Loading...
HomeMy WebLinkAboutGW1-2021-00438_Well Construction - GW1_20210201 PdiIE E XM WELL CONSTRUCTION RECORD(GW-1) For Internal Use Only: 1.'A ell Contractor Information: Terry White 14.WATER ZONES FROM TO DESCRIPTION Well Contractor Name rJ (t 14 ft. 3287-B ft ft. NC Well Contractor Certification Number IS.OUTER CASING for tulti-rued wd6 OR LINER ETFROM TO DL\METER THICKNESS MATERIAL R ft. a Company Name Ib.INNER CASING OR TUBING r7rerd-Ito 2.W'ell Construction Permit k: Mom TO DAMETER THICKNESS MATERIAL 1tv a0 applicable well e.nstruetton permit,it-1/1l' County,stare, Cari.nce.etc-) 0 IL 4 n- 2 in. I Seh40 PVC J.Act[Use(check well use): IL R. in. Water Supply Well: 17.SCREEN FROM I TO DIAMETER SLOTSIZE THICKNESS MATERIAL Agricultural [)Municipal/Public 4 fL 14 It 2 in. 0.010 SCh40 PVC Geothermal(Heating/Cording Supply) [)Residential Water Supply(single) IL n, Industrial/Commercial [)Residential Water Supply(shared) I&GROUT Irri alion FROM TO MATERIAL I EMPLACEMENT METHOD&AMOUNT Non-Water Supply Well: 2 ft 3 It Bentonite Poured/25LB Monitoring ORecovery p It 2 It Cement Poured/501-b Injection Well: ft ft Aquifer Recharge [)Groundwater Remediation U.SAND/GR PACK H Aquifer Storage and Recovery [)Salinity Barrier PROM TO TO MATERIAL EMPLACEMENT METHOD Aquifer'fest [)Stonnwater Drainage 3 IL 14 R• #2 Sand Poured Experimental'I'echnology [)Subsidence Control ft. ft Geothermal(Closed Loop) [)Tracer 20.DRILLING LOG humach addidaaY sheebl Geothermal(Heating/Cooling Return) r30ther(explain under#21 Remarks) Mom TO DESCRIPTON valor.bandana,iaumri,ni tir vu,en. ft ft See Consultant Log 4.Date Well(s)Completed: 1/26/2021 Well IDe M W-5 m ft. IL ft 5a.Well Location: BP Gas Station fL ft. Facility/Owner Name Facility lDd(if applicable) ft H. 5171 Jonathan Creek Rd. Waynesville 28785 n, ft. 1 Physical Address,City,and Zip ft R Haywood 21•REMARKS County Parcel Identification No.(PIN) 5b.Latitude and longitude in degrees/minutes/seconds or decimal degrees: (if well field,one Iavlong is sufficien) 22.Certification: 35 35 38.30 N 83031.40 W, /oytieu_ G{Jlief 1/28/2021 6.Is(are)the well(s)o% Permanent or [)Temporary Signature eCernfied Well Contactor Date 8, .igning,h,,form, I hereAv ,,1 fi that the well(s)a-as(arre/mrranreted m accord..... 7,Is this a repair loan existing well: [)Yes or %[)No a oli 15,4 NCAC 01" U100 or 15A NG4C 011' 02011 Well Conurimtion Smndarda.nd Ihal a If rhtx is a repaiq,fill our known aell construction mf.rmarlan and esplam the�mrc•r,f the .vpv Jthn record has been pr.mded to the..ell parer. repair under !1[remmkssection or on the Aa.k of thin j nn- 23.Site diagram or additional well details: S.For Geoprobe/DPT or Closed-Loop Geothermal Wells having the same You may use the back of this page to provide additional well site details or well construction,only I GW-I is needed. Indicate TOTAL NUMBER of wells construction details. You may also attach additional pages if necessary. drilled one SUBMITTAL INSTRUCTIONS 9.Total well depth below land surface: 14 (ft) 24a. For All Wells: Submit this form within 30 days of completion of well Formrdaplewellr hotilldepoeard/jjerent/exatnpk-3@200'and 21&100') construction to the following: 10.Static water level below top of casing:5 (ft.) Division of Water Resources,Information Processing Unit, [fw.ter level t.oh.vo eo:gag,use" 1617 Mail Service Center,Raleigh,NC 27699-1617 11.Borehole diameter:8 (in.) 24b.For Infection Wells: In addition to sending the forth to the address in 24a Auger above, also submit one copy of this form within 30 days of completion of well 12.W<II construction method: construction to the following: (i e.auger,rotary,cable,direct push,etc.) Division of Water Resources,Underground Injection Control Program, FOR WATER SUPPLY W ELLS ONLY: 1636 Mail Service Center,Raleigh,NC 27699-1636 13a-Yield(gpm) Method of test 24c. For Water Supply& Infection Wells: In addition to sending the form to the address(es) above, also submit one copy of this form within 30 days of 13h.Disinfection type: Amount: completion of well construction to the county health department of the county where constructed. Form GW-I North Carob.Department of Eneimnmenal Quality-Division of Water Resources Revised 2-22-2016