HomeMy WebLinkAbout20090611 Ver 1_Inspection_20121109Beverly Eaves Perdue
Governor
og0C2 ? I
...---a---.AVA ---,rintr6
North Carolina Department of Environment and Natural Resources O°
Mr J B Setzer, P E
Division 14 Engineer
N C Department of Transportation
253 Webster Road
Sylva, North Carolina 28779
Dear Mr Setzer
NCDENR
Division of Water Quality
Charles Wakild, P E Dee Freeman
Director Secretary
December 5, 2012
Subject Inspection-NCSR 1533
TIP No B-4291
Transylvania County
}r-1 D
On December 4, 2012, I inspected the construction work for the new bridge over the Davidson River on NCSR
1533 in Transylvania County Work is continuing on the new bridge and approaches Sediment and erosion
control structures appear to be maintained and working properly
Please ensure that all sediment and erosion control structures are maintained and that seeding and mulching are
performed as needed to protect State surface waters A copy of the inspection report is attached to this letter
If you have questions, please call me at 828-296-4500
-1ri,
Sincerely,
2'4 . e 1 0 e — e - R _
Michael R Parker
Environmental Senior Specialist
Attachment
cc Aaron Powell, PE
Mark Davis, Division 14, DEO
Ed Ingle, Roadside Environmental
Transportation Permitting Unit
Mike Parker, Asheville Regional Office
(Setzer) NCSR 1533 B-4291 Inspection Letter December 2012
SURFACE WATER PROTECTION SECTION —Asheville Regional Office
2090 U S 70 Highway Swannanoa NC 28778 8211
Phone 828 296-45001 FAX 828 299 7043
Internet www ncwaterquahty orq
An Equal Opportunity \ Affirmative Action Employer
NorthCarohna
Naturally
Site Inspection Report
Site Number WT000782
Site Name B-4291
Site Address
County Transylvania
Directions
Latitude
Site Owner Name Thorpe Gregory J
Inspection Date 12/04/12
Reason for Inspection Routine
Inspection Type Site Inspection (DOT)
Inspection Contact Person
On -Site Representative(s)
Region Asheville
Longitude
Phone
Primary Inspector Michael R Parker Phone 828-296-4500
Secondary Inspector(s)
Facility compliance Status
• Compliant Q Not Compliant
Program Area 401 (includes isolated/non-404)
Question Areas ti-.
® Permit (401 WQC)
Inspection Summary
New bridge has been constructed and contractor is grading site and working on bridge approaches
Seeding and mulching are scheduled for second week in December
Sediment and erosion control measures appear to be working properly
Permit (401 WQC)
Does the impact(s) match what was approved in the 401 WQC or non 404 permit?
Are the culverts and/or filled areas installed properly?
Is the site compliant with additional conditions of the 401 WQC or non 404 permit'?
Comment
s,/
Yes No NA NE
■ nnn
■ onn
■ nnn
Page 1
NCDENR
North Carolina Department of Environment and Natural Resources
Division of Water Quality
Beverly Eaves Perdue Charles Wakild P E Dee Freeman
Governor Director Secretary
November 7 2012
Mr J B Setzer P E
Division 14 Engineer
N C Department of Transportation
253 Webster Road
Sylva North Carolina 28779
Subject Inspection NCSR 1533
TIP No B 4291
Transylvania County
Dear Mr Setzer
On November 1 2012 I inspected the construction work for the new bridge over the Davidson River on NCSR
1533 in Transylvania County Sediment and erosion control structures appear to be maintained and working
properly
Please ensure that all sediment and erosion control structures are maintained and that seeding and mulching are
performed as needed to protect State surface waters A copy of the inspection report is attached to this letter
If you have questions please call me at 828 296 4500
Sincerely
Michael R Parker
Environmental Senior Specialist
Attachment
cc Aaron Powell PE
Mark Davis Division 14 DEO
Ed Ingle Roadside Environmental
Transportation Permitting Unit
Mike Parker Asheville Regional Office
(Setter)NCSR 1533 B 4291 Inspection Letter November 2012 NO V 2
0/2
SURFACE WATER PROTECTION SECTION—Asheville Regional Office
2090 U S 70 Highway Swannanoa NC 28778-8211
Phone 828 296-45001 FAX 828 299 7043 One
Internet www ncwaterquality orq NorthCarohna
An Equal Opportunity Affirmative Action Employer Naturally
Site Inspection Report
Site Number WT000782
Site Name B 4291
Site Address
County Transylvania Region Asheville
Directions
Latitude Longitude
Site Owner Name Thorpe Gregory J
Inspection Date 11/01/12
Reason for Inspection Routine
Inspection Type Site Inspection(DOT)
Inspection Contact Person Phone
On Site Representative(s)
Primary Inspector Michael R Parker Phone 828 296 4500
Secondary Inspector(s)
Facility compliance Status IN Compliant n Not Compliant
Program Area 401 (includes isolated/non 404)
Question Areas
II Permit(401 WQC)
Inspection Summary
Looked at project site while contractor was on site
Cored slab bridge has been installed across Davidson River
Approach slabs grading and paving have not been completed
Sediment and erosion control measures appeared to be working properly
Continue to maintain sediment and erosion control measures
Permit(401 WQC) Yes No NA NE
Does the impact(s)match what was approved in the 401 WQC or non 404 permit9 •
Are the culverts and/or filled areas installed properly'? 0 0
Is the site compliant with additional conditions of the 401 WQC or non 404 permit'? • 0 0 0
Comment
Page 1
AVA
NCDENR
09
North Carolina Department of Environment and Natural Resources
Division of Water Quality
Beverly Eaves Perdue Thomas A. Reeder Dee Freeman
Governor Acting Director Secretary
June 19, 2013
Mr. J. B. Setzer, P.E.
Division 14 Engineer
N.C. Department of Transportation
253 Webster Road
Sylva, North Carolina 28779
Subject: Inspection-NCSR 1533
TIP No. B-4291
Transylvania County
Dear Mr. Setzer:
On June 13, 2012, I inspected the construction work for the new bridge over the Davidson River on NCSR
1533 in Transylvania County. The new bridge has been completed and open to traffic and the contractor was
in the process of dismantling the old bridge. Sediment and erosion control structures appear to be maintained
and working properly.
Please ensure that all sediment and erosion control structures are maintained and that seeding and mulching are
performed as needed to protect State surface waters. A copy of the inspection report is attached to this letter.
If you have questions, please call me at 828-296-4500.
Sincerely,
Michael R. Parker
Environmental Senior Specialist
Attachment
cc: Aaron Powell, PE
Mark Davis, Division 14, DEO
Ben DeWit, Roadside Environmental
Transportation Permitting Unit
Mike Parker, Asheville Regional Office
(Setzer) NCSR 1533 B-429I Inspection Letter June 2013
SURFACE WATER PROTECTION SECTION — Asheville Regional Office
2090 U.S 70 Highway, Swannanoa, NC 28778-8211
Phone. 828-296-4500 \ FAX : 828-299-7043
Internet: www.ncwaterouality.orq
An Equal Opportunity l Affirmative Action Employer
NonrthCarolina
Naturally
Site Inspection Report
Site Number: WT000782
Site Name: B-4291
Site Address:
County: Transylvania
Directions:
Latitude: -
Site Owner Name: Thorpe, Gregory J.
Inspection Date: 06/13/13
Reason for Inspection: Routine
Inspection Type: Site Inspection (DOT)
Inspection Contact Person:
On -Site Representative(s):
Primary Inspector: Michael R Parker
Secondary Inspector(s):
Facility compliance Status: • Compliant
Program Area: 401 (includes isolated/non-404)
Question Areas:
Permit (401 WQC)
Inspection Summary:
Conducted site inspection with NCDOT Inspector.
New bridge has been completed and open to traffic.
Contractor was in the process of dismantling the old bridge.
Continue to maintain sediment and erosion control measures.
Seed and mulch all bare areas.
Permit (401 WQC)
Does the impact(s) match what was approved in the 401 WQC
Are the culverts and/or filled areas installed properly?
Is the site compliant with additional conditions of the 401 WQC
Comment:
Region: Asheville
Longitude:
0 Not Compliant
or non 404 permit?
or non 404 permit?
Phone:
Phone: 828-296-4500
Yes No NA NE
■ ❑ Q ❑
• 000
■ nnn
Page: 1