Loading...
HomeMy WebLinkAboutNCG030060_Regional Office Historical File Pre 2018Michael F. Easley, rrvcrn William G, Ross Jr„ Secretary North Carolina Department of Environment and Natural Resources March 16, 2007 Mr. Chris Alvis B R Lee Industries, Inc. 500 Lincoln County Parkway Ext, Lincolnton, NC 28092 Subject: Rescission of NPDES General Permit Certificate of Coverage NCG030060 B R Lee industries, Inc. Lincoln County Dear Mr. Chris Alvis Alan W. Klimek, P,E, Director Division of Water Quality Reference is made to your recent request for rescission of coverage under the subject NPDES General Permit. In your letter received on 11/28/2006, you stated that you have closed your facility. In accordance with your request, NPDES General Permit NCG030060 is rescinded, effective immediately. Operating a treatment facility, discharging wastewater or discharging specific types of stormwater to waters of the State without a valid NPDES permit will subject the responsible party to a civil penalty of up to $25,000 per day. Enforcement action will be certain for persons that have voluntarily relinquished permit coverage when, in fact, continuing pertnit coverage was necessary. If, in retrospect, you feel the site still requires permit coverage, you should notify this office immediately. Furthermore, if in the future you wish to again discharge to the State's surface waters, you must first apply for and receive a new NPDES permit. If the facility is in the process of being sold, you will be performing a public service if you would inform the new or prospective owners of their potential need for NPDES permit coverage. If you have questions about this matter, please contact Sarah Young at (919) 733-5083 x 502, or the Water Quality staff in our Mooresville Regional Office at 704-663-1699. Sincerely, Alan W. Klimek, P.E. cc: Mooresville Regional Office Stormwater Permitting Unit Central Files -w/attachments Fran McPherson, DWQ Budget Office MAR NorthCaroiina 47 rattrrallji Wetlands and Stormwater Branch 1617 Mail Service Center Raleigh, NC 27699-1617 Phone (919) 733.5083 Internet: h2o.enr.state.nc.us 512 N, Salisbury St. Raleigh, NC 27604 FAX (919) 733-9612 An Equal opportunitylAffrmative Action Employer-- 50°/0 Recycledll0% Post Consumer Paper .N48h2.6 F. E221.65F, Gov arrlar r „eleareggy North Carol too Igeparuman Envircegnen: and Natural Resources Alan Ve Klimek, P. E„ DiTecl lane seo:.n of Water Quality DIVISIONOF W,L March 15, 2007 Ntr. Kenneth Beuley, Authorized Member TKC CXV, LLC 593.5 Carnegie Blvd. Charlotte, NC 28209 Subject: NPDLS General Permit No. NCG010000 Secureoat International Lincoln County Dear Mr. Beide\ Recently you were sent a letter from the Division of Land 'Resources (DER) indicating that the Sedimentation and Erosion Control Plan for the subject development had been approved, Accompanying the DLR. letter was NPD1s.',S General Stormwiner Permit. No, NC:GO I 0000, which. authorizes you to discharge stormwater to the surface. waters of North Carolina from point source discharges associated with construction activities including clearing, grading, and other land disturbing activities. The purpose of this letter is 10 advise you of the importance of the Cieneral .Permit and the liabilities in the event of failure to comply with the terms and conditions of the Permit. If you have not already done so, it is suggested that you thoroughly read the permit. Of particular importance are Parts .1 and 11 of the permit, Pars I and 1 set forth the minimum visual monitoring and reporting requirements for your stormwater discharge. In particular, Part 1, Section B describes the visual monitoring frequencies in-1.d locations, the requirement to maintain a rain gauge onsite, and the need to maintain a written record ofall inspections, Upon commencement o f your land disturbing activity, you must initiate the visual monitoring and record keeping requirements in this permit. The visual monitoring data results must he maintained on -site and made available to a DWQ representative upon request. The remaining parts of the Permit set forth definitions, general conditions and special conditions applicable to the storm water discharge(s). The conditions include special reporting requirements in the event of noncompliance, bypasses, treatment unitlprocess taillifeti, etc. 474A 4CDENR Mooresville Regional Office Die ii011 of Water Qualqy gnat wymc nowatarqqaltv org tale gag Center Ave, Su qa 301 Ninon -gay ilk, NC 281 5 One NOrthCarana Aatariall Phone 704.-663-1699 CustonILr Service Fax 70,1-662-6040 1-8Th-623-6748 Equalepeaneturegglealamative Acton Employer — Recycled110% Post Consumer Pap-er such y, VOL I t (oti. O cree this of efe. t t` th e t9rth 4 .r s t ecntiot: �c°it�tv tc ttrcact thictt tct i� vtta ct`th it er t c tit °ot • . (: ctierei toi° 7 r to t r� � t., tc t c rcati•t<hc per e at 7 41663 (9. t ter °ill ir . ., rd to pravidin r an Ro Surfacev chi t i0r V ANA NCDENR North Carolina Department of Environment and Natural Resources Division of Land Resources James D. Simons, PG, PE Land Quality Section Michael F, Easley, Governor Director and State Geologist William G. Ross Jr., Secretary March 9, 2007 LETTER OF APPROVALAPPR�VAL WITil MODIFICATIONS Mr, Kenneth R. Beuley, Authorized Member TKC CXV, 5935 Carnegie Boulevard Charlotte, North Carolina 28209 RE: Project Name: Securcoat International Project ID: LINC0-2007-041. County Lincoln, Lincoln County Parkway River Basin: Catawba Submitted By: TKC Date Received by LQS: February 26, 2007 Plan Type: New Dear Mr. Beuley: This office has reviewed the subject erosion and sedimentation control plan. We find the plan to be acceptable with modifications and hereby issue this letter of Approval With Modifications. The Modifications Required for Approval are listed on the attached page. This plan approval shall expire three (3.) years following the date of approval, if no land -disturbing activity has been undertaken, as is required by Title 15A NCAC 4B .0129. Please be advised that Title 15A NC.A.0 4B .0118(a) requires that a copy of the approved erosion control plan be on file at the job site. Also, you should consider this letter to give the Notice required by G.S. 113A.-61,1 (a) of our right of periodic inspection to insure compliance with the approved plan.. North Carolina's Sedimentation Pollution Control Program is performance -oriented, requiring protection of existing natural resources and adjoining properties. if, following the commencement of this project, it is determined that the erosion and sedimentation control plan is inadequate to meet th.e requirements of the Sedimentation Pollution Control Act of 1973 (North I�tter of Approval NA°ita 1ociica ti ` KC ClXV, March s2007 Page 2 of 3 Carolina general Statute 11 1,'t- 1 through h tioh, ina.plementation of the revisions to insure compliance w rerrrire revisions to the plan and Act, .cnoptanee a and approval of this plan is orrditi ned upon your cot. .°rapllance \ith I cderal. and State natcr quality lan°s, regulations, tend rules. In addition, local city or county ordinances or rules may also apply to this land -disturbing t cti it This appr°ovdl does not supersede ny other permit or approval. Pica he aware that your project, AN be covered enclosed NPDES Stormw at r Permit i lC 1Ot ft .:oristruction \.ctiv ine }. You should first become fanaili all of the requirements for compliance with the enclosed general permit; Please note that this approval is based in part on the acrrr'arcf of thinform- ion provided in theFinancial Responsibility FOITT1, shiclayou have pro ided. You are requested to file an ded form if there is any change ire ili infonnati rra included on the forma, in addition, it would be helpful if you notify this office of notify us it you plan to hale a ireconstructamn conference. Your coop atior is app d. nee Glee ;proposed starting date for this project. please Zahn d S, Khan Refit canal Engineer and tualit° Section bnclosures` Certificaate of approval Modifications Required for Approval NPDFS Permit cc: Mansour p'dlin. (onsultir Inspection lepartnaent Surface Water Protection App-r%°I WI °' I..L.: arch 9, 2007" Page 3 of odihc .tlof MODIFICATIONS ,' Qt D FOR 4PPROV ProjectNan Securcoat International Project ID: LI C O 2 07- I County: Lid °In The plan appros I i heed upon tta tii era te condiconditions. Additional -asumeasuresmay I required if tae proposed m ares can not fu n as at ended. Eris , Governor William Ori, P Jr. Serfrotaffr North Carolina Der:cirtment of Frovircomont and Natural Res,furces Al t P E. DIrector Div,..sKm of Water (7.2-ualiz, DIVISION OF WATER QUALITY March 1.5, 2007 Mr, Thompson Daniel, III, Manager Westport Lakeside Development, 'LLC, 338 North Elm Street, Suite 320 Greensboro, 'NC 27401 Subject: NPDES General Permit N. NCG0100 Westport Lakeside Development Phase III Lincoln County Dear Mr, Daniel: Recently you ere sent a letter from the Division of Land Resources (DLR) indicating that the Sedimentation and Erosion Control Plan for the subject development had been approved. Accompanying the DLR letter Was 'NPDES General Stormwater Permit No. NC,G0 I 0000, which authorizes you to discharge storrnwater to the surface waters of North Carolina from point source discharges associated with construction activities including clearing, grading, and other land disturbing activities. 'fhe purpose of this let -ter is to advise you of the importance of the General Permit and the liabilities in the event of failure to comply with the terms and conditions of the Permit, If you have not already done so, it is suggested that you thorough1y. read the permit, Of particular importance are Parts I and II of the permit. Parts I and 11 set forth the minimumvisual monitoring and reporting requirements for your stormwater discharge, In particular, Part I, Section B describes the visual monitoring frequencies and locations, the requirement to maintain a rain gauge onsite, and the need to maintain a written record of all inspections, Upon commencement of your land disturbing activity, you must initiate the visual monitoring and record keeping requirements in this permit. The visual monitoring data results must be maintained on -site and made available to a D\VQ representative upon request, 'r he remaining parts of the Permit set forth definitions, general conditions and special conditions .applicable to the stormwater discharge(s). The conditions include special reporting requirements in the event of noncompliance, bypasses, treatment unit failures, etc. Mooresville Regional Office D ivi.s t on of Water Quah h'Y Internet: MITL,110.KrAP1441,:,rtororr 61D East Crfnter Ave, Suite 301 Moortsvilit, NC. 28115 ,One NolthCarolina Naturally Phone 704-6(A-169) Custr)mer Servce Fax 704-66 4-6040 -877-623-6748 An Equil opp.orrurrrry,'Arrrrnrifve Action Emptyer - 50%. Recricfeirla% Post Gcnsurner rtazer tote,, A ci fcr° such conditions of comfit 1 ` vanth the terms ant ment aLti( C? pursuant penalty of up to $25,000 per vir cau find at any tier e Perraalt°caca shauld contact this As term fled previousl , the purpose of th NPI FS General StorIaav titer Permit. ;Please read th you have any questions or need el a VNPDEStf"CR.J c Rot eli Krebs Surface Water Prrrtectic nSuper i or conditions of an NI'DES dent are 143-215,6 of the North r criminal penalties) noble to comply raaetlitrtely, 'Get.. :hidiassiiissed the thrills. and fthe irat tartar ce o1your ad contact this Office at 704.' 3 1 99 e look forward to providing any AN NCDENR North Carolina Department of Environment and Natural Resources Division of Land Resources James D. Simons, PG, PE Land Quality Section Michael F. Easley, Governor Director and State Geologist G. Ross Jr,, Secretary February 2 , 2007 LETTER OF P ZOVAL pson G. Daniel, 111, Manager ort Lakeside Development, L.L.C. :h. Elm Street, Suite 320 Greensboro, North. Carolina 27401 Project Name: Westport Lakeside Development Phase I1I Acres Approved: 4.4 Project ID: LFNCO-2007-03i County: Lincoln, Golf Course River Basin: Catawba Submitted By: Westport Lakeside Dcvrelopttaent. Date Received by LQS: February 2, 2007 Plan Type: Nev Daniel: th This office bras reviewed the subject erosion and sedirnentatic za control plan. We find the plan to be acceptable and hereby issue this Letter of Approval. The Certificate of Approval must be posted at the job site. This plan approval. shall expire three (3) years following the date of approval, if no land -disturbing activity has been undertaken, as is required by Title 15A NCAC 413 .0129. Title 15 ' NAC 4B .0118(a) requires that a copy of'the approved erosion control plan be on file at the job site. Also, this letter gives the notice required by G.S. 1 13A-61.1(a) of our right of periodic inspection to insure compliance with the approved plan, North Carolina's Sedimentation Pollution Control Act is performance -oriented, requiring; protection of e isting natural resources and adjoining properties. If, following the commencement of this project, the erosion and sedimentation control plan is inadequate to meet the requirements of the Sedimentation Pollution Control Act of 1973 (North Carolina General Statute 1 13A-51 through 66), this office may require revisions to' the plan and implementation of the revisions to insure compliance with the Act, Mooresville Regional Office 610 East Center Avenue, Suite 301, Mooresville, North Carolina 28115 Phone: 704-663-1699 / FAX 704-663-6040 Letter of :Approval 8Vestport Lakeside Development, February 28, 2007 Page 2 of 2 Acceptance and approval of this plan is conditioned upon your compliance with Federal and State Water quality laws regulations, and rules, In addition, local city or county ordinances or rules may also imply to this land -disturbing activity. 'Ibis approval does not supersede an other permit or appro al. Please be aware that your project will be covered by the enclosed NPDES Eieneral Stormwater Permit NCG01000 (Construction (Ntetivitiestf You shoLdd first become familiar NN ith all of the requiremetus for compliance 8,8ith the enclosed general permit. Please note that this approval is based in part on the accuracy of the information provided in the Financial Responsibility Forty', W hieh you provided. You are requested to tile an untended forth if there is any change in the infortriation included on the form, In addition, it would be helpful if you notify this office of the proposed starting date for this project: Please notify us if you pltin to have a preconstruction conference: \ our cooperation is appreciated, SHiae Enclosures: Sincerely, Scolt Hatee1101:).E, AssistantRugionat Engitteetk .. I. Quality Certificate of Approval NPDES Permit cc: Larissa M: Coles, P,E, Inspection Department Surface, Water Protection Nfichael.10 Easley, Governor G. Ross. fr., Secretary North Carolina Department of Environment and Namral Resources Alan W. .1•C 1 imek, l'„E„ Da-ex.:tor Division of Water Quality DIVISION' OF WATER QUAL February 21, 2007 Mr. Robert .Merck, :Member Kel-Kar Developers, LLC 1901.'Freeline 'Trail Iron Station, North Carolina 28080 Subject: NPDES General Permit No. NCG010 Pinnacle Ridge Lincoln County Dear Mr. Me ek: Recently you were sent a letter from the Division of Land Resources DI..,R) indicating that the Sedimentation and Erosion Control Plan for the subject development had been approved Accompanying the DLR letter was NPDES General Stormwater Permit No, NCG010000, which authorizes you to discharge stormwater to the surface waters of North Carolina from point source discharges associated with construction activities including clearing, grading, and other land disturbing activities. The purpose of this letter is to advise you of the importance of the General Permit and the liabilities in the event of failure to comply with the terms and conditions of the Permit. If you have not already done so, it is suggested that you thoroughly read the permit Of particular importance are Parts :I and I1 of the permit. Parts I and 11 set forth the minimum visual monitoring and reporting requirements for your stormwater discharge. In particular, Part 1. Section B describes the visual monitoring frequencies and locations, the .requirement to maintain a rain gauge onsite, and the .need to maintain a written record ofall inspections_ Upon commencement of your land. disturbing activity, you must initiate the visual monitoring and record keeping requirements in this permit. The visual monitoring data results must be maintained on -site and made available to a DWQ representative upon request, The remaining parts of the Permit set forth definitions, general conditions and special conditions applicable to the stormwater discharge(s). The conditions include special reporting requirements in the, event of noncompliance,. bypasses, treatment unit/process failures, ete, Mooresville! Regional Office Divisicn i WatN-Qua1try Internet: www.newati.Lar ornity.org 610 East Center Ave, Suite 3.01 Mooresvil1e, NC 28115 4,17[Carcrli rta 7Vaturally Phone 704-66,3-1699 Customer StTvice Fax 704-663-6040 1-877-623-6748 An Equal OpportunapaAffirmative Action ErnWoyer - 50% Recycled/1C% Post Consumer Paper perI tt fo q comply ith the tcrrns and col it is cif an NPDES permit czuc�t action pursuant to Section l 43 2 t 5.6 of the \ortl ip to S25,,000 per violation (andx' r criminal pcitttltic i t any time that you are Linable to comply r uld contact this Office lmrnediatcl\- ed previousl\', lie purpose of this lettci o pin water Permit. Please read the permit have ar e luestic r s car ncc l clarillcatid t advise .,:-� crrtact this iftzcc look for -ard subject the na Genet ay be assessed h tltc t rnis and G ` atcr Protection Reply tiper portancc gat our Lti37041.663lill.699 upn ibrigar AlLg'**11 NCDENR North Carolina Department of Environment and Natural Resources Division of Land Resources James D. Simons, PG, PE Land Quality Section Michael F. Easley, Governor Director and State Geologist " . 'l "ROVAi. "l1TFll NIODI IC TNS lr, Robert Alan Merck, Member Kel-Kar Developers, L.L.C. 1901 Treeline Trail Iron Station, North Carolina 28080 t Narne: Pinnacle Ridge Approved: L1NC.0-2l ti7-0037 County: Lincoln, Scl once Road Submitted By: Date Receive Plan Type: New Dear Mr. Merck: Developers, L,L.C, ary 8, 2007 William G. Ross Jr., Secretary '[his office has reviewed the subject erosion and sedinlec t:rticaz cr ntrc I plan. We find the plan to be acceptable with modifications and hereby issue this letter of Approval With Modifications: "1"he Modifications Required for Approval are listed on the attached page. This planapproval shall expire three (3) years following the date of approval, if no land -disturbing activity has been undertaken, as is required by Title 15A NCAC 4B .0129, e be advised that Title 1 5A NCAC 413 .0118(a) req Tires that a copy° of the approved erosion control plan be on. file at the job site. Also, you should consider this letter to give the Notice required by G.S. 11 3A-6I.I.(a) of our right of periodic inspection to insure compliance with the approved plan. North Carolina's Sedimentation f"olllttiota Control l rogram is per requiring protection of existing natural resources and adjoining properties. commencement of this project it is determined that the erosion and seditnentation co fed, •is nadequate to meet the requirements of the Sedimentation :Pollution Control Act of 1973 {.North [defter' of pprova. Kei-Kar ;Developers, February 1, 2007 Page 3 of 3 ons MCD1FI ' TI NS I'.I QI"II 1 IlM I OR APPRO' �} Project Name: Pinnacle Ridge Project ID: 1.INCO-20 7-037 County: [. ncoln The locations of the sediment basin outlets must be spec i ied on the plans. Porous hafflt s are required w itltin all sediment basins and traps. Please refer to Section 6.65 in the North Carolina Erosion and Sediment Control Planning and Des porous baffles. al for guidelines regarding A note on. Sheet 7 indicates the total disturbed area for this project will be 16.t)0 acres, chile the FRO states that 12,6 acres will be disturbed; please clarify the acreage that will be disturbed for this project. Please note that if the total disturbed area exceeds 12.6 acres, an additional plan fee inay be required. 4, Outlet protection should be provi vn.stream end of all storrrwtater condu An appropriately sized se dime.nt trap should be provided downstream ofthe pipe outlet at the site entrance. Wood posts are i with a minimum er allowed for use in silt fencing; all posts should be 1.33 lb/`linear ft steel of 5 feet. The plans should include a Please note that sediment Manual for guidelines rega. fo ce inle the inlet protection measure shown at the storm drainage inlets. protection is no longer allowed --Please refer to the Design t protection. Silt fence should be installed downstream of all sediment basins x=ithout blocking flow from the basin spillways) and other areas where runoff will not he collected by a l:em.porary diversion. Two copies of plans addressing the information requested above (arid an additional plan review fee, if required) rxrust be submitted to this office no later than February 1 , 200'7 in order for this ny questions regarding Approval to r these items. ain valid. Please call this office at 704.663.1699 Miehael Easley, Governor Wilk WTI . Ross jr,, Secretary North Carolina Department of Environment and Natural Resources Alan W. Klimek, P.E. Director Division of Water Quality DIVISION OF WATER QUALITY January 5, 2007 Mr. C.P. Weston, Manager, Project Controls Duke Energy Carolinas, LLC P,0 ,Box 1006 Charlotte, North Carolina 28201 Subject:. NPDFS General Permit No. NCG010000 North Lincolnton Retail Substation (Express Permit) Lincoln County Dear Mr, Weston: Recently you were sent a letter from the Division of Land Resources (MR) indicating that the Sedimentation and Erosion Control Plan for the subject development had been approved, Accompanying the DLR letter \vas NPDES General Stormwater Permit No. NCG01.0000, which authorizes you to discharge storm -water to the surface waters of North Carolina from point source discharges associated with construction activities including clearing, grading, and other land. disturbing activities The purpose of this letter is to advise you of the importance of the General Permit and theliabilities in the event of failure to comply with the terms and conditions of the Permit, If you have not already done so, it is suggested that you thoroughly read the permit. Of particular importance are Parts I. and II of the permit. Parts I and II set forth the minimum visual monitoring and reporting requirements for your stormwater discharge. In particular, Part I, Section B describes the visual monitoring frequencies and locations, the requirement to maintain a rain gauge onsite, and the need to maintaina written record of all inspections.. 1...1pon commencement of your land disturbing activity, you must initiate the visual monitoring and record keeping requirements in this permit. -Fhe visual monitoring data results must be maintained on -site and made available to a DWQ representative upon request„ The remaining parts of the Permit set forth definitions, general conditions and special conditions applicable to the stormwater discharge(s). The conditions include special reporting requirements in the event of noncompliance, bypasses, treatment unit/process failures, etc. ICDENR ,Oni INsilth(„_arolina Mooresville Regional Office Division of 'Water Quality Internet: vnewaterimality.org 610 East Center Ave, Suite 301 Mooresville,. NC 281 5 Phone 704-663-1699 Customer Service Fax 704-663-6040 1-8'77-623-6748. An Equal Opportunity/Affirmaiive Action Employer 50% Recycied/10% Post Consumer Paper Fai comply th the spa and conditions of an NPDES per gait nags subject to enforcement action pursuant to Section 3-2 % 6 of: the North Car hma Gene civil penalty of up t 25,000 l cr ie ation tandior criminal penalties) may he assessed for suc violations. u find at any titre that yo u are 'unable to comply with the terms and condition.. f day Permit , au should contact dais Ticei nediately. ioned prepreviousl ,the cirposc of this ictt .r is to you ofthc i portancc of our NPDES Gene r tl tc rnawater P rmit,, f lease read the permit and contact this Office at704/663-1699 in Moores rvillc i1" rc u l a °c any quequestions or need clarification, \'c. look forward to providin2 an assitanc.. 4'' P[J1 L.FR. c Gleason, P urf. Water Pr n Regional Supery sor James D. Simons, PG, PE NCDENR North Carolina Department of Environment and Natural Resources Division of Land Resources Land Quality Section Michael F: Easley, Governor Director and State Geologist William G. Ross Jr,, Secretary December 28, 2006 LETTER OF APPROVAL1TH MODIFICATIONS :Mr. CP. \Weston, Manager, Project Controls Duke Energy Carolinas, L.L.C. Post Office Box 1006 Charlotte, North Carolina 28201 RE: Project Name: North Lincolnton Retail Substation (Express Permit) Acres Approved: 1.4 Project ID: LINCO-2007-036 County: Lincoln, Saint Matthews Church Road River Basin: Catawba Submitted By: Duke Energy Carolinas, LI—C. Date Received by LQS: December 28„ 2006 Plan Type: New Dear Mr, Weston: This office has reviewed the subject erosion and sedimentation control plan. We find the plan to be acceptable with modifications and hereby issue this letter of Approval With Modifications, The Modifications Required for Approval are listed on the attached page. This plan approval shall expire three (3) years :following the date of approval, it no land -disturbing activity has been undertaken, as is required by Title 1.5A NCAC 4B .0129. Please be advised that Title 15A. NCAC 4B .0118(a) requires that a copy of the approved erosion control plan. be on file at the job site. Also, you should consider this letter to give the Notice required by G.S. 113A-61.1(a) of our right of periodic inspection to insure compliance with the approved plan. North Carolina's Sedimentation Pollution Control Program is performance -oriented, requiring protection of existing natural resources and adjoining properties. lf, following the commencement of this project, it is determined, that the erosion and sedimentation control plan is inadequate to meet the requirements of the Sedimentation Pollution Control Act of 1973 (North Letter of ppro\Via[ c ith £lod iicati Luke Energy Carolinas, December 28, 2006 Page 2of3 Carolina Genera1- Statute 11 -51 through ), this office may require rep isions to t impl rnentaation of the revisi to insure compliance with. the Act. nd Acceptance and approval of plan is conditioned upon your compliance with Federal and State aa,°ater quality laws, regulations. and rules, lta addition, local city or count x ordinances or rules may also apply tc dais land -disturbing bin ctia lty This approval does not supersede any other permit or approval. Please he award thaat your project i1 he cure cl by the enciased NPDES a to iwater Permit NCGOl t)t tt (Construction Acti eiti s . '`tau should first become familiar ca itla all of`tlre requir rtaents for compliance with the enclosed ggeneral permit. Please note that this appro al is based in part on the accuracy of the inf rrrZation provided ira the Financial Responsibility Form, Which you have provided. You are requested to file an amended farm if there is any change in the information included on the form In addition, it Vtiould he helpful if you notify this office of the proposed starting date for this project. Please notify us if you playa to have a preconstruction conference. Your cooperation Klaae 1 nclosures is appreciated,, 'rel aahid S. Khan Regional Engineer Land Quality Section Certificate of Approv Modifications Required forApproval NP p s Permit rspection Department Surface Water Protection Laetter of ppro l ith Io itications Duke Energy Carolinas, LC. December 28, 2006 Page 3 of MIFICATIONS REQUIRED FOR Project Na e. North Lincot tt ki Retail Substatiot Project ILA: LI`'0-707-3 County: Lincoln h PRO': p an approval is based upon the existing site conditions. Add itiun i measures rca . % be ired if the proposed measures can not functiot as intended. :Michael F. Easley, Governor Fin Cii.. Ros3 Jr., Secretary North Carol n 1 Departmcnt of11.-nvironment and Niviuri-JI Resources Alan W. Klimek, P E. Director Division of 'Witter ii'uality DIVISION OF WA'r ER QUALITy January 5, 2007 Mr. John D. Clark P.O. Box 2108 Flickory, North Carolina 28603 Subject: NPDES General Permit No, NCUOIO Clark Tire Lincoln County Dear Mr. Clark: Recently you were sent a letter from the Division of Land Resources (DLR) indicating that the Sedimentation and E:rosion Control Plan for the subject development had been approved. Accompanying the DLR letter was NPDES General Stormwater Permit No. NCG010000„ which authorizes you to discharge stormwater to the surface waters of North Carolina .from point source discharges associated with construction activities including clearing, grading, and other land disturbing activities. The purpose of this letter is to advise you of the importance of the General Permit and the liabilities in the event of failure, to comply with the tertns and conditions of the Permit. If you have not already done so, it is suggested that you thoroughly read the permit. Of particular iinportance are Parts I and II of the permit. Parts 1 and 11 set forth the minimum. visual monitoring and reporting requirements for your stormwater discharge. In particular, Part 1, Section B describes the visual monitoring frequencies and locations, the requirement to maintain a rain gauge onsite, and the need to maintain a written record ofall inspections. 1 Jpon commencement of your land disturbing activity, you must initiate the visual monitoring and record keeping requirements in this permit. The visual monitoring data results must be maintained on -site and inade available to a DWQ representative 'upon request. The remaining parts of the .Permit set forth definitions, general conditions and special conditions applicable to the stormwater discharge(s). The conditions include special reporting requirements in the event of noncompliance, bypasses, treatment unit/process failures, etc. AlricvA, ftt4A, KDENR Mooresville Regional Officiiii. 1-.)ivision of Water Quality Internet: wwwnovaterquairly.gry, 610 East Center Ave, Suite 301 Mouresivi tt, NC 28115 Om: . NthCarolma ,Vaturally Phone 704-663-1699 Customer Service LX 701-663-6040 1-877-623-6748 An Equal Oppwlun.itylAffirmative Action Employer - 50% Recycled/10% Post Consumer Paper comply N ith tic ttrrrzs and conditions of an \POPS permi pert -Inent acti puts nt to Section 3-215.6 of f North Stattttcs. cis it penalty ofup to $25,090per violation an . or criminal tt ch v t labons. if you find at any time that you are unable to comply conditions of the Per it, you should contact this Office immediately, , red pr \ S Gene "1 )or svill.if\cuha anee; W'NP LI'R. tt t the purpose of this lttr is to advise Rnu t. Please read the pe pit and contact this t questions or need clarification, We look for va Sincerely, 1) Rex G.. Surface: \V'at )n P.E. Protection Reg )nal sup ay subject the Carolina General may be assessed ith the terms and portance cif your at 704/663-1699 o providing in any visa i James D. Simons, PG, PE NCDENR North Carolina Department of Environment and Natural Resources Division of Land Resources Land Quality Section Michael F. Easley, Governor Director and State Geologist William G. Ross Jr., Secretary December 20. 2006 LETTER OF APPROVAL Wi FH i OI)IF11CTIONS Mr. John D. Clark Post Office Box 210 Hickory, North Carolina 28603 RE: Project Name: Clark Tire Acres Approved: 1.91 Project ID: LINCG-2007-029 County: Lincoln, NC Highway 16 River Basin: Catawba Submitted By: John D. Clark Date Received by LQS: December 1, 2006 Plan Type: New Dear This office has reviewed the subject erosion and sedimentation control l alan. We find the plan to be acceptable with modifications and hereby issue this letter of Approval With Modifications, The Modifications Required for Approval are listed on the attached page. This plan approval shall expire three (3) years following the date of approval, if no land -disturbing activity has been undertaken, as is required by Title 15A NCAC 4B .0129.. Please he advised that Title 15A NCAC 4B .{)1 18(a) requires that a copy of the approved erosion control plan be on file at the job site, Also, you should consider this letter to give the Notice required by G.S. 113A-61.1(a) of our right of periodic inspection to insure compliance with the approved plan. North Carolina's Sedimentation Pollution Control Program is performance -oriented, requiring protection of existing natural resources and adjoining properties. if, following the commencement of this project, it is determined that the erosion and sedimentation control plan is inadequate to meet the requirements of the Sedimentation Pollution Control Act of 1973 (North Letter caf Approval with Modifications John I:, Clark I ecerraber 20, 2006 Page 2 of CarolinaGeneral Statute 11 1 through 6). this office ma require recisions to th pl and inplerecatat'on of the revisions to insure a;onplh nee with the Act, r ceptanee and approv al at tai plan is Conditioned upon sour ccnaliarce with and State water quality laws, re ,ulations, and rules. In addition, local It ' or county ordinances or rules may also apply to this 1• d-disturbing activity. This approval does not supersede any other permit or approval, Please be aaysare that v°ou for n.vsFatcr Perinit NCG01000 all of the requirements for coataplian ed by the enclosed i PI 15 tiara c;tiv hies) You should first become tanul t the enclosed general permit, Please note tla=at dais approval is based iaa part on the accuracy of the information provided in the Financial Respont';ibllita• tomes, vvhch )pate have provided. You are requested to file an amended foam if there is any change iaa the iaalhiarrraatitata included on the form. In addition, it vcauld be helpful if you notify this office of the proposed starting date liar this project. Pease aaa tify us it r nu plan to have a preconstruct on conference, otr cooperation is appreciated 11 ae 1 rrclosures: Sincerely, Scott Ilat Assistant Reirna; Land C.uaalits'echo ate of Approval cations Required NP ES Permit cc:: Catawba Valley Lnineet Inspection Department Surface Water Protection, n r Appro Services Letter of Approval with Modifications John D. Clark December 20, 2006 Page 3 of 3 MODIFICATIONS REQUIRED FOR APPROVAL Project Name: Clark 'Fire Project ID LINC0-2007-029 County: Lincoln I. The temporary gravel construction entrance should be constructed With 27- 3" stone, instead of 45 or #57 stone. Michael F. Easley, Governor William Ross jr, Secretary North Carolina Department of Environment and Natural Resources Alan W. Klimek, F.E. Director Division. of 'Water Quality DIVISION OF WATER QUALITY January 5, 2007 NIr. Steve Maggs, Owner Steven Maggs & Danielle Snider 8279 Paytous Point Lane Denver, North Carolina 28037 Subject: NPDES General Permit No, NCG01.0000 Sure Safe Storage (Express Permit ) Lincoln County Dear Mr. Maggs: Recently youl,vere sent a letter from the Division of Land Resources (DLR) indicating that the Sedimentation and Erosion Control Plan for the subject development had been approved. Accompanying the DLR letter was NPDES General Stormwater .Permit No. NCGO10000, which authorizes you to discharge stormwater to the surface waters of North Carolina from point source discharges associated with construction activities including clearing, grading, and other land. disturbing activities. The purpose of this letter is to advise you of the importance of the General Permit and the liabilities in the event of failure to comply with the terms and conditions of the Permit: If you have not already done so, it is suggested that you thoroughly read the permit. Of particular importance are Parts I and II of the permit. Parts I and II set forth the minimum visual monitoring and reporting requirements for your stormwater discharge. In particular, Part I, Section B describes the visual monitoring frequencies and locations, the requirement to maintain a rain gauge onsite, and the need to maintain a written record of all inspections. Upon commencement of your land disturbing activity, you must initiate the visual monitoring and record keeping requirements in this .permit. The visual monitoring data results must be maintained on -site and made available to a DWQ representative upon request. The remaining parts of the Permit set forth definitions, general conditions and special conditions applicable to the stormwater discharge(s). The conditions include special reporting requirements in the event of noncompliance, bypasses, treatment unit/process failures, etc. ertA KDENR Mooresville Regional Office Division of Water Quality Internet: www.newaterqualitv.orz 610 East Center Ave, Suite 301 Moorev1llc, NC 28115 Phone 704-663-1699 one NortitCarolina ,Alzturally Customer Service Fax 704-663-6040 1-877-623-6748 An EqualOpportunity/Affirmative Action Employer - 50% Recycled/10% Post Consumer Paper per atrttee to Statutes. irk for such conditions o. to comply he ternns and conditions of an enforcement action pursuant to Section 1 3- 1 .6 of penalty ofup to S25,000 per violation and/or cririr bons, If you find at any time that you are unable to the Per you should contact this Office immediately. S permit aye subject the e North Carolina General penalties) may be assessed amply, with the terrns and s mentioned previously°, the -purpose of this letter is to advise ou of the importance ofyour ` NPDES General Star eater Permit, Please read the permit and contact this Office at 04 663-1 in Mooresville if you have any questions or need clarification. We look forward to providing any assistance. 'NPDF LTR.d c Sincerch D Rex Gleason, P, . face Water ProtectionRegional Supervisor Jaynes D. Simons, PG, PE Director and State Geologist AvA, NCDENR North Carolina Department of Environment and Natural Resources Division of Land Resources Land Quality Section Michael F. Easley, Governor William G. Ross Jr., Secretary December 20, 2006 LETTER OF APPROVAL WITH MODIFICATIONS Mr. Steve Maggs, Owner Steven Maggs & Danielle Snider 8279 Pavtous Point Lane Denver, North Carolina 28037 RE: Project Name: Sure Safe Storage (Express Permit) Acres Approved: 2.5 Project ID: LINCO-2007-032 County: Lincoln, NC Highway 16 River Basin: Catawba Submitted By: Steven Maggs & Danielle Snider Date Received by LOS: December 13, 2006 Plan Type: New Dear Mr, Maggs: This office has reviewed the subject erosion and sedimentation control plan. We find the plan to be acceptable with modifications and hereby issue this letter of Approval With Modifications. The Modifications Required for Approval are listed on the attached page. This plan approval shall expire three (3) years following the date of approval, if no land -disturbing activity has been undertaken, as is required by Title 15A NCAC 4B .0129. Please be advised that Title 15A NCAC 4B .0118(a) requires that a copy of the approved erosion control plan be on file at the job site. Also, you should consider this letter to give the Notice required by G.S. 113A-61.1(a) of our right of periodic inspection to insure compliance with the approved plan, North Carolina's Sedimentation Pollution Control Program is performance -oriented, requiring protection of existing natural resources and adjoining properties. If, following the commencement of this project, it is determined that the erosion and sedimentation control plan is inadequate to meet the requirements of the Sedimentation Pollution Control Act of 1973. (North Letter of Approval vvith Modifications Steven Maggs & ]Danielle Snider December 20, 2006 Page 2 of Carolina General Statute l l l through 6), this office m rnpleanentation of the revision o insure compliance vvith the Act, ions to the plan d Acceptance and approval of this plan is conditioned upon your compliance with Federal and State water quality laws, regulations, and rules, In addition, local city or county ordinances or rules may also apply to this land -disturbing acti\°its°. This approval does not supersede any other permit or approval, Please be aware that your project will be covered by the enclosed l`PDESGeneral Storraavvater Permit NCGQI000 (Construction Acti ities), You should first become familiarwith all of the requirements for compliance with the enclosed general permit. Please note thatthis approval is based in part on the cc any of the inforration provided in the Financial Responsibility Form, which you have provided.You are requested to file an amended form if there is any change in the information included on the form, In addition, it would be helpful if you notify this office of the proposed starting date for this project. Please notify us if you plan to have a preconstruetion conference. i S l/ac Your cooperation is appreciated. Sinc ahid S. Khan. Regional Engineer Land Quality Section Enclosures: Certificate of Approval Modifications Required for Approval NPDES Permit cc: ES Group, In Inspection Departmena Surface Water Protection er of Appro ail itl ons Steven Maggs & Danielle Snider December 20, 2006 Page 3 of 3 MODIFICATIONS RQUIR D FOR APPROVAL Project Names Sure Sale StoragStorage (Express Permit Project ID:, LINCO-2007-032 County: Ivitaccalat Stockpile area should be included in the limits f diturbance, I'he plan approval is based upon the existing site conditions, Please provide a revised plan to this Office for approval prior to any type of development or changes on this site. .,:.,,,•• Mr. R. Panico Peres, Vice President Sabo, Inc. 44099 Plymouth Oaks Blvd., Suite 112 Plymouth, Michigan. 48170 Dear 1r. Peres: Michad F. Easley, Governor Wf11 („i. Ross Jr , Secretary North. Carolina .Depaitnent t EnveronmenI ind Natural Resources Man "\ K rnk P 1Direclor 0011 Of Water Quality DIVISION OF WATER QUALITY Idnuary 5,2007 Subject: NPDES General Permit No, IX1(17-010000 Sabo (Express Permit) Lincoln County Recently You were sent a letter from the Division of Land Resources (DLR) indicating that the Sedimentation and Erosion Control Plan for the subject development had been approved. Accompanying the DLR letter was NPDES General Stormwater Permit No, NCGOI0:000, which authorizes you to discharge stormwater to the surface waters of North Carolina from point source. discharges associated with construction activities including clearing, grading, and other land disturbing activities, The purpose of this letter is to advise you of the importance of the General 'Permit and the liabilities in the event of failure to comply with the terms and conditions of the Permit: If you have not already done so, it is suggested that you thoroughly read the permit. Of particular Importance are Parts I and II of the permit. Parts 1 and II set forth the minimum visual monitoring and reporting requirements for your stormwater discharge, fn particida„r, Part 1, Section B describes the visual monitorin.g frequencies and locations, the requirement to maintaina rain gauge onsite, and the need to maintain a written record of ail inspections. Upon commencement of your land disturbing activity, you must initiate the visual monitoring and record keeping requirements in this permit. The visual monitoring data results must be maintained on -site and made available to a DWQ representative upon request. The remaining parts of the Permit set forth definitions, general conditions and special conditions applicable to the stormwater discharge(s). The conditions include special reporting requirements in theevent of noncompliance, bypasses, treatment unit/process failures, etc. Mooresville Regional Offke Division of Water Quality Intuner WAYw;1:0,1111grqNlil)!,„012, 610 East Center Ave, Suite. 301 Moortiville, NC 281E5 North Caroll NailirallY Phone 704-663-1699 Custorner Service Pax 704-663-6040 -877-623-6748 An Equal OpporunityLAffirmative Action Efnpleyer - 50% Reqiciedil 0% Post Consumer Paper Failure to cot with the tertns and conditions of an NPDES permit may subject the perrnittee to eriforceittient action pursuant to Sectim 143-215.6 of the North Carolina General Statutes, A civil penalty' of up to $25,000 per violation (andlor crim nal penalties) may be assessed for such violations. If you Iiind at any time that you are unable to comply witli the ter ns and conditions of the Permit, you should contact this Office inunediately, As mentioned previously, he purpose of this letter is to advise you of the importance of your NPDES General Stormwater Permit. Please read the permit and contact this Office at 704,-'663-199 in MooresNille if you have an questions or need clarification. We look forward to providing any assistance. Sincerely, e )( I.I. Rex Cileason, P.Ei Surface INiater Protection Regional Supetvisor James D. Simons, PG, PE Director and State Geologist NCDENR North Carolina Department of Environment and Natural Resources Division of Land Resources Land Quality Section December 19, 2006 LETTEROF APPROVAL WITH MODIFICATIONS Mr. R. Panico Peres, Vice President Sabo, Inc. 44099 Plymouth Oaks Boulevard, Suite 112 Plymouth., Michigan 48170 RE: Project Name: Sabo (Express Permit) Acres Approved: 12 Project ID: LINC0-2007-031 County: Lincoln, Lincoln County Parkway River Basin: Catawba Submitted By: Sabo, Inc. Date Received by LOS: December 11,, 2006 Plan Type: New Dear Mr, Peres: Michael F. Easley, Governor William G. Ross Jr., Secretary This office has reviewed the subject erosion and sedimentation control plan. We find the plan to be acceptable with modifications and hereby issue this letter of Approval With Modifications, The Modifications Required for Approval are listed on the attached page. This plan approval shall expire three (3) years following the date of approval, if no land -disturbing activity has been undertaken„ as is required by Title 15A, NCAC 4B .0129. Please be advised that Title 15A NCAC 4B ..0118(a) requires that a copy of the approved erosion control plan be on file at the job site. Also, you should consider this letter to give the Notice required by G.S. 1.13A-611(a). of our right of periodic inspection to insure compliance with the approved plan, North Carolina's Sedimentation Pollution Control Program is perforrn.ance-oriented, requiring protection of existing natural resources and adjoining properties. If, following the commencement of this project, it is determined that the erosion and sedimentation control plan is inadequate to meet the requirements of the Sedimentation Pollution, Control Act of 1973 (North. Ve SVil le Rep io ",,E11 Off ic 6 1 East Cle, "1, ter )venue 301. Moo resv 161 o rtl CaoE 8 1 "I Phone 7 il-C1l11, 117 1E1111) A X: 704-663 230:40 Letter of Approva Sabo, Inc. December 19, 2006 Page 2of3 Carolina General Statute implementation of the rev 3A-51 through 66), this office may require revisions to the plan and ons to insure compliance with the Act. Acceptance and approval of this plan is conditioned upon your compliance with Federal and State water quality laws, regulations, and rules. in addition, local city or county ordinances or rules may also apply to this land -disturbing activity. This approval does not supersede any other permit or approval. Please be aware that your project will be covered by the enclosed NPDES General Storznwater Permit NCG01000 (Construction Activities). You should first become familiar with all of the requirements for compliance with the enclosed general permit. Please note that this approval is based in the Financial Responsibility Form, which amended form if there is any change in the would be helpful if you notify this office of notify us if you plan to have a preconstructior Your cooperation is appreciated. ZSK/ae Enclosures: in part on the accuracy of the information provided you have provided. You are requested to file an information -included on the form. In addition, it the proposed starting date for this project. Please conference. Sincerely', Zahid. S. Khan Regional Engineer Land Quality Section Certificate of Approval Modifications Required for Approval NPDES Permit cc: Burton Engineering Associates Inspection Department Surface Water Protection fitter of Approval with Modifications Sabo, Inc. December 19, 2006 Page 3 of 3 MODIFICATIONS REQUIRED FOR APPROVAL Project Name: Sabo Project ID: LINCO-2007-03 1 County: Lincoln Please make sure all storm drainage pipes through the basins and CB#3 to FES#4 should be extended upon stabilization of upstream area. 2. Erosion and sediment control measures must be provided for stockpile area. 3. Baffles should be added in sediment basin #2. 4. The plan approval is based upon the existing site conditions. Please provide a revised plan to this Office for approval prior to any type of development or changes on this site.