Loading...
HomeMy WebLinkAbout20090597 Ver 5_2021-03-18 Wet Pond Supplement Form Signed_20210318SUPPLEMENT-EZ COVER PAGE r'RM5rt PROJECT INFORMATION 1 Project Name CCEP - Lott* 2 Prolect Area (ac) 24.05 3 Coastal Wetland Area (ac) 0 4 Surface Water Area (ac) 0 5 Is this project High or Low Density? High 6 Does this project use an oft -site SCM? No COMPLIANCE WITH 0211 .1003(4) 7 Width of vegetated setbacks provided (feet) 50 8 Will the vegetated setback remain vegetated? Yes 9 Is BUA other that as listed in .1003(4)(c-d) out of the setback? No 10 Is streambank stabilization proposed on this project? Ns 'NUMBER AND TYPE OF SCMs: 11 Infiltration System 0 12 Biaretentlon CeI1 0 13 Wet Pond 1 14 Stormwater Wetland 0 15 Permeable Pavement 0 16 Sand Filter 0 17 Rainwater Harvesting (RWH) 0 18 Green Root 0 19 Level Spreader -Filler Strip (LS-FS) 0 20 Disconnected Impervious Surface (DIS) 0 21 Treatment Swale 0 22 Dry Pond 0 23 StormFilter 0 24 Silva Cell 0 25 Bayfilter 0 26 Filters 0 fORi15 LOADED DESIGNER.CERTIFICATION 27 Name and Title: Mitch Craig, PE - Principal/Project Manager 28 Organization: CE Group, Inc. 29 Street address: 301 Glenwood Avenue, Suite 220 30 City, State, Zip: Raleigh, NC 27603 31 Phone number(s): (919) 387-8790 ext. 108 32 Email: MItch®CEGrvupInc.com rectification Statement I certify, under penalty of law that this Supplement-EZ form and all supporting information were prepared under my direction or superviesion; that die Information provided in the st of my knowledge end belief true, accrete. and complete, and that the engineering plans eped!{catons, operation and le� agreements and other supportlrg irdannatlon are consistent web the information proirded here. DRAINAGE AREAS 1 2 3 1s this a high density project? If so, number of drainage areas.'SCMs Is all/part of this project subject to previous rule versions? Yes 1 No 1 F�RM5LOAD ED DRAINAGE AREA INFORMATION gntir+e AI!a V _ # •' 4 Type of SCM Wet Pond 5 Total BUA in p_rotct Ssq_ft) 376186 sf 372282 sf , 6 New BUA on subdivided Tots (subject to permitting) (sq ft) 7 New BUA outside of subdivided Tots (subject to permitting) (sf) 376188 sf 1 372282 sf _ 8 Offsite - total area (sq ft) 9 Offsite BUA (sq ft) 10 Breakdown of new BUA outside subdivided lots: - Parking (sq ft) 8083 sf 8063 sf - Sidewalk (sq ft) 1117 sf 1117 sf - Roof (sq ft) 117585 sf 117585 sf - Roadway (sq ft) 19238 sf 15332 sf - Future (sq ft) 162899 sf 162899 sf - Other, please specify In the comment box below (sq ft) 87286 sf 67288 sf 11 New infiltrating permeable pavement on subdivided Tots (sq ft) , 12 New infiltrating permeable pavement outside of subdivided Tots (sq ft) , 13 Exisitng BUA that will remain (not subject to permitting) (sq ft) 14 Existing BUA that is already permitted (sq ft) i 15 Existing BUA that will be removed (sq ft) 16 Percent BUA 36% 49% 17 Design storm (inches) 1 in 18 Design volume of SCM (cu ft) 35473 cf I 19 Calculation method for design volume Simple Method ADDITIONAL_ INFORMATEON 20 Please use this space to provide any additional information about the drainage area(s): Other BUA: Loading Dock Area and Gravel Firs access drive WET POND 1 Drainage area number 1 2 Design volume of SCM (cu ft) - .. 4 Mtn MO 149G 35473 c1 . L-i... 3 Vim _ Is the 5CM sized to treat the SW from all surfaces at buid-out? 4. Is the SCM located away from contaminated sans? Yes 5. What are the side slopes of the SCM (H V)? a1 6 Does the SCM have retaining walls. gabion walls or other engineered side slopes? No 7 Are the inlets. outlets, and receiving stream protected from erosion (10-year storm)? Yes Is there an overflow or bypass for inflow volume In excess of the 8 design volume? Yes 9 What is the method for devralmir9 the SCM for maintenance? Pump (preferred) 10 If applicable, will the SCM be cleaned out after construction? Yes 11 Does the maintenance access comply with General MDC (8(? Yes 12 Does the drainage easement comply with General MDC (9)7 Yes 13 If the SCM is on a single family lot, does (win) the plat comply with General MDC (10)? 14 Is there an O&M Agreement that complies with General MDC (11)? . Yes 15 Is there an O&M Plan that complies with General MDC (12)7 — _ Yes , 18 Does the SCM follow the device specific MDC? 'Yes 17 Was the SCM designed by an NC licensed pro'essional? IPDc FROM 4 H ,1053 Yea r «,i a+ 18 19 Method used Hasa stage/storage table been provided In the calculations? 20 Elevation of the excavated main pod depth (bottom of sediment removal) (fmst) 248.00 21. Elevation of the main pool bottom -(top of sediment removal) (fmsl) 249.00 22 23 Elevation or the bottom of the vegetated shelf (fmsl) 255.00 Elevation of the permanent pod (fmsl) 255.50 24 Elevation cif the top of the vegetated shelf (fms1) 58.00 25 Merface Elevation of the temporary pod (fmst) 257,00 area of the main permanent pool (aquare feet) 171481 27 Volume of the main permanent pod (cubic feet) 71,494 ni 28 Average depth of the main pod (feet) 4.48 fl 29 Average depth equation used Equation 2- 30 If using equation 3, main pod perimeter (feet) 31 32 If using equation 3. width of submerged wig shelf {feet) Volume of the forebay (cubic feel) 124E of 33 Is this 15-20% of the volume In the main pod? Yes 34 Clean -out depth for forebay (Inches) 12 In 35 Design volume of SCM (cu ft) 35413 col 38 Is the outlet an o-Trce or a weir? Orifice 37 If orifice, orifice diameter (Inches) 3 M 38 If weir. well hegl4 (inches) 39 If weir, weir length !inches) 40 Drawdown time for (he temporary pool (days) _ 3.9 _ 41 42 Are the inlet(s) and outlet located in a manner that avoids short- ckcuitllg? _ Yea Are berms or baffles provided to Improve the flow path? Yes 43 Depth of forebay at entrance (inches) 90 In 44 45 Depth of forebay at exit (Inches) 78 In Does water Bow out of the forebay Ina nonerosive mamer? Yes 46 Width of the vegetated shelf {feet} 8 1t 47 48 Slope of vegetated shelf (HFV) 8:1 Does the orifice draws own from below the top surface of the permanent pool? - - Yes 49 Does the pond minimize Impacts to the receiving channel from the 1- yr, 24-hr storm? Yes 50 Are fountains proposed? (If Y. please provide documentation Thal MDC(9) Is met I No 51 Is a trash rack or after device provided to protect the outlet system? Yes 52 Are the dam and embankment planted in non -clumping turf grass? Yes Bermuda 53 — &d'has Species of turf that will be used on the dam and embankment a planting plan been provided for tFYr vegetate stern Yes I • NAL INFORMATION 1 'Please 55 use Otis space to provide any additional information about the wet pond(s): wet Pans 3 10:50 AM 3/18/2021