Loading...
HomeMy WebLinkAbout20200613 Ver 1_More Info Requested_20200713Strickland, Bev From: Yankura, Kaylie Sent: Monday, July 13, 2020 5:39 PM To: David Odom Cc: Brown, David W CIV USARMY CESAW (USA) Subject: Request for Additional Information; Thermal Belt Outreach Ministry DWR# 20200613 Mr. Odom, On May 6, 2020, the Division of Water Resources (Division) received your application requesting a 401 Water Quality Certification from the Division for the subject project. The Division has determined that your application is incomplete and cannot be processed. The application is on hold until the following items are addressed: 1. Please describe current conditions on site, including stream width, and provide a detailed engineering plan, profile view, and cross-section of all proposed culverts. These drawings must include details regarding stream alignment in relation to pipe alignment, pipe slope, pipe burial, and dissipater pad. [15A NCAC 02H .0502(b)] Provide justification for the proposed culvert dimensions based on reference reach information. [15A NCAC 02H .0506 (b)] 2. Please provide cross section details showing the provisions for aquatic life passage. [15A NCAC 02H .0506(b)(2)] 3. Per Condition #11 of GC4139, please provide details on how you are going to maintain the physical integrity of the stream above and below the culvert. [15A NCAC 02H .0506(b)(2)] a. If multiple pipes or barrels are required, they shall be designed to mimic natural stream cross section as closely as possible including pipes or barrels at flood plain elevation and/or sills where appropriate. Widening the stream channel should be avoided. Stream channel widening at the inlet or outlet end of structures typically decreases water velocity causing sediment deposition that requires increased maintenance and disrupts aquatic life passage. A construction sequence and detail should be provided to ensure the contractor is clear on construction of these benches. 4. Please indicate if the proposed culvert headwalls and concrete piers have been included within the permanent impacts included within the PCN. [15A NCAC 02H .0502(b)] Pursuant to Title 15A NCAC 02H .0502(c), the applicant shall furnish all of the above requested information for the proper consideration of the application. If all of the requested information is not received, the Division will be unable to approve the application and it will be returned. Please contact me if you have any questions. You may provide your response via email or mail to the address below. Thank you, Kaylie Yankura Environmental Specialist — Asheville Regional Office Water Quality Regional Operations Section NCDEQ — Division of Water Resources 2090 U.S. Hwy. 70 Swannanoa, N.C. 28711 828 296 4685 office 828 231 9634 mobile kaylie.yankura©ncdenr.gov 1 {4wr1,,L .1 rrntmW1 -Am E rr LEI (1p QJO) Email correspondence to and from this address is subject to the North Carolina Public Records Law and may be disclosed to third parties Based on the current guidance to minimize the spread of COVID-19, the Department of Environmental Quality has adjusted operations to protect the health and safety of the staff and public. Many employees are working remotely or are on staggered shifts. To accommodate these staffing changes, all DEQ office locations are limiting public access to appointments only. Please check with the appropriate staff before visiting our offices, as we may be able to handle your requests by phone or email. We appreciate your patience as we continue to serve the public during this challenging time. 2