Loading...
HomeMy WebLinkAbout20190593 Ver 6_Meeting Request Review_20210406 DWR Pre-Filing Meeting Request Form NORTH CAROLINA EnYlmnnienlrtl Qua fay ID#* 20190593 Version* 6 Regional Office* Central Office-(919)707-9000 Reviewer List* Rob Ridings Pre-Filing Meeting Request submitted 4/6/2021 ......................................................................................................................................................................................................................................................................................................................................................................................................................................................... Contact Name* Gordon Cashin Contact Email Address* gcashin@ncdot.gov Project Name* 1-5111, 1-40 Project Owner* NC Department of Transportation Project County* Johnston Owner Address: Street Address 1000 Birch Ridge Driive Address Line 2 City State/Rovince/Region Raleigh NC Fbstal/Zip Code Country 27610 USA Is this a transportation project?* r Yes r No Type(s)of approval sought from the DWR: r- 401 Water Quality Certification- I— 401 Water Quality Certification- Regular Express I— Individual Permit rJ Modification r- Shoreline Stabilization Does this project have an existing project ID#?* (' Yes r No Please list all existing project ID's associated with this projects.* 20190593 Do you know the name of the staff member you would like to request a meeting with? A meeting is not necessary Please give a brief project description below and include location information.* The project is under construction.A modification request is being prepared for design changes at one of the permitted sites.This is our 30- day notification. Please give a couple of dates you are available for a meeting. Please attach the documentation you would like to have the meeting about. pdf only By digitally signing below,I certify that I have read and understood that per the Federal Clean Water Act Section 401 Certification Rule the following statements: • This form completes the requirement of the Pre-Filing Meeting Request in the Clean Water Act Section 401 Certification Rule. • I understand by signing this form that I cannot submit my application until 30 calendar days after this pre-filing meeting request. . I also understand that DWR is not required to respond or grant the meeting request. Your project's thirty-day clock started upon receipt of this application. You will receive notification regarding meeting location and time if a meeting is necessary. You will receive notification when the thirty-day clock has expired,and you can submit an application. Signature radef4or Submittal Date 4/6/2021 Reviewer Meeting Request Decision Is a meeting required or is there more info needed?* r Yes6' No If rmre information is needed,please add corrrents for the email nofrfication below.