Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
NCS000480_Rutherford College Final SWMP_20210406
Stormwater Management Plan Town of Rutherford College NCS000480 March 30, 2021 R0F�; VIF D APFF� 0 6 2021 GENR-LAND QUALITY STORMWATER PERMITTING U Z # 0 Table of Contents PART1: INTRODUCTION........................................................................................................................ 1 PART2: CERTIFICATION........................................................................................................................ 2 PART3: MS4 INFORMATION................................................................................................................. 3 3.1 Permitted MS4 Area..................................................................................................................... 3 3.2 Existing MS4 Mapping..............*-*---............................................................................................. 4 3.3 Receiving Waters.......................................................................................................................... 9 3.4 MS4 Interconnection.................................................................................................................... 9 3.5 Total Maximum Daily Loads (TMDLs)..................................................................................... 10 3.6 Endangered and Threatened Species and Critical Habitat.......................................................... 11 3.7 Industrial Facility Discharges..................................................................................................... 11 3.8 Non-Stormwater Discharges...................................................................................................... 12 3.9 Target Pollutants and Sources.................................................................................................... 13 PART 4: STORMWATER MANAGEMENT PROGRAM ADMINISTRATION .................................. 17 4.1 Organizational Structure............................................................................................................. 17 4.2 Program Funding and Budget..................................................................................................... 19 4.3 Shared Responsibility................................................................................................................. 19 4.4 Co-Permittees............................................................................................................................. 21 4.5 Measurable Goals for Program Administration.......................................................................... 21 PART 5: PUBLIC EDUCATION AND OUTREACH PROGRAM......................................................... 23 PART 6: PUBLIC INVOLVEMENT AND PARTICIPATION PROGRAM .......................................... 29 PART 7: ILLICIT DISCHARGE DETECTION AND ELIMINATION PROGRAM ............................. 32 PART 8: CONSTRUCTION SITE RUNOFF CONTROL PROGRAM ................................................... 42 PART 9: POST -CONSTRUCTION SITE RUNOFF CONTROL PROGRAM ....................................... 45 PART 10: POLLUTION PREVENTION AND GOOD HOUSEKEEPING PROGRAMS ...................... 57 4 List of Tables Table 1: Summary of MS4 Mapping Table 2: Summary of MS4 Receiving Waters Table 3: Summary of Approved TMDLs Table 4: Summary of Federally Listed Species/Habitat Impacted by Surface Water Quality Table 5: NPDES Stormwater Permitted Industrial Facilities Table 6: Non-Stormwater Discharges Table 7: Summary of Target Pollutants and Sources Table 8: Summary of Responsible Parties Table 9: Shared Responsibilities Table 10: Co-Permittee Contact Information Table 11: Program Administration BMPs Table 12: Summary of Target Pollutants & Audiences Table 13: Public Education and Outreach BMPs Table 14: Public Involvement and Pailicipaliun BMPs Table 15: Illicit Discharge Detection and Elimination BMPs Table 16: Qualifying Alternative Program Components for Construction Site Runoff Control Program Table 17: Construction Site Runoff Control BMPs Table 18: Qualifying Alternative Program(s) for Post -Construction Site Runoff Control Program Table 19: Summary of Existing Post -Construction Program Elements Table 20: Post Construction Site Runoff Control BMPs Table 21: Pollution Prevention and Good Housekeeping BMPs PART 1: INTRODUCTION The purpose of this Stormwater Management Plan (SWMP) is to establish and define the means by which the Town of Rutherford College will comply with its National Pollutant Discharge Elimination System (NPDES) Municipal Separate Storm Sewer System (MS4) Pen -nit and the applicable provisions of the Clean Water Act to meet the federal standard of reducing pollutants in stonnwater runoff to the maximum extent practicable. This SWMP identifies the specific elements and minimum measures that the Town of Rutherford College will develop, implement, enforce, evaluate and report to the North Carolina Department of Environmental Quality (NCDEQ) Division of Energy, Minerals and Land Resources (DEMLR) in order to comply with the MS4 Permit number NCS000480, as issued by NCDEQ. This permit covers activities associated with the discharge of stormwater from the MS4 as owned and operated by the Town of Rutherford College and located within the corporate limits of the Town of Rutherford College. In preparing this SWMP, the Town of Rutherford College has evaluated its MS4 and the pennit requirements to develop a comprehensive 5-year SWMP that will meet the community's needs, address local water quality issues and provide the minimum measures necessary to comply with the permit. The SWMP will be evaluated and updated annually to ensure that the elements and minimum measures it contains continue to adequately provide for permit compliance and the community's needs. Once the SWMP is approved by NCDEQ, all provisions contained and referenced in this SWMP, along with any approved modifications of the SWMP, are incorporated by reference into the permit and become enforceable parts of the pennit. NCS000480 SWMP Town of Rutherford College March 30, 2021 Page 1 PART 2: CERTIFICATION By my signature below I hereby certify, under penalty of law, that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. I am aware that there are significant penalties for submitting false information, including the possibility of fines and imprisonment for knowing violations. I am also aware that the contents of this document shall become an enforceable part of the NPDES MS4 Permit, and that both the Division and the Environmental Protection Agency have NPDES MS4 Permit compliance and enforcement authority. © I am a principal executive officer or ranking elected official. ❑ I am a duly authorized representative and have attached the authorization made in writing by a principal executive officer or ranking elected official which specifies me as: ❑ A specific individual having overall responsibility for stormwater matters. ❑ A specific position having overall responsibility for stormwater matters. Signature: Name: Kenneth Geathers Title: Town Manager Signed this `31 day of 20 '. NCS000480 SWMP Town of Rutherford College March 30, 2021 Page 2 PART 3: MS4 INFORMATION 3.1 Permitted MS4 Area This Stormwater Management Plan (SWMP) applies throughout the corporate limits of the Town of Rutherford College, including all regulated activities associated with the discharge of stonnwater from the MS4. The map below shows the corporate limits of Town of Rutherford College as of the date of this document. NCS000480 SWMP Town of Rutherford College March 30, 2021 Page 3 3.2 Existing MS4 Mapping The current MS4 mapping includes all required elements for compliance. Below are a series of maps that show the locations of the catch basins, junction boxes, and drainage manholes within the City Limits. (Reference BMP 19). NCS000480 SWMP Town of Rutherford College March 30, 2021 Page 4 NCS000480 SWAP Town of Rutherford College March 30, 2021 Page 5 NCS000480 SWMP Town of Rutherford College March 30, 2021 Page 6 The following set of maps show the direction of flow and the major outfalls within Rutherford College Town limits. Further mapping is outlined in BMP 19. aaz a z n I11 =OM z 5 0 r- El NCS000480 SWMP Town of Rutherford College March 30, 2021 Page 7 NCS000480 SVVMP Town of Rutherford College March 30, 2021 PAS Z:� Table 1: Summary of MS4 Mapping Percent of MS4 Area Mapped 90 % No. of Major Outfalls* Mapped 29 total *An oufall is a point where the MS4 discharges from a pipe or other conveyance (e.g. a ditch) directly into su7face waters. Major outfalls are required to be mapped to meet permit requirements. A major outfall is a 36-inch diameter pipe or discharge from a drainage area > 50-acres; and for industrial zoned areas a 12-inch diameter pipe or a drainage area > 2-acres. 3.3 Receiving Waters The Town of Rutherford College MS4 is located within the Catawba River Basin and discharges directly into receiving waters as listed in Table 2 below. Applicable water quality standards listed below are compiled from the following NCDEQ sources: o Waterbody Classification Mau_ o Impaired Waters and TMDL Map o Most recent NCDEQ Final 303(d) List Table 2: Summary of MS4 Receiving Waters Receiving Water Name Stream Water 303(d) Listed Parameter(s) Index /'AU Quality of Interest Number Classification Catawba River l l-(37) WS-IV, B, n/a CA Hoyle Creek 11-45-(0.5 & WS-IV, CA n/a 2) Island Creek 11-46-(0.5) WS-IV, CA n/a Smith Branch 11-46-1 WS-IV n/a 3.4 MS4 Interconnection The Town of Rutherford College MS4 is interconnected and directly receives stormwater from the Town of Valdese MS4 (reference BMP 19); however the Town of Rutherford College MS4 does not directly discharge stormwater into another MS4. The MS4 does interconnect with the statewide NCDOT MS4 and includes: NCS000480 SWMP Town of Rutherford College March 30, 2021 Page 9 a. The interconnection is receiving stormwater from the NCDOT MS4. The number of interconnections is unknown. b. The interconnection is not discharging storrwater into the NCDOT MS4. The number of interconnections is unknown. c. The Town of Rutherford College MS4 mapping does not identify interconnections with the NCDOT MS4. d. The Town of Rutherford College MS4 mapping does include NCDOT MS4 outfalls. 3.5 Total Maximum Daily Loads (TMDLs) The TMDL(s) listed in Table 3 below have been approved within the MS4 area, as determined by the map and list provided on the NCDEQ Modeling & Assessment Unit web page. The table also indicates whether the approved TMDL has a specific stormwater Waste Load Allocation (WLA) for any watershed directly receiving discharges from the permitted MS4, and whether a Water Quality Recovery Program has been implemented to address the WLA. Outreach education and stream cleanup helps with the reduction of waste load allocation within approved TMDL municipalities. Table 3 : Summary of Approved TMDLs Water Body Name TMDL Pollutant(s) Storinwater Water Waste Quality Load Recovery Allocation Program (y/N) (Y/N) N/A N/A N N NCS000480 SWMP Town of Rutherford College March 30, 2021 Page 10 3.6 Endangered and Threatened Species and Critical Habitat Significant populations of threatened or endangered species and/or critical habitat are/are not identified within the regulated MS4 urbanized area. Based upon a review of the Endangered and Threatened Species and Species of Concern by County for North Carolina Map and Listed species believe to or known to occur in North Carolina map as provided by the U.S. Fish and Wildlife Service, the species listed in Table 4 have the potential to occur within the regulated MS4 urbanized area. Of those species listed, Table 4 summarizes the species that may be significantly impacted by the quality of surface waters within their habitat. Table 4: Potential Federally Listed Species/Habitat Impacted by Surface Water Quality Scientific Name Common name Species Group Federal Listing Status Glyptemys Bog Turtle Vertebrate T (S/A) muhlenber ii Glaucomys sabrinus Carolina northern Vertebrate E coloratus flying squirrel Myotis septentrionalis Northern long-eared Vertebrate T bat Corynorhinus Virginia big -eared bat Vertebrate E townsendii vir inianus Alasmidonta varicosa Brook floater Invertebrate ARS Ophiogomphus Edmons's Snaketail Invertebrate ARS edmundo Macromia margarita Margarita River Invertebrate ARS skimmer Microhexura Spruce -fir moss Invertebrate E montiva a spider Hexastylis naniflora Dwarf -flowered Vascular Plant T heartleaf Liatris helleri H.eller's blazing star Vascular Plant T Hedyotis purpurea Roan Mountain Bluet Vascular Plant E var. montana 3.7 Industrial Facility Discharges The Town of Rutherford College MS4 jurisdictional area includes the following industrial facilities which hold NPDES Industrial Stormwater Permits, as determined from the NCDEQ Maps & Pen -nit Data web page. NCS000480 SWMP Town of Rutherford College March 30, 2021 Page 11 Table 5: NPDES Stormwater Permitted Industrial Facilities Permit Number '' Facility Name NCG170393 A uafil O'Mara Inc. NCGNE0258 BSN-Jobst, Inc. 3.8 Non-Stormwater Discharges The water quality impacts of non-Stormwater discharges have been evaluated by the Town of Rutherford College as summarized in Table 6 below. The unpermitted non-stormwater flows listed as incidental do not significantly impact water quality. The Town of Rutherford College has evaluated residential and charity car washing and street washing for possible significant water quality impacts. Street washing discharges are addressed under the Pavement Management Program in Part 10 of this SWMP. The Department of Environmental Quality has not required that other non-Stormwater flows be specifically controlled by the Town of Rutherford College. Wash water associated with car washing that does not contain detergents or does not discharge directly into the MS4 is considered incidental. However, these types of non-stormwater discharges that do contain detergents/surfactants have been evaluated by the Town of Rutherford College to determine whether they may significantly impact water quality. The Town of Rutherford College will address the possibility of the below mentioned water quality impacts through public education and good housekeeping, as outlined in Part 5, BMP 3-7, and Part 10 BMP 45-47, 49, 53, 54, 56, 57 and 61 with a focus on the training of good housekeeping practices. Table 6: Non-Stormwater Discharges Non-Stormwater Discharge Water Quality Impacts Water line and fire hydrant flushing Incidental Landscape irrigation Incidental Diverted stream flows Incidental Rising groundwater Incidental Uncontaminated groundwater infiltration Incidental Uncontaminated pumped groundwater Incidental Uncontaminated potable water sources Incidental Foundation drains Incidental Air conditioning condensate Incidental Irrigation waters Incidental Springs Incidental Water from crawls ace pumps Incidental Footing drains Incidental Lawn watering Incidental Residential and charity car washing Possible Flows from riparian habitats and wetlands Incidental Dechlorinated swimming pool discharges Incidental Street wash water Possible Flows from firefighting activities Incidental NCS000480 SWMP Town of Rutherford College March 30, 2021 Page 12 3.9 Target Pollutants and Sources Table 7 below summarizes the water quality pollutants identified throughout Part 3 of this SWMP, the likely activities/sources/targeted audiences attributed to each pollutant, and identifies the associated SWMP program(s) that address it. In addition, the Town of Rutherford College has evaluated schools, homeowners, construction sites and businesses as target audiences that are likely to have significant stormwater impacts. Within the table below the following target pollutants have been commonly found to be concerns within the community. Litter: Illegal dumping has occurred within the Town. Cases general residential dumping have been noted by Town employees. This litter poses a threat to both our water bodies and the MS4 infrastructure, as the litter can create clogs and backups that damage the pipelines leading back to the stream. Some litter even poses a threat to groundwater if chemical leaching or breakdown of components into heavy metals occurs due to weathering of the litter. The dumping has been found typically road side but also in secluded urban areas. Sediment: Previous installed erosion control measure have been removed or fallen Sediment buildup is largely attributed to mismanaged construction sites with fallen or incorrectly installed sediment fences. It has been noticed in both reports from citizens and by code enforcement officers that there are several cases of construction sites not maintaining their erosion control fences during work. This has led to sediment buildup near storm drains, onto down slope private properties, and in some cases causing water to build up in nearby properties as the sediment is limiting the drains ability to remove runoff. In all cases code enforcement has responded and had the issue solved, but even being down for a short time can prove to have significant effects. Erosion control fences are required for sediment control permits during construction by the DEQ throughout the entire construction process. Gray Water: Straight piping washing machines out of the house Rarely, it has been noted a few homes have had their washing machines straight -piped out of their homes by creating makeshift piping using water hoses exit at windows. Homes are to be connected to the appropriate sewer system. This proves to be a source of detergents/soaps entering our storm drains in residential neighborhoods. In addition: residential, charity, and municipal car washes allow for soaps or waxes to enter the storm drain when vehicles are not being cleaned in the correct areas (such as vegetated patches or in areas that do not have storm drains). This allows for toxic contaminants to enter our waterways via the storm drain system. Fats Oils and Grease: Restaurants could possibly empty grease traps or not obtain a grease trap. The Health Department has reported restaurants not maintaining, or even owning, grease traps. This has led to cases of the restaurants either illegally dumping the grease or allowing the grease to drip onto NCS000480 SWMP Town of Rutherford College March 30, 2021 Page 13 nearby impermeable surface — which would eventually lead to water quality issues. Overflow from a lack of maintenance or throwing out the grease with general waste contributes to this problem. This is a health violation since the grease poses a physical risk, but it also can impair water bodies with an influx of water insoluble grease going down the storm drain. Chemicals: Totes have been noted in industrial areas, which could pose a risk. Town staff have noticed containers within manufacturing facilities that have unmarked chemicals. The totes are unlabeled in select industrial sites, leading to potential soil and water contamination, and/or incorrect spill cleanup procedure. In addition to not labeling the containers correctly, the Town has noted that the containers are not being correctly stored in a way to minimize risk to the water bodies from seepage, damage to the containers, or spills. Animal Operations/Urban Farming: A challenge to ensuring water quality for several factors. Animal operations are agriculture operations that raise cows, pigs, chickens, or other livestock as a product, be it from meat or byproducts of the animal, the latter being more problematic as the excess nutrients will lead to eutrophication which can eventually causing hypoxia in the water body. In a similar vein, agricultural runoff often caries excess fertilizer which also will cause eutrophication in streams with its cascading effects. Underground storage tanks: Storage devices installed below ground that contain hazardous materials/waste. These tanks can contain gasoline, fuels such as propane, industrial chemicals/oils, and most often human waste in areas not directly connected to the sanitary sewer. Any underground storage tank must be well maintained/monitored, and correctly installed due to the risk of them leaking. The leaks can cause whatever chemical the tank is storing to leak into the ground, harming the soil, groundwater/water table, and even surface waters as they are being fed from groundwater. If a fuel or industrial chemical tank is leaking, the chemical will leach into the soil — leading to toxic soil, contaminated groundwater, and possibly impairing a stream/water body. If a septic tank is leaking, it can overwhelm the natural processes of the soil (infiltration) leading to nutrient overload in streams fed by groundwater, or allowing pathogens to enter, increasing the risk of disease. Illicit discharges: Originate from a variety of sources, with an equally varied number of effects dependent on the chemical that is released. Typically, illicit discharges come from businesses, residents or municipal facilities who dump chemicals into storm drains either incidentally due to a lack of Illicit Discharge & Detection Elimination (IDDE) education or general carelessness. These chemicals can vary greatly, and can include grease, oils, chemicals, cleaning solutions, paints, metals, etc. This is a recognized problem as we have several 303(d) streams impaired from causes related to substances or attributions given to unclean discharges into the streams - in addition to reports generated by the municipality. Illegal dumping: When residents, businesses, or municipal employees dump waste randomly in non -permitted dumping areas. NCS000480 SWMP Town of Rutherford College March 30, 2021 Page 14 This waste can widely vary, causing a variety of problems. For example, citizens dumping televisions on the side of the road to avoid dumping fees, which allows for the metals or chemicals inside the tv to leach out as stormwater passes it (mercury, lead, and other metals). It can be a case of businesses dumping waste in watershed areas where runoff passes through the waste, either carrying it, or residuals of the waste into water bodies. It can also be a case of graders dumping sediment into areas without the correct allowances/precautions. The debris and chemicals accumulate over time and lead to chemical impairments, pH issues, turbidity impairments, or debris entering the stream/MS4 system. Improper disposal of waste: Improper disposal of waste is problematic because it allows chemicals, or difficult to manage waste, to enter the environment in ways that may be hard to track. For example; not giving a car battery to the correct waste management facility can allow for battery acid and lead to enter the soil which drains/collects in the groundwater. This problem has been noticed by municipal waste managers and is difficult to track as often the improper disposal waste is mixed in with the standard refuse. Other examples include grease going down sinks clogging MS4 systems, chemicals from batteries leaching into the groundwater, oil from oil changes not going to the correct facility, etc. Table 7: Summary of Target Pollutants and Sources Target Pollutant(s) Likely Source(s)/Target Audience(s) SWMP Program Addressing Target Pollutant(s)/AudienQe(s) Litter Residents, Businesses, Schools Public Education & Outreach Public Participation Sediment Construction Activity Public Education & Outreach, Construction Program Post -construction Program Gray water Residential Illicit Discharge Public Education & Outreach Fats, Oils and Grease Businesses (Restaurants) Illicit Discharge Public Education & Outreach Chemicals Industrial, Business and Residential Illicit Discharge Public Education & Outreach Good Housekeeping Animal Operations Commercial/Bona fide Farms/Urban Illicit Discharge Farming Public Education & Outreach Underground Storage Tanks Business and Residents Illicit Discharge Public Education & Outreach Illicit Discharges General Public, Businesses, Illicit Discharge Municipal Employees Public Education & Outreach Good Housekeeping Illegal Dumping and General Public, Businesses, Illicit Discharge Improper Disposal of Waste Municipal Employees Public Education & Outreach Good Housekeeping NCS000480 SWMP Town of Rutherford College March 30, 2021 Page 15 PART 4: STORMWATER MANAGEMENT PROGRAM ADMINISTRATION 4.1 Organizational Structure The Town of Rutherford College has contracted Western Piedmont Council of Governments (WPCOG) to coordinate Stormwater Management Plan development/writing efforts, to ensure the Town is facilitating Best Management Practices to protect water quality. The Town of Rutherford College will be the primary operator of this stormwater program. Staff will be trained in handling internal procedures and reports of stormwater issues/violations. WPCOG be implementing the Public Education & Outreach, and the Public Involvement & Participation on behalf of the Town. The following organizational chart is broken down by the six elements associated with Stormwater Management. Each of the positions under the elements will report back to the primary manager and then on to the Stormwater Program Administrator. StormVtater Program Aoministrdtor ,'.awn Maug=_raj starmm rer M.-gernent (WPr0G Senior Plan- ne:lNatt,r�rai Romeo s Rtlministrte ) Pubic Education ( Publit Involvement I Illicit Disth.,ge Dete:,w Post C�.r xtion Site I Po?ivtion Prevention./ and Owe= and Paticipatian and Elimirszias Runic` Caatrol Goy Htnssekeeping Tor hhun"v_Ipai Cryeracar� WP.^DG Senior Planner! 'NPCDG Senior Piarmerj WPCOG Code WPCOG WPCCtG ",PC"Senior Planner/ Natural Res —ts, Natural Resowces Camp;iance Storrnwater Stormxiater Natural Resoates A&oln-utrator Administrator Program M.-ger "'oliniitrator AeminastratoriMunicipai Administrator 3Gaa3 yEnfarrxment} FaciErtias Operauar, & 8xsettiepiag Ednc w,'; hRaintenance Program - Data Co/semi no WPCOG Seniar Planner( Reporrng;?hkDL Natural ReSoiB'res- requirements} ornin_'strater lEduca,cr: Tmr, Employee V,&4 Operation & P,wir<tera>ce hiu°aitipal SCK:, Operation and Maintemme VzN-le &. EqL9pmEnt Cleaning Pavemem Ntamgei nem Pe Mboe_s, herbicide & Ferrilaer N9a agement Table 8: Summary of Responsible Parties SWMP Component Responsible Position Staff Name Department Stormwater Program Town Manager Kenneth Geathers Administration, Town Administration of Rutherford College SWMP Management WPCOG Senior Johnny Wear WPCOG, Community Planner/Natural I and Regional Planning NCS000480 SWMP Town of Rutherford College March 30, 2021 Page 16 Public Education & WPCOG Senior Johnny Wear WPCOG, Community Outreach Planner/Natural and Regional Planning Resources. Administrator Public Involvement & WPCOG Senior Johnny Wear WPCOG, Community Participation Planner/Natural and Regional Planning Resources Administrator Illicit Discharge Illicit Discharge Officer Todd Justice WPCOG, Community Detection & Patrick DeMauro and Regional Planning Elimination Construction Site N/A N/A NCDEQ — Asheville Runoff Control Regional Office Post -Construction Stormwater Jack Cline WPCOG, Community Stormwater Administrator and Regional Planning Management Pollution Stormwater Jack Cline WPCOG, Community Prevention/Good Administrator and Regional Planning Housekeeping for Municipal Operations Municipal Facilities Stormwater Jack Cline WPCOG, Community Operation & Administrator and Regional Planning Maintenance Program Spill Response Program Utility Director John Leger Town of Rutherford College Public Works Stormwater Jack Cline WPCOG Community Administrator and Regional Planning, Volunteer/Town Fire Department, if applicable MS4 Operation & Utility Director John Leger Town of Rutherford Maintenance Program College Public Works Municipal SCM Utility Director John Leger Town of Rutherford Operation & College Public Works Maintenance Program Stormwater Jack Cline Administrator WPCOG Community and Regional Planning Pesticide, Herbicide & Utility Director John Leger Town of Rutherford Fertilizer Management College Public Works Program NCS000480 SWAP Town of Rutherford College March 30, 2021 Page 17 Vehicle & Equipment Utility Director John Leger Town of Rutherford Cleaning Program College Public Works Pavement Management Utility Director John Leger Town of Rutherford Program College Public Works 4.2 Program Funding and Budget In accordance with the issued permit, the Town of Rutherford College shall maintain adequate funding and staffing to implement and manage the provisions of the SWMP and comply with the requirements of the NPDES MS4 Permit. The budget includes the permit administering and compliance fee, which is billed by DEQ annually. As mentioned previous, WPCOG was contracted to write the Town of Rutherford College's Stormwater Management Plan, for a rate of $8,000.00. Also, the Town has a one-year contract (which will need to be modified, adopted, and signed every year) with Western Piedmont Council of Governments for the following services: Public Education & Outreach Program and Public Involvement & Participation Program. The current one year contract (July 1, 2019 and ending June 30, 2020) amount is $2,845.00. The Town of Rutherford College will be using Town staff, and on occasion West Consultants, to implement Illicit Discharge Detection and Elimination Program, Post -Construction Site Runoff Control Program, and Pollution Prevention and Good Housekeeping Programs. The Town has allocated $11,500.00 toward this effort. The Town will be responsible for the cost of the annual NPDES permit renewal, which is to be paid to the state. Any fees charged to the development community for BMP Inspections, Plan Review, and other associated fees will help offset this cost to the town. The Town reserves the right to apply stormwater utility fees to supplement stormwater management costs; these fees would be collected by the Town through tax or utility bills. The goal would be for the funds collected to support the stormwater program through stream repairs and other water quality efforts. Should the Town of Rutherford College choose not to renew the existing one-year contract with WPCOG, prior to the last month, a revision to the existing NPDES permit and Stormwater Management Plan would need to occur. The Town of Rutherford College would be required to renew the one-year contract for five years straight to fully carry out the 5 year NPDES permit cycle. Any changes to the partners or measures in this document will need to be reviewed and approved by NCDEQ. 4.3 Shared Responsibility Beginning July 2019, the Town of Rutherford College will be responsible to implement the following minimum control measures, with the aid of WPCOG (entity), which are as stringent as the corresponding NPDES MS4 Permit requirement. The Town of Rutherford College remains responsible for compliance if the other entity fails to perform the permit obligation and may be subject to enforcement action, if neither the Town of Rutherford College, nor the other entity fully performs the permit obligation. Table 9 below summarizes individual responsibilities for each program. NCS000480 SWMP Town of Rutherford College March 30, 2021 Page 18 Table 9: Shared Responsibilities S WMP BMP or Legal Permit Reference Implementing Entity & Program Naive Agreement General Requirements Town of Rutherford College N Public Education and WPCOG Stormwater Partnership Y Outreach Program Public Involvement and WPCOG Stormwater Partnership Y Participation Program Illicit Discharge Detection WPCOG Stormwater Partnership Y and Elimination Program Construction Site Runoff NCDEQ N/A Control Program Post -Construction Site WPCOG Stormwater Partnership Y Runoff Control Program West Consultants PLLC Y Pollution Prevention and WPCOG Stormwater Partnership Y Good Housekeeping Programs NCS000480 SWAP Town of Rutherford College March 30, 2021 Page 19 4.4 Co-Permittees There are no other entities applying for co-permittee status under the NPDES MS4 permit number NCS000480 for the Town of Rutherford College. 4.5 Measurable Goals for Program Administration Referencing, MS4 Inspection Report for the Town of Rutherford College - Program Implementation, Documentation & Assessment, Permit Citation - II.A.2. Stormwater Plan Implementation & Evaluation, II.A.3. Keeping the Stormwater Plan Up to Date, II.A.4. Availability of the Stormwater Plan, II.A.5. Stormwater Plan Modifications and II.A.7 Written Procedures; the Town has not evaluated the performance and effectiveness of the program and has not develop any procedures for doing so. In order to meet the State requirements for this section, a self -assessment of the effectiveness of the program components will be completed'annually. Written procedures, otherwise known as, the Stormwater Management Plan: SWMP update, has been drafted, but not adopted at this time. The SWMP will be adopted during Permit Year One of the NPDES permit cycle following acceptance of the SWMP and issuance of the NPDES permit. Included in the SWMP the Town will be required to establish written agreements with entities that are performing work on the Town's behalf (II.A.6.). MS4 Inspection Report for the Town of Rutherford College - Program Implementation, Documentation & Assessment, Permit Citation - III.A. Program Documentation; the Town maintained some documentation regarding inspections, but no other aspect of the program components. There was an overall lack of documentation relating to the Town's stormwater program (e.g., no documentation for inspections, maintenance activities, or educational programs). MS4 Inspection Report for the Town of Rutherford College - Program Implementation, Documentation & Assessment, Permit Citation - III.B. Annual Report Submittal: MS4 annual reports have not been submitted. Further, no fiscal analysis was provided (Permit Citation - IV.B). Within the below BMPs Annual Report are a required submittal that will occur on August 31 st each permit year and will include all applicable parts of the NPDES MS4 permit. The Town of Rutherford College will manage, document, and report the following Best Management Practices (BMPs) for the administration of the Stormwater Management Program using Public Education & Outreach, Public Involvement & Participation, Illicit Discharge Detection & Elimination, Post - Construction Site Runoff Control, and Pollution Prevention & Good Housekeeping. Table 11.: Program Administration BMPs Permit 2.1.2 and Part 4: Annual Self -Assessment' Ref. Measures to evaluate the performance and effectiveness of the SWMP program components at least annually. Results shall be used by the permittee to modify the program components as necessary to accomplish the intent of the Stormwater Program. The self -;assessment re ortin ' eriod is the fiscal year (Jul I — June 30). BMP A B C D No. Description of BMP Measurable Goal(s) Schedule for Annual Reporting Implementation Metric NCS000480 SWMP Town of Rutherford College March 30, 2021 Page 20 Table 11: Program Administration BMPs 1. Annual Self -Assessment Perform an annual evaluation of 1. Prepare, certify, and 1. Annually 1. Yes/No S WMP implementation, submit the Annual Self- Permit Years 1 — 4 suitability of SWMP Assessment to NCDEQ commitments and any proposed prior to August 31 each changes to the SWMP utilizing year. the NCDEQ Annual Self - Assessment Template. Permit 1.6: Permit Renewal Application Ref. ' Measures to submit a permit renewal application no later than 180 days prior to the expiration date of the NPDES MS4 permit. BMP ` A B C D No. Description of BMP Measurable Goal(s) Schedule for Annual Reporting Implementation Metric 2. Permit Renewal Application Audit stormwater program 1. Participate in an 1. TBD — Typically 1. Yes/No implementation for compliance NPDES MS4 Permit Permit Year 4 with the permit and approved Compliance Audit, as SWMP, and utilize the results to scheduled and performed prepare and submit a permit by EPA or NCDEQ. 2. Self -audit and 2. Permit Year 5 2. Yes/No/Partial renewal application package. document any stormwater program components not audited by EPA or NCDEQ utilizing the DEQ Audit Template. Submit Self - Audit to DEMLR (required component of permit renewal application package). 3. Certify the stormwater 3. Permit Year 5 3. Date of permit renewal permit renewal application submittal application (Permit renewal application form, Self -Audit, and Draft SWMP for the next 5-year permit cycle) and submit to NCDEQ at least 180 days prior to permit expiration. NCS000480 SWMP Town of Rutherford College March 30, 2021 Page 21 PART 5: PUBLIC EDUCATION AND OUTREACH PROGRAM The Town of Rutherford College will implement a Public Education and Outreach Program (developed by and programs ran by WPCOG) to distribute educational materials to the community or conduct equivalent outreach activities about the impacts of storm water discharges on water bodies and steps the public can take to reduce pollutants in storm water runoff. In reference to MS4 Permit Self Audit Report - Public Education and Outreach, Permit Citation II.B.2.a Program Requirements, II.B.2.c. Target Audiences, and II.B.2.h. Public Education and Outreach Program: The Town of Rutherford College had not defined goals & objectives for community wide issues. Stormwater impact target audiences and extend of exposure had not been recorded at public education and outreach events. The target audiences and identified pollutants listed in Part 3.9 of this SWMP, which will be addressed by the Public Education and Outreach Program, are summarized in Table 12 below. In addition, the Town of Rutherford College is required to inform businesses and the general public of the hazards associated with illicit discharges, illegal dumping and improper disposal of waste. Table 12: Summary of Target Pollutants & Audiences Target Pollutants/Sources Target Audience(s) Litter General Public Sediment Construction Activity Gray water Residential Fats, Oils and Grease Businesses (Restaurants) Animal operations Commercial, Bona fide Farms and/or Urban Farming Underground Storage Tanks Businesses and Residents Chemicals Industrial, Business and Residential Illicit Discharges General Public, Businesses, Municipal Employees Illegal Dumping General Public, Businesses, Municipal Employees Improper Disposal of Waste General Public, Businesses, Municipal Employees The WPCOG (on behalf of the Town of Rutherford College) will manage, implement and report the following public education and outreach BMPs. Table 13: Public Education and Outreach BMPs Permit 3.2: Outreach to Targeted Audiences Ref. Measures to identify the specific elements and implementation of a Public Education and Outreach Program to share educational materials to the community or conduct equivalent outreach activities about the impacts of stormwater discharges on water bodies and how the public can reduce pollutants in stormwater runoff. The permittee'shall document the extent of exposure of each media, event or activity, including those elements implemented locally or through a cooperative a eement. BMP A B C D No. Description of:BMP Measurable Goal(s) Schedule for Annual Reporting Im lementation Metric NCS000480 SWMP Town of Rutherford College March 30, 2021 Page 22 Table 13: Public Education and Outreach BWs 3. Stormwater Fliers Continue to utilize the WPCOG 1. Develop and 1. Permit Year 1 L-5. Number of flyers stormwater outreach program to distribute new fliers to distributed at each develop new educational raise general event; materials to be distributed at stormwater awareness. events, at the nearest county Number of flyers left 2. Develop and 2. Permit Year 2 library (Valdese Public Library, distribute new fliers for distribution at refilled annually or as required), educating about illicit Library; Number of and/or through mailers to utility discharges. flyers remaining when bill addresses. Five topics will be refilled 3. Develop and 3. Permit Year 3 addressed over the term of the distribute new fliers permit; general stormwater for illegal dumping's Number of fliers sent awareness, illicit discharges, impacts on stormwater through the mail. illegal dumping, chemicals and quality. 4. Develop and 4. Permit Year 4 proper disposal of waste. distribute new fliers to raise awareness on how chemicals impact stormwater. These flyers shall focus on educating how to reduce nutrient loads from residential and business landscaping. 5. Develop and 5. Permit Year 5 distribute new fliers to educate on the importance of proper waste disposal. 4. Public Event Outreach NCS000480 SWMP Town of Rutherford College March 30, 2021 Page 23 Table 13: Public Education and Outreach BMTs Provide stormwater educational 1. Staff will have 1. Annually 1. Number of attendees information to the citizens continue to have a at outreach booth through outreach activities at booth at the annual Permit Years 1-5 during the annual Fall community events. The Town will Fall Festival to Festival. maintain its outreach booth at the disperse stormwater annual Fall Festival to provide outreach educational materials and to raise materials/awareness awareness of stormwater issues. through the use of WPCOG will staff the booth on interactive educational behalf of the Town per their games and activities. outreach agreement. COVED-19 has limited outreach 2. Staff will provide 2. Annually 2. Number of attendees opportunities at public events due alternative outreach at alternative outreach to their cancelation in 2020. As opportunities if the Permit Years 1-5 booth such, alternative ways for this Fall Festival is type of outreach will be canceled, or as an Event/location of necessary. Alternatives, including additional outreach alternative outreach but not limited to, booths at supplement. Such booth farmers markets or a booth inside opportunities include the library (if open) can provide but are not limited to: these opportunities while still an outreach booth at being safe for participants. the Valdese Library, and/or an outreach booth at farmers markets (burke county or sawmills farmers markets), or other events if they are still available at different times throughout the year. 5. Youth Community Outreach Provide educational information, 1. WPCOG will 1. Annually 1. Number of activities, and educational provide instruction and activities/events materials to students and youth stormwater Permit Years 1-5 provided; community groups through educational activities classrooms, workshops, to youth community Number of participants community presentations, and/or groups, classrooms, present at these hands-on activities related to workshops, events/activities. stormwater best practices. The community targeted community groups can presentations, NCS000480 SWMP Town of Rutherford College March 30, 2021 Page 24 Table 13: Public Education and Outreach BMPs include: boy scouts, girl scouts, 4- 2. Staff will create a 2. Annually 2. Number of H clubs, school environmental presentation covering presentations provided programs, community stormwater topics to Permit Years 1-5 by teachers or staff environmental groups. Many of be presented in digital the individuals in these groups classrooms and/or Number of students will hit the same target audiences provided to teachers. present during the as student outreach but can be The PowerPoint will presentation more easily met with due to the be presented by nature of their organizations teachers and/or staff to students in a safe COVID-19 has limited outreach method such as an opportunities at schools, teacher online classroom. workshops, and other outreach opportunities due to school closures in 2020/2021. To supplement this, a PowerPoint presentation that can be shown digitally by staff and/or provided to teachers for classes will be created 6. Printed Materials The WPCOG will design new 1. Staff will create new 1. See BMP 3 1. See BMP 3 printed materials for target printed materials for audiences to aid stormwater distribution that education. The Town will addresses stormwater continue to distribute these best management materials at outreach events, practices. NCS000480 SWMP Town of Rutherford College March 30, 2021 Page 25 Table 13: Public Education and Outreach BWs available at Town hall, and 2. Staff will distribute 2. See BMP 3 2. See BMP 3 through utility bill mailers. printed materials at events, school presentations, and have them on display for public acquisition in Government buildings. The flyers will also be hosted on the WPCOG stormwater web page to enable digital access to this resource. 7. Annual Water Quality Conference Sponsor the Western Piedmont 1. Provide one 1. Annually 1. Number of attendees Council of Governments and presentation about one at conference. Lenoir Rhyne University's of the six NPDES Permit Years 1-5 Annual Water Quality Conference Minimum Control to provide outreach and public Measures at each participation. Staff will conduct annual conference. A the annual regional conference for different MCM will be continued education to local presented on each government officials, municipal year. staff, educators, local businesses, and the general public. NCS000480 SWMP Town of Rutherford College March 30, 2021 Page 26 Table 13: Public Education and Outreach BWs S. Evaluate Pollutants Sources and Audiences Reevaluate the target pollutants 1. Reevaluate the 1. Annually 1- 2. Number of target (litter, sediment, gray water, fats, presence of the pollutant violations. oils, grease, animal operations, underground storage tanks, super following target pollutants within the Permit Years 1-5 Were SWMP revisions fund sites, chemicals, illicit Town: litter, needed to address discharges, illegal dumping, sediment, gray water, target pollutants or improper disposal of waste), fats, oils, grease, urban audiences? sources, and associated target farming, underground audiences (residents, businesses, storage tanks, super schools, construction activity, fund sites, chemicals, commercial, farms, industrial, illicit discharges, development community, general illegal dumping and public, and municipal employees) improper disposal of that are likely to have significant waste to identify stormwater impacts and why they where outreach can be were selected. This evaluation is improved to address looking at target audiences that these pollutants. are creating pollution to allow the 2. Evaluate the 2. Annually Town to correctly focus education following target efforts in those areas. audiences to determine Permit Years 1-5 where outreach efforts should be focused to minimize stormwater pollutants: residents, businesses, schools, commercial, farms, industrial, development community, general public, and municipal employees. 9. Evaluate Public Education and Outreach BMPs. Evaluate the successful 1. See BMP 18 1. See BMP 18 1. See BMP 18 components of outreach through interest and feedback. NCS000480 SWMP Town of Rutherford College March 30, 2021 Page 27 Table 13: Public Education and Outreach BMPs Permit 2.1.7 and 3.2.3: ' Web Site Ref. Measures to provide a web site designed to convey the program's message and provide online materials including ordinances, or other regulatory mechanisms, or a list identifying the ordinances or other regulatory mechanisms, providing the legal an ority necessarry to im' lement and enforce the re uirements of the permit BMP A B C D No. Description of BMP Measurable Goal(s) Schedule for Im lementation Annual Reporting , Metric 10. Website Update and maintain the already 1. The Town will 1. Annually, 1. Was annual self - established webpage designed to maintain and update assessment uploaded convey information about the the stormwater web Permit Years 1-5 to the Town of stormwater program. The Town page by verifying all Rutherford College's webpage will: convey the links and contact website? Yes, No; importance of stormwater quality, information is Status; provide educational resource current/active, and links, compliant procedures, posting the current Did links, contact stormwater regulations, year educational information, or stormwater permit information, materials. documents need to be good housekeeping information, updated? Yes, No; ands shall host the current The municipal Status; SWMP, stormwater ordinance, stormwater webpage and annual report. will also post the Were new/current current SWMP, educational materials stormwater ordinance added to site? Yes, No; and that permit years Status. annual assessment. 11. Education Regarding Illicit Discharges Provide educational information 1. Train municipal 1. See BMP 50 1. See BMP 50 to municipal employees, employees in illicit businesses, citizens, and schools discharge detection about the hazards associated with and elimination. illicit discharges, illegal 2. Distribute material 2. See BMP 3 2. See BMP 3 dumping, and improper disposal of waste. (generated from BMP 3) to target audiences (municipal employees, schools, businesses, and citizens). 3. Provide education 3. Continuously, 3. Number of citizen during the illicit interactions during discharge enforcement Permit Years 1-5 enforcement. process. NCS000480 SWMP Town of Rutherford College March 30, 2021 Page 28 Table 13: Public Education and Outreach BMPs Permit 3.2.5: Stormwater Hotline Ref. Measures for a stormwater hotline/helpline for the purpose of public education and outreach BMP: 'A B C D No. Description of BMP Measurable Goal(s) Schedule for Implementation Annual Reporting Metric 12. Hotline The Town of Rutherford College 1. Identify specific 1. Permit Year 1 1. Was staff member will continue to provide a hotline staff member who will identified Yes or No. that functions as a way for serve as the default citizens to contact the Town to hotline contact. report illicit discharges, 2. Update hotline 2. Annually 2. Did the hotline stormwater/post construction number for stormwater number need to be issues, outreach questions and complaints and Permit Years 1-5 updated? Yes, No; concerns, and MS4 related information should the Status. concerns. number change. 3. Record number and 3. Continuously. 3. Number of hotline type of complaints, phone calls received concerns and Permit Years 1-5 by type/purpose of information related to call. each call. Purpose of the call, `type'/measure the call was about, date it occurred, and municipality of the caller will be recorded. 4. Train stormwater 4. Annually, 4. Did hotline staff hotline staff in general receive training? Yes, stormwater awareness, Permit Years 1-5 No; Status. complaint call protocols and appropriate contacts for referral and typical stormwater issues. 5. Publicize contact 5. Continuously, 5. Number of hotline information on the calls received overall. Town webpages as Permit Years 1-5 well as the Town of Rutherford College Facebook page. NCS000480 SWMP Town of Rutherford College March 30, 2021 Page 29 Table 13: Public Education and Outreach BMPs Permit 3.2.2 and 3.2.4: Outreach to Targeted Audiences Ref. Measures to identify the specific elements and implementation of a Public Education and Outreach Program to share educational materials to the community or conduct equivalent outreach activities about the impacts of stormwater discharges on water bodies and how the public can reduce pollutants in stormwater runoff. The permittee shall provide educational information to identified target audiences on pollutants/sources identified in table 12 above, and shall document the extent of exposure of each media, event or activity, including those elements implemented locally or throe h a cooperative aggreement. BMP A B C D No. Description of BMP Measurable Goal(s) Schedule for Implementation Annual Reporting Metric 13. Litter Management Create an educational outreach 1. Litter focused 1. See BMP 3 1. See BMP 3 flyer that focuses on the impacts outreach materials will of litter on water quality, runoff be created and quality, and how it impacts the distributed to environment as a whole. These government buildings materials will be distributed at and at outreach events 2. Stream cleanup 2. See BMP 19 2. See BMP 19 Town Hall and handed out at public outreach events. activities will be utilized to educate Educate participants during participants on the stream cleanups on the impacts of impacts of litter on litter to stormwater runoff and water bodies overall water quality. PART 6: PUBLIC INVOLVEMENT AND PARTICIPATION PROGRAM In reference to MS4 Permit Self Audit Report — Public Involvement and Participation, Permit Citation II.C.2.a. Volunteer Community Involvement Program, II.C.2.b. Mechanism for Public Involvement, and II.C.2.c. Hotline/Help Line: The Town plans to grow that effort in the future. Proximity to Lake Rhodhiss provides opportunity for public interest in events. The Town of Rutherford College will establish a hotline, webpage reporting form and survey/s, along with the use of the existing WPCOG Water Resource Committee to gather public input. Stream clean-ups will be completed on an annual basis. All events, programs, and public forums will be announced through social media. This SWMP identifies the minimum elements and implementation of a Public Involvement and Participation Program that complies with applicable State, Tribal and local public notice requirements. The Town of Rutherford College will manage, implement and report the following public involvement and participation BMPs. NCS000480 SWMP Town of Rutherford College March 30, 2021 Page 30 Table 14: Public Involvement and Participation BMPs Permit 3.3.1: Public Input Ref. Mechanisms for public involvement that provide for input on stormwater issues and the stormwater program. BMP A B C D No. Description of BMP Measurable Goal(s) Schedule for Annual Reporting Implementation Metric 14. Hotline for Public Input Provide a mechanism for public 1. Stormwater hotline 1. See BMP 12 1. See BMP 12 input on stormwater issues and (BMP 12) shall the stormwater program through include a public input utilizing the stormwater hotline component and/or (BMP 12). record public input comments/concerns. 15. Web Based Email Reporting Continue to provide a mechanism 1. Maintain the 1. Continuous, 1. Did the email need for public input via the Rutherford stormwater email to be updated? Yes, College stormwater email for complaint/reporting/in Permit Years 1-5 No; Status reporting stormwater issues and put contact allowing for input regarding the information on the stormwater program. Towns website. 2. Continue to use the 2. Continuous, 2. Number of Rutherford College questions, reports, and stormwater email to Permit Years 1-5 comments submitted record and track via the stormwater responses, inputs, email; issues, and concerns Purpose of each for metric reporting question, report, or comment. 16. Social Media Outreach — Event Promotion NCS000480 SWMP Town of Rutherford College March 30, 2021 Page 31 Table 14: Public Involvement and Participation BWs Utilize the existing Town of 1. Utilize the existing 1. Continuously 1. Total Number of Rutherford College Facebook Town of Rutherford posts on the Town of page to promote stormwater College Facebook Pen -nit Years 1-5 Rutherford College events, projects, outreach/general page to promote public Facebook page related stormwater awareness, and involvement and to the stormwater stormwater programs. This will be participation related to program. used as an outreach tool to stormwater programs, provide exposure to a larger events, and projects. audience and encourage The Facebook page engagement from the general will also be used to public. post stormwater educational materials and provide general stormwater awareness. 17. Water Resources Committee Provide a mechanism for public 1. Participate in 1. Quarterly meetings 1. Number of attendees input and participation via quarterly Water at each meeting. regional meetings on stormwater Resource Committee Permit Years 1-5 issues and the stormwater meetings, which are program. Typically, this open to the public, for committee is hosted by the discussion of water WPCOG once a quarter. This quality issues within committee also encourages the region. municipal interconnectivity regarding water quality within the Topics discussed will region. be recorded for annual reporting. 18. Public Survey and Evaluation NCS000480 SWMP Town of Rutherford College March 30, 2021 Page 32 Table 14: Public Involvement and Participation BMPs Provide a mechanism for public 1. Create and 1. Annually 1. Number of surveys input by creating a survey to administer an annual completed. engage the public and gauge survey to be linked to Permit Years 1-5 public interest in stormwater on the Towns website issues and the stormwater once a year. The program. The survey will be survey will be open to taking in responses/input on the feedback for a total of program as a whole — covering 4 weeks. The survey each minimum measure and BMP will also be shared on that refers to this Survey. the Towns Facebook page. Responses/results of the survey will be analyzed for reporting and evaluation. Permit 3.3.2: Volunteer Opportunities Ref. Measures to provide volunteer opportunities; designed to promote' ongoing.citizen participation. BMP A B C D No• Description ofBMP Measurable GGoal(s) Schedule for Annual Reporting Implementation Metric 19. Stream Cleanup NCS000480 SWMP Town of Rutherford College March 30, 2021 Page 33 -Table 14: Public Involvement and Participation BM[Ps Provide volunteer opportunities 1. Hold stream cleanup 1. Annually 1. Number of stream for ongoing citizen participation efforts by engaging cleanup events held; through stream cleanup activities. groups to conduct Permit Years 1-5 stream cleanup Number of stream Due to the COVID-19 pandemic, activities in cleanup participants additional safety precautions will appropriate areas. The total; need to be followed. Participants events will be will need to be spaced out in at promoted by the Number of trash bags least 6ft intervals along the Town. filled. stream, and materials (trash bags, gloves, `litter grabbers', printed For the Town of materials) will not be shared. Any Rutherford College, reused material, such as the the stream cleanups grabbers, will need to be sanitized will focus on before and after the cleanup event. McGalliard Creek, Masks will be required to Lake Rhodhiss, and/or participate in the event. water bodies that feed into them to help improve water quality and provide personal awareness for participants. 2. Provide all materials 2. Annually 2. Number of stream for stream cleanup clean up materials activities (i.e. gloves, Permit Years 1-5 distributed. trash bags, and trash pickers) hosted by Town and WPCOG. 3. The Town and 3. Annually 3. Was the event WPCOG will publicize publicized? Yes, No; the event (hosted by Permit Years 1-5 Status; WPCOG) to the public to gather volunteers Number of participants for stream cleanup per event. efforts to assist in public awareness and involvement. The event will be posted on the WPCOG website, The Town website, and flyers will be distributed at Town Hall. NCS000480 SWMP Town of Rutherford College March 30, 2021 Page 34 PART 7: ILLICIT DISCHARGE DETECTION AND ELIMINATION PROGRAM MS4 Inspection Report for the Town of Rutherford College — Illicit Discharge Detection and Elimination (IDDE), Permit Citation II.D.2.a. IDDE Program: The Town is regulated by the water supply watershed protection ordinance, which does not contain any specific language on the application of notice of violations. Written procedures for implementing an IDDE Program have not been completed. In response the Town will locate priority areas likely to have illicit discharges, conduct routine dry weather outfall inspections, identify illicit discharges and trace sources, eliminate the source(s) of an illicit discharge, and evaluate and assess the IDDE Program. The Town will also, in responses to, MS4 Inspection Report for the Town of Rutherford College — Illicit Discharge Detection and Elimination (IDDE), Permit Citation II.D.2.b. Legal Authority, the Town will create, adopt, maintain and enforce a stormwater ordinance and other regulatory mechanisms that provide the legal authority to prohibit illicit connections and discharges to the MS4. The Town maintained a map, but the major outfalls were not identified at time of audit. Since the audit was complete, the Town hired West Consulting to map all outfalls, inlets, basins, and flow direction (H.D.2.c. Storm Sewer System Map). In the future the Town will continue to update the MS4 map as new development occurs (Permit Ref: 3.4.1 BMP 19). In the last permit cycle, the Town did not conduct dry weather screening or maintain written procedures for dry weather field activity (TI.D.2.d. Dry Weather Flow Program). Within the Stormwater Management Plan a schedule is to be created to conduct dry weather screening. Data such as date screening occurred, location of inspected outfall, and photos of outfall will be recorded in GIS. The Town of Rutherford College Stormwater Management Plan outlines the response authority, but not procedures (II.D.2.e.). Due to water supply watershed not identifying notice of violation procedures, the Town of Rutherford College issued no NOVs. Currently, there is not a way to track and document investigations (II.D.21. & j.).Within the new permit cycle, as stated below, the Town will be adopting an TIDE Plan to establish written procedures. A chart will be used to track and document IDDE cases. This will allow the Town to identify priority areas based on historical data. Further, the Town will train municipal staff and the general public to identify illicit discharge and illegal dumping through the use of educational outreach materials and training opportunities. Previously, no training had been administered to employees (II.D.2.g.). Information to the public was provided in bill inserts on a regular basis (II.D.21.). Educational material will be available to help educate public employees, businesses, and the general public about hazards associated with illicit discharges and the improper disposal of waste. Public complaints of any kind can be report through a webpage portal; however the line of communication was not publicized (II.D.2.1). The stormwater hotline phone number, as mentioned in the public education and outreach and illicit discharge areas of this plan. The Town of Rutherford College will develop, manage, implement, document, report and enforce an Illicit Discharge Detection and Elimination Program which shall, at a minimum, include the following illicit discharge detection and elimination BMPs. NCS000480 SWMP Town of Rutherford College March 30, 2021 Page 35 Table 15: Illicit Discharge Detection and Elimination BMPs Permit 3.4.1: MS4 Map Ref. Measures to develop, update and maintain a municipal storm sewer system map including stoi-inwater conveyances, flow direction, major outfalls and waters of the United States receiving stormwater discharges. BMP A B C D No. Description of BMP Measurable Goal(s) Schedule for 'Implementation Annual Reporting Metric 20. Addition of Major Outfalls and Continual Updates to MS4 Map The Town will contract with West 1. Identify and add 1. Permit Year 1 1. Were outfalls added Consultants once a year to Update major outfalls, and to the MS4 map? Yes, and maintain the existing number of major No; Status; municipal storm sewer system outfalls to the existing map showing the infrastructure MS4 map Report number of and conveyances for managing major outfalls stormwater runoff from the Town. identified. West Consultants will be 2. When new 2. Annually 2. Were revisions to contracted to continue to maintain conveyances and/or the MS4 map the Town of Rutherford Colleges outfalls are located or Permit Years 1-5 required? Yes, No; MS4 map. Per the 2019 MS4 constructed, add new Status. audit, major outfalls will be added infrastructure to the to the existing MS4 map along existing map; to be Number of outfalls with its regular maintenance. updated on an annual identified/constructed basis. Number of Outfalls added over the permit term Permit 3.4.2: Regulatory Mechanism Ref. Measures to provide an IDDE ordinance or other regulatory mechanism that provides legal authority to prohibit, detect, and eliminate illicit connections and discharges, illegal clumping and spills into the MS4, including enforcement ; rocedures and actions. BMP A B C D No. Description of BMP Measurable Goal(s) Schedule for Annual Reporting Implementation Metric 21. Maintain Legal Authority 1. Redevelop and 1. Permit Year 1 1. Was the IDDE Update the existing ordinance updated? Illicit Discharge and Yes, No; Status; Elimination ordinance. Adoption of the Date ordinance was updated ordinance will adopted.. be done through council approval. NCS000480 SWMP Town of Rutherford College March 30, 2021 Page 36 Table 15: Illicit Discharge Detection and Elimination BMPs The Town will update the existing 2. Review the 2. Annually 2. Were revisions to IDDE ordinance that provides ordinance and update the ordinance needed? legal authority to prohibit, detect, if revision is required. Permit Years 2-5 Yes, No; Status. and eliminate illicit connections Revisions will require and discharges, illegal dumping council re -approval. and spills into the MS4 - This annual review including enforcement procedures will begin follow the and actions. This update shall ordinances update in include further definition of the permit year 1. issuance of NOVs (per the audit) and bring the IDDE ordinance up to current standard. Permit 3.4.3: IDDE Plan Ref. Measures to maintain and implement'a written IDDE Plan to Zetect and address illicit discharges, illegal dumping and any non-stormwater discharges identified as significant contributors of pollutants to the MS4. The plan shall provide standard procedures and documentation to: a) Locate priority areas likely to have illicit discharges, b) Conduct routine dry weather outfall inspections, c) Identify illicit discharges and trace sources, d) Eliminate the source(s) of an illicit discharge, and e) Evaluate and assess the IDDE Program.. BMP A B C D No. Description of BMP Measurable Goals) Schedule for Annual Reporting Im lementation Metric 22. IDDE Plan NCS000480 SWMP Town of Rutherford College March 30, 2021 Page 37 Table 15: Illicit Discharge Detection .and Elimination Bws Update and implement the written 1. Develop an updated 1. Permit Year 1 1. Was IDDE plan IDDE Plan to define the written IDDE Plan to developed? Yes, No; procedures for detecting and further define the Status; addressing illicit discharges, procedures of illegal dumping and any non- identifying, tracking Date draft plan is stormwater discharges identified and processing illicit submitted to DEQ for as significant contributors of discharges, illegal approval. pollutants to the MS4. Previously dumping and the Town of Rutherford College significant contributors had IDDE standard operating of pollutants to the procedures included in prior MS4. The plan shall stormwater plans, the new written build on the existing IDDE plan will build upon those IDDE program to and further define the IDDE better define the standard operating procedures. processes of IDDE enforcement and the issuance of NOV's. Submit IDDE Plan to DEQ for approval. 2. Train staff on the 2. See BMP 50 2. See BMP 50 processes defined in the IDDE Plan and what is required by the IDDE ordinance. 3. Implement/Enforce 3. See BMP 27 3. See BMP 27 the approved IDDE Plan and IDDE Ordinance. 23. Location of Priority Areas Establish and maintain procedures 1. Use MS4 map to 1. Permit Year 1 1. Were priority areas for locating priority areas likely to locate outfalls near located? Yes, No; have illicit discharges. A high high pollution risk Status. priority area is an area that has a areas. high chance of stormwater NCS000480 SWMP Town of Rutherford College March 30, 2021 Page 38 Table 15: Illicit Discharge Detection and Elimination Bws pollution potential: Areas with 2. Review priority 2. Annually 2. Were additional known dry weather outfall areas to determine if priority areas flows/violations, repeat offenders, additional areas need Permit Years 1-5 determined? Yes, No; business/commercial areas, to be included as Status; industrial areas, and businesses priority areas. The with high pollution potential. priority areas will be Number of Priority re-evaluated on an areas added upon annual basis to add revision. additional high priority areas should they be found or new ones develop. 24. Dry Weather Outfall Inspections Perform regular dry weather (no 1. Establish procedures 1. Permit Year 1 1. Were dry weather rain in previous 48 hours) outfall to divide the Town and inspection procedures inspections to proactively identify create a schedule for and schedule illicit discharges and illicit dry weather established Yes, No; connections. The Town will be inspections for known Status; broken into 5 sections, with at outfalls. The least one section (20%) being procedures will be Date SOP and inspected each permit year. If defined by the Towns schedule established. additional outfalls are located, IDDE plan (BMP 21). 2. Implement dry 2. Annually, 2. Number of dry they will be included in further dry weather weather inspection weather inspections inspections/scheduling. procedures. Permit Years 2-5 completed; Date inspections Number of potential occurred, location of illicit discharges (from inspected outfall, and dry weather flow) photos of outfall will identified. be documented. 25. Illicit Discharges and Trace Sources Establish procedures to track and 1. Establish procedures 1. See BMP 27 1. See BMP 27 document Illicit Discharge to track verified investigations. The procedures discharges and trace will be defined by the Towns sources. IDDE plan (BMP 22). 2. Maintain illicit 2. See BMP 27 2. See BMP 27 discharge tracking documentation. 26. IDDE Plan Enforcement and Documentation NCS000480 SWMP Town of Rutherford College March 30, 2021 Page 39 Table 15: Illicit Discharge Detection and Elimination BMPs Implement the IDDE Plan to 1. Screen priority areas 1. Annually, 1. Number of illicit detect and address illicit likely to have illicit discharges found in discharges, illegal dumping and discharges (BMP 22). Permit Years 1-5 priority areas. any non-stormwater discharges identified as significant 2. Investigate and 2. See BMP 27 2. See BMP 27 contributors of pollutants to the MS4. Enforce IDDE issues. 3. Evaluate and assess 3. Annually 3. Were revisions to the IDDE the IDDE plan plan/program — Permit Years 1-5 needed? Yes, No; Identify where Status. improvements can be made based on data collected. Changes must be approved by DEQ from the previously approved IDDE Plan. Permit 3AA: IDDE Tracking Ref. Measures for tracking and documenting the date(s) an illicit discharge, illicit connection or illegal dumping was observed, the results of the investigation, any follow-up of the investigation, the date the investigation was closed, the issuance of enforcement actions, and the ability to identify chronic violators_ BMP A B C D No. Description of BMP Measurable Goal(s) Schedule for Annual Reporting Implementation Metric 27. IDDE Tracking 1. Establish a 1. Permit Year 1 1. Was IDDE tracking list/documentation list created? Yes, No; procedure for tracking Status; illicit discharge connections and illegal Date tracking list was dumping violations, made. outlining who made the complaint, location of violation, note prior offenses, status and action taken. NCS000480 SWMP Town of Rutherford College March 30, 2021 Page 40 Table 15: Illicit Discharge Detection and Elimination BMPs Staff will create and maintain the 2. Track illicit 2. Continuously, 2. Number of verified mechanisms for tracking and discharge/connection following IDDE issues. documenting the date(s) an illicit and illegal dumping establishment in discharge, illicit connection or reports/investigations Permit Year 1. illegal dumping was observed, utilizing the IDDE the results of the investigation, tracking Permit Years 1-5 any follow-up of the documentation/list investigation, the date the investigation was closed, the issuance of enforcement actions, The list will differentiate staff and identifying chronic violators. discovery from citizen reporting to allow for review of the outreach program. 3. Upon investigation, 3. Continuously, 3. Number of enforce Illicit violations/enforcement Discharge/connection Permit Years 1-5 actions issued; and Illegal Dumping violations to ensure the Number of responsible violations/enforcement party/violator remedies actions resolved. verified illicit discharges. 4. Establish and 4. Semi -Annually, 4. Number of chronic maintain a list of violators identified. chronic violators, as Permit Years 1-5 applicable. Updated on a Semi-annual basis. NCS000480 SWMP Town of Rutherford College March 30, 2021 Page 41 Table 15: Illicit Discharge Detection and Elimination BMPs 5. Evaluate and assess 5. Annually, 5. Were revisions to the IDDE the IDDE tracking documentation — Permit Years 2-5 documentation Identify where needed? Yes, No; improvement can be Status. made based on data collected, problems encountered and needs. Evaluation will be done on an annual basis to find shortcomings with the IDDE program should they be determined. Permit 3.4.5: Staff IDDE Training Ref. Measures to provide training for municipal staff and contractors who, as part of their normal :job responsibilities, may come into contact with or otherwise observe an illicit discharge, illicit connection or illegal dumping.Training shall include identifying and reporting illicit discharges, illicit connections and illegal dumping. Each staff training event shall be documented, including the agenda/materials, date, and number of staff 'participating. BMP A B C D No. Description of BMP Measurable Goal(s) Schedule for, Annual Reporting Implementation Metric 28. Staff Training Train municipal staff and 1. Identify staff 1. See BMP 11 1. See BMP 11 contractors to identify and report members and/or illicit discharges, illicit contractors that are connections, illegal dumping and likely to observe an spills. illicit discharge, illicit connection and illegal dumping. NCS000480 SWAP Town of Rutherford College March 30, 2021 Page 42 Table 15: Illicit Discharge Detection and Elimination BMPs 2. Hold IDDE training 2. See BMP 50 2. See BMP 50 events to educate staff and contractors in identifying and reporting illicit discharges, illicit connections, illegal dumping, and spills. Trainings will have a sign in sheet to track the names of trained individuals. 29. IDDE Educator Establish appropriate staff 1. Train hotline staff in 1. See BMP 12 1. See BMP 12 contacts for field inquiries IDDE awareness, regarding IDDE education, complaint call outreach, and complaints. During protocols, and the IDDE enforcement, an outreach appropriate contacts approach to raise awareness of for referral. 2. Utilizing the Towns 2. See BMP 12 2. See BMP 12 why the violation is problematic will be taken (See BMP 11). The social media and hotline will also function as a website, publicize mechanic for responding to IDDE contact information for 9 questions from the public. IDDE reporting. Permit 3.4.6: IDDE Reporting Ref. Measures for the publicand staff to report illicit discharges, illegal dumping and spills'. The mechanism shall be publicized to facilitate reporting and shall be managed to provide rapid response by appropriately trained personnel. BMP A B C D No. Description of BMP Measurable Goal(s) Schedule for Annual Reporting Implementation . Metric 30. IDDE Reporting Hotline Utilize the existing hotline for 1. Utilize the hotline 1. See BMP 12 1. See BMP 12 enabling the public and municipal (BMP 12) to receive employees to report illicit IDDE reports. NCS000480 S`VMP Town of Rutherford College March 30, 2021 Page 43 Table 15: Illicit Discharge Detection and Elimination BMPs discharges, illegal dumping, and 2. Train hotline staff to 2. See BMP 12 2. See BMP 12 spills. differentiate between illicit discharge complaints and stormwater/post- construction complaints. The staff will also be trained to keep adequate records of the calls for metrics. 3. Publicize Hotline by 3. See BMP 12 3. See BMP 12 including the phone number on educational materials. Post the hotline number on the Town website and shared via the Rutherford College Facebook account. 31. IDDE Email Online Reporting The Town will continue to utilize 1. Continue to utilize 1. See BMP 15 1. See BMP 15 the Rutherford College the Rutherford College Stormwater reporting email for Stormwater email for receiving IDDE reports/input. receiving IDDE reports/input. 32. IDDE Reporting Efficiency Staff will provide a rapid response 1. Utilize the GIS 1. See BMP 20 1. See BMP 20 to all complaints received. Staff online map layer will record the response dates and (BMP 19) to track the summary of results to improve time of complaint, site IDDE program and the online visit, type of complaint Map. and all enforcement/resolution measures. NCS000480 SWMP Town of Rutherford College March 30, 2021 Page 44 Table 15: Illicit Discharge Detection and Elimination BWs 2. Evaluate response 2. Annually, 2. Average response time. Work to time. minimize response Permit Years 1-5 time to reported issues and record what is causing those issues to be fixed in later iterations of the plan. Track the times elapsed between when an IDDE incident is reported, and when it is addressed. NCS000480 SWMP Town of Rutherford College March 30, 2021 Page 45 PART 8: CONSTRUCTION SITE RUNOFF CONTROL PROGRAM In accordance with 15A NCAC 02H .0153, the Town of Rutherford College relies upon the North Carolina Sedimentation Pollution Control Act (SPCA) of 1973 as a qualifying alternative program to meet a portion of the NPDES MS4 Permit requirements for construction site runoff control measures. The SPCA requirements include reducing pollutants in stormwater runoff from construction activities that result in land disturbance of greater than or equal to one acre, and includes any construction activity that is part of a larger common plan of development that would disturb one acre or more. The state SPCA Program is either delegated to a city/town, delegated to a county, or implemented by NCDEQ in non - delegated areas. Table 16: Qualifying Alternative Program Components for Construction Site Runoff Control Program Permit Legal Meets Whole Reference State or Local Program Name Authority Implementing Entity or Fart of Requirement ' 3.5.1 - State Implemented SPCA Program 15A NCAC NCDEQ Part 3.5.4 Chapter 04 The Town of Rutherford College also implements the following BMPs to meet NPDES MS4 Permit requirements. Table 17: Construction Site Runoff Control BMPs Permit 3.5.6: Public Input Ref. Measures to provide and promote a means for the public to notify the appropriate authorities of observed erosion and sedimentation problems. BMP A B C D No. Description of BMP Measurable Goal(s) Schedule for Annual Reporting Implementation Metric 33. Municipal Staff Training Train municipal staff who receive 1. Train municipal 1. See BMP 50 1. See BMP 50 calls from the public on the staff on proper protocols for referral and handling of documentation of construction construction site runoff site runoff control complaints. control complaints. NCS000480 SWMP Town of Rutherford College March 30, 2021 Page 46 Table 17: Construction Site Runoff Control:BMPs This shall build upon the concepts 2. Maintain a list of 2. Continuously, 2. Number of of previous municipal staff have trained municipal staff construction run-off taken part in by focusing on who have reported Permit Years 1-5 issues reported by reporting, identifying, and construction run-off municipal staff; knowing how to handle issues. construction runoff violations. Date trained staff reporting list was established. 34. Means of Public Input Utilize the survey, the hotline, and 1. Use survey (BMP 1. See BMP 18 1. See BMP 18 the online form to give citizens 17) to obtain feedback methods of responding to how about public construction runoff is being perspective about managed. The survey will ask construction runoff in questions regarding: how they view construction runoff in the the Town. 2. Administer the 2. See BMP 18 2. See BMP 18 Town, what they think should be survey. The survey changed to improve upon said will be linked on the problems, and where they believe Towns website. there should be more focus within 3. Utilize reporting 3. See BMP 15 3. See BMP 15 the program. email (BMP 14) that will allow citizens and the development community (separately distinguished) to write concerns and report construction runoff issues. 4. Publicize the ability 4. See BMP 15 4. See BMP 15 to report concerns about construction runoff issues via the stormwater email on the Towns website and Facebook Page. Permit 3.5.5: Waste Management Ref. Measures to require construction .site operators to control waste such as discarded building materials, concrete truck washout, chemicals, litter, and sanitary waste at the construction site that may cause adverse impact to water uality- A B C D NCS000480 SWMP Town of Rutherford College March 30, 2021 Page 47 Table 17. Construction Site Runoff Control BMPs' BMP No. Description of BNW Measurable Goals) Schedule for Implementation Annual Reporting Metric 35. Waste Management Require construction site 1. Develop an 1. Permit Year 1 1. Ordinance operators to control waste at the ordinance that developed: Yes or No, construction site that may cause addresses construction Status. adverse impact to water quality. site waste. 2. Adopt developed 2. Permit Year 1 2. Ordinance adopted; ordinance through Yes, No; Status. council approval. Date ordinance was adopted. 3. Train municipal 3. See BMP 50 3. See BMP 50 staff on identifying and reporting construction waste violations. 4. Maintain adopted 4. Annually 4. Were any revisions ordinance (if revisions to the waste are needed). Permit years 2-5 management ordinance made? Yes, No; Status. If revisions were needed, date of revisions 5. Enforce ordinance 5. See BMP 20 5. See BMP 20 by using the online GIS map layer to track and document construction site waste concerns and corrective actions. NCS000480 SWMP Town of Rutherford College March 30, 2021 Page 48 PART 9: POST -CONSTRUCTION SITE RUNOFF CONTROL PROGRAM MS4 Inspection Report for the Town of Rutherford College — Post -construction Site Runoff Control Program Implementation Status, Permit Citation: Currently, the Town does not have a mechanism in place to require deed restrictions and protective covenants. Within the ordinance established in Permit Year One enabling language granting the Town of Rutherford College the ability to require deed restrictions and protective covenants (II.17.2.e.) will be included. An inventory of projects will be kept and proactive inspections will be administered by Staff semi- annually. A private engineer will certify each SCM annually to ensure functionality (II.F.2.g.) Upon non-compliance, enforcement action will be taken, not a common practice in years past, but now the Town will have a spreadsheet to record enforcement action to obtain compliance (H.F.2.i.). MS4 Inspection Report for the Town of Rutherford College — Post -construction Site Runoff Control Program Implementation Status, Permit Citation: H.F.3.c. Nutrient Sensitive Waters: The Town had not designed or constructed any SCMs in the permitted area specifically to reduce nutrient loads. This SWMP identifies the minimum elements to develop, implement and enforce a program to address stormwater runoff from new development and redevelopment projects that disturb greater than or equal to one acre, including projects less than one acre that are part of a larger common plan of development or sale, that are located within the Town of Rutherford College and discharge into the MS4. These elements are designed to minimize water quality impacts by utilizing a combination of structural Stormwater Control Measures (SCMs) and/or non-structural BMPs appropriate for the community, and ensure adequate long-term operation and maintenance of SCMs. In accordance with 15A NCAC 02H .0153 and .1017, the Town of Rutherford College implements the following State post -construction program requirements, which satisfy the NPDES Phase H MS4 post - construction site runoff control requirements as Qualifying Alternative Program(s) (QAPs) in the MS4 area(s) where they are implemented. Table 18: Qualifying Alternative Program(s) for Post -Construction Site Runoff Control Program State QAP Name State Requirements Local Ordinance / Regulatory Mechanism Reference Water Supply Watershed (WS-IV) 15A NCAC 2B WS-IV Watershed Ordinance (See .0620 - .0624 map) NCS000480 SWMP Town of Rutherford College March 30, 2021 Page 49 NCS000480 SWMP Town of Rutherford College March 30, 2021 Page 50 The Town of Rutherford College has existing requirements including the presence of a Qualifying Alternative Program(s) in all of the Town limits. The Qualified Alternative Program is the Lake Rhodhiss water supply watershed Critical Area WS-IV and Protected Area WS-IV. To ensure compliance with the NPDES MS4 Phase II post -construction program requirements the Town of Rutherford College applies the post -construction standards throughout the Town Limits, including the area that is located within the water supply watershed. These requirements are to be adopted as local ordinance(s) per BMP 37.B.1. and implementation per BMP 37.B.3-4, and are summarized in Table 19 below. NCS000480 SWMP Town of Rutherford College March 30, 2021 Page 51 Table 19: Summary of Existing Post -Construction Program Elements Permit Requirements for Municipal Ordinance/Code Reference(s) Date Adopted Plan Review and Approval and/or Document Title(s) 3.6.2(a) Authority Chapter 152 Zoning Code Watershed 4/5/2010 Protection 152.110 3.6.3(a) & 15A NCAC Chapter 152 Zoning Code Watershed 4/5/2010 02H.0153(c) Federal, State & Protection 152.111 Local Projects 3.6.3(b) Plan Review Chapter 152 Zoning Code Watershed 4/5/2010 Protection 152.155-152.122 3.6.3(c) O&M Agreement Chapter 152 Zoning Code Watershed 4/5/2010 Protection 152.124 3.6.3(d) O&M Plan Chapter 152 Zoning Code Watershed 4/5/2010 Protection 152.124 3.6.3(e) Deed Chapter 152 Zoning Code Watershed 4/5/2010 Restrictions/Covenants Protection 152.122 3.6.3(f) Access Easements Chapter 152 Zoning Code Watershed 4/5/2010 Protection 152.122 Permit Requirements for Municipal Ordinance/Code Reference(s) Date Adopted Inspections and Enforcement and/or Document Titles 3.6.2(b) Documentation Chapter 152 Zoning Code Watershed 4/5/2010 Protection 152.126 3.6.2(c) Right of Entry Chapter 152 Zoning Code Watershed 4/5/2010 Protection 152.115 3.6.4(a) Pre -CO Inspections Chapter 152 Zoning Code Watershed 4/5/2010 Protection 152.126 3.6.4(b) Compliance with Plans Chapter 152 Zoning Code Watershed 4/5/2010 Protection 152.126 3.6.4(c) Annual SCM Inspections Chapter 152 Zoning Code Watershed 4/5/2010 Protection 152.126 3.6.4(d) Low Density Inspections Chapter 152 Zoning Code Watershed 4/5/2010 Protection 152.126 3.6.4(e) Qualified Professional Chapter 152 Zoning Code Watershed 4/5/2010 Protection 152.122 Permit Requirements for Municipal Ordinance/Code Reference(s) Date Adopted Fecal CoIiform Reduction and/or Document Title(s) 3.6.6(a) Pet Waste Burke County Animal Control Ordinance 08/2017 Section 6-1 3.6.6(b) On -Site Domestic Chapter 51: Sewer Use Regulations 51.020 11/11/1984 Wastewater Treatment NCS000480 SWMP Town of Rutherford College March 30, 2021 Page 52 The annual reporting metrics for the post construction program are provided in Table 20: Post Construction Site Runoff Control BMPs below. Table 20: Post Construction Site Runoff Control BMPs Permit 4..1.3: Minimum Post -Construction Reporting Requirements Ref. '_ Measures to document activities over the course of the fiscal year (July l — June 30) including appropriate information to accurately describe rogress, status, and results. BMP A B C D No. Description of BMP Measurable Goal(s) Schedule for Annual Reporting Implementation Metric 36. Standard Reporting Implement standardized tracking, 1. Track number of 1. Continuously 1. Number of plan documentation, inspections and low density and high Permit Years 1-5 reviews performed for reporting mechanisms to compile density plan reviews low density and high appropriate data for the annual performed. density. self -assessment process. Data 2. Track number of 2. Continuously 2. Number of plan shall be provided for each Post- low density and high Permit Years 1-5 approvals issued for Construction/ Qualifying density plans low density and high Alternative Program being -approved. density. implemented as listed in Tables 3. Maintain a current 3. Continuously 3. Summary of number 18 and 19. inventory of low Permit Years 1-5 and type of SCMs density projects and added to the inventory; constructed SCMs and number and including SCM type or acreage of low density low density acreage, projects constructed. location and last inspection date. 4. Track number of 4. Continuously 4. Number of SCM SCM inspections Permit Years 1-5 inspections. performed. 5. Track number of 5. Continuously 5. Number of low low density Permit Years 1-5 density projects inspections performed. inspected. 6. Track number and 6. Continuously 6. Number of type of enforcement Permit Years 1-5 enforcement actions actions taken. issued. Permit 2.3':and 36: Qualifying Alternative Program(s) Ref. Measures to develop, implement and enforce additional BMPs in order to comply with the QAP state program requirements. BMP A B C D No. Description of BMP Measurable Goals) Schedule for Annual Reporting Implementation Metric NCS000480 SWMP Town of Rutherford College March 30, 2021 Page 53 Table 20: Post Construction Site Runoff Control BMPs 37. Qualifying Alternative Program The QAP requirements are applicable to the Town of Rutherford College; however the Phase II Post - construction Stormwater Ordinance is being administered to fulfill both requirements. Permit 3.6.2: Legal Authority Ref. Measures to maintain adequate legal authorities through ordinance or other regulatory mechanism to (a) review designs and proposals for new development and redevelopment to determine whether adequate storm, water control measures will be installed, implemented, and maintained, (b) request ,information such as stormwater plans, inspection reports, monitoring results, and other, information deemed necessary to evaluate compliance with the Post -Construction Stormwater Management Program, and (c) enter private property for the purpose of inspecting at reasonable times any facilities, equipment, practices, or operations related to stormwater discharges to determinewhether there is compliance with the Post -Construction Stormwater Management ; Program. MP A B C D No. Description of BMP Measurable Goal(s) Schedule for Annual Reporting Implementation Metric 38. Maintain Legal Authority The Town has adopted and will 1. Train staff (field 1. See BMP 50 1. See BMP 50 maintain in effect the the Water and office) in WSW Supply Watershed Model Ordinance procedures Ordinance (referenced in table 19 and enforcement above), which gives the Town actions. legal authority to review designs 2. Enforcement of the 2. Continuously, 2. Number of notices for new development and WSW Ordinance to of violations issued; redevelopment, to ensure ensure compliance of Permit Years 1-5 adequate stormwater controls, to new structures. Should Number of Civil request information, to perform the correct processes Citations issued; inspections on private property, and order not be and to perform other compliance followed, a notice of Number of still in activities related to this measure. violation will be progress of abatement The ordinance references the issued to address the at time of annual DEQ BMP Design Manual as the violation. report. source of standards to be used in selecting, designing, evaluating, and maintaining structural and non-structural BMPs. NCS000480 SWMP Town of Rutherford College March 30, 2021 Page 54 Table 20: Post Construction Site Runoff Control BMPs Permit 3.6.3: Plan Review and Approval Ref. Measures to maintain plan review and approval authority, standards and procedures to (a) Require Federal, State, and local goverrnlient projects to comply with Post -Construction Program requirements throughout the entire MS4 permitted area, unless the entity is subject to its own NPDES MS4 permit or a qualifying alternative program,(b) Conduct site plan reviews of all new development and redeveloped sites that disturb greater than or equal to one acre, and sites that disturb less than one acre that are part of a larger common plan of development or sale for compliance with 15A NCAC 02H.1017 and the qualifying alternative programs that apply within your jurisdiction,; (c) Ensure that each projecthas an Operation and Maintenance Agreement that complies with 15A NCAC 02H. 1050(12), (d) Ensure that each project has an Operation and Maintenance Plan that complies with 15A NCAC 02H .1050(13), (e) Ensure that each project has recorded deed restrictions and protective covenants, that require the project to be maintained consistent with approved plans, and ) Ensure that each SCM and associated maintenance accesses be protected in a permanent recorded easement per 15AA. NCAC 02H 1050 (9) and (10). BMP A B C D No. Description of BMP Measurable Goal(s) Schedule for Annual Reporting Implementation Metric 39. Plan Review and Approval Review plans for all new 1. Review procedures 1. Annually, 1. Were changes to the development and redevelopment and submittal procedures/submittal sites that will disturb greater than documents annually to Permit Years 1-5 documents needed? or equal to one acre (including determine if items need Yes, No; Status projects less than one acre that are to be added or part of a larger common plan of modified. If revisions were development or sale). needed, date of revisions All required submittals (as 2. Review plans for all 2. See BMP 36 2. See BMP 36 defined by the plan review procedures) must be received by new development and the Town before the issuance of a redevelopment sites Certificate of Occupancy (per that will disturb greater development). Should the than or equal to one procedures not be followed, a acre. This is including notice of violation and stop work projects less than one order will be issued in accordance acre that are part of a with the Town's ordinance and larger common plan of SOP. development or sale. This requirement also The Town of Rutherford College applies to Federal, State requires the County to hold the and Local Government Certificate of Occupancy on all projects. NCS000480 SWMP Town of Rutherford College March 30, 2021 Page 55 Table 20: Post Construction Site Runoff Control BMPs developments that fall under 3. Maintain the existing 3. See BMP 36 3. See BMP 36 stormwater regulations within the SCM Inventory sheet. Town. The CO is not issued until Said sheet tracks all all stormwater requirements required submittals, (designs, submittals, and relevant information, inspections) are satisfied and the and all projects within Stormwater Administrator the Town that have approves the issuance. gone through (and/or are going through) the The Town of Rutherford College stormwater review utilizes West Consultants to do procedure. SCM plan review regarding the structures, but the Town shall continue to manage the submittal/documentation part of the review. The Town collects the submittal documents and issues the permit after West Consultants reviews the SCM and drainage designs. West Consultants is recommended to encourage SCMs that help reduce nutrient loading to encourage the quality of nearby water bodies. 40. Operation and Maintenance Agreement and Plan The Operation and Maintenance 1. New SCMs built 1. Continuous 1. Number of (O&M) agreement requires within the Town shall permitted projects owners of structural SCMs to submit an approved Permit Years 1-5 with O&M plans that perpetually maintain and operate O&M Agreement and received their CO. the SCM according to the O&M O&M Plan prior to CO, plan submitted during the plan along with other review process, and shall require submittal requirements. submission of annual inspection Each O&M agreement reports written by a qualified will include a professional. requirement for annual inspections. 41. Recordation NCS000480 SWMP Town of Rutherford College March 30, 2021 Page 56 Table 20: Post Construction Site Runoff Control BMPs The plan review process shall 1. Ensure each project 1. See BMP 36 1. See BMP 36 include verification that has recorded deed permanent legal mechanisms are restrictions/protective in effect ensuring the project is covenants in effect to built consistently with its ensure development approved plans. This will be activities will be verified through the submittal of maintained consistent an engineer's certification and with the approved plans providing an as -built. These must (low and high density be received and accepted to -projects). approve the issuance of that 2. Ensure that each 2. See BMP 36 2. See BMP 36 projects CO. SCM and associated maintenance access A recorded deed restriction or areas are recorded in a protective covenant, along with permanent easement to an access easement is established guarantee access for through recordation. Recording inspection and both the access easement and maintenance of the deed restrictions are required for SCM by the Town. the issuance of a Certificate of Occupancy on high density developments. Permit 3.6.4: Inspections and Enforcement Ref. Measures to maintain inspection and enforcement authority, standards and procedures to: (a) Conduct post - construction inspections prior to issuing a Certificate of Occupancy or a Temporary Certificate of Occupancy. Alternatively, the project owner may provide a surety bond to guarantee compliance with the approved plan(s), (b); Ensure that the project has been constructed in accordance with the approved plan(s), (c) Ensure annual' inspection of each permitted SCM to ensure compliance with the approved Operation and Maintenance Agreement, (d) Ensure inspection of low density projects at least once during the permit term, and (e) Require that inspections be conducted by a qualified professional. BMP A B C D No. Description of BMP Measurable Goal(s) Schedule for Annual Reporting Implementation Metric 42. Inspection and Enforcement NCS000480 SWMP Town of Rutherford College March 30, 2021 Page 57 Table 20: Post Construction Site Runoff Control BMPs After project completion, but 1. Prior to issuance of a 1. Continuously 1. Number of pre -CO prior to issuance of a certificate of CO, a qualified Town inspections completed occupancy, an inspection will be representative shall Permit Years 1-5 completed by a qualified perform an inspection Number of repeat professional and/or a qualified on all project SCMs to inspections required. representative of the Town to ensure compliance. If ensure the project has been corrections are constructed according to the required, then follow plan/design. Following approval, up inspections will be annual inspections by a qualified performed until the professional will be completed. SCM and project site is Low density projects will be compliant prior to the inspected once in a permit term to issuance of CO. 2. Qualified municipal 2. Annually, 2. Number of SCM monitor potential unpermitted expansion and apply enforcement staff will perform inspections completed; if violations are found. inspections of all SCMs Permit Year 1-5 (both government and Number of failed Town of Rutherford College staff non -government) SCM inspections. will be responsible for the within the Town. municipal inspection of SCMs 3. The Owner of the 3. Annually 3. Number of qualified annually. SCM shall have a licensed professional Qualified Licensed Permit Year 1-5 inspections completed Professional perform an with documentation SCM inspection in received. accordance with the O&M Agreement and Number of SCMs DEQ SCM manuals under annual once a year. inspection enforcement. 4. Conduct inspection 4. Annually 4. Number of low of density inspections 20% of low -density Permit Years 1-5 done; Number of low projects each year (See density violators BMP 35 for inventory). found; Number of low density enforcement actions issued. NCS000480 SWMP Town of Rutherford College March 30, 2021 Page 58 Table 20: Post Construction Site Runoff Control BMPs Permit 3.6.5: Documentation Ref. ' Measures to maintain adequate documentation and standardized inspection and tracking mechanisms to: (a) Maintain an inventory of post construction SCMs and low density projects, (b) Document, track and maintain records of inspections and enforcement actions. Tracking shall include the ability to identify chronic violators, and (c) Make:available to developers all relevant ordinances, post-construction.require eats, design; standards, checklists, and/or othermaterials. BMP A B C D No. Description of BMP Measurable Goal(s) Schedule for Annual Reporting Implementation Metric 43. Documentation — Low Density Ensure tracking and records are 1. Maintain low 1. See BMP 36 1. See BMP 36 maintained on low density density project list to projects to ensure that upon include existing sites. inspection, impervious overages 2. Inspect the 2. See BMP 42 2. See BMP 42 can be determined, and corrective completed low -density actions taken. Ensure projects to ensure the informational materials are projects have not available on the Towns website to expanded into a high guarantee accessibility outside of density classification office hours. Through tracking thus needing a SCM. and inspections chronic violators will be identified. 20% of the low 3. Provide educational 3. Continuously 3. Number of low density sites will be inspected per materials to the density educational year. general public about Permit Years 1-5 materials distributed. low density developments: during the issuance of zoning permits, distributed through mailings, posted on social media, and handed out at events. NCS000480 SWMP Town of Rutherford College March 30, 2021 Page 59 Table 20: Post Construction Site Runoff Control BMPs 44. Documentation — High Density Ensure tracking and records are 1 Maintain an 1, See BMP 36 1 See BMP 36 maintained on projects to ensure inventory of all that upon granting of final CO developments and and follow-up inspection redevelopments impervious overages can be (public and private) determined and corrective actions with SCMs. Update taken. Ensure informational inventory as projects materials are available online to are reviewed, guarantee accessibility outside of approved, and office hours. Through tracking and inspections chronic violators constructed. 2. Provide educational 2. Continuously, 2. Number of high will be identified. material to developers density informational about high density Permit Years 1-5 materials distributed. development. At a minimum, hyperlinks will be maintained on the Towns web page directed to the Ordinance and to the BMP Design Manual. Printed materials will be distributed (but not limited to): during the issuance of zoning permits, distributed through mail, digitally posted on social media, and handed out at events. 3. Establish links to all 3. Annually 3. Items placed on the ordinances, manuals, webpage: Yes or No, policies, checklists, Permit Years 1-5 Status; design standards, and/or other materials Were items replaced on the Towns website. with current versions if revisions were required? Yes, No; Status. NCS000480 SWMP Town of Rutherford College March 30, 2021 Page 60 Table 20: Post Construction Site Runoff Control BMPs Permit 3.6.6: Fecal Coliform Reduction Ref. ` Measures to control, to the maximum extent practicable, sources of fecal coliform per 15A NCAC 02H .1017(7). At a minimum, the program shall include: (a) A pet waste management component, which may be achieved by revising an existing litter ordinance, and (b) An on -site domestic wastewater treatment system component, if applicable, which may be coordinated with local county health department, to ensure proper operation and maintenance of such systems. BMP A B C D No. Description of BMP Measurable Goal(s) Schedule for Annual Reporting Implementation Metric 45. Fecal Coliform Reduction Protective measures have been 1. Develop and adopt 1. Annually 1. Was the Pet Waste established through the adoption of a Pet Waste Ordinance Adopted? the pet waste component of the Ordinance to reduce Permit Years 1-5 Yes, No; Status. Phase II Stormwater Ordinance. the amount of pet waste that reaches Date of adoption Almost all the Town of Rutherford receiving water Colleges wastewater is managed bodies. 2. Develop and 2. Continuously, 2. Number of via a sewer system — however there are still some septic tanks distribute educational wastewater outside of the town that could materials on the Permit Years 1-5 educational materials potentially become a source of impacts of distributed. fecal coliform pollution. The larger unmaintained concern from wastewater fecal wastewater systems pollution comes from have on water unmaintained sewer lines/sewer quality. These flyers breaks. An outreach approach will will be used to raise be taken to assist in reducing this awareness of septic pollutant and raise awareness of wastewater pollution. what impacts not repairing/maintaming sewer lines has on water quality. NCS000480 SWMP Town of Rutherford College March 30, 2021 Page 61 PART 10: POLLUTION PREVENTION AND GOOD HOUSEKEEPING PROGRAMS This SWAP provides a comprehensive pollution prevention and good housekeeping strategy for the Town of Rutherford College municipal facilities and operations. Pollution prevention and good housekeeping is accomplished through the implementation of seven required programs, which collectively address the ultimate goal of preventing or reducing pollutant runoff from municipal operations such as park and open space maintenance, fleet and building maintenance, new construction and land disturbances, and municipal storm sewer system maintenance. Pollution prevention and good housekeeping for municipal operations includes the following programs: 1. Municipal Facilities Operation and Maintenance Program 2. Spill Response Program 3. MS4 Operation and Maintenance Program 4. Municipal SCM Operation and Maintenance Program 5. Pesticide, Herbicide and Fertilizer Management Program 6. Vehicle and Equipment Cleaning Program 7. Pavement Management Program The Town of Rutherford College will manage, implement and report the pollution prevention and good housekeeping BMPs as specified in Table 21 below for each required program. In response to the inefficiencies identified in the MS4 Inspection Report, Permit Citations II.G.2.a., the Town had maintained an inventory of municipal facilities, but had not determined which facilities were at risk to generate polluted stormwater runoff. A list of these possible polluters will be established. An O & M program for the facilities, SCMs, catch basins and conveyance systems has not be created to date (II.G.2.b, II.G.2.e, and II.G.2.£). After the acceptance of the SWMP and in Permit Year One, an O & M program will be established. (BMP 45). Furthermore, the municipal facilities and SCMs were being inspected annually, as required per DEQ, but did not include documentation for potential stormwater impacts (II.G.2.b. and II.G.21.). Incorporated in the O & M program, staff will be trained to determine appropriate operations and maintenance for facilities and SCMs. To date staff had no training in this area. The Town of Rutherford College staff did not perform street maintenance, including cleaning of catch basins and stormwater conveyances (II.G.2.e). II.G.2.d states that "The Town of Rutherford College did not evaluate BMPs based on their pollutant removal" in reference to streets, roads, and public parking lot maintenance. Several of the BMPs below address this issue by developing, adopting, and maintaining procedures that focus on pollutant removal in these impervious areas. Permit Reference: 3.7.7, BMP's 58-61 address this prior lack of evaluation and program implementation. BMP 58 focuses on setting schedules and requirements for street/parking lot sweeping. BMPs 59 and BMP 60 focuses on minimizing and collecting litter/debris, with BMP 59.B.2 working in part as a community outreach program. BMP 61 addresses procedures for cleaning the oils, fluids, and debris that can come from car accidents by utilizing the developed standard spill procedures as necessary according to II.G.2.c. NCS000480 SWMP Town of Rutherford College March 30, 2021 Page 62 In the audit, II.G.2.e addresses the prior lack of maintenance of the Town's storm sewer system, Permit Reference, 3.7.3, BMP's 48-51 focus on the training, inspection, and maintenance of said system. BMP 48 develops the required O&M plan which defines procedures/schedules, BMP 49 trains maintainers on the correct procedure, BMP 50 focuses on inspection along with its documentation, and BMP 51 addresses the audit problem itself by performing the maintenance on the system with documentation. Previously, the use of pesticides, herbicides, and fertilizers in municipal facilities was not well tracked or managed as stated in II.G.2.i. Permit Reference, 3.7.5, BMP 54 focuses to ensure all staff using pesticides, herbicides, and fertilizers are officially certified and following appropriate (minimal) usage. BMP 55 focuses on tracking contractor certification as well as the copies of permits of both municipal staff and contractors. II.G.2.j. addresses inconstant/lacking training for municipal employees in regards to good housekeeping and pollution practices. This is addressed in: 46.B.5, 47.B.4, 49.B.I BMP 53.B.5, 54.B.1, 56.13.2, 57.b.3, 6 Lb.1, and 45.b.1. Each of these BMPs focusing on each of the 7 programs required by the permit. II.G.2.k. addresses a lack of measures regarding correct waste disposal and cleaning of municipal vehicles/equipment. BMP 56 focuses on the washing side of the problem, addressing training, protocol, requirements, and options for municipal vehicle operators. BMP 57 focuses on the other side of the issue, ensuring that vehicle maintenance facilities are correctly disposing of waste and that permitting is correctly followed to ensure MS4 compliance. Table 21: Pollution Prevention and Good Housekeeping BMPs Permit 3.7.1: Municipal Facilities Operation and' Maintenance Program Ref. Measures to manage facilities that are owned and operated by thepermittee and have the potential for generating polluted stormwater runoff. The permee shall maintain a current inventory of municipal facilities; perform facility inspections and routine maintenance; establish specific frequencies, schedules, and standard documentation; provide staff training on general stormwater awareness and implementing pollution prevention and good housekeeping ractices. BMP A B C D No. Description of BMP Measurable Goal(s) Schedule for Annual Reporting Implementation Metric 46. Municipal Facilities Operation & Maintenance (O & M) Plan NCS000480 SWMP Town of Rutherford College March 30, 2021 Page 63 Table 21: Pollution Prevention and Good Housekeeping BMPs An O & M Plan must be 1. Inspect all 1. See BMP 47 1. See BMP 47 developed, implemented, and municipal facilities to maintained for each municipal determine which facility with the potential to facilities require an generate stormwater pollution. O&M plan to be These plans will define the developed. All expectations of the facility in facilities will be regards to stormwater/MS4 inspected once per regulations. Each municipal permit term. facility in which this is applicable Applicable facilities will implement an O&M plan. will be inspected The implementation of a plan annually (See BMP entails signing a legally binding 47). 2. Develop an O & M 2. Permit Year 1 2. Number of facility document that defines the party charged with ensuring that the plan for each O&M plans facility is correctly maintained municipal facility with developed. and documentation of the the potential to maintenance is adequate. The generate stormwater documents will also define the pollution. Each plan procedures in how the facility will will define required be maintained to reduce the risk procedures per of stormwater pollution. The applicable facility to facilities requiring O&M plans inspect, maintain and will be inventoried through BMP evaluate the facilities 46. Should the facility maintain risk of stormwater and/or store vehicles, washing pollution. procedures will be defined in the 3. Implement the 3. Continuously 3. Number of facility facilities O&M plan. written O & M Plan O&M plans (per applicable Permit Years 2-5 implemented. facility). 4. Enforce and inspect 4. See BMP 47 4. See BMP 47 the facilities to ensure compliance with the O & M Plans. NCS000480 SWMP Town of Rutherford College March 30, 2021 Page 64 Table 21: Pollution Preventionand Good Housekeeping BMPs 47. Municipal Facility and Inspections The municipal facilities operation 1. Establish: standard 1. Permit Year 1 1. Were procedures and maintenance plan will ensure operating procedures established? Yes, No; the facilities are being for municipal facility Status; managed/maintained in a way that inspections, a schedule does not negatively impact water of inspections, and a Date procedures quality. The facilities will be standard for report established; maintained in a scheduled and documentation/trackin well-defined manner by g. Was an inspection performing routine inspections. If schedule established? a facility is subject to SPCC requirements, then specific Date of schedule inspection procedures will be establishment. completed per the SPCC 2. Verify/reevaluate 2. Annually 2. Number of facilities requirements. the pollution potential added to the pollution As an inventory of municipally of facilities from the Permit Year 1-5 potential inventory owned facilities with stormwater existing facility pollution potential already exists, inventory. any new municipal facilities built This will be done during the permit cycle will be during facility evaluated and added to the list inspections to after the facilities completion. determine if the facility has become, or still is, a potential source of pollution. The inventory shall be split between high potential and low potential facilities. 3. Perform annual 3. Annually 3. Number of facilities facility inspections for inspected; high stormwater Permit Years 1-5 pollution potential Number of SPCC facilities and once per permitted facilities permit term inspected. inspections for low potential facilities, following the inspection SOP's established in BMP No. 46.1. NCS000480 SWMP Town of Rutherford College March 30, 2021 Page 65 Table 21: Pollution Prevention and Good Housekeeping BMPs 4. Document and 4. Annually 4. Number of correct issues found corrective actions during inspections. if' Permit Years 1-5 taken a facility is subject to (SPCC pennitted SPCC requirements, facilities and non - then ensure the correct SPCC facilities). documentation is in place for compliance with the regulation/requirement S. 5. Train municipal 5. See BMP 50 5. See BMP 50 facility staff on proper stormwater awareness and good housekeeping methods. Permit 3.7.2: Spill Response Program Ref. Measures'for facilities and operations that store and/or use materials that have the potential to contaminate stormwater runoff if spilled. The permittee shall maintain written spill response procedures and train staff on spill, response procedures. BMP A B C D No. Description of BMP Measurable Goal(s) Schedule for Implementation Annual Reporting Metric 48. Spill Response 1. Develop a written 1. Permit Year 1 1. Were the procedures spill response created for all facilities procedure plan for that require one Yes, each facility that No; Status Summary. requires one. 2. Implement the spill 2. Continuously 2. Number of spill response procedures response plans plan (per facility). Permit Years 2-5 implemented. 3. Maintain spill 3. Annually 3. Number of spill response procedures in response procedure response to problems Permit Years 1-5 plans that required that may arise from revisions. implementation of spill procedures. NCS000480 SWMP Town of Rutherford College March 30, 2021 Page 66 Table 21: Pollution Preventionand Good Housekeeping BMPs Spill response program for 4. Train facility staff 4. See BMP 50 4. See BMP 50 facilities and operations that store on spill response and/or use materials that pose a procedures. spill risk. The program will be 5. Respond to spills as 5. Continuously, 5. Number of non - designed in a way that tracks they occur and manage reportable spills; potential polluting facilities as the spills following Permit Years 1-5 well as defining the established spill Number of spills procedures/materials required for procedures. reported to DEQ. spill response in those facilities. Spill response procedures and Reportable spills (per plans can be included in the §143-215.85) will be facilities O&M plan. reported to DEQ. The definition of reportable spills will be written into each facility spill response plans following §143-215.85. Permit 3'7.3: MS4 Operation and Maintenance Program Ref. ` Measures to minimize pollutants in the stormwater collection system. The permittee shall provide operation and maintenance staff training .on stormwater awareness and pollution prevention, perform MS4 inspections, maintain the collection system including catch basins and conveyances; and establish specific frequencies, schedules, and standard documentation. BMP A B C D No. Description of BMP Measurable Goal(s) Schedule for Annual Reporting Implementation Metric 49. MS4 Operation & Maintenance (O & M) Plan An O & M Plan must be 1. Develop an O&M 1. Permit Year 1 1. Was the MS4 O&M developed, implemented and plan to define the Plan developed: Yes maintained to follow the required procedures to or No, Status. requirements of the MS4 NPDES schedule inspections, Phase II Stormwater collection perform maintenance system permit. As a component of and evaluations of the this plan, a capital improvement stormwater collection component will be included to system. The plan shall assist in prioritizing parts of the cover inspection MS4 as determined by the MS4 schedules, standard inspections (BMP 50) The O&M documentation, and staff responsibilities. NCS000480 SWMP Town of Rutherford College March 30, 2021 Page 67 Table 21: Pollution Prevention and Good Housekeeping BMPs Plan must also be submitted to 2. Submit the 2. Permit Year 1 2. Was the O & M DEQ for approval. developed O&M Plan Plan approved by to DEQ for approval. DEQ: Yes or No, Malcolm Boulevard is the only Status; street in Rutherford College that has a curb and gutter system. As Date of submittal to such preventative maintenance is DEQ. already done to clean this state 3. Implement the 3. Permit Years 2-5 3. Was the O&M Plan owned street, it will be included in the MS4 O&M plan. written and approved implemented, Yes, O&M Plan. No; Status. 4. Administer the 4. Continuously, 4. Number of MS4 O&M Plan (See BMP inspections completed. 51 & 52). Permit Year 2-5 50. MS4 Training Provide MS4 training to 1. Hold MS4 training 1. Permit Year 1 1. Number of trainings municipal and contracted staff to events to educate staff held; minimize pollutants in the on MS4 topics listed in stormwater collection system, the referencing BMPs. Number of personnel prevent unnecessary damage and wear on the system, increase Train all current municipal staff on trained. awareness of stormwater issues, permit year one, and show the procedures on how regardless of prior to deal with stormwater related training to bring them issues. up to current standards. This will These trainings will cover: illicit reoccur at the discharges, pollution prevention, beginning of each new outreach, how to respond to IDDE permit cycle or post construction issues, spill prevention and response The topics covered and procedures, municipal facility number of participants requirements, construction runoff, will be recorded at Post construction ordinance and each training. 2. Train any newly 2. Permit Years 2-5 2. Number of trainings procedures, pesticide and fertilizer management, IDDE Plan hired staff during held; procedures and requirements, permit years 2-5 or IDDE ordinance, and good were not previously Number of personnel housekeeping procedures. trained on stormwater trained. best management practices 51. MS4 Inspection NCS000480 SWMP Town of Rutherford College March 30, 2021 Page 68 Table 21: Pollution Prevention and Good Housekeeping BMPs Proactively perform MS4 1. Inspect the MS4 1. Continuously 1. Number of catch inspections to ensure clogged infrastructure (pipes, basins and lines, non-functioning SCMs, and major outfalls, Permit Years 1-5 conveyances drainage inadequacies are stormwater inspected; Number of identified. conveyances, and conveyance issues basins) to ensure found/reported; Miles functionality. of ROW's inspected 52. MS4 Maintenance MS4 inspections to ensure 1. Inspect all 1. See BMP 51 1. See BMP 51 clogged lines, non-functioning municipal catch basins basins, and drainage inadequacies and conveyances on an are repaired. If the municipality annual basis and/or cannot reasonably maintain issues upon report of with MS4 infrastructure found in maintenance being a permit year, it can be contracted required. 2. Maintenance will be 2. Continuously, 2. Number of MS4 out to a qualified licensed professional if the Town so completed upon cleanings/maintenance chooses to do so. The town will finding through Permit Years 1-5 actions performed. utilize public works resources to inspection or receiving maintain the MS4 infrastructure; reports of MS4 or the issue will be included in the infrastructure in poor Towns capital improvement condition. project list, and appropriately prioritized depending on the nature of the repair. Permit 3.7.4: Municipal SCM Operation and Maintenance Program Ref. Measures to manage municipally -owned, operated, and/or maintained structural stormwater control measures (SCMs) that are installed for compliance with the permittee's post -construction program. The permittee shall maintain a current inventory of SCMs, perform SCM inspections and maintenance, and shall establish specific frequencies, schedules, and documentation. BMP A B C D No. Description of BMP Measurable Goal(s) Schedule for Annual Reporting Implementation Metric 53. Municipal SCMs Operation & Maintenance (O & M) Plan NCS000480 SWMP Town of Rutherford College March 30, 2021 Page 69 The maintenance procedures and inventory of the Towns municipal SCMs will be kept up to date. However, at the time of developing this SWMP the Town does not currently have a municipally owned SCM. Should the Town of Rutherford College need to install one following expansion, these procedures will be followed. 54. 1 Municipal SCMs The municipal SCM/s operation and maintenance program will ensure the stormwater structures are being managed/maintained in a way that does not negatively impact water quality. The SCMs will be maintained in a scheduled and well-defined manner written in its O&M plan. At the time of developing this SWMP the Town of Rutherford College does not currently have a municipally owned SCM. Should the Town need to install one following expansion, these procedures will be followed. 1. Maintain an inventory of existing Town -owned SCMs with information including type, year built, date of last inspection, and maintenance actions. 2. Develop and maintain SCM Operation and Maintenance Plans for each Town -owned SCM. 3. Review/Update SCM inventory as necessitated by new Town 1. Verify the existing list of municipal SCMs is correct by visiting the sites to determine type and condition. Use aerial photography in conjunction with Town records to determine SCM location/ ownership. 2. Maintain Inventory of municipally owned SCMs. Add all new SCMs as they are constructed. 3. Perform annual inspection and maintenance of municipally owned SCMs to ensure the operation and maintenance plan is being followed. 2. Continuously 2. Were any municipal SCM O&M's developed? Yes, No; Status. 3. See BMP 54 1 3. See BMP 54 1. Permit Year 1 1. Is the SCM list complete: Yes or No, Status (Location and type to be documented). 2. Continuously 2. Did the inventory require any municipal Permit Years 1-5 SCMs to be added Yes, No; Status. 3. Annually 3. Number of municipal SCMs Permit Years 1-5 inspections done; Total number of Municipally owned SCMs NCS000480 SWMP Town of Rutherford College March 30, 2021 Page 70 Table 21: Pollution Prevention and Good Housekeeping BMPs 4. Document and 4. Annually 4. Number of issues correct issues found identified/recorded; during inspections. Pennit Years 1-5 Number of corrective actions/repairs taken. 5. Should a municipal 5. See BMP 50 5. See BMP 50 SCM be installed, Training on the maintenance of the SCM and its function shall be held. Permit 3.7.5: Pesticide, Herbicide and Fertilizer Management Program Ref. Measures to minimize water quality impacts from the use of landscape chemicals. The permittee shall provide routine pollution prevention and chemical use, storage and handling training, and shall ensure compliance with ennits anal applicator certifications. BMP A B C D No. Description of BMP Measurable Goal(s) Schedule for Implementation Annual Reporting Metric 55. Pesticide, Herbicide and Fertilizer Training to Staff Measures to minimize water 1. Continue to provide 1. See BMP 50 1. See BMP 50 quality impacts from the use of training to municipal landscaping chemicals. The only staff on the use, staff who will be allowed to apply storage, and handling pesticides, herbicides, or to get officially fertilizers will be certified certified. The training individuals who use methods that will include methods minimize the amounts used. of using minimal chemicals to reduce As staff previously took part in harmful effects, pesticide, herbicide, and fertilizer especially around trainings, this shall expand to SCM maintenance. include contractors that work on These trainings will behalf of the Town to ensure only now include safe applications are being done. contractors that work on behalf of the Town to ensure all pesticide applications do not pose potential pollution risk. NCS000480 SWMP Town of Rutherford College March 30, 2021 Page 71 Table 21: Pollution Prevention and Good Housekeeping BMPs 56. Pesticide, Herbicide and Fertilizer Compliance Ensure compliance with permits 1. Maintaining copies 1. Annually 1. Number of certified and certifications for the of licenses / personnel. administering of pesticides, certifications of all Permit Years 1-5 herbicides and fertilizer to ensure staff and contractors (FY19/20-FY23/24) application of product is less who use landscape impactful to stormwater runoff. chemicals. Only certified landscapers/sprayers are the ones applying pesticides, herbicides and fertilizers. Permit 3:7.6: Vehicle and Equipment Cleaning Program Ref. Measures to prevent and minimize contamination of stormwater.runoff from areas used for municipal vehicle and equipment maintenance and/or cleaning. The permtttee shall ensure that municipal industrial facilities subject to NPDES industrial permitting comply with those permit requirements, provide routine pollution prevention training to staff, perform routine inspections, and establish specific frequencies, schedules, and documentation. BMP A B C D No. Description of BMP Measurable Goal(s) Schedule for Implementation Annual Reporting Metric 57. Vehicle and Equipment Cleaning Prevent or Minimize 1. Establish Standard 1. See BMP 46 1. See BMP 46 Contamination of Stormwater Operating Procedure Runoff from all areas used for for containing and Vehicle and Equipment Cleaning. disposing of vehicle Wash water can be directed to the and equipment wash sanitary sewer or to vegetated water. The procedures areas. Where cleaning operations will be defined cannot be performed as described through the facilities above and when operations are O&M plan. 2. Provide routine 2. See BMP 50 2. See BMP 50 performed in the vicinity of a storm drainage collection system, vehicle pollution the drain is to be covered with a prevention training to portable drain cover during staff. NCS000480 SWAP Town of Rutherford College March 30, 2021 Page 72 Table 21: Pollution Prevention and Good Housekeeping BMPs cleaning activities. Any excess 3. Wash all municipal 3. Continuously 3. Number of vehicle standing water shall be removed light vehicles, Town washings performed; and properly handled prior to emergency vehicles, Permit Years 1-5 removing the drain cover. Or and equipment using Was vehicle washing another acceptable method is an established method completed per this installation of a SCM to capture listed under this BMP, BMP? Yes, No; Status; and treat the wash water runoff. or utilize a commercial carwash facility that If a commercial car wash is used, contains and treats invoices will be kept on record wash water where and recorded. applicable. 4. Record washing 4. See BMP 47 4. See BMP 47 procedures. Upon facility inspection (BMP 46) verify that documentation is being kept ensuring compliance and said documentation shows the facility is following the best management practices defined in their O&M tan. 58. Vehicle and Equipment Maintenance The Town of Rutherford College 1. Provide routine 1. See BMP 50 1. See BMP 50 does not have a facility for vehicle pollution prevention maintenance as municipal and waste management vehicles/equipment are taken to training to staff. local vehicle shops for maintenance. However municipal staff will be trained to be aware of the pollution potential of their vehicles to minimize the potential for pollution generation. Permit .3.7.7: Pavement Management Program Ref. Measures to reduce pollutants in stormwater runoff from municipally -owned streets, roads, and parking lots within the permittee's corporate limits. The permittee shall implement measures to control litter, leaves, debris, particulate and fluid pollutants associated with vehicles, and establish specific frequencies, schedules, and documentation. BMP A B C D No. Description of BMP Measurable Goal(s) Schedule for Annual Reporting Implementation' Metric NCS000480 SWMP Town of Rutherford College March 30, 2021 Page 73 Table 21: Pollution Prevention and Good Housekeeping BMPs 59. Street and Parking Lot Sweeping Measures to reduce pollutants in 1 Street/curb and 1. Annually 1. Total number of stormwater runoff from gutter sweeping will lane miles swept. municipally owned streets, roads, be done to reduce road Permit Years 1-5 and parking lots within the pollutants in runoff permittee's corporate limits. As with a focus on high the Town of Rutherford College priority areas prone to does not have a regular street buildup or higher cleaning service, streets will be chance of conveyance swept/cleaned annually. To damage/hindrance. 2. Track 2. Continuously 2. Number of high supplement this, an outreach approach and right of way conveyances/inlets that priority cleanings conveyances/inlets with frequent have frequent Permit years 1-5 done. issues will be prioritized. problems with pollution to prioritize their maintenance. 3. Develop and 3. Continuously 3. Number of street distribute educational pollution flyers flyers regarding street Permit Years 1-5 distributed. runoff pollution to help supplement street cleanings. 60. Litter Management Collect litter in public areas and 1. Parking lots public 1. Continuously 1. Number of full time parking lots to reduce negative waste receptacles are employees impacts on water quality. emptied on a weekly Permit Years 1-5 responsible; basis. Number of trash bags used. 2. All other litter 2. Annually 2. Number of litter collection is performed pick up events; on an as -needed basis Permit Years 1-5 utilizing available staff Weight of trash or community collected/disposed of volunteers. for each event (pounds); Number of staff and/or volunteers. 61. Leaf and Yard Debris Outreach NCS000480 SWMP Town of Rutherford College March 30, 2021 Page 74 Table 21: Pollution Prevention and Good Housekeeping BMPs Implement measures to reduce the 1. Leaves are disposed 1. Continuously 1. Number of bags of amount of leaves and debris of by individual leaves entering storm drains within the property owners. Permit Years 1-5 collected/disposed of Town. Leaves collected on from municipal town property will be properties The Town of Rutherford College bagged and properly does not provide a leaf collection disposed of. The service, however the company procedures for their contracted to collect trash on collection and disposal behalf of the Town will collect will be included in the bagged yard waste at the owner's facility O&M plans. 2. Educational 2. Annually 2. Number of leaf expense. materials will be litter/yard waste flyers To supplement this an educational developed and Permit Years 1-5 distributed. approach will be taken alongside distributed at Town including leaf management Hall to educate the procedures in the MS4 O&M plan residents/businesses on (BMP 48) and each facility O&M leaf litter and yard plan (BMP 45). debris impacts on stormwater quality. Should issues arise from this 3. Review MS4 O&M 3. See BMP 49 3. See BMP 49 approach, further Plan (BMP 48). If measures/revisions to the MS4 leaf/yard debris issues O&M plan shall be made to have arisen, revise address said issues. plan to address shortcomings. 62. Vehicle Pollutant Management Measures to prevent and minimize 1. Train first 1. Annually 1. Number of first contamination of stormwater responders for responders (staff) runoff from vehicle pollutants minimizing, collecting Permit Years 1-5 trained and date of following an accident. and disposing of fluids training. and other vehicular pollutants following an accident. NCS000480 SWMP Town of Rutherford College March 30, 2021 Page 75 Table 21: Pollution Prevention and Good Housekeeping BM[Ps 2. Continue equipping 2. Annually 2. Amount of materials the first responder used/replaced in kits. vehicles with spill kits Permit Years 1-5 and material containment tools. 3. Public Education to 3. Annually 3. Number of vehicle include information pollution educational about vehicle leaks in Permit Years 1-5 materials handed out. distributed materials and other educational resources. 4. Illicit Discharge 4. Annually 4. Number of vehicle enforcement for IDDE issues significant vehicle Permit Years 1-5 documented; number leaks from parked cars. of vehicle IDDE issues enforced/corrected. NCS000480 SWMP Town of Rutherford College March 30, 2021 Page 76