Loading...
HomeMy WebLinkAbout20081327 Ver 1_Site Inspection_20121107 0-1 NCDENR North Carolina Department of Environment and Natural Resources Division of Water Quality Beverly Eaves Perdue Charles Wakild P E Dee Freeman Governor Director Secretary November 7 2012 Mr J B Setzer P E Division 14 Engineer N C Department of Transportation 253 Webster Road Sylva North Carolina 28779 Subject Inspection NCSR 1783 Upward Road DWQ Project 08 1327 TIP No R 4430 Henderson County Dear Mr Setzer On November 1 2012 I inspected the construction work on Upward Road between US Highway 176 and Howard Gap Road in Henderson County Construction work is continuing all along Upward Road between Howard Gap Road and US Highway 176 with the main focus on grading culvert installation and paving Please ensure that all sediment and erosion control structures are being maintained as required and that seeding and mulching are being performed as needed to protect State surface waters Please refer to the attached copy of the inspection report for additional comments regarding the inspection If you have questions please call me at 828 296 4500 Sincerely :sect% l Michael R Parker Environmental Senior Specialist Attachment cc Aaron Powell Mark Davis Division 14 DEO Ed Ingle Roadside Environmental Transportation Permitting Unit Mike Parker Asheville Regional Office pre INET1ANDS AND STORMWAALTEIRTYB 1C-'4Upward Road R 4430 Inspection Letter November 2012 NOV - 92012 DENR RANCH SURFACE WATER PROTECTION SECTION—Asheville Regional Office 2090 U S 70 Highway Swannanoa NC 28778 8211 Phone 828 296-45001 FAX 828 299 7043 One Internet www unity Arqua tiv Ac NOrthCarohna An Equal Opportunity Affirmative Action Employer X1aturoo/hi Wetland Inspection Report Project Num 20081327 Version 1 Status Issued Project Name NCDOT SR 1783(R 4430) Project Type Road/Highway Widening 1 County Henderson Region Asheville I Location NCDOT SR 1783(R 4430) Latitude +35 17 51 Longitude 82 24 25 SW Plan Location Site Owner Name NC DOT PDEA Inspection Date 11/01/2012 Reason for Inspection Routine Inspection Type Site Inspection(DOT) I Inspection Contact Person Title Phone On Site Representative(s) Primary Inspector Michael R Parker Phone 828 296 4500 Secondary Inspector(s) Facility compliance Status • Compliant 0 Not Compliant I Program Area 401 (includes isolated/non 404) I Question Areas • Permit(401 WQC) Inspection Summary Looked at project with NCDOT staff and contractor representative Repair silt fence throughout project Complete placement of sediment control stone around catch basins as soon as risers are installed Seed and mulch all disturbed areas as soon as possible Continue to maintain sediment and erosion control devices Permit(401 WQC) Yes No NA NE Does the impact(s)match what was approved in the 401 WQC or non 404 permit'? . n n n Are the culverts and/or filled areas installed properly'? ■ n n n Is the site compliant with additional conditions of the 401 WQC or non 404 permit'? . n n n Comment Page 1