HomeMy WebLinkAboutNC0025496_Compliance Evaluation Inspection_20210401United States Environmental Protection Agency
E PA Washington, D.C. 20460
Water Compliance Inspection Report
Form Approved.
OMB No. 2040-0057
Approval expires 8-31-98
Section A: National Data System Coding (i.e., PCS)
Transaction
1 IN I
21IIIIII
Code NPDES yr/mo/day Inspection
2 L 3 I NC0025496 111 121 21/03/23 117
Type
1810I
IIIIIIIIIII
Inspector Fac Type
191S I 2011
IIIIIIIIIIIIIIIIII I IIIIII
i66
l
Inspection Work Days Facility Self -Monitoring Evaluation Rating B1 QA Reserved
67I1.0 I 70I4 I 71IN I 72 I N I 731 1 74 751
I I 1
I I I I I I 180
l
Section B: Facility Data
Name and Location of Facility Inspected (For Industrial Users discharging to POTW, also include
POTW name and NPDES permit Number)
Lincolnton WWTP
550 W Hwy 150 Bypass
Lincolnton NC 28092
Entry Time/Date
09:20AM 21/03/23
Permit Effective Date
16/11/01
Exit Time/Date
11:OOAM 21/03/23
Permit Expiration Date
20/07/31
Name(s) of Onsite Representative(s)/Titles(s)/Phone and Fax Number(s)
///
Donald A Burkey/ORC/704-736-8960/
Other Facility Data
Name, Address of Responsible Official/Title/Phone and Fax Number
Contacted
Stephen H Peeler,PO Box 617 Lincolnton NC 280930617/Public Works
Director/704-736-8940/7047368959 No
Section C: Areas Evaluated During Inspection (Check only those areas evaluated)
Permit Flow Measurement Operations & Maintenar Records/Reports
Self -Monitoring Progran Sludge Handling Dispo: Facility Site Review Effluent/Receiving Wate
Laboratory
Section D: Summary of Finding/Comments (Attach additional sheets of narrative and checklists as necessary)
(See attachment summary)
Name(s) and
OriATuvia
Signature(s) of Inspector(s) Agency/Office/Phone and Fax Numbers
Date
4/1/2021
,-DocuSigned by:
DWR/MRO WQ/704-663-1699/
BB057A2DE017498
Signature of Ma sviiits@Woh3viewer Agency/Office/Phone and Fax Numbers Date
Andrew Pitn r4.414 H P4415WR/MRO WQ/704-663-1699 Ext.2180/ 4.1.21
F161FB69A2D84A3...
EPA Form 3560-3 (Rev 9-94) Previous editions are obsolete.
Page# 1
NPDES yr/mo/day
31 NC0025496 111 121 21/03/23
I17
Inspection Type
18 [j
1
Section D: Summary of Finding/Comments (Attach additional sheets of narrative and checklists as necessary)
Page# 2
Permit: NC0025496
Inspection Date: 03/23/2021
Owner - Facility: Lincolnton WWTP
Inspection Type: Compliance Evaluation
Permit
(If the present permit expires in 6 months or less). Has the permittee submitted a new
application?
Is the facility as described in the permit?
# Are there any special conditions for the permit?
Is access to the plant site restricted to the general public?
Is the inspector granted access to all areas for inspection?
Yes No NA NE
• ❑ ❑ ❑
• ❑ ❑ ❑
Comment: The subject permit expired on 7/31/2020, renwall application has been submitted .The City
implements an approved Industrial Pretreatment Program.
Record Keeping Yes No NA NE
Are records kept and maintained as required by the permit? • ❑ ❑ ❑
Is all required information readily available, complete and current? • ❑ ❑ ❑
Are all records maintained for 3 years (lab. reg. required 5 years)? • ❑ El El
Are analytical results consistent with data reported on DMRs? • ❑ ❑ ❑
Is the chain -of -custody complete? • ❑ ❑ ❑
Dates, times and location of sampling •
Name of individual performing the sampling •
Results of analysis and calibration •
Dates of analysis •
Name of person performing analyses •
Transported COCs •
Are DMRs complete: do they include all permit parameters? • ❑ ❑ ❑
Has the facility submitted its annual compliance report to users and DWQ? • ❑ ❑ ❑
(If the facility is = or > 5 MGD permitted flow) Do they operate 24/7 with a certified operatc • ❑ ❑ ❑
on each shift?
Is the ORC visitation log available and current? • ❑ ❑ ❑
Is the ORC certified at grade equal to or higher than the facility classification? • ❑ ❑ ❑
Is the backup operator certified at one grade less or greater than the facility classification' • El ❑ ❑
Is a copy of the current NPDES permit available on site? • El El El
Facility has copy of previous year's Annual Report on file for review? ❑ ❑ ❑ •
Comment: The records reviewed during the inspection were organized and well maintained. DMRs,
COCs, ORC visitation logs, bench sheets, and calibration logs, were reviewed for
December 2020.
Laboratory Yes No NA NE
Page# 3
Permit: NC0025496
Inspection Date: 03/23/2021
Owner - Facility: Lincolnton WWTP
Inspection Type: Compliance Evaluation
Laboratory
Are field parameters performed by certified personnel or laboratory?
Are all other parameters(excluding field parameters) performed by a certified lab?
# Is the facility using a contract lab?
# Is proper temperature set for sample storage (kept at less than or equal to 6.0 degrees
Celsius)?
Incubator (Fecal Coliform) set to 44.5 degrees Celsius+/- 0.2 degrees?
Incubator (BOD) set to 20.0 degrees Celsius +/- 1.0 degrees?
Yes No NA NE
• ❑ ❑ ❑
Comment: Influent and effluent analyses (including field parameters) are performed under the City's
on -site certified laboratory (#153). Due to Covid-19 the laboratory instruments were not
inspected.The laboratory instrumentation used for field analyses appeared to be properly
calibrated and documented. The following commercial laboratories (NC certified) have been
contracted to provide analytical support:Prism Labs (COD, total nitrogen, total
phosphorusBlue Ridge Labs (metals, cyanide, Oil and Grease, Phenols, Bis-Phalte,
HardnessTwo Rivers Utilities: Low level mercury)Meritech: toxicity pollutant scan
Influent Sampling
# Is composite sampling flow proportional?
Is sample collected above side streams?
Is proper volume collected?
Is the tubing clean?
# Is proper temperature set for sample storage (kept at less than or equal to 6.0 degrees
Celsius)?
Is sampling performed according to the permit?
Yes No NA NE
• ❑ ❑ ❑
• ❑ ❑ ❑
• ❑ ❑ ❑
• ❑ ❑ ❑
• ❑ ❑ ❑
Comment: The subject permit requires influent composite BOD and TSS samples. The facility staff
perform and document monthly aliquot verifications
Effluent Sampling Yes No NA NE
Is composite sampling flow proportional? • ❑ ❑ ❑
Is sample collected below all treatment units? • ❑ ❑ ❑
Is proper volume collected? • ❑ ❑ ❑
Is the tubing clean? • ❑ ❑ ❑
# Is proper temperature set for sample storage (kept at less than or equal to 6.0 degrees • ❑ ❑ ❑
Celsius)?
Is the facility sampling performed as required by the permit (frequency, sampling type • El ❑ ❑
representative)?
Comment: The subject permit requires composite and grab effluent samples. The facility staff perform
and document monthly aliquot verifications on the sampler used for daily sampling
Page# 4
Permit: NC0025496
Inspection Date: 03/23/2021
Owner - Facility: Lincolnton WWTP
Inspection Type: Compliance Evaluation
Upstream / Downstream Sampling Yes No NA NE
Is the facility sampling performed as required by the permit (frequency, sampling type, anc • ❑ ❑ ❑
sampling location)?
Comment:
Operations & Maintenance
Is the plant generally clean with acceptable housekeeping?
Does the facility analyze process control parameters, for ex: MLSS, MCRT, Settleable
Solids, pH, DO, Sludge Judge, and other that are applicable?
Yes No NA NE
• ❑ ❑ ❑
• ❑ ❑ ❑
Comment: The facility appeared to be adequately treating wastewater at the time of the inspection. The
facility staff incorporate a comprehensive process control program with all measurements
being properly documented and maintained on-site.The facility is equipped with a SCADA
system to assist the staff with the operation of the treatment units/processes. The audible
and visual alarms are tested (and documented) on a monthly basis.
Pump Station - Influent
Is the pump wet well free of bypass lines or structures?
Is the wet well free of excessive grease?
Are all pumps present?
Are all pumps operable?
Are float controls operable?
Is SCADA telemetry available and operational?
Is audible and visual alarm available and operational?
Yes No NA NE
• ❑ ❑ ❑
• ❑ ❑ ❑
• ❑ ❑ ❑
• ❑ ❑ ❑
• ❑ ❑ ❑
• ❑ ❑ ❑
• ❑ ❑ ❑
Comment: The influent passes through a muffin monster prior to entering the wet well. at the time of the
inspection 4/5 of pump were in service.
Flow Measurement - Influent Yes No NA NE
# Is flow meter used for reporting? ❑ • ❑ ❑
Is flow meter calibrated annually? • ❑ ❑ ❑
Is the flow meter operational? • ❑ ❑ ❑
(If units are separated) Does the chart recorder match the flow meter? • ❑ ❑ ❑
Comment: The flow meter is calibrated annually and was last calibrated on 4/15/2020 by Clearwater,
Inc
Bar Screens
Type of bar screen
a.Manual
Yes No NA NE
•
Page# 5
Permit: NC0025496
Inspection Date: 03/23/2021
Owner - Facility: Lincolnton WWTP
Inspection Type: Compliance Evaluation
Bar Screens
b.Mechanical
Are the bars adequately screening debris?
Is the screen free of excessive debris?
Is disposal of screening in compliance?
Is the unit in good condition?
Yes No NA NE
Comment: The bar screenings are disposed into an open dumpster equipped with a drain plug.
Grit Removal
Type of grit removal
a.Manual
b.Mechanical
Is the grit free of excessive organic matter?
Is the grit free of excessive odor?
# Is disposal of grit in compliance?
Comment: Screenings and grit are disposed at the County Landfill.
Oxidation Ditches
Are the aerators operational?
Are the aerators free of excessive solids build up?
# Is the foam the proper color for the treatment process?
Does the foam cover less than 25% of the basin's surface?
Is the DO level acceptable?
Are settleometer results acceptable (> 30 minutes)?
Is the DO level acceptable?(1.0 to 3.0 mg/I)
Are settelometer results acceptable?(400 to 800 ml/I in 30 minutes)
Comment:
Yes No NA NE
•
• ❑ ❑ ❑
• ❑ ❑ ❑
Yes No NA NE
• ❑ ❑ ❑
• ❑ ❑ ❑
• ❑ ❑ ❑
• ❑ ❑ ❑
❑ ❑ ❑ •
Aeration Basins Yes No NA NE
Mode of operation Ext. Air
Type of aeration system Diffused
Is the basin free of dead spots? • ❑ ❑ ❑
Are surface aerators and mixers operational? • ❑ ❑ ❑
Are the diffusers operational? • ❑ ❑ ❑
Page# 6
Permit: NC0025496
Inspection Date: 03/23/2021
Owner - Facility: Lincolnton WWTP
Inspection Type: Compliance Evaluation
Aeration Basins
Is the foam the proper color for the treatment process?
Does the foam cover less than 25% of the basin's surface?
Is the DO level acceptable?
Is the DO level acceptable?(1.0 to 3.0 mg/I)
Yes No NA NE
• ❑ ❑ ❑
• ❑ ❑ ❑
Comment: Three of four aeration basins were in service. The 4th was used has a digester due to long
wet season.
Secondary Clarifier Yes No NA NE
Is the clarifier free of black and odorous wastewater?
Is the site free of excessive buildup of solids in center well of circular clarifier?
Are weirs level?
Is the site free of weir blockage?
Is the site free of evidence of short-circuiting?
Is scum removal adequate?
Is the site free of excessive floating sludge?
Is the drive unit operational?
Is the return rate acceptable (low turbulence)?
Is the overflow clear of excessive solids/pin floc?
Is the sludge blanket level acceptable? (Approximately'/ of the sidewall depth)
Comment: one of the two clarfiers was out for repaires.
Pumps-RAS-WAS
Are pumps in place?
Are pumps operational?
Are there adequate spare parts and supplies on site?
Comment:
Flow Measurement - Effluent
# Is flow meter used for reporting?
Is flow meter calibrated annually?
Is the flow meter operational?
(If units are separated) Does the chart recorder match the flow meter?
• ❑ ❑ ❑
• ❑ ❑ ❑
• ❑ ❑ ❑
• ❑ ❑ ❑
• ❑ ❑ ❑
• ❑ ❑ ❑
• ❑ ❑ ❑
• ❑ ❑ ❑
• ❑ ❑ ❑
• ❑ ❑ ❑
• ❑ ❑ ❑
Yes No NA NE
• ❑ ❑ ❑
• ❑ ❑ ❑
Yes No NA NE
• ❑ ❑ ❑
• ❑ ❑ ❑
• ❑ ❑ ❑
• ❑ ❑ ❑
Comment: The flow meter is calibrated annually and was last calibrated on 4/15/2020 by Clearwater,
Inc
Page# 7
Permit: NC0025496
Inspection Date: 03/23/2021
Owner - Facility: Lincolnton WWTP
Inspection Type: Compliance Evaluation
Disinfection -Liquid
Is there adequate reserve supply of disinfectant?
(Sodium Hypochlorite) Is pump feed system operational?
Is bulk storage tank containment area adequate? (free of leaks/open drains)
Is the level of chlorine residual acceptable?
Is the contact chamber free of growth, or sludge buildup?
Is there chlorine residual prior to de -chlorination?
Comment:
Yes No NA NE
• ❑ ❑ ❑
• ❑ ❑ ❑
• ❑ ❑ ❑
• ❑ ❑ ❑
De -chlorination Yes No NA NE
Type of system ? Liquid
Is the feed ratio proportional to chlorine amount (1 to 1)? ❑ ❑ • ❑
Is storage appropriate for cylinders? ❑ ❑ • ❑
# Is de -chlorination substance stored away from chlorine containers? • ❑ ❑ ❑
Are the tablets the proper size and type? El ❑ • El
Comment: Aqueous sodium bisulfite is used for dechlorination.
Are tablet de -chlorinators operational? ❑ ❑ • ❑
Number of tubes in use?
Comment:
Chemical Feed
Is containment adequate?
Is storage adequate?
Are backup pumps available?
Is the site free of excessive leaking?
Comment:
Effluent Pipe
Is right of way to the outfall properly maintained?
Are the receiving water free of foam other than trace amounts and other debris?
If effluent (diffuser pipes are required) are they operating properly?
Comment:
Yes No NA NE
• ❑ ❑ ❑
• ❑ ❑ ❑
Yes No NA NE
Page# 8
Permit: NC0025496
Inspection Date: 03/23/2021
Owner - Facility: Lincolnton WWTP
Inspection Type: Compliance Evaluation
Anaerobic Digester Yes No NA NE
Type of operation: Floating cover
Is the capacity adequate? • ❑ ❑ ❑
# Is gas stored on site? ❑ El El •
Is the digester(s) free of tilting covers? El • El El
Is the gas burner operational? ❑ ❑ ❑ •
Is the digester heated? ❑ ❑ ❑ •
Is the temperature maintained constantly? ❑ ❑ ❑ •
Is tankage available for properly waste sludge? • ❑ ❑ ❑
Comment: The facility is equipped with three anaerobic digesters and three storage tanks. One of the
digesters was out of order due to a tilting cover that made the cover come out of the
brackets. The tilting cover could cause a catastrophic failure to the structure and need to
either be repaired or taken out, this was noted on the previous inspection (5/30/2019).
Solids Handling Equipment
Is the equipment operational?
Is the chemical feed equipment operational?
Is storage adequate?
Is the site free of high level of solids in filtrate from filter presses or vacuum filters?
Is the site free of sludge buildup on belts and/or rollers of filter press?
Is the site free of excessive moisture in belt filter press sludge cake?
The facility has an approved sludge management plan?
Yes No NA NE
• ❑ ❑ ❑
• ❑ ❑ ❑
• ❑ ❑ ❑
❑ ❑ ❑ •
❑ ❑ ❑ •
❑ ❑ ❑ •
• ❑ ❑ ❑
Comment: Waste activated sludge (WAS ) is thickened by a DAF unit prior to being pumped to the
anaerobic digesters.
Drying Beds
Is there adequate drying bed space?
Is the sludge distribution on drying beds appropriate?
Are the drying beds free of vegetation?
# Is the site free of dry sludge remaining in beds?
Is the site free of stockpiled sludge?
Is the filtrate from sludge drying beds returned to the front of the plant?
# Is the sludge disposed of through county landfill?
# Is the sludge land applied?
(Vacuum filters) Is polymer mixing adequate?
Yes No NA NE
• ❑ ❑ ❑
• ❑ ❑ ❑
• ❑ ❑ ❑
Page# 9
Permit: NC0025496
Inspection Date: 03/23/2021
Owner - Facility: Lincolnton WWTP
Inspection Type: Compliance Evaluation
Drying Beds Yes No NA NE
Comment: Land application is the primary disposal of the bio-solids; however, drying beds are used
during emergency situations when wet weather prevents land application (drying beds were
being used at the time of the inspection). The drying bed sections currently being used
appeared to be well maintained
Standby Power
Is automatically activated standby power available?
Is the generator tested by interrupting primary power source?
Is the generator tested under load?
Was generator tested & operational during the inspection?
Do the generator(s) have adequate capacity to operate the entire wastewater site?
Is there an emergency agreement with a fuel vendor for extended run on back-up power?
Is the generator fuel level monitored?
Yes No NA NE
• ❑ ❑ ❑
• ❑ ❑ ❑
• ❑ ❑ ❑
• ❑ ❑ ❑
Comment: The facility is equipped with two backup generators. Both generators are tested monthly (not
under load) and serviced twice per year by a contracted company. The contracted company
tests the generators under load during each servicing event
Page# 10