HomeMy WebLinkAboutNCG030060_Regional Office Historical File Pre 2018Michael F. Easley, rrvcrn
William G, Ross Jr„ Secretary
North Carolina Department of Environment and Natural Resources
March 16, 2007
Mr. Chris Alvis
B R Lee Industries, Inc.
500 Lincoln County Parkway Ext,
Lincolnton, NC 28092
Subject: Rescission of NPDES General Permit
Certificate of Coverage NCG030060
B R Lee industries, Inc.
Lincoln County
Dear Mr. Chris Alvis
Alan W. Klimek, P,E, Director
Division of Water Quality
Reference is made to your recent request for rescission of coverage under the subject NPDES General
Permit. In your letter received on 11/28/2006, you stated that you have closed your facility. In
accordance with your request, NPDES General Permit NCG030060 is rescinded, effective immediately.
Operating a treatment facility, discharging wastewater or discharging specific types of stormwater to
waters of the State without a valid NPDES permit will subject the responsible party to a civil penalty of
up to $25,000 per day. Enforcement action will be certain for persons that have voluntarily relinquished
permit coverage when, in fact, continuing pertnit coverage was necessary. If, in retrospect, you feel the
site still requires permit coverage, you should notify this office immediately. Furthermore, if in the future
you wish to again discharge to the State's surface waters, you must first apply for and receive a new
NPDES permit.
If the facility is in the process of being sold, you will be performing a public service if you would inform
the new or prospective owners of their potential need for NPDES permit coverage.
If you have questions about this matter, please contact Sarah Young at (919) 733-5083 x 502, or the
Water Quality staff in our Mooresville Regional Office at 704-663-1699.
Sincerely,
Alan W. Klimek, P.E.
cc: Mooresville Regional Office
Stormwater Permitting Unit
Central Files -w/attachments
Fran McPherson, DWQ Budget Office
MAR
NorthCaroiina
47 rattrrallji
Wetlands and Stormwater Branch 1617 Mail Service Center Raleigh, NC 27699-1617 Phone (919) 733.5083
Internet: h2o.enr.state.nc.us 512 N, Salisbury St. Raleigh, NC 27604 FAX (919) 733-9612
An Equal opportunitylAffrmative Action Employer-- 50°/0 Recycledll0% Post Consumer Paper
.N48h2.6 F. E221.65F, Gov arrlar
r „eleareggy
North Carol too Igeparuman Envircegnen: and Natural Resources
Alan Ve Klimek, P. E„ DiTecl
lane seo:.n of Water Quality
DIVISIONOF W,L
March 15, 2007
Ntr. Kenneth Beuley, Authorized Member
TKC CXV, LLC
593.5 Carnegie Blvd.
Charlotte, NC 28209
Subject: NPDLS General Permit No. NCG010000
Secureoat International
Lincoln County
Dear Mr. Beide\
Recently you were sent a letter from the Division of Land 'Resources (DER) indicating that
the Sedimentation and Erosion Control Plan for the subject development had been approved,
Accompanying the DLR. letter was NPD1s.',S General Stormwiner Permit. No, NC:GO I 0000, which.
authorizes you to discharge stormwater to the surface. waters of North Carolina from point source
discharges associated with construction activities including clearing, grading, and other land
disturbing activities. The purpose of this letter is 10 advise you of the importance of the Cieneral
.Permit and the liabilities in the event of failure to comply with the terms and conditions of the
Permit. If you have not already done so, it is suggested that you thoroughly read the permit. Of
particular importance are Parts .1 and 11 of the permit,
Pars I and 1 set forth the minimum visual monitoring and reporting requirements for your
stormwater discharge. In particular, Part 1, Section B describes the visual monitoring frequencies
in-1.d locations, the requirement to maintain a rain gauge onsite, and the need to maintain a written
record ofall inspections, Upon commencement o f your land disturbing activity, you must initiate the
visual monitoring and record keeping requirements in this permit. The visual monitoring data results
must he maintained on -site and made available to a DWQ representative upon request. The
remaining parts of the Permit set forth definitions, general conditions and special conditions
applicable to the storm water discharge(s). The conditions include special reporting requirements in
the event of noncompliance, bypasses, treatment unitlprocess taillifeti, etc.
474A
4CDENR
Mooresville Regional Office Die ii011 of Water Qualqy
gnat wymc nowatarqqaltv org
tale gag Center Ave, Su qa 301 Ninon -gay ilk, NC 281 5
One
NOrthCarana
Aatariall
Phone 704.-663-1699 CustonILr Service
Fax 70,1-662-6040 1-8Th-623-6748
Equalepeaneturegglealamative Acton Employer — Recycled110% Post Consumer Pap-er
such y,
VOL
I t (oti.
O cree
this
of efe.
t t` th e t9rth 4 .r
s t ecntiot: �c°it�tv tc ttrcact thictt tct i� vtta ct`th it er t c tit °ot
• . (: ctierei toi° 7 r to t r� � t., tc t c rcati•t<hc per e at 7 41663 (9.
t ter °ill ir . ., rd to pravidin r an
Ro
Surfacev
chi
t i0r
V ANA
NCDENR
North Carolina Department of Environment and Natural Resources
Division of Land Resources
James D. Simons, PG, PE Land Quality Section Michael F, Easley, Governor
Director and State Geologist William G. Ross Jr., Secretary
March 9, 2007
LETTER OF APPROVALAPPR�VAL WITil MODIFICATIONS
Mr, Kenneth R. Beuley, Authorized Member
TKC CXV,
5935 Carnegie Boulevard
Charlotte, North Carolina 28209
RE: Project Name: Securcoat International
Project ID: LINC0-2007-041.
County Lincoln, Lincoln County Parkway
River Basin: Catawba
Submitted By: TKC
Date Received by LQS: February 26, 2007
Plan Type: New
Dear Mr. Beuley:
This office has reviewed the subject erosion and sedimentation control plan. We find the
plan to be acceptable with modifications and hereby issue this letter of Approval With
Modifications. The Modifications Required for Approval are listed on the attached page. This
plan approval shall expire three (3.) years following the date of approval, if no land -disturbing
activity has been undertaken, as is required by Title 15A NCAC 4B .0129.
Please be advised that Title 15A NC.A.0 4B .0118(a) requires that a copy of the approved
erosion control plan be on file at the job site. Also, you should consider this letter to give the
Notice required by G.S. 113A.-61,1 (a) of our right of periodic inspection to insure compliance
with the approved plan..
North Carolina's Sedimentation Pollution Control Program is performance -oriented,
requiring protection of existing natural resources and adjoining properties. if, following the
commencement of this project, it is determined that the erosion and sedimentation control plan is
inadequate to meet th.e requirements of the Sedimentation Pollution Control Act of 1973 (North
I�tter of Approval NA°ita 1ociica
ti
` KC ClXV,
March s2007
Page 2 of 3
Carolina general Statute 11 1,'t- 1 through h tioh,
ina.plementation of the revisions to insure compliance w
rerrrire revisions to the plan and
Act,
.cnoptanee a and approval of this plan is orrditi ned upon your cot. .°rapllance \ith I cderal.
and State natcr quality lan°s, regulations, tend rules. In addition, local city or county ordinances
or rules may also apply to this land -disturbing t cti it This appr°ovdl does not supersede ny
other permit or approval.
Pica he aware that your project, AN be covered enclosed NPDES
Stormw at r Permit i lC 1Ot ft .:oristruction \.ctiv ine }. You should first become fanaili
all of the requirements for compliance with the enclosed general permit;
Please note that this approval is based in part on the acrrr'arcf of thinform- ion provided
in theFinancial Responsibility FOITT1, shiclayou have pro ided. You are requested to file an
ded form if there is any change ire ili infonnati rra included on the forma, in addition, it
would be helpful if you notify this office of
notify us it you plan to hale a ireconstructamn conference.
Your coop
atior
is app
d.
nee
Glee ;proposed starting date for this project. please
Zahn d S, Khan
Refit canal Engineer
and tualit° Section
bnclosures` Certificaate of approval
Modifications Required for Approval
NPDFS Permit
cc: Mansour p'dlin. (onsultir
Inspection lepartnaent
Surface Water Protection
App-r%°I WI
°' I..L.:
arch 9, 2007"
Page 3 of
odihc .tlof
MODIFICATIONS ,' Qt D FOR 4PPROV
ProjectNan Securcoat International
Project ID: LI C O 2 07- I
County: Lid °In
The plan appros I i heed upon tta tii era te condiconditions. Additional -asumeasuresmay
I required if tae proposed m ares can not fu n as at ended.
Eris , Governor
William Ori, P Jr. Serfrotaffr
North Carolina Der:cirtment of Frovircomont and Natural Res,furces
Al t P E. DIrector
Div,..sKm of Water (7.2-ualiz,
DIVISION OF WATER QUALITY
March 1.5, 2007
Mr, Thompson Daniel, III, Manager
Westport Lakeside Development, 'LLC,
338 North Elm Street, Suite 320
Greensboro, 'NC 27401
Subject: NPDES General Permit N. NCG0100
Westport Lakeside Development Phase III
Lincoln County
Dear Mr, Daniel:
Recently you ere sent a letter from the Division of Land Resources (DLR) indicating that
the Sedimentation and Erosion Control Plan for the subject development had been approved.
Accompanying the DLR letter Was 'NPDES General Stormwater Permit No. NC,G0 I 0000, which
authorizes you to discharge storrnwater to the surface waters of North Carolina from point source
discharges associated with construction activities including clearing, grading, and other land
disturbing activities. 'fhe purpose of this let -ter is to advise you of the importance of the General
Permit and the liabilities in the event of failure to comply with the terms and conditions of the
Permit, If you have not already done so, it is suggested that you thorough1y. read the permit, Of
particular importance are Parts I and II of the permit.
Parts I and 11 set forth the minimumvisual monitoring and reporting requirements for your
stormwater discharge, In particular, Part I, Section B describes the visual monitoring frequencies
and locations, the requirement to maintain a rain gauge onsite, and the need to maintain a written
record of all inspections, Upon commencement of your land disturbing activity, you must initiate the
visual monitoring and record keeping requirements in this permit. The visual monitoring data results
must be maintained on -site and made available to a D\VQ representative upon request, 'r he
remaining parts of the Permit set forth definitions, general conditions and special conditions
.applicable to the stormwater discharge(s). The conditions include special reporting requirements in
the event of noncompliance, bypasses, treatment unit failures, etc.
Mooresville Regional Office D ivi.s t on of Water Quah h'Y
Internet: MITL,110.KrAP1441,:,rtororr
61D East Crfnter Ave, Suite 301 Moortsvilit, NC. 28115
,One
NolthCarolina
Naturally
Phone 704-6(A-169) Custr)mer Servce
Fax 704-66 4-6040 -877-623-6748
An Equil opp.orrurrrry,'Arrrrnrifve Action Emptyer - 50%. Recricfeirla% Post Gcnsurner rtazer
tote,, A
ci
fcr° such
conditions of
comfit 1 ` vanth the terms ant
ment aLti( C? pursuant
penalty of up to $25,000 per vir
cau find at any tier
e Perraalt°caca shauld contact this
As term fled previousl , the purpose of th
NPI FS General StorIaav titer Permit. ;Please read th
you have any questions or need el
a
VNPDEStf"CR.J c
Rot eli Krebs
Surface Water Prrrtectic nSuper i or
conditions of an NI'DES dent
are 143-215,6 of the North
r criminal penalties)
noble to comply
raaetlitrtely,
'Get..
:hidiassiiissed
the thrills. and
fthe irat tartar ce o1your
ad contact this Office at 704.' 3 1 99
e look forward to providing any
AN
NCDENR
North Carolina Department of Environment and Natural Resources
Division of Land Resources
James D. Simons, PG, PE Land Quality Section Michael F. Easley, Governor
Director and State Geologist G. Ross Jr,, Secretary
February 2 , 2007
LETTER OF P ZOVAL
pson G. Daniel, 111, Manager
ort Lakeside Development, L.L.C.
:h. Elm Street, Suite 320
Greensboro, North. Carolina 27401
Project Name: Westport Lakeside Development Phase I1I
Acres Approved: 4.4
Project ID: LFNCO-2007-03i
County: Lincoln, Golf Course
River Basin: Catawba
Submitted By: Westport Lakeside Dcvrelopttaent.
Date Received by LQS: February 2, 2007
Plan Type: Nev
Daniel:
th
This office bras reviewed the subject erosion and sedirnentatic za control plan. We find the
plan to be acceptable and hereby issue this Letter of Approval. The Certificate of Approval must
be posted at the job site. This plan approval. shall expire three (3) years following the date of
approval, if no land -disturbing activity has been undertaken, as is required by Title 15A NCAC
413 .0129.
Title 15 ' NAC 4B .0118(a) requires that a copy of'the approved erosion control plan be
on file at the job site. Also, this letter gives the notice required by G.S. 1 13A-61.1(a) of our right
of periodic inspection to insure compliance with the approved plan,
North Carolina's Sedimentation Pollution Control Act is performance -oriented, requiring;
protection of e isting natural resources and adjoining properties. If, following the
commencement of this project, the erosion and sedimentation control plan is inadequate to meet
the requirements of the Sedimentation Pollution Control Act of 1973 (North Carolina General
Statute 1 13A-51 through 66), this office may require revisions to' the plan and implementation of
the revisions to insure compliance with the Act,
Mooresville Regional Office
610 East Center Avenue, Suite 301, Mooresville, North Carolina 28115 Phone: 704-663-1699 / FAX 704-663-6040
Letter of :Approval
8Vestport Lakeside Development,
February 28, 2007
Page 2 of 2
Acceptance and approval of this plan is conditioned upon your compliance with Federal
and State Water quality laws regulations, and rules, In addition, local city or county ordinances
or rules may also imply to this land -disturbing activity. 'Ibis approval does not supersede an
other permit or appro al.
Please be aware that your project will be covered by the enclosed NPDES Eieneral
Stormwater Permit NCG01000 (Construction (Ntetivitiestf You shoLdd first become familiar NN ith
all of the requiremetus for compliance 8,8ith the enclosed general permit.
Please note that this approval is based in part on the accuracy of the information provided
in the Financial Responsibility Forty', W hieh you provided. You are requested to tile an untended
forth if there is any change in the infortriation included on the form, In addition, it would be
helpful if you notify this office of the proposed starting date for this project: Please notify us if
you pltin to have a preconstruction conference:
\ our cooperation is appreciated,
SHiae
Enclosures:
Sincerely,
Scolt Hatee1101:).E,
AssistantRugionat Engitteetk
.. I. Quality
Certificate of Approval
NPDES Permit
cc: Larissa M: Coles, P,E,
Inspection Department
Surface, Water Protection
Nfichael.10 Easley, Governor
G. Ross. fr., Secretary
North Carolina Department of Environment and Namral Resources
Alan W. .1•C 1 imek, l'„E„ Da-ex.:tor
Division of Water Quality
DIVISION' OF WATER QUAL
February 21, 2007
Mr. Robert .Merck, :Member
Kel-Kar Developers, LLC
1901.'Freeline 'Trail
Iron Station, North Carolina 28080
Subject: NPDES General Permit No. NCG010
Pinnacle Ridge
Lincoln County
Dear Mr. Me ek:
Recently you were sent a letter from the Division of Land Resources DI..,R) indicating that
the Sedimentation and Erosion Control Plan for the subject development had been approved
Accompanying the DLR letter was NPDES General Stormwater Permit No, NCG010000, which
authorizes you to discharge stormwater to the surface waters of North Carolina from point source
discharges associated with construction activities including clearing, grading, and other land
disturbing activities. The purpose of this letter is to advise you of the importance of the General
Permit and the liabilities in the event of failure to comply with the terms and conditions of the
Permit. If you have not already done so, it is suggested that you thoroughly read the permit Of
particular importance are Parts :I and I1 of the permit.
Parts I and 11 set forth the minimum visual monitoring and reporting requirements for your
stormwater discharge. In particular, Part 1. Section B describes the visual monitoring frequencies
and locations, the .requirement to maintain a rain gauge onsite, and the .need to maintain a written
record ofall inspections_ Upon commencement of your land. disturbing activity, you must initiate the
visual monitoring and record keeping requirements in this permit. The visual monitoring data results
must be maintained on -site and made available to a DWQ representative upon request, The
remaining parts of the Permit set forth definitions, general conditions and special conditions
applicable to the stormwater discharge(s). The conditions include special reporting requirements in
the, event of noncompliance,. bypasses, treatment unit/process failures, ete,
Mooresville! Regional Office Divisicn i WatN-Qua1try
Internet: www.newati.Lar ornity.org 610 East Center Ave, Suite 3.01 Mooresvil1e, NC 28115
4,17[Carcrli rta
7Vaturally
Phone 704-66,3-1699 Customer StTvice
Fax 704-663-6040 1-877-623-6748
An Equal OpportunapaAffirmative Action ErnWoyer - 50% Recycled/1C% Post Consumer Paper
perI
tt
fo q
comply ith the tcrrns and col it is cif an NPDES permit
czuc�t action pursuant to Section l 43 2 t 5.6 of the \ortl
ip to S25,,000 per violation (andx' r criminal pcitttltic
i t any time that you are Linable to comply
r uld contact this Office lmrnediatcl\-
ed previousl\', lie purpose of this lettci
o pin water Permit. Please read the permit
have ar e luestic r s car ncc l clarillcatid
t advise .,:-�
crrtact this iftzcc
look for -ard
subject the
na Genet
ay be assessed
h tltc t rnis and
G ` atcr Protection Reply tiper
portancc gat our
Lti37041.663lill.699
upn ibrigar
AlLg'**11
NCDENR
North Carolina Department of Environment and Natural Resources
Division of Land Resources
James D. Simons, PG, PE Land Quality Section Michael F. Easley, Governor
Director and State Geologist
" . 'l "ROVAi. "l1TFll NIODI IC TNS
lr, Robert Alan Merck, Member
Kel-Kar Developers, L.L.C.
1901 Treeline Trail
Iron Station, North Carolina 28080
t Narne: Pinnacle Ridge
Approved:
L1NC.0-2l ti7-0037
County: Lincoln, Scl once Road
Submitted By:
Date Receive
Plan Type: New
Dear Mr. Merck:
Developers, L,L.C,
ary 8, 2007
William G. Ross Jr., Secretary
'[his office has reviewed the subject erosion and sedinlec t:rticaz cr ntrc I plan. We find the
plan to be acceptable with modifications and hereby issue this letter of Approval With
Modifications: "1"he Modifications Required for Approval are listed on the attached page. This
planapproval shall expire three (3) years following the date of approval, if no land -disturbing
activity has been undertaken, as is required by Title 15A NCAC 4B .0129,
e be advised that Title 1 5A NCAC 413 .0118(a) req Tires that a copy° of the approved
erosion control plan be on. file at the job site. Also, you should consider this letter to give the
Notice required by G.S. 11 3A-6I.I.(a) of our right of periodic inspection to insure compliance
with the approved plan.
North Carolina's Sedimentation f"olllttiota Control l rogram is per
requiring protection of existing natural resources and adjoining properties.
commencement of this project it is determined that the erosion and seditnentation co
fed,
•is
nadequate to meet the requirements of the Sedimentation :Pollution Control Act of 1973 {.North
[defter' of pprova.
Kei-Kar ;Developers,
February 1, 2007
Page 3 of 3
ons
MCD1FI ' TI NS I'.I QI"II 1 IlM I OR APPRO' �}
Project Name: Pinnacle Ridge
Project ID: 1.INCO-20 7-037
County: [. ncoln
The locations of the sediment basin outlets must be spec i ied on the plans.
Porous hafflt s are required w itltin all sediment basins and traps. Please refer to Section 6.65 in the
North Carolina Erosion and Sediment Control Planning and Des
porous baffles.
al for guidelines regarding
A note on. Sheet 7 indicates the total disturbed area for this project will be 16.t)0 acres, chile the
FRO states that 12,6 acres will be disturbed; please clarify the acreage that will be disturbed for this
project. Please note that if the total disturbed area exceeds 12.6 acres, an additional plan fee
inay be required.
4, Outlet protection should be provi
vn.stream end of all storrrwtater condu
An appropriately sized se dime.nt trap should be provided downstream ofthe pipe outlet at the site
entrance.
Wood posts are i
with a minimum
er allowed for use in silt fencing; all posts should be 1.33 lb/`linear ft steel
of 5 feet.
The plans should include a
Please note that sediment
Manual for guidelines rega.
fo
ce inle
the inlet protection measure shown at the storm drainage inlets.
protection is no longer allowed --Please refer to the Design
t protection.
Silt fence should be installed downstream of all sediment basins x=ithout blocking flow from the
basin spillways) and other areas where runoff will not he collected by a l:em.porary diversion.
Two copies of plans addressing the information requested above (arid an additional plan review fee,
if required) rxrust be submitted to this office no later than February 1 , 200'7 in order for this
ny questions regarding
Approval to r
these items.
ain valid. Please call this office at 704.663.1699
Miehael Easley, Governor
Wilk WTI . Ross jr,, Secretary
North Carolina Department of Environment and Natural Resources
Alan W. Klimek, P.E. Director
Division of Water Quality
DIVISION OF WATER QUALITY
January 5, 2007
Mr. C.P. Weston, Manager, Project Controls
Duke Energy Carolinas, LLC
P,0 ,Box 1006
Charlotte, North Carolina 28201
Subject:. NPDFS General Permit No. NCG010000
North Lincolnton Retail Substation (Express Permit)
Lincoln County
Dear Mr, Weston:
Recently you were sent a letter from the Division of Land Resources (MR) indicating that
the Sedimentation and Erosion Control Plan for the subject development had been approved,
Accompanying the DLR letter \vas NPDES General Stormwater Permit No. NCG01.0000, which
authorizes you to discharge storm -water to the surface waters of North Carolina from point source
discharges associated with construction activities including clearing, grading, and other land.
disturbing activities The purpose of this letter is to advise you of the importance of the General
Permit and theliabilities in the event of failure to comply with the terms and conditions of the
Permit, If you have not already done so, it is suggested that you thoroughly read the permit. Of
particular importance are Parts I. and II of the permit.
Parts I and II set forth the minimum visual monitoring and reporting requirements for your
stormwater discharge. In particular, Part I, Section B describes the visual monitoring frequencies
and locations, the requirement to maintain a rain gauge onsite, and the need to maintaina written
record of all inspections.. 1...1pon commencement of your land disturbing activity, you must initiate the
visual monitoring and record keeping requirements in this permit. -Fhe visual monitoring data results
must be maintained on -site and made available to a DWQ representative upon request„ The
remaining parts of the Permit set forth definitions, general conditions and special conditions
applicable to the stormwater discharge(s). The conditions include special reporting requirements in
the event of noncompliance, bypasses, treatment unit/process failures, etc.
ICDENR
,Oni INsilth(„_arolina
Mooresville Regional Office Division of 'Water Quality
Internet: vnewaterimality.org 610 East Center Ave, Suite 301 Mooresville,. NC 281 5
Phone 704-663-1699 Customer Service
Fax 704-663-6040 1-8'77-623-6748.
An Equal Opportunity/Affirmaiive Action Employer 50% Recycied/10% Post Consumer Paper
Fai
comply th the spa and conditions of an NPDES per gait nags subject
to enforcement action pursuant to Section 3-2 % 6 of: the North Car hma Gene
civil penalty of up t 25,000 l cr ie ation tandior criminal penalties) may he assessed
for suc violations. u find at any titre that yo u are 'unable to comply with the terms and
condition.. f day Permit , au should contact dais Ticei nediately.
ioned prepreviousl ,the cirposc of this ictt .r is to you ofthc i portancc of our
NPDES Gene r tl tc rnawater P rmit,, f lease read the permit and contact this Office at704/663-1699
in Moores rvillc i1" rc u l a °c any quequestions or need clarification, \'c. look forward to providin2 an
assitanc..
4'' P[J1 L.FR. c
Gleason, P
urf. Water Pr
n Regional Supery sor
James D. Simons, PG, PE
NCDENR
North Carolina Department of Environment and Natural Resources
Division of Land Resources
Land Quality Section Michael F: Easley, Governor
Director and State Geologist William G. Ross Jr,, Secretary
December 28, 2006
LETTER OF APPROVAL1TH MODIFICATIONS
:Mr. CP. \Weston, Manager, Project Controls
Duke Energy Carolinas, L.L.C.
Post Office Box 1006
Charlotte, North Carolina 28201
RE: Project Name: North Lincolnton Retail Substation (Express Permit)
Acres Approved: 1.4
Project ID: LINCO-2007-036
County: Lincoln, Saint Matthews Church Road
River Basin: Catawba
Submitted By: Duke Energy Carolinas, LI—C.
Date Received by LQS: December 28„ 2006
Plan Type: New
Dear Mr, Weston:
This office has reviewed the subject erosion and sedimentation control plan. We find the
plan to be acceptable with modifications and hereby issue this letter of Approval With
Modifications, The Modifications Required for Approval are listed on the attached page. This
plan approval shall expire three (3) years :following the date of approval, it no land -disturbing
activity has been undertaken, as is required by Title 1.5A NCAC 4B .0129.
Please be advised that Title 15A. NCAC 4B .0118(a) requires that a copy of the approved
erosion control plan. be on file at the job site. Also, you should consider this letter to give the
Notice required by G.S. 113A-61.1(a) of our right of periodic inspection to insure compliance
with the approved plan.
North Carolina's Sedimentation Pollution Control Program is performance -oriented,
requiring protection of existing natural resources and adjoining properties. lf, following the
commencement of this project, it is determined, that the erosion and sedimentation control plan is
inadequate to meet the requirements of the Sedimentation Pollution Control Act of 1973 (North
Letter of ppro\Via[ c ith £lod iicati
Luke Energy Carolinas,
December 28, 2006
Page 2of3
Carolina Genera1- Statute 11 -51 through ), this office may require rep isions to t
impl rnentaation of the revisi
to insure compliance with. the Act.
nd
Acceptance and approval of plan is conditioned upon your compliance with Federal
and State aa,°ater quality laws, regulations. and rules, lta addition, local city or count x ordinances
or rules may also apply tc dais land -disturbing bin ctia lty This approval does not supersede any
other permit or approval.
Please he award thaat your project i1 he cure cl by the enciased NPDES a
to iwater Permit NCGOl t)t tt (Construction Acti eiti s . '`tau should first become familiar ca itla
all of`tlre requir rtaents for compliance with the enclosed ggeneral permit.
Please note that this appro al is based in part on the accuracy of the inf rrrZation provided
ira the Financial Responsibility Form, Which you have provided. You are requested to file an
amended farm if there is any change in the information included on the form In addition, it
Vtiould he helpful if you notify this office of the proposed starting date for this project. Please
notify us if you playa to have a preconstruction conference.
Your cooperation
Klaae
1 nclosures
is appreciated,,
'rel
aahid S. Khan
Regional Engineer
Land Quality Section
Certificate of Approv
Modifications Required forApproval
NP p s Permit
rspection Department
Surface Water Protection
Laetter of ppro l ith Io itications
Duke Energy Carolinas, LC.
December 28, 2006
Page 3 of
MIFICATIONS REQUIRED FOR
Project Na e. North Lincot tt ki Retail Substatiot
Project ILA: LI`'0-707-3
County: Lincoln
h
PRO':
p an approval is based upon the existing site conditions. Add itiun i measures rca . % be
ired if the proposed measures can not functiot as intended.
:Michael F. Easley, Governor
Fin Cii.. Ros3 Jr., Secretary
North Carol n 1 Departmcnt of11.-nvironment and Niviuri-JI Resources
Alan W. Klimek, P E. Director
Division of 'Witter ii'uality
DIVISION OF WA'r ER QUALITy
January 5, 2007
Mr. John D. Clark
P.O. Box 2108
Flickory, North Carolina 28603
Subject: NPDES General Permit No, NCUOIO
Clark Tire
Lincoln County
Dear Mr. Clark:
Recently you were sent a letter from the Division of Land Resources (DLR) indicating that
the Sedimentation and E:rosion Control Plan for the subject development had been approved.
Accompanying the DLR letter was NPDES General Stormwater Permit No. NCG010000„ which
authorizes you to discharge stormwater to the surface waters of North Carolina .from point source
discharges associated with construction activities including clearing, grading, and other land
disturbing activities. The purpose of this letter is to advise you of the importance of the General
Permit and the liabilities in the event of failure, to comply with the tertns and conditions of the
Permit. If you have not already done so, it is suggested that you thoroughly read the permit. Of
particular iinportance are Parts I and II of the permit.
Parts 1 and 11 set forth the minimum. visual monitoring and reporting requirements for your
stormwater discharge. In particular, Part 1, Section B describes the visual monitoring frequencies
and locations, the requirement to maintain a rain gauge onsite, and the need to maintain a written
record ofall inspections. 1 Jpon commencement of your land disturbing activity, you must initiate the
visual monitoring and record keeping requirements in this permit. The visual monitoring data results
must be maintained on -site and inade available to a DWQ representative 'upon request. The
remaining parts of the .Permit set forth definitions, general conditions and special conditions
applicable to the stormwater discharge(s). The conditions include special reporting requirements in
the event of noncompliance, bypasses, treatment unit/process failures, etc.
AlricvA,
ftt4A,
KDENR
Mooresville Regional Officiiii. 1-.)ivision of Water Quality
Internet: wwwnovaterquairly.gry, 610 East Center Ave, Suite 301 Mouresivi tt, NC 28115
Om: .
NthCarolma
,Vaturally
Phone 704-663-1699 Customer Service
LX 701-663-6040 1-877-623-6748
An Equal Oppwlun.itylAffirmative Action Employer - 50% Recycled/10% Post Consumer Paper
comply N ith tic ttrrrzs and conditions of an \POPS permi
pert -Inent acti puts nt to Section 3-215.6 of f North
Stattttcs. cis it penalty ofup to $25,090per violation an . or criminal
tt ch v t labons. if you find at any time that you are unable to comply
conditions of the Per it, you should contact this Office immediately,
,
red pr
\ S Gene "1
)or svill.if\cuha
anee;
W'NP LI'R. tt t
the purpose of this lttr is to advise Rnu
t. Please read the pe pit and contact this t
questions or need clarification, We look for va
Sincerely,
1) Rex G..
Surface: \V'at
)n P.E.
Protection Reg
)nal sup
ay subject the
Carolina General
may be assessed
ith the terms and
portance cif your
at 704/663-1699
o providing in any
visa i
James D. Simons, PG, PE
NCDENR
North Carolina Department of Environment and Natural Resources
Division of Land Resources
Land Quality Section Michael F. Easley, Governor
Director and State Geologist William G. Ross Jr., Secretary
December 20. 2006
LETTER OF APPROVAL Wi FH i OI)IF11CTIONS
Mr. John D. Clark
Post Office Box 210
Hickory, North Carolina 28603
RE: Project Name: Clark Tire
Acres Approved: 1.91
Project ID: LINCG-2007-029
County: Lincoln, NC Highway 16
River Basin: Catawba
Submitted By: John D. Clark
Date Received by LQS: December 1, 2006
Plan Type: New
Dear
This office has reviewed the subject erosion and sedimentation control l alan. We find the
plan to be acceptable with modifications and hereby issue this letter of Approval With
Modifications, The Modifications Required for Approval are listed on the attached page. This
plan approval shall expire three (3) years following the date of approval, if no land -disturbing
activity has been undertaken, as is required by Title 15A NCAC 4B .0129..
Please he advised that Title 15A NCAC 4B .{)1 18(a) requires that a copy of the approved
erosion control plan be on file at the job site, Also, you should consider this letter to give the
Notice required by G.S. 113A-61.1(a) of our right of periodic inspection to insure compliance
with the approved plan.
North Carolina's Sedimentation Pollution Control Program is performance -oriented,
requiring protection of existing natural resources and adjoining properties. if, following the
commencement of this project, it is determined that the erosion and sedimentation control plan is
inadequate to meet the requirements of the Sedimentation Pollution Control Act of 1973 (North
Letter caf Approval with Modifications
John I:, Clark
I ecerraber 20, 2006
Page 2 of
CarolinaGeneral Statute 11 1 through 6). this office ma require recisions to th pl and
inplerecatat'on of the revisions to insure a;onplh nee with the Act,
r ceptanee and approv al at tai plan is Conditioned upon sour ccnaliarce with
and State water quality laws, re ,ulations, and rules. In addition, local It ' or county ordinances
or rules may also apply to this 1• d-disturbing activity. This approval does not supersede any
other permit or approval,
Please be aaysare that v°ou
for n.vsFatcr Perinit NCG01000
all of the requirements for coataplian
ed by the enclosed i PI 15
tiara c;tiv hies) You should first become tanul
t the enclosed general permit,
Please note tla=at dais approval is based iaa part on the accuracy of the information provided
in the Financial Respont';ibllita• tomes, vvhch )pate have provided. You are requested to file an
amended foam if there is any change iaa the iaalhiarrraatitata included on the form. In addition, it
vcauld be helpful if you notify this office of the proposed starting date liar this project. Pease
aaa tify us it r nu plan to have a preconstruct on conference,
otr cooperation is appreciated
11 ae
1 rrclosures:
Sincerely,
Scott Ilat
Assistant Reirna;
Land C.uaalits'echo
ate of Approval
cations Required
NP ES Permit
cc:: Catawba Valley Lnineet
Inspection Department
Surface Water Protection,
n
r Appro
Services
Letter of Approval with Modifications
John D. Clark
December 20, 2006
Page 3 of 3
MODIFICATIONS REQUIRED FOR APPROVAL
Project Name: Clark 'Fire
Project ID LINC0-2007-029
County: Lincoln
I. The temporary gravel construction entrance should be constructed With 27- 3" stone, instead of 45 or
#57 stone.
Michael F. Easley, Governor
William Ross jr, Secretary
North Carolina Department of Environment and Natural Resources
Alan W. Klimek, F.E. Director
Division. of 'Water Quality
DIVISION OF WATER QUALITY
January 5, 2007
NIr. Steve Maggs, Owner
Steven Maggs & Danielle Snider
8279 Paytous Point Lane
Denver, North Carolina 28037
Subject: NPDES General Permit No, NCG01.0000
Sure Safe Storage (Express Permit )
Lincoln County
Dear Mr. Maggs:
Recently youl,vere sent a letter from the Division of Land Resources (DLR) indicating that
the Sedimentation and Erosion Control Plan for the subject development had been approved.
Accompanying the DLR letter was NPDES General Stormwater .Permit No. NCGO10000, which
authorizes you to discharge stormwater to the surface waters of North Carolina from point source
discharges associated with construction activities including clearing, grading, and other land.
disturbing activities. The purpose of this letter is to advise you of the importance of the General
Permit and the liabilities in the event of failure to comply with the terms and conditions of the
Permit: If you have not already done so, it is suggested that you thoroughly read the permit. Of
particular importance are Parts I and II of the permit.
Parts I and II set forth the minimum visual monitoring and reporting requirements for your
stormwater discharge. In particular, Part I, Section B describes the visual monitoring frequencies
and locations, the requirement to maintain a rain gauge onsite, and the need to maintain a written
record of all inspections. Upon commencement of your land disturbing activity, you must initiate the
visual monitoring and record keeping requirements in this .permit. The visual monitoring data results
must be maintained on -site and made available to a DWQ representative upon request. The
remaining parts of the Permit set forth definitions, general conditions and special conditions
applicable to the stormwater discharge(s). The conditions include special reporting requirements in
the event of noncompliance, bypasses, treatment unit/process failures, etc.
ertA
KDENR
Mooresville Regional Office Division of Water Quality
Internet: www.newaterqualitv.orz 610 East Center Ave, Suite 301 Moorev1llc, NC 28115
Phone 704-663-1699
one
NortitCarolina
,Alzturally
Customer Service
Fax 704-663-6040 1-877-623-6748
An EqualOpportunity/Affirmative Action Employer - 50% Recycled/10% Post Consumer Paper
per atrttee to
Statutes. irk
for such
conditions o.
to comply he ternns and conditions of an
enforcement action pursuant to Section 1 3- 1 .6 of
penalty ofup to S25,000 per violation and/or cririr
bons, If you find at any time that you are unable to
the Per
you should contact this Office immediately.
S permit aye subject the
e North Carolina General
penalties) may be assessed
amply, with the terrns and
s mentioned previously°, the -purpose of this letter is to advise ou of the importance ofyour
`
NPDES General Star eater Permit, Please read the permit and contact this Office at 04 663-1
in Mooresville if you have any questions or need clarification. We look forward to providing any
assistance.
'NPDF LTR.d c
Sincerch
D Rex Gleason, P, .
face Water ProtectionRegional Supervisor
Jaynes D. Simons, PG, PE
Director and State Geologist
AvA,
NCDENR
North Carolina Department of Environment and Natural Resources
Division of Land Resources
Land Quality Section Michael F. Easley, Governor
William G. Ross Jr., Secretary
December 20, 2006
LETTER OF APPROVAL WITH MODIFICATIONS
Mr. Steve Maggs, Owner
Steven Maggs & Danielle Snider
8279 Pavtous Point Lane
Denver, North Carolina 28037
RE: Project Name: Sure Safe Storage (Express Permit)
Acres Approved: 2.5
Project ID: LINCO-2007-032
County: Lincoln, NC Highway 16
River Basin: Catawba
Submitted By: Steven Maggs & Danielle Snider
Date Received by LOS: December 13, 2006
Plan Type: New
Dear Mr, Maggs:
This office has reviewed the subject erosion and sedimentation control plan. We find the
plan to be acceptable with modifications and hereby issue this letter of Approval With
Modifications. The Modifications Required for Approval are listed on the attached page. This
plan approval shall expire three (3) years following the date of approval, if no land -disturbing
activity has been undertaken, as is required by Title 15A NCAC 4B .0129.
Please be advised that Title 15A NCAC 4B .0118(a) requires that a copy of the approved
erosion control plan be on file at the job site. Also, you should consider this letter to give the
Notice required by G.S. 113A-61.1(a) of our right of periodic inspection to insure compliance
with the approved plan,
North Carolina's Sedimentation Pollution Control Program is performance -oriented,
requiring protection of existing natural resources and adjoining properties. If, following the
commencement of this project, it is determined that the erosion and sedimentation control plan is
inadequate to meet the requirements of the Sedimentation Pollution Control Act of 1973. (North
Letter of Approval vvith Modifications
Steven Maggs & ]Danielle Snider
December 20, 2006
Page 2 of
Carolina General Statute l l l through 6), this office m
rnpleanentation of the revision
o insure compliance vvith the Act,
ions to the plan d
Acceptance and approval of this plan is conditioned upon your compliance with Federal
and State water quality laws, regulations, and rules, In addition, local city or county ordinances
or rules may also apply to this land -disturbing acti\°its°. This approval does not supersede any
other permit or approval,
Please be aware that your project will be covered by the enclosed l`PDESGeneral
Storraavvater Permit NCGQI000 (Construction Acti ities), You should first become familiarwith
all of the requirements for compliance with the enclosed general permit.
Please note thatthis approval is based in part on the cc any of the inforration provided
in the Financial Responsibility Form, which you have provided.You are requested to file an
amended form if there is any change in the information included on the form, In addition, it
would be helpful if you notify this office of the proposed starting date for this project. Please
notify us if you plan to have a preconstruetion conference.
i S l/ac
Your cooperation is appreciated.
Sinc
ahid S. Khan.
Regional Engineer
Land Quality Section
Enclosures: Certificate of Approval
Modifications Required for Approval
NPDES Permit
cc: ES Group, In
Inspection Departmena
Surface Water Protection
er of Appro ail itl ons
Steven Maggs & Danielle Snider
December 20, 2006
Page 3 of 3
MODIFICATIONS RQUIR D FOR APPROVAL
Project Names Sure Sale StoragStorage (Express Permit
Project ID:, LINCO-2007-032
County: Ivitaccalat
Stockpile area should be included in the limits f diturbance,
I'he plan approval is based upon the existing site conditions, Please provide a revised plan to
this Office for approval prior to any type of development or changes on this site.
.,:.,,,••
Mr. R. Panico Peres, Vice President
Sabo, Inc.
44099 Plymouth Oaks Blvd., Suite 112
Plymouth, Michigan. 48170
Dear 1r. Peres:
Michad F. Easley, Governor
Wf11 („i. Ross Jr , Secretary
North. Carolina .Depaitnent t EnveronmenI ind Natural Resources
Man "\ K rnk P 1Direclor
0011 Of Water Quality
DIVISION OF WATER QUALITY
Idnuary 5,2007
Subject: NPDES General Permit No, IX1(17-010000
Sabo (Express Permit)
Lincoln County
Recently You were sent a letter from the Division of Land Resources (DLR) indicating that
the Sedimentation and Erosion Control Plan for the subject development had been approved.
Accompanying the DLR letter was NPDES General Stormwater Permit No, NCGOI0:000, which
authorizes you to discharge stormwater to the surface waters of North Carolina from point source.
discharges associated with construction activities including clearing, grading, and other land
disturbing activities, The purpose of this letter is to advise you of the importance of the General
'Permit and the liabilities in the event of failure to comply with the terms and conditions of the
Permit: If you have not already done so, it is suggested that you thoroughly read the permit. Of
particular Importance are Parts I and II of the permit.
Parts 1 and II set forth the minimum visual monitoring and reporting requirements for your
stormwater discharge, fn particida„r, Part 1, Section B describes the visual monitorin.g frequencies
and locations, the requirement to maintaina rain gauge onsite, and the need to maintain a written
record of ail inspections. Upon commencement of your land disturbing activity, you must initiate the
visual monitoring and record keeping requirements in this permit. The visual monitoring data results
must be maintained on -site and made available to a DWQ representative upon request. The
remaining parts of the Permit set forth definitions, general conditions and special conditions
applicable to the stormwater discharge(s). The conditions include special reporting requirements in
theevent of noncompliance, bypasses, treatment unit/process failures, etc.
Mooresville Regional Offke
Division of Water Quality
Intuner WAYw;1:0,1111grqNlil)!,„012, 610 East Center Ave, Suite. 301 Moortiville, NC 281E5
North Caroll
NailirallY
Phone 704-663-1699 Custorner Service
Pax 704-663-6040 -877-623-6748
An Equal OpporunityLAffirmative Action Efnpleyer - 50% Reqiciedil 0% Post Consumer Paper
Failure to cot with the tertns and conditions of an NPDES permit may subject the
perrnittee to eriforceittient action pursuant to Sectim 143-215.6 of the North Carolina General
Statutes, A civil penalty' of up to $25,000 per violation (andlor crim nal penalties) may be assessed
for such violations. If you Iiind at any time that you are unable to comply witli the ter ns and
conditions of the Permit, you should contact this Office inunediately,
As mentioned previously, he purpose of this letter is to advise you of the importance of your
NPDES General Stormwater Permit. Please read the permit and contact this Office at 704,-'663-199
in MooresNille if you have an questions or need clarification. We look forward to providing any
assistance.
Sincerely,
e )(
I.I. Rex Cileason, P.Ei
Surface INiater Protection Regional Supetvisor
James D. Simons, PG, PE
Director and State Geologist
NCDENR
North Carolina Department of Environment and Natural Resources
Division of Land Resources
Land Quality Section
December 19, 2006
LETTEROF APPROVAL WITH MODIFICATIONS
Mr. R. Panico Peres, Vice President
Sabo, Inc.
44099 Plymouth Oaks Boulevard, Suite 112
Plymouth., Michigan 48170
RE: Project Name: Sabo (Express Permit)
Acres Approved: 12
Project ID: LINC0-2007-031
County: Lincoln, Lincoln County Parkway
River Basin: Catawba
Submitted By: Sabo, Inc.
Date Received by LOS: December 11,, 2006
Plan Type: New
Dear Mr, Peres:
Michael F. Easley, Governor
William G. Ross Jr., Secretary
This office has reviewed the subject erosion and sedimentation control plan. We find the
plan to be acceptable with modifications and hereby issue this letter of Approval With
Modifications, The Modifications Required for Approval are listed on the attached page. This
plan approval shall expire three (3) years following the date of approval, if no land -disturbing
activity has been undertaken„ as is required by Title 15A, NCAC 4B .0129.
Please be advised that Title 15A NCAC 4B ..0118(a) requires that a copy of the approved
erosion control plan be on file at the job site. Also, you should consider this letter to give the
Notice required by G.S. 1.13A-611(a). of our right of periodic inspection to insure compliance
with the approved plan,
North Carolina's Sedimentation Pollution Control Program is perforrn.ance-oriented,
requiring protection of existing natural resources and adjoining properties. If, following the
commencement of this project, it is determined that the erosion and sedimentation control plan is
inadequate to meet the requirements of the Sedimentation Pollution, Control Act of 1973 (North.
Ve SVil le Rep io ",,E11 Off ic
6 1 East Cle, "1, ter )venue 301. Moo resv 161 o rtl CaoE 8 1 "I Phone 7 il-C1l11, 117 1E1111) A X: 704-663 230:40
Letter of Approva
Sabo, Inc.
December 19, 2006
Page 2of3
Carolina General Statute
implementation of the rev
3A-51 through 66), this office may require revisions to the plan and
ons to insure compliance with the Act.
Acceptance and approval of this plan is conditioned upon your compliance with Federal
and State water quality laws, regulations, and rules. in addition, local city or county ordinances
or rules may also apply to this land -disturbing activity. This approval does not supersede any
other permit or approval.
Please be aware that your project will be covered by the enclosed NPDES General
Storznwater Permit NCG01000 (Construction Activities). You should first become familiar with
all of the requirements for compliance with the enclosed general permit.
Please note that this approval is based
in the Financial Responsibility Form, which
amended form if there is any change in the
would be helpful if you notify this office of
notify us if you plan to have a preconstructior
Your cooperation is appreciated.
ZSK/ae
Enclosures:
in part on the accuracy of the information provided
you have provided. You are requested to file an
information -included on the form. In addition, it
the proposed starting date for this project. Please
conference.
Sincerely',
Zahid. S. Khan
Regional Engineer
Land Quality Section
Certificate of Approval
Modifications Required for Approval
NPDES Permit
cc: Burton Engineering Associates
Inspection Department
Surface Water Protection
fitter of Approval with Modifications
Sabo, Inc.
December 19, 2006
Page 3 of 3
MODIFICATIONS REQUIRED FOR APPROVAL
Project Name: Sabo
Project ID: LINCO-2007-03 1
County: Lincoln
Please make sure all storm drainage pipes through the basins and CB#3 to FES#4 should be
extended upon stabilization of upstream area.
2. Erosion and sediment control measures must be provided for stockpile area.
3. Baffles should be added in sediment basin #2.
4. The plan approval is based upon the existing site conditions. Please provide a revised plan to
this Office for approval prior to any type of development or changes on this site.