HomeMy WebLinkAbout20201842 Ver 2_Cleveland Bluffs Stream Restoration Plan V1 with attachments_20210405Cleveland Bluffs
Stream Restoration Plan
Requested By:
KG Plaza, LLC
Mr. Jack Carlisle & Mr. Fields Carlisle
8620 River Road
Wilmington, NC 28412
Prepared By:
Southern Environmental Group, jnc.
5315 South College Road, Suite E
Wilmington, NC 28412
910.452.2711
Date:
December 23, 2020
Cleveland Bluff's Stream Restoration Plan
5 LG'
I. Introduction
KG Plaza LLC seeks to restore 456 linear feet of an unnamed tributary to Middle Creek in the Neuse
River Watershed, in Johnston County, North Carolina. The unnamed tributary (UT 1) was piped as part
of ongoing development activities. This Restoration Plan has been composed to address the North
Carolina Division of Water Resources (NCDWR) concerns outlined in their Notice of Violation dated
June 24, 2019. This document will summarize the history of UT 1, pre- and post -disturbance site
conditions, and the proposed Restoration Plan.
II. Location
The site is located within the Cleveland Bluffs subdivision, located south of the intersection of
Cornwallis Road and Cleveland Road, near Garner, NC (see Attachment 1 — Vicinity Map). UT 1 is
located along the west side of the clubhouse and north of an existing pond. It is in the Neuse River
Basin, and the Upper Neuse subbasin. The 8-digit HUC is 03020201. This site is not located within a
Neuse River Basin Targeted Local Watershed. The USGS Edmondson quad was utilized for this
document (see Attachment 2 — USGS Topo Map).
III. Watershed Data
The general watershed area of Middle Creek is comprised of single-family subdivisions and agricultural
land. According to the USGS tool StreamStats, UT 1 has a drainage area of 20 acres (0.0313 sq. mi.)
(see Attachment 3 — Drainage Area Map). The watershed consists of a portion of the Cleveland
Elementary School, Cornwallis Road, some wooded areas, rural pasture, and meadow.
IV. Existing Site Conditions
A. Pre -development Conditions
Historically, the entire area of the subdivision was agricultural land. UT 1 was likely channelized
to maintain good farm drainage pre-1950. Cleveland Elementary, constructed in approximately
2004, lies to the northeast of UT 1. It appears that most of the stormwater generated from
impervious surfaces on this property is collected via stormwater inlets and piped directly into the
channelized feature upstream of UT 1. Most recently, UT 1 was part of a residential parcel, that
contained a single mobile home. There was a cultivated field along the west side of UT 1 up until
2015, and a smaller cultivated field on the east side of UT 1, north of the mobile home until 2015.
A soil road provided access from Cornwallis Road, which had a culverted crossing over the
unnamed tributary. There was also a culverted crossing downstream, at the point that UT 1 enters
the existing pond. UT 1 was a relatively straight channel, with, at best, intermittent flow, based on
in -person observations. The feature did not have any benching or steep banks and was regularly
mowed by the landowner. The lower third of this channel had been possibly excavated and
impounded sometime after 2006, based on Google Earth imagery (see Attachment 4 — 2014 Google
Earth Aerial). On April 24, 2015, Johnston County made a sitewide Neuse River Buffer
Determination. UT 1 (Feature B on Buffer Call) was determined to be "not subject" to the Johnson
County Neuse River Buffer Ordinance. (see Attachment 5 — Neuse River Buffer Call).
No N.C. Stream Assessment Method (NCSAM) forms were completed before UT 1 was piped.
However, based on available historical aerial imagery, extensive experience, and observations of
similar drain -ways, it is likely that UT 1 would score as a low -quality stream in both ratings classes
(USACE and NCDWR). Based on these ratings, UT 1 seemed to only serve as a low functioning
conduit for upstream stormwater to quickly move through the channel and enter the existing pond.
This rapid movement through the system would have provided little uplift or value to downstream
water quality.
2
Cleveland Bluff's Stream Restoration Plan
5LGi
B. Current Conditions
The upstream off -site reach of UT 1 could be classified as a channelized headwater stream. The
culvert at the upstream end of UT 1 was moved as part of installation of an asphalt pedestrian
walking trail to serve the subdivisions residents. UT 1 was then piped down to an existing pond.
The site was then graded and stabilized with grasses and is mowed and maintained as green space.
C. Soils
According to the Soil Survey of Johnston County, UT 1 is mapped as Cowarts loamy sand, 2 to 6
percent slopes. This well drained soil was formed on ridges on marine terraces and is comprised of
loamy and sandy marine deposits.
D. Existing Plant Communities
The site is currently regularly mowed and maintained as green space for the subdivision.
E. Threatened and Endangered Species
According to N.C. Natural Heritage Program, there are no element occurrences within UT 1.
V. Restoration Plan
To restore UT 1 to its previous condition, the existing pipe will be removed, and the channel restored
in its original footprint ( see Attachment 6 —Post-Development Impacts to Stream and Wetlands and
Proposed Mitigation, Restoration of Channel). The lower third of UT 1 was a pond pre -impact but will
be restored to a continues channel down to the culvert under the amenities access road which flows to
the exiting pond resulting in approximately 456' of stream channel.
The basic stream design includes a 3' channel bottom, slightly larger than the average width of the
original bottom which will reduce the velocity and allow longer water retention within the stream bed.
The channel bottom will be on a 1.43% grade or slope, similar to the original channel. The banks of the
channel are designed to be on a 3:1 slope. The stream banks will be lined with coir matting anchored
in place and overseeded. Based on velocity calculations, seeding the coir matted banks with Class C or
D vegetation will meet 2-year and 10-year events. The site will be stabilized with the appropriate
wetland seed mix and a variety of non -wetland seed higher on the banks and adjacent to the channel.
Additionally, the headwater of this tributary is comprised of mature tree and shrub species, which will
also provide a seed source for volunteer site appropriate species over time. Please see Attachment 6 for
stream design drawings and Channel Analysis Worksheet.
The construction sequence would include removal of the pipe and stabilizing the channel in one event.
During this time, sediment and erosion control measures will be utilized to prevent sediment discharge
into downstream waters. While we would hope this can be accomplished in 2 weeks, it will be weather
dependent and may take longer in adverse conditions.
To start the restoration, process the restoration plan does require the approval of NC DWR and the
USACE. This restoration plan will be included in a Nationwide Permit request scheduled to be
submitted between January 3, 2021 and January 12, 2021. We anticipate working with the agencies
following that submittal to finalize any comments and requested modifications to the design as quickly
as possible and hope to receive approval in January or February of 2021. Once we have received
approval to begin the restoration process, work will begin as soon as possibly but with some
consideration of the growing season and germination requirements of the approved seed mix. We would
3
Cleveland Bluff's Stream Restoration Plan
5L&
propose an approximate start date of March 15tI and approximate completion by April 15tI`. We do
realize that we have 120 days from the approval date to complete the restoration process and will adjust
our timeline accordingly to meet the agreed upon deadline.
VI. Monitoring Plan
The monitoring plan for the site will follow the guidance outlined in the U.S. Army Corps of Engineers
— Wilmington District Public Notice: Notification of Issuance of Guidance for Compensatory Stream
and Wetland Mitigation Conducted for Wilmington District (October 24, 2016). Monitoring data
collected on the site will include photos, plant survival analyses, and channel stability analyses.
Monitoring will take place for a period of 5 years, unless the NCDWR and USACE agrees the site has
met the success criteria and monitoring can be stopped. Early completion of monitoring will only be
provided through written approval from the NCDWR and USACE. Annual monitoring reports will be
submitted to these agencies no later than November 30 of each monitoring year.
A. Stream Monitoring
Stream monitoring and reports will include monitoring of the vegetative, hydrologic, and
geomorphic functions of the restored channel. Channel stability will be assessed yearly, to track
performance of the restoration work. Visual inspection to assess hydrologic regime will be
conducted at each monitoring event, to include assessment of channel establishment and migration,
overbank events, and ordinary high-water indicators. Vegetation will be monitored for health and
vigor, to include documentation of the need for additional plantings as necessary to maintain
channel stability. Visual monitoring will be conducted by traversing the entire mitigation site to
identify and document areas of poor plant vigor, areas dominated by undesirable volunteer species,
prolonged inundation, native and exotic invasive species, or other areas of concern.
B. Success Criteria
Succuss criteria for UT 1 will be accomplished after the following parameters are met.
1. Bank stabilization — 80% of the stream bank is observed to be stable, with no signs of ongoing
erosion (bank rilling or head cutting).
2. Vegetation — The site will be assessed for overall percentage of vegetation coverage, with the
total length of buffer breaks (areas lacking vegetation >10 feet wide) at less than 25% of total
length of UT 1.
4
Cleveland Bluff's Stream Restoration Plan
5r Gi
Attachment 1
Location Map
5
Southfort D
N
,rvrme/ all Rd
4
ocs
s
co
Stream Restoration Project Area
HUC - Middle Creek
et
F•
olrnoralc"
0
U
0302020109
cic
Ge
Pa PuOdenl9
In
3
3
0
0
0 0.1250.25 0.5 0.75
1 inch = 1 miles
Map Source: ESRI Street Maps
Miles
Vicinity Map
Cleveland Bluffs Stream Restoration
Clayton, Johnston Co., N.C.
12/18/2020 019-115.01
Cleveland Bluff's Stream Restoration Plan
5r Gi
Attachment 2
USGS Topo Map
6
Stream Restoration Project Area
0 200 400 800 1,200 1,600
Feet
1 inch = 800 feet
Map Source: USGS TopoView Service,
2016 Edmondson panel, 7.5' quad, 1:24k scale
USGS Topo Map
Cleveland Bluffs Stream Restoration
Clayton, Johnston Co., N.C.
12/18/2020 019-115.01
Cleveland Bluff's Stream Restoration Plan
5r Gi
Attachment 3
Drainage Area Map
7
Stream Restoration Project Area
StreamStats Watershed Area
r1 HI 1C - Mir1r1Ia Crank
0 0.0150.03 0.06 0.09 0.12
Miles
D
1 inch = 0 miles
Map Source: 2019 NCOneMaps Orthoimagery,
USGS StreamStats Service
rainage Area Map
Cleveland Bluffs Stream Restoration
Garner, Johnston Co., N.C.
12/18/2020 019-115.01
N
Cleveland Bluff's Stream Restoration Plan
5r Gi
Attachment 4
2014 Google Earth Aerial
8
`= Stream Restoration Protect Area
0 25 50 100 150 200
Feet
1 inch = 100 feet
Map Source: 2014 Google Eath
Aerial Photgraph - 2014
Cleveland Bluffs Stream Restoration
Garner, Johnston Co., N.C.
12/18/2020 019-115.01
Cleveland Bluff's Stream Restoration Plan
5r Gi
Attachment 5
Neuse River Buffer Ca11
9
DEPARTMENT OF PUBLIC UTILITIES
POST OFFICE BOX 2263
SMITHFIELD, N.C. 27577
(919) 989-5075
May 19, 2015
Donnie Adams, PE
DC Adams Engineering, Inc.
335 Athletic Club Blvd.
Clayton, NC 27527
Subject: Neuse River Buffer Call
NBR# NB 15-005
Project Name: Cleveland Bluffs PUD (NC PIN# 163600-54-5620)
Location / Directions: Cornwallis Road, Garner, NC, approximately 0.30 miles south of the intersection
of Cornwallis Rd and Cleveland Rd. Parcel is located on east side of Cornwallis Rd.
Subject Stream: UT to Middle Creek (C,NSW)
Determination Date: April, 24, 2015 Staff: Carlos Bagley, PE
Feature
A
Al
Stream
Type
(E/I/P)*
Pond
I
Not
Subject
z
Subject
Pond not
subject
Below Pond
Soil
Survey
USGS
Topo
L
Latitude
(Dec.
Degrees)
Longitude
(Dec.
Degrees)
B
n
T
D
P
E
Pond
n
F
Pond
n
G
P
H
Pond
n
= Ephemeral / Intermittent/ Perenn .al
Printed on recycled paper ti)
Explanation: The feature(s) listed above that are checked "Subject" to the Johnston County Neuse
Riparian Buffer Ordinance (Section 14-393 Johnston County Code of Ordinances) has or have been
approximately shown on either the Soil Survey of Johnston County, North Carolina (1994) or the most
recent version of the 1:24,000 (7.5 minute) quadrangle topographic maps prepared by the United States
Geologic Survey (USGS), and have been located on the property and possess characteristics that qualify
it to be a stream. Each feature that is checked "Not Subject" has been determined not to be a stream or
is not present on the property. There may be other streams located on your property that do not show up
on the maps referenced above but still may be considered jurisdictional according to the US Army Corps
of Engineers and/or the North Carolina Division of Water Resources.
This on -site determination shall expire five (5) years from the date of this letter. Landowners or
affected parties that dispute a determination made by Johnston County may request a
determination by the Director of the Division of Water Resources c/o the 401 and Buffer
Permitting Unit, or its successor. An appeal request must be made within sixty (60) days of the
date of this letter or from the date the affected party (including downstream and/or adjacent
owners) is notified of this letter. A request for a determination by the Director must be submitted
in writing with a copy of this letter to:
North Carolina Division of Water Resources
401 & Buffer Permitting Unit
1650 Mail Service Center
Raleigh, North Carolina 27699-1650
This determination is final and binding unless, as detailed above, a request for an appeal has been
made in writing within sixty (60) days.
The owner/future owners should notify the Division of Water Resources (including any Local,
State, and Federal Agencies) of this decision concerning any future correspondences regarding the
subject property (stated above). This project may require a Section 404/401 Permit for the
proposed activity. Any inquiries should be directed to the US Army Corps of Engineers Raleigh
Regulatory Field Office at (919) 554-4884 and the Division of Water Resources 401 & Buffer
Permitting Unit at (919) 791-4200.
If you have any questions regarding this determination, please feel free to contact Carlos Bagley at (919)
209-8333 or via email at carlos.bagley(Ujohnstonnc.corn.
Sincerely,
Carlos Bagley, PE
Environmental Manager
Riparian Buffer / Stream Determination
r ur
FEATURE A (POND) -
Not Subject
FEATURE Al - Subject
below pond at existing
tree line
FEATURE E (UPPER
POND) - Not Subject.
Feature not shown on
soils map.
Johnston County Public Utilities
309 E. Market Street
P.O. Box 2263
Smithfield, NC 27577
FEATURE B - Not
Subject
WEi t tON'
FEATURE C - Subject
FEATURE D - Subject
Bb,
FEATURE F (LOWER
POND) - Subject
FEATURE G - Subject
FEATURE H - Not
Subject. Feature not
shown on soils map.
Soil Survey of Johnston County
North Carolina
USDA Soil Conservation Service
1994
A LEN"RD
Property Info:
Sandra S. Allen
9638 Cleveland Road
Clayton, NC 27520
PIN# 163600-54-5620
Thomas Franklin Allen, Jr.
2426 Cornwallis Road
Garner, NC 27529
PIN# 16300-63-2285
Riparian Buffer / Stream Determination
FEATURE E (UPPER
POND) - Not Subject
Johnston County Public Utilities
309 E. Market Street
P.O. Box 2263
Smithfield, NC 27577
USGS Topographical Map
Edmondson Quad
7.5-Minute Series
2013
Property Info:
Sandra S. Allen
9638 Cleveland Road
Clayton, NC 27520
PIN# 163600-54-5620
Thomas Franklin Allen, Jr.
2426 Cornwallis Road
Garner, NC 27529
PIN# 16300-63-2285
Cleveland Bluff's Stream Restoration Plan
5rGi
Attachment 6
Post -Development Impacts to Stream and Wetlands and Proposed Mitigation Restoration of
Channel
10
YELLOW PINE LANE
CLEVELAND BLUFFS PHAS1
IROQUIS COURT
OVERALL PROPERTY BOUNDARY
SPRING CREEK ESTATES
JURISDITIONAL STREAM
(NOT SUBJECT TO
BUFFER RULES)
PIPE OUTFALL 3.1\
(NO IMPACTS) , 2
SITE 3
PIPE OUTFALL 3.2
PIPE OUTFALL 3.3
•
SITE 3
SITE 1B
SITE 1 A
THE GROVE
POST -DEVELOPMENT IMPACTS
STREAM IMPACTS
WETLAND IMPACTS
SITE
DESCRIPTION
(FEET)
(AC)
(SF)
1B
DRIVEWAY CROSSING/PARKING
38
--
--
2A,2B
SIDEWALK/TRAIL
--
--
--
3
STORMWATER PIPING
490
--
--
4
ROADWAY CROSSING
54
0.025
1,098
5
SANITARY SEWER CROSSING
-
0.000
9
APPROX. PRE —DEVELOPMENT WETLAND AREA
STREAM IMPACTS
WETLAND IMPACTS
CLEVELAND BL FFS — FUTURE PHASE
\_—OVERALL PROPERTY BOUNDARY
Vl
CSD
ENGINEERING
LICENSE # C-2710
ENGINEERING
LAND PLANNING
COMMERCIAL / RESIDENTIAL
PERMIT DRAWINGS FOR
P.O. BOX 1250
WENDELL, NC 27591
(910) 791-4441
CLEVELAND BLUFFS SUBDIVISION
DATE::
CLEVELAND BLUFFS SUBDIVISION
F-
0
ca
rt
rt
d
w
12/21/2020
HORZ. SCALE: 1" = 50'
DRAWN BY: JO
CHECKED BY:: DS
PROJECT NO.: 18-0454
Sheet PD-3.0
sheet No 3 OF 9
/ /
/ /
/ / MULTI —USE PATH
/
/
COIR MATING
RIPARIAN SEED
AND MU CH
// ' / /
/ / //
WITH \\ it
MIX 3. 0' BASE CHANNEL �' /1 ,l
\ \\
\ o \
/
-
/ COIR MATTING
WITH
_ CLUB HOUSE ACCESS ROAD
__ _
/ RIPARIAN SEED MIX — = '
-� " � '�'''
i
F—_—�'
- �-.- �%' /
/ AND MULCH
.
.. ' :.. r
_ ..�
�I I �T
�� - _
�/ ,/
- - 1' "I it
- - REMOVE DI
-
thIZAWA.eww
..
r4 RI. C. RIPE � REMOVE JB
� �-
—i 1 /
l
� � �
- J
/:�,..-.,�
'
} REMOVE EX. PIPE P 2
I N)
(R 1
____
(IET/4/
)
4..• • .
/
II
/
/
/
J 1
/ ill
110
/ ill,
WARM SEASON
/I
GRASS (SOD) o
COIR MATTING WITH
4n
I
I I
I
RIPARIAN SEED MIX
AND MULCH
3, 0
b
.:
ROCK/GRAVEL
SUBSTRATE WITH
GEOTEXTILE LINING
I EX. LOT LINES
I I
CHANNEL
TYPICAL
SECTION
1 1
_ , 1
/4 .
r
PERMIT DRAWINGS FOR
CLEVELAND BLUFFS SUBDIVISION
LOCATED IN CLEVELAND TOWNSHIP
JOHNSTON COUNTY, NORTH CAROLINA
1
OWNER(S): KG PLAZA, LLC
6025 TARIN RD
WILMINGTON, NC 28409
I
280
MULTI —USE
PATH
280
270
EX. 24"
1
R.C. PIPE
CHANNEL THAL
WEG (INVERT)
1 •4,3q
EX. GROUND @
CENTERLINE OF CHANNEL
— '
— — — — _
,,\
CLUB HOUSE
ACCESS ROAD
_�,
�\
\
\I
270
EX. 24"
R.C. PIPE
I
I
I
I
I
�\
260
APPROX. POND
ELEV.
260
0+00 1+00 2+00 3+00 4+00 5+00
Page 1 of 2
CHANNEL ANALYSIS WORKSHEET
Date: 12/22/2020 Computed: JFO Checked: HSR CSD Engineering
3 N. Main Street
Suite D
Project: Cleveland Bluffs Subdivsion (JC# 19-096-P) Wendell, NC 27591
919.624-0997
Q Discharge (cfs) A Flow Area (sf)
Zreq (Q x n)/(1.49 x Slope^0.5) P Wetted Perimeter (ft)
B Base Width (ft) R Hydraulic Radius (ft)
Y Normal Depth (ft) V Velocity (fps)
M1 Left Side Slope Zav A*RA2/3
M2 Right Side Slope T Shear Stress (psf) 62.4 x Y x Slope
n Manning's Roughness Coefficient (Reference 1; Table 3, Charts 5 thru 9)
Tp Permissable Shear Stress (Reference 1; Table 2)
Reference 1: FHWA Hydraulic Engineering Circular No. 15, Publication No. FHWA-IP-87-7, 1988
Station: 0' TO 440'
Description: Channel Mitigation
Q=
Slope =
n=
Zreq =
29.3 cfs
0.0143 ft/ft
0.069
11.4 ft
2-Year Channel
Class C Vegetation with coir matting
B
M1
M2
A
P
Zav
T
Tp
Remarks
3.0
1.5
3.0
3.0
11.3
12.5
0.90
2.4
10.5
1.34
4.00
Stable
Q=
Slope =
n=
Zreq =
29.3 cfs
0.0143 ft/ft
0.053
8.7 ft
Class D Vegetation with coir matting
B
M1
M2
A
P
Zav
T
Tp
Remarks
3.0
1.50
3.0
3.0
11.3
12.5
0.90
3.1
10.5
1.34
4.00
Stable
Station: 0' TO 440'
Description: Channel Mitigation
Q=
Slope =
n=
Zreq =
56.4 cfs
0.0143 ft/ft
0.060
18.9 ft
10-Year Channel
Class C Vegetation with coir matting
B
M1
M2
A
P
Zav
T
Tp
Remarks
3.0
2.0
3.0
3.0
18.0
15.6
1.15
3.3
19.8
1.78
4.00
Stable
Q=
Slope =
n=
Zreq =
56.40 cfs
0.0143 ft/ft
0.066
20.9 ft
Class D Vegetation with coir matting
B
M1
M2
A
P
Zav
T
Tp
Remarks
3.0
1.0
3.0
3.0
5.6
9.0
0.62
2.0
4.0
0.85
4.00
Stable
Page 2 of 2
CHANNEL ANALYSIS WORKSHEET
Date: 12/22/2020 Computed: JFO Checked: HSR CSD Engineering
3 N. Main Street
Suite D
Project: Cleveland Bluffs Subdivsion (JC# 19-096-P) Wendell, NC 27591
919.624-0997
Q Discharge (cfs) A Flow Area (sf)
Zreq (Q x n)/(1.49 x Slope^0.5) P Wetted Perimeter (ft)
B Base Width (ft) R Hydraulic Radius (ft)
Y Normal Depth (ft) V Velocity (fps)
M1 Left Side Slope Zav A*RA2/3
M2 Right Side Slope T Shear Stress (psf) 62.4 x Y x Slope
n Manning's Roughness Coefficient (Reference 1; Table 3, Charts 5 thru 9)
Tp Permissable Shear Stress (Reference 1; Table 2)
Reference 1: FHWA Hydraulic Engineering Circular No. 15, Publication No. FHWA-IP-87-7, 1988
Station: 0' TO 440'
Description: Channel Mitigation
Q = 103.7 cfs
Slope = 0.0143 ft/ft
n = 0.055
Zreq = 31.8 ft
100-Year Channel
Class C Vegetation with temporary matting
B
MI
M2
A
P
Zav
T
Tp
Remarks
3.0
2.5
3.0
3.0
25.4
18.5
1.37
4.0
31.3
2.19
4.00
Stable
Q = 103.70 cfs
Slope = 0.0143 ft/ft
n = 0.045
Zreq = 26.5 ft
Class D Vegetation with temporary matting
B
MI
M2
A
P
Zav
T
Tp
Remarks
3.0
2.3
3.0
3.0
22.4
17.4
1.29
4.6
26.6
2.03
4.00
Stable