HomeMy WebLinkAbout20120072 Ver 5_Modification_20121106LETTER OF TRANSMITTAL
S &ME, Inc.
9751 Southern Pine Blvd.
Charlotte, NC 28273
(704) 523 -4726
(704) 525 -3953 fax
N.C. Division of Water Quality
401 Wetlands Unit
1617 Mail Service Center
Raleigh, NC 27699 -1617
Attention: Ms. Karen Higgins
WE ARE SENDING YOU: ® Attached
❑ Shop drawings ❑ Prints
❑ Copy of letter ❑ Report
DATE 10.31.12
JOB NO: 1357.10.022
ATTENTION: Ms. Karen Higgins
RE: PNG Line # 170 Project
I - O C) I a, V5
1029.12
❑ Under separate cover via
❑ Plans ❑ Draft
the following items-
El Specifications
COPIES
DATE
NO
DESCRIPTION
2
1029.12
1
Copies of Request for Revision of Crossing Method
1
1031.12
2
Check for $240
THESE ARE TRANSMITTED AS CHECKED BELOW:
�RD
❑ For approval ® For your record
❑ As requested ❑ For review and comment ❑
❑ FORBIDS DUE —/—/— ❑ PRINTS RETURNED AFTER LOAN TO US
REMARKS: Karen - please do not hesitate to call us at 704.523 4726 with questions.
Thank you.
SIGN:
ED 12@91R99:11 ?1
Q) V 0 6 2 012
i
s
DENR - WATER QUALITY 3
S &ME, INC / 9751 Southern Pine Boulevard / Charlotte, NC 28273 -5560 / p 704 523 4726 f 704 525 3953 / www smemc com
October 29, 2012
U.S. Army Corps of Engineers
Asheville Regulatory Field Office
151 Patton Avenue, Room 208
Asheville, North Carolina 28801 -5006
Attention: Mr. Steve Kichefski
N.C. Division of Water Quality
401 Wetlands Unit
512 North Salisbury Street
Raleigh, North Carolina 27604
Attention: Ms. Karen Higgins
DENR - NJATEf� QUALITY .
Reference: Request for Revision of Crossing Method
PNG Line # 170 Project
Cabarrus, Iredell and Mecklenburg Counties, North Carolina
S &ME Project No. 1357 -10 -022
Action ID No. 2012 -00298
DWQ Project No. 12 -0072
Dear Mr. Kichefski and Ms. Higgins:
S &ME, Inc. (S &ME) wishes to submit a request to revise a proposed crossing method
associated of one jurisdictional stream at the Piedmont Natural Gas (PNG) Line # 170
Project. The project entails construction of approximately 8.8 miles of natural gas
transmission pipeline in Cabarrus, Iredell and Mecklenburg Counties, North,Carolina.
The location of the overall project corridor is depicted on the Site Vicinity Map (Figure
1), and the location of the stream subject to the proposed change is shown on a USGS
topographic map (Figure 2) and a 2010 Aerial Photograph (Figure 3).
On October 17, 2012, Michael Burkhard of the North Carolina Division of Water Quality
(NCDWQ) visited the project site with Joey Lawler of S &ME and Bruce Barger, PNG's
Lead Environmental Inspector. The purpose of the site visit was to review the
construction contractor's request for a change in crossing method at Stream 3.1. The
crossing is currently permitted as a jack and bore, with a 70 -foot construction corridor
(30 feet permanent and 40 feet temporary) across the feature. However, because the
stream channel is extremely incised, it was determined the necessary bore pit would
S &ME, INC / 9751 Southern Pine Boulevard / Charlotte, NC 28273 -5560 / p 704 523 4726 f 704 525 3953 / www smemc corn
Request for Revision of Crossing Method S&ME Project No. 1357 -10 -022
PNG Line # 170 Project October 29 2012
require a depth and width exceeding that which could be accomplished practicably.
Following his review of the subject stream, Mr. Burkhard concurred with this assessment,
and determined that a change in crossing should be authorized at this location.
Accordingly, we request that the crossing of Stream 3.1 be changed from a jack and bore
to a conventional (trenched) crossing. Photographs of the subject stream are included as
an attachment to this letter.
The contractor will be able to perform the work within the currently authorized 70 -feet of
workspace, and as such, no additional impacts will be incurred as a result of this change
in crossing method. The revised drawing that depicts the change in crossing method and
location is attached for your consideration.
Thanks you for your time and consideration of this request. Again, please note that
because the change in the method of construction does not involve additional stream
impacts beyond those currently permitted for this crossing, this letter is being submitted
only for your approval and records.
If you have questions, please feel free to contact us at 704.523.4726.
Sincerely,
S &ME
oey ler, P.W.S.
Project Manager
ilawler@smeinc.com
D &"04 pt'�
Darrin Peine, Q.E.P.
Natural Resources Department Manager
ddpeine@smeinc.com
Senior Reviewed by Julie Bennett- Hudel, P.G., LEED AP
Attachments:
• Figure 1: Site Vicinity Map
• Figure 2: USGS Aerial Photograph
• Figure 3: 2010 Aerial Photograph
• Revised Jurisdictional Waters of the U.S. Impact Plan (Sheet 14Arev of 24)
• Site Photographs
f
21
1
Ired ell
County
115
Davidson
21 73
So
vfh
O
73
Caldwell
N'
L
A
AC /
m
Stream 3.1
Crossing Location
73
13
Co-'
Cabarrus
County
rowan
ounty
21
9
gtM1 C�emf 9
4
0 1 2
Miles
c
REFERENCE:
THE BACKGROUND GEOGRAPHIC INFORMATION SYSTEMS (GIS) LAYERS WERE OBTAINED FROM THE
STREETMAP USA DATASET THE PROPOSED PIPELINE ROUTE WAS DERIVED FROM DATA PROVIDED BY
MCKIM AND CREED, INC. PLEASE NOTE THIS MAP IS FOR INFORMATIONAL PURPOSES ONLY. IT IS NOT Greek
MEANT FOR DESIGN, LEGAL, OR ANY OTHER USES. THERE ARE NO GUARANTEES ABOUT ITS ACCURACY.
S &ME, INC. ASSUMES NO RESPONSIBILITY FOR ANY DECISION MADE OR ANY ACTIONS TAKEN BY THE USER PI eline Route
BASED UPON THIS INFORMATION. ' p
DALE: AS SHOWN SITE VICINITY MAP FIGURE
ATE: 10.10.12 -` S&ME Request for Revison of Crossing Method NO.
RAWN BY: PNG - Line # 170
JoL - Multiple Counties, North Carolina
1ECKED BY: WYYW.SMEINC.COM
JBH PROJECT NO: 1357 -10 -022
WF519 &11
GAS �_� GAS _� _ 20' TEMPOR Ry WORK q E`
GAS
CAS
GAS _
PROPOSE-0 OAS `\
GAS
_OiMPORARy
STREAM 3.1
PERENNIAL RPW
99 LF TEMPORARY IMPACT \
0 LF PERMANENT IMPACT
(STREAM BED IMPACTS IN LINEAR FEET) \
170 —ME -18 "
WF519 &O
PF43-UINARY PLAT:
NOT FOR RECORDATICN,
CONVEYANCES, OR $ALES
NOTES
— ALL DISTANCES SHOWN ARE HORIZONTAL GROUND DISTANCES AND ARE IN FEET UNLESS OTHERWISE NOTED.
— THIS MAP DOES NOT CONFORM TO GS 47 -30, AS AMENDED. NOT INTENDED FOR RECORDATION.
— WETLANDS SURVEYED BY TRIMBLE "PATHFINDER" METHODS.
— THE SOLE PURPOSE OF THIS PLAT IS TO SHOW JURISDICTIONAL BOUNDARIES AS DELINEATED BY S &ME, INC
— BASIS OF BEARING IS NORTH CAROLINA STATE PLANE COORDINATE SYSTEM (NAD 83/NSRS2007).
N Z
o�
f:
8'
170 —ME -15
_
TEMPORARY ARY
r GROSSING MAT
GAS 1
9T
JOB NUMBER: 031 39 -011 3
C,
yC.
.U)NAL WATERS OF THE U.B.
VICINITY MAP
NOT TO SCALE
TEMPORARY WORK SPACE
€ - - TEMPORARY IMPACT LIMIT
PERMANENT CONVERSION UMIT
GA GAS: PROPOSED GAS LINE
PERMANENT CONVERSION LIMIT
TEMPORARY IMPACT LIMIT
EASEMENT
TEMPORARY WORK SPACE
GAS
\\ GAS
\ S19B.G9
7.62 \ NFSI9&05
"`YYY
Date
08.11
GRAPHIC SCALE
0 15 30 60
1 1 I 1
( IN FEET )
1 10011 - 30 TL
NOT TO SCALE
FLAG TABLE
FLAG LENGTHI BEARING NORTHING EASTING
WFS190.04 i 1' N 838337.90 E 1462834.90
WFS198.05 N 638280.27 E 146285145
WFS19 8,06 -_4_ N 838224.25 E 1462864.04
Y*'99B.07 - - -- - - - N 638180.88 E 1462880.87
M799 8,08 47, 7' "W N 638175.39 E 1462813.30
WFSI9 &09 'W N 638220.19 E 1482897.28
WFS19 &10 75. ' S' N 838271.81 E 1482875.19
WFS198.11 N 638344.23 E 1182855.30
JOB NUMBER: 031 39 -011 3
.U)NAL WATERS OF THE U.B.
4* R'+T /{A �{ &CREED
DWG. NUMBER: 53.1
L I
/�(�"r �,fW
1V�'1�1LV1 �..LV.+GLJ
SHEET NUMBER: 14A rev Of 24
OF
8020 TOWER POINT DRIVE
CHARLOTTE, NORTH CAROIJNA 28227
PROD. SURVEYOR: JLS
0I
PIEDMONT NATURAL CM I-WE
TELE: (704) 841 -2588
DRAWN BY: AH
WETLAND DELINEATION FLAG
IREEIEU, MECKLENBLM AND
FAX (704) 841 -2587
F -1222
COMPUTER FILE: 53/
DATE: O6 08 08 12
CABARRUS COUNTIES, NORTH CAROLNA
Date
08.11
GRAPHIC SCALE
0 15 30 60
1 1 I 1
( IN FEET )
1 10011 - 30 TL
NOT TO SCALE
FLAG TABLE
FLAG LENGTHI BEARING NORTHING EASTING
WFS190.04 i 1' N 838337.90 E 1462834.90
WFS198.05 N 638280.27 E 146285145
WFS19 8,06 -_4_ N 838224.25 E 1462864.04
Y*'99B.07 - - -- - - - N 638180.88 E 1462880.87
M799 8,08 47, 7' "W N 638175.39 E 1462813.30
WFSI9 &09 'W N 638220.19 E 1482897.28
WFS19 &10 75. ' S' N 838271.81 E 1482875.19
WFS198.11 N 638344.23 E 1182855.30
LEGEND
TEMPORARY CHANNEL IMPACT
OTEMPORARY
IMPACT AREA
L I
PERMANENT CONVERSION AREA
WETLAND AREA
FCSCP',,-,
STREAM DELINEATION MG
0I
COMPUTED POINT
WETLAND DELINEATION FLAG
IM:TLAND/STREAM BOUNDARY
EXISTING WOODS LINE
GAS — GAS
— PROPOSED GAS LINE
— GAS — GAS — W--
EXISTING GAS LINE
- -
PROPOSED EASEMENT
- -
EXISTING EASEMENT
- - - - - - ^- -
- IMPACT LIMIT
- -- PROPERTY UNE
- —. — ---
- TEMPORARY WORK SPACE
View of Stream 3.1 at proposed crossing location facing downstream.
View of Stream 3.1 at proposed crossing location facing upstream.
SITE PHOTOGRAPHS
Request for Revision of Crossing Method
Piedmont Natural Gas - Line # 170
Multiple Counties, North Carolina
PHOTO PAGE 1