Loading...
HomeMy WebLinkAbout20210694 Ver 1_Meeting Request Review_20210402 4,;(P . DWR Pre-Filing Meeting Request Form NORTH CAROLINA EnWmnnacnlrtl Qua fay ID#* 20210694 Version* 1 Regional Office* Asheville Regional Office-(828)296-4500 Reviewer List* Kevin Mitchell Pre-Filing Meeting Request submitted 4/2/2021 ......................................................................................................................................................................................................................................................................................................................................................................................................................................................... Contact Name* Dave McHenry Contact Email Address* dgmchenry@ncdot.gov Project Name* B-6054A Project Owner* NCDOT Division 14 Project County* Haywood Owner Address: Street Address 253 Webster Road Address Line 2 City State/Rovince/Region Sylva NC Fbstal/Zip Code Country 28779 USA Is this a transportation project?* r Yes r No Type(s)of approval sought from the DWR: rJ 401 Water Quality Certification- I— 401 Water Quality Certification- Regular Express • Individual Permit r- Modification r- Shoreline Stabilization Does this project have an existing project ID#?* r Yes r No Do you know the name of the staff member you would like to request a meeting with? Kevin Mitchell Please give a brief project description below and include location information.* The project involves replacement of Bridge No. 57 vin Interstate 40 at Exit 7 in Haywood County.The bridge is over class C Tr Cold Springs Creek. The previous DWR liason to NCDOT, Kevin Barnett, met on-site on May 6, 2019 to review the preliminary project. Please give a couple of dates you are available for a meeting. 4/6/2021 4/5/2021 Please attach the documentation you would like to have the meeting about. pdf only By digitally signing below,I certify that I have read and understood that per the Federal Clean Water Act Section 401 Certification Rule the following statements: • This form completes the requirement of the Pre-Filing Meeting Request in the Clean Water Act Section 401 Certification Rule. • I understand by signing this form that I cannot submit my application until 30 calendar days after this pre-filing meeting request. . I also understand that DWR is not required to respond or grant the meeting request. Your project's thirty-day clock started upon receipt of this application. You will receive notification regarding meeting location and time if a meeting is necessary. You will receive notification when the thirty-day clock has expired,and you can submit an application. Signature Submittal Date 4/2/2021 Reviewer Meeting Request Decision Is a meeting required or is there more info needed?* r Yes6' No If more information is needed,please add corrrents for the email nofrfication below.