HomeMy WebLinkAbout20210676 Ver 1_Meeting Request Review_20210401DWR Pre -Filing Meeting Request Form
ID#*
Regional Office*
Reviewer List*
20210676
Version*
1
Asheville Regional Office - (828) 296-4500
Kaylie Yankura
Pre -Filing Meeting Request submitted 4/1/2021
Contact Name *
Contact Email Address*
Project Name*
Project Owner*
Project County*
Owner Address:
Zan Price
zan@jenningsenv.com
Whitewater River Restoration
Bill Bell
Jackson
Street Address
840 Springdale Road NE
Address Line 2
City State / Province / Region
Atlanta GA
Fbstal / Zip Code Country
30306 USA
Is this a transportation project?* r Yes r No
Type(s) of approval sought from the DWR:
I7 401 Water Quality Certification - I— 401 Water Quality Certification -
Regular Express
I— Individual Permit I— Modification
F Shoreline Stabilization
Does this project have an existing project ID#?*
r Yes (' No
Do you know the name of the staff member you would like to request a meeting with?
Kaylie Yankura
Please give a brief project description below and include location information. *
Stream: Whitewater River
Proposed Project Length: 300 linear feet
Coordinates: 35.05278, -83.05222
Drainage Area: 7.4 square miles with 90% forested watershed
NCDEQ Classification: C;Tr;HQW
Stream restoration is proposed in the summer of 2021 in order to improve
water quality, stabilize eroding streambanks, and enhance natural
habitats for trout and other aquatic species. The project will apply natural
channel design techniques including streambank grading to a stable
slope, installation of a log j-hook vane and two log vanes, and riffle
enhancement with boulder clusters. Native riparian vegetation will be
planted for permanent buffer protection at least 50 feet from the water
edge.
Please give a couple of dates you are available for a meeting.
4/15/2021
Please attach the documentation you would like to have the meeting about.
Existing Condition Photograph.pdf 249.33KB
pdf only
By digitally signing below, I certify that I have read and understood that per the Federal Clean Water Act Section
401 Certification Rule the following statements:
• This form completes the requirement of the Pre -Filing Meeting Request in the Clean Water Act Section 401 Certification
Rule.
• I understand by signing this form that I cannot submit my application until 30 calendar days after this pre -filing
meeting request.
• I also understand that DWR is not required to respond or grant the meeting request.
Your project's thirty -day clock started upon receipt of this application. You will receive notification regarding meeting location
and time if a meeting is necessary. You will receive notification when the thirty -day clock has expired, and you can submit an
application.
Signature
Submittal Date 4/1/2021
Reviewer Meeting Request Decision
Is a meeting required or is there more info needed?*
r Yes r No
If nrore information is needed, please add convents for the evail notification below.
Whitewater River Restoration Project —Jackson County
Eroding Rightbank Facing Upstream