on plans. Locate earthen -material stockpile areas at least 50 feet away from storm drain inlets, sediment basins, perimeter sediment controls and surface waters unless it can be shown no other alternatives are reasonably available. 2. Protect stockpile with silt fence installed along toe of slope with a minimum offset of five feet from the toe of stockpile. 3. Provide stable stone access point when feasible. 4. Stabilize stockpile within the timeframes provided on this sheet and in accordance with the approved plan and any additional requirements. Soil stabilization is defined as vegetative, physical or chemical coverage techniques that will restrain accelerated erosion on disturbed soils for temporary or permanent control needs. NORTH CAROLI NA I/ Environmental Quality EADIRDADE MR/ OR DOPLER CLEARLY MAIM MODE vAOGur IOIYG EVICE WNW IS O I I Mak ONSITE CONCRETE WASHOUT STRUCTURE WITH LINER IR MARES . INIE A -A Imo L AC71 AL LOCATION DEM MER DI FIELD R. 11E fAlrri:1E imam, STECILMED OWL E MDEADED NEE DE LOOM NOM f E E/OED M 6 M OOCIIES CAPACITY. &WQTE VAEDYT SnweruE ODE TO E arAEY MAR® VIM D®YL HOMO REVEL I MOP./ OR STAPLER MODE E'VE'DL�� MW i. Kif AL LOCATION EIflY•ED N Fm.D L M COOKIE sao,T SIGCICED •V L E M5NTA0® WHEN TIE LMM NO/CI mM REAMS IDD OF TIE mDCIIDE0 CMACEY 19 PROVIDE ADEE AIE It wet rr mow% STRUCTURE Ism E CLDE IVA= WITH MIRE NOT= EV= BFI nW ORA . SHITIIT STRIICTIIac ABOVE GRAD 41 SHUT STRUCTURE CONCRETE WASHOUTS 1. Do not discharge concrete or cement slurry from the site. 2. Dispose of, or recycle settled, hardened concrete residue in accordance with local and state solid waste regulations and at an approved facility. 3. Manage washout from mortar mixers in accordance with the above item and in addition place the mixer and associated materials on impervious barrier and within lot perimeter silt fence. 4. Install temporary concrete washouts per local requirements, where applicable. If an alternate method or product is to be used, contact your approval authority for review and approval. If local standard details are not available, use one of the two types of temporary concrete washouts provided on this detail. 5. Do not use concrete washouts for dewatering or storing defective curb or sidewalk sections. Stormwater accumulated within the washout may not be pumped into or discharged to the storm drain system or receiving surface waters. Liquid waste must be pumped out and removed from project. 6. Locate washouts at (east 50 feet from storm drain inlets and surface waters unless it can be shown that no other alternatives are reasonably available. At a minimum, install protection of storm drain inlet(s) closest to the washout which could receive spills or overflow. 7. Locate washouts in an easily accessible area, on level ground and install a stone entrance pad in front of the washout. Additional controls may be required by the approving authority. 8. Install at least one sign directing concrete trucks to the washout within the project limits. Post signage on the washout itself to identify this location. 9. Remove leavings from the washout when at approximately 75% capacity to limit overflow events. Replace the tarp, sand bags or other temporary structural components when no longer functional. When utilizing alternative or proprietary products, follow manufacturer's instructions. 10. At the completion of the concrete work, remove remaining leavings and dispose of in an approved disposal facility. Fill pit, if applicable, and stabilize any disturbance caused by removal of washout. HERBICIDES, PESTICIDES AND RODENTICIDES 1. Store and apply herbicides, pesticides and rodenticides in accordance with label restrictions. 2. Store herbicides, pesticides and rodenticides in their original containers with the label, which lists directions for use, ingredients and first aid steps in case of accidental poisoning. 3. Do not store herbicides, pesticides and rodenticides in areas where flooding is possible or where they may spill or leak into wells, stormwater drains, ground water or surface water. If a spill occurs, clean area immediately. 4. Do not stockpile these materials onsite. HAZARDOUS AND TOXIC WASTE 1. Create designated hazardous waste collection areas on -site. 2. Place hazardous waste containers under cover or in secondary containment. 3. Do not store hazardous chemicals, drums or bagged materials directly on the ground. NCGO1 GROUND STABILIZATION AND MATERIALS HANDLING EFFECTIVE: 04/01/19 SELF -INSPECTION, SECTION A: SELF -INSPECTION PART III RECORDKEEPING AND REPORTING normal business hours in accordance with the table site conditions would cause the safety inspection the ins ection may be delayed until the next business day on In addition, when a storm event of equal to or of normal business hours, the self -inspection shall be of the next business day. Any time when inspections Inspection Record. Self -inspections are required during below. When adverse weather or personnel to be in jeopardy, the inspection which it is safe to perform the inspection. greater than 1.0 inch occurs outside performed upon the commencement were delayed shall be noted in the Inspect Frequency (during normal business hours) Inspection records must include: (1) Rain gauge maintained in good working order Daily Daily rainfall amounts. If no daily rain gauge observations are made during weekend or holiday periods, and no individual -day rainfall information is available, record the cumulative rain measurement for those un- attended days (anc this will determine if a site inspection is needed). Days on which no rainfall occurred shall be recorded as "zero." The permittee may use another rain -monitoring device approved by the Division. (2) E&SC Measures At least once per 7 calendar days and within 24 hours of a rain event > 1.0 inch in 24 hours 1. Identification of the measures inspected, 2. Date and time of the inspection, 3. Name of the person performing the inspection, 4. Indication of whether the measures were operating properly, 5. Description of maintenance needs for the measure, 6. Description, evidence, and date of corrective actions taken. (3) Stormwater discharge outfalls (SDCs) At least once per 7 calendar days and within 24 hours of a rain event > 1.0 inch in 24 hours 1. Identification of the discharge outfalls inspected, 2. Date and time of the inspection, 3. Name of the person performing the inspection, 4. Evidence of indicators of stormwater pollution such as oil sheen, floating or suspended solids or discoloration, 5. Indication of visible sediment leaving the site, 6. Description, evidence, and date of corrective actions taken. (4) Perimeter of site At least once per 7 calendar days and within 24 hours of a rain event > 1.0 inch in 24 hours If visible sedimentation is found outside site limits, then a record of the following shall be made: 1. Actions taken to clean up or stabilize the sediment that has left the site limits, 2. Description, evidence, and date of corrective actions taken, and 3. An explanation as to the actions taken to control future releases. (5) Streams or wetlands onsite or offsite (where accessible) At least once per 7 calendar days and within 24 hours of a rain event > 1.0 inch in 24 hours If the stream or wetland has increased visible sedimentation or a stream has visible increased turbidity from the construction activity, then a record of the following shall be made: 1. Description, evidence and date of corrective actions taken, and 2. Records of the required reports to the appropriate Division Regional Office per Part III, Section C, Item (2)(a) of this permit. (6) Ground stabilization measures After each phase of grading 1. The phase of grading (installation of perimeter E&SC measures, clearing and grubbing, installation of storm drainage facilities, completion of all land -disturbing activity, construction or redevelopment, permanent ground cover). 2. Documentation that the required ground stabilization measures have been provided within the required timeframe or an assurance that they will be provided as soon as possible. NOTE: The rain inspection resets the required 7 calendar day inspection requirement. SELF -INSPECTION, RECORDKEEPING SECTION B: RECORDKEEPING PART III AND REPORTING deviation shall be kept on the site. The throughout the coverage under this permit. plan shall be kept on site and available for hours. 1. 2. 3. E&SC Plan Documentation The approved E&SC plan as well as any approved approved E&SC plan must be kept up-to-date The following items pertaining to the E&SC inspection at all times during normal business Item to Document Documentation Requirements (a) Each E&SC measure has been installed and does not significantly deviate from the locations, dimensions and relative elevations shown on the approved E&SC plan. Initial and date each E&SC measure on a copy of the approved E&SC plan or complete, date and sign an inspection report that lists each E&SC measure shown on the approved E&SC plan. This documentation is required upon the initial installation of the E&SC measures or if the E&SC measures are modified after initial installation. (b) A phase of grading has been completed. Initial and date a copy of the approved E&SC plan or complete, date and sign an inspection report to indicate completion of the construction phase. (c) Ground cover is located and installed in accordance with the approved E&SC plan. Initial and date a copy of the approved E&SC plan or complete, date and sign an inspection report to indicate compliance with approved ground cover specifications. (d) The maintenance and repair requirements for all E&SC measures have been performed. Complete, date and sign an inspection report. (e) Corrective actions have been taken to E&SC measures. Initial and date a copy of the approved E&SC plan or complete, date and sign an inspection report to indicate the completion of the corrective action. Additional Documentation to be Kept on Site In addition to the E&SC plan documents above, the following items shall be kept on the site and available for inspectors at all times during normal business hours, unless the Division provides a site -specific exemption based on unique site conditions that make this requirement not practical: (a) This General Permit as well as the Certificate of Coverage, after it is received. (b) Records of inspections made during the previous twelve months. The permittee shall record the required observations on the Inspection Record Form provided by the Division or a similar inspection form that includes all the required elements. Use of electronically -available records in lieu of the required paper copies will be allowed if shown to provide equal access and utility as the hard -copy records. Documentation to be Retained for Three Years All data used to complete the e-NOI and all inspection records shall be maintained for a period of three years after project completion and made available upon request. [40 CFR 122.41] PART II, SECTION G, ITEM (4) DRAW DOWN OF SEDIMENT BASINS FOR MAINTENANCE OR CLOSE OUT Sediment basins and traps that receive runoff from drainage areas of one acre or more shall use outlet structures that withdraw water from the surface when these devices need to be drawn down for maintenance or close out unless this is infeasible. The circumstances in which it is not feasible to withdraw water from the surface shall be rare (for example, times with extended cold weather). Non -surface withdrawals from sediment basins shall be allowed only when all of the following criteria have been met: (a) The E&SC plan authority has been provided with documentation of the non -surface withdrawal and the specific time periods or conditions in which it will occur. The non -surface withdrawal shall not commence until the E&SC plan authority has approved these items, (b) The non -surface withdrawal has been reported as an anticipated bypass in accordance with Part III, Section C, Item (2)(c) and (d) of this permit, (c) Dewatering discharges are treated with controls to minimize discharges of pollutants from stormwater that is removed from the sediment basin. Examples of appropriate controls include properly sited, designed and maintained dewatering tanks, weir tanks, and filtration systems, (d) Vegetated, upland areas of the sites or a properly designed stone pad is used to the extent feasible at the outlet of the dewatering treatment devices described in Item (c) above, (e) Velocity dissipation devices such as check dams, sediment traps, and riprap are provided at the discharge points of all dewatering devices, and (f) Sediment removed from the dewatering treatment devices described in Item (c) above is disposed of in a manner that does not cause deposition of sediment into waters of the United States. PART III SELF -INSPECTION, RECORDKEEPING AND REPORTING SECTION C: REPORTING 1. Occurrences that Must be Reported Permittees shall report the following occurrences: (a) Visible sediment deposition in a stream or wetland. (b) Oil spills if: • They are 25 gallons or more, • They are less than 25 gallons but cannot be cleaned up within 24 hours, • They cause sheen on surface waters (regardless of volume), or • They are within 100 feet of surface waters (regardless of volume). (c) Releases of hazardous substances in excess of reportable quantities under Section 311 of the Clean Water Act (Ref: 40 CFR 110.3 and 40 CFR 117.3) or Section 102 of CERCLA (Ref: 40 CFR 302.4) or G.S. 143-215.85. (d) Anticipated bypasses and unanticipated bypasses. (e) Noncompliance with the conditions of this permit that may endanger health or the environment. 2. Reporting Timeframes and Other Requirements After a permittee becomes aware of an occurrence that must be reported, he shall contact the appropriate Division regional office within the timeframes and in accordance with the other requirements listed below. Occurrences outside normal business hours may also be reported to the Department's Environmental Emergency Center personnel at (800) 858-0368. Occurrence Reporting Timeframes (After Discovery) and Other Requirements (a) Visible sediment deposition in a stream or wetland • Within 24 hours, an oral or electronic notification. • Within 7 calendar days, a report that contains a description of the sediment and actions taken to address the cause of the deposition. Division staff may waive the requirement for a written report on a case -by -case basis. • If the stream is named on the NC 303(d) list as impaired for sediment - related causes, the permittee may be required to perform additional monitoring, inspections or apply more stringent practices if staff determine that additional requirements are needed to assure compliance with the federal or state impaired -waters conditions. (b) Oil spills and release of hazardous substances per Item 1(b)-(c) above • Within 24 hours, an oral or electronic notification. The notification shall include information about the date, time, nature, volume and location of the spill cr release. (c) Anticipated bypasses [40 CFR 122.41(m)(3)] • A report at least ten days before the date of the bypass, if possible. The report shall include an evaluation of the anticipated quality and effect of the bypass. (d) Unanticipated bypasses [40 CFR 122.41(m)(3)] • Within 24 hours, an oral or electronic notification. • Within 7 calendar days, a report that includes an evaluation of the quality and effect of the bypass. (e) Noncompliance with the conditions of this permit that may endanger health or the environment[40 CFR 122.41(I)(7)] • Within 24 hours, an oral or electronic notification. • Within 7 calendar days, a report that contains a description of the noncompliance, and its causes; the period of noncompliance, including exact dates and times, and if the noncompliance has not been corrected, the anticipated time noncompliance is expected to continue; and steps taken or planned to reduce, eliminate, and prevent reoccurrence of the noncompliance. [40 CFR 122.41(1)(6). • Division staff may waive the requirement for a written report on a case -by -case basis. r,= `y NORTH CAROLINA 1; Environmental Quality VJ CSD ENGINEERING LICENSE # C-2710 ENGINEERING LAND PLANNING COMMERCIAL / RESIDENTIAL P.O. BOX 1250 WENDELL, NC 27591 (910) 791-4441 EROSION & SEDIMENT CONTROL PLAN NCGO1 DETAILS & SPECIFICA 110NS CONSTRUCTION DRAWINGS FOR 02. Li 1Z *" CAR VI - EA 032721 ►►111111 12/2/20 PLAN NOT RELEASED FOR CONSTRUCTION ME >- m co Oc ZE Lu Oc DATE:: 12/2/2020 HORZ SCALE: N/A DRAWN BY: JFO CHECKED BY: HSR PROJECT NO.: 18-0454 NCGO1 SELF -INSPECTION, RECORDKEEPING AND REPORTING EFFECTIVE: 04/01/19 Sheet Sheet No. EC2.2 4 OF 6 ESC PLAN LEGEND re e (Apoop --- (2) EXISTING BOUNDARY LMI115 OF CONS1RUcnaV/ DISTURBANCE £XIS11NG CULVERT C WS1RUC11ON ENTRANCE SJL T MICE/SILT MICE CUTLET TREE PROTECTION FENCE PROPOSED CULVERT WATTLE STANDARD ROCK CHECK DAM SEDIMENT BASIN SKIMMER BAFFLES ROCK INLET PROTECTION ROCK PIPE INLET PROTEC1ION TEMP. DIVERSION TEMP. CLEAN-WA1ER DIVERSION TEMP. EC MATTING PERMANENT S121L REINFORCEMENT MATTING TEMP. SLOPE DRAIN J i / 50' RIPARIAN BUFFER LIMITS / EXIS11NG PROPERTY BOUNfiAR 7 / / / / / / / / 50' RIPARIAN BUFFER LIMITS / SKIM R BASIN 3 WIDTH = 50 L NGTH = 100.0 FT DEPTH 2.0 FT WEIR GTH — 13 FT SKIM RSIZ'=2.5IN SKIMMER 0r FICE = 1.8 IN EXIS11NG PROPERTY BOUNDARY 290 / / SKIMMER BASIN 1 WIDTH = 83. LENGTH = 6.0 FT DEPTH —2.OFT WEI LENGTH = 8 FT SKIMMER SIZE = 3IN SKIMMER ORIFICE = 2.9 1N 60 30 0 60 120 180 SCALE IN FEET: 1"= 60' 1 Vl CSD ENGINEERING LICENSE # C-2710 ENGINEERING LAND PLANNING COMMERCIAL / RESIDENTIAL P.O. BOX 1250 WENDELL, NC 27591 (910) 791-4441 EROSION & SEDIMENT CONTROL PLAN ESC PLAN (1) - POND 2 & NEXT PHASE J CONSTRUCTION DRAWINGS FOR N N ULo Lo z oo z O z CARa1 • 032721 coC G I N � I �t�� 0 G ,,,,, H� 12/2/20 PLAN NOT RELEASED FOR CONSTRUCTION 0 >- m 1 DA TE: 12/2/2020 HORZ SCALE: 1” = 60' DRA WN B Y. JFO CHECKED BY: HSR PROJECT NO.: 18-0454 Sheet EC3.0 Sheet No. 5 OF 6 RIM 264.80 INV. IN 261.80 (E - 18") INV. IN 261.80 (NW - 24") 261.80 (S - 24"), RIM 267.00 INV. OUT 262.60 (SE - 24") RIM 264.80 INV. IN 260.40 (N - 24') INV. IN 260.40 (SE - 18") INV. OUT 260.40 (W - 30") PROPOSED WET POND 2 1" = 40' r VARIES 10' VARIES 6' EMBANKMENT TOP= 265.0 (COMPACTED) amjamj\� EMERGENCY SPILLWAY = 264.0 78LF 18" R.C.PIPE INV = 247 PIPE DIAPHRAGM (AS RECOMMENDED BY S11E GEOTECHNICAL ENGINEER) VARIES INV =2554 36' LOP OF GRAZE (WEIR) = 262.5 NWSEL = 259.0 12' 72' \-\\\ \\ BOTTOM EL - EXISI1N \/ \r BOTTOM OF 6:1 SHELF = 259.0 PE DIAPHRAGM BOTTOM EL = 255 +/- BOTTOM SWM CONTROL STRUCTURE EL = 252.9 EL-259.0 STONE 1.5'mn. 5FT ALL SLOPES 2:1 MAXIMUM BELOW WATER SURFACE 10 FT FOREBAY VOLUME OF REQUIRED STORAGE; TYPICAL 1 3 FT (MIN.) NON WOVEN FLIER FABRIC UNDER STONE pIPE SEDIMENT CLEANOUT BOTTOM = 254 ELEV. = 257 OUTLET PROIECION AS ON PLANS EMBANKMENT & FOREBAY SECTION DETAIL NOT TO SCALE 100YR WSEL = 264.4 25YR WSEL = 263.5 10YR WSEL = 2628 1YR WSEL = 261.2 pNORMAL POOL WSEL = 259.0 J �ESC PLAN LEGEND CE SF)( x TP 0-p (2) EMYISING BOUNDARY LIMITS OF CONS1RUCHON/ DIS1URBANCE E.k1SING CULVERT 'ONS1RUc11AN E1VIRANCE SILT fENCE/SYLT fENCE OUTLET TREE PR0IECNON MICE PROPOSED CULVERT WATTLE STANDARD ROCK CHECK DAM SEDIMENT BASIN SOAR BAFFLES ROCK INLET PR01EC11AN ROCK PIPE INLET PRO1ECHON 1EMP. DIVERSION 1EMP. CLEAN-WA1ER DIVERSION 1EMP. EC MATTING PERMANENT SOIL REINIFOROEMENT MATING 1EMP. SLOPE DRAIN r J FABRICATED GRATE TOP 4'' -n 11 - n - 4" 4" 4" -WEIR - :CUT : =1- 4 4" X FT X FT WELDED BARS, GALVANIZED, OR EQUIVALENT FABRICATED GRATE TOP DETAIL NOT TO SCALE f 100 FT 1 TOP OF EMBANKMENT ELEVAION = 265.0 ARICULATED BLOCK OUTSIDE OF PATH EMERGENCY SPILL WA Y FRONT VIEW - POND NOT TO SCALE "WET POND NOTES 1. PORTABLE PUMP TO BE USED TO DRAIN POND DURING CONSTRUCTION. PUMP TO BE PLACED ON TOP OF BERM WITH SCREEN ATTACHED TO HOSE INLET AND COVERED WITH STONE. HOSE OUTLET TO DRAIN SPECIAL STILLING BASIN AS SHOWN ON PLANS. 2. PIPE FILTER DIAPHRAGM AND PIPE CRADLE FOR POND OUTLET PIPE SHALL BE UTILIZED IN LIEU OF SEEP COLLAR; TO BE DESIGNED AND SPECIFIED BY GEOTECHNICAL ENGINEER. 3. POND SIDESLOPES TO BE PERMANENTLY STABILIZED WITH TURF GRASS. 4. BASIN TO BE RECORDED IN A DRAINAGE EASEMENT. 5. TEMPORARY EROSION CONTROL MAT71NG TO BE PLACED ON ALL SLOPES. 6. BASIN TO BE SKIMMER BASIN DURING CONSTRUCTION. EROSION CONTROL NOTES 1. SEE SHEET C2.1 FOR SOIL STABILIZATION 11ME FRAMES AND SOIL STABILIZATION GUIDELINES 2. UPON INSTALLATION OF CLEAN WATER DIVERSIONS, THE EXCAVATED MATERIAL SHALL BE IMMEDIATELY STABILIZED WITH TEMPORARY EROSION CONTROL MATTING. 3. UPON INSTALLATION OF TEMPORARY DIVERSIONS, THE EXCAVATED MATERIAL SHALL BE STABILIZED WITH STRAW NETTING AS SPECIFIED FOR NORTH AMERICAN GREEN S150 EROSION CONTROL BLANKET OR EQUIVALENT ROLLED EROSION CONTROL PRODUCT. 4. UPON REACHING FINAL GRADE FOR PERMANENT SWALES/CHANNELS, STABILIZE PER PERMANENT SEEDING & MULCHING GUIDELINES AND LINE WITH TEMPORARY MA171NG AS SPECIFIED FOR NORTH AMERICAN GREEN S150 EROSION CONTROL BLANKET OR EQUIVALENT ROLLED EROSION CONTROL PRODUCT. J NO1E& 1. TEMPORARY SKIMMER TO BE INSTALLED ON PRIMARY OUTLET STRUCTURE BOX AND TO REMAIN IN PLACE UN71L SITE IS PERMANENTLY STABILIZED PER NCDEQ/LQS SEDIMENTA710N AND EROSION CONTROL PERMIT. SEE SKIMMER DETAILS FOR INSTALLA710N. 2. RIP RAP TO BE PLACED AROUND THE PERIMETER OF OUTLET BOXES 3. 6 FT x 6 FT PRECAST CONCRETE BOXES OR EQUIVALENT HAND -BUILT. 4' FAIRCLOTH SKIMMER OR EQUAL ORIFICE DIA. = 3.7" C_ 4" PVC SCREW PLUG 4" ORIFICE ASSEMBLY 4" TEE SKIMMER CONNEC110N TO BE CAPPED ONCE SKIMMER IS REMOVED 4' CAP TO REMAIN UNTIL SKIMMER IS REMOVED. THEN DRILL 3' HOLE IN CAP 12" TOP OF STONE = 255' TOP OF BOX AT BACK OF BOX EL= 263.5 EL= 262.5 °°CA19 EL= 253.4 RECTANGULAR ORIFICE IN RISER 6 SMOOTH STONE (D50=9') W/ NONWOVEN FILTER FABRIC (TO SURROUND EN71RE OUTLET STRUCTURE) 24' RCP OUTLET PIPE 6"BASE EL = 2529 f POND OUTLET STRUCTURE DETAILS •eltittft bv./a�i■iiiiiiie�I � E■■■■■■■■■ � I��iiiiiiiiii /a -J■■■■■■■■■■� - ■■■■■■■■■■: �� ■■■■■■■■■■ A. ��■■■■■■■ ,. APO Oilieli•O NENNEN &MA 4.0' ORIFICE ASSEMBLY Vl CSD ENGINEERING LICENSE # C-2710 ENGINEERING LAND PLANNING COMMERCIAL / RESIDENTIAL P.O. BOX 1250 WENDELL, NC 27591 (910) 791-4441 EROSION It SEDIMENT CONTROL PLAN POND 2 CONSTRUCTION DETAILS 1 CONSTRUCTION DRAWINGS FOR **0. vC A Ra l E 032721 �U'y .tiG CO C I N E.. ►►������ 2/2/20 PLAN NOT RELEASED FOR CONSTRUCTION F- 0 co cc W O W DATE:: 12/2/2020 HORZ SCALE: 1” = 40' DRAWN BY: JFO CHECKED BY: HSR PROJECT NO.: 18-0454 Sheet EC4" 0 NOT TO SCALE J Sheet No. 6 OF 6