Loading...
HomeMy WebLinkAbout20210050 Ver 1_Buffer Approval Letter_20210405 April 5, 2021 DWR # 20210050 Ver 1 Durham County Durham Public Schools Mr. Bernard Hall 211 Hamlin Road Durham, NC 27704 (Delivered via email to Bernard_hall@dpsnc.net) Subject: AUTHORIZATION CERTIFICATE PER THE NEUSE RIVER RIPARIAN BUFFER PROTECTION RULES (15A NCAC 02B .0714) WITH ADDITIONAL CONDITIONS Northern High School Replacement Project Mr. Hall, You have our approval for the impacts listed below for the purpose described in your application received by the Division of Water Resources (Division) on January 11, 2021. This letter shall act as your Authorization Certificate Approval as described within15A NCAC 02B .0611(b). These impacts are covered by the Neuse Buffer Rules and the conditions listed below. Please note that you should get any other federal, state or local permits before proceeding with your project, including those required by (but not limited to) Clean Water Act Section 404 and/or 401 Authorizations, Sediment and Erosion Control, Non-Discharge, and Water Supply Watershed regulations. The following impacts are hereby approved, provided that all of the Conditions listed below, and all of the conditions of the Neuse Buffer Rules are met. No other impacts are approved, including incidental impacts. [15A NCAC 02B .0714]. Type of Impact Amount Approved (units) Permanent Amount Approved (units) Temporary Buffers – Zone 1 Impact area 1 (stream SE) 14,928 (square feet) 0 (square feet) Impact area 1 (stream SD) 2,619 (square feet) 0 (square feet) Impact area 1 (stream SD) 5,575 (square feet) 0 (square feet) Impact area 1 (stream SD) 1,774 (square feet) 0 (square feet) Impact area 1 (stream SD) 1,114 (square feet) 0 (square feet) Impact area 2 (stream SD) 936 (square feet) 0 (square feet) Impact area 3 (stream SD) 906 (square feet) 0 (square feet) Impact area 4 (stream SD) 853 (square feet) 0 (square feet) Impact area 4 (stream SD) 791 (square feet) 0 (square feet) Impact area 5 (stream SD) 847 (square feet) 0 (square feet) Impact area 5 (stream SD) 6,792 (square feet) 0 (square feet) Impact area 6 (stream SD) 282 (square feet) 0 (square feet) Impact area 7 (stream SD) 943 (square feet) 0 (square feet) Impact area 8 (stream SD) 1,024 (square feet) 0 (square feet) Impact area 9 (stream SA) 914 (square feet) 0 (square feet) Buffers – Zone 2 Impact area 1 (stream SE) 7,119 (square feet) 0 (square feet) Impact area 1 (stream SD) 492 (square feet) 0 (square feet) Impact area 1 (stream SD) 4,985 (square feet) 0 (square feet) Impact area 1 (stream SD) 182 (square feet) 0 (square feet) Impact area 2 (stream SD) 698 (square feet) 0 (square feet) Impact area 3 (stream SD) 631 (square feet) 0 (square feet) Impact area 4 (stream SD) 609 (square feet) 0 (square feet) Impact area 4 (stream SD) 1,984 (square feet) 0 (square feet) Impact area 5 (stream SD) 672 (square feet) 0 (square feet) Impact area 5 (stream SD) 4146 (square feet) 0 (square feet) Impact area 6 (stream SD) 742 (square feet) 0 (square feet) Impact area 7 (stream SD) 655 (square feet) 0 (square feet) Impact area 8 (stream SD) 670 (square feet) 0 (square feet) Impact area 9 (stream SA) 615 (square feet) 0 (square feet) Compensatory Mitigation Using a Private Mitigation Bank Mitigation must be provided for the proposed impacts as specified in the table below. The Division has received a Statement of Availability letter from EBX-Neuse I, LLC and Environmental Banc & Exchange to meet this mitigation requirement. The specific bank site to be debited may be Cedar Grove, Hatley, or Bucher all located in HUC 03020201. Until EBX receives and clears your payment, and proof of payment has been provided to this Office, no impacts specified in this Certification shall occur. For accounting purposes, this Certification authorizes payment to EBX to meet the following compensatory mitigation requirement [15A NCAC 02B .0714(12)]: Compensatory Mitigation Compensatory Mitigation Required Bank Sponsor River & Sub-Basin Number Buffers-Zone 1 61,512 (square feet) EBX-Neuse I, LLC Neuse: 03020201 Buffers-Zone 2 10,678.5 (square feet) EBX-Neuse I, LLC Neuse: 03020201 This approval is for the purpose and design described in your application. The plans and specifications for this project are incorporated by reference as part of this Authorization Certificate. If you change your project, you must notify the Division and you may be required to submit a new application package. If the property is sold, the new owner must be given a copy of this Authorization Certificate and is responsible for complying with all conditions. [15A NCAC 02B .0714]. If you are unable to comply with any of the conditions below, you must notify the Raleigh Regional Office within 24 hours (or the next business day if a weekend or holiday) from the time the permittee becomes aware of the circumstances. The permittee shall report to the Raleigh Regional Office any noncompliance with the conditions of this Authorization Certificate and/or any violation of state regulated riparian buffer rules [15A NCAC 02B .0714]. Information shall be provided orally within 24 hours (or the next business day if a weekend or holiday) from the time the applicant became aware of the circumstances. This approval and its conditions are final and binding unless contested. [G.S. 143-215.5] This Authorization Certificate can be contested as provided in Chapter 150B of the North Carolina General Statutes by filing a Petition for a Contested Case Hearing (Petition) with the North Carolina Office of Administrative Hearings (OAH) within sixty (60) calendar days. Requirements for filing a Petition are set forth in Chapter 150B of the North Carolina General Statutes and Title 26 of the North Carolina Administrative Code. Additional information regarding requirements for filing a Petition and Petition forms may be accessed at http://www.ncoah.com/ or by calling the OAH Clerk’s Office at (919) 431-3000. One (1) copy of the Petition must also be served to the North Carolina Department of Environmental Quality: William F. Lane, General Counsel Department of Environmental Quality 1601 Mail Service Center Raleigh, NC 27699-1601 This Authorization Certificate neither grants nor affirms any property right, license, or privilege in any lands or waters, or any right of use in any waters. This Authorization Certificate does not authorize any person to interfere with the riparian rights, littoral rights, or water use rights of any other person, nor does it create any prescriptive right or any right of priority regarding any usage of water. This Authorization Certificate shall not be interposed as a defense in any action respecting the determination of riparian or littoral rights or other rights to water use. No consumptive user is deemed by virtue of this Authorization Certificate to possess any prescriptive or other right of priority with respect to any other consumptive user regardless of the quantity of the withdrawal or the date on which the withdrawal was initiated or expanded. This Authorization shall expire five (5) years from the date of this letter. This letter completes the review of the Division under the Neuse Riparian Buffer Rules as described in 15A NCAC 02B .0714. Please contact Rick Trone at rick.trone@ncdenr.gov if you have any questions or concerns. Sincerely, Paul Wojoski, Supervisor 401 & Buffer Permitting Branch cc: Anna Reusche, SEPI Engineering and Construction Inc. (via email) April Norton, USACE Raleigh Regulatory Field Office (via email) DWR 401 & Buffer Permitting Branch electronic file Filename: 20210050 Ver 1_Northern High School Replacement Project_NRB_Durham